AASHTO FLexible Pavement Design Procedure (Tables 1-6 To 1-10)
AASHTO FLexible Pavement Design Procedure (Tables 1-6 To 1-10)
Example: To be 99% confident that the pavement will remain at or above its TSI, a ZR value of
–2.326 would be used in the equation.