CV-Amit Sinha
CV-Amit Sinha
EMPLOYMENT RECORD
Employer : Tractable Engg.and Pvt. Limited –Gas Vertical.
Position: Site Engineer-Construction (From 02st July 2012 to till date).
Punj Lloyd Group.
Position Sr. Engineer-Pipeline (From 25 July 2011 to 20 June 2012).
Tractable Engg.and Pvt. Limited –Gas Vertical.
Position: Engineer-Construction-Gas Vertical (From 18st June 2010 to 20 July
2011).
Jai Hind Projects Ltd.
Position: Engineer-QA/QC (From 30th Dec. 2009 to 17th June 2010).
Kirlosker Construction and Pvt. Ltd.
Position: Assistant Engineer (From 28 May 2008 to 22 Dec. 2009).
Growth Path : 1. As a GET to Asst. Engineer from 28th May 2008 to 22th Dec 2009.
2. As an Engineer-QA/QC from 30th Dec 2009 to 17th June 2010.
3. As an Engineer-Construction from 18st June 2010 to 20 July 2011.
4. As an Sr. Engineer-Pipeline from 25 July 2011 to 20 June 2012
5. As an Engineer-Constructions from 02 July 2012 to till date.
Ongoing Projects : 1. Mayur vihar CNG station to Batra Petrol pump and chilla 1&2
CNG station. (6”X6km).
2. 4”NB pipeline shifting work at Noida city centre metro station.
Projects Handled (In City : 1. Ghazipur to Dasna (12”X16’X18”X 27.6 km)
Gas Distribution for 2. Meerut Road inter connectivity line (18” X7.7 km)
Ghaziabad, Noida and 3. Ghaziabad Phase –II project, Spread I (18”X10.1 km)
Delhi from 18st June 2010 4. Ghaziabad to Loni connectivity line (8”X9 km)
to till date). 5. Vasundhra-Indrapuram-Noida connectivity line- (8” X 5km)
6. Govindpuram More to IGL CNG station - Spur line (6”X 1.5 km)
7. Sanjay Nagar to IGL CNG station - Spur line (4” X .4 km).
8. Noida (Sec.92 to Sec.125 and Sec.37 inter connectivity line (8”X8km,
6”X2km and $”X2km).
9. Mayur vihar CNG station to Chilla village CNG station (6’NBX5km).
10. 4”NB pipeline shifting work at Noida city centre metro station.
11. PIMS work for Client in NCR zone
2 of 6
Curriculum Vitae
Project Engineer (For involvement in whole CS Pipeline network getting
Executed in the district of Ghaziabad, Noida and Delhi) – To execute and
supervise the project by getting the work done from the contractors.
To certify the RA and final bills of contractor’s.
Key role : To coordinate with the Govt. Authorities to get the permission for laying
of pipeline in the critical areas, follow-up with the Contractors and TPI, s
for the smooth flow of the work and deliver project to client as per
requirement of their customers.
Welding Operations
•Monitoring the welding activities as per WPS, PQR & Quality System Procedure and witnessing Welder
Qualification Test for welders; conducting visual inspection of fit up and welding joint and performing visual
inspection as per code specification.
•Ensuring quality control of welding procedures, including consumables, parameters, purge control, preheating
and inter-pass temperature control, etc.
3 of 6
Curriculum Vitae
•Inspecting different types of welding process, SMAW, TIG, Filler rods for different materials, welding procedure
qualification as per ASME Code Sec. IX, welder performance qualification as per ASME Sec IX.
Testing & Inspection
•Organizing inspection on piping fabrication & erection, piping spools fabrication, pipe supports fabrication and
their erection on pipe rack; inspecting and witnessing all site quality activities like electrodes qualification test, fit
up, weld visual etc.
•Looking after preparation of test packages and checking the revised drawing; conducting the leak detection
method such as pneumatic test and hydro-test procedure.
•Conducting the hydro test for piping system; preparing hydrostatic test packages, which includes preparation of
marked up P&ID’s and isometric drawings and all related documents related pertaining to hydro testing.
JOB PROFILE
City Gas Distribution : Preliminary Survey:
Surveying of route for the Pipeline prior to the award of the project to
finalize the route and obstructions on the alignment of the pipeline and
thereby finding out the areas of which jurisdiction the alignment covers.
Liaisoning:
Approaching to the concern authorities under whom the pipeline area
covers to get the permission for laying the pipeline.
Execution:
Coordinating and following up with the contractors and with the
consultants to execute the project at the stipulated time by continuous
monitoring and sounding alarm as and when required.
Shut down/Looping of Pipelines:
Planning, coordination and execution of shutdown and looping of
charged pipelines to cater the demand of CNG in city gas distribution
network.
Oil & Gas Pipeline : Engineering:
( Pipeline and Station Reviewing of all Detailed Engineering Drawing
Piping) Review of As-Built Drawings
Execution:
Project planning, Scheduling & Co-ordination.
Implementation of scheduled plan by means of resource
management, Manpower management, Time Management.
Monitoring flow of work
Various project related report generation.
Co-ordination with Client, TPIA and Contractors.
Documentation:
Preparation of Job Procedures for all Mechanical activities.
Preparation of WPS, PQR, EQT.
Final handing over of all departmental project documents to the
Operation and Maintains team.
Preparation of work schedules on primavera P6(8.2 version)
CERTIFICATION:
5 of 6
Curriculum Vitae
I, the undersigned, certify that, to the best of my knowledge and belief, this Curriculum Vitae (CV) correctly describes
my qualification, my experience and me. I understand that any willful mis-statement described herein above may lead
to my disqualification or dismissal, if employed.
6 of 6