Facade Broken Glass Monitoring Report (11-25-19)
Lift Lobby
Function Function (Void
Lift Lobby 3033 S1 Lift Lobby 3003 S1 3rd Flr 3033 3rd flr S2
Room 1 Room 1 Area)
and
3rd Flr 3rd Flr 3rd Flr 3rd Flr
BOH Near 3005
3rd Flr 3rd Flr BOH near 3rd Flr All Day
BOH near Dining
Lift Lobby 8035 S2 All day 3005 8035 S2 8004 8035
All day din.
din.
SUMMARY
Total Units: 48 Units
Remaining Units: 33 Units NOTE: BMU USED FOR LEAK REPAIR
Total Broken Glass: 61 pcs
Total of Glass delivered: 33 pcs
Total of Glass replaced: 26 pcs
CHALLENGES: BMU USED FOR LEAK REPAIR