Professional Documents
Culture Documents
Washing Check List PDF
Washing Check List PDF
9:12 AM
O.C. # 2120170552/1 ART# 35569-0299 Wash: DUBIOUS SHORT Date : 27-May-17 PPR QTY
Before forwarding the PPR to FID for BULK Decision tick the following:
1. Before Wash Balloon Air Pressure / Time apply for Scrapping Air Pressure: _____________ Time: _____________ minutes
3. PPR Wash on this temperature and time Temperature: _____________ centigrade Time: _____________ minutes
4. PPR Dry on this temperature and time Temperature: _____________ centigrade Time: _____________ minutes
6. Confirmation of Stonning against the receipe of this Wash Req. Not Req. Remarks: _________________________
7. Check Tone / Wash of the PPR with Approved Sample. Ok Not Ok Remarks: _________________________
8. Check Hand Feel of PPR with Approved Sample. Ok Not Ok Remarks: _________________________
9. Can these PPR proceeded for Bulk Cutting Decision Yes No, Re-trial Req. Remarks: _________________________
11. Wrinkle on Seat Area Required / Not Required. Required Not Required
12. Wrinkle on Knee Area Required / Not Required. Required Not Required
17. After Wash Balloon Air Pressure / Time apply for Spray Air Pressure: _____________ Time: _____________ minutes