BOQ English Version
BOQ English Version
BOQ English Version
1
QUANTITY (BOQ)
IL STORAGE PROJECT IN TIMOR LESTE
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ -
$ -
2
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
B FUEL STATION
I PREPARATION WORK
1 Mobilization & Demobilization 1.00
2 Temporary site office (Direksi Keet) 1.00
3 Temporary Electricity & water supply during construction 1.00
4 New Installation and/or power upgrading (40KVA) 1.00
5 Temporary fence 1.00
6 Safety Facilities 1.00
7 Site Security Staff 1.00
Sub Total I
3
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
4
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
e. Resin 7.50
f. Catalyst 1.00
g. Acceton 15.00
16 Loading and Unloading of fuels Equipment and Accessories
a. Hose lossing Dim.4" 1.00
b. Allumunium Tight fill elbow 4" 1.00
c. Gravity Coupler 4"x4" 1.00
d. Vapuor Hose 3" + Chamlock 4"(code.633) 1.00
e. Elbow vapuor recovery dual point 1.00
17 Piping & Fittings
a. Flexible Pipe 4" 120.00
b. Flexible Pipe 2" 120.00
c. Electrofusion Welding Socket 4" 15.00
d. Electrofusion Elbow 2" 35.00
e. Termination 2" 30.00
f. Termination 4" 10.00
5
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
6
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
Sub Total II
7
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
8
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
9
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
10
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
11
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
12
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
2 Finishing Works
a. Brick wall & Plestering works
1 Masonry Brick Wall 1:4 247.00
2 Plestering & Rendering works 1:3 (Toilet) 45.00
3 Plestering & Rendering works 1:5 (Building) 220.69
b - Frame including Door & Window from Aluminium
1 Double door Frame Less glass tempered t.10mm uk.2,10x2x80 (PJ1) 5.00
2 Single door Frame tempered t.10mm 2,10x80 (P1) 4.00
3 Glass window Frame 64.36
4 Window type J1 5.00
6 Window type BV1 1.00
13
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
14
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
15
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
Sub Total IV
16
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
17
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
3 LIGHTNINGROD WORK
a. Unit Air terminal, Electro Static System Radius = 68 Meter 1.00
18
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
4 GENSET WORK
a. Diesel Generating Set silent type cap 30 KVA 1.00
b. Reinforcement concrete for GENSET foundation, K300 0.90
c. Grounding Genset c/w Cooper rod, galvanized pipe 1", cable BC 50 mm 1.00
d. Exhaust/muffler works Including flexible connection,black steel Pipe to the box trap 3.00
e. Installation of ducting Intake fan by using BJLS 50 of 2 m length 1.00
19
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
20
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
Sub Total V
21
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
22
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
15 mm 20.00
Bal Valve : 32 mm 8.00
Gate Valve : 32 mm 1.00
Sub Total VI
23
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION
24
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
$ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
25
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
unit $ - $ -
unit $ - $ -
Cu.m $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
Kg $ - $ -
26
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Kg $ - $ -
ltr $ - $ -
ltr $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
m' $ - $ -
m' $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
27
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
pcs $ - $ -
pcs $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Point $ - $ -
m $ - $ -
pcs $ - $ -
28
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
$ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
29
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Sq.m $ - $ -
m' $ - $ -
LS $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
30
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Sq.m $ - $ -
unit $ - $ -
unit $ - $ -
unit $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
unit $ - $ -
Sq.m $ - $ -
Unit $ - $ -
Unit $ - $ -
31
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Unit $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Unit $ - $ -
Unit $ - $ -
m' $ - $ -
Unit $ - $ -
Unit $ - $ -
Point $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
m' $ - $ -
m' $ - $ -
32
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
Pcs $ - $ -
Unit $ - $ -
Unit $ - $ -
m' $ - $ -
Ls $ - $ -
$ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
33
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
kg $ - $ -
kg $ - $ -
Sq.m $ - $ -
Ls $ - $ -
Ls $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
34
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Sq.m $ - $ -
Ls $ - $ -
$ -
Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Unit $ - $ -
Unit $ - $ -
Sq.m $ - $ -
Unit $ - $ -
Unit $ - $ -
35
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Sq.m $ - $ -
m' $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
36
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
$ -
37
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
$ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
$ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
38
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Unit $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
39
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Point $ - $ -
Unit $ - $ -
$ -
Unit $ - $ -
40
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Set $ - $ -
Bar $ - $ -
m' $ - $ -
Unit $ - $ -
Lot $ - $ -
Ls $ - $ -
Lot $ - $ -
Ls $ - $ -
$ -
Unit $ - $ -
Cu.m $ - $ -
Lot $ - $ -
m' $ - $ -
Ls $ - $ -
41
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
Ls $ - $ -
$ -
Unit $ - $ -
Point $ - $ -
Unit $ - $ -
Unit $ - $ -
lbr $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -
$ -
42
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
$ -
Cu.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Ls $ - $ -
m' $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
43
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -
Cu.m $ - $ -
Ls $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
44
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
Pcs $ - $ -
Pcs $ - $ -
$ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
45
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
$ -
+III+IV+V+VI+VII) $ -
46
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE
C GASOIL STORAGE
I CANOPY WORK
1 Excavation work for Foot plate 200x200x200 cm 8.70
2 Mortar Ground Leveling 0.44
3 Foot Plate Foundation K300 (Plate Thickness=30 cm) 2.40
4 Connecting Beam 30x50 cm 0.42
5 Reinforcement concrete Column K300 (40x40 cm) 0.54
6 Concrete work for composite structure 0.81
7 Supply & Installation of INP steel for Column 320X131X11.5X17.3X6.9mm 10.00
8 Supply & Installation of INP Steel for Beam 200X90X7.5X11.3X4.5mm 36.40
9 Supply & Installation of Truss structure RHS 50x50mm 84.00
10 Supply & Installation of purlin RHS 50X50mm 123.20
11 Supply & Installation of Zincalume Colorbond 0.42 mm 156.80
12 Supply & Installation of Fascia (Lisplank) Zincalume Colorbond 0.42 mm 50.40
13 Roof Accessories (Trekstang, anchor bolt, stiffener, etc) 1.00
14 Backfilling work 2.18
47
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE
48
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE
49
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE
GRAND TOTAL
50
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Sq.m $ - $ -
m' $ - $ -
Ls $ - $ -
Cu.m $ - $ -
51
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
$ -
52
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE
Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
Ls $ - $ -
$ -
Ls $ - $ -
$ -
Sq.m $ - $ -
53
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE
m' $ - $ -
m' $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
Cu.m $ - $ -
$ -
ND TOTAL $ -
54
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMO
SUMMARY
NO ITEM DESCRIPTION
B FUEL STATION
I PREPARATION WORK
C GASOIL STORAGE
I CANOPY WORK
INCLUDING TAX
SUMMARY
$ -
$ -
$ -
$ -
$ -
$ -
$ -
S $ -
$ -
$ -
$ -
$ -
$ -
DING TAX
TAL (A+B+C) $ -