HAZARD IDENTIFIED RISK ASSESMENT AND RISK CONTROL (HIRARC)

Company: Conducted by :
Yung Kong Construction sdn bhd
(Name, Designation)

Bricklaying Work ROBBY A/L ANIL


Process/Location:
SAFETY AND HEALTH OFFICER
Approved by:
Lim sok hiong
(Name,Designation) Date: (From:1/9/2018 to 2/12/2020 )
Site agent

Date: 1/9/2018 Review Date: - Next Review Date: 30/11/2018

1. Hazard Identification 2. Risk Analysis 3. Risk Control


L S R
I E I
No Work Activity? Hazard Which can cause/effect Existing Risk K V S Recommended PIC
Control E E K Control (Due
L R
(if any) I I
Measures Date/Status)
H T
O Y
O
D

1. Bricklaying work Falling from height- Extensive body Full PPE 5 4 20 Safety hardness issuing Safety Dept
Human injury/fatal compliance, tool box and hard barricade for
training floor opening

Make having crane a


Accidentally Full PPE valid PMA & Driver
knocking while Body injury compliance, tool box 2 2 4 has valid competent Safety Dept
loading brick training license & critical lift
inspection

Falling Object from Extensive body Full PPE 3 2 6 Carry barricade at Safety Dept
height level injury/fatal compliance, tool box ground level wear
training work on going and
warning signage
1. Hazard Identification 2. Risk Analysis 3. Risk Control
L S R
I E I
No Work Activity? Hazard Which can cause/effect Existing Risk K V S Recommended PIC
Control E E K Control (Due
L R
(if any) I I
Measures Date/Status)
H T
O Y
O
D
Pinch in between Body injury Full PPE 2 2 4 Working at height safe Safety Dept
while loading brick compliance, tool box operational procedure
training and training

Sharpe edge object- Bodily injury and first Eliminate, Full PPE 3 1 3 Random inspection Safety Dept
pallet,door,or aid type injury compliance and worn proper PPE
window frame