JOB TITLE / AIM:Jsa for tile fixing in Laundry accommodation block C office building.
JSA DATE:05/01/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Ali Moosa SCRIBE: Abdullah Khan
PARTICIPANTS: Muslim
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Tools and workers
2. Cement plastering on floor
3. Cutting of tiles
4.tile Fixing
5.Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
site that the E &P Personnel got inspected the electrical
equipment. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Open trench The use of leather gloves and proper lifting
techniques are required
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site. Ensure excavation
certificate to BHP are in place
Workers starting the job without JSA JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Proper checking of welding cable wire with tag
and grounding must be done.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves. Ensure trolley are
secured with stable support
2 Cutting of tiles Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
hand injury, dust, eye injury, Ear Injury req..Safety shoes, helmet, safety glass, dust mask
and Ear Plugs Shall be worn.,
Hand injury/ . First aid kit available at site.
Hand gloves and welding gloves should be worn
Eye injury Ensure workers are wearing both the eye goggles
& face shield/welding mask

Ensure that no flammable/combustible materials


are on the area.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Snake bite Workers will inform and be aware about the
presence at the area. No killing of snakes
Unskilled and uninducted personnel starting Ensure that toolbox meeting was regularly
the job conducted and people are aware of the job and the
hazard enclosed in the job they are performing
Ensure workers are not wearing hi-vest and loose
dress/scarf while performing the. job

Tripping hazards Ensure proper staging of welding materials have


proper barrication if necessary & that workers are
accessing the right walkway.
Personnel interface Other worker not involve in the job must not come
closer to the area\

Equipment Failure Ensure that equipment was check in daily basis and
checklist available at the equipment and tools and
colour coded
Ensure proper access and egress for all vehicles
Pinch point hazard Ensure that no baby grinders shall used with
positive lock. Ensure it was colour coded and
inspected prior to use
Back injury Ensure proper handling and positioning while
hauling a materials
3 Cement plastering on floor and Tile EYE / Skin Irritation Ensure that the MSDS is available and workers
fixing shall know the hazard of that chemical.

Ensure that eye wash shall be available at all time


for washing purposes.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Sharp Edges Be aware of the sharp cuts of the tiles
Sinage shall be in place for the tile fixing
Demobilization same Proper house keeping is done prior to
demobilization