Building Specification

VS 470 MPOV MK III


Multi Purpose Offshore Vessel

DATE: 2011-06-27

WSD Doc. No 3720-100-001

Rev. B

B 2011-06-27 TVE

A 2011-06-08 TVE

- 2011-05-03 TVE

Revision Date Carried Verified by Approved by Comments


out by
3720 VS 470 MPOV Mk III

INTRODUCTION 1
Definitions 1
Units 1
Abbreviations 2
SFI Grouping System 6
GENERAL 8
0.1 General 8
0.2 Description 8
0.3 Design temperatures 8
0.4 Main dimensions 8
0.5 Trial Speed 9
0.6 Capacities 9
0.9 Accommodation 10
0.10 Classification 10
0.11 Rules 11
0.12 Certificates 12
0.13 Drawings, Instruction Manuals etc. 13
0.14 User`s manual 13
0.15 Equipment list, instruction books 14
0.16 Materials 14
0.17 Workmanship 14
0.18 Inspection 14
0.19 Modifications 14
0.20 Spare parts 15
0.21 Buyer`s supply 15
1 SHIP GENERAL 16
12 MODELS 16
127 Ship model 16
15 TRIALS AND TESTS 16
150 Trials general 16
151 Machinery testing 16
152 Inclining experiment 16
153 Fuel- oil, lub. oil and hydraulic oil 17
154 Dock testing and Trial trip 17
155 Post Seatrial Inspection 18
16 GUARANTEE 18
161 Guarantee 18
2 HULL 19
20 HULL MATERIALS 19
200 Hull general 19
201 Hull materials 19
203 Sandblasting, Priming and Painting 20
204 Testing of Tanks, Bulkheads etc 20
205 X-ray and Ultrasonic testing of Hull parts 20
21 AFT BODY 20
210 General from stern to frame 20 20
211 Shell plates 20
212 Steering gear room 20
213 Skeg 21
22 ENGINE AREA 21
220 General, frame 63-89 21
221 Shell Plating 21
222 Bottom, keel 21
223 Inner bottom 21
226 Deck platforms 22
23 MIDSHIP/CARGO AREA 22
230 General, frame 22 to 63 22
234 Deck 22
235 Deck below 1st deck. 22
236 Bulkheads 22
237 HIPAP trunks 22
239 Bottom side tanks and top side tanks 23
24 FOREBODY 23
240 General, frame 89 to stem 23
241 Shell plates 23
242 Stores below C- and B-deck 23
243 Forecastle deck/C-deck 23
246 Bow and stem section 23
247 Chain lockers 23
25 SUPERSTRUCTURE AND DECKHOUSE 24
250 Superstructure and Deck house 24
253 Superstructure 25
254 Wheelhouse 25
26 HULL OUTFITTING 26
261 Hull marking 26
262 Bottom plugs and Sea-inlets 26
263 Foundations 27
264 Bilge keel 27
266 Hawse pipes, anchor pockets 27
267 Gutter bars, Bulwarks and Cargo rail 27
268 Funnel 28
27 MATERIAL PROTECTION EXTERNAL 28
270 Painting - General 28
271 Flat bottom, side bottom, sea chests, etc. 29
272 Topside and bulwark, cargorail and winches 29
273 External deck 30
274 Bulwark inside and cargo rail 30
275 Superstructure, deckhouse 31
276 Galvanized items - External 31
278 External cathodic protection 32
28 MATERIAL PROTECTION INTERNAL 32
281 Accommodation, deck house, store rooms 32
282 Lowest part of engine room 33
283 Internal bulwarks, engine room, accommodation, deckhouse, 33
285 Ballast tanks, oily water tank, chain lockers, , cofferdams, void spaces, roll reduction tank 34
286 Fresh water tanks 35
287 Fuel oil, lube oil, and hydraulic oil tanks 35
289 Water ballast tanks 35
29 MISCELLANEOUS HULL WORK 36
290 Miscellaneous internal areas, vent and air trunks, all other surfaces 36
3 EQUIPMENT FOR CARGO 37
30 HATCHES 37
304 Manholes 37
31 EQIPMENT FOR CARGO 37
315 Cargo fittings on 1st deck 37
316 Tarpaulins 38
33 DECK CRANES 38
331 Offshore crane 38
332 Auxiliary crane 38
4 SHIP EQUIPMENT 40
40 MANOEUVRING MACHINERY AND EQUIPMENT 40
400 Maneuvring control 40
402 Rudder 40
403 Steering gear 40
404 Tunnel thrusters 41
405 Roll reduction tanks 41
408 Dynamic postioning system 41
41 NAVIGATION EQUIPMENT 45
410 Radar plants 45
412 DGPS 45
413 Gyro plants, Auto pilot, Compasses 46
414 Echo sounder, Speed log 46
415 Clinometer 47
417 Misc. nautical equipment 47
418 Radar, Signal and Antenna mast 47
419 ECDIS, AIS, SSAS, VDR and SSRS 47
42 COMMUNICATION EQUIPMENT 48
421 Radio plant 48
422 MOB boat radios, EPIRB, Radar transponders 48
423 Local area network (LAN) 49
424 VHF, UHF and Mobile telephones 49
425 Calling, command and telephone systems 49
427 Light and Signalling equipment 50
43 ANCHORING AND MOORING EQUIPMENT 51
431 Anchor with chain and equipment 51
433 Windlasses with chain stoppers, rollers etc 51
434 Capstans and Tugger winches 52
435 Fixed mooring equipment 52
436 Loose mooring equipment 53
437 Towing equipment 53
44 REPAIR AND CLEANING EQUIPMENT 53
441 Repair and maintenance equipment 53
444 Washing system 53
445 Incinerator 54
446 Outfitting in store rooms 54
448 Nameplates for Machinery, Equipment, Piping etc 54
45 LIFTING AND TRANSPORT EQUIPMENT FOR MACHINERY COMPONENTS 54
452 Travelling cranes and lifting equipment in engine room 54
5 EQUIPMENT FOR CREW 55
50 LIFESAVING EQUIPMENT 55
500 General 55
501 MOB-boats with equipment 55
502 Life rafts with equipment 55
503 Emergency marking 55
504 Medicines and first aid equipment 56
505 Loose fire-fighting equipment 56
51 INSULATION, PANELS, BULKHEADS, DOORS, SIDE SCUTTLES AND WINDOWS 56
510 General 56
511 Insulation, bulkheads and panelling 56
512 Doors with coamings in accommodation 56
514 External doors with coamings 57
515 Side scuttles and windows 57
52 INTERNAL DECK COVERING, LADDERS, STEPS, RAILING 57
521 Deck base covering, internal 57
522 Deck top covering, internal 58
524 Stairs, handrails in accommodation 58
525 Floor plates, ladders and pl.forms in engine room 58
526 Ladders, Platforms, Railings etc in tanks 58
53 EXTERNAL DECKS 58
531 Deck covering 58
533 Hand rails, Railings and Gates 59
534 Ladders and Steps 59
54 FURNITURE AND INVENTORY 59
541 Furniture for Crew 59
542 Furniture in wheelhouse 63
543 Mattresses 63
544 Curtains w/equipment 63
546 Entertainment equipment 63
55 GALLEY, PANTRY, PROV. AND LAUNDRY EQUIPMENT 64
551 Galley and Pantry 64
552 Equipment / Outfitting in Galley 64
554 Freezing and refrigeration system 65
558 Laundry 66
559 Garbage room 66
56 TRANSPORT EQUIPMENT FOR CREW 66
564 Gangway 66
57 VENTILATION, AIRCONDITION AND HEATING SYSTEMS 66
571 Ventilation and Aircond. systems for Accomodation (HVAC) 66
572 Ventilation for the remaining parts of the vessel 68
573 Ventilation for engine control room/ SW-board room 69
574 Ventilation Engine room 69
575 Ventilation of cargo area 70
576 Ventilation of thruster rooms 70
579 Natural ventilation 71
58 SANITARY SYSTEM AND EQUIPMENT 71
581 Sanitary supply system 71
582 Sanitary discharge system 72
583 Sanitary equipment 72
584 Drinking water system 73
6 MACHINERY MAIN COMPONENTS 74
60 DIESEL ENGINES FOR PROPULSION 74
600 General 74
601 Diesel engines for propulsion 74
63 PROPELLER PLANT, TRANSMISSION 74
634 Controllable pitch propeller plants 75
637 Main reduction gears with thrustbearings and couplings 75
65 MOTOR AGGREGATES FOR MAIN EL. PRODUCTION 76
651 Motor aggregate 76
66 EMERGENCY GENERATOR 77
665 Harbour/Emergency generator 77
667 Shaft Generator 78
7 SYSTEMS FOR MACHINERY COMPONENTS 80
70 FUEL OIL SYSTEM 84
700 General 84
701 Fuel oil transfer and drain system 84
702 Fuel purification plant 85
703 Fuel oil service system 85
71 LUB OIL SYSTEM 85
711 Lub oil transfer and drain system 85
712 Lube Oil Purification System 86
713 Lub oil system for propulsion machinery 86
72 COOLING SYSTEM 86
720 General 86
721 Sea water cooling system 87
722 Fresh water cooling system 87
73 COMPRESSED AIR SYSTEM 88
731 Starting air system 88
732 Service 88
734 Instrument air supply system 88
74 EXHAUST SYSTEM 88
743 Exhaust gas system 88
76 DISTILLED & MAKE UP WATER SYSTEMS 89
761 Freshwater generators 89
79 AUTOMATION SYSTEM FOR MACHINERY AND CARGO SYSTEMS 89
790 General 89
791 Engine control room 90
792 Common automatic equipment, engine alarm etc. 90
793 Automation equipment for propulsion machinery and transmission, engine telegraph etc. 93
795 Electric generating plant 95
797 Automation for other machinery equipment 97
798 Cable leads and piping for automation systems for machinery 98
8 SHIP SYSTEMS 99
80 BALLAST, BILGE AND DRAIN SYSTEMS, GUTTER PIPES OUTSIDE ACCOMMODATION 99
800 General 99
801 Ballast system 99
803 Bilge system 100
804 Scupper pipes outside accomodation 100
81 FIRE AND LIFEBOAT ALARM SYSTEMS, FIRE FIGHTING SYSTEMS 101
810 Fire fighting general 101
811 Fire detection, fire and general alarm system 101
813 Fire and washdown system 103
815 Fire fighting system with gas 103
82 AIR AND SOUNDING SYSTEM 103
821 Air and sounding systems in tanks 103
83 SPECIAL COMMON HYDRAULIC OIL SYSTEMS 104
831 Special hydraulic oil systems 104
85 ELECTRICAL SYSTEMS, GENERAL PART 104
850 Electrical system general 104
855 Administrative net work 107
86 ELECTRICAL SUPPLY SYSTEM 107
860 General 107
866 Batteries and batterey charges 108
868 Shore Connection box 109
87 ELECTRICAL COMMON DISTRIBUTION 110
870 Main Ship service and Emergency switchboards 110
871 440V and 230V Main Switchboard 111
872 440V/230V Emerg. switchboard 112
874 Motor starters 113
875 Distribution boards and panels 113
88 ELECTRICAL CABLES AND INSTALLATION 114
880 Cableways 117
882 Cableways in accommodation 117
883 Cableways on external decks 117
89 ELECTRICAL DISTRIBUTION SYSTEM 118
891 Electrical lighting systems for engine room etc 121
892 Electrical lighting for superstructure/accommodation 121
895 Electrical lighting system for weather decks 122
897 Electrical heating equipment 123
898 Electrical Motors, General 124
List of figures
1 SFI ............................................................................. 7
Project no: 3720
VS type: VS 470 MPOV Mk III

INTRODUCTION

Definitions
"As fitted plans" : Drawings and documentation showing the Vessel as built.

Approved : Means approved by the Class, Authority and/or Buyer.

Authority : National or international regulations to which the Vessel will be built.

Builder : Company contracted to build the Vessel for the Buyer.

Buyer : Company ordering the Vessel from the Builder.

Class : Classification Society responsible for approval of the Vessel


according to a set of established construction rules.

Length (L) : As defined in the Load Line Convention.

Length (LOA) : Maximum length of the Vessel.

Load Line Convention: The International Load Line Convention signed in London
on 5th April 1966.

Maker : Name of company that manufactures equipment which can be


installed in the Vessel.

Maker's list : List of alternative makers which will be requested to offer delivery of defined equipment of parts
for the building of the vessel.

Units

Basic units

Quantity Unit Symbol

Length Metre m

Mass Kilogram tonne kg


t (tonnes)
1 t = 1000 kg's

Time Second s

Electric current Ampere A

INTRODUCTION 27th of June 2011 - REV B Page 1


Project no: 3720
VS type: VS 470 MPOV Mk III

Temperature Centigrade C°

Force Newton N=kg*m/s2

Energy Joule J=Nm

Power Watt W=J/s

Pressure Pascal Pa=N/m2


Bar 1 bar=105 Pa

Frequency Hertz Hz=s-1


Rpm Rotation pr.minute

Other units

Quantity Abbreviation Unit

Barrel bbls 1 bbls= 0.1590m3

Cubic feet cu.ft 1 cu.ft = 0.0283 m3

Specific gravity s.g t/m3

Abbreviations

AC : Alternating Current

AIS : Automatic Identification System

ANSI : American National Standards Institute

ABCS : Automated Bulk Hose Connection Stations

ARPA : Automatic Radar Plotting Device

ASFA : Automated Sea Fastening Arrangement

BHAB : British Helicopter Advisory Board

BHS : Bulk Handling System

BS : British Standard

BNWAS : Bridge Navigation Watch Alarm System

CAA : Civil Aviation Administration

CCTV : Closed Circuit Television

COLREG : Convention on International Regulation for Preventing Collision at Sea

CPP : Controllable Pitch Propeller

CPU : Central Processing Unit

CRT : Cathode Ray Tube

CT : Current Transformer

INTRODUCTION 27th of June 2011 - REV B Page 2


Project no: 3720
VS type: VS 470 MPOV Mk III

D & ID :Duct and Instrument Diagrams


diagram

DC : Direct Current

DEM : Diesel electric / mechanical

DGPS : Differential Global Positioning System

DIN : Deutsche Industri Normen

DLL : Defined Load Line

DNV : Det Norske Veritas Region Norge AS

DO : Grade of Fuel (Diesel oil) Sp.gr. 0.83 for design purpose only

DP : Dynamic Positioning

DSC : Digital Selective Call

E0 : Unmanned Engine room

ECDIS : Electronic Chart Display and Information System

ECR : Engine Control Room

EGC : Enhanced Group Call

EMC : Electro Magnetic Compatibility (the technology to minimize EMI/RFI)

EMI : Electro Magnetic Interference

EPIRB : Emergency Position Indication Radio Beacon

EX : Explosion proof

FAT : Factory Acceptance Test

FI-FI : Fire Fighting

FMEA : Failure Mode Effect Analysis

FO : Fuel Oil

FP : Fixed propeller

Fr. (fr.) : Frame nos. indicate position from aft perpendicular

FRC : Fast Rescue Craft

FU : Follow Up

FW : Fresh Water

GMDSS : Global Maritime Distress and Safety System

GMS : Global System for Mobile telecommunications

gp : Refer to group number in the SFI system

GPS : Global Positioning System

GRP : Glass Reinforce Polyester

HCU : Heave Compensating Unit

HF : High Frequency

HiPAP : High Precision Acoustic Position (transducer)

INTRODUCTION 27th of June 2011 - REV B Page 3


Project no: 3720
VS type: VS 470 MPOV Mk III

HPR : Hydro-acoustic Positioning Reference

HT : High Temperature

HVAC : Heat, Ventilation and Air-Conditioning

I/O : Input/ Output

IACS : International Association of Classification Societies

IAS : Integrated Automation System

IEC : International Electro-Technical Commission

IES : International Electrical Standard

IGBT : Insulated Gate Bipolar Transistor

IGCT : Integrated Gate Communicated Thyristor

IMCA : International Marine Contractors Association

IMO : International Maritime Organisation

INLS : Refer to IMO resolution A.673 (16)

IOPP : International Oil Pollution Prevention

IP rating : Ingress Protection of enclosures

ISO : International Standardisation Organisation

LAN : Local Area Network, Data Communication Network

LCD : Liquid Crystal Display

LO : Lubrication Oil

LRIT : Long Range Interception & Tracking

LRS : Lloyds Register of Shipping

LT : Low Temperature

MCC : Motor Control Centre

MCCB : Moulded Case Circuit Breaker

MCR : Max. Continuous Rating

MCT : Multi Cable Transit

MF : Medium Frequency

MRU : Motion Reference Unit

NBDP : Narrow-Band Direct Printing terminal

NFU : Non Follow UP

NMA : National Maritime Administration

NMEA : National Marine Electronics Association

NOx : Oxides of Nitrogen

NS : Norwegian Standard

NUC : Not Under Command

INTRODUCTION 27th of June 2011 - REV B Page 4


Project no: 3720
VS type: VS 470 MPOV Mk III

ORO : Oil Recovery Operations

P & ID : Piping and Instrument Diagrams


diagr

PEP : Peak Emitting Power

PMS : Power Management System

PPM : Parts Per Million

PWM : Pulse Width Modulator

QA : Quality Assurance

QC : Quality control

RAO : Response Amplitude Operator

RB : Regulatory Bodies

RFI : Radio Frequency Interference

RMS : Root Means Square

ROV : Remotely Operated Vehicle

s.gp. : Refer to sub group number in the SFI system

SART : Search And Rescue Radar Transponder

SCR : Silicone Controlled Rectifier

SFI : SFI Group system, The Ship Research Institute of Norway

SOLAS : Safety Of Life At Sea

SOPEP : Shipboard Oil Pollution Emergency Plan

SBM : Special Bearing Monitoring

SPM : Make of instrument for shock pulse testing

SSB : Single Side Band radio telephone

THD : Total Harmonic Distortion

UPS : Uninterrupted Power Supply

USCG : United States Coast Guard

VAS : Vessel Automation System

VDR : Voyage Data Recorder

VDU : Video Display Unit

VMS : Vessel management system

VS : Vik-Sandvik AS

WSD : Wartsila Ship Design AS

INTRODUCTION 27th of June 2011 - REV B Page 5


Project no: 3720
VS type: VS 470 MPOV Mk III

SFI Grouping System

INTRODUCTION

SFI-Grouping system
The layout of the following specification is based on the SFI GROUP SYSTEM. This group system has been
designed primarily to provide shipyards and shipping companies with a tool for the specification of ships and
an estimation of shipbuilding costs.

The classification system is divided into the following Main Groups:

0. General
1. Ship, General
2. Hull
3. Equipment for cargo
4. Ship equipment
5. Equipment for crew and passengers
6. Machinery main components
7. Systems for machinery, main
8. Ship common systems

Each main group (m.gp., one (1) digit) is divided into groups (gp, two (2) digits). Each group is again
subdivided into sub-groups (s.gp, three (3) digits).
Components specified twice or under different sub-groups shall only be delivered once.

Fig. 1

INTRODUCTION 27th of June 2011 - REV B Page 6


Project no: 3720
VS type: VS 470 MPOV Mk III

Fig. 1 SFI

INTRODUCTION 27th of June 2011 - REV B Page 7


Project no: 3720
VS type: VS 470 MPOV Mk III

GENERAL

0.1 General
This specification together with General Arrangement no. 3720-101-001 from Naval Architects Wartsila Ship
Design Norway AS, describes a Construction Diving Offshore Vessel, type VS 470 MPOV Mk III.
The Vessel shall be designed to comply with the normal requirements within the offshore oil industry for such
Vessels.
The Vessel shall be built for world-wide operation except for areas with ice.

0.2 Description
The Vessel shall be constructed with 1st deck, double bottom tanks and wing tanks.
1st deck shall be reinforced to bear a load of 10 tonnes/m2.
Deckhouses with accommodation on A, B, C and D -deck with wheelhouse on top.
A mezzanine deck with ROV control room and ROV office shall be arranged aft of superstructure.
Propulsion systems with two (2) main diesel engines driving independent propulsion systems.
Two electrical driven tunnel thrusters forward and two (2) electrical driven tunnel thrusters aft.

0.3 Design temperatures


The Vessel's machinery and equipment and related systems shall be suitable
for service under the following conditions:

Criteria Temperature

Maximum ambient air temperature + 38 oC - RH 90%

Minimum ambient air temperature - 20 oC

Maximum temperature of seawater + 32 oC

Minimum temperature of seawater +1 oC

Maximum space temperature in engine room + 50 oC

0.4 Main dimensions

Length over all 75.55 m

Length between p.p 64.50 m

0 GENERAL 27th of June 2011 - REV B Page 8


Project no: 3720
VS type: VS 470 MPOV Mk III

Breadth moulded 19.20 m

Depth to 1st deck 7.60 m

Scantling draught 6.50 m

Summer draft 6.00 m

Frame spacing 0.60 m

0.5 Trial Speed


Speed shall be min.12 with closed moonpool if provided with main engine output 2x2320 kW.
The hull shall be cleaned and the trails carried out in calm sea with wind 2 Beaufort and at a draft of 4.00 m at
Sea State 2.

0.6 Capacities

Dead-weight at loaded mean summer draft approx. 2500 tonnes

Deck cargo capacities:

Deck area approx. 680 m2

Deck area mezzanine deck approx. 120 m2

Cargo deck strength 10.0 Mt/m2

Tank contents Approx. capacity in m3

Fuel oil total 1300

Fresh water 280

Water Ballast 1400

FO Settling 2 x 45

FO Service 2 x 20

Sludge 17

FO Overflow 33

Waste oil 13

Lube oil 30

Bilge/Oily water 36

0 GENERAL 27th of June 2011 - REV B Page 9


Project no: 3720
VS type: VS 470 MPOV Mk III

Sewage tanks 28 + 30

Grey water tank 37

Hydr. oil 4

0.9 Accommodation
The Vessel shall have accommodation and certificate for Sixty (60) persons and one (1) Hospital, according
to GA plan.

0.10 Classification
The Vessel with engines and equipment shall be built under the supervision of and in accordance with current
IMO and SOLAS Regulations (including latest Amendments) and to Det Norske Veritas or any other IACS
member.

The vessel shall fly Panama flag.

The Vessel shall be classed by Det Norske Veritas (DNV) to obtain the following notation:

* Construction symbol.

1A1 Main character of class.

CLEAN Requirements for controlling and limiting operational emissions and discharges.

DYNPOS AUTR Redundancy in technical design and with an independent joystick system back-up.

E0 Instrumentation and automation to allow for unattended machinery spaces.

NAUT-OSV (T) Bridge ergonomics for reduced workload and improved operational conditions in tropical
waters.

COMF-V(3) Covering requirements for noise and vibration.

DK (+) Deck strengthening for heavy cargo.

SF Compliance to damage stability requirements.

0 GENERAL 27th of June 2011 - REV B Page 10


Project no: 3720
VS type: VS 470 MPOV Mk III

0.11 Rules
The Vessel with equipment shall be built according to the following Rules and Regulations:
Flag State regulations.
IMO Resolution MSC 235 (82) Guidelines for the Design and Construction of Offshore Supply Vessels
2006, where applicable.
IMO Resolution MSC 267 (85) International Code of Intact Stability (2008 IS Code).
IMO MSC.266(84) - Code of Safety for Special Purpose Ships, 2008- (for not more than 60 persons).
International Convention of Load Lines of 1966 including subsequent ammendments.
International Convention on Tonnage Measurements 1969.
International Convention for Preventing Collision at Sea 1972, COLREGS, as amended.
International Convention for the Safety of Life at Sea, SOLAS 2009, with latest amendments.
International Convention for the Prevention of Pollution from Ships - MARPOL 73/78 Annex I,II, III, IV, V
and VI.
Rules and regulations governing navigation of the Panama Canal and Suez Canal and Panama and
Suez Canal Tonnage Regulations (Tonnage Certificates only).
Maritime Labour Convention, MLC 2006.
IMO NOx Technical Code - Technical Code on Control of Emission of Nitrous Oxides from Marine
Diesel.
IMO Noise levels - Code on noise levels on board ships. Resolution A.468 (XII).
IMO ISPS Code - International Code for the Security of Ships and of Port Facilities.
IMO ISN Code - International Management Code.
IMO LSA Code - International Life-Saving Appliance Code, Resolution MSC.48(66).
IMO FTP Code - International Code for Application of Fire Test Procedures, Resolution MSC.61(67).
IMO FSS Code - Fire Safety Systems, Resolution MSC.98(73).
IMO Resolution MSC 128(75) Performance Standard for a Bridge Navigation Watch Alarm System
(BNWAS).
IMO Alarms and Indicators - Code on Alarms and Indicators, Resolution A.830(19).
International conference of standards of Training, certification and watch keeping for seafarers, 1995
(IMO, STCW).
ISO Vibration standard 6954, 2000 "Guidelines for the measurement, reporting and evaluation of
vibration with regard to habitability on passenger and merchant ships".
Final Acts of the World Administrative Radio Conference, 1997.(The Vessel shall be equipped for area
A3 acc. to GMDSS rules, and according to International registration 1973 and Radio regulations 1982).
IEC/TC18 Regulation for electrical installation on board ships.
IEE Recommendations for the Electrical and Electronic Equipment of Ships 6th Edition.
IEC publication no. 60331, 60332, 60092 and 60533.
Electromagnetic Compatibility of Electrical and Electronic Installation on Ships, IEC 533.
BWM - International convention for the Control and Management of Ship`s Ballast water and Sediments,
2004.
AFS - International Convention on the Control of Harmful Anti-Fouling Systems on Ships, 2001 - Annex 1
- Controls on Anti-Fouling Systems.
IMO Resolution MEPC.179(59) Guidelines for the development of the inventory of hazardous materials.
IMO MSC/Circ 645 Guidelines for Vessels with Dynamic Positioning Systems.
IMCA M103 Guidelines for the Design & Operation of DP vessels.
The Flag State Health Directorate (Building, cleaning, disinfection and maintenance of fresh water
tanks).
IMO Resoulution MSC 215 (82) Performance Standard for Protective Coatings (PSPC) for dedicated
ballast tanks.
IMO - Guidelines for Emergency towing.
US Coastguard Regulations for Foreign Flag Vessels, calling US ports regarding prevention of pollution
by oil, sewage and garbage.
IACS Standard, Accuracy in Shipbuilding.

0 GENERAL 27th of June 2011 - REV B Page 11


Project no: 3720
VS type: VS 470 MPOV Mk III

0.12 Certificates
All necessary certificates, including classification reports shall be delivered with the Vessel, without any
remarks.
Certificates shall be final or provisional according to standard from issuer.
All fees for approval of calculations, drawings and inspection both to Class and Authorities shall be included.
Certificates for the Vessel's hull, machinery and equipment shall be delivered with the Vessel in one (1)
original and one (1) copy to the Buyer.

All certificates required shall be delivered, such as, but not limited to:
Certificate of nationality.
International tonnage certificate.
Suez Canal Tonnage certificate.
Panama Canal Tonnage certificate.
Safety certificate for construction.
Safety certificate for equipment.
Classification certificate for Hull, Machinery and Electronic Equipment.
Safety Radio certificate.
Radio license.
Builder certificate.
Loadline certificate.
Machinery certificates.
IOPP certificate.
EIAPP for engines.
Machinery Emission Certificate in accordance with MARPOL 73/78, Air pollution Annex IV.
El.plant (in acc to DNV regulations).
Anchor- chain and wire certificates.
Windlass.
Crane and lifting appliance certificates.
Pad eyes, lashing points and lifting eyes (shall be marked with SWL).
Guide rollers (manufacturer's certificate).
Bollards (manufacturer's certificate).
Fairleads (manufacturer's certificate).
CO2 certificate.
AC/OX certificate.
Deratting exemption certificate.
Nationality certificate.
Certificate of fitness CA 673.
Certificate of compass.
Certificate of seaworthiness.
INLS certificate.
Cargo gear record booklet.
PSPC Certificate.
List of Inventory of Hazardous Materials (in compliance with IMO res. MEPC.179(59).
Asbestos free certificate.
Sewage certificate.

Calculation for tonnage certificate for Suez, and Panama (Suez lights not included, but sockets and brackets
included, Panama fairleads included).

0 GENERAL 27th of June 2011 - REV B Page 12


Project no: 3720
VS type: VS 470 MPOV Mk III

Equipment certificates required by Class and Authorities shall be delivered, minimum but not limited
to:
Life rafts certificates.
Life saving equipment certificates.
MOB boat and davit certificate.
Fire appliance certificates.
Air breathing app. Certificates.
Lantern certificates.
Medical certificates.
Compass Adjustment certificate.
Certificate for fresh water tanks.

Document of compliance for:


IMO 468 (noise).
ISO 6954(vibration).
ILO regulations.

0.13 Drawings, Instruction Manuals etc.


Approval of drawings:
All relevant design and arrangement drawings shall be submitted for approval to the Buyer or to the Buyer's
representative in triplicate.
Buyer to undertake to dispatch one (1) approved or not approved copy with comments to the Builder within
fourteen (14) days of receipt.
A detailed procedure between Builder and Buyer regarding drawing approval shall be agreed upon.
Full list of drawing, calculations, "as fitted plan", handbooks, manuals and other information shall be
submitted for approval.
All correspondence between Builder and Authorities and Class shall be submitted in copy to Buyer.

Delivery of drawings:
At delivery of the Vessel, "as built" drawings shall be delivered with, one (1) paper copy for the Vessel and
one (1) paper copy and one (1) CD rom to the Buyer.
All documentation for the Vessel and its intended operation required by Authorities shall be delivered.

0.14 User`s manual


Three (3) copies users' manuals in English for all equipment and systems onboard the Vessel shall be
delivered.
The users' manuals shall also be delivered on an electronic format, to the extent of availability.

0 GENERAL 27th of June 2011 - REV B Page 13


Project no: 3720
VS type: VS 470 MPOV Mk III

0.15 Equipment list, instruction books


The Builder shall deliver a equipment list with names, types and capacities for all equipment.
Maintenance instruction and recommended spare parts, suppliers name, address, telephone, fax- and e-mail
address shall be sent to the Buyers representative in due time.

0.16 Materials
New, first class materials etc. shall be used, with a quality suitable for this type and size of Vessel, adapted to
world-wide operation.
All steel materials for the hull shall be of ship's building quality with certificate from Class. Where aluminium is
used, this will be saltwater durable according to Class regulations.
All wooden materials shall be dry and of good quality.
No materials containing asbestos shall be used.
Bolts and nuts on open decks shall be of stainless steel.

0.17 Workmanship
The workmanship throughout shall be good marine standards, and particular care shall be taken to ensure
fair lines and smooth surfaces.
All workmanship shall be carried out according to approved drawings and good shipyard practice. Steel work
shall be carried out within latest issue of IACS standard.

0.18 Inspection
Builder shall afford every facility for such inspection and provide suitable equipped offices for the Buyer's
Representatives, with toilet and washing facilities, telephone, telefax
services, high capacity multi-media Pentium PC with inkjet printer / plotter and high speed modem facilities
with ISDN or similar telephone line, plans and document filing facilities, large pin board for pinning up
drawings etc.
The offices shall be large enough to accommodate the Buyer's representative and his assistants. Minimum
three (3) persons.
The Buyer may send to and maintain at the Builder's yard, at the Buyer's own cost and expense, one (1) or
more representatives to act on behalf of the Buyer in attending the tests and inspections relating to the
Vessel, it's machinery, equipment and outfitting, and in any other matters for which he is specifically
authorised by the Buyer

0.19 Modifications
The Buyer is entitled to request modifications or additional work. Such extra work shall only be carried out
upon written request to the Builder.
All such work shall be carried out only according to separate written agreements.
For all modifications and changes the Change Order (CO) form shall be filled out and signed by both parties.
No work shall start before the CO is signed.
Agreements concerning additional work or changes to contain price, delivery conditions and information
about whether the change/additional work leads to changes of deadweight, speed or other functions.
Changes being made during the building period, from contract date, in national or foreign rules and
regulations or in the Class regulations, and require modification to the Vessel shall be carried out by the
Builder.

0 GENERAL 27th of June 2011 - REV B Page 14


Project no: 3720
VS type: VS 470 MPOV Mk III

The Buyer shall pay for these modifications.


For work of the type mentioned above, additional charges or reductions shall be calculated according to the
stipulations of the main contract and forwarded to the Buyer for approval before the execution.

0.20 Spare parts


Spare parts shall be supplied by the Builder according to Class, except for equipment supplied by Buyer.
All spare parts, incl. Buyer's delivery, shall be well protected against corrosion and mechanical damages.
Bigger parts shall be well clamped, and everything stored in shelves and/or cupboards.

0.21 Buyer`s supply


Generally, Buyer's supply shall be as follows:
Charts, general.
Galley and pantry utensils.
Casseroles.
Glass, crockery and china.
Office machinery not specified in this specification.
Books and charts.
Consumer goods.
Loose lab. equipment.
Linen.
Mooring equipment, above class requirements.
Wire for winches complete with necessary sockets/splices ready for spooling.
Spareparts above Class requirements.
Owner's flags.

The Builder shall receive, store and bring onboard, without extra charges, all goods and equipment delivered
by the Buyer. Sufficient space for Buyer's supply shall be provided.

0 GENERAL 27th of June 2011 - REV B Page 15


Project no: 3720
VS type: VS 470 MPOV Mk III

1 SHIP GENERAL

12 MODELS

127 Ship model


One (1) model per vessel ordered - of the Vessel in scale 1:75 shall be delivered to the Buyer's main office.
For marketing purposes one model should be delivered to the Buyer's main office at the earliest possible
convenience.

15 TRIALS AND TESTS

150 Trials general


All parts of the Vessel and all workmanship shall be inspected and tested.
The Buyer's representative shall be present at all tests. All machinery shall be tested according to the
accepted program of tests. All tests shall be accepted before the Vessel is handed over to the Buyer.

151 Machinery testing


The Buyer shall be notified latest fourteen (14) days before testing the machinery at the engine factory.
Torsion and vibration calculations shall be carried out by the engine supplier and approved by the Class. All
machinery shall be tested at the quay before the trial trip.

152 Inclining experiment


Capacity plan of all tanks shall be prepared.
Preliminary stability calculations shall be prepared and submitted to the Buyer.
The Vessel's light ship weight and location of centre of gravity shall be determined by an inclining experiment.
A complete booklet showing capacities and centres of gravity of tanks shall be delivered together with the
stability book.
The stability book with all conditions and capacities shall be delivered with the Vessels.
Final approved stability book shall be delivered to the Buyer latest three (3) months after delivery of the
Vessel.

1 SHIP GENERAL 27th of June 2011 - REV B Page 16


Project no: 3720
VS type: VS 470 MPOV Mk III

153 Fuel- oil, lub. oil and hydraulic oil


The Builder shall supply fuel oil, lube oil, hydraulic oil etc. for tests and trials.
Type and quality of oil shall be decided by the Buyer from those recommended by the supplier of machinery.
All consumption of oil concerning testing, flushing and trial trip, shall be covered by the Builder. Further, filling
up all systems to working level, for lub. oil and hydraulic oil at delivery.

154 Dock testing and Trial trip


Dock tests shall be carried out when systems are ready for testing, according to approved test program.

During these trials, all machinery, piping systems, equipment, deck machinery, control systems, air
conditioning, galley and laundry equipment, ventilation, alarm systems, remote control systems,
communication systems and all other equipment shall be tested to satisfaction of the Buyer, Class and
Authorities.
Electronic equipment, including navigation and communication shall be tested.
Electrical plant shall be tested.
Pump test including test of loading, discharging and ballasting system.
MOB boat davit and MOB boat shall be tested.

All deck equipment and cranes to be tested.


Main propulsion machinery shall be tested at maximum practicable power levels.
Main generators shall be loaded to maximum possible level using Vessel's auxiliary load and thruster. Tunnel
thrusters shall be tested.
Before trial trip all systems shall be commissioned and function tested at quay.

Open water sea trials


Sea trials shall begin as soon as all basin trials have been satisfactorily completed and when the Builder
declares that Vessel is complete and equipped in all respects and ready.
It is intended that the first part of sea trials shall be used mainly for running machinery, compass and controls
adjustment, including joystick control system, anchor trials and any other tests considered appropriate.
During sea trials machinery and equipment shall be checked in operation. Electrical load with indicated
machinery running shall be recorded at least every hour.

A technical trial trip shall be performed and the following tests shall be carried out and approved:
1. Progressive speed test and fuel consumption measurement at 20% - 100 % output of the main engine.
2. Crash stops ahead and astern.
4. Manoeuvring test.
5. Emergency stop.
6. Thruster tests.
7. Anchor test.
8. Steering gear test, including circle and eight (8) manoeuvre test to SB and PS.
9. Noise measurements.
10. Compass correction.
11. Test of heating/ ventilation/ Air-condition system.
12. Power management system test
13. Joystick test.
14. A stern manoeuvrability test with and without use of thrusters.
15. Illumination measurement of the Vessel.
16. DP test.
After trial trip, a report shall be made on all tests carried out during the trial.
This report shall be handed over to the Buyer. Any faults found during the trial shall be

1 SHIP GENERAL 27th of June 2011 - REV B Page 17


Project no: 3720
VS type: VS 470 MPOV Mk III

corrected and if necessary, a new trial trip carried out before delivery of the Vessel.

154.1 Noise and Vibration test


The noise level shall be within COMF - V(3) and according the International Maritime Organisation (IMO)
Resolution A.468 (XII), 1981, entitled:
"Code on noise levels on board ships", should be followed for the normal sailing (propellers 80% loaded)
condition, engine room fans and necessary equipment running, as well as the HVAC-system in the
accommodation.
Noise level in the accommodation on the 1st deck can be accepted with higher than
COMF-V(3), 10dB(A).

DP condition
All thrusters and propellers running at 40 % load, engine room fans and necessary equipment running, as
well as the HVAC-system in the accommodation.

Vibration levels
Reference - ISO 6954 - Guidance notes on acceptable vibration levels and their measurement.

154.2 FMEA of DP power and control system


A failure Mode and Effect Analysis (FMEA) shall be performed according to procedures described in IMO
MSC 97 (73) Annex 4, and Global Maritime.
The FMEA shall at least contain the following main chapters : Summary and Conclusion, Introduction,
System descriptions, Supplementary information and FMEA test programme.

155 Post Seatrial Inspection


After the above Sea Trials the main engines and reduction gearboxes shall be opened up for inspection
according to Class requirements.

All filters shall be controlled and cleaned.


All paper cartridge shall be renewed.

If any defects become apparent during the sea trials, these machinery parts shall be opened up for
inspection, these shall be properly corrected and re-tested to the Buyer's satisfaction.

16 GUARANTEE

161 Guarantee
See contract.

1 SHIP GENERAL 27th of June 2011 - REV B Page 18


Project no: 3720
VS type: VS 470 MPOV Mk III

2 HULL

20 HULL MATERIALS

200 Hull general

Slots, scallops
Slots and air holes and drain holes shall be provided where necessary,
minimum radius 50 mm.
Openings / slots in upper part of tanks shall have area minimum the area of the vent pipe for the tank.
Openings / slots in the bottom of the tanks, longitudinal and transverse, shall have an area of min. 25 %
above the dimension of the suction pipes.
Generally, non-tight structural members shall be provided with adequate access/lighting holes provided such
holes are necessary or practicable and not detrimental to the structural strength.
In all tanks, outside areas and other areas likely to corrode, all free edges, included those in notches, shall be
grinded to radius minimum R 2 mm, except behind insulated areas and oil tanks.

Manholes
Manholes with dimensions of at least 600 x 400 mm shall be arranged in all tanks and cofferdams.
Dimensions min. 500 x 700 mm for liquid mud tanks.
Manholes in 1st deck to have covers flush with the wooden plank.
Manhole covers for liquid mud tanks shall be provided with an inspection plug.
Manholes to double bottom tanks shall be raised flange type. Manhole covers shall be bolted and provided
with lifting bars and bead welded contents label.

Welding general
All welding shall meet Class requirements.
Welding shall be carried out around all scallops, air- and drain holes and slots etc. the ends of all lugs for
frames etc.
Lifting lugs, temporary lugs and all clips shall be cut off and remains shall be ground flush with the steel
structure if not otherwise agreed.

201 Hull materials


The hull shall be built of steel `Grade A`.
All materials shall be delivered with certificates according to Class.

2 HULL 27th of June 2011 - REV B Page 19


Project no: 3720
VS type: VS 470 MPOV Mk III

203 Sandblasting, Priming and Painting


All steel materials shall be sand/grid blasted to grade SA 2,5 and painted with zinc-silicate primer.
The type of primer and thickness shall be suitable for the top coating.

204 Testing of Tanks, Bulkheads etc


All tanks shall be pressure water or air tested according to Class requirements.
No tank or compartment boundary connection shall be coated or painted (except for shop primer) until
tightness testing has been completed and passed by classification surveyor and Buyer's representative.
All decks, flats, shell, bulkheads, etc. shall be hose tested as required by classification rules.

205 X-ray and Ultrasonic testing of Hull parts


X-ray and ultrasonic testing of hull parts according to Class requirements. Copies of tests shall be handed
over to the Buyer's representative.

21 AFT BODY

210 General from stern to frame 20


The aft ship shall be designed for twin (2) propellers and twin (2) rudders.
One (1) Steering gear compartment.
Tanks for water ballast.
One (1) anti-rolling tank connected to water ballast.
One (1) Anti-healing tank.
The Vessel shall have skeg keel in aft ship.
Two (2) tunnel thrusters in skeg.
Two (2) heavy shaft bracket. Strengthening of aft ship around rudder trunk and propeller tubes / brackets
Pipes between propeller brackets and propeller tubes.
Rope bins.

211 Shell plates


Shell plates around rudder trunks, propeller brackets and stern tubes shall be increased locally with insert
plates.
Eye plates in shell above rudders, and propellers.

212 Steering gear room


A steering gear room shall be arranged below 1st deck with foundations for steering gears, tanks, starters etc.
Emergency exit hatch in 1st deck to steering gear room PS.

2 HULL 27th of June 2011 - REV B Page 20


Project no: 3720
VS type: VS 470 MPOV Mk III

213 Skeg
A centre skeg shall be arranged.

22 ENGINE AREA

220 General, frame 63-89


Tanks in engine area according to tank plan.
Cofferdams according to Class.
One (1) engine control room with switchboard and engine control stations.
Engine control room shall be sound insulated and shall have raised floor.
Double layer windows in engine control room. Windows shall be A60.
One(1) work station with table, chair and full height bookshelves in engine control room.
One (1) workshop in engine room.

221 Shell Plating


Shell plates shall be according to the Class.
Marks in plates from lugs etc. shall be welded and grounded.
Shell plates from 1st deck level and 1000 mm below shall be increased to compensate for the lack of fender
bars.

222 Bottom, keel


Double bottom in engine room area.
Tanks in double bottom according to tank plan.
Longitudinal framing in double bottom with transverse girders.

223 Inner bottom


Inner bottom shall have longitudinal framing and transverse girders.
Main engines and reduction gears foundations shall be an integrated part of the double bottom construction.
Necessary local stiffeners and support shall be arranged for foundation for auxiliary machinery on the
tanktop.
Manholes on tanktop in engine room shall have a 75 mm coaming.
Keel plate in centre with thickness according to Class.

Tank no 202 and 206 to be used for fixed ballast.

2 HULL 27th of June 2011 - REV B Page 21


Project no: 3720
VS type: VS 470 MPOV Mk III

226 Deck platforms


Platforms in engine room according to engine room arrangement.

23 MIDSHIP/CARGO AREA

230 General, frame 22 to 63


Cargo (FO) tanks and ballast tanks according to General arrangement.
HP profiles shall be used as stiffeners in 1st deck inside tanks.
One (1) Overflow tank.
One (1) Propulsion room.
One (1) Void space, prepared for future Moon pool according to GA.

234 Deck
1st deck shall be reinforced for a specific load of 10 tonnes/m2 in deck cargo area.
Deck plate in 1st deck shall be 16 mm.
Foundations for deck stanchions, see item 315.

Mezzanine deck (aft of accommodation for ROV equipment).


16 mm steel plate in mezzanine deck.
Maximum six (6) pillars below mezzanine deck. Deck strength 3 t/m2. Free height below
mezzanine deck shall be min. 3500 mm.

235 Deck below 1st deck.


Cargo area shall have a 2nd deck.

236 Bulkheads
The vessel shall have transverse watertight bulkheads according to requirements.
Four (4) of the transversal watertight bulkheads shall be equipped with local- and remote controlled watertight
doors.

237 HIPAP trunks


Structure shall be prepared for future installation og 2 x HIPAP systems.

2 HULL 27th of June 2011 - REV B Page 22


Project no: 3720
VS type: VS 470 MPOV Mk III

239 Bottom side tanks and top side tanks


Double bottom tanks shall be arranged for WB. Wing tanks shall be arranged for WB.
Void spaces and ducts for void U-tanks.
All according to GA and tankplan.

24 FOREBODY

240 General, frame 89 to stem


Forebody from forward part of engine room to stem with tanks and 2 x tunnel thrusters.
Soft nosed.
Mooring rope bins in bosun store below C-deck with hatch Ø 300 mm in C-deck forward.

241 Shell plates


Shell plating in way of anchor pockets shall be increased locally with insert plating.

242 Stores below C- and B-deck


Shelves and bins in store according to agreement with Buyer.

243 Forecastle deck/C-deck


Forecastle deck (C-deck) with reinforcement for windlass and mooring equipment.

246 Bow and stem section


Soft nose bow.
Horizontal stiffeners / girders in bow.

247 Chain lockers


Two (2) self-stowing, watertight chain lockers shall be located forward as indicated on the General
Arrangement. Increased steel plates in bottom and 200 mm of sides.
Grating approx. 150 mm above bottom in chain lockers.
Quick release arrangement for anchor chain fastening point to locker.

2 HULL 27th of June 2011 - REV B Page 23


Project no: 3720
VS type: VS 470 MPOV Mk III

25 SUPERSTRUCTURE AND DECKHOUSE

250 Superstructure and Deck house


All arrangements shall be in accordance with GA.

Deck house on1st deck shall include:


Casings and ventilation.
Entrance to engine room from open deck through corridor. Remote emergency stops shall be arranged in
corridor.
Paint store.
Incinerator/Garbage room.
Deck workshop/store.
Laundry.
Store rooms.
Spare part store.
Electrical workshop.
Hospital.
Male change room.
Female change room.
Duty mess.
CO2 room.
Emergency control station.
8 x Void boyancy tanks/stores.

Deck house on A-deck shall include:


Casings.
Gymnasium.
Client office.
ROV/Survey areas.
Offices.
Provision rooms.
Galley.
Mess room.
Two (2) Day rooms.

Superstructure on B-deck shall include:


Casing.
Emergency generator room.
A/C plant room.
Chemical store.
Conference room.
ROV office.
Ships Office.
Thirteen (13) x 2men cabins.
Deck for MOB boat.

Superstructure on C-deck shall include:


Casing.
Ten (10) x 2 men cabins.

2 HULL 27th of June 2011 - REV B Page 24


Project no: 3720
VS type: VS 470 MPOV Mk III

Seven (7) One-men cabin.


One (1)State cabin.

Superstructure on D-deck shall include:


Casing.
Instrument room.
Four (2) x State cabins.
Four (4) One-men cabins.

Superstructure on bridge deck shall include:


Casings.
Wheelhouse.

Top of wheelhouse:
Casing.
Store room/Battery locker.
Foundation for mast, antennas etc.

Height between decks:


1st deck to A-deck : 2800 mm
A-deck to B-deck : 2800 mm
B-deck to C-deck : 2800 mm
C-deck to D-deck : 2800 mm
D-deck to bridge deck : 2800 mm
Bridge deck to wheelhouse top: 400 mm raised floor in wheelhouse +
2800 mm net height inside wheelhouse
Free-height below ROV mezzanine deck shall be 3500 mm.

253 Superstructure
Superstructure on C-deck.
The superstructure shall be made of steel and shall be well-stiffened and well integrated with the ship
structure.
All outer bulkheads shall have gutters.
Stiffeners in front and side bulkheads shall have bracket connection to the gutters.
Continuously welding of all stiffeners in deck house.
Steel plates in front bulkhead shall be 2 mm above Class requirement.

254 Wheelhouse
Wheelhouse on bridge deck.
Wheelhouse shall be made of steel.
Raised floor in wheelhouse for cable and ventilation ducting.
Windows shall be welded to the wheelhouse bulkheads.
Skylights / "Over windows" forward and aft.
Platform on bridge wing to ship side SB and PS.
Top of wheelhouse shall be strengthened for navigation equipment and antennas.
Protection bars above aft wheelhouse windows.
Platform and rails aft part of wheelhouse (use when cleaning windows).

2 HULL 27th of June 2011 - REV B Page 25


Project no: 3720
VS type: VS 470 MPOV Mk III

Foundations for sat-TV and V-sat antennas on mast/wheelhouse.

26 HULL OUTFITTING

261 Hull marking


The location and marking of the marks shall be as follows:

Mark Location Marking Height -


mm

Funnel marks Below wheelhouse - PS & SB Bolted painted steel plate 1800

Bow mark On shell plate at bow Steel plate & paint

Vessel Name Bow Shell - PS & SB aft Shell - PS & SB Steel plate & paint 700/500

Port of Registry Aft Shell - PS & SB Steel plate & paint 350

Tank Boundaries Bottom & Side Shell as required PS&SB Bead welds

Draft Marks Side Shell - Aft and forward PS & SB Steel Plate & paint

Freeboard Marks Side Shell Midships PS & SB Steel Plate & paint

Thruster Positions Side Shell - In Way of Thrusters PS and SB. Steel Plate &paint

Bottom Plugs Bottom Shell - In Way of Plugs Bead welds & paint

Paint Mark (Division Side Shell - PS & SB (Lower Border of Topside 75 mm bead welds at 1 m
Line) Paint) spacing

Frame marks On PS & SB. Every tenth frame Steel plate & painted

IMO number Bulkhead, forecastle and engine room bulkhead

Bottom Equipment On ship's side PS & SB. Steel plate & paint

VS 470 MPOV Superstructure - PS & SB Steel plate & paint

Builder's plate Superstructure - PS & SB Steel plate & paint

Owner`s logo Superstructure - PS & SB Steel plate & paint

262 Bottom plugs and Sea-inlets


Bottom plugs from all tanks in double bottom and side.
Sign showing the tank numbers at each bottom plug.
Two (2) sea-inlets combined with box cooler compartments (delivered by Builder) in engine room.
One (1) sea inlet aft.
One (1) sea inlet for emergency fire pumps aft.
All with strainer plate bolted and hinged to the shell.
All sea inlets shall be equipped with closing valves.

Each sea chest shall have connection for:

2 HULL 27th of June 2011 - REV B Page 26


Project no: 3720
VS type: VS 470 MPOV Mk III

Venting to open air (min. DN50.)


Dosage of chemicals for anti-fouling and hot water from boiler.
Different consumers with extension suction pipe.

263 Foundations
All foundations on deck and engine room shall be strong with necessary support.
Machinery and equipment shall be bolted to foundations.
"Chock fast" or steel shall be used where flexible mounting is not specified. Engine machinery, pipes and
shaft generator to be installed with flexible mounting.

264 Bilge keel


Bilge keels on each side shall be welded to a doubling plate. The bilge keels shall have scallops.
The bilge keels shall be made in three (3) sections and shall be as deep as possible without extending below
the baseline or outboard of the shear strake.

266 Hawse pipes, anchor pockets


Hawse pipes between anchor pocket and B-. deck shall be installed. Hawse pipes shall be min. 15mm thick.
Hawse pipes shall be Round bars on bottom and top of the hawse pipes shall be installed.
Anchor pockets on each side shall be suitable for deep sea Speck anchor.

267 Gutter bars, Bulwarks and Cargo rail

Gutter bars
Gutter bars shall be arranged inside stiffeners on all exterior accommodation bulkheads and around all wet
interior spaces.
Flat bar coaming around all opening in decks, around all external decks and around oily machinery.

Bulwark/Railing
Bulwark on C-deck with recesses for bollards.
Height of bulwark shall be 1200 mm.
A HP profile on top, support on each frame. Steps in way of mooring equipment.
Reinforcement around fairleads and mooring equipment.
Bulwark on 1st deck, stbd and port according to General Arrangement.
The bulwark on 1st deck shall be sloped inboards.

Railing around all open decks, deck openings etc. according to GA.

Cargo Rail
A transverse cargo protection bulkhead with openings on frame 67.
Openings in transverse bulkhead.

2 HULL 27th of June 2011 - REV B Page 27


Project no: 3720
VS type: VS 470 MPOV Mk III

Buoyancy tanks
Buoyancy tanks PS and SB, frame 04-67.
Watertight doors in some buoyancy tanks, ref GA.
Recess for vent. pipes.

268 Funnel
One (1) funnel PS. The funnel shall be made of steel. Door in funnel at top of wheelhouse. The exhaust
outlets shall be aft of the funnel.
Ventilation outlets in funnel with closing device.
Ladders/steps inside the funnel as necessary for access for maintenance/inspection.
A platform shall be arranged between the funnel and deck house on top of the wheelhouse.
One (1) ventilation duct for engine room ventilations SB side from 2nd deck to below
C-deck. Ventilation inlet between B- and C- deck with stainless steel grids, water traps and closing device.

27 MATERIAL PROTECTION EXTERNAL

Rooms without lining


Lugs and steel eyes on external hull and rooms without lining shall be burned away and grounded. Cuts shall
be filled with weld and ground flush. Sharp edges shall be rounded with grinding machine to radius min. 2
mm.

Rooms with lining


Lugs and eyes shall be cut to the height of no more than 10 mm.

Tanks
Cuts shall be filled with weld. Grinding where there are sharp edges to radius min. 2 mm.
Lugs shall be removed and grinded in tanks, bilge areas and below floor plate levels.

270 Painting - General


With the assistance of paint supplier a paint scheme must be prepared and submitted to the buyer for
approval. The paint scheme should comply with this specification and all the applicable regulations in force.
The approved painting scheme will be final binding document for the purpose of production.

All steel shall be sandblasted to grade SA 2,5 and primed with zinc primer. All painting work shall be carried
out with good workmanship and according to common good practice.
Painting and material protection shall be carried out with brushing, rolling or spraying according to the paint
manufacturer's recommendation for the different types of paint and material protection.
All sharp edges in tanks and outside structure shall be, radius minimum 2mm.

All external welds and damaged primer shall be sandblasted to SA 2,5, and touched up with zinc primer.
All internal welds and damaged primer shall be steel brushed and touched up with zinc primer.
All edges and welding seams shall be strip coated before next coating.

All paint work shall be carried out according to the paint manufacturer's recommendations. High-pressure
spraying is applied all over where it is practical.
All areas shall be touched up with a primer paint before top coat is applied.

2 HULL 27th of June 2011 - REV B Page 28


Project no: 3720
VS type: VS 470 MPOV Mk III

Parts of steel which shall be riveted or screwed together shall be painted same as weather deck on the
mating areas, but not in oil tanks.

Specified MY thickness according to the paint specification shall be considered as minimum thickness.
This Paint Specification is based on paint delivered by Jotun. Other paint manufacturers with equal standard
can be used.
Colours shall be decided by the Buyer.

Supplier of paint according to Makers List.

All coated tanks shall be sand blasted to SA 2.5 prior to coating. Fresh water tanks, ballast tanks, brine-,
liquid mud tanks and all coated product tanks.

The following paragraphs are for guidelines only. An approved specification prepared by the selected paint
supplier will be binding and supersede all the recommendations contained here.

271 Flat bottom, side bottom, sea chests, etc.


(sharp edges etc. shall be rounded or smoothed. Min. radius = 2 mm)

Coat no. Product DFT Microns

1 Jotacote universal alu 250

2 Vinyguard Silvergrey 88 alu R.T. 50

3 AF Sea Omega light red 125

4 AF Sea Omega dark red 125

Total 550

272 Topside and bulwark, cargorail and winches


(sharp edges etc. shall be rounded or smoothed. Min. radius = 2 mm)

Coat no. Product DFT Microns

1 Jotacote universal alu 125

2 Jotacote universal alu 125

3 Hardtop orange 430 50

Total 300

2 HULL 27th of June 2011 - REV B Page 29


Project no: 3720
VS type: VS 470 MPOV Mk III

273 External deck


(sharp edges etc. shall be rounded or smoothed. Min. radius = 2 mm)

Coat no. Product DFT Microns

1 Jotacote universal alu 125

2 Jotacote universal turquoise 125

3 Hardtop as green137 50

Total 300

273.2 High temperature areas

Coat no. Product DFT Microns

1 Sølvalitt alu 20

2 Sølvalitt alu 20

3 Sølvalitt alu 20

Total 60

273.3 Masts, cranes, funnels etc.

Coat no. Product DFT Microns

1 Jotacote universal alu 150

2 Jotacote universal buff 150

3 Jotacote universal PSO yellow 414 75

Total 375

274 Bulwark inside and cargo rail


(sharp edges etc. shall be rounded or smoothed. Min. radius = 2 mm)

2 HULL 27th of June 2011 - REV B Page 30


Project no: 3720
VS type: VS 470 MPOV Mk III

Coat no. Product DFT Microns

1 Jotacote universal alu 125

2 Jotacote universal buff 125

3 Hardtop orange 430 50

Total 300

275 Superstructure, deckhouse

Coat no. Product DFT Microns

1 Jotacote universal alu 125

2 Jotacote universal light yellow 125

3 Jotacote PSO white 75

Total 325

276 Galvanized items - External


All area shall be cleaned thoroughly, to remove oil, grease, salts and other contaminations. All exposed areas
shall be painted. Galvanized items passing through tanks and behind linings not to be painted.

Coat no. Product DFT Microns

1 Jotacote universal, turquoise 100

2 Jotacote universal inner colour 100

3 Jotacote PSO Owners colour 75

Total 275

276.1 External aluminium

Coat no. Product DFT Microns

1 Jotacote universal, turquoise 100

2 Jotacote universal Owners 100

3 Jotacote PSO Owners colour 75

2 HULL 27th of June 2011 - REV B Page 31


Project no: 3720
VS type: VS 470 MPOV Mk III

Total 275

Galvanizing
Hot dip galvanising shall be carried out according to ISO 1461. Minimum coating thickness 100 microns.
Painting according to paint supplier's recommendations.
All internal, external and tank ladders, safety hoops, handrails and stanchions, galvanized pipes etc.
shall be dipped galvanized after fabrication.
Where pipes are required to be galvanized, pipes shall be hot dipped galvanized after all bending,
flanging and welding is complete. As far as practical final installation make-up pipes shall be returned for
hot dip galvanizing after all hot work is complete.
Touch up work if warranted to done with prior approval of owners representative.

278 External cathodic protection


Zinc anodes shall be placed on hull, tunnel thrusters, rudders, in the sea chests and in the internal cross-
over. Anode-plan shall be worked out.
The anodes shall be sized for a 3-year-life.

28 MATERIAL PROTECTION INTERNAL

281 Accommodation, deck house, store rooms

Coat no. Product DFT Microns

1 Jotacote universal alu 50

Total

281.1 Steel behind insulation/lining


All areas shall be cleaned thoroughly to remove oil, grease, salt and contamination. Welding seams, rust and
damaged shop primer shall be powertool cleaned to min. St 2.

Coat no. Product DFT Microns

1 Jotacote univeral alu 75

2 HULL 27th of June 2011 - REV B Page 32


Project no: 3720
VS type: VS 470 MPOV Mk III

Total

282 Lowest part of engine room


All areas shall be cleaned thoroughly to remove oil, grease, salt and contamination. Welding seams, rust and
damaged shop primer shall be powertool cleaned to min. St. 2.

Coat no. Product DFT Microns

1 Jotacote uiversal alu 125

2 Jotacote universal white 125

Total 250

282.1 Engines

Coat no. Product DFT Microns

1 Pilot II Green 131 40 my

283 Internal bulwarks, engine room, accommodation, deckhouse,


storages, casing, funnel, tunnelthruster room, propulsion room, emergency generator room, cargo
area, air handling room
- and all other compartments containing equipment, workshops, miscellaneous internal areas, ventilation and
air trunks and all other surfaces not specified.
All areas shall be cleaned thoroughly to remove oil, grease, salt and contamination. Welding seams, rust and
damaged shop primer shall be powertool cleaned to min. St 2, sharp edges etc. shall be rounded to min.
radius = 2 mm.

Coat no. Product DFT Microns

1 Jotacote universal buff 75

2 Pilot II white 40

Total 115

2 HULL 27th of June 2011 - REV B Page 33


Project no: 3720
VS type: VS 470 MPOV Mk III

283.1 Internal decks (where no flooring)

Coat no. Product DFT Microns

1 Jotacote universal buff 75

2 Pilot II Owners colour 50

Total 125

283.2 Tanktop in cargo area, tunnel thruster room, propulsion room, stores etc.

Coat no. Product DFT Microns

1 Jotacote universal alu 125

2 Jotacote universal white 125

Total 250

283.3 Cargo area inside

Coat Product DFT Microns


no.

1 Jotacote universal alu 125

2 Jotacote universal buff 125

3 Hardtop Grey 38 50

Total 450

285 Ballast tanks, oily water tank, chain lockers, , cofferdams, void spaces, roll reduction tank

Coat no. Product DFT Microns

1 Jotacote universal alu 200

2 Jotacote universal buff 150

Total 350

2 HULL 27th of June 2011 - REV B Page 34


Project no: 3720
VS type: VS 470 MPOV Mk III

285.1 Grey water & slop- sewage- water tanks

Coat no. Product DFT Microns

1 Tankguard storage red 200

2 Tankguard light red 200

Total 400

286 Fresh water tanks


Sharp edges etc. shall be rounded or smoothed min. radius 2 mm.
All areas shall be blast cleaned to SA 2 1/2 (ISO 8501 - 1:1988) after all hot work is completed.

Coat no. Product DFT Microns

1 Tankguard Aqua light red 225

2 Tankguard Aqua white 225

Total 450

287 Fuel oil, lube oil, and hydraulic oil tanks


One coat of Chugoku primer compatible for oil tanks, shall be applied.
After finalising all welding work in tanks, all welding seems and other areas where original zinc primer are
damaged shall be wire brushed and thereafter the full tank carefully cleaned and all damaged areas re-
primed.

289 Water ballast tanks


Sharp edges etc. shall be rounded or smoothed min. radius 2 mm.
All areas shall be blast cleaned to SA 2 1/2 (ISO 8501 - 1:1988) after all hot work is completed.

Coat no. Product DFT Microns

1 Jotacote universal alu 200

2 Jotacote universal buff 200

Total 400

2 HULL 27th of June 2011 - REV B Page 35


Project no: 3720
VS type: VS 470 MPOV Mk III

29 MISCELLANEOUS HULL WORK

290 Miscellaneous internal areas, vent and air trunks, all other surfaces
All steel areas shall be thoroughly cleaned to remove oil, grease, salts and contaminations.
Corroded areas shall be powertool cleaned to min. ST2 (ISO 8501-1:1988).
Jotacote universal Primer buff 1 x 80 my
Pilot II Gloss (to shade) 1 x 50 my

Woodwork
Woodwork shall be painted as deck house where this is found suitable.

Untreated woodwork except wooden deck


To be treated with oil or 2-3 coats Hardol or 2-3 coats Jotun Spontan Varnish.

Insulation
Insulation shall not be painted where this might have influence on the insulating quality. This applies for both
acoustic and thermal insulation.

Cables
Cables shall not be painted, painting and overspray will have influence on the insulating quality. Any paint
and overspray shall be cleaned off all cabling.

Consoles, furnishings and other surface finished equipment


Bought in equipment with an approved surface finish shall not be painted.
Any pain and overspray shall be cleaned off.

Pipes & channels


To be treated as bulkheads and superstructure with coats as for surroundings.

2 HULL 27th of June 2011 - REV B Page 36


Project no: 3720
VS type: VS 470 MPOV Mk III

3 EQUIPMENT FOR CARGO

30 HATCHES

General
All hatches shall be made of steel. Stainless steel in all movable parts.
Emergency hatches from steering gear room, cargo area, engine room and accommodation according to the
rules.
All exits shall be fitted with opening mechanisms that are easily handled from the inside and outside. Exit
hatches shall have contra-weight for easy opening.
Securing devices in open position for all hatches. Arrangement for locking with padlocks and according to the
ISPS code.

On 1st deck
A flush hatch, 1600 x 2000 mm to be arranged for access to engine room, cut outs w/heavy grating in decks
above 1st deck.
One (1) flush hatches 1800 x 2000 mm for access to 2nd deck in cargo area and one (1) 1800 x 2000 flush
hatches in 2nd deck.

304 Manholes
Manholes shall be arranged in all tanks, cofferdams, chain lockers etc.
Two (2) manholes in each large tank.
Manholes shall have handles where practical.
Tank name shall be welded beside manhole openings.
Steel coamings around flush manholes on tank top and decks.

31 EQIPMENT FOR CARGO

315 Cargo fittings on 1st deck


Deck arrangement shall include totally sixteen (16) cargo deck sockets with changeable caps. and casing
stanchions.
Deck sockets and parts mounted in the deck shall be stainless steel (SWL 20 tonnes).
The cargo deck sockets must be flush with the deck.

3 EQUIPMENT FOR CARGO 27th of June 2011 - REV B Page 37


Project no: 3720
VS type: VS 470 MPOV Mk III

316 Tarpaulins
Tarpaulins shall be arranged for:
Searchlights
Compass
Mob boat

The tarpaulins shall be of Herquilite or similar quality.


All tarpaulins shall have brass eyelets and lashings.

33 DECK CRANES

331 Offshore crane


Start Option
One (1) electro hydraulic knuckleboom deck crane on 1st-deck SB - side.

Main lift capacity:


60 tonnes at 12m radius.
27 tonnes at 20m radius.
Hook speed max load: 0-25m/min.
Hook speed light load: 0-50 m/min.
Lifting height: 2000m.
Outreach: 4.6 - 20.0m
Fdyn: 1.3

Aux. hook capacity:


15 tonnes at 23m radius.
Hook speed: 0-25m/min.
Hook speed light load: 0-50 m/min.
Lifting height: 100m.
Outreach: 3.8 - 23.0m
Fdyn: 1.54

Crane cradle shall be installed.


The crane shall have self contained electro hydraulic power unit.

End Option

332 Auxiliary crane


One (1) electro hydraulic knuckleboom deck crane on C-deck PS:
Lifting capacity: 3.0 tonnes (SWL).
Working radius: 16.0 m.
Hoisting speed: 30 m/min.
Slewing time: 360° 40 sec.
Wire length: 40 m.
3.0 tonnes hook with certificate.

Crane cradle shall be installed.

3 EQUIPMENT FOR CARGO 27th of June 2011 - REV B Page 38


Project no: 3720
VS type: VS 470 MPOV Mk III

The crane shall have self contained electro hydraulic power unit.

3 EQUIPMENT FOR CARGO 27th of June 2011 - REV B Page 39


Project no: 3720
VS type: VS 470 MPOV Mk III

4 SHIP EQUIPMENT

40 MANOEUVRING MACHINERY AND EQUIPMENT

400 Maneuvring control


Manoeuvring control stations in wheelhouse for main propellers, tunnel thrusters and rudders.
One (1) station forward wheelhouse, two (2) identical in aft wheelhouse and one (1) on each bridge wing
according to GA and NAUT-OSV(T) notation. The manoeuvring system shall be electrical, Ref also SFI 790.

402 Rudder
Two (2) high lift rudders with forged steel rudder-stock and with stainless steel liner and steel boxes.
The rudder trunks shall be integrated parts of the aft ship. The rudder shall be fitted with eye for lifting and
also fitted with filling and drain plugs.
Watertight seal shall be fitted under each steering machine.

403 Steering gear


Two (2) steering gears, electro-hydraulic, according to Class.
Four (4) electro-hydraulic pumps. Rudder angle 2x45 degr.
The steering shall be effected from control positions at bridge, see item 408.
Alarm panel shall be installed at engine control room. All alarms and safety devices shall be according to
Class and Authority.
Oil reservoir with sight glass, level switch, drain plug and fittings.
One (1) 200-litre storage tank for steering gear oil.
The steering gears shall be connected to a Joy-stick control.
It shall be possible to operate the rudders independent of each other and in parallel.

Starters and alarm system:


One (1) panorama rudder indicator.
Two(2) rudder indicators for mounting on console (One(1) forward and one(1) aft).
Two (2) rudder control panels.
One (1) synchronising unit/split rudder.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 40


Project no: 3720
VS type: VS 470 MPOV Mk III

404 Tunnel thrusters


Two (2) tunnel thrusters forward with fresh water cooled motors. Each rating 800 kW.
Two (2) el. driven tunnel thrusters aft with fresh water cooled motors. Each rating 590 kW.
Tunnel thrusters shall have CP propellers.
Gratings in thruster openings, bolted on the propeller side.
Electro motors for tunnel thrusters (if feasible) shall have nipple for SPS Single Point Monitoring for bearings
and vibration.

405 Roll reduction tanks

Roll reduction tank


One (1) roll reduction tank aft, below 1st deck according to General arrangement.
Damping device in the tanks.
The tanks shall be connected to the water ballast system.
A separate roll-indicator picture shall be included in the Vessel Management System indicating the rolling
time, rolling angle, draft, trim etc. of the Vessel.

Anti heel systems


One (1) pair of water ballast wing tanks shall be arranged for anti heel operations, ref. GA.
The pump controlled anti-heeling systems shall primarily be designed to transfer water between the two (2)
water ballast wing tanks.
One (1) frequency controlled (variable rpm) pump with minimum capacity of 1000 m3/hr.
The system shall be manually and auto remote controlled from the bridge.

408 Dynamic postioning system

408.1 Dynamic postioning system


A dual redundant Dynamic Positioning (DP) system, based on two (2) control computers shall be integrated
as part of the IAS, i.e. the hardware and basic software, last edition on delivery, shall be identical with that of
the Thruster Control.

Operational Philosophy
The operations shall be carried out with the Vessel in the DP mode and positioned close up to fixed
installations.
The system shall be arranged for easy change-over from DP mode to manual mode by one (1) single
operation of one bottom.

Software
The system software shall include all modes and functions necessary for an efficient operation.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 41


Project no: 3720
VS type: VS 470 MPOV Mk III

Basic Modes and Functions


The following operational modes shall be provided:
Manual/Joystick Mode.
Auto Mode.
Stand by.
Mixed manual and auto.
Auto heading.
Auto position.
Auto track - high speed/low speed.
Auto pilot.
Stand by / Training.

Manual update of the Off-line Computer

Thruster Allocation
Auto thruster allocation
Two (2) Operator selected allocation modes

Others
Power Load Monitoring and Blackout Prevention.
Alarm System.
Display System.
Built-in Trainer.
Special Functions.
DP On-line Consequence Analysis Class II.
In Class II Consequence Analysis, any single failure shall be taken into account.

Capability Simulation
The operator should see the DP capability as a function of present environmental situation and the
consequences of various possible failure situations. These failure situations shall cover the requirements of
DnV as an extension to what is required by the classification authorities.
In addition the operator shall be able, from the present situation, to change/select any combination of:
Thrusters
Generators/bus ties
Wind, wave and current

The operator shall also be able to display a vessel capability plot based on the selection of these inputs.

Follow Target Mode


The Vessel shall be able to automatically follow a moving target and keep a constant position relative to the
target by use of HPR (option) or Fanbeam position reference systems.

Auto Track (Low Speed)


This mode shall enable the vessel to follow a predefined track between waypoints (leg) with a operator-
defined speed (0 to 4 knots) and heading on each leg. Facilities shall be included for editing way-points,
heading and speed.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 42


Project no: 3720
VS type: VS 470 MPOV Mk III

Alternative Rotation Point


This function shall provide the facility for defining rotation points in fixed positions relative to the centre of
gravity of the vessel, even if this is outside the hull.

Motion prediction
This function shall simulate the motion pattern of the Vessel.

Manual Bias
Special function for over-riding of DP system.

Black box
Function for storing (and possibility for "playback") of all DP and manoeuvring commands, events and
operation.

Hardware
DP System.
Two (2) identical DP Operator Stations shall be provided.
One (1) DP Process Station shall be provided. (Dual computer unit and dual I/O).
One (1) independent Joystick interfaced to the DP-system complete with connection sockets at three (3)
different locations.

Peripherals
One (1) printer (silent type).
One (1) colour hard copy unit.

Interfaces
Position Reference systems:
Two (2) HiPAP SSBL and LBL (network interface only) Hipap Buyers supply.
Two (2) DGPS (providing a NMEA-0183 interface).
One (1) Fanbeam (Serial line).
One (1) Radius 1000 with 500 transponder, Buyers supply.Yard to include interface only.

Sensors:
Three (3) gyro compasses.
Three (3) Motion Reference Unit.
Two (2) Wind sensor.

Power Plant:
Bus tie status.
Generator effect.

Thruster/Propellers:
Ready.
Pitch/rpm setpoint and feedback.

Sensors and Position Reference Systems


Sensors and position reference systems complete with all necessary controls, special cabling and interfaces
to the DP and Thruster Control systems shall be supplied.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 43


Project no: 3720
VS type: VS 470 MPOV Mk III

Sensors
Three (3) gyro compasses.
Two (2) wind sensors.
Three (3) motion reference units, pitch and roll accuracy of better than 0.1%, 1 MRU 2 and MRU 5 or
equal.

High Precision Acoustic Positioning Systems


The Vessel shall be prepared for future installation of 2 x HIPAP systems.
At present only pipe with blind flange thrue vessel bottom and bulkheads shall be installed.

Differential Global Positioning and Glonass Systems


One (1) DGPS/Glonass systems including:
DGPS/Glonass receivers with antenna, computer and operator interface.
One (1) Inmarsat demodulator/interface.

One (1) DGPS/Glonass systems including:


DGPS/Glonass 12 channel, dual frequency receivers with antenna, computer and operator interface.
One (1) Spotbeam demodulator and antenna.

Fanbeam
One (1) Fanbeam laser system including:
One (1) Fanbeam receiver with laser unit, display and control unit.
Two (2) reflective prisms.

The fanbeam laser unit shall be remotely operated and shall have "tilt".

408.2 Joystick system


An independent Joystick system shall be installed, according to rules.
The Joystick system shall be interfaced to gyro, aft rudders and propellers and fwd. and aft tunnel thrusters.
The following modes shall be included:
Joystick mode.
Automatic Heading Control.
Wind compensation.
Auto pilot.

One (1) operator unit shall be mounted in the forward control station. One (1) operator unit shall be mounted
in the aft station and one portable joystick unit shall be provided with a five (5) meter cable to plug into the
bridge wing sockets.

408.3 Machinery system


Any requirements to machinery systems arising from the redundant equipment Class II and the Class
notation AUTR shall be implemented such as for cooling systems, diesel fuel supply etc.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 44


Project no: 3720
VS type: VS 470 MPOV Mk III

408.4 Transponder launching system


Foundation for one (1) gantry and transponder winch shall be arranged on C-deck.
Electrical power for the winch shall be provided.
Equipment shall be Buyers supply.

41 NAVIGATION EQUIPMENT

General
The Vessel shall be fitted out with navigation equipment with all necessary installation and systems for
navigation and operation of this type of Vessel, according to rules and regulations.
All cables for navigation installation shall be Class approved types and shall be fixed according to Class
requirement and group 88 of this specification.
The bridge arrangement and antenna arrangement shall be approved by Buyer, Class and
Authority.
All navigation equipment shall be of IMO approved type, supplied with IMO certificates, and shall be of high
standard and of a recognised brand. The navigation equipment shall have all interfaces necessary to fulfil the
requirement stated in Class and Authority rules.

410 Radar plants


Both radar sets shall be equipped with performance monitor, daylight screen and shall be gyro stabilised. The
antenna units in radar mast shall be fitted with minimum blind sectors (no blind sectors at all in front and on
stbd. side). The radar antennas shall be installed for easy maintenance and service.

The following radar sets shall be supplied and installed:


One (1) radar 10 cm/ S band, IMO ARPA, 20 target. Antenna 12 ft.
Transmitter 30 kW, power supply 230 V.
Display LCD/TFT Maritime ECDIS 20.1"

One (1) radar 3 cm/ X band w/mini ARPA, 40 target. Antenna 8 ft.
Transmitter 25 kW, power supply 230 V.
Display LCD/TFT Maritime ECDIS 20.1".

One (1) radar slave display LCD/TFT Maritime ECDIS 19" for aft installation with
interswitch to 10 and 3 cm radars.
Both radars shall be equipped with interfaces to gyro, speed log, autopilot, DGPS and AIS.

412 DGPS
One (1) DGPS for navigation shall be supplied and installed on the bridge.
The DGPS shall be interfaced to the ARPA radar.
DGPS shall be interfaced to all relevant positioning, navigation and communication equipment (GMDSS).
The DGPS system for navigation shall have interfaces to Navtex, Inmarsat C, VHF/DSC, MF/HF DSC, both
ARPA radars and other relevant positioning and navigation systems. 24V Supply from GMDSS battery.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 45


Project no: 3720
VS type: VS 470 MPOV Mk III

413 Gyro plants, Auto pilot, Compasses

Gyro compass
The following equipment shall be supplied and installed:
Three (3) Gyro compass, common with DP.
One (1) Analogue steering repeater in fwd. console, wheelhouse.
Two (2) Digital repeater with rate of turn indicator for fwd. and aft overhead consoles.
Two (2) Gyro repeaters for azimuth bearings on each bridge wing.
Two (2) Gyro repeater in steering gear room.
One (1) No voltage alarm in wheelhouse.
One (1) Azimuth circle and azimuth mirror.

Gyro compasses accuracy should be class and prepared for DP suppliers requirements.
Gyro signal shall be transmitted to the Radars, satellite navigator, DGPS, course recorder and auto pilot
system.

Autopilot
The Autopilot shall be supplied from the 24V battery system on bridge.
One(1) Autopilot with high accuracy course-keeping, including the following functions and accessories:
"Off-course" recorder/alarm.
Override tiller.
Continues speed adoption.
Memory of the ship's actual behaviour.

One (1) Auxiliary Auto Pilot for control from aft console.
The Autopilot shall have interfaces to gyro compasses, speed log, magnetic compass,
and DP system, Inmarsat C, DGPS and radars (plotting system).

Magnet compass
One(1) Magnetic compass, 10" projector type, including the following functions and accessories:
Illumination, 230V and 24V with dimmer switch.
Azimuth mirror.
Periscope reflector.
Fluxgate coil for connection to autopilot ("off course" alarm).

414 Echo sounder, Speed log

Echo sounder
The Echo sounder shall be supplied from the 230V main system or from 24V battery system on bridge.
The following equipment shall be supplied and installed:
One (1) Echo sounder.
Anchor watch alarm.

Speed log
One(1) Doppler type speed log including the following functions and accessories:

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 46


Project no: 3720
VS type: VS 470 MPOV Mk III

Dual axis.
Bottom tracking and water mass tracking.
Temperature measuring.
Transducer.
Signal splitter.
Gate valve hull fitting.

Two(3) Speed and Distance indicators(steering console, aft console and DP desk).
The Speed log shall be interfaced with both radar, autopilot and DP positioning system.

415 Clinometer
One (1) Clinometer in wheelhouse.
One (1) Clinometer in engine control room.

417 Misc. nautical equipment


One (1) Ship clock of chrome metal with ship's name shall be fitted.
One (1) Radar/signal mast as shown on the GA-plan. The mast shall be fitted with light and signalling
equipment, blocks with lines for flags and day signals.
Jackstaff shall be fitted forward.
One set (1) Signal flags.
Four (4) Thermometers.
Three(3) 6" ship watches.
Two (2) Binoculars 7 x 50 with case.
One (1) Parallel ruler.
One (1) Barometer.
Three (3) Anchor signal balls.
Three (3) Black signal beacons.
One (1) Wind gauge with direction indicator common with DP.
One (1) Bearing plate, Azimuth type.
One (1) Weather facsimile.

418 Radar, Signal and Antenna mast


Mast for a.m. equipment shall be installed according to GA-plan.

419 ECDIS, AIS, SSAS, VDR and SSRS

Electronic Chart Systems (ECDIS)


Dual (2) Electronic Chart Systems shall be interfaced to the DP system,
The systems shall have interfaces to DGPS, radars(tracked ARPA targets), gyro compass, magnet compass,
speed log, echo sounder, autopilot and AIS.
The system shall meet NAUT OSV.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 47


Project no: 3720
VS type: VS 470 MPOV Mk III

Automatic Identification System (AIS)


One (1) IMO approved AIS system with an antenna shall be installed for automatic information of the Vessel's
identity, position, course, speed etc. according to IMO's requirement for this type of Vessel. The system shall
be interfaced to necessary equipment for receiving the required information. The AIS shall be supplied from
the 230V emergency supply system through the Ship's UPS system. The AIS shall be interfaced to radars.

Voyage Data Recorder (VDR)


One (1) IMO approved Voyage Data Recorder (VDR) shall be installed for collecting and storing relevant
ship's data and thereby facilitate the reconstruction of ship incidents at sea.
(Maritime Black Box) The VDR shall be capable of collecting analogue, serial and digital data types and shall
be designed and installed to meet the requirements specified in SOLAS V, IMO A.861.

Ship Security Alert System (SSAS)


One (1) IMO approved Ship Security Alert System shall be installed on the navigation bridge.

Sound Reception System (SRS)


One (1) SRS, according to IMO requirements shall be installed, for transfer of fog signals to the bridge.

Bridge Navigation Watch Alarm System (BNWAS)


One (1) Bridge Navigational Watch Alarm System (BNWAS), according to IMO requirements shall be
installed, for warnings to vessel master in case of the incapacity of the watch-keeping officer due to accident,
sickness or in the event of a security breach, e.g. piracy and/or hijacking etc.

42 COMMUNICATION EQUIPMENT
All systems mentioned in this section shall comply with the authority's rules and regulations.
Radio and communication equipment according to international rules and requirements, GMDSS rules for
area A3.

421 Radio plant


One (1) HF/MF radio station, 150 W with DSC.
One (1) Transmitter antenna AT82T.
One (1) Antenna AT82.
One (1) Power supply and equipment for GMDSS A3 station.
One (1) Computer distribution unit DD-20 for NMEA.
Two (2) Semi duplex VHF with within build call sign .A DSC.
Four (4) Antenne AV7 VHF Dipol.
Two (2) Inmarsat C with EGC receiver.

422 MOB boat radios, EPIRB, Radar transponders


One (1) Jotron automatic EPIRB.
Two (2) Radar transponders.
Three (3) Portable GMDSS-VHF.
One (1) Jotron, Tron 45SX manual emergency beacon GMDSS.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 48


Project no: 3720
VS type: VS 470 MPOV Mk III

423 Local area network (LAN)


Data communication network (LAN)
An on-board Ethernet data communication network of marine type shall be installed.
The network shall be the interface between all workstations onboard and shall consist of shielded twisted pair
high quality Cat. 5 wire-braid armoring cables, network hub, multi-port repeaters and router according to
manufacturer/ Buyer's standard, with interface to V-Sat system Ku-band and mobile telephone system for
connection to e-mail system.
Arrangement drawing shall be approved by Buyer.

Wiring shall be provided to Data sockets in the following rooms:


Engine Control Room(1 pcs.).
All offices.
Wheelhouse (2 pcs.).
Captain, Master Chief Engineer and Owner's cabins.

424 VHF, UHF and Mobile telephones


Three (3) Portable, ex proof UHF-Motorola.
Three (3) Helmet equipment for Motorola.
Two (2) Smoke diver helmet equipment.
Foundation, cabling and the KU band equipment shall be installed.
Two (2) Simplex VHF with handheld mic.
Two (2) Remote connections to semi duplex VHF and speaker.
Two (2) Antenne AV7 VHF Dipol.
Two (2) Interfaces for fwd and aft VHF's for aft operator chairs.

425 Calling, command and telephone systems


Integrated telephone, PA and intercom system
The arrangement drawing with location of sub-stations shall be approved by Buyer.
A programmable integrated automatic exchange telephone, intercom, call logging and Public Address system
approved by Authority and Class shall be installed, with capacity of minimum 40 lines, operation on 230V AC
main supply and with 24VDC back-up supply (automatic change-over). Main station shall be located on the
bridge.

The system shall be equipped with the following functions:


Call transfer, take call, short message and programmable wake up call etc.
Master and radio console station shall have group call facility.
Communication between bridge and engine shall have first priority.
Master stations shall be low-speaking with communication to all stations.
Sub-stations shall be loud speaking with communication to bridge.
All sub-stations in accommodation with possibilities for hands-free or private conversation by use of
handset.
Minimum six (6) speech channels.
Call-logging system, programmable.

Sub-station shall be installed in the following rooms:


One(1) in each corridor.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 49


Project no: 3720
VS type: VS 470 MPOV Mk III

One (1) in;


Master/bridge
Radio operation desk
In each cabin
In each office
In each day room
Mess room
Conference room
Hospital
Changing room
Galley
Gymnasium
Deck workshops
Engine room
Engine control room
Instrument room
Steering gear room
Engine room workshop
Emergency generator room
Electrical workshop

Ten (10) external substations with separate loudspeaker, IP 56.


Four (4) wireless headsets with microphones for high noise areas.

Sound powered telephone


The following sound powered battery-less telephones shall be installed:
Between bridge and engine room.
Between bridge and gear area.
Between bridge and emergency generator room.
Between bridge and engine control room.
Between bridge and fire control station.
Between bridge and steering gear room.

Relay for external signal device shall be fitted on telephones in engine room, engine control room, gear room
and emergency generator room. Signalling device shall be fitted on telephones in the same rooms and shall
be of an electronic siren type (yoda light).

427 Light and Signalling equipment


All systems mentioned in this section shall comply with the authority's rules and regulations.

Lanterns
Lanterns, cables and control panels shall be supplied from emergency generator in addition to main electrical
supply. All navigation lantern stations to have duplex lanterns.
Control panels shall be fitted with audio and visual alarm, plug in type relays and shall be located on bridge.
All signal lamps, navigation lamps etc. shall be of cast brass/copper/bronze, min. IP 56 and solid
construction.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 50


Project no: 3720
VS type: VS 470 MPOV Mk III

Morse lamp
One (1) Morse lamp shall be fitted in mast.
One (1) Day Morse lamp, Aldis or equivalent.

Typhoon etc.
One (1) thermostatic heated typhoon of enclosed type, with automatic fog signal.

Sound & visual signals


One (1) Ships bell, 300mm, located on forecastle deck.
One (1) Megaphone.
Three (3) Anchor signal balls.
Three (3) Black signal beacons.

Searchlights
Three (3) Searchlights shall be fitted on the wheelhouse roof, one(1) located fore and two (2) aft with the
following functions and accessories:
Remotely (electrically) operated from inside bridge.
Variable focus.
Capable of giving 360° total coverage.

Signal flags, national flags


Flag locker for all flags (50) shall be provided and located on the bridge.
Six (6) flag lines with blocks shall be fitted to the yard arms of the main mast.

43 ANCHORING AND MOORING EQUIPMENT

431 Anchor with chain and equipment

Anchors
Two (2) stockless spec anchors in accordance with Class requirements grade K3.
Two (2) anchor chains length in accordance with Class requirements.

Chain cables and shackles etc.


Anchor chain shall be Grade K3. Diameter in accordance with Class requirements.
In addition, one Kenter type shackle shall be arranged between the gypsy and the cable stopper.
Cable clench shall be fitted at the higher part of the chain locker and each chain shall be connected to the
clench with two sets of end-links.
Releasing of chain shall be possible from outside of the chain locker.

433 Windlasses with chain stoppers, rollers etc


One (1) anchor windlass/mooring winch with closed gear box shall be installed on C-deck.
The windlass / mooring winch shall be electro hydraulic driven, start/stop of HPU unit from bridge, and shall
consist of:

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 51


Project no: 3720
VS type: VS 470 MPOV Mk III

Two (2) declutchable cable lifters with band brake, (approx.) 12 tonnes pull at 0 - 14 m/min.
Brake control : Manual.
Brake holding load : According to Classification Society's requirements.
Two (2) declutchable drums with dimension dia. 400 mm / dia. 1250 mm, length; 1000 mm.
Manual brake control.
Two (2) free end warping heads.
Two (2) chain stoppers with lashing screw for chain Grade 3 steel stud link chain cable.

434 Capstans and Tugger winches

Capstans
Two (2) electro-hydraulic driven Capstans aft on 1ST deck.
Capacity: 8 tonnes.
Each Capstan shall have warping head.
Brake control: manual.
Protection bars and roller fairleads in cargo rail.
Local control and remote radio control.

Tugger winches
Two (2) electro-hydraulic Tugger Winches, pull: 10.0 tonnes.
Wire capacity: 60 m.
Local control and remote radio control. Constant tension function.
Protection bars and roller fairleads aft of Tugger Winches.

Option
The hydraulic pipes shall be terminated at forward part of buoyancy tanks. Both tugger winches shall be
stowered on 1st deck.
At the option of the Buyer the winches shall be installed at the nere by location, and commit ion without any
additional costs.
End option.

435 Fixed mooring equipment


All bollards and chocks as required by Class and Panama authorities, minimum:
One (1) bollards (ND 500) in center C-deck.
Four (4) bollards (ND 400).
Eight (8) Chocks (305 x 230).
One (1) Double chock (355 x 255).
Two (2) Roller fearleads.

Bollards shall be of welded design and shall be welded to a foundation on deck with eyes for stopper ropes
welded to the base.
Three (3) horizontal rollers (mounted on top of bollards).
Two (2) double rollers recessed in top of bulwark.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 52


Project no: 3720
VS type: VS 470 MPOV Mk III

436 Loose mooring equipment


The Builder shall deliver ropes and wire according to Class requirements. Synthetic lines shall be
polypropylene type.

437 Towing equipment


Complete arrangement to fulfill IMO requirements for emergency towing.

44 REPAIR AND CLEANING EQUIPMENT

441 Repair and maintenance equipment


One (1) Lathe, 1000 mm centre distance, with standard equipment, 250 mm centre height.
One (1) Drilling machine with standard equipment, 30 mm drills.
One (1) Grinding machine with two (2) grinding discs of abt. 150 mm.
One (1) Electric welding machine.
One (1) Wash basin of stainless steel with hot and cold water, drain to bilge in engineroom.
One (1) Steel topped bench with drawers and lockers underneath.
One (1) Flexible lamp shall be fitted with the grinding machine.
One (1) Flexible lamp shall be fitted with the drilling machine.

For propulsion machinery, auxiliary engines and separators, hand tools shall be delivered according to the
manufacturer's standard delivery including special tools for removal of piston, liners, propellers, shafts,
rudders, steering gears, thrusters etc.
All tools shall be located on tool boards, in shelves and in drawers/lockers arranged in the engine room
workshop.

Lockers with sea fastening for total of ten (10) bottles shall be arranged on 1st deck (bottles delivered by the
Buyer).
One (1) set gas welding and cutting equipment with 60 m hoses.
Welding benches shall be arranged in deck workshop.
Ventilation suction shall be arranged above welding bench.

Tray, abt. 1000 x 1000 mm, with 50 mm coaming for cleaning of big filters with drain to sludge tank shall be
arranged below floor in engine room.

444 Washing system


A high-pressure washing system with hot and cold water shall be installed. The system shall be equipped
with two (2) pumps, one (1) as stand-by pump, capacity approx. 2000 ltr/pr hours at 200 bars.
Two (2) pistols and 50 m hoses.
Hot and cold water supply for the high pressure washing machine.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 53


Project no: 3720
VS type: VS 470 MPOV Mk III

445 Incinerator
One (1) incinerator, with capacity min. 500 000 kcal/h shall be arranged in separate room.
Arrangement for burning of solid waste, plastic and sludge oil shall be included.
One (1) sludge tank in incinerator room.
The incinerator shall be in accordance with MARPOL 73/78, Annex II, reg. 16.

446 Outfitting in store rooms


Storerooms and workshops shall be arranged as shown on General Arrangement drawing.
Arrangement and number of shelves shall be according to Buyer's advice.
Paint stores shall be arranged with shelves and workbench.
Steelwork benches in engine room workshop and in deck store / deck workshop shall be installed.
The work benches shall have one (1) 6" vice per bench and two large drawers.

448 Nameplates for Machinery, Equipment, Piping etc


All valves, sounding pipes, covers, doors, starters, switchboard, manoeuvre desk etc. shall be marked with
signs and have English text.
The pipelines shall be marked with international colour system.
All escape routes in accommodation and in machinery spaces (Emergency exits) shall be marked with
illuminating signals at the floor level (Photo luminescent type material not requiring external power).
Valves, doors and all external marking shall be fixed with screws. Accommodation internal doors marking
shall be on plastic plates.
External nameplates shall be of stainless steel and fixed with stainless steel rivets.
All tank vent pipes, sounding pipes and loading points shall be colour marked.
All ventilation openings on deck shall have labels with white text on red background (text according to
drawings). Size abt. 150x80 mm.

45 LIFTING AND TRANSPORT EQUIPMENT FOR MACHINERY COMPONENTS

452 Travelling cranes and lifting equipment in engine room


Two(2) trolley beams with 1000 kg hoisting gears for lifting parts from main engines, leading to the flush
hatches in 1st deck.
Lifting eyes marked with SWL shall be fitted above all heavy machinery and above all electrical motors above
two hundred and fifty (250) kg.

4 SHIP EQUIPMENT 27th of June 2011 - REV B Page 54


Project no: 3720
VS type: VS 470 MPOV Mk III

5 EQUIPMENT FOR CREW

50 LIFESAVING EQUIPMENT

500 General
All equipment shall be in accordance with the rules and regulations and with certificates.
The Vessel shall be fully equipped for the total number of crew and passengers, totally
sixty (60) persons.

501 MOB-boats with equipment


One (1) MOB boat with certificate for six (6) persons. Driven by a diesel engine and waterjet. Min speed 25
knots fully loaded.
One (1) Single point davit.
The davit with winch shall be electro hydraulic, offload release hook, type Henriksen, certified for launching
MOB boat.

502 Life rafts with equipment


Life rafts according to rules for sixty (60) persons.
Survival suits for sixty (60) persons.
Four (4) life buoys with light and line.
Two (2) life buoys with line.
Two (2) life buoys with light and smoke signal.
One (1) line-throwing appliance with lines.
Life jackets for totally sixty (60) persons.

All equipment shall be of approved type.


All life belts, life buoys and survival equipment shall be marked with the ship's name and home port.
Safety-, danger- and rescue plans shall be put up on the wall.
Lockers for survival suits and life jackets shall be installed.

503 Emergency marking


All escape routes (EMERGENCY EXITS) shall be marked with illuminating signs at the floor level. Under
deck and in the engine room the escape routes shall be clearly marked by means of painted arrows pointing
to the exits.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 55


Project no: 3720
VS type: VS 470 MPOV Mk III

504 Medicines and first aid equipment


Medicines and first aid equipment according to rules and regulations.

505 Loose fire-fighting equipment


Fire extinguishers of acknowledged make shall be delivered in number and placed acc. to regulations. Glass
cabinets containing axe and torch shall be fitted near exit doors to deck.
Fireman's equipment to consist of two (2) smoke diver sets with sufficient spare air bottles.

Compressor and facility for refilling of bottles shall be installed.


Hose stations shall be marked with "Fire Hose".
Hose station equipment in accommodation, if required, shall be kept in locker built in flush with bulkheads.
Fire hoses and nozzles acc. to rules and regulations.
One (1) international fire coupling.

51 INSULATION, PANELS, BULKHEADS, DOORS, SIDE SCUTTLES AND WINDOWS

510 General
The accommodation shall be arranged for sixty (60) persons according to GA.

511 Insulation, bulkheads and panelling


Insulation against ship's side, outer walls and decks of 100 mm fireproof mineral wool mats.
The insulation shall be calculated for an inside temperature of +22°C and an outside temperature of -20oC
(max. K-value: 0,75 W/m2 ° C).
Insulation between decks in accommodation shall be 75 mm mineral wool mats.
PVC film between insulation and ceiling panels in bridge and instrument room.

A complete module based non-progressive incombustible partition and ceiling system shall be used for the
whole accommodation. Panelling shall be 25 mm thick against outer walls and outer bulkheads, and 50 mm
thick panelling between rooms in accommodation. Included in the system shall be all internal doors complete
with frames and hardware. Surface material throughout the accommodation in accordance with the
regulations. The ceiling panels shall be 100 mm wide, except in galley.
Special noise and heat insulation shall be provided against the ventilation room and the casing and
emergency generator room.
Lining and ceiling in galley shall be of stainless steel.

512 Doors with coamings in accommodation


Doors in accommodation shall be type B - 15. Coamings shall be of steel.
Ventilation opening with closing valve in the lower part of the door. All accommodation doors shall have
handles and a master-key system.
Doors to change room, ventilation room and stairways shall be A-0 steel doors.
Doors for galley and laundry shall have light opening of min. 730 mm.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 56


Project no: 3720
VS type: VS 470 MPOV Mk III

Master key system for all doors.


For remote controlled sliding doors, see sfi gp 236.

514 External doors with coamings


Light opening about 730 mm for all external doors, except for doors to stores rooms etc. that shall be 650
mm.
Doors from open deck to wheelhouse shall be of aluminium with steel coaming.
Other doors from open deck to accommodation, storerooms etc. shall be steel doors with steel coaming. All
doors with hooks, handles and master-key system.
Doors to accommodation shall have window with diameter min. 250 mm.
All movable parts shall be of brass / stainless steel.

515 Side scuttles and windows

Wheelhouse
Windows in wheelhouse according to GA-Plan.
Blind covers according to the rules.
The window frames shall be welded to the wheelhouse. All windows to be protected from welding sparks and
marks.
Straight-line type window wipers in accordance with NAUT-OSV.
Freshwater flushing shall be arranged for all windows.
The system shall be controllable from the aft console.
Heating in three (3) wheelhouse windows forward and three (3) aft and in accordance with NAUT OSV.

Accommodation
Portholes or windows in all living rooms, galley and mess room.
Portholes shall have a light opening of 400 mm.
Rectangular windows, min. 450 mm x 600 mm. At least one (1) hinged window/porthole in each
cabin/accommodation room which is intended for vessel crew. All windows shall be of "weld-on type" with the
main frame of steel and the glass frame of brass.
Portholes shall be operable with blind covers of steel.
Steel blind covers for windows in front bulkhead.

52 INTERNAL DECK COVERING, LADDERS, STEPS, RAILING

521 Deck base covering, internal


Steel deck in accommodation shall be covered with approx. 10-15mm Marine Elastic 4660 or equal underlay.
Sound insulated floating floor on 1st deck and A- and B -deck in accommodation (except galley and provision
room) and elsewhere if necessary to meet comfort Class.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 57


Project no: 3720
VS type: VS 470 MPOV Mk III

522 Deck top covering, internal


Vinyl covers in accommodation.
Plastic imitated ship flooring in wheelhouse, captain and chief engineers' cabins and mess- and dayroom,
"shipdeck" flooring. Wheel house Ship deck flooring shall be made on the top of 19mm marine plywood
without any undulation.
In galley and sanitary rooms, non-skid ceramic tiles laid in plastic cement.
Galley shall have gutters with a stainless steel grating above the gutters.
In engine control room, and switch board room there shall be raised floor with vinyl coverage of non-skid
mats.
The vinyl shall be of Heavy Duty type.

524 Stairs, handrails in accommodation


Ladders shall be of steel.
Handrails on both sides in all passageways and stairs.
Stairs in accommodation shall have light metal nosing.
Paint on floors in storerooms.

525 Floor plates, ladders and pl.forms in engine room


Loose floor plates in engine room, cargo area and tunnel thrusters room shall be made of chequered 5 mm
aluminium plates or galvanised gratings screwed onto steel beams. Steel floor plates only where required by
Class for emergency exit in machinery spaces.
Above valves, mud boxes, filters etc.(steel plates shall only be used where aluminium are not approved by
Class) removable floor plates shall be fitted. Further ladders, with open treads, steps, rail stanchions and
handrails.
Grating and platforms where necessary for access.

526 Ladders, Platforms, Railings etc in tanks


Good access shall be arranged to all tanks.
Steps, handrail etc. shall be fitted for internal inspection.
Ladders for access to tanks.
Platforms for cleaning freshwater tanks.

53 EXTERNAL DECKS

531 Deck covering


See paint specification Item 270.
All escape ways to have non skid coating.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 58


Project no: 3720
VS type: VS 470 MPOV Mk III

533 Hand rails, Railings and Gates


Rails shall be provided on all decks where no bulwarks are provided.
Storm rails shall be fitted outside of the accommodation.
Pipes and stanchions shall be hot galvanised prior to mounting on the Vessel.

534 Ladders and Steps


External ladders shall have open treads and handrails on both sides of galvanised steel pipe. The ladders
shall be bolted to clips welded to deck and shall be galvanised.
One (1) vertical ladders from bridge deck to top of wheelhouse and from bridge deck to
platform on top of wheelhouse.
Suitable vertical steel ladders or vertical steps shall be provided for mast.
Galvanised steel gratings on steel frames outside exterior accommodation doors.

54 FURNITURE AND INVENTORY

541 Furniture for Crew


Beds, writing desks, shelves, closet and similar in cabins, mess etc to be of laminated chipboard
construction.
Chairs, office chairs and sofas to be made of wood or steel construction with upholstery.
Sofas in dayroom to have upholstery of foam plastic and covered with leather, fabric or PVC of suitable color.
Chairs in mess room to have upholstery of foam plastic and covered with imitated leather or fabric.
The tables to be made of chipboard plate, covered with plastic laminate on the upper side and contra
laminate on the lower.
Beds shall have dimensions min. 800 x 2000 mm.
250 mm x 1000 mm lee board above mattresses and 1000 mm level with mattresses.
Mattresses for all beds, 180 mm thick of good interior sprung quality with fire-resistant covers.
Beds shall have two (2) drawers beneath. Drawers shall have lock.
Free-standing furniture shall have means of securing.
Safe in Captain's cabin with writing desk and chair.

Showers/Toilets shall have:


Showers shall be recessed 150 mm.
Minimum net height inside the wet room modules shall be minimum 2050 mm.
One (1) Shower with thermostatic mixing valve.
One (1) Hand basin.
One (1) Toilet.
One (1) Mirror with shelf and cupboard with positive catcher (not magnetic).
Two (2) Towel hooks.
One (1) Glass holder.
One (1) Toilet roll holder.
One (1) Shower curtain. Shower curtain to be mounded 10 cm inside of recess.
One (1) Handle in the shower.
One (1) Towel rail.

Cabins without bathroom shall have washbasin with cold and hot water.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 59


Project no: 3720
VS type: VS 470 MPOV Mk III

Hospital
Hospital room on 1st deck with:
One (1) table with drawers.
Lightning powered from emergency generator and main generator.
Wash hand basin with elbow taps for hot and cold water.
Portable shower head with extending hose.
Instrument table.
Medical cabinet (locked).
Communication to bridge.
Two (2) lockers.
One (1) chair.
One (1) bed.

FURNITURE IN CABINS

State Single Double


Cabins Cabins Cabins

Prefabricated toilet block 1 1 1

Bed 1 1 2

Chair 0 1 1

Easy Chair 1 0 0

Wardrobe 1 1 2

Desk 1 1 1

Book shelf 1 1 1

Sofa 1 1 1

Sofa table 1 0 0

Coat hook 2 2 4

Fridge (built-in) 40 l 1 0 0

Cupboard 1 1 1

TV 1 0 0

Furnityre in living quarters

Mess
Thirty-six (36) seats.
Six (6) tables.
One (1) hat rack with clothes hooks.
Shelves.
One (1) dispenser for cups, glasses and plates of wooden material.
One (1) notice board (600 x 1000).
Desk for food, cooled.
Desk for hot food.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 60


Project no: 3720
VS type: VS 470 MPOV Mk III

Dayroom I
Eight (8) sofa seats.
Five (5) armchairs.
One (1) book case, full height.
One (1) cabinet for Hi-Fi and TV /video (with drawers).
Two (2) tables.
One (1) flower arrangement.

Dayroom II
Eight (8) sofa seats.
One (1) cabinet for Hi-Fi and TV / video (with drawers).
One (1) tables.
One (1) flower arrangement.

Ship office (B-deck)


One (1) writing desk with drawers
Two (2) computer tables
Two (2) revolving chair
Two (2) file cabinets (3 drawers)
Three (3) coat hooks
One (1) white board
One (1) drawing locker
Two (2) shelves (above desk)

ROV office (B-deck)


One (1) writing desk with drawers.
Two (2) computer tables
Two (2) revolving chair.
Two (2) file cabinets (3 drawers).
Three (3) coat hooks.
One (1) white board.
Two (2) shelves (above desk).

Client office (A-deck)


One (1) writing desk with drawers.
Two (2) computer tables.
Two (2) revolving chair.
Two (2) file cabinets (3 drawers).
Three (3) coat hooks.
One (1) white board.
Two (2) shelves (above desk).

2 x offices (A-deck)
One (1) writing desk with drawers.
Two (2) computer tables.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 61


Project no: 3720
VS type: VS 470 MPOV Mk III

Two (2) revolving chair.


Two (2) file cabinets (3 drawers).
Three (3) coat hooks.
One (1) white board.
One (1) drawing locker.
Two (2) shelves (above desk).

Conference room
One (1) Conference table with eight (8) chairs.
Three (3) coat hooks.
One (1) white board.

Male changing rooms, 1st deck


Fourty-six (46) lockers.
One (1) hand washing basin in stainless steel with three (3) mixing batteries.
One (1) toilet.
One (1) shower.
One (1) garbage bin.
Three (3) paper holders.
One (1) mirror.

Female changing room on 1st deck


Twelve (12) lockers.
One (1) hand washing basin in stainless steel with cold and hot water.
One (1) mirror.
One (1) toilet.
One (1) shower.
One (1) garbage bin.
One (1) paper holder.

Duty mess
Two (2) L-sofas w/12 seats.
Two (2) sofa tables.
One (1) Coffe/Tea machine.
One (1) Sink w/hot and cold water.
One (1) drinking fontaine.

Gymnasium
One (1) Exercise bicycle.
One (1) Rowing exercise machine.

The gym shall be arranged with good ventilation.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 62


Project no: 3720
VS type: VS 470 MPOV Mk III

542 Furniture in wheelhouse


Maneuver desks and consoles with hinged front and side doors shall be arranged according to class and IMO
requirements, including:
One (1) Radio table.
One (1) Wheelhouse chair forward, sliding chair (leather cover).
Two (2) Wheelhouse chairs aft with manoeuvre controls, sliding chairs (leather cover).
Two (2) Chairs in radio area.
Two (2) Lockers for flags (with door).
One (1) Chart table with chart drawers, table to be suitable arranged in order to also be used as
emergency common central.
One (1) Chart lamp.
One (1) Wash basin cold and hot water and with shelves.
One (1) Coffee machine, 2 litres.
One (1) Drinking water fountain (hot and cold water).
One (1) Refrigerator, 50 litres.
One (1) Whiteboard, 600 x 1000 mm.
One (1) Garbage bin.

543 Mattresses
One (1) inner spring and polyurethane foam mattress of 180 mm thick of good quality with fire resistant cover
shall be supplied for each bed. Mattresses shall be of standards commercial grade and furnished by the
Builder. The mattress cover shall be made of cotton. Mattresses shall fit with a suitable clearance in berth.

544 Curtains w/equipment


Curtains and roller blinds fitted for all portholes and windows except wheelhouse and galley
Chart table shall be encircled by light proof curtains.
Transparent sunshield roller curtains on all windows in wheelhouse.
The roller curtains shall be recessed in wheelhouse ceiling when not in use.
Curtains on all beds in two (2) man cabins.

546 Entertainment equipment

TV/video entertainment system.


TV antenna signals shall be taken from the V-Sat system (see group 424).
Four (4) tuners shall be installed on a rack. The central TV antenna system shall be distributed by sufficient
numbers of amplifiers and antenna signal splitters around the Vessel with TV antenna sockets in all cabins,
mess room and dayroom.
36" colour TV sets shall be installed in dayrooms and in state rooms. In day rooms and state rooms also a
video player and DVD player shall be installed and connected to the antenna system.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 63


Project no: 3720
VS type: VS 470 MPOV Mk III

55 GALLEY, PANTRY, PROV. AND LAUNDRY EQUIPMENT

551 Galley and Pantry


Layout of galley and mess shall be according to Buyer's approval.
Galley and pantry equipment shall be of good ships quality.
Two (2) Refrigerators, one(1) in the mess room and one (1) in the galley, each 300 litres.
One (1) Bain Marie with 4 trys minimum in mess room serving 60 persons for hot food.
One (1) Combined steamer with capacity 8 l/l GN, min. 6 kW, water consumption: 25 litres/h. Including
stand.
Two (2) Galley range with four (4) burners and large size baking oven.
One (1) Dishwasher, horizontal marine type.
One (1) Coffee percolator, 5 litres.
One (1) Micro wave oven in galley and one (1) in messroom.
One (1) Mixmaster, type Kenwood chief or similar with standard delivery.
One (1) Mixer, min. 10 litres, with ked/mix and grating attachment.
One (1) Potato peeler, 5 kg/ min.
One (1) Electric slicer.
One (1) Salad bar with 4 trays minimum in mess room serving 60 persons for cold food.
One (1) Baking tray in Sanipan with flour drawers below.
One (1) Meat chopping block.
One (1) Meat saw.
Two (2) Big trash cans.
One (1) Fat fryer with ventilation system.
One (1) Convection oven.
One (1) Stainless steel sink with two (2 ) basins of large and deep type and draining board.
One (1) Stainless sink for hand washing.
One (1) Garbage compactor.
One (1) Garbage grinder.

Required lockers, shelves, drawers and benches shall be of stainless steel.


Bulkhead lining shall be of stainless steel.

552 Equipment / Outfitting in Galley


Galley in general shall be arranged as given on the arrangement drawing.
Arrangements taps for washing galley floor with warm / cold water.
All stainless steel worktops, sinks etc. shall have stainless steel fronts with drawers / cupboard doors fitted as
appropriate.
All galley linings, ceilings and outfitting shall be stainless steel.

Stainless steel deep gutter with scuppers shall be arranged around perimeter of galley to provide good
drainage.
Drawers and lockers shall be arranged as place permits, and to common practice.

One (1) working bench shall be arranged with drawers and lockers. Work benches and cabinets shall have
exposed corners rounded wherever practicable. Working benches, shelves, drawers and lockers shall be of
stainless steel.
Plug sockets for galley machinery shall be arranged.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 64


Project no: 3720
VS type: VS 470 MPOV Mk III

A ventilation hood of stainless steel with grease trap channel / drain and removable filter of stainless steel
mesh shall be arranged above the galley range, fat fryer and gyro pan and convection oven.

554 Freezing and refrigeration system

Provision rooms
Refrigerated and non-refrigerated dry provision stores shall be arranged with aluminium shelves minimum
600 mm as shown on the GA plan.

Temperatures:
Cold room: approx. -25° C
Cool room: approx. + 4° C
Dry provision room: approx. + 8° C, connected to the AC system.

Dry provision room


Linings and ceilings for non-refrigerated dry provision store shall be 12 mm water resistant panels. Door shall
be 700 x 1980 mm.
Dry provision room shall be connected to air conditioning plant and with separate extraction fan.

Refrigerated provision rooms


Refrigerated spaces shall include cold and cool rooms.
All insulation shall be min. 200 mm mineral wool mats. Lining and ceiling shall be 12 mm water resistant
panels.
All internal sealant shall be food safe silicon. All doors shall be 700 x 1980 mm clear opening.
The refrigeration plant shall be fresh water cooled and fully automatic, with one (1) working and one (1)
standby compressor units. Each compressor of 100% capacity. Each compressor capacity is based on a
maximum running time of 18 hrs per day.
Cooling of the chambers shall be direct expansion unit air coolers with ribbed copper tube cooling section and
electric fan.
Automatic defrosting, door seal and sump drain heaters shall be fitted.
Door and fittings shall be of stainless steel.
Doors shall have handles on both sides.
Internal alarm in all provision rooms.

Refrigerated compartment alarm system


Refrigerated compartment alarm system shall be provided as follows:
Water-proof type push-button with lamp in each refrigerating chamber.
Bells with a red pilot lamp in the corridor, galley and on bridge.
Bells shall be clearly marked to indicate the nature of the alarm.

The system shall be fed from the 24 VDC supply system.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 65


Project no: 3720
VS type: VS 470 MPOV Mk III

558 Laundry
Laundry equipment:
Three(3) Washing machines, fully automatic, each capacity of 7 kg.
Three (3)) Tumble dryers, each capacity of 7 kg.
One(1) Stainless steel washbasin.
Two (2) Locker (shall be made of stainless steel).
One (1) Ironing table.

All equipment shall be of marine type. All mounting frames shall be of stainless steel.

559 Garbage room


One (1) garbage room (combined with Incinerator room) on 1st deck with ventilation fan.

56 TRANSPORT EQUIPMENT FOR CREW

564 Gangway
One (1) light, aluminium gangway with handrails and safety net, length about 8 m shall be delivered.
One (1) Pilot ladder on each side.
Two (2) Platforms for gangway, one(1) each side on A-deck aft superstructure.

57 VENTILATION, AIRCONDITION AND HEATING SYSTEMS

General
The ventilation system shall be design to:
Maintain acceptable working and living environment for personnel.
Maintain no- destructive condition for equipment.
Prevent formation of combustible mixture and maintain an atmosphere where the gas / air mixture is kept low
during normal operation.
Prevent smoke spreading and keep enclosed escape ways free from smoke in case of fire.

571 Ventilation and Aircond. systems for Accomodation (HVAC)


The system shall have capacity to include the accommodation and the mezzanine deck.

Accommodation, navigation and control spaces shall be air conditioned from a central system:
Air conditioning Unit (HVAC), ...... 1 x 100 %.
Included also:
Chilled water units, .................. 2 x 60 %.
Defroster system for wheelhouse.

Design Conditions

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 66


Project no: 3720
VS type: VS 470 MPOV Mk III

Ambient conditions Ambient conditions Interior Condition Interior Condition

Conditions Temp °C Rel.humidity % Temp °C Rel.humidity %

Summer primary data +35 70 +22 50

Winter -20 +20 50

Vendor specific HVAC specification to be prepared and submitted for approval. Final approved vendor
specification will be binding and will supersede the guidance in this specification.

The cooling machinery shall be designed for fresh water-cooling, temp.: 38o C.

Air condition plant


A fully automatic air-conditioning plant (HVAC) for heating, cooling and ventilation of accommodation shall be
provided, in compliance with the relevant Regulations.
The plant shall be of modern design with special consideration towards energy recovery, low power
consumption and low noise level in cabins.
The system shall be arranged with single- ducting and separate pre-heating element with Individual
temperature controlling for each cabin / room.
Fans shall be frequency controlled.
The plant shall be designed for 50 (100) % fresh air supply, but also with possibility to run the system with
variable ratio of re-circulated air, up to 50 %.
It shall be possible to control the ventilation system to ensure a comfortable temperature and sufficient
changes of air without draft under the climatic conditions under which the unit is specified to operate.
The relative humidity shall not be below 30 % or above 70 %.
Engine control room / Switch board room 2 x 100% cooling capacity.

The following shall be included in the (HVAC) plant:


Inlet section with dampers for mixing of fresh air and return air.
Filter section.
Cooling section.
Hot water heating section.
Fan section with two-speed motor.
Outlet-/ sound damper section.
Base frame.

Intake shall be of ample size and arranged with water trap and drainage to scupper. Air inlets shall be located
so as to prevent water ingress hazards.
Exhaust from offensive odour rooms shall be routed to the outside and away from and over air inlets.

Air vents from health offices, galleys, laundries and lavatories shall be led in special ducts and never be re-
circulated.
Axial fans shall be mounted by min. 5 mm soft packing and neoprene insulated bolts. Silencers shall be
included for all axial fans.
Spare parts necessary to ensuring continuous operation of the plant shall be included.

Offensive odour rooms such as galley, garbage incinerator room, shall be under low pressure to prevent
possible offensive odours to enter crew areas.
All ventilation openings shall have closing arrangement according to rules.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 67


Project no: 3720
VS type: VS 470 MPOV Mk III

Galley
The galley shall have a separate supply and exhaust system with two (2)-speed fan motor.
The exhaust system in galley shall be fitted with galley hood and fat filter above the galley range and
convection oven and deep fryer. The galley hoods shall extend well outside the equipment it is designed to
cover.

A sufficient number of cabin units with adjustable air-flow and with built in electric heater shall be fitted in all
rooms.
The heaters shall be thermostat controlled and heating element shut off in case of fan stop.
All sanitary spaces, change room, dayroom and laundry shall be fitted with separate exhaust system.

The air in conditioned spaces shall exhaust into corridors and private toilets through door louvers and under
cuts.
The air in corridors shall exhaust naturally to open air exterior or shall be re-circulated back to the air-handling
unit.
The air in hospital, laundries, change room, and sanitary spaces shall not be re-circulated.
A separate exhaust system for laundry including tumble dryers shall be provided. Fan with el.motor outside
air-stream.

Ducting
Pre-insulated spiral ducting - outer and inner galvanized steel tube with intervening layer of mineral wool
insulation. Duct fittings comprise either moulded internal mineral wool insulation with a lining of neoprene
rubber or to be of double wall construction with intervening insulation depending on size and type.

Cooling
The cooling system shall be based on circulation of Chilled water.
Chilled water plant shall be provided, consisting of two (2) separate modules, each having minimum 60% of
the total required need for cooling.
The cooling compressors / cooling units shall be located in engine room. The refrigerating fluid shall be
R407c.

Heating
The AC unit to have a electric heating battery.

572 Ventilation for the remaining parts of the vessel


General
Ventilation shall be arranged for all daily accessible spaces. The listed rooms / compartments shall have
mechanical ventilation indicated with min. air change rates in term of volume / hour.
For final determination of ventilation capacity for each area, a thermal calculation shall be executed taking
into account a realistic number of people, electric load, heat radiation from equipment etc. and the heat
transmission factors.

Mechanical Natural

Room/Compartment Suppy Exh. Supply Exh. Remark

Navigation Bridge 10 x Separate Cooling unit + HVAC,


Defroster

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 68


Project no: 3720
VS type: VS 470 MPOV Mk III

Instrument room 8 x Separate Cooling unit + HVAC

Bow Thruster room 8 x

Main Engine room x x Two(2) frequency controlled fans

`Cargo` Area 8 x

El.Workshop 8 x

General Store 6 x

Engine Room Workshop 8 x

Engine Room Stores 6 x

Engine Control room 8 x Separate Cooling unit

Provision Handling Room 10 x Connected HVAC

Incinerator / Garbage Room 8 x

Deck Workshop 8 x

Paint Store 20 x

Chemical Store 20 x

Dry Provision 10 x

Stores 6 x

Emergency Generator Room

Bosun Stores 6 x

Switch board room 8 x Fan-coil cooling unit

Propulsion machinery room 12 x

Garbage room 10

573 Ventilation for engine control room/ SW-board room


Switchboard room/ECR
A separate fan-coil unit, connected the chilled water system, shall be installed for the switchboard room.
Fresh air supply shall be arranged from the engineroom ventilation system.
The cooling capacity shall be determined after final decision of equipment and dissipated "wild heat" .

574 Ventilation Engine room


Fans (with capacity above 1000 m3/h) shall be resilient mounted and have "sound traps".
The supply ducts to the engine room shall be branched off to secure satisfactory ventilation throughout the
whole engine room. Each ventilation opening / outlet shall have removable / washable filters and direct outlet
control.
Amply dimensioned louvers for air inlet / outlet shall be provided, well-screened from exhaust and water
spray.
Fire dampers /hatches shall be fitted in all ducts between the engine room and the open air, and shall be
remotely controlled by means of compressed air or hydraulic.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 69


Project no: 3720
VS type: VS 470 MPOV Mk III

Outlet for the extraction fans shall be provided with oil drip pan and drain pipe line to engine room. Closing
device shall be made of stainless steel.

Ventilating of the main engine room


Two (2) off axial fans to be provided for air supply to engine room. One (1) fan to be of 2-speed type and one
to be of reversible type.
Total air supply to be calculated on basis of design requirements in ISO 8861:1988. Effective drainage of
seawater from the vent inlets to be arranged.
Distribution channels to be arranged in engine room for an efficient ventilation of the engine spaces.

574.1 Emergency generator room


Emergency diesel generator room shall be mechanically ventilated in accordance with recommendation from
supplier, with regard to radiator cooling of the generator.
Mechanical ventilation shall be provided by engine radiator fan.
In addition, one (1) el.motor driven axial flow supply fan shall be provided.
Natural supply air louvers shall also be arranged to cover emergency generator fan when the above supply
fan is not operating.

574.2 Ventilation of propulsion room


Separate supply fan and necessary ducting shall be provided for exchanging the air throughout the area,
necessary ducting shall be arranged for good distribution throughout the whole area.
Fire dampers and watertight closing device shall be provided in accordance with relevant regulations.

575 Ventilation of cargo area


Mechanical ventilation shall be provided by separate supply fan and necessary ducting for exchanging the air
throughout the area.
Supply ducting shall be arranged for good distribution throughout the whole area.
Fire dampers and watertight closing device in bulkheads shall be provided in accordance with relevant
regulations.
Capacity........................ : ~ 10000 m3/h

576 Ventilation of thruster rooms


Mechanical ventilation shall be provided by separate supply fan and necessary ducting for exchanging the air
throughout the areas.
Supply ducting shall be arranged for good distribution throughout the whole areas.
Fire dampers and watertight closing devices shall be provided in accordance with relevant regulations.
Capacity each room..................... : ~ 2000 m3/h

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 70


Project no: 3720
VS type: VS 470 MPOV Mk III

576.1 Paint store and chemical store


Mechanical ventilation (under pressure) shall be provided by separate extraction fan (ex. Proof) with
necessary ducting and watertight closing device in accordance with relevant regulations, both for outlet and
inlet.

576.2 Deck stores and similar rooms


Mechanical ventilation shall be provided by separate supply fan.

576.3 Workshops
Permanent welding positioning in deck workshop shall have smoke extraction duct and fan.

576.4 Incinerator room


One (1) exh.fan shall be provided for incinerator room.
One (1) supply fan shall be installed, with capacity for the incinerator and ventilation of the room.

579 Natural ventilation


The spaces served by natural ventilation - including the Acetylen/Oxygen store -shall be provided with top
and bottom ventilation pipes.
The air inlets and outlets shall have covers or goosenecks, with shutters, of watertight design where
necessary.

58 SANITARY SYSTEM AND EQUIPMENT

581 Sanitary supply system

Piping system
Sanitary systems shall be based on fresh water.
Piping system shall be divided into suitable sections with closing valves for each deck.
All hot water lines shall have miniature ball valves at faucet connections.
All pipes for hot and cold fresh water shall be of copper or approved plastic in accommodation.
All hot water pipes shall be insulated and cold water pipe shall be sweat protected.
All tapping locations in accommodation shall have both cold and hot water supply.

Two (2) hot water circulation pumps of centrifugal type shall be installed, each with 100 % capacity.
The pumps shall take suction from the El boiler and deliver to ring lines for hot water.
One (1) FW transfer pump with capacity 50m3/h for transfer between the FW tanks.
Bunker stations shall be arranged for FW on 1st deck, PS & SB side.

Faucet specifications:

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 71


Project no: 3720
VS type: VS 470 MPOV Mk III

Low consumption water mixer faucets for showers fitted with shower device.
Water mixer faucets for basins.
Water mixer faucets for sinks.
Faucet in laundry.
Where necessary (in engine room, cargo area, propulsion room, laundry, galley etc.) faucet for hose
connection shall be fitted.

Dimension and material throughout: 1/2" chrome plated brass.


One (1) wash-basin of stainless steel with water mixer shall be fitted in engine room.
Freezing secured fresh water tapping with hot and cold water shall be arranged outside
superstructure according to Buyer's instruction. (One(1) located at the Fan beam)
One (1) of the wash basins of stainless steel shall be fitted in engine room.

Pressure sets
A constant pressure system shall be installed with two (2) pumps, capacity: 2 x 6 m3 /h - 60 mWG. Suction
from F.W. tank's branck off valves on pressure side with pressure control valve, delivering to the F.W. tank in
service.
The hot water to be supplied by two (2) off 300 l hot water tanks with electrical heating elements off approx.
10 kW each. the electric elements each. The hot water circuit, which is for domestic use only, has fresh water
supply from vessel hydrophore system.

582 Sanitary discharge system


One (1) sewage tank. Sewage discharge from washbasin, showers and sinks shall have sloped pipes to
sewage tank.
A sewage vacuum discharge system for toilets shall be fitted.
One (1) sewage discharge pump capacity 20 m3 /h 20 mWG.
One (1) ejector capacity 10 m3 /h - 10 mWG.
A sewage treatment plant, with capacity for sixty (60) persons, USCG and IMO approved type II shall be
installed. Possibility to by-pass sewage plant.

Gutter drain
Indoor gutter drain shall be led to gutter on deck below, and eventually, to engine room bilge or nearest bilge.
Outdoor gutter drain shall be led to gutter on deck pads and eventually to 1st deck.
Drains shall be fitted behind lining.

Piping system
Discharging pipes shall be galvanized steel pipes in accommodation.
Ability for flushing the discharge pipe from sewage treatment plant and sewage tank by fire-wash system.
The piping shall be fitted with one isolating valve and one (1) access flange on each line at each deck level.

583 Sanitary equipment


All sanitary equipment shall be of good marine quality.
Deep bowl washbasins shall be of vitreous china.
Hand basins in engine room, changing room and laundry shall be stainless steel.
Basin in hospital shall be of stainless steel.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 72


Project no: 3720
VS type: VS 470 MPOV Mk III

584 Drinking water system


Two (2) drinking water units with UV and cool filter.
The units shall supply hot and chilled water. One (1) on bridge and one (1) in Duty mess.

5 EQUIPMENT FOR CREW 27th of June 2011 - REV B Page 73


Project no: 3720
VS type: VS 470 MPOV Mk III

6 MACHINERY MAIN COMPONENTS

60 DIESEL ENGINES FOR PROPULSION

600 General
The propulsion system shall consist of two (2) main diesel engines and two (2) propellers.

Each system shall include:


CP propeller, propeller shaft, reduction gearbox with PTO and shaft generator, main engine with flexible
coupling.
All machinery shall be of first class marine type. The system and lay out shall be arranged for safe operation
and easy access.
All components and systems shall be designed to operate under the environmental conditions and Class /
Authority requirements as described in Group 0.
Each main engine set shall form an independent unit, including all the required accessories to make the
engines and support systems complete and operational.
Machinery and equipment shall be installed on solid foundation to minimise the effect of vibration, deflection
in the crankshafts and couplings and misalignment etc.
For major machinery, such as reduction gearboxes etc. adjustable steel chocks shall be used. Main engines
shall be resilient mounted.

601 Diesel engines for propulsion


The diesel engines for propulsion shall consist of two (2) medium speed marine diesel engines.
Main engine rating (MCR) each 2320 kW at 900 rpm.
Fuel: MDO.
Each engine shall be flexible coupled to shaft via a reduction gearbox with vertical offset. Main engines shall
be flexible mounted and have flexible connections to all pipe work leading to and from engines.
The main engine speed governors of electronic type, shall be fitted with necessary control and safety
equipment.
Spare parts shall be supplied according to Class and suppliers recommendation.

63 PROPELLER PLANT, TRANSMISSION

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 74


Project no: 3720
VS type: VS 470 MPOV Mk III

634 Controllable pitch propeller plants


Two (2) controllable pitch propellers shall be installed.
Propeller diameter: 2900 mm.
Material of hub: stainless steel.
Number of blades: four (4), each propeller.
Material of blades : Ni-Al-Br.
Speed of propeller : 230 rpm, approx.

The system shall include:


Propeller shafts with couplings, bearings, bulkhead glands, stern tubes with linings and inner and outer seals
with separate tanks for lubrication of inner seals, lube oil pressured tanks for outer seals and shaft brake.

High temperature sensors with remote temperature read-outs shall be installed in stern tube white-metal
bearings, both forward and aft. All intermediate shaft bearings shall be oil lubricated sleave bearings with oil
bath, level glass - or other methods with similar result, equipped with temperature sensors for remote read-
outs as well as local thermometer.

Pitch control system


The main hydraulic pump for the servo and CP system, for each propeller pitch control, shall be mechanically
driven by a PTO on the reduction gearbox.
One (1) electric motor driven stand-by pump shall be installed for each gearbox.
The stand-by pump shall start automatically, in the event of oil pressure drop.
Oil coolers shall be provided.
Control panels shall be installed in the wheelhouse (fore-and aft console) and in ECR.

Each control panel at least to contain the following function and equipment for each engine/gearbox/pitch
control:
Tachometer for engine speed.
Tachometer for shaft speed.
Pitch indicator.
Clutch control.
Indication/alarm lights/buzzer.
Control switches.

In addition, the system shall be connected to the Joystick system.


An emergency control system(local) for operation of the engine speed, pitch control and clutch shall be
provided.

637 Main reduction gears with thrustbearings and couplings


Two (2) single input, single-out gearboxes with vertical offset and built in thrust bearing shall be installed.
Gearbox shall have a PTO outlet for shaft generator.
Each main engine shall be connected to each gearbox by means of a hydraulic operated soft clutch and shall
be provided with built in servo-mechanism for pitch propeller.
Oil coolers shall be provided according to Class and manufacturers requirement.
Flexible coupling between the main engines and shaft lines, and between the shaft lines and gear boxes.
Flexible coupling also between PTI and Shaft generator.

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 75


Project no: 3720
VS type: VS 470 MPOV Mk III

65 MOTOR AGGREGATES FOR MAIN EL. PRODUCTION

651 Motor aggregate


Two (2) diesel generator sets shall be installed having the following characteristics:
Rating, approx. : 900 ekW.
Voltage: See gr. no. 860.
Speed: 1800 RPM.
Fuel: MDO.

Auxiliary systems
The diesel engines shall be complete with:
Lube oil system with engine driven lube oil pump.
Freshwater cooling system for the engine with engine driven cooling water pump.
Fuel oil system with engine driven fuel oil pump.
Air starting equipment according to class requirements.
The gen. set (aux. engine and generator) shall be built on a common bed frame.

Control and monitoring


Local instrument panel on engines shall be arranged with the following equipment:
Tachometer, lube oil pressure gauge, water thermometer, oil temperature gauge, hour counter and
start/stop/emergency stop buttons, etc.

Following monitoring shall be arranged as a minimum for remote reading to monitoring system in control
room:
Lub.oil pressure.
Low lub.oil pressure, shut down.
Lub oil temperature.
Fresh water temperature.
High fresh water temperature, shut down.
Exhaust temperature after turbo charger.
Fuel oil leaking alarm.
Over speed alarm.

Woodward (or equal) electronic governor system with remote control from main switchboard shall be fitted.
The electronic speed governor shall be capable of regulating the speed of each diesel engine such that the
generator shall meet the Class and Authority's requirement of speed drop.
Automatic stop of engine at very low lubrication oil pressure, very high water temperature and over speed
shall be provided, with alarm connected to the alarm system.
Alarm and monitoring for low lubrication oil pressure, high cooling water temperature, low level in f.w.
expansion tank, etc, according to Class and Manufacturers standard.
Spares according to the Class' request.

Generator
Generators: Synchronous A/C generator, designed for short time parallel running with the shaft
generator.
Protections: As regulations.
Cooling: Air.
Enclosure: IP 23.

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 76


Project no: 3720
VS type: VS 470 MPOV Mk III

The generators shall be arranged for parallel running with each other.

66 EMERGENCY GENERATOR

665 Harbour/Emergency generator


One(1) harbour - / emergency aggregate, shall be installed having the following characteristics:

Type of engine
Rating (generator): 450 ekW, Voltage see gr. 860.
Speed 1800 RPM.
Fuel Marine diesel.
Cooling Fresh water via Radiator.

Following monitoring shall be arranged as a minimum, both local and remote reading to monitoring system in
control room:
Lub.oil pressure.
Low lub. oil pressure, shut down.
Lub.oil temperature.
Fresh water temperature.
High fresh water temperature, shut down.
Exhaust temperature after turbo charger.
Fuel oil leaking alarm.
Overspeed alarm.

One (1) electrical starting systems according to rules and one (1) hydraulic starting system.

Hand-operated L.O priming pump.

The emergency / harbour generator set shall be arranged for short time parallel running with the aux.
generating sets.
The generator/engine in general shall be equipped as gr. 651, except for the safety devices (see 795).

Mode selector switch


A mode selector switch for emergency/harbour generator set operation shall be fitted in the Emergency
switchboard. The selector switch shall only have two (2) positions, "Emergency" and "Harbour". Should
inform VMS with an alarm if not in emergency mode.

The selector switch shall include the following functions:


Very-high cooling water temperature safety shut-down devices (only activated in harbour mode).
Automatic start and disconnection of main switchboard upon failure of the main source of power (only
activated in emergency mode).

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 77


Project no: 3720
VS type: VS 470 MPOV Mk III

Emergency mode
If a black-out occurs for the generator systems, the emergency generator set shall start automatically and
connect to the Emergency switchboard, according to Class and Authority requirement. The connection
between emergency switchboard and main switchboard shall be automatically disconnected, upon failure of
the main source of power.

Ready to sail Emergency procedure


Instructions containing information of required fuel oil tank level, position of mode selector switch, ventilation
openings, valves, etc. shall be fitted at the emergency switchboard, to ensure that when the vessel is under
way, all control devices are in correct positions for the independent emergency operation of the emergency
generator set and emergency switchboard.

Harbour mode
The generator set shall be arranged for short time parallel running with the aux. generating sets, when in
harbour mode. The emergency switchboard and main switchboard shall be connected also when the diesel
engine is running (feedback line). The feedback circuit breaker in emergency switchboard shall automatically
trip at overload on the diesel generator set. This circuit breaker shall also trip at short circuit in the "feedback"
line, and shall also be selective with the emergency generator circuit breaker.
A low level alarm shall be installed in the fuel tank for the emergency diesel engine. This alarm shall be
activated before the fuel level is decreased to a level corresponding to 18 hours emergency service. Fuel
tank level connected VMS system.
The noise requirements from the Authorities to be fulfilled with harbour aggregate having 100% load.
The diesel engine and the generator shall be built on a common bed frame and to be flexible installed.
Flexible pipes to be arranged for fuel oil and cooling water between engine and engine bed.

667 Shaft Generator


Two(2) Shaft generators shall be installed and connected to the PTO on the reduction gearboxes. The shaft
generator shall be flexible mounted.
The Shaft generators shall be equipped with necessary control equipment and automatic voltage regulation
equipment.

The Shaft generators shall have following characteristics:


Output Approx. 1600 ekW.
Voltage 3 x 440 V, 60 Hz.
Speed max. 1800 RPM.
Protection IP 44.

An arrangement shall be fitted for overload prevention of shaft generators, by an automatic side thrusters
pitch reduction equipment, for preventing black-out.

The shaft generators shall be controlled by the Power Management System. An arrangement shall be fitted
for overload prevention of shaft generators, by automatic propeller pitch reduction equipment, for preventing
black-out.

The shaft generators shall be fresh water-cooled and shall have stand-still heating, thermistors built-in to the
stator windings and monitoring of the temperature of the shaft bearings, all connected to the Vessel's alarm
and monitoring system.

The generator shall have sleeve bearings. The rotor shall be balanced for the actual RPM, necessary
weights, and to be provided with necessary Class certificate.

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 78


Project no: 3720
VS type: VS 470 MPOV Mk III

Shaft generators shall have nipple for SPS Single Point Monitoring for bearings and vibration

6 MACHINERY MAIN COMPONENTS 27th of June 2011 - REV B Page 79


Project no: 3720
VS type: VS 470 MPOV Mk III

7 SYSTEMS FOR MACHINERY COMPONENTS

GENERAL
Piping system shall meet the requirements of the classification society unless higher requirements are
explicitly stated in this specification. Piping shall be arranged according to good marine engineering practice,
with the minimum practical number of bends of appropriate radius.
Piping carrying fluids shall not be arranged with flanges or pipe connections above switchboards. Expansion
bends shall be fitted to preventing damage due to expansion of piping or movement of structure.
Piping of ND 50 and above shall be connected by weld-on flanges; piping of smaller diameter by
compression fittings.

After completion, piping systems shall be cleaned by circulating the related fluid through coarse - gauze slave
filters fitted on the suction side of pumps. The filters shall be inspected and cleaned prior to sea trials.
All lube and hydraulic piping shall be thoroughly cleaned after final welding by immersion in acid and
thereafter lubricated with oil prior to erecting and filling of systems.
Pipes shall be tested according to the Classification Society's rules.
Pipes, valves and fittings shall be supplied with certificates as required by the Classification Society.

In way of pumps, heat exchangers etc. the piping shall be arranged to permit overhauls of the unit with
minimum dismantling of pipes.
External piping shall be fitted with drain plugs where necessary.
All pipes shall be fastened safely.
Colour marking for various pipe systems according to ISO standard type system.
Pipes shall be supported according to good practice in order to prevent damages from vibrations and other
causes.

Hydraulic pipes in tanks and external pipes ≤ 25 mm shall be of stainless steel.

Pumps
All pumps shall have mechanical seal type.
All pumps shall have casing of cast steel or bronze, impellers of bronze and shaft of stainless steel.

MATERIAL GUIDE - ABSTRACT OF PIPE MATERIAL

GP System Dimension Material Standard Standard Remarks


Dimension Material

381 Hydraulic pipes for All dim.(in tanks and Precision steel pipes DIN 2391 NS DIN 2445
valve control on open decks) 2503 NS 1211

403 Hydr. lines for All dim. Precision steel pipe DIN 2391 NS DIN 2445
steering gear 2503 NS 1211

434 Low pressure All dim. Steel DIN 2448 NS DIN 1629
hydr. pipes (Indoor/outdoor) 2501 NS 12111

434 High pressure All dim. Precision steel DIN 2391 NS DIN 2445
hydr. pipes 2503 NS 1211

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 80


Project no: 3720
VS type: VS 470 MPOV Mk III

554 Refr. Cooling All dim. Copper DIN 1786 NS


(coolant side) 2501

571 Air condition All dim. As for refr. syst.


system

581 Sanitary supply All dim. Copper or plastic


(approved type)

582 Sanitary drain All Blucher or equivalent SS 316


dim.(ab.freeboarddk.)

All dim.(bel. freeb.dk.) Galvanised steel DIN 2448 DIN 1629

70 Fuel oil DN≤ 32 Precision steel pipe DIN 2391 DIN 2445

DN≥ 40 Steel NS 2503 NS 1211

71 Lube oil DN≤ 32 Precision steel pipe DIN 2391 DIN 2445

DN≥ 40 Steel NS 2503 NS 1211

721 Sea cooling water All dim. Galv. steel NS 2501 DIN 1629

722 Fresh cooling DN≤ 32 Precision steel pipe DIN 2391 DIN 2445
water

DN≥ 40 Steel NS 2503 NS 1211

731 Starting air DN≤ 32, inside Precision steel pipe DIN 2391 DIN 2445

DN≤ 32, outside Stainless st. ( AISI DIN 2448 DIN 1629
316L)

DN≥40 Steel

732 Service Air All dim.,outside Stainless steel

All dim., inside Precision steel pipe

734 Control air All dim. Copper, but stainless


steel inside tanks

74 Exhaust pipes, ME Steel DIN 1629

74 Exhaust pipe aux. Steel DIN DIN 1629


engines 2448/2458

801/ General, Bilge and All dim. Galv. steel NS 2501 DIN 1629 Hot dip
803 ballast galvanized

804 Gutter pipes All dim. Galv. steel NS 2501 DIN 1629 Hot dip
galvanized

813 Fire & deckwash All dim. Galv. steel NS 2501 DIN 1629
general service

814 All dim. Hot dip galvanized

815 CO2 All dim. Galv. steel

816 Foam All dim. Galv. steel NS 2501 DIN 1629

821 Air and sounding All dim. Galv. steel/steel NS 2501 DIN 1629

821 Sample lines Stainless steel

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 81


Project no: 3720
VS type: VS 470 MPOV Mk III

MATERIAL GUIDE - ABSTRACT OF VALVE MATERIAL

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 82


Project no: 3720
VS type: VS 470 MPOV Mk III

SFI System Nominal Size Description Standard Material Body Standard Material Garniture Remarks

434 Hydraulic All dim. According to supplier`s standard

444 High- pressure washing All dim. Ball valve St. Steel St. Steel

70 Fuel Oil DN≤40 Ball valve Bronze Bronze

DN>40 Butterfly valve Cast iron Al. Bronze

71 Lube Oil DN≤ 32 Ball valve Bronze Bronze

DN=40 Ball valve Cast iron Bronze

DN≥50 Butterfly valve Cast iron Al. bronze

721 Sea Water Cooling All dim. Butterfly/gate valve Lined Cast iron Al. Bronze/ Buna-N Valves on ship side and sea inlet to be
Ductile Iron

722 Fresh Water Cooling DN≤32 Globe Ball valve Bronze Bronze Buna-N for temp. below 80°C, EPDM
for temp. above 80°C.

DN≥40 Butterfly/Globe valve Cast iron St.St

731 Starting Air DN≤32 Ball valve Forged steel

DN≥40 Ball valve /Globe valve Steel /Cast steel

732 Service air All dim. Ball valve Brass Brass

801 Ballast All dim. Butterfly valve Cast iron Al. Bronze/ Buna-N

803 Bilge All dim. Butterfly valve Cast iron Al. Bronze/ Buna-N

813 Fire and Deck wash hydrants All dim. Globe valve Bronze incl. hose coupling Bronze NOR coupling no. 2

813 Fire & Deck wash, general service DN≤40 Ball valve Bronze Bronze

DN>50 Butterfly valve Cast iron Bronze

815 CO2 All dim. Ball valve Bronze Bronze

816 Foam DN≤40 Ball valve Bronze Bronze

DN>50 Butterfly valve Cast iron Bronze

821 Sounding All dim. Ball valve Bronze Bronze Cylindric self closing cock w/test cock
screw

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 83


Project no: 3720
VS type: VS 470 MPOV Mk III

70 FUEL OIL SYSTEM

700 General
A complete fuel oil service system with standby equipment for all main engines at 100 % MCR shall be
provided in accordance with the class requirements.

Two (2) fuel oil service tanks, one (1) fuel oil settling tank and one (1) fuel oil service tank in emergency
generator room.

All service and settling tanks shall have level gauges, quick-closing valves.
Waste oil and drip trays shall be made according to good marine standard.

Fuel oil transfer and service pumps, and fuel oil purifier shall have remote stop facilities outside machinery
space according to requirement and regulations.

701 Fuel oil transfer and drain system

Bunkering and overflow system


Connections (stations) for diesel oil bunkering shall be provided on PS and SB with piping to a FO valve
chest.

An overflow (over-bunkering protection) system shall be provided for all bunker, settling and service tanks
etc. Each tanks shall be connected, via goose-neck to a common overflow and vent pipe, self-drained to a
nominated double bottom overflow tank. (see also gr. 821). A sight glass and an overflow alarm shall be fitted
in the last section before entering into the overflow tank. The system shall be designed with a safety factor
corresponding to capacity of the bunkering line (150m3/hrs).
The nominated overflow tank shall be equipped with high level alarms.

Transfer system
A fuel oil transfer system shall be arranged with suction from storage tanks and discharge to settling- and
service tanks. The system, including pump and valves, shall be locally manually operated.
The system shall include all storage tanks, one (1) settling tank, two (2) daily service tanks (PS and SB) and
one (1) service tank for the emergency generator, all according to General arrangement / Tank plan drawing.
The system shall be arranged for inter-transferring between all FO tanks.

Transfer pumping system shall include:


One (1) transfer pump, with a capacity of 20 m3/h, 2 bar.
A system for backup shall be in place.

Piping for fuel oil settling and daily service tanks shall be dimensioned for use of transfer pumps, based on a
pumping capacity of 20 m3/h. All three (3) tanks shall be connected the common overflow system.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 84


Project no: 3720
VS type: VS 470 MPOV Mk III

Drain system
All fuel tanks in machinery spaces above double bottom tanks shall be equipped with drip trays of sufficient
capacity for collecting any leakage of oil which may occur from valves, fittings etc. The drip trays shall be
drained to the fuel oil drain tank.
Fuel oil service and settling tanks shall have an accessible drain (self-closing valve) fitted at the lowest point
of the tanks, for removing water and sediment. These drains shall be arranged directly to the sludge tank.
A separate fuel oil drain tank shall be arranged according to General arrangement drawing, for collecting of
clean fuel leakage from diesel engines, drip trays and other equipment in the system.

702 Fuel purification plant


One (1) fully automatic, self-cleaning purifiers for marine diesel shall be installed.
Capacity : min. 2000 l/h (effective throughput).
All controls and alarms available in maker's control unit shall be fitted.
The purification plant shall have possibility for purifying from settling tank to service tanks, as well as from
service tank and back to same service tank. The purifier shall also have possibility for purifying direct from
fuel overflow to settling- or service tanks.

One (1) ample diesel sludge tank shall be provided in engine room, according to General arrangement plan.

703 Fuel oil service system


All consumers, like main engines, generator sets and boiler shall be arranged for marine gas oil.
Service tanks on both port and starboard shall be arranged for full operation of all consumers.
From service tanks, individual branch lines shall be arranged to all consumers.
Approved valves of quick-closing type shall be arranged on tanks according to rules and requirements.

Supply lines to main engines shall be arranged for the following way of operation:
All engines shall be supplied from either port or starboard tank with necessary isolation valves for changing
between.
Fuel return lines form engines shall be arranged according to supply lines, either flowing back to service
tanks or to suction line. All return lines shall have continuous raising.
All consumers shall have duplex filters installed in supply lines.

71 LUB OIL SYSTEM

711 Lub oil transfer and drain system


Suitable lube oil storage tanks shall be arranged for main engines, auxiliary engine, reduction gears,
hydraulic systems, tunnel thrusters, steering gears.
The tanks shall be arranged with filling from deck, level glass, air-pipes, tapping cocks, manholes and
drip trays.
The lube oil tank in the double bottom to be heated.
The drip trays shall be drained to waste oil/sludge tank.
For the main- and auxiliary engines filling shall be arranged from the respective tanks.
One (1) transfer pump, capacity 5 m3/h - 3 Bar for lub.oil.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 85


Project no: 3720
VS type: VS 470 MPOV Mk III

One (1) flow meter for measuring filling of oil to main engines.
Connections from lube oil transfer suction line to lube oil separator suction side.
One (1) sludge pump capacity 5 m3/h - 3 Bar with delivery to deck.
Emergency stop of sludge pump on deck.

Following small storage tanks shall be arranged:


In steering gear room, one (1) x 300 litres.
In forward thrusters room, one (1) x 200 litres.
In cargo area, one (1) x 200 litres, for stern tube.
In cargo area, one (1) x 200 litres, for aft thrusters.

Drain trays shall be fitted below all storage tanks.


All tanks with filling from deck and with gauge glass.
Vent. pipes from small storage tanks shall only be locally on the tank area (not to deck).

712 Lube Oil Purification System


Two (2) lube oil purifiers, automatic self-cleaning type, with capacity according to engine supplier`s
recommendations, shall be installed. El.heaters shall be included.
(The installation shall be considered after final decision of type of main engines).
The piping systems shall be arranged in such a way that it shall only be possible to have suction and delivery
from the same main engine at the time.
All control valves shall be screw-lift type.

713 Lub oil system for propulsion machinery


The lube oil systems lay out shall be in full compliance with the engine manufacturer's recommendation.
The main engines shall have dry sump with system tank located in tanktop below main engines.

72 COOLING SYSTEM

720 General
The main cooling systems to be divided into two separate systems, one system for port side main engine with
connected equipment and one system for starboard side main engine with connected equipment.
The propulsion plant and auxiliary engines to be cooled by central plate coolers. Coolers and pump capacity
to be rated according to sea water temperature of 32°C and freshwater low temperature of 37°C.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 86


Project no: 3720
VS type: VS 470 MPOV Mk III

721 Sea water cooling system


Sea Chests, engine room Two (2) sea chests to be arranged in engine room, one on each side, One (1) high
suction and One (1) Low suction. Both sea inlets to be arranged with strainers. Both sea inlets to be
connected to a crossover pipe or a crossover tank. A dosage system to be installed for engine room sea
chests.

Arrangement for draining and venting of the cooling water piping shall be fitted.

A separate central cooling system shall be arranged in the aft part of the vessel with one(1) central cooler
with back flushing and with two (2) seawater pumps.

Water intakes
The two (2) sea chests compartments in the engine room shall be connected to each other via crossover.
The different consumers, such as ballast water intake, and fire and wash water intake shall be arranged off
the crossover pipe.
One (1) sea chest shall be provided aft, for emergency fire pump intake.

722 Fresh water cooling system


The vessels propulsion system with engine driven equipment to be plate cooled.
The coolers to be dimensioned for 100% load of the systems.
Each cooler to have minimum 15% fouling factor.
Main engines and reduction gear to be connected to the plate cooler.
Each main engine to be arranged with thermostatically controlled electric preheating module in HT circuit.

All freshwater systems shall have anti-freezing medium.

A separate freshwater central cooling system shall be installed in aft cargo area for cooling of reduction
gearboxes, shaft generators, side-thruster motors, The freshwater side shall have two(2) electrical driven
freshwater pumps. One (1) acting as stand-by pump (fully interchangeable) and one(1) expansion tank.

A separate freshwater cooling system shall be installed forward for cooling of air-condition for
accommodation and engine control room, side-thruster motors and provision cooling system.
The freshwater side shall have two(2) electrical driven freshwater pumps. One (1) acting as stand-by pump
(fully interchangeable) and one(1) expansion tank.
In addition one(1) smaller el. driven freshwater pump for cooling of provision cooling system alone. These
three (3) pumps shall be remote operated from ECR console.
Two (2) off Aux. Engine freshwater cooling systems shall be installed, with one(1) expansion tank for each
aux. engine.

A pre-heater, including pump shall be installed for stand still purpose. The main HT pump shall be mounted
on main engine. An electrical driven stand-by HT pump shall be installed. A HT cooler and lube oil cooler for
main engine shall be installed.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 87


Project no: 3720
VS type: VS 470 MPOV Mk III

73 COMPRESSED AIR SYSTEM

731 Starting air system


The main- and auxiliary engines shall be arranged for compressed air starting.

The starting air system including remote control etc. shall be arranged in accordance with the engine
supplier's recommendations and the rules in force.

Two (2) start-air receivers, capacity according to rules in force.


Two (2) compressors, electrically driven with automatic start/stop, capacity: 2 x 35 m3/h - 30 Bar.
Compressors shall be air-cooled.

Separate line (8 bars) shall be routed from start-air receivers to the typhoon.

732 Service
A system for supplying of service air (7 Bar) to workshops, cargo area, steering gear compartment, side
thruster room, engine room (5 pcs) and decks (5 pcs) shall be provided.

Supply from start air system via pressure reduction valve.


One (1) service air compressor, screw type, capacity 50 m3 /h - 8 bar, with dehumidifier and dozing apparatus
for anti-freezing medium.

734 Instrument air supply system


Control/instrument air shall be supplied from starting and service air system via reduction valve filters and
dehumidifying device of adequate capacity.

74 EXHAUST SYSTEM

743 Exhaust gas system


Exhaust gas system from main engines, aux. engines, emergency generator diesel and the boiler shall be
carried to atmosphere at the aft end of the funnel with watertight penetration.
Exhaust outlets shall be facing approx. 45 deg. out from the ship's side.
From diesel engines the piping shall be flexible suspended to the steel structure.

Attention shall be paid regarding expansion of the systems, necessary compensators shall be provided.
Silencers and spark arrestors in all exhaust systems from diesel engines min. 35 db noise reduction. The
exhaust pipes shall be insulated (75 mm) and covered by galvanised steel plates.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 88


Project no: 3720
VS type: VS 470 MPOV Mk III

76 DISTILLED & MAKE UP WATER SYSTEMS

761 Freshwater generators


One (1) Reverse Osmosis, fresh water maker, shall be installed.
Capacity: 25 tonnes / 24 hrs.

Produced fresh water from the water makers shall be led through neutralizing filter to the fresh water store
tank. In addition a separate pipe line, fitted with UV- sterilizers and carbon-filter shall be carried to scullery or
dry provision room.

79 AUTOMATION SYSTEM FOR MACHINERY AND CARGO SYSTEMS

790 General

Construction and operation


Sufficient instrumentation alarms and control equipment for safe operation of the main engines and all
auxiliaries shall be arranged in accordance with instrumentation list.
The control and instrument plant shall also be in accordance with requirements regarding "Dead man alarm"
(applicable to Vessels above 500 gr.reg.t.)
All components and wires shall be clearly marked with number in accordance with the drawings. All name-
and number-plates as well as reference shall be engraved laminated PVC unless otherwise specified.
Water and oil pipes inside the consoles shall be avoided. Necessary air pipes shall be separated or
eventually shielded from electric and electronic equipment. Air ventilating pipes from pneumatic equipment
shall be led outside of consoles.

Bridge consoles, general


On bridge there shall be installed two(2) manoeuvre consoles, one (1) forward and one(1) aft.

Bridge console / forward


Fwd bridge consoles shall have control and monitoring equipment for rudders, propulsion, side thrusters,
navigation equipment, VHF, wipers, alarm panels, communication systems etc.

Bridge console / aft


Aft bridge consoles shall have control and monitoring for rudders, propulsion, side thrusters, navigation
equipment, VHF, wipers, alarm panels, communication systems, cargo systems.

Following equipment shall be separately installed in wheelhouse:


Fire alarm panel.
Navigation lights (main /emergency).
Signal lights.
Distribution panels.
Emergency stop system of aux.
Panel for watertight doors.
Emergency stop with running lights for cargo pumps.
Hospital alarm.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 89


Project no: 3720
VS type: VS 470 MPOV Mk III

791 Engine control room


A control room with manoeuvring stand, control cargo pumps, alarm panel and main switchboard shall be
arranged. The control room shall be air- conditioned and insulated against noise and heat.

Engine control room console


Console shall have control and monitoring systems for main propulsion. aux. engine, electric system in
accordance with supplier's delivery and required by the Classification Society.
Console shall have monitoring systems for side thrusters, steering gear, in accordance with supplier's
delivery and required by the Classification Society.

792 Common automatic equipment, engine alarm etc.


Vessel Management System
A Vessel Management System shall be installed to provide control, monitoring and alarm for fuel oil, ballast
and freshwater system, tank monitoring and machinery alarm / monitoring.
All alarms related to the propulsion and main machinery shall be analogous when relevant. Instruments,
sensors and control equipment shall be of simple, robust and standardised design.
Remote transmitters shall be used in order to avoid sensing lines carrying fuel, oil, steam or water being led
into the control room.
Local instrumentation, such as thermometers, pressure gauges, etc., shall be provided as necessary for
manual start up, control, and monitoring of equipment in the machinery spaces. Scale engraving shall be in
metric units.
Pressure and temperature sensors shall be installed in places where there is minimal risk for damage during
normal overhaul and maintenance. Temperature sensors shall be installed in wells and be capable of being
withdrawn for replacement or calibration.
All components and wires shall be marked with numbers in accordance with the instrumentation list and
installation drawings.

System structure
The system shall feature the following functions:
1. Multi-user system.
2. Provide users with a simple and correct overview of the various systems using system
pictures/diagrams.
3. Shall be self-monitoring; i.e. it is equipped with alarms which monitor its own faults.
4. Divides the Vessel's machinery into System Failure group for internal watch and different display groups;
i.e.:

Main engines.
Auxiliary Engines.
Thruster system.
Propulsion systems.
FW system - manual controlled.
Bilge system - remote controlled.
Fuel and BW system - remotely controlled.
Cooling system - manual controlled.
Fuel system - manual controlled.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 90


Project no: 3720
VS type: VS 470 MPOV Mk III

Lube oil system - manual controlled.


Pressure air - manual controlled.

5.A simple and straightforward parameter adjustments; i.e. limit values, time delays, sensor calibration etc.
6.Provide users with a simple and correct overview of the various systems using system
pictures/diagrams.Possibilities for inhibit of individual signals and listing of all inhibited signals.
7.Possibility for off scanning of individual signals and listing of all off-scanned signals.
8.Interlock function.
9.Group status-, alarm summary and event lists.
10.Bargraph presentation for a simple status presentation.
11.Printer for different types of reports and listing.
12.Action group function: i.e. input point status combinations give output action (open/close contracts).
13.Trends of analogue signals, inhibited and off-scanned signals, past events, also running hour etc. on
motors above 100 kW.
14.Control, alarm and monitoring system shall interface following systems:
Sounding system (group 381 and 821).

System pictures / mimic diagrams


The system shall be provided with mimic diagrams/pictures for ballast system, cargo control system,
propulsion plant, electrical power plant.
Other installed pictures which shall be available as follows:
Tank sounding separate tanks.
Tank sounding groups of tanks.
System alarms.
System configuration.

Tank group picture


The alarm and monitoring system to receive tank data from sounding system.
This pictures display all information about the actual tanks, such as:
For each tank:
Max. Cubic metres.
Alarm limits.
Density (Man./auto).
Percentage of full tank.
Level in metres.
Cubic metres.

For the group:


Max. Cubic metres.
Percentage of full group.
Cubic metres.

The information shall be presented graphically and numerically.

Operator station in wheelhouse


Two (2) off monitoring units shall be installed.
Each unit shall include one (1) off colour monitor, one (1) off PC with keyboard, one (1) off pointing device
and an alarm buzzer.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 91


Project no: 3720
VS type: VS 470 MPOV Mk III

Operator station in engine control room


Two (2) off monitoring units shall be installed.
These units shall include one (1) off colour monitor, one (1) off keyboard, one (1) off pointing device, one (1)
off colour printer, one (1) off alarm printer and an alarm buzzer.

Watch and responsibility system to be combined into the common machinery alarm and monitoring system,
according to Class requirements.

Engineer's alarm
When the engine room is unattended, the alarms of the engine alarm system shall be extended to the
following alarm panels:
Alarm panel in cabins (Chief, 1st. Eng. and Electrician).
Alarm panel in mess room.
Alarm panel in each dayroom.
Alarm panel in bow thrusters room.
Alarm panel in thrusters room aft.

Deadman alarm
The "deadman" alarm system required for operation with one (1) man only in engine room according to
regulations.
"Dead man system" ON/OFF panel (one off).
"Dead man system" RESET panels (two off).

Engine rooms' alarm signals


The following visible /audible alarm signals shall be arranged as follows: in steering gear room, red. gear
room (cargo area), three(3) in main engine room and one(1) in each side thruster room etc. and shall be easy
to identify:
Abonden ship alarm.
Automatic telephone alarm.
Batteryless telephone alarm.
Fire alarm.
Engine alarm.
CO2 alarm.

The engine alarm and telephones' alarm shall be given by means of high intensity flickering lights and a
sufficient number of small low noise alarm horns.

Instruments
All instruments shall be of suitable construction for their maximum operating value. Scaling in ISO units,
where suitable.
Local thermometers shall be of the liquid filled glass tube type.
Local pressure gauges shall be of the liquid filled type.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 92


Project no: 3720
VS type: VS 470 MPOV Mk III

793 Automation equipment for propulsion machinery and transmission, engine telegraph etc.
Two (2) electronic remote control systems (one (1) for each propulsion plant) for engine speed, clutch
operation and pitch control with automatic overload protection shall be installed.
Remote control operations for main engines, CP propellers and shafts shall be fitted in the wheelhouse and in
the engine control room. The remote control of engine speed shall be achieved by electronic governor.

The engine control system shall be designed according to Class notation requirement and for unmanned
engine room operation.
The engine control room manoeuvring shall be actuated electrically with the regulating handle.
The wheelhouse manoeuvring shall be actuated electrically with the regulating handle.

The wheelhouse, engine control room and local manoeuvring (if applicable) shall include functions as
follows:
Control of propeller pitch.
Speed regulating.
Control of clutch.
Emergency stopping (also for shaft generators).

Choice of remote control location shall be made in the Engine Control Room with confirmation from the
wheelhouse. The control selection and confirmation procedure shall conform to the requirements of the
Classification society.

Necessary instrumentation shall be provided at the engine side to support manoeuvring from the engine site.
This shall include engine order telegraph repeater and RPM indicator.

Separate system for emergency control of main propellers shall be installed on bridge and in the engine
control room.

Redundancy
The remote control systems shall be designed and installed as two (2) electrically and mechanically totally
independent plants. One (1) failure in one (1) plant shall not put the other plant out of operation and vice
versa.
Each plant shall have two (2) galvanic isolated power supplies.

PROTECTION AND SAFETY DEVICE

Emergency trip
The main engines shall stop automatically with alarm under the following conditions:
ME low lub. oil pressure.
ME high coolant temperature.
ME overspeed.
Reduction gear, low oil pressure.
ME high bearing temp (if recommended by supplier).

Manual emergency stop button shall be provided in the ECR and wheelhouse. Manual emergency lever
(including stop position) shall be provided at the local control position.

Turning gear protection


A system shall be arranged to prevent the engines from starting, when the turning gear is engaged (locking of
starting control valve).

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 93


Project no: 3720
VS type: VS 470 MPOV Mk III

Engine telegraph system


If a serious emergency situation should occurs, with both the main- and the emergency control out of
operation, the RPM shall be locally controlled. The order from the wheelhouse will then be given using the
emergency machinery telegraph, and the RPM will be manually adjusted on the engine.

Telegraph system shall be provided in accordance with the propulsion control manufacturer's standard in
accordance with Classification society requirements but will include,
at a minimum following functions:
Bridge console mounted double-faced transmitter/receiver.
Engine control room console receiver with reply.
Buzzer at bridge and engine control room consoles.
Receiver near engine side, emergency operation.
Telegraph logger on bridge control console.

The emergency machinery telegraphs - one port and one starboard - shall be independent of the Vessel's
ordinary remote control system. They shall be connected to 24V DC battery systems. There shall be one(1)
unit for each side in the forward bridge console, (the transmitter) and one(1) unit for each side in each control
room (the receiver).

The receiver shall have acknowledgement push-button. The orders, given by operating a switch or push
buttons in the wheelhouse transmitter, shall be visually shown on the receiver by means of clearly marked
indication lamps. An audible signal shall be given when a new command is transmitted.

The orders shall be:


Ahead full.
Ahead half.
Ahead slow.
Stop.
Astern slow.
Astern half.
Astern full.

Revolution indicator for the main engines


Main engines revolution shall be indicated in the following locations:
Wheelhouse console forward.
Wheelhouse console aft.
Engine side (each engine).
Engine control console.

Change-over of control position


Transfer of location for propulsion control shall be completed as follows:

Propulsion Control Transfer Positions

From To Procedure

Local (Engine Side) ECR Position change over accomplished at Engine Side

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 94


Project no: 3720
VS type: VS 470 MPOV Mk III

ECR Wheelhouse Position change over accomplished in ECR with confirmation back from
the wheelhouse

The control selection and confirmation procedure shall conform to the requirements of the Classification
society.

795 Electric generating plant

Control and operation of generator sets


The diesel generator sets shall be started and stopped from the engine control room or from the engine side.
The diesel generator set shall be started and connected automatically in the event of a dead bus for one of
the two (2) shaft generators.

The diesel generator set shall automatically shut down in accordance with the manufacturer's design criteria. A
shut-down condition shalll be identified by an alarm connected to the Vessel Management System.

The diesel generator set shall be fitted with its own electronic governor, with the speed setting remotely
carried out by the governor control switch on the engine control room main switchboard.
Automatic synchronising, frequency control and preferential tripping shall be provided.

Shaft generators
The shaft generators should only be used when requested shaft power is available on the main engine and
the engine speed is locked in shaft generator mode.
The PMS system shall carry out synchronizing, closing and opening of generator breaker, automatic load-
sharing and signalling to pitch control system for necessary pitch reduction(shaft generators).

Load reduction/pitch reduction system


Main propulsion pitch control system:
A system for Load reduction/ Pitch reduction of the main propeller systems, to ensure sufficient power to the
shaft generators, shall be arranged. The system shall be initiated by current measurement on the shaft
generators, with an output signal to the pitch control system, for immediate pitch reduction (at 100 % load).

Thrusters pitch control system:


A system shall also be arranged for Load/ Pitch reduction of all thrusters (fwd./ stern thrusters). The system
shall be initiated by kW- and current measurement on the shaft generators, with an output signal to the pitch
control system, for immediate pitch reduction (at 100 % load).

Blocking/interlocks of heavy consumers


An interlock system shall be arranged to prevent the tunnel thrusters, cargo pumps and cargo compressors to
run when the diesel generating set is powering the actual busbar.

Power Management System


The entire electrical power plant shall be automatically controlled by a Power Management System (PMS).
The power management system shall be provided with the following functions:
Automatic power management of the generators depending on the necessary power demand and the
generators ability and stand by situation. The correct and suitable combination should automatically be
established.
In case of starting of big consumers the available power should automatically be checked and if necessary
the stand by diesel generator should be started automatically and connected to the switchboard. As soon as
available power is accepted, the big consumers should start.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 95


Project no: 3720
VS type: VS 470 MPOV Mk III

The PMS shall give signal to open the bustie at the following conditions:
Short circuit on one busbar.
Wrong busbar frequency.
Reverse reactive power on generator(s).
The PMS shall have possibilities for automatic load sharing of generators.

System structure, PMS


The power management system shall ensure consistency and maximum efficiency of power generation
equipment. The system shall be controllable from the CRT workstation located in the Engine Control Room.

The system shall perform at least, but not limited to the following functions:
Automatic load dependent start and stop of aux. diesel generating set (including black-out start of stand-
by generator).
Automatic control and protection of aux. - and harbour diesel engines.
Automatic speed/frequency control of aux. diesel generating set.
Automatic operation of air circuit breakers for generators.
Automatic generator off-loading prior to load free disconnection of generator circuit breakers.
Automatic control and protection of shaft generators.
Automatic control and protection of aux. generators.
Automatic control of emergency/harbour generator (function disconnected in emergency mode).
Automatic control of shore connection.
Automatic control and protection of Main switchboard including operation of bus-tie breakers.
Synchronizing of all motor operated breakers.
Automatic load sharing and load control with software for black-out prevention caused by sudden
overloads due to stop of generators.
Heavy consumer control including start request and start accept of heavy consumers.
Critical alarm handling / shutdown.
Aux. pump control.
Automatic preferential tripping of non-essential load.
Mode selection; (Under Way, Standby, Cargo load/ disch.-, Cargo load/ disch. Harbour, Harbour resting
(emerg./harbour gen.) and optional). Some of the mode may be combined if similar.
Indication (mimic diagram of all necessary parameters for electric power plant in Ship's alarm system.

Reduction in propeller pitch/ loads, tunnel thruster loads, pitch or speed reductions, must be introduced in the
period it takes to start and bring a new generator set on the line.
Each aux. diesel generator set shall automatically shut down in accordance with the manufacturer's design
criteria. A shut-down condition shall be identified by an alarm connected to the Vessels Management System.

Each aux. diesel generator set shall be fitted with its own electronic governor, with the speed setting remotely
carried out by the PMS or manual by the governor control switch on main switchboard.
Preferential Trip
When the running generator (s) is overloaded, non-essential consumers shall be automatically tripped to
prevent the complete power failure of the Vessel. The preferential tripping system of non-essential
consumers shall be arranged according to class and suppliers recommendations, with alarm indication in the
machinery alarm system.

The following non-essential consumers shall be tripped:


HVAC system (A/C compressors and heating element).
Galley equipment.
Welding machine.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 96


Project no: 3720
VS type: VS 470 MPOV Mk III

Aux. Engine Safety System


A safety system for protection and control of the aux. engine shall be provided. The safety system shall
control and protect the aux. engine in order to prevent faulty operation and/or major failure. The system shall
automatic stop the engine upon critical failure that may lead to breakdown of the engines, so as very low lub.
oil pressure, very high coolant temperature and overspeed, in addition to any further requirements according
to the Class. Cables shall be hardwired to the shutdown solenoid.
The safety system for the aux. engine shall include alarm and monitoring of the engines as well. The alarm
shall be clearly indicated on the safety system panel / cabinet. In addition a common alarm for each engine
shall be given to the central alarm plant.
The safety alarm system shall be a separate system.

Control and operation of emergency generator set


When the voltage of the main bus fails, the emergency generator set shall be automatically started with time
delay and the emergency switchboard shall be energized automatically.

Safety devices for over-speed or loss of lubricating oil pressure (very low pressure) shall be provided on the
engine and arranged so that the engine shall automatically shut-down in the event of either occurrence.

797 Automation for other machinery equipment


Remote manual control of pumps
The following pumps shall be capable of being manually started and stopped from a remote operating station
(ECR):
Bilge and Ballast Pumps.
Cargo Pumps.

Local manual control of equipment

The following systems shall be controlled from local (equipment supplied) systems:
Hydrophore plant.
Air condition and ventilation.
Sewage plant.
Starting air system.
Lub oil system.
Fuel oil and lub oil purifiers.
Fresh water filling and transfer.
Main DO Supply Pumps.
Diesel Oil Transfer Pumps.
Fresh Water Cooling Pumps.
M.E. Jacket Water Pumps.
Main Sea Water Pumps.

Fuel oil transfer system


Starting DO transfer pumps shall be a manual operation. However, the transfer pumps shall be automatically
start and stopped upon detecting a low or high level in any tank served.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 97


Project no: 3720
VS type: VS 470 MPOV Mk III

Purifier control system


All purifiers shall be manually started and stopped.
However, the purifier control system shall provide automatic sludge discharging for all purifiers and by-pass
the fuel oil to a selected tank upon detecting an abnormal condition.

Air compressor control system


Main air compressors shall be stopped automatically at the following conditions:
Discharge air temperature, high.
Lubricating Oil pressure, low.

All air compressors shall be fitted with both automatic and manual controls. Manual stop/start buttons shall be
provided for each air compressor and additionally, each compressor shall be automatically started/stopped by
detecting the pressure of the air reservoirs.

Engine room bilge system


The engine room oil/water separator pump shall be started automatically by detecting a high level in the bilge
holding tank and shall be stopped automatically by detecting low level in bilge holding tank. If the separated
water's oil content is higher than the set limit, the water shall automatically be returned to the bilge holding
tank with alarm given.
High-level alarm shall be provided for bilge wells and bilge holding tank.
An automatic oil discharge control system shall be provided for the oil/water separator.

Remote level measuring system


Remote reading of level of fuel oil cargo, day tanks, settling tank/liq. mud, ballast tanks, bilge water tank ,
fresh water tanks and big lub. oil tanks for main engine shall be installed. Operator Panels shall be integrated
as part of Vessel Management System.

798 Cable leads and piping for automation systems for machinery
Special care shall be taken to avoid electromagnetic interference (reference to Requirements in IEC 60533
concerning EMC, "Electromagnetic Compatibility of Electrical and Electronic Installations in Ships"). Coaxial
terminating of screens shall be arranged.
Where necessary, multicore cables with twisted pairs shall be used. All cables to enter connection and
termination boxes upward. Water pockets shall be avoided in the pipe systems for remote control and
measuring.

7 SYSTEMS FOR MACHINERY COMPONENTS 27th of June 2011 - REV B Page 98


Project no: 3720
VS type: VS 470 MPOV Mk III

8 SHIP SYSTEMS

80 BALLAST, BILGE AND DRAIN SYSTEMS, GUTTER PIPES OUTSIDE


ACCOMMODATION

800 General
See also Gr. 7, General.
Attention must be paid with regard to expansion of the piping. Pipes passing through tanks shall be provided
with expansion bends, or approved bellows (Sliding joints are not permitted inside tanks). Piping crossing fuel
oil tanks shall be all welded. Ballast-/ bilge piping inside ballast tanks shall have flange connections.
Pumps shall have non-return valves.
Clamps shall normally be bolted.

Material:
See list for piping material gr. 700. Additionally the piping shall be delivered with certificate according to
requirement for Classification Societies.
All pumps shall have casing of cast steel or bronze.

801 Ballast system


Two (2) combined ballast/fire pumps shall be installed.
The ballast system shall be arranged for complete inter-transferring between all the ballast tanks, roll
reduction and anti healing tanks, based on one-line system and double valve manifold.
The two (2) DB tanks used for fixed ballast shall not be connected to the ballast system.
The system shall have direct overboard discharges.
The system shall have remotely controlled valves and pumps, controlled from the vessel VMS system.

Piping material according to list of piping material gr. 7.

Specification of ballast/fire pumps.

MATERIALS

DESCRIPTION QTY Head TYPE PUMP LINER / SPINDLES/ PRIME


CAPACITY M.C.L CASING IMPELLER SHAFT MOVER
(M3/H)

BALLAST PUMPS 2 2 X 100 90 CENTRI- BRONZE BRONZE STAINLESS EL. MOTOR


FUGAL STEEL

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 99


Project no: 3720
VS type: VS 470 MPOV Mk III

803 Bilge system


The bilge pumping arrangement shall be according to SOLAS regulation 35-1, for passenger ships.
The power bilge pumps shall be placed in separate watertight compartments and so arranged or situated that
these compartments will not be flooded by the same damage.
The pumps available for bilge service shall be distributed throughout the watertight compartments.
All pumps, chests and valves shall be located inward of B/5 of the breadth of the ship.
The arrangements shall be such that at least one (1) bilge pump shall be available for use in all flooding
conditions which the ship is required to withstand - the bilge pumps and their sources of power shall be so
distributed throughout the length of the ship that at least one (1) pump in an undamaged compartment will be
available.

Two (2) off Screw pumps and one (1) of Centrifugal pump with ring primer shall be arranged.
Capacity : According to class requirements.
Remote start/stop of bilge pump, also from aft part of cargo area.
Pressure gauge on bilge pipe in aft cargo area.

One (1) bilge ejector, capacity 30 m3/h shall be provided for suction from chain lockers and discharge
overboard. The ejector shall be driven from hose from fire station.

Bilge lines
Bilge suctions shall be arranged from bilge wells and hollows in all compartments according to drawings
approved by Classification Society and involved authorities.
Mud boxes shall be fitted to all branch bilge pipes from machinery spaces etc.
Discharge overboard, to oily-water collection tank and to International standard flanges on deck shall be
provided.

Oily water separator


One (1) oil water separator, USCG approved for engine room, capacity:1 m3/h 15 p.p.m. shall be installed.
Separate pump for discharging of sludge to deck shall be installed, capacity: 5 m3/h - 30 mWG. The bilge
water separator shall be suitable for bilge water containing chemicals.
Connection from sludge tank, dirty oil tank, drain tanks and bilge water tank.
The pump shall have emergency stop on main deck, close to discharge outlet.

Alarms
Alarms for high level in bilge wells in engine room, cargo area, side thruster rooms, steering gear room,
emergency generator room and other watertight compartments under main deck shall be furnished.
Alarms shall be interfaced to Vessel Management System.

804 Scupper pipes outside accomodation


Deck scuppers shall be arranged to give good drainage from all parts of decks. The possible trim of the
vessel shall be taken into consideration.
Scupper pipes from weather deck shall be led inside ship's side and overboard just above water line.
Separate drainage shall be arranged at 1st deck from winch recess at the aft end of the superstructure, to
overboard at both sides.
Drain pipes from top of funnel shall be led overboard.
Drain from air-condition units shall be led overboard.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 100


Project no: 3720
VS type: VS 470 MPOV Mk III

81 FIRE AND LIFEBOAT ALARM SYSTEMS, FIRE FIGHTING SYSTEMS

810 Fire fighting general


Following fire- fighting systems shall be arranged:

Compartment System

Main machinery space CO2 protected

Main engines and Boiler Water mist

Switchboard room/ECR CO2 fire extinguishers

Accommodation Portable extinguishers

Incinerator room Water mist

Galley hood CO2 protected

Deep fat fryer CO2/foam protected

Paint store Sprinkler system, supplied by fire main

Chemical store Sprinkler system, supplied by fire main

Fire hoses, Fire extinguishers, fireman's outfit, breathing apparatus, international connection, etc. shall be
arranged according to regulations.

Water mist system to be manually controlled in fire control station and as required by Class.

811 Fire detection, fire and general alarm system

Fire detecting plant

General
One(1) Class approved Automatic Fire Detecting and Alarm System shall be installed according to Class and
Authority requirement.
The central unit shall be located at the bridge, with sub-panel in engine control room(console).
The fire detecting and alarm system shall be of the 24 V automatic type covering accommodation as well as
machinery spaces and control room.
The system shall be of the analogue addressable type. The central unit shall be fitted with internal 24V back-
up battery, with normal supply fed from 230V emergency switchboard(automatic change-over).

Detectors
All detectors shall be of a Class approved type.
Smoke detectors of combined type (optical with heat element) shall be installed in all corridors and further in
all spaces in which a fire might be expected to originate.
Heat detectors in cabins and day / mess rooms.
Manual call points shall be installed throughout the ship according to rules and regulations. The installation
shall be according to Class and Authority requirement.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 101


Project no: 3720
VS type: VS 470 MPOV Mk III

A combination of thermal rise detectors, smoke/ion detectors and manual call points shall be installed in the
engine room, according to Class and Authority requirement.
At least one (1) smoke/ion detector shall be fitted behind main- and emergency switchboard.

Manual call points


The manually operated call points for fire alarm shall be installed according to rules and regulations, and shall
be installed at least as follows:
One (1) - Wheelhouse.
One (1) - Engine control room.
Two (2) - Cargo area.
One (1) - Emergency generator room.
Two (2) - Each accommodation passage.
One (1) - Galley.
One (1) - Each passage/exit having entrance to engine room.
One (1)- Steering gear room.

The call points shall be prominently marked and easily identified.

General alarm
The general alarm with necessary equipment shall be incorporated in the fire alarm system.

Alarm bells and sirens


Alarm bell/sirens shall be installed in the accommodation passages, engine control room, wheelhouse,
engine room, cargo area, galley, emergency generator room and steering gear room.
The sound level of alarm bells/sirens shall be according to regulations.
Bells and electric horns/sirens shall sound continuously for fire alarm and intermittently for general alarm with
signal generator.
Red flashing lights shall warn of fire in noisy areas where fire alarm bells are installed. This shall be
accomplished by intermittent operation of general alarm lights.
Alarm bells etc. on each deck shall be supplied from more than one(1) source when more than one(1) unit is
installed.

Emergency stop of fans and pumps


Arrangement for manual stop of fans and pump shall be arranged outside engine room.

CO2 release alarm system


CO2 release alarm system shall be installed as follows:
One (1) - Limit switchC02 release box.
One (1) - Electric siren, in engine control room.
Two (2) - Typhoon, in the engine room.
Visual alarm indications as needed throughout the Engine Room.

The system shall be fed from the 24V DC system with back-up from the 230V emergency supply system
(automatic change-over).

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 102


Project no: 3720
VS type: VS 470 MPOV Mk III

813 Fire and washdown system


Fire stations shall be arranged in engine room, accommodation and on decks according to rules. Each station
shall consist of a glass fibre locker (with hinges of stainless steel) containing 15 m x 2 " artificial fibre hose
and one(1) combined jet nozzle and fog-nozzle.
Additionally two(2) of stations (quick connection for hose) shall be arranged for wash down purposes.
Branch off lines, connected the hawse pipes for washing of anchor chain shall be arranged.
Necessary drain cocks shall be fitted to the fire main line.
Necessary insulation of valves shall be fitted.

Fire pumps
The ballast pumps shall be arranged as combined fire pumps (see gr. 801).
The fire pumps shall have start/stop from the fire station in wheelhouse, engine control room and local.

Emergency fire pump:


One (1) emergency fire fighting pump, shall be installed.
Capacity: 40 m3/h - 7,0 bar
Pump shall have mechanical shaft seal.
The pump shall have el. motor powered from the emergency generator.
The pump shall be located in aft thrusters room and have separate sea suction and discharge to fire main
line.

Fixed local application fire-fighting system


In addition to fixed fire-extinguishing system hazard portions of the main engines, boiler and incinerator shall
be protected by a fixed fresh water-based fire-fighting system.
The system shall have both automatic and manual release capabilities.
Separate pump, located outside the protected area shall be included.

815 Fire fighting system with gas


CO2 extinguishing system shall be arranged for engine room, galley hood and deep fat fryer.
The bottles for CO2 fire extinguishing shall be placed in the separate room on 1st. deck.

82 AIR AND SOUNDING SYSTEM

821 Air and sounding systems in tanks


Sounding of tanks shall be integrated in Vessel Management System.
Air pipes shall be fitted to all tanks, cofferdams, stores, sea chests etc., and shall be carried above the deck
to open air. Automatic vent head (approved type) shall be installed.
DB tanks used for fixed ballast shall be equipped with blind flanges at vent head flanges, for sealing of tanks
after filling. Filling shall be done by fire hose through vent heads.
Small loose storage tanks shall have local vent pipes, not to deck.
ND 40 pipe with valve on all FW tank vent pipe.
All fuel oil tanks shall be connected to a common overflow system (see gr. 701) Each arranged with a loop
before connected the overflow-/air pipe, on top. The overflow -/air pipe shall be arranged as a combined
overflow and air/ventilation system. The pipe shall be arranged for self-drainage, with the lowest end
connected to the overflow tank. The top end shall be extended to above deck for venting.
Separate air-/ventilation pipe to open deck shall be arranged from the nominated overflow tank, which shall
be arranged with ventilation from both forward and aft of the tank.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 103


Project no: 3720
VS type: VS 470 MPOV Mk III

Manual sounding shall be provided for all storage tanks.


Remote sounding for all water ballast tanks, fuel and FW tanks with display in engine control room through
Vessel Management system.
Fuel oil service and settling tank, lub. oil storage tanks and hydraulic oil storage tanks shall have approved
type of gauges glass.
Cofferdams shall have manual sounding and vents to deck.
Vents from sewage tank shall be carried to the top of the funnel.

83 SPECIAL COMMON HYDRAULIC OIL SYSTEMS

831 Special hydraulic oil systems


El. hydraulic power plants shall be installed for providing of hydr. oil to the following:
One (1) hydraulic power plant for windlass.
One (1) hydraulic power plant for capstans.
One (1) hydraulic power plant for tugger winches.
One (1) hydraulic power plant for crane.
One (1) hydraulic power plant for MOB davit.

Some of these systems can be common systems, all depending of types and suppliers.

The power unit shall be fitted in steering gear room.


Local and remote control of power unit.
Densotape (grease tape) on external hydraulic connections (ermeto).

85 ELECTRICAL SYSTEMS, GENERAL PART

850 Electrical system general

Class, Authority, approvals


All electrical installation, systems, equipment, switchgear etc. shall fully comply with IEC Standards , NEK
410, Class and Authority, described in Main Group 0.
All important equipment shall be supplied with Class certificate, according to Class and Authority
requirement.
Requirements in IEC 60533 concerning EMC, "Electromagnetic Compatibility of Electrical and Electronic
Installations in Ships", shall be fulfilled as a minimum.
Electrical installations shall be designed to ensure proper operations when the Vessel is inclined as specified
by the Class Society and regulatory body requirements.
The design of the electric plant including generators, motors and controllers shall be co-ordinated to insure
that the voltage dip, when starting the motors with the highest inrush current shall not exceed 15 percent of
the rated voltage.
Electrical and electronic equipment shall be designed, constructed and installed to tolerate transient AC
voltage of -15%/+20% and frequency variation of ± 10%.
Voltage transients shall stabilize to steady state conditions within 2 seconds.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 104


Project no: 3720
VS type: VS 470 MPOV Mk III

Frequency transients shall stabilize to steady state conditions within 5 seconds.

Marking of electrical system


All electrical equipment shall be clearly and durably labelled for easy identifying with necessary information.
All cables (in both ends), conductors and terminals also shall be clearly labelled for easy reference to
drawings, etc. If both ends of the cable can be easily seen at the same time, only one(1) cable tag is
required.
All switchboards, distribution panels, junction boxes, etc. shall be permanently marked at the outside using
engraved durable labels (PVC or equal) fixed by screws in accordance with installation drawings.
All circuits and outgoing feeders shall be properly and permanently marked using engraved durable labels.
Inside switchboards and distribution panels the marking may be of a simpler type (not necessary with
engraved PVC labels).
Electrical equipment and measuring instruments shall be scaled in metric units.
All instruction manuals, drawings, diagrams, name plates, etc. shall be written in English.

General paining requirements for switchboards, panels, etc.


All metal surfaces except stainless steel brackets shall be sandblasted to white metal and powder-coat
painted with Epoxy paint. Alternatively, properly degreased and painted with two (2) coats of primer and at
least one (1) top coat of Epoxy paint will also be accepted.

Terminals for control and signalling


Terminals for control and signal cables shall be of the spring type terminals, not the screw type terminals.

Monitoring of dual supplies/speed sensors


For equipment with dual supply or dual speed sensors for governors, an alarm shall be initiated when the
equipment are supplied by the backup power or backup speed sensor.

Running of water pipes above essential electrical equipment


Flanges for pipes containing water or other liquids shall in general not be fitted above switchboards,
distribution boards, control panels, motors. If such flanges must be fitted above essential electrical equipment
by any reason, they shall be protected properly to ensure no spraying of liquid from damaged flange.

General switchboard requirements


Feeder circuits shall be protected by moulded-case circuit breakers with both time-over current and
instantaneous trip features.
Moulded-case circuit breakers for motor circuits shall have a shunt trip coil or under-voltage trip coil for
preferential trip or emergency stop, where required by the Class Society.
All moulded case circuit breakers including breakers in the group starter and group distribution panels shall
have plug-in mounting. These breakers shall be removable from the panel front without de-energising the
main bus.

Electrical load analysis


A preliminary electrical load balance shall be worked out to indicate the load at the following conditions:
Transit.
Stand-by.
Cargo load/discharge(harbour).
Harbour manoeuvring.
Harbour resting.
Emergency power.
ROV operation.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 105


Project no: 3720
VS type: VS 470 MPOV Mk III

Short Circuit and Device Evaluation Study


A short circuit study shall be performed to determine the maximum symmetrical and asymmetrical fault levels
developed in the electrical AC system.
Protective device evaluation analysis shall also be performed, which shall compare the making and breaking
ratings of the protective devices (fuses, breakers, etc.) to the available fault duties determined, shall be
available at their location by the short circuit study.
This evaluation shall determine if the system protective devices can withstand the available short circuit
duties that the system can deliver.
The study shall be based upon the one-line diagrams provided for the electrical system. Bus, distribution
board and branch number identifications shall be assigned to the system for easy reference between the one-
line diagram and the computer printouts.
Voltage drop analysis
A Voltage drop analysis during start of large AC motors shall be performed, to ensure that voltage dip during
the starting period of such motors shall not cause disturbance to other loads on the AC system and that the
voltage drop is within the Class requirement.

Emergency stops
Emergency stops shall also be provided for all machinery, stand-by pumps, fans, transfer pumps, separators,
fuel shut-off valves and other auxiliaries as required by Class. The emergency switches shall be located in a
safety station located outside engine room, in addition to the bridge.
All emergency switch functions shall be provided with loop monitoring according to requirement.
For ventilation in accommodation, emergency stop switches shall be provided on the bridge.

For cargo pumps, the following emergency stops shall be provided on the bridge:
Fuel oil cargo pumps.
Drill water.

Electrical power system


Electrical plant for this Vessel to consist of the following main equipment, the capacities hereafter are given
as guidance only:

Qnt. Equipment Capacity Remarks

Two (2) Auxiliary generator sets 900 ekW 440V,60Hz

One(1) Emergency/Harbour diesel gen set 450 ekW 440V,60Hz

One(1) 440V Main switchboard

One(1) 230V Ship Service switchboard

One(1) 440/230V Emergency switchboard

Two (2) Transformers for 230V emerg. 440V approx. 100 kVA
Distribution

Two (2) Transformers for 230V main 440V approx. 150 kVA
distribution

Two (2) Shaft generators 1600 ekW 440V,60Hz

Two (2) Tunnel motors 590 kW

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 106


Project no: 3720
VS type: VS 470 MPOV Mk III

Two (2) Starters, Tunnel motors 590 kW

Two (2) Tunnel motors 800 kW

Two (2) Starter, Tunnel motors 800 kW

855 Administrative net work


A CAT 5 network shall be installed with two (2) connections in each of following locations:
Bridge.
Engine control room.
Offices.
Officers cabins.
Dayrooms.

86 ELECTRICAL SUPPLY SYSTEM

860 General
The electrical plant shall be powered by two (2) aux. generators or by the Emergency/harbour generator, or
by the shore connection.

Generating sets
Aux. generators: 440VAC, - 60Hz
Emergency/Harbour generator: 440VAC, - 60Hz

Main Distribution systems

Switchboard name Voltage/frequency/ phase Supply obtained from Connected consumers

440VAC Main 440VAC-60Hz-three 440VAC Aux. generator 440VAC Power consumers


switchboard phase-three wire(+Gnd.)

230VAC Ship Service 230VAC-60Hz-three 440/230VAC transformer 230VAC Power consumers


switchboard phase-three wire(+Gnd.)

440/230VAC Emergency 440VAC 60Hz-three 440VAC Emerg. 440/230VAC Emergency


switchboard phase-three wire(+Gnd.) generator, or from 440V consumers
230VAC-60Hz-three Ship Service switchboard
phase-three wire(+Gnd.)

Battery systems 24VDC, two wire Battery chargers or Automation/navigation/


batteries communication

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 107


Project no: 3720
VS type: VS 470 MPOV Mk III

440V AC Main System


The 440VAC generators shall serve as the source of power to the system thorough the 440VAC Main
switchboard.
The system shall provide power for all equipment connected to the feeder sections of the 440VAC Main
switchboards as well as the 440/230V Emergency switchboard and 440VAC distribution panels ("P").
The system shall also supply the 230VAC Ship Service switchboard via two (2) transformers.

440 VAC Emergency System


Normal power for the emergency switchboard shall be supplied from the 440V Main switchboard through a
bus tie breaker. Upon loss of normal power, the emergency generator shall be automatically started and shall
open the bus tie breaker to the 440VAC Main switchboard. Then the emergency generator breaker shall be
engaged and supply power to the emergency consumers. The emergency generator circuit breakers shall be
electrically interlocked in order to prevent damage to electrical systems.
During "in port" conditions, with main generators resting, the 440VVAC Main power system shall be supplied
by the harbour/emergency generator.

230 VAC Ship Service System


The 230 VAC Ship Service system shall be supplied from the 440V Main switchboard via appropriate
(440V/230 VAC) transformers. The 230 VAC systems shall serve all lighting circuits and other 230 VAC
power consumers.

24 VDC System
One (1) 24V radio battery GMDSS reserve source (normally the GMDSS radio station shall be fed from 230V
main supply or 230V emergency supply).
One (1) 24VDC battery system shall be fitted for supply of 24V bridge equipment.
Two (2) 24VDC battery systems (redundant systems) shall be fitted for supply of 24V engine room/ECR
equipment.
Two (2) 24VDC starting battery systems for emergency generator shall be fitted.

Welding transformer
In workshop a welding transformer/rectifier shall be mounted. Capacity of approx. 250A welding current.

866 Batteries and batterey charges


Batteries
All batteries shall be Marine Lead Acid Batteries and shall be so located that the batteries' temperature at all
times remain within the manufacturer's specification. A location at open deck exposed to sun and frost shall
normally not be accepted, without additional means to protect the batteries.

The following battery banks shall be provided and installed:


One (1) x GMDSS radio equipment.
One (1) x Fire detection plant (internal).
One (1) x Alarms, controls, navigation & radio equipment on bridge (redundant systems).
Two (2) x Alarms, control, monitoring equipment for engine room (redundant systems).
Two (2) x Starting of emergency generating set (redundant systems).

UPS systems
One (1) UPS shall be installed for Vessel Management System.
Two (2) UPS for Vessel Management operator stations and Buyers supplied PC's and for Intercom system.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 108


Project no: 3720
VS type: VS 470 MPOV Mk III

All with capacity for minimum 30 minutes.


The power shall bypass the UPS in case of UPS failure.
The voltages shall be 24VDC unless otherwise specified by the makers of the receptacle equipment.
Capacity, discharge rate as well as number of sets for each of the above batteries shall be in accordance with
regulations and maker's recommendation.
All battery banks for bridge equipment shall be mounted in heavy-duty fibre glass boxes with rubber waffle
matting underneath them.

Battery chargers
Each battery bank shall have separate charging device with volt and current control for high rate and trickle
charging with uninterrupted power supply to the specified consumers.
Battery banks for bridge and engine room equipment shall have two (2) battery charges for each battery bank
in order to get 100% redundancy of power for important equipment.
One (1) of the chargers for each of these battery banks shall be fed from the emergency switchboard.
Each battery charger shall be fitted in the vicinity of the respective battery in a dry area.

868 Shore Connection box


440V Shore connection shall be connected to the 440V Main switchboard. The shore connection shall be
interlocked with the 440VAC, aux. generator breakers and the Emergency/ harbour generator breaker to
prevent parallel operation.

The following equipment for the shore connection shall at least be equipped in the 440V Main switchboard:
Two (2) contactors for phase sequence shifting.
Two (2) push buttons for connecting/disconnecting of shore supply.
Two (2) indicating light ("shore power available"/"shore power connected").
One (1) Phase sequence meter with relay for phase sequence shifting.
One (1) Phase sequence selector switch.
One (1) Ammeter.
One (1) Ammeter switch.

In addition, a shore connection box shall be installed in a suitable location on 1st deck (e.g. in the emergency
generator room).
Cable entry shall be provided at the bottom of the box for the temporary connection of the shore power cable.
Cable entry with hinged cover shall be designed to facilitate ease of cable connection and hook up.

The connection box shall be fitted with followings:


One (1) - 200 A moulded case circuit breaker.
One (1) - Phase sequence indication lamps.
One (1) - "Power On" indicating lamp.
One (1) - Kilowatt-hour meter.

A 40 meters length of shore power connecting cable with 200 A capacity shall be provided and stored. Cable
shall be securely stowed in an area protected from weather and seas.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 109


Project no: 3720
VS type: VS 470 MPOV Mk III

87 ELECTRICAL COMMON DISTRIBUTION

870 Main Ship service and Emergency switchboards

General
The following switchboards shall be installed:
One(1) 440V Main switchboard.
One(1) 230V Ship Service switchboard.
One(1) 440/230V Emergency switchboard.

The switchboards shall be of self-supporting dead-front, drip-proof , box frame construction with a drip-cover
over the top and shall have hinged front panels that can be opened without disturbing the meters, pilot lamps,
etc. mounted on them. Each access panel shall be provided with stays to hold access panels open. The
switchboard shall be provided with insulated steel handrails in both front and back.

All switchboards shall be resiliently mounted on heavy-duty shock absorbers mounted on top and bottom of
switchboards.

All MCCBs for motor starters shall be equipped with the ST motor characteristic.

Terminals
Cable terminals shall be of the solderless type and clearly marked with the circuit served.

Fuses
Control and instrument circuits shall be protected by mini circuit breakers except for circuits where the
opening of the circuit could be hazardous. Current transformers for instrumentation shall not be fused.

Bus Bars
The bus bars shall have sufficient current-carrying capacity for continuous operation and provisions shall be
made for withstanding mechanical strains created by electromagnetic forces by large motor starting currents
or fault currents. The bus bars shall be made of copper and shall be provided with silver-surfaced
connections.
Bus bar supports shall be provided with sufficient strength to withstand a short circuit of bus bars, and shall
be made of moisture resistant materials.

Earth busbars
Cobber earth-busbars shall be fitted throughout the switchboard and so arranged that running of earth
conductors and connections shall be easy survey-able and easy accessible also after the installation of
switchboard. Only one earth conductors for each screw in PE and IE busbar. PE and IE busbar shall be
properly labelled and the connection to the hull shall be easy accessible. All earth connections onboard shall
be accessible and shall be labelled.

Labelling
Labels shall be provided in English and shall identify all switchboard components, such as circuit breakers,
control switches, instruments, indicating lights, terminal blocks, transformers, etc.
The nameplate on feeder circuits shall indicate the feeder designation, name of application, cable cross-
section and ampere rating.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 110


Project no: 3720
VS type: VS 470 MPOV Mk III

871 440V and 230V Main Switchboard

General
The Aux. generator shall supply the 440V Main switchboard. The switchboard shall be equipped with two(2)
separated bus-bars internal connected by one (1) motor-operated bus-tie breaker.
All circuit breakers on the switchboard shall be able to withstand the maximum short circuit capacity when
generators are running, one (1) thruster is running and half of the cargo pumps and cargo compressors are
running.
The Main switchboard shall be of the "dead front" type, arranged with necessary numbers of standardized,
segregated, self supporting metal clad steel sheet compartments and fitted out with 4 bus-bar systems. The
Main switchboard shall be air insulated and designed for ship operation and equipped with withdrawable
motor-operated air circuit breakers for generators, thrusters and bus-tie breaker. The switchboard shall be
designed for free standing mounting on vibration dampers.
The switchboard shall be tested according to IEC and Class requirement.
Connection of power cables shall be from the bottom only. Connection of auxiliary cables may be arranged
from the side (arranged with throating) or bottom.
The generators shall be protected by draw-out type air circuit breakers of the trip free type and controlled by
the switchboard automation system. The circuit breaker for the generators shall have an over current trip
device with long time over current and short time delay trip action, and a magnetic coil for instantaneous trip
and under-voltage trip.
Automatic earth fault monitoring shall be provided for all outgoing feeders/ busbar systems.
Necessary converters/ signal outputs shall be provided for propulsion plant, thrusters, etc

Parallel operation of generators


The aux. generators shall be arranged for parallel running with automatic load sharing arrangement.

Internal wiring
Auxiliary wiring inside the panel shall be of the insulated stranded copper conductor type. All wiring shall be
halogen free and flame retardant type according to IEC 332-3C and approved by Class. Voltage class shall
be 230V for all internal wiring. All internal wiring shall be terminated by ferrules.

Moulded case circuit breakers (MCCB)


All outgoing feeders shall be provided with moulded case circuit breakers (MCCB) (except for thrusters which
are provided with air circuit breakers).
All MCCB shall have plug-in mounting. These breakers shall be removable from the panel front without de-
energising the main bus.

Bus bar systems


The 440V switchboard shall be separated into four (4) bus bar systems and the 440V consumers shall be
arranged between the busbar systems for maximum redundancy.

Generator panels
One (1) generator panel shall be fitted for each generator. Each generator panel shall contain equipment for
protection and control of the respective generator.

The control equipment installed in the front of the panel shall at least contain the following:

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 111


Project no: 3720
VS type: VS 470 MPOV Mk III

One (1) Ammeter (scale min. 130% of the rated full load).
One (1) Voltmeter (scale min. 120% of the rated voltage).
One (1) Wattmeter (scale min. -15/+150% of the rated full load).
One (1) Frequency meter (scale min. +/-8% of the nominal frequency).

Necessary push buttons and indication lamps for the generator breakers and control equipment.

Feeder section
The 440 VAC feeder panel shall at least be provided with the following:
One (1) - Insulation level meter with earth indication lamp (for each busbar system)
Necessary numbers of triple pole moulded case circuit breakers (plug-in type) according to single line
diagram and systems/equipment described in specification.

230V Ship Service switchboard


The 230V Ship Service switchboard may be a part of the 440V switchboard.
Bus-tie breakers shall at normal operation be open and the switchboard shall be supplied from two (2)
transformers, feeding each section of the 230V switchboard. The transformers are fed from the 440V Main
switchboard.
All circuit breaker shall be of moulded case plug-in type.

Bus bar systems


The 230V section shall be separated into two (2) bus bar systems and the 230V consumers shall be arranged
between the two (2) sections for maximum redundancy.

The 230 VAC feeder panel shall be provided with following:


One (1) - Ammeter with a selector switch for reading each phase current of the transformer's secondary
circuit.
One (1) - Voltmeter with a selector switch for reading each phase.
One (1) - Insulation level meter with earth indication lamp (Class approved).

872 440V/230V Emerg. switchboard


The switchboard shall normally be supplied from 440V main switchboard.
All circuit breakers shall be able to withstand the maximum short circuit capacity when
Two (2) off generators are running in parallel. 230V section shall fed from two (2) 440/230V transformers,
supplied from the 440V section of the 440/230V Emergency switchboard.

230VAC Feeder Panel


The 230 VAC feeder panel shall be provided with followings:
One (1) - Ammeter with a selector switch for emergency transformer.
One (1) - Voltmeter with a selector switch.
One (1) - Insulation level meter with earth indicating lamp.
Necessary number of triple or two (2) pole moulded case circuit breakers.
Two (2) - Spare breaker.

The 230 VAC feeder panel shall be fed from the 440 VAC feeder panel of the emergency switchboard via the
emergency transformers.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 112


Project no: 3720
VS type: VS 470 MPOV Mk III

874 Motor starters

General
In general, starters shall be of a drip-proof type and shall be of suitable construction for either deck or
bulkhead mounting.

Starters shall be of electro-magnetically operated type, except starters for non-essential motors of 0.2 kW
and less, that may be manually operated with moulded case circuit breakers or protectively fused line
switches.

Hr. counter on all motors, not included in the Automation system, above 20kW
In general, starters below 10 kW shall be of direct-on-line starting type.
Star Delta starters between 10 kW and 50 kW. Soft start above 50 kW.

Where excessively high starting current of the large motors could cause voltage drop of the switchboard bus
bars more than 15 %, the starters for those motors shall be of star-delta reduced voltage starting type or auto
transformer starting type. If star to delta starters is used, means should be provided to prevent transients on
the main power network.
Tunnel thruster shall have auto-transformer starting.

875 Distribution boards and panels

General
All distribution panels shall be made of aluminium or steel with painted surface.
Drawings indicating system and circuits shall be put inside all terminal boxes and distribution boards.

Earth busbars
Cobber earth-busbars shall be fitted and so arranged that running of earth conductors and connections shall
be easy survey-able and easy accessible also after the installation of switchboard. Only one earth conductors
for each screw in PE and IE busbar. PE and IE busbar shall be properly labelled.

Earth leakage switches


Earth leakage switches (30mA) shall be fitted for all feeders supplying floor-heating cables.

440V distribution board


The 440V distribution boards for supply of 440V power consumers shall be located where necessary around
the Vessel.

230V distribution board


The 230V distribution boards for supply of low consumption- and domestic equipment shall be located where
necessary around the Vessel, with at least one (1) 230V distribution board fitted on each deck level.
230V distribution panels for engine room may be centrally located in the Engine Control Room. 230V
distribution panels for accommodation shall be located in a central position on the deck served.

230V AC Emergency distribution board


230VAC Emergency distribution boards shall be fed from the emergency switchboard, and shall supply all
necessary Emergency consumers around the Vessel, if not supplied directly from the emergency
switchboard.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 113


Project no: 3720
VS type: VS 470 MPOV Mk III

Navigation light panel


Two (2) Signal light distribution panel shall be supplied from both the main switchboard and emergency
switchboard.

24V DC distribution boards


Five (5) dead-front type battery switchboards shall be provided for the 24V battery distribution
systems(switchboards on bridge shall be recessed type).

The distribution boards shall be denominated as follows:


24VDC Distribution board for GMDSS console.
24VDC Distribution board for consumers on bridge.
24VDC Distribution board No.1 for consumers in engine room.
24VDC Distribution board No.2 for consumers in engine room.
24VDC Distribution board No.1 for Vessel Management System.

Distribution boards for ROV and Deck in stainless steel lockers.

Two (2) identical distributions boards shall be installed. One (1) to feed connection point on aft
accommodation and port side of deck, and one (1) to feed connection point on SB side of deck.
Each distribution board to supply the following via individual breakers:
440VAC, 3ph, 300A to 440V Socket Station at each connection point.
230VAC, 3ph, to transformers for 230VAC socket stations and 230VAC UPS.
110VAC, 3ph, to transformers for 110VAC socket stations.

88 ELECTRICAL CABLES AND INSTALLATION

General
Cables supplying a single load, in general, shall have a continuous current carrying capacity of the connected
load.

Cables supplying multiple loads, in general, shall have a current carrying capacity calculated without
consideration of demand factor and/or diversity factor to the total connected loads.

The voltage drop on all power and lighting circuits from main bus bars to the final termination point shall not
exceed 6% of the nominal voltage, except for DC circuits, where a maximum voltage drop of 10% of the
nominal voltage is allowed.

The type of cables and installation inside switchboards, starters, panels, etc. shall be provided in compliance
with the regulations of the Classification Society and the requirements of Section and its various subsections.

Power cables and signal cables shall be run, fixed and connected according to maker's Installation Manual
and according to IEC 60533 regarding EMC. Distance between power cables and signal cables shall be
sufficient to avoid interference.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 114


Project no: 3720
VS type: VS 470 MPOV Mk III

Cable and wire marking


All cables, conductors and terminals shall be clearly and durably labelled for easy indication and drawing
reference.

Routing of cables
In general, all cables shall be supported by continuous corrosion resistant steel metal hangers, ladders or
cable trays as far as possible. Metal hangers, ladders or cable trays also shall be provided in bends in order
to get a continuous support. Expansion joints shall be provided where required. No cables shall be run on
unpainted steel.

In the engine room, machinery spaces and other wet rooms, all cable hangers, ladders and trays, including
their fixing devices, shall be made of galvanized steel.
On weather decks all cable hangers, ladders and trays shall be made of stainless steel or Class approved
non-metallic materials with equal properties.

When fixed to aluminium structures, aluminium alloy cable ladders and trays shall be used.

Cable installation on weather decks shall be minimised. Cables shall be run through galvanized steel pipes or
protected cable trays and shall be as short as possible. Cables shall be provided with heat shrinkable tubes
to seal the cable and gland transition for all weather deck installation.

All cables shall be routed in a way that protects them from mechanical damage. If this is not possible, they
shall be protected from damage by steel covers.

Painting of cables
No cables shall generally be painted, as painting may impair the properties of the outer protective sheathing
and prevent the possibility of distinguishing power and control cable types by different colour coding system
of outer sheath, regarding proper separation of cables. If cables shall be painted, by any reason, it shall be
documented that the painting not will impair the properties of the outer protective sheathing.

Separation of cables
Where a system shall have duplicated supply and/or control cables, for safety reason (steering gears, etc.),
the cable routes shall be located apart from each other.

Cable inlets
On external decks or other exposed area, cable inlets shall only be from the bottom of equipment through a
watertight gland. Goose-necks on external decks shall be fact aft.
Goose necks pipes on open deck shall be faced aft.

Cable bundles and fixing of cables


Power cable of maximum six (6) cables or signal cables of maximum 15 cables shall be bunched together by
one (1) clamp.
If bunching of larger formations is used for cables expected to be under full load simultaneously, a correction
factor of 0.85 shall be applied.

The cables shall be fixed with a fixing point ratio at least according to the table below:

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 115


Project no: 3720
VS type: VS 470 MPOV Mk III

Cable runs Maximum distance Maximum distance Remarks


between plastic between stainless
securing strips steel securing strips

On top of horizontal 0,5M 1M


ladders/trays

Hanging below horizontal cable 0,3M 0,7M


ladder

On vertical cable ladder 0,3M 0,7M Stainless steel clamps or band can
also be used.

When cable runs are subjected to water splashing on weather decks they shall be secured by stainless steel
securing strips, clips, saddles or bands. The maximum distance between fixings of cable and its support
(cable trays or pipes) shall be 500 mm.

Fixing of single core cables laid in trefoil formation for 3 phase installation used for e.g. generators, tunnel
thruster, etc. shall be fixed by use of specially made safety clamps (type Alcatel/Nexans Safety Clamps or
equal). The maximum distance between the clamps shall be 0,2m, to withstand the thermomechanical and
electromagnetic short-circuit forces.

Single core cables


To avoid undesirable inductive effect, single core cables should normally not be used for AC installation
onboard this Vessel, other than for Short-circuit proof installation.

Earthing
Generally shall all metal parts of the electrical installation, other than current carrying parts be earthed.
Earthing may, however, be omitted for double-insulated equipment, bearing housings, low voltage equipment
etc.

Electric equipment enclosure


All electrical equipment in machinery or similar spaces shall have at least IP 44 enclosures unless otherwise
specified.
Equipment under floors and other wet places shall have minimum IP 55 enclosure and equipment on deck
shall be of minimum IP 56 enclosure.

Cable types
All cables shall be marine type weather resistant cables designed for 55°C ambient temperature and a
temperature class of 85°C for propulsion, power and lighting cables.
All cables shall have Class certificate and shall in general be constructed by use of tinned stranded copper
conductor, insulation of Cross linked Poly-Ethylene (XLPE) or Ethylene Propylene Rubber (EPR) and with
outer sheet of EVA cross-linked rubber.
All power cables shall be produced and tested in accordance with the following international standards: IEC
60092-352 (insulation material), IEC 60092-359 (sheathing material), IEC 60331 (fire resistant), IEC 60332-3
(fire retardant), IEC 61034 (low smoke), IEC 60754-1 (halogen free), IEC 60754-2 (no corrosivity).
All control and signal cables shall be produced and tested in accordance with the following international
standards: IEC 60092-352, IEC 60332-3 (fire retardant), IEC 61034 (low smoke), IEC 60754-1 (halogen free),
IEC 60754-2 (no corrosivity).

For easy identification and separation of signal, control and power cables, the outer sheet of cables should be
coloured in different colours (Two colour standard to be used).

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 116


Project no: 3720
VS type: VS 470 MPOV Mk III

Spare cables
Unused wires/cables shall be earthed/short circuited in minimum one end. Where possible, both ends shall
be earthed, short circuited and marked.

880 Cableways

General
All cables shall be effectively supported and secured without damaging the outer covering of the cables.
Cable groups shall be supported on metal hangers, ladders or cable trays, located away from exhaust or hot
pipes, and shall be installed clear of steel hull structure, in order to permit painting of the surrounding
structures.
Cable ladders shall preferably be fitted with "Z"-rungs for possibilities to run cables on both sides of the cable
ladders.
Cable trays shall below 1st deck be insulated from 1st decks girders and stiffeners, due to welding on 1st deck.

882 Cableways in accommodation


The cable trunks shall have removable hatches for easy excess. Distribution boards shall be located in cable
trunks at each deck.

Cables in the whole accommodation shall be concealed in conduits behind ceiling and lining. Halogen free
plastic conduits, wall boxes and ceiling boxes shall be used. Where it is impossible to run conduits behind
linings, cable ducts with colour matching the wall shall be used.
Main cable trays shall mainly follow the corridors where the junction boxes for the concealed installation shall
be placed, above removable ceiling or behind removable linings.
Panel work in accommodation, covering cable runs, shall be easily removable.
One (1) pipe from engine control room to bridge deck for spare cables.

883 Cableways on external decks


Cable installation on weather deck shall be minimised. For protection of vertical single cable penetration,
galvanized pipes with cable gland on top shall be installed. The pipes, which shall be equipped with swan
neck, shall have a high of 900 mm above the actual deck level and shall be strongly welded to the deck.

Cables on weather decks shall be properly protected against mechanical damages.


All cable trays and cable ladders shall be of stainless steel. Cables shall be secured by means of securing
strips, clips, saddles or bands of stainless steel.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 117


Project no: 3720
VS type: VS 470 MPOV Mk III

89 ELECTRICAL DISTRIBUTION SYSTEM

General
The following general items are valid for the complete electrical and automation installation throughout the
whole Vessel (see also group 88). For distribution panels, see group 875.

Degree of protection
All electrical equipment shall at least fulfil the Class requirement regarding enclosure degree of protection in
relation to location of equipment.
In addition to Class requirement, all weather deck control stations and instrumentation, and all socket outlets,
enclosures, junction boxes, floodlights, fluorescent lights and other light fittings shall have IP66/67 rated
degree of protection.
Equipment in dry accommodation spaces shall have IP 20 rated degree of protection or better.
Equipment in engine rooms shall have IP 44 rated degree of protection or better.

Lighting systems

General
Explosion-proof fluorescent lights shall be provided in gas-hazardous spaces.

Lighting control panels shall be installed in the wheelhouse and suitable locations as appropriate.
When control panels are located remote from the area served, sub panels with switches and breakers shall
be provided as appropriate in the area served.

Permanent lamps shall be fed from the 230 VAC normal supply system unless otherwise specified.

Lighting equipment
High quality fluorescent fixtures of recognized standard type, constructed for marine use shall be used
throughout the whole Vessel except for rooms where wall lamps or special exclusive lamps shall be fitted.
Fluorescent fixtures shall not be equipped with power compensation capacitors, due to the risk of harmonic
resonance.
Lighting fixtures exposed to mechanical damage shall be protected with guards for incandescent lamps and
polycarbonate globes for fluorescent lamps.

Fixtures for exterior applications shall be constructed of stainless steel, bronze, polycarbonate or iron free
aluminium. Fixtures for interior locations shall be constructed of steel or aluminium.
Lighting fixtures and accessories exposed to water and water spray shall be watertight.

The bodies of switches, plugs, receptacles, junction boxes, etc., may be constructed of synthetic resins, cast
brass, stainless steel or steel plate. Stainless steel or cast bronze material shall be used for these
applications in areas exposed to the weather.

Junction boxes
Junction boxes may be provided for cable joints, where necessary, but in general, the numbers of junction
boxes should be restricted to a minimum.

Junction boxes shall be clearly marked with PVC labels designating voltage and feeder circuit/system. If
junction boxes are concealed behind ceiling or lining, the labelling should be located on the outside of such
panels.

Junction boxes in engine room shall be located above fixed flooring, except connections to equipment
mounted bellow the fixed flooring

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 118


Project no: 3720
VS type: VS 470 MPOV Mk III

Switches
Switches used for lighting branch circuit shall be of 16A double pole type and the material of body shall be
synthetic resin or cast brass.

Switches shall be flush mounted in the accommodation and other areas where bulkheads are finished with
joiner work or panels and surface mounted in other areas.

For ceiling lights in other cabins/rooms, one (1) switch shall be fitted near the entrance door.

For engine room lights and passage lights, moulded case circuit breakers on distribution boards shall be used
as switches.
A deck-light switching panel for all outside lighting shall be arranged on the bridge.

Receptacles
In general, receptacles shall be double type 15A DIN type, 3-pole(2p + earth). Earth pin shall be used as
earthing connection for metal frames of portable appliance.
In accommodation
Receptacles of a sufficient number, voltage and capacity are shall be provided throughout the working and
living spaces of the Vessel.

Wheelhouse
At least five (5) receptacles shall be installed around in the wheelhouse for various purpose. In addition, at
least one (1) twin receptacle shall be installed inside each bridge console(fore and aft).

Engine room/workshop
Sufficient numbers of receptacles for portable tools, etc. shall be fitted in engine room and workshops.

Receptacles for external deck


One(1) DIN-type twin socket outlet with cover shall be fitted inside each corridor entrance on all decks.
One (1) watertight socket outlet (single) with screw cap shall be fitted in a protected place on the forecastle
deck.
Two(2) watertight socket outlets(single) with screw cap shall be fitted on 1st deck in a protected place aft of
the superstructure(SB/PS).

Reefer sockets
Three (3) reefer sockets, 230V, 60Hz shall be arranged below mezzanine deck.

Emergency lighting and lighting distribution


Emergency lighting shall be installed throughout the vessel according to Class and Authority requirement.
Emergency lighting shall normally be used as general illumination purpose and fed from the emergency
switchboard via each emergency lighting distribution panel.
Where rules and regulations require lighting fixtures supplied from two (2) separate circuits, one (1) of them
shall be connected to the emergency supply system.
Around outside aft deck, in corridors at each deck, in each stairway and escape routes, some light fixtures
with built-in chargeable batteries (3 hours capacity) shall be mounted as part of the emergency light system,
approx. 17 units (depending of arrangement).

Emergency lighting circuits shall be provided as partial lighting in at least the following areas:

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 119


Project no: 3720
VS type: VS 470 MPOV Mk III

Wheelhouse and communications spaces.


Hospital.
Mess room.
Galley.
Passage ways.
Staircases.
Engine Room.
Engine control room.
Working deck.
Emergency generator room.
Steering gear room.
Thruster area.
Cargo area.
At MOB station.
Engineers cabins.

Lifeboat light, life raft light, chart light, bunker lights, instrument light, navigation and signal light shall also be
fed from the emergency switchboard.

Illumination levels
In general, rooms and spaces shall be effectively illuminated according to the following standard. The figures
given are the average horizontal illumination levels with a tolerance of 10% at the stated measuring points.

Average illumination levels shall be:

Compartment/area Illumination level Remarks


in lux

Engine rooms 200 300 at control panels

Machinery rooms 200

Engine Control Room 250

Workshops 250

Stores 150

Galley 250

Mess and day room 150

Cabins 150

Laundry 150

Wheelhouse(night operation) (at shore) 10 150 Special red ceiling lights Ordinary lights

Cargo compartments 150

Refrigerated chambers and dry provision store 150

Working deck area 100

Mooring stations 100

Toilets 150

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 120


Project no: 3720
VS type: VS 470 MPOV Mk III

Emergency generator room 100

891 Electrical lighting systems for engine room etc

General
In general, machinery spaces, stores, thruster rooms, workshop, etc, shall be illuminated by two (2) x 18W
fluorescent light fittings. Other light fitting types may be used for special illumination purpose.

Working light
A sufficient number of working light shall be fitted in engine and workshops.
Flexible working lamps shall be fitted on all machine tools as well as on all working benches.

Lighting fixtures in machinery spaces, engine room, stores, etc.


Machinery space lighting shall be so arranged that failure of one branch circuit shall not cause complete
darkness in the said space.

Engine room, cargo area, storerooms, workshops etc. shall be provided with high quality fluorescent fixtures
of the following types:
Two (2) x 18W with polycarbonate shade, IP 44 enclosure.

Lighting ECR
Flush mounted fluorescent fittings of two (2)x18W shall be installed in the ceiling in engine control room.

892 Electrical lighting for superstructure/accommodation

Wheelhouse lighting
Fluorescent light fittings shall be used as general lighting in the wheelhouse (2x18W).
Down light fixtures of fluorescent type (11W) shall be installed above all control consoles with separate
dimmer switches for each console.

In addition to the ordinary lighting, special red lighting to preserve the night vision shall be installed for the
wheelhouse, toilet in wheelhouse and the chart space. Approx. eight (8) fluorescent light fittings, 1 x 18W,
recessed type, shall be installed in the ceiling for this purpose. The red lighting shall be supplied from the
emergency switchboard and shall be provided with dimmer switches, giving a variable red lighting.

The door between wheelhouse and corridor below shall be provided with a door switch for switching off the
bright light in corridor while the door is open, preventing bright light from the said area to come into the
wheelhouse.

Bath and toilet rooms


One (1) lighting fixture 1 x 18W including a socket outlet with isolating transformer (shaver outlet), shall be
mounted above the mirror. Additional ceiling light of recessed type shall be fitted, if necessary (IP44).
All switches shall be located outside the bath and toilet rooms.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 121


Project no: 3720
VS type: VS 470 MPOV Mk III

Cabins lighting
The light installation shall be according to the lux levels indicated in the table above.

The following equipment shall be installed in each cabin as a minimum:


One(1) x Fluorescent fitting, 2x18W of recessed type shall be installed in each room (cabin and
bedroom).Sufficient numbers of 230V downlights may also be used as an alternative, if more
appropriate.
One(1) x Fluorescent berth light, 1 x 8W, with diffuser, shall be installed above each berth (head end),
with on/off switch fitted on the front. Shall be connected to the emergency lighting circuit.
One(1) x Wall lamp of ornamental type.
Three (3) x Twin receptacles (230V) for radio, refrigerator, hair dryer etc., one (1) of them shall be
installed above the table.
One(1) x Fluorescent fitting, 1x18W, mounted above the desk (below book shelf), with switch fitted on
the front.

The additional equipment shall be installed in the officers' cabins/clients cabins:


Two(2) x Wall lamps of ornamental type.
One(1) x Flexible table lamp, 1x18W.
One(1) x Downlight, 1x13W.
One(1) x Twin receptacles(230V).

Ceiling lights in cabins shall have on off switch at cabin door and by the bed.

Mess room / day rooms lighting


Two (2) x 18W recessed fluorescent lighting fixtures, with silver/aluminium metal screen shall be used as
ceiling lights. In addition, down-light /low voltage illumination shall be arranged, for illumination of special
area.
Necessary amount of ornamental type wall and/or table lamps shall be arranged to give a comfortable
environment (depending of room size, design and arrangement).
The lighting shall be so arranged that failure of one branch circuit shall not cause complete darkness in the
room.
Fluorescent ceiling light, down lights, wall and table lamps to have separate switches arranged at each
entrance.
All lights shall be regulated by means of dimmer switches.

Offices
Two (2) x 19W recessed fluorescent lighting fixtures, with golden metal screen to be used as ceiling lights.
One (1) light fixture with flexible arm shall be fitted above each writing desk.

895 Electrical lighting system for weather decks

General
Deck lighting in working deck area shall comply with Rules.
High-pressure sodium floodlights shall be fitted for lighting of fore-, side- and aft decks and other open deck
areas.
All floodlights, searchlights and fluorescent fittings in the forecastle area must be given special protection
against sea spray.
Part of the deck light shall be fed from the emergency switchboard.
A switch control panel for all deck lighting shall be fitted in the wheelhouse.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 122


Project no: 3720
VS type: VS 470 MPOV Mk III

General deck lighting


High quality 2 x 18W and/or 2 x 36W fluorescent lamps made of polycarbonate or stainless steel shall be
installed as general illumination on outside decks. For exposed deck area in front and stbd./port sides of
superstructure, fluorescent lighting of type brass luminaries.

Cables shall pass through accommodation with short cable pipe connections to the lighting fixtures. Cables
between lighting fixtures shall be protected by steel conduits. No bare cables shall be run on deck.
Flexible/movable lamps shall be connected via junction boxes with flexible cable entering box through
covered cable gland.

Lifeboat/Life raft Embarkation Lights


One (1) 300 W, halogen floodlight with local switch shall be fitted at MOB boat and one (1) 300 W on SB side
(Gangway light).

One (1) 2x18 W, fluorescent fixture with built-in battery pack(3 hours), shall be fitted at each life raft storage
space as suitable, controlled from the wheelhouse light control panel.

The lights shall be fed from the 230 VAC emergency supply system.

Floodlights
High-pressure sodium and halogen floodlights shall be provided for deck illumination. Sodium vapour type
floodlight shall be provided for working deck area/after deck. Lighting shall be controlled from the lighting
control panel in the wheelhouse.
Illumination levels shall be according to the lux table above.

The following floodlights shall be fitted:


Eight (8) units 2 x 400W High-pressure sodium floodlights.
Two (2) units 1 x 400W High-pressure sodium floodlights.
Six (6) units 1 x 1000W Halogen floodlight.

897 Electrical heating equipment

General
230V AC power to be used for heating of electric motor and generators.
440V or 230V to be used for space heating.
El. heating floor in bathrooms.

Electric space heating


Electric heaters to be installed for sufficient heating of the compartments specified below.

The following heaters to be installed as a minimum:

Compartment Heater type Approx. Power Remarks

Wheelhouse Panel heater 4 x 2kW Common


thermostat

Emergency generator room Fan heater 2 kW IP 44

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 123


Project no: 3720
VS type: VS 470 MPOV Mk III

Steering gear room Fan heater 2 5 kW IP 44

Thruster room fwd Fan heater 5 kW IP 44

Cargo area Fan heater 3x5kW IP 44

Bosun store Fan heater 5 kW IP 44

Deck stores Fan heater or panel type 3 kW IP 44

Propulsion area Fan heater or panel type 2x3 kW IP 44

Chemical store EX heater 1 kW EX approved

Paint store EX heater 1 kW EX approved

Cabins and accommodation Panel heaters 1-2 kW

Electric heaters above 1000 watt shall be regulated with at least 2 steps. All heaters shall be thermostat
operated. If one compartment contains more than two electric heater(e.g. wheelhouse), the heaters shall be
controlled by one 2-step thermostat.

898 Electrical Motors, General

General
Motors shall be of squirrel cage induction type designed for 440 VAC, three phase, 60 Hz, except for motors
less than 0,4 kW, or motors for domestic service of small capacity, which may be 220 VAC single phase or
three phase type, in accordance with manufacturer's standard and IEC standard.

All major electrical motors shall in access of build in termic protection have PTC sensors built into the wire
windings and one in spare when possible.

Enclosure
In general, motors shall be of the semi-enclosed drip-proof construction.
The enclosures of motors shall be cast iron or aluminium alloy, unless inherent in equipment design.

The motor enclosures shall have the following requirements, or better:

Compartment/area Degree of Remarks


protection

Below the lowest floor in engine room, and thruster IP56 Totally enclosed fan cooled type
room

Machinery areas IP54

Weather deck IP56 Enclosed watertight construction

Accommodation/dry area IP23

Motors for workshop equipment, and for galley-, laundry- and other domestic equipment , shall be according
to manufacturer's standard.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 124


Project no: 3720
VS type: VS 470 MPOV Mk III

Insulation
Stator windings shall be treated with insulating varnish to resist oil and water. Generally, motors shall be
designed and constructed into class "B" (for motors below 45kW) or Class "F" insulation (for motors above
45kW).
The motors shall be designed for ambient temperature of 550C.
The motors shall comply with Class requirement and IEC standard.

Space Heater
Stator winding heating type or element type space heater shall be provided for all motors of 50 kW and
above, for all motor exposed to the weather and for all motors for standby pumps.

8 SHIP SYSTEMS 27th of June 2011 - REV B Page 125