Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC
Miscommunication with 1. Coordinate the activity to the Project Enduser and Project Owner
Operational Delay to schedule and before commencing.
the Project Enduser and work activity.
Project Owner A 2. Follow Schedule and arrange the required document to avoid any
cause of delaay.
3. Refer to gant chart as the reference for preparing
PTW.
PPE
Preparation of EL
1
Documents or Permit to Prepare necessary document
such as associated permits S
Work (PTW)
EC
PPE
EL 1. remove any items that may obstruct the work activity. Keep the
working area, platform clear of debris or liquid spills.
S
Site Survey of the area Site Evaluation for the work area. Occupational Health Physical injury to workers
for the Dismantling of EC
2 Evaluate the possible hazard and & Safety Sprain and strain
old cables and Cable due to slipping hazard
trays. risks. 1.Cordon the area an d keep sign to warn others of the potentil hazard.
A 2.ensure close monitoring and supervision
3.materials to be stored in a safe and secure manner
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC
Site Survey of the area
for the Dismantling of Site Evaluation of the work area. Occupational Health 1. Limiting access by keeping people out of noisy areas (85db high)
Evaluate the possible hazard and & Safety Exposure to loud Noise Hearing Impairment 2. Limiting time spent in noisy areas
old cables and Cable risks.
trays. A 3. dentify areas with high noise level and provide suitable signage to
remind workers that they will be expose in high noise level in that
particular area.
Parallel or simultaneous May result in exposing 1. Ensure proper coordination and communication with other
Occupational Health activity of other workers and or potential contractor to avoid parrallel/simoltanueous activities.
& Safety trades/contractor in the 2. Supervisors and Safety Officers to ensure precise and
work area. to harm and danger. A
close supervision to all activities.
3. Supervisor shall conduct talks about nature of works and
associated potentil hazards and their essential precautionary measure.
PPE 1. Personnel to wear mandatory PPE such as but not limited to:
Hardhat, safety Goggles, Safety Shoes, earplug.
EL
S
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
Manual handling of tools and
materials EC
Preparation and (Combination/box/open wrench,
hacksaw, Pusch cart, multi-tester, 1. provide an awareness training regarding line of fire and hand finger
3 mobilization of tools, voltage detector, masking tape, Occupational Health Pinch Point Cuts, wounds safety.
equipments and & Safety 2. Know the hazards and dangers in the job to be done.
materials extension cord, GFCI, grinder,
Toolbox, electrician tools, A 3. Be aware of
dismantled cables and cable pinch point
trays). 4. Check and inspect the tools that they are in good condition and safe
to use.
PPE 1. wear safety gloves
EL 1. remove any items that may obstruct the work activity. Keep the
working area, platform clear of debris or liquid spills.
S
EC
Occupational Health Physical injury to workerss sprain and strain
& Safety due to Slip hazard
1.Cordon the area an d keep sign to warn others of the potential
A hazard.
2.ensure close monitoring and supervision
3.materials to be stored in a safe and secure manner
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
4 Mobilization of Mobilization of manpower to Occupational Health Hit by moving macheniry 1. Ensure all workers abide to the traffic rules and regulations in the
manpower work area by means of walking & Safety plant.
A 2. Ensure workers use the pedestrian walkway provided during
travelling.
3. Be extra careful when crossing the road
PPE
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
S
EC
Mobilization of Mobilization of manpower to Occupational Health Slip and Trip 1. Bring only what you need and don’t bring unnecessary tools.
fractures 2. Identify other possible causes of slip, trip, area such as pressence of
manpower work area by means of walking & Safety
protudring rebars wet floor, and others.
A 3. Every flatform shall be kept free from any obstruction, materials, and
rubish.
4. When they become slippery due to nature of work, steps shall be
taken by way of sanding, cleaning or by any other means to roughen
the surface.
EL 1. Make sure all access and egress, access ladders, steps and ramps are
safe and secure.
S
EC
1. All personnel to have read and understood the RA that is specific for
May result in exposing their area of work.
5 Preparation of work area Assess work area; access and Occupational Health poor access and egress workers and or potential 2. RA is to be modified where and when necessary to reflect
weather condition & Safety to harm and danger. A the changing work area.
3. Supervisor shall conduct talks about
nature of works and associated potential hazards and their essential
precautionary measure.
PPE 1. Personnel to wear mandatory PPE such as but not limited to:
Hardhat, safety Goggles, Safety Shoes, earplug.
EL
S
EC
May result in exposing 1. only authorized personnel are allowed to enter in the work area.
Occupational Health unauthorized entry of workers and or potential
& Safety personnel to harm and danger. 2.Cordon the area and keep sign to warn others of the
A potential hazard.
3.ensure close monitoring and supervision
PPE
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
PPE 1. Personnel to wear mandatory PPE such as but not limited to:
Hardhat, safety Goggles, Safety Shoes, earplug.
EL
S
EC 1. Refer to list of Circuit breaker to be isolate (LOTOTO)
Identification and Identification and Marking of Diffent color for tagging will be
6 Marking of cables to be cables to be dismantle using wire Operational Incorrect labeling people get electricuted used for cable that has power and
during dismantle
dismantled tracer and voltage detector no power.
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
Identification and Identification and Marking of 1. Only competent personnel to do the task Diffent color for tagging will be
6 Marking of cables to be cables to be dismantle using wire Operational Incorrect labeling people get electricuted 2.Cordon the area and keep sign to warn others of the used for cable that has power and
during dismantle potential hazard.
dismantled tracer and voltage detector no power.
3.ensure close monitoring and supervision.
A 4. Proper coordination and communication with SCPC elctrical
personnel.
5. Each cable to be dismantle/demolish should be
identified with a particular tape, such as 'Green' ensuring that the
similar tape is not used in any adjacent cables.
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
8 Cutting of cables/wires Cutting of identified/mark and Occupational Health Cutting the wrong cables electrocution, fatality 1. Each cable to be cut and dismantled should be identified with a
disconnected cables/wires & Safety particular tape or marking.
2. if several cables or conductors are being cut or dismatled, they
shall be cut one at a time.
A 3. No cables shall be cut until it has been physically removed to an
access point.
4. Tools used to cut cables shall not be positioned in a
way that they may cause inadvertent damage to other cables.
5. cutting tools with insulated handle only should be used for this
purpose.
PPE
EL
S
EC
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC
PPE
EL
S
EC
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC 1. Provide adequate ventilation
PPE
EL
S
PPE 1. Personnel to wear mandatory PPE such as but not limited to:
Hardhat, safety Goggles, Safety Shoes.
EL
Pull out/removal of cable from S
panels, cable trays, conduit and Occupational Health Falling from heights Serious injury, fatality
electrical equipment.(working at & Safety
heights)
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
PPE 1. wear full body harness with double lanyard and shock absorber.
EL
S
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
PPE Use suitable PPE: Hard Hat, Safety Glass, Gloves, Safety Shoes
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC
1. Ensure and practice obesrvation skills by looking Above, Behind,
potential of being struck Below Inside(ABBI).
Occupational Health by object during laceration and bruises
& Safety A 2. Refer to the List of cable trays that need to dismantled.
inspection process 3. . Ensure precise supervision
4. Ensure proper
coordination and communication
PPE Provide PPE's Such as but nt limited to: Safety Hardhat, Safety Goggles,
Safety shoes, Safety Gloves
EL
S
EC
Identification and 1. Bring only what you need and don’t bring unnecessary tools.
10 marking of cable trays Visual inspection, Identification Occupational Health Slip and Trip physcally injury to workers
2. Identify other possible causes of slip, trip, area such as pressence of
and conduit pipes to be and marking of cable trays and & Safety protudring rebars wet floor, and others.
dismantled. conduit pipes to be dismantled. 3. Every flatform shall be kept free from any obstruction, materials, and
A
rubish.
4. When they become slippery due to nature of work, steps shall be
taken by way of sanding, cleaning or by any other means to roughen
the surface.
PPE
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL
S
EC
Dismantling of identified cable
trays and conduit pipe by
loosening and removing fasteners 1. Only competent and authorized personnel to perform the activity.
11 Dismantling of cable in splice plate by using hand Occupational Health unsafe or incorrect use of hand injury
trays and conduits tools. (Hand Tools & Safety hand tools 2. Provide adequate monitoring and supervision at the workplace.
includes spanners, combination A
wrench, open wrench, box 3. use right tools for the right job.
wrench) 4. educate and train personnel for proper use
and handling of hand tools.
PPE Provide PPE's Such as but nt limited to: Safety Hardhat, Safety Goggles,
Safety shoes, Safety Gloves
EL
S
Occupational Health Falling from heights Serious injury, fatality
& Safety
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
PPE Use suitable PPE: Hard Hat, Safety Glass, Gloves, Safety Shoes
EL
S
PPE 1. personnel to wear suitable full body harness with double lanyards
and shock absorber.
EL
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
PPE 1. Wear PPE's such as but not limited to hardhat, Safety Shoes, Safety
Goggles.
EL
S
Occupational Health Fall from scaffold or 1. Secure supporting PTW for working at heights
& Safety working flatform Serious injury, fatality 2. Ensure close supervision
3. Ensure 100% tie-off of full body harness
A lanyard 4. ensure 3 point of
contact while descending and ascending on scaffold ladder and working
flatform. 5. Make
sure all workers stayfully within the scaffold at all times.
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
PPE 1. wear full body harness with double lanyard and shock absorber.
EL
S
1. Ensure material is carried in small quantity to minimize the weight
EC carried.
2. use of mechanical aid if necessary (push cart or
hauling of dismantled cables and trolley)
cable trays to approved Occupational Health Ergonomically Hazards
12 Housekeeping 5's temporary disposal or storing body pain, back injury
area. (Manual handling, carrying & Safety
and hauling). 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the load
A is to heavy/large (Buddy Buddy System)
3. See if you can break the load into smaller pieces.
4. Conduct regular exercise and streching before the activity.
5. Conduct training in manual handling and storing of materials.
EL
S
EC
Occupational Health Pinch point and sharp 1. Educate worker on proper hand placement
hand and finger injuries 2. Buddy buddy system
& Safety edges
A 3. proper communication and
coordination before lifting tubular pipes.
4. provide an awareness
training regarding line of fire and hand finger safety.
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
Company Instrumentation & Control Specialists, Inc. Document ID No. JSEA -ICS - 001
Department/s Contractor Revision No. 5
Job Title Dismantling of Old Cables, Conduits and Cable Trays Effective Date Nov. 29 - Dec. 5, 2019
Item Procedure / Process Activities/Equipment/Products Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
No. or Services Source / Vulnerability
EL 1. remove any items that may obstruct the work activity. Keep the
working area, platform clear of debris or liquid spills.
S
EC
Occupational Health Physical injury to workers Sprain and strain
& Safety due to slipping hazard
1.Cordon the area an d keep sign to warn others of the potential
A hazard.
2.ensure close monitoring and supervision
3.materials to be stored in a safe and secure manner
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
INSTRUCTIONS:
Please contact TDC/IMS Department if you have questions.
COLUMN DESCRIPTION
1 Processes, Enlist all processess, activities, equipment, materials and services that are covered by your
Activities, Department's operation.
Equipment,
Products or You may refer to the following:
Services • Processes/ activities as indicated by your Departmental procedures;
• Lists of equipment which are included in your operation;
• Materials or products that you use in your operation; and
• Services that you offer to other Department or party
R Routine When operations or activity are performed in accordance to plan or w/in the
operation conditions
NR Non-Routine When there is deviation from plan or operating conditions giving rise to
change in product specification or minor accident
Abnormal condition of process, activities, equipment, product or services
A Abnormal
E Emergency All foreseeable emergency situations
3 Hazard / Aspect Identify hazards / aspects related to the process / task.
If the Residual Risk is High or Extreme (10 and above), an OTP may need to be submitted to design
9 OTP stronger controls to reduce the risk.
The procedure(s) for hazard identification and risk assessment shall take into account:
> The level to which the risk would affect the financial results of the business and the ability of the business to
deliver its strategy and objectives, e.g:
> Impact score should consider other relevant factors in relation to risk identified based on experience/expert
judgement
Impact Level
Impact SCORE
Criteria Insignificant Minor Moderate Major Critical
1 2 3 4 5
Health and No impact Self-medication; Require treatment Temporary Fatality or severe
safety Risk local first aid by a medical disability/ irreversible/
treatment practitioner
Impairment, permanent
disability
(Localized -
contained within
the site)
Major impact
(immediate or long
term harm);
Likelihood Assessment
> The chances of risks occuring based on the information below and your own management experience and intuition
> Likelihood and impact should be assessed BOTH on a Gross or Inherent (before the application of controls) and Net
or Residual (after the application of controls) basis
Likelihood
Likelihood SCORE
Criteria Rare Unlikely Likely Highly Likely Almost Certain
1 2 3 4 5
1 out of 1,000,000 1 out of 100,000 1 out of 10,000 1 out of 1,000 1 out of 100
chances chances chances chances chances
Possibility of event
from happening is
remote
RISK ASSESSMENT MATRIX
IMPACT
SCORE 1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
LIKELIHOOD
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
13 - 25 EXTREME RISK (ER) Stop - Analyze work method and ensure substantial
safe work controls (e.g., work permit system) are
determined and applied.Revised methodology to be
authorized by Responsible Manager.
MANAGEMENT RESPONSE / ACTIONS TO BE TAKEN
Other Risk Types
(Lifted from SMPC ERM Policy)
• Action is advisable if it is cost effective
• The issue does not necessarily warrant immediate attention but should have an agreed
programme for resolution within a reasonable time if it is cost effective.
• Business concern is not likely to significantly impact the validity and accuracy of balance sheet
and P&L accounts but would materially affect the economy and adequacy of a process.
• Matters that generally include recommendations which will lead to a general improvement in
the control environment over time or could improve economy and adequacy of a process.
• Action required to control the risk
• Value added ideas. These matters generally include recommendation which will have
significant improvement on the accuracy, economy and adequacy of a process.
• Material value added ideas. These matters generally include recommendations which will have
significant improvement on the validity, accuracy, economy and adequacy of a process.
CALACA POWER COMPLEX
Title of Document Risk Assessment Document ID No.
Division ( If applicable ) Revision No.:
Department(s) Effective Date:
ACTIVITY
INHERENT RESIDUAL
Type of
Item Procedure / Process Activities, Equipment, Products or Activity Risk Impact / Legal Compliance Impac Likelih Risk RISK Impa Likeli Risk RISK Action Plan
/Condi Aspect / Hazard t ood ASSESSME HOC Control Measures ct hood ASSESSME Opportunities Identified
No. Services tion/Sit Category Risk (if any) (thru OTP)
NT NT
uation
I L IxL I L IxL
Operatio EL
nal S
EC Use two-way radio for long distance
communication or other device
approved by the management.
PPE
Operatio EL
nal S
EC Use two-way radio for long distance
communication or other device
approved by the management.
PPE
Occupati EL
onal S
Health &
Safety EC
Back injury,
Ergonomics hazards: Sprains, muscle OSH Rule 1412.07 Lifting of EXTREME
repeated motions in 5 3 15 2.56 1.54 3.94 LOW RISK
awkward position cramps, and body weights RISK
pain
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
CALACA POWER COMPLEX
Title of Document Risk Assessment Document ID No.
Division ( If applicable ) Revision No.:
Department(s) Effective Date:
ACTIVITY
INHERENT RESIDUAL
Type of
Item Procedure / Process Activities, Equipment, Products or Activity Risk Impact / Legal Compliance Impac Likelih Risk RISK Impa Likeli Risk RISK Action Plan
/Condi Occupati Aspect / Hazard ASSESSME HOC Control Measures ASSESSME Opportunities Identified
No. Services Category
tion/Sit onal Risk (if any) t ood ct hood (thru OTP)
NT NT
uation Health &
Safety I L IxL I L IxL
A 1. Use Proper/Ergonomic tools.
2. When moving things from high
places use a tool or a flatform.
3. Get help when you think you need
it/Practice buddy-buddy sytem.
4. Use equipment to make your job
easier.
Back injury, 5. Secure any bulky, awkward or
Ergonomics hazards:
repeated motions in Sprains, muscle OSH Rule 1412.07 Lifting of 5 3 15 EXTREME delicate items. 2.56 1.54 3.94 LOW RISK
cramps, and body weights RISK 6. Conduct regular exercise and
awkward position pain streching before the activity.
7. Conduct training in CPC-SAF-PRO-022
Safety guidelines in lifting heavy objects
PPE
Occupati EL
onal S
Health &
Safety EC
A 1. When moving things from high
places use a tool or a flatform.
2. Get help when you think you need it.
3. Use equipment to make your job
easier.
4. Secure any bulky, awkward or
delicate items.
Back injury, 5. See if you can break the load into
Ergonomics hazards: Sprains, muscle OSH Rule 1412.07 Lifting of EXTREME smaller pieces.
repeated motions in 5 3 12 6. Conduct regular exercise and 2.56 1.54 3.93 LOW RISK
cramps, and body weights RISK
awkward position pain streching before the activity.
7. Conduct training in CPC-SAF-PRO-022
Safety guidelines in lifting heavy objects
PPE
Occupati EL
onal S
Health &
Safety EC
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
CALACA POWER COMPLEX
Title of Document Risk Assessment Document ID No.
Division ( If applicable ) Revision No.:
Department(s) Effective Date:
ACTIVITY
INHERENT RESIDUAL
Type of
Item Procedure / Process Activities, Equipment, Products or Activity Risk Impact / Legal Compliance Impac Likelih Risk RISK Impa Likeli Risk RISK Action Plan
/Condi Occupati Aspect / Hazard ASSESSME HOC Control Measures ASSESSME Opportunities Identified
No. Services Category
tion/Sit onal Risk (if any) t ood ct hood (thru OTP)
NT NT
uation Health &
Safety I L IxL I L IxL
A 1. Provide first aid facility and medical
personnel for monitoring and treatment
of sick personnel
2. Educate workers on the risk of
working when sick.
Poor Health Condition: Injury to working OSH Rule 1093.12 Instruction 3. Provide posters educating, giving
Pressence of illness 3 4 12 HIGH RISK information and reminding personnel 1.54 2.05 3.15 LOW RISK
personnel on Health Hazards
while working on how to maintain good health.
4. Never allow sick personnel to do the
task
PPE
Occupati EL
onal S
Health & EC
Safety
A 1. Conduct Safety Orientation, & TBT
CPC-SAF-PRO-002 Safety Orientation
2. Discuss company code of conduct
rules & safety Rules.
3. Implement Diciplinary Action for
OSHS Rule 1070: Occupational violators.
Health and Environmental 4. Adequate supervission and
Unsafe Acts & Behavior, Violence, Physical Control monitoring of personnel.
working under influence Injury OSHS Rule 1080: Personal 4 3 12 HIGH RISK 5. Provission of Alco-Blow Device and 2.05 1.54 3.16 LOW RISK
of drugs/alcohol Protective Equipment regular monitoring to employees.
OSHS Rule 1060: Premises of 6. Medical records and drug test to
Establishment
employees.
PPE
Occupati EL
onal S
Health &
Safety EC
Cardiac failure,
stroke and (in the
OSHS Rule 1060 Premises of 1. Conduct Safety Orientation, & TBT
Exposure to extreme case of Establishment
cold exposure) EXTREME CPC-SAF-PRO-002 Safety Orientation
environmental OSHS Rule 1080 Personal 5 3 15 2. BP monitoring 2.30 1.54 3.54 LOW RISK
conditions respiratory Protective Equipment and RISK A
infections, heat- 3. Signages
or cold-related Devices 4. CPC-SAF- PRO-010 Personnel
illnesses, Protective Equipment.
S
EC
R - RoutineNR - Non RoutineN - NormalA - Abnormal ConditionE - Emergency Situation Risk Assessment Form CPC-IM-PRM-009-01-F01_Rev 2Effectivity Date Decmber 1, 2017
CALACA POWER COMPLEX
Title of Document Risk Assessment Document ID No.
Division ( If applicable ) Revision No.:
Department(s) Effective Date:
ACTIVITY
INHERENT RESIDUAL
Type of
Item Procedure / Process Activities, Equipment, Products or Activity Risk Impact / Legal Compliance Impac Likelih Risk RISK Impa Likeli Risk RISK Action Plan
/Condi Aspect / Hazard t ood ASSESSME HOC Control Measures ct hood ASSESSME Opportunities Identified
No. Services tion/Sit Category Risk (if any) (thru OTP)
NT NT
uation
I L IxL I L IxL
Occupati EL
onal S
Health &
Safety EC Provission of Safe pedstrian access.
PPE
Occupati EL
onal S
Health &
Safety EC Provission of Safe pedstrian access.
PPE
Occupati EL
onal S
Health &
Safety EC Vacuum cleaning system
A