Asf City Motorway M-9 Karachi: S R Consultants
Asf City Motorway M-9 Karachi: S R Consultants
Asf City Motorway M-9 Karachi: S R Consultants
ASF CITY
MOTORWAY M-9
KARACHI
CLIENT:
CONSULTANT ARCHITCT:
MEP CONSULTANTS:(J.V)
S R CONSULTANTS
CONSULTING ENGINEERS & PLANNERS
SRC
TITLE:
PROPOSED
SLEEVES SECTION
& DETAILS
( MASTER PLAN )
REVISION:
05 --/--/--
06 --/--/--
DESIGNED BY : APPROVED BY :
KM Z. RAZI
CAD BY : SCALE :
TT NTS
CHECKED BY : DATE:
IA 27-07-2018
DRAWING NO. :
UESI-ASF-MB-EL06
DRAWING STATUS:
CONSTRUCTION DRAWING
LEGENDS
NOTE:
1.0. THE SIZE OF STORM WATER DRAIN SHOWN IN THIS
SECTION IS INDICATIVE ONLY. THE SECTION SHALL BE
FINALIZED AFTER THE APPROVAL OF DRAINS
LOCATION.
NOTE:
2.0. ALL PIPES / SLEEVES ENDS SHALL BE PLUGGED
WITH REQUIRED SIZE OF END CAPS BEFORE BACK
FILLING.
DRAWING REFERENCE:
\\Server-pc\d\UESI\ASF CITY - 2017\04 - DRAWINGS\02 - ELECTRICAL\02 - MASTER PLAN JUNE 2018\12 - 24 JULY 2018\01 - UPDATED DRAWINGSEL06 - SECTION DETAILS..dwg Jul 27, 2018 - 7:35pm