Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

7/10/2020 Quiz 001: Attempt review

Home / My courses / UGRD-CS6209-2013T / Week 2: Software Engineering Principles / Quiz 001

Started on Friday, 10 July 2020, 9:15 PM


State Finished
Completed on Friday, 10 July 2020, 9:37 PM
Time taken 22 mins 7 secs
Grade 19.00 out of 20.00 (95%)

Question 1 It is important in designing software that is free from unnatural restrictions and limitations.
Correct

Mark 1.00 out of Select one:


1.00
a. Incremental Development

b. Generality 

c. Consistency

d. Anticipation of Change

Your answer is correct.

Question 2 It is a system composed of people and computers that processes or interprets information.
Correct

Mark 1.00 out of Select one:


1.00
a. Data

b. Information System 

c. Data System

d. Information

Your answer is correct.

Question 3 Explain what is meant by PRODUCT with reference to one of the eight principles as per the ACM/IEEE
Correct Code of Ethics ?
Mark 1.00 out of
1.00 Select one:
a. Software engineers shall ensure that their products and related modifications satisfy the client

b. It means that the product designed /created should be easily available

c. Software engineers shall ensure that their products and related modifications meet the highest
professional standards possible 

d. The product should be easy to use

Your answer is correct.

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 1/6
7/10/2020 Quiz 001: Attempt review

Question 4 Efficiency in a software product does not include ________


Correct

Mark 1.00 out of Select one:


1.00
a. responsiveness

b. licensing 

c. processing time

d. memory utilization

Your answer is correct.

Question 5 It implies separating software into components according to functionality and responsibility.
Correct

Mark 1.00 out of Select one:


1.00
a. Anticipation of change

b. Modularity 

c. Abstraction

d. Separation of Concerns

Your answer is correct.

Question 6 Company has latest computers and state-of the- art software tools, so we shouldn’t worry about the
Correct quality of the product.
Mark 1.00 out of
1.00 Select one:
True

False 

Question 7 They deal with structures and algorithms without regard for the meaning or importance of the data
Correct that is involved.
Mark 1.00 out of
1.00 Select one:
a. Software Engineer

b. Software developers 

c. Database Administrator

d. Programmer

Your answer is correct.

Question 8 Identify an ethical dilemma from the situations mentioned below:


Correct

Mark 1.00 out of Select one:


1.00
a. Agreement in principle with the policies of senior management

b. Refusing to undertake a project

c. All of the mentioned

d. Your employer releases a safety-critical system without finishing the testing of the system 

Your answer is correct.

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 2/6
7/10/2020 Quiz 001: Attempt review

Question 9 As per an IBM report, “31%of the project get cancelled before they are completed, 53% overrun their
Correct cost estimates by an average of 189% and for every 100 projects, there are 94 restarts”.What is the
Mark 1.00 out of reason for these statistics ?
1.00

Select one:
a. All of the mentioned

b. Lack of software ethics and understanding

c. Lack of adequate training in software engineering 

d. Management issues in the company

Your answer is correct.

Question 10 An ________________ process simplifies verification. If you develop software by adding small increments of
Correct functionality, then, for verification, you only need to deal with the added portion
Mark 1.00 out of
1.00 Select one:
a. Incremental Development 

b. Generality

c. Abstraction

d. Consistency

Your answer is correct.

Question 11 Select the incorrect statement: “Software engineers should


Correct

Mark 1.00 out of Select one:


1.00
a. not knowingly accept work that is outside your competence.”

b. not use your technical skills to misuse other people’s computers.”

c. be dependent on their colleagues.” 

d. maintain integrity and independence in their professional judgment.”

Your answer is correct.

Question 12 These are the policies that govern the operation of a computer system. 
Correct

Mark 1.00 out of Select one:


1.00
a. Sofware

b. Hardware

c. People

d. Procedures 

Your answer is correct.

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 3/6
7/10/2020 Quiz 001: Attempt review

Question 13
Choose the correct option in terms of Issues related to professional responsibility
Correct

Mark 1.00 out of Select one:


1.00
a. Intellectual property rights

b. Both Confidentiality & Intellectual property rights 

c. Managing Client Relationships

d. Confidentiality

Your answer is correct.

Question 14 “Software engineers should not use their technical skills to misuse other people’s computers.”Here the
Correct term misuse refers to:
Mark 1.00 out of
1.00 Select one:
a. Dissemination of viruses or other malware

b. All of the mentioned 

c. Unauthorized modification of computer material

d. Unauthorized access to computer material

Your answer is correct.

Question 15 Identify the correct statement: “Software engineers shall


Correct

Mark 1.00 out of Select one:


1.00
a. act consistently with the public interest.” 

b. ensure that their products only meet the SRS.”

c. act in a manner that is in the best interests of his expertise and favour.”

d. all of the mentioned

Your answer is correct.

Question 16 This category includes the computer itself, which is often referred to as the central processing unit
Correct (CPU), and all of its support equipment.
Mark 1.00 out of
1.00 Select one:
a. Procedures

b. Data

c. Hardware 

d. Software

Your answer is correct.

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 4/6
7/10/2020 Quiz 001: Attempt review

Question 17 A field studying computers and algorithmic processes, including their principles, their software and
Incorrect hardware designs, their applications, and their impact on society, whereas IS emphasizes functionality
Mark 0.00 out of over design.
1.00

Select one:
a. Computer information system

b. Information Technology

c. Information System

d. Computer Science 

Your answer is incorrect.

Question 18 The reason for software bugs and failures is due to


Correct

Mark 1.00 out of Select one:


1.00
a. Software companies

b. All of the mentioned

c. Software Developers

d. Both Software companies and Developers 

Your answer is correct.

Question 19 It refers to computer programs and the manuals (if any) that support them.
Correct

Mark 1.00 out of Select one:


1.00
a. Feedback

b. Procedures

c. Software 

d. People

Your answer is correct.

Question 20 It is often easier to use if these two concerns are divided as much as possible into separate sets of
Correct client functions.
Mark 1.00 out of
1.00 Select one:
a. Abstraction

b. Software Engineering Principles

c. Modularity

d. data structure component 

Your answer is correct.

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 5/6
7/10/2020 Quiz 001: Attempt review

◄ WEEK2 - Software Engineering


Jump to... WEEK3 - Technical Development ►
Principles - PPT

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=25224&cmid=1239 6/6

You might also like