Curriculum Vitae

Name : AMIT KUMAR SINHA


Address for : Tractable Engineering and Pvt. Ltd.,10 A,Shivaji Marg,New Delhi
Communication
Contact : Mob: +91 9899721353
Email: [email protected]
Date of birth : 01th July, 1985.
Nationality : Indian
Passport No. H0532974
Marital status : Single
Languages Known : English, Hindi
Qualification : B.TECH. (Mechanical Engineering) From U.P.T.U, LUCKNOW.

Total Work Experience : Approx 6 Years.


Field of Expertise : Cross country gas pipeline and CGD projects in India and abroad:
Planning.
•Project Planning, Monitoring and progress tracking with the help of Primavera
software (P6, version 8.2).
•Planning of Project Activities as per Project approved plan or work schedule.
•Preparing Daily reports (DPR), Weekly progress report (WPR), Fortnight
Progress and Monthly progress Report (MPR) and making analysis of planned
schedule with actual progress and submit reports to clients for review.
•Making total capitalization reports on quarterly basis and certifies material
consumption reports to make smooth flow or requirement of money and
materials in projects.
•Coordination with Client and Contractors for work Progress and follow up with
Contractors on their commitment to fulfill in time with tracking in line of their
submitted work schedule.
•Arrange for progress review meeting on weekly basis with contractors and
client on work status.
•Monitoring the actual resources mobilization as planned resources and time to
time make intervention and suggestion to contractor’s to increase resources as
per planned schedule.
•Certifying RA and final bills as per Physical progress of contractor’s to make a
good flow or rotation of money in Projects.
•Assist. Project Management team from site level on technical and inputs data
for Intiation, Planning, and execution, tracking and closing of projects.
•Pipeline Engineering Co-ordination on change in pipeline route and technical
supports to Clients and contractors on change in as per physical site condition on
different pipeline activities with taking in sense of technical codes.
•Monitoring Subcontract or vendor progress with their submitted work schedule
to make enhance of any concern pipeline activity.
•Departmental cost estimation of the project execution at bidding level
Execution.
•Execution of Carbon Steel pipelines for the Cross country pipeline and City Gas
Distribution with Proven abilities in developing and deploying best-in-class
processes for executing projects through productivity management, efficiency
improvement and time reduction initiatives. Demonstrated competencies in
multi-tasking and meeting aggressive deadlines and budget and Coordinate a
multidisciplinary team as the Base in Charge to ensure that the milestones at site
are achieved on time.
•Responsible for regular review & update with Franchisee for construction
activity at assigned site and ensure adherence to project plan for assigned site
Coordinating with all the concerned government officers/departments on the
issues of permissions related to pipeline ROU and other related issues.
•Supervision for Pipeline integrity maintains system for whole NCR zone (150km
1 of 6
Curriculum Vitae
of different Dia. of pipeline).
Quality.
•Supervision of all pipeline activity from initiation of project to contract closing
and ensure al check points and witness of work as per approved inspection and
test plan (ITP).
•To provide and testing of High pressure pipeline including hydro testing and
pneumatic testing of station piping works and also carried out the Valve
inspection of High pressure manual and actuated valves.
•Co-ordinate the Final Documentation activities and also the As-built drawings
with regard to the project close out activities.
•Supervision of field personnel and contractors engaged in construction and
commissioning activities with completion of projects
•Pre-Fabrication, Erection, Execution, of Mechanical Piping and pipeline Works
and QA/QC documentation for whole pipeline and Piping Works of Oil & gas
Pipeline Projects.
•Handling of pipeline activity (From Rou Survey to Commissioning).
Preparation of WPS, PQR and conduct their test and its related DT and NDT.
•Supervision of CIPL, DCVJ survey work as per requirement of PNGRB guidelines.
•Monthly monitoring of TLP, TRV and different valve chambers (O&M works).

EMPLOYMENT RECORD
Employer : Tractable Engg.and Pvt. Limited –Gas Vertical.
Position: Site Engineer-Construction (From 02st July 2012 to till date).
Punj Lloyd Group.
Position Sr. Engineer-Pipeline (From 25 July 2011 to 20 June 2012).
Tractable Engg.and Pvt. Limited –Gas Vertical.
Position: Engineer-Construction-Gas Vertical (From 18st June 2010 to 20 July
2011).
Jai Hind Projects Ltd.
Position: Engineer-QA/QC (From 30th Dec. 2009 to 17th June 2010).
Kirlosker Construction and Pvt. Ltd.
Position: Assistant Engineer (From 28 May 2008 to 22 Dec. 2009).
Growth Path : 1. As a GET to Asst. Engineer from 28th May 2008 to 22th Dec 2009.
2. As an Engineer-QA/QC from 30th Dec 2009 to 17th June 2010.
3. As an Engineer-Construction from 18st June 2010 to 20 July 2011.
4. As an Sr. Engineer-Pipeline from 25 July 2011 to 20 June 2012
5. As an Engineer-Constructions from 02 July 2012 to till date.
Ongoing Projects : 1. Mayur vihar CNG station to Batra Petrol pump and chilla 1&2
CNG station. (6”X6km).
2. 4”NB pipeline shifting work at Noida city centre metro station.
Projects Handled (In City : 1. Ghazipur to Dasna (12”X16’X18”X 27.6 km)
Gas Distribution for 2. Meerut Road inter connectivity line (18” X7.7 km)
Ghaziabad, Noida and 3. Ghaziabad Phase –II project, Spread I (18”X10.1 km)
Delhi from 18st June 2010 4. Ghaziabad to Loni connectivity line (8”X9 km)
to till date). 5. Vasundhra-Indrapuram-Noida connectivity line- (8” X 5km)
6. Govindpuram More to IGL CNG station - Spur line (6”X 1.5 km)
7. Sanjay Nagar to IGL CNG station - Spur line (4” X .4 km).
8. Noida (Sec.92 to Sec.125 and Sec.37 inter connectivity line (8”X8km,
6”X2km and $”X2km).
9. Mayur vihar CNG station to Chilla village CNG station (6’NBX5km).
10. 4”NB pipeline shifting work at Noida city centre metro station.
11. PIMS work for Client in NCR zone

2 of 6
Curriculum Vitae
Project Engineer (For involvement in whole CS Pipeline network getting
Executed in the district of Ghaziabad, Noida and Delhi) – To execute and
supervise the project by getting the work done from the contractors.
To certify the RA and final bills of contractor’s.
Key role : To coordinate with the Govt. Authorities to get the permission for laying
of pipeline in the critical areas, follow-up with the Contractors and TPI, s
for the smooth flow of the work and deliver project to client as per
requirement of their customers.

1. Myanmar China pipeline project (Myanmar-China Oil Pipeline Project


(Myanmar Section) and Myanmar-China Gas Pipeline Project (Myanmar
Section) are the projects co-invested by the companies of China, Myanmar
and other countries. The owners of the projects include South-East Asia
Crude Oil Pipeline Company Limited and South-East Asia Gas Pipeline
Company Limited.
Oil Pipeline for about 145km from Made Island Oil Initial Station to Marker
YCD058;
Gas Pipeline for about 160km from Kyaukpyu Gas Initial Station to Marker
Projects Handled (In Cross
QCD058;.(From July 2011 to June 2012).
Country Pipeline).
Client: SEAOGP (CNPC).
PMC: Langfang china.
2. Bawana Nangal Pipeline Project (36” Dia X 150 Km line) Natural Gas
Pipeline Project (Dec. 2009 to 17th June 2010).
Client: Gail India Limited.
3. Dadri Panipat Pipeline Project – (30” Dia. X 132 km line EPC Project) R-
LNG Pipeline Project (May-2008 to Dec. 2009).
Client: Indian oil corporation Limited.
PMC: Mecon India Limited.
Role as Sr. Engineer-pipeline• Project Planning, schedule making, budgeting,
and preparing billing schedule, resource planning monitoring, documentation of
project.
• Execution periodic progress reviews, cost tracking, chasing up engineering,
deliveries, erection and commissioning activities, internal and external.
Role: Engineer-QA/QC- Preparation of work procedure and get work
Key Role approval from PMC and clients.
Engineering and site co-ordination, Work, Execution monitoring of whole
pipeline/Piping works on Quality control documentation.
Role: Asst.Engineer –
Handlingdifferentpipelineactivity,s(Grading,Stringing,mainlinewelding,RT,Repair
welding, Coating ) Engineering, Execution and supervision of pipeline Activities
with Mechanical Piping activities.
KEY ACCOUNTABILITIES:

Project & Construction Management


•Understanding project scope of work, participating in technical discussion & advising on selection of pipeline (UG)
and piping (AG) route decision; ensuring compliance with the prescribed company or contractor, clients, standards
and statutory regulations.
•Heading all activities including providing technical inputs for methodologies; expediting production schedules and
evaluating with tracking and update projects with the help of computer aided program PrimveraP6(Version 8.2).
•Providing assistance in resources allocation in a project as per approved budget.
• Document turnover and transmittal during project completion.

Welding Operations
•Monitoring the welding activities as per WPS, PQR & Quality System Procedure and witnessing Welder
Qualification Test for welders; conducting visual inspection of fit up and welding joint and performing visual
inspection as per code specification.
•Ensuring quality control of welding procedures, including consumables, parameters, purge control, preheating
and inter-pass temperature control, etc.

3 of 6
Curriculum Vitae
•Inspecting different types of welding process, SMAW, TIG, Filler rods for different materials, welding procedure
qualification as per ASME Code Sec. IX, welder performance qualification as per ASME Sec IX.
Testing & Inspection
•Organizing inspection on piping fabrication & erection, piping spools fabrication, pipe supports fabrication and
their erection on pipe rack; inspecting and witnessing all site quality activities like electrodes qualification test, fit
up, weld visual etc.
•Looking after preparation of test packages and checking the revised drawing; conducting the leak detection
method such as pneumatic test and hydro-test procedure.
•Conducting the hydro test for piping system; preparing hydrostatic test packages, which includes preparation of
marked up P&ID’s and isometric drawings and all related documents related pertaining to hydro testing.

JOB PROFILE
City Gas Distribution : Preliminary Survey:
Surveying of route for the Pipeline prior to the award of the project to
finalize the route and obstructions on the alignment of the pipeline and
thereby finding out the areas of which jurisdiction the alignment covers.
Liaisoning:
Approaching to the concern authorities under whom the pipeline area
covers to get the permission for laying the pipeline.
Execution:
Coordinating and following up with the contractors and with the
consultants to execute the project at the stipulated time by continuous
monitoring and sounding alarm as and when required.
Shut down/Looping of Pipelines:
Planning, coordination and execution of shutdown and looping of
charged pipelines to cater the demand of CNG in city gas distribution
network.
Oil & Gas Pipeline : Engineering:
( Pipeline and Station  Reviewing of all Detailed Engineering Drawing
Piping)  Review of As-Built Drawings
Execution:
 Project planning, Scheduling & Co-ordination.
 Implementation of scheduled plan by means of resource
management, Manpower management, Time Management.
 Monitoring flow of work
 Various project related report generation.
 Co-ordination with Client, TPIA and Contractors.
Documentation:
 Preparation of Job Procedures for all Mechanical activities.
 Preparation of WPS, PQR, EQT.
 Final handing over of all departmental project documents to the
Operation and Maintains team.
 Preparation of work schedules on primavera P6(8.2 version)

On Job Achievements : In Pipeline ( City Gas Distribution projects)

 Individually Handed 5 Different Project & 5 different contractors at a


single time and completed all the projects at stipulated time.
 Successfully completed 18”X10.1 km of Ghaziabad Phase II project
as a PMC Project In-Charge and did commissioning for the same.
 Successfully completed 18”X7.7 km of Meerut Road inter
connectivity Pipeline project and the line and did commissioning for
the same.
 Successfully executed 8” X 5 km of Vasundhra -Indrapuram Noida
pipeline project as a Project In-charge and did commissioning for the
4 of 6
Curriculum Vitae
same.
 Successfully executed and commissioned the Pipeline from CBI
Academy to Dasna of (16” and 18” X8.5 Km) as a PMC in-charge and
also coordinated with many Govt. Authorities for getting the
permission to lay the line. Constructed CGS (City Gate Station) and
commissioned the distribution of CNG for the whole Ghaziabad
from GAIL Terminal.
 Commissioned Spur-line which supplies CNG to Sanjay Nagar CNG
station.
 Successfully completed the looping of NOIDA Network with
Ghaziabad Network for the uninterrupted supply of Gas to Noida.
In Pipeline (Oil & Gas Cross country Pipeline Projects).
 Individually Executed 1 No’s of SV Stations for DPPL- Project (Which
includes Hydro testing (at 140 Bar) and Pneumatic Testing (at 95 Bar)
for the stations and terminals.
 Involved in Nitrogen Purging, Commissioning activities for DPPL
Project.
 Individually prepared the test pack and got the Clearance for the
Hydro and Pneumatic Tests for DPPL Project.
 Attended a joint inspection with M/s IOCL for gas and flaming
detection system for SV and Terminal station in DPPL Project.
 Individually executed 36 kmX30” mainline hyderotesting in DPPL
Project.

Certification & Training :


programs attended ASNT Level II (RT) , PRIMVERA-P6 (version 8.2)
Other Interest : Playing Cricket, Badminton, Carom, Table Tennis & Reading Books
Currently based at : New Delhi
Current CTC : 5.5 Lacs INR Per Annum
Expected CTC : Negotiable.

Notice Period : 30 Days


Sh. Vijay Bahudar Singh
1 Manager-Construction, Tractable Engineering and Pvt. Ltd.
Mobile No.: +91- 9718872607
Mr. Sanjay Bhusan,
Sr.Manager-Construction
Referees 2
Tractable Engineering and Pvt. Ltd.
Mobile No.:+91 989968805
Sh. Praduman Tiwari
3 Executive Director, Jai Hind Projects Pvt. Ltd.
Mobile No.: +91 9690019500.

CERTIFICATION:

5 of 6
Curriculum Vitae
I, the undersigned, certify that, to the best of my knowledge and belief, this Curriculum Vitae (CV) correctly describes
my qualification, my experience and me. I understand that any willful mis-statement described herein above may lead
to my disqualification or dismissal, if employed.

Date: 08.03.14 (Amit Kumar Sinha)