Scaffolding Erection and Dismantling
Scaffolding Erection and Dismantling
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
1. Mobilization, Hit against Bodily injuries a) Check vehicle of its Mo R L a) Never use WSH / Task
demobilization of personnel or road worthiness. communicati supervisor
scaffolding material property Property damaged b) Comply with road on phone
speed limits and while driving.
driving regulation.
c) Banksman shall be b) Driver must
provided during be LTA
loading, unloading, licensed
moving operation.
Fire / Explosion Bodily injuries a) Check gas, oil, fluid Mo R L a) Vehicle tune WSH / Task
ignition leaks regularly. up & regular supervisor
Property damaged b) Install spark maintenance
arrestor. regime.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
Blocking of road Delay in emergency a) Never leave vehicle Mo R L a) Leave the WSH / Task
access & response un-attended key at the supervisor
emergency (Lorrycrane, Prime ignition if
facilities mover, lorry) operator /
b) Provide banksman driver
for traffic control. leaving the
vehicle.
2. Mobilization, Hit by moving Bodily injury / a) Ensure all workers Mo R L a) Be extra WSH / Task
demobilization of machinery Fatality abide to the traffic careful when supervisor
manpower rules and crossing the
regulations in the road.
plant. b) Ensure
b) Ensure workers workers
use the pedestrian wearing full
walkway provided P.P.E.
during travelling.
3. Manual handling of Ergonomically Bodily injury / a) Educate worker of Mo O M a) Advice WSH / Task
scaffolding materials hazard Back injury correct manual worker to supervisor
lifting method. seek help if
b) Ensure material is the load is
carried in small too heavy /
quantity to large.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
Slipping hazard Bodily injury a) Ensure floor is Mo R L a) Maintain good WSH / Task
always in dry housekeeping. supervisor
condition.
b) Ensure slip
resistant safety
shoe are worn.
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
4. Survey of scaffold Possible scaffold Bodily injury / a) Ensure that the Mo R L a) Precise WSH / Task
erection area before failure Fatality / ground is in good coordination. supervisor
start erecting Damage to property compacted b) Ensure
condition. workers are
b) Ensure that there are educate on
no overhead cables spotting
routing where potential
scaffold is going to hazard /
be erected. SPSA.
5. Lay solo boards, if Ergonomically Bodily injury / a) Educate worker of Mo O M a) Advice WSH / Task
required place base hazard Back injury correct manual worker to supervisor
plates at suitable lifting method. seek help if
location b) Ensure material is the load is
carried in small too heavy /
quantity to large.
minimise the weight
carried.
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
Sharp edges Cuts a) Ensure hand glove Mo R L a) Ensure close WSH / Task
around the base is worn in any work supervision. supervisor
plate operation.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
6. Pitch the standards at Ergonomically Bodily injury / a) Educate worker of Mo O M a) Advice WSH / Task
spacing of not more hazard Back injury correct manual worker to supervisor
than 2.5m apart lifting method. seek help if
b) Ensure material is the load is
carried in small too heavy /
quantity to large.
minimise the weight
carried.
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
Sharp edges at Cuts a) Ensure hand glove Mo R L a) Ensure close WSH / Task
scaffold pipes is worn in any work supervision. supervisor
ends operation.
7. Secure foot-tie at inner Hit by falling Bodily injury / a) Ensure vertical tubes Mo R L a) Ensure WSH / Task
side of not more than vertical tubes Fatality / are not released until worker are supervisor
460mm from ground Damage to property the foot ties are trained and
securely installed. qualified to
b) Implement a buddy erect,
system for dismantle or
assistance to hold modify
vertical tubes scaffold.
during securing of b) Ensure close
foot-tie. supervision.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
8. Install the lift ledgers Ergonomically Bodily injury / a) Educate worker of Mo O M a) Advice WSH / Task
and transoms hazard Back injury correct manual worker to supervisor
lifting method. seek help if
b) Ensure material is the load is
carried in small too heavy /
quantity to large.
minimise the weight
carried.
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
Sharp edges at Cuts a) Ensure hand glove Mo R L a) Ensure close WSH / Task
scaffold pipes is worn in any work supervision. supervisor
ends operation.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
`
9. Install temporary Ergonomically Bodily injury / a) Educate worker of Mo O M a) Advice WSH / Task
platform (at least hazard Back injury correct manual worker to supervisor
500mm wide) and lifting method. seek help if
temporary access c) Ensure material is the load is
ladder carried in small too heavy /
quantity to large.
minimise the weight
carried.
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
Sharp edges Cuts a) Ensure hand glove Mo R L a) Ensure close WSH / Task
around the metal is worn in any work supervision. supervisor
decking operation.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
Continuation : Hit by falling metal Bodily injury / a) Ensure metal Mo R L a) Ensure WSH / Task
decking, ladder, Fatality / decking, ladder, are worker are supervisor
ratchet spanner Damage to property not released until it trained and
and coupling is securely qualified to
installed. erect,
b) Implement a buddy dismantle or
system for modify
assistance to hold scaffold.
the metal decking b) Ensure close
during securing. supervision.
c) Ensure ratchet
spanner is secured
to the erector’s
body.
10. Lay metal decking for Falling from height Bodily injury / a) Ensure all erectors Mo R L a) Ensure close WSH / Task
lift platform Fatality are equipped with supervision. supervisor
safety harness with
double lanyards and
shock absorber.
b) All personnel are
100% tie-off when
working at height
above 1.2m.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
Pinch points Bodily injury a) Educate worker on Mo R L a) Ensure hand WSH / Task
proper hand glove is worn supervisor
placement. in any work
operation.
Sharp edges Cuts a) Ensure hand glove Mo R L a) Ensure close WSH / Task
around the metal is worn in any work supervision. supervisor
decking operation.
Hit by falling metal Bodily injury / a) Ensure metal Mo R L a) Ensure WSH / Task
decking, ratchet Fatality / decking, ladder, are worker are supervisor
spanner and Damage to property not released until it trained and
coupling is securely qualified to
installed. erect,
b) Implement a buddy dismantle or
system for modify
assistance to hold scaffold.
the metal decking
during securing.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
11. Install ladders to access Falling from height Bodily injury / a) Ensure all Mo R L a) Ensure close WSH / Task
each individual lift Fatality scaffolders are supervision. supervisor
equipped with
safety harness with
double lanyards and
shock absorber.
b) All personnel are
100% tie-off when
working at height
above 1.2m.
Falling off ladder Bodily injury a) Ensure the ladder is Mo R L a) Implement a WSH / Task
tied -down by putlog buddy supervisor
couplers of scaffold system for
wires, when using assistance to
wires for securing the
excess portion of wire
hold the
must be trimmed off metal
to prevent cuts & decking
puncture wounds. during
securing.
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Level Risk
Likelihood
Action Officer,
Severity
Possible Accident / Existing Risk Control Designation
Additional Risk
No. Work Activity Hazard Ill Health &
(if any) Control (Follow-up
Persons-at-Risk
date)
Continuation : Hit by falling metal Bodily injury / a) Ensure metal Mo R L a) Ensure WSH / Task
decking, ladder, Fatality / decking, ladder, are worker are supervisor
ratchet spanner Damage to property not released until it trained and
and coupling is securely qualified to
installed. erect,
b) Implement a buddy dismantle or
system for modify
assistance to hold scaffold.
the ladder during
securing.
Bad weather / Bodily Injury a) No activity allowed Mo R L a) Ensure all WSH / Task
lightning during CAT 1. personnel supervisor
Fatality are notified
of the
lightning
alert.
1 Mobilisation of Construction Plant & Equipment (CPE) Robin engine, vibrator, excavator, concrete truck and concrete pump truck.
2 Placement of CPE at various locations in the Plants East and West Plant.
15 Painting/Coating N/A
16 NDE N/A
RISK MATRIX
LIKELIHOOD
REMOTE OCCASSIONAL FREQUENT
SEVERITY