Form D.F.R. (P.W.) - 25 Running Account of Contractor: Rajanpur Canals Division Hajipur Sub Division
Form D.F.R. (P.W.) - 25 Running Account of Contractor: Rajanpur Canals Division Hajipur Sub Division
2011
Check measured vide CMB No. 54/L Page 37 A-38 Dated: /20 36%
6 Rehandling of earthwork: upto a lead of 50 ft. (15 m). 1000 Cft 17865 500 8932.50 0
8 Cement plaster 1.5" (40 mm) thick ratio 1:6, on slope. 100 Sft 216320.00 1600 3461120.00 1586310.00
9 Cement plaster 1.5" (40 mm) thick ratio 1:6, in bed. 100 Sft 113952.10 1500 1709281.50 760947.00
Bitumen coating to plastered or cement concrete surface. 20 lbs per 100 Sft
10 100 Sft 17427.10 400 69708.40 31613.20
( 9.07 kg per Sq. m.)
Cement concrete lining using washed screened and graded stone aggregate,
11 100 Cft 56933.50 18000 10248030 4696758
ratio 1:2:4 Type -C, in slope.
Cement concrete lining using washed screened and graded stone aggregate,
12 100 Cft 29991.30 16000 4798608 2136208
ratio 1:2:4 Type C, in bed.
Providing and placing cement sand and bitumen in joint sealent ratio 1:2:3,
13 Rft 30769.48 4 123078 46887
1/2" wide and 1" thick.
Earthwork excavation in irrigation channels, drains, etc. to designed
14 section, grades and profiles, excavated material disposed off and dressed 1000 Cft 2178 3000 6534 2964
within 50 ft. (15 m) lead in ordinary soil.
Excavation in foundation of building bridges and other structures including
dagbelling dressing refilling around structure with excavated earth watering
15 1000 Cft 338 3500.00 1183
and ramming lead up to 1 chain (30m) and lift up to 5 ft. (1.5m) in ordinary
soil. 1183
Cement Concrete brick or stone ballast 1/1/2 to 2" (40 mm to 50 mm) ratio
16 100 Cft 76.25 13000 9913 9912
1:4:8 gauge in foundation and plinth.
17 Pacca brick work in foundation and plinth in ratio 1:3 cement sand mortar. 100 Cft 234.00 12500 29250 29250
300
2632654.5
2333408
513115.8
8932.5
380944
1874809.6
948334.5
38095.2
5551272
2662400
76190
3570
III-MEMORANDUM OF PAYMENT
__________________________________________________________________________________
Signature of Contractor.