No Pins at Door Opening For Mud Base at Shower: House Foundation Plan
No Pins at Door Opening For Mud Base at Shower: House Foundation Plan
E THICKENED
10 SLAB EDGE
8” 16”
16’-0”
24”
BENCHES
ABOVE
9’-6”
9’-3” PLACE #4 “L” 4” x 28” REBAR PINS AT CHANGE IN FOUNDATION
ALL APEX WALL PERIMETER. BASIC DEPTH SEE EXTERIOR 6’-0”
SPACING IS 16” OC AT APEX CORE ELEVATIONS MUD SLAB
CENTERS - NO PINS @ DOORS AT SHOWER
SIMILAR TO F/10
8” WALL C =
COLUMN C
OPENING FOR
24’-7”
MUD BASE @
8”
A 10
LAUNDRY
13’-11”
10’-3”
CHANGE IN
FOUNDATION DEPTH CONDENSER
7’-2” B
SEE EXTERIOR ON PAD
10
C 10 ELEVATIONS
8”
NOTE: CMU WALLS CENTER ON J NO PINS
FTGS, CMU CENTERLINES 1” FROM 16 32” RADIUS 32”
@ DOOR E 10
APEX WALLS CENTERLINES 14’-0”
6’-10” D 10
6’-0” 3’-4” 9’-8” 10’-0”
20’-0”
37’-0 11/16” 4’-0” 9’-8” 3’-4” 7’-1 1/2” 9’-9” 7’-1 1/2”
24’-0”
64’-0” Drawn by AB & RG
Date 11/2/12
73’-6”
N Revisions
HOUSE FOUNDATION PLAN 1.
#4 V&H 1/4” = 1’-0” FOR FOUNDATION, CONCRETE, REINFORCING STEEL, & OTHER STEEL NOTES: REFER TO SHEET 17
ALL FOOTINGS BEAR ON FIRM UNDISTURBED EARTH 2.
APEX BLOCK
6x6 COL 6x6 COL 3.
#4 V&H CONCRETE CONCRETE
NOTE: CMU WALLS CENTER ON CAP SLOPED STANDOFF CAP SLOPED STANDOFF Radius Project # 10-781
FTGS, CMU CENTERLINES 1” FROM FOR POST BASE FOR POST BASE
APEX WALLS CENTERLINES APEX BLOCK DRAINAGE ABU66 W/ (2) DRAINAGE ABU66 W/ (2)
#4 ‘L’ 6” x 30” @
16” OC 1/2 “ MB 1/2 “ MB
& 3/8” x 8” AB & 3/8” x 8” AB
6” x 6” 10-10
SLAB MESH #4 ‘L’ 6” x 30” @
ADJ 16” 16”
#4 “L” 36” @ 16” OC #3 STIRRUPS
WALL ABOVE ABOVE #3 STIRRUPS
16” OC 6” x 6” 10-10 OR @ 8” VERT SLAB @ 8” VERT
SLAB
SLAB MESH OPENING
#4 GRID - 24” #4 “L” 36” @
EACH WAY (2) #4 CONTIN
16” OC SLAB SLAB
#4 GRID - 24”
(2) #4 CONTIN
EACH WAY
16x16x8
CMU HOUSE
“CHIMNEY
40” 32” 32”
BLOCK” FOUNDATION
COLUMNS
8” x 8” x 16” 32”
8” x 8” x 16” 6 COURSES PLAN
CMU BLOCK CMU BLOCK
,
6” x 6” 10-10
SLAB MESH (DASHES) 14” x 48”
#4 ‘L’ 4” x 28” @
#4 ‘L’ 4” x 28” @ ROUND
16” OC
4” 16” OC COL.
PLAN VIEW:
#4 x 10” CROSS- #4 x 10” CROSS- PLAN VIEW:
#3 STIRRUPS,
4” PIECE @ 4’ OC #3 STIRRUPS,
PIECE @ 4’ OC 6”x 6”
#4 GRID - 24” 8” 8” F 4”x 4”
10
4 COURSE CMU AROUND (4) #4
EACH WAY 10 AROUND (4) #4
5 COURSE CMU SHALLOW WALL FTG VERT
(2) #4 CONTIN DEEP WALL FTG (2) #4 CONTIN VERT
18” 18”
E THICKENED SLAB AT EDGE B DEEP WALL FOOTING C SHALLOW WALL FOOTING D COLUMN FOOTING A COLUMN FOOTING
10 1” = 1’-0” SLAB NOT THICKENED @ COL FTG INTERSECTIONS 10 1” = 1’-0” 10 1” = 1’-0” 10 1” = 1’-0” 10 1” = 1’-0”