PROVISION OF FABRIC MAINTENANCE SERVICES

NIPEX TENDER # STARDEEP.00000059


COMPENSATION SCHEDULE

ES/NCDMB/CNL-CITT-TEMPL/0208/19/UPD/FABRIC MAINTENANCE SERVICES

Bidders Name: NGOFA


S/No. Item Description Unit INSPECTION SERVICES LTD
A Lump Sum Items
1 MOBILIZATION US$
LUMP SUM PRICE for complete mobilization of all material, equipment and Per Service
personnel to Onne/Port Harcourt for onward movement to Agbami FPSO. Order 3,000
LUMP SUM PRICE for complete mobilization of all material, equipment and Per Service
personnel to Escravos for onward movement to Agbami FPSO. Order 2,500
LUMP SUM PRICE for complete mobilization of all material, equipment and Per Service
personnel to Lagos for onward movement to Agbami FPSO. Order 1,000
LUMP SUM PRICE for complete mobilization of all material, equipment and Per Service
personnel to Warri for onward movement to Agbami FPSO. Order 1,500
2 DEMOBILIZATION US$

LUMP SUM PRICE for complete demobilization of all material, equipment and Per Service
personnel from Agbami FPSO. Order 3,000
3 MARK-UP

Mark-up on additional third party materials or services. Percent 15.22%

B PER M2 RATES INCLUDING COATING MATERIALS AND GRITS


Unit Rate (US$)

2
Unit work rates per M for Wet Blasting and Painting INCLUDING the supply of
COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS
1 M2
required for surface preparation of GROUP A Structures (Hull machinery space,
Hull Deck, Module Structure. Accommodation). 6,000
Unit work rates per M2 for Wet Blasting and Painting INCLUDING the supply of
2 COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS M2
required for surface preparation of GROUP B structures – Process Equipment. 6,000
Unit work rates per M2 for Wet Blasting and Painting INCLUDING the supply of
COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS
3
required for surface preparation of GROUP D – High temperature service on
M2
FPSO. 6,000
Unit work rates per M2 for Wet Blasting and Painting INCLUDING the supply of
4 COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS M2
required for surface preparation of GROUP E – Process Equipment Tank Lining. 6,000
Unit work rates per M2 for Wet Blasting and Painting INCLUDING the supply of
5 COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS M2
required for surface preparation of GROUP F- Touch up on Agbami FPSO. 6,000
Unit work rates per M2 for Wet Blasting and Painting INCLUDING the supply of
6 COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS M2
required for surface preparation of GROUP G- Splash zone Area. 6,000
Unit work rates per M2 for Chipping and Painting INCLUDING the supply of
COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS
7
required for surface preparation of GROUP A, B, C , D, E, F, G equipment and
M2
areas.
C PER M2 RATES EXCLUDING COATING MATERIALS AND GRITS Rate ($)

Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
1 M2
GRITS required for surface preparation of GROUP A Structures (Hull machinery
space, Hull Deck, Module Structure. Accommodation on Agbami FPSO.
5500
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
2 of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and M2
GRITS required for surface preparation of GROUP B – Process Equipment. 5500
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
3
GRITS required for surface preparation of GROUP D – High temperature service
M2
on FPSO. 5500
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
4
GRITS required for surface preparation of GROUP E – Process Equipment Tank
M2
Lining on Agbami FPSO. 5500
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
5
GRITS required for surface preparation of GROUP F- Touch up on Agbami
M2
FPSO. 5500
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
6 of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and M2
GRITS required for surface preparation of GROUP G- Splash zone Area. 3600
Unit work rates per M2 for Chipping and Painting EXCLUDING the supply of
COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS
7
required for surface preparation of GROUP A, B, C , D, E, F, G equipment and
M2
areas. 5000
PER M2 RATES EXCLUDING COATING MATERIALS AND GRITS (BUT
D Rate (US$)
INCLUSIVE OF ROPE ACCESS TEAM (RAT) RATES)
2
Unit work rates per M for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
1 M2
GRITS required for surface preparation of GROUP A Structures (Hull machinery
space, Hull Deck, Module Structure. Accommodation on Agbami FPSO. 7000

Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
2 of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and M2
GRITS required for surface preparation of GROUP B – Process Equipment. 7000
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
3
GRITS required for surface preparation of GROUP D – High temperature service
M2
on FPSO. 7000
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
4
GRITS required for surface preparation of GROUP E – Process Equipment Tank
M2
Lining on Agbami FPSO. 7000
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and
5
GRITS required for surface preparation of GROUP F- Touch up on Agbami
M2
FPSO. 7000
Unit work rates per M2 for Wet Blasting and Painting EXCLUDING the supply
6 of COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and M2
GRITS required for surface preparation of GROUP G- Splash zone Area. 7000
Unit work rates per M2 for Chipping and Painting EXCLUDING the supply of
COATING MATERIALS (Paint, Thinner, Solvent and Degreaser etc.) and GRITS
7
required for surface preparation of GROUP A, B, C , D, E, F, G equipment and
M2
areas. 7000

E EQUIPMENT AND MACHINERY UoM Rate Stand by Rate


(US$/day) (US$/day)
1 Diesel Compressor (1100CCFM); Min class- rig safe Each 3000 2000
2 Diesel Compressor (900CCFM) ; Min class -rig safe Each 3000 2000
3 Diesel Compressor (750CCFM); Min class -rig safe Each 3000 2000
4 Diesel Compressor (600CCFM); Min class- rig safe Each 3000 2000
5 Diesel Compressor (400CCFM) ;Min class -rig safe Each 3000 2000
6 Diesel Compressor (350CCFM); Min class -rig safe Each 2500 1500
7 Grit Blasting Pots (200-400 liters Capacity) Each 2000 1500

8 Wet Blasting Pot complete with accessories (400-500 liters capacity) Each 3500 2000

9 Wet Blasting Pot complete with accessories (200- 300 liters capacity) Each 3000 1500

10 Wet Blasting Pot complete with accessories (50-100 liters capacity) Each 2000 1000
11 Airless Spraying Machine complete with Pump and Lines Each 300 150
12 Conventional Spraying Machine Each 1500 750
13 Air Tank 200ltrs capacity Each 250 100
14 Blaster Air Filtration Unit Each 300 150
15 Blaster Nozzles Each 250 200
16 1 ¼” Blasting Hoses (40M) Each 300 150
17 ¾” Air Hose Each 300 150
18 3/8” Air Hose Each 300 150
19 ¼” Paint spray hose 18M long with termination Each 1000 500
20 High Pressure (HP) Painting Hose Each 600 300
21 Air Fed Blasting Hood Each 300 150
QA/QC Painting and Inspection Equipment as specified in the Bid
22 Each
Package 450 250
23 Paint QA/QC Equipment : Pull off test Kit ASTM D 4541 Each 300 150
Paint QA/QC Equipment: Low voltage Holiday detector/High voltage
24 Each 250 225
holiday detector
25 Pneumatic Paint mixer - Ingersoll Rand Brand Each 90 45
Pneumatic Grinding Machine grade 1 with brass needles -Ingersoll Rand
26 Each 50 25
Brand
27 Pneumatic needle gun machine Ingersoll Rand Brand Each 50 25
28 Computer system with Printer and UPS Each 100 50

29 Hand Radio Communication rated for Class 1, Div 2 Each 50 25

30 One (1) Lot of Scaffold Materials as described in the bid package Each 700 350
31 Pressure washing machine Each 300 150
32 Fire Blankets ( a roll) Each 100 50
33 Heavy Duty Tarpaulin (40 feet x 40 feet) Each 250 225
34 Portable Vice Each 190 95
35 Rope Access Kit Each 100 50
36 Rigging Kit Each 130 65
37 Man lift Each 100 50
PAINTERS TOOL BOX as described in the compensation details
38 Each 50 25
documents in the bid package
39 Container with certified lifting equipment (20FT X 8FT X 8FT) Each 75 37.5
40 Container with lifting certified equipment (10FT X 8FT X 8FT) Each 70 35
Container with certified lifting equipment (20FT X 8FT X 8FT) and
41 Each 75 69.82
intrinsically safe A/C.
A/C Container with certified lifting equipment (10FT x 8FT x 8FT) and
42 Each 70 69.82
intrinsically safe A/C.
43 CONSUMABLES (1 Lot) CONTENTS as required Each 20 10

F PERSONNEL SERVICES Unit Base Rate Bidder's All


USD Inclusive Rate USD
1 Project Manager Day 206.38 250.00
2 Project Supervisor / Engineer Day 263.90 298.23
3 Site / Safety Supervisor Day 109.22 150.00
4 Lifting & Rigging Inspector Day 69.73 100.00
5 Crane Operator Day 69.73 100.00
6 Painting Foreman Day 78.96 70.00
7 Medic Day 151.30 200.00
8 Blaster / Spray Painter Day 65.38 100.00
9 Scaffolder Day 69.73 100.00
10 Hand Painter Day 69.73 100.00
11 Structural Fitter / Welder Day 97.18 150.00
12 Safety Officer / Fire Watch Day 78.99 110.00
13 QA/QC Inspector Day 97.18 120.23
14 Mechanic Day 83.39 130.00
15 Pot Operator Day 48.81 100.00
16 Rigger / Helper Day 69.73 105.00
17 Admin / Clerical Office Day 48.81 70.00
18 Security / Logistics Coordinator Day 127.83 160.23
19 Radio Operator Day 48.81 70.02
20 IRATA Rope Access Level II/ Painter (National) Day 228.78 360.75
21 IRATA Rope Access Level I/ Painter (National) Day 151.30 200.84
Provision of IRATA certified Level 3 Rope Access NDT Technician - ASNT
22 Level 2 qualified Services Day 275.57 456.00
Provision of IRATA Level 3 Rope Access/Coating Inspector Nace CIP
23 Level 2 Services Day 274.54 456.00
Provision of IRATA Level 3 Rope Access Clockspring/Lead Technician
24 Services Day 274.54 392.82

25 Provision of API 510/IRATA Level 2 Rope Access Technician Services Day 257.27 390.31

26 Provision of IRATA certified Level 3 Rope Access Technician Services Day 256.23 399.01
Provision of IRATA certified Level 3 Rope Access Welder - ASME Section
27 IX qualified Services Day 256.23 399.01
Provision of IRATA certified Level 2 Rope Access NDT Technician - ASNT
28 Level 2 qualified Services Day 229.82 399.01
Provision of IRATA Level 2 Rope Access/Coating Inspector Nace CIP
29 Level 2 Services Day 228.78 399.01
Provision of IRATA Level 2 Rope Access Clockspring Technician
30 Services Day 228.78 399.01

31 Provision of IRATA certified Level 2 Rope Access Technician Services Day 219.11 389.80
Provision of IRATA certified Level 2 Rope Access Welder - ASME Section
32 IX qualified Services Day 219.11 389.80

33 Provision of API 510/IRATA Level 1 Rope Access Technician Services Day 214.97 379.75
Provision of IRATA Level 1 Rope Access/Coating Inspector Nace CIP
34 Level 2 Services Day 183.02 268.26
Provision of IRATA Level 1 Rope Access Clockspring Technician
35 Services Day 183.02 268.26

36 Provision of IRATA certified Level 1 Rope Access Technician Services Day 151.30 255.00
IRATA certified Level 2 Rope Access NDT Technician - ASNT Level 2
37 qualified Day 561.68 877.26
38 IRATA Level 2 Rope Access/Coating Inspector Nace CIP Level 2 Day 561.68 877.26
IRATA certified Level 3 Rope Access NDT Technician - ASNT Level 2
39 qualified Day 561.51 877.01

40 IRATA certified Level 3 Rope Access Welder - ASME Section IX qualified Day 561.00 877.00
41 IRATA Level 3 Rope Access/Coating Inspector Nace CIP Level 2 Day 561.00 877.00
42 IRATA Level 3 Rope Access Clockspring/Lead Technician Day 561.00 877.00
43 IRATA certified Level 3 Rope Access Technician Day 558.62 860.23
44 IRATA Level 2 Rope Access Clockspring/Lead Technician Day 527.68 829.08
45 API 510/IRATA Level 2 Rope Access Technician Day 527.17 827.10

46 IRATA certified Level 2 Rope Access Welder - ASME Section IX qualified Day 510.68 800.00
47 IRATA Level 1 Rope Access Clockspring/Lead Technician Day 510.17 800.00
48 API 510/IRATA Level 1 Rope Access Technician Day 510.17 800.00
49 IRATA certified Level 2 Rope Access Technician Day 504.56 800.00
50 IRATA Level 1 Rope Access/Coating Inspector Nace CIP Level 2 Day 477.53 655.92
51 IRATA certified Level 1 Rope Access Specialist Day 459.51 639.51
52 IRATA Rope Access Level III/ Painter /Supervisor Day 561.51 698.23