This document provides a rate analysis for a metal beam crash barrier. It lists the type of crash barrier as a 3mm thick corrugated sheet metal beam rail fixed to vertical steel posts. It then breaks down the unit rate per running meter into costs for labor, machinery, materials, overhead charges, and contractor's profit to calculate a total cost of Rs. 2639.00 per running meter.
This document provides a rate analysis for a metal beam crash barrier. It lists the type of crash barrier as a 3mm thick corrugated sheet metal beam rail fixed to vertical steel posts. It then breaks down the unit rate per running meter into costs for labor, machinery, materials, overhead charges, and contractor's profit to calculate a total cost of Rs. 2639.00 per running meter.
This document provides a rate analysis for a metal beam crash barrier. It lists the type of crash barrier as a 3mm thick corrugated sheet metal beam rail fixed to vertical steel posts. It then breaks down the unit rate per running meter into costs for labor, machinery, materials, overhead charges, and contractor's profit to calculate a total cost of Rs. 2639.00 per running meter.
This document provides a rate analysis for a metal beam crash barrier. It lists the type of crash barrier as a 3mm thick corrugated sheet metal beam rail fixed to vertical steel posts. It then breaks down the unit rate per running meter into costs for labor, machinery, materials, overhead charges, and contractor's profit to calculate a total cost of Rs. 2639.00 per running meter.
Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, #REF! 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 (RA) Unit = Running metre Taking output = 4.5 metre length a) Labour Mate day 0.060 286.40 17.18 L-12 Blacksmith day 0.500 294.00 147.00 L-02 Mazdoor day 1.000 294.00 294.00 L-13 b) Machinery Tractor-trolley hour 0.100 234.00 23.40 P&M-053 c) Material Corrugated sheet,3 mm thick, "W" beam section railing,4.5 44.97 1853.21 M-179 /1000 kg 41.210 m in length Channel post 150 x 75 x 5 mm,1.8 m long,3 Nos @ 16.4 44.97 3982.54 M-179 /1000 kg 88.560 kg per metre Spacer 150 x 75 x 5 mm channel 0.33 m long,3 Nos @ 44.97 730.31 M-179 /1000 kg 16.240 16.4 kg per metre 44.97 899.40 M-130 Nuts and bolts kg 20.000 Add 25 per cent of the cost of material for fabrication, nuts, bolts 1866.37 and washers etc.) d) Overhead charges 10% on (a+b+c) 981.34 e) Contractor's profit 10% on (a+b+c+d) 1079.48 Cost for 4.5 metre = a+b+c+d+e 11874.24 Rate per metre = (a+b+c+d+e)/4.5 2638.72 say 2639.00 Rmt