DCII BROKEN GLASS MONITORING REPORT (AS OF 11-25-19)

DAMAGED GLASS (UNITS) GLASS DELIVERED GLASS REPLACED AS OF 11-25-19


Zone 1 Zone 2 Zone 3 Villa Zone 1 Zone 2 Zone 3 Villa Zone 1 Zone 2 Zone 3 Villa

Lift Lobby
Function Function (Void
Lift Lobby 3033 S1 Lift Lobby 3003 S1 3rd Flr 3033 3rd flr S2
Room 1 Room 1 Area)
and
3rd Flr 3rd Flr 3rd Flr 3rd Flr
BOH Near 3005
3rd Flr 3rd Flr BOH near 3rd Flr All Day
BOH near Dining
Lift Lobby 8035 S2 All day 3005 8035 S2 8004 8035
All day din.
din.

Beside bar 8005 (1 Panel


3005 11039 6th 7th BOH (Mini bar) 6005 15023 6th
lounge door Balance)

10070 9005 Balcony glass


7068 / BOH Mini bar 6005 15023 15th 8070 7005 18036 15th
8070 7005 18036 17th 8072 8004 19026 12088 18002
8004 19026 19th 10070 8005 19038 15088 19002
9072(Balcony) 8005 19038 10074 9005 7005
10070 9005 11074 12008
6005
10074 10004 12088 16004
11074 12008 15088 / Lift lobby 17004
12088 16004 16066 18008
17004 18005
15088 / Lift Lobby
18008 19002
16066 18002 19004
18th Lift Lobby 18005 19008
19th BOH Pantry 19002 19008 Balcony Door
All-Day Dining Sq. 6 19004
19008

SUMMARY
Total Units: 48 Units
Remaining Units: 33 Units NOTE: BMU USED FOR LEAK REPAIR
Total Broken Glass: 61 pcs
Total of Glass delivered: 33 pcs
Total of Glass replaced: 26 pcs
CHALLENGES: BMU USED FOR LEAK REPAIR

Prepared by: Façade Team