BOQ For Home
BOQ For Home
FAMILY HOUSE
WAKISO DISTRICT
ELEMENT NO. 1
SUBSTRUCTURE
EXCAVATION AND EARTHWORK
Excavate top vegetative soil to average depth n. e. 150mm, load,
wheel and deposite material 50m away from site.
A SM 154 2,000 308,000
ANTI-TERMITE PROTECTION
Treat surfaces of hardcore with ''Aldlex" or any other equal
and approved antitermite solution.
B LITRES 40 3,800 152,000
DAMP PROOFING
230mm(1000gauge)Hessian based bituminous felt damp proof
D course ROLL 1 170,000 170,000
lapped 150mm at joints bedded in cement sand mortar.
1/1/1
262,000
1/1/3
A142 BRC
F ROLL 2 350,000 700,000
T12 bars (12m length) for the foundation base strips plus
G No. 34 29,000 986,000
transport
R8 diameter styrups/rings
H No. 10 15,000 150,000
Binding wire
I Kgs 15 5,000 75,000
TRANSPORT
L bags 80 3,000 240,000
spades/transport
M No. 5 20,000 100,000
wheelbarrows/transport
N No. 3 200,000 600,000
LAKE SAND
O m3 7 85,715 600,005
WATER
P LITRES 2200 25 55,000
1/1/3
1/1/4
AMOUNT(Ush)
ITEM DESCRIPTION UNIT QTY RATE(Ush)
ELEMENT NO. 2
SUPERSTRUCTURE
-
BRICK WORK
BRICK WORK
mortar -
D cement bags 62 34,000 2,108,000
1/2/5
AMOUNT(Ush)
ITEM DESCRIPTION UNIT QTY RATE(Ush)
ELEMENT NO. 3
B galvanised Angle brackets 200x100x100 mm sheet metal 1.5mm No. 50 10,000 500,000
1/3/5
Page 6 - BOQ Family House by MGKB building contractors Ltd. Uganda
Roof covering -
J special self drilling screws to fix to wooden structure pcs 230 593 136,390
K drilling machine and generator hire per day No. 2 75,000 150,000
1/3/8
112mm dia UPVC half round gutter fixed with pvc brackets
N LM 9 24,000 216,000
screwed onto fascia board.
1/3/8
5000 ltr circular PVC tank as crest tank including tap and drain No. 1 1,900,000 1,900,000
- 1/3/9
1/3/9
ELEMENT No. 4
INTERNAL FINISHES.
WALL FINISHES
SM 164 -
15mm thick Internal plaster to the walls 1:3/c:s mortar
A 50kg cement bags No. 28 34,000 952,000
FLOOR SCREED -
PAINTING -
1/4/11
tins (4
I super gloss white 2 60,000 120,000
litres)
Group House and Family House got the same roof structure
ELEMENT NO. 4
1/4/13
ELEMENT No.5
FITTINGS
ENERGY EFFICENT FIREWOOD STOVE OR ITS
A EQUIVALENT 1 1,464,000 1,464,000
LUMPSUM
B Six sitter dinning table/ 6 chiors + transport 1 370,000 370,000
lumpsum
F 2 600,000 1,200,000
sleeping platform + transport lumpsum
TOTAL CARRIED TO BILL SUMMARY 7,159,000
1/5/13
A Fibre Shower try complete with a mixer (900X900) item 1 350,000 350,000
1/6/14
ELEMENT No. 7
STEEL CASEMENT DOOR
Supply and fix the follownin mild stel casement doors to
architect's detail constructed from standard mild steel
sections to BS 990 comprising of a 50mmX50X2mm thick
door frame, 1 No. 40X40X2mm shutter rebated with
20x20x3mm t-sections and 1.5mm thick double faced M.S
plate all primed with red oxide paint before deliverly to site
complete with and including all nessessary ironmongery,
plugging, and screwing to jambs, head and cill:
Suply and fix 1.000mmX2.100mm wooden door complete No. 1 700,000 700,000
supply and fix the following ironmongary complte with all
matching screws and keys -
-
TOTAL CARRIED TO BILL SUMMARY 2,675,000
1/7/16
ELEMENT No. 8
WINDOWS
A overall size 400X1,000 mm high + labour for window fixing No. 4 350,000 1,400,000
B overall size 400X1,400 mm high + labour for window fixing No. 7 400,000 2,800,000
1/8/17
Page 17 - BOQ Family House by MGKB building contractors Ltd. Uganda
ELEMENT No. 9
SEPTIC TANK
A FOUNDATION EXCUVATION
mortar blinding -
C 40mm thick 1.3 C/S blinding to the base of the excuvation pit SM 7 13,000 91,000
foundation concrete -
3
2 SAND + transport M 3.5 85,715 300,003
plaster work -
15 mm thiick 1:2 cement sand mortar plaster to internal walls of
G the septic tank finished using a wooden float -
cast medium medium duty cover and frame for clear 600X600
J opening measured separetely and bedded into cement mortar No. 3 160,000 480,000
1/9/18
Page 18 - BOQ Family House by MGKB building contractors Ltd. Uganda
ITEM DESCRIPTION UNIT QTY RATE(USHs) AMOUNT (USHs)
ELEMENT No. 10
SOAK PIT
PIT EXCUVATION
B Hard core filling into soak pit upto striped level M3 4 120000 480,000
1/10/20
A EARTH WORKS
2 STONE TOPPING
SKILLED(1) HRS 8 3,125 25,000
UNSKILLED (3) HRS 24 1,875 45,000
3 CONCRETING -
A SKILLED(4) HRS 32 3,125 100,000
B UNSKILLED(7) HRS 56 1,875 105,000
4 WATER TANK BASE
A unskilled(4 No.) HRS 62 1,875 116,250
B SKILLED(2No.) HRS 32 3,125 100,000
5 SUPERSTRUCTURE (4DAYS) -
BRICK WORK (165 S.M) -
11 DOOR FIXING
A SKILLED(2) HRS 16 4,375 70,000
-
12 PAINTING -
A windows and doors SM 9 6,700 60,300
B labour(to paint the inernal walls) SM 165 6,700 1,105,500
13 ROOFING
15 EXTRA OVER
training of concrete foundation, and training of brick laying and
A buying of materials and doing paper works HRS 503 3,500 1,760,500
B ADDITIONAL TIME FOR FINISHING WORK IN TIME HRS 354 3,200 1,132,800
1/10/21
SUB-TOTAL 1 70,263,775
SSS
FAMILY HOUSE
SIGN: SIGN:
CONSTRUCTION MANAGER CIVIL ENGINEER
DATE: 23th /09/2017 DATE: 25th /09/2017