Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

L

I N
O
C
H
A
T
T
O
D
R
I V
E

BA
CO TBAL
SK
UR
E
T
L

HO TING
EX
IS
USE
BL A

EX
DIW NG
DG

ISTI
.

OFF WH

EX
DP TING
IS
ICE
CP
GP
AR

CO
K

AD WH

EX
DP TING
MPO H

EX

MIN
DP TING

IS
IS
W
UN
D
BA TO
SE
MEN

PA EXIS
T

RKI TIN
NG G
AR
EA
LI
N

PEC
WAT ISTI
O

EX
ER NG
PU

B
C

MP

LDG.
H

LI
AT

NO
TO

CP
GP

CH
AR

AT
K
D
R

TEN
TO
IV

NIS
E

DR

COU
IV

RT
E
PR
OV P
INC ROP
IAL OSE
CA D
PIT SITE
OL
OF
B OH
OL

WAREH
OUSE
CHE
D

DOS
T

TE N
NIS

O.F.Z
COU

.
NORTH

JUST
RT

ICE
LL HA

DEN
RTC

COM R
POU
MO
TORP

N
MOT

D
OO
LO
FFIC

RPO O
E
IBP

OL
MDP

CONCRETE COLUMN'
TYPICAL
TYP. OF METERS
CADWELD EXOTHERMIC
CABLE TO STEEL
CONNECTION
BARE TINNED
#6 BARE COPPER CABLE
COPPER WIRE
1" PVC CONDUIT CONCEALED
WITHIN COLUMN AND / OR
WALL CONSTRUCTION
GRADE
REBAR BONDING
CLAMP
CADWELD TINNED
COPPER CABLE

CADWELD EXOTHERMIC
PARALLEL CABLE
CONNECTION

#4 COPPER WIRE
TO OTHER
METER

TO OTHER SUPPORT COLUMN


CADWELD EXOTHERMIC CADWELD EXOTHERMIC
CABLE TO GROUND ROD CABLE TO GROUND ROD
CONNECTION CONNECTION GROUND ROD TEST STATION
DETAIL

3/4" X 10' 3/4" X 10'


PB
-
GROUND ROD GROUND ROD

SECTIONAL BLOW-UP
ELEVATION DETAIL

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS GEN. NOTES
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- REBAR GROUNDING
DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL MDP SCHEDULE OF LOADS
PROF. ELECTRICAL ENGINEER INCORPORATED MDP PANEL BOARD DETAIL NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING VICINITY MAP REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
01 24
EDGAR A. TIU LOCATION MAP SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
X30 2X200

X50 X125 2X200 2X250

X38 2X100 2X250 2X250

7Y250

ATS
2X250
X14 X14 2X100 2X100
7Y250

7Y250

MDP
2X150

GENERATOR

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- ELECTRICAL
RISER DIAGRAM DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AS BUILT NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
02 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-1 PB-1
9 11
PB-1 PB-1
8 10

PB-1
7

EE-03

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS AS BUILT
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- BASEMENT FLOOR
POWER/ DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AUXILIARY NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LAYOUT AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
03 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-11
PB-4 PB-10
PB-10 3
1 3
1 PB-11
1

PB-11
2
PB-4
2 PB-4
19 PB-11
6

PB-10 PB-10
2 4 PB-11 PB-11
PB-4 PB-4 4 5
PB-10 3 17 PB-4
5 PB-4 21
4

PB-4
PB-4 23
22
PB-10 PB-10 PB-4 PB-11
6 7 20 PB-11
8
7

PB-4 PB-4
PB-4 PB-4
6 PB-11 24
7 26 PB-4
PB-10 PB-4 PB-11 11 28
11 15 14

PB-11
PB-10 13
8 PB-10
10 PB-11 PB-11 PB-11
12 10 9

PB-4
PB-4
25
8 PB-4
9 PB-11 PB-11
PB-10 16 22
13 PB-11
18
PB-10 PB-11
21 PB-4 15
PB-10
12 27 PB-11
PB-11 17
PB-10 PB-10 20
9 22

PB-4 PB-11 PB-4


PB-4 18 24 29 PB-11 PB-11
PB-11
11 PB-10 25 21 19
14
PB-4
13 PB-11
PB-11
PB-4 PB-4 PB-4 23
26
10 14 16

PB-10
19 PB-10 PB-10 PB-11 PB-11 PB-11
16 17 PB-10 28 29 30
PB-4 15 PB-10
12 20

PB-11
27
PB-10
18

EE-04

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS AS BUILT
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- GROUND FLOOR
POWER/ DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AUXILIARY NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LAYOUT AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
04 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-13
PB-12 7
01
PB-13
PB-13
1
2
PB-12 PB-12 PB-13 PB-13
PB-12 03 PB-6 PB-13
02 3 6
02 PB-12 21 8
04
PB-13
PB-6 4
1 PB-13
5
PB-6 PB-12
3 05

PB-6
PB-6 PB-6
2 PB-6 PB-13
PB-12 20 22 PB-6
06 PB-6 4 PB-13 23 17
5 PB-6 14
PB-6 PB-13 27
24 9
PB-12 PB-13
06 12
PB-6 PB-12
6 09

PB-6 PB-6
PB-6 7 26 PB-13
PB-6 PB-4 PB-6
11 PB-12 PB-6 25 18
PB-13 26 28
15 24
PB-12 10
07 PB-13
PB-6
8 15
PB-13
PB-6 19
9
PB-12
10 PB-12
PB-12
11 PB-13
PB-12 14
11
08 PB-13
PB-6 20
10
PB-12 PB-13
12 PB-13
13
16

PB-4
26

PB-6
19
PB-6
PB-13
PB-12 29 PB-6 29
16 31 PB-13
PB-6
32 32
PB-6 PB-13
PB-13
14 21 PB-13 PB-13
PB-12 18 PB-13
PB-12 PB-12 22 24
21 31
19 24

PB-6 PB-6
PB-12 31
15 17 PB-13
PB-6 PB-6
PB-6 30
16 19
17
PB-6 PB-12
PB-6 18 PB-6
25 PB-13
12 PB-6 30
9
13
PB-12
23

PB-13
PB-12 25 PB-13
20 28
PB-13
PB-12 23 PB-13
18 PB-12 33
22

EE-05

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
AS BUILT SECOND REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR POWER/
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL AUXILIARY LAYOUT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
05 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-8
PB-8 9
1
PB-8
13 PB-15 PB-15
PB-8 PB-14 PB-8 2 3
PB-14
8 26 14
25 PB-15
PB-14 PB-14 PB-14 PB-14 1
1 2 23 24

PB-14
3

PB-8 PB-8
5 16
PB-14 PB-14
4 7
PB-15
PB-14 PB-14 8
PB-8 PB-15
5 6 PB-15 PB-15
7 6 PB-15
PB-8 4 5
7
10 PB-8
17

PB-14
12 PB-15 PB-15 PB-15
9 10 13
PB-15
PB-8 PB-15 12
22 11
PB-15
14
PB-8
15
PB-15 PB-15 PB-15
PB-14 PB-14 PB-14 15 17 18
8 PB-14 PB-14 11 13 PB-15 PB-15
9 10
16 22

PB-15 PB-15
21 PB-15
PB-15 20 23
19

PB-8
18

PB-8
PB-8 PB-8 19
3 PB-8 20
11 PB-15
PB-15
30
24 PB-8
PB-14 PB-15 PB-15
PB-15 PB-15 21
PB-8 17 27 31
PB-14 25 26
2 PB-14
14 PB-14
15 16
PB-8
PB-14
4
22
PB-8
12 PB-15
32
PB-8
PB-14 6 PB-15
PB-14 PB-15
21 28
18 29
PB-14
19

PB-14
20

EE-06

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
AS BUILT REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- THIRD FLOOR
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL POWER/ AUXILIARY
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LAYOUT AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
06 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-9
15 PB-16
PB-16
2
1

PB-9
17

PB-16
3

PB-16 6
4 PB-16
5

PB-16 PB-16
6 7

PB-16
8

PB-16
9

PB-9
16

PB-16
PB-16 10
11 PB-16
14

PB-16
13

PB-16
12

EE-07

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS AS BUILT
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- 4TH FLOOR
POWER/ DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AUXILIARY NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING
LAYOUT AS BUILT
REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
07 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
EE-08

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
AS BUILT REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- DECK FLOOR
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL POWER/ AUXILIARY
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LAYOUT AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
08 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
EE-09

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS AS BUILT
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- BASEMENT
FLOOR DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED LIGHTING NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING
LAYOUT AS BUILT
REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
09 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-2
10

PB-2 PB-3
S
8 8

S2 S2
S1 PB-3
9
S1 S1
S
S1 S1 S1
S1 S2 S1
S
S1
S1 S1 S
S1 S1
S1 PB-2 PB-3
S1 S2
S1 9 10 S1 S1

PB-3 S1
S
S1
S S1 PB-2
7
7
S1S1
S PB-3 S
S1
S1
S1
S 11 S2

S
S1
S1
S

S1
S2 S2 S2 S2
S3 S2 S2 S1 S2

PB-2 PB-3
PB-2 11 12
6 S1

S1 S1

S1 S1 S1
S2
S1

S1 S1 S1
S1
S
S1
S1
S1 S1
S1 S1

S1 S1
S1 S1
PB-2
5 S1 S1
S1 PB-3
S1 PB-3
PB-2 5
4 4 S1

S1 S2 S2 S1
PB-3 S2
S2
S2 S2 6
S2

S1 S
PB-2 PB-3
12 13
S2
S2 S1 S2 S2 S2
S1
S1

PB-2 PB-3
2 2

S1 S1

S1
S1

S1
PB-2 PB-3
1 1
S3 S2 S1
S1
S1
S1 S1 S2 S1 S1
S2 S1
PB-2 PB-3
3 S1 3
PB-2 PB-3
S1
13 PB-2 14
S2 14
S1 S3 S2
S2
S2

S2
S1 S
S1 S1

PB-3
15
LEGEND:

PIN LIGHT 18W T5 LED TUBE LIGHT 18W

600X600mm LED
W/ REFLECTOR 36W

CIRCULAR LAMP 24W

T8 LED TUBE LIGHT 20W

EE-10 1200X600mm LED 24W

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
PB-2 UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND
15 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- GROUND FLOOR
LIGHTING LAYOUT DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AS BUILT NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
10 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-5
26

PB-5
11

PB-5
10
S1

S1 S1 S1
S1
S1 S1
S1 S1
S1
S1 S1
S1 S1 S1 S1 S1
PB-5 S1
S 7
S1 S1
PB-5 S1
24 S1 S1 PB-5
S1 S1 25
S1 S1 S1 S1 S1 S2

PB-5 PB-5
8 12
PB-5 PB-5 PB-5 PB-5
5 S2 S2 PB-5
6 4 14
S1 S1 S2 S1 S2 16 S1
S1 S1
PB-5
13

S1
S2 S1 S1 S1

S1 S1 S1 S1 S2
S1
S1 S1 S1 S2 PB-5
S1 S2 15
S1

S1

S1 S1 S2
S1
S2

S1 S1
S1 S1
S1 S1
S2

S1
S1

S1 S3

S2
2 S1 S2 S1 S2 2 S1
S S2 S
S3 S2

PB-5
17
PB-5
S1 PB-5 18
S2 S2 S2 9 S2 S2 S2
S1
S2 S1

S2 S2

PB-5 S1
PB-5
2
23
S1
S2 S1

S1
S1 S1 S1
PB-5
S1
1 S1 S1
S2
S1
S1

S1 S1 S1 PB-5 S1
20
S1 S2
PB-5
S1
19
S1
S1 S1 S1 S1 S1
PB-5 S1
3 S1 S1 S1
S1 S1 S1
S1 S1 S1
PB-5
22

PB-5
21

LEGEND:

PIN LIGHT 18W T5 LED TUBE LIGHT 18W

600X600mm LED
W/ REFLECTOR 36W

CIRCULAR LAMP 24W

T8 LED TUBE LIGHT 20W

1200X600mm LED 24W


EE-11

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
SECOND FLOOR REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- LIGHTING
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
11 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-7
PB-7
34 28

S1
S1 S1 S1 S1

S1 S1 S1
S1
S1 S1

S1 S1

PB-7 PB-7 S1 S1 PB-7


S1 S1
9 20 15
S1 S1 S1 S1 PB-7 S1
S1 27
S1
S1
S1 S1
PB-7 PB-7 S1 S1
S1 S1 S1
21 10

PB-7
S2
PB-7 31 S1
PB-7 PB-7 S1 PB-7 PB-7 PB-7 PB-7 PB-7
30 S1 S1 S2
S1 S1S1 22 32 4 S1 5 S1 6 S1 7 S1 8 S1 S1
S1
PB-7 S1
11 S1
S1 S1

S1

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

PB-7 PB-7
16 18

3950.000
S1 S1 S1 S1 S1

S1 S1 S1 S1 S1
PB-7
17
3950.000

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S1 S1
S1

PB-7
26 S1
S1 S2 S1 S1 S1
S1 S1 S1 S1 S1 S1
PB-7 S2 S2
PB-7
33
29 PB-7
2800.000

30
PB-7
PB-7
S2 S2 S1 28 S1 S2 S3 S3
14

PB-7
S2 12

S1 S1
S1 S1 S1

S1
S1S2 S1 PB-7 S1
25 S1
S1 S1
S1 S1
PB-7 S1
13 PB-7
S1
S1 S1 PB-7 PB-7 3 S1
S1 PB-7 PB-7
S1 S1 1
23 24 S1
2
S1 S2 S1 S1
S3
S1
S1 S1 S1

S1
S1

LEGEND:

PIN LIGHT 18W T5 LED TUBE LIGHT 18W

600X600mm LED
W/ REFLECTOR 36W

CIRCULAR LAMP 24W

T8 LED TUBE LIGHT 20W

EE-12
1200X600mm LED 24W

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- THIRD FLOOR
LIGHTING LAYOUT DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AS BUILT NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
12 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-9
PB-9
1
2

S1 S1
S1 S1 S1 S1 S1

S1 S1 S1 S1

S1 S1

S3 S2
S1 S1
S2

PB-9
13
S1 S1

PB-9
6
CEREMONIAL HALL
S1 S1

PB-9
3
PB-9
PB-9 5 PB-9
4 14

S1 S1

S1
S1

PB-9
12

PB-9
S1
11
S1

PB-9
8
PB-9
7
S3

S1 S1

S1 S1
S1

S2

PB-9
10

S1
PB-9
S1
S1 9
S1 S1 S1
S1

LEGEND:

PIN LIGHT 18W T5 LED TUBE LIGHT 18W

600X600mm LED
W/ REFLECTOR 36W

CIRCULAR LAMP 24W

T8 LED TUBE LIGHT 20W

1200X600mm LED 24W


EE-13

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- 4TH FLOOR
LIGHTING LAYOUT DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AS BUILT NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
13 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
PB-9
14

EE-14

NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE


1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- DECK FLOOR
LIGHTING LAYOUT DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL
PROF. ELECTRICAL ENGINEER INCORPORATED AS BUILT NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
14 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

EE-15 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED


DIMENSIONS ONLY ARE TO BE TAKEN.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS BASEMENT REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR FDAS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS BUILT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
15 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

EE-16 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED


DIMENSIONS ONLY ARE TO BE TAKEN.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
GROUND REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR FDAS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS BUILT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
16 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

EE-17 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED


DIMENSIONS ONLY ARE TO BE TAKEN.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
SECOND REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR FDAS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS BUILT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
17 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

EE-18 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED


DIMENSIONS ONLY ARE TO BE TAKEN.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
THIRD REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR FDAS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS BUILT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
18 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

EE-19 2. DRAWINGS ARE NOT TO BE SCALED, THE STATED


DIMENSIONS ONLY ARE TO BE TAKEN.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
FOURTH REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FLOOR FDAS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL LAYOUT AS BUILT
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
19 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
EE-20 1. ALL DIMENSION ARE IN METERS AND MILLIMETERS
UNLESS SHOWN OTHERWISE.
BROUGHT TO THE ATTENTION OF & RESOLVED BY
THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS- FDAS RISER
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL DIAGRAM
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, CEO EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING AS BUILT REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
20 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19,MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
PANEL DETAIL REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS-
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL SCHEDULE OF
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LOADS REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
21 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19, MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
PANEL DETAIL REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS-
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL SCHEDULE OF
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LOADS REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
22 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19, MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
PANEL DETAIL REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS-
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL SCHEDULE OF
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LOADS REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
23 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19, MAKATI CITY AMO
NOTES: 3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS BROUGHT TO THE ATTENTION OF & RESOLVED BY
UNLESS SHOWN OTHERWISE. THE ENGINEER BEFORE THE WORK IS PUT IN HAND

2. DRAWINGS ARE NOT TO BE SCALED, THE STATED 4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
DIMENSIONS ONLY ARE TO BE TAKEN. THE RELEVANT ARCHITECTURAL AND SERVICES
DRAWINGS.

PREPARED BY SUBMITTED BY PROJECT TITLE SHEET CONTENTS PROJECT OF REVIEWED BY RECOMMENDING APPROVAL APPROVED BY SHEET NO.
JOINT VENTURE OF:
CONSTRUCTION/ REPAIR/ IMPROVEMENT OF VARIOUS
PANEL DETAIL REPUBLIC OF THE PHILIPPINES
FEDERICO D. DACASIN
SPECIFIED
CONTRACTORS AND
INFRASTRUCTURE INCLUDING LOCAL PROJECTS-
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
EE
DEVELOPMENT CONSTRUCTION OF THE NEW BOHOL PROVINCIAL SCHEDULE OF
PROF. ELECTRICAL ENGINEER INCORPORATED NONATO M. PAYLADO MARIO M. MONTEJO, OIC EDGAR B. TABACON, CESO IV
REG No.: 2057 PTR No.: 7335598
CAPITOL TO REPLACE CONDEMNED BUILDING LOADS REGIONAL OFFICE NO. VII
CHIEF, PLANNING AND DESIGN ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
24 24
EDGAR A. TIU SOUTH ROAD PROPERTIES, CEBU CITY
REG DATE: 03-19-1986 REG VALID: 06-22-2021
LOCATION: TAGBILARAN CITY, PROVINCE OF BOHOL CHAIRMAN, DESIGN AND BUILD COMMITTEE
TIN No.: 222-164-441 ISSUED: 01-04-19, MAKATI CITY AMO

You might also like