Download as pdf or txt
Download as pdf or txt
You are on page 1of 37

COCHIN SHIPYARD LIMITED

(A Government of India Enterprise)

Request for Proposal (RFP)

SAP - ASSESSMENT & AUDIT

Enquiry No: ISD/134/ERP/AUD/2018  

Last date of submission of Proposal: 31 July 2018 15:00 Hrs 

PO Bag # 1653, Perumanoor P O 
Kochi  682015 
Tel: +91 484 2501296, 2501889  
Web: www.cochinshipyard.com 
Table of Contents 
Tender Notice ..................................................................................................................................... 3 

1. Introduction .............................................................................................................................. 5

2. Objective ................................................................................................................................... 5

3. SAP – ERP Solution Overview .................................................................................................. 6

4. Scope of Work .......................................................................................................................... 7

5. Project Plan ............................................................................................................................. 10

6. Eligibility/Pre‐qualification Criteria ...................................................................................... 10

7. Technical Bid Evaluation Criteria .......................................................................................... 12

9. Pre‐Bid meeting ...................................................................................................................... 14

10. Execution Plan & methodology ............................................................................................. 14

11. Instructions to the Bidder ...................................................................................................... 15

11. EMD ......................................................................................................................................... 17

12. Security Deposit / Performance Bank Guarantee (PBG) ..................................................... 17

13. General Terms & Conditions ................................................................................................. 18

Annexure ‐ I Business Process Master List (BPML) in SAP ..................................................................20 
Annexure‐II Non Disclosure Agreement ........................................................................................ 23 
Annexure‐III Bank Guarantee ........................................................................................................ 26 
Forms 
FORM A1: Expertise & Experience ................................................................................................ 28 
FORM A2: Details of the Projects as Mentioned in Form A1 ........................................................ 29 
FORM A3: Letter of Confirmation / Declaration ........................................................................... 30 
FORM A4: Financial Capability ...................................................................................................... 31 
FORM A5: Manpower Details to be deputed for CSL Project ....................................................... 32 
FORM A6: Compliance Checklist ................................................................................................... 33 
FORM A7: Pre‐Bid Questionnaire .................................................................................................. 36 
FORM A8:Format for Price Bid ...................................................................................................... 37 

SAP Assessment & Audit  Page 2 of 37     Cochin Shipyard Ltd 


1. Tenders  should  be  submitted  in  two  separate  sealed  envelopes  super  scribing  "PART‐I  EMD  &
TECHNICAL  BID  FOR  SAP  ASSESSMENT  &  AUDIT  “(Envelope1)  and  "PART‐II  PRICE  BID  FOR  SAP
ASSESSMENT & AUDIT" (Envelope2). Both sealed envelopes (Technical and Price) should be kept
in  a  third  sealed  envelope  super  scribing  "BIDS  FOR  SAP  ASSESSMENT  &  AUDIT  OF  COCHIN
SHIPYARD LTD" (Envelope3) addressed to DGM (IT) as indicated in the tender notice.
2. Bidders shall submit the EMD (Envelope 4) in a separate sealed envelope super scribed with EMD ‐
SAP  ASSESSMENT  &  AUDIT  OF  COCHIN  SHIPYARD  LTD  which  shall  be  kept  inside  the  envelope
containing the Technical bid document (envelope1).
3. The tenders of only those bidders shall be considered who have submitted the EMD as above.
4. All the envelopes shall indicate the Tender Number, Name and Address of the Bidder.
5. Only hard copies of  offers are entertained. Price bids of technically qualified offers only shall  be
opened. All pages of the documents should be signed and sealed.
6. Technical Bid Should Contain The Following Details
(i) Original  tender  document  duly  signed  and  sealed  on  all  pages  ‐  including  scope  of  work, 
general Terms & Conditions 
(ii) Copy of un‐priced bid format as per Form‐A8 (price bid WITHOUT prices/numerals)  
(iii) Pre qualification criteria compliance list  
(iv) Documents required as per Pre qualification criteria. 
(v) Documents to prove credentials asked to undertake the subject work.  
(vi) Self attested copy of PAN card under Income Tax Act  
(vii) Self attested copy of GST Registration Number and details  
(viii) VALID copy of MSME/NSIC Registration Certificate along with the list of items / services for 
which they are registered, as issued by NSIC for EMD exception, if applicable. 
(ix) Start‐up Registration certificate as defined under notification of DIPP GSR 501(E) dated 23 
May 2017 for availing the specified relaxations if applicable. 
(x) Checklist  compliance  filled  up  completely  duly  signed  and  sealed.  The  non  submission  of 
duly filled Techno Commercial Checklist will lead to the rejection of the bids. 

7. Sealed quotations addressed to The Deputy General Manager (IT) should reach the above address
on or before the due date and time indicated above. Bids submitted by email or ordinary post shall
not  be  considered  and  shall  be  rejected.  CSL  will  not  be  responsible  for  Postal  delay  or  non‐
delivery/non receipt of tender documents.

Sd/‐ 

FOR COCHIN SHIPYARD LIMITED     
DEPUTY GENERAL MANAGER (IT) 
COCHIN SHIPYARD LTD. 

SAP Assessment & Audit  Page 4 of 37     Cochin Shipyard Ltd 


 
1. Introduction 
Cochin Shipyard Limited (CSL) was incorporated in the year 1972 as a fully owned Government of 
India  company.  CSL  has  recently  completed  a  successful  IPO  process  and  is  currently  a  listed 
Company with 75% stake held by the Govt. of India. Over the last three decades, the company has 
emerged  as  a  forerunner  in  the  Indian  Shipbuilding  &  Ship  Repair  industry.  CSL  has  secured 
shipbuilding  orders  from  internationally  renowned  companies  from  Europe  &  Middle  East  and  is 
currently  building  the  country’s  first  Indigenous  Aircraft  Carrier.  CSL  commenced  Ship  Repair 
operations in the year 1982 and has undertaken close to 2000 repair projects of all types of ships 
including up‐gradation of ships of oil exploration industry as well as periodical layup repairs and life 
extension of ships of Navy, UTL, Coast Guard, Fisheries and Port Trust besides merchant ships of SCI 
&  ONGC.  The  yard  has,  over  the  years,  developed  adequate  capabilities  to  handle  complex  and 
sophisticated  repair  jobs.  CSL’s  performance  has  been  rated  high  by  the  Indian  industry  over  the 
past few years. 

2. Objective 
 Conduct  an  assessment  and  audit  of  the  SAP‐ERP  solution  implemented  in  Cochin 
Shipyard Limited (CSL). 
 Provide  an  insight  on  the  extent  the  SAP‐ERP  solution  is  helping  the  organization  to 
achieve its business objectives. 
 Identify the gaps for comprehensiveness and correctness of the transactions. 
 Check  if  the  system  is  designed  in  the  most  optimal  manner  to  meet the  CSL  business 
requirements. 
 Conduct training on the observations to improve utilization of the SAP solution in CSL. 

Result of the review shall include: 

 Detailed report on identified gaps. 
 Potential improvement areas and recommendations in line with CSL business process. 
 Presentation of observations and recommendations to the top management. 
 Roadmap for implementation of the agreed recommendations to the Top Management. 
 
The  audit  shall  be  carried  out  onsite  in  a  two‐phased  manner  to  review  the  SAP  performance, 
utilization and optimization: 

 Phase  I  –10  Weeks  ‐  SAP  assessment  and  audit,  observations,  recommendations  for 
improvement,  training  and  roadmap  for  implementation  of  the  agreed 
recommendations. 
 Phase II – 2 Weeks ‐ Follow‐up review and re‐audit (After implementation of the agreed 
recommendations for an expected period of 12 Weeks). 

 
SAP Assessment & Audit  Page 5 of 37                     Cochin Shipyard Ltd 
 
 
3. SAP – ERP Solution Overview 
CSL has gone live with the SAP‐ERP solution in July 2014. Details of modules / functionalities of the 
project  which  went  live  on  are  enclosed  as  Business  Process  Master  List  (BPML)  available  at 
Annexure‐1.  

The modules implemented and its functionalities are given below: 
Sr 
Functionality  SAP Module Status 
No. 
1  Finance and Control  FICO  Implemented 

2  Materials Management  MM  Implemented 

Personnel and Administration, 
3  Organization & Management, Payroll, E‐ HCM  Implemented 
Recruitment 
Ship Building & Ship Repair Activities, 
4  PS  Implemented 
Capital Projects 
5  Sales and Distribution  SD  Implemented 
6  Utilities & Maintenance  PM  Implemented 

7  Quality Inspection  QM  Implemented 

8  Document Management System.  DMS  Implemented 

9  Business Intelligence  BI/BO  Implemented (Minimal usage)

Enterprise Portal ‐Employees Self Service, 
10  EP‐ ESS/MSS Implemented 
Travel Management, E‐learning. 

Portal Applications like Visitor 
11  Management System, Man hour Booking,  EP  Implemented 
Vehicle Request, Online File Tracking etc. 

12  Environmental Health and Safety   EHS  Implemented 

13  Solution Manager  SolMan  Implemented 

Attendance system, Retired employee’s 
Medical insurance, Web Application for 
14  PI  Implemented 
attendance display, Retirees details & 
Medical claim for Workmen. 

15  E‐Tendering for Procurement.  SRM  Implementation In Progress 

 
SAP Assessment & Audit  Page 6 of 37                     Cochin Shipyard Ltd 
 
 
4. Scope of Work 
Sr No  Description
4.1  Effective usage of ERP: 

  4.1.1. Understand the existing business processes and existing ERP application  
a) Mapping  of  Business  process  into  ERP  with  suggestions  for  process  re‐
engineering‐if any. 
b)  Identify  the  gaps  in  the  existing  processes  and  suggest  appropriate  process 
redesign solution available in the standard application, if any. 
c) Identify overlapping, unused, unmapped and redundant processes. 
d) Integration and linking of various modules. 
e) Review of 10‐12 identified processes completely for correctness from beginning 
to final output. 
f) Examine the extent to which processes as per BBP mapped into the ERP system 
are actually being used. 
g) Review  of  25‐30  identified  critical  customized  transactions  in  SAP  and 
recommendation for improvement, if any. 
  4.1.2. Checking for Existence of manual process, and control there‐off for such manual 
process 
a) Review existing manual processes and to minimize user intervention by means of 
process redesign or customization. 
b) Identify the timelines for implementing the customizations / redesign (if any). 
  4.1.3. Visit  the  departments  to  assess  the  usage  of  ERP  and  adequacy  of  IT 
infrastructure, validations and controls etc. 
  4.1.4. Better MIS Tools for improving Top Management system usage. 
4.1.5. Identify Top Management MIS reporting requirements. 
4.1.6. Assessment  of  the  level  to  which  the  system  meets  management  information 
needs. 
  4.1.7. Master Data Analysis 
a) Review  critical  master  data  (material,  vendor  and  customer)  across  modules  to 
assess data quality. 
b) Master  data  creation/maintenance  procedure  validation  against  standard 
practices. 
4.2  Adequacy and Efficiency of ERP infrastructure / Utilization 
  4.2.1. Review of Technical Architecture of ERP system for uptimes and data loss. 
4.2.2. Configuration of concurrent jobs: Configuration of concurrent job, run book, key 
system parameters. 
4.2.3. Resources  utilization:  Review  utilization  of  resources  (with  respect  to  ERP 

SAP Assessment & Audit  Page 7 of 37                     Cochin Shipyard Ltd 


 
 
Hardware, network) and highlight bottleneck (if any).
4.2.4. Configuration of RDBMS: Review the configuration and setups of RDBMS as per 
industry standards and CSL requirements. 
4.3  ERP software maintenance/ ABAP customization 
  4.3.1. Review all customizations/all change requests after Go‐Live in CSL. 
4.3.2. Review  version  control  in  the  customized  development  environment  that  is 
necessary to run business operations at CSL. 
4.3.3. Recommend  documents  that  are  to  be  updated  with  respect  to 
customization/version. 
4.3.4. Review top 10 identified transactions facing performance issue and recommend 
solution for the same. 
4.3.5. Code  review  to  find  out  if  the  optimized  code  is  being  used  for  minimizing 
execution  time  and  recommendation  to  improve  performance  (for  Top  30 
identified critical Z developments). 
4.3.6. Review  the  procedure  for  development  testing  and  Transport  Management  for 
sufficient documentation. 
4.4  Disaster recovery process 

  4.4.1. Review  of  existing  Business  Continuity  and  Disaster  Recovery  Plan/policy  and 
effectiveness  of  data  application  /  replication  between  the  Data  Centre  and  DR 
Centre. 
4.4.2. Review compliance of all the DR principles and norms of CSL which are essential 
for critical operations. 
4.4.3. Evaluation  of  data  backup  policy  /  strategy  with  regard  to  its  effectiveness, 
management of backups etc. 
4.5  Validations and controls in ERP 
  4.5.1. Review existing configurations, validations, checks and controls in the ERP system 
and to suggest Industry Best Practices where ever applicable. 
4.5.2. Review  the  existing  User  profiles  and  Security  profiles  and  map  them  with 
Industry Best Practices. 
4.5.3. Segregation of Duties (SoD) review. 
4.6  Evaluation of Security Measures 
  4.6.1. Review of security measures implemented in ERP system and work‐stations. 
4.6.2. Standards  set  for  strengthening  user  log‐in  and  password  and  risk  of  un‐
authorized access to the system 
4.6.3. Risk & Control based assessment for the end to end business processes. 
4.6.4. Review of existing Audit‐trail implementation and suggestion for improvement. 

SAP Assessment & Audit  Page 8 of 37                     Cochin Shipyard Ltd 


 
 
4.7  Skill development of users –existing & for future 
  4.7.1. Identify learning and development opportunities for the existing & new users and 
recommendations for improvement. 
4.8  Future path for ERP and related expansion 
  4.8.1. Review  whether  the  current  version  of  ERP  application  is  abreast  of  the  latest 
releases and trends and fit for future up gradations from OEM and recommend 
on the up‐gradation, if required. 
4.8.2. Review whether the Application can provide all existing functionalities along with 
mitigating  current  operation  challenges  and  help  the  organization  achieve  its 
objectives. 
4.8.3. Recommend  on  the  additional  modules/software  to  be  taken  based  on  CSL 
requirements.  
4.8.4. License  agreements  and  recommendation  to  optimally  handle  future 
requirements. 
4.9  Interface with Non ERP systems 
  4.9.1. Review  the  interface  between  the  Business  ERP  applications  with  non  ERP 
systems. 
4.9.2. Review major challenges in implementation of interface. 
4.10  Adequacy of SAP support Structure
  4.10.1. Review adequacy of IT and functional human resources for managing SAP system 
and infrastructure effectively. 
4.10.2. Review  and  evaluate  the  system  in  place  for  the  SAP‐ERP  support  (Incident 
management System) and recommendation for improvement. 
4.11  Deliverables 
  4.11.1. Submission of project plan 
4.11.2. Execution of project as per scope of work 
4.11.3. Control gaps for business process controls and standard settings 
4.11.4. Draft Audit Report with gaps and audit recommendation in line with CSL business 
process.  The  draft  report  should  adequately  cover  all  the  aspects  of  scope  of 
work mentioned in the tender. It should also contain summary of Audit findings. 
4.11.5. Presentation of draft audit report to CSL. 
4.11.6. Training on the observations to improve utilization of the SAP solution in CSL 
4.11.7. Final Audit report after incorporating suggestions/ comments from CSL. 
4.11.8. Roadmap for implementation of the agreed recommendations with indication for 
short term/ long term implementation. 
4.11.9. Presentation of the final audit report to CSL for final acceptance. 
4.11.10. Submission of final audit report to CSL. 
  Technical  audit  is  required  to  be  completed  without  disrupting  the  regular  SAP  related 
operations of CSL to the extent possible. If for any reason, the regular operations are required 

SAP Assessment & Audit  Page 9 of 37                     Cochin Shipyard Ltd 


 
 
to be suspended, the same shall be aligned with the maintenance schedule of the Basis team 
to keep the system down time to the barest minimum. 

 
5. Project Plan 
Estimated overall period of the project is 12 (Twelve) Weeks. Ten Weeks for Phase1 and 2 Weeks 
for Phase2. There shall be a gap of Three months between phase 1 and phase 2 for implementing 
the agreed recommendations/observations. Project plan can be reviewed and finalized mutually.  
Indicative Schedule as given below: 
Estimated Duration 
Sr No  Major Activities  Phase 
in weeks 
5.1  Project Preparation and Resource mobilization  Phase ‐ 1  2 Weeks 
Conduct  Business  Process  Review,  discussion 
5.2  with  Process  Owners  and  assessment  &  audit  Phase ‐ 1  6 Weeks 
of the SAP solution onsite. 
Audit  recommendations  discussion  with  CSL 
team  onsite,  interactive  training  to  address 
knowledge  gaps,      Report  submission  with 
5.3  Phase ‐ 1  2 Weeks 
comments,  improvement  options  and 
Roadmap  for  Implementation  of  the  agreed 
recommendations with timeline 
Project  Management  during  implementation 
5.4  Phase ‐ 2  12 Weeks 
of agreed observations by CSL / AMS vendor 
Follow up review & audit onsite and Final audit 
5.5  Phase ‐ 2  2 Weeks 
report submission 
 
6. Eligibility/Pre‐qualification Criteria 
(To be duly filled and submitted along with Technical offer‐ Part I) 
The prospective bidder should satisfy the following criterion. 
Compliance 
Sr  Deviations
Criteria  by the 
No.  bidder  , if any 
(Yes/No) 
6.1.  Bidder  should  be  a  consultancy/auditing  firm, having at  least  5     
years of experience in SAP review/audit as on 31.03.2018. (Details 
of experience need to be enclosed as per Form A1 & A2. Copy of 
Purchase  order  /  Contract,  WCC  and  documentary  proof  to  be 
attached). 

SAP Assessment & Audit  Page 10 of 37                     Cochin Shipyard Ltd 


 
 
Bidder  should  have  successfully  completed  at  least  three  post 
implementation SAP review/audit involving minimum FICO, HCM, 
MM, PS/PP & SD modules during the last 5 financial year’s period, 
6.2.  for  organisations  with  SAP  ECC  user  license  of  minimum  200     
numbers  during  the  project.  (Details  of  experience  need  to  be 
enclosed as per Form A1 & A2.Copy of Purchase order / Contract, 
WCC and documentary proof to be attached). 
The  bidder  should  have  successfully  completed  at least  one  SAP
post  implementation  review/audit  in  a  Central/State  Govt. 
Organisation  /  Public  Sector  Undertaking  /  Public  Sector 
6.3.  Enterprise  during  the  last  5  financial  year’s  period.  (Details  of     
experience  need  to  be  enclosed  as  per  Form  A1  &  A2.Copy  of 
Purchase  order  /  Contract,  WCC  and  documentary  proof  to  be 
attached). 
Purchase  Order  value  of  at  least  one  of  the  SAP  Review/audit 
6.4.  should  be  at  least  an  equivalent  of  Rs.  20  Lakhs.  (Copy  of     
Purchase order / Contract to be attached). 
The  bidder’s  shall  use  automated  tools  covering  transactions, 
6.5.  processes  and  master  data  for  the  project.  (Tools  details  to  be     
attached). 
The bidder should not have been blacklisted by any State/Central 
Government organizations /Firms / Institutions/ Central PSU / PSE 
6.6.  for  which  the  statement  stating  that  the  bidder  has  not  been     
blacklisted by any institution of the Central/state Government in 
past three years may please be submitted. (Refer Form A3). 
6.7. 
The  bidder  should  not  be  the  consultancy  /  implementation     
partner for the SAP implementation project of CSL. 
The bidder should have a valid ISO 9001/ ISO 27001, certification,
6.8.  as on the date of submission of bid. Attach documentary proof in     
support.  
The  bidder  should  have  a  positive  net  worth  during  last  three 
6.9. 
years.  (Supported  with  Audited  Balance  Sheet  and  Profit  &  Loss     
Account or Annual Report for the last three financial years Refer 
Form A4). 

Project  Manager  shall  have  proven  project  management 


experience and shall have minimum 10 years domain experience, 
6.10  knowledge and skill   to communicate to CSL Top Management as     
required.  Attach  CV  along  with  experience  details  of  the  Project 
Manager to be deputed exclusively to CSL for this project. 

SAP Assessment & Audit  Page 11 of 37                     Cochin Shipyard Ltd 


 
 
The bidder should have in roll personnel to be deputed to CSL for 
this project, having following qualifications and experience. 
Experience :  At least three years experience in SAP review/audit. 
Qualification: 
 Certified  SAP  ECC  6.0  professional  with  SAP 
review/audit back ground 
 CISA/DISA preferred 
The  team  of  auditors  (minimum  8  persons)  engaged  for  SAP 
6.11  review/audit  in  CSL  should  have  the  relevant  qualification  and     
experience listed above in their respective areas.  
Attach  documentary  proof  of  list  of  personnel  to  be  deputed 
exclusively  for  CSL  project  along  with  their  qualification  and 
experience (Attach CV). (Refer Form A5). 
Any  change/addition  of  consultants  with  requisite  certification 
and  experience  at  a  later  stage  would  require  prior  written 
approval  from  CSL.  CSL  reserves  the  right  to  reject  /change  any 
person in the list. 
6.12.  The  bidder  must  fulfill  the  above  eligibility  criteria/  pre‐qualification  conditions  for 
evaluation of their bids. Bids fulfilling the above eligibility/ pre‐ qualification conditions will 
only  be  evaluated  by  the  duly  constituted  evaluation  committee  of  CSL.  Bids  not  fulfilling 
the  eligibility/  pre‐qualification  conditions  given  above  shall  be  summarily  rejected. 
Undertaking  for  subsequent  submission  of  any  of  the  above  documents  will  not  be 
entertained  under  any  circumstances.  CSL  reserves  the  right  to  reject  the  bid  without 
making any reference to the bidder. 
 
7. Technical Bid Evaluation Criteria   
For calculating the Technical Score (TS), the individual scores of each of the parameters mentioned 
below  will  be  considered.  Any  party  obtaining  minimum  70  marks  only  qualifies  for  price  bid 
opening; unqualified price bids will not be opened.  
Max 
Criteria  Marks 
Marks 
1. Number of years of experience of the Firm in SAP review/Audit area (Will be   
considered  only  on  submission  of  satisfactory  certificate  from  clients. 
20 
Experience as on 31.03.2018 ‐  less than 180 days will be ignored and 180 
days and more will be treated as 1 year) 
a. 5 Years 17 
b. 5+ to 7 Years 18   
c. More Than 7 years  20 

SAP Assessment & Audit  Page 12 of 37                     Cochin Shipyard Ltd 


 
 
 
2. Competency  of  the  firm  to  undertake  SAP  review/audit  for  the  core  40 
modules ‐ Marks per SAP audit module and Maximum marks (Bidder has to 
submit satisfactory certificates from the clients in respective area). 
            Module  Marks per Audit  Max marks 
a. FICO  2  6 
b. HCM  2  6 
c. MM  1  3 
d. PS/PP  3  9 
e. SD  1  3 
f. QM  0.5  1.5 
g. PM  0.5  1.5 
h. ESS/MSS/EP  2  5 
i. DMS  0.5  1.5 
j. BIBO/EHS  0.5  1.5 
k. SolMan  0.5  1 
 
l. PI  0.5  1 

3. Team Profiles and experience  (Project manager & Team members)  40 
 
(i) Project Manager  
a. Certified Project Management Professional  04 

b. Work experience in SAP review/audit  as project manager/  04   
project  head  (02  marks  per  assignment  ,  maximum    04 
marks) 
(ii) Project team – Resources considered for scoring for the 8 core   
modules FICO, HCM, MM, PS, SD,QM,ESS/MSS & BASIS respectively   
(32Marks – 4 marks for each person)      
a. Work experience in SAP review/audit  
04 
(01 mark per assignment.  Maximum  04 marks) 
Total Technical Score    100 
   
8. Terms of Payment 
8.1. 20% payment at project initiation after resource mobilization to CSL. 
8.2. 40%  payment  on  submission  of  the  bill  after  completing  all  the  deliverables  for  all 
implemented modules in CSL and submitting the detailed audit report as per Project Plan 
in Clause 5.2 & 5.3.  
8.3. Balance 40% payment after submission  of the final audit report after Re‐audit of all the 
implemented modules in CSL.  

SAP Assessment & Audit  Page 13 of 37                     Cochin Shipyard Ltd 


 
 
8.4. Payment will be made by RTGS / NEFT to the account of vendor. The name of the bank, 
branch, A/C No., IFSC code & other particulars shall be furnished by the vendor in the pro‐ 
forma of CSL. 

9. Pre‐Bid meeting 
9.1. Any bidder requiring a clarification of the proposal document must notify CSL by email on 
or before 10 July 2018 in the pre‐bid questionnaire format placed at Form‐A7. Any request 
for  clarification  in  writing  must  be  addressed  to  [email protected]  and 
[email protected].  
9.2. The compilation of all clarifications sought / queries raised during the pre‐bid meeting and 
its replies shall be made available as corrigendum in CSL website and Central Procurement 
Portal (CPP). Any modification of the tender documents which may become necessary as a 
result  of  the  pre‐bid  meeting  shall  be  made  by  CSL  exclusively  through  the  issuance  of 
corrigendum. 
9.3. The bidder or his official representative is advised to attend the Pre‐bid meeting which will 
be  convened  at  CSL.  The  meeting  shall  be  attended  by  techno‐commercially  competent 
senior representative(s) of the bidder duly authorized. Date of the pre‐bid meeting is 13th 
July 2018 at 14.00 hrs at CSL. 
9.4. All bidders are advised to study the bid document thoroughly and come prepared for the 
meeting. 
9.5. The purpose of the meeting will be to clarify or address doubts / suggestions, if any on the 
bid  document  and  to  address  queries  on  any  issues  that  may  be  raised  at  that  stage. 
Minutes of meeting will be prepared.  

10. Execution Plan & methodology  
Bidders shall describe in detail the proposed approach to the scope of work, methodologies and 
strategies to be adopted, management of project risk and methods of communication with CSL. 
Proposal should include a description of how the project will be executed through all its stages.  

The execution plan and methodology should include the following:  

i. Plan of Action  
ii. Organization of team 
iii. Operation base of project management 
iv. Methodology to be adopted 
v. Milestones for CSL review and hold points 

The successful bidder shall execute the assigned work as per the project Plan in Clause 5 and to 
the satisfaction of CSL.  

SAP Assessment & Audit  Page 14 of 37                     Cochin Shipyard Ltd 


 
 
11. Instructions to the Bidder 
11.1. Tenders should be submitted in two separate sealed envelopes super scribing "PART‐I EMD 
& TECHNICAL BID FOR SAP ASSESSMENT & AUDIT “ (Envelope1) and "PART‐II PRICE BID 
FOR SAP ASSESSMENT & AUDIT" (Envelope2). Both sealed envelopes (Technical and Price) 
should  be  kept  in  a  third  sealed  envelope  super  scribing  "BIDS  FOR  SAP  ASSESSMENT  & 
AUDIT"    (Envelope3)  addressed  to  DGM  (IT)  as  indicated  in  the  tender  notice.  Tender 
number,  due  date  and  name  &  address  of  the  bidder  should  be  mentioned  on  the 
envelopes. Offers not submitted as above shall not be considered. 
 
11.2. Bidders shall submit the EMD (Envelope 4) in a separate sealed envelope super scribed with 
EMD ‐ SAP ASSESSMENT & AUDIT OF COCHIN SHIPYARD LTD which shall be kept inside the 
envelope  containing  the  Technical  bid  document  (Envelope  1).  The  tenders  of  only  those 
bidders will be considered who have submitted the EMD as above.   
 
11.3. The envelopes shall indicate the Tender Number, Name and address of the Bidder on the 
top of all the envelopes. 
 
11.4. Sealed  quotations  addressed  to  The  Deputy  General  Manager  (IT)  should  reach  the 
address indicated in the tender notice on or before the due date and time. Bids submitted 
by  email  or  ordinary  post  shall  not  be  considered  and  shall  be  rejected.  CSL  will  not  be 
responsible for Postal delay or non‐delivery/non receipt of tender documents. 
 
11.5. All  bids  and  supporting  documentation  shall  be  submitted  in  English  and  should  be  clear 
and unambiguous. Offer should be free from overwriting. Corrections and additions, if any, 
must be duly attested. Incomplete/ ambiguous offers will be rejected.  
 
11.6. The  bidder  is  expected  and  deemed  to  have  read,  understood  and  agreed  to  all 
instructions,  forms,  terms  and  specifications  etc.  in  the  tender  document  while  bidding. 
Failure to furnish all information required or False/ambiguous information or submission of 
bid  not  substantially  responsive  to  the  bidding  documents  in  every  respect  will  be  at  the 
Bidder’s risk and may result in rejection of the bid.  
 
11.7. Only hard copies of offers are entertained.  
 
11.8. All pages of the offer (including all supporting documents / attachments) should be serially 
numbered  and  signed  by  the  authorized  signatory  of  the  bidder  in  acceptance  of  all  the 
terms and conditions,  in the format: “Current page no/total no. of pages”. Unsigned and 
Unstamped bids shall be summarily rejected.  
 

SAP Assessment & Audit  Page 15 of 37                     Cochin Shipyard Ltd 


 
 
11.9. Tender documents, downloaded from the CSL website/Central Procurement Portal, shall be 
downloaded in Toto and no change, whatsoever shall be made. If any alteration is made in 
the tender document submitted by the Bidder and if found out (be it at any stage of the 
tender processing and even after award of the contract), it will be viewed seriously by CSL 
and CSL has the right to reject the offer if required. 
 
11.10. Technical Bid Should Contain The Following Details 
i. Original tender document duly signed and sealed on all pages (including scope of work, 
general Terms & Conditions and Annexure). 
ii. Copy of un‐priced bid format as per Form‐A8 (price bid WITHOUT prices/numerals)  
iii. Pre qualification criteria compliance list as per Clause ‐6 
iv. Documents required as per Pre qualification criteria Forms A1 – A5 
v. Documents to prove credentials asked to undertake the subject work.  
vi. Self attested copy of PAN card under Income Tax Act  
vii. Self attested copy of GST Registration Number and details 
viii. VALID copy of MSME/NSIC Registration Certificate along with the list of items / services 
for which they are registered, as issued by NSIC for EMD exception, if applicable. 
ix. Start‐up Registration certificate as defined under notification of DIPP GSR 501(E) dated 
23 May 2017 for availing the specified relaxations if applicable. 
x. Checklist compliance as per Form ‐ A6 filled up completely duly signed and sealed. The 
non submission of duly filled Techno Commercial Checklist will lead to the rejection of 
the bids. 
 
11.11. Price bid to be submitted as per Form‐A8. 
11.12. Price bids of technically qualified bidders only shall be opened; unqualified price bids shall 
not be opened.  
 
11.13. The lowest Total Cost of Ownership (TCO) among the qualified bidders shall be eligible for 
award of contract. If this lowest amount is the same for two Bidders then CSL will consider 
the bidder with higher Technical Score for awarding the contract. 
 
11.14. After  CSL  notifies  the  successful  Bidder  that  the  bid  has  been  accepted,  and  the  selected 
Bidder has sent in his Letter of Acceptance, CSL shall facilitate signing of contract and shall 
provide the draft Contract agreement.  The effective date of contract shall be the date of 
signing of contract. 
 
11.15. The offer shall be valid for acceptance for a minimum period of 180 days from the date of 
opening of the Part‐ II Price Bid. 
 

SAP Assessment & Audit  Page 16 of 37                     Cochin Shipyard Ltd 


 
 
11.16. Bidders shall not be allowed to attend the part I technical bid opening. 
 
11.17. Bids once submitted shall not be returned to the bidder under any circumstances.  
 
11.18. CSL  reserves  the  right  to  modify,  expand,  restrict,  scrap  this  proposal  or  reject  any  RFP 
without assigning any reason. 
 
11.19. All  corrigenda,  addenda,  amendments  and  clarifications  to  Tender  Specifications  will  be 
hosted in the website www.cochinshipyard.com and Central Procurement Portal, and will 
not  be  published  in  the  newspaper  or  any  other  media.  Bidders  shall  keep  themselves 
updated with all such developments till the last date and time of submission of the tender. 
 

12. EMD 
Earnest Money Deposit (EMD) of  Rs.75,000  /‐  (Rupees  Seventy Five  Thousand  Only) can be 
remitted in the form of Demand Draft from Nationalized /Scheduled Banks  in favour of "Cochin 
Shipyard Limited" payable at Kochi.  Cash, Cheque, Bank Guarantee, Postal orders etc., are not 
acceptable. 
 
No interest will be payable to EMD. EMD’s of unsuccessful bidders will be returned only after 
executing the contract agreement with the successful bidder. The EMD of the successful bidder 
will  be  returned  only  after  execution  of  the  Contract  Agreement  and  after  furnishing  of  the 
required Security Deposit / Performance Bank Guarantee.  
 
Bidders with valid registration under National Small Industrial Corporation (NSIC) / Micro Small 
and Medium Enterprises (MSME) will be eligible for all relaxation subject to the submission of 
valid documents. To qualify for EMD exemption, firms should necessarily submit VALID copy of 
the Registration Certificate along with the list of items / services for which they are registered, 
as issued by NSIC, in Part‐I Technical Bid. 
 
The EMD may be forfeited:‐If the bidder withdraws his bid during the period of bid validity. In 
the  case  of  successful  bidder,  if  the  bidder  fails  to  accept  the  order  or  submit  the  security 
deposit. 

13. Security Deposit / Performance Bank Guarantee (PBG)  
The successful bidder should furnish Security Deposit issued by a Nationalized Bank equivalent 
to 10% of the total contract value in Indian rupees in the form of Bank guarantee valid till the 
successful  completion of the project and submission  of final reports plus 28 days.  In case  the 
contract  is  extended  further,  the  validity  of  the  Security  Deposit  shall  stand  automatically 

SAP Assessment & Audit  Page 17 of 37                     Cochin Shipyard Ltd 


 
 
extended.  Security  Deposit  must  be  submitted  within  14  days  after  the  effective  date  of 
contract as specified in Contract Agreement and in the form provided in Annexure ‐ III.  

Failure  of  the  successful  bidder  to  comply  with  these  requirements  shall  constitute  sufficient 
grounds for the annulment of the contract and forfeiture of the EMD.  

No  interest  is  payable  on  Security  Deposit.  The  Security  Deposit  shall  be  returned  within  two 
months  after  the  expiry  of  contract  and  on  fulfillment  of  all  contractual  obligations  and 
liabilities if any, in the matter. 

Bidders with valid registration under NSIC / MSME category are also entitled for all privileges, 
concessions, relaxations etc stipulated by relevant Govt. orders in this regard. 

14. General Terms & Conditions  
14.1. Cost of Bidding 
The bidder shall bear all costs associated with the preparation and submission of its bid, and 
CSL  will  in  no  case  be  responsible  or  liable  for  these  costs,  regardless  of  the  conduct  or  the 
outcome of the bidding process. 
 
14.2. Startup Firms / MSEs or Otherwise 
For  Start‐ups  (MSEs  or  otherwise),  the  turnover  and  prior  work  experience  expressed  in 
monetary terms, are relaxed to 50% of the prescribed limit in this tender. Start‐up Registration 
certificate  as  defined  under  notification  of  DIPP  GSR  501(E)  dated  23  May  2017  shall  be 
submitted along with offer for availing the above relaxations. 
14.3. Validity of the proposal  
The proposal submitted shall indicate that it is a firm and irrevocable offer and shall remain 
valid for a period of not less than 180 days from the date of opening of the Price bid.  
 
14.4. Confidentiality  
This  request  for  proposal  and  all  materials  submitted  by  CSL  for  this  purpose,  must  be 
considered confidential, and may not be distributed or used for any purpose other than the 
preparation of a response for submission to CSL.  

The  Bid  documents  shall  remain  the  exclusive  property  of  the  CSL  without  any  right  to  the 
Bidder to use them for any purpose other than the preparation of a response for submission 
to CSL.  Non disclosure agreement (NDA) as per Annexure‐ II shall be signed by the successful 
bidder.  Disclosure  of  any  part  of  the  information  contained  therein  to  parties  not  directly 
involved in providing the services /products requested, could result in disqualification and/or 
legal action. When submitting confidential material to CSL, the bidder must clearly mark it as 
such.  

SAP Assessment & Audit  Page 18 of 37                     Cochin Shipyard Ltd 


 
 
14.5.  Risk Purchase  
If the supplier fails to provide the service / project phase ordered within the delivery period as 
per Project plan or violate any of the terms and conditions of the contract, CSL shall have the 
following rights:  
 To terminate the contract with 15 days notice forfeiting the security deposit.  
 To award the work to any third party at the risk and cost of the successful bidder. 
 
14.6. Contract /Agreement  
The  Successful  Bidder  shall  enter  into  an  agreement  with  CSL  for  carrying  out  the  SAP 
Assessment and Audit as per the scope of work, under the terms and conditions on non judicial 
Rs. 500/‐ stamp paper. The above stamp paper will be arranged by the bidder for execution of 
agreement. The contract/agreement shall be for a period as per the agreed Project Plan from 
the date of commencement, extendable further if mutually agreed by both the parties.  
 
14.7. Liquidated Damage for Delays  
If the bidder fails in the due performance of the contract within the time fixed by the contract 
or  any  extension  thereof,  bidder  shall  be  liable  to  pay  liquidated  damages  to  the  extent  of  a 
sum of 1% of the contract value per week, subject to a maximum of 10% of the contract value. 
Once the maximum is reached, CSL may consider termination of the contract. In assessing such 
delays, CSL Project Manager’s decision is final and binding on the bidder. The penalty for late 
delivery will be deducted from the bill amount.  
 
14.8.  Jurisdiction  
All questions, disputes or difference arising under, out of, or in connection with contracts shall 
be subject to the exclusive jurisdiction of the Courts at Ernakulam, Kerala, India.  
 
14.9.  Force Majeure 
In the event of either party being rendered unable by `Force Majeure' to perform any obligation 
required  to  be  performed  by  them  under  the  contract,  the  relative  obligation  of  the  party 
affected by such `Force Majeure' will stand suspended for the period during which such cause 
lasts.  The  word  `Force  Majeure'  as  employed  herein  shall  mean  acts  of  God,  war,  revolt, 
agitation,  strikes,  riot,  fire,  flood,  sabotage,  civil  commotion,  road  barricade  (but  not  due  to 
interference of employment problem of the Consultant), acts of government of the two parties, 
which  makes  performance  impossible  or  impracticable  and  any  other  cause,  whether  of  kind 
herein enumerated or otherwise which are not within the control of the party to the contract 
and  which  renders  performance  of  the  contract  by  the  said  party  impossible.  CSL  may  allow 
additional  time  as  is  mutually  agreed,  to  be  justified  by  the  circumstances  of  the  case.  The 
occurrence/ cessation of force majeure situation is to be informed with documentary evidence 
within 15 days from the date of occurrence/cessation. 
 
SAP Assessment & Audit  Page 19 of 37                     Cochin Shipyard Ltd 
 
 
Annexure ‐ I 
Business Process Master List (BPML) in SAP 
Module  Process 
Account Payables 
Account Receivables 
Costing and Profitability 
Provident Fund 
General Ledger 
FICO  TDS and TCS 
  Bank Accounting 
Asset Accounting 
Internal Order Accounting 
Gratuity Trust 
Treasury 
Fund Management 
SB‐P2P ‐Raw Material (Domestic) 
SB‐P2P ‐Import 
SB‐P2P ‐Spares and Consumables 
SB‐P2P ‐Assets and Capital Items 
SB‐P2P‐ Services and Sub Contracting 
SB‐P2P ‐Package Procurement 
SB‐ Inventory Management 
SB‐Consumption based planning 
MM  SB‐LC, BG, Insurance and Warranty 
  SB ‐ Release Strategy 
SR‐P2P ‐Raw material (Domestic) 
SR‐P2P ‐Import 
SR‐P2P ‐Spares and Consumables 
SR‐P2P‐ Services and Sub Contracting 
SR‐ Inventory Management 
SR‐Consumption based planning 
SR‐LC, BG, Insurance and Warranty 
SR ‐ Release Strategy 
Ship Building 
PS 
Capital Projects 
 
Ship Repair 
SAP Assessment & Audit  Page 20 of 37                     Cochin Shipyard Ltd 
 
 
SB‐Enquiry from customer through /Mail/Telephone/Fax 
SB‐Enquiry register  
SB‐Cost Estimation 
SB‐Quotation 
SB‐Contract Processing 
SB‐Regularization of the Contract 
SB‐Variation Order/Change Order 
SB‐Milestone Confirmation 
SD  SB‐Invoice/Billing 
  SR‐Enquiry from customer through /Mail/Telephone/Fax 
SR‐Enquiry register  
SR‐Cost Estimation 
SR‐Quotation 
SR‐Firm stemming 
SR‐Contract Processing 
SR‐Advance procurement 
SR‐Invoice/Billing 
SR‐Settlement 
Organizational Management 
Personnel Administration 
Personnel Time Management 
Payroll 
METI 
HCM  ESS/MSS 
  Visitors Management 
Training and Event Management 
E Recruitment 
Personnel Development 
Travel Management 
Vacancy Roster Management 
Breakdown Maintenance 
Preventive Maintenance 
Planned Maintenance 
PM 
Calibration & Testing of Equipments, Instruments & Tools 
Log Entry and Monthly report of Power Consumption 
Vehicle Request Registration 

SAP Assessment & Audit  Page 21 of 37                     Cochin Shipyard Ltd 


 
 
AMC Complaint Registration Process for Computers & its Peripherals 
Consumables Booking 
Gas and water request 
Work permit and confined space entry 
Quality Inspection in Ship Building 
QM  Quality Inspection in Ship Repair 
Audit Management 
Incident Management and Action Tracking 
Hazard item and risk assessment 
EHS  
Waste and regulatory management 
Occupational Health planning and monitoring 
DMS  Document Management 
 

 
 
 

SAP Assessment & Audit  Page 22 of 37                     Cochin Shipyard Ltd 


 
 
      Annexure‐II 

Non Disclosure Agreement 
M/s Cochin Shipyard Limited, Perumanoor PO, Cochin‐682015, (hereinafter called M/s CSL) has entered into a 
contract  with  M/s(Company  Name),  with  its  registered  office  at  (Office  address),  (hereinafter  called  M/s 
(Company Name in Short) for the " SAP Assessment and Audit " , by placing Purchase Order (PO) (PO number) 
dt.(PO date) for an  amount of RS.(PO  Amount)  on M/s(Company Name). As per confidentiality Clause (Clause 
no)  of  the  PO,  a  Non‐disclosure  agreement  has  to  be  signed  between  M/s(Company  Name)  and  M/s  CSL  for 
complying the same without any level of dilution.  

This  Non‐Disclosure  Agreement,  dated  as  of  (Agreement  date)  is  made  and  signed  between  M/s  CSL  and 
M/s(Company  Name)  in  connection  with  the  SAP  Assessment  and  Audit  in  Cochin  Shipyard  Limited. 
M/s(Company Name) means any person employed by M/s(Company Name) either directly or through their sub‐
contractors or provisional employees or trainees working for the SAP Assessment and Audit Service and M/s CSL 
means  any  person  of  CSL  employed  either  directly  or  through  their  sub‐contractors  or  provisional  employees 
working for CSL. In this Agreement, unless the context otherwise requires. M/s CSL and M/s (Company Name) 
shall  hereinafter  be  jointly  referred  to  as  the  "Parties"  and  individually  as  the  "Party"‐  The  Party  hereinafter 
disclosing  information  shall  be  referred  to  as  the  "Disclosing  Party"  and  the  Party  hereinafter  receiving 
information shall be referred to as the "Recipient" or "Receiving Party".  

The Non‐disclosure agreement covers the following;  

a)  Information  relating  to  the  SAP  Assessment  and  Audit  at  M/s  CSL  shall  not  be  disclosed  by  M/s  (Company 
Name)  to  any  agency  or  any  other  persons  not  officially  concerned  with  such  process.  The  undue  use  by 
M/s(Company  Name)  of  confidential  information  related  to  the  process  may  be  treated  as  breach  of 
confidentiality  and  dealt  with  accordingly.  Except  with  the  prior  written  consent  of  M/s  CSL,  M/s  (Company 
Name) shall not at any time communicate either in hard copy form or electronic means or in any other mode to 
any other organization, person or entity any confidential information acquired in the course of the contract. 

 b) Neither Party will disclose to any third party without the prior written permission consent of the other party 
any  confidential  information  which  is  received  from  the  other  party  for  the  purpose  of  providing  or  receiving 
services. 

c) Each party will take measures to protect the confidential information of the other party that, in the aggregate 
are  no  less  protective  than  those  measures  it  uses  to  protect  the  confidentiality  of  its  own  comparable 
confidential information, and in any event, not less than a reasonable degree of protection. Both parties agree 
that any confidential information received from other party shall only be used for the purpose of providing or 
receiving services under the above referenced contract for SAP Assessment and Audit.  

In  this  agreement  "Confidential  Information"  shall  mean  any  information  relating  to  the  Disclosing  Party's 
business,  commercial  information  or  any  information  of  a  technical  nature  comprising  inter  alia  products, 
processes,  methodologies,  frameworks,  models,  ideas,  interpretations,  Legal,  technical  and  other  documents, 
manuals,  tariffs,  standards,  software,  discs,  reports,  research,  working  notes,  papers,  data  or  information  in 
wired  or  wireless  mode,  drawings,  layout  ,  installation  details  of  any  equipment/crane/  machinery,  data  and 
techniques  used  by/owned  by  "Cochin  Shipyard  Limited"  in  connection  with  SAP  Assessment  and  Audit  in 

SAP Assessment & Audit  Page 23 of 37                     Cochin Shipyard Ltd 


 
 
whatever  form,  provided all  oral  disclosure of  confidential  information  is  submitted  by the  Disclosing  Party  in 
writing to the Recipient within 30 (thirty) days, indicating compliance to the terms of this agreement.  

In  due  consideration  of  the  above,  Cochin  Shipyard  Limited  granting  M/s  (Company  Name)  access  to  the 
Confidential Information and vice‐versa, the Parties undertake that:  

1. Subject to Clause 8 below, the Recipient will keep the Confidential Information strictly confidential and will 
not disclose it to any third party without the Disclosing Party's prior written consent, at any point of time.  

2. Confidential Information will be disclosed only to those personnel and permitted assigns of the Recipient who 
need access to the Confidential Information for the proper performance of their duties in relation to the project 
and only to the extent necessary for the purpose of SAP Assessment and Audit. The Recipient, will solemnly take 
required  steps  appropriately  in  all  means  to  ensure  that  all  personnel  to  whom  access  to  the  Information  is 
given are aware of its confidentiality and that they are bound by restrictions at least as onerous as those placed 
on the Parties by the terms of this agreement.  

3. The Parties acknowledge that some or all of the Information is or may be price sensitive information and that 
the  use  of  such  information  may  be  regulated  or  prohibited  by  applicable  legislations  and  the  Recipient 
undertakes  not  to  use  any  such  Information  for  any  unlawful  purpose.  On  acquiring  any  Confidential 
Information,  the  Recipient  shall  comply  with  all  applicable  laws  in  India  in  relation  to  insider  trading  and 
otherwise the acquisition of securities.  

4. The Recipient agree to indemnify and hold harmless the Disclosing Party, its partners and staff and any of the 
Disclosing Party's clients to whom the Information relates against all loss, damage and expense (including legal 
expenses  relating  to  any  actions,  proceedings  and  claims  brought  or  threatened)  of  whatsoever  nature  and 
howsoever arising out of any breach by the Recipient of the confidentiality obligations under this Agreement.  

5. Confidential Information disclosed to the Recipient will be used solely for the purpose of SAP Assessment and 
Audit. 

 6. The Recipient shall establish and maintain all reasonable security measures to provide for the safe custody of 
the Information in whatever form it may be and to prevent unauthorized access to it.  

7. This Agreement shall remains in effect for 10 years from the Effective Date of this Agreement ("Term"). On 
completion of SAP Assessment and Audit, the Recipient shall return all the Confidential Information disclosed to 
the Recipient and any copies thereof in whatever form it may be including soft copies, electronic forms to the 
Discloser.  

8. The obligations contained above shall not apply to any Information which  

a. is or subsequently comes into the public domain otherwise than through a breach of this agreement; 
b. is already rightfully in the Recipient's possession;  
c. is obtained by the Recipient from a third party without any restriction on disclosure;  
d. The  Recipient  required  to  disclose  by  law  or  professional  or  regulatory  obligation  with  the  Disclosing 
Party's prior written consent.  
 

SAP Assessment & Audit  Page 24 of 37                     Cochin Shipyard Ltd 


 
 
9. Each party shall be responsible for any breach of this Agreement by any of their respective Representatives. If 
the  Recipient  becomes  aware  of  any  breach  of  confidence  or  threatened  breach  of  confidence  by  any  of  the 
Recipient's  direct  employees  or  provisional  employees  including  trainees  or  agents  or  sub‐contractors,  the 
Recipient  will  promptly  notify  the  Disclosing  Party  of  the  same  and  give  the  Disclosing  Party  all  reasonable 
assistance in connection with any proceedings which the Disclosing Party may institute against such persons. In 
case of breach of confidence, the damages will be assessed by the discloser and compensation claimed from the 
recipient as per the suitable laws as applicable in India including Indian Penal Code, Information Technology Act 
2000, Intellectual Property law, Indian Contract Act, company laws and the jurisdiction for all such proceedings 
will be at the courts at Ernakulam.  

10.  The  Recipient  shall  comply  with  the  obligations  set  out  herein  throughout  the  tenure  of  contract  and 
thereafter.  

11.  The  Recipient  acknowledges  that  the  Disclosing  Party  shall  retain  the  copyright  and  intellectual  property 
rights in the Confidential Information and that the Receiving Party shall not copy, adapt, transmit through wired 
media  or  wireless  media,  modify  or  amend  full  or  any  part  of  the  Confidential  Information  or  otherwise  deal 
with any part of the Confidential Information except with the prior express written consent of Disclosing Party 
during period of the above contract.  

12. This Agreement shall be fully governed by and construed in accordance with the relevant laws of India.  

13.  Notices:  Any  notice,  claim  or  demand  in  connection  with  this  agreement  shall  be  given  in  writing  to  the 
relevant party at the address set out herein and sent by letter/fax shall be deemed received when properly sent, 
any notice sent by hand shall be deemed received when actually delivered and any notice sent by post shall be 
deemed received 72 hours after posting. A copy of all notices/replies sent between M/s CSL and M/s (Company 
Name) shall be emailed to (Company mail id) & [email protected] respectively.  

For M/s Cochin Shipyard Limited             For M/s (Company Name)  
DGM (IT)                   Business Head  
 
Witness: 1                   Witness: 1  
Witness: 2                   Witness: 2 
 

SAP Assessment & Audit  Page 25 of 37                     Cochin Shipyard Ltd 


 
 
Annexure‐III 
Bank Guarantee 
To  
COCHIN SHIPYARD LTD  
(GOVT. OF INDIA ENTERPRISE,)  
   PO BAG No. 1653, PERUMANOOR PO, COCHIN 682 015. 
 

WHEREAS...................................... (Name & Address of Supplier) (Hereinafter called "the Supplier") 
has  undertaken,  in  pursuance  of  Contract.............................................  No.......................  Dated: 
………..to  execute.............................................................  (Name  of  Contract  and  brief  description  of    
works) (Hereinafter called "the Contract"). 
 
AND  WHEREAS  it  has  been  stipulated  by  COCHIN  SHIPYARD  LTD  (The  Buyer  ‐  hereinafter  called 
"CSL") in the said contract that the Supplier shall furnish CSL with a Bank Guarantee by a recognized 
bank  for  the  sum  specified  therein  as  security  for  compliance  with  the  Supplier’s  obligations  in 
accordance  with  the  Contract.  AND  WHEREAS  we  have  agreed  to  give  the  Supplier  such  a  Bank 
Guarantee. 
NOW  THEREFORE  we.............................................  (Name  of  the  Bank)  having  its  Head  Office 
at.............................  ...........................  (Address  of  Head  Office)  and  acting  through  its  branch  office 
at....................... (Address of the executing branch) (hereinafter called "the Bank") hereby affirm that 
we  are  the  Guarantor  and  responsible  to  CSL,  on  behalf  of  the  Supplier  up  to  a  total  of 
................................ (amount of Guarantee).................................. (in words), such sum being payable 
in the types and proportions of currencies in which the Contract Price is payable and we undertake to 
pay CSL upon your first written demand and without cavil or argument, any sum or sums within the 
limits  of.........................  (amount*  of  guarantee)    as  aforesaid  without  CSL  needing  to  prove  or  to 
show grounds or reasons for CSL's demand for the sum specified therein. 
 
We, the Bank, hereby waive the necessity of CSL demanding the said debt from the Supplier before 
presenting us with the demand. 
 
We, the Bank, further agree that no change or addition to or other modification of the terms of the 
Contract or of the Works to be performed there under or of any of the Contract documents which 
may be made between CSL and the Supplier shall in any way release us from any liability under this 
guarantee, and we hereby waive notice of any such change, addition or modification. 
 
This guarantee shall be valid until …………………………………………………... 
 
Notwithstanding anything contained herein: 
 
SAP Assessment & Audit  Page 26 of 37                     Cochin Shipyard Ltd 
 
 
 
1. Our  liability  under  this  Bank  Guarantee  shall  not  exceed  Rs.......................... 
(Rupees.................................only). 
2. This Bank Guarantee shall be valid up to (date) and  
3. We are liable to pay the guaranteed amount or any part thereof under this bank guarantee only 
and only if CSL serve upon us a written claim or demand on or before.......................... (Date). 
 
                         
                      Yours truly,  
 
Signature and seal of the guarantor:........................................................... 
Name of Bank:........................................................... 
Address:...........................................................  
 
 
Date :........................... 
 
 
 
*An amount shall be inserted by the Guarantor, representing the percentage of the Contract Price 
specified in the Contract and denominated in Dollars / Indian Rupees. 
 
 
 
 
 
 

SAP Assessment & Audit  Page 27 of 37                     Cochin Shipyard Ltd 


 
 
Forms 
Form A1 
FORM A1: Expertise & Experience 
 
RFP Ref. No.:‐    

Sr.  Description  Details 


No. 
Bidders’  SAP  Review/audit  total  experience in  years  as  on   

31.03.2018.  
Total number of post implementation SAP review/audit successfully   
completed  by  the  firm  during  the  last  five  consecutive  financial 
2  years  as  on  31.03.2018.  (Copy  of  Purchase  order  /  Contract  and 
WCC/documentary proof to be attached) Details to be provided in 
the table mentioned in Form A2. 
Total number of post implementation SAP review/audit successfully   
completed  by  the  firm  during  the  last  five  consecutive  financial 

years  as  on  31.03.2018,  involving  all  FICO,  HCM,  MM,  PS/PP  &  SD 
modules with minimum 200 SAP ECC user license. 
Total number of post implementation SAP review/audit successfully   
completed  by  the  firm  during  the  last  five  consecutive  financial 

years as on 31.03.2018, in Central/State Govt. Organisation / Public 
Sector Undertaking / Public Sector Enterprises. 
Total number of post implementation SAP review/audit successfully   
completed  by  the  firm  during  the  last  five  consecutive  financial 

years as on 31.03.2018, with purchase order value of an equivalent 
of Rs.20 lakhs or more. 
Automated Tools used for SAP Review/Audit    

Methodology adopted for SAP Review/Audit   

* Attach separate work sheet wherever required. 

Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
Seal of Company 

SAP Assessment & Audit  Page 28 of 37                     Cochin Shipyard Ltd 


 
 
Form A2 

     FORM A2: Details of all the Projects as Mentioned in Form A1 
  RFP Ref. No.:‐  

Type of  SAP  Contact  Modules 


Name of the  PO  covered in 
Organization  SAP ECC User  PO No  Period  Current  Person,  
Sr.  Organization  Review/ 
(Mention  Amount of Audit in  status of  the SAP 
No.  (including 
Govt/PSU/PSE/o License Count & Date in INR 
Audit  Months  the Project  Telephone  review 
address)  start date  no&Email d  /audit 
thers) 
                     
                     
                     
                     
                     
                     
 (May attach separate sheet if required)  
 *Copy  of  Purchase order /Contract and WCC/documentary proof of completion to be attached 

Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
Seal of Company 

SAP Assessment & Audit  Page 29 of 37                     Cochin Shipyard Ltd 


 
 
 

Form A3 

         FORM A3: Letter of Confirmation / Declaration 
 

LETTER OF CONFIRMATION / DECLARATION 

 
To, 

The Deputy General Manager 
Information System Department 
Administrative Building 
Cochin Shipyard Limited 
Perumanoor P.O., Kerala, India ‐ 682 015 
 

RFP Ref. No.:‐  

Dear Sir, 
We  confirm  that  we  will  abide  by  the  conditions  mentioned  in  the  Tender  Document  (RFP  and 
annexure) in full and without any deviation. 

We shall observe confidentiality of all the information passed on to us in course of the SAP Review 
/Audit process and shall not use the information for any other purpose than the current tender. 

We confirm that we have not been black listed in last three years, from the date of floating of the 
RFP  or  at  the  time  of  submission  of  Tender,  by  any  State/Central  Government  organizations 
/Firms / Institutions/ Central PSU / PSE. 

We  also  confirm  that  we  are  not  involved  in  CSL  ERP  implementation  Project  as  Program 
Managers /consultancy / Implementation partner/ Software solution provider. 

Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
 
 
 
 
Seal of Company 

SAP Assessment & Audit  Page 30 of 37                     Cochin Shipyard Ltd 


 
 
 

Form A4 

   FORM A4: Financial Capability 
 

RFP Ref. No.:‐  

Net worth as at the end 
Annual Revenue /  
Sr. No.  Financial Year  of the 
Turn Over 
financial year 
1       

     

     

*Attach separate work sheet if required. 
 

 
 

 
Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
 
 
Seal of Company 

 
 

SAP Assessment & Audit  Page 31 of 37                     Cochin Shipyard Ltd 


 
 
 
Form A5 

   FORM A5: Manpower Details to be deputed for CSL Project 
 

RFP Ref. No.:‐  

Sr.  For CSL 
Description  Professional  In Rolls # 
No.  Project # 

SAP  Certified  with  SAP     



review/audit background

Number  of  Professional  Manpower     


2  CISA/DISA Certified 
available  for  SAP  Review/Audits  in 
the organization and the number of  More  than  three  years 
personnel  to  be  deputed  for  CSL  experienced  in  SAP 
SAP review/audit project      
3  review/  audit  with  the 
(Mention  count  for  the  Permanent  qualification  as  specified 
employees only )  Sr No 1 above. 
 

   
TOTAL 

 *Attach separate work sheet if required and CV of the Team members. 
 

 
 

Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
 
 
Seal of Company 
 

 
SAP Assessment & Audit  Page 32 of 37                     Cochin Shipyard Ltd 
 
 
 Form A6 

         FORM A6: Compliance Checklist 
 
We,  M/s  …………………………………………………hereby  solemnly  confirm  and  declare  that  we  have  gone 
through the entire  tender document / instructions, Scope of Work, Project Schedule,  Prequalification 
criteria,  General  terms  and  conditions  and  all  other  documents  attached  to  the  RFP 
……………………………………of  M/s  Cochin  Shipyard  Ltd,  in  detail  and  full.  Entire  specifications,  Scope  of 
Work,  Prequalification  criteria,  Project  Schedule,  instructions,  terms  and  conditions  are  noted  and 
understood  and  get  clarified  with  M/s  Cochin  Shipyard  Ltd.  and  submitting  the  offer  herewith.  We 
reconfirm 
TECHNO‐COMMERCIAL CHECK LIST 

COMPLIANCE Page 
SL  No in 
DESCRIPTION  Remarks/Deviation
NO.  YES  NO  the 
Offer 

1  It is confirmed that scope of works in detail as per         
Clause ‐4 is noted and accepted. 
2  It is confirmed that Project Plan as per Clause ‐5 is         
noted and accepted. 
It  is  confirmed  that  the  Eligibility/Pre‐Qualification 
3  criteria  as  per  Clause  ‐  6  is  noted  and  submitted         
filled and duly signed along with the offer. (Specify 
Page Nos.) 
It is confirmed that the Forms A1& A2 required as 
per  the  pre‐qualification  criteria  clause  6.1  to  6.5 
4  and  copy  of  documentary  proofs  in  this  regard         

submitted  (filled  and  duly  signed)  along  with  the 


offer. (Specify Page Nos.) 
5  Letter of confirmation/ declaration as per Form A3         
submitted as required. (Specify Page No.) 
6  ISO  certification  documentary  proof  submitted.         
(Specify Page No.) 
7  Financial  capability  as  per  Form  A4  submitted  as         
required. (Specify Page No.) 
8  Project  Manager  CV  and  experience  details         
submitted as required. (Specify Page No.) 

SAP Assessment & Audit  Page 33 of 37                     Cochin Shipyard Ltd 


 
 
Documentary  proof  of  list  of  personnel  to  be 
9  deputed exclusively for CSL project along with their         
qualification  and  experience  as  per  Form  A5 
submitted. (Specify Page No). 
10  It is confirmed that Technical Bid evaluation criteria         
as per Clause ‐7 is noted and understood. 
11  CSL terms of payment as per Clause‐8 is noted and         
Accepted. 
Execution Plan & methodology requested in Clause 
12  – 10 is submitted along with the offer (Specify Page         

Nos.) 
It is confirmed that the instructions, EMD, Security 
13  deposit and terms and conditions as per Clause 11         

to 14 read and understood. 
14  Self  attested  copy  of  PAN  card  under  Income  Tax         
Act submitted. (Specify Page Nos.) 
15  Self attested copy of GST Registration Number and         
details submitted (Specify Page Nos.) 
VALID  copy  of  MSME/NSIC  Registration  Certificate 
16  along with the list of items / services for which they         
are  registered,  as  issued  by  NSIC  for  EMD 
exception, if applicable. (Specify Page Nos.) 
Start‐up  Registration  certificate  as  defined  under 
17  notification of DIPP GSR 501(E) dated 23 May 2017         

for availing the specified relaxations if applicable. 
It is confirmed that Original tender document read 
18  and  understood  completely  and  submitted  a  copy         
duly  signed  and  sealed  on  all  pages.  (Specify  Page 
Nos.) 
EMD  as  per  clause  12  submitted  in  separate 
19  envelope along with the technical bid document as         

required in the tender.  
Copy of un‐priced bid format as per Form‐A8 (price 
20  bid  WITHOUT  prices/numerals)  submitted.  .         

(Specify Page No.) 
 
We,  M/s  ………………………………………………..solemnly  reconfirm  and  declare  that  the  above  checklist 
points  elicited  are  fully  known  to  us  and  we  hereby  confirm  its  compliances  in  full  for  the  entire 
project period including its guarantee period. It is also confirms that we will consider and implement 

SAP Assessment & Audit  Page 34 of 37                     Cochin Shipyard Ltd 


 
 
the  detailed  specification  in  the  RFP  and  points  in  this  check  list  are  considered  as  reaffirmation  of 
those points in concise form. I the undersigned hereby truly confirm that I am authorized to sign on 
this document as per articles of association of M/s …………………………. where I am employed as per the 
details given along with my signature below. 
 
 
Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
 
 
Seal of Company 
 

SAP Assessment & Audit  Page 35 of 37                     Cochin Shipyard Ltd 


 
 
 

Form A7 

   FORM A7: Pre‐Bid Questionnaire 
 
 
 
Sr. No.  Reference Clause  Page No  Description  Bidder’s Query  CSL Reply 
           

           

           

 
 
 
 
 
 
 
 
 
 
Date:  Authorized Representative Signature: 
Place:  Name: 
Designation: 
Company Name: 
 
 
Seal of Company 
 
 

SAP Assessment & Audit  Page 36 of 37                     Cochin Shipyard Ltd 


 
 
Form A8 

FORM A8:Format for Price Bid 
PART II‐ Price Bid for "Tender for conducting SAP Assessment & Audit” 

RFP Ref. No.: 
(Please submit in a separate Envelope. The Technical Bid must not contain any price information else the 
bidder will be liable to be disqualified.) 
Amount (in INR)  GST as per the current 
Particulars  Total Cost (in INR) 
Excluding GST   rate applicable 
  (A)  (B)  (C)=(A)+(B) 
Gross  Cost  of  SAP  Rs.  GST (….%)  
Assessment  &  Audit  as  GST (…Amount) 
per  the  scope  defined 
in  the  RFP  (Inclusive  of 
all fees & expenses) 
 
Less: Discount, if any 

Net  Cost  of  SAP   


Assessment  &  Audit  as 
per  the  scope  defined 
in  the  RFP  (Inclusive  of 
all fees & expenses) 
 
(TOTAL AMOUNT IN WORDS: ‐ INR .........................................................................................................)  
 
 
Authorized Signatory with Seal  
Date:  
Place:  
 
Notes:‐  
1. The Price Bid should contain the Total Assignment cost, on a fixed cost Basis. CSL will neither provide 
nor  reimburse  any  expenditure  towards  any  type  of  Accommodation,  Travel  Ticket,  Airfares,  Train 
fares, Halting expenses, Transport, Lodging, Boarding etc.  
2. The prices should be quoted in INR only  
3. GST should be mentioned in the separate column as provided in the format  
4. Providing Price bid other than this format may lead to rejection of the bid.  
5. Total cost inclusive of all taxes shall be considered to find out the L1 bidder. 
 
 

SAP Assessment & Audit  Page 37 of 37                     Cochin Shipyard Ltd 


 

You might also like