Spec Reference
Spec Reference
TITLE:
SCOPE & SPECIFICATION FOR RECIPROCATING COMPRESSOR
ENAR Petrotech Services (Pvt.) PACKAGE
Limited , 7-B , Sector 7-A ,
Korangi Industrial Area , Karachi
Pakistan
TABLE OF CONTENTS
1. GENERAL ........................................................................................................................................... 3
7. SHIPPING ......................................................................................................................................... 36
8. GUARANTEE ................................................................................................................................... 36
Page - 2
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 3 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
1. GENERAL
1.1. Introduction
PPL is producing hydrocarbons from number of fields including Adhi field from two
independent retrograde condensate “Tobra” & “Khewra” (T/K) reservoirs and crude oil
from Sakaesar reservoir. The well fluids produced from T/K reservoirs are processed
by two independent process plants “Plant-I & Plant-II” installed at Adhi field. Each
plant is capable of processing ~25 MMSCFD of raw gas to produce sales gas, LPG and
NGL. Another LPG/NGL Recovery Plant & Oil Stabilization facility recently installed
containing capacity of 30 MMSCFD raw gas & 5000 BPD oil. The new Plant-III is
located adjacent to the existing Plants as an independent Plant.
Currently there are 17 nos. of producing wells which are scattered around the
production facilities in North-South direction of the processing plant. Most of the wells
are dual producers (Tobra & Khewra formations). However, some wells also
producing wax & Asphaltenes, as their temperatures are very near or below to wax
appearance temperature (WAT). In addition to above, these wells are also having high
pour points. Therefore, special design consideration shall be given for compressor
packages by the Supplier to handle such waxy and Asphaltenes based feed gas.
On the basis of well head flowing pressures some wells are named as high pressure
(HP) wells (operating range 63- 93 barg), some are medium pressure (MP) wells
(operating range 28-62 barg) and few are low pressure (LP) wells (operating range 7 –
28 barg).
Wells with 29-45 API fluids are fed to Crude Oil Stabilization facility while wells with
45-58 API are fed to LPG /NGL Plant. Accordingly, some wells have a single feeder
line producing both formations commingle and some wells have two feeder lines for
producing each formation separately due to significant difference in their API
gravities.
Keeping in view declining pressure profiles ADHI wellheads modifications have been
suggested to overcome the problem of high back pressure on ADHI wells to maintain
Page - 3
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 4 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
the productivity through their existing gas gathering networks. In this regard, Pakistan
Petroleum Limited (PPL) is implementing compression (Nodal) for some of wells of
ADHI gas field to maintain the production plateau from depleting pressures wells.
Following nodal compressions are envisaged to install.
1.2. Definitions
Terms used in this scope and specification have the following meanings:
“Vendor / Supplier” shall mean the entity with which PPL shall place order for the
Packaged Reciprocating Compressors covered in this scope and
specification on outright purchase.
API 11P Packaged Reciprocating Compressors for Oil and Gas Production
Services.
Page - 4
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 5 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
ASME Sec-VIII Boiler and Pressure Vessel Code. Rules for Construction of
Pressure Vessels
All applicable codes and standards of ASTM, GPSA, IEC, ISA, NACE, NFPA,
OSHA, SSPC, TEMA.
Page - 5
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 6 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Any errors or omissions noted by Supplier in this scope and specification shall be
immediately brought to the attention of the Company. All deviations to this scope and
specification, other related specifications or annexure and relevant codes & standards
shall be brought to the knowledge of the Company in the bid. All deviations made
during the procurement, design, manufacturing, testing and inspection shall be with
written approval of the Company prior to execution of work. Such deviations shall be
shown in the documentation prepared by Supplier.
Page - 6
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 7 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
drawings for Company’s approval prior to finalization of design), fabricate, paint, test
and prepare for shipment.
Supplier is advised to select from its standard range, compressors that will operate at
given operating conditions. It should be noted that any equipment, instrument, etc.
required making package operational throughout the operating life as indicated shall be
considered in Supplier’s scope.
Supplier shall also be responsible for all Sub-suppliers coordination, data and other
documents, provision of guarantees, provision of equipment and personnel for the trial
assembly, mechanical run and functional testing of complete packages at Supplier’s
works and packaging and delivery as specified in the tender document.
Supplier shall arrange each package according to good industry and well recognized
practices, which facilitates operation and maintenance.
Supplier shall ensure that all components of the Reciprocating Compressor Packages
are new.
Page - 7
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 8 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier shall be responsible for the design, engineering, supply of all materials,
manufacturing / fabrication, assembling, testing, painting, preservation, shipment
transportation, installation supervision, pre-commissioning and commissioning
required for the Compressor package in accordance with this scope and specification.
Supplier shall submit all design details, general arrangement, and detailed drawings
(03 sets of each) for company approval prior to finalization of design.
- Supply of Compressor package complete with gas engine including lube oil, fuel
gas, PLC system, field instrumentation, F&G detectors & control devices,
machine monitoring sensors, power supply etc. as outlined in this document.
- Supply of Open path Gas Detectors and UV/IR flame detectors along with all
mounting accessories and calibration testing equipment.
Page - 8
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 9 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
- Supply of two (02) years spare parts list with price (containing OEM / vendor part
no. for traceability and ordering purposes to ensure 02 years smooth operation
after commissioning.
- Arrange guarantee & warrantee certificates from the original manufacturer of the
equipment.
- Performance Testing (Factory and at Site) and Training to operating staff at site.
- Complete civil foundation design of the package. In this respect, Supplier shall
provide detailed civil foundation drawings along with all calculations and design
consideration details. Supplier shall also be responsible to supply foot-print
anchor bolts templates of major equipment skids for an early error free
construction of foundations at site.
- 3-D model of the whole package along with all interconnecting piping for
Company’s review / approval
2.1 Commissioning Spares
A complete set of spare parts required for commissioning and start-up shall also be
supplied and shipped with the package. These parts shall be tagged to show the part
number for cross-referencing against a materials list.
Page - 9
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 10 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier shall also specify and supply the first fill of lubricants and consumables for
commissioning and start-up. This shall include the necessary quantity required for
flushing the various systems.
Page - 10
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 11 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Page - 11
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 12 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier shall be responsible for conducting training sessions for personnel at OEM
premises and at site. In this respect, supplier shall submit detailed training program in
his proposal.
Page - 12
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 13 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
During detail engineering, one (01) design review meeting would be performed with
supplier at his design office to discuss/finalize the design information such as control
concept, plot plan, equipment specifications, and HAZOP study of the package; which
would be provided / performed by the Supplier for civil, structural, piping, mechanical,
electrical, instrumentation and other detailed engineering works for the Project and its
tie-ins/interconnections with other units.
3. PACKAGE OVERVIEW
Gas engine driven reciprocating compressors are required for compression service for
continuous operation.
The package shall be complete with lubrication, sealing, cooling, ignition, exhaust,
instrument gas, fuel gas and start gas system for compressor & driver as required.
The design life of the package shall be minimum twenty (20) years.
Page - 13
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 14 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
The minimum general piping and instrumentation requirements are shown on P&ID
no. RG-1501-PID-1011 however, Supplier is responsible for provision of any other
instrumentation, piping equipment etc. which are required to fulfill the safe and
reliable operation of the package.
All platforms, ladders and other access facilities required for the proper operation and
maintenance of the compressors and associated auxiliaries shall also be included.
Special lifting equipment required for maintenance, loading, unloading and delivery at
site including any required lifting beams or frames shall be included.
Microprocessor based instrumentation, controls and local PLC control panel are
required to provide necessary protection for the equipment and desired control of the
package operation.
The package shall be suitable for use in Class-I Division-2 and Group C&D area.
Supplier shall be responsible for carrying out Pulsation and Torsional studies of each
type of compressor package.
The package shall have its own instrument gas / fuel gas conditioning and supply
system for on- skid instrumentation and control system only.
The package shall be supplied with its own fuel gas conditioning system. Fuel gas take
off shall be from compressor suction piping within the package limit. Startup gas shall
also be considered supplied from the same conditioning system.
Inspection and testing of the complete package shall be performed in accordance with
the industry standards and codes, to ensure the quality and functioning of the packages.
Painting or/and coating of the packages shall be adequate to prevent them from rust,
corrosion and any other sediment during shipment and after installation on site.
Page - 14
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 15 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
All the above components shall be mounted on a structural steel skid. Proper
packaging of the complete package before shipment is required to avoid damage to any
of the component /equipment during the shipment.
Supplier shall be responsible for the provision of necessary foundation design data
including but not limited to verification of size and location of all anchor bolts, static
and dynamic loading conditions for foundation design.
After installation, Supplier shall be responsible for all checks prior to commissioning.
These checks include alignment of the packages, operability of lube oil system, and all
instrumentation field tests. Supplier will depute its Engineer/Technician or a technical
team at the time of commissioning).
4. PACKAGE REQUIREMENTS
Details on the requirements of the package are provided in the following sections.
Start and End of Operation the operating conditions shall be as the scenarios
mentioned in the Data Sheets RG-1501-DS-1821 to RG-1501-DS-1825.
4.2 Compressor
Compressors shall be reciprocating type, separable, meeting the requirements of API
11P and this Scope & Specification for Packaged Reciprocating Compressor
Page - 15
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 16 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier shall clearly indicate any deviation(s) or exception(s) to the standard(s) and/or
specification in its bid. The compressors shall contain the following
components/systems as a minimum:
Page - 16
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 17 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
4.3 Driver
Gas engine is required as driver of the compressors. Supplier must indicate the type of
engine whether two or four stroke and indicate the engine rated rpm. The engine can be
turbo charged or natural aspirated, however Supplier shall give full justification of the
type selected for the packages. The gas engine shall be of RPM suitable for continuous
operation. The organ shall contain the following components/systems as a minimum.
Basic Components/Systems
i) Crankcase breather
ii) Carburetor
iii) Governor
iv) Ignition system including igniter
v) Exhaust system including expansion joint, residential spark arresting grade
exhaust muffler, silencer, detonation sensors, etc.
vi) Cooling system including jacket and auxiliary coolant pump, intercooler (for
turbocharged engine), air cooler for engine jacket water etc.
vii) Lubrication system including oil strainer, pump, filter, oil cooler etc.
viii) Oil bath air filter
ix) Control system.
x) Separate lube oil day tank with stand.
xi) Shielded ignition system, alternator power with battery pack.
xii) Crankcase oil level control.
xiii) Able to operate at variable speed to enable Compressor operation at various
capacities/varying demand in terms of flow and suction / discharge pressures.
Page - 17
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 18 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Page - 18
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 19 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
i) Air cooled heat exchanger (after / interstage cooling of process gas, engine
jacket water, etc.)
ii) Manually operated louvers
iii) Cooling fan
iv) Coolant pump
v) Bug screen
vi) Tank for coolant
Page - 19
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 20 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
i) First stage suction scrubber with Demister Pads (API 11P class C)
ii) Interstage scrubber with Demister Pads (API 11P class B).
iii) Suction and discharge pulsation bottles.
iv) Blow-case Vessels
All the pipe work shall be designed, tested and fabricated according to ANSI B31.3.
The design should facilitate ease of operation and maintenance. Suitable break flanges
and/or couplings should be provided for easy removal/re-installation of pipe work for
maintenance purposes. Supplier shall ensure that all the pipe work (on-skid and
interconnecting) is free from any stress by carrying out Piping Flexibility Analysis.
Considering the fact that Wax and Asphaltenes are present in feed gas therefore,
Supplier must provide minimum 3” line sizes in liquid section of the package. Further,
no pocket consideration must be given in inter-connecting piping as much as possible.
Page - 20
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 21 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Piping shall be well supported on skid and on foundations for interconnecting piping.
Pipe supports shall be designed considering dead loads, live loads, dynamic loads due
to flow induced vibration, pulsation, wind, shipping, etc. Pipe supports shall be so
designed to accommodate pipe movement due to thermal and pressure stresses and
shall be sufficiently supported to prevent differential settlement and undue forces and
stresses in the piping or connected equipment.
Also, Relief valve vent header, starting bypass line and recycle line shall be provided.
Compressor recycle line shall be with recycle valve. Compressor bypass line shall be
equipped with a double Block & Bleed Valve with Non-Return Valves (NRV).
Pneumatic automatic isolating valves for emergency shutdown (ESDs) required at
suction and discharge linked with compressor tripping. Valves loading / unloading
devices and capacity control arrangement such as automatic kickback, speed control
with variable pockets and a bypass loop for operation during compressor outage.
Common header for all Blow down, Relief Vent and Packing Vent.
Supplier shall provide vent and drain tank for compressor packing and distance piece
with sight glass. Supplier shall determine size of the tank. The tank can be shipped
loose for installation at site by Supplier.
Valves only from a renowned top quality manufacturer shall be acceptable. Automatic
actuated Shutdown valves together with manual isolation valves shall be required at the
process gas inlet and outlet of the package.
Check valve is also required at the process gas outlet of the package. Available line
sizes at battery limit of the package are as per following Supplier is required to provide
skid connections at battery limit with RF flanges (upto 600#) and for 900#, RTJ
flanges are required.
Page - 21
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 22 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
As the wellhead stream contains gas, condensate and free water, the liquids must be
removed upstream of the compression stages. Therefore, the compression package re-
injects the liquids into the compressor discharge stream. A system of blow-case vessels
shall be provided in the compression package, in which gas from the compressor
discharge drives the liquid into the downstream pipeline. All major, interconnecting
piping and valves shall be supplied by vendor. Refer Piping & Instrumentation
Diagram RG-1501-PID-1011 to P&ID RG-1501-PID-1011.
Page - 22
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 23 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
shall have respective root valves / manifolds in addition to piping isolation valves. All
transmitter and gauges shall be logically arranged and mounted on instrument racks.
Each compressor skid shall supplied with following Fire and Gas Detectors (loose
supplied).Installation of detectors shall be done by others;
Fire Detector: 03 numbers SIL-2 UV/IR along with all accessories
Gas Detector: 02 sets SIL-2 Open Path (line of Sight)
The package shall have its own microprocessor based PLC control unit. A local
display shall be provided for monitoring and control of the unit. Project RG-1501-ISP-
6003 (Control System Design Basis) shall be referred for selection of desired PLC for
compressor skid control system. Annunciation of Alarms and Shutdown conditions
shall be skid mounted.
All electrical equipment and instruments shall be suitable for use in Class-I, Division-
2, Group C&D classified area. The method of protection shall be Ex‘d’ certification.
OEM/Vendor supplied Hazardous Area Certification for all electronic
instrument/equipment shall be provided.
Supplier shall supply all electrical supplies required for complete functioning of the
packages. The electrical generators and battery should be of appropriate capacity and
should be driven through P.T.O (Power Take-Off) from compressor’s engine.
There will be ex-proof lighting arrangement (i.e. Light assemblies, glands, junction
boxes etc.) on skid.
Page - 23
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 24 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Following are equipment wise instruments and controls required as a minimum and
shall be read in conjunction with requirement mentioned on P&ID and compressor
data sheet:
Compressor
i) Crankcase oil level controller , transmitter with low level alarm and trip.
ii) Lubricator no flow sensor
iii) Oil pressure transmitter
iv) Oil pressure indicating transmitter (in and out of oil filter)
v) Oil temperature indicating transmitter (in and out of oil cooler)
vi) Vibration Transmitters
Gas Engine
i) Crankcase oil level controller , transmitter with low level alarm
ii) Oil pressure transmitter
iii) Oil pressure gauges
iv) Jacket water temperature transmitter with high temperature alarm and trip Jacket
water cooler temperature indicating transmitter (in and out of cooler)
v) Auxiliary water cooler temperature indicating transmitter (in and out of cooler)
vi) Jacket water coolant level transmitter with alarm and trip
vii) Auxiliary water coolant level transmitter with alarm and trip.
viii) Oil cooler temperature indicating transmitter (in and out of cooler)
ix) Governor actuator for automatic speed control
x) Mechanical vibration transmitter
Scrubbers
i) Electronic level controller , transmitter with High / Low alarms
ii) Electronic level transmitter with High-High / Low-Low alarms and trips
Pressure regulator
iii) Suction scrubber thermal PSV
iv) 1st stage discharge PSV
Page - 24
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 25 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Air Cooler
i) Mechanical vibration switch
ii) Temperature indicating transmitter (in and out of air cooler/service)
Local Process
i) Process temperature indicating transmitter for suction and discharge.
ii) Process pressure transmitters for sensing;
Each stage suction pressure
Each stage discharge pressure
iii) Final stage flow through orifice meter
Page - 25
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 26 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
The control system shall be provided with Ethernet Modbus TCP/IP communication
ports for communication with Wellhead compressors’ SCADA RTUs. Project
Specification RG-1501-ISP- 6003 (Control System Design Basis) and RG-1501-ISP-
6002 (SCADA System Specification) shall be referred for selection of desired SCADA
system for Wellhead compressors remote monitoring and control in Central control
room.
– The enclosure of the Microprocessor Based system shall be Explosion proof type
suitable for Class-1, Div-2, and Group C&D area. ExP type is not acceptable.
– Vendor shall provide separate instrument for control and shutdown requirements
– Panel of Compressor skid PLC system and HMI shall be provided with adequate
sunshades to protect panels from direct sunlight.
– PLC along with all of its components such as I/O modules, power supply,
communication modules, programming suite, HMI software shall be of latest
type / model being offered at time of bid by selected Vendor/OEM. Any
Page - 26
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 27 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
equipment which is going to obsolete in nearby future and is under notice period
by OEM in term of spare or services support shall not be provided.
The SCADA System and Telemetry supply shall include Remote Telemetry Panels
housing (transceivers/UHF radios, Power supplies, Switches), Antennas, radio to
antenna cables, Antennas Structure, PLC Hardware, Base Station (Power Supplies,
Communication equipments, communication cabinets, redundant transceivers/UHF
radios and Antenna), redundant SCADA servers, workstation and other associated
required equipment for complete and reliable operation.
The control system PLC of each Compressor Package shall interface with the Plant
Control Room/System through New SCADA system. This Compressor PLC shall have
redundant module for Modbus TCP/IP communication which will be interfaced with
UHF radios placed in Remote Telemetry Panels (RTPs).
These RTP will have Transceivers/Radios that shall be powered by new independent
Solar Panel to be provided by Supplier, Antennas and other required accessories for
Page - 27
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 28 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
license free UHF (900 MHz) two way radio communications. This SCADA
communication is used for complete monitoring of the Compressor Packages
including process parameters.
Facility for remote monitoring and on-line configuration changes of compressor skid
PLC from SCADA station and CCR shall be provided.
Power Supply
Compressor skid PLC and Compressor SCADA Remote Terminal Panel shall be
powered by Supplier supplied Solar Panel. Solar panel along with all accessories such
as cells, charge controller, batteries etc shall be sized, supplied and installed as
detailed in project specification for Solar Power System RG-1501-ELA-6500.
SCADA servers and HMIs at Central Control room shall be powered by Supplier
supplied UPS system along with all accessories. UPS system along with all accessories
such as charge controller, batteries etc shall be sized, supplied and installed as detailed
in project specification for UPS Power System RG-1501-ELA-6501.
4.13 Skid
Supplier shall be responsible for supply and design of the skid structure suitable for oil
field applications. All calculations to prove compliance with the specific requirements
and standards shall be held by Supplier and available for audit by Company. The
subject structure shall be designed to include all dead loads, live loads, equipment
vibration, bundle-pull, pipe load, pipe expansion thermal and friction, wind load,
seismic load, impact and erection loads and forces and any other loads.
The skid frame shall be suitable for oil field applications and handling with mobile
crane using a single point lift at the construction site. Where it is necessary to use
special lifting beams, slings, shackles, etc. these shall be provided by Supplier.
Page - 28
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 29 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Vibration
Emission Requirement
The emission shall be within limits as per NEQS attached otherwise Catalytic converter shall
be provided.
Color coding for equipment & piping etc. shall be finalized after approval by
Company.
Page - 29
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 30 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Nozzle openings shall be protected with steel cover with rubber gaskets. Nitrogen
blanketing will not be required.
Page - 30
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 31 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Process piping or tubing shall be tested with water after shop fabrication into sub-
assemblies.
The Supplier shall perform the Factory Test as per API-618 “Mechanical Running
Test” requirements. The unit including integral auxiliary system packages shall receive
a 4-hours mechanical running test before shipment. Further, Auxiliary equipment not
integral with the unit such as oil pumps, oil coolers, filters, inter-coolers and after-
coolers shall receive both an operational test and a 4-hours mechanical running test
before shipment.
The Supplier shall perform the full load test of each Compressor Unit at
Manufacturer’s Facility.
The Supplier shall ensure that all workshop tests and inspections of main components
shall be conducted (during and/or on completion of manufacture) in accordance with
the recommended standards & practice.
Manufacturer shall inform Company/ Company Representative about the date of test
60 days in advance. No testing shall commence without written approval of Company/
Company representative. Company reserves the right to witness any aspects of the
Page - 31
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 32 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
assembling process. The Supplier shall submit an inspection and testing procedure for
review and approval by Company/ Company Representative prior to start assembling.
The manufacturer shall submit for Company’s review and approval a complete plan for
the factory and site acceptance testing. This plan must be complete and provide
sufficient detail to indicate the exact nature of each test, time required, expected results
and systematic procedure. The plan shall be submitted at least 60 days in advance to
the FAT.
The objective of the FAT is to verify that the purchased systems, as configured for
delivery to site, meets or exceeds the specified designed functional requirements. The
FAT shall be a 100% complete system functional test and shall be witnessed by
Company/ Company Representative.
The Supplier shall submit an inspection and testing procedure for review and approval
by Company prior to start assembling for testing at shop.
All examination methods shall be as per API 11P 2nd edition, ASME VIII and other
applicable codes to the relevant equipment, piping, etc.
Page - 32
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 33 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
shall be carried out only if prior to the test the continuous operation of the compressors
has been attributable to the supplier, the continuous test shall be started from the
beginning (day 1) again.
If the Performance Test is interrupted for reasons attributable to the Supplier. The
Supplier shall, at promptly re-engineer and /or carryout such modifications as are
required to rectify the causes of the interruption. Company will thereafter give notice
in writing to the Supplier specifying the date on which Performance Test may be
recommended.
If the Compressor fails to meet the Performance Guarantee herein specified for reasons
attributable to the Supplier; Tests of the Compressors or the said portion shall be
repeated within a reasonable time upon the same terms and conditions.
Page - 33
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 34 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Company reserves the right to visit the premises of Supplier for the purpose of
undertaking Quality Audits relating to the unit and services covered by this scope and
specification, the extent of which will be discussed with Supplier before, PO award.
Prior notice of five working days will be given to Supplier of any such audits. A copy
of the audit report will be forwarded to Supplier on completion. Any findings resulting
from such audits shall necessitate the implementation of appropriate corrective actions
based on a time scale to be agreed with Company.
Regular visits by Company for the purpose of surveillance and documentation review
will not be carried out as a matter of course. However, should it become apparent that
Page - 34
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 35 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier’s agreed Manufacturing Quality Control Plan is either inadequate or not being
implemented, Company reserves the right to increase the level or frequency of its
Quality Control activities or request Supplier to revise its working practices, as
necessary.
- QC Plan review/markup
- Surveillance of major Sub-suppliers
- Certification and manufacturing data review
Page - 35
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 36 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
7. SHIPPING
Complete package shall be properly conditioned for shipping against all possible
damages. The Supplier shall be responsible for shipment of package equipment to the
Company’s site in Pakistan and for the adequacy of the preparations for shipment
ensuring that materials and equipment arrive at their destination in undamaged
condition. The Supplier shall provide the Company shipment details, date of
equipment departure and arrival at site and a list of weights and sizes of shipment
packages prior to dispatch, to ensure that there are adequate facilities available at the
site for safely unloading and placing the equipment in its designated location.
8. GUARANTEE / WARRANTY
Page - 36
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 37 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
10.1 Transmittals
All documents submitted to the Company shall be accompanied by a transmittal com-
pleted by Supplier. All transmittals will be sequentially numbered.
Page - 37
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 38 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
All above documents eight (08) sets shall be submitted in clearly labeled 4 ring white
hard cover binders. All documents smaller than A4 shall be inserted into A4 pre-
punched, top-opening plastic wallets (if original certification, etc.) or attached to A4
sheets. Documents larger than A4 shall be folded to A4 size and inserted into A4 pre-
punched, top-opening plastic wallets with the project document number/title block
clearly visible to the front.
Page - 38
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 39 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
Supplier shall also submit electronic/soft copies of all design data, documents,
drawings, etc. This also includes design details by Supplier’s Sub-suppliers.
All drawings shall be provided in AutoCAD 2000 format. All documentation shall be
prepared in MS Office 2000.
In case of conflict among this Specification, the referenced specifications and the International
Codes and Standards, the Supplier shall bring the matter to the Company’s attention for
resolution and approval in writing.
The order of precedence shall be as follows:
In the event of any conflict of data or requirements in any of above documents, it is the
Supplier’s responsibility to resolve these conflicts and obtain Company’s approval before
proceeding with design, manufacture or purchase. In any case the most stringent requirement
shall prevail. However, Company’s interpretation shall be final.
Page - 39
PAKISTAN PETROLEUM LIMITED DOC NO: RG-1501-MA-3502
PAGE: 40 of 40
DESIGN, MANUFACTURING / FABRICATION, REV: 0
ASSEMBLING & SUPPLYING OF PACKAGED
DATE: 04 – July – 2016
RECIPROCATING COMPRESSORS WITH
INSTALLATION SUPERVISION, PRE-
COMMISSIONING, COMMISSIONING & START-UP
SERVICES
SCOPE & SPECIFICATION FOR RECIPROCATING
COMPRESSOR PACKAGE
11.3 API
Page - 40