SAFE LAUNCH Procedure
SAFE LAUNCH Procedure
QMP/06A
REV NO. 01
PAGE NO. 01 OF 01
3 HOD Development
Customer Prescribed
Get PSW sign off from customer
Format
Production handover
Handover part to production as per
4 sheet Project Leader
procedure
(F/CFT/10B)
6
check for dimensional/Cp, Cpk results
Project Leader
(SOP + 3 Months)
7
If result ok then exit for production
HOD Development
PREPARED BY APPROVED BY