JSA For Wrapping
JSA For Wrapping
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any tools make sure that it got
site inspected. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Open trench All open trench should be barricaded off when not
attended
Ensure that workers will stop there works if strong
wind comes
Ensure that access and egress is available in the
area
Ensure that materials will be kept secured in one
place and garbage materials will be properly
manage and contained
Ensure that buddy system is in place no one will be
permitted to work alone especially at night works
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site. Ensure excavation
certificate to BHP are in place
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Hand Injury/back injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.
2 Manual Excavation Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
hand injury, dust, eye injury req..Safety shoes, helmet, safety glass, dust mask,
Heat Stress/Exhaustion Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Snake bite Workers will inform and be aware about the
presence at the area. No killing of snakes
Unskilled and uninducted personnel starting Ensure that toolbox meeting was regularly
the job conducted and people are aware of the job and the
hazard enclosed in the job they are performing
Dust Ensure proper wetting of soil and workers are
wearing dust mask
Excavated area Area with excavation/holes to be barricaded.
Tripping hazards Ensure that workers accessing the right walkway
and watch your steps.
Personnel & equipment interface Other worker not involve in the job must not come
closer to the area\
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
Ensure banks person are available at the area
Ensure that any excavation deeper than 4ft must be
bench or sloped
3. Preparation/Coating & Pipe Back injury Ensure workers have been oriented about the
Wrapping proper positioning.
Ensure that pipe will be elevated placing sand bag
enough to wrap the pipe
Ensure sufficient enough of manpower is available
during preparation.
Ensure that workers are wearing dust must.
Ensure that helmet & safety glass shall not be
removed and chin strap will be wear sothat the
helmet will not fall during wrapping