Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

767

Airplane Characteristics for


Airport Planning

Boeing Commercial Airplanes

D6-58328
SEPTEMBER 2005 i
767 AIRPLANE CHARACTERISTICS FOR AIRPORT PLANNING
LIST OF ACTIVE PAGES

Page Date Page Date Page Date


Original Preliminary
1 to 90 April 1979
Rev A Preliminary
1 to 96 July 1980
Rev B July 1981
1 to 106
Rev C April 1983
1 to 106
Rev D December 1983
1 to 126
Rev E January 1986
1 to 204
Rev F February 1989
1 to 176
Rev G December 2003
1 to 200
Rev H September 2005
1 to 268 All Pages

D6-58328
ii SEPTEMBER 2005
TABLE OF CONTENTS

SECTION TITLE PAGE

1.0 SCOPE AND INTRODUCTION 1


1.1 Scope 2
1.2 Introduction 3
1.3 A Brief Description of the 767 Family of Airplanes 4

2.0 AIRPLANE DESCRIPTION 7


2.1 General Characteristics 8
2.2 General Dimensions 15
2.3 Ground Clearances 19
2.4 Interior Arrangements 23
2.5 Cabin Cross-Sections 30
2.6 Lower Cargo Compartments 32
2.7 Door Clearances 37

3.0 AIRPLANE PERFORMANCE 45


3.1 General Information 46
3.2 Payload/Range for Long-Range Cruise 47
3.3 F.A.R. Takeoff Runway Length Requirements 57
3.4 F.A.R. Landing Runway Length Requirements 93

4.0 GROUND MANEUVERING 103


4.1 General Information 104
4.2 Turning Radii 105
4.3 Clearance Radii 108
4.4 Visibility from Cockpit in Static Position 109
4.5 Runway and Taxiway Turn Paths 110
4.6 Runway Holding Bay 115

5.0 TERMINAL SERVICING 117


5.1 Airplane Servicing Arrangement - Typical Turnaround 118
5.2 Terminal Operations - Turnaround Station 123
5.3 Terminal Operations - En Route Station 129
5.4 Ground Servicing Connections 132
5.5 Engine Start Pneumatic Requirements - Sea Level 139
5.6 Ground Pneumatic Power Requirements 144
5.7 Conditioned Air Flow Requirements 147
5.8 Ground Towing Requirements 151

D6-58328
SEPTEMBER 2005 iii
TABLE OF CONTENTS (CONTINUED)

SECTION TITLE PAGE

6.0 JET ENGINE WAKE AND NOISE DATA 153


6.1 Jet Engine Exhaust Velocities and Temperatures 154
6.2 Airport and Community Noise 177

7.0 PAVEMENT DATA 181


7.1 General Information 182
7.2 Landing Gear Footprint 185
7.3 Maximum Pavement Loads 188
7.4 Landing Gear Loading on Pavement 191
7.5 Flexible Pavement Requirements - U.S. Army Corps of
Engineers Method (S-77-1) 198
7.6 Flexible Pavement Requirements - LCN Method 201
7.7 Rigid Pavement Requirements -
Portland Cement Association Design Method 204
7.8 Rigid Pavement Requirements - LCN Conversion 207
7.9 Rigid Pavement Requirements - FAA Method 211
7.10 ACN/PCN Reporting System: Flexible and Rigid Pavements 214

8.0 FUTURE 767 DERIVATIVE AIRPLANES 225

9.0 SCALED 767 DRAWINGS 227

D6-58328
iv SEPTEMBER 2005

You might also like