Jsa For Tile Fixing
Jsa For Tile Fixing
Jsa For Tile Fixing
JOB TITLE / AIM:Jsa for tile fixing in Laundry accommodation block C office building.
JSA DATE:05/01/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Ali Moosa SCRIBE: Abdullah Khan
PARTICIPANTS: Muslim
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Tools and workers
2. Cement plastering on floor
3. Cutting of tiles
4.tile Fixing
5.Demobilization
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
site that the E &P Personnel got inspected the electrical
equipment. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Open trench The use of leather gloves and proper lifting
techniques are required
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site. Ensure excavation
certificate to BHP are in place
Workers starting the job without JSA JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Proper checking of welding cable wire with tag
and grounding must be done.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves. Ensure trolley are
secured with stable support
2 Cutting of tiles Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
hand injury, dust, eye injury, Ear Injury req..Safety shoes, helmet, safety glass, dust mask
and Ear Plugs Shall be worn.,
Hand injury/ . First aid kit available at site.
Hand gloves and welding gloves should be worn
Eye injury Ensure workers are wearing both the eye goggles
& face shield/welding mask
Equipment Failure Ensure that equipment was check in daily basis and
checklist available at the equipment and tools and
colour coded
Ensure proper access and egress for all vehicles
Pinch point hazard Ensure that no baby grinders shall used with
positive lock. Ensure it was colour coded and
inspected prior to use
Back injury Ensure proper handling and positioning while
hauling a materials
3 Cement plastering on floor and Tile EYE / Skin Irritation Ensure that the MSDS is available and workers