Live Loads

GRID 3 (TRANSVERSE FRAME)


For 1st Floor to 4th Floor: Beam 1-2 2-3 3-4 4-4
COMPUTING LIVE LOAD FOR 1ST FLOOR TO 4TH FLOOR:
Office = 2.4 kPa
SUBJECTED INTO TWO TRIANGULA R LOADS
q x shorter dimension of the slab
WTriangular =
2
kN
24 (5 m) kN
WTriangular = m
=6
2 m
kN
2(WTriangular ) = 12
m

q x shorter dimension of the slab


Wequivalent uniform distributed load =
3
kN
24 (5 m) kN
Wequivalent uniform distributed load = m
=4
2 m
kN
2(Wequivalent uniform distributed load ) = 8
m

GRID C (LONGITUDINAL FRAME)


For 1st Floor to 4th Floor: Beam A-B B-C C-D D-F
COMPUTING LIVE LOAD FOR 1ST FLOOR TO 4TH FLOOR:
Office = 2.4 kPa
SUBJECTED INTO TWO TRIANGULA R LOADS

q x shorter dimension of the slab


WTriangular =
2
kN
24 (5 m) kN
WTriangular = m
=6
2 m
kN
2(WTriangular ) = 12
m
q x shorter dimension of the slab
Wequivalent uniform distributed load =
3
kN
24 (5 m) kN
Wequivalent uniform distributed load = m
=4
2 m
kN
2(Wequivalent uniform distributed load ) = 8
m