Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Hindustan Copper Limited

Pricing Summary Of CC Rod 8mm


As on: 31-JUL-19
Date PRICE_F PRICE_F Rate_FBI Rate_FBI
BIL BIL(D+1) L+0.05 L+0.05(D
+1)
01-JUL-19 445376 445541 69.0165 69.0424
02-JUL-19 439151 438426 69.0424 68.9276
03-JUL-19 435846 435701 68.9276 68.9045
04-JUL-19 437564 436904 68.9045 68.7999
05-JUL-19 433828 433504 68.7999 68.7482
08-JUL-19 437437 437638 68.7482 68.7801
09-JUL-19 429984 428724 68.7801 68.5769
10-JUL-19 432825 431820 68.5769 68.4165
11-JUL-19 436267 437653 68.4165 68.6355
12-JUL-19 439437 439425 68.6355 68.6336
15-JUL-19 442816 442711 68.6336 68.6172
16-JUL-19 439963 441477 68.6172 68.8551
17-JUL-19 438828 439275 68.8551 68.9258
18-JUL-19 441139 440815 68.9258 68.8749
19-JUL-19 449268 450530 68.8749 69.0699
22-JUL-19 446328 446150 69.0699 69.0422
23-JUL-19 443350 443486 69.0422 69.0635
24-JUL-19 444312 444164 69.0635 69.0404
25-JUL-19 446318 446772 69.0404 69.1111
26-JUL-19 442100 441092 69.1111 68.9523
29-JUL-19 441415 440447 68.9523 68.8
30-JUL-19 439982 68.8

Pricing Avg Avg ( Price Product M. H. Markup


(USD) Exchange (RS.) Factor Charges (RS.)
Rate) (RS.)
FN-1 5908.36 Copper Cathode 1.04 3300 0
FN-2 5972.59 Full
Copper Cathode 1.04 3300 1500
FN_F1 5908.36 68.77 438744
Cut
FN_F2 5972.59 68.94 444426 CC Rod 8mm Std 1.04 3300 0
FN_FMID 5934.7 68.71 440247
CC Rod 8mm NS 1.04 3300 -400
M 5940.48
CC Rod 11mm 1.04 3300 0
M_F 5940.48 68.86 440182
CC Rod 12.5mm 1.04 3300 0
W-1 5908
W-2 5890.9 CC Rod 16mm 1.04 3300 0
W-3 5978.5 CC Rod 19mm 1.04 3300 0
W-4 5971.93 Copper Cathode 1.04 3300 0
W_F1 5908 68.94 439795 GCP
W_F2 5890.9 68.63 436612
W_F3 5978.5 68.78 443825
W_F4 5971.93 69.01 444826
Premium
Details (USD)
Product Name CSP FN M PC RT W
CC Rod 8mm NS 160 180 160 180 160 180
CC Rod 11mm 180 200 180 200 180 200
CC Rod 16mm 200 220 200 220 200 220

Price Options: Exchange rate Options: Lifting Options:

D - Daily W - Average Week SBI TT Selling Rate Immediate

M - Average Month W1 - 1st To 7th FBIL Reference Rate Forward (1/2/3) month

FN - Average Fortnight W2 - 8th To 14th Note: For Daily booking Exchange Rate Type Minimum 9 MT

FN1 - 1st To 15th W3 - 15th To 21th Date Of Booking (D) or

FN2 - 16th To End Of Month W4 - 22th To End Of Month Date Next To Date of Booking (D+1)

RT – Real Time

Basic Price = [(Booked Price In USD + Premium)* Multiplication Factor* Exchange Rate]+Handling Charges + Markup
CC Rod 8mm Std 160 180 160 180 160 180
CC Rod 12.5mm 180 200 180 200 180 200
Copper Cathode Full 80 100 80 100 80 100
CC Rod 19mm 220 240 220 240 220 240
Copper Cathode Cut 110 130 110 130 110 130
Copper Cathode GCP 80 100 80 100 80 100

Price Options: Exchange rate Options: Lifting Options:

D - Daily W - Average Week SBI TT Selling Rate Immediate

M - Average Month W1 - 1st To 7th FBIL Reference Rate Forward (1/2/3) month

FN - Average Fortnight W2 - 8th To 14th Note: For Daily booking Exchange Rate Type Minimum 9 MT

FN1 - 1st To 15th W3 - 15th To 21th Date Of Booking (D) or

FN2 - 16th To End Of Month W4 - 22th To End Of Month Date Next To Date of Booking (D+1)

RT – Real Time

Basic Price = [(Booked Price In USD + Premium)* Multiplication Factor* Exchange Rate]+Handling Charges + Markup

You might also like