ISDP SMART QC
www.huawei.com
9 Expansion 100% after completion of the service ATP approved by MS HW OR MSFI approved
11 Power Rectifier Installation 100% after completion of the service MSFI or sample photos approved by Huawei in body email
NMS CONVERTER INSTALLATION &
12 100% after completion of the service
INTEGRATION NMS Documentation Test signed by Huawei PIC
4 Dismantle & Packing, Last Mile Delivery, CD4, CD6 100% after completion of the service Packing list or Delivery Note or Return Note
or Berita Acara Serah Terima Material
5 IP migration , E1 Crossconnect 100% after completion of the service Tracker Integration Report OR Link Route
approve by Huawei
6 Replacement/Relocation Equipment ; 100% after completion of the service photos before & after
replacement/relocation approved by
Huawei in body email or
BAPA (Berita Acara Pembongkaran Aset)-for
Replacement/Relocation
7 Compensation 100% after PO issuance copy approved SCCRF or CFCRF
8 BTS Integration 100% after PAC issued by Customer PAC Approved
9 Expansion 100% after completion of the service ATP approved by MS HW OR MSFI approved
10 Misplaced 100% after completion of the service Pictorial Report ; MSFI
11 Power Rectifier Installation 100% after completion of the service MSFI or sample photos approved by Huawei
in body email
12 NMS CONVERTER INSTALLATION & INTEGRATION 100% after completion of the service NMS Documentation Test signed by Huawei
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6 PIC
ISDP Smart QC KPI
Goal ISDP Smart QC
1. (Baseline FTPR 100%) QC huawei approved 100% (no rejected HSIR)
Subcont must be submit HSIR via ISDP SMART QC after installation completed
100%. No fake Photo Allowed
2. (Baseline SDD 4.9%) Qc Huawei found defect less than 4.9%( defect per sites)
Subcont QC must be inform QC Huawei to do inspection together , our target is
10% from total installation completed.
Sample :
September 2016 subcont A completed installation is 20 site. Then Subcont A must
inform QC Huawei to do inspection together 10% = 2 site.
(minor defect = labels, laying cable, insulating plate, etc)
3. For partners to achieve good KPI, partners must comply with two guidelines
above.