Piping and Instrumentation Drawing
Piping and Instrumentation Drawing
Piping and Instrumentation Drawing
OSD
OPERATIONAL SHUTDOWN FLOWSTATION XXX = 3 DIGIT NUMBER IA INSTRUMENT AIR
B BLOWDOWN & RELIEF
1 (SYSTEM LEFT PRESSURISED) CI CHEMICAL INJECTION
LINE PRODUCT F FUEL GAS / FLARE PILOT GAS
OSD BANK/TRAIN SHUTDOWN CENTRIFUGAL PUMP RECIPROCATING PUMP RESTRICTION
2 FO FUEL OIL
RO ORIFICE PA PROCESS AIR / POWER AIR
LINE DIAMETER
OSD W FRESH WATER /SERVICE WATER
3
UNIT SHUTDOWN P PROCESS VAPOUR AND LIQUID
REFEENCE DRAWING/REVISION NOTES CLIENT:
ABC-TPEF-EKUF1-PX2365-002620-001/Z01
NEWCR SS
NEWCROSS EXPLORATION & PRODUCTION LIMITED
R3 14/09/18 AS BUILT RE-ISSUED FOR REVIEW K.E. U.O. U.E. PROJECT: DESIGN OF SKIDDED 600# 4 HEADER 24 SLOTS SEGMENTED INLET MANIFOLD
R2 04/09/18 AS BUILT RE-ISSUED FOR REVIEW K.E. U.O. U.E. #24 NORMAN WILLIAMS STREET #3 CHRIS EFUYEMI ONANUGA STREET
R1 03/08/18 AS BUILT- ISSUED FOR REVIEW K.E. U.O. U.E.
SOUTHWEST IKOYI, LAGOS LEKKI PHASE 1, LAGOS TITLE LEGEND SHEET AND DRAWING IDENTIFICATION
CTR COMPANY JOB No':
REV DATE DESCRIPTION DVVN CHK'D APP'D APP'D DWG. NO.: EKUF1-19001-FODE-PR-SYM-1000