CSR−2020−Final

GOVERNMENT OF PUNJAB
PUBLIC WORKS DEPARTMENT

CSR-2020
(COMMON SCHEDULE OF RATES)
CHAPTERS 1 TO 34

FOURTH EDITION

ISSUED BY:
CHIEF ENGINEER (HQ), PUNJAB PWD (B&R)
BLOCK-C, NIRMAN BHAWAN
DISTRICT ADMINISTRATIVE COMPLEX, PATIALA
Email: [email protected] Ph. No: 0175-2360003
CSR−2020−Final
CSR−2020−Final

FOREWORD

Common Schedule of Rates (CSR) is an illustrative and comprehensive document that is


published by the Department of Public Works (B&R), Punjab from time to time to provide a
uniform economic base to all the Engineering Departments, Boards/Corporations/Agencies and
Private Sector Organizations working with the Punjab Government for the purpose of cost
estimation of construction activities.

The maiden issue was published in the year 1962 and was revised subsequently in the year
1987 and then again in 2010. Over the period of time ceiling premiums were provided from time
to time as and when required.

In the year 2020, foreseeing the current and future requirements, technological advances and
modified tax structure due to imposition of GST, the CSR has been accordingly revised. While
doing so current market rates have been thoroughly studied and taken into consideration. Many
new items of work have been included, thereby avoiding the need for Non schedule items.

I am thankful to all the Chief Engineers, Superintending Engineers, Executive Engineers and
other drawing and clerical staff members of all Punjab Government Departments who gave their
valuable contributions and support for finalizing this edition of CSR.

The contribution of Er. Vipan Bansal, Executive Engineer (CSR Cell), Sh. Bhupinder Mittal,
HDM (CSR Cell) and various technical committees remains the pivotal basis for framing this
edition of CSR.

I am sure that this CSR will be quite helpful to all the concerned in construction industry carrying
out development works in the State of Punjab.

This CSR has been issued with the approval of the Direction Committee of Chief Engineers,
in the meeting held on 17.08.2020.

Er. V.S. Dhindsa


Chief Engineer (H.Q.),
Punjab, PWD (B&R),
Patiala.

Foreword CSR-2020
CSR−2020−Final
CSR−2020−Final
COMPOSITION OF
THE DIRECTION COMMITTEE OF CHIEF ENGINEERS
AS PER
GOVERNMENT OF PUNJAB, PUBLIC WORKS DEPARTMENT (B&R-3 BRANCH) NOTIFICATION NO.
8/59/2013-3BR3/207 DATED 28.07.2020
(POWER & GUIDELINES ISSUED VIDE PSPW LETTER NO. 8/59/2013-3BR3/679-91 DT. 25.02.2014)

1. Chief Engineer (Head PUBLIC WORKS DEPARTMENT (B&R)


Quarter) Convernor

2. Chief Engineer (Canals) DEPARTMENT OF WATER RESOURCES

3. Chief Engineer DEPARTMENT OF WATER SUPPLY & SANITATION

4. Chief Engineer DEPARTMENT OF LOCAL BODIES

5. Chief Engineer WATER SUPPLY & SEWERAGE BOARD, PUNJAB

6. Chief Engineer DEPARTMENT OF RURAL DEVELOPMENT & PANCHAYATS

7. Chief Architect DEPARTMENT OF ARCHITECTURE

8. Chief Engineer (Electrical) PUBLIC WORKS DEPARTMENT (B&R), ELECTRICAL WING

Special Invitees Any Technical Head of Other departments, Semi Govt. Undertakings/
Organisations/ Corporations.

Members CSR-2020
CSR−2020−Final
CSR−2020−Final

CONTENTS
Chapter Name of the Chapter Page No.
No.
Preface .. .. i - viii
0 Explanatory Notes .. .. 1-52
1 Daily Wages .. .. 1-2
2 Hire Charges of Machinery .. .. 3-6
3 Materials .. .. 7-47
4 Loading & Un-Loading .. .. 48-52
5 Carriage .. .. 53-81
6 Earth Work .. .. 82-90
7 Rock-Cutting .. .. 91
8 Dismantling .. .. 92-97
9 Centring & Shuttering .. .. 98-99
10 Concrete .. .. 100-111
11 Brick Work .. .. 112-123
12 Stone Masonry .. .. 124-129
13 Hoisting, Roofing and Water Proofing .. .. 130-155
14 Flooring and Dados .. .. 156-193
15 Plastering & Pointing .. .. 194-201
16 White Washing, Distempering, Painting & Polishing .. .. 202-211
17 Wood Work & Aluminum Work .. .. 212-263
18 Steel & Iron Work .. .. 264-276
19 Lining .. .. 277-288
20 Outlets .. .. 289-296
21 Bridges - Foundation & Sub-Structure .. .. 297-337
22 Bridges - Super-Structure & Protection Work .. .. 338-354
23 River and Canal Protection Work .. .. 355-363
24 Road Work .. .. 364-408
25 Maintenance of Canals & Drains .. .. 409-413
26 Miscellaneous .. .. 414-418
27 Quantities of Materials .. .. 419-431
28 Water Supply .. .. 432-498
29 Sewerage and Drainage .. .. 499-540
30 Sanitary Installations .. .. 541-581
31 Maintenance of Building & Furniture .. .. 582-590
32 Horticulture .. .. 591-613
33 Green Buildings .. .. 614-626
34 Electrical .. .. 627-741

Contents CSR-2020
CSR−2020−Final
CSR−2020−Final

PREFACE
CSR - 2020
1 Public Works Department, Punjab is the core department of Govt. of Punjab, solely responsible for
any revision or change in the Common Schedule of Rates with contribution of Department of Water
Resources, Department of Water Supply & Sanitation and Punjab Water Supply & Sewerage Board.
Earlier since after independence, the CSR was initially developed in 1962 which was in FPS system.
Thereafter it was converted into metric system in the year 1965-66 as interim Common Schedule of
Rates. Further it was revised in 1987. Then in the year 2010 third edition CSR-2010 was issued.
Further many amendments in shape of A&C slips were done in the last ten years as per the
recommendations of Direction Committee of Chief Engineers and various suggestions received form
Advisor Technical to Govt. of Punjab from time to time.

2 Now because of change of taxation structure like introduction of goods & services Tax and other
cesses introduced by the Govt, it becomes utmost necessary to reframe this Common Schedule of
Rates.

3 Direction Committee of Chief Engineers has been re-constituted by Govt. on 28.07.2020 where in the
Chief Engineers of eight departments are members and Chief Engineer (HQ) PWD (B&R) Punjab
being the Convernor (Detail of composition appended in the previous page).

4 The Chapters related to Civil works, irrigation, Water Supply & Sanitation, Sewerage, Horticulture
and Electrical works have been reframed by the concerned departments. All the chapters along with
one new chapters on Green Buildings have been framed by various sub committees of PWD (B&R)
Civil Wing, Electrical wing, DWS, DWSS & PWSSB (As per Appendix-1).

5 These revised chapters have been compiled and now the CSR - 2020 comprises the following
chapters:-

(i) Chapter No. 1 to 18, 21, Buildings, Culverts, Bridge & Road Works, Horticulture including new
22, 24, 26, 27, 31, 32 & 33 chapter on Green Buildings.

(ii) Chapter No 19, 20, 23 & Irrigation works such as outlets lining River & Canal Protection works
25 etc.

(iii) Chapter No 28 & 30 Public Health works such as Water Supply & Sanitation works.

(iv) Chapter No 29 Sewerage & Drainage Works

(v) Chapter No. 34 Electrical works

6 This CSR is applicable to the works to be executed by various Govt. Department & Semi-Govt.,
Boards, Corporations of Punjab State & Important Private Projects.

7 The CSR-2020 is based on detailed analysis of rates for each item of work. While working out of the
rate of the Schedule, current market rates, labour rates issued by Department of Labour Punjab.
Input have been taken from various similar sources as DSR, CPWD SOR, MES SOR.

(i)

Preface CSR-2020
CSR−2020−Final
8 The rates given in this CSR are for normal construction and maintenance works. For large scale
projects, specialized and emergent works like closure works, flood works etc. separate rates may be
determined by, the Chief Engineer of the Department concerned.

9 This CSR will not be applicable to the agreements and work orders already in vogue and these will
continue to be operated on the basis of the previous CSR till their completion.

10 The areas in the state have been sub-divided into the following two zones :-
PLAINS (Zone-A)
Area of all districts of Punjab excluding sub-mountainous region but including Chandigarh and
Municipal areas of towns of the Sub-mountainous region and south west of and including road land
width of PGI (Chandigarh) to Mullanpur- Kurali-Ropar-Kathgarh (on Balachaur-Ropar Road) to
Rattewal-Bhaddi, Singhpur (on Garhshankar-Anandpur Sahib Road) to Karimur Chahwala Village
(Where Kandi Canal crosses) along Kandi Canal (Right Hand Side) to Hoshiarpur-Talwara (Crossing
Mukerian-Talwara Road) to Hajipur to Manser meeting at NH:44 (Jalandhar-Pathankot road) to
Pathankot-Manmoon Cantt. to Madhopur to Jammu. .

SUB-MOUNTAINOUS REGION (Zone-B)


Northern Eastern side ( Right Hand Side) of PGI (Chandigarh) to Mullanpur- Kurali-Ropar-Kathgarh
(on Balachaur-Ropar Road) to Rattewal-Bhaddi, Singhpur (on Garhshankar-Anandpur Sahib Road) to
Karimur Chahwala Village (Where Kandi Canal crosses) along Kandi Canal (Right Hand Side) to
Hoshiarpur-Talwara (Crossing Mukerian-Talwara Road) to Hajipur to Manser meeting at NH:44
(Jalandhar-Pathankot road) to Pathankot-Manmoon Cantt. to Madhopur to Jammu.

11 The works at New Delhi and Delhi shall be carried out on the basis of C.P.W.D. Schedule of Rates
and specifications.

12 The Explanatory Notes on each chapter of CSR has also been provided in this edition of CSR.

13 The rates given in this CSR are based on the latest edition of the Punjab P.W.D. specifications
supplemented with relevant IS Code including subsequent Addenda and Corrigenda issued from time
to time for all chapters except Chapter No.21, 22 "Bridges," Chapter No.24 "Road work" for which the
specifications of Road and Bridge work evolved by the roads wings of the Ministry of Road Transport
& Highways Published by the Indian Roads Congress New Delhi, are to be adopted. The rates in
respects of "Electrical Installations" Chapter 34 are based on revised specifications.

14 Unless otherwise specified, the labour rates for various items of construction work include handling of
materials within 100 metres. The through rates include all rehandling of materials at site of work and
no payment is due to the contractor on this account. However this rehandling of 100 mtr is not to be
deducted from the Payable carriage because this 100 mtr. is not a part of carriage.

15 The through rates, given in the CSR, include the carriage of materials as follows :-

(a) For materials such as timber, steel, aluminum, glass and electrical goods, etc., which have to be
arranged by the contractor, the entire carriage is included in the rate, irrespective of the lead.

(b) For such materials as brick ballast, bajri, sand, stone, bitumen and cinder, source of bricks is
within 5 km from the site of work through rate include carriage, extra lead involved beyond 5 km
unless otherwise stated, is payable as per carriage rates and the resources shall be certified as
such by the Sub Divisional Engineer in writing.

(ii)

Preface CSR-2020
CSR−2020−Final
(c) For bricks/fly ash bricks, source of bricks is within 5 km from the site of work through rate include
carriage. In case the source is beyond the radius of 5 km of the site of work, the through rates
include carriage upto first 5 km measured from source of bricks irrespective of the fact whether
this initial distance consists of katcha and pucca or partly katcha and pucca. The lead beyond
this initial distance of 5 km will be payable at the rates provided in the Schedule of Rates for the
corresponding subsequent kilometres. For this purpose the source of bricks shall be the nearest
possible working kiln from where the bricks can be obtained and the resources shall be certified
as such by the Sub Divisional Engineer in writing.

(d) Average rates have been taken for quarry material in analysis of rates for working out the rates.
However rates from the quarry having cheapest landed price at particular location shall apply and
the rate shall be correspondingly adjusted by giving (+) or (-) loading to the average rates for the
respective items. Rates of material at various quarries are attached in chapter No. 3- Material.

(e) Average rates have been taken for brick / tiles in analysis of rates for working out the rates.
However rates for the respective districts shall apply and the rate shall be correspondingly
adjusted by giving (+) or (-) loading to the average rates for the respective items. District wise
rates of bricks/tiles are attached in chapter No. 3- Material.

16 The through rates include all octroi charges, toll tax, GST, Labour Welfare Cess, turnover tax and
other local taxes etc., paid by the contractor in bringing the material to the site of work.

17 The Rates of CSR have been worked out with GST rate on Govt. works contract @12%. In case of
Non Govt. /commercial project if any, the implication of GST with different rate can bee loaded/added
in the estimate concerned.

18 The rates include all the expenses on account of contribution of EPF, ESI, Insurance of work &
workers, arrangement of Bank Guarantee/ Performance Guarantee, Office Management, Bidding
participation Key Personal, Laboratory setup and Supervision of work.

19 The through rates include the wastage and breakage of various materials during construction.

20 Unless otherwise specified, the labour rates include the cost of water, tools and plants, labour and
materials for scaffolding and cost of good earth for mud mortar and mud plaster wherever required.

21 In case of works below ground level like basement of buildings and public health works such as
sewers, disposal works etc, the rates upto a depth of 4 metres below ground level, shall be the same
as for work in superstructure in first storey. For depths greater than 4 metres, additional rates for
subsequent storeys shall be added. For works which are not deeper than 1.5 metres from ground
level, ordinary rates for works in foundation & plinth shall apply.

22 Where the description of any item is too long, only essential portion may be written in estimates,
tenders contract and measurement books, although it will be deemed to cover the entire item
nomenclature as described fully in the CSR.

23 Wherever the column for "Rates" is neither headed by "Plains (Zone-A)" nor by "Sub-mountainous
Region (Zone-B)" the same may be considered to apply to both the regions.

24 Abbreviations of units, wherever occurring, in the Punjab, P.W.D. CSR-2020, are as mentioned here
in after:-
(iii)

Preface CSR-2020
CSR−2020−Final
A. LENGTH B. AREA

Millimetre .. mm Square millimetre .. sq mm/sqm

Centimetre .. cm Square centimetre .. sq cm/sqcm/Cm 2

Decimetre .. dm Squaremetre .. sq m/sqm


Metre .. m area .. a

Decametre .. dam hectare .. ha


Hectometre .. hm Square Kilometre .. sq km/sqkm

Kilometre .. km/Km

C. VOLUME D. CAPACITY
Cubic millimetre .. cu mm/cumm Milli litre .. ml
Cubic centimetre .. cu cm/cucm Litre .. ltr
Cubic metre .. cu m/cum Kilo litre .. kl

E. WEIGHT F. DENSITY
Milli .. mg Kilogram per cubic .. Kg/cum
gram .. g
kilogram .. kg/Kg
quintal .. qtl/Qtl
Tonne (Metric Tonne) .. t

G. DISCHARGE H. COUNTING

Cubic metre per second .. cu m/s Number/Numbers .. no/nos

Note :- The abbreviations mentioned herein before are for signify both singular as well as plural number.

MISCELLANEOUS

Common Schedule of Rates .. C.S.R./CSR Reinforced Cement .. R.C.C./RCC


Concrete

Director General of supplies .. D.G.S. & D. Plain Cement .. P.C.C/PCC


and Disposal Concrete

Public work Department .. P.W.D./PWD Poly Vinyl Chloride .. P.V.C./PVC

Indian Standard .. I.S./IS Short Way Mesh .. S.W.M./SWM

Bureau of Indian Standard .. B.I.S./BIS High Density .. H.D.P.E./HDPE


Polyethylene

Indian Standard Institution .. I.S.I./ISI Low Density .. L.D.P.E./LDPE


Polyethylene
(iv)

Preface CSR-2020
CSR−2020−Final

Indian Roads Congress .. I.R.C./IRC Mild Steel .. M.S./MS

Billet Rolled Committee .. B.R.C./BRC Revolutions per .. R.P.M./RPM


minute
Toos and Plants .. T. & P./T&P Miniature circuit .. M.C.B./MCB
breaker
Notice Inviting Tender .. N.I.T./NIT Alternating Current .. A.C./AC

Galvanized Iron .. G.I./GI Single Pole .. S.P./SP

Asbestos cement Corrugated .. A.C.C./ACC Single pole & neutral .. S.P. & N./ S.P.N.

Asbestos Cement .. A.C./AC Kilo-watt hour .. K.W.H./kwh

Joint Plan Committee .. J.P.C./JPC Plain cement .. P.C.C./PCC


concrete

Cast Iron .. C.I./CI Ready Mix Concrete .. R.M.C./RMC

Heavy Cast Iron .. H.C.I./HCI

Rolled Steel. .. R.S./RS General Electric Co. .. G.E.C./GEC

Open Flume .. O.F./OF Larsen & Toubro .. L. & T./L&T

Adjustable Proportionate .. A.P.M./APM Double Pole .. D.P./DP


Module

Orifice Semi Module .. O.S.M./OSM Triple Pole .. T.P./TP

Full Supply Depth .. F.S.D./FSD Triple Pole with .. T.P.N./ T.P.& N.


Neutral

Natural Surface Level .. N.S.L./NSL Aluminium conductor .. A.C.S.R./ACSR


steel reinforced

Ground Level .. G.L./GL Normally Open .. N.O./NO

Spring Level .. S.L./SL Normally Closed .. N.C./NC

Standard wire gauge .. S.W.G./SWG Current transformer .. C.T./CT

Ampere .. Amp. High rupturing .. H.R.C./HRC


capacity
(v)

Preface CSR-2020
CSR−2020−Final
Diametre .. dia. Supply and erection .. S.&E./S&E

Internal dia .. i/d Branch distribution .. B.D.F.B./BDFB


fuse-board

Outer dia .. o/d or OD Over Head Bus-Bar .. O.H.B.B.C./OHB


Chamber BC

All Aluminium Conductor .. A.A.C./AAC Stone ware .. S.W./SW

25 DECIMAL POINTS UPTO WHICH MEASUREMENTS SHALL BE TAKEN ARE AS UNDER:-

(i) All items of Punjab P.W.D. .. (a) Dimensions shall be measured to the nearest 0.01 metre.
Common Schedule of However, rounding off the figures shall not be applicable to
Rates 2020 except as conversion of basic dimensions of material and as restricted
mentioned below : in the P.W.D. Specifications (Punjab) in force from time to
time.
(b) Area shall be worked out to the nearest 0.01 sqm.
(c) Cubic contents shall be worked out to the nearest 0.01 cu m.

(ii) Loading, un-loading, .. Length, breadth and height of stack shall be measured correct to
stacking and carriage. a cm. Suitable deduction shall be made to account for voids in
loose stacking according to factor, mentioned in relevant chapters
of specifications or CSR.

(iii) Dismantling .. Measurements to be taken correct upto the place of decimal, as


per respective original items, mentioned in this para.

(iv) Supply and filling cinder on .. Length and breadth shall be measured correct to a cm and
roof including light average depth to 5mm.
ramming.

(v) Items of skirting and .. Correct to 3 mm where the height of skirting does not exceed 30
dados, including that on cm and where the height of skirting exceeds 30 cm, it shall be
risers and treads of stairs measured correct to a cm.
of plaster, precast terrazzo
tiles, Agra red stone and of
terrazzo, etc.

(vi) Items of skirting and .. Correct to 1 mm where the height of skirting does not exceed 30
dados, including that on cm, and where the height of skirting exceeds 30 cm it shall be
risers and treads of stairs measured correct to a cm.
of white Makrana Marble,
Chittor Black Marble and
of Kotah Stone,

(vii) Hoisting of wooden .. Length shall be measured correct to a cm and breadth and depth,
beams. correct to 5 mm.

(vi)

Preface CSR-2020
CSR−2020−Final
(viii) Wood work wrought, .. In cubic metres nearest to four places of decimal. Length of each
planed and fixed for piece shall be measured nearest to a cm and X-sectional
trusses, chowkhats etc. dimensions shall be measured as specified in Ch. 17 of the CSR,
correct to 5 mm.

(ix) Shutters of all type. .. Shutters shall be measured in sqm nearest to 2 places of decimal,
in close position, covering the rebate of the frame. Over lap of two
shutters shall not be measured. The width and height of shutter
shall be measured correct to a cm.

(x) Pelmets. .. The pelmets shall be measured along the sides and face of
planking correct to a cm.

(xi) (a) Steel reinforcement. .. In accordance with the instructions contained in the book of
P.W.D. specifications, the standard factor prescribed therein, shall
be taken in calculating the consumption of steel.

(b) Structural steel, steel Finished sections shall be measured in running metres correct to
window a cm and their weight calculated, on the basis of which steel is
supplied to the contractor, by the Deptt. or from standard tables
for tested steel.

26 The implications of tendered premium above or below (plus or minus) the ceiling premium fixed by the
Direction Committee of CE shall be as under:-
"The percentage tendered premium/abatement shall be added to/subtracted from Ceiling Premium
only. The percentage so arrived at shall be applicable to the basic rates printed in C.S.R."

27 The rates provided in the CSR-2020 are for preparation of estimates only.

28 Rates of all the items in CSR are in Indian Rupees.

Issued under the Authority of


The Direction Committee of Chief Engineers,
Punjab

(vii)

Preface CSR-2020
CSR−2020−Final
CSR−2020−Final

Detail of Sub Committees who have made Sincere efforts for the successful Reframing of CSR-2020 Appendix-1

Sub Officer Name Convenor /Designation


Name & Designation of Coordinating
Committe
Team (In H.Q. Level)
e No. CSR Chapter
SE/XEN & his team Supporting Staff

1 2 4 5 6 7
1 Convenor CE (Canal),Water Resources Er. Vijay Kumar Garg, XEN, Water Er. Arun Kumar Gupta,
Department, Hydel Bhawan, Resources, Chandigarh Er. Anmolpal
Chandigarh 20-Outlets, Er. Harshant verma,
25-Canal & Drainage work SDO, Water Resources.

2 Convenor CE (Drainage),Water Resources Er. Devinder Singh Sh. Tapinder Singh


Department,Hydel Bhawan, SE, Drainage, Circle Patiala CHD, Drainage Circle
Er. Sanjeev Gupta Chandigarh 23-River & Canal Patiala
Protection work

3 Convenor CE (Lining),Water Resources Er. Vijay Kumar Garg, XEN, Water Er. Arun Kumar Gupta,
Department, Hydel Bhawan, Resources, Chandigarh Er. Anmolpal
Chandigarh (Now Merged in Canal) 19-Canal Lining Er. Harshant verma,
SDO, Water Resources.

4 Er. Anil Kumar Bansal Convenor CE (North), W/S & Sanitation, Patiala Er. J.S. Sidhu, Sh. Sukhveer Singh JDM,
XEN (works), H.Q. W/S & Sanitation, W/S & Sanitation, Division
Patiala Ludhiana
28-Water Supply Er. J.S. Chahal,
XEN, W/S & Sanitation,
Division Moga

Er. Amrik Singh, Er. Harpreet Singh, AE,


XEN, W/S & Sanitation, Division No. Sh. Harmesh Kumar,
1, Patiala HDM, W/S & Sanitation,
Er. Kamal Kishore, Division No. 1, Patiala
30-Sanitary Installation
XEN, W/S & Sanitation, Division No.
1, Mohali

(viii)

Appendix-I CSR-2020
CSR−2020−Final

Sub Officer Name Convenor /Designation


Name & Designation of Coordinating
Committe
Team (In H.Q. Level)
e No. CSR Chapter
SE/XEN & his team Supporting Staff

1 2 4 5 6 7
5 Er. Harinder Singh Convenor Chief Engineer, PWSSB, Patiala Er. Jitin Vashudeva Er. Balraj Singh
29-Sewerage and XEN, PWSSB, Division No. 1, SDE, PWSSB, Sub
Drainage Jalandhar Division No. 2, Jalandhar

6 Er. V.K. Chopra Convenor CE, (Electrical), Punjab PWD ((B&R))


Chandigarh Special contribution from all Design Cells specially
Er. Vikas Vashisht, AE
ER. Deepika Jindal, AE
Er. Vikas Gupta Member SE, Electrical Circle (South), Punjab 34-Electrical along with officers of Punjab Mandi Board,
PWD (B&R), Patiala Health System Corporation Limited,
Deptt. of Local Bodies,
Panchayti Raj, Punjab Police Housing Corporation, GMADA.

7 Er. Kulwant Singh Convenor SE, Construction Circle, Sh. Lal Bahadar (CHD),
PWD (B&R), Ludhiana Drawing Branch (P.R.),
Er. G.S. Sarao, Specially Invited :
Er. Rakesh Garg Member XEN, Construction Division No. 1, 2-Machinery XEN (Plan Road), Sh. Harjinder Pal
PWD (B&R), Ludhiana 24-Road work HDM Provincial Division,
PWD (B&R), Ludhiana
Er. Adesh gupta Member XEN, Provincial Division,
PWD (B&R), Ludhiana

(ix)

Appendix-I CSR-2020
CSR−2020−Final

Sub Officer Name Convenor /Designation


Name & Designation of Coordinating
Committe
Team (In H.Q. Level)
e No. CSR Chapter
SE/XEN & his team Supporting Staff

1 2 4 5 6 7
8 Er. Ravi Chawla Convenor SE, Construction Circle No. 2,
PWD (B&R), Patiala

Er. Balwinder Singh Member XEN, Construction Division, Input Chpaters


PWD (B&R), Sirhind 1-Daily Wages,
Er. Deepak Goyal,
3-Materials Sh. Ajmer Singh (CDM),
XEN (PMGSY)
Er. Bankesh Sharma Member XEN, Construction Division, 4-Loading & Unloading Drawing Branch (PMGSY)
PWD (B&R), Nabha 5- Carriage

Er. Ajay Garg Member XEN (Puda), Patiala

9 Er. T.R. Katnoria Convenor SE, Construction Circle,


PWD (B&R), Hoshairpur

Er. Pawan Kumar Member XEN, Construction Division, 6-Earth Work,


Er. J.S. Anand, Sh. Darshan Singh (CHD),
PWD (B&R), Mukerian 7-Rock Cutting,
XEN (LR), Drawing Branch (L/R)
12-Stone Masonry
Er. Manjit Singh Saini Member XEN, Construction Division No. 1,
PWD (B&R), Patiala

10 Er. N.R. Goyal Convenor SE, Construction Circle No. 1,


PWD (B&R), Patiala 11-Brick Work,
13-Hositing &
Roofing,
Er. S.L. Garg Member XEN, Provincial Division No. 1, 14-Flooring & Dados,
Er. Manpreet Dua, Sh. Mohan Singh (HDM),
PWD (B&R), Patiala 15-Plastering &
XEN (Prov. Divin No. 2, Patiala) Drawing Branch,
Pointing,
Provl. Divn. No. 2, Patiala
16-White washing,
Er. Naveen Mittal Member XEN, Construction Division, Distempering,
PWD (B&R), Patiala Painting &
Polishing

(x)

Appendix-I CSR-2020
CSR−2020−Final

Sub Officer Name Convenor /Designation


Name & Designation of Coordinating
Committe
Team (In H.Q. Level)
e No. CSR Chapter
SE/XEN & his team Supporting Staff

1 2 4 5 6 7
11 Er. J.S. Tung Convenor SE, Construction Circle, 9-Centering and
PWD (B&R), Bathinda Shuttering,
10-Concrete, Er. S.L. Garg, Sh. Lal Singh (HDM),
Er. Neeraj Bhandari Member Provincial Division, 17-Wood work, XEN, Prov.Divn.-1, Patiala Drawing Branch
PWD (B&R), Bathinda 18-Steel & Iron work, Er. M.K.Garg, SDE, (Planning Plan Road),
26-Miscellaneous, Er. Deepak Goyal, AE
Er. Suresh Kumar Member Provincial Division,
27-Quantities of
PWD (B&R), Mansa
Materials
12 Er. P.J. Arora Convenor SE, Construction Circle,
PWD (B&R), Chandigarh 8- Dismantling, Sh. Harjeet Singh (HDM),
Er. Tersem Raj
Er. Arashdeep Singh Member XEN, Provincial Division, 31-Maintenance of Drawing Branch,
XEN (Central Works Divin), Patiala
PWD (B&R), Chandigarh Building & Central Works Divison,
Er. Rajpreet Singh Sidhu Member XEN, Provincial Division, Furniture Patiala
PWD (B&R), Mohali
13 Er. B.S. Tuli Convenor SE, Construction Circle,
PWD (B&R), Pathankot 21-Bridges
Er. Manmohan Singh Member XEN, Construction Division, Foundations &
PWD (B&R), Pathankot Sub-Structure, Er. S.K. Jindal Sh. Balbir Singh (CDM),
22-Bridge-Super- SE (P&I) Drawing Branch (Bridges)
Er. Manmohan Singh Member XEN, Provincial Division, Structure &
PWD (B&R), Gurdaspur Protection work

14 Er. Janail Singh Convenor XEN, Horticulture Division, PWD


(B&R), Ludhiana
Er. Harpreet Singh, AE Er. Jasdeep Singh , AE
Er. Brij Mohan Member SDE, Horticulture Sub Division, PWD Horticulture Sub Division, PWD Horticulture Sub Division,
Bhardawaj (B&R), Ludhiana 32-Horticulture
(B&R), Ludhiana PWD (B&R), Ludhiana
Er. Satinder Singh Member SDE, Horticulture Sub Division, PWD
(B&R), Amritsar

(xi)

Appendix-I CSR-2020
CSR−2020−Final

Sub Officer Name Convenor /Designation


Name & Designation of Coordinating
Committe
Team (In H.Q. Level)
e No. CSR Chapter
SE/XEN & his team Supporting Staff

1 2 4 5 6 7
15 Er. Manjit Singh Convenor SE, Construction Circle No. 1,
PWD (B&R), Jalandhar

Er. Bhagwinder Singh Member XEN, Provincial Division, Er. Richa Aggarwal , Sh. Darshan Singh (CHD),
New Chapter for Item
Tuli PWD (B&R), Jalandhar XEN Drawing Branch
relates to Water Proofing
(Training & HRMS) (Bridges Structure)
Er. Nek Chand Member XEN, Construction Division No.1,
PWD (B&R), Jalandhar

16 Er. Paramjit Goyal Convenor SE, Construction Circle,


PWD (B&R), Sangrur

Er. Deepak Goyal Member XEN (HQ), PWD (B&R), Patiala


New Chapter for Item
Er. Parwinder Singh, Sh. Amrik Singh (CHD),
relates to Green Buildings
Er. Bankesh Sharma Member XEN, Construction Division, XEN (NH) Drawing Branch (N.H.)
& Specifications
PWD (B&R), Nabha

Er. Vaneet Singla Member Sub Divisional Engineer,


PWD (B&R), Nabha

17 Er. Vipan Bansal XEN


Specially invited for assisting with CSR Cell for their technical
Smt. Arvinder Rattan CHD inputs
Overall compilation of
CSR Cell (HQ), PWD ((B&R)), Patiala Er. Harjit Singh SDE,
CSR-2020
Er. Karan Gupta JE,
Sh. Bhupinder Mittal HDM Sh. Jagdish Singh Clerk

(xii)

Appendix-I CSR-2020
CSR−2020−Final
CSR−2020−Final

EXPLANATORY NOTES

ON

CSR-2020
(COMMON SCHEDULE OF RATES)
CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 1- DAILY WAGES

Daily wages of labour have been provided according to present day prevailing
rates as notified by State Govt. Department of Labour under the Minimum Wages Act
w.e.f. 01.09.2019. All classes of labour, which are likely to be employed in any branch
of the Public Works Department have been included in this chapter. The rates given in
this chapter are primarily for the analysis of rates and take into account one paid
holiday per week allowed to labour under the Minimum Wages Act and no additional
cost on this account is to be provided over and above these rates. These rates are
exclusive of GST, labour cess, contractor's profit and overhead expenses but inclusive
of weekly rest.

For employment of departmental labour on muster rolls, the rates given in this
chapter may be considered as maximum rates up to which the Executive Engineer can
authorize employment of labour. If the prevailing rates in a certain locality are lower
than the ones given in this chapter, the Executive Engineer will authorize employment
at the prevalent and not at the CSR rates. On the other hand if in a certain locality
prevailing conditions necessitate payment on higher rates the Superintending Engineer
shall increase the rates suitably up to a maximum of 25% above the CSR rates. This
increase in rates shall be for a specific period not exceeding six months after which the
rates shall be reviewed and revised downwards, if the conditions so warrant. The Chief
Engineer of the department shall have full powers to authorize any increase in the
labour wages for departmental work for any length of time in any particular locality.

**************************************************************

1 CSR-2020
CSR−2020−Final

CHAPTER NO. 2 – HIRE CHARGES OF MACHINERY

The hire charges of machinery are based on the rates provided for the same in
Standard Data Book of MORT&H for the year 2001-02. The rates have been updated
by adopting Linking Factor for Manufactured Goods and WPI of Machinery and
Equipment. Factor for arriving at present rates has been derived by using Whole Sale
Price Index (WPI). The WPI has been worked out for the year 2020.
The rates include all the operational and maintenance charges such as cost of
fuels, lubricants, stores, establishment, depreciation and interest charges. In case
machinery is provided by the department, the working cost as mentioned below shall
be recovered from the contractor. These rates are for estimation purposes and not for
hiring of private machinery from the market for which competitive tenders/quotations
shall be called and approval of the appropriate competent authority shall be obtained.
The outputs mentioned for the construction equipments are for the compacted
quantities of the relevant items and not for loose quantities.
These rates are exclusive of GST, contractor's profit, labour welfare cess.

**************************************************************

2 CSR-2020
CSR−2020−Final

CHAPTER NO. 3-MATERIALS

In this chapter rates have been given for those classes of material which appear
in the Analysis of Rates of the Common Schedule of Rates. These rates are shown for
the purpose of analysis and not for the obtaining supplies from the market. The supplies
will be obtained either by placing orders with the Controller of Stores or by calling
tenders as may be required under the rules and orders in force.
In case of bricks and tiles, the rates for supply shall not be more than the
Controlled Rates fixed by the Deputy Commissioner of the respective districts.
The rates of these items as given in the Schedule of Rates include the cost of
land and water. Sometimes land and water are given free of cost as in case of canal
lining works in the Department of Water Resources. In such cases the rates shall be
suitably reduced. The rates of various items have been provided in this chapter after
ascertaining the same from the market or from various executive engineers in the State
and in certain cases even from the suppliers. Most of rates given in this chapter are at
the source of supply and do not include carriage to the site of work. Wherever,
departure from this practice has been made, it has been specifically mentioned in the
description of that item.
Regarding revision of rates of cement, steel and quarry rates of different
materials, they are fixed/ revised by the Direction Committee of the Chief Engineers and
Quarry Committee respectively from time to time.
The rates for stone, bajri, crushed aggregates, sand, etc., include royalty and
malkana and nothing extra is payable over and above the rates for these items. The
rates for Tor Steel/Structural Steel provided in this chapter are for ISI marked steel.
Paints: - In case of paints, rates for branded paints such as Nerolac, Asian,
Berger and equivalent classes have been provided.
All the rates in this chapter are inclusive of GST & other taxes as applicable but
excludes Contractors Profit and Labour Cess.
Measurement of materials: - While making measurements for supply of materials
like boulder, aggregate, etc., suitable deduction shall be made to account for voids in
loose stacking as mentioned in the relevant specifications of materials given in chapter
no. 3 of PWD Specifications.

**************************************************************

3 CSR-2020
CSR−2020−Final

CHAPTER NO. 4- LOADING AND UNLOADING OF MATERIALS

The rates for loading and unloading of materials have been based after taking into
consideration the following factors:-

(a) The rates which are actually being charged by the labour for loading and unloading
in the field.

(b) Time spent in loading or unloading of a particular material.

(c) Unloading of material is easier than loading because in the latter case the labour
has to work against the gravity ; while in unloading of materials-like mild steel,
timber, stone, etc., they have just to be thrown down from the wagons or trucks and
in case of materials like sand, bajri, stone, metal, etc., they have just to be pushed
with rakes. It is therefore essential that in case of such materials the rate for
unloading should be lower than the one for loading.

(d) The bricks and tiles shall be properly stacked in vehicles while loading and when
unloading, these shall be directly placed in stacks and not dumped on the ground
and then stacked. In case of bricks and tiles, nominal sizes have been mentioned in
the Schedule of Rates. In the book of PWD specifications certain tolerance limits
have been provided for these materials. Variation of sizes within these limits will be
ignored for the purpose of loading, unloading and carriage of these materials.
Lead for loading into wagons or lorries or boats has been specified as 15.00
metre. If the lead involved is more than 15 metre., Carriage rates will be paid for
additional lead. for unloading, provision has been made for clearing the materials 1.50
metre. away from the rails or 6.50 metre. away from the water edge.
Rates for stacking of certain class of materials have also been provided in this
chapter. These rates include the maximum lead of 15.00 metre., if greater lead is
involved, carriage rates will be paid for additional lead. The rates for stacking bricks and
tiles are only to be paid when dumped materials are to be stacked. This rate of stacking
is not payable over and above the rate for loading, unloading or for carriage because
the latter rates include the provision for stacking as well.
These rates are inclusive of all taxes, GST, Labour Welfare Cess and
contractor's profit.
Where the lead for loading and unloading is more than the lead specified as
mentioned above, this should be paid at carriage rates (Chapter No. 5).While making
measurements for loading, unloading or stacking suitable deductions shall be made on
4 CSR-2020
CSR−2020−Final

account of voids in the loose stacking according to the factors mentioned in the relevant
specifications of materials as given in Chapter No.3 of the P.W.D Specifications. Where
the quantity earth work is involved more than 100 cum no unloading will be paid
because unloading shall be done by tipping itself.

**************************************************************

5 CSR-2020
CSR−2020−Final

CHAPTER NO. 5-CARRIAGE

The materials have been divided into certain groups which have been formed on
the basis of units of measurement, time and labour involved in loading & unloading.
Such materials which are measurable in the same units and which require the same
labour and time for loading & unloading have been grouped together. Unless otherwise
stated, the rates for carriage do not include the labour for loading, unloading and
stacking for the purpose of measurement. Where material is unloaded from wagons and
then carried, separate payment shall be made for unloading the material from wagons.
Provision for extra payment of 20% over and above the basic rates of the
kilometre concerned has been made for carriage of materials on river/choe beds. This
extra payment will be made for the actual length involved in river or choe bed. For
example if stone boulder is being carried and there is a river or choe half a kilometre
wide in the 4th kilometre, additional rate of 20% will be allowed on (Rs. 162.08. – Rs.
147.45) /2= Rs.7.31 only.
For carriage of materials on unmetalled roads, 20% extra will be paid on the
basic rates of the kilometre concerned for the actual length of unmetalled road. If some
material is being carried and the whole of kilometre 4 and half of kilometre 5 is
unmetalled, 20 % extra will be allowed on the carriage rate for kilometre 4 and half of
kilometre 5. This additional rate for unmetalled roads will not be payable on items 5.2,
5.3 and 5.4 which are for carriage of small consignments or carriage by mazdoors,
donkeys, mules, camels or carts.
In case of carriage of materials by road transport, the cost of carriage for the
initial kilometre is comparatively much higher than the subsequent kilometres. For very
long leads, the rate for subsequent kilometres decreases very much. Direct carriage for
actual lead for each kilometers distance covered has been given in CSR from which
cost of initial 5 kilometres must be deducted because the same has been added while
preparing DAR for a particular item.
However the rates as derived in this chapter are not applicable to under
mentioned situations, which are of immediate nature and are unavoidable :-
(a) When materials like machinery of fittings are to be carried which are likely to be
damaged if handled roughly during transit by rail.
(b) When special materials classified by the Superintending Engineer as being of
fragile nature are to be carried.

6 CSR-2020
CSR−2020−Final

(c) When due to urgency of work and anticipate delay in arranging trucks, it is
considered essential to resort to carriage by private vendors of specialization work
with the prior approval of Superintending Engineer.
The Superintending Engineer has full powers to deal such situations after
applying his mind and allow extra rates after considering all in & outs. The rates of
carriage of materials also include the carriage of containers in which the materials are
contained. For instance, if 100 tons of bitumen is carried in drums, the net weight of
bitumen will be 100 tons and the weight of drums will be over and above this weight.
Nothing extra will be paid for the weight of bitumen drums which are supposed to be
carried in addition to the bitumen within the same rate.
In case of carriage of steel, sometimes the length of sections is more than 6
metre which cannot be easily accommodated in the body of a truck. If the material is
mild steel / TMT / Tor steel bars, the same should be bent so as to accommodate them
in the truck and nothing extra is payable. In case of steel sections like R.S. Joists, rails
etc which cannot be easily bent, the same may be carried by making special
arrangements like trailers etc., in such case the rates for carriage as given in the
Common Schedule of Rates may be increased by 50%.
Where a river is to be crossed by Ferry or Boat Bridge, the loaded trucks cannot
be carried across and they have to be unloaded to some extent before crossing the
river. The unloaded material has to be carried by manual or animal labour across the
river and then reloaded into the trucks. This not only involves additional expenditure,
but also extra time. In order to compensate for this, additional rate may be allowed by
increasing 50%.
While making measurements of materials for purposes of payment for carriage,
suitable deduction shall be made to account for voids in loose stacking. This factor will
be different with different materials and may be ascertained from the relevant
specifications of that material as given in Chapter No. 5 of Hand Book of Specifications.
The rates under Item No. 5.6 do not provide for special carriage arrangements
like cranes, trailors etc. Carriage of machinery not covered by this item should be paid
at special rates to be determined after inviting quotations and approved by the
Superintending Engineer.
Carriage rates are inclusive of all taxes, GST, Contractors Profit and Labour
Welfare Cess. The rates for carriage of materials manually upto 0.50 kilometre and by
mechanical means for every kilometre lead, have been given. The actual lead is to be
paid, If the lead is in fraction of kilometer, will be payable for full kilometer. For carriage
in sub mountainous area S.E concerned may increase the carriage rate suitably up to
7 CSR-2020
CSR−2020−Final

maximum 20% of that rate provided for plains in case he is satisfied that the existing
CSR are not reasonable.

**************************************************************

8 CSR-2020
CSR−2020−Final

CHAPTER NO. 6- EARTH WORK

The basic rate of Earth Work in excavation has been given without dressing and
without compensation of Earth taken from private land and with a combined lead of 15
metre. The combined lead includes horizontal lead plus the vertical lift converted into
lead. Items for dressing and payment for compensation have been provided for
separately. For converting lift into horizontal lead, the lift upto 3.60 metre will be
multiplied by 10 and from 3.60 metre to 6.0 metre, it will be 50% of quantity as obtained
from 0 to 3.60 metre multiplying with 10 and above beyond 6.0 metre. it will multiplied
with 20. No cross leads what-so-ever shall be measured and paid for. The rates for
rehandling of recently deposited earth work and gravel work after excavation will be 20
percent less than the excavation rates. Earth work deposited before monsoon season
which has had a full monsoon on it, will be considered as a normal earth work for
excavation. The lift shall be measured from the centre of gravity of the excavated earth
to that of placed earth. This shall constitute the mean lift for that section. When earth
has to be carried over spoil bank and dumped beyond it, the mean lift would be the
difference in levels between the centre of gravity of the excavated earth and top of the
spoil bank omitting the dowel. Rates for additional lead have been given in slabs for
7.50 metre each of additional lead. If the lead exceeds a slab by 1.50 metre or so, full
payment for 7.50 metre lead will be made. These rates are for building works. However
for other works, these rates will be applicable upto the quantity of 100 cum where as
beyond 100 cum, the rates shall be payable as per the Item No. 6.21 by mechanical
means. The rates for carriage of materials manually upto 0.50 kilometre and by
mechanical means for every km lead have been given. The actual lead is to be paid, if
the lead is in fraction, the rate is to be worked out by interpolation. For borrowing of
earth, the rates provided in this chapter are exclusive of compensation/royalty. Extra for
compensation/royalty for the earth brought from private land if required be paid as per
the Item No. 6.4 of the chapter. Separation of the item of dressing is necessary as in
certain cases, the contractor's leave the work incomplete and the balance work has to
be got done through other contractual agency.
Separate rate has been provided for dressing of new work and for repair work.
The rate for dressing in case of repair work is higher as the quantity of earthwork
involved is much less while the cost of dressing is comparatively high. A lower rate for
dressing has been provided in case of soils consisting of sand only. These rates are
supposed to include all local lifts and leads. The earth work shall be supposed to

9 CSR-2020
CSR−2020−Final

have been carried by mechanical transport at the carriage rates given in 'Carriage'
chapter. These carriage rates shall be supposed to include the excavation and all other
allowances and nothing over and above these rates will be payable.
The basic rate has been fixed for soils having dry bulk density up to 1.6t/cum.
For dry bulk density higher than 1.6t/cum, additional rates have been provided.
Hardness allowance shall be paid with the approval of the Superintending Engineer. For
dry bulk densities more than 1.8t/cum, suitable rates shall be fixed by the
Superintending Engineer based upon the actual analysis worked out by the Executive
Engineer.
Additional rates have been provided for wet Earth Work. These rates will,
however, be payable after obtaining written approval of the Superintending Engineer. If
pumping is required in wet earthwork, the same shall be paid on actual basis. Similarly
for making payments for slush or daldal, approval of the Superintending Engineer will
be obtained.
Re-handling of Earthwork and Gravel Works:- Where re-handling of recently
deposited earthwork and gravel work is done, payment shall be reduced by 20% of the
normal rates in excavation. Earthwork which is deposited before monsoon season and
which has had the full monsoon on it, will be considered as normal earthwork in
excavation.
Earthwork in Excavation and Foundations:- Separate rate has been provided
for this item which includes all kinds of soils and no hardness or wetness allowance has
to be paid. The rate includes refilling/backfilling the sides of trenches in 15 cm layers,
watering, ramming and disposal of surplus soil.
Earthwork Filling under Floors:- For earth filling under floors, two rates have
been provided-firstly for filling the surplus soil that has been excavated from foundations
and secondly the earth work which is actually excavated and then filled in. Separate
rates have also been provided for earthwork over roofs for which special good earth is
to be brought from outside.
Other Rates:- Separate rates have been provided for items like earthwork by
boats, earthwork by tramways or rails, dressing dowels, restoring boundary road drains,
construction of new boundary road, covering boundary road with sarkanda, ploughing
and leveling borrow pits, berm trimming, etc.

**************************************************************

10 CSR-2020
CSR−2020−Final

CHAPTER NO. 7-ROCK CUTTING

The separate rates for rock cutting have been provided both in the plain and sub-
mountainous region of Punjab. The method of measurement of lift and converting lift
into lead is the same as for Earthwork. For the classification of rock cutting, PWD
Specifications Book may be referred before applying the rate for any item.

**************************************************************

11 CSR-2020
CSR−2020−Final

CHAPTER NO. 8-DISMANTLING


The rates given in this chapter are for non-hydraulic works. For hydraulic works,
rate will be enhanced by 50%. (Hydraulic works are defined as those works which
remain submerged under water for most of their lives). The items which can be
considered as hydraulic works are:-
"Stone masonry in lime or cement, burnt bricks, tiles lining, tile masonry in lime
or cement mortar, lime or cement concrete, reinforced cement concrete and pucca
grouted stone pitching when Submerged under water".
The rates of various items provided in this chapter are inclusive of sorting &
stacking dismantled material and removing the same within a distance of 100 metres.
Unless otherwise specified, the rates cover the cost of all tools and plants, ladders,
scaffolding and all other accessories required for dismantling. Rates for removing doors
and windows are of two types-Firstly where walls are not be dismantled and the doors &
windows are to be removed with chowkhats by making recesses in the walls: Secondly
where doors and windows are to be removed along with and dismantling of walls. In
latter case, the rates have to be lower as the work become easier. The chapter has
been made comprehensive by including the dismantling of nearly every type of material.
The rates of dismantling considered in this chapter involve majority of labour
component, the rates of which have been revised as per prevalent applicable rates. The
dismantling of same item by mechanical means has also been provided where it is
expected that no useful material can be recovered.
Since, now-a-days high strength concrete such as M-25, M-30 & above are
used, the demolition, if required, is exercised by using mechanical mixer through
specialized agencies, for which rates has been provided which includes disposal of
building rubbish/malba, unserviceable material obtained from dismantling by
mechanical means, including loading, unloading and transporting to approved
municipal dumping ground or as approved by Engineer-in-charge, with all lifts and leads
up to 1 kilometer and lead beyond 1 kilometer will be work out as per rates in carriage
chapter no.5. Where useful material is obtained from dismantling it will be deposited in
Govt. store or auctioned or recovery made from the agency as per conditions evaluated
by Engineer-in-charge.
Dismantling should be done with utmost care avoiding damage to the material,
so retrieved taking all necessary precautions for the protection of public properties and
keeping down dust and nuisance etc.

**************************************************************

12 CSR-2020
CSR−2020−Final

CHAPTER NO. 9: CENTERING AND SHUTTERING

This chapter has been made very comprehensive to include centering & shuttering for
every type of structural building component i.e. for foundations, columns, slab, beams,
retaining walls, buttresses, louvers, precast components, round walls, arches & domes,
etc. In addition to this, centering & shuttering for slabs for culverts with varying spans
from 1.00 metre to 6.00 metre has also been covered in this chapter.
All items for centering & shuttering in this chapter have been worked out with steel
shuttering, pipe scaffolding & vertical supports with steel pipes and through rates
include all costs for material, labour for erecting& removal after casting, loading,
unloading and carriage from market to& fro. All rates are for centering & shuttering for
height up to 4.00 metre above plinth level. Extra rate has been provided for extra
height, if height of single storey exceeds 4.00 metre for additional height of 1.00 metre
or part thereof. Extra rate has also been provided for every floor. Extra rate @ 10% of
labour rate is payable for smooth surface where no ceiling or RCC wall plaster is to
carried out and through rate be increased accordingly.

**************************************************************

13 CSR-2020
CSR−2020−Final

CHAPTER NO. 10-CONCRETE

This chapter is the basis for all types of building works, public health works, Electrical
works as well as for Irrigation works. Coarse sand should be used for all types of RCC
works. In this chapter rates for all types of design mixes has been provided as per data
received from Research Laboratory Pb. PWD B&R, Patiala which also includes cost of
admixture where ever required. Nothing addition or subtraction in these rates is to be
carried for using more or less quantity of cement / admixture as per mix design in field.
Rates have also been provided for mixing concrete with manual labour, volumetric
mixers, batch type mixers and with computerized batch mix plant along with costs for
using vibrators etc. Rates for pumping concrete with Hydraulic Pump Floor wise have
also been introduced in this chapter along with manual labour, if concreting at upper
floors is carried out manually. It is worthwhile to mention here that if concerting is done
with Pump then rates for manual labour for respective floors are not payable. The rates
for concreting with computerized batch mix plant and transportation with transit mixer
includes cost for carriage by Transit mixer up-to 1 kilometre. Extra carriage beyond 1
kilometre lead is payable per cum/ km. as per rates in this chapter.
Rates for Piling with manual work have also been introduced in this chapter for different
diameter of piles along with rates for testing and using bentonite, if required.

**************************************************************

14 CSR-2020
CSR−2020−Final

CHAPTER NO. 11-BRICK WORK

This chapter has been made comprehensive by adding normal items of Brick
Work, Jibi Work, Gilafi work, Tile masonry, Tile facing, Reinforced brick & Jali work,
Brick Work in cement lime & sand mortar. In case of specially moulded brick work for
Sewers & Well Shafts, it may not be possible to understand exactly the requirement of
brick and tile jali work as given in the Schedule of Rates, detailed sketches of different
types of jali work have, therefore, been given in the Hand Book of P.W.D. Specifications
which may be referred to for proper execution of work in the field. The following items
have also been provided for small quantity of brick work which are otherwise not
workable for very small quantum of brick work specially in repair works:-
(1) Extra for labour for works involving up to 1.00 cum. for first class burnt brick work
laid in cement sand mortar in foundation and plinth for repair work.
(2) Extra for labour for works involving up to 1.00 cum. for first class burnt brick work
laid in cement sand mortar in superstructure for repair work.
The main item of brickwork has been divided into two broad classifications-firstly,
building works and small engineering works; and secondly, large engineering works. In
building works and small engineering works either the quantity of brick work is small or
the walls are of thin sections and therefore, per mason is less. On the other hand, in
case of large engineering works like piers of bridges, etc., the sections are so thick that
each mason can give greater per day and the expenditure on scaffolding per cum. is
less. It is therefore, reasonable that rate in case of such large engineering works should
be less than the one allowed for building works. Keeping this in view, the rates given in
this chapter for general brickwork are for all building works & small engineering works
involving total quantity of brick work up to 15.00 cum. A reduction of 10% in the labour
charges for large engineering works involving total quantity of brick work exceeding
15.00 cum. The example given below will illustrate this procedure clearly.(Rate
calculated for large engineering works involving total quantity of brick work exceeding
15.00 cum.
Example- The rate for first class brickwork laid in cement sand mortar (1:6) in
first storey upto 4 metre above plinth level is Rs. 537.78 per cum for labour and Rs.
2595.23 for compete work for works in plains. In case of large engineering works, the
labour rate for this item will be reduced by 10% and will work out to Rs. 484.00 per cum.
Similarly the through rate will be reduced by same amount and will work out to Rs.
2541.45 (Rs. 2595.23 - Rs. 53.78).

15 CSR-2020
CSR−2020−Final

In case of building work, it is easy to define the work in foundations and plinth,
but in case of Engineering Works and also in case of boundary walls, there is no plinth
level. The rates for bricks work done up to 1.5 metres height above the top of
foundation concrete in case of compound walls and in other Engineering Works is the
same as for brick work in foundation and plinth. In case of foundation of bridges – for
these with ordinary open foundations, masonry above top of foundation concrete and in
case of well foundation above top of well cap for a height of 1.5 metres shall be paid for
at the rate appearing in Schedule for masonry in foundation & plinth.
For rates of brickwork in superstructure, the storey height of 4 metres has been
fixed. If the height of any storey is less than 4 metres, the same rate will be applicable,
but in any individual case where the storey height is more than 4 metres, the rate for
brickwork for that storey will be increased as per rates given under item No. 11.29. The
height of a storey will be measured from the finished ground floor level in case of first
storey and from the top of structural roof of the lower storey in case of subsequent
storeys.
Extra rate has been provided for brickwork in square or rectangular pillars in
buildings. The quantity of brick work in the pillars in building work is very small, but the
expense on keeping all the four faces in plumb and in making corners true and the
surface even, proportionately more labour cost is involved. This extra rate, however is
not payable in case of bridges and other engineering works where the sections are
quite thick and do not justify any additional labour. For circular pillars constructed with
dressed bricks, additional rates have been provided to the cost of dressing each and
every brick. Additional rate provided for brickwork in arches has been split up according
to the span of arch because the cost of centering goes on increasing with the increase
in span of the arch. Extra rate has been provided for profile walls and flared out walls of
syphons and super-passage etc., because this involves greater amount of labour. The
rate for fire brick work in lining of fire places, flues etc has also been provided. Ground
hydrated lime shall be used in all items of brick work in lime mortar.
The item of tile masonry should be differentiated from the item of tile facing.
While tile facing will be provided in a single layer on edge in front of brick or stone wall,
the tile masonry will be constructed in the entire thickness with brick tiles.
In case it is proposed to use second class brickwork on account of non-
availability of first class bricks or on account of temporary nature of the structure,
through rates of corresponding items shall be reduced by 10% per cum:, the labour
rates will however remain the same.

16 CSR-2020
CSR−2020−Final

The labour rates as well as through rates are inclusive of all types of labour
involved for mixing of mortar, cost of water, laying for brick work and all other labour
required for finishing a particular type of brick work including curing also. In case water
is supplied free of cost by the department, rates will be reduced accordingly. The labour
rate given in this chapter include the cost of water, tools and plants, scaffolding (Labour
& Materials) and cost of good earth for mud mortar and mud plaster, wherever required.
Unless otherwise stated, the labour rates include the cost of rehandling of materials
with in 100 metres.

**************************************************************

17 CSR-2020
CSR−2020−Final

CHAPTER NO. 12-STONE MASONRY

The definition of various types of stone masonry as in vogue in the Buildings &
Roads and Irrigation Branches differs from each other. The stone masonry has been
classified into proper types keeping in view the definition and description given by the
standard text-books written by various Indian and English authors.
In this chapter the include the cost of water, tools and plant, labour and materials
for scaffolding and centering and shuttering, ladders, plant & templates wherever
required and cost of good earth for mud mortar where required. Unless otherwise
stated, the labour rates include the rehandling of materials within 100 metres. The
labour also rates include the cost of dressing stones according to the relevant PWD
Specifications. The rates given in this chapter have been worked out assuming the use
of quarried stone. Quarried stone is normally softer than the boulder and is easy to
dress. Whereas the boulder is not only harder but requires lot of dressing to bring the
stone into roughly rectangular shape.
Provision has been made to increase the labour rates for items of stone masonry
by 10% per cum where stone masonry is constructed with small boulders or with stones
obtained by breaking large boulders. This additional rate is not applicable in case of
ashlar masonry because the dressing required is very fine and the cost of dressing is so
high that it does not matter whether stone is obtained from quarries or from boulders. In
case of Schedule of Rates for sub-mountainous areas, provision has been made for
Dhajji walling with different specifications.
The storey height for stonework in superstructure has been kept as 6 metres in
case of ashlar masonry and 4 metres in case of other types of masonry. In ashlar work
the building will be normally quite high and the ordinary height of 4 metres will not be
applicable. In case of ashlar and block-in-course masonry, now separate rate has also
been provided for work in foundations and plinth for ease of making payments to the
agency though this item is lesser used in plinth & foundation and is largely used in
superstructure.
Provision has been made for dry stone masonry in squared rubble and random
rubble as Items No. 12.20 and 12.30. This item is provided for making retaining and
breast walls in case of road work and the same rate applies both for foundations and
superstructure. Items No. 12.40 and 12.42 are not applicable to stone breast or
retaining walls which require greater stability but these apply only to works of purely
temporary nature like small huts made at the site of work for storage of cement, etc.

18 CSR-2020
CSR−2020−Final

The through rates for stone masonry include the cost of stone at the site of work
within 5 kilometre of lead. However rates shall be worked out by taking actual leads by
increase or decrease over the CSR rates .

**************************************************************

19 CSR-2020
CSR−2020−Final

CHAPTER NO. 13-HOISTING, ROOFING AND WATER-PROOFING

Separate rates have been provided for hoisting and placing in position R.C.C.
lintels, battens shelves, bed-plates, wooden battens, wooden beams, wooden trusses,
R.S. joists and steel roof trusses. These rates are for hoisting up to 13 feet (4 meters)
height above plinth level. For every additional height of 13 feet (4 meters) or part
thereof, 20% will be added in case of beams, trusses, R.S. Joists etc. For other items
like wooden battens, R.C.C. shelves, etc., only 10% increase will be provided. Two
different rates have been given because hoisting of lintels, shelves, bed plates and
wooden battens is easier while that of beams and trusses is rather difficult for greater
heights. The item for hoisting of roof trusses and plate girders is applicable to buildings
of any spans, but for bridges up to 15.00 mt. span/only. For bridge girders having spans
more than 15.00 mt, special rates will be worked out and paid for on the merits of each
case.
In case of through rates of items like lintels, battens, shelves, bed-plates, beams,
trusses, R.S. Joists, etc. the cost of hoisting is already included and is not payable over
and above. Rates have been provided for different types of roofing-like first class mud-
roofing, 2nd class mud-roofing, 3rd class mud-roofing, thatch roofing, rooting of cement
concrete tiles, corrugated G.I. sheet roofing and asbestos sheet roofing. Effort has been
made to include all ancillary items like gutters, ridges, rain water pipes, apron pieces for
C.G. and cement asbestos sheet roofing. In case of cement asbestos rain water pipes,
two rates have been provided-firstly for fixing the pipes on wall face and secondly for
embedding the pipes in masonry work. The rates for cast iron pipes have been provided
for fixing on wall face; if these are embedded in the masonry the labour rate will be
reduced in the same proportion as cement asbestos rain water pipes.
Miscellaneous items have been provided like top and bottom khurras, khassi,
parnalas, etc.
Provision has been made for ceiling of deodar and kail wood planking, dasuty
cloth and hessian cloth ceiling, plywood ceiling, asbestos ceiling, celotex and treetex
ceiling and plaster of pairs ceiling. The rates for ceiling do not include cast of beading.
separate rates for beading of different sections have been provided. The design of
beading and framework may be different cases and therefore, it has been considered
essential to separate out this item from the item of ceiling work.
The rates for followings new items has been introduced in CSR :-
a) Corrugated sheets Reinforced by organic fibres and/or inorganic synthetic fibres
cement .
20 CSR-2020
CSR−2020−Final

b) Extra for straight cutting, roofing accessories. & circular cutting in reinforced by
organic fibres and/or inorganic synthetic fibres cement corrugated, semi
corrugated sheets..
c) Extra for providing and fixing wind ties of 40x 6 mm flat iron section Ridges and
hips.
d) Machine moulded aluminium covering of approved pattern & design for
expansion joints.
e) Un-plasticized Rigid PVC rain water pipes dia. 110mm, 160 mm & 200 mm..
f) light weight calcium silicate false ceiling tiles 15 mm thick densifiedtegular edged
eco friendly.
g) Wall paneling at all heights with integral densified calcium silicate panels/tiles.
h) False ceiling with integral densified calcium silicate reinforced with fibre and
natural filler, GRG (Glass Fibre Reinforced Gypsum) ceiling, Mineral fibre false
ceiling of approved texture, design and pattern Anti-microbial false ceiling.
i) Water proofing treatment of RCC Structure, roof, terraces, basements, retaining
walls, water tanks, wet areas and injection grouting etc.

**************************************************************

21 CSR-2020
CSR−2020−Final

CHAPTER NO. 14-FLOORING AND DADOS

This chapter has been made very comprehensive to include every type of
flooring which is required to be done these days. Terrazo flooring has been broadly
divided into two types-firstly terrazzo laid in-situ and secondly precast terrazzo tiles.
Terrazo work is then subdivided into four classes according to the use of ordinary or
white cement and the pigments to be added to cement. In first category, ordinary
cement without addition of any pigment is used. In second category, white cement
manufactured in India is used instead of ordinary cement. In third category, such
shades are provided as can be obtained by adding pigments to ordinary grey cement.
In the fourth category are provided such shades of terrazzo which require addition of
pigments like orange, buff, yellow to white cement. Pigments for blue or green terrazzo
are even costlier and, therefore, these items have been further separated. All the rates
of above categories are for the use of white marble chips. If marble chips of different
colours are to be used, the rates have to be increased as coloured marble chips are
costlier than the white chips. Similarly the rates for dados and skirting have been
subdivided into various classes on the above consideration.
Rates for high-class flooring like marble tile flooring of various kinds (namely
Doongri marble, Makarana marble, Pink marble, Black marble, Udaipur Green marble,
Morwad marble, Kumari marble), Kotah stone flooring, Teak-wood flooring, Paraquet
flooring, Vitrified tile flooring of various sizes and grades, Vitrified mat finish flooring,
Full body vitrified tile flooring, Tactile tile flooring for visually impaired persons, Italian
marble flooring, Matt finish granite flooring, Polished granite flooring, Flamed granite
flooring, Factory machine made cement concrete interlocking paver blocks of different
thicknesses from 60 mm to 100 mm., Glass mosaic flooring, Cement concrete flooring
with hardner have also been provided. In addition to this rates for filling joints in vitrified
tile flooring with epoxy grout has also been added.
The rates given in the schedule are for flooring on ground floor. For every
additional storey, the rates may be increased as per note (iv) at the beginning of the
chapter. For terrazzo work in-situ on columns, extra rate has been provided to cover the
extra expenditure on laying and rubbing as per note (vii) at the beginning of the chapter.
The note (v) regarding use of coarse sand in flooring work at the end of the chapter
should be kept in view.
As now days the thickness of marble as available in market has been reduced
from 15 mm-20 mm to 12 mm-15 mm, the rates for all items of marble has been
modified in addition to earlier rates with marble of lesser thickness.
22 CSR-2020
CSR−2020−Final

As per IRC- SP: 63, new items for providing & laying interlocking pavers of
thicknesses 60, 80 & 100 mm. which are manufactured with block making machine
equipped with steel mould and strong vibratory table fixed with table under hydraulic
pressure has been introduced. The rates of laying of Dry Brick Ballast 40 mm gauge
and of Dry Stone Ballast 40 mm gauge for flooring has also been added.
Use of rubber moulded interlocking pavers 50 mm & 60 mm thick has been
restricted to non traffic areas having width upto 3.05 metre. Chequered tiles are to be
used over footpaths.

**************************************************************

23 CSR-2020
CSR−2020−Final

CHAPTER NO. 15- PLASTERING & POINTING

Plastering – This item of work has been divided into three categories i.e.
plastering on walls, plastering on floors and plastering on underside of ceiling.
Plastering on floors is the easiest as it does not require any scaffolding. Moreover, there
is no wastage of material and a mason can give comparatively more out-turn. The
plastering on walls is more difficult than that on floors; scaffolding is required and there
is wastage of material and the out-turn per mason becomes less as compared to
plastering on floors. Plastering on the underside of the slabs or on ceiling is even more
difficult. In this case the quantity of scaffolding required is much more than in case of
plastering on walls; the wastage of material is also much more and the out-turn per
mason is much less as compared to plastering on walls. Therefore separate rate have
been provided for these different classes of work. In every class of work, rates have
been provided for various thicknesses of plaster and various mortar mixes. Similarly
provision for mud-plaster has been made separately for walls and floors.
The labour as well as through rates worked out under this chapter includes all
labour for mixing of mortar, carriage to site of work, scaffolding charges including all
types of sundries etc. labour and material, cost of water, tools and plants, preparation of
surface for plastering, plastering operations and curing afterwards.
For plastering and pointing in each subsequent storey above the first storey, the
labour as well as through rates of plaster and pointing shall be increased as per Item
No. 15.84 for every additional storey.
The rates for plastering, pointing given are for superstructure up-to 4 metre
height whether the first storey or the subsequent storeys. In case any single storey
exceeds 4 metre height (as in case of overhead-reservoir and outer face of walls etc.),
the labour as well as through rates of plaster and pointing shall be increased as per
Item No. 15.85 for every additional height of 2 metre or part thereof. It is applicable in
both cases internal as well as external.
For plastering and pointing the exterior walls of height more than Third storey
from ground level for every additional height of single storey upto 4 metre or part
thereof, for such situations the labour as well as through rates of plaster and pointing
shall be increased as per Item No. 15.22. However in this case the additional rate
payable as per Item No. 15.85 as stated above will not be applicable.
Unless otherwise stated the labour rates include the rehandling of materials
within 100 metres. The rates include the cost of water, where the water is supplied free
24 CSR-2020
CSR−2020−Final

of cost by department, the labour rates shall be reduced by 3% and through


accordingly. In case of Plaster for wall and ceiling there is huge involvement of
scaffolding and watering. To meet with these expenses, sundries have been provided
@ 5% in this chapter.
The effect on account of Gaz. Notification No.S.O 94/C.A. 11/1948/Ss.3and
5/2012 dated 15-11-2012 Note 24 issued by Govt of Punjab Department of Labour has
been taken into account while revising the through/labour rates for plastering and
pointing outside building above 3 storeys.

**************************************************************

25 CSR-2020
CSR−2020−Final

CHAPTER NO. 16 –WHITE WASHING, DISTEMPERING, PAINTING &


POLISHING
Painting work has been broadly classified according to the nature of surface to
be painted-namely, woodwork, metallic surfaces and plastered or concrete surfaces.
This has been done because each type of surface requires different treatment of
different quality of paints. For wood-work ready mixed or synthetic enamel paints are to
be used and the surface has to be properly treated for knotting and stopping. In case of
metallic surface specially prepared paints which are suitable for metallic surface are to
be used. The priming coat is also specially prepared for metallic surfaces. There are
separately paints for roofing only which are called "roofing paints". In case of certain
metallic surfaces like water tanks, anticorrosive bitumastic paints are to be used. For
painting on plastered and concrete surfaces different varieties of paints are
manufactured which are not affected by the chemical action of free lime in the cement.
Special priming coats are also available to counteract such chemical actions. Special
flooring paints are manufactured for painting floors and this item needs less labour than
painting on walls etc. Separate rates have been provided for all these items of work.
However, an important point to be noted is that synthetic enamel paint is suitable for all
types of surfaces whether wooden, metallic, plastered or concrete. In this chapter
Enamel Paints means the Enamel paints will be first quality paints manufactured by
reputed firms like Nerolac, Asian, Berger or equivalent, approved by the Engineer-in-
Charge. However the rates for painting with ordinary quality paint which exists earlier
have been deleted from CSR as these has become obsolete and are not used these
days.
Aluminum primer- According to the latest practice aluminum primer is used for
priming coat on woodwork. This primer has excellent sealing qualities and has got
better covering capacity than an ordinary priming paint. Use of this primer has,
therefore, been adopted in the Schedule of Rates. This priming paint should be
preferred over ordinary priming paints.
Distempering – Rates for distempering with dry distemper and oil bound
distemper have been provided. Rates have been worked out based on superior quality
distempers manufactured by standard firms like Shalimar, Jenson and Nicholson,
British Paints, etc. The use of inferior distempers has been prohibited and they never
give proper quality of lasting surface. The use of proper distempers may be insisted
upon in the field while allowing these rates. The practice of mixing pigments and glue
with chalk as substitute for distemper may be guarded against.

26 CSR-2020
CSR−2020−Final

For filling of dents and imperfections and leveling on primed walls, wooden and
metallic surface prior to application of subsequent coats provisions for Acrylic Wall Putty
has been introduced in CSR. It is used for interior application only.
Polyurethane polish (PU) – PU is exterior wood finish which is specially
formulated to have weather resistance, light fastness and non yellowing properties in all
season. PU wood finish is a two component polyurethane wood finish that can be
applied on solid wood veneer. It is available in glossy and matt finish.
The rates for white washing, distempering, painting and decorative cement
based paints etc. upto 4 metre height whether the first storey or the subsequent
storeys, in case any single storey exceeds 4 metre height (as in case of overhead-
reservoir and outer face of walls etc.), the labour as well as through rates of white
washing, distempering, painting and decorative cement based paints etc. shall be paid
as per Item No. 16.72 for every additional height of 2 metre or part thereof. It is
applicable in both cases internal as well as external.
The rates for external white washing, distempering, painting and decorative
cement based paints etc. for the exterior walls of height more than Third storey from
ground level for every additional height of single storey upto 4 metre or part thereof, for
such situations the labour as well as through rates of white washing, distempering,
painting and decorative cement based paints etc. shall be paid as per Item No. 16.77.
However in this case the additional rate payable as per Item No. 16.72 as stated above
will not be applicable.
For painting or priming coat on trusses of height above 5 metre, the labour as
well as through rates shall be paid as per Item No. 16.71.
Unless otherwise stated the labour rates include the rehandling of materials
within 100 metres. The rates given in item No. 16.48, 16.49, 16.50, 16.51, 16.54, 16.55,
16.56 & 16.57 are inclusive of printing & lettering. The labour rates given in this chapter
include the cost of tools and plant, i.e. painting brush etc and scaffolding wherever
required. The rates include the cost of water, where the water is supplied free of cost by
department, the labour rates shall be reduced by 1% and through rates accordingly.
The effect on account as note no. 24 of Gaz. Notification No.S.O 94/C.A.
11/1948/Ss.3and 5/2012 dated 15-11-2012 issued by Govt of Punjab Department of
Labour has been taken into account while revising the through/labour rates for white
washing, distempering, painting and decorative cement based paints etc. outside
building above 3 storeys.

**************************************************************
27 CSR-2020
CSR−2020−Final

CHAPTER NO. 17-WOOD WORK AND ALUMINUM WORK

In this chapter rates have been provided for wood work wrought, planed and
fixed in position for imported species of wood i.e. Imported Teak, Red Meranti, Kapur
Sal in addition to conventional species of wood i.e. Deodar, Teak, Sal, Champ, Hollock
etc. which were/are already used in the State. Provision has also been made for
planking of different types of timber and of different thicknesses. The item on woodwork
comprises of two type of work-firstly beams and battens which require only sawing to
sizes, planning and fixing in position and secondly such items as roof trusses and built-
in-fixtures which require making of joints. The rates for woodwork apply to such items of
work as do not involve jointing and a suitable increase has been provided for works
where jointing is involved.
Wooden boundary gates shall be paid at the rates of roof trusses.
Doors and windows- Rates have been provided for different types of doors and
window in different thicknesses for woods as mentioned above. For doors and windows,
through rate does not include the cost of fitting but includes the cost of fixing the same.
These items have been omitted from the rate because in certain cases tower bolts,
handles, etc., of brass or any other specific material are to be used However, for
estimating purposes, the cost for these items to be added to the rates has been worked
out separately.
In case of through rates for chowkhats for doors and windows, it includes the
cost of holdfasts, corners straps, brass hinges for the shutters and brass screws,
chocks, stops and cords along with brass hinges for the chocks, but it does not include
the cost of any other fittings like tower bolts, handles etc although it includes the cost of
fixing the same. Charges for fixing tower bolts to wire gauze shutters of any species are
included in the rate, but the cost and labour for fixing door springs is not included and
has to be paid for separately.
Items as Mortise locks have been provided for such situations where either flush
shutters or shutters already manufactured by some other agency are got fixed. The
contractor is only to make the chowkhats along with holdfasts, etc., fix the same in
position and also to fix the shutters along with the fittings supplied by the department.
The through rate of the contractor, however, includes the cost of wood for chowkhats,
holdfasts, iron/brass hinges, corner straps, cleats, stops, etc. The shutters and fittings
like tower bolts, sliding bolts and handles shall be supplied free of cost by the
department. For similar items of work for cupboards, the rates shall be reduced as the
frame for cupboards will be of thinner sections and there will be saving on timber.
28 CSR-2020
CSR−2020−Final

Separate labour rates have been provided for fixing mortice or rim locks or latches and
for fixing helical door springs or double action spring hinges or sliding bolts.
Glazing- Two types of items for fixed glazing have been provided. In the first
type, door or window chowkhats are made and fixed in position and a glazed shutter
with styles and rails is then made and screwed into the rebate into the chowkhat. In the
second type of fixed glazing, no shutter is made, but the glazing is fixed directly into the
door or window chowkhat as the case may be. These two items should, therefore, be
differentiated. The through rate, however, includes cost of timber, labour for making
chowkhats and shutter where required, fixing the same, glazing, etc.
In certain cases the single door or a single window may be partly fixed and partly
openable. In such cases the entire unit will be measured under the general item of
glazed doors and windows, if the area of fixed glazing is less than 25% of the openable
areas. If the area of fixed glazing exceeds 25% of openable area the two will be
measured separately, the measurement in each case being up to the centre line of
mullion.
Frosted Glass Panes- Where in case of glazed doors and windows of fixed
glazing frosted glass panes are used instead of ordinary panes, the through rate shall
be increased by Rs. 10 per sqm. of the actual are of frosted glass pane.
Fixing Glass Panes- Separate rate has been provided for fixing glass panes.
This item can be useful in maintenance work for replacing the broken glass panes.
Flush Doors- The labour and through rates have also been provided for flush
doors of different varieties from commercial facing to laminated facing factory
manufactured solid flush doors. These rate has been provided for various thickness of
flush shutters with elm or gurjan facing of both sides, elm or gurjan facing on one side
and teak facing on the other side and teak facing on both the sides. The labour rates
include the labour only for fixing pre manufactured flush doors and fixing of fittings.
In addition to above new provisions on through rates as well as labour rates
basis has been provided in CSR for fixing Expanded metal fixed on chowkhats with
moulding of 25 mm thick of different types of wood, Anodized Aluminum Mat Finish
handles and tower bolts ISI marked of various size, Decorative high pressure laminated
sheet 1mm (SF, 1 Star, 2 Star) thick, Decorative laminated sheet 0.72 mm thick &
reverse side of adhesive bonding quality, Aluminum grill with U- type beading or clip
ruber, Aluminum wire mesh, Aluminum composite panels (ACP) for external cladding or
Facades of buildings, Insulation and Signage, Ball bearing hinges, Ward robe locks
etc. Items for supply & installation of Suspended spider glazing system and Frameless

29 CSR-2020
CSR−2020−Final

toughened glass, Curtain wall with Aluminum composite panel cladding, Semi-unitized
curtain wall glazing system has also been provided in CSR.
The labour rates given in this chapter include the cost of tools & plants and
scaffolding (Labour and Material) wherever required. Unless otherwise stated, the
labour and through rates include all wastage of timber in sawing & cutting and sawing
charges including carriage to & from saw mills. It also includes rehandling of materials
with in 100 metre.

**************************************************************

30 CSR-2020
CSR−2020−Final

CHAPTER NO. 18-STEEL AND IRON WORK


The items of steel work have been divided into two broad categories-firstly, steel
work ordinary and second structural steel work. Ordinary steel work has been further
subdivided into two classes-firstly work which is fixed independently without connecting
plates like R.S. joists flats, tees, angles, etc. In the second category are taken items like
hip and jack rafters, common rafters, purlins, etc. which are fixed with angle cleats and
other connecting plates. In case of structural steel work, different items have been
provided like roof trusses, plate girders, steel ladders, frame grill gratings, iron grated
doors and stanchions. Trusses and girders have been divided into two categories: firstly
trussed girders for any span for buildings and for 15 metres spans for bridges; and
secondly plate or trussed girders of bridges from 15 to 30 metres span. In these items
there may be little difference in fabrication, but hoisting becomes more and more
difficult with the increase of span. Labour rate including the cost of hoisting has
therefore, to vary with the span, so rent or machinery i.e. hydra cranes etc. involved has
been also added in through as well as labour rates. No rates have been provided for
bridge girders of span greater than 30 metres and in these cases special rates will be
worked out and paid for depending upon the local conditions.
Rates for boundary gates shall be the same as for roof trusses.
Built-up Girders and Stanchions- This item has been split up into two parts,
Items No.18.6 provides for built up girders or stanchions consisting of single joists or
channel section while Item No. 18.7 applies to compound girders or compound
stanchions built up from two or more R.S. joists or channels. Cost of fabrication and
hoisting will be different in these two cases.
Steel reinforcement- Labour and through rates have been provided for bending,
binding, placing in position of mild steel reinforcement for R.C.C. work Item has been
divided into two classes-(a) 20 mm dia bars and below (b) above 20 mm dia bars.
Labour rate for bigger size bars have been reduced because the work involved in
bending, binding and placing in position is less for bigger diametre bars weight for
weight. The through rate is still lower because the bars of large diametres are cheaper
than those of small diametres. Measurement of overlaps & chairs in reinforcement steel
for building works shall be considered as per IS:1200.
Steel Windows- Rates for the supply of steel windows have been provided
according to the existing market rates. The rate decreases as the size of windows
increases. In case of fixed steel windows, the rate is much less because no shutter is
required. These rates are only for the purpose of estimating and analysis and not for
actual purchase which will be made on the basis of actual tenders. This provision has
31 CSR-2020
CSR−2020−Final

been made because there are quite a few manufactures in the market and their rates
vary a little from each other. Labour rates have been provided separately for fixing steel
windows. Fixing of glass panes is not included in the items of fixing steel windows as
this item requires special metal sash, putty and therefore, special rate for supplying and
fixing glass panes in steel windows have been provided.
Rolling/Collapsible Steel Shutters – The items of supplying & fixing
rolling/collapsible steel shutters are provided. Payment is to be made for the exact size
of opening where rolling shutter is to be fixed.
Pressed Steel Frames (Chowkhats) – Rates for supplying & fixing of pressed
steel frames for doors & windows (single rebate & double rebate) of 18 guage (1.25
mm) thick steel sheet of the specified sections including iron lugs, iron hinges including
bolts for fixing stops, lock-notch provision for receiving tower bolts, hydraulic spring are
also provided.
Before making the payment the gauge, the size and the section of steel
chowkhats (whether for single rebate or for double rebate including the sectional size)
and the weight of steel chowkhats shall be recorded in the measurement book by the
Sub Divisional Engineer/ Engineer-in-Charge to ensure conformity with the above
stipulations regarding weight.
Miscellaneous – The through rates are also provided for Japani sheet
chowkhats of various thicknesses, Fixing galvanized iron sheet chowkhats, Steelwork
using rectangular/square hollow mild steel pipe used in structural work such as sheds
etc, Expandable fasteners of specified size with necessary plastic sleeves & galvanized
M.S. screws, Stainless steel pipe & fitting, Safety signages, Grab bar of various types,
Knobset made of stainless steel, Roofing/Wall cladding with PPGL sheets, Gutter 250
mm wide with PPGL sheet (pre painted galvalume steel).
The rates in this chapter are for both riveted as well as welded work and the cost
of all rivets, bolts and nuts are included in the through rates. The labour rates include
the cost of tools and plants, welding rods and scaffolding (labour and material)
wherever required. The labour rates also cover the electrical and gas charges where
welding work is done. The through rates in this chapter are for ISI marked steel. The
increase for using integrated plant steel will be decided by the Competent Authority if
directed to use it.

**************************************************************

32 CSR-2020
CSR−2020−Final

CHAPTER NO. 19- LINING

The chapter has been framed on the basis of corresponding chapter on lining in
CSR-2010. The banks of canal are made up in layers which are compacted with rollers
with optimum moisture content. To achieve greater compaction, the sections of the
bank are kept more than the designed width. The extra width is removed later on and
this item is termed as lip cutting. Separate rates have been provided for lip cutting,
which includes all allowances like hardness, lead etc. Item of lip cutting has been
further sub-divided in categories as per vertical depth of canal in 1.5m internal. After lip
cutting dressing of bed and preparation of sub-grade is to be done for which separate
rates have been provided for bed of side slopes. Items have been provided for double
layer lining as well as single layer. Concrete lining in canal has been provided. Rates for
concrete lining of canal for which concrete is prepared by automatic computerized
batching and mixing plant is carried up to site in transit mixers, have been framed. This
item has been sub-divided in two categories viz. laying of concrete with help of paver
and manual laying.
Further this item has been sub-divided as per depth of channel viz.
1) 0m-3.5m vertical height
2) 3.5m-5.5m
3) 5.5m-7.5m and 7.5m & above.
The rates of carriage of Earth work with tipper & trolley in canal and drains have
been separately worked out and provided in this chapter.

**************************************************************

33 CSR-2020
CSR−2020−Final

CHAPTER NO. 20- OUTLETS

The rate of this chapter on outlets has been framed on the basis of
corresponding chapter in CSR-2010. The rates have been provided after including
GST. All the items of work like earth work for new outlets & dismantling of old outlets
has been provided in the rates. The various items have been split up to cover the
different classes of work under different Local conditions. The rates for Constructing or
dismantling the open Flume APM or OSM type outlet have been classified as per H The
rates have been based on discharge of channel as the bank width varies with increase
in discharge. Separate rates have provided for different types of adjustments which are
required in masonary outlets and APM outlets. The adjustment of Y or B involves
different operations & different rates have been provided for these. Again the rates will
vary according to the H of the outlet. Separate rates for all these items/situations have,
therefore been provided after detailed analysis.

**************************************************************

34 CSR-2020
CSR−2020−Final

CHAPTER NO. 21-BRIDGES FOUNDATION AND


SUB-STRUCTURE

This chapter has been made very comprehensive to include every type of
foundations and sub-structures for different types bridges to arrive a cost for inviting
bids. The rates as worked up under this chapter are based upon MORT&H data book
and specifications 5th revision. All rates under this chapter include 10% contractor profit
on material component and 35% extra charges over labour and machinery component,
which includes 25% overhead charges towards contractor's establishment, design
charges and other petty expenditures and 10% as contractor profit. In addition to these,
provisions for sundries charges @ 2% and 1% as labour cess has also been included in
rates.
Rates for this chapter have been derived with PPC cement, however Rs: 20/-
per bag may be added where OPC cement is to be used. Steel rates have been
provided as per chapter No: 3 – Material rates of CSR 2020 for ISI brand steels and
where provision for integrated plant steel is to be provided, additional rate will be
decided by the Competent Authority . Rates for all RCC items have been devised as
per MORT&H Data book which also includes the cost of admixture and nothing extra is
payable over and above these rates. Rates for bitumen have been taken as on dated:
01.07.2020, any addition or subtraction from these rates may be carried out while
preparing estimates. All rates for material include carriage upto 5.00 Km, further rates
may be adjusted accordingly as per lead while calculating landing rates.

**************************************************************

35 CSR-2020
CSR−2020−Final

CHAPTER NO. 22- BRIDGES-SUPERSTRUCTURE AND


PROTECTION WORK

This chapter has been made very comprehensive to include rates for
superstructure for bridges and protection work for approaches to bridges and bridge
structure. Rates for RCC anti crash railing and metal crash barrier has also been
introduced in this chapter. The rates as worked up under this chapter are based upon
MORT&H data book and specifications 5th revision. All rates under this chapter include
10% contractor profit on material component and 35% extra charges over labour and
machinery component, which includes 25% overhead charges towards contractor's
establishment, design charges and other petty expenditures and 10% as contractor
profit. In addition to these, provisions for sundries charges @ 2% and 1% as labour
cess has also been included in rates.
DAR for this chapter have been derived with PPC cement, however Rs: 20/- per
bag may be added where OPC cement is to be used. Steel rates have been provided
as per chapter No: 3 – Material rates of CSR 2020 for ISI brand steel and where
provision for integrated plant steel is to be provided, additional rate will be decided by
the Competent Authority. Rates for all RCC items have been devised as per MORT&H
Data book which also includes the cost of admixture and nothing extra is payable over
and above these rates. Rates for bitumen has been taken as on dated: 01.07.2020, any
addition or subtraction from these rates may be carried out while preparing estimates.
All rates for material include carriage up to 5.00 Km, further rates may be adjusted
accordingly as per lead while calculating landing rates.
This chapter also includes rates for pre-cast and pre-tensioned girders which are
being frequently used these days for longer spans and multi spanned bridge structures.
These rates include cost for concrete, HT strands, wedges, pipe casing for strands,
centering and shuttering, cost for transportation from casting yard to site of work and
hydra cranes for lifting and placing girders.
All types of expansion joints and bearings for bridges are a proprietary item, the
manufacturer must be approved by MORT&H and a written warranty for manufacturing
defect for 15 years must be taken from the manufacturer before installation.
As new concepts and new technology is being devised for bridge construction
during present era, rates for all such new components except the conventional one's as
taken in this chapter are subject to the approval of the Chief Engineer.

**************************************************************

36 CSR-2020
CSR−2020−Final

CHAPTER NO. 23- RIVER AND CANAL PROTECTION WORKS

The rate of item No. 23.5 for making pilchhi, farash or sarkanda rolls has been
taken excluding supply of materials. This item is only to be paid if pilchhi, farash and
sarkanda is supplied in loose form according to item No. 23.1. When supply of this
material is taken as compacted in rolls of required diameter and length, no payment
over and above item No. 23.1 (b) shall be made. Item 23.8, 23.9 and 23.10 involves the
use of pilchhi, farash and sarkanda made into rolls of six inches diameters and five feet
long. These rates include the cost of making rolls of pilchhi, farash and sarkanda. No
payment for making rolls shall be made over and above the rates of these items as
given in the schedule.
The rate of item no. 23.22 for filling empty cement bags with sand or earth and
sewing shall include the cost of E. C bags and strings. Sand bags shall be specified as
a means of temporary protection only. Cost of earth/ sand and their lead rates are not
included in these rates. The rates of filling of empty cement bags with sand or earth
after sewing and laying in position (dry/ water) have been provided to lay these filled
bags in position.(Item no. 23.26 for positioning in dry and 23.27 for positioning in water
with maximum lead of 30 meters taken)
For the item no. 23.29, the size of weaving of wire crates has been taken 1.2 m x
1.2 m. In shallow reaches, size may be increased whereas in deep and inaccessible
situations the same may be decreased. Actual size of wire crates used at the site of
work shall be as specified by the Engineer-in-charge. The smaller the size of the crate,
higher would be the cost of weaving as more MS annealed wire will be used. The crates
shall be made from M.S. Annealed Wire No. 6 or 8 S.W.G (4.75 or 4.00 mm) including
binding sides and partitions to make crates of the size 15 cm x 15 cm or 25 cm x 7.5
cm.

**************************************************************

37 CSR-2020
CSR−2020−Final

CHAPTER NO. 24 –ROAD WORK

The through & labour rates for laying and consolidation of soling (Granular Sub
Base) and wearing course (with WBM & WMM specifications) are provided and they
include cost of laying of stone metal, water charges, establishment/running charges of
machinery i.e. road roller, mixing plant, motor grader & vibratory roller etc. The rates
with different materials are worked out from approved quarries with an average lead of
5 kilometer to work site/plant, difference of quarry rates & bitumen rates with average
rate as taken in CSR while driving item rate as on date of preparing estimate. The basic
rates of bitumen of various grades as on date 01.07.2020 as issued by IOC/HPCL
refineries have been taken. Deduction of suitable rebate by refinery may also to be
applied if any. In case of carriage of bitumen, cost of round trip distance (RTD) of 20
kilometer is included in basic rates of bituminous items and beyond RTD of 20
kilometer, Lead beyond 20 km be taken as mentioned in the schedule. However,
beyond RTD of 300 kilometer, flat rate @ Rs. 2/- per km./ MT of bitumen is payable.
Rates for surface dressing have been provided for first coat with bitumen VG-10
and prime coat with bitumen emulsion slow setting. The rates under this chapter have
been worked out with continuous plant as well as with batch mix plant for all bituminous
items of roads as per MORT&H specification (5th revision). Items of consolidation with
lime treatment, dismantling of the road and restoring the road cut etc. are also added.
Rates for Concrete pavements with Dry Lean Concrete, Carpeting with Slip form
paver with electronic sensor with OPC cement as well as cement with addition of Fly
ash as per guide lines and as per Job Mix formula received from Research Laboratory,
Pb. PWD B&R, Patiala has been introduced in this chapter.
For road signage and safety of road users, rates for all items of mandatory
boards, informatory boards, advance direction board, cautionary boards, overhead &
cantilever gantry boards as per IRC 67:2012 using retro reflective micro prismatic
sheeting for different category of roads are added. Other road safety furniture items i.e.
Bollards, Road Studs with double shank, Median Marker, Delineator, Solar Cat eye etc.
has also been taken.
Rates for dismantling of existing bituminous crust with Cold Milling Machine,
rates for Cast in situ & Precast Kerb & Channels, Road Furniture items like Kilometer
Stone, 200 Meters Stone, Boundary Pillar, Making & Filling Expansion Joints with
Polysulphide has also been introduced in this chapter.

**************************************************************

38 CSR-2020
CSR−2020−Final

CHAPTER-NO.-25- MAINTENANCE OF CANALS & DRAINS

The rate of clearance of Weed, Jalla, Booti, Sarkanda etc. of lined/unlined


channels manually is incorporated in this Chapter No. 25 for the maintenance of the
channels. The rate varies according to the discharge of the channel. More the
discharge, higher is the rate. Similarly, this rate also depends on the growth of weed,
jalla, booti, sarkanda, etc. The rate increases as the growth varies from light to medium
and then to heavy.
In the item no. 25.3, the clearance of the drains is to be done manually on the
basis of the condition of the drain (Wet and Dry) as well as on the basis of discharge of
the drain.
Separate rate of mechanical clearance is also added in the item no. 25.7 (a), (b)
and 25.8. In item no 25.7(a, b) , the rate proportionate to the width of the bed of the
drain has been calculated and included accordingly.
The rates of clearance of drain (manual or mechanical) includes proper disposal
of the weed, jalla, sarkanda, booti, etc. on the outer slopes of the embankments.

**************************************************************

39 CSR-2020
CSR−2020−Final

CHAPTER NO. 26- MISCELLANEOUS

In this chapter rates have been provided for such items as are of miscellaneous
nature and cannot be grouped under any other chapter. One of the important items is
cutting of trees and removal thereof from Government land. The rate for this item
depends upon the girth of the tree which is to be measured 1.25 metres above ground
level. If the stumps are also to be grubbed in addition to felling of tree, the rates are to
be doubled in case of plains schedule and multiplied by 2.5 in case of hill schedule. The
trees and stumps which are got cut and removed will be the property of Government
and a note to this effect has been given in this chapter. Although these rates have been
given, it is suggested that cutting and removing of trees should not normally be done
through contractors. Such trees should be sold by auction and the purchase price
should include the purchasers liability to get the trees cut and grubbed and to remove
them from Government land. However, where it is not considered feasible to do so the
trees may be got cut on contract basis but the timber thus obtained will remain the
property of Government.
Jungle Clearance- Two types of rates have been provided for jungle clearance-
firstly for new areas acquired for the construction of roads, buildings, new canals or
extension of channels. The rates for these items vary depending upon the intensity of
the jungle. The actual rates are to be fixed by the Executive Engineer according to local
conditions and the amount of work involved. Separate rates have been provided for
jungle clearance along the running canals, branches, distributaries and minors
depending upon the discharge of the channel. This jungle clearance normally involves
cutting away of bushes and other wild growth on the canal banks or boundary roads.
Since it is not possible to assess the exact rate for jungle clearance very correctly, it
has been specified that the item of jungle clearance should be got done through
departmental labour and the rates provided in the Schedule may be utilized for
estimating purpose only.
Water allowance- Provision has been made for water allowance for concrete,
bricks and stone masonry, plastering, pointing, flooring, etc., depending upon the lead
from which water is actually brought. These rates are only for extraordinary water
arrangements. For ordinary and normal water arrangements the cost is included in the
respective items of the CSR. These additional rates are payable in case of plains when
water is not available locally and fixing of hand pumps at the site of work is neither
feasible nor practically possible due to small amount of works or due to depth of spring
level and where water is actually carried by carts or by mechanical transport from a lead
40 CSR-2020
CSR−2020−Final

greater than half a kilometre. In case of hilly areas water allowance is payable only
where water cannot be brought by gravity in kuhls from a reasonable distance and
where it is not available locally within one furlong of the site of work and where water is
actually to be carried by manual labour or by mechanical transport from a distance
exceeding one furlong.

**************************************************************

41 CSR-2020
CSR−2020−Final

CHAPTER NO. 27- QUANTITIES OF MATERIALS

The detailed analysis of rates for the entire Common Schedule have been
printed separately for the use of departmental officers and the quantities of materials
required for each item have been indicated therein. However, important items which are
very common in practice have been given in this chapter for ready reference and for
preparing the consumption statement on the completion of works. Consumption of
materials for such items which have not been given in this chapter can be obtained from
the analysis of rates.
While working out the quantity of sand required for various items of work, 15%
wastage has been allowed as sand normally gets wasted partially due to getting mixed
with soil and partially due to blowing away with the wind.
These consumption factors are for average conditions and are for the purposes
of estimates and for preparing consumption accounts. However, in actual practice
variation up to 5% above or below can take place due to different grading of materials,
tolerances in sizes of materials and due to greater or lesser wastage in handling and
construction. It is, therefore, recommended that variations to this extent may not be
taken serious notice of nothing extra is payable on excess consumption/wastage of the
materials than taken in this chapter.

**************************************************************

42 CSR-2020
CSR−2020−Final

CHAPTER NO. 28 – WATER SUPPLY

The cost of items taken in this chapter involves cost of material (predominately)
and labour component (small as compared to cost of material). The material rates taken
in this chapter have been taken from Chapter 1,2,3,4,5,6,11,15 and 16 of this CSR. The
other rates for material and pipes have been obtained from market rates and/or
Wholesale Price Index for 2020, published by Ministry of Commerce (Department for
Promotion of Industry and internal Trade), Govt. of India. The labour rates have been
taken from Chapter 1 of this CSR. Daily wages of labour which are prevailing rates as
notified by State Govt. Department of Labour under the Minimum Wages Act w.e.f.
01.09.2019.
The market rates thus obtained have been compared to WPI to enforce economy
and rationality while determining the rates.
The rates of D.I. pipes and specials incorporated in this chapter are based on
recommendations of Punjab Water Supply and Sewerage Board (PWSSB), as PWSSB
is the major used of D.I. pipes and specials as compared to DWSS.
Efforts have been made to balance all elements like economy, market rates,
least cost to government, and market conditions.
These rates are inclusive of GST, contractor's profit, labour welfare cess etc.
and all the other applicable taxes, whatsoever.

**************************************************************

43 CSR-2020
CSR−2020−Final

CHAPTER NO. 29 – Sewerage & Drainage

The cost of items taken in this chapter involves cost of material and labour
component. Some rates required to form the rates of items in this chapter have been
taken from Chapter 1,2,3,4,5,6,9,10,11,15,16 and 18 of this CSR. The other rates for
materials and pipes have been obtained from market rates. The labour rates have been
taken from Chapter 1 of this CSR. Daily wages of labour which are prevailing rates as
notified by State Govt. Department of Labour under the Minimum Wages Act w.e.f.
01.09.2019.
The market rates thus obtained have been compared to WPI to enforce economy
and rationality while determining the rates.
The rates incorporated in this chapter are based on recommendations of Punjab
Water Supply and Sewerage Board (PWSSB), as PWSSB mostly use Sewerage and
Drainage items for execution of works.
Efforts have been made to balance all elements like economy, market rates,
least cost to government, and market conditions.
These rates are inclusive of GST, contractor's profit, labour welfare cess etc.
and all the other applicable taxes, whatsoever.

**************************************************************

44 CSR-2020
CSR−2020−Final

CHAPTER NO. 30 – SANITARY INSTALLATIONS

Provision has been made for sanitary fittings of good Indian manufacturer like
Bombay Potteries and Parry's. Sanitary fittings of other equally good Indian
manufactures may be used, if approved by the Engineer-in-charge. In this connection
the Superintending Engineer will circulate from time to time the list of fittings of good
Indian manufactures which may be considered to be on the approved list and which
may be allowed to be used on works. Separate rates have been provided for different
types of fittings, pipes and specials for different sizes.
Provision has been made for CP fittings of good Indian manufacturer like Asian
Paints, Jaquar and Parry's. Sanitary fittings of other equally good Indian manufactures
may be used, if approved by the Engineer-in-charge. In this connection the
Superintending Engineer will circulate from time to time the list of fittings of good Indian
manufactures which may be considered from the approved list and which may be
allowed to be used on works. Separate rates have been provided for different types of
fittings, pipes and specials of different sizes.

**************************************************************

45 CSR-2020
CSR−2020−Final

CHAPTER NO. 31- MAINTENANCE OF BUILDING AND FURNITURE

In this chapter various items have been provided for repair work in building
which are not covered in other chapters. Mainly items include plaster work in patches,
fixing of new chowkhats in existing openings, making required size opening in existing
brick wall, renewing glass panes in place of existing glass panes and regrading of tile
terracing etc. In these items labour component involved is much higher than the normal
works.
Rates for spirit polishing of items like tables, side boards, almirahs, book-shelves
etc. have been based on superficial of top or front elevation. These items can vary
considerably in sizes and therefore, rates have to be provided according to the area.
Whereas other items like chairs, peg tables, cane sofas, hat and coat stands, etc.,
where there is no variation in the surface area involved. For caning work, rates have
been provided only for local Bareilly cane. Singapore cane is not available in market
and therefore, this item has not been provided for. A substitute for cane has been
prepared form plastic. Rates for this item have also been provided under head "Re-
caning with artificial (plastic) cane" Rates for polishing and re-caning of seats etc. have
been provided on the basis of through rates as the coat of material is approximately
small as compared to labour involved. In case of upholstering or recovering of sofas
and sofa chairs, both labour and through rates have been given but the through rates
do not include the cost of cloth which has to be purchased and supplied by the
department as a number of varieties of cloth are available in the market and it is not
suitable to specify any one of them in the Schedule of Rates.

**************************************************************

46 CSR-2020
CSR−2020−Final

CHAPTER NO. 32 – HORTICULTURE

In this chapter rates have been provided for Turfing Slopes, Planting Hedges,
Landscaping and Horticulture work in buildings and roads. Provision has been made for
developing all types of softscape features and associated hardscape elements not
covered in any other chapter.
Cost of irrigation water - Cost of irrigation water has not been included in any
item as water is generally available in most of the buildings. Separate item of irrigation
with tractor tanker has been included, which can be added wherever water source is not
available on site. Number of irrigations and quantity of water shall be worked out
according to season, soil type, size and type of plants. However, cost of labour for
watering the plants has been included in all items.
Digging of pits – Rate for digging of pits has been provided by volume of pit instead of
earlier practice of number of pits of fixed size. Pit size has not been specified for trees,
shrubs and specimen plants and shall be decided by the Engineer-in-charge as per
specification, soil type and other site conditions.
Plant nurseries are being maintained by Horticulture wings of many departments
and manufacture estimates are usually made of production of ornamental plants.
Keeping in view this requirement, rates have been provided for different types of potting
mixtures, polybags and pots for nurseries.
Plant species and varieties – Selection of plant species and varieties shall be at the
discretion of Engineer-in-charge as per site conditions, design and availability of plants.
General size of plants has been specified for trees and shrubs and rate may be reduced
in case plants of specified size are not available and smaller size plants are planted.
Site clearance – Rates have been provided for different types of site clearance
and must be included in every plantation work, where site has construction debris or
other irregularities which can affect plant growth. Objective shall be to provide optimum
soil conditions for initial plant growth. Good quality clean top soil must be ensured for a
minimum depth of 15 cm.
Grassing – Provision of Farm Yard Manure has been excluded from the
grassing items as it encourages weed growth. However, if sufficient time is available for
development of lawn by repeated irrigation and removal of weeds, Farm Yard Manure
may be added as per requirement of site. Rate for chemical fertilizers has been
included. Rates for rough grassing for road berms and other low maintenance areas
have been provided. Separate rates have been provided for large areas of active use
like playgrounds. Rates for fine grassing include planting of roots at different spacings
47 CSR-2020
CSR−2020−Final

as well as planting of ready turf and the relevant item may be selected according to site
conditions and nature of work.
Tree guards – Tree guards are generally required for protecting trees planted
along roads and are major component of total cost. Rates for different types of tree
guards has been provided to suit different conditions. Rates have also been provided
for repair and reuse of steel tree guards. After the trees have grown a sufficiently rigid
trunk, the tree guards can be removed and reused for new plantation thus saving tree
trunks from physical damage by tree guards and saving expenditure on procurement of
new tree guards.
Irrigation systems – Rates for drip irrigation, sprinkler irrigation and rain gun
systems have been provided for optimum use of water and reduction in labour cost for
irrigation. The rates include all accessories required for installation of irrigation systems
above the basic pipe network. The rates for basic pipe network are available in the
chapters on Public Health and relevant items can be used from that chapter.
Artificial grass – Rates have been provided for different types of artificial grass
which can be used indoor or at the locations with no direct sunlight available for growth
of natural grass. The rates are inclusive of all accessories and materials required for
installation of artificial grass and nothing extra shall be paid.
Vertical garden – Rates have been provided for installation of outdoor and indoor
vertical gardens where ground space is not available for regular plantation but it is
desirable to create greenery for environmental and aesthetic functions.
Roof garden – The rates for developing green roof have been provided for use
in green buildings as required under ECBC. The rates do not include waterproofing,
insulation or protection layer of the roof deck which are available in roofing chapter,
however, rates for root barrier has been included which must be installed in all types of
green roofs. Separate rates for base layers, up to planting media have been provided
for extensive and semi-intensive green roofs and intensive green roofs. Rates for
planting media have been provided by volume since depth of media may vary
depending on design objectives.
Maintenance of Horticulture works: Every item of actual planting like shrub, lawn,
ground cover, pot plants, vertical garden etc. has a corresponding separate item for its
maintenance for one year. However, for maintenance of trees, rates are provided
according to age of tree. Maintenance of roof gardens shall be done as per rates
provided for maintenance of various plant types and lawn.
Rates of good earth, farm yard manure, dry bamboo, stone, brick tiles and steel
items like tree guards have been calculated with carriage lead of 5 kilometre. In case of
48 CSR-2020
CSR−2020−Final

items used from other chapters in analyzing the rates e.g. excavation of earth, etc.
leads and lifts are as per relevant chapter. In case longer lead and lift is involved in the
execution of these items, additional rate shall be paid accordingly. Rates of all other
items are inclusive of carriage to the site of work.

**************************************************************

49 CSR-2020
CSR−2020−Final

CHAPTER NO. 33 GREEN BUILDINGS

It is the need of the hour to adopt sustainable, energy efficient and new emerging
green & clean technologies in construction to create sustainable built environment. As
such, Punjab Energy Conservation Building Code (PECBC) has been notified by
Government of Punjab. It has become imperative to include items pertaining to Energy
Efficient Materials in Punjab Common Schedule of Rates (CSR) for its implementation.
Though, new emerging technologies such as pre-cast concrete tiles, hollow concrete
blocks, solid concrete blocks etc are already in use, but many new materials have come
up over the past few years and are being used over the conventional building materials.
Rate analysis for various building insulation materials such as PUF
(Polyurethane foam) Spray, PUF (Polyurethane foam) Slab, Extruded Polystyrene
(XPS), items pertaining to Cool Roofs such as Heat Reflective Paint, Heat Resistant
Tile etc., items pertaining to Glazing and UPVC Doors & Windows have been taken.
Nothing extra shall be payable on account of carriage of materials as these are specific
items and carriage is already included in the item rates. Although, this chapter has been
framed to implement ECBC code which implies to building complexes having:-
• Connected load of 100 KW or greater or a contract demand of 120 KVA or
greater.
• Conditioned area of 500 m² or more.
However, the items as framed may also be used as per the site requirement in all
other buildings as per approval of the competent authority.

**************************************************************

50 CSR-2020
CSR−2020−Final

CHAPTER NO. 34 – ELECTRICAL

The rates in this chapter have been based on the new revised schedule of rates-
2020 and are in conformity with the revised general specifications - 2018. The detailed
analysis of rates for various items have been prepared on the basis of current market
rates. The price of various materials have been taken in the analysis of rates based on
the lowest quotations /price list rates. The manufacturer's with minimum required
standards / specifications have been considered. Quotation /price list rates for such
items of Indian manufacturers which do not meet with minimum required specifications
or which have been found defective as a result of practical experience have been
ignored.
In the case of recessed/ surface wiring, the wiring items in three categories such
as with heavy gauge welded conduit pipe, HDPE & PVC pipe with flame retardant
copper wire and Modular /Flush piano type accessories are taken.
While working out the composite rates for various points in case of wiring items,
the following lengths of wiring have been taken into account: -
1. In case of Recessed welded conduit pipe, HDPE & PVC pipe:-
(a) Light, Fan or Call-bell point with single control 5.00 metre
(b) 5-Pin, 6 Amp. wall socket point 2.50 metre
(c) 5-Pin, 6 Amp. plug control comprising wall socket point 0.45 metre
(d) Light point without control (This shall apply where two lights 2.50 metre
are provided which are operated with one switch only. One of
these points shall be paid for as light point with single control
and the other as light point without control)
(e) Light point with double control (This shall apply in case of light 10.00 metre
point for stairs or at entrance of hall where one light is to be
controlled by two switches in opposite directions)
2. In case of Surface welded conduit pipe & PVC pipe:-
(a) Light, Fan or Call-bell point with single control 5.00 metre
(b) 5-Pin, 6 Amp. wall socket point 2.50 metre
(c) 5-Pin, 6 Amp. plug control comprising wall socket point 0.45 metre
(d) Light point without control (This shall apply where two 2.50 metre
lights are provided which are operated with one switch
only. One of these points shall be paid for as light point

51 CSR-2020
CSR−2020−Final

with single control and the other as light point without


control)
(e) Light point with double control (This shall apply in case of 7.00 metre
light point for stairs or at entrance halls where one light is
to be controlled by two switches in opposite directions)
The lengths of wiring mentioned above apply to old buildings and new buildings,
in plains as well as hills, irrespective of type of construction, height of roof and local
conditions. Any variations in these items shall be reflected in premium/abatement over
the CSR rates.

***************************************************************

52 CSR-2020
CSR−2020−Final
CHAPTER NO. 1
DAILY WAGES
Notes :-
(i) The wages given below have been adopted for analysing the rates of various items of works.

(ii) The payment to the labour on daily wages will be paid as per rate fixed by the Labour Department
Govt. of Punjab, from time to time.

(iii) The Chief Engineer of a branch shall have full powers to authorise any increase in the labour
wages for departmental work for any length of time in any particular locality.

(iv) These rates are exclusive of GST, labour cess, contractor's profit and overhead expenses but
inclusive of weekly rest.

(v) The labour rates taken in this chapter are on the basis of minimum wages in Punjab fixed by
Labour Department, Government of Punjab as per notification of Labour Deptt. Punjab Letter No.
ST/27067 dt. 04-11-2019.

(vi) The rates of skilled & semi-skilled labour are inclusive of all necessary tools which are normally
carried by them according to trade practice in the locality.

Sr. No. Description Unit As on 01.09.2019

1 2 3 4

L.1 Air-Conditioner/Refrigerator Mechanic Per Day 442.25


L.2 Bajri Spreader (Tarring Work) Per Day 402.55
L.3 Bar Bender Per Day 442.25
L.4 Bhisti Per Day 338.05
L.5 Blacksmith (Ist Class) Per Day 442.25
L.6 Blacksmith (2nd Class) Per Day 402.55
L.7 Blaster Per Day 338.05
L.8 Boatman Per Day 368.05
L.9 Breaker (Hole driller) Per Day 338.05
L.10 Mason (Ist Class) Per Day 442.25
L.11 Mason (2nd Class) Per Day 402.55
L.12 Bucketman (Tarring work) Per Day 368.05
L.13 Carpenter (Ist Class) Per Day 442.25
L.14 Carpenter (2nd Class) Per Day 402.55
L.15 Driver (L.M.V) Per Day 402.55
L.16 Driver (H.M.V) Per Day 442.25
L.17 Diver Per Day 442.25
L.18 Electrician Per Day 442.25
L.19 Electrical/Mechanical/Chargeman Per Day 442.25

Chapter-1 Page 1 CSR-2020


CSR−2020−Final
Sr. No. Description Unit As on 01.09.2019

1 2 3 4
L.20 Fitter,Turner and Pipe Fitter (Ist Class) Per Day 442.25
L.21 Fitter,Turner and Pipe Fitter (2nd Class) Per Day 402.55
L.22 Fitter Helper Per Day 338.05
L.23 Floor Polisher Per Day 368.05
L.24 Glazier (Glassman)/Grinder (for
Per Day 368.05
rubbing)/Guttiman
L.25 Hammer Man Per Day 368.05
L.26 Handle Man (Tarring work) Per Day 338.05
L.27 Lineman (Ist Class) Per Day 442.25
L.28 Lineman (2nd Class) Per Day 402.25
L.29 Mate/Supervisor Per Day 368.05
L.30 Mason for plaster of paris work (Ist Class) Per Day 442.25
L.31 Mazdoor (Skilled) (Upper) Per Day 402.55
L.32 Mazdoor (Skilled) (Lower)/Mali Per Day 368.05
L.33 Mazdoor (Semi Skilled) (Upper) Per Day 368.05
L.34 Mazdoor (Semi Skilled) (Lower)/Dresser Per Day 338.05
L.35 Mazdoor (Un-Skilled)/Chowkidar/Cleaner Per Day 338.05
L.36 H. Skilled Worker ( Upper) Per Day 402.55
L.37 H. Skilled Worker ( Lower)/Welder Per Day 368.05
L.38 Mazdoor (Woman) Per Day 338.05
L.39 Operator Per Day 402.55
L.40 Painter (Ist Class) Per Day 442.25
L.41 Painter (2nd Class) Per Day 402.55
L.42 Para Medical Personnal Per Day 442.25
L.43 Plumber (Ist Class) Per Day 442.25
L.44 Plumber (2nd Class) Per Day 368.05
L.45 Sprayer (for Tar, Bitumen, etc.) Per Day 402.55
L.46 Stone Chisler with Cutter (Ist Class) Per Day 402.55
L.47 Sewerman Per Day 368.05
L.48 Well Sinker Per Day 442.25
L.49 White Washer (Ist Class) Per Day 402.55
L.50 White Washer (2nd Class) Per Day 368.05

Chapter-1 Page 2 CSR-2020


CSR−2020−Final

CHAPTER NO. 2
HIRE CHARGES OF MACHINERY
Notes :-
(i) These rates are based on Hire Charges of Machinery taken in MORT&H Data Book 2001-02.
Present day rates have been derived by using Linking Factor for WPI to arrive at year 2011-12 and
further by enhancing these rates as per Whole Sale Price Index for 2020 issued by Govt. of India,
Ministry of Commerce & Industry Department for Promotion of Industry and Internal Trade, Office of
the Economics Advisor, New Delhi

(ii)
The rates include all operational and maintenance charges such as cost of fuels, lubricants, stores,
establishment, depreciation and interest charges. In case the machinery is provided by the
department, the working cost as mentioned below shall be recovered from the contractor.

(ii) These rates are for analysing the rates of various items for works and not for hiring of private
machinery from the market for which competitive tenders/quotations shall be called and approval of
the appropriate competent authority shall be obtained.

(iv) The outputs mentioned for the construction equipments are for the compacted quantities of the
relevant items and not for loose quantities.

(v) These Rates are exclusive of contractor's profit, labour cess and GST.

Output/Capacity Unit Rates


Sl. No. Description Activity (in Rs.)

1 2 3 4 5 6
2.1 Air Compressor General 170/250 cfm hour 323.42

2.2 Air compressor with pneumatic Dismantling of


chisel attachment for cutting hard Concrete -- hour 685.57
clay.

2.3 Batching and Mixing Plant 30 cum Concrete Mixing


20 cum/hour hour 2260.80
capacity

2.4 Batching and Mixing Plant 15 - 20 Concrete Mixing


13 cum/hour hour 1884.00
cum capacity

2.5 Bitumen Pressure Distributor Bitumen Spraying Prime Coat and


Tack Coat = 1750
sqm/hour Surface
hour 1086.44
Dressing and Seal
Coat type A = 400
sqm/hour

2.6 Bitumen Boiler oil fired Bitumen Heating 1500 litre capacity hour 200.96

2.7 Concrete Paver Finisher with 40 HP Concrete Paving


20 cum/hour hour 2904.50
Motor

2.8 Concrete Pump of 45 & 30 cum Concrete Pumping


33 / 22 cum/hour hour 259.05
capacity

2.9 Concrete Bucket Concrete Pouring cum hour 15.70

Chapter-2 Page 3 CSR-2020


CSR−2020−Final
Output/Capacity Unit Rates
Sl. No. Description Activity (in Rs.)

1 2 3 4 5 6
2.10 Concrete Mixer 0.4/0.28 cum Concrete Mixing 2.5 cum/hour hour 235.50

2.11 Batch Type Concrete mixer as per Concrete Mixing


2.5 cum/hour hour 600.00
IS: 1791

2.12 Crane 80 tonnes Lifting Purpose 80 tonnes capacity hour 1295.25

2.13 Cranes 35 tonnes Lifting Purpose 35 tonnes capacity hour 863.50

2.14 Cranes 3 tonnes Lifting Purpose 3 tonnes capacity hour 361.10

2.15 Cranes with grab bucket 0.75 cum Well Sinking


0.75 cum capacity hour 994.33
capacity

2.16 Dozer D - 80 - A 12 Spreading /Cutting / 300/ 150/250


Clearing hour 3768.00
cum/hour

2.17 Dozer D - 50 - A 15 Spreading /Cutting / 200/ 120/150


Clearing hour 2234.11
cum/hour

2.18 Emulsion Pressure Distributor Bitumen Spraying


1750 sqm/hour hour 810.12

2.19 Front End loader 1 cum bucket Soil loading /


capacity Aggregate loading 60 /25 cum/hour hour 816.40

2.20 Generator 250 KVA Generation of


electric Energy 200 KVA hour 1766.25

2.21 Generator 125 KVA Generation of


100 KVA hour 883.13
electric Energy

2.22 Generator 100 KVA Generation of


80 KVA hour 706.50
electric Energy

2.23 Generator 63 KVA Generation of


50 KVA hour 541.65
electric Energy

2.24 Generator 33 KVA Generation of


25 KVA hour 376.80
electric Energy

2.25 GSB Plant 50 cum Producing GSB 40 cum /hour hour 1051.90

2.26 Grouting Pump with Agitator Grouting -- hour 108.85

2.27 Batch Type Hot Mix Plant - 120 DBM/BM/SDC/


40 cum /hour hour 23707.00
TPH capacity Premix

2.28 Continuous type Hotmix Plant - 100 DBM/BM/SDC/


30 cum/hour hour 17532.19
TPH capacity Premix

Chapter-2 Page 4 CSR-2020


CSR−2020−Final
Output/Capacity Unit Rates
Sl. No. Description Activity (in Rs.)

1 2 3 4 5 6
2.29 Continuous type Hotmix Plant - 60 DBM/BM/SDC/
25 cum/hour hour 14020.10
to 90 TPH capacity Premix

2.30 Continuous type Hotmix Plant - 40 DBM/BM/SDC/


17 cum/hour hour 11225.50
to 60 TPH capacity Premix

2.31 Hydraulic Chip Spreader Chip Spreading 1500 sqm/hour hour 2669.00

2.32 Hydraulic Excavator of 1 cum Excavation


60 cum/hour hour 1318.80
bucket

2.33 Integrated Stone Crusher 100THP Crushing of Spalls 100 TPH hour 8776.30

2.34 Integrated Stone Crusher 200 HP Crushing of Spalls 200 TPH hour 18463.20

2.35 Kerb Casting Machine Kerb Making 80 m/hour hour 314.00


2.36 Mastic Cooker Preparation of
Mastic Asphalt 1 tonnes capacity hour 62.80

2.37 Mechanical Broom Hydraulic Surface Cleaning 1250 sqm/hour hour 361.10
2.38 Motor Grader 3.35 mtr blade Clearing /Spreading 200/200/50/50
/GSB /WBM hour 2425.65
cum/hour
2.39 Mobile slurry seal equipment Mixing and laying
slurry seal 2700 sqm/hour hour 1020.50

2.40 Needle Vibrator Compaction of


Concrete 8 cum/hour hour 47.10

2.41 Paver Finisher Hydrostatic with Paving of DBM/


sensor control 100 TPH BM/SDBC/ Premix 25 cum/hour hour 2708.25

2.42 Paver Finisher Mechanical 100 TPH Paving of WMM


/Paving of DLC/ 34/34/15 cum/hour hour 987.53
PC/Seal Coat
2.43 Piling Rig with Bantonite Pump Piling Work
2 to 3 m/hour hour 5534.25
2.44 Pneumatic Road Roller Rolling of Asphalt
Surface 25 cum/hour hour 1259.14

2.45 Pneumatic Sinking Plant Pneumatic Sinking


of wells 1.5 to 2.00 cum/hour hour 4223.30

2.46 Pot Hole Repair Machine Repair of potholes 4 cum/hour hour 918.45
2.47 Pre-stressing Jack with Pump & Stressing of steel
-- hour 130.31
access wires/stands
2.48 Plate compactor Compaction of
20 cum/hour hour 94.20
Earth
2.49 Plate Vibrator Compaction of
8 cum/hour hour 47.10
Concrete
2.50 Ripper Scarifying 60 cum/hour hour 28.26

2.51 Rotavator Mixing 25 cum/hour hour 17.27

2.52 Road marking machine Road marking 18.75 sqm/hour hour 94.20

Chapter-2 Page 5 CSR-2020


CSR−2020−Final
Output/Capacity Unit Rates
Sl. No. Description Activity (in Rs.)

1 2 3 4 5 6
2.53 Smooth Wheeled Roller 8 tonne Soil Compaction
/BM Compaction 70/12/8 to 10
hour 314.00
/WBM Compaction cum/hour

2.54 Screed Vibrator Compaction of


Concrete 8 cum/hour hour 47.10

2.55 Tandem Road Roller Rolling of Asphalt


Surface 25 cum/hour hour 1158.66

2.56 Tipper - 5 cum Transportation of


soil, GSB, WMM, 5.5 cum capacity km 314.00
Hotmix etc.

2.57 Transit Mixer 4.0/4.5 cum Transportation of


Concrete Mix to site 4.5 cum/hour hour 942.00

2.58 Transit Mixer 3.0 cum Transportation of


3 cum/hour hour 863.50
Concrete Mix to site

2.59 Tractor with or without trolley Pulling or


transportation -- hour 261.66

2.60 Tractor with Rotavator Mixing 25 cum/hour hour 261.66

2.61 Tractor with Ripper Scarifying 60 cum/hour hour 261.66

2.62 Truck 5.5 cum per 10 tonnes Material Transport 5.50 cum capacity km 22.77
2.63 Truck 5.5 cum per 10 tonnes Material Transport 5.50 cum capacity hour 292.02
2.64 Truck Trailor 30 tonne capacity Transportation 30 tonnes capacity hour 785.00
2.65 Vibratory Roller 8 tonne Earth or soil / GSB /
100/60/60/25
WBM hour 1151.33
cum/hour
2.66 Vacuum Pump with mat & Power Finishing of
Floater Concrete 6.25 sqm/hour hour 422.33
Pavements
2.67 Water Tanker for General work Water Transport 6 kl capacity hour 146.95
2.68 Water Tanker for Road work Water Transport 6 kl capacity km 261.66
2.69 Wet Mix Plant 100 TPH Mixing of Wet Mix
40 cum /hour hour 2033.15
Macadam
2.70 Wet Mix Plant 60 TPH Mixing of Wet Mix
Macadam 25 cum/hour hour 1219.89

2.71 Dragline
1 Cu yd Capacity Excavation of earth
i) 68 cum/hour (dry)
work (undressed) hour 2943.22
ii) 57 cum/hour (wet)
0.75 Cu yd Capacity Excavation of earth
i) 37 cum/hour (dry)
work (undressed) hour 22.86
ii) 31 cum/hour (wet)

Chapter-2 Page 6 CSR-2020


CSR−2020−Final

CHAPTER NO. 3
MATERIALS
Notes :-
(i) The Rates given below have been adopted for analysing the rates of various items of works and not for obtaining supplies from market.

(ii) These rates are inclusive of GST & other taxes as applicable but exclusive of contractor's profit and labour cess.

(iii) All the rates in this chapter are for materials at the source of supply and inclusive of cost of any cases/ drums/containers or any type of bags etc. except where
specified otherwise.

(iv) Supplies from market shall be obtained after calling tenders or quotations, as these rates are for estimation purpose only.

(v) While making measurements for payment purposes, suitable deduction shall be made for voids to account for loose stacking of aggregates/boulders as
stipulated in the relevant specification.

(vi) The rates of all aggregates include loading charges except for sand, natural bed material and boulders. The loading of sand, natural bed material and boulders
shall be paid as per Chapter-4 of CSR.

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
M-1 Aggregates (average rate of all the quarries) Note:- Quarry wise aggregates rates attached at Annexure-I)

(a) Stone Metal Hand Broken/Crushed, Crushed Bajri

(i) 90mm to 40mm nominal size. Cum 2517 516.08 5% 541.88

(ii) Gravel 75mm to 25mm Cum 2517 509.27 5% 534.73

Chapter-3 Page 7 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(iii) 63mm to 45mm nominal size Cum 2517 517.14 5% 543.00

(iv) 53mm to 22.4mm nominal size Cum 2517 512.64 5% 538.27

(v) 40 mm nominal size Cum 2517 487.25 5% 511.61

(vi) 25 mm nominal size Cum 2517 496.40 5% 521.22

(vii) 20 mm nominal size Cum 2517 496.40 5% 521.22

(viii) 12mm to 13.2mm nominal size Cum 2517 545.48 5% 572.75

(ix) 10mm to 11.2mm nominal size Cum 2517 570.14 5% 598.65

(b) Water borne stone aggregate Cum

(i) 12mm to 13.2mm nominal size Cum 2517 529.06 5% 555.51

(ii) 10mm to 11.2mm nominal size Cum 2517 546.96 5% 574.31

(iii) 6 mm nominal size Cum 2517 702.03 5% 737.13

(c) Coarse Sand Cum 2517 680.68 5% 714.71

(d) Fine Sand with FM not less than 1.6 Cum 2517 494.34 5% 519.06

Chapter-3 Page 8 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(e) Stone Dust Cum 2517 584.73 5% 613.97

(f) GSB Course Grade-I & II Cum 2517 537.23 5% 564.09

(g) Stones breaking into spalls, size 75 mm. Cum 2517 476.19 5% 500.00

(h) Stones breaking into ballast (excluding screening and washing)

(i) Size 40 mm gauge. Cum 2517 500.00 5% 525.00

(ii) Size 20 mm gauge. Cum 2517 520.00 5% 546.00

(i) Screening ,Stone ballast, shingle or kankar (Labour only). Cum 2517 70.00 5% 73.50

(j) Stone ballast or Bajri washing (Labour only).


Cum 2517 70.00 5% 73.50

M-2 (i) Aluminumstrip 40mm wide 2mm thick. mtr 7606 42.12 18% 49.70

(ii) Aluminumplain strip edging 57mm x 12mm x 3mm.


each 7606 72.00 18% 84.96

(iii) Aluminumplain strip edging 38mm x 12mm x 3mm.


each 7606 72.00 18% 84.96

(iv) Aluminumstrip 25mm. Kg 7606 195.00 18% 230.10

(v) Aluminumstrip 10mm. Kg 7606 195.00 18% 230.10

Chapter-3 Page 9 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
M-3 Fly Ash Cum 2621 free

M-4 Asbestos cement products except pipes at site of work.

(i) Gypsum boards (ISI Marked) -

(a) 9.5 mm thick. sqm 6809 136.50 18% 161.07

(b) 12.5 mm thick. sqm 6809 160.00 18% 188.80

(c) 15 mm thick. size 8'x4' sqm 6809 180.00 18% 212.40

(ii) Corrugated sheets -

(a) Corrugated sheets 6mm thick. sqm 6811 150.00 18% 177.00

(b) Corrugated sheets 7mm thick. sqm 6811 170.00 18% 200.60

(c) Semi Corrugated sheets 6mm thick. sqm 6811 155.00 18% 182.90

(d) Semi Corrugated sheets 7mm thick. sqm 6811 160.00 18% 188.80

(iii) Fibre Sheets:-

(a) Fibre reinforced by organic fibres and / or inorganic


synthetic fibres cement corrugated sheet 6 mm thick sqm 7019 237.93 18% 280.76

Chapter-3 Page 10 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(b) Fibre reinforced by organic fibres and/ or inorganic
synthetic fibres cement corrugated serrated adjustable mtr 7019 210.00 18% 247.80
ridge

(c) Fibre reinforced by organic fibres and/ or inorganic


synthetic fibres cement Ridge Finial. pair 7019 165.00 18% 194.70

(d) Fibre reinforced by organic fibres and/ or inorganic


synthetic fibres cement corrugated appron piece. mtr 7019 200.00 18% 236.00

(e) fibre cement reinforced by organic fibres and/or inorganic


synthetic fibres roofing accessories as Eave's filler mtr 7019 175.00 18% 206.50

(f) Fibre reinforced by organic fibres and/ or inorganic


mtr 7019 280.00 18% 330.40
synthetic fibres cement North light Curves.

(g) Fibre reinforced by organic fibres and/ or inorganic


mtr 7019 310.00 18% 365.80
synthetic fibres cement Ventilators Curves.

(h) Fibre reinforced by organic fibres and/ or inorganic


synthetic fibres cement Barge Boards. mtr 7019 400.00 18% 472.00

(i) Fibre reinforced by organic fibres and/ or inorganic


pair 7019 165.00 18% 194.70
synthetic fibres cement Ridge Finial.

(iv) Poly Carbonate Sheets:-

(a) 12 mm thick multiwalled sqm 3920 860.00 18% 1014.80

Chapter-3 Page 11 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(b) 10 mm thick multiwalled sqm 3920 753.00 18% 888.54

(c) 1 mm thick solid sqm 3920 452.00 18% 533.36

(d) 2 mm thick solid sqm 3920 807.00 18% 952.26

(e) Aluminumstrip for poly carbonate sheet mtr 7606 308.00 18% 363.44

(v) Plain sheets -

(a) Plain sheets 4mm thick. sqm 6811 113.98 18% 134.50

(b) Plain sheets 6mm thick. sqm 6811 170.97 18% 201.74

(vi) Ridges 1.10 metre Long. pair 6811 350.00 18% 413.00

M-5 Ballies:-

(i) Safeda Ballies-

(a) 100 mm dia m 2516 69.87 18% 82.45

(b) 125 mm dia m 2516 90.67 18% 106.99

(c) 150 mm dia m 2516 111.82 18% 131.95

M-6 Bamboo:-

(i) 25 mm dia, 2.5m long. each 4602 100.00 5% 105.00

Chapter-3 Page 12 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(ii) 25 mm dia, 3m long each 4602 120.00 5% 126.00

M-7 (a) Bitumen Rate w.e.f 01.07.2020 (Rate at Panipat refinery)


including all taxes but excluding carriage.

(i) VG-10 (BULK) t 2714 26080.00 18% 30774.40

(ii) VG-10 (PACK) t 2714 NA

(iii) VG-30 (BULK) t 2714 26880.00 18% 31718.40

(iv) VG-30 (PACK) t 2714 NA

(v) CRMB-50 (BULK) t 2714 NA

(vi) CRMB-50 (PACK) t 2714 NA

(vii) CRMB-55 (BULK) t 2714 29370.00 18% 34656.60

(Viii) CRMB-55 (PACK) t 2714 NA

(ix) CRMB-60 (BULK) t 2714 30630.00 18% 36143.40

(x) CRMB-60 (PACK) t 2714 NA

(xi) EMULSION-RAPID (RS-1) (BULK) t 2714 28190.00 18% 33264.20

(xii) EMULSION-RAPID (RS-1) (PACK) t 2714 35740.00 18% 42173.20

(xiii) EMULSION-MEDIUM (BULK) t 2714 29920.00 18% 35305.60

Chapter-3 Page 13 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(xiv) EMULSION-MEDIUM (PACK) t 2714 37969.00 18% 44803.42

(xv) EMULSION-SLOW (SS-2)(BULK) t 2714 28061.00 18% 33111.98

(xvi) EMULSION-SLOW (SS-2) (PACK) t 2714 35813.00 18% 42259.34

(b) Blown Bitumen

(i) R 25/85 Grade. t 2714 38000.00 18% 44840.00

(c) Felts-

(i) Bitumen felt, Fibre base, self finished type-2 grade-I sqm 2715 63.00 18% 74.34

(i) Bitumen felt, Fibre base, self finished type-2 grade-II sqm 2715 63.00 18% 74.34

(i) Bitumen felt, Fibre base, self finished type-2 grade-III sqm 2715 72.00 18% 84.96

M-8 Boards BWP grade ISI Marked:-

(a) Standard quality hard board sheets/ ply board sheet.

(i) 4.5mm thick. (4mm available) sqm 4410 258.24 18% 304.72

(b) Insulation Board Natural colour.

(i) 9mm. sqm 4410 466.87 18% 550.91

(ii) 12mm. sqm 4410 538.00 18% 634.84

(iii) 18mm. sqm 4410 688.64 18% 812.60

Chapter-3 Page 14 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(iv) 25mm. sqm 4410 805.70 18% 950.73

(c) Particle Boards

(i) 12mm. sqm 4410 270.00 18% 318.60

(ii) 19mm. (18mm available) sqm 4410 317.00 18% 374.06

(iii) 25mm. sqm 4410 435.00 18% 513.30

M-9 Boulders (at quarry site)

(i) Stone boulders upto 18 kg cum 2517 568.59 5% 597.02

(ii) Stone boulders 18 to 40 kg cum 2517 667.25 5% 700.61

(iii) Stone boulders above 40 kg cum 2517 613.48 5% 644.15

M-10 Breaking ballast from brick bats (including stacking)

(a) (i) 40mm. cum 6904 333.33 5% 350.00

(ii) 25mm. cum 6904 333.33 5% 350.00

(iii) 20mm. cum 6904 333.33 5% 350.00

(b) Extra for breaking from Jhama bricks. cum 6904 333.33 5% 350.00

Chapter-3 Page 15 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
M-11 Brushes ISI Marked :--

(i) Hard wire brushes (14 gauge) size 200mm x 63mm x


40mm wires raised & fixed in wooden case complete in each 9603 17.79 18% 20.99
all respects.

(ii) Painting brushes (Ordinary Quality). 25mm width each 9603 12.70 18% 14.99

(iii) Painting brushes (Ordinary Quality). 50mm width each 9603 25.45 18% 30.03

(iv) Painting brushes (Superior Quality). 75mm width each 9603 80.00 18% 94.40

(v) Painting brushes (Superior Quality). 100mm width each 9603 169.50 18% 200.01

(vi) Katool Brushes (size 250mm x 63mm) of 75mm Coir


raised and fixed in wooden case complete in all respects. each 9603 20.00 18% 23.60

(vii) Soft brushes (size 225mm x 63mm) with 63mm raised


hair fixed in wooden case complete in all respects. each 9603 25.00 18% 29.50

M-12 Bricks First Class (Clay/Fly Ash) (at kiln site):- (Note:- District wise rates for Bricks / tiles attached at Annxure-II)

(a) Bricks 22.86cm x 11.11cm x 6.83cm hand moulded at


kiln site average rate of all Districts. 1000 nos 6904 4571.43 5% 4800.00

(b) Modular brick tiles 19cm x 9cm x 4cm for roofing,


flooring, tile masonry and canal lining at kiln site. 1000 nos 6904 5000.00 5% 5250.00

(c) Tiles 22.86cm X 11.43cm X 3.81cm hand moulded at kiln


1000 nos 6904 4761.90 5% 5000.00
site for all Districts.

Chapter-3 Page 16 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(d) Brick bats from well burnt or burnt bricks. cum 6904 450.00 5% 472.50

M-13 (a) Abrasive grinding stones ( Number 1,2,2L,3,4,5,6) ) for Set of 3


rubbing & polishing. 6804 200.00 18% 236.00
stones

(b) Mild Steel grinding Vatti ( 0 Number ) for cutting &


each 6804 40.00 12% 44.80
leveling

(c) Ironite - Floor Hardener (Ironite powder to be


incorporated into Granolithic topping for Light Medium 50 kg
3214 500.00 18% 590.00
Heavy duty flooring) bag

(d) Terrazzoo tiles 20mm thick sqm 6810 320.00 18% 377.60

(e) Chequered tiles at site of work sqm 6907 300.00 18% 354.00

(f) Precast P.C.C. tiles at site of work sqm 6907 300.00 18% 354.00

(g) Terrazzoo tiles with white cement 20mm thick sqm 6810 430.00 18% 507.40

(h) Terrazzoo tiles 12.50mm thick sqm 6810 320.00 18% 377.60

(i) Terrazzoo tiles with white cement 12.5 mm thick sqm 6810 350.00 18% 413.00

M-14 Cast iron rain water pipe non pressure ISI Marked :-

(i) C.I. Rain water pipe (Non pressure) 100mm dia. m 7303 688.00 18% 811.84

(ii) C.I. head 100mm dia. each 7303 475.00 18% 560.50

Chapter-3 Page 17 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(iii) C.I. shoe 100mm dia. each 7303 475.00 18% 560.50

M-15 Cement (Ex Shop in local market)

(a) Portland Pozzolana Cement including bag per bag


2523 234.37 28% 299.99
of 50 kg
(b) White Cement including bag per bag
2523 560.00 28% 716.80
of 50 kg
(c) Extra rate for OPC Cement per bag
2523 20.00 28% 25.60
of 50 kg

M-16 Cinder 12.5 mm nominal size screened at site (I.S.2686-1977)


cum 6904 770.00 18% 908.60
Bricks

M-17 Steam Coal. t 2701 2380.00 5% 2499.00

M-18 Butt Hinges (All items ISI Marked)


Anodized Aluminum Mat Finish

(a) Anodized Aluminum Mat Finish

(i) 125mm x 75mm x 4mm. each 7610 30.00 18% 35.40

(ii) 100mm x 75mm x 4mm. each 7610 18.00 18% 21.24

(iii) 75mm x 40mm x 3.2mm. each 7610 10.00 18% 11.80

(b) Handles Anodized AluminumMat Finish

(i) 125mm with plate 175mmx32mm. ten nos 7610 480.00 18% 566.40

Chapter-3 Page 18 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(ii) 100mm with plate 150mmx32mm. ten nos 7610 425.00 18% 501.50

(iii) 75mm with plate 125mmx32mm. ten nos 7610 400.00 18% 472.00

(c) Hasps & staples (Safty type) Anodized AluminumMat Finish

(i) 150mm. ten nos 7610 255.00 - - - 18% 0% 300.90

(ii) 115mm. ten nos 7610 210.00 18% 0% 247.80

(iii) 90mm. ten nos 7610 150.00 18% 0% 177.00

(d) Sliding door bolts - Anodized AluminumMat Finish

(i) 300mmx16mm. each 8302 129.34 18% 152.62

(ii) 250mmx16mm. each 8302 116.67 18% 137.67

(e) Tower Bolts (Barrel type) Anodized AluminumMat Finish each

(i) 250mmx10mm. each 8302 44.00 18% 51.92

(ii) 200mmx10mm. each 8302 35.00 18% 41.30

(iii) 150mmx10mm. each 8302 28.00 18% 33.04

(iv) 100mmx10mm. each 8302 20.00 18% 23.60

Chapter-3 Page 19 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(f) Commercial ply wood BWP grade 4mm thick 3 ply ISI Marked at
site of work. sqm 4412 258.24 18% 304.72

M-19 Flush Door BWP grade ISI Marked with liping all sides

Block Board Construction.

(A) Teak wood Ply on Both faces

(i) 40mm thick. sqm 4412 1592.24 18% 1878.84

(ii) 35mm thick. sqm 4412 1194.36 18% 1409.34

(iii) 30mm thick. sqm 4412 1140.56 18% 1345.86

(iv) 25mm thick. sqm 4412 1032.96 18% 1218.89

(B) Commercial Ply on Both faces

(i) 40mm thick. sqm 4412 1175.24 18% 1386.78

(ii) 35mm thick. sqm 4412 914.60 18% 1079.23

(iii) 30mm thick. sqm 4412 860.80 18% 1015.74

(iv) 25mm thick. sqm 4412 753.20 18% 888.78

(C) Commercial Ply on one face & Teak Surface on other surface

(i) 40mm thick. sqm 4412 1130.00 18% 1333.40

Chapter-3 Page 20 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(ii) 35mm thick. sqm 4412 1076.00 18% 1269.68

(iii) 30mm thick. sqm 4412 1022.20 18% 1206.20

(iv) 25mm thick. sqm 4412 914.60 18% 1079.23

M-20 Fuel wood. qtl 4401 1000.00 1000.00

M-21 Galvanised, iron sheet (0.80mm) plain or corrugated at site of


t 7301 65000.00 18% 76700.00
work.

M-22 Galvanised iron wire at site of work 4mm. qtl 7217 5000.00 18% 5900.00

M-23 Glass strips ISI Marked

(i) 4mm thick 40mm deep. m 7013 10.40 18% 12.27

(ii) 6mm thick 40mm deep. m 7013 10.72 18% 12.65

(iii) 25mm wide 4mm thick. m 7013 5.50 18% 6.49

(iv) 50mm wide 4mm thick. m 7013 13.40 18% 15.81

(v) 40mm wide 3mm thick. m 7013 8.04 18% 9.49

(vi) 32mm wide 4mm thick. m 7013 7.00 18% 8.26

(vii) 25mm wide 3mm thick. m 7013 5.00 18% 5.90

M-24 Glass panes ISI Marked at site of work

Chapter-3 Page 21 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(a) Plain

(i) 2mm thick (5.18 kg per sqm) sqm 7013 220.00 18% 259.60

(ii) 3mm thick (8.44 kg/sqm) sqm 7013 300.00 18% 354.00

(iii) 4mm thick (10.75 kg/sqm) sqm 7013 360.00 18% 424.80

(b) Frosted

(i) 2mm thick (5.18 kg per sqm) sqm 7013 164.00 18% 193.52

(ii) 3mm thick (8.44 kg/sqm) sqm 7013 246.00 18% 290.28

(iii) 4mm thick (10.75 kg/sqm) sqm 7013 328.00 18% 387.04

M-25 Glue kg 3506 178.00 18% 210.04

M-26 Hirmichi Qtl 3201 1400.00 - - - 18% - 1652.00

M-27 Jali (Cement Concrete)

(i) 50 mm thick. sqm 6810 547.00 18% 645.46

(ii) 40 mm thick sqm 6810 456.00 18% 538.08

(iii) 25 mm thick sqm 6810 383.00 18% 451.94

Chapter-3 Page 22 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
M-28 Blank

M-29 Lime

(i) Commercial dry lime (I.S. – 1514). qtl 2522 600.00 5% 630.00

M-30 Lubricants
(i) Burnol 100 gms. per tube 3004 207.63 18% 245.00

(ii) Compressor oil per ltr 8413/3403 102.00 18% 120.36

(iii) Distilled water per ltr 2201 10.00 5% 10.50

(iv) Grease loose per ltr 3403 128.41 18% 151.52

(v) Grease (2 kg packing) 2 kg 3403 568.00 18% 670.24

(vi) Grease (1 kg packing) 1 kg 3403 142.00 18% 167.56

(vii) Grease (½ kg packing) 1/2 kg 3403 145.00 18% 171.10

(viii) High speed diesel (as on 31.07.2020) per ltr 2710 75.00 0% 75.00

(ix) Hydro brake fluid (1 ltr packing) per ltr 3819 270.00 18% 318.60

(x) Hydro brake fluid (½ ltr packing) per ltr 3819 137.00 18% 161.66

(xi) Hydro brake fluid (¼ ltr packing) per ltr 3819 73.00 18% 86.14

Chapter-3 Page 23 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(xii) Kerosene oil (Superior) per ltr 2710 25.09 18% 29.61

(xiii) Light diesel oil per ltr 2710 29.66 18% 35.00

(xiv) Mobile oil (Loose) per ltr 8413/3403 82.60 18% 97.47

(xv) Mobile oil (5 ltr packing) per ltr 8413/3403 933.00 18% 1100.94

(xvi) Mobile oil (1 ltr packing) per ltr 8413/3403 195.00 18% 230.10

(xvii) Mobile oil (½ ltr packing) per ltr 8413/3403 101.00 18% 119.18

(xviii) Mobile oil (¼ ltr packing) per ltr 8413/3403 55.00 18% 64.90

(xix) Petrol per ltr 2710 75.16 18% 88.69

(xx) Sarson oil per kg 1514 110.00 5% 115.50

(xxi) Soap per kg 3401 46.61 18% 55.00

(xxii) Waste cotton per kg 5201 80.00 18% 94.40

M-31 Marble chips 4.75mm & down gauge

(a) White & black. qtl 6802 85.00 18% 100.30

Chapter-3 Page 24 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(b) Chocolate grey or yellow. qtl 6802 85.00 18% 100.30

(c) Baroda green. qtl 6802 85.00 18% 100.30

M-32 Marble piece for crazy floor 19mm to 20mm. qtl 6802 110.00 18% 129.80

M-33 Marble tiles plain

(i) Udaipur Green Marble 18-20 mm thick


a Size 0.30 sqm to 0.50 sqm sqm 6802 325.00 18% 383.50

b Slabs size above 0.50 sqm sqm 6802 375.00 18% 442.50

(ii) Udaipur Green Marble 12-15 mm thick


a Size 0.30 sqm to 0.50 sqm sqm 6802 300.00 18% 354.00

b Slabs size above 0.50 sqm sqm 6802 350.00 18% 413.00

(iii) Pink Makrana Marble 18-20mm thick


a Size 0.30 sqm to 0.50 sqm sqm 6802 450.00 18% 531.00

b Slabs size above 0.50 sqm sqm 6802 550.00 18% 649.00

(iv) Pink Makrana Marble 12-15mm thick


a Size 0.30 sqm to 0.50 sqm sqm 6802 400.00 18% 472.00

b Slabs size above 0.50 sqm sqm 6802 450.00 18% 531.00

Chapter-3 Page 25 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(v) White Makrana tiles 18-20mm thick

a Size 0.30 sqm to 0.50 sqm sqm 6802 500.00 18% 590.00

b Slabs size above 0.50 sqm


sqm 6802 700.00 18% 826.00

(vi) Morwad Marble tiles 18-20mm thick

a Size 0.30 sqm to 0.50 sqm sqm 6802 325.00 18% 383.50

b Slabs size above 0.50 sqm sqm 6802 375.00 18% 442.50

(vii) Morwad Marble tiles 12-15mm thick

a Size 0.30 sqm to 0.50 sqm sqm 6802 300.00 18% 354.00

b Slabs size above 0.50 sqm sqm 6802 350.00 18% 413.00

(viii) White Makrana tiles 12- 15 mm thick


a Size 0.30 sqm to 0.50 sqm sqm 6802 450.00 18% 531.00

b Slabs size above 0.50 sqm


sqm 6802 600.00 18% 708.00

(ix) Kumari grey without oxide and cavities flooring 18mm to 20mm
thick of varying sizes

Chapter-3 Page 26 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
a Size 0.30 sqm to 0.50 sqm sqm 6802 400.00 18% 472.00

b Slabs size above 0.50 sqm sqm 6802 450.00 18% 531.00

(x) Kumari grey without oxide and cavities flooring 12mm to 15mm
thick of varying sizes

a Size 0.30 sqm to 0.50 sqm sqm 6802 350.00 18% 413.00

b Slabs size above 0.50 sqm sqm 6802 400.00 18% 472.00

(xi) Black Marble tiles of Kishangarn, Zebra, Makrana , Dhabi or


Doongri Zebra thickness 18mm to 20mm

a Size 0.30 sqm to 0.50 sqm sqm 6802 450.00 18% 531.00

b Slabs size above 0.50 sqm sqm 6802 500.00 18% 590.00

(xii) Black Marble tiles of Kishangarn, Zebra, Makrana , Dhabi or


Doongri Zebra thickness 12mm to 15mm

a Size 0.30 sqm to 0.50 sqm sqm 6802 400.00 18% 472.00

b Slabs size above 0.50 sqm sqm 6802 450.00 18% 531.00

(xiii) Kotah stone tile flooring 20mm to 30 mm thick sqm 6802 370.00 5% 388.50

(xiv) Kotah stone tile flooring 30mm to 40 mm thick sqm 6802 450.00 5% 472.50

(xv) Black Granite stone tiles 18mm to 20mm thick sqm 6802 1722.00 18% 2031.96

(xvi) Coloured Granite stone tiles 18mm to 20mm thick sqm 6802 1600.00 18% 1888.00

Chapter-3 Page 27 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(xvii) Rough red sand stone (from Agra) 40mm thick sqm 6802 420.00 5% 441.00

(xviii) Rough kota stone 40 to 50 mm thick sqm 6802 400.00 5% 420.00

(xix) Flamed finish granite stone slab Jet Black, Cherry Red, Elite sqm 6802 1050.00 18% 1239.00

(xx) Black Granite Stone 19-20mm thick sqm 6802 1560.20 18% 1841.04

(xxi) Colored Granite Stone 19-20mm thick sqm 6802 1610.00 18% 1899.80

(xxii) Fine dressed red stone (From Agra) flooring 40mm thick sqm 6802 450.00 5% 472.50

(xxiii) Plain coloured 3.20mm gauge linoleum covering to floors sqm 6802 500.00 18% 590.00

(xxiv) Resilient vinyl sheet floor covering 2 mm thick, having a vinyl


plastic wear layer with backing intended for use in light commercial sqm 6802 500.00 18% 590.00
and residential buildings

(xxiv) Laminate wooden flooring (Grade AC3 or AC3+ laminates) 6 mm


to 12 mm thick, having core made up of medium-density fiberboard
(MDF),which is less resistant to impact damage and less resistant
to being dented by heavy furniture, having a décor layer to give
each floor its appearance and consisting of one or more sheets of sqm 6802 1150.00 18% 1357.00
paper impregnated with melamine resin and top wear layer having
clear aluminum oxide finish that protects the decorative layer &
imparts the desired level of sheen, from full gloss to low gloss

(xxv) Morward Marble strips 18 to 20 mm. Wide mtr 6802 45.00 18% 53.10

(xxvi) Dholpur stone tiles 25 mm thick sqm 6802 400.00 18% 472.00

Chapter-3 Page 28 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(xxvii) Butch work with rough dressed Dholpur stone 40 mm to 50 mm
sqm 6802 200.00 18% 236.00
thick

(xxviii) Fine dressed and machine rubbed red sand stone ( from Agra ) 25
sqm 6802 450.00 18% 531.00
mm to 50 mm thick

M-34 Munjban at site of work (Coir Yarn) kg 5308 60.00 5% 63.00

M-35 Niwar
(i) Cotton. kg 5701 120.00 12% 134.40

(ii) Nylon kg 5407 105.00 - - 12% - - 117.60

M-36 Paints, distempers, oil and primer etc.

(a) Distempers of approved manufacture ISI Marked.

(i) Dry distempers (Non washable) in all shades. kg 3210 30.00 18% 35.40

(ii) Oil bound washable distempers in all shades. kg 3210 30.46 18% 35.94

(iii) Distemper primer. ltr 3210 70.00 18% 82.60

(iv) Exterior cement based decorative paint such as snow-


cem, Robbia-cem at site of work. kg 3210 140.00 18% 165.20

Chapter-3 Page 29 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(b) Oil

(i) Turpentine oil. ltr 3805 80.00 18% 94.40

(c) Paints ISI Marked

(i) Aluminumpaints ltr 3209 150.00 18% 177.00

(ii) Anti corrosive bitumastic paint ltr 3208 100.00 18% 118.00

(iii) Anti corrosive odourless black bitumastic paint. ltr 3208 100.00 18% 118.00

(iv) Methylated spirit, without container. ltr 2207 68.75 18% 81.13

(v) Type wood preservative other than solignum. ltr 814 260.00 18% 306.80

(vi) Paint remover (Thinner). ltr 3209 68.75 18% 81.13

(vii) Ready mixed emulsion paint for plastered or concrete


ltr 3209 165.00 18% 194.70
surface (in all shades).Aluminumpaints

(viii) Ready mixed exterior paint for plastered or concrete


ltr 3209 165.00 18% 194.70
surface (in all shades).Aluminumpaints

(ix) Ready mixed exterior paint for metalic surface (in all
shades). Aluminumpaints ltr 3209 165.00 18% 194.70

(x) Creosote. ltr 3209 90.00 18% 106.20

Chapter-3 Page 30 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(xi) Ready mixed paint for wood work or wooden surface in
ltr 3209 165.00 18% 194.70
(all shades.)

(xii) Premium Acrylic dirt resistance Exterior Paint ltr 3209 270.00 18% 318.60

(xiii) Road marking paint white:-

(a) For asphalt surface. ltr 3208 160.00 18% 188.80

(b) For concrete surface. ltr 3208 210.00 18% 247.80

(xiv) Road marking paint (Spirit based yellow)

(a) For asphalt surface. ltr 3208 160.00 18% 188.80

(b) For concrete surface. ltr 3208 210.00 18% 247.80

(xv) Road marking paint (Spirit based black)

(a) For concrete surface. ltr 3208 145.00 18% 171.10

(xvi) Roofing white ready mixed paint for corrugated sheets.


ltr 3208 120.00 18% 141.60

(xvii) Roofing red grey or green ready mixed paint for


ltr 3208 210.00 18% 247.80
corrugated sheets.

(xviii) Black synthetic enamel paint ltr 3209 160.00 18% 188.80

Chapter-3 Page 31 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(xix) a) Thermoplastic paint with coverage of 5kg/10sqm kg 3209 90.00 18% 106.20

b) Glass beeds for Thermoplastic paint (350gm per sqm)


kg 7018 77.00 18% 90.86

(d) Pigment Steiner

(i) Black red chocolate colours and dark shades. kg 3209 70.00 18% 82.60

(ii) Red chocolate orange buff or yellow paint (Red oxide of


kg 3209 65.00 18% 76.70
iron) Light shades.

(iii) Green or blue (Indian) medium shade. kg 3209 72.00 18% 84.96

(e) Primers

(i) Aluminumwood primer. ltr 3209 125.00 18% 147.50

(ii) Cement primer. ltr 3209 60.00 18% 70.80

(iii) Pink primer for wood. ltr 3209 105.00 18% 123.90

(iv) Primer for metal. ltr 3209 95.31 18% 112.47

(f) Polish

(i) French spirit polish. ltr 3209 200.00 18% 236.00

(ii) Mansion polish (Ready made). ltr 3209 280.00 18% 330.40

(iii) Wax polish (Ready made). kg 3208 230.00 18% 271.40

Chapter-3 Page 32 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(g) Varnish

(i) Acid resisting varnish. ltr 3209 240.00 18% 283.20

(ii) Ordinary varnish. ltr 3209 93.75 18% 110.63

(iii) Superior copal varnish. ltr 3209 115.00 18% 135.70

(iv) Superior spare varnish. ltr 3209 115.00 18% 135.70

(v) Varnish interior or exterior. ltr 3209 175.78 18% 207.42

(h) Miscellaneous

(i) Caustic soda. kg 2815 38.00 18% 44.84

(ii) Coal tar. tonne 6807 22000.00 18% 25960.00

(iii) Creosote oil. ltr 2707 340.00 18% 401.20

(iv) Plaster of paris. kg 2520 5.00 5% 5.25

(v) Putty for wooden filler. kg 3214 30.00 18% 35.40

(vi) Putty for steel work. kg 3214 51.00 18% 60.18

M-37 Rolling Shutter & its parts

Chapter-3 Page 33 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(i) Rolling shutter made of 80mm x 1.25mm machine rolled


laths. sqm 7309 1800.00 18% 2124.00

(ii) Top cover for rolling shutter. m 7309 500.00 18% 590.00

(iii) 27.5 cm. long wire spring, grade No.2 for rolling shutter.
each 7320 325.00 18% 383.50

(iv) Ball bearing for rolling shutters. each 8482 970.00 18% 1144.60

(v) Exceeding 11.20 up to 16.80 sqm area of door Extra for


mechanical devices chain and cranked operation for sqm 7308 700.00 18% 826.00
operating rolling shutters.

(vi) Exceeding 16.80 sqm area of door. sqm 7308 300.00 18% 354.00

M-38 Sand (at quarry site)

(a) Clean & screened sand including removal of over-burden


of soil to expose the sand quarry up to the depth of 30 m,
cum - - - - - - -
if necessary within 30 metres excluding washing but
including royalty.

(b) Clean & screened sand within 30 metres excluding


washing but including royalty where removal of over- Rate Already included
burden of Soil above 30 cm depth is necessary. cum - - - - - - -
in M-1 (c)

(c) Clean, sharp and coarse sand from the following quarries Rate Already included
(including royalty etc):- cum
in M-1 (c)

Chapter-3 Page 34 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

M-39 (a) Sand paper. (60, 80, 100, 120 number)


each 6805 1.90 18% 2.24

(b) Sand Paper steel (100, 150, 180, 220, 320 number) each 6805 11.00 18% 12.98

M-40 Sealing compound. kg 3214 270.00 18% 318.60

M-41 Spun Yarn


kg 5205 90.00 - 5% - - - 94.50

M-42 Steel Fe-415, Fe-500, Fe-550 (ISI Marked).(Ex Shop in local


Market)

(a) Angles qtl 7216 3550.00 18% 4189.00

(b) Tor steel Bars qtl 7213-7215 3894.00 18% 4594.92

(c) Channels qtl 7216 3650.00 18% 4307.00

(d) Flats qtl 7208-7212 3650.00 18% 4307.00

(e) Joists qtl 7216 3850.00 18% 4543.00

(f) Plates all thickness qtl 7208-7272 5200.00 18% 6136.00

(g) Square bars qtl 7213-7215 3650.00 18% 4307.00

(h) All rectangular, Square and Circular pipe hollow Sections


qtl 7306 4400.00 18% 5192.00
ISI Marked

(i) Rolled steel T & Z Section. qtl 7208-7212 4400.00 18% 5192.00

Chapter-3 Page 35 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

(j) Welded Mesh 25 mm x 25 mm (2.5mm thick) sqm 7314 220.00 18% 259.60

(k) TMT Bars (Fe 500)(ISI Marked).(Ex Shop in local Market)


qtl 7213-7215 4050.00 18% 4779.00

(l) TMT Bars (Fe 550)(ISI Marked).(Ex Shop in local Market)


qtl 7213-7215 4102.00 18% 4840.36

(m) Extra rate for Steel Fe-415, Fe-500, Fe-550 (Integrated


Plant Marked). qtl 7213.00 300.00 18% 354.00

(n) Chicken Mesh 7217/7229/


sqm 42.00 18% 49.56
7313

(o) MS sheet all gauges 7217/7229/


qtl 4400.00 18% 5192.00
7313

M-43 Surkhi prepared from well burnt bricks, ground and screened at
cum 6904 700.00 - - - 18% - 826.00
source.

M-44 Tiles

(a) Ceramic Coloured Glazed tiles Matt/Semi Matt/Glossy/ Highly


Gloss finish/printed/ highlighter/ emboss

(i) 310mm x 450mm x 8mm sqm 6902 330.00 18% 389.40

(ii) 300mm x 600mm x 8mm sqm 6902 360.00 18% 424.80

(iii) Acid / Alkali Resistant Tiles - 300 mm x 300 mm sqm 6902 520 18% 613.60

Chapter-3 Page 36 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(b) White Ceramic graze tile in all colours and design Ist Quality

(i) 300mm x 200mm x 6mm sqm. 6902 260.00 18% 306.80

(ii) 325mm x 250mm x 8mm sqm. 6902 260.00 18% 306.80

(iii) 150mm x 150mm x 6mm sqm. 6902 240.00 18% 283.20

(iv) 100mm x 100mm x 6mm sqm. 6902 220.00 18% 259.60

M-45 Timber

(a) Cheel

(i) In sleepers. cum 4407 48000.00 18% 56640.00

(b) Deodar Wood

(i) In sleepers. cum 4407 103000.00 18% 121540.00

(ii) In planks. cum 4407 112000.00 18% 132160.00

(c) Kail Wood

(i) In sleepers. cum 4407 74000.00 18% 87320.00

(ii) In planks. cum 4407 80000.00 18% 94400.00

(d) Sal Wood

Chapter-3 Page 37 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(i) In scantling. cum 4407 63000.00 18% 74340.00

(ii) In planks. cum 4407 70000.00 18% 82600.00

(e) Teak Wood

(i) In scantling. cum 4407 107000.00 18% 126260.00

(ii) In planks. cum 4407 140000.00 18% 165200.00


(f) Hollock Wood

(i) In scantling. cum 4407 -

(ii) In planks. cum 4407 60035.00 18% 70841.30


(g) Champ

(i) In scantling. cum 4407 -

(ii) In planks. cum 4407 94500.00 12% 105840.00


(h) Red Meranti
(a) Normal (15 to 16 kg per cft. Approx.) cum 4407 45903.00 18% 54165.54

(b) Super (18 to 19 kg per cft. Approx.) cum 4407 49434.00 18% 58332.12

(c) Sinker (20 to 21 kg per cft. Approx.) cum 4407 54730.50 18% 64581.99
(i) Yellow Meranti
(a) Normal (15 to 16 kg per cft. Approx.) cum 4407 44137.50 18% 52082.25

(b) Super (18 to 19 kg per cft. Approx.) cum 4407 47668.50 18% 56248.83

Chapter-3 Page 38 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
(c) Sinker (20 to 21 kg per cft. Approx.) cum 4407 52965.00 18% 62498.70

(j) Imp. Teak Wood @ 1750/- each cft. cum 4407 61792.50 18% 72915.15

M-46 Wire Gauge 22 gauge 12x12 mesh of (140 G gauge) at site of


sqm 7314 207.13 18% 244.41
work .

M-47 Fire Bricks size 22.86 cm x 11.11 cm x 6.83 cm 1000 nos 6902 5000.00 5% 5250.00

M-48 Ladder ( Hire Charges) (10 steps) per day 9403 8.00 18% 9.44

M-49 Sawing Charges of wood. cum 2506 1496.00 5% 1570.80

M-50 White lead. kg 7806 170.00 18% 200.60

M-51 Chalk Mitti. qtl 2510 1000.00 5% 1050.00

M-52 Interlocking tiles by block making machine

(a) 50mm thick Interlocking tiles (rubber moulded) sqm 7016 310.00 18% 365.80

(b) 60mm thick Interlocking tiles (rubber moulded) sqm 7016 340.00 18% 401.20

(c) 60mm thick Interlocking tiles by block making machine sqm 7016 364.40 18% 429.99

M-53 80mm thick Interlocking tiles by block making machine sqm 7016 457.00 18% 539.26

M-54 100mm thick Interlocking tiles by block making machine sqm 7016 630.00 18% 743.40

M-55 Parameter Channel M.F.-6 m 7318 46.00 18% 54.28


Chapter-3 Page 39 CSR-2020
CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12

M-56 Main Runner 4' M.F.-5 m 1318 80.00 18% 94.40

M-57 Intermediate runner 4' M.F.-7 m 7318 80.00 18% 94.40

M-58 Hanging Strips (Ceiling angle) m 7318 28.00 18% 33.04

M-59 Filling with jointing compound 0.807 kg per sqm. m 3302 25.00 18% 29.50

M-60 Metal rawl plug and screw for fixing parameter @ 450mm for fixing
ceiling angle. each 6401 10.00 18% 11.80

M-61 Nuts & Bolts 25mm x 8mm each 7318 1.70 18% 2.01

M-62 G.I. Connecting Clip. each 7318 7.00 18% 8.26

M-63 Powder coated Gypsum Screw. each 7318 0.35 18% 0.41

M-64 Joint paper Tape Role. each 4802 290.00 18% 342.20

M-65 Bentonite Powder kg 2508 4.50 5% 4.73

M-66 (a) Aluminum Glazing all sections kg 7610 215.00 18% 253.70

(b) Extra for 50 Micron powder coating kg 7616 42.00 18% 49.56

(c) EPDM/ Neoprene Rubber gasket for Aluminumjoinery. kg 4002 61.00 18% 71.98

M-67 Square M S beadings for Glass(10x10x1.6 mm tube) mtr 7216 27.00 18% 31.86

Chapter-3 Page 40 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
M-68 Vitrified floor tiles in light colour shades made using Soluble
(i) Salt Technology / Digital
a 600x600 mm size sqm 6902 280.00 18% 330.40

b 800 mm x 800 mm size sqm 6902 320.00 18% 377.60

c 1000x1000 mm size sqm 6902 380.00 18% 448.40

(ii) Vitrified floor tiles in light colour shades made using double
charged Technology

a 600x600 mm size sqm 6902 500.00 18% 590.00

b 800 mm x 800 mm size sqm 6902 600.00 18% 708.00

c 1000x1000 mm size sqm 6902 650.00 18% 767.00

(iii) Vitrified floor tiles in light colour shades full body same
material

a 600 x 600 mm size sqm 6902 750.00 18% 885.00

(iv) Tactile tile 600 x 600 mm sqm 6902 480.00 18% 566.40

(v) Extra Cost for using darker fast shade Vitrified or Rectified
sqm 6902 50.00 18% 59.00
Tiles instead of lighter shades.

a High polymer modified quick set tile adhesive bag 50 kg.


Bag 6902 450.00 18% 531.00

b Cement based grout to be filled in the joints bag 50 kg.


Bag 6902 400.00 18% 472.00

Chapter-3 Page 41 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
c Epoxy grout mix of 0.70 kg of organic coated filler of
desired shade (0.10 kg of hardener and 0.20 kg of resin kg 6902 371.00 18% 437.78
per kg)

M-69 ACC Strips 40mmx4mm m 6812 3.60 18% 4.25

M-70 Iron Fitting ISI Marked

a) Hinges 75mm each 7324 8.00 18% 9.44

b) Hinges 100mm each 7324 14.00 18% 16.52

c) Sliding Bolt 200mm each 7316 90.00 18% 106.20

d) Sliding Bolt 250mm each 7316 110.00 18% 129.80

e) Sliding Bolt 300mm each 7316 120.00 18% 141.60

f) Handle 125mm each 7415 10.00 18% 11.80

g) Handle 150mm each 7415 15.00 18% 17.70

h) Kunda Chapka each 7415 15.00 18% 17.70

i) Tower Bolt 150mm each 7318 40.00 18% 47.20

j) Tower Bolt 200mm each 7318 50.00 18% 59.00

Chapter-3 Page 42 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
k) Door Spring ISI Marked (Ordinary) each 7320 80.00 18% 94.40

l) Floor Spring ISI Marked (Small) each 7320 1450.00 18% 1711.00

m) Floor Spring ISI Marked (Big) each 7320 1850.00 18% 2183.00

n) Hydraulic Door Spring ISI Marked each 8302 450.00 18% 531.00

M-71 PCC Kerb M-20 Hydraulic made size 250mm high x 165mm
bottom x115mm top mtr 6810 165.00 18% 194.70

M-72 E.C. Bag Plastic 50 kg each 2017 3.25 18% 3.84

M-73 Polythene films/ sheet of 100,125, 150, 200,250 micron kg 3920 105.00 18% 123.90

M-74 M.S. annealed wire 4mm kg 7229 48.00 18% 56.64

M-75 (a) Supply of Pilchi, Farash, Sarkhanda q 9603 280.00 0% 280.00

(b) Supply of Pilchi, Farash, Sarkhanda including loading,


q 9603 340.00 0% 340.00
unloading and carriage for 5 km.

(c) Polethene kg 3920 105.00 18% 123.90

M-76 Coir-rope kg 5607 65.00 5% 68.25

M-77 Bearing Description


1 Free Flot Bearing-100 MT (SPFF-100MT) each 8483 13855.00 18% 16348.90

Chapter-3 Page 43 CSR-2020


CSR−2020−Final

Sr. No. Description Unit HSN Rate GST Rates i/c GST.
CODE
0% 5% 12% 18% 28%

1 2 3 4 5 6 7 8 9 10 11 12
2 Fixed Bearing-100MT(SPFX-100 MT) each 8483 14990.00 18% 17688.20

3 Slide Guide Bearing (L)-100 MT (SPSG)L)-100 MT) each 8483 19800.00 18% 23364.00

4 Slide Guide Bearing (T)-100 MT (SPSG(T)-100 MT each 8483 21950.00 18% 25901.00

5 Free Float Bearing-200MT(SPFF-100MT) each 8483 28300.00 18% 33394.00

6 Fixed Bearing -200MT(SPFX-200 MT) each 8483 32790.00 18% 38692.20

7 Slide Guide Bearing(L)-200 MT (SPSG(L)-200 MT each 8483 43300.00 18% 51094.00

8 Slide Guide Bearing (T)-200 MT (SPSG(T)-200 MT each 8483 45650.00 18% 53867.00

9 Free Float Bearing-300 MT(SPFF-300 MT) each 8483 48400.00 18% 57112.00

10 Fixed Bearing-300 MT (SPFX-300 MT) each 8483 50490.00 18% 59578.20

11 Slide Guide Bearing (L)-300 MT (SPSG(L)-300 MT) each 8483 77900.00 18% 91922.00

12 Slide Guide Bearing (T)-300 MT (SPSG (T) -300 MT) each 8483 79850.00 18% 94223.00

13 Supply of Elastomeric Bearing as per IRC:83, Part-II cum 8483 70.00 18% 82.60

M-78 Expansion Joint

1 Supply of Strip Seal type Expansion Joint System with


Stud type Anchorage capable of accommodation RM 7308 5000.00 18% 5900.00
movement up to 80 mm

Chapter-3 Page 44 CSR-2020


CSR−2020−Final

Rate of Aggregate for all Quarries Recived from S.E Construction Circle cum Convenor Quarry Committee vide
Letter No. 1046 dt.11.10.2019 through CE (HQ) letter No.295/CSR dt.19.06.2020.

Rates in Rs. Per cubic metres without GST, Labour cess, Contractor Profit & other cesses.
Annexure-I
S.No. Description Lohand Bharat Agampur Khera Talwara & Mirthal Damtal Pathankot Haryaal Burj Kotia
Khad Garh (Ropar) Kamlout Kumahi Madhopur
(Ropar) (Ropar) Devi

1 2 3 4 5 6 7 8 9 10 11 12
(i) 12/13.2 mm Crushed Bajri
565.02 656.84 641.53 609.16 633.29 362.19 - 397.17 379.54 664.55

(ii) 10mm/ 11.20 mm Crushed Bajri


565.02 656.84 661.44 626.82 647.81 461.13 - 459.36 386.92 665.94

(iii) Water Borne Bajri 12/13.2 mm


565.02 656.84 677.70 551.78 612.49 362.19 - 425.44 379.54 530.56

(vi) 53-22.4 mm Stone Metal


582.68 617.99 635.65 653.30 487.43 322.70 - 312.64 307.39 693.98

(vii) 63-45 mm Stone Metal


582.68 617.99 635.65 662.13 536.80 322.70 - 312.64 307.39 676.32

(viii) 90-45 mm Stone Metal


582.68 623.88 - 711.64 588.43 322.70 - 312.64 307.39 679.27

(ix) Screning 12.5/13.2 mm Type "A"


565.02 656.84 641.53 609.16 633.29 362.19 - 397.17 379.54 664.55

(x) Screning 10 mm/11.2 mm Type "B"


565.02 656.84 661.44 626.82 647.81 461.13 - 459.36 386.92 665.94

(xi) boulder (3.6 kg to 18 kg)


- 790.40 - - 600.70 429.91 - 424.03 429.91 736.57

Annexure-I Page 45 CSR-2020


CSR−2020−Final

S.No. Description Lohand Bharat Agampur Khera Talwara & Mirthal Damtal Pathankot Haryaal Burj Kotia
Khad Garh (Ropar) Kamlout Kumahi Madhopur
(Ropar) (Ropar) Devi

1 2 3 4 5 6 7 8 9 10 11 12
(xii) boulder upto (18Kg to 40 kg)
790.40 790.40 677.70 - 633.29 570.67 - 568.31 570.67 736.57

(xiii) boulder Above (40Kg)


- - - - 613.48 - - - - -

(xiv) Gravel 75mm to 25mm/ Filter Media


- 653.30 600.33 622.41 394.58 415.19 - 395.76 316.26 676.32

(xv) Stone Matel 40mm


582.68 629.76 - 666.55 459.90 308.41 - 286.92 297.87 665.94

(xvi) Stone Metal 25mm for BM


565.02 656.84 - 653.30 494.88 308.41 - 286.92 297.87 708.00

(xvii) GSB course grade I & II


317.82 482.62 600.33 494.39 502.85 616.61 - 590.10 545.93 684.46

(xviii) Coarse sand


565.02 635.65 694.50 741.59 - 694.05 - 686.29 651.94 776.38

(xix) Stone Dust.


406.10 485.56 635.65 640.07 573.51 694.05 - 686.29 651.94 489.36

Annexure-I Page 46 CSR-2020


CSR−2020−Final

Rate of Brick/tiles in various Distt. at kiln site without GST, Labour Cess and
Contractor's profit & other cesses.
Annexure-II
Sr. No. Name of Distt Bricks Tiles
Basic Rate Unit Basic Rate Unit
1 2 3 4 5 6
1 Amritsar, Tarn Taran,
Jalandhar, Ludhiana, Mohali, 4857.14 1000 Nos 5047.62 1000 Nos
Chandigarh
2 Gurdaspur, Pathakot, Patiala,
Kapurthala 4761.90 1000 Nos 4952.38 1000 Nos

3 Hoshiarpur, SBS Nagar


5047.62 1000 Nos 5238.10 1000 Nos

4 Ropar, Fatehgarh Sahib


4666.67 1000 Nos 4857.14 1000 Nos

5 Barnala, Ferozpur, Sangrur


4380.95 1000 Nos 4571.43 1000 Nos

6 Faridkot, Mukatsar, Fazilka,


Mansa 4000.00 1000 Nos 4190.48 1000 Nos

7 Bathinda
4095.23 1000 Nos 4285.71 1000 Nos

8 Moga
4285.71 1000 Nos 4476.19 1000 Nos

Annexure-II Page 47 CSR-2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 4

LOADING AND UNLOADING


Notes :-
(i) These rates are inclusive of all taxes, GST, Labour Welfare Cess and contractor's profit.

(ii) Where the lead for loading and unloading is more than the lead specified in the following rates, this
should be paid at carriage rates (Chapter No. 5) for second and third chains of 30 metres length as
the case may be.

(iii) The following rates do not provide for any special arrangements such as provision of mechanical
equipment for loading purposes. The unloading of heavy machinery or consignments requiring crane
work or special arrangements will be paid seperately.

(iv) While making measurements for loading, unloading or stacking suitable deductions shall be made to
account for voids in the loose stacking according to the factors mentioned in the relevant
specifications of materials as given in chapter No. 3 of the P.W.D specifications.

(v) The rates of loading, unloading and stacking shall also include the loading, unloading and stacking of
containers in which the materials are contained. For instance, if 100 tonnes of bitumen are loaded or
unloaded in 160/200 litres drums, the net weight of bitumen will be 100 tonnes and weight of the
drum will be over and above this weight. Nothing extra will be paid for the weight of the bitumen
drums which are supposed to be carried in addition to the bitumen with in the same rate.

(vi) Bricks and tiles shall be properly stacked in vehicles and not dumped. While unloading these shall be
directly placed into stacks and not dumped on the ground and then stacked.

(vii) The rates of item No. 4.29 to 4.40 are not payable over and above the rates of item No. 4.3, 4.7, 4.9
to 4.11 and 4.20 to 4.24.

(viii) Where the earth work involved is more than 100 cum, then no unloading will be paid because
unloading shall be done by tipping.

Sr. No. Description Unit Rate for Rate for unloading


loading from wagons non-
into tipping trucks or
wagon, Boats including
Trucks or clearing 1.5 meters
boats away from the Rail
within 15 or 6 meters away
meters lead from the water edge
and excluding
stacking unless
otherwise stated.
1 2 3 4 5
By Mechanical Means
4.1 (A) Stone (building or pitching) Sand, Earth, Fly
Ash, Bajri, Shingle, Spalls, Brick bats, Brick cum 19.48 6.27
ballast and Stone metal.

Chapter-4 Page 48 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Rate for unloading
loading from wagons non-
into tipping trucks or
wagon, Boats including
Trucks or clearing 1.5 meters
boats away from the Rail
within 15 or 6 meters away
meters lead from the water edge
and excluding
stacking unless
otherwise stated.
1 2 3 4 5
(B) Coal t 10.24 3.33

By Manual Means
4.2 (A) Stone (building or pitching) Sand, Earth, Fly
Ash, Bajri, Shingle, Spalls, Brick bats, Brick cum 31.36 18.29
ballast and Stone metal.

(B) Coal t 54.32 36.58

4.3 Bricks 22.86 cm. size (including stacking) 1000 nos 73.17 73.18

4.4 Tiles including stacking :-

(i) 30.48 cm x 15.24 cm x 5.08 cm 1000 nos 88.86 88.86

(ii) 22.86 cm x 11.43 cm x 3.81 cm 1000 nos 52.27 52.26

4.5 (a) Cement bags full including stacking up to 10


100 nos 313.60 313.61
bags height in jute bags.

(b) Cement bags full including stacking up to 10


100 nos 344.96 344.96
bags height in paper bags .

4.6 Empty Cement bags including stacking.


100 nos 18.29 15.68

4.7 White (or non-hydraulic) lime or kankar (or


Hydraulic) lime in bags including stacking. t 62.73 57.50

4.8 White lime or kankar lime in bulk.


t 54.88 47.04

4.9 M.S. Bars, structural steel G.I. pipes and specials,


C.I. manhole covers, steps and other castings and
t 104.54 83.62
other ancillary items like lead, hemp-yarn etc.
including stacking.

4.10 (a) 200 Litres barrel full including stacking. each 13.06 10.45

(b) Bitumen drums full including stacking . each 10.45 7.84

Chapter-4 Page 49 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Rate for unloading
loading from wagons non-
into tipping trucks or
wagon, Boats including
Trucks or clearing 1.5 meters
boats away from the Rail
within 15 or 6 meters away
meters lead from the water edge
and excluding
stacking unless
otherwise stated.
1 2 3 4 5
4.11 Small packages of store up to one qtl including
stacking. qtl 10.45 10.45

4.12 Timber sleepers (Standard sizes and by manual


Labour) 100 nos 209.06 177.70

4.13 Packages containing material :-

(a) Heavy above one tonne if crane or any other


suitable device is arranged by the contractor. t 313.60 313.61

(b) (i) Heavy above one tonne if crane or any other


suitable device is arranged by the Deptt. t 83.62 83.62

(ii) Medium 0.50 tonne to one tonne if crane or


any other suitable device is arranged by the t 156.81 156.80
Deptt.

(iii) Light under 0.50 tonne if crane or any other


suitable device is arranged by the Deptt. t 104.54 104.54

4.14 Rails with fastenings t 104.54 104.54

4.15 Ballies :-

(i) Less than 20 cm girth at centre, 4 metres to


6 metres long. 100 nos 114.98 104.54

(ii) 20-35 cm girth at centre, 6 to 9m long.


100 nos 156.81 125.44

(iii) 35-50 cm girth at centre, 6 to 10.5 m long.


100 nos 209.06 156.80

4.16 Shuttering :-

(i) In Trucks
truck load 125.46 125.44

(ii) In wagons (broad gauge)


wagon load 334.52 334.51

Chapter-4 Page 50 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Rate for unloading
loading from wagons non-
into tipping trucks or
wagon, Boats including
Trucks or clearing 1.5 meters
boats away from the Rail
within 15 or 6 meters away
meters lead from the water edge
and excluding
stacking unless
otherwise stated.
1 2 3 4 5
(iii) In bogies (broad gauge) 8 wheeled
669.01 669.02
bogie load

4.17 Stone sets into or from wagons, trucks or boats


including stacking within one chain of the unloading cum 52.27 52.26
point.

4.18 Petrol 10 litre tins including checking and weighing.


100 nos 73.17 73.18

4.19 Kerosene oil or petrol 20 litre tins including


100 nos 146.35 146.34
checking and weighing.

4.20 Cast iron/RCC Pipes :-

(i) Upton 300mm dia bore t 104.54 81.01

(ii) Exceeding 300 mm but up to 450 mm dia


bore t 209.06 162.04

(iii) Exceeding 450 mm but up to 600 mm dia


t 313.60 243.03
bore

4.21 Asbestos cement pipes. t 104.54 81.01

4.22 Stone ware pipes. t 104.54 81.01

4.23 PVC pipes t 104.54 81.01

4.24 H.D.P.E, pipes. t 104.54 81.01

Stacking within 15 metres of the unloading points into stacks of specified sizes.

4.25 Pitching stones, spalls brick bats building stone


cum 20.92
ballast, stone metal, sand bajri and shingle.

4.26 Coal cum 20.92

4.27 White lime or Kankar lime in bulk. t 15.68

4.28 Timber cum 15.68

4.29 Bricks 22.86 cm. size 1000 nos 52.27

Chapter-4 Page 51 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Rate for unloading
loading from wagons non-
into tipping trucks or
wagon, Boats including
Trucks or clearing 1.5 meters
boats away from the Rail
within 15 or 6 meters away
meters lead from the water edge
and excluding
stacking unless
otherwise stated.
1 2 3 4 5
4.30 Tiles

(i) 30.48 cm x 15.24 cm x 5.08 cm 1000 nos 67.95

(ii) 22.86 cm x 11.43 cm x 3.81 cm 1000 nos 41.81

4.31 Cement bags full. 100 nos 125.46

4.32 (a) Empty cement bags stacking. 100 nos 2.61

(b) Empty cement bags bundling. 100 nos 10.45

4.33 White (or non-hydraulic) lime or kankar (or


Hydraulic) lime in bags. t 31.36

4.34 M.S Bars, structural steel G.I. pipes and specials,


C.I Manhole covers, steps other castings and other t 52.27
ancillary items like lead, hemp-yarn etc.

4.35 (a) 200 litres barrel full. each 4.18

(b) Bitumen drums full . each 2.61

4.36 Small packages of store up to one qtl . qtl 2.61

4.37 Cast iron/RCC Pipes :-

(i) Upton 300mm i/d t 33.96

(ii) Exceeding 300 mm but up to 450 mm i/d t 67.95

(iii) Exceeding 450 mm but up to 600 mm i/d t 88.86

4.38 Asbestos cement pipes. t 33.96

4.39 Stone ware pipes. t 33.96

4.40 P.V.C/H.D.P.E. Pipes. t 33.96

Chapter-4 Page 52 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 5
CARRIAGE
Notes :-

(i) The rates for carriage of materials manually upto 0.50 km and by mechanical means for every km
lead, have been given. In case of actual lead exceed one K.M and falls into next, full rate of the next
K.M will be paid i.e. fraction of K.M. will be payable for the full K.M.

(ii) These rates are inclusive of all taxes, GST, Labour Welfare cess and contractor's profit.

(iii) Unless otherwise stated, the carriage rates do not include loading unloading and stacking for
purpose of measurements.

(iv) For carriage of materials on river choe beds 20% extra, over the basic rates of kilometres concerned,
should be paid for actual river or choe bed-length involved.

(v) For carriage of materials on unmetalled roads 20% extra, on the basic rates of kilometres concerned,
excepting those for item No. 5.3 to 5.5 should be paid.

(vi) For carriage in sub mountainous area, the SE concerned may increase the carriage rates suitably
upto maximum of 20% of the rates provided for the plains, in case he is satisfied that the existing
CSR rates are not reasonable.

(vii) For carriage of lengths above 6 metres of heavy steel sections like RS Joists, rails etc. which cannot
be easily bent, increase the rates for steel in item No. 5.2 by 50 percent.

(viii) Where a river is to be crossed by Ferry or Boat Bridge, the loaded trucks cannot be carried across
and they have to be unloaded to some extent before crossing the river. The unloaded material has to
be carried by manual or animal labour across the river and then reloaded into the trucks. This not
only involves additional expenditure, but also extra time. In order to compensate for this, additional
rate may be allowed by increasing 50%.

(ix) Carriage rates of all materials carried in the containers include the carriage of containers in which the
materials are carried. Only the net weight of material carried is payable excluding the weight of
container.

(x) While making measurements of materials for the purposes of payment for carriage, suitable
deduction shall be made to account for voids in loose stacking. The factor will be different with
different materials and may be ascertained from the relevant specifications of that material, as given
in chapter No. 5 of PWD specifications.

(xi) The Superintending Engineer concerned may sanction the approved rates of Truck operators Unions
in specific and emergent cases, in case he feels that the existing schedule rates are not workable.

(xii) The rates under item No. 5.6 do not provide for special carriage arrangements like cranes, trailors
etc. Carriage of machinery not covered by this item should be paid at special rates to be determined
after inviting quotations/Tenders.

(xiii) The rate for carriage of Bitumen as per item no. 5.2 (iii) are for Round Trip Distance. Round Trip
Distance means if lead for single side is 10 km, then RTD will be taken as 20 km, for lead beyond
RTD of 300 Km will be payable @ Rs.2/- per km per MT

(xiv) Carriage of aggregates has been given eparately for total distance / lead and nothing extra to be
added for pervious KM.

Chapter-5 Page 53 CSR-2020


CSR−2020−Final
(xv) Direct carriage for actual lead for each kilometers distance covered has been given in CSR from
which cost of initial 5 kilometres must be deducted because the same has been added while
preparing DAR for a particular item.

Sr. Description Unit Rates for


No. Zone-A & Zone-B
5.1 (i) Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders,
Kankar and Building Rubbish.

1st chain of 30 metres cum 28.78

2nd and 3rd chain, per chain of 30 metres cum 6.24

For subsequent chain per chain of 30 metres upto 0.50 km cum 3.36

(ii) Cement

1st chain of 30 metres t 57.61

2nd and 3rd chain, per chain of 30 metres t 4.80

For subsequent chain per chain of 30 metres upto 0.50 km t 2.39

(iii) Tar, Bitumen and other road binders

1st chain of 30 metres t 57.61

2nd and 3rd chain, per chain of 30 metres t 4.80

For subsequent chain per chain of 30 metres upto 0.50 km t 2.39

(iv) M.S. Bars, steel, coal, lime G.I. pipes and special C.I.
manhole covers, steps and other castings and ancillary
miscellaneous items like lead, hemp yarn etc.

1st chain of 30 metres t 96.01

2nd and 3rd chain, per chain of 30 metres t 4.80

For subsequent chain per chain of 30 metres upto 0.50 km t 2.39

(v) Timber

1st chain of 30 metres cum 24.00

2nd and 3rd chain, per chain of 30 metres cum 3.84

For subsequent chain per chain of 30 metres upto 0.50 km cum 1.92

(vi) Bricks (22.86 cm x 11.11cm x 6.83cm)

1st chain of 30 metres 1000 nos 72.00

Chapter-5 Page 54 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
2nd and 3rd chain, per chain of 30 metres 1000 nos 13.45

For subsequent chain per chain of 30 metres upto 0.50 km 1000 nos 9.59

(vii) Tiles (30.48 cm x 15.24cm x 5.08cm)

1st chain of 30 metres 1000 nos 91.20

2nd and 3rd chain, per chain of 30 metres 1000 nos 21.59

For subsequent chain per chain of 30 metres upto 0.50 km 1000 nos 11.52

(viii) Tiles (22.86 cm x 11.43cm x 3.81cm)

1st chain of 30 metres 1000 nos 57.61

2nd and 3rd chain, per chain of 30 metres 1000 nos 13.45

For subsequent chain per chain of 30 metres upto 0.50 km 1000 nos 7.19

5.2 (i) Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone
boulders, Kankar and building rubbish, Earth.

0.5 to 1.0 km cum 96.01

2.0 km cum 119.04

3.0 km cum 141.12

4.0 km cum 162.23

5.0 km cum 182.40

0-6.0 km cum 200.67

0-7.0 km cum 209.81

0-8.0 km cum 223.87

0-9.0 km cum 234.64

0-10.0 km cum 245.43

0-11.0 km cum 256.19

0-12.0 km cum 266.97

0-13.0 km cum 277.76

0-14.0 km cum 288.53

0-15.0 km cum 299.32

0-16.0 km cum 310.09

Chapter-5 Page 55 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-17.0 km cum 320.88

0-18.0 km cum 331.65

0-19.0 km cum 342.43

0-20.0 km cum 353.20

0-21.0 km cum 362.03

0-22.0 km cum 370.85

0-23.0 km cum 379.67

0-24.0 km cum 388.48

0-25.0 km cum 392.40

0-26.0 km cum 396.32

0-27.0 km cum 400.24

0-28.0 km cum 404.16

0-29.0 km cum 408.08

0-30.0 km cum 412.00

0-31.0 km cum 415.92

0-32.0 km cum 419.84

0-33.0 km cum 423.76

0-34.0 km cum 427.68

0-35.0 km cum 431.60

0-36.0 km cum 435.52

0-37.0 km cum 439.43

0-38.0 km cum 443.36

0-39.0 km cum 447.27

0-40.0 km cum 451.20

0-41.0 km cum 455.11

0-42.0 km cum 459.04

0-43.0 km cum 462.95

0-44.0 km cum 466.88

Chapter-5 Page 56 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-45.0 km cum 470.79

0-46.0 km cum 474.72

0-47.0 km cum 478.63

0-48.0 km cum 482.56

0-49.0 km cum 486.47

0-50.0 km cum 490.40

0-51.0 km cum 494.31

0-52.0 km cum 498.23

0-53.0 km cum 502.15

0-54.0 km cum 506.07

0-55.0 km cum 509.99

0-56.0 km cum 513.91

0-57.0 km cum 517.83

0-58.0 km cum 521.75

0-59.0 km cum 525.67

0-60.0 km cum 529.59

0-61.0 km cum 533.51

0-62.0 km cum 537.43

0-63.0 km cum 541.35

0-64.0 km cum 545.27

0-65.0 km cum 549.18

0-66.0 km cum 553.11

0-67.0 km cum 557.02

0-68.0 km cum 560.95

0-69.0 km cum 564.86

0-70.0 km cum 568.79

0-71.0 km cum 572.70

0-72.0 km cum 576.63

0-73.0 km cum 580.54

Chapter-5 Page 57 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-74.0 km cum 584.47

0-75.0 km cum 588.38

0-76.0 km cum 592.31

0-77.0 km cum 596.22

0-78.0 km cum 600.15

0-79.0 km cum 604.06

0-80.0 km cum 607.98

0-81.0 km cum 610.93

0-82.0 km cum 613.87

0-83.0 km cum 616.80

0-84.0 km cum 619.74

0-85.0 km cum 622.68

0-86.0 km cum 625.62

0-87.0 km cum 628.57

0-88.0 km cum 631.50

0-89.0 km cum 634.45

0-90.0 km cum 636.41

0-91.0 km cum 638.36

0-92.0 km cum 640.32

0-93.0 km cum 642.29

0-94.0 km cum 644.25

0-95.0 km cum 646.20

0-96.0 km cum 648.16

0-97.0 km cum 650.13

0-98.0 km cum 652.08

0-99.0 km cum 654.04

0-100.0 km cum 656.00

0-101.0 km cum 657.63

Chapter-5 Page 58 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-102.0 km cum 659.27

0-103.0 km cum 660.90

0-104.0 km cum 662.54

0-105.0 km cum 664.16

0-106.0 km cum 665.81

0-107.0 km cum 667.43

0-108.0 km cum 669.05

0-109.0 km cum 670.70

0-110.0 km cum 672.32

0-111.0 km cum 673.97

0-112.0 km cum 675.60

0-113.0 km cum 677.23

0-114.0 km cum 678.87

0-115.0 km cum 680.50

0-116.0 km cum 682.12

0-117.0 km cum 683.76

0-118.0 km cum 685.40

0-119.0 km cum 687.03

0-120.0 km cum 688.67

0-121.0 km cum 690.29

0-122.0 km cum 691.94

0-123.0 km cum 693.56

0-124.0 km cum 695.20

0-125.0 km cum 696.83

0-126.0 km cum 698.45

0-127.0 km cum 700.10

0-128.0 km cum 701.72

0-129.0 km cum 703.36

0-130.0 km cum 705.00

Chapter-5 Page 59 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-131.0 km cum 706.63

0-132.0 km cum 708.25

0-133.0 km cum 709.90

0-134.0 km cum 711.52

0-135.0 km cum 713.16

0-136.0 km cum 714.80

0-137.0 km cum 716.42

0-138.0 km cum 718.07

0-139.0 km cum 719.69

0-140.0 km cum 721.32

0-141.0 km cum 722.96

0-142.0 km cum 724.60

0-143.0 km cum 726.23

0-144.0 km cum 727.85

0-145.0 km cum 729.49

0-146.0 km cum 731.12

0-147.0 km cum 732.76

0-148.0 km cum 734.38

0-149.0 km cum 736.03

0-150.0 km cum 737.65

0-151.0 km cum 739.16

0-152.0 km cum 740.67

0-153.0 km cum 742.17

0-154.0 km cum 743.66

0-155.0 km cum 745.17

0-156.0 km cum 746.67

0-157.0 km cum 748.17

0-158.0 km cum 749.68

Chapter-5 Page 60 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-159.0 km cum 751.18

0-160.0 km cum 752.67

0-161.0 km cum 754.19

0-162.0 km cum 755.69

0-163.0 km cum 757.19

0-164.0 km cum 758.70

0-165.0 km cum 760.20

0-166.0 km cum 761.69

0-167.0 km cum 763.20

0-168.0 km cum 764.70

0-169.0 km cum 766.20

0-170.0 km cum 767.72

0-171.0 km cum 769.20

0-172.0 km cum 770.71

0-173.0 km cum 772.22

0-174.0 km cum 773.72

0-175.0 km cum 775.22

0-176.0 km cum 776.73

0-177.0 km cum 778.22

0-178.0 km cum 779.72

0-179.0 km cum 781.23

0-180.0 km cum 782.73

0-181.0 km cum 784.24

0-182.0 km cum 785.75

0-183.0 km cum 787.24

0-184.0 km cum 788.74

0-185.0 km cum 790.25

0-186.0 km cum 791.75

0-187.0 km cum 793.25

Chapter-5 Page 61 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-188.0 km cum 794.75

0-189.0 km cum 796.25

0-190.0 km cum 797.75

0-191.0 km cum 799.27

0-192.0 km cum 800.77

0-193.0 km cum 802.27

0-194.0 km cum 803.77

0-195.0 km cum 805.27

0-196.0 km cum 806.77

0-197.0 km cum 808.28

0-198.0 km cum 809.78

0-199.0 km cum 811.28

0-200.0 km cum 812.78

0-201.0 km cum 814.28

0-202.0 km cum 815.79

0-203.0 km cum 817.30

0-204.0 km cum 818.80

0-205.0 km cum 820.30

0-206.0 km cum 821.79

0-207.0 km cum 823.30

0-208.0 km cum 824.80

0-209.0 km cum 826.30

0-210.0 km cum 827.81

0-211.0 km cum 829.30

0-212.0 km cum 830.80

0-213.0 km cum 832.32

0-214.0 km cum 833.82

0-215.0 km cum 835.32

Chapter-5 Page 62 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-216.0 km cum 836.83

0-217.0 km cum 838.32

0-218.0 km cum 839.82

0-219.0 km cum 841.33

0-220.0 km cum 842.83

0-221.0 km cum 844.33

0-222.0 km cum 845.85

0-223.0 km cum 847.34

0-224.0 km cum 848.84

0-225.0 km cum 850.35

0-226.0 km cum 851.85

0-227.0 km cum 853.35

0-228.0 km cum 854.85

0-229.0 km cum 856.35

0-230.0 km cum 857.85

0-231.0 km cum 859.36

0-232.0 km cum 860.87

0-233.0 km cum 862.37

0-234.0 km cum 863.87

0-235.0 km cum 865.37

0-236.0 km cum 866.87

0-237.0 km cum 868.38

0-238.0 km cum 869.88

0-239.0 km cum 871.38

0-240.0 km cum 872.88

0-241.0 km cum 874.38

0-242.0 km cum 875.88

0-243.0 km cum 877.40

0-244.0 km cum 878.90

Chapter-5 Page 63 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-245.0 km cum 880.40

0-246.0 km cum 881.90

0-247.0 km cum 883.40

0-248.0 km cum 884.90

0-249.0 km cum 886.41

0-250.0 km cum 887.91

0-251.0 km cum 889.40

0-252.0 km cum 890.92

0-253.0 km cum 892.42

0-254.0 km cum 893.92

0-255.0 km cum 895.43

0-256.0 km cum 896.93

0-257.0 km cum 898.42

0-258.0 km cum 899.93

0-259.0 km cum 901.43

0-260.0 km cum 902.93

0-261.0 km cum 904.44

0-262.0 km cum 905.95

0-263.0 km cum 907.44

0-264.0 km cum 908.95

0-265.0 km cum 910.45

0-266.0 km cum 911.95

0-267.0 km cum 913.46

0-268.0 km cum 914.95

0-269.0 km cum 916.45

0-270.0 km cum 917.95

0-271.0 km cum 919.46

0-272.0 km cum 920.96

Chapter-5 Page 64 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-273.0 km cum 922.47

0-274.0 km cum 923.97

0-275.0 km cum 925.47

0-276.0 km cum 926.97

0-277.0 km cum 928.48

0-278.0 km cum 929.98

0-279.0 km cum 931.48

0-280.0 km cum 932.98

0-281.0 km cum 934.48

0-282.0 km cum 935.98

0-283.0 km cum 937.50

0-284.0 km cum 939.00

0-285.0 km cum 940.50

0-286.0 km cum 942.00

0-287.0 km cum 943.50

0-288.0 km cum 945.00

0-289.0 km cum 946.51

0-290.0 km cum 948.01

0-291.0 km cum 949.50

0-292.0 km cum 951.01

0-293.0 km cum 952.52

0-294.0 km cum 954.02

0-295.0 km cum 955.53

0-296.0 km cum 957.03

0-297.0 km cum 958.52

0-298.0 km cum 960.03

0-299.0 km cum 961.53

0-300.0 km cum 963.03

Beyond 300 km (per km) cum 1.50

Chapter-5 Page 65 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
(ii) Cement

0.5 to 1.0 km t 39.36

0-2.0 km t 55.19

0-3.0 km t 70.08

0-4.0 km t 82.07

0-5.0 km t 92.15

(iii) Tar, Bitumen and other Road Binders RTD

0-20.0 km t 112.36

0-21.0 km t 118.25

0-22.0 km t 124.13

0-23.0 km t 130.00

0-24.0 km t 135.88

0-25.0 km t 139.81

0-26.0 km t 143.72

0-27.0 km t 147.65

0-28.0 km t 151.56

0-29.0 km t 155.48

0-30.0 km t 159.40

0-31.0 km t 163.32

0-32.0 km t 167.24

0-33.0 km t 171.16

0-34.0 km t 175.08

0-35.0 km t 179.00

0-36.0 km t 182.92

0-37.0 km t 186.84

0-38.0 km t 190.76

0-39.0 km t 194.68

0-40.0 km t 198.60

0-41.0 km t 201.21

Chapter-5 Page 66 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-42.0 km t 203.82

0-43.0 km t 206.43

0-44.0 km t 209.05

0-45.0 km t 211.66

0-46.0 km t 214.27

0-47.0 km t 216.89

0-48.0 km t 219.50

0-49.0 km t 222.11

0-50.0 km t 224.73

0-51.0 km t 227.34

0-52.0 km t 229.95

0-53.0 km t 232.57

0-54.0 km t 235.18

0-55.0 km t 237.79

0-56.0 km t 240.41

0-57.0 km t 243.02

0-58.0 km t 245.63

0-59.0 km t 248.24

0-60.0 km t 250.86

0-61.0 km t 253.47

0-62.0 km t 256.08

0-63.0 km t 258.70

0-64.0 km t 261.31

0-65.0 km t 263.92

0-66.0 km t 266.54

0-67.0 km t 269.15

0-68.0 km t 271.76

0-69.0 km t 274.38

Chapter-5 Page 67 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-70.0 km t 276.99

0-71.0 km t 279.60

0-72.0 km t 282.21

0-73.0 km t 284.83

0-74.0 km t 287.44

0-75.0 km t 290.05

0-76.0 km t 292.67

0-77.0 km t 295.28

0-78.0 km t 297.89

0-79.0 km t 300.51

0-80.0 km t 303.12

0-81.0 km t 305.40

0-82.0 km t 307.69

0-83.0 km t 309.97

0-84.0 km t 312.27

0-85.0 km t 314.55

0-86.0 km t 316.84

0-87.0 km t 319.12

0-88.0 km t 321.41

0-89.0 km t 323.69

0-90.0 km t 325.98

0-91.0 km t 328.26

0-92.0 km t 330.56

0-93.0 km t 332.84

0-94.0 km t 335.13

0-95.0 km t 337.41

0-96.0 km t 339.70

0-97.0 km t 341.98

0-98.0 km t 344.27

Chapter-5 Page 68 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-99.0 km t 346.55

0-100.0 km t 348.85

0-101.0 km t 350.81

0-102.0 km t 352.77

0-103.0 km t 354.73

0-104.0 km t 356.69

0-105.0 km t 358.65

0-106.0 km t 360.61

0-107.0 km t 362.57

0-108.0 km t 364.53

0-109.0 km t 366.49

0-110.0 km t 368.45

0-111.0 km t 370.40

0-112.0 km t 372.37

0-113.0 km t 374.33

0-114.0 km t 376.29

0-115.0 km t 378.24

0-116.0 km t 380.21

0-117.0 km t 382.17

0-118.0 km t 384.13

0-119.0 km t 386.08

0-120.0 km t 388.05

0-121.0 km t 390.01

0-122.0 km t 391.97

0-123.0 km t 393.92

0-124.0 km t 395.89

0-125.0 km t 397.85

0-126.0 km t 399.80

Chapter-5 Page 69 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-127.0 km t 401.76

0-128.0 km t 403.73

0-129.0 km t 405.69

0-130.0 km t 407.64

0-131.0 km t 409.21

0-132.0 km t 410.77

0-133.0 km t 412.35

0-134.0 km t 413.91

0-135.0 km t 415.48

0-136.0 km t 417.05

0-137.0 km t 418.61

0-138.0 km t 420.18

0-139.0 km t 421.75

0-140.0 km t 423.32

0-141.0 km t 424.89

0-142.0 km t 426.45

0-143.0 km t 428.02

0-144.0 km t 429.59

0-145.0 km t 431.16

0-146.0 km t 432.73

0-147.0 km t 434.29

0-148.0 km t 435.86

0-149.0 km t 437.43

0-150.0 km t 439.00

0-151.0 km t 440.56

0-152.0 km t 442.13

0-153.0 km t 443.70

0-154.0 km t 445.27

0-155.0 km t 446.84

Chapter-5 Page 70 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-156.0 km t 448.40

0-157.0 km t 449.97

0-158.0 km t 451.54

0-159.0 km t 453.11

0-160.0 km t 454.68

0-161.0 km t 456.24

0-162.0 km t 457.81

0-163.0 km t 459.38

0-164.0 km t 460.94

0-165.0 km t 462.52

0-166.0 km t 464.08

0-167.0 km t 465.65

0-168.0 km t 467.22

0-169.0 km t 468.78

0-170.0 km t 470.36

0-171.0 km t 471.92

0-172.0 km t 473.49

0-173.0 km t 475.06

0-174.0 km t 476.62

0-175.0 km t 478.20

0-176.0 km t 479.76

0-177.0 km t 481.33

0-178.0 km t 482.90

0-179.0 km t 484.46

0-180.0 km t 486.04

0-181.0 km t 487.60

0-182.0 km t 489.16

0-183.0 km t 490.74

Chapter-5 Page 71 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-184.0 km t 492.30

0-185.0 km t 493.88

0-186.0 km t 495.44

0-187.0 km t 497.00

0-188.0 km t 498.58

0-189.0 km t 500.14

0-190.0 km t 501.72

0-191.0 km t 503.28

0-192.0 km t 504.84

0-193.0 km t 506.42

0-194.0 km t 507.98

0-195.0 km t 509.54

0-196.0 km t 511.12

0-197.0 km t 512.68

0-198.0 km t 514.26

0-199.0 km t 515.82

0-200.0 km t 517.38

0-201.0 km t 518.96

0-202.0 km t 520.52

0-203.0 km t 522.10

0-204.0 km t 523.66

0-205.0 km t 525.22

0-206.0 km t 526.80

0-207.0 km t 528.36

0-208.0 km t 529.93

0-209.0 km t 531.50

0-210.0 km t 533.06

0-211.0 km t 534.64

0-212.0 km t 536.20

Chapter-5 Page 72 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-213.0 km t 537.77

0-214.0 km t 539.34

0-215.0 km t 540.90

0-216.0 km t 542.48

0-217.0 km t 544.04

0-218.0 km t 545.61

0-219.0 km t 547.18

0-220.0 km t 548.74

0-221.0 km t 550.31

0-222.0 km t 551.88

0-223.0 km t 553.45

0-224.0 km t 555.02

0-225.0 km t 556.58

0-226.0 km t 558.15

0-227.0 km t 559.72

0-228.0 km t 561.29

0-229.0 km t 562.86

0-230.0 km t 564.42

0-231.0 km t 565.99

0-232.0 km t 567.56

0-233.0 km t 569.13

0-234.0 km t 570.70

0-235.0 km t 572.26

0-236.0 km t 573.83

0-237.0 km t 575.40

0-238.0 km t 576.97

0-239.0 km t 578.52

0-240.0 km t 580.10

Chapter-5 Page 73 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-241.0 km t 581.67

0-242.0 km t 583.24

0-243.0 km t 584.81

0-244.0 km t 586.36

0-245.0 km t 587.94

0-246.0 km t 589.51

0-247.0 km t 591.08

0-248.0 km t 592.65

0-249.0 km t 594.20

0-250.0 km t 595.78

0-251.0 km t 597.35

0-252.0 km t 598.91

0-253.0 km t 600.49

0-254.0 km t 602.04

0-255.0 km t 603.62

0-256.0 km t 605.19

0-257.0 km t 606.75

0-258.0 km t 608.33

0-259.0 km t 609.88

0-260.0 km t 611.46

0-261.0 km t 613.03

0-262.0 km t 614.59

0-263.0 km t 616.17

0-264.0 km t 617.72

0-265.0 km t 619.29

0-266.0 km t 620.87

0-267.0 km t 622.43

0-268.0 km t 624.01

0-269.0 km t 625.56

Chapter-5 Page 74 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

0-270.0 km t 627.13

0-271.0 km t 628.71

0-272.0 km t 630.27

0-273.0 km t 631.85

0-274.0 km t 633.40

0-275.0 km t 634.97

0-276.0 km t 636.55

0-277.0 km t 638.11

0-278.0 km t 639.68

0-279.0 km t 641.24

0-280.0 km t 642.81

0-281.0 km t 644.39

0-282.0 km t 645.95

0-283.0 km t 647.52

0-284.0 km t 649.08

0-285.0 km t 650.65

0-286.0 km t 652.23

0-287.0 km t 653.79

0-288.0 km t 655.36

0-289.0 km t 656.92

0-290.0 km t 658.49

0-291.0 km t 660.07

0-292.0 km t 661.63

0-293.0 km t 663.20

0-294.0 km t 664.76

0-295.0 km t 666.33

0-296.0 km t 667.90

0-297.0 km t 669.47

Chapter-5 Page 75 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
0-298.0 km t 671.04

0-299.0 km t 672.60

0-300.0 km t 674.17

Beyond 300 km RTD per MT/ Km t 2.00

(iv) MS Bars, Steel, Coal, Lime, GI pipes and specials, CI


manhole covers, steps and other castings and ancillary
miscellaneous items like lead, hemp yarn etc.

0.5 to 1.0 km t 72.00

2.0 km t 88.32

3.0 km t 103.68

4.0 km t 117.12

5.0 km t 129.61

(v) Timber

0.5 to 1.0 km cum 49.44

2.0 km cum 60.96

3.0 km cum 71.52

4.0 km cum 81.59

5.0 km cum 91.20

(vi) Bricks (22.86 cm x 11.11cm x 6.83cm)

0.5 to 1.0 km 1000 nos 111.36

2.0 km 1000 nos 180.00

3.0 km 1000 nos 245.75

4.0 km 1000 nos 309.12

5.0 km 1000 nos 369.60

6.0 km to 10.0 km (Rate per KM) 1000 nos 36.99

11.0 km to 30.0 km (Rate per KM) 1000 nos 19.00

(vii) Tiles 30.48 x 15.24x5.08 cm

0.5 km to 1.0 km 1000 nos 348.49

2.0 km 1000 nos 439.69

3.0 km 1000 nos 510.71

Chapter-5 Page 76 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

4.0 km 1000 nos 573.13

5.0 km 1000 nos 633.60

6.0 km to 10.0 km (Rate per KM) 1000 nos 42.01

(viii) Tiles 22.86x11.43x3.81 cm

0.50 km to 1.0 km 1000 nos 108.48

2.0 km 1000 nos 136.33

3.0 km 1000 nos 162.23

4.0 km 1000 nos 187.19

5.0 km 1000 nos 211.20

6.0 km to 10.0 km 1000 nos 13.01

11.0 km to 30.0 km (Rate per KM) 1000 nos 9.50

(ix)(a) Cast iron pipes 80mm i/d (Truck load 8.50 tonnes)

0.50 km to 1.0 km t 115.20

2.0 km t 125.76

3.0 km t 136.33

4.0 km t 146.90

5.0 km t 157.43

(ix)(b) Cast iron pipes 100mm to 150mm i/d (Truck load 7.0
tonnes)

0.50 km to 1.0 km t 143.99

2.0 km t 156.49

3.0 km t 168.95

4.0 km t 181.44

5.0 km t 193.93

(ix)(c) Cast iron pipes 200mm to 350 mm i/d (Truck load 5.50

0.50 km to 1.0 km t 198.72

2.0 km t 215.03

3.0 km t 231.36

Chapter-5 Page 77 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
4.0 km t 247.69

5.0 km t 264.00

(ix)(d) Cast iron pipes 400 mm to 600 mm i/d (Truck load 4.75

0.50 km to 1.0 km t 245.75

2.0 km t 264.00

3.0 km t 282.24

4.0 km t 300.48

5.0 km t 318.72

(x)(a) Cement asbestos pipes 80mm to 150 mm i/d (Truck load

0.50 km to 1.0 km t 158.40

2.0 km t 172.82

3.0 km t 187.19

4.0 km t 201.60

5.0 km t 216.00

(x) (b) Cement asbestos pipes 200mm to 250mm i/d (Truck load

0.50 km to 1.0 km t 217.92

2.0 km t 238.07

3.0 km t 258.23

4.0 km t 278.40

5.0 km t 298.56

(xi) PVC/HDPE pipes all sizes (Truck load 2.20 tonnes)

0.50 km to 1.0 km t 433.91

2.0 km t 472.33

3.0 km t 510.71

4.0 km t 549.11

5.0 km t 587.52

(xii)(a) S.W. pipes 100 mm to 200mm i/d (Truck load 4.50 tonnes)

0.50 km to 1.0 km t 217.92

2.0 km t 238.07

Chapter-5 Page 78 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

3.0 km t 258.23

4.0 km t 277.96

5.0 km t 298.56

(xii)(b) S.W. pipes 225mm to 450mm i/d (Truck load 4.00 tonnes)

0.50 km to 1.0 km t 240.00

2.0 km t 264.00

3.0 km t 288.02

4.0 km t 311.99

5.0 km t 336.00

(xiii) Carriage of RCC pipes 100 mm to 150 mm i/d (Truck load


(a) 6.75 tonnes)

0.50 km to 1.0 km t 146.90

2.0 km t 159.36

3.0 km t 171.84

4.0 km t 184.32

5.0 km t 196.80

(xiii) RCC pipes 200mm to 300mm i/d (Truck load 6.50 tonnes)
(b)

0.50 km to 1.0 km t 152.16

2.0 km t 165.12

3.0 km t 178.06

4.0 km t 191.04

5.0 km t 203.99

(xiii) RCC pipes 350mm to 450mm i/d (Truck load 6.00 tonnes)
(c)

0.50 km to 1.0 km t 164.16

2.0 km t 178.06

3.0 km t 192.00

4.0 km t 205.91

Chapter-5 Page 79 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B
5.0 km t 219.84

(xiii) RCC pipes above 450 mm i/d (Truck load 5.0 tonnes)
(d)

0.50 km to 1.0 km t 199.20

2.0 km t 216.00

3.0 km t 232.83

4.0 km t 249.60

5.0 km t 266.44

5.3 Carriage for odd jobs.

(a) Mazdoor load upto 40 kg and distance upto 3.0 km


Each 76.80

(b) Mazdoor load upto 40 kg and distance exceeding 3.0km and


Each 153.60
up to 6.0km

5.4 Carriage of small consignments out of the Railway premises to a


distance of 10 chains of 30 metres each, including loading, qtl 38.40
unloading and stacking.

5.5 Carriage over short distance of small consignments, upto 2.0 qtls in
weight including loading, un-loading and stacking.

(a) 1.0 km qtl 62.38

(b) 2.0 km qtl 86.40

(c) 3.0 km qtl 105.60

(d) Subsequent km per km qtl 9.59

5.6 Carriage of light/medium package, containing material.

(a) By manual labour, individual piece, weighing from 1.50 qtls


to 4.0 qtls and not mounted on wheels, including stacking.

(i) Upto 150 metres Piece 240.00

(ii) Exceeding 150 metres and upto 300 metres Piece 384.00

(b) By mechanical transport including the use of pully block,


individual piece weighing upto one tonne.

(i) Ist 300 metres t 240.00

(ii) Add for every 300 metres but up to 1200 metres t 28.78

(iii) For 1600 metres exceeding 1200 metres t 355.21

Chapter-5 Page 80 CSR-2020


CSR−2020−Final
Sr. Description Unit Rates for
No. Zone-A & Zone-B

(iv) Add for every subsequent km up to 8.00 km t 35.00

(v) Add for every subsequent km above 8.00 km up to


t 27.47
16.00 km

5.7 Carriage of empty cement bags including bundling.

(i) Ist 300 metres 100 nos 9.59

(ii) 2nd and 3rd (300 metres) 100 nos 2.36

(iii) For One km 100 nos 14.40

(iv) For Two km 100 nos 23.04

(v) For Three km 100 nos 30.72

(vi) Above 3.0 km but up to 13.0 km 100 nos 5.99

(vii) Subsequent km 100 nos 5.00

5.8 Carriage of soaking and mortar mixing tanks.

(i) For One km qtl 24.00

(ii) For Two km qtl 38.40

(iii) For Three km qtl 43.19

(iv) For Four km qtl 51.33

(v) For Five km qtl 57.61

(vi) For Six km qtl 66.47

(vii) Subsequent km qtl 5.99

5.9 Bending MS Bars for carriage purposes. t 105.60

Chapter-5 Page 81 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 6
EARTH WORK
Notes :-
(i) Converting lift into horizontal lead :- For converting lift into horizontal lead, the lift upto 3.60 metres
will be multiplied by 10, from 3.60 metres to 6.0 metres it will be 50% of qty. as obtained from 0 to
3.60 mtr multiplied with 10 beyond 6.0 metres it will be multiplied by 20. No cross leads what-so-ever
shall be measured and paid for.

(ii) Rehandling of earth work and gravel work :- The rates of rehandling of recently deposited earth work
and gravel work after excavation will be 20 percent less on excavation rates. Earth work deposited
before monsoon season which has had a full monsoon on it, will be considered as a normal earth
work for excavation.

(iii) Measurement of lift :- The lift shall be measured from the centre of gravity of the excavated earth to
that of placed earth. This shall constitute the mean lift for that section. When earth has to be carried
over spoil bank and dumped beyond it, the mean lift would be the difference in levels between the
centre of gravity of the excavated earth and top of the spoil bank omitting the dowel.

(iv) Rates for additional lead have been given in slabs for 7.50 metres each of additional lead. If the lead
exceeds a slab by 1.50 metres or so, full payment for 7.50 metres lead will be made.

(v) These rates are for building works and upto quantity of 100 cum only for other engineering works. For
other engineering works quantity beyond 100 cum, the rates shall be payable as per the Item by
mechanical means Item No. 6.19.

(vi) The rates for carriage of materials manually upto 0.50 km and by mechanical means for every km
lead, have been given. In case actual lead exceeds one KM and falls into next, full rate of next km is
to considered i.e. fraction of KM will be payable for the full KM.

Sr. Description Unit Zone-A Zone-B


No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
6.1 Earth work of silt clearance of channels and
drains:-
(a) Kassi work undressed involving an average
horizontal throw up to 2 metres and cum 77.00 77.00 85.00 85.00
average vertical lift up to 0.5 metres

(b) Basket work with combined lead upto 7.50


cum 109.00 109.00 120.00 120.00
metres undressed.

(c) Dressing for sub-item (a) and (b) supra. cum 7.00 7.00 8.00 8.00

(d) Extra for every 7.5 metres additional lead.


cum 4.00 4.00 4.00 4.00

Note :- No extra allowance of wetness, slush or


humus dal dal are payable for item No. 6.1.

6.2 Earth work excavation in ordinary soil, exclusive


of compensation of earth:-

Chapter-6 Page 82 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Kassi work undressed involving an average
horizontal throw up to 2.0 metres and an
average vertical lift up to 0.5 metres cum 77.00 77.00 85.00 85.00
including breaking of clods.

(b) Earth work undressed with a combined lead


upto 15 metres including breaking of clods. cum 109.00 109.00 120.00 120.00

(c) Lead
(i) Extra for every 7.50 metres additional lead
beyond 15 metres but upto 300 metres. cum 5.00 5.00 6.00 6.00

(ii) Extra for 7.50 metres additional lead


beyond 300 metres but upto 500 metres. cum 4.00 4.00 4.00 4.00

Note :- For leads beyond 500 metres earth work


shall be payable at carriage rates for sand,
bajri and ballast etc. given in the chapter
No. 5 item No. 5.2 and loading, unloading
as per chapter No. 4. Except those
provided under item No. 6.2 (f) and (g).

(d) Wet Earth work

(i) Extra for wet earth work from bottom of


excavation upto level of sub soil water cum 19.25 19.25 19.25 19.25

(ii) Extra for wet earth work from level of sub


cum 11.55 11.55 11.55 11.55
soil water upto 30 cm above

(iii) Extra for wet earth work for depth above 30


cum 7.70 7.70 7.70 7.70
cm of sub soil water level

(e) Hardness

(i) Extra for hard soil with D.B.D. (Dry bulk


cum 18.00 18.00 20.00 20.00
density) from 1.60 to 1.70 gm/c.c.

(ii) Extra for hard soil with D.B.D. (Dry bulk


density) from 1.70 but upto 1.80 gm/ c.c. cum 36.00 36.00 40.00 40.00

(iii) Extra for D.B.D. upto 1.80 gm/ c.c. cum 54.00 54.00 54.00 54.00

(f) Extra for pudding work cum 91.00 91.00 100.00 100.00

(g) Admixtures of shingle or Kankar:

Chapter-6 Page 83 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) Extra for admixture of shingle or kankar
exceeding 10 percent but upto 20 percent. cum 23.00 23.00 25.00 25.00

(ii) Extra for admixture of shingle or kankar


exceeding 20 percent but upto 30 percent. cum 36.00 36.00 40.00 40.00

(iii) Extra for admixture of shingle or kankar


exceeding 30 percent but upto 40 percent. cum 59.00 59.00 65.00 65.00

Note :- For admixture above 40% rates for gravel


work excavation shall apply --

(h) Extra for slush. Cum 58.87 58.87 58.87 58.87

(i) Extra for daldal cum 98.11 98.11 98.11 98.11

6.3 Dressing of earth work

(i) New work or remodeling work.


Sqm 1.23 1.23 1.23 1.23
Unit

(ii) Repair work. Sqm 1.71 1.71 1.71 1.71

(iii) Sand only. Sqm 0.86 0.86 0.86 0.86

6.4 Extra For compensation & royalty for Ordinary


earth/ Ordinary clay taken from private land. cum 60.22 60.22 60.22 60.22

6.5 Earth work containing Gravel (in loose from in


non cohesive binding material) work in excavation
with occasional use of picks exclusive of
compensation of earth undressed with combined
lead upto 15 metres with percentage of gravel or
Kankar.

(a) Exceeding 40 % but upto 60 %. cum 166.00 166.00 183.00 183.00

(b) Exceeding 60 % but upto 80 %. cum 194.00 194.00 213.00 213.00

(c) Exceeding 80 % but upto 100 %. cum 212.00 212.00 233.00 233.00

(d) Extra for every 7.5 metres additional lead


beyond 15 m. cum 6.00 6.00 7.00 7.00

(e) Extra for wet earth work containing gravel


above sub soil water level. cum 16.60 16.60 16.60 16.60

(f) Extra for earth work containing gravel under


standing water. cum 24.90 24.90 24.90 24.90

Chapter-6 Page 84 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(g) Extra for earth work containing gravel under
flowing water. cum 41.50 41.50 41.50 41.50

(h) Extra for dressing earth work containing


gravel. Sqm 1.71 1.71 1.71 1.71

6.6 Earth work in excavation in foundations trenches


etc. in all kinds of soil where Pick-Jumper work is
not involved and not exceeding 2.0 metres depth
including dressing of bottom and sides of
trenches, stacking the excavated soil clear from cum 182.00 182.00 200.00 200.00
the edge of excavation and subsequent filling
around masonry in 15 cm, layers with compaction
including disposal of all surplus soil as directed
within lead of 30 metres.

6.7 Earth work in excavation of foundations of bridges


culverts, buildings including handling of material
with a combined lead of 15 metres dressing of
bed and sides stacking the excavated soil from
the edge of excavation and subsequent filling
around:-

(a) For ordinary gravel soil involving pick work


cum 263.00 263.00 289.00 289.00

(b) For semi-conglomerate soil of the nature of


pick jumper work. cum 350.00 350.00 385.00 385.00

(c) For hard clayey soil or hard conglomerate


or semi-rocky type of the nature of pick- cum 378.00 391.00 416.00 429.00
jumper with occasional blasting.

(d) Extra for wet earth work above sub soil


water level. cum 26.30 26.30 26.30 26.30

(e) Extra for Earth work under standing water.


cum 39.45 39.45 39.45 39.45

(f) Extra for Earth work under flowing water.


cum 65.75 65.75 65.75 65.75

(g) Extra for every 7.50 metres additional lead


beyond 15 m. cum 6.00 6.00 7.00 7.00

6.8 Earth filling

Chapter-6 Page 85 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
a (i) Earth filling under floors with surplus
ordinary soil or soil containing gravel or
kankar upto 40% excavated from outside
cum 63.00 63.00 69.00 69.00
the building plinth in 15 cm layers including
ramming, watering and consolidating lead
upto 30 metres

(ii) Earth filling under floors with surplus soil


containing more than 40% gravel or kankar
excavated from foundation & taken only
from outside the building plinth in 15 cm cum 113.00 113.00 124.00 124.00
layers including ramming watering and
consolidation lead upto 30 metres

b (i) Earth work (exclusive of compensation for


earth) in excavation in ordinary soil or soil
containing gravel or kankar upto 40% and
filling in 15 cm layers in foundation and
cum 140.00 140.00 154.00 154.00
plinth including ramming watering and
consolidating under floors with earth
brought from a distance not exceeding 30
metres

(ii) Earth work in excavation in soil containing


more than 40% gravel or kankar (Exclusive
of compensation for earth) and filling in 15
cm layers in foundation and plinth including
cum 194.00 194.00 213.00 213.00
ramming, watering and consolidating under
floors with earth brought from a distance
not exceeding 30 metres.

c (i) Earth filling under floors with surplus


ordinary soil or soil containing gravel or
kankar upto 40% taking outside the
cum 277.00 277.00 305.00 305.00
premises in 15 cm layers including
ramming, watering and consolidated lead
upto 1000 metres

(ii) Earth filling under floors with surplus soil


containing more than 40% taking outside
the premises in 15 cm layers including cum 327.00 327.00 360.00 360.00
ramming watering and consolidated lead
upto 1000 metres

(d) Extra for additional lead above 30 metres. As per


rates
cum under
item No.
6.2 (c)

(e) Removal of slips from road side to:-

Chapter-6 Page 86 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) out side road boundary into depressions
with combined lead of 15 metres inclusive Rates of Rates of
of cost of of explosive, compressed air items items
T&P. Nos. 7.0 Nos. 7.0
to 7.10 to to 7.10 to
be paid be paid
according according
cum
to type of to type of
work after work after
reducing reducing
the rates the rates
by 10 by 10
percent percent

(ii) Extra for every additional 7.5 metres lead


above 15 metres. cum 5.15 5.15 5.15 5.15

6.9 Earth work over Roofs

(a) Earth work over roofs of one story building


with good earth free of any admixture of
foreign matter including breaking of clods,
cum 237.00 237.00 261.00 261.00
ramming, watering, dressing and horizontal
lead upto 30 metres.

(b) Extra for additional lead beyond 30 metres. As per


rates
cum under
item no.
6.2 (c)

(c) Extra for every additional storey. cum 15.00 15.00 17.00 17.00

6.10 Earth work undressed by boats including hire of


boats:-

(a) Digging and loading in boats within 15


cum 109.00 109.00 120.00 120.00
metres lead.

(b) Carriage by boats upto 300 metres.


cum 1.00 1.00 1.00 1.00

(c) Extra for distance beyond 300 metres and


upto 750 metres (per 30 metres). cum 1.00 1.00 1.00 1.00

Note For lead beyond 750 metres the rates


:- under item No. 6.2 (c) will be applicable.

(d) Unloading earth from boats cum 59.00 59.00 65.00 65.00

6.11 Earth work undressed by tramway or rail :-


Chapter-6 Page 87 CSR-2020
CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(a) Digging and loading into tracks within 15


cum 109.00 109.00 120.00 120.00
metres lead.

(b) Hand shunting of N.G. tip wegons (per 30


cum 7.00 7.00 8.00 8.00
metres)

(c) Unloading earth from tip wagons and


cum 29.00 29.00 32.00 32.00
clearing with 3.0 metres from rail.

(d) Unloading earth from B.G. Trucks clearing


cum 61.00 61.00 67.00 67.00
1.5 metres from rail.

(e) Unloading earth from B.G. Trucks and


cum 81.00 81.00 89.00 89.00
spreading 4.5 metres from rail.

(f) Unloading earth from B.G. Trucks and


cum 100.00 100.00 110.00 110.00
spreading upto 30 metres from rail.

6.12 Dressing of dowels in addition to payment for


dressed earth work. cum 5.00 5.00 6.00 6.00

6.13 Restoring boundary road drains.


metre 5.00 5.00 6.00 6.00

6.14 Making new boundary road including leveling and


dressing 3.0 metres to 5.0 metres wide.

(a) In unploughed Land


metre 12.00 12.00 13.00 13.00

(b) In ploughed Land.


metre 25.00 25.00 28.00 28.00

Note The rates for item No. 6.13 are to be paid only in
:- reaches where no earth work for boundary roads
is paid for.

6.15 (a) Covering boundary road with 7.50 cm deep


sarkanda of Jungle upto 300 metres lead
metre 14.00 14.00 15.00 15.00
including cutting and supply of sarkanda to
jungle.

(b) Covering boundary road with 7.50 cm deep


sarkanda or jungle lead 300 metres to 1000
metre 28.00 28.00 31.00 31.00
metres including cutting and supply of
sarkanda or jungle.

(c) Extra for carriage of Sarkanda:-

(i) 2nd Kilometree metre 14.00 14.00 15.00 15.00

Chapter-6 Page 88 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(ii) 3rd Kilometre metre 12.00 12.00 13.00 13.00

(iii) 4th Kilometre metre 11.00 11.00 12.00 12.00

(iv) 5th Kilometre metre 10.00 10.00 11.00 11.00

(v) 6th Kilometre metre 9.00 9.00 10.00 10.00

(vi) 7th Kilometre metre 8.00 8.00 9.00 9.00

(vii) Subsequent Km metre 6.00 6.00 7.00 7.00

6.16 Ploughing and leveling borrow pits.


Acre 3680.00 3680.00 4048.00 4048.00

6.17 Berm trimming both sides :-

(a) Channels upto one metre depth


Km 4166.00 4166.00 4583.00 4583.00

(b) Channels exceeding 1.0 metre but upto


1.50 metre depth. Km 6101.00 6101.00 6711.00 6711.00

(c) Channels exceeding 1.5 metre but upto 2.5


metres depth. Km 9294.00 9294.00 10223.00 10223.00

6.18 Dag-belling:-

(a) Single Kassi stroke minimum 7.5 cm depth.


Km 805.00 805.00 886.00 886.00

(b) Double Kassi strove 'V' shaped minimum


10 cm depth. Km 1602.00 1602.00 1762.00 1762.00

(c) Double Kassi strove 'V' shaped minimum


15 cm depth. Km 2115.00 2115.00 2327.00 2327.00

6.19 Excavation in Soil (any type) using Hydraulic


Excavator CK 90 with hydraulic excavator of 0.9
cum bucket capacity including cutting, trimming
bottom and side slopes, in accordance with cum 34.00 34.00 37.00 37.00
requirements of lines, grades and cross sections,
including all lifts and combined lead upto 30m.

Chapter-6 Page 89 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
6.20 Laser leveling of land up to 300 mm with tractor &
Laser leveling Machine complete in all respect.

(a) Up to 5 acre
5 acre 12443.20 12443.20 13687.52 13687.52

(b) up to 10 acre 10
22397.76 22397.76 24637.54 24637.54
acre
(c) Above 10 acre Per
2115.34 2115.34 2326.87 2326.87
acre

Chapter-6 Page 90 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 7

ROCK CUTTING

Notes :-
(I) Converting lift into horizontal lead :-

For converting lift into horizontal lead the lift up to 3.60 metres will be multiplied by 10, from 3.60
metres to 6.0 metres it will be squared & multiplied by 3.3 and beyond 6.0 metres, it will be
multiplied by 20. No cross leads what-so-ever shall be measured and paid for.

(ii) Measurement of lift :-

The lift shall be measured from the centre of gravity of the excavated rock to that of placed rock.
This shall constitute the mean lift for that section. When rock has to be carried over a spoil bank
and dumped beyond it, the mean lift would be the difference in levels between the centre of gravity
of the excavated rock and top of the spoil bank omitting the dowel.

Sr. Description Unit Zone-A Zone-B


No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Excavation including handling of materials within
15 meters inclusive of cost of explosives and
dressing compressed air and T&P.

7.1
Pick work
cum 184.00 184.00 202.00 202.00
7.2
Pick and jumper work.
cum 290.00 290.00 319.00 319.00
7.3
Jumper work.
cum 321.00 321.00 353.00 353.00
7.4
Jumper work with occasional blasting.
cum 467.00 486.00 514.00 533.00
7.5
Blasting ordinary Rock.
cum 539.00 569.00 593.00 623.00
7.6
Blasting hard Rock.
cum 765.00 825.00 842.00 902.00
7.7
Blasting conglomerate mass.
cum 905.00 989.00 996.00 1080.00
7.8
Blasting conglomerate trenches.
cum 1184.00 1299.00 1302.00 1417.00
7.9
Through cut Rock excavation.
cum 10 percent extra over above rates
7.10
Extra for every 7.5 meters additional lead.
cum 2.69 2.69 2.69 2.69

Chapter-7 Page 91 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 8
DISMANTLING
Notes:-
The rates given under this chapter are subject to the following conditions in addition to the
conditions laid down in the public works "General Conditions of Contract etc." and PWD
specifications.

(i) Unless otherwise stated, the rates include sorting and stacking dismantled material and removing
the same within a distance of 100 metres.

(ii) The rates given below are for non-hydraulic works. For hydraulic works, which are required to be
dismantled these shall be enhanced by 50 per cent. (hydraulic works are those which remain
submerged under water for most of their lives). The items, which can be considered as hydraulic
works, are :-
"Stone masonry in lime or cement, burnt bricks, tile lining & tile masonry in lime or cement mortar,
lime or cement concrete, reinforced cement concrete and pucca grouted pitching when submerged
under water."

(iii) Unless otherwise specified, the rates cover the cost of all tools & plants, ladders, scaffolding and all
other adjuncts required for dismantling.

(iv) Dismantling should be done with utmost care avoiding damage to the material, so retrieved taking
all necessary precautions for the protection of Public properties and keeping down dust and
nuisance etc.

(v) For Disposal of malba will be worked out as per chapter no. 5.

Sr. Description Unit Zone-A Zone-B


No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
8.1 Dismantling stone masonry/Rubble masonry
including stacking of serviceable materials and
disposal of unserviceable materials.

(a) In lime cum 517.00 569.00

(b) In cement cum 687.00 756.00

(c) Scabbled or rubble stone masonry in


cum 256.00 282.00
mud.

(d) Dry rubble or dry scabbled masonry cum 175.00 193.00

8.2 Dismantling stone pitching or soling

(a) Stone pitching dry cum 175.00 193.00

(b) Grouted with natural silt and clay cum 313.00 344.00

(c) Stone pitching laid dry and grouted with


cum 242.00 266.00
dry ballast

(d) Stone pitching grouted with dry ballast


cum 341.00 375.00
and with natural silt and clay

Chapter-8 Page 92 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

8.3 Dismantling stone spalls or Brick bats filling cum

(a) In dry cum 156.00 172.00

(b) Grouted with natural silt and clay cum 223.00 245.00

(c) In wire crates including opening of crates


cum 275.00 303.00
and stacking crate material

Note :- When the work to be dismantled under items


No. 8.2 and 8.3 is under water, add 50% to
above rates.

8.4 Dismantling pucca grouted pitching cum 517.00 569.00

8.5 Dismantling brick work tile, masonry or tile


lining

(a) In lime cum 517.00 569.00

(b) In cement cum 682.00 750.00

(c) Arch work in cement or lime cum 829.00 912.00

(d) In mud cum 256.00 282.00

(e) In mud with Jibi face cum 313.00 344.00

(f) Gilafi brick work cum 175.00 193.00

(g) Gilafi Brick work with Jibi face cum 223.00 245.00

(h) Sundried brick work in mud cum 137.00 151.00

(i) Dismantling dry brick work cum 137.00 151.00

8.6 Dismantling concrete

(a) Lime concrete, cement concrete of 1:6:12


cum 412.00 453.00
or leaner mix

(b) Cement concrete plain 1:4:8 or 1:5:10 cum 682.00 750.00

(c) Cement concrete plain 1:3:6 mix cum 976.00 1074.00

(d) Cement concrete plain1:2:4 mix cum 1365.00 1502.00

(e) Reinforced cement concrete cum 2204.00 2424.00

8.7 Dismantling metalling or dry brick ballast cum 175.00 193.00

8.8 Dismantling roofing

(a) First class mud roofing sqm 63.00 69.00

(b) Second class mud roofing sqm 56.00 62.00

(c) Mud roofing with wooden planks laid over


sqm 52.00 57.00
battens,.

(d) Thatched roofing sqm 19.00 21.00

Chapter-8 Page 93 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(e) Sirki Sarkanda roofing sqm 26.00 29.00

(f) Jack arch roofing excluding joists or


sqm 64.00 70.00
terraced roofing

8.9 Dismantling wood work from roof. cum 1207.00 1328.00

8.10 Stripping and stacking slate or tiles of a roof.


sqm 44.00 48.00

8.11 Stripping and stacking iron sheets of a roof


including ridging, flashing, eaves boards gutters sqm 29.00 32.00
and down pipes.

8.12 Add for planks and battens in case of items nos


sqm 25.00 28.00
8.10 and 8.11

8.13 Add for roof trusses of iron or wood, (rafters,


purling etc.) in case of item Nos. 8.10 and 8.11. sqm 53.00 58.00

8.14 Dismantling mud walling cum 137.00 151.00

8.15 Dismantling Dhajji walling.


sqm 52.00 57.00

8.16 Dismantling cement conglomerate floors 25mm


to 50mm thick including concrete base. sqm 109.00 120.00

8.17 Dismantling cement conglomerate floors 25mm


to 50mm thick without concrete base sqm 57.00 63.00

8.18 Dismantling brick or flagged stone flooring


including concrete base. sqm 85.00 94.00

8.19 Dismantling brick or flagged stone flooring


sqm 28.00 31.00
without concrete base.

8.20 Dismantling plank flooring


sqm 53.00 58.00

8.21 Dismantling plank ceiling and supporting timber


sqm 67.00 74.00

8.22 Dismantling cloth ceiling and supporting timber


sqm 29.00 32.00

8.23 Dismantling stoneware drains and concrete


mtr 19.00 21.00

8.24 Removing R.C.C. battens from roofs


cum 2066.00 2273.00

8.25 Removing R S beams from structures or


qtl 343.00 377.00
trusses

Chapter-8 Page 94 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

8.26 Removing Doors and Windows (Steel or wood)


with chowkhats by making recesses in walls
when the wall is not to be dismantled.

(a) Doors of area 3 sqm and below. each 223.00 245.00

(b) Windows of area 3 sqm and below each 142.00 156.00

(c) Clerestory windows of area 3 sqm and


each 71.00 78.00
below.

8.27 Removing hume pipes

(a) 150mm to 300 mm dia mtr 100.00 110.00

(b) 300mm to 600 mm dia mtr 156.00 172.00

(c) 600mm to 900 mm dia mtr 223.00 245.00

8.28 Removing sal ballies from structures including


stacking each 39.00 43.00

8.29 Dismantling sleepers from centering including


each 39.00 43.00
stacking out side

8.30 Dismantling tram way track mtr 14.00 15.00

8.31 Scraping

(a) White wash and colour wash sqm 7.00 8.00


(b) Lime plaster sqm 36.00 40.00
(c) Cement plaster sqm 36.00 40.00
(d) Mud plaster sqm 6.00 7.00

(e) Bricks dismantled from brick work in lime 1000


1580.00 1738.00
or cement. nos
(f) Bricks dismantled from brick work in mud. 1000
395.00 435.00
nos
(g) Tiles dismantled from the work in lime or 1000
2073.00 2280.00
cement nos
(h) Dismantling boulder masonry/concrete
(i) In cement or lime cum 626.00 689.00
(ii) In mud cum 137.00 151.00
8.32 Dismantling wire gauge with frame work
including separating frame work and putting sqm 11.00 12.00
wire gauge into rolls.

Chapter-8 Page 95 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
8.33 Dismantling reinforced brick work including
cutting, cleaning and straightening of bars.
cum 1608.00 1769.00

8.34 Dismantling rain water pipes of ACC/CI with


clamps and specials etc. mtr 21.00 23.00

8.35 Dismantling glazed tiles (to be carefully


sqm 127.00 140.00
removed).
8.36 Dismantling asbestos cement celotax or other
hard board ceiling or partition walls including sqm 44.00 48.00
supporting timber

8.37 Dismantling wooden chajjas and sun shades


sqm 52.00 57.00

8.38 Removing doors and windows together with the


dismantling of walls

(i) Doors each 118.00 130.00


(ii) Windows each 79.00 87.00
(iii) Clerestory windows each 79.00 87.00
8.39 Dismantling of brick work in cement sand
mortar / lime mortar including T&P scaffolding
wherever necessary, sorting the dismantled
cum 660.00 726.00
material, disposal of unserviceable material. &
staking the serviceable material with all lifts &
lead of 100 metre (By Mechanical Means)

8.40 Dismantling of PCC including T&P scaffolding


wherever necessary, sorting the dismantled
material, disposal of unserviceable material. & cum 808.00 889.00
staking the serviceable material with all lifts &
lead of 100 mtr (By Mechanical Means)

8.41 Dismantling of pre-stressed / RCC including


T&P scaffolding wherever necessary, sorting
the dismantled material, disposal of
unserviceable material. & staking the cum 1553.00 1708.00
serviceable material with all lifts & lead of 100
mtr (By Mechanical Means)

8.42 Dismantling precast concrete Kerb thickness


40mm up to 75mm This item is to be taken under 8.6 a

Chapter-8 Page 96 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
8.43 Taking out existing CC interlocking paver
blocks from footpath/ central verge/pavement,
including removal of rubbish etc., disposal of
unserviceable material to the dumping ground,
sqm 107.00 118.00
for which payment shall be made separately
and stacking of serviceable material within 50
metre lead as per direction of Engineer-in-
Charge.

8.44 Dismantling aluminium/ Gypsum partitions,


doors, windows, fixed glazing and false ceiling
including disposal of unserviceable material and
stacking of serviceable sqm 46.00 51.00
material within 50 meters lead as directed by
Engineer-in-charge

8.45 Dismantling barbed wire or flexible wire rope in


fencing including making rolls and stacking Kg 30.00 33.00
within 50 metres lead.

8.46 Dismantling steel work in built up sections in


angles, tees, flats and channels including all
gusset plates, bolts, nuts, cutting rivets, welding kg 5.00 6.00
etc. including dismembering and stacking within
50 metres lead.

Chapter-8 Page 97 CSR-2020


CSR−2020−Final
CHAPTER NO. 9
CENTRING AND SHUTTERING
Notes :-
(i) Unless otherwise stated, the rates include handling of all materials within 100 metres.

(ii) Where-ever smooth exposed concrete finish is desired and plaster is not to be done 10 percent
extra on the labour rates shall be payable. The through rates shall be increased correspondingly.

(iii) These rates are for steel shuttering only. Hence only steel shuttering is to be used.

(iv) For estimate purposes shuttering may be taken as under:-

(a) For foundation work and plinth beams @ 1.50sqm/cum

(b) For slabs & stair case @ 8.25sqm/cum

( c) For columns, beams, door lintels @ 8.00sqm/cum

(d) For R.C.C. domes @ 10.00sqm/cum

(e) For walls @ 13.00sqm/cum

(f) For shelves @ 18.50sqm/cum

(g) For facia or any thin section @ 20.00sqm/cum

Sr. No. Description Unit Rates


Zone-A Zone-B

1 2 3 4 5
9.1 Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) sqm 210.00 231.00

9.2 Centering and shuttering for faces of walls, partitions,


retaining walls and the like (vertical or battering including
attached pilasters buttresses etc. sqm 405.00 446.00

9.3 Centering and shuttering for faces of walls, partitions,


retaining walls and the like (vertical or battering) including
attached pilasters, buttresses etc when curved. sqm 445.00 490.00

9.4 Centering and shuttering for columns (Square or rectangular


or poly gonal in plain) Sqm 477.00 525.00

9.5 Centering and shuttering for columns (circular or curved in


plain) sqm 482.00 530.00

9.6 Centering and shuttering for sides and soffits of beam,


beams, launching girders, bressumers, lintels. sqm 380.00 418.00

9.7 Centering and shuttering for arches of varandah, door and


windows openings. sqm 927.00 1020.00

9.8 Centering and shuttering for flat surfaces such as


suspended floors, roofs, landings, chajjas, shelves etc. sqm 532.00 585.00

Chapter-9 Page 98 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rates
Zone-A Zone-B

1 2 3 4 5
9.9 Centring and shuttering for stair cases with sloping with
soffits including risers and stringers. sqm 446.00 491.00

9.10 Centring and shuttering for parapet, fascias and other similar
items including edges. sqm 520.00 572.00

9.11 Centring and shuttering for slab of culverts for vent height up
to 3.00 mtr sqm 581.00 639.00

9.12 Centring and shuttering for R.C.C. domes


sqm 1261.00 1387.00

9.13 Shuttering for precast R.C.C. battens/cement concrete block


in situ such as staggered RC blocks arrow and plain cement
concrete block. sqm 304.00 334.00

9.14 Shuttering for precast and plain or Reinforced concrete


blocks, wall plates, bedplates, shelves etc. sqm 291.00 320.00

9.15 Extra rate for shuttering in each subsequent storey above


the first. Storey work done in subsequent storey above the
first storey up to height of 4 metres or part thereof up to the sqm 10.00 11.00
roof top level of that storey.

9.16 Extra rate for shuttering work done above 4 metres height
(where any single storey exceeds 4 metres in height) for
every additional height of 1 metres or part thereof. sqm 41.00 45.00

Chapter-9 Page 99 CSR-2020


CSR−2020−Final
CHAPTER NO. 10
CONCRETE
Notes :-
(i) Unless otherwise stated, the labour rates include the rehandling charges of material within 100
metres

(ii) The labour and through rates include the cost of water. Where water is supplied by the
department 3% cost of labour rate should be deducted and through rate should be reduced
accordingly.

(iii) The labour rates as well as through rates of concrete include the cost of curing and protecting in
bad weather conditions.

(iv) The rates given in this chapter are for hand-mixed concrete as well as mixture mixed, batch type
mixture mixed.

(v) The rates given in this chapter are for non-vibrated concrete unless otherwise specified.

(vi) The rates given for superstructure are work done up to a height of 4 metres above plinth level or
up to the first storey roof top level which ever may be lower.The rate given for superstructure are
for work done upto a height of 4 meters above plinth level or upto the first storey roof top level,
which ever may be lower.

(vii) To the extent the plinth area of an inter floor remains within and up to 40 percent of the plinth
area of the main storey of the building immediately below the said inter-floor such an inter floor
should be regarded as mezzanine and if plinth area of the said inter-floor exceeds this limiting
figure of 40 per cent then the said inter-floor should be regarded for purposes of note (vi) above
as a regular storey. A mezzanine floor is not to be regarded as a separate additional storey in the
structure for purposes of allowing extra rate for concrete in superstructure . In the case of building
storey having such a mezzanine, therefore, the storey shall be considered for the full height
ignoring the existence of the mezzanine inter-floor.

(viii) The rates given given in this chapter are for both cast-in-situ and precast work. The precast work
includes the cost of hoisting and fixing in position.

(ix) The rates for all items exclude the cost of steel reinforcement and form work/centring and
shuttering except for item No. 10.40, rate of which includes the labour and material for centring
and shuttering complete.

(x) The labour rates given in this chapter include the cost of water, Tools and Plant, Scaffolding
(Labour and material) and cost of good earth for mud mortar, wherever required.

(xi) Coarse sand for item No. 10.13 to 10.28, 10.40, 10.59 to 10.65 & 10.70 shall be as per Punjab
PWD Specifications No.3.30.

(xii) 10 percent extra is payable on labour only for work in RCC slabs having inclination more than 25
degrees with the horizontal. Nothing extra shall be paid for lesser inclinations.

(xiii) Item no 10.1 to 10.12 are without using mechanical mixer allowed for the work where the overall
quantity of PCC involved is only up to 5 cum at one site or carrying of mixer is not feasible. Where
overall quantity is more than 5 cum, the work is to be executed by using mechanical mixer.

Chapter-10 Page 100 CSR-2020


CSR−2020−Final
(xiv) The rate is for mixed design item with or without admixture, nothing extra shall be paid for adding
the admixture or cement. Where concreting is done by using RMC/by using concrete pumping
machine cement content is required to be increased by 10% of the admixutre and 2% of cement
content in respective items after getting approval from the competent authority.

(xv) If the concreting is done by pumping method, then increases in rate for storey wise shall be
permitted under respective item in that case item no. 10.48 & 10.49 will not be applicable.

(xvi) For estimate purposes steel reinforcement may be taken as under:-

Sr.no Description Steel for load Steel for RCC frame


bearing masonry structure up to 3
structure up to 2 storey
storey
In kg per cum In kg per cum
1 2 3 4 5 6
(a) For foundation
60 per cum 80 per cum

(b) For Plinth Beam


100 per cum 150 per cum

( c) Extra in foundation for addl. Each Storey


10 per cum 10 per cum

(d) For Roof Slab and Door lintel


80 per cum 100 per cum

(e) For Column


100 per cum 150 per cum

(f) Extra in columns for addl. Each storey


20 per cum 20 per cum

(g) For RCC Beam


100 per cum 150 per cum

(h) For RCC Domes


100 per cum 100 per cum

(i) For walls


120 per cum 120 per cum

(j) Extra in walls for addl. Each storey


10 per cum 10 per cum

(k) For Shelves


60 per cum 60 per cum

(l) For Fascia or any thin section


70 per cum 70 per cum

(m) For Piles


30 per cum 40 per cum

Chapter-10 Page 101 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
10.1 Mud concrete with brick ballast 40mm gauge
mixing by manual means. Cum 1699.00 2907.00 1869.00 3077.00

10.2 Mud concrete with stone ballast 40mm gauge


mixing by manual means. Cum 1699.00 2515.00 1869.00 2685.00

10.3 Lime concrete 1:2:8 (0.13 cum lime 0.26 cum


surkhi one cum brick ballast) 40mm gauge Cum 1205.00 3440.00 1326.00 3561.00
mixing by manual means.
10.4 Lime concrete 16:24:100 (0.16 cum lime, 0.24
cum surkhi and one cum brick ballast 32mm Cum 1205.00 3594.00 1326.00 3715.00
gauge mixing by manual means.
10.5 Lime concrete 16:24:100 (0.16 cum lime, 0.24
cum surkhi and one cum brick ballast 20mm Cum 1205.00 3594.00 1326.00 3715.00
gauge mixing by manual means.
10.6 Cement concrete 1:8:16

a With brick ballast 32mm / 40mm gauge


i mixing by manual means
Cum 1205.00 3411.00 1326.00 3532.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3523.00 1448.00 3655.00

b With stone aggregates 40mm gauge


i mixing by manual means Cum 1205.00 3015.00 1326.00 3136.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3127.00 1448.00 3259.00

10.7 Cement concrete 1:8:16

a With brick ballast 20mm gauge


i mixing by manual means
Cum 1205.00 2837.00 1326.00 2958.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 2948.00 1448.00 3080.00

b With stone aggregates 20mm gauge


i mixing by manual means Cum 1205.00 3027.00 1326.00 3148.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3139.00 1448.00 3271.00

10.8 Cement concrete 1:6:12

a With brick ballast 40mm gauge


i mixing by manual means
Cum 1205.00 3570.00 1326.00 3691.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3664.00 1448.00 3796.00

Chapter-10 Page 102 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) With stone aggregate 40mm gauge
i mixing by manual means Cum 1205.00 3178.00 1326.00 3299.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3290.00 1448.00 3422.00

10.9 Cement concrete 1:5:10

a with brick ballast 40mm gauge


i mixing by manual means Cum 1205.00 3697.00 1326.00 3818.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3228.00 1448.00 3360.00

(b) With stone aggregate 40mm gauge

i mixing by manual means Cum 1205.00 3309.00 1326.00 3430.00


ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3421.00 1448.00 3553.00

10.10 Cement concrete 1:4:8

a with brick balast 40mm gauge

i mixing by manual means Cum 1205.00 3888.00 1326.00 4009.00


ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3999.00 1448.00 4131.00

10.11 Cement concrete 1:4:8

(a) with stone ballast 20mm gauge


i with stone ballast 20mm gauge Cum 1205.00 3519.00 1326.00 3640.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3630.00 1448.00 3762.00

(b) With stone aggregate 40mm gauge


i mixing by manual means Cum 1205.00 3508.00 1326.00 3629.00
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3619.00 1448.00 3751.00

10.12 Cement concrete 1:3:6

a with stone ballast or shingle

i mixing by manual means Cum 1205.00 3813.00 1326.00 3934.00


ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 3924.00 1448.00 4056.00

10.13 Cement concrete 1:2:4

a With stone ballast or shingle

i mixing by manual means Cum 1205.00 4564.00 1326.00 4685.00

Chapter-10 Page 103 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
ii mixing by mechanical means using concrete
mixer volumetric type Cum 1316.00 4675.00 1448.00 4807.00

10.14 Extra over item No. 10.1 to 10.13 when work


is done in situ in small quantities not
exceeding 0.30 cum per block in situ such as
staggered blocks, arrows, concrete block over Cum 267.00 267.00 294.00 294.00
inverted filters, bed plates arches etc.

10.15 Reinforced cement concrete M-20


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 1801.00 5158.00 1981.00 5338.00
reinforcement centring and shuttering in
foundation and plinth.

10.16 Reinforced cement concrete M-25


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 1801.00 5385.00 1981.00 5565.00
reinforcement centring and shuttering in
foundation and plinth

10.17 Reinforced cement concrete M-30


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 1801.00 5676.00 1981.00 5856.00
reinforcement centring and shuttering in
foundation and plinth

10.18 Reinforced cement concrete M-35


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 1801.00 5974.00 1981.00 6154.00
reinforcement centring and shuttering in
foundation and plinth

10.19 Reinforced cement concrete M-40


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 1801.00 6135.00 1981.00 6315.00
reinforcement centring and shuttering in
foundation and plinth

10.20 Reinforced cement concrete M-20


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 2551.00 5908.00 2806.00 6163.00
reinforcement centring and shuttering in
superstructure.

Chapter-10 Page 104 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
10.21 Reinforced cement concrete M-25
mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 2551.00 6135.00 2806.00 6390.00
reinforcement centring and shuttering in
superstructure.

10.22 Reinforced cement concrete M-30


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel Cum 2551.00 6426.00 2806.00 6681.00
reinforcement centring and shuttering in
superstructure.

10.23 Reinforced cement concrete M-35


mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
Cum 2551.00 6724.00 2806.00 6979.00
by needle vibrator but excluding steel
reinforcement centring and shuttering in
superstructure.
10.24 Reinforced cement concrete M-40
mechanically batch mixed using batch mixed
using concrete mixer and vibrated by needle
Cum 2551.00 6884.00 2806.00 7139.00
vibrator but excluding steel reinforcement
centring and shuttering in superstructure.

10.25 Damp proof course 7.5 Cm thick cement


concrete 1:2:4 with 2 coats of bitumen 20/30
penetration at 1.65 Kg per sqm laid hot and sqm. 183.00 534.00 201.00 552.00
sanded

10.26 Damp proof course 4cm thick of cement


concrete 1:2:4 with 2 coats of bitumen 20/30
penetration at 1.65 Kg per sqm laid hot and sqm. 98.00 331.00 108.00 341.00
sanded

10.27 Damp proof course 4cm thick of cement


concrete 1:2:4 with water proofing compound
as per manufactures guidelines. sqm. 98.00 244.00 108.00 254.00

10.28 Damp proof course 2.5cm thick of cement


concrete 1:2:4 with 2 coats of bitumen 20/30
penetration at 1.65 Kg per sqm laid hot and sqm. 75.00 240.00 83.00 248.00
sanded

10.29 Supplying & laying dry brick bats Cum 146.00 992.00 161.00 1007.00
10.30 Supplying & laying dry brick ballast Cum 146.00 1461.00 161.00 1476.00
10.31 Nicking cement concrete surface (over 28
days old including preparation and laying Sqm 23.00 28.00 25.00 30.00
slurry

Chapter-10 Page 105 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
10.32 Washing concrete surface scrubbing with
brushes including preparing and laying slurry sqm 14.00 19.00 15.00 20.00

10.33 Nicking lime concrete surface


sqm 16.00 16.00 18.00 18.00

10.34 Grouting concrete between the grooves of


gates including labour for shuttering sqm 317.00 317.00 349.00 349.00

10.35 Preparing watering and ramming surface for


laying concrete sqm

(a) Head work

(i) Horizontal
sqm 27.00 27.00 30.00 30.00

(ii) Glacies and crest


sqm 54.00 54.00 59.00 59.00

(b) Channels (irrigation)

(i) Horizontal
sqm 23.00 23.00 25.00 25.00

(ii) Glacis and crest


sqm 35.00 35.00 39.00 39.00

10.36 Preparing surface for inverted fillers


sqm 13.00 13.00 14.00 14.00

10.37 Plain cement concrete 1:8:16 with stone


ballast 40mm guage using 20% plum Cum 1205.00 2712.00 1326.00 2833.00

10.38 Plum cement concrete 1:6:12 with stone


ballast 40mm gauge, using 20% plum Cum 1205.00 2829.00 1326.00 2950.00

10.39 Plum cement concrete 1:5:10 with stone


ballast 40mm gauge using 20 percent plum Cum 1205.00 2947.00 1326.00 3068.00

10.40 Providing, hoisting and fixing in super


structure for first storey precast reinforced
cement concrete work in string courses,
bands, copings, bed plates, anchor blocks,
plain window sills and the like including the
cost of required centring & shuttering, cost of
Cum 5512.00 8776.00 6063.00 9327.00
1:2:4 hand mixed (1 cement: 2 coarse sand: 4
graded stone aggregate 20mm nominal size)
but excluding the cost of steel
reinforcement.(Qty of each unit shall not
exceed 0.04 cum)

Chapter-10 Page 106 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
10.41 Providing, hoisting and fixing in super
structure for first storey precast reinforced
cement concrete in small lintels not
exceeding 1.5m clear span including the cost
of required centring & shuttering, cost of 1:2:4
hand mixed (1 cement: 2 coarse sand : 4 Cum 5304.00 8147.00 5834.00 8677.00
graded stone aggregate 20mm nominal-size)
but excluding the cost of steel
reinforcement.(Qty of each unit shall not
exceed 0.06cum)

10.42 Extra for using batch type concrete mixer as


per IS : 1791 where not included in the rates . Cum 216.00 216.00 238.00 238.00

10.43 Extra for using concrete mixer volumetric type


where not included in the rates . Cum 136.00 136.00 150.00 150.00

10.44 Extra for using needle vibrator where not


included in the rates . Cum 27.00 27.00 30.00 30.00

10.45 Extra for using computerised concrete batch


mixing plant including carriage by transit
mixer within 1 km lead (note: where concrete Cum 340.00 340.00 374.00 374.00
mixer is already included in the rate the same
shall be deducted )

10.46 Extra for pumping charges of Batch Mix


Concrete / Ready mix conrete work (RMC)
Cum 88.00 88.00 97.00 97.00

b Extra rate for enhancement in pumping


power, addition of pipe length, scaffolding for
handling the pipe arrangement for pumping of
concrete in subsequent storey above the
Cum 22.00 22.00 24.00 24.00
below storey up to height of 4 meters or part
there of up to the roof top level of that storey

10.47 Extra for carriage of RMC/batch mixed


concrete with transit mixture beyond 1st km . Cum/
34.00 34.00 37.00 37.00
km

10.48 Extra for R.C.C/PCC. work done in each


subsequent storey above the first storey up to
height of 4 metres or part thereof up to the cum 181.00 181.00 199.00 199.00
roof top level of that storey.

10.49 Extra for RCC/PCC work done above 4


metres height (where any single storey
exceeds 4 metres in height) for every cum 45.00 45.00 50.00 50.00
additional height of 1 metres or part thereof.
10.50 Extra for using admixture in designed mix
concrete. kg 15.00 60.00 17.00 62.00

Chapter-10 Page 107 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
10.51 Providing precast cement concrete Jali 1:2:4
(1 cement: 2 coarse sand : 4 graded stone
aggregate 6mm nominal size) reinforced with
1.6 mm dia mild steel wire including centring
and shuttering, roughening cleaning, fixing
and finishing in cement mortar 1:3 (1 cement:
3 fine sand) etc. complete excluding
plastering of the jambs, sills and soffits.

a 50 mm thick sqm. 595.00 1304.00 655.00 1364.00


b 40 mm thick sqm. 595.00 1186.00 655.00 1246.00
c 25 mm thick sqm. 595.00 1091.00 655.00 1151.00
10.52 Extra for laying PCC/RCC in or under foul
positions Cum 220.00 220.00 242.00 242.00

10.53 Boring, providing and installing bored cast-in-


situ reinforced cement concrete pile of
specified diameter and length below the pile
cap to carry a safe working load not less than
specified, excluding the cost of concrete and
steel reinforcement (The rates of concrete
and steel reinforcement are to be taken for
respective item of chapter No.10 & 18
respectively) but including the cost of boring
with manual auger (without bentonite solution)
and temporary casing of appropriate length
for setting out and removal of same and the
length of the pile to be embedded in the pile
cap etc. all complete as per BIS
specifications/ codes, including removal of
excavated earth with all lifts and leads
(Length of pile for payment shall be measured
upto bottom of pile cap)

a 200 mm Dia pile


m 401.00 401.00 441.00 441.00
b 250 mm Dia pile
m 455.00 455.00 501.00 501.00
c 300 mm Dia pile
m 530.00 530.00 583.00 583.00
d 400 mm Dia pile
m 625.00 625.00 688.00 688.00
e 450 mm Dia pile
m 754.00 754.00 829.00 829.00
f 500 mm Dia pile
m 847.00 847.00 932.00 932.00
g 600 mm Dia pile
m 1109.00 1109.00 1220.00 1220.00
10.54 Extra for providing under reamed bulb as per
BIS specifications/ codes.

a 200 mm Dia pile m 368.00 368.00 405.00 405.00

Chapter-10 Page 108 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
b 250 mm Dia pile m 399.00 399.00 439.00 439.00
c 300 mm Dia pile m 444.00 444.00 488.00 488.00
d 400 mm Dia pile m 496.00 496.00 546.00 546.00
e 450 mm Dia pile m 549.00 549.00 604.00 604.00
f 500 mm Dia pile m 647.00 647.00 712.00 712.00
g 600 mm Dia pile m 700.00 700.00 770.00 770.00
10.55 Extra for using Bentonite slury with Bentonite
pump in case of unstable bore

a 200 mm Dia pile m 212.00 212.00 233.00 233.00


b 250 mm Dia pile m 212.00 212.00 233.00 233.00
c 300 mm Dia pile m 382.00 382.00 420.00 420.00
d 400 mm Dia pile m 481.00 481.00 529.00 529.00
e 450 mm Dia pile m 557.00 557.00 613.00 613.00
f 500 mm Dia pile m 632.00 632.00 695.00 695.00
g 600 mm Dia pile m 776.00 776.00 854.00 854.00
10.56 Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.
a Single pile upto 50 tonne capacity

Initial test. each


38869.00 38869.00 42756.00 42756.00
test
b Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.

Single pile upto 50 tonne capacity

Routine test. each


23004.00 23004.00 25304.00 25304.00
test

Chapter-10 Page 109 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
c Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.
Single pile above 50 tonne and upto 100
tonne capacity

Initial test. each


54735.00 54735.00 60209.00 60209.00
test
d Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.

Single pile above 50 tonne and upto 100


tonne capacity

Routine test. each


35696.00 35696.00 39266.00 39266.00
test
e Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.
Group of two or more piles upto 50 tonne

Initial test. each


75359.00 75359.00 82895.00 82895.00
test
f Vertical load testing of piles in accordance
with IS 2911 (Part-IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
specification & the direction of Engineer in-
charge.

Group of two or more piles upto 50 tonne

Routine test. each


46009.00 46009.00 50610.00 50610.00
test
10.57 Cyclic vertical load testing of pile in
accordance with IS code of practice IS : 2911
(part-IV) including preparation of pile head etc
for.
a Single pile

Chapter-10 Page 110 CSR-2020


CSR−2020−Final
Sr. Description
Zone-A Zone-B
No.
Unit
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Upto 50 tonne capacity pile each
23004.00 23004.00 25304.00 25304.00
test
b Cyclic vertical load testing of pile in
accordance with IS code of practice IS : 2911
(part-IV) including preparation of pile head etc
for.

Single pile
Above 50 tonne and upto 100 tonne capacity
each
pile 35696.00 35696.00 39266.00 39266.00
test
c Cyclic vertical load testing of pile in
accordance with IS code of practice IS : 2911
(part-IV) including preparation of pile head etc
for.
Group of two piles
Upto 50 tonne capacity pile each
46009.00 46009.00 50610.00 50610.00
test
10.58 Lateral load testing of single pile in
accordance with IS code of practice IS : 2911
(part-IV) for determining safe allowable lateral
load on pile.

Upto 50 tonne capacity pile each


23004.00 23004.00 25304.00 25304.00
test
b Lateral load testing of single pile in
accordance with IS code of practice IS : 2911
(part-IV) for determining safe allowable lateral
load on pile.

Above 50 tonne and upto 100 tonne capacity


pile each
35696.00 35696.00 39266.00 39266.00
test

Chapter-10 Page 111 CSR-2020


CSR−2020−Final
CHAPTER NO. 11
BRICK WORK
Notes :-
(i) Unless otherwise stated, the labour rates include the cost of rehandling of materials within 100
metres.

(ii) These rates are meant for are building works and small engineering works where the total
quantity of Brick work does not exceed 15 cum. The labour rates for large engineering works
involving more than 15 cum of brick work shall be reduced by ten per cent and the through rates
shall be reduced correspondingly.

(iii) Through rate for brick work with first class clay brick or fly ash brick if the work done with 2nd
class Bricks will be reduced by Rs. 10% per cum than the rates with first class clay brick or fly ash
brick for that item of work.

(iv) The labour rates as well as through rates include the cost of water. In case water is supplied free
of cost by the department, rates will be reduced accordingly.

(v) The rates for brick work done, upto 1.5 metres height above the top of foundation concrete in
case of compound walls and in other Engineering works is the same as for brick work in
foundation and plinth.

(vi) The Labour rate given in this chapter include the cost of water, tools & plants, scaffolding
(Labour & Materials) and cost of good earth for mud mortar and mud plaster, where ever
required.

(vii) To the extent the plinth area of an inter floor called mezzanine remains within and upto 40 per
cent of the plinth area for the main storey of the building immediately below the said inter floor,
such an inter floor should be regarded as mezzanine and if plinth area of the inter floor exceeds
this limiting figure of 40 per cent than the inter floor should be considered, for purpose of item No.
11.29 of this chapter, as a regular storey. A mezzanine floor is not to be regarded as a separate
additional storey in the structure for purpose of allowing extra rate for brick work under item No.
11.29. In the case of a building storey having such a mezzanine, that storey shall be considered
for the full height as if ignoring the existence of the mezzanine inter floor.

(viii) Regarding the payment of extra rate, upto first storey (4 mtr height) above plinth level, the rates
for super structure will be payable only for subsequent storey above roof of lower floor level, the
structure above plinth level, will be considered as first storey.

(ix) The rate for this chapter has been worked out with fine sand.If coarse sand is to be used then
extra rate as per item no.11.73 will be added.

(x) Ground hydrated lime shall be used in all items of brick work in lime mortar.

(xi) The rate of item No. 11.29 (a),11.29 (c), 11.47 & 11.52 shall be calculated as under:- i.e.
Rate of 4th storey= Rate of 1st storey + Extra rate for 2nd storey + Extra rate for 3rd storey +
Extra rate for 4th storey.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.1 (i) First class burnt work laid in cement sand
mortar 1:7 in foundation and plinth cum 1327.00 4886.00 1460.00 5019.00

Chapter-11 Page 112 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.1 (ii) Pulverized Fly Ash - Lime Bricks as per class-
12.5 of IS: 12894-2002 laid in cement sand
mortar 1:7 in foundation and plinth (laying shall cum 1327.00 4509.00 1460.00 4642.00
be done as per PWD specifications).

11.2 (i) First class burnt brick work laid in cement sand
mortar 1:7 in first storey upto 4 metres above
plinth level. cum 1464.00 5008.00 1610.00 5154.00

11.2 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS: 12894-2002 laid in cement Sand
mortar 1:7 in first storey upto (4 metres) above
plinth level (laying shall be done as per PWD cum 1464.00 4647.00 1610.00 4793.00
specifications).

11.3 (i) First class burnt brick laid in cement sand


mortar 1:6 in foundation and plinth cum 1327.00 4934.00 1460.00 5067.00

11.3 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS: 12894-002 laid in cement sand
mortar 1:6 in foundation and plinth (laying shall cum 1327.00 4573.00 1460.00 4706.00
be done as per PWD specifications).

11.4 (i) First class burnt brick work laid in cement sand
mortar 1:6 in first storey upto 4 metres above
plinth level. cum 1464.00 5071.00 1610.00 5217.00

11.4 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS:12894-2002 laid in cement sand
mortar 1:6 in first storey (upto 4 metre height)
above plinth level (laying shall be done as per cum 1464.00 4711.00 1610.00 4857.00
PWD specifications).

11.5 First class burnt brick work laid in cement sand


mortar 1:5 in foundation and plinth cum 1327.00 5013.00 1460.00 5146.00

11.5 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS:12894-2002 laid in cement sand
mortar 1:5 in foundation and plinth (laying shall cum 1327.00 4653.00 1460.00 4786.00
be done as per PWD specifications).

Chapter-11 Page 113 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.6 First class burnt brick work laid in cement sand
mortar 1:5 in first storey upto 4 metres above
plinth level. cum 1464.00 5151.00 1610.00 5297.00

11.6 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS: 12894-2002 laid in cement sand
mortar 1:5 in first storey upto 4 metres above
plinth level (laying shall be done as per PWD cum 1464.00 4790.00 1610.00 4936.00
specifications).

11.7 First class burnt brick work laid in cement sand


mortar 1:4 in foundation and plinth cum 1327.00 5109.00 1460.00 5242.00

11.7 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS:12894-2002 laid in cement sand
mortar 1:4 in foundation and plinth (laying shall cum 1327.00 4748.00 1460.00 4881.00
be done as per PWD specifications).

11.8 First class burnt brick work laid in cement sand


mortar 1:4 in first storey upto 4 metres above
plinth level. cum 1464.00 5246.00 1610.00 5392.00

11.8 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS:12894-2002 laid in cement sand
mortar 1:4 in first storey upto 4 metres above
plinth level (laying shall be done as per PWD cum 1464.00 4886.00 1610.00 5032.00
specifications).

11.9 First class burnt brick work laid in cement sand


mortar 1:3 in foundation and plinth cum 1327.00 5315.00 1460.00 5448.00

11.9 (ii) Pulverized Fly Ash - Lime Bricks as per class-


12.5 of IS: 12894-2002 laid in cement sand
mortar 1:3 in foundation and plinth (laying shall cum 1327.00 4955.00 1460.00 5088.00
be done as per PWD specifications).

11.10 First class burnt brick work laid in cement sand


mortar 1:3 in first storey upto 4 metres above
plinth level. cum 1464.00 5453.00 1610.00 5599.00

Chapter-11 Page 114 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.10 (ii) Pulverized Fly Ash - Lime Bricks as per class-
12.5 of IS: 12894-2002 laid in cement sand
mortar 1:3 in First storey upto 4 metres above
cum 1464.00 5092.00 1610.00 5238.00
plinth level (laying shall be done as per PWD
specifications).

11.11 First class burnt brick work laid in cement sand


mortar 1:2 in first storey upto 4 metres above
plinth level. cum 1464.00 5787.00 1610.00 5933.00

11.12 First class burnt brick work laid in lime mortar


1:2 (one lime and two surkhi) foundation and
cum 1327.00 5164.00 1460.00 5297.00
plinth

11.13 First class burnt brick work laid in lime mortor


1:2 (one lime and two surkhi) in first storey
cum 1464.00 5301.00 1610.00 5447.00
(upto 4 metres height) above plinth level.

11.14 First class burnt brick work laid in lime surkhi


and mortar 1:1:1 (one lime, one surkhi and one
cum 1327.00 5848.00 1460.00 5981.00
sand) in foundation and plinth.

11.15 First class burnt brick work laid in lime surkhi


and mortar 1:1:1 (one lime, one surkhi and one
cum 1464.00 5379.00 1610.00 5525.00
sand) in first storey (upto 4 metres height)
above plinth level

11.16 First class brick work laid in cement, lime, sand


mortar 1:1:6 (one cement, one lime and six
sand) in foundation and plinth cum 1327.00 5163.00 1460.00 5296.00

11.17 First class brick work laid in cement, lime sand


mortar 1:1:6 in first storey (upto 4 metres cum 1464.00 5301.00 1610.00 5447.00
height) above plinth level

11.18 First class brick work laid in cement, lime, sand


mortar 1:2:9 (one cement, two lime and nine
sand) in foundation and plinth cum 1327.00 5115.00 1460.00 5248.00

11.19 First class brick work laid in cement, lime sand


mortar 1:2:9 (one cement, two lime and nine
sand) in first storey (upto 4 metres height) cum 1464.00 5252.00 1610.00 5398.00
above plinth level

Chapter-11 Page 115 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.20 First class brick work laid in cement, lime, sand
mortar 1:3:12 (one cement, three lime and
Twelve sand) in foundation and plinth cum 1327.00 5094.00 1460.00 5227.00

11.21 First class brick work laid in cement, lime sand


mortar 1:3:12 (one cement, three lime and
Twelve sand) in first storey (upto 4 metres cum 1464.00 5252.00 1610.00 5398.00
height) above plinth level

11.22 115mm brick wall laid in cement, lime sand


mortar 1:1:6 (one cement, one lime and Six
sand) in super structure (up to 4 metre height) Sqm. 206.00 626.00 227.00 647.00
above plinth level.

11.23 First class burnt brick work laid in mud mortar


in foundation and plinth cum 819.00 3833.00 901.00 3915.00

11.24 First class brick work laid in mud mortar in first


storey (upto 4 metre height) above plinth level cum 1004.00 4018.00 1104.00 4118.00
in super structure.

11.25 Extra for laying brick work in or under water


and/or liquid mud including cost of pumping or
bailing out water and removing slush etc. cum 139.00 139.00 153.00 153.00
complete.

11.26 Extra for forming cavity 5cm to 7.5cm wide in


cavity walls with necessary weep and vent
holes including use of cores and cost of
providing and fixing bitumastic coated M .S. ties Sqm 96.00 121.00 106.00 131.00
300mm long of 25x3mm section at not less
than 3 ties per sqm as per approved design.

11.27 Brick work with machine moulded modular


bricks of class designation 125 in exposed brick
work including making horizontal and vertical
grooves 10mm wide 12mm deep complete cum 1021.00 4907.00 1123.00 5009.00
above plinth level in super structure in cement
mortar 1:6 (1 cement : 6 fine sand).

11.28 Brick work with selected F.P.S. bricks of class


designation 105 in exposed brick work including
making horizontal and vertical grooves 10mm
wide 12mm deep complete above plinth level in cum 1337.00 4965.00 1471.00 5099.00
super structure. in cement mortar 1:6 (1
cement : 6 fine sand)

Chapter-11 Page 116 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5

11.29 a Extra for work done in additional storey upto 4


metre above the top of structural roof of lower
cum 146.00 146.00 161.00 161.00
storey for Brick Work/ Concrete Block/ Clay
Block.

11.29 b Extra for c above 4 meters (where any single


storey exceeds 4 metres in height) for every
additional height of 2 metres or part thereof for Cum 181.00 181.00 199.00 199.00
Brick Work/ Concrete Block/ Clay Block.

11.29 c Extra for 115mm/100mm thick walls for


additional storey upto 4 meters above the top of
structural roof of lower storey for Brick Work/ sqm 15.00 15.00 17.00 17.00
Concrete Block/ Clay Block.

11.29 d Extra for 115mm/100mm thick of walls done


above 4 meters (where any single storey
exceeds 4 meters in height) for every additional Sqm. 30.00 30.00 33.00 33.00
height of 2 meters or parts thereof for Brick
Work/ Concrete Block/ Clay Block.

11.30 (a) Extra for profile walls Cum 103.00 103.00 113.00 113.00

(b) Extra for flared out walls of syphon, super cum 143.00 143.00 157.00 157.00

11.31 Extra for brick work in square or rectangular cum 430.00 430.00 473.00 473.00

11.32 Extra for burnt brick work in circular pillars


constructed with dressed bricks including cost cum 975.00 1860.00 1073.00 1958.00
of dressing bricks

11.33 Extra for burnt brick work in arches excluding


cost of shuttering.

(a) Upto 1.5 Meters Span cum 175.00 396.00 193.00 414.00

(b) More than 1.5 metres but less than 3


cum 286.00 634.00 315.00 663.00
metres span

(c) More than 3 metres but less than 6


cum 394.00 837.00 433.00 876.00
metres span

11.34 115 mm thick brick wall with every fourth


course reinforced with hoop iron laid in 1:4 sqm 226.00 695.00 249.00 718.00
cement mortar in superstructure

11.35 115mm thick brick wall in cement sand mortar


1:4 without reinforcement in foundations and Sqm. 175.00 611.00 193.00 629.00
plinth

Chapter-11 Page 117 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.36 115mm thick brick wall in cement sand mortar
1:4 without reinforcement in superstructure Sqm. 204.00 640.00 224.00 660.00

11.37 115mm thick brick wall in cement sand mortar


1:5 without reinforcement in foundations and
Sqm. 175.00 601.00 193.00 619.00
plinth

11.38 115mm thick brick wall in cement sand mortar


1:5 without reinforcement in superstructure Sqm. 204.00 630.00 224.00 650.00

11.39 75mm thick brick wall laid in cement sand


mortar 1:4 with every alternate course
reinforced with hoop iron in superstructure Sqm. 211.00 553.00 232.00 574.00

11.40 First class 115mm thick honey comb brick work


laid in cement mortar 1:4 Sqm. 222.00 672.00 244.00 694.00

11.41 First class 225mm thick honey comb brick work


laid in cement mortar 1:4 Sqm. 315.00 991.00 347.00 1023.00

11.42 Providing 75 mm first class brick drip course at


juntion of roof and walls laid in cement sand
mortar 1:4 including dressing of bricks Rmt 55.00 121.00 61.00 127.00

11.43 Providing 75 mm first class brick on edge drip


course at juntion of roof and walls laid in
cement sand mortar 1:4 including dressing of Rmt 83.00 192.00 91.00 200.00
bricks

11.44 Reinforced brick work in lintels 1:3 Cement


sand mortar excluding steel reinforcement. cum 2113.00 6135.00 2324.00 6346.00

11.45 First class brick tile masonry with


22.86x11.43x3.81 cm tiles in cement sand
cum 2109.00 8715.00 2320.00 8926.00
mortar 1:4 in Ist storey upto 4 metres above
plinth level.

11.46 First class brick tile masonry with


22.86x11.43x3.81cm tiles in cement sand
mortar 1:6 in Ist storey upto 4 metres above cum 2109.00 8413.00 2320.00 8624.00
plinth level.

Chapter-11 Page 118 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.47 Extra for brick tile masonry in additional storey
upto 4 metre above the top of structural roof of cum 200.00 200.00 220.00 220.00
lower storey

11.48 Extra for brick tile masonry in square or


rectangular pillars cum 498.00 498.00 548.00 548.00

11.49 Tile facing with 22.86x11.43x3.81 cm tile laid in


cement sand mortar 1:4 in Ist storey upto 4
metres above plinth level without steel Sqm 321.00 631.00 353.00 663.00
reinforcement

11.50 Tile facing with 22.86x11.43x3.81 cm tile laid in


cement sand mortar 1:4 in Ist storey upto 4
metres above plinth level without steel Sqm 307.00 716.00 338.00 747.00
reinforcement

11.51 Bricks and bricks jali tile with 22.86cmx11.43


cm thick alternate layer laid in cement sand
mortar 1:4 using 30 number bricks tiles Sqm 249.00 676.00 274.00 701.00
22.56x11.43x3.81cm

11.52 Extra for tile facing in additional storey upto 4


metres above the top of structural roof of the Sqm 30.00 30.00 33.00 33.00
lower storey

11.53 Brick jali with 22.86x11.43cm thick alternative


layers laid in cement sand mortar 1:4 using 58
Sqm 312.00 775.00 343.00 806.00
number bricks

11.54 V shaped brick jali in 22.86cm thick walls laid in


cement sand mortar 1:6 finished with 12.5mm
thick cement sand plaster 1:6 including making Sqm 1182.00 1872.00 1300.00 1990.00
straight edges with plaster

11.55 Dressed or moulded three brick cornice laid in


cement sand mortar 1:4 including 12.5mm thick
Mtr. 116.00 260.00 128.00 272.00
cement plaster 1:4 or pointing as required

11.56 Dressed or moulded two brick cornice laid in


cement sand mortar 1:4 including 12.5mm thick
cement plaster 1:4 or pointing as required Mtr. 165.00 251.00 182.00 268.00

11.57 Dressed or moulded one brick cornice laid in


cement sand mortar 1:4 including 12.5mm thick
cement plaster 1:4 or pointing as required Mtr. 81.00 110.00 89.00 118.00

Chapter-11 Page 119 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.58 Corbelling around almirah including 12.5mm
thick cement plaster 1:6 Mtr. 72.00 136.00 79.00 143.00

11.59 Maroo corners making from first class bricks


and fixed in position with cement morter 1:4 Nos. 156.00 194.00 172.00 210.00

11.60 Dressing chamfering of bricks to required


shape in masonry work Nos. 5.00 5.00 6.00 6.00

11.61 Replacing Kallar eaten bricks


Nos. 8.00 16.00 9.00 17.00

11.62 Providing and laying brick work laid dry in walls.


Cum 420.00 4076.00 462.00 4118.00

11.63 Extra for special moulded radiated work in


arches of egg-shaped sewers circular barrals
and similar drainge works, excluding cost of Cum 459.00 459.00 505.00 505.00
centering and moulds

11.64 Extra for specially moulded brick work in


circular work such as well shafts circular
sumps, pump chambers etc. in which specially
moulded or cut bricks have to be used but for Cum 311.00 311.00 342.00 342.00
which no centring or supports are required upto
4.5 metre internal diametre.

11.65 Chiseling side of head regulator's and other


brick work to increase gullet width Sqm. 342.00 342.00 376.00 376.00

11.66 Fire brick work in linings to fire places flues etc.


(except in chimney shafts.) cum 2391.00 5924.00 2630.00 6163.00

11.67 Pise work (mud walling) including the cost of


earth water and laying the earth into shape,
pruning and scraping complete in all respect. Cum 601.00 601.00 661.00 661.00

11.68 Extra labour for First class burnt bricks


masonry in well steining of square, rectangular
cum 1798.00 1798.00 1978.00 1978.00
or polygonal well.

11.69 Extra labour for First class burnt brick masonry


in well steining of circular well. cum 1978.00 1978.00 2176.00 2176.00

Chapter-11 Page 120 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.70 76mm thick brick architrave to windows and
ventilators 115mm projected laid in cement
sand mortar 1:4 including 12.5 mm thick Mtr. 60.00 113.00 66.00 119.00
cement plaster 1:4

11.71 Providing 5.55cm brick daily facing with brick


size 22.86cm x 5.55cm x 6.83cm to be
obtained after cutting from full brick size of sqm 261.00 562.00 261.00 562.00
22.86cm x 11.11cm x 6.83cm laid in cement
sand mortar 1:3 on RCC lintels, beams, facia
etc.
11.72 Providing and laying autoclaved aerated
cement blocks masonry with 100mm thick AAC
blocks in super structure above plinth level in
cement mortar 1:4 (1 cement : 4 fine sand ) cum 1205.00 5637.00 1326.00 5758.00
The rate includes providing and placing in
position 2 Nos. 6 mm dia M.S. bars at every
third course of masonry work.

11.73 Extra cost for using coarse sand instead of fine


sand in brick masonry.

A For solid masonry cum - 59.48 - 59.48

B For 115 mm thick masonry sqm - 7.00 - 7.00

11.74 Providing and laying in super structure for first


storey factory made with vibro-hydraulic
compaction machine precast solid block of
cement concrete setting in position with cement
cum 1774.00 9015.00 1951.00 9192.00
mortar 1:3 (1 cement:3 course sand ) including
cost of hosting, centering and shuttering
complete as per IS:2185 (Part-1): 2005.

11.75 Providing and laying in super structure for first


storey factory made with vibro-hydraulic
compaction machine precast Hollow block of
cement concrete setting in position with cement
cum 1774.00 7484.00 1951.00 7661.00
mortar 1:3 (1 cement:3 course sand ) including
cost of hosting, centering and shuttering
complete as per IS:2185 (Part-1): 2005.

Chapter-11 Page 121 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.76 Providing and laying in super structure for first
storey factory made with vibro-hydraulic
compaction machine precast solid block of
cement concrete 100 mm thick setting in
position with cement mortar 1:3 (1 cement:3 Sqm 219.00 1023.0 241.00 1045.00
course sand ) including cost of hosting,
centering and shuttering complete as per
IS:2185 (Part-1): 2005.

11.77 Providing and laying in super structure for first


storey factory made with vibro-hydraulic
compaction machine precast hollow block of
cement concrete 100 mm thick setting in
position with cement mortar 1:3 (1cement:3 Sqm 219.00 783.00 241.00 805.00
course sand ) including cost of hosting,
centering and shuttering complete as per
IS:2185 (Part-1): 2005.

11.78 Perforated Burnt Clay Bricks having strength


12.5 N/mm2 of IS:2222 laid in cement sand
mortar 1:5 in in foundation and plinth (laying cum 1327.00 4976.00 1460.00 5109.00
shall be done as per PWD specifications).

11.79 Perforated Burnt Clay Bricks having strength


12.5 N/mm2 of IS: 2222 laid in cement sand
mortar 1:5 in first stoery upto 4 metres above
cum 1464.00 5114.00 1610.00 5260.00
plinth level (laying shall be done as per PWD
specifications).

11.80 Perforated Burnt Clay Bricks having strength


12.5 N/mm2 of IS: 2222 laid in cement sand
mortar 1:6 in in foundation and plinth (laying cum 1327.00 4887.00 1460.00 5020.00
shall be done as per PWD specifications)

11.81 Perforated Burnt Clay Bricks having strength


12.5 N/mm2 of IS: 2222 laid in cement sand
mortar 1:6 in first stoery upto 4 metres above
cum 1464.00 5025.00 1610.00 5171.00
plinth level (laying shall be done as per PWD
specifications).

11.82 Providing & Laying 200 mm thick mansonay in


super structure with factory made precast burnt
clay hollow blocks conforming to IS: 3952) in
position with cement mortar 1:5 including cost
cum 1454.00 7049.00 1599.00 7194.00
of hoisting centering & shuttering complete for
first storey, laying shall be done as per PWD
specifications.

Chapter-11 Page 122 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 5
11.83 Providing & Laying 100 mm thick mansonay in
super structure with factory made precast burnt
clay hollow blocks conforming to IS: 3952) in
position with cement mortar 1:4 including cost
sqm 181.00 893.00 199.00 911.00
of hoisting centering & shuttering complete
laying shall be done as per PWD specifications.

11.84 Extra for labour for works involving up to 1.00


cum. for First class burnt work laid in cement
sand mortar in foundation and plinth for repair cum 332.00 332.00 365.00 365.00
work.

11.85 Extra for labour for works involving up to 1.00


cum. for First class burnt work laid in cement
sand mortar in superstructure for repair work. cum 344.00 367.00 378.00 401.00

Chapter-11 Page 123 CSR-2020


CSR−2020−Final
CHAPTER NO. 12
STONE MASONRY
Notes :-

(i) The labour rates include the cost of water, tools & plant, labour & materials for scaffolding, centring
and shuttering, ladders, plant & templates, wherever required, and cost of good earth for mud mortar
where required.

(ii) Unless otherwise stated, the labour rates include the rehandling of materials within 100 metres.

(iii) The labour rates include the cost of dressing stones according to the relevant PWD Specifications.

(iv) The labour as well as through rates for item nos. 12.11, to 12.13, 12.16 to 12.24, 12.28 to 12.34 are
applicable when quarried stone is used. When work is executed with small boulders or with stone
obtained by breaking large boulders, the above rates will be increased by 10% per cum for labour
rate on account of extra labour involved in dressing and through rate be derived accordingly.

(v) The through rate of the stone masonry includes the cost of stone at the site of work irrespective of
the distance from the source. But stone masonry will normally be constructed in such area where
stone is available locally or in the vicinity of the site of the work. Variations in actual lead in such
cases will be taken care of by premium / abatement over the CSR rates. However where stone is not
available near at site but has to be brought from long distances, item of stone masonry should not be
specified. If some work has to be constructed in stone due to very special reasons, extra provision
for carriage of stone should be made in the estimates.

Sr. Description Unit Zone-A Zone-B


No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
ASHLAR MASONRY
12.1 Fine ashlar in cement mortar (1:3) upto 6 meters
above plinth level. cum 15309.00 17123.00 16840.00 18654.00

12.2 Fine ashlar in cement mortar (1:6) upto 6 meters


above plinth level. cum 15309.00 16765.00 16840.00 18296.00

12.3 Rough tooled & bastard ashlar in cement mortar


(1.3) upto 6 meters above plinth level. cum 10833.00 12886.00 11916.00 13969.00

12.4 Rough tooled & bastard ashlar in cement mortar


(1:6) upto 6 meters above plinth level. cum 10833.00 12617.00 11916.00 13700.00

12.5 Rustic ashlar in cement mortar 1:3 upto 6 meters


above plinth level. cum 10689.00 12742.00 11758.00 13811.00

12.6 Rustic ashlar in cement mortar 1:6 upto 6 meters


above plinth level cum 10689.00 12055.00 11758.00 13124.00

Chapter-12 Page 124 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
12.7 Extra for above items for every additional storey
of height upto 4 metre above the top of structural cum 303.00 303.00 333.00 333.00
roof of lower storey.
12.8 Extra for arch work excluding centering and
shuttering. cum 653.00 653.00 718.00 718.00

12.9 Cut stone work in cornices, string courses, etc. in


cement mortar 1:3 cum 22952.00 24766.00 25247.00 27061.00

12.10 Cut stone work in cornices, string courses, etc. in


cement mortar 1:4 cum 22952.00 24697.00 25247.00 26992.00

Block in Course Rubble Masonry


12.11 Block in course upto 4 meters above Plinth Level
in Cement Mortar 1:4 cum 8345.00 10857.00 9180.00 11692.00

12.12 Block in course upto 4 meters above plinth level


in cement mortar 1:5 cum 8345.00 10751.00 9180.00 11586.00

12.13 Block in course upto 4 meters above plinth level


in cement mortar 1:6 cum 8345.00 10679.00 9180.00 11514.00

12.14 Extra for above items for every additional storey


of height upto 4 meters above the top of cum 256.00 256.00 282.00 282.00
structural roof of lower storey.
12.15 Add extra for arch work including centring and
shuttering cum 653.00 811.00 718.00 876.00

SQUARED OR RECTANGULAR PILARS OF


RUBBLE MASONRY
12.16 Squared rubble masonry coursed (coursed
rubble) in foundations and plinth in Cement cum 2588.00 5193.00 2847.00 5452.00
mortar 1:4
12.17 Squared rubble masonry coursed (coursed
rubble) in foundations and plinth in cement mortar cum 2588.00 5059.00 2847.00 5318.00
1:5
12.18 Squared rubble masonry coursed (coursed
rubble) in foundations and plinth in Cement cum 2588.00 4971.00 2847.00 5230.00
mortar 1:6
12.19 Squared rubble masonry coursed (coursed
rubble) in foundations and plinth in mud mortar cum 2279.00 3889.00 2507.00 4117.00

12.20 Squared rubble masonry coursed (coursed


rubble) in foundations and plinth and
superstructure laid dry

Chapter-12 Page 125 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) where building stone is specially arranged
by the Contractor. cum 1647.00 3257.00 1812.00 3422.00

(b) where stone is available within 100 meters


from rock cutting already done cum 1656.00 - 1822.00 -

(c) where stone is available within 100 meters


from dismantled or failed structure cum 1373.00 - 1510.00 -

12.21 Squared rubble masonry uncoursed or built to


courses in foundations and plinth in cement cum 2810.00 5415.00 3091.00 5696.00
mortar 1:4 to a pattern if specified.
12.22 Squared rubble masonry uncoursed or built to
courses in foundations and plinth in cement cum 2810.00 5280.00 3091.00 5561.00
mortar 1:5 to a pattern if specified.
12.23 Squared rubble masonry uncoursed or built to
course in foundation and plinth in cement mortar
cum 2810.00 5192.00 3091.00 5473.00
1:6 to a pattern if specified

12.24 Squared rubble masonry uncoursed or built to


courses in foundations and plinth in mud mortar
cum 2427.00 4037.00 2670.00 4280.00
to a pattern if specified.

12.25 Add for work in superstructure upto 4 meters


above plinth level. cum 420.00 420.00 462.00 462.00

12.26 Extra for above items for every additional storey


of height upto 4 meters of above the top of
structural roof of lower storey. cum 273.00 273.00 300.00 300.00

12.27 Extra for arch work including centring and


shuttering. cum 653.00 811.00 718.00 876.00

12.28 Random rubble masonry or polygonal rubble


masonry (Kentish Rag) or random or polygonal
rubble built to courses in foundations and plinth in cum 2168.00 4542.00 2385.00 4759.00
cement mortar 1:8

12.29 Random rubble masonry or polygonal rubble


masonry (Kentish Rag) or random or polygonal
rubble built to courses in foundations and plinth in cum 2168.00 4605.00 2385.00 4822.00
cement mortar 1:7

12.30 Random rubble masonry or polygonal rubble


masonry (Kentish Rag) or random or polygonal
rubble built to courses in foundations and plinth in cum 2158.00 4667.00 2374.00 4883.00
cement mortar 1:6

Chapter-12 Page 126 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
12.31 Random rubble masonry or polygonal rubble
masonry (Kentish Rag) or randam or polygonal
rubble built to courses in foundations and plinth in cum 1267.00 2876.00 1394.00 3003.00
mud mortar

12.32 Random rubble masonry or polygonal rubble


masonry (Kentish Rag) or random or polygonal
rubble built to courses in foundations and plinth
and superstructure laid dry.
(a) Where building stone in specially arranged
by the Contractor cum 1497.00 3107.00 1647.00 3257.00

(b) Where stone is available within 100 meters


from rock cutting already done. cum 1054.00 1054.00 1159.00 1159.00

(c) Where stone is available with in 100


meters from dismantled or failed structure. cum 1356.00 1356.00 1492.00 1492.00

12.33 Boulder masonry in cement mortar (1:6) in


foundations and plinth. cum 2158.00 4793.00 2374.00 5009.00

12.34 Boulder masonry in mud mortar in foundations


and plinth. cum 1131.00 2876.00 1244.00 2989.00

12.35 Add for work in superstructure 4 meters above


plinth level cum 420.00 420.00 462.00 462.00

12.36 Extra for above items for every additional storey


of height upto 4 metre above the top of structural cum 273.00 273.00 300.00 300.00
roof of lower storey.
12.37 Rough hammer dressing of boulders:-

(a) Quartzite stone 2-3 faces


cum 782.00 - 860.00 -

(b) Quartzite stone 4-5 faces


cum 1289.00 - 1418.00 -

(C ) Sand stone 2-3 faces


cum 628.00 - 691.00 -

(d) Sand stone 4-5 faces


cum 1054.00 - 1159.00 -

12.38 Hammer dressing of stone for face work


Sqm 245.00 - 270.00 -

12.39 Fine chisel dressing (three line dressing) of


stones Sqm 830.00 - 913.00 -

12.40 Ordinary chisel dressing (two-line dressing) of


stones. Sqm 457.00 - 503.00 -

12.41 Rough tooled dressing (one-line dressing) of


stone. Sqm 365.00 365.00 402.00 402.00

Chapter-12 Page 127 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
12.42 Dry stone masonry for work of parley temporary
nature (excluding dressing) cum 641.00 641.00 705.00 705.00

12.43 Stone filling behind retaining walls.


cum 339.00 1501.00 373.00 1535.00

Chapter-12 Page 128 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
DHAJI WALLING

12.44 Walling 12.5 cm thick kail wood framing


unwrought with stone in cement mortar 1:6 with
plaster and white washing but including treatment Sqm 642.00 4017.00 706.00 4081.00
of frame work for plastering.
12.45 Walling 12.5 cm thick kail wood framing
unwrought with stone in mud mortar without
plaster and white washing but including treatment Sqm 625.00 3758.00 688.00 3821.00
of frame work for plastering.
12.46 Extra for laying stone masonry in or under water
and/or liquid mud including cost of pumping or
bailing out water and removing slush etc. cum 548.00 548.00 603.00 603.00
Complete.

Chapter-12 Page 129 CSR-2020


CSR−2020−Final
CHAPTER NO. 13
HOISTING, ROOFING AND WATER PROOFING
Notes :-

(i) Unless otherwise stated, the labour rates include handling of material within 100 metres.

(ii) The rates for hoisting are for heights upto 4 metres above plinth. For every additional 4 metres
height or part thereof, add 10 per cent on item Nos. 13.1 to 13.5 and add 20 per cent on item Nos.
13.6 to 13.9.

(iii) The rates for hoisting are not to be paid over and above the rates for manufacture of beams/
battens, etc., as given in other chapters, because these rates already include hoisting charges.

(iv) The labour rates given in this chapter include the cost of water, tools & plant, scaffolding
(Labour and material) and cost of good earth for mud mortar and mud plaster, wherever required.

(v) For item No. 13.9 for bridge girders having spans more than 15 metres, special rates will be
worked out and paid for on the merits of each case.

(vi) The rates for item Nos. 13.58 to 13.65 exclude the cost of beading and frame work for base
which is to be paid for separately.

(vii) The rates given are for single storey. For every additional storey of 4 mtr. or part thereof add Rs.
3.00 per sqm for item No. 13.11, 13.13, 13.14 and 13.17.

(viii) Rates for polycarbonate sheet are with Aluminum strips for roofing purposes, if aluminum strips
not provided then through rate should be reduced accordingly.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.1 Hoisting R.C.C. lintel and placing in position
cum 1717.00 1717.00 1888.70 1888.70

13.2 Hoisting R.C.C. battens and placing in position


cum 2081.00 2081.00 2289.10 2289.10

13.3 Hoisting R.C.C. shelves and placing in position


cum 1374.00 1374.00 1511.40 1511.40

13.4 Hoisting R.C.C. bed plates and placing in position


cum 2060.00 2060.00 2266.00 2266.00

13.5 Hoisting wooden battens and placing in position


cum 1275.00 1275.00 1402.50 1402.50

13.6 Hoisting wooden beams and placing in position


cum 1008.00 1008.00 1108.80 1108.80

Chapter-13 Page 130 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

13.7 Hoisting wooden trusses and placing in position


cum 4639.00 4639.00 5102.90 5102.90

13.8 Hoisting R.S. Joists and placing in position


Qtl. 398.00 398.00 437.80 437.80

13.9 Hoisting steel roof trusses plate girders of any


span for buidlings and plate trusses girders for
bridges upto 15m span Qtl. 730.00 730.00 803.00 803.00

13.10 Assembling at site and hoisting and placing in


position tubular trusses, complete with
accessories such as parlings , bracing,
longitudinal ties, truss shoes, purlin clips and Qtl. 673.00 673.00 740.30 740.30
other truss components, complete in all respects.

13.11 Second class mud roofing consisting of one layer


of tiles 22.86 x 11.43 x 3.81 cm laid in cement
mortar 1:3 including 6mm thick cement plaster 1:4
on top with two coats of bitumen painting at 2.63
Kg/Sam covered with 10cm of mud and two layers
Sqm. 416.00 980.00 457.60 1021.60
of 25mm mud plaster with gobri on top and
cement plaster 1:4 on parapet between tiles and
drip course 1:2 cement pointing under side of tiles
and filling of spaces between the battens.

13.12 Third class mud roofing consisting of two layers of


sirki and sarkanda covered with 12.5 cm mud
plaster with gobri leeping on top Sqm. 171.00 273.00 188.10 290.10

13.13 (i) Terracing consiting of tiles 22.86x11.43x3.83cm


laid over 25 mm mud plaster 7.5 cm mud filling on
another layer of 25mm mud plaster including two
coats of bitumen laid hot at 1.65 Kg. /Sqm top of Sqm. 357.00 720.00 392.70 755.70
R.C.C. slab including grouting with cement sand
mortar 1:4 and top surface to be left clean after
wire brushing

13.13 (ii) Terracing consiting of Machine made vibro-


hydraulic compacted burnt clay brick tiles
22.86x11.43x3.83cm laid over 25 mm mud plaster
7.5 cm mud filling on another layer of 25mm mud
plaster including two coats of bitumen laid hot at Sqm. 357.00 726.00 392.70 761.70
1.65 Kg. /Sqm on top of R.C.C. slab including
grouting with cement sand mortar 1:4 and top
surface to be left clean after wire brushing

Chapter-13 Page 131 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

13.13 Terracing consiting of machine made Hollow Clay


(iii) Tiles 80mm thick (Smooth surface) confirming to
IS: 3951 (Part-I)-2009 laid over 25 mm mud
plaster 7.5 cm mud filling on another layer of
25mm mud plaster including two coats of bitumen
laid hot at 1.65 Kg. /Sqm on top of R.C.C. slab Sqm. 357.00 975.00 392.70 1010.70
including grouting with cement sand mortar 1:4
having 10mm wide joints spacing on all sides of
tiles and top surface to be left clean complete as
per specification (laying shall be done as per
PWD specifications).

13.14 Roofing consisting of 5cm thick precast cement


concrete 1:2:4 tiles laid in position with cement
sand mortar 1:3 over R.C.C. battens 0.6 m apart
excluding cost of R.C.C. Battens but including
4cm thick screed of cement concrete 1:4:8 over
tiles 2 coats of bitumen at 2.34 Kg. per sqm Sqm. 150.00 399.00 165.00 414.00
25mm mud plaster 7.5 mud over another layer of
25mm mud plaster filling space between battens
over beam with cement concrete (1:3:6) blocks in
cement morter 1:3 and cement pointing 1:2 on the
underside of tiles.

13.15 Thatching 15 cm thick including bamboo frame


and matting but excluding the cost purlins
Sqm. 112.00 715.00 123.20 726.20

13.16 Thatching 23cm thick including bamboo frame


and matting but excluding the cost of purlins Sqm. 138.00 537.00 151.80 550.80

13.17 Tile terracing laid dry over roof consisitng of one


layer of tiles 22.86x11.43x3.83 including grouting
with cement sand mortar 1:4 top surface to be left Sqm. 96.00 387.00 105.60 396.60
clean after wire brushing

13.18 Corrugated G.I. Sheet roofing 0.80 mm thick fixed


with galvanized iron J or L hooks 10mm dia, G.I.
Limpot and bitumen washers complete excluding Sqm. 87.00 925.00 95.70 933.70
the cost of purling rafters and trusses

13.19 Corrugated asbestos Sheet roofing 6 mm thick


sheets fixed with G.I. hooks and bolts, limpet and
bitumen washers complete fixed in position Sqm. 116.00 367.00 127.60 378.60
excluding the cost of perlins, rafters and trusses.

Chapter-13 Page 132 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.19 (i) Providing reinforced by organic fibres and/or
inorganic synthetic fibres cement 6 mm thick
corrugated sheets (as per IS: 14871) roofing up to
any pitch and fixing with polymer coated J, or L
hooks, bolts and nuts 8 mm dia. G.I. plain and
Sqm. 60.00 384.00 66.00 390.00
bitumen washers or with self drilling fastener and
EPDM washers etc. complete (excluding the cost
of purlins, rafters and trusses), including cutting
sheets to size and shape wherever required.

13.19 (ii) Extra for straight cutting in reinforced by organic


fibres and/or inorganic synthetic fibres cement
corrugated, semi corrugated 6 mm thick sheet
roofing for making openings of area exceeding 40 mt 41.00 44.00 45.10 48.10
square decimeter for chimney stacks, skylights
etc.

13.19 Extra for circular cutting in reinforced by organic


(iii) fibres and/or inorganic synthetic fibres cement
corrugated/ semi corrugated 6 mm thick sheet
roofing for making openings of area exceeding 40 mt 113.00 121.00 124.30 132.30
square decimeter.

13.19 Extra for providing and fixing wind ties of 40x 6


(iv) mm flat iron section. mt 17.00 133.00 18.70 134.70

13.20 Semi Corrugated asbestes Sheet roofing 7 mm


thick sheets fixed with G.I. hooks and bolts, limpet
and bitumen washers complete fixed in position Sqm. 116.00 398.00 127.60 409.60
excluding the cost of perlins, rafters and trusses.

13.21 Ridges and valleys 45 cm overall, in plain G.I.


Sheet 0.80mm fixed with galvanzed iron J. and L.
hooks 10mm diameter, G.I. Limpet and bitumen Mtr. 86.00 416.00 94.60 424.60
washers complete

13.21 Providing and fixing ridges and hips in fibre


(i) cement reinforced by organic fibres and/or
inorganic synthetic fibres roofing with suitable
fixing accessories or self drilling fastener and Mtr. 40.00 371.00 44.00 375.00
EPDM washer etc. complete.

a Plain wing adjustable ridges Mtr. 40.00 300.00 44.00 304.00


b Close fitting adjustable ridges Mtr. 52.00 435.00 57.20 440.20
c Unserrated adjustable hips Mtr. 52.00 383.00 57.20 388.20

Chapter-13 Page 133 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.22 G.I. Sheet gutters 0.80mm thick semicircluar
15cm diametre including fixing with clamps and Mtr. 187.00 488.00 205.70 506.70
making connections with rain water pipes.

13.23 Asbestos cement ridges fixed with G.I. J & L


hooks 10mm diametre G.I. Plain and bitumen Mtr. 58.00 511.00 63.80 516.80
washers complete.

13.24 Asbestos cement valley gutter


45cmx12.5cmx15cm size fixed with galvanised
iron J and L hooks 10mm diametre and flat iron
clamps 25mmX3mm size G.I. Plain and bitumen Mtr. 70.00 520.00 77.00 527.00
washers including asbestos rope and plastic
compund in joints complete.

13.25 Providing and fixing asbestos cement corrugated


and semi corrugated apron piece with crank bolts Mtr. 61.00 327.00 67.10 333.10
in position etc complete.

13.25 (i) Providing and fixing fibre cement reinforced by


organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I. Mtr. 30.00 332.00 33.00 335.00
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:
Corrugated apron pieces

13.26 Providinga and fixing asbestos cement corrugated


ridge Final in the ridge. Nos. 73.00 465.00 80.30 472.30

13.27 Providing and fixing asbestos cement


semicorrugated sheet ridge, Final in the ridge. Nos. 73.00 530.00 80.30 537.30

13.27 Providing and fixing fibre cement reinforced by


(i) organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I. Nos. 73.00 1370.00 80.30 1377.30
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:

Ridge Finial

Chapter-13 Page 134 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.27 (ii) Providing and fixing precoated galvanised iron
profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-charge)
total coated thickness with zinc coating 120 grams
per sqm as per IS: 277, in 240 mpa steel grade, 5-
7 microns epoxy primer on both side of the sheet
and polyester top coat 15-18 microns. Sheet
should have protective guard film of 25 microns
minimum to avoid scratches during transportation
and should be supplied in single length upto 12
metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling /self tapping
screws of size (5.5x 55 mm) with EPDM seal,
complete upto any pitch in horizontal/ vertical or
curved surfaces, excluding the cost of purlins,
rafters and trusses and including cutting to size
and shape wherever required.

(a) 0.50 mm (+ 0.05 %) thick


Sqm 56.00 541.00 62.00 546.60
(b) 0.60 mm (+ 0.05 %) thick
Sqm 56.00 635.00 62.00 640.60

13.27 Providing and fixing ( PPGL) precoated painted


(iii) galvalume sheet roofing (size, shape and pitch of
corrugation as approved by Engineer-in-charge)
The end rib shall have anti cappillary groove and
return leg. The steel sheet must be having yield
strength of 550 MPa ( Fy= 550 MPa) metallic
coated with Zinc- Aluminium alloy ( i.e. 55% Al,
43.4%Zinc, 1.6% Si-Zincalume) AZ150 ( Min. 150
bm/mm2 total on both sides), pre painted with
super Durable Polyster XRW quality paint
includes inorganic infrared reflective pigment. The
sheet confirms to general requirement of AS/NZS
2728 type 4/ IS 15965 class 3 durability and gloss
value of 25% -40%. should be supplied in single
length upto 12 metre or as desired by Engineer-in-
charge. The sheet shall be fixed using self drilling
/self tapping screws of size (5.5x 55 mm) with
EPDM seal, complete upto any pitch in horizontal/
vertical or curved surfaces, excluding the cost of
purlins, rafters and trusses and including cutting to
size and shape wherever required.

(a) 0.50 mm (+ 0.05 %) thick


Sqm 56.00 601.00 62.00 606.60
(b) 0.60 mm (+ 0.05 %) thick
Sqm 56.00 712.00 62.00 717.60

Chapter-13 Page 135 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.27 Providing and fixing Gutter 250mm wide with
(iv) PPGL 0.50 thick (TCT) manufactured from zinc /
aluminium alloy coated high tensile steel, having
minimum yield strength of 550 MPa of approved
colour fixed by means of self-drilling screws Mtr 227.00 1352.00 250.00 1374.70
limped washers as per the manufactures
guidelines complete in all respect and to the entire
satisfaction of engineer in charge.

13.27 Providing and fixing polycarbonate sheet sheet


(v) should have protective guard film of 25 microns
minimum to avoid scratches during transportation
metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling /self tapping
screws with EPDM seal, and the joints shall be
provided with aluminium strips at top and bottom
as a seal complete upto any pitch in horizontal/
vertical or curved surfaces, excluding the cost of
purlins, rafters and trusses and including cutting to
size and shape wherever required.

(a) Pollycarbonate sheet Multiwalled 10mm


thick Sqm 182.00 1584.00 200.00 1602.20

(b) Pollycarbonate sheet Multiwalled 12mm


thick Sqm 182.00 1727.00 200.00 1745.20

(c) Pollycarbonate sheet 1mm thick solid type


Sqm 114.00 1114.00 125.00 1125.40

(d) Pollycarbonate sheet 2mm thick solid type


Sqm 114.00 1588.00 125.00 1599.40

13.28 Providing and fixing asbestos cement corrugated


sheet eaves filler piece in position etc complete. Mtr. 46.00 356.00 50.60 360.60

13.28 Providing and fixing fibre cement reinforced by


(i) organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I. Pair 259.00 225.00 284.90 250.90
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:

13.29 Providing and fixing asbestos cement


semicorrugated sheet eaves filler piece in position Mtr. 46.00 356.00 50.60 360.60
etc complete

Chapter-13 Page 136 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.30 Providing and fixing asbestos cement expension
joints for semi corrugated sheets fixed with 16mm
dia G.I. Bolts with bitumen and G.I. washer etc Mtr. 36.00 132.00 39.60 135.60
complete.

13.31 Providing and fixing asbestos cement semi


corrugated & corrugated sheet north light curves
Mtr. 46.00 875.00 50.60 879.60
with asbestos sheet roofing and purlins etc.

13.31 Providing and fixing fibre cement reinforced by


(i) organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I. Mtr. 36.00 437.00 39.60 440.60
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:

13.31 Providing and fixing fibre cement reinforced by


(ii) organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I. Mtr. 36.00 478.00 39.60 481.60
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:

13.31 Providing and fixing fibre cement reinforced by


(iii) organic fibres and/or inorganic synthetic fibres
roofing accessories in all colours with polymer
coated J or L hooks, bolts and nuts and or G.I.
Mtr. 26.00 598.00 28.60 600.60
seam bolts and nuts, G.I. plain and bitumen
washers or with self drilling fastener and EPDM
washer etc. complete:

Barge Boards

13.32 Providing and fixing asbestos expansion joints or


north light curves etc. complete Nos. 55.00 314.00 60.50 319.50

13.33 Providing and fixing asbestos expension joints for


ridge etc. complete Pair 109.00 369.00 119.90 379.90

13.34 Providing and fixing asbestos cement rain water


pipe 100mm dia with M.S. holder and clamps
fixed on wall face with cement mortar 1:4 Mtr. 144.00 249.00 158.40 263.40
complete

13.35 Embedding asbestos cement 100mm dia rain


water pipe in cement mortar curing masonry Mtr. 45.00 144.00 49.50 148.50
works

Chapter-13 Page 137 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

13.36 Providing and fixing asbestos cement plain bend


100mm dia in position with gutter etc. Nos. 56.00 120.00 61.60 125.60

13.37 Providing and fixing asbestos cement swan neck


100mm dia in position with asbestos cement pipe Nos. 80.00 247.00 88.00 255.00

13.38 Providing and fixing asbestos cement hexagonal


rainwater head 33cmx24cm for asbestos cement
Nos. 118.00 259.00 129.80 270.80
pipe in position.

13.39 Providing and fixing asbestos shoe for asbestos


cement rain water pipe in position. Nos. 80.00 143.00 88.00 151.00

13.40 Providing and fixing union clips in gutter of


asbestos cemetn sheet roofing etc complete Nos. 116.00 129.00 127.60 140.60

13.41 Providing and fixing cast iron 100mm dia rain


water pipe with screw and wooden plugs fixed and
wall face including filling joints with spun yarn and Mtr. 163.00 1154.00 179.30 1170.30
cement mortar 1:2 excluding head and shoes etc.

13.42 Providing and fixing cast iron head for rain water
pipe on wooden plugs fixed on wall face including
filling the joints with spun yarn and cement mortar Nos. 124.00 774.00 136.40 786.40
1:2

13.43 Providing and fixing cast iron shoe for rain water
pipe on wooden plugs fixed on wall face including
filling the joints with spun yarn and cement mortar Nos. 124.00 774.00 136.40 786.40
1:2

13.44 Embedding 100mm C.I. rain water pipe non


pressure I.S.I. Mark pipe in cement mortar during Mtr. 45.00 1029.00 49.50 1033.50
masonary work.

13.45 Top Khurra 0.6mx0.6m for rain water pipe in


25mm thick cement concrete 1:2:4 over 50.00
thick cement concrete 1:8:16 Nos. 52.00 95.00 57.20 100.20

13.46 Khurra on roof as per item No. 13.43 with C.I.


Spouts 100 mm dia fixed in position. Nos. 74.00 127.00 81.40 134.40

Chapter-13 Page 138 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.47 Khurra on roof as per item No. 13.43 with A.C
Spouts 100 mm dia fixed in position. Nos. 74.00 133.00 81.40 140.40

13.48 Khurra on roof as per item No. 13.43 with G.I


Spouts 100 mm dia fixed in position. Nos. 74.00 123.00 81.40 130.40

13.49 Khurra on roof as per item No. 13.43 with R.C.C.


spouts 100 mm dia fixed in position. Nos. 74.00 123.00 81.40 130.40

13.50 Khassi parnalas 12.5mm thick in ceemnt concrete


mortar (1:2) 35cm out side width and upto 4.25m Mtr. 72.00 106.00 79.20 113.20
height

13.51 Bottom khurra on ground 1.2m 0.6m consisting of


bricks on edge laid in cement mortar 1:3 over 7.5
cm cement concret 1:8:16 including 12.5mm thick Nos. 179.00 677.00 196.90 694.90
cement plaster 1:3

13.52 Laying 10 cm earth and two coats of 25mm mud


plaster with gobri leeping on top including two
Sqm. 190.00 271.00 209.00 290.00
coats of bitumen painting at 1.65 Kg. Per Sqm

13.53 Applying bitumen on roof including heating and


carrying to roof. Qtl. 140.00 5065.00 154.00 5079.00

13.54 Extra bitumen painting at 0.69 Kg. per Sqm.


Sqm. 8.00 348.00 8.80 348.80

13.55 Cement concrete 1:2:4 gola 10cm x 10cm


concave quadrant along junction of roofs with
parapet wall finished smooth, where specially Mtr. 45.00 65.00 49.50 69.50
specified.

13.56 Providing and laying four courses of water


proofing treatment with bitumen felt over roofs
consisting of first and third courses of blown type
bitumen grade 85/25 applied hot at 1.20 Kg. Per
sqm of area for each course second course on
roofing felt type 3grade-1 (Hession base self Sqm. 67.00 321.00 73.70 327.70
finished bitumen felt) and fourth and final course
of stone grit 6mm and down size or peasizes grit
spread at 0.006cum per Sqm including
preparation of surface complete.

13.57 Supplying and filling cinder on roof (Ist story)


including light ramming Cum. 474.00 1472.00 521.40 1519.40

Chapter-13 Page 139 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

13.58 Kail wood plank ceiling 20mm thick tongued and


grooved planking. Sqm. 278.00 1848.00 305.80 1875.80

13.59 Providing and fixing dasuty cloth ceiling.


Sqm. 55.00 189.00 60.50 194.50

13.60 Providing and fixing hession cloth ceiling


Sqm. 55.00 109.00 60.50 114.50

13.61 Providing and fixing ply-wood (4mm) ceiling


Sqm. 43.00 387.00 47.30 391.30

13.62 Providing and fixing 5mm thick asbestos sheets


ceiling Sqm. 343.00 363.00 377.30 397.30

13.63 Providing and fixing 12.5mm thick insulating


perforated board (such as celotax, treetax etc, Sqm. 50.00 675.00 55.00 680.00
ceilling)

13.64 Providing and fixing mineral fibre false ceiling tiles at all
heights With 16 mm thick beveled tegular mineral fibre
Anti-microbial false ceiling tile of size 595X595mm of
approved texture, design and pattern. The tiles should
have Humidity Resistance (RH) of 99%, Light Reflection
> 85%, Thermal Conductivity k = 0.052 - 0.057 w/m K,
Fire Performance as per (BS 476 pt - 6 &7)in true
horizontal level suspended on interlocking T-Grid of hot
dipped all round galvanized iron section of 0.33 mm
thick (galvanized @120 gsm) comprising of main T
runners of 15x32 mm of length 3000 mm, cross T of
size 15x32mm of length 1200 mm and secondary
intermediate cross T of size 15x32 mm of length 600
mm to form grid module of size 600x600 mm
suspended from ceiling using galvanized mild steel item
(galvanised@80gsm) 50 mm long 8mm outer diameter
M-6 dash fasteners, 6 mm diameter fully threaded
Sqm. 252.00 1856.00 277.20 1881.20
hanger rod up to 1000 mm length and L-shape level
adjuster of size 85x25x2 mm, spaced at 1200 mm
centre to centre along main ‘T’. The system should rest
on periphery walls /partitions with the help of GI
perimeter wall angle of size24x24X3000 mm made of
0.40 mm thick sheet, to be fixed to the wall with help of
plastic rawl plug at 450 mm centre to centre & 40 mm
long dry wall S.S. screws. The exposed bottom portion
of all T-sections used in false ceiling support system
shall be pre-painted with polyester baked paint, for all
heights. The work shall be carried out as per
specifications, drawings and as per directions of the
engineer-in-charge.

Chapter-13 Page 140 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.65 Providing and Fixing ceiling consisting of 12.5mm
thick Gypsum Board of any size G.I. Cradling
hanged from the ceiling by means of G.I. hanger
complete as per drawings,specifications and tothe Sqm. 436.00 1321.00 479.60 1364.60
entire satisfaction of engineer-in- charge.

13.66 Providing and Fixing of Copper Sheet 16 Gauge


350mm wide on expansion joint including covering
with C. Concrete complete in all respect as per mtr 172.00 4370.00 189.20 4387.20
specifications.

13.67 Providing and fixing 4mm thick 300mm wide


Asbestos sheet with gatties and screw on vertical
expansion joints one side fixed and one side fixed
mtr 179.00 237.00 196.90 254.90
with slotted holes complete in all respect as per
specifications.

13.68 Providing and fixing partition upto ceiling height


consisting of G.I. frame and required board
including providing and fixing of frame work made
of special section power pressed/ role form G.I.
sheet with zinc coating of grade 175 consisting of
floor and ceiling channel 50mm wide having equal
flanges of 32mm and 0.5mm thick fixed to the
floor and ceiling at the spacing of 610mm centre
to centre with dash fastener of 12.5mm dia-
meter,40mm length and the studs 48mm wide
having one flange of 34mm and other flange
36mm and 0.50mm thick fixed vertically within
flanges of floor and ceiling channel and placed at
a spacing of 610mm centre to centre by 6mm dia
Sqm 453.00 1198.00 498.30 1243.30
bolts and nuts at both ends of partition fixed flush
to wall with rawl plugs at spacing 450mm centre to
centre and fixing of boards to either side of frame
work by 25mm drive all screws on studs, floor and
ceiling channels at the spacing of 300mm centre
to centre, including jointing and finishing to a flush
finish with recommended jointing compound,
jointing tape, joint finisher and two coats of primer
suitable for board as per manufacture’s
specificatior and direction of engineer-in-charge
all complete.

Chapter-13 Page 141 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.69 Providing and fixing, in position concealed G.I.
section for wall panelling using board of required
thickness fixed on the ‘W profile (0.55mm thick )
having a knurled web of 51.55mm and two flanges
of 26mm each with lips of 10.55 mm placed @
610mm C/C in perimeter channel having one
flange of 20mm and another flange of 30mm with
thickness of 0.55mm and web of length 27mm.
Perimeter channel is fixed on the floor and the
ceiling with the nylon sleeves @ 610mm C/C with
fully threaded self-tapping drive all screws. Board
is fixed to the ‘Wprofile with 25 mm countersunk
ribbed head screws @ 200mm C/C, all complete
as per the drawing & directions of engineer-in-
charge the joints of the boards are finished with
specially formulated jointing compound and 48mm
wide fiber tape to provide seamless finish.

13.69 Tapered edge calcium silicate board made with


(a) calcareous & siliceous materials reinforced with
cellulose fiber manufactured through autoclaving
process to give stable crystalline structure, Non
combustible & spread of Flame (as per BS
Sqm 406.00 1172.00 446.60 1212.60
standard 476 Part IV & VII), Water, Termite &
Fungus resistant, compressive strength 25
kg/sq.cm, Bending strength 100 kg/sq.cm. 10 mm
Thick

13.69 Glass fibre reinforced gypsum board 12.5 mm


(b) thick conforming to IS: 2095- 1996: Part - I

12.50mm thick Sqm 406.00 776.00 446.60 816.60

13.70 Providing and fixing thermal insulation of ceiling


(under deck insulation) with Resin Bonded Fibre
glass wool conforming to IS : 8183 density
24kg/m3, 50mm thick, wrapped in 200 G Virgin
Polythene bags fixed to ceiling with metallic cleats Sqm 157.00 553.00 172.70 568.70
(50x50x3mm) @ 60 cm and wire mesh of
12.5mm x 24g wire and mesh, for top most ceiling
of building.

13.71 Providing and fixing covering 2mm thick 300mm


first class fibre sheet with gatties and screw on
vertical expansion joints one side fixed and one
side fixed with slotted holes to allow movement m 72.00 429.00 79.20 436.20
complete in all respect as per specifications and
to the entire satisfaction of engineer- in- charge.

Chapter-13 Page 142 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.72 Providing and fixing covering 200mm wide
Aluminium Sheet 14 Gauge with gatties and
screw on vertical expansion joints one side fixed
and one side fixed with slotted holes to allow
movement complete in all respect as per mt 72.00 541.00 79.20 548.20
specifications and to the entire satisfaction of
engineer- in- charge.

13.72 a Providing and fixing machine moulded aluminium


covering of approved pattern & design, made out
of machine cut aluminium sheet and machine
holed for receiving dash fastener, over expansion
joints on vertical surfaces/ceiling floors, the fixing
on plate in one row on one side of joint only shall
be done with stainless steel dash fasteners of 8
mm dia and 75 mm long bolt including providing kg 60.00 524.00 66.00 530.00
aluminium washers 2 mm thick & 15 mm dia , at a
staggered pitch of 200mm centre to centre
including drilling holes in the receiving surface and
providing expandable plastic sleeves in holes etc.
complete as per direction of Engineerin-charge.

13.72 b Powder coated aluminium sheet 2.5mm thick


(minimum thickness of powder coating 50 micron) kg 60.00 555.00 66.00 561.00

13.73 Providing and fixing covering 200mm wide


G.I.Sheet 14 Gauge with gatties and screw on
vertical expansion joints one side fixed and one
side fixed with slotted holes to allow movement mt 72.00 392.00 79.20 399.20
complete in all respect as per specifications and
to the entire satisfaction of engineer- in- charge.

13.74 Providing and fixing 110 mm dia . U.P.V.C Rain


water pipe of 2.5 kgf./sqm as per IS:4985
including jointing during masonary complete as
per specifications and to the entire satisfaction of
Engineer-in- charge. (If fixed on wall face clamp to mt 6.00 122.00 6.60 122.60
be paid separatly as per respective item)

13.74 a Providing and fixing on wall face unplasticised


Rigid PVC rain water pipes (working pressure
2.50 kgf / cm²) conforming to IS : 4985, including
jointing with seal ring (i) Single socketed pipes.

Chapter-13 Page 143 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
i U-PVC pipes (working pressure 2.5 kgf. / sqcm)
Single socketed pipe 110 mm dia. mt 72.00 190.00 79.20 197.20

ii U-PVC pipes (working pressure 2.5 kg / sqcm)


Single socketed pipe 160 mm dia. mt 72.00 313.00 79.20 320.20

iii U-PVC pipes (working pressure 2.5 kg / sqcm)


Single socketed pipe 200 mm dia. mt 72.00 445.00 79.20 452.20

13.75 Providing and fixing 110 mm dia. U.P.V.C bend


for Rain water pipe as per IS:14735 including
jointing complete as per specifications and to the
entire satisfaction of Engineer- in- charge.

a UPVC 110 mm bend nos. 37.00 135.00 40.70 138.70


b UPVC 160 mm bend nos. 37.00 153.00 40.70 156.70
c UPVC 200 mm bend nos. 37.00 166.00 40.70 169.70

13.76 Providing and fixing 110 mm dia. U.P.V.C


Coupling/Sockete for Rain water pipe as per
IS:14735 including jointing complete as per
specifications and to the entire satisfaction of
Engineer- in- charge.

a UPVC 110 mm bend nos. 34.00 84.00 37.40 87.40


b UPVC 160 mm bend nos. 34.00 110.00 37.40 113.40
c UPVC 200 mm bend nos. 34.00 131.00 37.40 134.40

13.77 Preformed fillers for expansion joints in concrete


pavement and structures (non-extruding and
resilient type) part-3 Polymer Based (CED 13:
building construction practices including painting, Mtr. 682.00 1003.00 750.20 1071.20
varnishing and allied finishing) complete as per IS
1838-3 (2011):

Chapter-13 Page 144 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.78 Providing & laying integral cement based water
proofing treatment including preparation of
surface as required for treatment of roofs,
balconies, terraces etc consisting of following
operations: (a)
Applying a slurry cost of neat cement using 2.75
kg/sqm. of cement admixed with water proofing
compound conforming to IS. 2645 and
approved by Engineer- in- charge over the RCC
slab including adjoining walls upto 300mm height
including cleaning the surface before treatment.
(b) Laying brick bats with mortar using broken
bricks/ brick bats 25mm to 115mm size with 50% Sqm. 211.00 453.00 232.10 474.10
of cement mortar 1:5 (1 cement :5 coarse sand)
admixed with water proofing ompound conforming
to IS: 2645 and approved
by Engineer-in-charge over 20mm thick layer of
cement mortar of mix 1:5 ( 1 cement L5 coarse
sand) admixed with water proofing compound
conforming to IS :2645 and approved by Engineer.

Chapter-13 Page 145 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.79 Providing and fixing mineral fibre false ceiling tiles (
NRC 0.55 to 0.6) at all heights of size
595X595x16 mm of approved texture, design and
pattern. The tiles should have Humidity Resistance (RH)
of 99%, Light Reflection > 85%, Thermal Conductivity k
= 0.052 - 0.057 w/m K, Fire Performance as per (BS
476 pt - 6 &7)in true horizontal level suspended on
interlocking T-Grid of hot dipped all round galvanized
iron section of 0.33 mm thick (galvanized @120 gsm)
comprising of main T runners of 15x32 mm of length
3000 mm, cross T of size 15x32mm of length 1200 mm
and secondary intermediate cross T of size 15x32 mm
of length 600 mm to form grid module of size 600x600
mm suspended from ceiling using galvanized mild steel
item (galvanised@80gsm) 50 mm long 8mm outer
diameter M-6 dash fasteners, 6 mm diameter fully
threaded hanger rod up to 1000 mm
Sqm 283.00 1681.00 311.30 1709.30
length and L-shape level adjuster of size 85x25x2 mm,
spaced at 1200 mm centre to centre along main ‘T’. The
system should rest on periphery walls /partitions with the
help of GI perimeter wall angle of size24x24X3000 mm
made of 0.40 mm thick sheet, to be fixed to the wall with
help of plastic rawl plug at 450 mm centre to centre & 40
mm long dry wall S.S. screws. The exposed bottom
portion of all T-sections used in false ceiling support
system shall be pre-painted with polyester baked paint,
for all heights. The work shall be carried out as per
specifications, drawings and as per directions of the
engineer-in-charge.

Chapter-13 Page 146 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.80 Providing and fixing tiled false ceiling of specified
materials of size 595x595 mm ( GI Metal Ceiling Lay in
plain Tegular edge Global white color tiles of size
595x595 mm, and 0.5 mm thick with 8 mm drop; made
of G I sheet having galvanizing of 100 gms/sqm (both
sides inclusive) and electro statically polyester powder
coated of thickness 60 microns(minimum), including
factory painted after bending.) in true horizontal level,
suspended on inter locking metal grid of hot dipped
galvanized steel sections ( galvanized @ 120 grams/
sqm, both side inclusive) consisting of main "T" runner
with suitably spaced joints to get required length and of
size 24x38 mm made from 0.30 mm thick (minimum)
sheet, spaced at 1200 mm center to center and cross
"T" of size 24x25 mm made of 0.30 mm thick (minimum)
sheet, 1200 mm long spaced between main "T" at 600
mm center to center to form a grid of 1200x600 mm and
secondary cross "T" of length 600 mm and size 24x25 Sqm 283.00 1234.0 311.30 1262.30
mm made of 0.30 mm thick (minimum) sheet to be
interlocked at middle of the 1200x600 mm panel to form
grids of 600x600 mm and wall angle of size 24x24x0.3
mm and laying false ceiling tiles of approved texture in
the grid including, required cutting/making, opening for
services like diffusers, grills, light fittings, fixtures, smoke
detectors etc. Main "T" runners to be suspended from
ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6
mm fixed to ceiling with 12.5 mm dia and 50 mm long
dash fasteners, 4 mm GI adjustable rods with
galvanised butterfly level clips of size 85 x 30 x 0.8 mm
spaced at 1200 mm center to center along main T,
bottom exposed width of 24 mm of all Tsections shall be
pre-painted with polyester paint, all complete for all
heights as per specifications, drawings and as directed
by Engineer-in-charge.

Chapter-13 Page 147 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.81 Providing and fixing tiled false ceiling of specified materials of
size 595x595 mm ( GI Metal Ceiling Lay in perforated Tegular
edge global white color tiles of size 595x595 mm and 0.5 mm
thick with 8 mm drop; made of GI sheet having galvanizing of
100 gms/sqm (both sides inclusive) and 20% perforation area
with 1.8 mm dia holes and having NRC (Noise Reduction
Coefficient ) of 0.5, electro statically polyester powder coated
of thickness 60 microns (minimum), including factory painted
after bending and perforation, and backed with a black Glass
fiber acoustical fleece..) in true horizontal level, suspended on
inter locking metal grid of hot dipped galvanized steel sections
( galvanized @ 120 grams/ sqm, both side inclusive) consisting
of main "T" runner with suitably spaced joints to get required
length and of size 24x38 mm made from 0.30 mm thick
(minimum) sheet, spaced at 1200 mm center to center and
cross "T" of size 24x25 mm made of 0.30 mm thick (minimum)
sheet, 1200 mm long spaced between main "T" at 600 mm
center to center to form a grid of 1200x600 mm and secondary
cross "T" of length 600 mm and size 24x25 mm made of 0.30
mm thick (minimum) sheet to be interlocked at middle of the Sqm 283.00 1234.0 311.30 311.30
1200x600 mm panel to form grids of 600x600 mm and wall
angle of size 24x24x0.3 mm and laying false ceiling tiles of
approved texture in the grid including, required cutting/making,
opening for services like diffusers, grills, light fittings, fixtures,
smoke detectors etc. Main "T" runners to be suspended from
ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6
mm fixed to ceiling with 12.5 mm dia and 50 mm long dash
fasteners, 4 mm GI adjustable rods with galvanised butterfly
level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm center
to center along main T, bottom exposed width of 24 mm of all
Tsections shall be pre-painted with polyester paint, all
complete for all heights as per specifications, drawings and as
directed by Engineer-in-charge.

Chapter-13 Page 148 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.82 Providing and fixing false ceiling at all heights with
integral densified calcium silicate reinforced with fibre
and natural filler false ceiling tiles of Size 595x595 mm
of approved texture, design and patterns having NRC
(Noise Reduction coefficient) of 0.50 (minimum) as per
IS 8225:1987, Light reflectance of 85% (minimum). Non
combustible as per BS:476 (part-4), fire performance as
per BS:476 (part 6 &7), humidity resistance of 100%,
thermal conductivity < 0.043 W/m K as per ASTM
518:1991, in true horizontal level suspended on
interlocking metal powder coated T-Grid of hot dipped
galvanised iron section of 0.40 mm thick on Silhouette
profile,rotary stiched double webbed white with 6mm
reveal profile (white/black),comprising of main-T
runners of size
1912SUB HEAD : 26- N 15x42mm of length 3000 mm,
cross - T of size 15x42 mm of length 1200 mm and
secondary intermediate cross-T of size 15x42 mm of
sqm 283.00 1627.00 311.30 1655.30
length 600mm to form grid module of size 600 x 600
mm, suspended from ceiling using galvanised mild steel
items (galvanizing @ 80 grams per sqm) i.e. 50 mm
long, 8 mm outer diameter M-6 dash fasteners, 6 mm
dia fully threaded hanger rod upto 1000 mm length and
L-shape level adjuster of size 85x25x2 mm. Galvanised
iron perimeter wall angle of size 22x19x0.40 mm of
length 3000 mm to be fixed on periphery wall / partition
with the help of plastic rawl plugs at 450 mm center to
center and 40mm long dry wall S.S screws. The work
shall be carried out as per specifications, drawing and
as per directions of the Engineer-in-Charge.

Chapter-13 Page 149 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.83 Providing and fixing in position wall panelling at all
heights with integral densified calcium silicate
panels/tiles of size 595 x 595mm, having NRC (Noise
Reduction coefficient) of 0.50 (minimum) as per IS
8225:1987, Light reflectance of 85% (minimum). Non
combustible as per BS:476 (part-4), fire performance as
per BS:476 (part 6 &7), humidity resistance of 100%,
thermal conductivity <0.043 W/m K as per ASTM
518:1991, comprising of a frame made from especially
fabricated galvanised mild steel sheet 0.50 mm thick
pressed section (galvanizing @120 grams per sqm
including both sides) i.e.vertical studs of size 48 x 34 x
36 mm are placed at 600mm center to center in a floor
and ceiling channel section of size 50 x 32m fixed to the
floor and soffit at 600mm centers using 12mm
dia,50mm long wedge type expanded zinc alloy dash
fastner with 10mm bolt. This same channel is then to be
fixed in horiziontal direction at 600mm center to center
sqm 456.00 2332.00 501.60 2377.60
so as to form a grid of 600mm x 600mm. Glasswool of
50mm thickness is then to be inserted in the slots and
finally calcium silicate non combustible panels/tiles are
to be screw fixed with self tapping pan head nickel
coated mild steel screws of size 13 x 3.2mm on to this
grid leaving an even groove of 1 mm between the
panels. The joints between the panels are to be duly
jointed and finished using recommended jointing
calcium silicate based compound and fiber joint tape roll
50mm wide (90 metre ) roll and two coats of primer
suitable for panelling as per manufacturer's specification
as per direction of Engineer-in-Charge all complete.

13.84 Providing and fixing 15 mm thick false ceiling


tiles at all heights with integral densified calcium
silicate reinforced with fibre and natural filler false
ceiling tiles of Size 595x595 mm of approved
texture, design and patterns having NRC (Noise
Reduction coefficient) of 0.50 (minimum) as per
IS 8225:1987, Light reflectance of 85%
(minimum). Non combustible as per BS:476 (part-
sqm 250.00 1233.00 275.00 1258.00
4), fire performance as per BS:476 (part 6 &7),
humidity resistance of 100%, thermal conductivity
< 0.043 W/m K as per ASTM 518:1991,in true
horizontal level on the existing frame work
consisting of T-sections and Lsections suitably
fixed according to tile size as per direction of
Engineer-in-charge.

Chapter-13 Page 150 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.85 Providing & fixing false ceiling at all heights with
GRG (Glass Fibre Reinforced Gypsum) false
ceiling tiles of Size 595x595 mm of approved
texture, design and patterns having moisture
content less than 2%, humidity resistance of 99%,
NRC0.50 to 0.75 as per IS 8225:1987, Non
combustible as per BS 476 (part 4)-1970 and light
reflectance of 85% (minimum) to be laid in true
horizontal level suspended on inter-locking metal
T-Grid of hot dipped galvanised iron section of
0.33mm thick (galvanized @ 120 grams per sqm
including both sides) comprising of main-T
runners of size 15x32 mm of length 3000 mm,
cross - T of size 15x32 mm of length 1200 mm
and secondary intermediate cross-T of size
15x32 mm of length 600mm to form grid module
of size 600 x 600 mm, suspended from ceiling
using galvanised mild steel items (galvanizing @
80 grams per sqm) i.e. 50 mm long, 8 mm outer
diameter M-6 dash fasteners, 6 mm dia fully
threaded hanger rod upto 1000 mm length and L-
shape level adjuster of size 85x25x2 mm.
Galvanised iron perimeter wall angle of size
24x24x0.40 mm of length 3000 mm to be fixed on
periphery wall / partition with the help of plastic
rawl plugs at 450 mm center to center and 40 mm
long dry wall wood screws. The work shall be
carried out as per specifications, drawing and as
per directions of the Engineer-in-Charge.

i 12 mm thick micro tegular edged semi


perforated GFRG (Glass Fibre Reinforced
Gypsum) false celing tiles of Size 595x595 sqm 283.00 1338.00 311.30 1366.30
mm

ii With fully perforated 12 mm thick micro


tegular edged or 10 mm thick square
edged GRG false ceiling tiles. sqm 283.00 1473.00 311.30 1501.30

Chapter-13 Page 151 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.86 Providing and fixing mineral fibre false ceiling tiles at all
heights of size 595X595mm of approved texture, design
and pattern. The tiles should have Humidity Resistance
(RH) of 99%, Light Reflection > 85%, Thermal
Conductivity k = 0.052 - 0.057 w/m K, Fire Performance
as per (BS 476 pt - 6 &7)in true horizontal level
suspended on interlocking T-Grid of hot dipped all round
galvanized iron section of 0.33 mm thick (galvanized
@120 gsm) comprising of main T runners of 15x32 mm
of length 3000 mm, cross T of size 15x32mm of length
1200 mm and secondary intermediate cross T of size
15x32 mm of length 600 mm to form grid module of size
600x600 mm suspended from ceiling using galvanized
mild steel item (galvanised@80gsm) 50 mm long 8mm
outer diameter M-6 dash fasteners, 6 mm diameter fully
threaded hanger rod up to 1000 mm length and L-shape
level adjuster of size 85x25x2 mm, spaced at 1200 mm
centre to centre along main ‘T’. The system should rest
on periphery walls /partitions with the help of GI
perimeter wall angle of size24x24X3000 mm made of
0.40 mm thick sheet, to be fixed to the wall with help of
plastic rawl plug at 450 mm centre to centre & 40 mm
long dry wall S.S. screws. The exposed bottom portion
of all T-sections used in false ceiling support system
shall be pre-painted with polyester baked paint, for all
heights. The work shall be carried out as per
specifications, drawings and as per directions of the
engineer-in-charge.

i With 16 mm thick beveled tegular mineral


fibre false ceiling tile (NRC 0.55 to 0.6)
sqm 233.00 1364.00 256.30 1387.30
size 595x595 mm

ii With 20 mm thick beveled tegular mineral


fibre false ceiling tile (NRC 0.7)
sqm 475.00 1788.00 522.50 1835.50

iii With 16 mm thick beveled tegular mineral


fibre Anti-microbial false ceiling tile
confirming to ISO 5 (class 100) sqm 475.00 2157.00 522.50 2204.50
specifications
13.87 Extra for addition of synthetic Polyester triangular
fibre of length 6 mm, effective diameter 10-40
microns and specific gravity of 1.34 to 1.40 in Per
cement plaster/mortar by using 125 gms. of Bag
synthetic Polyester triangular fibre for 50 Kgs. of 50
10.00 75.00 11.00 76.00
cement used in cement mortar for water proofing Kg of
treatment to RCC structures as per directions of Cem
Engineer-in-Charge. ent

Chapter-13 Page 152 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.88 Water proofing treatment of RCC structures (after
making the surface clean, dry & free from all
internal voids or honey combs ), with Zycosil
/equivalent water proofing Solution (1 litre of
Zycosil / equivalent & 20 litres of potable water
stirred first & 2 litres of Zycoprime / equivalent
Sqm 114.00 236.00 125.00 247.40
added and stirred (total 23 litres)) using two coats
till it meets the saturation level and testing as per
RILEM or by water drops test in which water drops
do not absorb but drops remain or rolls.

13.89 Water proofing of roof terraces, Basements,


Retaining Walls, Water tanks etc with Zydex
Zycoprime / Elastobar / Equivalent solution so as
to form a water-resistant cementitious bonding
coat and to form on-site seamless cross-linked
elastomeric membrane on the concrete surface to
reduce its porosity. Creating a cementitious
elastomeric polymeric membrane of Elastobar
and Zycoprime/Equivalent after application of
Zycosil & Zycoprime Solution in New
Construction. Take equal parts of Elastobar and
Cement and form a paste. Add little water to the Sqm 161.00 423.00 177.00 439.10
paste to make it brushable. Apply the paste on
surface with brush. Leave the surace for drying for
at least 4 - 6 hours to get elastomeric membrane.
After this application, make one more layer of
rough cementatios membrane using mixture of 1
Part of Zycoprime + 1 Part of Cement + 1 Part of
fine sand. Apply paste on the surface with a brush
to make a rough texture. Now your surface is
ready to bond well with tiles/screed.

13.90 Supply & Fixing Fiber Glass Coated Mesh with


thickness of 45 Gsm for the water proofing of roof
terraces, bathrooms , Water tanks, etc. The
surface to be levelled, finished, made smooth
before fixing of Fiber Glass Mesh, complete in all Sqm 31.00 119.00 34.00 122.10
respect as per manufactures specification and as
per directions of Engineer-in-Charge.

Chapter-13 Page 153 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.91 Water proofing treatment of Roof Slab with High
performance cementitious two component
product, consisting of a powder component and
an acrylic polymer using two coats ( Dr Fixit
Roofseal flex - Packaging Size: 12 .5 kg (7.5 kg
powder + 5 kg polymer) / equivalent water
proofing Solution ). The slurry thus formed by
mixing the two, is to be applied on new roofs to Sqm 161.00 559.09 177.00 575.19
forms a seamless, highly elastic, non-toxic
waterproofing layer on the roof with a life
expectancy of 7 years. The work shall be carried
out all complete as per specification and the
direction of the Engineer-in-charge.

13.92 Waterproofing of wet areas ( Concrete/ Masonary


Surface ) and any water retaining structures such
as swimming pools, water tanks, Bathrooms,
toilets, balconies, planters etc with high
performance polymer modified cementitionous
coating ( DR. FIXIT FASTFLEX / Equivalent ) to
provide tough film build-up and highly elastic film
formation, which accommodates thermal
Sqm 161.00 504.51 177.00 520.61
movements so as to provide seamless coating
without any joints to prevents water leakage. The
scope of work also includes surface prepration
and cleaning, washing and removing dust,dirt and
loose particles from concrete / masonary surface
complete in all respects.

13.93 Supplying & applying Colour Epoxy bonding


adhesive on Floors, having coverage of 0.60 Sqm
/ Kg of approved make such as Astral / STP or
any other equivalent brand, prepared and applied
as per manufacturer’s specifications including
preparation of surface, making the surface clean,
dry & free from all internal voids, etc complete Sqm 479.00 1742.00 527.00 1789.90
fully applied over existing base to provide a high-
performance, semi-smooth, impervious, easy to
clean and durable surface entirely to the
satisfaction of Engineer in Incharge.

Chapter-13 Page 154 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
13.94 Providing and applying injection grouting using
cement slurry admixed with Fosroc Chemical
Conplast WL or any other equivalent compound
@ 300 ml/ Bag of cement through the uPVC
nozzles ( 12mm dia uPVC/ Plastic Nozzles - 4" to
9" long @ 5 No: / Sqm of area) , provided into the
cracks/ honeycombed areas using 140 PSI hand
operated Grouting Pump under pressure till the Sqm 322.00 1076.00 354.00 1108.20
refusal,doing final Cement slurry Grouting (after
28 Days),, finally cutting & sealing of Nozzle.
including all labour, supervision, tools and tackles
and transportation etc. complete as per direction
of Enginner -in- charge.

Chapter-13 Page 155 CSR-2020


CSR−2020−Final
CHAPTER NO. 14
FLOORING & DADOS
Notes :-
(i) Unless otherwise stated, the labour rates include the handling charges of materials within 100
metres.

(ii) As there is huge involvement of water in cement based work, sundries @5% of labour component
has been taken in this chapter.

(iii) The rates include the cost of water. Where the water is supplied free by the Department, the labour
rates shall be decreased by 3% and through rates be decreased accordingly.

(iv) The rates given are for ground floor only. Add Rs. 3/- per sqm for every additional storey.

(v) The labour rates given in this chapter include the cost of water, tools & plants, cost of good earth
for mud mortar and mud plaster, wherever required.

(vi) Sand (fine aggregate) for 1:2:4 concrete in item of conglomerate, polished and terrazzo flooring
shall be as per Punjab PWD Specifications No: 3.30.

(vii) For Square and rectangular columns, enhance the labour rate for item no. 14.41 to 14.55 by
33.3%. For round and elliptical columns, enhance the labour rates for the item no. 14.53 to 14.55
by 100%. The through rates are to be increased accordingly.

(viii) Risers of stair-case are to be paid as per skirting or dado rates, while treads and landings are to be
paid as per flooring rates of similar specifications.

(ix) The rates for rubbing and polishing to granolithic finish are for rubbing & polishing to granolithic
granite finish.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.1 Laying of Dry Brick Ballast 40 mm gauge for


flooring. Cum 244.00 1456.00 268.40 1480.40

14.2 Laying of Dry stone Ballast 40 mm gauge for


flooring. Cum 244.00 1078.00 268.40 1102.40

14.3 Base course of floor consisting of 100mm thick


cement concrete 1:8:16 and 100mm sand filling Sqm 138.00 403.00 151.80 416.80
using mechanical mixer for mixing of material

14.4 Floating coat of 1:5mm thick neat cement laid in


one operation to the topping Sqm 14.00 29.00 15.40 30.40

14.5 Conglomerate floor 25mm thick cement concrete


topping 1:2:4 using mechanical mixer for mixing Sqm 154.00 238.00 169.40 253.40
of material

Chapter-14 Page 156 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.6 Conglomerate floor 40mm thick cement concrete
topping 1:2:4 using mechanical mixer for mixing Sqm 170.00 304.00 187.00 321.00
of material

14.7 Conglomerate floor 50mm thick cement concrete


topping 1:2:4 using mechanical mixer for mixing
Sqm 178.00 346.00 195.80 363.80
of material

14.8 Conglomerate floor 25mm thick cement concrete


rete 1:2:4 on 100mm thick cement concrete
1:8:16 and 100mm sand filling. using mechanical Sqm 293.00 657.00 322.30 686.30
mixer for mixing of material

14.9 Conglomerate floor 40mm thick cement concrete


1:2:4 on 100mm thick cement concrete 1:8:16
and 100mm sand filling. using mechanical mixer Sqm 308.00 708.00 338.80 738.80
for mixing of material

14.10 Conglomerate floor 50mm thick cement concrete


rete 1:2:4 on 100mm thick cement concrete
1:8:16 and 100mm sand filling using mechanical Sqm 316.00 749.00 347.60 780.60
mixer for mixing of material

14.11 Screed of 50mm thick cement concrete 1:8:16 to


be laid below the topping using mechanical mixer
Sqm 82.00 148.00 90.20 156.20
for mixing of material

14.12 Screed of 40mm thick cement concrete 1:8:16 to


be laid below the topping using mechanical mixer Sqm 82.00 155.00 90.20 163.20
for mixing of material

14.13 25mm thick conglomerate floor of cement


concrete 1:2:4 over flat brick laid dry with 25mm
open joints alround filled with cement concrete
1:2:4 simultaneously with topping over 100mm Sqm 181.00 407.00 199.10 425.10
sand filling using mechanical mixer for mixing of
material

14.14 25mm thick polished flooring cement concrete


1:2:4 toping finished with 3 mm thick neat coat of
cement rubbed and polished using mechanical Sqm 289.00 402.00 317.90 430.90
mixer for mixing of material

14.15 40mm thick grey polished flooring cement


concrete 1:2:4 toping finished with 3 mm thick
neat coat of cement rubbed and polished using Sqm 309.00 472.00 339.90 502.90
mechanical mixer for mixing of material

Chapter-14 Page 157 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.16 20mm thick grey polished skirting or dado
consisting of bottom layer of 16mm thick cement
sand plaster 1.3 and finished 3mm thick topping
of neat cement rubbed and polished including Sqm 457.00 566.00 502.70 611.70
rounding of junction with floors.

14.17 Flat brick paving laid dry over 25mm thick mud
mortar grouted with sand Sqm 54.00 287.00 59.40 292.40

14.18 Dry brick on edge paving sand grouted over


50mm thick earth and mud plaster Sqm 94.00 472.00 103.40 481.40

14.19 Laying First Class Dry Brick on edge flooring or


paving in ordinary bonded courses or in herring
bond or other special courses / bond with rough
dressing of soil, final dressing of earth to give
level surface and camber. Al joints shall be
thoroughly filled / grouted with dry sand, applied Sqm 63.00 441.00 69.30 447.30
to a thickness of not less than 20 mm over the
surface of flooring and brushed into the joints,
rolling the surface with light road roller after
sprinkling with water complete in all respects.

14.20 Dry brick on edge paving sand grouted over


50mm thick rammed brick aggregate 40mm Sqm 88.00 524.00 96.80 532.80
gauge

14.21 Flat brick or tile flooring laid in cement sand


mortor 1:4 on 100mm thick cment concret 1:8 :16
and 100mm thick sand filling and cement pointed Sqm 307.00 869.00 337.70 899.70
1:2 on top.

14.22 Brick on edge flooring laid in cement sand mortar


1:4 on 75mm thick cement concrete 1:8:16 and
100mm sand filling cement pointing 1:2 on top Sqm 357.00 998.00 392.70 1033.70

14.23 Flat brick or tile flooring laid dry over a bed of


6mm thick cement sand mortar 1:6 grouted with
cements sand mortar 1:4 and top surface to be Sqm 101.00 368.00 111.10 378.10
left clean after wire brushing

14.24 Brick on edge flooring with bricks of class


designation 105 , including cement slurry etc.
Sqm 214.00 898.00 235.40 919.40
complete in cement mortar 1:4 with F.P.S. bricks.

Chapter-14 Page 158 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.25 40mm thick grey terrazo topping rubbed and
polished to a granolithic fincish under layer 34mm
thick cement concret 1:2:4 and top layer 6mm
thick with 3mm gauge white marble makrana Sqm 364.00 566.00 400.40 602.40
chipping from indigenous marble laid in 1:1½ (50
Kg of ordinary grey cemetn and 0.05 cum of white
marble chippings)

14.26 40mm thick grey terrazo topping rubbed and


polished to a granolithic fincish under layer 31
mm thick cement concret 1:2:4 and top layer
9mm (4mm to 7mm thick) with the gauge white
Sqm 423.00 635.00 465.30 677.30
marble makrana chipping from indigenous marble
laid in 1:1½ (50 Kg of ordinary grey cemetn and
0.05 cum of white marble chippings)

14.27 40mm thick grey terrazo topping rubbed and


polished to a granolithic fincish under layer 28
mm thick cement concret 1:2:4 and top layer 12
mm thick with 7mm 10mm gauge white marble
makrana chipping from indigenous marble laid in Sqm 423.00 643.00 465.30 685.30
1:1½ (50 Kg of ordinary grey cemetn and 0.05
cum of white marble chippings)

14.28 40mm thick white terrazo topping rubbed and


polished to a granolithic finish under layer 34mm
thick cement concret 1:2:4 and top layer 6mm
thick with 3mm gauge white marble makrana
chipping from indigenous marble laid in 1:1½ Sqm 364.00 615.00 400.40 651.40
(37.5 Kg of white cement, 12.5 kg marble powder
and 0.05 cum of white marble chippings)

14.29 40mm thick white terrazo topping rubbed and


polished to a granolithic finish under layer 31mm
thick cement concret 1:2:4 and top layer 9mm
thick with 4mm to 7 mm gauge white marble
makrana chipping from indigenous marble laid in Sqm 423.00 707.00 465.30 749.30
3:1:6 (37.5 Kg of white cement, 12.5 kg marble
powder and 0.05 cum of white marble chippings).

14.30 40mm thick white terrazo topping rubbed and


polished to a granolithic finish under layer 28 mm
thick cement concret 1:2:4 and top layer 12 mm
thick with 7mm to 10 mm gauge white marble
makrana chipping from indigenous marble laid in Sqm 423.00 732.00 465.30 774.30
3:1:6 (37.5 Kg of white cemet, 12.5 Kg marble
powder and 0.05 cum of white marble chippings)

Chapter-14 Page 159 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.31 40mm thick black red or chocolate terrazo


topping rubbed and polished to a granolithic finish
under layer 34mm thick cement concret 1:2:4 and
top layer 6mm thick with 1 mm to 4 mmgauge
white marble makrana chipping from indigenous Sqm 364.00 626.00 400.40 662.40
marble laid in 3:1:6 (50 Kg of ordinary grey
cement with admixture of black red or chocolate
pigment to give to required back ground and 0.05
cum of marble chippings)

14.32 40mm thick black red or chocolate terrazo


topping rubbed and polished to a granolithic finish
under layer 31 mm thick cement concret 1:2:4
and top layer 9mm thick with 4mmto 7mm gauge
white marble makrana chipping laid in 3:1:6
Sqm 423.00 726.00 465.30 768.30
(37.50 Kg of ordinary grey cement 12.5 kg
marble powder with adixture to black red or
chocolate pigment to give to required back
ground and 0.05 cum of marble chippings)

14.33 40mm thick black red or chocolate terrazo


topping rubbed and polished to a granolithic finish
under layer 28 mm thick cement concret 1:2:4
and top layer 12mm thick with 7mmto 10mm
gauge white marble makrana chipping laid in Sqm 423.00 734.00 465.30 776.30
3:1:6 (37.50 Kg of ordinary grey cement 12.5 kg
marble powder with adixture to black red or
chocolate pigment to give to required back
ground and 0.05 cum of marble chippings)

14.34 40mm thick orange, buff, yellow, or pink terrazo


topping rubbed and polished to a granolithic finish
under layer 34mm thick cement concret 1:2:4 and
top layer 6 mm thick with 4mm to 7mm gauge
white marble makrana chipping from
indigendienous marble laid in 3:1:6 ( 37.5 Kg of Sqm 423.00 725.00 465.30 767.30
white cement and 12.5 kg of marble powder with
admixture of orange buff, yellow or pink pigment
to give to required back ground and 0.05 cum of
marble chippings)

14.35 40mm thick orange, buff, yellow, or pink terrazo


topping rubbed and polished to a granolithic finish
under layer 31mm thick cement concret 1:2:4 and
top layer 9 mm thick with 4mm to 7 mm gauge
white marble makrana chipping from indigenous Sqm 423.00 785.00 465.30 827.30
marble laid in 3:1:6 (37.50 Kg of white cement
with admixture of orange buff, yellow or pink
pigment to give to required back ground and 0.05
cum of marble chippings)

Chapter-14 Page 160 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.36 40mm thick orange, buff, yellow, or pink terrazo


topping rubbed and polished to a granolithic finish
under layer 28mm thick cement concret 1:2:4 and
top layer 12 mm thick with 7mm to 10 mm gauge
white marble makrana chipping from indigenous Sqm 423.00 821.00 465.30 863.30
marble laid in 3:1:6 (37.50 Kg of white cement
with admixture of orange buff, yellow or pink
pigment to give to required back ground and 0.05
cum of marble chippings)

14.37 40mm thick blue or green terrazo topping rubbed


and polished to a granolithic finish under layer of
34mm thick cement concret 1:2:4 and top layer
6mm thick with 1mm to 4 mm gauge white
marble makrana chipping from indigenous marble Sqm 364.00 667.00 400.40 703.40
laid in 3:1:6 (37.50 Kg of white cement with
admixture of blue or green colour to give required
back ground and 0.05 cum of white marble
chippings)

14.38 40mm thick blue or green terrazo topping rubbed


and polished to a granolithic finish under layer of
31 mm thick cement concret 1:2:4 and top layer
9mm thick with 4mm to 7mm gauge white marble
makrana chipping from indigenous marble laid in Sqm 423.00 785.00 465.30 827.30
3:1:6 (37.5 Kg of white cement 12.5 kg with
admixture of blue or green colour to give required
back ground and 0.05 cum of marble chippings)

14.39 40mm thick blue or green terrazo topping rubbed


and polished to a granolithic finish under layer of
28 mm thick cement concret 1:2:4 and top layer
12 mm thick with 7mm to 10 mm gauge white
marble makrana chipping from indigenous marble Sqm 423.00 811.00 465.30 853.30
laid in 3:1:6 (37.5 Kg of white cement 12.5 kg with
admixture of blue or green colour to give required
back ground and 0.05 cum of marble chippings)

14.40 50mm thick ironite ( Metallic Floor Hardner to be


mixed with Granolithic topping for heavy duty
floors) floor consisiting of 40mm thick cement
concrete 1:2:4 base and top layer 10mm thick
laid with one part of ironite and grey cement Sqm 441.00 781.00 485.10 825.10
mixed together in the ratio of 1:4 by weight to two
parts of hard granite chippings 6mm gauge by
volume finished smooth with hard rubbing

Chapter-14 Page 161 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.41 20mm thick grey terrazo skirting or dado, rubbed
and polished granolithic finish under layer 14mm
thick cement sand plaster 1:3 and top layer 6mm
thick with 1mm to 4 mm gauge, white marble
makrana chippings laid in 1:1½ (50 Kg of Sqm 718.00 862.00 789.80 933.80
ordinary grey cement and 0.05 cum of whit
marble chippings ) including rounding of
junctions.

14.42 20mm thick grey terrazo skirting or dado, rubbed


and polished granolithic finish under layer 11mm
thick cement sand plaster 1:3 and top layer 9mm
thick with 4mm to 7 mm gauge, white marble
makrana chippings laid in 1:1½ (50 Kg of Sqm 718.00 867.00 789.80 938.80
ordinary grey cement and 0.05 cum of whit
marble chippings ) including rounding of
junctions.

14.43 20mm thick grey terrazo skirting or dado, rubbed


and polished granolithic finish under layer 8 mm
thick cement sand plaster 1:3 and top layer
12mm thick with 7mm to 10 mm gauge, white
marble makrana chippings laid in 1:1½ (50 Kg of Sqm 718.00 909.00 789.80 980.80
ordinary grey cement and 0.05 cum of whit
marble chippings ) including rounding of
junctions.

14.44 20mm thick white terrazo skirting or dado, rubbed


and polished to a granolithic finish, layer 14mm
thick cement sand plaster 1:3 and top layer 6mm
thick with 1mm to 4 mm gauge, white marble
makrana chippings laid in 1:1½ (50 Kg of Sqm 718.00 911.00 789.80 982.80
ordinary grey cement and 0.05 cum of whit
marble chippings ) including rounding of
junctions.

14.45 20mm thick white terrazo skirting or dado, rubbed


and polished to a granolithic finish, under layer
11mm thick cement sand plaster 1:3 and top
layer 9mm thick with 4mm to 7mm, gauge white
marble makrana chippings laid in 3:1:6 (37.50 Kg Sqm 718.00 940.00 789.80 1011.80
of ordinary grey cement 12.50 gk marble powder
and 0.05 cum of whit marble chippings ) including
rounding of junctions.

Chapter-14 Page 162 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.46 20mm thick white terrazo skirting or dado, rubbed
and polished granolithic finish under layer 8 mm
thick cement sand plaster 1:3 and top layer
12mm thick with 7mm to 10 mm gauge, white
marble makrana chippings laid in 3:1:6 (37.50 Kg Sqm 718.00 990.00 789.80 1061.80
of white cement, 12.5 kg marble powder and
0.05 cum of whit marble chippings ) including
rounding of junctions.

14.47 20mm thick black, red or chocolate terrazo


skirting or dado, rubbed and polished to a
granolithic finish, layer 14mm thick cement sand
plaster 1:3 and 6mm thick with 3mm gauge, white
marble makrana chippings from indigenous
marble laid in 1:1½ (50 Kg of ordinary grey Sqm 718.00 924.00 789.80 995.80
cement with admixture of black, red or chocolate
pigment to give required back ground and 0.05
cum of marble chippings (including rounding of
junctions.)

14.48 20mm thick black, red or chocolate terrazo


skirting or dado, rubbed and polished to a
granolithic finish, layer 11mm thick cement sand
plaster 1:3 and 9mm thick with 4mm to 7mm
gauge, white marble laid chippings from
indigenous marble laid in 1:1½ (50 Kg of ordinary Sqm 718.00 929.00 789.80 1000.80
grey cement with admixture of black, red or
chocolate pigment to give required back ground
and 0.05 cum of marble chippings (including
rounding of junctions.)

14.49 20mm thick black, red or chocolate terrazo


skirting or dado, rubbed and polished to a
granolithic finish, under layer 8mm thick cement
sand plaster 1:3 and 12mm thick with 7mm to
10mm gauge, white marble laid chippings from
indigenous marble laid in 1:1½ (50 Kg of ordinary Sqm 718.00 1030.00 789.80 1101.80
grey cement with admixture of black, red or
chocolate pigment to give required back ground
and 0.05 cum of marble chippings (including
rounding of junctions.)

Chapter-14 Page 163 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.50 20mm thick orange bluff, yellow or pink terrazo
skirting or dado, rubbed and polished to a
granolithic finish, under layer 14mm thick cement
sand plaster 1:3 and top ayer 6mm thick with 1
mm to 4 mm gauge, white marble makrana
chippings from indigenous marble laid in 3:1:6
(37.50 Kg of white cement, 12.50 kg marble Sqm 718.00 963.00 789.80 1034.80
powder with admixture of orange bluff, yellow or
pink pigment to give required back ground and
0.05 cum of white marble chippings (including
rounding of junctions.)

14.51 20mm thick orange bluff, yellow or pink terrazo


skirting or dado, rubbed and polished to a
granolithic finish, under layer 11mm thick cement
sand plaster 1:3 and top layer 9mm thick with
4mm to 7mm gauge, white marble makrana
chippings laid in 3:1:6 i(37.50 Kg of white cement Sqm 718.00 1044.00 789.80 1115.80
12.50kg marble powder with admixture of orange
buff, yellow or pink pigment to give required back
ground and 0.05 cum of white marble chippings
(including rounding of junctions.

14.52 20mm thick orange bluff, yellow or pink terrazo


skirting or dado, rubbed and polished to a
granolithic finish, under layer 8 mm thick cement
sand plaster 1:3 and top layer 12mm thick with
7mm to 10mm gauge, white marble makrana
chippings laid in 3:1:6 i(37.50 Kg of white cement Sqm 718.00 1111.00 789.80 1182.80
12.50kg marble powder with admixture of orange
buff, yellow or pink pigment to give required back
ground and 0.05 cum of white marble chippings
(including rounding of junctions.

14.53 20mm thick blue or green skirting or dado,


rubbed and polished to a granolithic finish, under
layer 14mm thick cement sand plaster 1:3 and
top layer 6mm thick with 1mm to 4 mm gauge,
white marble makrana chippings from indigenous
marble laid in 1:1½ (50 Kg of white cement with Sqm 718.00 963.00 789.80 1034.80
admixture of blue or green pigment to give
required back ground and 0.05 cum of white
marble chippings (including rounding of
junctions.)

Chapter-14 Page 164 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.54 20mm thick blue or green skirting or dado,
rubbed and polished to a granolithic finish, under
layer 11mm thick cement sand plaster 1:3 and
top layer 9mm thick with 4mm to 7 mm gauge,
white marble makrana chippings from indigenous
marble laid in 3:1:6 (37.5 Kg of white cement , Sqm 718.00 1044.00 789.80 1115.80
12.5 kg marble powder with admixture of blue or
green pigment to give required back ground and
0.05 cum of white marble chippings (including
rouding of junctions.)

14.55 20mm thick blue or green skirting or dado,


rubbed and polished to a granolithic finish, under
layer 8mm thick cement sand plaster 1:3 and top
layer 12mm thick with 7mm to 10 mm gauge,
white marble makrana chippings from indigenous
marble laid in 3:1:6 (37.5 Kg of white cement , Sqm 718.00 1111.00 789.80 1182.80
12.5 kg marble powder with admixture of blue or
green pigment to give required back ground and
0.05 cum of white marble chippings (including
rounding of junctions.)

14.56 Extra over item no: 14.24 and 14.42 for plains if
(a) 33 % white cement in 6 mm thick top layer is Sqm 17.95 17.95 17.95 17.95
used.

14.56 Extra labour for projected nosing of stair case of


(b) any shape and design.
Mtr. 64.00 64.00 70.40 70.40

14.57 Extra for making chequers of approved pattern


on cement concrete floors, steps, landing, sqm. 44.00 44.00 48.40 48.40
pavements etc.

14.58 Precast terrazo tiles of 20mm minimum thickness


in ordinary grey cement with marble chips of size
and colour as required laid on 20mm thick bed of
cement mortar 1:3 (1 cement 3 sand) with neat
Sqm 517.00 1066.00 568.70 1117.70
cement slurry between joints and over the base
for floors, treads of steps and landings including
rubbing and polishing

14.59 Precast chequred tiles of 20mm minimum


thickness in ordinary grey cement without chips
laid on 20mm thick bed of cement mortar 1:3 with
Sqm 228.00 788.00 250.80 810.80
neat cement slurry between joints and over the
base for floors, treads of steps and landings

Chapter-14 Page 165 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.60 Precast P.C.C. tiles conforming to IS 1237-1980,
20 cm x 20 cm x 2.5 cm in ordinary grey cement
without chips laid on 20mm thick bed of cement
mortar 1:3 with neat cement slurry between joints Sqm 228.00 788.00 250.80 810.80
and over the base for floors, treads of steps and
landings

14.61 Precast P.C.C. tiles conforming to IS 1237-1980,


25 cm x 25 cm x 2.5 cm in ordinary grey cement
without chips laid on 20mm thick bed of cement
mortar 1:3 with neat cement slurry between joints Sqm 228.00 788.00 250.80 810.80
and over the base for floors, treads of steps and
landings

14.62 Precast P.C.C. tiles conforming to IS 1237-1980,


30 cm x 30 cm x 2.5 cm in ordinary grey cement
without chips laid on 20mm thick bed of cement
mortar 1:3 with neat cement slurry between joints Sqm 228.00 788.00 250.80 810.80
and over the base for floors, treads of steps and
landings

14.63 Precast terrazo tiles of 20mm minimum thickness


in white cement with marble chips of size and
colour as required laid on 20mm thick bed iof
cement morter 1:3 (1 cement and 3 sand ) with
neat cement slurry made of white cement Sqm 475.00 1254.00 522.50 1301.50
between joints and over the base for floors,
treads of steps and landings including rubbing
and polishing.

14.64 Precast terrazo tiles of 20mm minimum thickness


in white cement mixed with buff, yellow,
chocolate or orange pigment as required laid in
20mm thick bed of cement mortar 1:3 with neat
cement slurry mixed with pigment to match the Sqm 475.00 1276.00 522.50 1323.50
shade of tiles between joints and over the base in
floors, treads of steps and landings including
rubbing and polishing

14.65 Precast terrazo tiles of 20mm minimum thickness


in white cement mixed with black red or
chocolate with marble chips of size and colour as
per required laid on 20mm thick bed of cement
mortar 1:3 with neat cement slurry mixed with Sqm 475.00 1202.00 522.50 1249.50
pigment to match the shade of tiles between
joints and over the base in floors, treads of steps
and landings including rubbing and polishing

Chapter-14 Page 166 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.66 Precast terrazo tiles of 20mm minimum thickness
in ordinary white cement mixed with green or blue
pigment with marble chips of size and colour as
per required laid on 20mm thick bed of cement
mortar 1:3 with neat cement slurry mixed with
Sqm 475.00 1276.00 522.50 1323.50
pigment to matech the eshade of tiles between
joints and over the base in floors, treads of steps
and landings including rubbing and polishing

14.67 Precast terrazo tiles of 12.5 minimum thickness


in ordinary cement with marble chips of size and
colour as required laid on 10mm thick cement
plaster 1:3 jointed with neat cement slurry in Sqm 658.00 1178.00 723.80 1243.80
skirting or dado and risers of steps including and
rubing and polishing

14.68 Precast terrazo tiles of 12.5mm minimum


thickness in white cement with marble chips of
size and colour as required laid on 10mm thick
cement plaster 1:3 jointed with neat cement slurry Sqm 658.00 1272.00 723.80 1337.80
in skirting or dado and risers of steps including
and rubbing and polishing.

14.69 Precast terrazo tiles of 12.5mm minimum


thickness in white cement with , buff, yellow
chocolate or orange pigment with marble chips of
size and colour as required, laid on 10mm thick
cement plaster 1:3 and jointed with neat cement Sqm 658.00 1294.00 723.80 1359.80
slurry with pigment to match the shade of tiles in
skirting, dado and risers of steps including
rubbing and polishing.

14.70 Precast terrazo tiles of 12.5mm minimum


thickness in ordinary cement mixed with black red
or chocolate pigment marble chips of size and
colour as required, laid on 10mm thick cement
plaster 1:3 and jointed with neat cement slurry Sqm 658.00 1201.00 723.80 1266.80
with pigment to match the shade of tiles in
skirting, dado and risers of steps including and
polishing

14.71 Precast terrazo tiles of 12.5mm minimum


thickness in white cement mixed with green or
blue pigment as required, laid on 10mm thick
cement plaster 1:3 and jointed with neat cement Sqm 658.00 1294.00 723.80 1359.80
slurry with pigment to match the shade of tiles in
skirting, dado and risers of steps including and
polishing

Chapter-14 Page 167 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.72 Providing and laying Anti skid Ceramic floor tiles
of size 300x300 mm x 10 mm thick of 1st quality
conforming to IS : 15622 of approved make in
colours such as White, Ivory, Grey, Fume Red
Brown, laid on flooring skirting and dado in
12.5mm thick cement plaster 1:3 in base and
Sqm 305.00 672.00 335.50 702.50
jointed with @ 3.3 kg/sqm including pointing the
joints with white cement and matching pigment
etc., completewhite cement slurry in joints
including corners angles and beading.

14.73 Marble stone flooring with 18-20 mm thick marble


stone, as per sample of marble approved by
Engineer-in-charge, over 20 mm (average) thick
base of cement mortar 1:4 (1 cement : 4 coarse
sand) laid and jointed with grey cement slurry,
including rubbing and polishing complete with :

(i) Makrana, Doongri, Adanga viened and


chack Doongri with grey stretches.

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1376.00 521.40 1423.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1674.00 521.40 1721.40

(ii) Kumari grey without oxide and cavaties


flooring 18mm to 20mm thick of varing
sizes

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1227.00 521.40 1274.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1301.00 521.40 1348.40

(iii) Black Marble tiles of Kishangarn, Zebra,


Makrana , Dhabi or Doongri Zebra
thickness 18mm to 20mm

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1301.00 521.40 1348.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1376.00 521.40 1423.40

(iv) Udaipur Green Marble Tiles of thickness


18mm to 20mm

Chapter-14 Page 168 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1115.00 521.40 1162.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1190.00 521.40 1237.40

(v) Pink plain marble Marble Tiles of various


sizes 18mm to 20 mm thick

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1301.00 521.40 1348.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1450.00 521.40 1497.40

(vi) Morwad marble Marble Tiles of various


sizes 18mm to 20 mm thick

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1115.00 521.40 1162.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1190.00 521.40 1237.40

14.74 Marble stone flooring with 12-15 mm thick marble


stone, as per sample of marble approved by
Engineer-in-charge, over 20 mm (average) thick
base of cement mortar 1:4 (1 cement : 4 coarse
sand) laid and jointed with grey cement slurry,
including rubbing and polishing complete with :

(i) Makrana, Doongri, Adanga viened and


chack Doongri with grey stretches.

(a) Slab sizes from 0.30 sqm to 0.50 sqm. Sqm 474.00 1525.00 521.40 1572.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1525.00 521.40 1572.40

(ii) Kumari grey without oxide and cavaties


flooring 12mm to 15mm thick of varing
sizes

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1152.00 521.40 1199.40

Chapter-14 Page 169 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(b) Slabs sizes above 0.50 sqm
Sqm 474.00 1227.00 521.40 1274.40

(iii) Black Marble tiles of Kishangarn, Zebra,


Makrana , Dhabi or Doongri Zebra
thickness12mm to 15mm

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1366.00 521.40 1413.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1450.00 521.40 1497.40

(iv) Udaipur Green Marble Tiles of thickness


12mm to 15mm

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1078.00 521.40 1125.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1152.00 521.40 1199.40

(v) Pink plain marble Marble Tiles of various


sizes 12mm to 15 mm thick

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1227.00 521.40 1274.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1301.00 521.40 1348.40

(vi) Morwad marble Marble Tiles of various


sizes 12mm to 15 mm thick

(a) Slab sizes from 0.30 sqm to 0.50 sqm.


Sqm 474.00 1078.00 521.40 1125.40

(b) Slabs sizes above 0.50 sqm


Sqm 474.00 1152.00 521.40 1199.40

14.75 Extra for pre finished nosing to treads of steps of


marble stone. ( Full gola, half round gola etc.) mt 178.00 178.00 195.80 195.80

14.76 Extra for marble stone flooring in treads of steps


and risers using single length
sqm 426.00 426.00 468.60 468.60
up to 2.00 metre.

Chapter-14 Page 170 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.77 Marble work of thickness 18-20 mm for wall lining
(veneer work), backing filled with a grout of
average 12 mm thick in cement mortar 1:3 (1
cement : 3 coarse sand), including pointing with
white cement mortar 1:2 (1 white cement : 2
marble dust) with an admixture of pigment to
match the marble shade (To be secured to the
backing by means of cramps, which shall be paid
for separately).

(i) Makrana, Doongri, Adanga viened and


chack Doongri with grey stretches.

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1705.00 929.50 1789.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 2003.00 929.50 2087.50

(ii) Kumari grey without oxide and cavaties


Lining 15mm to 20mm thick of varing sizes

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1556.00 929.50 1640.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1630.00 929.50 1714.50

(iii) Black Marble tiles of Kishangarn, Zebra,


Makrana , Dhabi or Doongri Zebra
thickness 15mm to 20mm

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1630.00 929.50 1714.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1705.00 929.50 1789.50

(iv) Udaipur Green Marble Tiles of thickness


15mm to 20mm

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1444.00 929.50 1528.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1519.00 929.50 1603.50

(v) Plain Pink Marble Tiles of thickness


15mm to 20mm

Chapter-14 Page 171 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(a) Tiles Size 0.3 sqm to 0.50 sqm
Sqm 845.00 1630.00 929.50 1714.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1779.00 929.50 1863.50

(vi) Morwad marble Marble Tiles of various


sizes 15mm to 20 mm thick

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1407.00 929.50 1491.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1481.00 929.50 1565.50

14.78 Marble work of thickness 12-15 mm for wall lining


(veneer work), backing filled with a grout of
average 12 mm thick in cement mortar 1:3 (1
cement : 3 coarse sand), including pointing with
white cement mortar 1:2 (1 white cement : 2
marble dust) with an admixture of pigment to
match the marble shade (To be secured to the
backing by means of cramps, which shall be paid
for separately).

(i) Makrana, Doongri, Adanga viened and


chack Doongri with grey stretches.

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1630.00 929.50 1714.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1854.00 929.50 1938.50

(ii) Kumari grey without oxide and cavaties


Lining 12mm to 15mm thick of varing sizes

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1481.00 929.50 1565.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1556.00 929.50 1640.50

(iii) Black Marble tiles of Kishangarn, Zebra,


Makrana , Dhabi or Doongri Zebra
thickness 12mm to 15mm
(a) Tiles Size 0.3 sqm to 0.50 sqm
Sqm 845.00 1630.00 929.50 1714.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1779.00 929.50 1863.50

(iv) Udaipur Green Marble Tiles of thickness


12mm to 15mm

Chapter-14 Page 172 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1407.00 929.50 1491.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1481.00 929.50 1565.50

(v) Plain Pink Marble Tiles of thickness


12mm to 15mm

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1630.00 929.50 1714.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1779.00 929.50 1863.50

(vi) Morwad marble Marble Tiles of various


sizes 12mm to 15 mm thick

(a) Tiles Size 0.3 sqm to 0.50 sqm


Sqm 845.00 1407.00 929.50 1491.50

(b) Slabs sizes above 0.50 Sqm


Sqm 845.00 1481.00 929.50 1565.50

14.79 Providing and fixing stainless steel cramps of


required size and shape for anchoring stone wall
lining to the backing or securing adjacent stones
in stone wall lining in cement mortar 1:2 (1 kg 254.00 601.00 279.40 626.40
cement : 2 coarse sand), including making the
necessary chases in stone and holes in walls
wherever required.

14.80 Providing and fixing copper pins 7.5 cm long 6


mm diameter for securing adjacent stones in
stone wall lining in cement mortar 1:2 (1 cement :
Each 18.00 33.00 19.80 34.80
2 coarse sand),including making the necessary
chases.

14.81 Coloured glazed tiles 20 cm x 20 cm and 5 mm


thick in skirting and dado on 12 mm thick cement
plaster 1:3 in baseand jointing with grey cement
Sqm 366.00 785.00 402.60 821.60
slurry @ 3.3kg per sqm and filling joints with
white cement slurry in joints including bevelled
corners.

14.82 Chittor black marble tiles 15mm to 20 mm thick in


risers of steps, skirting dado, walls and pillars laid
in 12.5 mm thick cement mortar 1:3 and jointed
with neat cement slurry mixed with pigments to Sqm 845.00 1599.00 929.50 1683.50
match the shade of marble including rubbing and
polishing

Chapter-14 Page 173 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.83 Rough red sand stone (from Agra) 40mm thick
set in cement mortar 1:5 (1 cement 5 sand) Sqm 378.00 958.00 415.80 995.80

14.84 Kota stone slab 20-25 mm thick flooring over 20


mm (average) thick base laid over and jointed
with grey cement slurry mixed with pigment to
match the shade of the slab including rubbing Sqm 428.00 1097.00 470.80 1139.80
and polishing complete with base of cement
mortar 1 : 4 (1 cement : 4 coarse sand) :

14.85 Kotah stone rough dressed 40mm to 50mm thick


slabs, set to pattern in pavements over 20mm
thick base of cement mortar (1 cement, 3 Sand)
laid and jointed with neat cement slurry, mixed Sqm 428.00 1185.00 470.80 1227.80
with pigment to match the shade of stone

14.86 Kotah stone tiles 20mm thick in skirting risers of


steps, dado walls and pillars laid in 12.5mm thick
cement mortar 1:3 (1 cement 3 coarse sand) and
jointed with neat cement slurry mixed with Sqm 661.00 1335.00 727.10 1401.10
pigment to match the shade of stone, including
rubbing and polishing

14.86 a Extra for pre finished nosing in treads of steps of


Kota stone/ sand stone slab. mt 101.00 101.00 111.10 111.10

14.86 b Extra Labour rate if Kota stone/ sand stone in


treads of steps and risers using single length. sqm 24.00 24.00 26.40 26.40

14.87 Black Granite stone tiles 15mm to 20mm thick in


skirting, risers of steps, dado walls and pillars laid
in 12.5mm thick cement mortar 1:3 (1 cement 3
coarse sand) and jointed with neat cement slurry
mixed with pigment to match the shade of stone, Sqm 792.00 3155.00 871.20 3234.20
including rubbing and polishing including labour
for fixing dowel pins and cramps.

14.88 Coloured Granite stone tiles 15mm to 20mm thick


in skirting, risers of steps, dado walls and pillars
laid in 12.5mm thick cement mortar 1:3 (1
cement 3 coarse sand) and jointed with neat
Sqm 792.00 3278.00 871.20 3357.20
cement slurry mixed with pigment to match the
shade of stone, including rubbing and polishing
including labour for fixing dowel pins and cramps.

Chapter-14 Page 174 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.89 a Providing and laying flamed finish Granite stone
18mm thick in flooring in required design and
patterns, in linear as well as curvilinear portions
of the building all complete as per the
architectural drawings with 18 mm thick stone
slab over 20 mm (average) thick base of cement
mortar 1:4 (1 cement : 4 coarse sand) laid and
jointed with cement slurry and pointing with white
cement slurry admixed with pigment of matching
shade including rubbing, curing and polishing etc.
all complete as specified and as directed by the
Engineer-in-Charge :

Flamed finish granite stone slab Jet Black,


Cherry Red, Elite Brown, Cat Eye or equivalent. Sqm 427.00 2104.00 469.70 2146.70

14.89 b Providing and laying Polished Granite stone 18


mm thick flooring in required design and
patterns, in linear as well as curvilinear portions
of the building all complete as per the
architectural drawings with 18 mm thick stone
slab over 20 mm (average) thick base of cement
mortar 1:4 (1 cement : 4 coarse sand) laid and
jointed with cement slurry and pointing with white
cement slurry admixed with pigment of matching
shade including rubbing , curing and polishing
etc. all complete as specified and as directed by
the Engineer-in-Charge.

Polished granite stone slab Jet Black, Cherry


Red, Elite Brown, Cat Eye or equivalent. Sqm 427.00 2813.00 469.70 2855.70

14.89 c Providing and laying Mat finish Granite stone


flooring in required design and patterns, in linear
as well as curvilinear portions of the building all
complete as per the architectural drawings with
18 mm thick stone slab over 20 mm (average)
thick base of cement mortar 1:4 (1 cement : 4
coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed
with pigment of matching shade including
rubbing, curing and polishing etc. all complete as
specified and as directed by the Engineer-in-
Charge :

Mat finish granite stone slab Jet Black, Cherry


Red, Elite Brown, Cat Eye or equivalent. Sqm 378.00 2455.00 415.80 2492.80

14.90 Fine dressed red stone (From Agra) flooring


40mm thick set in 12.5mm thick cement mortar
1:5 including jointing with cement mortar 1:2 with Sqm 378.00 1078.00 415.80 1115.80
an admixture of pigment to match the shade of
stone

Chapter-14 Page 175 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.91 Fine dressed red sand stone (from Agra) flooring


40mm thick set in 12.5mm thick cement mortar
1:3 jointing with cement mortar 1:2 with an Sqm 378.00 1097.00 415.80 1134.80
admixture of pigment to match the shade of
stone.

14.92 Teak wood 25 mm planking tongued and grooved


flooring including fixing with screws complete. Sqm 320.00 5125.00 352.00 5157.00

14.93 Teak wood 40mm planking tongued and grooved


flooring including fixing with screw complete Sqm 320.00 8329.00 352.00 8361.00

14.94 Parquet flooring 40mm thick consisitng of Ist


class well seasoned shisham wood of standard
pattren laid in flooring consiting of bitumen
applied hot @ 4.86 Kg. Per Square metrer over
Sqm 1244.00 4693.00 1368.40 4817.40
12.5mm thick cement sand plaster 1:4 top
surface rubbed smoth and wax polished to a fine
finish

14.95 Rough red stone (From Agra) flooring 40mm


thick, set in 12.5mm thick cement sand mortar
1:3 including jointing with cement mortar 1:2 with Sqm 378.00 1014.00 415.80 1051.80
an admixture of pigment to match the shade of
stone

14.96 Rough red sand stone (From Agra) flooring


40mm thick, set in 12.5mm thick cement sand
mortar 1:5 including jointing with cement mortar Sqm 378.00 996.00 415.80 1033.80
1:2 with an admixture of pigment to match the
shade of stone

14.97 Providing and laying plain coloured 3.20mm


gauge linoleum covering to floors laid dry. The
term linoleum has been derived from the Latin
words linum, meaning linseed, and oleum,
meaning oil. Linoleum flooring can be described
as a type of flooring that makes use of solidified Sqm 44.00 724.00 48.40 728.40
linseed oil (linoxyn) as the base, along with wood
flour, tree resins, cork dust, a touch of ground
limestone and pigments (for adding color).

Chapter-14 Page 176 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.98 Providing and laying plain coloured 3.20mm
gauge linoleum covering to floors laid dry, if
linoleum of exact size is used. The term linoleum
has been derived from the Latin words linum,
meaning linseed, and oleum, meaning oil.
Linoleum flooring can be described as a type of Sqm 44.00 724.00 48.40 728.40
flooring that makes use of solidified linseed oil
(linoxyn) as the base, along with wood flour, tree
resins, cork dust, a touch of ground limestone
and pigments (for adding color).

14.99 Providing and laying resilient vinyl sheet floor


covering 2 mm thick, having a vinyl plastic wear
layer with backing intended for use in light
commercial and residential buildings, duly fixed to Sqm 133.00 852.00 146.30 865.30
the base floor using adhesive as approved by the
manufacturer.

14.100 Providing and laying Laminate wooden flooring


(Grade AC3 or AC3+ laminates) 6 mm to 12 mm
thick, having core made up of medium-density
fiberboard (MDF),which is less resistant to impact
damage and less resistant to being dented by
heavy furniture, having a décor layer to give each
floor its appearance and consisting of one or
more sheets of paper impregnated with melamine Sqm 234.00 1838.00 257.40 1861.40
resin and top wear layer having clear aluminum
oxide finish that protects the decorative layer &
imparts the desired level of sheen, from full gloss
to low gloss, duly fixed to the base floor using
adhesive as approved by the manufacturer.

NOTE :- AC3 Grade has no backing material


while higher grades are provided with a cotton
type sheet backing further backed by a sound
proofing sheet backing.

Chapter-14 Page 177 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.101 Providing and laying Laminate wooden flooring
(Grade AC4 or AC4+ laminates) 6 mm to 12 mm
thick, having a good backing layer made up of
plastic laminate or melamine, core made up of
medium-density fiberboard (MDF),which is less
resistant to impact damage and less resistant to
being dented by heavy furniture, having a décor
layer to give each floor its appearance and
consisting of one or more sheets of paper Sqm 234.00 2042.00 257.40 2065.40
impregnated with melamine resin and top wear
layer having clear aluminum oxide finish that
protects the decorative layer & imparts the
desired level of sheen, from full gloss to low
gloss, duly fixed to the base floor using adhesive
as approved by the manufacturer.

14.102 Deodar wood 40mm thick planking tongued and


grooved flooring including fixing with screws Sqm 415.00 6522.00 456.50 6563.50
complete

14.103 Kail wood 40mm thick planking tongued and


grooved flooring including fixing with screws Sqm 415.00 3884.00 456.50 3925.50
complete

14.104 Providing & fixing glass strips 3mm thick in floor


(a) 40mm wide

(a) 40 mm wide Metre 10.00 22.00 11.00 23.00

(b) 32 mm wide Metre 10.00 19.00 11.00 20.00

(c) 25 mm wide Metre 10.00 17.00 11.00 18.00

14.105 Providing & fixing glass strips 4mm thick in floors

(a) 50 mm wide Metre 10.00 29.00 11.00 30.00

(b) 40 mm wide Metre 10.00 25.00 11.00 26.00

(c) 32 mm wide Metre 10.00 21.00 11.00 22.00

(d) 25 mm wide Metre 10.00 20.00 11.00 21.00

14.106 Providing & fixing 18mm to 20mm thick marble


strips in joints of terrazo / cement concrete floors.

(a) 50 mm wide Metre 10.00 53.00 11.00 54.00

Chapter-14 Page 178 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

(b) 40 mm wide Metre 10.00 46.00 11.00 47.00

14.107 Sand filling under floor and in wells of bridge


foundation including handling withing 100 metres Cum 70.00 1005.00 77.00 1012.00

14.108 Providing and fixing flat iron strip 40mmx5mm


thick in flooring (in stepping of floor) including
cutting straightening & fixing with nails etc. Metre 22.00 110.00 24.20 112.20
complete fixed in position

14.109 Dholpur stone tiles 25 mm thick in wall facing (


lining ) laid in any pattern as specified on 12.5
mm thick cement sand plaster 1:3 and jointed
with neat cement slurry mixed with pigment to Sqm 757.00 1485.00 832.70 1560.70
match the shade of stone including rubbing &
polishing including labour for fixing cramps, pins
& dowels etc.

14.110 Butch work with rough dressed Dholpur stone 40


mm to 50 mm thick laid on 12.5 mm thick cement
coarse sand mortar 1:3 icluding dressing & Sqm 757.00 1178.00 832.70 1253.70
cutting the stone to required shape & size.

14.111 Fine dressed and machine rubbed red sand


stone ( from Agra ) 25 mm to 50 mm thick lining
on wall, pillars, skirting, dado & risers of steps laid
in any pattern as specified on 12.5 mm thick
cement coarse sand mortar 1:3 with neat cement Sqm 586.00 1391.00 644.60 1449.60
slurry admixture of pigment to match the shade of
stone including labour for fixing cramps, dowels,
pins, etc.

14.112 Providing and laying vitrified floor tiles in


different sizes in light colour shades made using
Soluble Salt Technology (thickness to be
specified by the manufacturer) with water
absorption’s less than 0.08% and conforming to
IS : 15622 of approved make in all colours and
shades, laid on 20mm thick cement mortar 1:4 (1
cement: 4 fine sand), complete. ( Soluble salt
Print Penetration should be up to 1 to 2 mm after
the tiles are fired & polished ).

a Size 600x600 mm Sqm 273.00 749.00 300.30 776.30


b Size 800x800 mm
Sqm 273.00 803.00 300.30 830.30
c Size 1000x1000 mm
Sqm 273.00 885.00 300.30 912.30

Chapter-14 Page 179 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.113 Providing and laying vitrified floor tiles of


different sizes in light colour shades made using
Double Charge technology (thickness to be
specified by the manufacturer) with water
absorption’s less than 0.08% and conforming to
IS : 15622 of approved make in all colours and
shades, laid on 20mm thick cement mortar 1:4 (1
cement: 4 fine sand), complete. ( Design is
homogenous throughout the tile body ).

a Size 600x600 mm Sqm 273.00 1048.00 300.30 1075.30

b Size 800x800 mm Sqm 273.00 1184.00 300.30 1211.30

c Size 1000x1000 mm Sqm 273.00 1253.00 300.30 1280.30

14.114 Deduct for not using 20 mm thick cement mortar


1:4 (1 cement : 4 coarse sand) bedding in laying
of floor tiles and jointing with grey cement slurry Sqm 273.00 368.00 300.30 395.30
@ 3.3 kg/ sqm.

14.115 Providing and laying vitrified floor tiles in


different sizes in light colour shades made using
Full Body Technology (thickness to be specified
by the manufacturer) with water absorption’s less
than 0.08% and conforming to IS : 15622 of
approved make in all colours and shades, laid on
20mm thick cement mortar 1:4 (1 cement: 4 fine
sand), complete. ( Full body vitrified tiles have
pigment in entire body / thickness of tile which
makes chips and scratches less noticeable and
make na ideal choice for high traffic zones.)

Size 600x600 mm
a Sqm 272.00 1421.00 299.20 1448.20

Chapter-14 Page 180 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.116 Providing and Laying Tactile Flooring full body
vitrified , low water absorption below 5%, having
excellent slip resistance , very dense, durable
and abrasion resistant, solid through colour, fade
proof, highly chemical and stain resistance
unglazed finish porcelain tile of size 300mm x
300mm x 10mm + 5mm thick, approved profile
design, Tec-button/Tec-liner laid in ordinary grey Sqm 273.00 1810.00 300.30 1837.30
cement and on 20mm thick bed of cement mortar
1:3 filling neat cement slurry between joints with
White Cement containing pigment to match the
shade complete in all respect. (Tile design and
pattern will be as per guidelines issued for
persons with disability)

14.117 Fixing glazed/ Ceramic/ Vitrified floor tiles with


cement based high polymer modified quick-set
tile adhesive (Water based) conforming to IS: Sqm 305.00 363.00 335.50 393.50
15477, in average 3mm thickness.

14.118 Grouting the joints of flooring tiles having joints of


3 mm width, using 2mm to 3 mm gap using
spacers and later this gap to be filled with
cement based grout ) with Cement base grout
and matching pigments etc., complete, including
filling / grouting and finishing complete as per
direction of Engineer-in-charge.

a Size 600x600 mm. Sqm 90.00 124.00 99.00 133.00

b Size 800x800 mm. Sqm 68.00 97.00 74.80 103.80

c Size 1000x1000 mm. Sqm 45.00 67.00 49.50 71.50

14.119 Extra Cost for using darker fast shade Vitrified or


Rectified Tiles instead of lighter shades. Sqm 0.00 68.00 0.00 70.21

14.120 Grouting the joints of flooring tiles having joints of


3 mm width, using epoxy grout mix of 0.70 kg of
organic coated filler of desired shade (0.10 kg of
hardener and 0.20 kg of resin per kg), including
filling / grouting and finishing complete as per
direction of Engineer-in-charge.

a Size 600x600 mm. Sqm 90.00 177.00 99.00 186.00

Chapter-14 Page 181 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
b Size 800x800 mm. Sqm 68.00 140.00 74.80 146.80

c Size 1000x1000 mm. Sqm 45.00 98.00 49.50 102.50

14.121 Deduct for not grouting the joints with white


cement and matching pigment in the items of
Sqm 9.00 44.00 9.90 44.90
fixing of vitrified tiles.

14.122 Providing and laying Rectified Porcelin floor tiles


400x400mm or more (thickness to be specified
by the manufacturer) of premium quality
conforming to IS:15622 of approved make in all
colours laid on 20mm thick bed of Cement Mortar Sqm 273.00 844.00 300.30 871.30
1:4 ( 1 Cement : 4 Fine sand) for new flooring
complete .

14.123 Providing and laying Rectified Porcelin floor tiles


400x400mm or more (thickness to be specified
by the manufacturer) of premium quality
conforming to IS:15622 of approved make in all
colours laid on 20mm thick bed of Cement Mortar
1:4 ( 1 Cement : 4 Fine sand) for new flooring or
laid with cement based high polymer modified Sqm 273.00 871.00 300.30 898.30
quick set tile adhesive (water based) of approved
make IS 15477 marked using 5 Kg adhesive per
Sqm of tile area in average 3mm thickness over
existing floor, including pointing the joints with
white cement and matching pigments etc.,
complete

14.124 Deduct for not using 20mm thick cement mortar


1:4 (1 cement : 4 fine sand ) bedding in laying of
Sqm 183.00 246.00 201.30 264.30
floor tiles.

14.125 Providing and fixing 1st quality ceramic glazed


wall tiles Matt/Semi Matt/Glosy/Highly Gloss
finish/Highlighter/emboss conforming to IS :
15622 (thickness to be specified by the
manufacture of approved make in all colours,
shades except burgundy, bottle green, black of
size 200 x 300 mm, 100x200mm, 200x200mm
Sqm 276.00 699.00 303.60 726.60
as approved by Engineer-in-Charge in skirting,
risers of steps and dados over 12 mm thick bed
of cement Mortar 1:4 (1 cement: 4 fine sand) and
jointing with grey cement slurry @ 3.3kg per sqm
including pointing in white cement mixed with
pigment of matching shade complete.

Chapter-14 Page 182 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.126 Providing and fixing 1st quality ceramic glazed
wall tiles Matt/Semi Matt/Glosy/Highly Gloss
finish/Highlighter/emboss conforming to IS :
15622 (thickness to be specified by the
manufacture of approved make in all colours,
shades except burgundy, bottle green, black of
size 250 x 330 mm & 300x300mm as approved Sqm 276.00 699.00 303.60 726.60
by Engineer-in-Charge in skirting, risers of steps
and dados over 12 mm thick bed of cement
Mortar 1:4 (1 cement: 4 fine sand) and jointing
with grey cement slurry @ 3.3kg per sqm
including pointing in white cement mixed with
pigment of matching shade complete.

14.127 Providing and fixing 1st quality ceramic glazed


wall tiles Matt/Semi Matt/Glosy/Highly Gloss
finish/Highlighter/emboss conforming to IS :
15622 (thickness to be specified by the
manufacture of approved make in all colours,
shades except burgundy, bottle green, black of
size 450 x 310 mm as approved by Engineer-in- Sqm 276.00 795.00 303.60 822.60
Charge in skirting, risers of steps and dados over
12 mm thick bed of cement Mortar 1:4 (1 cement:
4 fine sand) and jointing with grey cement slurry
@ 3.3kg per sqm including pointing in white
cement mixed with pigment of matching shade
complete.

14.128 Providing and fixing 1st quality ceramic glazed


wall tiles Matt/Semi Matt/Glosy/Highly Gloss
finish/Highlighter/emboss conforming to IS :
15622 (thickness to be specified by the
manufacture of approved make in all colours,
shades except burgundy, bottle green, black of
size 600 x 300 mm as approved by Engineer-in- Sqm 305.00 853.00 335.50 883.50
Charge in skirting, risers of steps and dados over
12 mm thick bed of cement Mortar 1:4 (1 cement:
4 fine sand) and jointing with grey cement slurry
@ 3.3kg per sqm including pointing in white
cement mixed with pigment of matching shade
complete.

Chapter-14 Page 183 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.129 Providing and fixing 1st quality ceramic glazed
wall tiles Matt/Semi Matt/Glosy/Highly Gloss
finish/Highlighter/emboss conforming to IS :
15622 (thickness to be specified by the
manufacture of approved make in all colours,
shades except burgundy, bottle green, black of
size 600 x600 mm as approved by Engineer-in- Sqm 305.00 893.00 335.50 923.50
Charge in skirting, risers of steps and dados over
12 mm thick bed of cement Mortar 1:4 (1 cement:
4 fine sand) and jointing with grey cement slurry
@ 3.3kg per sqm including pointing in white
cement mixed with pigment of matching shade
complete.

14.130 Providing and fixing 10mm thick acid and/or alkali


resistant tiles 300 mm x 300 mm of approved
make and colour using acid and/or alkali resisting
mortar bedding and joints filled with acid and/or
alkali resisting cement as per IS : 4457 complete Sqm 305.00 1097.00 335.50 1127.50
as per the direction of Engineer-in- Charge, in
flooring or in dado / skirting on a bed of 12 mm
thick mortar 1 : 4 (1 acid proof cement: 4 coarse
sand).

14.131 Providing and applying Anti Termite Treatment


using pre constructional chemical treatment
measures as per IS - 6313 - 2001 ( Part 2 ) &
using Chemical containg chloropyrifos systemic
insecticide diluted to manufacturer's
specifications (i) In foundation pits, by treating
the bottom & sides upto height of 300mm by
uniformly spraying solution @ 5 Litre / Sqm (ii) In litre 61.00 372.00 67.10 378.10
the refill earth on both sides of all built up walls @
7.5 Litre / Running meter ( width - 300 mm, depth
- 450 mm ) (iii) Before laying the floor, by
uniformly sprinkling the top surface of the
consolidated earth within the outer perimeter @ 5
Litre solution per Sqm.

Note :- The Engineer in Charge will ensure


consumption of chemical as per manufacturer's
specifications & minimum 5 years warranty from
the concerned dealer.

Chapter-14 Page 184 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.132 Providing and applying Anti Termite Treatment
using post constructional chemical treatment
measures as per IS - 6313 - 2001 ( Part 3 ) &
using Chemical containg chloropyrifos systemic
insecticide diluted to manufacturer's
specifications by drilling holes in the floor slab &
litre 805.00 1116.00 885.50 1196.50
along skirting 300 mm apart & 12 mm dia, drilling
holes along all possible entry points such as
junctions of floor and walls, door frames, sewage
lines, entry points , etc. & injecting them with the
chemical solution.

Note :- The Engineer in Charge will ensure


consumption of chemical as per manufacturer's
specifications & minimum 5 years warranty from
the concerned dealer.

14.133 Katani marble flooring 12mm to 15mm thick over


12.5mm thick base of Cement mortar 1:3 laid and
jointed with white cement slurry with pigment to
mater the shade of marble including rubbing &
Polishing.
Tiles Size 45 cm x 60 cm & above
Sqm 474.00 1392.00 521.40 1439.40

14.134 Mandana stone tile flooring 15mm to 20 mm thick


over 12.5mm thick base of cement mortar 1:3 (1
cement, 3 Sand) laid and jointed with neat
cement slurry, mixed with pigment to match the Sqm 474.00 1371.00 521.40 1418.40
shade of stone including rubbing and polishing

14.135 Providing and Laying Out Door precast designer


chequered tiles of any size & any shape 25mm
thickness having top layer of white cement mixed
with pigment, laid on 20mm thick bed of ordinary
cement mortar 1:3 (1 ordinary cement: 3 fine
sand), joints grouted with white cement slurry Sqm 349.00 1025.00 383.90 1059.90
containing pigment to match the shade complete
in all respect as per specifications and to the
entire satisfaction of engineer-in-charge.

Chapter-14 Page 185 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.136 Providing and laying 50 mm thick factory made
cement concrete interlocking paver block of M-30
grade machine made rubber moulded smooth
finish with strong vibratory process or with vibro-
hydraulic compaction machine and of approved
size and design / shape laid in Ordinary Grey and
pattern over and including 40 mm thick Sqm 134.00 602.00 147.40 615.40
compacted bed of coarse sand, filling the joints
with fine sand etc, all complete as per directions
of Engineer-in-Charge for Non traffic Areas and
streets having width less than 3.05 mt. ( Also not
to used over footoaths).

14.137 Providing and laying 60 mm thick factory made


cement concrete interlocking paver block of M-35
grade machine made rubber moulded smooth
finish with strong vibratory process or with vibro-
hydraulic compaction machine and of approved
size and design / shape laid in Ordinary Grey and
pattern over and including 40 mm thick Sqm 134.00 645.00 147.40 658.40
compacted bed of coarse sand, filling the joints
with fine sand etc, all complete as per directions
of Engineer-in-Charge for Non traffic Areas and
streets having width less than 3.05 mt.( Also not
to used over footoaths).

14.138 Providing and laying 60 mm thick factory made


cement concrete interlocking Paving blocks of M-
35 grade manufactured by block making
machine equipped with steel mould clamped to a
strong vibratory table with hydraulic pressure for
compaction of concrete as per IRC SP 63 -2014
and of approved size and design / shape laid in Sqm 134.00 676.00 147.40 689.40
Ordinary Grey Colour and pattern over and
including 40 mm thick compacted bed of coarse
sand, filling the joints with fine sand etc, all
complete as per directions of Engineer-in-
Charge.

14.139 Providing and laying 80 mm thick factory made


cement concrete interlocking Paving blocks of M-
40 grade manufactured by block making
machine equipped with steel mould clamped to a
strong vibratory table with hydraulic pressure for
compaction of concrete as per IRC SP 63 -2014
and of approved size and design / shape laid in Sqm 134.00 805.00 147.40 818.40
Ordinary Grey Colour and pattern over and
including 40 mm thick compacted bed of coarse
sand, filling the joints with fine sand etc, all
complete as per directions of Engineer-in-
Charge.

Chapter-14 Page 186 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.140 Providing and laying 100 mm thick factory made


cement concrete interlocking Paving blocks of M-
50 grade manufactured by block making
machine equipped with steel mould clamped to a
strong vibratory table with hydraulic pressure for
compaction of concrete as per IRC SP 63 -2014
Sqm 134.00 1034.00 147.40 1047.40
and of approved size and design / shape laid in
Ordinary Grey Colour and pattern over and
including 40 mm thick compacted bed of coarse
sand, filling the joints with fine sand etc, all
complete as per directions of Engineer-in-
Charge.

14.141 Extra Cost for using darker fast shade for


interlocking pavers Tiles of any shape & Sqm 0.00 65.00 0.00 66.86
thickness instead of grey colours.

14.142 Providing and fixing Morwad Marble Strip 12mm


to 15mm thick and 100 mm wide in kotah stone
flooring over 12.50mm thickness base of cement
mortar 1:3 jointed with cement slurry including
cost of additional mortar equivalent to the kota Rmt. 44.00 124.00 48.40 128.40
stone thickness andcolouring pigment to match
the colour rubbed and polished to granolithic
finish complete in all respects.

14.143 Providing and fixing machine cut, mirror/ eggshell


polished , Marble stone work for wall lining
(veneer work) including dado, skirting, risers of
steps etc., in required design and pattern
wherever required, stones of different finished
surface texture, on 12 mm (average) thick
cement mortar 1:3 (1 cement : 3 coarse sand)
laid and jointed with white cement slurry @ 3.3
kg/sqm including pointing with white cement
slurry admixed with pigment of matching shade,
including rubbing, curing, polishing etc. all
complete as per Architectural drawings, and as
directed by the Engineer-in-Charge

(a) 18 mm thick Italian Marble stone


slab,Perlato, Rosso verona, Fire Red or
Sqm 2054.00 7297.00 2259.40 7502.40
Dark Emperadore etc.

Chapter-14 Page 187 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.144 Providing and laying machine cut, mirror
polished, Italian Marble stone flooring laid in
required pattern in linear portion of the building all
complete as per architectural drawings, with 18
mm thick stone slab laid over 20 mm (average)
thick base of cement mortar 1:4 (1 cement : 4
coarse sand) laid and jointed with white cement
slurry @ 4.4 kg/sqm including pointing with white
cement slurry admixed with pigment to match the
marble shade including rubbing, curing and
polishing etc. all complete as specified and as
directed by the Engineer-in-Charge.

(a) 18 mm thick Italian Marble stone


slab,Perlato, Rosso verona, Fire Red or Sqm 1556.00 6506.00 1711.60 6661.60
Dark Emperadore etc.

14.145 Providing and laying italian machine cut, mirror


polished Marble stone flooring, in required design
(Simple geometrical, abstract etc.) and in
patterns in combination with Italian marble stones
of different colours, shades and finished surface
texture etc., in linear portions of the building, all
complete as per the architectural drawings, with
18 mm thick stone slab laid over 20 mm
(average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with
white cement slurry @ 4.4 kg/sqm, including
pointing with white cement slurry admixed with
pigment to match the marble shade, including
rubbing, curing and polishing etc. all complete as
specified and as directed by the Engineer-in-
Charge.

18 mm thick Italian Marble stone


(a) slab,Perlato, Rosso verona, Fire Red or Sqm 1751.00 6872.00 1926.10 7047.10
Dark Emperadore etc.

14.146 Providing and fixing Glass mossaic tiles on


finished plain wall surface of size 20 mm x 20
mm x 4 mm in all colour, design , fixing in
customize design as per direction of Engineer-in-
Charge. The glass mosaic tiles to be fixed on the
wall surface with the help of approved adhesive Sqm 244.00 3117.00 268.40 3141.40
applied at the rate of 2.5 kg per sqm and grouting
of the same. The rate is inclusive of all operation,
material and required pattern approved by
Engineer-in-Charge:

Chapter-14 Page 188 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.147 52 mm thick cement concrete flooring with
concrete hardener topping, under layer 40 mm
thick cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal
size) and top layer 12 mm thick cement hardener
consisting of mix 1:2 (1 cement hardener mix : 2
Sqm 335.00 396.00 368.50 429.50
graded stone aggregate 6 mm nominal size) by
volume, hardening compound mixed @ 2 litre per
50 kg of cement or as per manufacturer's
specifications. This includes cost of cement
slurry, but excluding the cost of nosing of steps
etc. complete.

14.148 62 mm thick cement concrete flooring with


concrete hardener topping, under layer 50 mm
thick cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20mm nominal
size) and top layer 12mm thick cement hardener
consisting of mix 1:2 (1 cement hardener mix : 2
Sqm 350.00 423.00 385.00 458.00
graded stone aggregate, 6mm nominal size) by
volume, hardening compound mixed @ 2 litre per
50 kg of cement or as per manufacture’s
specifications. This includes cost of cement
slurry, but excluding the cost of nosing of steps
etc. complete.

14.149 Providing & laying Epoxy Flooring 2mm thick (


overall thickness) with selflevelling with Hi- build
epoxy primer 100 micron thickness, self leveling
epoxy screed 900 micron thickness, FQ sand
and self levelling epoxy top coat having thickness Sqm 146.00 659.00 160.60 673.60
1000 micrones with all materials as mentioned /
required to provide desired finish to the entire
satisfaction of Engineer in charge,

14.150 Providing & laying Epoxy Flooring 1.5 mm thick (


overall thickness) with selflevelling with Hi- build
epoxy primer 100 micron thickness, self leveling
epoxy screed 500 micron thickness, FQ sand
and self levelling epoxy top coat having thickness Sqm 122.00 550.00 134.20 562.20
900 micrones with all materials as mentioned /
required to provide desired finish to the entire
satisfaction of Engineer in charge,

14.151 Providing & laying Epoxy Flooring 1.1mm thick (


overall thickness) with selflevelling with Hi- build
epoxy primer 100 micron thickness, and self
levelling epoxy top coat having thickness 1000
Sqm 98.00 441.00 107.80 450.80
micrones with all materials as mentioned /
required to provide desired finish to the entire
satisfaction of Engineer in charge,

Chapter-14 Page 189 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

14.152 Wall lining butch work upto 10m height with


Dholpur stone 40 mm thick rough facing on the
exposed surface with stone strips of minimum
length 300 mm and required width, including
embedding every tenth layer and bottom most
layer in masonry or concrete after making
necessary chases of size 75x75 mm and by
providing layer of 75 mm thick strips i/c 12 mm sqm 843.00 1740.00 927.30 1824.30
thick bed of cement mortar 1:3 (1Cement : 3
coarse sand) i/c ruled pointing in cement mortar
1:2 (1 white cement : 2 stone dust) with an
admixture of pigment to match the shade of stone
complete as per direction of Engineer-in-charge.

14.153 Stone work (machine cut edges) for wall lining


etc. (veneer work) upto 10 metre
height, backing filled with a grout of average 12
mm thick cement mortar 1:3 (1cement : 3 coarse
sand) including pointing in white cement mortar
1:2 (1 white cement : 2 stone dust) with an
admixture of pigment matching the stone shade
:(To be secured to the backing and the sides by
means of cramps and pins which shall be paid for
separately) :

a 50 mm thick
sqm 2118.00 3065.00 2329.80 3276.80

b 40mm thick
sqm 2118.00 2942.00 2329.80 3153.80

c 30mm thick
sqm 2118.00 2818.00 2329.80 3029.80

ii Red sand stone - Exposed face machine cut and


table rubbed with rough backing

a 50 mm thick
sqm 3260.00 4207.00 3586.00 4533.00

b 40mm thick
sqm 3260.00 4084.00 3586.00 4410.00

c 30mm thick
sqm 3260.00 3960.00 3586.00 4286.00

iii White sand stone - exposed face fine dressed


with rough backing.

Chapter-14 Page 190 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
a 50 mm thick
sqm 2118.00 4065.00 2329.80 4276.80

b 40mm thick
sqm 2118.00 3741.00 2329.80 3952.80

c 30mm thick
sqm 2118.00 3418.00 2329.80 3629.80

iv White sand stone - Exposed face machine cut


and table rubbed with rough backing

a 50 mm thick
sqm 3260.00 5207.00 3586.00 5533.00

b 40mm thick
sqm 3260.00 4884.00 3586.00 5210.00

c 30mm thick
sqm 3260.00 4560.00 3586.00 4886.00

v
Gang saw cut stone

a 30mm thick Red sand stone


sqm 975.00 1721.00 1072.50 1818.50

b 30mm thick White sand stone


sqm 975.00 1869.00 1072.50 1966.50

14.154 Providing and fixing dry cladding upto 10 metre


heights with 30mm thick gang saw cut stone with
(machine cut edges) of uniform colour and size
upto 1mx1m, fixed to structural steel frame work
and or with the help of cramps, pins etc. and
sealing the joints with approved weather sealant
as per Architectural drawing and direction of
Engineer-in-charge. (The steel frame work,
stainless steel cramps and pins etc. shall be paid
for separately).

a 30mm thick Red sand stone sqm 786.00 1665.00 864.60 1743.60

b 30mm thick White sand stone


sqm 786.00 1812.00 864.60 1890.60

Chapter-14 Page 191 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
14.155 Providing and fixing structural steel frame (for dry
cladding with 30 mm thick gang saw cut with
machine cut edges sand stone) on walls at all
heights using M.S. square/ rectangular tube in the
required pattern as per architectural drawing,
including cost of cutting, bending, welding etc.
The frame work shall be fixed to the wall with the
help of M.S. brackets/ lugs of angle iron/ flats etc.
which shall be welded to the frame and
embedded in brick wall with cement concrete
block 1:2:4 (1 cement :2 coarse sand :4 graded
stone aggregate 20 mm nominal size) of size
300x230x300 mm, including cost of necessary
centring and shuttering and with approved
expansion hold fasteners on CC/RCC surface, kg 57.00 138.00 62.70 143.70
including drilling necessary holes. Approved
cramps/ pins etc. shall be welded to the frame
work to support stone cladding, the steel work will
be given a priming coat of Zinc primer as
approved by Engineer-in-charge and painted with
two or more coats of epoxy paint (Shop drawings
shall be submitted by the contractor to the
Engineer-in-charge for approval before
execution). The frame work shall be fixed in true
horizontal & vertical lines/planes. (Only structural
steel frame work shall bemeasured for the
purpose of payment, tainless steel cramps shall
be paid for separately and nothing extra shall be
paid).

14.156 Providing and fixing adjustable stainless steel


cramps of approved quality,required shape and
size, adjustable with stainless steel nuts, bolts
and washer (total weight not less than 260 gms),
for dry stone cladding fixed on frame work at
Each 124.00 245.00 136.40 257.40
suitable location, including making necessary
recesses in stone slab, drilling required holes etc
complete as per direction of the Engineer-in-
charge.

14.157 Providing and fixing expandable fasteners of


specified size with necessary plastic sleeves and
galvanised M.S. screws including drilling holes in
masonry work /
CC/ R.C.C. and making good etc.complete.

25 mm long
a Each 6.00 15.00 6.60 15.60

32 mm long
b Each 6.00 16.00 6.60 16.60

Chapter-14 Page 192 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
40 mm long
c Each 6.00 19.00 6.60 19.60

50 mm long
d Each 6.00 21.00 6.60 21.60

14.158 Mirror polishing on marble work/Granite


work/stone work where ever required to sqm 189.00 234.00 207.90 252.90
give high gloss finish complete.

14.159 Providing and fixing Mettal extendable hold


fasteners on C.C. /R.C.C./Brick masonry surface
backing including drilling necessary holes and the
cost of bolt etc complete.

a Fastener with threaded dia 6 mm Each 10.00 25.00 11.00 26.00

b Fastener with threaded dia 10 mm Each 10.00 26.00 11.00 27.00

c Fastener with threaded dia 12 mm Each 10.00 43.00 11.00 44.00

14.160 Cutting of floor topping of concrete / Kota Stone /


any kind of marble/ tile floor depth up to 50mm
with the help of mechanical cutter and chisel (with
due care so that surrounding floor should not be
damage) to lay the tactile flooring 300mm wide
including cost of providing and laying 25mm to Sqm 391.00 503.00 430.10 542.10
28mm thick cement concrete 1:2:4 as per
requirement complete as per specification,
Harmonised guidelines for PwD and as desired
by Engineer-in-charge.

Chapter-14 Page 193 CSR-2020


CSR−2020−Final
CHAPTER NO. 15
PLASTERING & POINTING
Notes :-
(i) Unless otherwise stated, the labour rates include the rehandling of materials within 100 metres.

(ii) The rates include the cost of water. Where the water is supplied free of cost by department, the
labour rates shall be reduced by 3% and through rates accordingly.

(iii) The labour rates for item no. 15.53 to 15.57 include the cost of Earth, Bhusa and Gobri etc.

(iv) The labour rates given in this chapter include the cost of water, tools & plant, scaffolding & all
types of sundries etc (including labour & material).

(v) In case of Plaster for wall and ceiling there is huge involvement of scaffolding and watering.To
meet with these expenses Sundries have been provided @5% in this Chapter.

(vi) In view of Note No. 24 of Gaz.Notification No.S.O 94/C.A. 11/1948/Ss.3and 5/2012 Dated 15-11-
2012 Issued by Govt of Punjab Department of Labour,has been taken into account while revising
the through/ labour rate for plastering and pointing outside building above 3 storey.

(vii) In Case where item no 15.22 is used then item no 15.85 cannot be applicable above third storey
height for External Plaster.

Sr. Description Unit Zone-A Zone-B


No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.1 Plastering on walls 6 mm thick cement
plaster 1:2 sqm 124.00 164.00 136.00 176.40

15.2 Plastering on walls 6 mm thick cement


sqm 124.00 156.00 136.00 168.40
plaster 1:3

15.3 Plastering on walls 6 mm thick cement


sqm 124.00 150.00 136.00 162.40
plaster 1:4

15.4 10mm thick Cement Plaster 1:2 sqm 126.00 181.00 139.00 193.60

15.5 10mm thick Cement Plaster 1:3 sqm 126.00 173.00 139.00 185.60

15.6 10mm thick Cement Plaster 1:4 sqm 126.00 164.00 139.00 176.60

15.7 12.5 mm thick cement plaster 1:2 sqm 137.00 213.00 151.00 226.70

15.8 12.5 mm thick cement plaster 1:3 sqm 137.00 199.00 151.00 212.70

15.9 12.5 mm thick cement plaster 1:4 sqm 137.00 189.00 151.00 202.70

15.10 12.5 mm thick cement plaster 1:5 sqm 137.00 181.00 151.00 194.70

15.11 12.5 mm thick cement plaster 1:6 sqm 137.00 175.00 151.00 188.70

Chapter-15 Page 194 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

15.12 12.5mm thick raised cement mortar bend 1 metre


/ drip course in cement mortar 1:3 long and
3.85 4.58 4.23 4.96
1 cm
wide

15.13 12.5mm thick raised cement mortar bend 1 metre


/ drip course in cement mortar 1:4 long and
3.85 4.36 4.23 4.74
1 cm
wide

15.14 16mm thick cement plaster 1:2 in two coat


work sqm 158.00 253.00 174.00 268.80

15.15 16mm thick cement plaster 1:3 in two coat


sqm 158.00 238.00 174.00 253.80
work

15.16 16mm thick cement plaster 1:4 in two coat


work sqm 158.00 223.00 174.00 238.80

15.17 16mm thick cement plaster 1:5 in two coat


work sqm 158.00 212.00 174.00 227.80

15.18 20mm thick cement plaster 1:2 in two coat


sqm 182.00 295.00 200.00 313.20
work

15.19 20mm thick cement plaster 1:3 in two coat


sqm 182.00 279.00 200.00 297.20
work

15.20 20mm thick cement plaster 1:4 in two coat


sqm 182.00 260.00 200.00 278.20
work

15.21 20mm thick cement plaster 1:5 in two coat


work sqm 182.00 247.00 200.00 265.20

15.22 Extra for plastering exterior walls of height


more than Third storey from ground level
for every additional height of single storey sqm 31.00 31.00 34.00 34.10
or part thereof.

15.23 20mm thick cement mortar bend/ drip per metre


course in cement mortar 1:4 long and
6.00 7.00 7.00 7.60
per cm
wide

15.24 12.5 mm thick lime surkhi sand plaster


1:1:1 sqm 137.00 183.00 151.00 196.70

15.25 12.5 mm thick cement lime sand plaster


sqm 137.00 220.00 151.00 233.70
1:1:6

Chapter-15 Page 195 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.26 12.5 mm thick lime surkhi plaster 1:2 sqm 137.00 180.00 151.00 193.70

15.27 12.5 mm thick lime surkhi plaster 2:3(2


lime and 3 surkhi) sqm 137.00 188.00 151.00 201.70

15.28 20mm thick cement plaster 1:6 in two


sqm 182.00 237.00 200.00 255.20
coats work

15.29 20mm thick lime surkhi plaster 1:2 in two


coats work sqm 182.00 260.00 200.00 278.20

15.30 25mm thick cement lime plaster 1:1:6 sqm 185.00 287.00 204.00 305.50

15.31 25mm thick cement plaster 1:2 in 2 coats


work sqm 185.00 336.00 204.00 354.50

15.32 25mm thick cement plaster 1:3 in 2 coats


sqm 185.00 313.00 204.00 331.50
work

15.33 25mm thick cement plaster 1:4 in 2 coats


work sqm 185.00 288.00 204.00 306.50

15.34 25mm thick cement plaster 1:5 in two


coats work sqm 185.00 272.00 204.00 290.50

15.35 25mm thick cement plaster 1:6 in two


coats work sqm 185.00 261.00 204.00 279.50

15.36 10mm thick cement plaster 1:2 on floors.


sqm 87.00 144.00 96.00 152.70

15.37 10mm thick cement plaster 1:3 on floors.


sqm 87.00 135.00 96.00 143.70

15.38 10mm thick cement plaster 1 : 4 on floors.


sqm 87.00 126.00 96.00 134.70

15.39 12.5 mm thick cement plaster 1:2 on


floors sqm 95.00 170.00 105.00 179.50

15.40 12.5 mm thick cement plaster 1:3 on


floors sqm 95.00 159.00 105.00 168.50

15.41 Plastering on underside of ceiling 6mm


thick cement plaster 1:3 sqm 134.00 166.00 147.00 179.40

15.42 Plastering on underside of ceiling 6mm


thick cement plaster 1:4 sqm 134.00 160.00 147.00 173.40

Chapter-15 Page 196 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.43 Plastering on underside of ceiling 10mm
thick cement plaster 1:3 sqm 136.00 184.00 150.00 197.60

15.44 Plastering on underside of ceiling 10mm


thick cement plaster 1:4 sqm 136.00 175.00 150.00 188.60

15.45 12.5 mm thick cement plaster 1:4 sqm 137.00 189.00 151.00 202.70

15.46 MISCELLANEOUS (Extra for mixing soap


solution 1% for cement plastering) sqm 2.00 6.00 2.00 6.20

15.47 Extra for providing and mixing water


proofing material in cement plaster work
@ 1 kg per 50 kg of cement. per bag
24.00 69.00 26.00 71.40
of cement

15.48 Cement rendering on plaster 1mm thick sqm 49.00 59.00 54.00 63.90

15.49 12.5mm thick cement plaster in damp


proof course 1:3 with two coats of
bitumen at 1.65Kg. Per Sqm laid hot and
sanded

(a) Vertical sqm 137.00 283.00 151.00 296.70

B Horizontal sqm 77.00 223.00 85.00 230.70

15.50 20mm thick cement plaster in damp proof


course 1:3 with two coats of bitumen at
1.65Kg. Per Sqm laid hot and sanded

(a) Vertical sqm 182.00 360.00 200.00 378.20

(b) Horizontal sqm 146.00 324.00 161.00 338.60

15.51 40 mm thick cement plaster D.P.C. 1:3


with admixture of water proofing sqm 250.00 460.00 275.00 485.00
compound @ 1 Kg/ Bag of cement.

15.52 Bearing Plaster of 10 mm thick cement


mortar 1:3 cement sand finished with a
floating coat of neat cement and thick
sqm 108.00 158.70 119.00 169.50
coat of Lime wash / P.O.P. on top of walls
when dry for bearing of R.C.C. slabs &
beams.

15.53 Mud plaster 12.5mm thick with gobri


leeping including all materials on walls. sqm 52.00 59.00 57.00 64.20

Chapter-15 Page 197 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

15.54 Mud plaster 25 mm thick with gobri


leeping including all materials on walls. sqm 52.00 65.00 57.00 70.20

15.55 Mud plaster - 12.5mm thick with gobri


leeping including all materials on Floors & sqm 41.00 48.00 45.00 52.10
Roofs.

15.56 Mud plaster on floor and roofs 25mm


thick with gobri leeping including all sqm 41.00 54.00 45.00 58.10
materials on Floor & Roofs.

15.57 Gobri leeping including all Materials on


floors & roofs. sqm 19.00 19.00 21.00 20.90

15.58 Lime pointing 2:3 weathered and struck.


sqm 110.00 120.00 121.00 131.00

15.59 Cement pointing 1:2 deep variety sqm 110.00 127.00 121.00 138.00

15.60 Cement pointing 1:3 deep variety sqm 110.00 123.00 121.00 134.00

15.61 Flush/Ruled/Struck or weathered pointing


on tile brick work with cement mortar 1:3 sqm 152.00 204.00 167.00 219.20
(1 cement :3 fine sand).

15.62 Lime pointing 2:3 flush on brick walls sqm 70.00 79.00 77.00 86.00

15.63 Cement pointing flush 1:2 flush on stone


walls sqm 99.00 129.00 109.00 138.90

15.64 Cement pointing 1:2 (Raised) on stone


walls sqm 132.00 182.00 145.00 195.20

15.65 Striking joints in lime or cement on brick


walls sqm 87.00 87.00 96.00 96.00

15.66 Cement pointing 1:2 flush on brick on


edge flooring sqm 70.00 108.00 77.00 115.00

15.67 Cement pointing 1:2 flush on flat brick


sqm 56.00 70.00 62.00 75.60
flooring

15.68 Cement pointing flush 1:2 underside of


roofs with bricks tiles 30cmx15cm sqm 60.00 70.00 66.00 76.00

15.69 Cement pointing on stone slab pavement


sqm 60.00 68.00 66.00 74.00
with cement mortar 1:2

Chapter-15 Page 198 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.70 Washed stone grit plaster on exterior
walls of height upto 10 M. above ground
level in two layers, under layer 12.5mm
cement plaster 1:4 (1 cement : 4 coarse
sand ) furrowing coarse sand : 2 stone
chipping 10mm nominal size) in panels
with groove all around Kg of cement per
square metre, top layer 15mm cement
plaster 1:1/2:2 (1 cement: 1/2the under
layer with scratching tool, applying cement sqm 373.00 546.00 410.00 583.30
slurry on the under layer @ 2 as per
approved pattern including scrubbing and
washing, the top layer with brushes and
water to expose the stone chippings,
complete as per specification and
direction of Engineer-in- charge (Payment
for providing grooves shall be made
separately).

15.71 Forming groove of uniform size in the top


layer of washed stone grit plaster as per
approved pattern using wooden battens,
nailed to the under layer including removal
of wooden battens, repair to the edges of
panels and finishing the groove complete
as per specifications and direction of the
Engineer-in-charge :

15 mm wide and 15 mm deep groove m 32.00 33.00 35.00 36.20

15.72 Forming groove of uniform size in the top


layer of washed stone grit plaster as per
approved pattern using wooden battens,
nailed to the under layer including removal
of wooden battens, repair to the edges of
panels and finishing the groove complete
as per specifications and direction of the
Engineer-in-charge :

20 mm wide and 15 mm deep groove m 32.00 36.00 35.00 39.20

15.73 Extra for washed grit plaster on exterior


walls of height more than 10m from sqm 88.00 88.00 97.00 97.00
ground

15.74 Extra for washed stone grit plaster on


circular work not exceeding 6m in radius sqm 76.00 76.00 84.00 84.00
(in two coats).

Chapter-15 Page 199 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.75 Forming groove of uniform size from
12xl2mm and upto 25xl5mm in plastered
surface as per approved pattern using
wooden battens, nailed to the under layer
including removal of wooden battens, m 32.00 35.00 35.00 38.20
repairs to the edges of plaster panel and
finishing the groove complete as per
specifications and direction of the
Engineer-in-Charge.

15.76 Extra for using white cement in place of


ordinary cement in the top layer of the sqm - 94.47 - 104.00
item of washed stone grit, plaster.

15.77 Floor polishing on masonry or concrete


floors with wax polish of approved brand sqm 45.00 48.00 50.00 52.50

15.78 Providing and fixing facing extruded clay


Tile (Glass Reinforced Clay Tiles (GRC))
any size any shade & design on wall with
under layer of 12 mm thick cement plaster
1:3 and jointed with neat cement matched
sqm 1313.00 2249.00 1444.00 2380.30
with pigment complete as per
drawings,specifications and to the entire
satisfaction of engineer- in- charge.

15.79 Providing and fixing chicken mesh for


brick work and RCC junction of
galvanized low carbon wire, annealed wire
of diametre 0.6 to 2.0mm distance sqm 117.00 187.00 129.00 198.70
between the faces of the hexagon 13 to
50mm complete in all respect.

15.80 Providing and fixing face Tiles 230 x 75


x17 mm machine made vibro-hydraulic
compacted Burnt Clay brick Tile silicon
coated on one side (Colour Terracotta
series) on wall with under layer of 12 mm
thick cement plaster 1:3 and jointed with sqm 1021.00 1682.00 1123.00 1784.10
neat cement matched with pigment
complete as per drawings, specifications
and to the entire
satisfaction of engineer- in- charge.

Chapter-15 Page 200 CSR-2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
15.81 Providing and fixing face Tiles 230 x 50
x17 mm machine made vibro hydraulic
compacted Burnt Clay brick Tile silicon
coated on one side (Colour Terracotta
series) on wall with under layer of 12 mm
thick cement plaster 1:3 and jointed with sqm 1021.00 1770.00 1123.00 1872.10
neat cement matched with pigment
complete as per drawings, specifications
and to the entire satisfaction of engineer-
in- charge.

15.82 Providing and fixing face Tiles 230 x 38


x18 mm machine made vibro hydraulic
compacted Burnt Clay brick Tile silicon
coated on one side(Colour Terracotta
series) on wall with under layer of 12 mm
thick cement plaster 1:3 and jointed with sqm 1021.00 1814.00 1123.00 1916.10
neat cement matched with pigment
complete as per drawings, specifications
and to the entire satisfaction of engineer-
in- charge.

15.83 Extra Cost for using darker fast shade


face Tiles of any size machine made
hydraulic compacted Burnt Clay brick Tile sqm 0.00 147.00 0.00 147.00
silicon coated on one side instead of
lighter shades.

15.84 Extra for Plastering in each subsequent


storey above the first storey upto 4 metre sqm 2.00 2.00
above plinth level.

15.85 Extra for Plastering where any single


storey height exceeds 4 metres in height
for every additional height of 2 metres or sqm 7.00 8.00
part thereof.(Internal or External)

Chapter-15 Page 201 CSR-2020


CSR−2020−Final
CHAPTER NO. 16
WHITE WASHING, DISTEMPERING, PAINTING & POLISHING
Notes :-

(i) Unless otherwise stated the labour rates include the rehandling of materials within 100 metres.

(ii) The rates include the cost of water, where the water is supplied free of cost by department, the
labour rates shall be reduced by 1% and through rates accordingly.

(iii) Rates for distempering with dry and oil bound distemper have been provided in this chapter.
These rates have been based on superior quality distempers, manufactured by standard firms.
The use of inferior/local/non branded distempers shall not be permitted as they never give
proper quality of lasting surface.

(iv) The labour rates given in this chapter include the cost of water, tool & plant, painting brush ,
scaffolding (Wherever Required) and all types of sundries etc( including labour and materials).

(v) Only First Quality paint manufactured by reputed firm like Nerolac, Asian, Berger, ICI or
Equivalent are to be used as approved by the Engineer-in-charge and no other Local/Ordinary
non branded paint shall be used.

(vi) In view note no. 24 of Gaz. Notifiaction No.S.O 94/C.A. 11/1948/Ss.3and 5/2012 Dated 15-11-
2012 Issued by Govt of Punjab Department of Labour has been taken into account while
revising the through / labour rate for painting outside building above 3 storey.

(vii) In Case where item no 16.77 is used then item no 16.72 cannot be applicable above third storey
height for External Painting.

Sr. No. Description of Item Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.1 White washing (First coat or subsequent one
sqm 6.00 7.00 7.00 8.00
coat)

16.2 White washing (two or more coat)


sqm 9.00 11.00 10.00 12.00

16.3 White washing (Three coat)


Sqm 12.00 15.00 13.00 16.00

16.4 Colour Washing ( First coat or subsequent


Sqm 11.00 15.00 12.00 16.10
coat ).

16.5 Colour washing (two or more coats)


Sqm 16.00 22.00 18.00 24.00

16.6 Preparation of plastered surfaces for


distempering including surface, applying filling
with approved quality filler consisting of
plaster of paris and chalk mitti including Sqm 59.00 61.00 65.00 67.00
finishing the surface to the required finish
complete

Chapter-16 Page 202 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.7 Distempering with dry distemper of approved
manufacture two or more coats over one
priming coat to give an even shade Sqm 49.00 63.00 54.00 68.00

16.8 Distempering with dry distemper of approved


manufacture one coat on old distempered Sqm 25.00 27.00 28.00 30.00
work

16.9 Distempering with dry distemper of approved


manufacture two or more coats on old
distempetered surface when shade is changed Sqm 41.00 46.00 45.00 50.00

16.10 Distempering with Acrylic washable oil bound


distemper (of approved manufacture) two or
more coats over one priming coat to give an Sqm 58.00 71.00 64.00 77.00
even shade

16.11 Distempering with Acrylic washable oil bound


distemper (of approved manufacture) one
coat over one priming coat on old Sqm 27.00 30.00 30.00 33.00
distempered surface

16.12 Distempering with Acrylic washable oil bound


distemper (of approved manufacture) two or
more coats on old distempered work when Sqm 42.00 46.00 46.00 50.00
shade is changed

16.13 Finishing walls with exterior decorative


cement based paint such as snowcem,
robbiacem etc. two or more coats to give an Sqm 41.00 55.00 45.00 59.00
even shade

16.14 Finishing walls with exterior decorative


cement based such as snowecem, robbiacem
Sqm 27.00 32.00 30.00 35.00
etc. on old work one coat to give an even
shade

16.15 Preparation of plywood surface for painting


including sand papering the surface and
applying filling with approved quality fillers
consisting of white lead, linseed oil, Varnish, Sqm 29.00 43.00 32.00 46.00
and Chalk Mitti including finishing the surface
to required finish complete.

16.16 Applying pink primer or aluminum priming


coat on wood work including preparation of Sqm 20.00 28.00 22.00 30.00
surface knotting and stopping etc.

Chapter-16 Page 203 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.17 Painting two or more coats excluding priming
coat with synthetic enamel paint in all shades
on wood work, metallic or plastered, concrete Sqm 35.00 66.00 39.00 70.00
surface to give an even shade.

16.18 Painting two or more coats with synthetic


enamel paints in all shades on old wood work
or metallic or plastered or concrete surface to Sqm 38.00 64.00 42.00 68.00
give an even shade including rubbing down
old paint.

16.19 Painting one coat with synthetic enamel paint


in all shades on old wood work or metallic or
plastered or concrete surfaces to give an even Sqm 22.00 36.00 24.00 38.00
shade including rubbing down old paint.

16.20 Applying priming coat with metal primer on


new steel or iron work including preparation of Sqm 17.00 24.00 19.00 26.00
surface.

16.21 Painting two or more coats excluding priming


coat with ready mixed paint for metallic sqm 36.00 62.00 40.00 66.00
surfaces in all shades on steel or iron work

16.22 Painting one coat with readymixed paint of


metallic surfaces in all shades on old steel or Sqm 22.00 34.00 24.00 36.00
iron works.

16.23 Painting two or more coats on iron sheets


roofing with ready mixed Paint in all shades to sqm 45.00 77.00 50.00 82.00
give an even shade

16.24 Painting one coat on iron sheets roofing with


ready mixed paint in all shades on old work to Sqm 25.00 46.00 28.00 49.00
give an even shade

16.25 Painting two or more coats with aluminum


paint to give an even shade excluding priming Sqm 45.00 63.00 50.00 68.00
coat

16.26 Painting one coat with aluminum paint on old


Sqm 27.00 36.00 30.00 39.00
work to give an even shade

16.27 Painting two or more coats with anticorrosive


bitumastic Paint to give an even shade Sqm 40.00 54.00 44.00 58.00

16.28 Painting one coat with anticorrosive


bitumastic paint on old work to give an even Sqm 26.00 33.00 29.00 36.00
shade

Chapter-16 Page 204 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.29 Painting two or more coats anticorresive
ordourless black bitumatic paint inside steel Sqm 42.00 56.00 46.00 60.00
water tanks

16.30 Painting one coat with anticorresive


ordourless black bitumastic paint inside old Sqm 26.00 33.00 29.00 36.00
steel water tank

16.31 Applying priming coat with cement primer in


all shade on newly plastered or concrete Sqm 13.00 21.00 14.00 22.00
exterior surface

16.32 Floor painting two or more coats with epoxy


paint in all shades on work to give an even Sqm 40.00 77.00 44.00 81.00
shade

16.33 Floor painting one coat with epoxy paint in all


shades on old work to give an even shade Sqm 20.00 43.00 22.00 45.00

16.34 Burning old paint with blow Lamp Sqm 37.00 43.00 41.00 47.00

16.35 Removing old paint with caustic soda solution


and preparing surface Sqm 32.00 36.00 35.00 39.00

16.36 Scraping brushing to remove paint to base


metal surface Sqm 101.00 101.00 111.00 111.00

16.37 Painting one coat with solignum


Sqm 12.00 20.00 13.00 21.00

16.38 Painting two coats with solignum


Sqm 18.00 32.00 20.00 34.00

16.39 Varnishing with copal varnish one coat of


sizing and two coats of varnishing on wood
work including stopping.

(a) With superior quality paint


Sqm 45.00 82.00 50.00 87.00

(b) With ordinary quality Paint


Sqm 45.00 76.00 50.00 81.00

16.40 Varnishing with copal varnish one coat


including rubbing of previous coat

(a) With special Quality


Sqm 21.00 37.00 23.00 39.00

Chapter-16 Page 205 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) With ordinary quality Paint
Sqm 21.00 34.00 23.00 36.00

16.41 Oiling wood work with raw linseed oil


Sqm 8.00 16.00 9.00 17.00

16.42 Oiling wood work with raw linseed oil and


Sqm 10.00 14.00 11.00 15.00
water

16.43 Painting one coat with creosote


Sqm 12.00 16.00 13.00 17.00

16.44 Painting two coats with creosote


Sqm 18.00 26.00 20.00 28.00

16.45 Spirit polishing two coats including a coat of


Sqm 113.00 153.00 124.00 164.00
wood filler on wood work

16.46 Spirit polishing one coat in old wood work


Sqm 62.00 77.00 68.00 83.00

16.47 Painting new letters and figures of black cm ht.


synthetic enamel paint to an even shade per 2.73 2.64 2.90 2.99
letter

16.48 Repainting letters and figures of black cm ht.


synthetic enamel paint to give an even shade per 1.63 1.68 1.79 1.84
letter

16.49 Painting gauges 60 cm wide reading to


centimetre with synthetic enamel Paint (two or metre 350.00 410.00 385.00 445.00
more coats ) to give an even shade

16.50 Painting sounding rods and other gauges


reading to centimetre with synthetic enamel
paint

(a) One coat work


metre 56.00 65.00 62.00 71.00

(b) Two coat work


metre 90.00 108.00 99.00 117.00

16.51 Painting leveling staff with synthetic enamel


paint

(a) One coat work


metre 302.00 313.00 332.00 343.00

(b) two coat work


metre 455.00 466.00 501.00 512.00

Chapter-16 Page 206 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.52 Painting canal gates with Khanki mixture
applied hot

(a) One coat work


Sqm 11.00 20.00 12.00 21.00

(b) two coat work


Sqm 16.00 32.00 18.00 34.00

16.53 Extra over and above rates in item No. 15.53


where scaffolding is used Sqm 4.58 4.58 5.04 5.04

16.54 Painting distance marks with synthetic enamel


paint

(a) One coat work

(i) Main canals


each 38.00 45.00 42.00 49.00

(ii) Distributaries
each 27.00 32.00 30.00 35.00

(b) Two coat work

(i) Main canals


each 54.00 65.00 59.00 70.00

(ii) Distributaries
each 38.00 46.00 42.00 50.00

16.55 Painting 200 metre stones with synthetic


enamel paint

(a) One coat work


Each 69.00 75.00 76.00 82.00

(b) One coat work


Each 112.00 123.00 123.00 134.00

16.56 Painting kilometre stones with synthetic


enamel paint

(a) One coat work

(i) 5th kilometre Stones


Each 775.00 828.00 853.00 906.00

(ii) Ordinary Kilometre Stone


Each 417.00 444.00 459.00 486.00

Chapter-16 Page 207 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iii) Kilometre stone on Village road


Each 317.00 338.00 349.00 370.00

(b) Two coat work

(i) 5th kilometre Stones


Each 1260.00 1346.00 1386.00 1472.00

(ii) Ordinary Kilometre Stone


Each 679.00 722.00 747.00 790.00

(iii) Kilometre stone on Village road


Each 549.00 583.00 604.00 638.00

16.57 Painting village boards with synthetic enamel


paint

(i) One coat


Each 184.00 206.00 202.00 224.00

(ii) Two coat work


Each 301.00 338.00 331.00 368.00

16.58 Finishing walls with textured exterior paint of


required shade with two or more coats applied
@ 3.28 litre/10Sqm over and including base Sqm 54.00 155.00 59.00 160.00
coat of water proofing Cement Paint applied
@ 2.20 Kg/10 Sqm

16.59 Finishing walls with acrylic smooth exterior


paint of required shade with two or more coats
applied @ 1.67 litre/10Sqm over and Sqm 54.00 91.00 59.00 96.00
including base coat of water proofing Cement
Paint applied @ 2.20 Kg/10 Sqm

16.60 Finishing walls with Premium Acrylic smooth


exterior paint with silicon additives of
required shade with two or more coats applied
@ 1.43litre/10 Sqm over and including base Sqm 54.00 100.00 59.00 105.00
coat of water proofing Cement Paint applied
@ 2.20 Kg/10 Sqm

16.61 Painting with oil type wood preservative of


approved brand and manufacturer-new work Sqm 16.00 50.00 18.00 52.00
two or more coats

Chapter-16 Page 208 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.62 Providing and applying two coats of fire
retardant paint unthined on cleaned wood/ ply
surface @ 3.5 litre per 10 Sqm per coat
Sqm 59.00 259.00 65.00 265.00
including preparation of base surface as per
recommendations of manufacturer to make
the surface fire retardant

16.63 Wall painting with plastic emulsion paint of


approved brand and manufacturer to give an Sqm 59.00 89.00 65.00 95.00
even shade (two or more coats)

16.64 Painting with acid proof paint of approved


brand and manufacture to give an even shade- Sqm 59.00 88.00 65.00 94.00
two or more coats

16.65 Preparation of plastered or concrete surface


for painting (including sand papering the
surface) using ready mixed cement based wall Sqm 59.00 80.00 65.00 86.00
putty by applying two or more coats to get
required finish

16.66 Melamine polish two or more coats to give


required finish including one coat of wood Sqm 733.00 943.00 806.00 1016.00
filler

16.67 Finishing with epoxy paint two or more coat at


all locations prepared and applied as per Sqm 64.00 96.00 70.00 102.00
manufacturer specifications complete.

16.68 Providing surface treatment to external /


internal wall with water resistant grade, anti
fungal, anti rusting, antifoaming, high
percentage acrylic binder washable surface
with two coats to be provided with spatula
Sqm 126.00 265.00 139.00 278.00
over one coat cement primer including
preparation of surface with water resistant
grade match colour complete as per
specifications and to the entire satisfaction of
engineer- in- charge.

16.69 Providing and applying plaster of paris (ISI


marked such as JK, Kohinoor, Maharaja etc.)
punning 6mm thickness over plastered
surface to prepare the surface even and Sqm 237.00 282.00 261.00 306.00
smooth complete in all respect as per the
directions of Engineer-in-charge.

Chapter-16 Page 209 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.70 Providing & applying heritage granual
homogeneous wall finishing system from
Bakelite Coating & Paints Pvt. Consisting of
two component system of dry Granual (25
kg/pack) made of 92% silice particle, coated
with fade resistant pigmants and 100% acrylic
co-polymers bonding agent (5 ltr pack) with
the applied thickness of coating being Sqm 237.00 880.00 261.00 904.00
between 0.8 to 1.2mm to be applied in single
coat on a cured level smooth plastered, as per
the shade combination approved and as per
manufacturer specification, all complete
inclusive of primer on the base.

16.71 Extra labour for Painting or Priming coat on


trusses/Gantry board or similar structures of sqm 49.00 54.00
height above 4 metre for every additional
height of 2 mtr or part thereof.
16.72 Extra rates for white washing, distempering,
painting and decorative cement based paints
etc for superstructure Where any single storey
height exceeding 4 mtr in height for every sqm 3.00 3.30
additional height of 2 mtr or part thereof
(External or Internal)

16.73 Preparation of plastered or concrete surface


for painting (including sand papering the
surface) using Acryllic Wall Putty by applying
two or more coats to get required finish
including priming coat to make an even Sqm 72.00 119.00 79.00 126.00
surface before applying Acrylic wall putty on
new plastered surface.Complete as per
specifications

16.74 Polyurethane polish (PU) two or more coats to


give required finish including two coat of wood
sealer Including Preparation of surface/base Sqm 952.00 1371.00 1047.00 1466.00
complete as per specification

16.75 Painting two or more coats Italian Pigmented


PU white glossy or matt in all shades on wood Sqm 952.00 1359.00 1047.00 1454.00
work surface to give an even shade Including
Preperation of surface/base complete as per
16.76 Wall painting with (bio grade)plastic emulsion
paint of approved brand and manufacturer to
give an even shade (two or more coats)
Sqm 59.00 125.00 0.00 131.00
Generally used in hospital buildings etc
Complete as per Specifications.

Chapter-16 Page 210 CSR-2020


CSR−2020−Final
Sr. No. Description of Item Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
16.77 Extra rates for External white washing,
distempering, painting and decorative cement
based paints etc for walls of height above
Third storey from ground level for every sqm 12.00 13.20
additional height of single storey or part
thereof.

Chapter-16 Page 211 CSR-2020


CSR−2020−Final

CHAPTER NO. 17
WOOD WORK
Notes : -

(i) Unless otherwise stated, the labour rates include rehandling of materials within 100 metres.

(ii) Unless otherwise stated, the labour and through rates include all wastage of timber in sawing

(iii) Through rates for items requiring use of wire gauge include the cost of 140 G gauge galvanised

(iv) The labour rates given in this chapter include the cost of tools & plants and scaffolding (including
Labour and material), wherever required.

(v) The rate for item No. 17.1 to 17.6 apply to simple wood work not involving any jointing such as
beams/ battens etc. Where jointing is involved as in case of roof trusses composite beams etc.,
increase the labour and through rate by Rs. 3600/- per cum. In case of built -in-fixtures involving
jointing increase the rates by Rs. 2400/- per cum

(vi) The rates for item No. 17.10,17.11,17.15, 17.16 exclude the cost of sliding bolts, Tower bolts,
handles but include the cost of labour for fixing them.

(vii) In case fixed glazing is continuous to open able shutter, the area of fixed glazing will be
measured up to central line of mullion if the area of fixed glazing exceeds 25 percent of the open
able area. If the area of fixed glazing is up to 25 percent of the open able area then the whole
area shall be measured as open able and paid for as such.

(vii) The wood work in chowkhats of doors and windows shall be done at site strictly as per P.W.D
Specifications. Nothing extra shall be paid for wastage, or for dimensions, supplied beyond
those specified and for horns. The length of each piece shall be measured overall, so as to
include the projection for tenons. In case of mouldings, roundings circular rebates, circular and
varying sections, the sectional area of the piece shall be taken as the area of the least square or
rectangle from which such section can be cut, and nothing extra shall be paid for such moulding
and rebates.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.1 Deodar wood wrought planed and fixed in


position
cum 7015.00 180872.00 7717.00 181574.00

17.2 Kail wood wrought planed and fixed in


position
cum 7015.00 131697.00 7717.00 132399.00

17.3 Chil wood wrought planed and fixed in


position
cum 7015.00 87890.00 7717.00 88592.00

Chapter-17 Page 212 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.4 Commercial Hard wood such as Hollock
cum 6767.00 100138.00 7444.00 100815.00

17.5 Teak wood wrought planed and fixed in


position
cum 6767.00 173182.00 7444.00 173859.00

17.6 Sal wood wrought


cum 6767.00 104750.00 7444.00 105427.00

17.7 Deodar wood planking planed on both


sides i.e. based and fixed in position
including nails and screws etc.

(a) 50mm thick Sqm 385.00 9821.00 424.00 9860.00

(b) 45 Thick Sqm 371.00 8863.00 408.00 8900.00

(c) 40mm thick Sqm 357.00 7905.00 393.00 7941.00

(d) 30mm thick Sqm 330.00 6137.00 363.00 6170.00

(e) 25mm thick Sqm 314.00 5031.00 345.00 5062.00

(f) 20 mm thick Sqm 297.00 3926.00 327.00 3956.00

(g) 12.50mm thick Sqm 277.00 2600.00 305.00 2628.00

17.8 Kail wood planking planed on both sides


rebated and fixed in position including
nails and screws etc.

(a) 50mm thick Sqm 385.00 7125.00 424.00 7164.00

(b) 45 mm Thick Sqm 371.00 6436.00 408.00 6473.00

(c) 40mmThick Sqm 352.00 5536.00 387.00 5571.00

(d) 30 mm thick Sqm 330.00 4478.00 363.00 4511.00

(e) 25 mm thick Sqm 314.00 3683.00 345.00 3714.00

Chapter-17 Page 213 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(f) 20 mm thick Sqm 297.00 2889.00 327.00 2918.70

(g) 12.5 mm thick Sqm 277.00 1936.00 305.00 1964.00

17.9 Teak wood planking planed on both sides


rebated and fixed in position including
nails screws etc.

(a) 50mm thick Sqm 476.00 10080.00 524.00 10128.00

(b) 45 mm thick Sqm 462.00 9105.00 508.00 9151.00

(c) 40 mm thick Sqm 439.00 7531.00 483.00 7575.00

(d) 30 mm thick Sqm 412.00 5731.00 453.00 5772.00

(e) 25 mm thick Sqm 399.00 4832.00 439.00 4872.00

(f) 20 mm thick Sqm 386.00 3932.00 425.00 3971.00

(g) 12.5 mm thick Sqm 366.00 2582.00 403.00 2619.00

17.10 Deodar wood doors shutter windows


(i) shutter including hinges, screw and cords
etc. Complete fixed in position

(a) Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf) sqm 727.00 5288.00 800.00 5361.00

(ii) 35mm thick sqm 721.00 4701.00 793.00 4773.00

(iii) 30mm thick sqm 714.00 4263.00 785.00 4334.00

(b) Battened and framed

(i) 50mm thick sqm 631.00 8021.00 694.00 8084.00

(ii) 45m thick taking size of door sqm 625.00 7619.00 688.00 7682.00

(c.) Battened and braced shutter


50mm thick complete sqm 636.00 7299.00 700.00 7363.00

17.10 Red meranti Normal (15 to 16 kg per cft.


(ii) Approx.) doors shutter windows shutter
including hinges, screw and cords etc.
Complete fixed in position

Chapter-17 Page 214 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(a) Panelled, glazed or glazed and
panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 2718.00 800.00 2791.00

(ii) 35mm thick


sqm 721.00 2376.00 793.00 2448.00

(iii) 30mm thick


sqm 714.00 2193.00 785.00 2264.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 3699.00 694.00 3762.00

(ii) 45m thick taking size of door


sqm 625.00 3531.00 688.00 3594.00

(c) Battened and braced shutter


sqm 636.00 3405.00 700.00 3469.00
50mm thick complete

17.10 Red meranti Normal Super (18 to 19 kg


(iii) per cft. Approx.) doors shutter windows
shutter including hinges, screw and cords
etc. Complete fixed in position

(a) Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 2855.00 800.00 2928.00

(ii) 35mm thick


sqm 721.00 2500.00 793.00 2572.00

(iii) 30mm thick


sqm 714.00 2303.00 785.00 2374.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 3909.00 694.00 3972.00

(ii) 45m thick taking size of door


sqm 625.00 3728.00 688.00 3791.00

(c) Battened and braced shutter


sqm 636.00 3592.00 700.00 3656.00
50mm thick complete

Chapter-17 Page 215 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.10 Red meranti Sinker quallity (20 to 21 kg
(iv) per cft. Approx.) doors shutter windows
shutter including hinges, screw and cords
etc. Complete fixed in position

(a) Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 3061.00 800.00 3134.00

(ii) 35mm thick


sqm 721.00 2686.00 793.00 2758.00

(iii) 30mm thick


sqm 714.00 2469.00 785.00 2540.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 4255.00 694.00 4318.00

(ii) 45m thick taking size of door


sqm 625.00 4056.00 688.00 4119.00

(c) Battened and braced shutter


sqm 636.00 3904.00 700.00 3968.00
50mm thick complete

17.10 Yellow meranti Normal (15 to 16 kg per


(v) cft. Approx.) doors shutter windows
shutter including hinges, screw and cords
etc. Complete fixed in position

A Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 2649.00 800.00 2722.00

ii 35mm thick
sqm 721.00 2314.00 793.00 2386.00

iii 30mm thick


sqm 714.00 2138.00 785.00 2209.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 3583.00 694.00 3646.00

Chapter-17 Page 216 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(ii) 45m thick taking size of door
sqm 625.00 3421.00 688.00 3484.00

(c) Battened and braced shutter


sqm 636.00 3301.00 700.00 3365.00
50mm thick complete

17.10 Yellow meranti Super (18 to 19 kg per cft.


(vi) Approx.) doors shutter windows shutter
including hinges, screw and cords etc.
Complete fixed in position

A Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 2787.00 800.00 2860.00

ii 35mm thick
sqm 721.00 2438.00 793.00 2510.00

iii 30mm thick


sqm 714.00 2248.00 785.00 2319.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 3793.00 694.00 3856.00

(ii) Battened and framed 45m thick


sqm 625.00 3619.00 688.00 3682.00
taking size of door

(c.) Battened and braced shutter


sqm 636.00 3488.00 700.00 3552.00
50mm thick complete

17.10 Yellow meranti Sinker (20 to 21 kg per cft.


(vii) Approx.) doors shutter windows shutter
including hinges, screw and cords etc.
Complete fixed in position

(a) Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 2993.00 800.00 3066.00

ii 35mm thick
sqm 721.00 2624.00 793.00 2696.00

iii 30mm thick


sqm 714.00 2414.00 785.00 2485.00

Chapter-17 Page 217 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(b) Battened and framed

(i) 50mm thick


sqm 631.00 4161.00 694.00 4224.00

(ii) 45m thick taking size of door


sqm 625.00 3967.00 688.00 4030.00

(c) Battened and braced shutter


sqm 636.00 3821.00 700.00 3885.00
50mm thick complete

17.10 Imported Teak Wood doors shutter


(viii) windows shutter including hinges, screw
and cords etc. Complete fixed in position

A Panelled, glazed or glazed and


panelled.

(i) 40mm thick (Single Leaf)


sqm 727.00 3336.00 800.00 3409.00

ii 35mm thick
sqm 721.00 2935.00 793.00 3007.00

iii 30mm thick


sqm 714.00 2691.00 785.00 2762.00

(b) Battened and framed

(i) 50mm thick


sqm 631.00 4738.00 694.00 4801.00

(ii) 45m thick taking size of door


sqm 625.00 4514.00 688.00 4577.00

(C.) Battened and braced shutter


50mm thick complete sqm 636.00 4341.00 700.00 4405.00

17.10 Deodar wood doors shutter with 12mm


(ix) thick phenol Bonded BWP ply (Anchor Kit
ply, Nova teak , or National or any other
ISI approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

Chapter-17 Page 218 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(i) 40 mm thick
sqm 700.00 4077.00 770.00 4147.00

(ii) 35 mm thick
sqm 696.00 3748.00 766.00 3818.00

(iii) 30 mm thick
sqm 691.00 3413.00 760.00 3482.00

17.10 Red meranti Normal (15 to 16 kg per cft.


(x) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2542.00 770.00 2612.00

(ii) 35 mm thick
sqm 696.00 2405.00 766.00 2475.00

(iii) 30 mm thick
sqm 691.00 2265.00 760.00 2334.00

17.10 Red meranti Super (18 to 19 kg per cft.


(xi) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2624.00 770.00 2694.00

(ii) 35 mm thick
sqm 696.00 2477.00 766.00 2547.00

(iii) 30 mm thick
sqm 691.00 2326.00 760.00 2395.00

Chapter-17 Page 219 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.10 Red meranti Sinker (20 to 21 kg per cft.
(xii) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2747.00 770.00 2817.00

(ii) 35 mm thick
sqm 696.00 2584.00 766.00 2654.00

(iii) 30 mm thick
sqm 691.00 2418.00 760.00 2487.00

17.10 Yellow meranti Normal (15 to 16 kg per


(xiii) cft. Approx.) doors shutter with 12mm
thick phenol Bonded BWP ply (Anchor Kit
ply, Nova teak , or National or any other
ISI approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

(a) Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2501.00 770.00 2571.00

(ii) 35 mm thick
sqm 696.00 2369.00 766.00 2439.00

(iii) 30 mm thick
sqm 691.00 2234.00 760.00 2303.00

17.10 Yellow meranti Super (18 to 19 kg per cft.


(xiv) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

Chapter-17 Page 220 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(i) 40 mm thick
sqm 700.00 2583.00 770.00 2653.00

(ii) 35 mm thick
sqm 696.00 2441.00 766.00 2511.00

(iii) 30 mm thick
sqm 691.00 2295.00 760.00 2364.00

17.10 yellow meranti Sinker (20 to 21 kg per cft.


(xv) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2706.00 770.00 2776.00

(ii) 35 mm thick
sqm 696.00 2548.00 766.00 2618.00

(iii) 30 mm thick
sqm 691.00 2387.00 760.00 2456.00

17.10 Imported Teak Wood (20 to 21 kg per cft.


(xvi) Approx.) doors shutter with 12mm thick
phenol Bonded BWP ply (Anchor Kit ply,
Nova teak , or National or any other ISI
approved quality) I/C hinges, screws,
chocks & cords etc. Complete fixed in
position (Single leaf)

a Phenol Bonded Ply Panel

(i) 40 mm thick
sqm 700.00 2911.00 770.00 2981.00

(ii) 35 mm thick
sqm 696.00 2728.00 766.00 2798.00

(iii) 30 mm thick
sqm 691.00 2541.00 760.00 2610.00

Chapter-17 Page 221 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.10 Hollock wood doors shutter windows
(xvii) shutter including hinges, screws, chocks,
cheats, stops cords etc. complete fixed in
position.

a panelled, glazed or glazed and


panelled.

i 40 mm thick
sqm 717.00 2907.00 789.00 2979.00

ii 35 mm thick
sqm 712.00 2538.00 783.00 2609.00

iii 30 mm thick
sqm 706.00 2338.00 777.00 2409.00

b Battened and Framed single leaf

i 50 mm thick
sqm 399.00 3648.00 439.00 3688.00

ii 45 mm thick
sqm 394.00 3459.00 433.00 3498.00

C Battened and braced shutter


50mm thick complete sqm 831.00 3903.00 914.00 3986.00

17.10 Kiln seasoned Hollock wood doors shutter


(xviii) with 12mm thick phenol Bonded BWP ply
ISI Marked anchor, Kit ply, Nova Teak,
National Or equivalent including Hinges,
Screws, Shocks Cleats, Stops and Cords
etc. complete fixed in position (Single
Leaf).

a Phenol Bonded B.W.P. ply panel

(i) 40 mm thick
sqm 700.00 2858.00 770.00 2928.00

ii 35mm thick
sqm 696.00 2683.00 766.00 2753.00

iii) 30 mm thick
sqm 691.00 2501.00 760.00 2570.00

Chapter-17 Page 222 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.10 Golden Champ, wood, doors, shutter,
(xix) windows, shutter including hinges, screws,
chocks, cheats, stops, cords etc. complete
fixed in position.

a panelled, glazed or glazed and


panelled.

i 40 mm thick
sqm 717.00 2482.00 789.00 2554.00

ii 35 mm thick
sqm 712.00 2158.00 783.00 2229.00

iii 30 mm thick
sqm 706.00 1999.00 777.00 2070.00

b Battened and framed

i 50mm thick
sqm 399.00 2966.00 439.00 3006.00

ii 45mm thick
sqm 394.00 2820.00 433.00 2859.00

C Battened and braced shutter


50mm thick complete. sqm 831.00 3251.00 914.00 3334.00

17.10 Golden Champ wood doors shutter with


(xx) 12mm thick phenol Bonded BWP ply ISI
Marked anchor, Kit ply, Nova Teak,
National Or equivalent including Hinges,
Screws, Shocks Cleats, Stops and Cords
etc. complete fixed in position (Single
Leaf)

a Phenol Bonded BWP Ply Panel

i 40 mm thick
sqm 700.00 2571.00 770.00 2641.00

ii 35mm thick
sqm 696.00 2432.00 766.00 2502.00

iii 30mm thick


sqm 691.00 2288.00 760.00 2357.00

Chapter-17 Page 223 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.10 Cheetah Champ (Assam) wood doors
(xxi) shutter windows shutter including hinges,
screws, chocks, cheats, stops cords etc.
complete fixed in position.

a panelled, glazed or glazed and


panelled.

i 40 mm thick
sqm 717.00 4041.00 789.00 4113.00

II 35 mm thick
sqm 712.00 3564.00 783.00 3635.00

III 30 mm thick
sqm 706.00 3252.00 777.00 3323.00

Bi Battened and framed

i 50 mm thick
sqm 399.00 5454.00 439.00 5494.00

II 45mm thick
sqm 394.00 5181.00 433.00 5220.00

C Battened and braced shutter


50mm thick complete. sqm 831.00 5584.00 914.00 5667.00

17.10 Cheetah Champ (Assam) wood doors


(xxii) shutter with 12mm thick phenol Bonded
BWP ply ISI Marked anchor, Kit ply, Nova
Teak, National Or equivalent including
Hinges, Screws, Shocks Cleats, Stops
and Cords etc. complete fixed in position
(Single Leaf)

a Phenol Bonded BWP Ply Panel

i 40 mm thick sqm 700.00 3670.00 770.00 3740.00

ii 35mm thick sqm 696.00 3393.00 766.00 3463.00

iii 30 mm thick sqm 691.00 3109.00 760.00 3178.00

17.10 Bansam Champ (Assam) wood doors


(xxiii) shutter windows shutter including hinges,
screws, chocks, cheats, stops cords etc.
complete fixed in position.

Chapter-17 Page 224 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

a panelled, glazed or glazed and


panelled.

i 40 mm thick
sqm 717.00 2482.00 789.00 2554.00

II 35 mm thick
sqm 712.00 2158.00 783.00 2229.00

III 30 mm thick
sqm 706.00 1999.00 777.00 2070.00

B Battened and framed

i 50 mm thick
sqm 399.00 2966.00 439.00 3006.00

ii 45mm thick sqm 394.00 2820.00 433.00 2859.00

C Battened and braced shutter


50mm thick complete. sqm 831.00 3249.00 914.00 3332.00

17.10 Bansam Champ (Assam) doors with


(xxiv) 12mm thick phenol Bonded BWP ply ISI
Marked anchor, Kit ply, Nova Teak,
National Or equivalent including Hinges,
Screws, Shocks Cleats, Stops and Cords
etc. complete fixed in position (Single
Leaf)

a Phenol Bonded BWP Ply Panel

(i) 40 mm thick
sqm 700.00 2574.00 770.00 2644.00

ii 35mm thick
sqm 696.00 2432.00 766.00 2502.00

iii 30 mm thick
sqm 691.00 2288.00 760.00 2357.00

17.11 Wire gauze deodar wood door shutter


(i) without springs housed in chowkats
(Single Leaf)

i 35 mm thick sqm 493.00 3583.00 542.00 3632.00

ii 30mm thick taking size of door sqm 487.00 3181.00 536.00 3230.00

Chapter-17 Page 225 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.11 Wire gauge Hollock wood door shutter
(ii) without springs housed in chowkhat.

A 35 mm thick sqm 487.00 2004.00 536.00 2053.00

B 30 mm thick sqm 482.00 1843.00 530.00 1891.00

17.11 Wire Gauge Golden Champ wood door


(iii) shutter without springs housed in
chowkhat.

A 35 mm thick sqm 487.00 1747.00 536.00 1796.00

B 30 mm thick sqm 482.00 1603.00 530.00 1651.00

17.11 Wire Gauge Cheetah Champ (Assam)


(iv) wood door shutter without springs housed
in chowkats.

A 35 mm thick sqm 487.00 2774.00 536.00 2823.00

B 30 mm thick sqm 482.00 2491.00 530.00 2539.00

17.11 Wire Gauge Bansam Champ (Assam)


(v) wood door shutter without springs housed
in chowkats.

A 35 mm thick sqm 487.00 1747.00 536.00 1796.00

B 30 mm thick sqm 482.00 1603.00 530.00 1651.00

17.11 Wire Gauge Red meranti wood Normal


(vi) (15 to 16 kg per cft. Approx.) door shutter
without springs housed in chowkats.

(A) 35 mm thick sqm 487.00 1718.00 536.00 1767.00

(B) 30 mm thick sqm 482.00 1578.00 530.00 1626.00

17.11 Wire Gauge Red meranti wood Super (18


(vii) to 19 kg per cft. Approx.) door shutter
without springs housed in chowkats.

Chapter-17 Page 226 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(A) 35 mm thick sqm 487.00 1795.00 536.00 1844.00

(B) 30 mm thick sqm 482.00 1644.00 530.00 1692.00

17.11 Wire Gauge Red meranti wood Sinker


(viii) (20 to 21 kg per cft. Approx.) door shutter
without springs housed in chowkats.

(A) 35 mm thick sqm 487.00 1910.00 536.00 1959.00

(B) 30 mm thick sqm 482.00 1744.00 530.00 1792.00

17.11 Wire Gauge Yellow meranti wood Normal


(ix) (15 to 16 kg per cft. Approx.) door shutter
without springs housed in chowkats.

(A) 35 mm thick sqm 487.00 1680.00 536.00 1729.00

(B) 30 mm thick sqm 482.00 1545.00 530.00 1593.00

17.11 Wire Gauge Yellow meranti wood Super


(x) (18 to 19 kg per cft. Approx.) door shutter
without springs housed in chowkats.

(A) 35 mm thick sqm 487.00 1756.00 536.00 1805.00

(B) 30 mm thick sqm 482.00 1611.00 530.00 1659.00

17.11 Wire Gauge Yellow meranti wood Sinker


(xi) (20 to 21 kg per cft. Approx.) door shutter
without springs housed in chowkats.

(A) 35 mm thick sqm 487.00 1871.00 536.00 1920.00

(B) 30 mm thick sqm 482.00 1710.00 530.00 1758.00

17.11 Wire Gauge Imported teak wood door


(xii) shutter without springs housed in
chowkats.

(A) 35 mm thick sqm 487.00 2063.00 536.00 2112.00

Chapter-17 Page 227 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(B) 30 mm thick sqm 482.00 1876.00 530.00 1924.00

Note :- The unit measurement of the item no


17.11 is area of clear shutter opening. In
case wire gauge shutter is fixed with
additional molding on existing chowkhats,
payment will be made on overall
measurement of masonry opening

17.12 (i) Deodar wood cup board shutter with


plywood panels or faced on both side fixed
in position (excluding the cost of handles
bolts hasp with staple but including the
labour for fixing them

(a) 30mm thick sqm 713.00 3064.00 784.00 3135.00

(b) 25mm thick sqm 713.00 2809.00 784.00 2880.00

17.12 (ii) Hollock wood cup board shutter with


plywood panels or faced on both side fixed
in position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2272.00 779.00 2343.00

b) 25 mm thick sqm 708.00 2272.00 779.00 2343.00

17.12 Golden Champ cup board shutter with


(iii) plywood panels or faced on both side fixed
in position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2115.00 779.00 2186.00

b) 25 mm thick sqm 706.00 1992.00 777.00 2063.00

17.12 Cheetah Champ (Assam) cup board


(iv) shutter with plywood panels or faced on
both side fixed in position (excluding the
cost of handles, bolts hasp with staple but
including the labour for fixing them)

Chapter-17 Page 228 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
a) 30 mm thick sqm 708.00 2698.00 779.00 2769.00

b) 25 mm thick sqm 706.00 2517.00 777.00 2588.00

17.12 Bansam Champ (Assam) cup board


(v) shutter with plywood panels or faced on
both side fixed in position (excluding the
cost of handles, bolts hasp with staple but
including the labour for fixing them)

a) 30 mm thick sqm 708.00 2115.00 779.00 2186.00

b) 25 mm thick sqm 706.00 1992.00 777.00 2063.00

17.12 Red meranti Normal (15 to 16 kg per cft.


(vi) Approx.) cup board shutter with plywood
panels or faced on both side fixed in
position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2098.00 779.00 2169.00

b) 25 mm thick sqm 706.00 1977.00 777.00 2048.00

17.12 Red meranti Super (18 to 19 kg per cft.


(vii) Approx.) cup board shutter with plywood
panels or faced on both side fixed in
position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2141.00 779.00 2212.00

b) 25 mm thick sqm 706.00 2016.00 777.00 2087.00

17.12 Red meranti Sinker (20 to 21 kg per cft.


(viii) Approx.) cup board shutter with plywood
panels or faced on both side fixed in
position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2207.00 779.00 2278.00

b) 25 mm thick sqm 706.00 2075.00 777.00 2146.00

Chapter-17 Page 229 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.12 Yellow meranti Normal (15 to 16 kg per


(ix) cft. Approx.) cup board shutter with
plywood panels or faced on both side fixed
in position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2076.00 779.00 2147.00

b) 25 mm thick sqm 706.00 1957.00 777.00 2028.00

17.12 Yellow meranti Super (18 to 19 kg per cft.


(x) Approx.) cup board shutter with plywood
panels or faced on both side fixed in
position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2120.00 779.00 2191.00

b) 25 mm thick sqm 706.00 1997.00 777.00 2068.00

17.12 Yellow meranti Sinker (20 to 21 kg per cft.


(xi) Approx.) cup board shutter with plywood
panels or faced on both side fixed in
position (excluding the cost of handles,
bolts hasp with staple but including the
labour for fixing them)

a) 30 mm thick sqm 708.00 2185.00 779.00 2256.00

b) 25 mm thick sqm 706.00 2055.00 777.00 2126.00

17.12 Imported Teak Wood cup board shutter


(xii) with plywood panels or faced on both side
fixed in position (excluding the cost of
handles, bolts hasp with staple but
including the labour for fixing them)

a) 30 mm thick sqm 708.00 2294.00 779.00 2365.00

b) 25 mm thick sqm 706.00 2153.00 777.00 2224.00

17.13 (i) Wire gauze fixed on chowkats with 25mm


deodar wood cover molding of full width sqm 162.00 1350.00 178.00 1366.00

Chapter-17 Page 230 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.13 (ii) Wire gauge fixed on chowkats with 25mm


thick sqm 162.00 979.00 178.00 995.00
Hollock wood cover molding of full width.

17.13 Wire gauge fixed on chowkats with 25mm


(iii) thick Golden Champ wood cover molding
sqm 162.00 869.00 178.00 885.00
of full width.

17.13 Wire gauge fixed on chowkats with 25mm


(iv) thick Cheetah Champ (Assam) wood sqm 162.00 1277.00 178.00 1293.00
cover molding of full width.

17.13 Wire gauge fixed on chowkats with 25mm


(v) thick Bansam Champ (Assam) wood sqm 162.00 869.00 178.00 885.00
cover molding of full width.

17.13 Wire gauge fixed on chowkats with 25mm


(vi) thick Red meranti Normal (15 to 16 kg per
cft. Approx.) wood cover molding of full sqm 162.00 857.00 178.00 873.00
width.

17.13 Wire gauge fixed on chowkats with 25mm


(vii) thick Red meranti Super (18 to 19 kg per
cft. Approx.) wood cover molding of full sqm 162.00 887.00 178.00 903.00
width.

17.13 Wire gauge fixed on chowkats with 25mm


(viii) thick Red meranti Sinker (20 to 21 kg per
cft. Approx.) wood cover molding of full sqm 162.00 933.00 178.00 949.00
width.

17.13 Wire gauge fixed on chowkats with 25mm


(ix) thick Yellow meranti Normal (15 to 16 kg
per cft. Approx.) wood cover molding of sqm 162.00 842.00 178.00 858.00
full width.

17.13 Wire gauge fixed on chowkats with 25mm


(x) thick yelow meranti super (18 to 19 kg per
cft. Approx.) wood cover molding of full sqm 162.00 872.00 178.00 888.00
width.

17.13 Wire gauge fixed on chowkats with 25mm


(xi) thick yellow meranti sinker (20 to 21 kg
per cft. Approx.) wood cover molding of sqm 162.00 918.00 178.00 934.00
full width.

Chapter-17 Page 231 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.13 Wire gauge fixed on chowkats with 25mm


(xii) thick Imp. Teak Wood wood cover sqm 162.00 994.00 178.00 1010.00
molding of full width.

17.14 Expanded metal fixed on chowkats with


(i) 25mm deodar wood cover molding of full sqm 162.00 1402.00 178.00 1418.00
width

17.14 Expanded metal fixed on chowkats with


(ii) 25mm Hollock wood cover molding of full sqm 162.00 1031.00 178.00 1047.00
width

17.14 Expanded metal fixed on chowkats with


(iii) 25mm Red meranti Normal (15 to 16 kg
per cft. Approx.) cover molding of full sqm 162.00 909.00 178.00 925.00
width

17.14 Expanded metal fixed on chowkats with


(iv) 25mm Red meranti Super(18 to 19 kg per
cft. Approx.) cover molding of full width sqm 162.00 939.00 178.00 955.00

17.14 Expanded metal fixed on chowkats with


(v) 25mm Red meranti Sinker (20 to 21 kg
per cft. Approx.) cover molding of full sqm 162.00 985.00 178.00 1001.00
width

17.14 Expanded metal fixed on chowkats with


(vi) 25mm yellow meranti Normal (15 to 16 kg
per cft. Approx.) cover molding of full sqm 162.00 893.00 178.00 909.00
width

17.14 Expanded metal fixed on chowkats with


(vii) 25mm Yellow meranti Super(18 to 19 kg
per cft. Approx.) cover molding of full sqm 162.00 924.00 178.00 940.00
width

17.14 Expanded metal fixed on chowkats with


(viii) 25mm Yellow meranti Sinker (20 to 21 kg
per cft. Approx.) cover molding of full sqm 162.00 970.00 178.00 986.00
width

17.14 Expanded metal fixed on chowkats Imp.


(ix) Teak Wood with 25mm cover molding of sqm 162.00 1046.00 178.00 1062.00
full width

Chapter-17 Page 232 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.15 Deodar wood chowkats including iron hold


(i) fasts iron hinges corner straps clears,
stops wooden knobs fixed in position.

A Double Rebate (60mm x 150mm) Mtr 238.00 1895.00 262.00 1919.00

B Single Rebate (60mm x 100mm) Mtr 229.00 1358.00 252.00 1381.00

17.15 Chowkats of commercial hard wood such


(ii) as Hollock confirming to ISI specification
no 1003 m kiln seasoned of doors and
windows including iron hold fasts, corner
straps cleats, stops, bolts for hold fasts
etc, complete fixed in position (Section
60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


x 150mm) Mtr 233.00 1140.00 256.00 1163.00

B Single Rebate (60mm x 100mm) Mtr 225.00 846.00 248.00 869.00

17.15 Chowkats of commercial hard wood such


(iii) as Golden Champ confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


x 150mm) Mtr 236.00 957.00 260.00 981.00

B Single Rebate (60mm x 100mm)


Mtr 225.00 721.00 248.00 744.00

17.15 Chowkats of commercial hard wood such


(iv) as Cheetah Champ (Assam) confirming to
ISI specification no 1003 m kiln seasoned
of doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


x 150mm) Mtr 233.00 1640.00 256.00 1663.00

B Single Rebate (60mm x 100mm)


Mtr 225.00 1181.00 248.00 1204.00

Chapter-17 Page 233 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.15 Chowkats of commercial hard wood such


(v) as Bansam Champ (Assam) confirming to
ISI specification no 1003 m kiln seasoned
of doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


x 150mm) Mtr 233.00 955.00 256.00 978.00

B Single Rebate (60mm x 100mm)


Mtr 225.00 721.00 248.00 744.00

17.15 Chowkats of Red meranti Normal (15 to


(vi) 16 kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


Mtr 233.00 935.00 256.00 958.00
x 150mm)

B Single Rebate (60mm x 100mm) Mtr 225.00 708.00 248.00 731.00

17.15 Chowkats of Red meranti Super (18 to 19


(vii) kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)
A Double Rebate (60mm x 150mm) (60mm
x 150mm) Mtr 233.00 986.00 256.00 1009.00

B Single Rebate (60mm x 100mm)


Mtr 225.00 742.00 248.00 765.00

17.15 Chowkats of Red meranti Sinker (20 to 21


(viii) kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)
A Double Rebate (60mm x 150mm) (60mm
Mtr 233.00 1063.00 256.00 1086.00
x 150mm)

Chapter-17 Page 234 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
B Single Rebate (60mm x 100mm) Mtr 225.00 794.00 248.00 817.00

17.15 Chowkats of Yellow meranti Normal (15 to


(ix) 16 kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


Mtr 233.00 910.00 256.00 933.00
x 150mm)

B Single Rebate (60mm x 100mm) Mtr 225.00 691.00 248.00 714.00

17.15 Chowkats of Yellow meranti Super (18 to


(x) 19 kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


Mtr 233.00 961.00 256.00 984.00
x 150mm)

B Single Rebate (60mm x 100mm) Mtr 225.00 725.00 248.00 748.00

17.15 Chowkats of Yellow meranti Sinker (20 to


(xi) 21 kg per cft. Approx.) confirming to ISI
specification no 1003 m kiln seasoned of
doors and windows including iron hold
fasts, corner straps cleats, stops bolts for
hold fasts etc, complete fixed in position
(Section 60mm x 150mm)

A Double Rebate (60mm x 150mm) (60mm


Mtr 233.00 1038.00 256.00 1061.00
x 150mm)

B Single Rebate (60mm x 100mm) Mtr 225.00 777.00 248.00 800.00

17.15 Chowkats of Imp. Teak Wood


(xii) confirming to ISI specification no 1003 m
kiln seasoned of doors and windows
including iron hold fasts, corner straps
cleats, stops bolts for hold fasts etc,
complete fixed in position (Section 60mm
x 150mm)
A Double Rebate (60mm x 150mm) (60mm
Mtr 233.00 1166.00 256.00 1189.00
x 150mm)

Chapter-17 Page 235 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
B Single Rebate (60mm x 100mm)
Mtr 225.00 863.00 248.00 886.00

17.15 Sail wood chowkats including iron hold


(xiii) fasts iron hinges corner straps clears,
stops wooden knobs fixed in position.

A Double Rebate (60mm x 150mm)


Mtr 238.00 1267.00 262.00 1291.00

B Single Rebate (60mm x 100mm)


Mtr 229.00 935.00 252.00 958.00

17.15 Kapoor Sail wood chowkats including iron


(xiv) hold fasts iron hinges corner straps clears,
stops wooden knobs fixed in position.

A Double Rebate (60mm x 150mm)


Mtr 238.00 1138.00 262.00 1162.00

B Single Rebate (60mm x 100mm)


Mtr 229.00 848.00 252.00 871.00

17.16 Deodar wood cup board chowkats


(i) including iron hold facts, iron hinge,
corner, straps, wooden knobs or handles Mtr 188.00 730.00 207.00 749.00
fixed in position (Size 45 x 60mm)

17.16 Kiln seasonal Hollock wood cup board


(ii) chowkats including iron hold fasts, iron
hinges corner straps, wooden knobs or Mtr 187.00 457.00 206.00 476.00
handles fixed in position (Size 45 x
60mm).

17.16 Golden Champ wood cup board chowkats


(iii) including iron hold fasts, iron hinges
corner straps, wooden knobs or handles Mtr 187.00 407.00 206.00 426.00
fixed in position (Size 45 x 60mm).

17.16 Cheetah Champ (Assam) wood cup board


(iv) chowkats including iron hold fasts, iron
hinges corner straps, wooden knobs or Mtr 187.00 589.00 206.00 608.00
handles fixed in position (Size 45 x
60mm).

Chapter-17 Page 236 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.16 Bansam Champ (Assam) wood cup board
(v) chowkats including iron hold fasts, iron
hinges corner straps, wooden knobs or
Mtr 187.00 407.00 206.00 426.00
handles fixed in position (Size 45 x
60mm).

17.16 Red meranti Normal (15 to 16 kg per cft.


(vi) Approx.) wood cup board chowkats
including iron hold fasts, iron hinges
Mtr 185.00 400.00 204.00 419.00
corner straps, wooden knobs or handles
fixed in position (Size 45 x 60mm).

17.16 Red meranti Super (18 to 19 kg per cft.


(vii) Approx.) wood cup board chowkats
including iron hold fasts, iron hinges Mtr 187.00 416.00 206.00 435.00
corner straps, wooden knobs or handles
fixed in position (Size 45 x 60mm).

17.16 Red meranti Sinker (20 to 21 kg per cft.


(viii) Approx.) wood cup board chowkats
including iron hold fasts, iron hinges
corner straps, wooden knobs or handles Mtr 187.00 436.00 206.00 455.00
fixed in position (Size 45 x 60mm).

17.16 Yellow meranti Normal (15 to 16 kg per


(ix) cft. Approx.) wood cup board chowkats
including iron hold fasts, iron hinges
corner straps, wooden knobs or handles Mtr 187.00 396.00 206.00 415.00
fixed in position (Size 45 x 60mm).

17.16 Yellow meranti Super (18 to 19 kg per cft.


(x) Approx.) wood cup board chowkats
including iron hold fasts, iron hinges
Mtr 187.00 409.00 206.00 428.00
corner straps, wooden knobs or handles
fixed in position (Size 45 x 60mm).

17.16 Yellow meranti Sinker (20 to 21 kg per cft.


(xi) Approx.) wood cup board chowkats
including iron hold fasts, iron hinges
corner straps, wooden knobs or handles Mtr 187.00 429.00 206.00 448.00
fixed in position (Size 45 x 60mm).

Chapter-17 Page 237 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.16 Imp teak wood cup board chowkats
(xii) including iron hold fasts, iron hinges
corner straps, wooden knobs or handles Mtr 187.00 463.00 206.00 482.00
fixed in position (Size 45 x 60mm).

17.17 Kail wood doors shutter and window


(i) shutter panelled, glazed or glazed and
panelled including hinges screws chokes
cleats and cords etc. complete Fixed in
position (Single Leaf)

(a) 40mm thick sqm 727.00 3878.00 800.00 3951.00

(b) 35mm thick sqm 727.00 3581.00 800.00 3654.00

17.17 Wire gauze door shutter with Kail wood


(ii) without springs housed in chowkats
(Single Leaf)

(a) 35mm thick sqm 727.00 3052.00 800.00 3125.00

(b) 30 mm thick sqm 482.00 2301.00 530.00 2349.00

17.18 Teak wood doors shutter and windows


panelled glazed or panelled including Iron
hinger, screws etc. complete fixed in
position (excluding cost of tower bolts and
handles but including labour for fittings the
same) (Single Leaf)

(a) 35mm thick sqm 842.00 4374.00 926.00 4458.00

(b) 30mm thick sqm 838.00 3923.00 922.00 4007.00

(c) 25 mm thick sqm 832.00 3527.00 915.00 3610.00

17.19 Teak wood wire gauge shutters without


spring (Single Leaf)

(a) 35mm thick (Single Leaf) sqm 733.00 4307.00 806.00 4380.00

(b) 30mm thick sqm 718.00 3325.00 790.00 3397.00

Chapter-17 Page 238 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(c) 25mm thick (Single Leaf) sqm 713.00 2950.00 784.00 3021.00

17.20 Fixing wire gauze out side the clerestory


window including teak wood chowkats and sqm 409.00 3772.00 450.00 3813.00
cover molding

17.21 Teak wood chowkats including iron hold


fasts, corner straps, iron hinges, cleats,
stops, wooden knobs or handles fixed in
position.

A Single Rebate (60mm x 100mm) mtr 260.00 1406.00 286.00 1432.00

B Double Rebate (60mm x 150mm) mtr 266.00 1966.00 293.00 1993.00

17.22 Fixing mortise or rim locks or latches


(i) complete (Labour Only) nos 138.00 ----- 152.00 -----

17.22 Providing and fixing bright finished brass


(ii) door latch with necessary screws etc. no 138.00 1119.00 152.00 1133.00
complete : 300x16x5 mm

17.22 Providing and fixing bright finished brass


(iii) door latch with necessary screws etc.
no 138.00 959.00 152.00 973.00
complete : 250x16x5 mm

17.22 Providing and fixing bright finished brass


(iv) 100 mm mortise latch and lock with 6
levers and a pair of lever handles with no 105.00 1734.00 116.00 1745.00
necessary screws etc. complete (best
make of approved quality).

17.22 Providing and fixing Brass 100mm mortice


(v) latch and lock with 6 levers without pair of
handles (best make of approved quality) No. 105.00 343.00 116.00 354.00
for aluminum doors including necessary
cutting and making good etc. complete.

17.23 Cost of aluminum fittings complete for


doors, windows such as tower bolts,
handles,Stoppers and screw etc. for these
fittings (Excluding sliding bolt)

(i) For shutter area up to 0.50 sqm sqm ----- 248.00 ----- 248.00

(ii) For shutter area above 0.50 sqm sqm ----- 111.00 ----- 111.00

Chapter-17 Page 239 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.24 Curtain rod 25mm dia aluminum pipe with
brackets fixed in position including nails mtr 125.00 205.00 138.00 218.00
and screws etc. (Deodar Wood)

17.25 Curtain rod 25mm dia aluminum pipe with


brackets fixed in position including nails mtr 166.00 245.00 183.00 262.00
and screws etc. (Teak Wood)

17.26 Providing & Fixing glass panes with nails


and putty or wooden strip complete in all
respect
(a) Glazing area upto 0.09 sqm

(i) 2mm thick or 5.18 Kg/sqm nos 9.00 32.00 10.00 33.00

(b) Glazing area above 0.09 sqm

(i) 3mm thick or 8.44 Kg/ sqm sqm 110.00 582.00 121.00 593.00

(ii) 4mm thick or 10.78 Kg/ sqm sqm 110.00 668.00 121.00 679.00

(iii) 5.0mm thick Plate glass (INDIAN) sqm 132.00 772.00 145.00 785.00

(iv) 8.0mm thick Plate glass(weight not less


than 20 kg/ sqm) sqm 249.00 1058.00 274.00 1083.00

17.27 Factory manufactured flush door fixed in


position iron hinges, etc (excluding the
cost of any fittings other than specified
above but including labour for fixing the
same in position
(Code : II Revision IS-2191 Part-I) 1973

(a) Commercial with elm or gurjan


facing on both \ Sides with
laminated core and lipped edges:-

(i) 20mm thick


sqm 273.00 1773.00 300.00 1800.00

(ii) 25mm thick


sqm 273.00 1951.00 300.00 1978.00

(iii) 30mm thick


sqm 273.00 2196.00 300.00 2223.00

(iv) 35mm thick


sqm 273.00 2307.00 300.00 2334.00

Chapter-17 Page 240 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(b) Decorative with elm or gurjan
facing on one side and teak facing
on the other side edges lipped
with teak with laminated core

(i) 20mm thick


sqm 273.00 2001.00 300.00 2028.00

(ii) 25mm thick


sqm 273.00 2043.00 300.00 2070.00

(iii) 30mm thick


sqm 273.00 2196.00 300.00 2223.00

(iv) 35mm thick


sqm 273.00 2307.00 300.00 2334.00

(c) Decorative with teak facing on


both sides edges lipped with teak
with laminated core

(i) 20mm thick sqm 273.00 2735.00 300.00 2762.00

(ii) 25mm thick sqm 273.00 3020.00 300.00 3047.00

(iii) 30mm thick sqm 273.00 3163.00 300.00 3190.00

(iv) 35mm thick sqm 273.00 3305.00 300.00 3332.00

17.28 Providing and fixing PVC Plug 38mm long


including cutting bricks work and fixing in
cement mortar 1:3 no 3.00 4.00 3.00 4.00

17.29 Providing and fixing deodar wood plain


lining tongued and grooved including PVC
Plug plugs placed at 45cm to 60 cm
centers complete with necessary screws
(frame work shall be payable extra)

(a) 20mm thick sqm 199.00 3407.00 219.00 3427.00

(b) 12mm thick sqm 178.00 2105.00 196.00 2123.00

Chapter-17 Page 241 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.30 Providing and fixing Kail wood plain lining
tongued and grooved including PVC Plug
placed at 45cm to 60cm centers complete
with necessary screws (Frame work will
be payable extra)

(a) 20mm thick sqm 199.00 2505.00 219.00 2525.00

(b) 12mm thick sqm 178.00 1563.00 196.00 1581.00

17.31 Providing and fixing teak wood plain lining


tongued and grooved including PVC Plug
placed at 45cm to 60cm centres complete
with necessary screws frame work shall
be payable extra.

(a) 40mm thick sqm 245.00 6906.00 270.00 6931.00

(b) 25mm thick sqm 193.00 3664.00 212.00 3683.00

(c) 20mm thick sqm 199.00 3532.00 219.00 3552.00

(d) 12mm thick sqm 178.00 2179.00 196.00 2197.00

17.32 Providing and fixing ply wood, plain lining,


butt jointed including PVC Plug placed at
45 cm to 65 cm centers complete with
necessary nails (Frame work shall be
payable extra)

(a) 4mm thick 3 ply decorative ply


wood with teak faced on one side sqm 99.00 640.00 109.00 650.00

(b) 6mm thick decorative ply wood


teak faced on one side. sqm 99.00 937.00 109.00 947.00

(c) 9mm thick decorative wood with


teak faced on one side sqm 99.00 1255.00 109.00 1265.00

(d) 12mm thick decorative wood with


teak faced on one side sqm 99.00 1334.00 109.00 1344.00

(e) 4mm thick 3 ply commercial ply


sqm 99.00 524.00 109.00 534.00
wood

Chapter-17 Page 242 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

(f) 9mm thick commercial ply wood


sqm 99.00 819.00 109.00 829.00

(g) 12mm thick commercial ply wood


sqm 99.00 1011.00 109.00 1021.00

17.33 Providing and fixing deodar wood beading


in door and window chowkats with iron
screws, fixing position, complete as per mtr 35.00 142.00 39.00 146.00
design and shape required (50mm x
12mm)

17.34 Providing and fixing beading to door and


windows chowkats of commercial hard
wood, such as Hollock, Champ, Chirassy
Chaplash etc (Non coniferous timber other
than teak conforming to ISI specification
no 100., kiln seasoned) with iron screws,
fixed in position complete as per design
and shape required

(a) 50mmx12mm mtr 32.00 91.00 35.00 94.00

(b) 40mm x 12mm mtr 31.00 80.00 34.00 83.00

17.35 Providing and fixing teak wood beading to


door windows chowkats with iron screws
fixed in position complete as per design
and shape required

(a) 50mmx12mm mtr 40.00 143.00 44.00 147.00

(b) 40mmx12mm mtr 44.00 127.00 48.00 131.00

17.36 Providing and fixing 12mm thick 100mm


wide pelmets with 25mm dia meter
aluminum rod and bracket and including
fixing with 25mmx 3mm M.S. flat 3cm long
and PVC Plug Etc. complete

(a) Deodar wood mtr 84.00 708.00 92.00 716.00

(b) Kail wood mtr 84.00 578.00 92.00 586.00

(c) Commercial hard wood such as


Hollock, Champ, Chikrassy and mtr 83.00 465.00 91.00 473.00
Chaplashek

Chapter-17 Page 243 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

(d) Teak wood mtr 82.00 680.00 90.00 688.00

17.37 Providing and fixing 12mm thick 150mm


wide pelmets with 25mm dia aluminum
rod and brackets including fixing with
25mmx3mm MS Flat 10cm long and PVC
Plug etc complete

(a) Deodar wood mtr 115.00 898.00 127.00 910.00

(b) Kail wood mtr 115.00 687.00 127.00 699.00

(c) Commercial & hard wood such as


Hollock etc. 25mm dia aluminum
rod and brackets including (Non
coniferous timber other than teak
mtr 115.00 555.00 127.00 567.00
conforming to ISI Specification
No. 1003 mkiln seasoned

(d) Teak wood mtr 115.00 810.00 127.00 822.00

17.38 Extra for providing and fixing aluminum


curtain rail with rollers, stop ends, and
brackets in palments instead of teak wood mtr -- 48.00 -- 48.00
25mm dia and brackets (Actual length of
rail to be measured)

17.39 Providing and fixing 4mm thick hard board


of approved quality in partition including
fixing to frames with screws complete mtr 85.00 597.00 94.00 606.00
(Beading and frame work to be paid
separately

17.40 Providing and fixing decorative ply wood,


4mm thick three ply teak faced on one
side in partition including fixing to frames mtr 109.00 621.00 120.00 632.00
with steel screws complete

17.41 Providing and fixing helical door spring


150mm (superior quality) including
necessary screws, complete

(a) Brass helical spring Each 62.00 218.00 68.00 224.00

(b) Iron Helical spring Each 62.00 190.00 68.00 196.00

Chapter-17 Page 244 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.42 Providing an fixing MS of Double action


spring hinges with necessary screws etc.
complete

(a) 100 mm Each 48.00 235.00 53.00 240.00

(b) 125mm Each 62.00 339.00 68.00 345.00

(c) 150mm Each 62.00 373.00 68.00 379.00

17.43 Providing and fixing hydraulic door closer


ISI mark with necessary screw etc.
complete

(a) ISI designation no I (Size of door


no 14.00 987.00 15.00 988.00
up to 700mm)

(b) I.S.I Designation No. II (size of


no 14.00 1149.00 15.00 1150.00
door 701mm to 850mm)

(c) I.S.I Designation No. III (size of


no 14.00 1310.00 15.00 1311.00
door 851mm to 1000mm)

17.44 Providing and fixing 0.50mm thick


aluminum sheet including cost of
sqm 176.00 496.00 194.00 514.00
necessary fittings i.e. screws, etc.
complete

Chapter-17 Page 245 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.45 Providing and fixing aluminum work for
doors, windows, ventilators and partitions
with extruded built up standard tubular
sections/appropriate z sections and other
sections conforming to Is: 733 and IS :
1285 of Jindal, Hindalco, Mahavir or
equivalent make approved by Engineer in
Charge , fixed with rawl plugs and screws
or with fixing clips, or with expansion hold
fasteners including necessary filling up of
gaps at junctions, at top, bottom and sides
with required PVC Plug/neoprene felt etc.
aluminum sections shall be smooth, rust
free, straight, mitered and jointed
mechanically wherever required including
cleat angle, aluminum snap beading for
glazing/paneling, C.P.brass/stainless steel
screws, all complete as per architectural
drawings and the directions of Engineer-In-
Charge. (Glazing and paneling to be paid
for separately) :

(a) For fixed portion and chawkhats


Kg. 23.00 352.00 25.00 354.00

(b) For shutters of doors, windows &


ventilators including providing and
fixing hinges/pivots and labour for
fixing of fittings wherever required
including the cost of PVC Plug / Kg. 28.00 368.00 31.00 371.00
neoprene gasket required

17.46 Providing and fixing 12mm thick


(i) prelaminated particle board flat pressed
three layer or graded wood particle board
conforming to IS: 12823 Grade l Type ll, in
paneling fixed in aluminum doors,
windows shutters and partition frames with
C.P. brass / stainless steel screws etc. sqm 153.00 956.00 168.00 971.00
complete as per architectural drawings
and directions of Engineer-In-Charge. Pre-
laminated particle board with decorative
lamination on one side.

Chapter-17 Page 246 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.46 Providing and fixing 12mm thick
(ii) prelaminated particle board flat pressed
three layer or graded wood particle board
conforming to IS: 12823 Grade l Type ll, in
paneling fixed in aluminum doors,
windows shutters and partition frames with
C.P. brass / stainless steel screws etc. sqm 146.00 1148.00 161.00 1163.00
complete as per architectural drawings
and directions of Engineer-In-Charge. Pre-
laminated particle board with decorative
lamination on Both side.

17.47 Providing and fixing glazing in aluminum


door, window, ventilator shutters and
partitions etc. with PVC Plug/ neoprene
gasket etc. complete as per the
architectural drawings and the directions
of engineer-in-charge . (Cost of aluminum
snap beading shall be paid in basic item)

(i) Float glass panes of 5 mm thickness


sqm 153.00 1035.00 168.00 1050.00

(ii) Float glass panes of 4mm thickness


sqm 153.00 924.00 168.00 939.00

17.48 Providing and fixing double action


hydraulic floor spring of approved brand
and manufacture IS : 6315 marked, for
doors including cost of cutting floors as
required, embedding in floors and cover
plates with brass pivot and single piece no 177.00 1862.00 195.00 1880.00
MS sheet outer box with slide plate and
with stainless steel cover plate etc.
complete as per the direction of Engineer-
in-charge.

17.49 Providing and fixing aluminum sliding door


bolts ISI marked anodized (anodic coating
not less than grade AC 10 as per IS :
1868) transparent or dyed to required
colour or shade with nuts and screws etc.
complete :

A 300mm x 16mm no 31.00 199.00 34.00 202.00

Chapter-17 Page 247 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
B 250mm x 16mm no 31.00 183.00 34.00 186.00

17.50 Providing and fixing commercial plywood


12mm thick sqm 140.00 1006.00 154.00 1020.00

17.51 Providing and fixing commercial plywood


18mm thick sqm 140.00 1249.00 154.00 1263.00

17.53 Providing and fixing commercial plywood


25mm thick sqm 151.00 1674.00 166.00 1689.00

17.54 Providing and fixing teak wood plain lining


tongued and grooved on and including
PVC Plug plugs complete with necessary
sqm 215.00 3504.00 237.00 3526.00
screws and priming coat on unexposed
surface 20 mm thick

17.55 Providing and fixing teak wood plain lining


tongued and grooved including PVC plugs
complete with necessary screws and sqm 197.00 2184.00 217.00 2204.00
priming coat on unexposed surface 12
mm thick

17.56 Providing and fixing 12 mm thick, 150 mm


wide pelmet of flat pressed 3 layer or
graded wood particle board medium
density grade-I, IS : 3087 marked
including top cover of 6 mm commercial
ply wood conforming to IS: 303 BWR
grade, nickel plated MS pipe 20 mm dia mtr 133.00 462.00 146.00 475.00
(heavy type) curtain rod with nickel plated
brackets including fixing with 25x3 mm MS
flat 10 cm long and rawl plugs 50 mm long
(designation 10 no) etc all complete

17.57 Providing and fixing 18 mm thick, 150 mm


wide pelmet of coir veneer board ISI
marked IS : 14842 - 2000, including top
cover of 6 mm coir veneer board, nickel
plated MS Pipe 20 mm dia (heavy type)
mtr 124.00 549.00 136.00 561.00
curtain rod with nickel plated brackets
including fixing with 25x3 mm MS Flat 10
cm long and rawl plug 50 mm long
(designation 10 no) etc., all complete

Chapter-17 Page 248 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.58 Providing and fixing oxidized MS Safety
chain with necessary fixtures for doors.
(Weighing not less than 450 gms.) no 6.00 79.00 7.00 80.00

17.59 Providing and fixing of 30mm thick factory


made Polyvinyl Chloride (PVC) door
shutter (without chowkhat) made of styles
and rails of a UPVC Plug profile section of
size 30mm x 60mm and wall thickness
2mm ±0.2mm with inbuilt decorative
molding edging on one side. The styles
and rails with plastic brackets of size
75x220mm meter and welded at the
corners. The- stiles of the shutter
reinforced by inserting galvanized MS tube
of size 25x20mm and 1mm ± 0.1mm wall
thickness. The lock rail made up of ‘H’
section, a UPVC Plug profile section of sqm 174.00 3302.00 191.00 3319.00
size 30mm x 100mm and 2mm±0.2mm
wall thickness welded to the shutter style
with a UPVC Plug profile section single
panel of size not less than 620mm, having
overall thickness of 20 mm and 1 mm±0.1
mm wall thickness with 20 mm panel
beading of suitable size /Glass(4mm thick
plain glass)/louver section, louver frame of
suitable size, as per manufactures
specification and direction of Engineering-
charge. (For WC and bathroom door
Shutter)

Chapter-17 Page 249 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.60 Providing and fixing of 25mm thick PVC
flush door shutters (without chowkhat)
upto 737mm width of colour and shade as
approved by Engineer-in-charge made out
of a one piece Multi chamber extruded
PVC Plug section of the size of 762mm X
25mm or less as per requirement with an
average wall thickness of 1mm ± 0.3mm.
PVC Plug foam end cap of size 23x10mm
are provided on both vertical edges to
ensure the overall thickness of 25mm. An
MS tube having dimensions 19mm x
19mm is inserted along the hinge side of
the door. Core of the door shutter should
be filled with High Density Polyurethane sqm 174.00 3425.00 191.00 3442.00
Code Description Unit Quantity Rate
Amount foam. The Top & Bottom edges of
the shutter are covered with an end-cap of
the size 25mm X 11mm. Door shutter
shall be reinforced with special polymeric
reinforcements as per manufactures’
specification and drawing to take up
necessary hardware and fixtures. Stickers
indicating the locations of hardware will be
pasted at appropriate places

17.61 Providing & fixing teak wood top size


(i) 150mm x 75mm on stair railing including
polishing complete in all respect. rmt 322.00 1939.00 354.00 1971.00

17.61 Providing & fixing imported teak wood top


(ii) size 150mm x 75mm on stair railing
including polishing complete in all respect. rmt 311.00 1248.00 342.00 1279.00

Chapter-17 Page 250 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.62 Providing & fixing 30mm thick Factory
Made solid Panel PVC Door shutter
(Pannel thickness 5mm) Consisting of
frame made out of M.S tubes of 19 guage
thickness and size of 19mm x 19mm for
styles & 15mm x 15mm for top & bottom
rails. M.S frame shall have a coat of steel
primers of approved make & manufacture.
M.S frame shall be covered with 5mm
thick heat moulded PVC 'C' Channel of
size 30 x 50mm forming styles, and 5mm
thick, 75mm wide PVC sheets for top rail,
lock rail & bottom rail on either side, and
10mm (5mm x 2) thick, 20mm wide cross
PVC sheet as gap insert for top rail &
bottom rail. Panneling of 5mm thick PVC sqm 815.00 2831.00 897.00 2913.00
sheet to be fitted in the M.S Frame
welded/Sealed to the styles & Rails with
30mm wide x 5mm thick PVC sheet
beading on either side and joined together
with solvent cement adhesive.an
additional 5mm thick PVC strips of 20mm
width is to be stuck on the interior side of
the 'C' Channel using PVC solvent cement
adhesive etc. complete as per
manufacturer's specification, conforming
to test criteria specified in IS:4020-
1998,Drawings and to the entire
satisfaction of engineer-in-charge.

Chapter-17 Page 251 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.63 Providing & fixing 30mm thick Factory
Made solid Panel PVC Door shutter
(Pannel thickness 10mm) Consisting of
frame made out of M.S tubes of 19 guage
thickness and size of 19mm x 19mm for
stiles & 15mm x 15mm for top & bottom
rails. M.S frame shall have a coat of steel
primers of approved make & manufacture.
M.S frame shall be covered with 5mm
thick heat moulded PVC 'C' Channel of
size 30 x 50mm forming stiles, and 5mm
thick, 75mm wide PVC sheets for top rail,
lock rail & bottom rail on either side, and
10mm (5mm x 2) thick, 20mm wide cross
PVC sheet as gap insert for top rail &
bottom rail. Panneling of 5mm thick PVC sqm 815.00 3617.00 897.00 3699.00
sheet to be fitted in the M.S Frame
welded/Sealed to the stiles & Rails with
30mm wide x 5mm thick PVC sheet
beading on either side and joined together
with solvent cement adhesive.an
additional 5mm thick PVC strips of 20mm
width is to be stuck on the interior side of
the 'C' Channel using PVC solvent cement
adhesive etc. complete as per
manufacturer's specification,conforming to
test criteria specified in IS:4020-1998,
Drawings and to the entire satisfaction of
engineer-in-charge.

17.64 Providing & fixing factory made Solid PVC


Chowkhat Door frame of the size 50mm x
47mm with a wall thickness of 5mm made
out of extruded 5mm PVC foam sheet,
mitre cut at 2 corners & joined with 2Nos
of 150mm long brackets of 15 x 15mm
M.S square tube. the two vertical doors
profiles are to be reinforced with 19 x
19mm M.S square tube of 19 guage, the
door framed shall be fixed to the wall
using 65/100mm long M.S screws through rmt 203.00 476.00 223.00 496.00
the frame by using fasteners. a minimum
of 4 nos of screws to be provided for each
vertical member & minimum 2nos for
horizontal member etc. as per
manufacturer's specification,conforming to
test criteria specified in IS:4020-1998,
Drawings and to the entire satisfaction of
engineer-in-charge.

Chapter-17 Page 252 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.65 Providing & fixing 30mm thick factory


made Hollow PVC Profile PVC Flush door
shutter consisting of panel of of 20mm
thickness,frame made out of M.S. tubes of
size of 19mm x 19mm x19 guage inserted
inside the hollow section of stiles, top and
bottom rails and two 19mm x 19mm MS
tubes inserted horizontally inside the
hollow profile section using 5mm thick
PVC sheet using screws. Hollow PVC
profile shall be lipped with 10mm (5mm x sqm 532.00 3277.00 585.00 3330.00
2) thick x 20mm width on stiles and rails
using solvent cement. the inner panel shall
be laminated with 5mm thick termite proof,
water proof and fire retardant Prelam PVC
sheet using solvent cement on both the
sides of panel etc. complete as per
manufacturer's specification,conforming to
test criteria specified in IS:4020-1998,
Drawings and to the entire satisfaction of
engineer-in-charge.

17.66 Providing & fixing 32mm thick factory


made Internal solid door shutter consisting
of solid core particle board of 24mm
thickness, lipped with 15mm (5mm x 3)
thick x 32mm width on one stiles & top
rails & 10mm (5mm x 2) thick x 32mm
width on the other stiles & Bottom rails.
The panel laminated with 4mm thick
termite proof, water proof & fire resistant sqm 1137.00 3991.00 1251.00 4105.00
PVC sheet both side using rubber
adhesive on flush door & solvent Cement
adhesive on the PVC lipping etc. complete
as per manufacturer's
specification,conforming to test criteria
specified in IS:4020-1998, Drawings and
to the entire satisfaction of engineer-in-
charge.

17.67 Providing and fixing 65mm wide and 2 to


3mm thick PVC cover on stair case ralling
in any shape and size fixed with adhesive
Mtr. 91.00 388.00 100.00 397.00
compound in all respect as per drawings.

17.68 Providing & fixing 4" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 72.00 13.00 73.00
directions of Engineer-in-charge.

Chapter-17 Page 253 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.69 Providing & fixing 6" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 86.00 13.00 87.00
directions of Engineer-in-charge.

17.70 Providing & fixing 9" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 146.00 13.00 147.00
directions of Engineer-in-charge.

17.71 Providing & fixing 12" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 279.00 13.00 280.00
directions of Engineer-in-charge.

17.72 Providing & fixing 1'-3" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 457.00 13.00 458.00
directions of Engineer-in-charge.

17.73 Providing & fixing 1'-6" stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 546.00 13.00 547.00
directions of Engineer-in-charge.

17.74 Providing & fixing 2' stainless steel


handles ISI marked on door & window
frames complete in all respect as per the No. 12.00 1568.00 13.00 1569.00
directions of Engineer-in-charge.

17.75 Providing & fixing 4" stainless steel tower


bolts ISI marked on door & window frames
complete in all respect as per the No. 15.00 164.00 17.00 166.00
directions of Engineer-in-charge.

17.76 Providing & fixing 6" stainless steel tower


bolts ISI marked on door & window frames
complete in all respect as per the No. 15.00 238.00 17.00 240.00
directions of Engineer-in-charge.

Chapter-17 Page 254 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.77 Providing & fixing 8" stainless steel tower
bolts ISI marked on door & window frames
complete in all respect as per the No. 15.00 312.00 17.00 314.00
directions of Engineer-in-charge.

17.78 Providing & fixing 12" stainless steel tower


bolts ISI marked on door & window frames
complete in all respect as per the No. 15.00 460.00 17.00 462.00
directions of Engineer-in-charge.

17.79 Providing & fixing1'-6" stainless steel


tower bolts ISI marked on door & window
frames complete in all respect as per the No. 15.00 682.00 17.00 684.00
directions of Engineer-in-charge.

17.80 Providing & fixing 2' stainless steel tower


bolts ISI marked on door & window frames
complete in all respect as per the No. 15.00 904.00 17.00 906.00
directions of Engineer-in-charge.

17.81 Providing & fixing 2'-6" stainless steel


tower bolts ISI marked on door & window
frames complete in all respect as per the No. 15.00 1127.00 17.00 1129.00
directions of Engineer-in-charge.

17.82 Providing & fixing 125mm with Plate


175mm X 32 mm anodized aluminum Mat
Finish handles ISI marked on door &
window frames complete in all respect as No. 12.00 24.00 13.00 25.00
per the directions of Engineer-in-charge.

17.83 Providing & fixing 100mm with Plate


150mm X 32 mm anodized aluminum Mat
Finish handles ISI marked on door &
window frames complete in all respect as No. 12.00 64.00 13.00 65.00
per the directions of Engineer-in-charge.

Chapter-17 Page 255 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.84 Providing & fixing 75mm with Plate
125mm X 32 mm anodized aluminum Mat
Finish handles ISI marked on door &
window frames complete in all respect as No. 12.00 64.00 13.00 65.00
per the directions of Engineer-in-charge.

17.85 Providing & fixing 250 X 10 mm anodized


aluminum Mat Finish tower bolts ISI
marked on door & window frames
complete in all respect as per the No. 15.00 73.00 17.00 75.00
directions of Engineer-in-charge.

17.86 Providing & fixing 200 X 10 mm anodized


aluminum Mat Finish tower bolts ISI
marked on door & window frames
complete in all respect as per the No. 15.00 61.00 17.00 63.00
directions of Engineer-in-charge.

17.87 Providing & fixing 150 X 10 mm anodized


aluminum Mat Finish tower bolts ISI
marked on door & window frames
complete in all respect as per the No. 15.00 52.00 17.00 54.00
directions of Engineer-in-charge.

17.88 Providing & fixing 100 X 10 mm anodized


aluminum Mat Finish tower bolts ISI
marked on door & window frames
complete in all respect as per the No. 15.00 41.00 17.00 43.00
directions of Engineer-in-charge.

17.89 Providing & Fixing decorative high


pressure laminated sheet 1mm SF thick
with high density protective surface layer
and reverse side of adhesive bonding
quality conforming to IS : 2046 Type S, Sqm 598.00 1112.00 658.00 1172.00
including cost of adhesive of approved
quality.

17.90 Providing & Fixing decorative high


pressure laminated sheet 1mm (1 Star)
thick with high density protective surface
layer and reverse side of adhesive
Sqm 546.00 1242.00 601.00 1297.00
bonding quality conforming to IS : 2046
Type S, including cost of adhesive of
approved quality.

Chapter-17 Page 256 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

17.91 Providing & Fixing decorative high


pressure laminated sheet 1mm (2 Star)
thick with high density protective surface
layer and reverse side of adhesive
bonding quality conforming to IS : 2046 Sqm 546.00 1279.00 601.00 1334.00
Type S, including cost of adhesive of
approved quality.

17.92 Providing & Fixing decorative high


pressure laminated sheet 1mm thick High
Class Texture with high density protective
surface layer and reverse side of adhesive
bonding quality conforming to IS : 2046 Sqm 546.00 1372.00 601.00 1427.00
Type S, ISI marked complete in all
respect as per the directions of Engineer-
in-charge.

17.93 Providing & Fixing decorative laminated


sheet 0.72mm thick and reverse side of
adhesive bonding quality conforming to IS
Sqm 546.00 828.00 601.00 883.00
: 2046 Type S, including cost of adhesive
of approved quality.

17.94 Providing and fixing aluminum grill 6.3


mm including cost of necessary fittings
i.e. screws,u Type Beading etc. complete
sqm 155.00 507.00 171.00 523.00

17.95 Providing and fixing aluminum grill 6.3


mm including cost of necessary fittings
i.e. screws With Clip Ruber etc. Complete
kg 171.00 554.00 188.00 571.00

17.96 Providing and fixing aluminum Wire Mesh


including cost of necessary fittings i.e.
screws,u Type Beading etc. complete kg 145.00 721.00 160.00 736.00

17.97 Providing & fixing ACP Sheets of various


thickness High Class ISI marked
complete in all respect as per the
directions of Engineer-in-charge.

Chapter-17 Page 257 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(i) 6mm thick ACP Sheet sqm 760.00 3115.00 836.00 3191.00

(ii) 4mm thick ACP Sheet sqm 727.00 2370.00 800.00 2443.00

(iii) 3mm thick ACP Sheet sqm 727.00 2085.00 800.00 2158.00

17.98 Providing & fixing Stainless steel ball


bearing hinges of size 100x89x3mm ISI
marked on door & window frames No. 12.00 168.00 13.00 169.00
complete in all respect as per the
directions of Engineer-in-charge.

17.99 Providing and fixing special quality bright


finished brass cupboard or ward robe
locks with four levers of approved quality
including necessary screws etc. complete
in all respect as per the directions of
Engineer-in-charge.

i 40mm No. 105.00 167.00 116.00 178.00

ii 50 mm No. 105.00 205.00 116.00 216.00

iii 65 mm No. 105.00 212.00 116.00 223.00

iv 75 mm No. 105.00 231.00 116.00 242.00

Chapter-17 Page 258 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.100 Design supply & installation of suspended
Spider Glazing system designed to
withstand the wind pressure as per IS 875
(Part-III). The Suspended System held
with Spider Fittings of SS-316 Grade
Steel of approved manufacturer with
glass panel having 12 mm thick clear
toughened glass held together with SS-
316 Grade Stainless steel Spider.& bolt
assembly with laminated glass fins 21 mm
thick. The Glass fins and glass panel
assembly shall be connected to
Slab/beams by means of SS- 316 Grade
stainless steel brackets & Anchor bolts
and at the bottom using SS channel of sqm 439.00 7118.00 483.00 7162.00
50x25x2mm using fastener & anchor
bolts, non star bushes and separators to
prevent bi-metallic contacts, all complete
to perform as per specification and
approved drawings. The complete system
to be designed to accommodate thermal
expansion & seismic movements etc. The
joints between glass panels (6 to 8 mm)
and gaps at the perimeter & in U channel
of the assembly to be filled with non
staining weather sealant, so as to make
the entire system fully water proof & dust
proof.

17.101 Providing and fixing 12 mm thick


frameless toughened glass door shutter of
approved brand and manufacture,
including providing and fixing top & bottom
pivot & double acting hydraulic floor spring
type fixing arrangement and making sqm 1082.00 4094.00 1190.00 4202.00
necessary holes etc. for fixing required
door fittings, all complete as per direction
of Engineer-in-charge

17.102 Designing, fabricating, testing, installing


and fixing in position Curtain Wall with
aluminum Composite Panel Cladding, with
open grooves for linear as well as sqm 1173.00 3111.00 1290.00 3228.00
curvilinear portions of the building , for all
heights and all levels etc. including:

Chapter-17 Page 259 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.103 Providing, assembling and supplying
vision glass panels (IGUs) comprising of
hermetically-sealed 6-12- 6 mm insulated
glass (double glazed) vision panel units of
size and shape as required and specified,
comprising of an outer heat strengthened
float glass 6mm thick, of approved colour
and shade with reflective soft coating on
surface # 2 of approved colour and shade,
an inner Heat strengthened clear float
glass 6mm thick, spacer tube 12mm wide,
dessicants, including primary seal and sqm 507.00 2625.00 558.00 2676.00
secondary seal (structural silicone sealant)
etc. all complete for the required
performances, as per the Architectural
drawings, as per the approved shop
drawings, as specified and as directed by
the Engineer-in-Charge. The IGUs shall
be assembled in the factory/ workshop of
the glass processor.

17.104 Extra for openable side / top hung vision


glass panels (IGUs) including providing
and supplying at site all accessories and
hardwares for the openable panels as
specified and of the approved make such
as heavy duty stainless steel friction
hinges, min 4 -point cremone locking sets
with stainless steel plates, handles,
buffers etc. including necessary tainless sqm 939.00 2939.00 1033.00 3033.00
steel screws/ fasteners, nuts, bolts,
washers etc. all complete as per the
Architectural drawings, as per the
approved shop drawings, as specified and
as directed by the Engineer- in-Charge.

17.105 Providing and fixing aluminum tubular


handle bar 32 mm outer dia, 3.0 mm thick
& 2100 mm long with SS screws etc
Powder coated minimum thickness 50
No. 12.00 558.00 13.00 559.00
micron aluminum tubular handle bar
.complete as per direction of Engineer-in-
Charge.

Chapter-17 Page 260 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
17.106 Providing and supplying aluminum
extruded tubular and other aluminum
sections as per the architectural drawings
and approved shopdraw ings , the
aluminum quality as per grade 6063 T5 or The The
T6 as per BS 1474,including super labour for labour for
durable powder coating of 60-80 microns this item this item
conforming to AAMA 2604 of required has been has been
colour and shade as approved by the sqm including 355.00
including
355.00
Engineer-in-Charge. ( The item includes in the in the
cost of material such as cleats, sleeves, complete complete
screws etc. necessary for fabrication of item item
extruded aluminum frame work. Nothing under under
extra shall be paid on this account). The 17.107 17.107
weight of aluminum extruded section shall
be taken for purpose of payment.

17.107 Designing, fabricating, testing, protection,


installing and fixing in position semi (grid)
unitized system of structural glazing (with
open joints) for linear as well as curvilinear sqm 886.00 2093.00 975.00 2182.00
portions of the building for all heights and
all levels, including:

(a) Structural analysis & design and preparation of shop drawings for the specified design loads
conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind
pressure without any failure), including functional design of the aluminum sections for fixing
glazing panels of various thicknesses, aluminum cleats, sleeves and splice plates etc. gaskets,
screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire
stop (barrier)-cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure
equalisation & drainage and protection against fire hazard including

(b) Fabricating and supplying serrated M.S. hot dip galvanised / aluminum alloy of 6005 T5
brackets of required sizes, sections and profiles etc. to accommodate 3 Dimensional movement
for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/
masonry/structural steel framework of building structure using stainless steel anchor fasteners/
bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel
grade 316, of the required capacity and in required numbers.

(c) Providing and filling, two part pump filled, structural silicone sealant and one part weather
silicone sealant compatible with the structural silicone sealant of required bite size in a clean and
controlled factory / work shop environment, including double sided spacer tape, setting blocks
and backer rod, all of approved grade, brand and manufacture, as per the approved sealant
design, within and all around the perimeter for holding glass.

(d) Providing and fixing in position flashings of solid aluminum sheet 1 mm thick and of sizes,
shapes and profiles, as required as per the site conditions,
to seal the gap between the building structure and all its interfaces with curtain glazing to make it
watertight.

Chapter-17 Page 261 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7
(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to
make it watertight, by incorporating principles of pressure equalization, providing suitable gutter
profiles at bottom (if required), making necessary holes of required sizes and of required
numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating
and installation of aluminum grid, installation of glazed units, T&P, scaffolding and other
incidental charges including wastages etc., enabling temporary structures and services, cranes
or cradles etc. as described above and as specified. The item includes the cost of getting all the
structural and functional design including shop drawings checked by a structural designer, dully
approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of
all samples of the individual components for testing in an approved laboratory, field tests on the
assembled working structural glazing as specified, cleaning and protection till the handing
over of the building for occupation. In the end, the Contractor shall provide a water tight structural
glazing having all the performance characteristics etc. all complete as required, as per the
Architectural drawings, as per item description, as specified, as per the aproved shop drawings
and as directed by the engineering-Charge.

Note:- 1. The cost of providing extruded aluminum frames, shadow boxes, extruded aluminum
section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel
wire mesh shall be paid for separately under relevant items under this sub- head. However, for
the purpose of payment, only the actual area of structural glazing (including width of grooves) on
the external face shall be measured in sqm. up to two decimal places.

Note:-2. The following performance test are to be conducted on structural glazing system if area
of structural glazing exceeds 2500 Sqm from the
certified laboratories accreditated by NABL(National Accreditation Board for Testing and
Calibration Laboratories), Department of Science & echnologies,
India. Cost of testing is payable separately. The NIT approving authority will decide the necessity
of testing on the basis of cost of the work, cost of the test and importance of the work.
Performance Testing of Structural glazing system Tests to be conducted in the NABL accredited
lab or by any other accreditation body which operates in accordance with ISO/ IEC 17011 and
accredits labs as per ISO/ IEC 17025.

1. Performance Laboratory Test for Air Leakage Test (-50pa to - 300pa) & (+50pa to +300pa) as
per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr
2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a
range up to 2000 ml.
3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01- 05 testing method for a
range upto 2000 ml
4. Structural Performance Deflection and deformation by static air pressure test (1.5 times
design wind pressure without any failure) as per ASTME-330- 10 testing method for a range upto
50 mm
5. Seismic Movement Test (upto 30 mm) as per AMA 501.4-09 testing method for Qualitative
test, Tests to be conducted on site.
6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi)
upto 2000 ml

17.108 Extra for providing vision panel not


exceeding 0.1 sqm in all type of flush
doors (cost of glass excluded)

Chapter-17 Page 262 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate

1 2 3 4 5 6 7

i Rectangular or square Sqm 1240.00 1707.00 1364.00 1831.00

ii Circular Sqm 1550.00 2017.00 1705.00 2172.00

17.109 Providing & fixing of knobset made of


stainless steel body, having provision of
latch and bolt, 3 nos key set, inside push
lock model ETL-101A, Finish SS/PB/AB
make-ENOX or any equivalent (Lock
should be releasable from out side in case
of emergency) as per requirement for Each 142.00 1087.00 156.00 1101.00
unisex toilet for PwD complete as per
specifications, Harmonised guidelines for
PwD and as desired by engineer-in-
charge.

Chapter-17 Page 263 CSR-2020


CSR−2020−Final

CHAPTER NO. 18
STEEL AND IRON WORK
Notes :-

(i) The rates in this chapter are for both riveted as well as welded work.

(ii) The labour and through rates for item Nos. 18.1,18.2,18.3,18.6, 18.7, 18.17, 18.18 and 18.19 are
for a height up to 4 m above plinth.

(iii) The cost of all rivets, bolts and nuts is included in the through rates.

(iv) The labour rates given in this chapter includes the cost of tools & plants, welding rods and
scaffolding (including labour and material) where ever required. The labour rates also cover the
electrical and gas charges, where welding work is done.

(v) The rates given in item No. 18.17 are also applicable for the item of "tie rod" provided in the well
steining. These rates also include the cost of flat steel bond ring, threading and welding, whenever
done, complete in all respects. Only bottle nuts are payable as per item No. 18.16.

(vi) Rates for steel boundary gates shall be the same as for the steel roof trusses.

(vii) Unless otherwise stated, the labour rates include handling of materials with in 100 m.

(viii) The centre mullion in any door and window frame will be counted and paid 1.5 time of outer section
of its door for item No. 18.24, 18.50 & 18.51.

Sr. Description Zone-A Zone-B


No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.1 Steel work fixed independently without connecting
plates including cutting hoisting and fixing in
position

(a) R S Joists qtl 1218.00 6496.00 1340.00 6618.00

(b) FLATS qtl 1066.00 6066.00 1173.00 6173.00

(c) Tees angles & channels qtl 1066.00 5930.00 1173.00 6037.00

18.2 Steel work in hip & jack rafters common rafters


purlins etc. with angle cleats and other qtl 1376.00 6240.00 1514.00 6378.00
connecting plates

Chapter-18 Page 264 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.3 Structural steel work in angles, tees, flats, riveted,
including cutting, fixing all gusset plates, bolts,
nuts, rivets etc. with hoisting and erecting in
position.

(a) For roof truss, well curbs, plate girders etc.


of any span for building for bridges upto
15M span qtl 3266.00 8130.00 3593.00 8457.00

(b) For plates and trussed girders etc. for


bridge of span more than 15 metres but
upto 30 mts. Span including cost of all qtl 3967.00 8831.00 4364.00 9228.00
machinery i.e hydra crane etc

18.4 Wrought iron & Mild steel ladders, framed grills,


gratings etc. with ends of bars riveted or molded
forged framed window guards, barred iron doors
stair case iron railing etc. including cost of bolts qtl 3868.00 9140.00 4255.00 9527.00
and nuts, screws, welding rod complete fixing in
position

18.5 Iron grated doors, including pintle hinges &


arrangements. qtl 4116.00 8980.00 4528.00 9392.00

18.6 Structural steel work in girders or Stanchions built


up of one joist / or channel section. Riveted
including cutting and fixing old gusset plates
bolts, Nuts, Rivets etc. complete with flange qtl 1366.00 6366.00 1503.00 6503.00
plates, head, sole plates, angle connections etc.
with hoisting & erecting in position

18.7 Structural steel work in compound girders or


Stanchions built up from two or more R.S. joists
or channel section or plates & angles etc.
including cutting and fixing all lattice bars,
stiffeners, gusset plates, bolts, nuts, rivets, qtl 2404.00 7404.00 2644.00 7644.00
welding rod, etc. complete with flange plates,
heads, sole plates, angle connections, etc. with
hoisting and erecting in position

Chapter-18 Page 265 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.8 Providing and fixing G.I. Sheet 0.80mm thick
garage doors, with 40mm x 40mm x6mm angle
iron frame with diagonal braces, 3.15mm thick
gusset plates at the top and 25mm dia meter
pulleys and T-iron 50mm x 50mm x 6mm guides sqm 1354.00 3077.00 1489.00 3212.00
at bottom including locking arrangement with
handles and pintles, etc. complete in all respect.

18.9 Providing and fixing G.I. Sheet 0.80mm thick


sliding shutters with 40mmx40mmx6mm angle
iron frame with diagonal braces 3.15mm gusset
plates at the junctions, hooks at top and 25mm
dia pulleys at bottom and 40mmx40mmx25mm sqm 1354.00 3432.00 1489.00 3567.00
dia pulleys at bottom and 40mx40mmx6mm
angle iron top and bottom guides including
locking arrangement with handles etc. complete
in respects.
18.10 Providing and fixing 14 gauge MS sheet garage
doors with 40mmx40mmx6mm angle iron frame
with diagonal braces 3.15mm gusset plates
sqm 1813.00 3900.00 1994.00 4081.00
including locking arrangement with handles etc.
complete in respects

18.11 (a) Supplying and fixing rolling shutters, of


approved make, made of 80mmx1.25mm,
M.S. Laths, interlocked together through
their entire length and jointed together, at
the end, by end locks, mounted on
specially designed pipe shaft, with
brackets, side guides, 27.5cm long wire
spring grade No. 2 and arrangement for sqm 162.00 2797.00 178.00 2813.00
inside and outside locking with push and
pull operation complete, including top
cover 0.80mm thick (payment is to be
made for the exact size of opening where
rolling shutter is to be fixed)

(b) Providing and fixing ball bearing for push


and pull type rolling shutters, from 9.20 to each - 1257.00 - 1257.00
12 sqm area

(c) Extra for providing mechanical device,


chain and crank operation, for operating
each - 907.00 - 907.00
rolling shutter, exceeding 11.20 sqm in
area, of the rolling shutter

Note :- Payment to be made, for area of clear opening.

Chapter-18 Page 266 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.12 Providing and Fixing in position collapsible steel
shutters, with vertical channels
20mmx10mmx2mm and braced with flat iron
diagonals 20mmx5mm size with top and bottom
rails of T iron 40mmx40mmx6mm with 38mm dia sqm 148.00 1703.00 163.00 1718.00
steel pulleys, complete with bolts, nuts, locking
arrangements, stoppers, handles, etc. complete
in all respects.

18.13 Supplying and fixing fan clamps with 50mmx6mm


flat iron 50cm long and U-hooks of 16mm
diametre M.S. Bars, of approved size with nuts each 141.00 248.00 155.00 262.00
including threading etc. complete in all respects.

18.14 Providing and fixing M.S. round or square bars at


required spacing in wooden frames of windows kg 24.00 75.00 26.00 77.00
and clearstory windows.

18.15 Nuts & Bolts of all sizes and length required


kg 78.00 78.00

18.16 Mild steel requirement for RCC work where not


including the complete rate of RCC including
bending, binding and placing in position complete
in all respects.

(i) Up to 20mm dia bars qtl 1015.00 6426.00 1117.00 6528.00

(ii) Above 20mm dia bars qtl 921.00 6331.00 1013.00 6423.00

18.17 Cold twisted deformed (Ribbed/ Tor steel) Bars


(Fe 415 grade as per IS 1786-2008) , for R.C.C
works, where not including in the complete rate of qtl 874.00 6284.00 961.00 6371.00
RCC including binding & bending and placing in
position complete

18.18 Cold twisted detormed (Ribbed/ Tor steel) Bars


(Fe 500 grade as per IS 1786-2008) , for R.C.C
works, where not including in the complete rate of qtl 874.00 6497.00 961.00 6584.00
RCC including bending and binding placing in
position complete

18.19 Cold twisted detormed (Ribbed/ Tor steel) Bars


(Fe 550 grade as per IS 1786-2008) , for R.C.C
works, where not including in the complete rate of qtl 874.00 6568.00 961.00 6655.00
RCC including binding, bending and placing in
position complete

Chapter-18 Page 267 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.20 Supplying openable steel windows, of standard
rolled steel Z sections, joints mitered and
Electrically flash-welded, with iron fittings
including necessary iron handles, Peg-stay
catchers bolts, iron plugs and pressed steel
projected hinges and glazing clips, complete
(Excluding glazing ) and finished with two coats of
ready mixed paint red lead non setting primer

(a) Upto 1 sqm area kg 43.00 110.00 47.00 114.00

(b) Above one sqm Area kg 43.00 108.00 47.00 112.00

18.21 Supplying fixed steel windows, of standard rolled


steel Z-section joints mitered and electrically flash
welded including iron Iugs and glazing clips
complete (including glazing and Finished with two kg 40.00 105.00 44.00 109.00
coats of ready mixed paints, red lead, non setting
primer

18.22 Fixing steel windows in walls with lugs,


embedded in 15cmx12cmx7.5cm cement
concrete blocks of 1:2:4 excluding of glass panes sqm 211.00 - 232.00 -
and cost of cement concrete for lugs

18.23 Fixing steel window in walls with lugs, embedded


in 15cmx12cmx7.5cm of cement concrete block
of 1:2:4 mix including cost of cement concrete for sqm 211.00 240.00 232.00 261.00
lugs.

18.24 Supplying Pressed steel sheet frames (chowkhat)


consisting of 18gauge (1.25 mm thick steel sheet
of the specified section, including iron lugs (hold
fast) iron hinges conforming to PWD specification
including bolts for fixing stops lock notch
provision for receiving tower bolts and finished
with 1 primer coat approved quality, fixed in
position excluding the cost of cement concrete
1:3:6 for fillings in the frame and cement concrete
1:2:4 for lugs complete

(a) Doors and windows frame of size 118mm


x 60mm with 40 mm wide single rebate
m 214.00 472.00 235.00 493.00
weighing 3.43 kg per meter.

(b) Doors and windows frame of size 113mm


x 60mm with 35 mm wide single rebate m 214.00 469.00 235.00 490.00
weighing 3.38 kg per meter.

Chapter-18 Page 268 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(c) Doors and windows frame of size 151mm


x 60mm with 35 mm wide double rebate m 214.00 531.00 235.00 552.00
weighing 3.95 kg per meter.

(d) Doors and windows frame of size 161mm


x 60mm with 40 mm wide double rebate m 215.00 540.00 237.00 562.00
weighing 4.05 kg per meter.

(e) Cup board frame of size 75mmx45mm


with 25mm wide single rebate m 218.00 369.00 240.00 391.00

18.25 Supplying and fixing glass panes with glazing


clips and special metal sash putty of approved
make.

(a) Glass panes 3mm or 8.44 kg per sqm


sqm 18.00 512.00 20.00 514.00
upto 0.4 sqm area

(b) Glass panes 4mm or 10.75 kg / sqm


sqm 18.00 598.00 20.00 600.00
exceeding 0.4 sqm of area

18.26 Extra for providing & fixing Steel beading of


approved shape steel tube beading size 12mm X
12mm, 18 gauge of approved shape and section
with screw for fixing of glass panes instead of m 27.00 56.00 30.00 59.00
glazing clips and metal slash putty in steel doors ,
windows & Ventilators complete in all respect

18.27 Wire gauge fixed in steel windows, of standard


rolled steel section with 3mm thick flat iron cover
moulding of 12.5 mm width, fixed with machine sqm 372.00 755.00 409.00 792.00
screws, complete in all respects.

18.28 Welding by gas or by electric plant, including


carriage to and from workshop etc. Cm 3.00 3.00

18.29 Providing and fixing M.S. angle iron 40x40x6mm


chowkhat including iron hold fasts butt hinges
fixed in position, finished with red lead non setting
primer complete in all respect

(a) For single rebate. kg 31.00 89.00 34.00 92.00

(b) For double rebate kg 31.00 97.00 34.00 100.00

Chapter-18 Page 269 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.30 Providing and fixing stair case railing made out of
M.S. Square bars 20x20m as vertical cost 0.70
metre high fixed with M.S. Base plate of
m 262.00 908.00 288.00 934.00
40mx40mmx6mm and flat iron 40mmx6mm as
hand rail complete in all respects.

18.31 Providing & Fixing of 10 gauge welded mesh of


25mm x 25mm size fixed on steel glazing with
MS flat 20mm x 6mm beeding complete in all
sqm 146.00 655.00 161.00 670.00
respect including painting two coats with
Synthetic Enamel Paint and Priming Coat

18.32 Providing & Fixing MS Flat 50mm x 6mm,


150mm long with 10mm dia MS bar 175mm long
hooks in RCC slab for fixing false ceiling
each 31.00 61.00 34.00 64.00

18.33 Providing & Fixing door floor spring double action


of ISI specification for aluminum door/ steel doors
each 592.00 2990.00 651.00 3049.00

18.34 Providing & Fixing of 12mm MS Rod in cement


concrete block of size 675mm x 150mm x
150mm including cost of block for cycle stand as
each 59.00 230.00 65.00 236.00
per design required completed in all respects.

18.35 Extra for work done in each subsequent storey


above the first storey for item No. 18.17, 18.18, qtl 13.00 13.00 14.00 14.00
18.19 and 18.34

18.36 Extra for Work done in each subsequent storey


above the first storey for Item No. 18.1 and 18.2 qtl 20.00 20.00 22.00 22.00

18.37 Extra for work done in each subsequent storey


above the first storey for Item No.18.3, 18.6 and qtl 26.00 26.00 29.00 29.00
18.7.

Chapter-18 Page 270 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.38 Providing & fixing of Box type steel windows,
made of various ERW section outer 60mm x
25mm, central mullion 60mm x 25mm, for shutter
50mm x 20mm having thickness of 1.25mm (18
gauge), shash bar MS Tee 25mm x 3mm where
required joints mitered and electrically flash-
welded, with iron fittings including necessary iron
handles, hinged cleat, tower bolts, iron hold fast
and pintle hinges complete (excluding glazing kg 38.00 128.00 42.00 132.00
and wire gauge) and finished with ready mixed
paint red lead non setting primer complete as per
specification, Drawings and to the entire
satisfaction of engineer-in-charge. (Note:-
Glazing, wire gauge and grill will be paid as per
respective items)

18.39 Providing & fixing 16 gauge stainless steel pipe


railing of grade 304 duly fixed on steps with the
help of bolts grouted on steps with hand rail and
newel post of 50mm dia Stainless steel pipe, Kg 62.00 481.00 68.00 487.00
Balusters of 40mm dia Stainless steel pipe and
guard 3 Nos of 15mm dia Stainless Steel pipe
complete in all respect

18.40 Providing & fixing T-iron frames for doors,


windows and ventilators of mild steel Tee-
sections, joints mitered and welded with 15x3mm
lugs, 10cm long embedded in cement concrete
blocks 15x10x10 cm of 1:3:6 or with wooden
plugs and screws or with dash fastener or rawl kg 35.00 108.00 39.00 112.00
plugs and screws or with fixing clips or with bolts
and nuts as required including fixing of necessary
butt hinges and screws and applying a priming
coat of approved steel primer.

18.41 Re-barring ( Chemical Anchor) of 8mm dia bar,


hole size 12mm, depth 100mm with 10ml
injectable mortar epoxy adhesive (Hybrid each 89.00 183.00 98.00 192.00
urethane methacrylate adhesive) re-baring
chemical complete in all respect.

18.42 Re-barring ( Chemical Anchor) of 10mm dia bar,


hole size 14mm, depth 100mm with 10 ml
injectable mortar epoxy adhesive (Hybrid each 86.00 185.00 95.00 194.00
urethane methacrylate adhesive) re-baring
chemical complete in all respect.

Chapter-18 Page 271 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.43 Re-barring (Chemical Anchor) of 12mm dia bar,
hole size 16mm, depth 120mm with 14 ml
injectable mortar epoxy adhesive (Hybrid
each 173.00 303.00 190.00 320.00
urethane methacrylate adhesive) rebaring
chemical complete in all respect.

18.44 Re-barring (Chemical Anchor) per hole for 16mm


dia bar, hole size 20mm, depth 160mm with
injectable mortar epoxy adhesive (Hybrid each 230.00 436.00 253.00 459.00
urethane methacrylate adhesive) rebaring
chemical 24 ML

18.45 Re-barring (Chemical Anchor) of 20mm dia bar,


hole size 25mm, depth 200mm with 47 ml
injectable mortar epoxy adhesive (Hybrid each 251.00 633.00 276.00 658.00
urethane methacrylate adhesive) rebaring
chemical complete in all respect.

18.46 Re-barring (Chemical anchor) of 25mm dia bar,


hole size 32mm, depth 250mm with 100 ml
injectable mortar epoxy adhesive (Hybrid each 251.00 992.00 276.00 1017.00
urethane methacrylate adhesive) rebaring
chemical complete in all respect.

18.47 Providing & fixing 16 gauge stainless steel pipe


gate of grade 304 duly fixed at site with the help
of M.S pivot & hinges grouted in cement kg 99.00 406.00 109.00 416.00
concrete complete in all respect as per any kind
of drawing & design

18.48 Providing Polyester Powder coating 50 micron


any coloured specified to alumnum section of
various sizes including carriage of material from kg 68.00 68.00 75.00 75.00
market to workshop & workshop to site of work.

18.49 Providing Polyester Powder coating 60 to 70


micron any coloured specified to M.S Grill section
of various sizes including carriage of material
kg 26.00 26.00 29.00 29.00
from market to workshop & workshop to site of
work.

Chapter-18 Page 272 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.50 Supplying and fixing of GI sheet frames
(Chowkat) consisting of 18 gauge (1.25mm) thick
steel sheet of the specified section (standard
design latest), including iron lugs (hold fasts) iron
hinges conforming to PWD specifications
including bolts for fixing steps, lock notch
provision for receiving tower bolts and finished,
fixed in position including the cost of cement
concrete 1:3:6 for filling in the frame and cement
concrete 1:2:4 for lugs complete to the
satisfaction of Engineer-in-charge.

(a) Doors and windows frame of size 118mm x


60mm with 40 mm wide single rebate weighing
m 208.00 539.00 229.00 560.00
3.43 kg per meter.

(b) Door and window frame of size 113mmx60mmx


with 35mm wide single rebate m 208.00 534.00 229.00 555.00

(c) Doors and windows frame of size 151mm x


60mm with 35 mm wide double rebate weighing m 208.00 606.00 229.00 627.00
3.95 kg per meter.

(d) Doors and windows frame of size 161mm x


60mm with 40 mm wide double rebate weighing m 208.00 617.00 229.00 638.00
4.05 kg per meter.

18.51 Supplying and fixing of Japani sheet frames


(Chowkat) consisting of 18 gauge (1.25mm) thick
steel sheet of the specified section (standard
design latest), including iron lugs (hold fasts) iron
hinges conforming to PWD specifications
including bolts for fixing steps, lock notch
provision for receiving tower bolts and finished,
fixed in position including the cost of cement
concrete 1:3:6 for filling in the frame and cement
concrete 1:2:4 for lugs complete to the
satisfaction of Engineer-in-charge.

(a) Doors and windows frame of size 118mm x


60mm with 40 mm wide single rebate weighing m 210.00 626.00 231.00 647.00
3.43 kg per meter.

(b) Door and window frame of size 113mmx60mmx


with 35mm wide single rebate m 210.00 620.00 231.00 641.00

Chapter-18 Page 273 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) Doors and windows frame of size 151mm x
60mm with 35 mm wide double rebate weighing m 210.00 762.00 231.00 783.00
3.95 kg per meter.

(d) Doors and windows frame of size 161mm x


60mm with 40 mm wide double rebate weighing m 210.00 773.00 231.00 794.00
4.05 kg per meter.

18.52 Steel work in built up tubular (round, square or


rectangular hollow tubes etc. ISI Marked) trusses
etc., including cutting, hoisting, fixing in position
and applying a priming coat of approved steel
primer, including welding and bolted with special
shaped washers etc. complete having span:-

(a) Up to 15.00 Mtr. Span


qtl 3410.00 10327.00 3751.00 10668.00

(b) Above 15.00 mt. Span including the cost for


machinery i.e. Hydra cranes etc. for hoisting in
position. qtl 4122.00 11211.00 4534.00 11623.00

18.53 Steel work in built up tubular pipes (round, square


or rectangular hollow tubes etc. ISI Marked) for
flat shed (ie.Where no truss work is involved)
including cutting, hoisting, fixing in position and qtl 2573.00 9490.00 2830.00 9747.00
applying a priming coat of approved steel primer,
including welding and bolted with special shaped
washers etc. complete.

18.54 Providing and fixing expandable fasteners of


specified size with necessary plastic sleeves and
galvanised M.S. screws including drilling holes in
masonry work / CC/ R.C.C. and making good
etc.complete.

(a) 25 mm long each 5.00 15.00 6.00 16.00

(b) 32 mm long each 5.00 16.00 6.00 17.00

(c) 40 mm long each 5.00 18.00 6.00 19.00

(d) 50 mm long each 5.00 21.00 6.00 22.00

Chapter-18 Page 274 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
18.55 Providing and fixing Stainless Steel pipe and
fitting of grade A ISI-304 as per IS standard 3448
complete with press type fitting (fitting shall be
paid for separately) i/c fixing of the pipe with
clamps at 1.00 m spacing including cutting and
making good the walls including testing of joints
complete as per direction of Engineer-in- charge.
(The pipe length inserted in the fitting shall not be
measured for payment)

(a) 15.88 mm outer dia pipe m 73.00 230.00 80.00 237.00

(b) 22.22 mm outer dia Pipe mt 73.00 373.00 80.00 380.00

(c) 28.58 mm outer dia Pipe mt 73.00 407.00 80.00 414.00

(d) 34 mm outer dia Pipe mt 73.00 522.00 80.00 529.00

(e) 42.70 mm outer dia Pipe mt 73.00 549.00 80.00 556.30

18.56 Providing and fixing Stainless Steel specials &


fitting ( such as Elbow, Tee, Reducers, Sockets
etc) of grade A ISI-304 as per IS standard 3448
complete for press type fitting (fitting shall be paid
for separately) i/c fixing of the fittings with pipe &
making good the walls including testing of joints
complete as per direction of Engineer-in-charge.

10 % of cost for all above mentioned items at Sr.


No. 18.55 pipes ranges be increased for labour
as well as through rates as required respectively.

18.57 Providing and Installation of Safety signage as


per guideline for person with disability made of
retro reflective sheeting as per colour specified
and writing matter will be of same material in
white fixed / pasted over 4mm thick aluminum
Sqm 1113.00 8509.00 1224.00 8620.00
composite sheet, including cost of writing matter
with braille also firmly fixed on wall with nylon
fastener, brass screw and washer complete as
per specification and as desired by engineer in
charge.

18.58 Providing Polyester Powder coating 50 micron


any coloured specified to alumnum fittings
various sizes including carriage of material from
market to workshop & workshop to site of work..

Chapter-18 Page 275 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
a Tower Bolt 100mm to 300 mm Long each 17.00 17.00 19.00 19.00

b Sliding Bolt all Sizes each 25.00 25.00 28.00 28.00

c Handles all Sizes each 22.00 22.00 24.00 24.00

d Door Stopper each 13.00 13.00 14.00 14.00

Chapter-18 Page 276 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 19
LINING
Notes :-
(i) Labour rates for lining items include handling of materials within 100 ms.

(ii) The labour rates and through rates include cost of water,curing,protecting in bad weather
conditions .

(iii) The rates for item Nos. 19.1 to 19.6 include the cost of fine dressing to exact level, watering and
preparing sub-grade. All basket earth work to be paid extra at the rates for lip cutting.

(iv) For Item No. 19.7, 19.9, 19.20, 19.21, 19.22, 19.23, 19.24, 19.25, 19.26, 19.27, the labour &
through rates for lining of side slopes from 0 to 3.5m height be reduced by 5%, if the depth of the
channel is upto 1.5m.

Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
19.1 Dressing bed and preparation of sub
grade for lining. sqm 10.77 10.77 11.85 11.85

19.2 Dressing side slopes and preparation


of sub grade for lining. sqm 17.55 17.55 19.31 19.31

19.3 Dressing bed and preparation of sub


grade for lining in earth work with
admixture of shingle or kankar :-

(a) Up to 40 per cent


sqm 16.93 16.92 18.62 18.61

(b) Above 40 per cent


sqm 21.54 21.54 23.69 23.69

19.4 Dressing side slopes and preparation


of sub grade for lining in earth work
with admixture of shingle or kankar :-

(a) Up to 40 per cent sqm 21.54 21.54 23.69 23.69

(b) Above 40 per cent sqm 27.88 27.88 30.67 30.67

19.5 Dressing bed and preparation of sub-


grade for lining in mixed gravel and sqm 31.60 31.60 34.76 34.76
conglomerate reaches.

Chapter-19 Page 277 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
19.6 Dressing side slopes and preparation
of sub grade for lining in mixed gravel
and conglomerate reaches. sqm 36.45 36.46 40.10 40.11

19.7 Double layer tile lining for irrigation


channels consisting of :-

(i) 10mm thick cement mortar 1:5 on sub-


grade.

(ii) First layer of 5.08 cm. thick tiles 30.48


x 15.24 cm laid in 1:5 cement mortar
as mentioned above.

(iii) Sand-wiched plaster 1:3 cement sand


mortar 16mm thick.

(iv) Second layer of tile 5.08 cm thick laid


in 1:3 cement sand mortar with 6mm
thick layer of mortar over sand-wiched

The above gives total thickness of


lining 13.36 cm

(I) In bed sqm 165.95 596.50 182.55 613.10

(II) On side slopes:-

(a) Upto 3.5 ms height above bed level. sqm 202.03 632.58 222.23 652.78

(b) Above 3.5 ms but upto 5.5 ms height


sqm 208.75 639.30 229.63 660.18

(c) Above 5.5 ms but upto 7.5 ms height


sqm 212.11 642.66 233.32 663.87

Note :- The height is to be measured vertically.

19.8 Single layer tile lining in bed only


consisting of :-

(i) 10mm thick cement mortar 1:5 on sub-


grade

Chapter-19 Page 278 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(ii) Single layer of 5.08 cm thick tiles
30.48x15.24x5.08cm. laid in 1:5
cement sand mortar mentioned
above.

(iii) 20mm thick cement plaster 1:3


properly rendered and finished.

sqm 130.11 393.49 143.12 406.50

19.9 Cement concrete lining 15cm. thick or


less for irrigation channels, using
cement concrete 1:3:6 :-

(a) hand mixed concrete lining in bed.


cum 1180.75 3436.99 1298.83 3555.07

(b) hand mixed concrete lining on side


cum 1301.55 3557.79 1431.71 3687.95
slopes for vertical height up to 3.5m.

(c) hand mixed concrete lining on side


cum 1461.01 3717.25 1607.11 3863.35
slopes for vertical height above 3.5m

(d) hand mixed concrete lining on side


cum 1620.46 3876.70 1782.51 4038.75
slopes for vertical height above 5.5m

19.10 Excavating conglomerate for drains


and bed sleepers under the lining. cum 883.75 883.75 972.13 972.13

19.11 Making dry brick drains behind lining


7.5cm brick all-round. m 28.22 28.21 31.04 31.03

19.12 Putting 1:3 (Cement:water) cement


slurry with cement @ 2.25 kg per sqm
on prepared bed and side slopes sqm 6.39 21.06 7.03 21.70
before laying concrete on bed and
side slopes

19.13 Extra allowance for providing sqm of


templates in curved portion of lining. curved 1.05 12.49 1.16 12.60
surface

19.14 Extra allowance for form work in


concrete lining :-

(a) In bed cum 128.18 366.15 141.00 378.97

(b) On side slopes. cum 153.81 391.79 169.19 407.17

Chapter-19 Page 279 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
19.15 Extra allowance for scaffolding in tile,
brick and concrete lining for side sqm 0.96 11.22 1.06 11.32
slopes only.

Note :- The rates for item No. 19.15 are


payable on area of side slopes only.

19.16 Filling expansion joints with special Per m


impervious hot pour 12.5mm wide. per cm 0.05 1.90 0.06 1.91
depth

19.17 Bending and fixing iron rungs on lined


slopes as per IS code:; 3873-1993 each 64.10 499.78 70.51 506.19

19.18 Cement pointing 1:2 on tile lining.

(a) In bed sqm 48.43 59.68 53.27 64.52

(b) On side slopes. sqm 53.93 65.18 59.32 70.57

Note :- The work of item No. 19.18 is to be


done and paid for only when specially
permitted by the Superintending
Engineer.

19.19 Earth work for lip cutting for lining of


irrigation channels inclusive of all
allowances, lead and dressing :-

(a) 0 to 1.5 m depth


cum 151.12 151.12 166.23 166.23

(b) depth exceeding 1.5 ms but upto 3.0


cum 158.37 158.37 174.21 174.21
ms.

(c) depth exceeding 3.0 ms but upto 4.5


cum 172.89 172.89 190.18 190.18
ms.

(d) depth exceeding 4.5 ms but upto 6.0


cum 194.66 194.66 214.13 214.13
ms.

(e) depth exceeding 6.0 ms but upto 7.5


cum 216.44 216.44 238.08 238.08
ms.

Chapter-19 Page 280 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
Note :- (i) The height in item No. 19.19 is to be
measured vertically.

(ii) The rates for lip cutting are payable


for the entire depth including the
bottom curve.
19.20 Single layer brick lining for irrigation
(i) channels (Distributaries and minors)
or section for all depths consisting of :-

(a) First layer 12.5mm thick cement


plaster 1:5 on sub grade and finished.

(b) Second layer of 10mm thick cement


plaster 1:3 properly rendered and
finished.

(c) 75mm thick bricks laid in 1:3 cement


sand mortar over second layer. sqm 273.98 687.46 301.38 714.86

In side slopes for all sections


19.20 Single layer brick lining for irrigation
(ii) channels (Distributaries and minors)
or section for all depths consisting of :-

(a) First layer 12.5mm thick cement


plaster 1:5 on sub grade and finished.

(b) Second layer of 10mm thick cement


plaster 1:3 properly rendered and
finished.

(c) 75mm thick bricks laid in 1:3 cement


sand mortar over second layer.
sqm 219.19 632.65 241.11 654.57

In bed for Trapezoidal Section Only

19.21 (a) Brick lining 7.5cm thick in 1:3 cement


sand mortar over low density
polyethylene over dressed sub-grade
with 12.5 mm thick sand cushion in sqm 212.28 565.07 233.51 586.30
curved bed portion only including
laying, trenching and jointing LDPE.

Chapter-19 Page 281 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

(b) Brick lining 7.5cm thick in 1:3 cement


sand mortar over 12.5 mm thick
base plaster 1:6 over dressed sub-
grade including laying, trenching and
jointing of low density polyethylene.

(i) On Side Slopes sqm 274.32 664.80 301.75 692.23

(ii) In Bed (for Trapezoidal Section Only)


sqm 219.46 609.93 241.41 631.88

19.22 Cement concrete lining 15cm. thick or


less for irrigation channels, using
cement concrete 1:2:4 (M-15)

(a) Hand mixed concrete lining in bed. cum 1180.75 4081.67 1298.83 4199.75

(b) Hand mixed concrete lining on side


slopes for vertical height upto 3.5 m.
cum 1301.55 4202.48 1431.71 4332.64

(c) Hand mixed concrete lining on side


slopes for vertical height above 3.50
cum 1461.01 4361.93 1607.11 4508.03
m but upto 5.50 m

(d) Hand mixed concrete lining on side


slope for vertical height above 5.5 m
cum 1620.46 4521.38 1782.51 4683.43
but upto 7.50 m

19.23 Cement concrete lining 15cm thick or


less for irrigation channels, using
cement concrete 1:2:4 (M-15)

(a) Machine mixed concrete lining in bed.


cum 1286.26 4187.18 1414.89 4315.81

(b) Machine mixed concrete lining on side


slopes for vertical height upto 3.5 m.
cum 1407.06 4307.98 1547.77 4448.69

Chapter-19 Page 282 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(c) Machine mixed concrete lining on
side slope for vertical height above
cum 1566.51 4467.43 1723.16 4624.08
3.50 m but upto 5.50 m.

(d) Machine mixed concrete lining on side


slope for vertical height above 5.5 m
cum 1725.96 4626.89 1898.56 4799.49
but upto 7.50 m

19.24 Cement concrete lining 15cm thick or


less for irrigation channels, using
cement concrete 1:3:6 (M-10)

(a) Machine mixed concrete lining in bed.


cum 1286.25 3542.49 1414.88 3671.12

(b) Machine mixed concrete lining on side


slopes for vertical height upto 3.5 m.
cum 1407.06 3663.30 1547.77 3804.01

(c) Machine mixed concrete lining on


side slope for vertical height above
cum 1566.51 3822.75 1723.16 3979.40
3.50m but upto 5.50 m

(d) Machine mixed concrete lining on side


slope for vertical height above 5.5m
cum 1725.96 3982.20 1898.56 4154.80
but upto 7.50

19.25 115 mm thick brick on edge lining in


herring bone bond/zig-zag or other
specified pattern in 1:3 cement sand
mortar over 10mm thick cement
plaster 1:3 over 12.50 mm thick
cement plaster in 1:5 on sub grade.

(a) On side slopes. sqm 293.49 873.78 322.84 903.13

(b) In bed sqm 234.79 815.08 258.27 838.56

Chapter-19 Page 283 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
19.26 115 mm thick brick on edge lining in
herring bone bond/zig-zag or other
specified pattern laid in 1:3 cement
sand mortar over LDPE over 12.5 mm
thick base plaster 1:6 over dressed
sub grade including laying, trenching
and jointing of low density
polyethylene.

(a) On side slopes. sqm 324.29 881.94 356.72 914.37

(b) In bed sqm 259.44 817.08 285.38 843.02

19.27 115 mm thick brick on edge lining in


herring bone bond/zig-zag or other
specified pattern laid in 1:3 cement
sand mortar over low density
polyethylene over dressed sub grade
including laying, trenching & jointing
LDPE

(a) On side slopes. sqm 237.22 751.68 260.94 775.40

(b) In Bed (with 15 mm sand cushion


underneath lining.) sqm 189.77 720.62 208.75 739.60

19.28 Filling triangular portion under coping


and on side of toe wall underneath
lining with 1:3 cement sand mortar. cum 1103.97 5492.27 1214.37 5602.67

19.29 Raking, cleaning and filling of hollow


joints in cement sand mortar 1:3 on
side slopes of tile lined channel.

(a) When depth of channel is more than


5ft and water is running
sqm 128.52 133.59 141.37 146.44

(b) When depth of channel is more than


5ft and work is done in closure.
sqm 113.67 114.58 125.04 125.95

Chapter-19 Page 284 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
Note:- (i) If depth is less than 5 fts. , above
rates of item no. 19.29(a), 19.29(b) be
decreased by 15%. This rate will also
be applicable to bed portion.

(ii) If the work pertains to flat brick lining


the labour rates as well as through
rates will be increased by 33% of
rates of tile lining.

(iii) If the work pertains to brick on edge


lining the labour rates as well as
through rates will be increased by
70% of rates of tile lining.
19.30 Brick lining 75 mm thick in 1:3
cement, sand mortar over LDPE over
dressed sub-grade with 15 mm thick
sand cushion in bed for trapezoidal
(a) On side slopes. sqm 212.28 559.88 233.51 581.11

(b) In bed sqm 169.83 533.86 186.81 550.84

19.31 Laying brick on edge coping 229mm


wide and 115mm thick in cement
sand mortar 1:3 m 27.08 140.15 29.79 142.86

19.32 Laying brick on edge coping 356mm


wide and 115mm thick in cement
sand mortar 1:3 m 42.11 212.59 46.32 216.80

19.33 Laying brick on edge coping 550mm


wide and 115mm thick in cement
sand mortar 1:3 m 65.13 328.90 71.64 335.41

19.34 Laying E.C bags filled with cement


concrete 1:4:8 including sewing and
laying in position within 30 ms bag 53.35 131.75 58.69 137.09
complete in all respects.

19.35 Laying E.C bags filled with cement


concrete 1:3:6 including sewing and
laying in position within 30 ms bag 53.35 135.21 58.69 140.55
complete in all respects.

Chapter-19 Page 285 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
19.36 Cement concrete lining 10cm. thick or
less with mechanical Paver for
irrigation channels, using cement
concrete M-15 with cement content
325 kg/cum mixed in an automatic
computerized Batching & Mixing Plant
and transported to the site in transit
mixers with an average lead of 1 Km

(a) Computerized Batching & Mixing


plant mixed concrete lining on bed
and on slide slopes upto vertical
cum 2155.36 5502.76 2370.90 5718.30
height 2.0m.

(b) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 2m but upto cum 2201.68 5549.07 2421.85 5769.24
3.5m.

(c) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 3.50 m but cum 2269.06 5616.46 2495.97 5843.37
upto 5.5 M

(d) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 5.5 m but cum 2336.42 5683.82 2570.06 5917.46
upto 7.5 M

(e) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height 7.5 M and above cum 2403.80 5751.20 2644.18 5991.58

19.37 Cement concrete lining 10cm. thick or


less with mechanical Paver for
irrigation channels, using cement
concrete M-10 with cement content
225kg/cum mixed in an automatic
computerized Batching & Mixing Plant
and transported to the site in transit
mixers with an average lead of 1 Km

Chapter-19 Page 286 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(a) Computerized Batching & Mixing
plant mixed concrete lining on bed
and on slide slopes upto vertical cum 2155.36 5062.21 2370.90 5277.75
height 2.0m.

(b) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 2m but upto cum 2201.68 5108.52 2421.85 5328.69
3.5m.

(c) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 3.50 m but cum 2269.06 5175.91 2495.97 5402.82
upto 5.5 M

(d) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height above 5.5 m but cum 2336.42 5243.27 2570.06 5476.91
upto 7.5 M

(e) Computerized Batching & Mixing plant


mixed concrete lining on side slopes
for vertical height 7.5 M and above cum 2403.80 5310.65 2644.18 5551.03

19.38 Excavation of Soil using Hyraulic


Excavator and hydraulic Tractor Trolly
I/C cutting and loading in Trolly and
transporting to the embankment
locations with all lifts and leads

(a) Disposal/carraige from 0 upto 450m


cum 59.45 59.45 65.40 65.40

(b) Disposal/ carraige additional beyond


450m upto 1Km cum 16.00 16.00 17.60 17.60

(c) Disposal/carraige for every additional


Km upto 10Km cum 25.39 25.39 27.93 27.93

Chapter-19 Page 287 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
Note 1. The above rates are worked out for
irrigation works along Katcha Bank of
the Canal /Distributory Minor.
2. In case of carriage of earth on
Pucca Road along bank of canal
.These rates shall be reduced by 20%
if lead is more than 450m.
3. These rates are applicable for a
lead of 10 km only beyond 10 km
rates of carriage of earth by Tipper
shall be taken.

19.39 Excavation of soil using hydraulic


Excavator and tippers I/C cutting and
loading in tippers and transporting to
the embankments location with all lifts
and leads.
Note- For Katcha Road rates will be
increased by 20%.

(a) disposal/carraige from 0m upto 450m.


cum 54.41 54.41 59.85 59.85

(b) disposal/carraige for every additional


cum 15.75 15.75 17.32 17.32
1km upto 10km(plains)

Note Beyond 10km rates of carraige of


earth/soil shall be taken as per CSR
chapter-5

19.40 Cement concrete lining 75mm. thick


or less laid manually for irrigation
channels, using cement concrete M-
15 with cement content 325 kg/cum
mixed in an automatic computerized
Batching & Mixing Plant and cum 1697.06 5044.47 1866.77 5214.18
transported to the site in transit
mixers with an average lead of 1
Km(FOR TRAPEZOIDAL SECTION
AND CUP SECTION OF ALL RADII)

Chapter-19 Page 288 CSR-2020


CSR−2020−Final
CHAPTER NO. 20
OUTLETS

Notes :-
(i) The term "discharge" wherever used in this Chapter means designed full supply discharge of the
parent channel opposite the oulet.

(ii) The labour rates include the rehandling of materials within 100 ms.

(iii) For outlets on lined canals, the basic rate will be 20% extra over and above the rate for katcha
canal.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
20.1 Earth work for outlet:-

(a) Earth work for dismantling or construction of


new pipe or barrel type outlets (including
excavation, refilling, consolidation and
dressing)

(i) Channel discharge upto 1.5 cums per


second. job 632.00 632.00 695.00 695.00

(ii) Channel discharge exceeding 1.5 cum/s


but upto 3 cum/s job 1007.00 1007.00 1108.00 1108.00

(iii) Channel discharge exceeding 3 cum/s


but upto 6 cum/s job 1580.00 1580.00 1738.00 1738.00

(iv) Channel discharge exceeding 6 cum/s


but upto 10 cum/s job 2488.00 2488.00 2737.00 2737.00

(b) Earth work involved in dismantling Open flume,


A.P.M. or O.S.M. type Outlets (including
excavation, refilling , consolidation and
dressing )

(i) With 'H' upto 0.5 m


job 632.00 632.00 695.00 695.00

(ii) With 'H' more than 0.5 m. but upto 0.9


m job 1580.00 1580.00 1738.00 1738.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 2488.00 2488.00 2737.00 2737.00

(c ) Earth work involved in dismantling gullet walls


of outlets for adjusting 'Y' of A.P.M. or 'B' of
open flume outlets:-

Chapter-20 Page 289 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) With 'H' upto 0.5 m
job 190.00 190.00 209.00 209.00

(ii) With 'H' more than 0.5 m. but upto 0.9


job 592.00 592.00 651.00 651.00
m

(iii) With 'H' more than 0.9 m but upto


job 948.00 948.00 1043.00 1043.00
1.10m

(d) Earth work involved in constructing new O.F.,


A.P.M. or O.S.M. type outlets.

(i) With 'H' upto 0.5 m


job 1896.00 1896.00 2086.00 2086.00

(ii) With 'H' more than 0.5 m. but upto 0.9


m job 3673.00 3673.00 4040.00 4040.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 5450.00 5450.00 5995.00 5995.00

20.2 Dismantling outlets including removal of


dismantled material involving lead upto 100
metres.

(a) Pipe or barrel type outlets

(i) Channel discharge upto 1.5 cum/s


Each 592.00 592.00 651.00 651.00

(ii) Channel discharge above 1.5 cum/s but


upto 3 cum/s Each 790.00 790.00 869.00 869.00

(iii) Channel discharge above 3 cum/s but


upto 6 cum/s Each 889.00 889.00 978.00 978.00

(iv) Channel discharge above 6 cum/s but


upto 10 cum/s Each 948.00 948.00 1043.00 1043.00

(b) Dismantling O.F., A.P.M. or O.S.M. type outlets


consisting of total dismantling i.e. concrete R.C.
Slab and cement masonry.

(i) With 'H' upto 0.5 m


job 3317.00 3317.00 3649.00 3649.00

Chapter-20 Page 290 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(ii) With 'H' more than 0.5 m. but upto 0.9
m job 6398.00 6398.00 7038.00 7038.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 9478.00 9478.00 10426.00 10426.00

(c ) Dismantling O.F., A.P.M. Or O.S.M. type


outlets involving dismantling cement masonry
and removing of precast R.C. Slab

(i) With 'H' upto 0.5 m


job 2370.00 2370.00 2607.00 2607.00

(ii) With 'H' more than 0.5 m. but upto 0.9


m job 5095.00 5095.00 5605.00 5605.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 7820.00 7820.00 8602.00 8602.00

(d) Dismantling tail cluster bifurcation :-

(i) Complete dismantling including


concrete and masonry. job 5687.00 5687.00 6256.00 6256.00

(ii) Cement masonry only


job 4147.00 4147.00 4562.00 4562.00

(e) Dismantling tail cluster trifurcation:-

(i) Complete dismantling including


concrete and masonry. job 7938.00 7938.00 8732.00 8732.00

(ii) Cement masonry only


job 5687.00 5687.00 6256.00 6256.00

(f) Dismantling tail cluster quadrifurcation:-

(i) Complete dismantling including


concrete and masonry job 10308.00 10308.00 11339.00 11339.00

(ii) Cement masonry only


job 7464.00 7464.00 8210.00 8210.00

20.3 Making temporary A.P.M. Block and fixing at


site

Chapter-20 Page 291 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) In case of new outlets where no
dismantling and reconstructing of gullet job 408.00 573.00 449.00 614.00
walls is involved

(b) Extra for dismantling and reconstructing


gullet walls where temporary A.P.M.
block is to be fixed on existing outlet
without change in width of gullet i.e. 'B'

(i) With 'H' upto 0.5 m


job 539.00 1231.00 593.00 1285.00

(ii) With 'H' more than 0.5 m. but upto 0.9


m job 738.00 1802.00 812.00 1876.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 1086.00 2455.00 1195.00 2564.00

(c ) Extra over item No. 20.3(a) in case of old


Outlets where dismantling and reconstructing
of gullet walls is involved including change in
width of gullet i.e. 'B' of the outlet upto 30 m.m.

(i) With 'H' upto 0.5 m


job 742.00 1733.00 816.00 1807.00

(ii) With 'H' more than 0.5 m. but upto 0.9


m job 1266.00 3216.00 1393.00 3343.00

(iii) With 'H' more than 0.9 m but upto


1.10m job 1847.00 4695.00 2032.00 4880.00

20.4 Adjusting A.P.M. to the correct 'Y' and fixing in


position:-

(a) In case of new outlet where no dismantling and


reconstructing of gullet wall is involved. Job 150.00

(b) Extra over item No.20.4(a) In case of outlets


where dismantling and reconstructing of gullet Same as
walls is involved without change in width of for item
Job
gullet i.e. 'B' of the outlet No.
20.3(b)

Chapter-20 Page 292 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c ) Extra over item No. 20.4 In case of old outlets
where dismantling and reconstructing of gullet Same as
walls is involved including change in width of for item
Job
gullet i.e. 'B' of the outlet upto 30 m.m. No.
20.3(c)

20.5 Adjusting check plates of open flume outlet to


correct 'B' and fixing at site flush with the gullet
walls :-

(a) In case of new outlets where no dismantling


and reconstructing of gullet walls is involved.
job 150.00

(b) Extra over item No. 20.5(a) In case of old


Same as
outlets where dismantling and reconstructing of
for item
gullet wall is involved without change in width of job
No.
gullet Walls i.e. 'B' of the outlet
20.3(b)

(c) Extra over item No. 20.5(a) In case of existing


outlets where dismantling and reconstructing
side walls is involved including
change of 'B' upto 30 mm

(i) With 'H' upto 0.5 m


job 836.00 1900.00 920.00 1984.00

(ii) With 'H' more than 0.5 m but upto 0.9 m


job 1553.00 3938.00 1708.00 4093.00

(iii) With 'H' more than 0.9 m but upto


job 2561.00 6095.00 2817.00 6351.00
1.10m

20.6 Extra over item Nos. 20.3, 20.4 And 20.5 as


the case may be, for adjusting of crest levels of
O.F and A.P.M. outlets with 1:2:4 cement
concrete when lowering of crest level is
involved.

(a) With 'H' upto 0.5 m


job 365.00 409.00 402.00 446.00

(b) With 'H' more than 0.5 m but upto 0.9 m


job 547.00 613.00 602.00 668.00

(c) With 'H' more than 0.9 m but upto 1.10 m


job 729.00 818.00 802.00 891.00

Chapter-20 Page 293 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
20.7 Extra over item Nos. 20.3, 20.4 And 20.5 as
the case may be, for Adjusting of crest levels of
O.F and A.P.M. outlets with 1:2:4 cement
concrete when raising of crest level is involved

(a) With 'H' upto 0.5 m


job 273.00 318.00 300.00 345.00

(b) With 'H' more than 0.5 m but upto 0.9 m


job 365.00 431.00 402.00 468.00

(c) With 'H' more than 0.9 m but upto 1.10 m


job 547.00 635.00 602.00 690.00

20.8 Constructing, watching and removing bund in


running water for outlets:-

(a) For adjusting 'B''Y' or crest Level of the O.F.


and A.P.M. types for plains and for dismantling
or constructing pipe or barrel type outlets for
sub mountainous region:-

(i) For channels with designed F.S. depth


upto 0.5m. job 1250.00 1415.00 1375.00 1540.00

(ii) for channels with designed F.S. depth


above 0.5 m but upto 0.9m job 2131.00 2448.00 2344.00 2661.00

(iii) for channels with designed F.S. depth


above 0 .90 but upto 1.0 m job 3864.00 4384.00 4250.00 4770.00

(b) For constructing complete O.F Or A.P.M. type


outlets in running water:-

(i) For channels with designed F.S. depth


upto 0.5m. job 2773.00 3169.00 3050.00 3446.00

(ii) for channels with designed F.S. depth


above 0.5 m But upto 0.9m job 3755.00 4299.00 4131.00 4675.00

(iii) for channels with designed F.S. depth


above 0.90 but upto 1.1 m job 6188.00 7112.00 6807.00 7731.00

(c ) For dismantling or constructing pipe channels.

Chapter-20 Page 294 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) For channels with designed F.S. depth
upto 0.5m. job 1250.00 1415.00 1375.00 1540.00

(ii) for channels with designed F.S. depth


above 0.5 m but upto 0.9 m job 1340.00 1567.00 1474.00 1701.00

(iii) for channels with designed F.S. depth


above 0.90 but upto 1.1 m job 2174.00 2463.00 2391.00 2680.00

20.9 Adjusting 'B' of tail cluster by dismantling and per


rebuilding throat walls 385.00 821.00 424.00 860.00
outlet

20.10 Extra labour for dressing bricks On O.F. and


A.P.M. type outlets

(i) With 'H' upto 0.5 m per


720.00
outlet

(ii) With 'H' more than 0.5 m. but upto 0.9 per
m 1440.00
outlet

(iii) With 'H' more than 0.9 m but upto per


1.10m 2280.00
outlet

20.11 Repairing damaged reducing collar of hume per


365.00 394.00 402.00 431.00
pipe outlets outlet

20.12 Laying iron pipes for outlets upto 150 m.m.


mtr 52.80
diameter

20.13 Laying R.C.C. pipes for outlets and culverts


including joining ends and fixing collar with
cement mortar 1:2 :-

(a) upto 150 mm inside diameter


mtr 58.00 71.00 64.00 77.00

(b) above 150 mm but upto 300 mm inside


mtr 122.00 148.00 134.00 160.00
diameter

(c ) above 300 mm but upto 600 mm inside


mtr 304.00 376.00 334.00 406.00
diameter

(d) above 600mm but upto 900 mm inside


mtr 608.00 737.00 669.00 798.00
diameter

Chapter-20 Page 295 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
20.14 Hoisting and placing precast R.C. concrete slab
or stones in position on outlets or W.C. culverts per
422.40
outlet

20.15 Providing APM cast iron block complete in all


respects including supply of pig iron, casting
and pattern making, as per ISI specifications
no. 7986-1976

0.20 ft = 6.1 cm (min wt 65 kg)


(i) job 6370.00

0.25 ft= 7.6 cm (min wt 68 kg)


(ii) job 6664.00

0.32 ft= 9.9 cm (min wt 72 kg)


(iii) job 7056.00

0.40 ft= 12.2 cm (min wt 76 kg)


(iv) job 7448.00

0.5 ft= 15.2 cm (min wt 80 kg)


(v) job 7840.00

0.8 ft= 24.4 cm (min wt 84 kg)


(vi) job 8232.00

1.0 ft= 30.5 cm (min wt 90 kg)


(vii) job 8820.00

Chapter-20 Page 296 CSR-2020


CSR−2020−Final
CHAPTER NO. 21
Bridges- Foundations & Sub- Structure
Notes :-

1 The rates are based on PPC cement, however where OPC cement is to be used , additional rate
@ Rs. 20/- per bag may be added.

2 The rates for all materials include carriage up to 5km., additional carriage be adjusted accordingly
while deriving landing rates.

3 The rates of bitumen are based as on 01.07.2020.Difference be adjusted as on date while


preparing landing rates for estimate.

4 All rates for concrete include cost for Tools, Plant, vibrators & admixture wherever necessary as
per MORT&H guide lines.

5 Separate rates for different heights for sub structure have been added in this chapter, payment be
made accordingly.

6 10% extra cost of cement has already been taken for works under water, nothing extra should be
paid over & above these rates.

7 Rates for concrete include transportation of concrete with transit mixture up to 5 km, additional
carriage if any be added as per rates under chapter 10 for carriage of concrete by transit mixture.

8 All rates include cost for water, if supplied by the department, the rates be reduced accordingly.

9 The rates of steel of item No. 21.27, 21.33 and 21.34 are inclusive of wastage, overlaps, couplings,
welded joints,spacer bars, chairs, stays, hangers and annealed steel wire or other methods for
binding and placing, shall not be measured and cost of these items shall be deemed to be included
in the rates for reinforcement as per section 1600 of MORT&H specification.

Sr. Descripition Unit Zone-A Zone-B


No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

21.1 Earth work in excavation of


foundation of structures as per
drawing and technical specification,
including setting out, construction
of shoring and bracing, removal of
stumps and other deleterious
matter, dressing of sides and
bottom and backfilling with
excavated surplus soil.

In Ordinary soil

Chapter-21 Page 297 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
A Manual Means

a Depth upto 3 m cum 192.33 192.33 211.56 211.56

b Depth 3 m to 6 m cum 247.28 247.28 272.00 272.00

c Depth above 6 m cum 329.70 329.70 362.67 362.67

B Mechanical Means 0.00 0.00 0.00 0.00

a Depth upto 3 m cum 69.67 69.67 76.64 76.64

b Depth 3 m to 6 m cum 79.63 79.63 87.59 87.59

c Depth above 6m cum 99.00 99.00 108.90 108.90

C Ordinary Rock (not requiring


blasting)
a) Depth upto 3 m by manual
means cum 274.75 274.75 302.22 302.22

b Depth upto 3 m by
Mechanical cum 86.79 86.79 95.47 95.47
Means

D Hard Rock (requiring blasting)


cum 531.19 603.77 584.31 656.89

E Hard Rock ( blasting prohibited )


cum 577.02 577.02 634.72 634.72

F Marshy Soil

a Depth upto 3 m by
manual means cum 658.32 658.32 724.15 724.15

b Depth upto 3 m by
Mechanical Means cum 166.83 166.83 183.52 183.52

G Back Filling in Marshy cum 410.61 410.61 451.67 451.67

Chapter-21 Page 298 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.2 Filling space around footing in rock
with Plain cement concrete 1:3:6
nominal mix or in foundation with
crushed stone aggregate 40
mm nominal size mechanically
mixed, placed in foundation cum 1008.98 3632.33 1109.87 3733.23
and compacted by vibration
including curing for 14 days.

21.3 Sand Filling in Foundation


Trenches as per Drawing &
cum 163.71 1154.32 180.08 1170.69
Technical Specification

21.4 Plain cement concrete 1:3:6


nominal mix in foundation with
crushed stone aggregate 40 mm
nominal size mechanically mixed, cum 1008.98 3632.33 1109.87 3733.23
placed in foundation and
compacted by vibration including
curing for 14 days.

21.5 Brick Masonry Work in Cement


Mortar 1:3 in Foundation complete
excluding Pointing and Plastering, cum 1567.89 5707.82 1724.68 5864.61
as per Drawing and Technical
Specifications.

21.6 Stone Masonry Work in Cement


Mortar 1:3 in Foundation complete
as per Drawing and Technical
Specifications.

A Square Rubble Coursed


Rubble Masonry (first sort) cum 2205.87 5072.84 2426.45 5293.42

B Random Rubble Masonry


cum 1999.58 4909.33 2199.54 5109.29

21.7 Plain/Reinforced Cement Concrete


in Open Foundation complete as
per Drawing and Technical
Specifications.

A PCC Grade M15 cum 1401.94 4319.17 1542.14 4459.36

B PCC Grade M20 cum 1428.92 4782.82 1571.81 4925.71

Chapter-21 Page 299 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

C RCC Grade M20

(i) Using Concrete Mixer cum 1431.16 4824.40 1574.27 4967.52

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 820.91 4215.39 903.00 4297.48

D PCC Grade M25

(i) Using Concrete Mixer cum 1433.67 5131.11 1577.03 5274.47

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 824.90 4523.89 907.39 4606.38

E RCC Grade M25

(i) Using Concrete Mixer cum 1436.13 5135.64 1579.74 5279.25

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 827.22 4563.95 909.94 4646.67

F PCC Grade M30

(i) Using Concrete Mixer cum 1419.13 5153.82 1561.05 5295.74

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 811.63 4544.25 892.79 4625.41
Pump

G RCC Grade M30

(i) Using Concrete Mixer cum 1420.53 5140.41 1562.58 5282.46

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 813.14 4571.35 894.45 4652.66
Pump

H RCC Grade M35

(i) Using Concrete Mixer cum 1391.36 5204.92 1530.50 5344.06

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 786.90 4640.12 865.59 4718.81
Pump

Chapter-21 Page 300 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.8 Providing and Constructing
Temporary Island 16 m diameter
for Construction of Well
Foundation for 8m dia. Well.

A Assuming depth of water


1.0 m and height of island to No 68552.80 129944.55 75408.08 136799.83
be 1.25 m.

B Assuming depth of water


4.0 m and height of island No 156307.52 627403.12 171938.27 643033.87
4.5 m

21.9 Providing and constructing one


span service road to reach island
location from one pier location to m 1710.91 6301.25 1882.00 6472.34
another pier location

21.10 Providing and Laying Cutting Edge


of Mild Steel weighing 40 kg per
metre for Well Foundation MT 20175.93 75884.80 22193.53 77902.40
complete as per Drawing and
Technical Specification.

21.11 Plain/Reinforced Cement Concrete,


in Well Foundation complete as per
Drawing and Technical
Specification.

A Well curb

(i) RCC Grade M20


Case I

Using Concrete Mixer cum 2414.39 5807.63 2655.83 6049.07

With Batching Plant, Transit


Mixer and Concrete Pump cum 1710.55 5105.04 1881.60 5276.09

(ii) RCC M25 Grade

Using Concrete Mixer cum 2522.82 6265.81 2775.10 6518.09

With Batching Plant, Transit


Mixer and Concrete Pump cum 1818.34 5560.50 2000.17 5742.33

(iii) RCC M35 Grade

Chapter-21 Page 301 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
Using Concrete Mixer cum 2558.75 6417.63 2814.62 6673.51

Using Batching Plant,


Transit Mixer and Concrete cum 1854.52 5713.41 2039.98 5898.86
Pump

B Well steining

(i) PCC M20 Grade

Using Concrete Mixer cum 1794.27 5148.18 1973.70 5327.60

(ii) RCC Grade M20 Case I

(I) Using Concrete Mixer cum 1799.87 5193.12 1979.86 5373.10

(II) With Batching Plant, Transit


Mixer and Concrete Pump
cum 1154.52 4549.01 1269.98 4664.46

(iii) PCC M25 Grade

Using Concrete Mixer cum 1847.52 5544.97 2032.28 5729.72

With Batching Plant, Transit


Mixer and Concrete Pump
cum 1202.23 4901.22 1322.45 5021.44

(iv) RCC M25 Grade

Using Concrete Mixer cum 1854.08 5597.08 2039.49 5782.49

With Batching Plant, Transit


Mixer and Concrete Pump
cum 1208.42 4950.58 1329.26 5071.42

(v) PCC Grade M30

Using Concrete Mixer cum 1853.30 5587.99 2038.63 5773.32

Using Batching Plant,


Transit Mixer and Concrete
cum 1207.44 4940.06 1328.18 5060.80
Pump

(vi) RCC Grade M30


Case I

Using Concrete Mixer cum 1857.29 5620.98 2043.02 5806.71

Chapter-21 Page 302 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
Using Batching Plant,
Transit Mixer and Concrete
cum 1211.75 4975.44 1332.93 5096.61
Pump

(vii) RCC Grade M35

Using Concrete Mixer cum 1872.05 5730.93 2059.25 5918.14

Using Batching Plant,


Transit Mixer and Concrete
cum 1226.51 5085.39 1349.16 5208.04
Pump

(viii) RCC M40 Grade

Using Batching Plant,


Transit Mixer and Concrete
cum 1245.25 5229.91 1369.78 5354.44
Pump

C Bottom Plug

(i) PCC Grade M20

Using Concrete Mixer cum 1731.87 5535.28 1905.06 5708.47

Using Batching Plant,


Transit Mixer and cum 884.96 4711.16 973.45 4799.66
Crane/concrete pump

(ii) PCC Grade M25

Using Concrete Mixer cum 1748.13 5761.95 1922.94 5936.76

Using Batching Plant,


Transit Mixer and cum 901.05 4935.52 991.16 5025.62
Crane/concrete pump

(iii) PCC Grade M30

Using Concrete Mixer cum 1751.51 5808.87 1926.66 5984.02

Using Batching Plant,


Transit Mixer and cum 904.43 4982.49 994.87 5072.93
Crane/concrete pump

(iv) PCC Grade M35

Using Concrete Mixer cum 1758.73 5909.25 1934.60 6085.12

Using Batching Plant,


Transit Mixer and cum 911.64 5082.75 1002.81 5173.91
Crane/concrete pump

Chapter-21 Page 303 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
D Intermediate plug

(i) Grade M20 PCC

Using Concrete Mixer cum 1411.87 4927.19 1553.06 5068.38

Using Batching Plant,


Transit Mixer and cum 598.69 4134.73 658.56 4194.60
Crane/concrete pump

(ii) PCC Grade M25

Using Concrete Mixer cum 1411.87 5062.51 1553.06 5203.69

Using Batching Plant,


Transit Mixer and cum 598.69 4314.78 658.56 4374.64
Crane/concrete pump
(iii) PCC Grade M30

Using Concrete Mixer cum 1411.87 5144.49 1553.06 5285.68

Using Batching Plant,


Transit Mixer and cum 598.69 4354.10 658.56 4413.96

E Crane/concrete
Top plug pump

(i) Grade M15 PCC cum 1185.35 4100.51 1303.88 4219.04

(ii) PCC Grade M20 cum 1185.35 4539.25 1303.88 4657.79

(iii) Grade M25 PCC

Using Concrete Mixer cum 1185.35 4880.72 1303.88 4999.26

With Batching Plant, Transit


Mixer and Concrete Pump cum 598.50 4297.49 658.35 4357.34

(iv) Grade M30 PCC

Using Concrete Mixer cum 1185.35 4917.97 1303.88 5036.51

Using Batching Plant,


Transit Mixer and Concrete cum 598.50 4331.12 658.35 4390.97
Pump

F Well cap

(I) RCC Grade M20

Using Concrete Mixer cum 1431.16 4824.40 1574.27 4967.52

Using Batching Plant,


Transit Mixer and Concrete cum 820.91 4215.39 903.00 4297.48
Pump

Chapter-21 Page 304 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(ii) RCC Grade M25

Using Batching Plant,


Transit Mixer and Concrete cum 827.22 4569.38 909.94 4652.10
Pump

(iii) RCC Grade M30

Using Batching Plant,


cum 813.14 4576.82 894.45 4658.14
Transit Mixer and Concrete

(iv) RCC Grade M35

Using Batching Plant,


cum 786.90 4645.78 865.59 4724.47
Transit Mixer and Concrete

(v) RCC M40 Grade

Using Batching Plant,


cum 792.52 4777.18 871.78 4856.43
Transit Mixer and Concrete

21.12 Sinking of 6 m external


diameter well (other
than pneumatic method
of sinking) through all
types of strata namely
sandy soil, clayey soil
and rock as shown
against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed
level.The rate inclusive
of dewatering

A Sandy Soil

(i) Depth below bed level upto


m 5311.70 5311.70 5842.87 5842.87
3.0 M

(ii) Beyond 3m upto 10m depth


m 7491.48 7491.48 8240.63 8240.63

(iii) 11 m depth m 7866.06 7866.06 8652.67 8652.67

12 m depth m 8259.36 8259.36 9085.30 9085.30

13 m depth m 8672.33 8672.33 9539.56 9539.56

14 m depth m 9105.95 9105.95 10016.55 10016.55

15 m depth m 9561.25 9561.25 10517.38 10517.38

Chapter-21 Page 305 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

16 m depth m 10039.31 10039.31 11043.24 11043.24

17 m depth m 10541.28 10541.28 11595.41 11595.41

18 m depth m 11068.34 11068.34 12175.17 12175.17

19 m depth m 11621.76 11621.76 12783.94 12783.94

20 m depth m 12202.85 12202.85 13423.14 13423.14

(iv) 21 m depth m 15741.67 15741.67 17315.84 17315.84

22 m depth m 16922.29 16922.29 18614.52 18614.52

23 m depth m 18191.46 18191.46 20010.61 20010.61

24 m depth m 19555.82 19555.82 21511.40 21511.40

25 m depth m 21022.51 21022.51 23124.76 23124.76

26 m depth m 22599.20 22599.20 24859.12 24859.12

27 m depth m 24294.14 24294.14 26723.55 26723.55

28 m depth m 26116.20 26116.20 28727.82 28727.82

29 m depth m 28074.91 28074.91 30882.40 30882.40

30 m depth m 30180.53 30180.53 33198.58 33198.58

(v) 31 m depth m 33198.58 33198.58 36518.44 36518.44

32 m depth m 36518.44 36518.44 40170.28 40170.28

33 m depth m 40170.28 40170.28 44187.31 44187.31

34 m depth m 44187.30 44187.30 48606.03 48606.03

35 m depth m 48606.04 48606.04 53466.64 53466.64

36 m depth m 44555.53 53466.64 58813.30 58813.30

37 m depth m 58813.30 58813.30 64694.63 64694.63

38 m depth m 64694.63 64694.63 71164.09 71164.09

39 m depth m 71164.09 71164.09 78280.50 78280.50

40 m depth m 78280.50 78280.50 86108.55 86108.55

B Clayey Soil ( 6m dia. Well


)

(i) Depth below bed level upto


m 7520.38 7520.38 8272.41 8272.41
3.0 M

Chapter-21 Page 306 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

(ii) Beyond 3m upto 10m depth


m 17390.10 17390.10 19129.11 19129.11

(iii) 11 m depth m 19172.59 19172.59 21089.85 21089.85

12 m depth m 20131.22 20131.22 22144.34 22144.34

13 m depth m 21137.78 21137.78 23251.56 23251.56

14 m depth m 22194.67 22194.67 24414.14 24414.14

15 m depth m 23304.40 23304.40 25634.84 25634.84

16 m depth m 24469.62 24469.62 26916.58 26916.58

17 m depth m 25693.10 25693.10 28262.41 28262.41

18 m depth m 26977.76 26977.76 29675.54 29675.54

19 m depth m 28326.65 28326.65 31159.32 31159.32

20 m depth m 29742.98 29742.98 32717.28 32717.28

(iv) 21 m depth m 38063.94 38063.94 41870.33 41870.33

22 m depth m 40918.74 40918.74 45010.61 45010.61

23 m depth m 43987.64 43987.64 48386.40 48386.40

24 m depth m 47286.71 47286.71 52015.38 52015.38

25 m depth m 50833.21 50833.21 55916.53 55916.53

26 m depth m 54645.70 54645.70 60110.27 60110.27

27 m depth m 58744.13 58744.13 64618.54 64618.54

28 m depth m 63149.94 63149.94 69464.93 69464.93

29 m depth m 67886.19 67886.19 74674.81 74674.81

30 m depth m 72977.65 72977.65 80275.42 80275.42

(v) 31 m depth m 77064.40 77064.40 84770.84 84770.84

32 m depth m 84770.83 84770.83 93247.91 93247.91

33 m depth m 93247.92 93247.92 102572.71 102572.71

34 m depth m 102572.71 102572.71 112829.98 112829.98

35 m depth m 112829.99 112829.99 124112.99 124112.99

36 m depth m 124112.99 124112.99 136524.29 136524.29

Chapter-21 Page 307 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
37 m depth m 136524.29 136524.29 150176.72 150176.72

38 m depth m 150176.71 150176.71 165194.38 165194.38

39 m depth m 165194.39 165194.39 181713.83 181713.83

40 m depth m 181713.83 181713.83 199885.21 199885.21

C Soft Rock (6m dia well )

Depth in Soft rock strata up


m 24316.81 24316.81 26748.50 26748.50
to 3m

D Hard Rock (6m dia well )

Depth in hard rock strata


m 23477.71 24324.70 25825.49 26672.48
upto 3 m

21.13 Sinking of 7 m external


diameter well (other
than pneumatic method
of sinking) through all
types of strata namely
sandy soil, clayey soil
and rock as shown
against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed
level.The rate inclusive
of dewatering.

A Sandy Soil

(i) Depth below bed level upto


m 7917.41 7917.41 8709.15 8709.15
3.0 M

(ii) Beyond 3m upto 10m depth


m 10523.13 10523.13 11575.44 11575.44

(iii) 11 m depth m 11049.29 11049.29 12154.22 12154.22

12 m depth m 11601.75 11601.75 12761.93 12761.93

13 m depth m 12181.84 12181.84 13400.02 13400.02

14 m depth m 12790.93 12790.93 14070.02 14070.02

15 m depth m 13430.48 13430.48 14773.53 14773.53

16 m depth m 14102.00 14102.00 15512.20 15512.20

Chapter-21 Page 308 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
17 m depth m 14807.10 14807.10 16287.81 16287.81

18 m depth m 15547.46 15547.46 17102.21 17102.21

19 m depth m 16324.83 16324.83 17957.31 17957.31

20 m depth m 17141.07 17141.07 18855.18 18855.18

(iv) 21 m depth m 22111.98 22111.98 24323.18 24323.18

22 m depth m 23770.38 23770.38 26147.42 26147.42

23 m depth m 25553.16 25553.16 28108.48 28108.48

24 m depth m 27469.64 27469.64 30216.60 30216.60

25 m depth m 29529.86 29529.86 32482.85 32482.85

26 m depth m 31744.61 31744.61 34919.07 34919.07

27 m depth m 34125.46 34125.46 37538.01 37538.01

28 m depth m 36684.86 36684.86 40353.35 40353.35

29 m depth m 39436.22 39436.22 43379.84 43379.84

30 m depth m 42393.94 42393.94 46633.33 46633.33

(v) 31 m depth m 46633.33 46633.33 51296.66 51296.66

32 m depth m 51296.66 51296.66 56426.33 56426.33

33 m depth m 56426.33 56426.33 62068.96 62068.96

34 m depth m 62068.96 62068.96 68275.86 68275.86

35 m depth m 68275.85 68275.85 75103.44 75103.44

36 m depth m 75103.43 75103.43 82613.77 82613.77

37 m depth m 82613.77 82613.77 90875.15 90875.15

38 m depth m 90875.15 90875.15 99962.67 99962.67

39 m depth m 99962.66 99962.66 109958.93 109958.93

40 m depth m 109958.93 109958.93 120954.82 120954.82

B Clayey Soil ( 7m dia. Well


)

(I) Depth below bed level upto


m 10523.13 10523.13 11575.44 11575.44
3.0 M

(ii) Beyond 3m upto 10m depth


m 17859.97 17859.97 19645.96 19645.96

Chapter-21 Page 309 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

(iii) 11 m depth m 19690.62 19690.62 21659.68 21659.68

12 m depth m 20675.15 20675.15 22742.67 22742.67

13 m depth m 21708.91 21708.91 23879.80 23879.80

14 m depth m 22794.36 22794.36 25073.80 25073.80

15 m depth m 23934.08 23934.08 26327.49 26327.49

16 m depth m 25130.78 25130.78 27643.86 27643.86

17 m depth m 26387.32 26387.32 29026.05 29026.05

18 m depth m 27706.69 27706.69 30477.36 30477.36

19 m depth m 29092.02 29092.02 32001.22 32001.22

20 m depth m 30546.62 30546.62 33601.28 33601.28

(iv) 21 m depth m 39092.40 39092.40 43001.64 43001.64

22 m depth m 42024.33 42024.33 46226.76 46226.76

23 m depth m 45176.15 45176.15 49693.77 49693.77

24 m depth m 48564.36 48564.36 53420.80 53420.80

25 m depth m 52206.69 52206.69 57427.36 57427.36

26 m depth m 56122.19 56122.19 61734.41 61734.41

27 m depth m 60331.35 60331.35 66364.49 66364.49

28 m depth m 64856.20 64856.20 71341.82 71341.82

29 m depth m 69720.41 69720.41 76692.45 76692.45

30 m depth m 74949.44 74949.44 82444.38 82444.38

(v) 31 m depth m 79146.61 79146.61 87061.27 87061.27

32 m depth m 87061.27 87061.27 95767.40 95767.40

33 m depth m 95767.40 95767.40 105344.14 105344.14

34 m depth m 105344.15 105344.15 115878.57 115878.57

35 m depth m 115878.56 115878.56 127466.42 127466.42

36 m depth m 127466.42 127466.42 140213.06 140213.06

37 m depth m 140213.06 140213.06 154234.37 154234.37

38 m depth m 154234.37 154234.37 169657.81 169657.81

Chapter-21 Page 310 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

39 m depth m 169657.80 169657.80 186623.58 186623.58

40 m depth m 186623.58 186623.58 205285.94 205285.94

C Soft Rock ( 7m dia well)

Depth in soft rock strata


m 21409.41 21409.41 23550.35 23550.35
upto 3m

D Hard Rock (7m dia well)

Depth in Hard rock strata up


m 27004.50 28468.92 29704.94 31169.37
to 3 m

21.14 Sinking of 8 m external


diameter well ( other than
pneumatic method of
sinking ) through all types of
strata namely sandy soil,
clayey soil and rock as
shown against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed level.

A Sandy Soil

(i) Depth below bed level upto


m 9671.26 9671.26 10638.39 10638.39
3.0 M

(ii) Beyond 3m upto 10m depth


m 11873.97 11873.97 13061.37 13061.37

(iii) 11 m depth
m 12467.67 12467.67 13714.44 13714.44

12 m depth m 13091.06 13091.06 14400.17 14400.17

13 m depth m 13745.61 13745.61 15120.17 15120.17

14 m depth m 14432.89 14432.89 15876.18 15876.18

15 m depth m 15154.53 15154.53 16669.98 16669.98

16 m depth m 15912.26 15912.26 17503.49 17503.49

17 m depth m 16707.87 16707.87 18378.66 18378.66

18 m depth m 17543.26 17543.26 19297.59 19297.59

Chapter-21 Page 311 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
19 m depth m 18420.42 18420.42 20262.46 20262.46

20 m depth m 19341.44 19341.44 21275.58 21275.58

(iv) 21 m depth m 24950.46 24950.46 27445.51 27445.51

22 m depth m 26821.74 26821.74 29503.91 29503.91

23 m depth m 28833.37 28833.37 31716.71 31716.71

24 m depth m 30995.88 30995.88 34095.47 34095.47

25 m depth m 33320.57 33320.57 36652.63 36652.63

26 m depth m 35819.62 35819.62 39401.58 39401.58

27 m depth m 38506.09 38506.09 42356.70 42356.70

28 m depth m 41394.05 41394.05 45533.46 45533.46

29 m depth m 44498.60 44498.60 45533.46 45533.46

30 m depth m 47836.00 47836.00 52619.60 52619.60

(v) 31 m depth m 52619.59 52619.59 57881.55 57881.55

32 m depth m 57881.56 57881.56 63669.72 63669.72

33 m depth m 63669.71 63669.71 70036.68 70036.68

34 m depth m 70036.68 70036.68 77040.35 77040.35

35 m depth m 77040.35 77040.35 84744.39 84744.39

36 m depth m 84744.38 84744.38 93218.82 93218.82

37 m depth m 93218.82 93218.82 102540.70 102540.70

38 m depth m 102540.71 102540.71 112794.78 112794.78

39 m depth m 112794.78 112794.78 124074.26 124074.26

40 m depth m 124074.26 124074.26 136481.69 136481.69

B Clayey Soil ( 8m dia. Well


)

(I) Depth below bed level upto


m 12880.86 12880.86 14168.94 14168.94
3.0 M

(ii) Beyond 3m upto 10m depth


m 18819.16 18819.16 20701.08 20701.08

(iii) 11 m depth m 20748.12 20748.12 22822.93 22822.93

12 m depth m 21785.53 21785.53 23964.08 23964.08

Chapter-21 Page 312 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

13 m depth m 22874.81 22874.81 25162.29 25162.29

14 m depth m 24018.55 24018.55 26420.41 26420.41

15 m depth m 25219.48 25219.48 27741.43 27741.43

16 m depth m 26480.45 26480.45 29128.50 29128.50

17 m depth m 27804.47 27804.47 30584.92 30584.92

18 m depth m 29194.69 29194.69 32114.16 32114.16

19 m depth m 30654.42 30654.42 33719.86 33719.86

20 m depth m 32187.14 32187.14 35405.85 35405.85

(iv) 21 m depth m 41191.88 41191.88 45311.07 45311.07

22 m depth m 44281.26 47602.36 48709.39 48709.39

23 m depth m 47602.36 47602.36 52362.60 52362.60

24 m depth m 51172.54 51172.54 56289.79 56289.79

25 m depth m 55010.48 55010.48 60511.53 60511.53

26 m depth m 59136.26 59136.26 65049.89 65049.89

27 m depth m 63571.49 63571.49 69928.64 69928.64

28 m depth m 68339.35 68339.35 75173.29 75173.29

29 m depth m 73464.80 73464.80 80811.28 80811.28

30 m depth m 78974.66 78974.66 86872.13 86872.13

(v) 31 m depth m 83397.24 83397.24 91736.96 91736.96

32 m depth m 91736.96 91736.96 100910.66 100910.66

33 m depth m 100910.66 100910.66 111001.73 111001.73

34 m depth m 111001.73 111001.73 122101.90 122101.90

35 m depth m 122101.90 122101.90 134312.09 134312.09

36 m depth m 134312.09 134312.09 147743.30 147743.30

37 m depth m 147743.29 147743.29 162517.62 162517.62

38 m depth m 162517.62 162517.62 178769.38 178769.38

39 m depth m 178769.39 178769.39 196646.33 196646.33

40 m depth m 196646.33 196646.33 216310.96 216310.96

Chapter-21 Page 313 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

C Soft Rock ( 8m dia well)

Depth in soft rock strata


upto 3m m 21310.45 21310.45 23441.50 23441.50

D Hard Rock(8m dia well)

Depth in Hard rock strata up


to 3 m m 29329.35 39744.24 32262.28 42677.17

21.15 Sinking of 9 m external


diameter well (other
than pneumatic method
of sinking) through all
types of strata namely
sandy soil, clayey soil
and rock as shown
against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed
level.The rate inclusive
of dewatering

A Sandy Soil

(i) Depth below bed level upto


3.0 M m 9820.32 9820.32 10802.35 10802.35

(ii) Beyond 3m upto 10m depth


m 13023.95 13023.95 14326.34 14326.34

(iii) 11 m depth
m 13675.14 13675.14 15042.66 15042.66

12 m depth m 14358.90 14358.90 15794.79 15794.79

13 m depth m 15076.85 15076.85 16584.54 16584.54

14 m depth m 15830.69 15830.69 17413.76 17413.76

15 m depth m 16622.22 16622.22 18284.44 18284.44

16 m depth m 17453.33 17453.33 19198.66 19198.66

17 m depth m 18326.00 18326.00 20158.60 20158.60

18 m depth m 19242.30 19242.30 21166.53 21166.53

Chapter-21 Page 314 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

19 m depth m 20204.42 20204.42 22224.86 22224.86

20 m depth m 21214.64 21214.64 23336.10 23336.10

(iv) 21 m depth m 27366.89 27366.89 30103.58 30103.58

22 m depth m 29419.40 29419.40 32361.34 32361.34

23 m depth m 31625.86 31625.86 34788.45 34788.45

24 m depth m 33997.80 33997.80 37397.58 37397.58

25 m depth m 36547.63 36547.63 40202.39 40202.39

26 m depth m 39288.71 39288.71 43217.58 43217.58

27 m depth m 42235.36 42235.36 46458.90 46458.90

28 m depth m 45403.01 45403.01 49943.31 49943.31

29 m depth m 48808.24 48808.24 53689.06 53689.06

30 m depth m 52468.85 52468.85 57715.74 57715.74

(v) 31 m depth m 57715.73 57715.73 63487.30 63487.30

32 m depth m 63487.30 63487.30 69836.03 69836.03

33 m depth m 69836.03 69836.03 76819.63 76819.63

34 m depth m 76819.63 76819.63 84501.59 84501.59

35 m depth m 84501.60 84501.60 92951.76 92951.76

36 m depth m 92951.76 92951.76 102246.94 102246.94

37 m depth m 102246.94 102246.94 112471.63 112471.63

38 m depth m 112471.63 112471.63 123718.79 123718.79

39 m depth m 123718.80 123718.80 136090.68 136090.68

40 m depth m 136090.68 136090.68 149699.75 149699.75

B Clayey Soil ( 9m dia. Well


)

(I) Depth below bed level upto


3.0 M m 13633.78 13633.78 14997.16 14997.16

(ii) Beyond 3m upto 10m depth


m 20262.80 20262.80 22289.07 22289.07

Chapter-21 Page 315 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(iii) 11 m depth
m 22339.73 22339.73 24573.70 24573.70

12 m depth m 23456.72 23456.72 25802.39 25802.39

13 m depth m 24629.56 24629.56 27092.52 27092.52

14 m depth m 25861.04 25861.04 28447.14 28447.14

15 m depth m 27154.09 27154.09 29869.50 29869.50

16 m depth m 28511.79 28511.79 31362.97 31362.97

17 m depth m 29937.38 29937.38 32931.12 32931.12

18 m depth m 31434.25 31434.25 34577.68 34577.68

19 m depth m 33005.96 33005.96 36306.56 36306.56

20 m depth m 34656.26 34656.26 38121.89 38121.89

(iv) 21 m depth m 44351.76 44351.76 48786.94 48786.94

22 m depth m 47678.15 47678.15 52445.97 52445.97

23 m depth m 51254.01 51254.01 56379.41 56379.41

24 m depth m 55098.06 55098.06 60607.87 60607.87

25 m depth m 59230.41 59230.41 65153.45 65153.45

26 m depth m 63672.69 63672.69 70039.96 70039.96

27 m depth m 68448.14 68448.14 75292.95 75292.95

28 m depth m 73581.75 73581.75 80939.93 80939.93

29 m depth m 79100.39 79100.39 87010.43 87010.43

30 m depth m 85032.91 85032.91 93536.20 93536.20

(v) 31 m depth m 89794.75 89794.75 98774.23 98774.23

32 m depth m 98774.23 98774.23 108651.65 108651.65

33 m depth m 108651.66 108651.66 119516.83 119516.83

34 m depth m 119516.83 119516.83 131468.51 131468.51

35 m depth m 131468.52 131468.52 144615.37 144615.37

36 m depth m 144615.37 144615.37 159076.91 159076.91

37 m depth m 159076.91 159076.91 174984.60 174984.60

38 m depth m 174984.60 174984.60 192483.06 192483.06

Chapter-21 Page 316 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

39 m depth m 192483.06 192483.06 211731.37 211731.37

40 m depth m 211731.37 211731.37 232904.51 232904.51

C Soft Rock (9m dia well)

Depth in soft rock strata


upto 3m m 25334.81 25334.81 27868.29 27868.29

D Hard Rock(9m dia well)

Depth in Hard rock strata up


to 3 m m 31982.04 43616.95 35180.24 46815.16

21.16 Sinking of 10 m external


diameter well ( other than
pneumatic method of
sinking ) through all types of
strata namely sandy soil,
clayey soil and rock as
shown against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed level.

A Sandy Soil

(i) Depth below bed level upto


3.0 M m 11673.10 11673.10 12840.41 12840.41

(ii) Beyond 3m upto 10m depth


m 13788.35 13788.35 15167.18 15167.18

(iii) 11 m depth
m 14477.77 14477.77 15925.54 15925.54

12 m depth m 15201.66 15201.66 16721.83 16721.83

13 m depth m 15961.74 15961.74 17557.91 17557.91

14 m depth m 16759.83 16759.83 18435.81 18435.81

15 m depth m 17597.82 17597.82 19357.60 19357.60

16 m depth m 18477.71 18477.71 20325.48 20325.48

17 m depth m 19401.60 19401.60 21341.76 21341.76

Chapter-21 Page 317 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
18 m depth m 20371.68 20371.68 22408.85 22408.85

19 m depth m 21390.26 21390.26 23529.29 23529.29

20 m depth m 22459.77 22459.77 24705.75 24705.75

(iv) 21 m depth m 28973.10 28973.10 31870.41 31870.41

22 m depth m 31146.08 31146.08 34260.69 34260.69

23 m depth m 33482.04 33482.04 36830.24 36830.24

24 m depth m 35993.20 35993.20 39592.52 39592.52

25 m depth m 38692.68 38692.68 42561.95 42561.95

26 m depth m 41594.63 41594.63 45754.09 45754.09

27 m depth m 44714.22 44714.22 49185.64 49185.64

28 m depth m 48067.79 48067.79 52874.57 52874.57

29 m depth m 51672.88 51672.88 56840.17 56840.17

30 m depth m 55548.34 55548.34 61103.17 61103.17

(v) 31 m depth m 61103.17 61103.17 67213.49 67213.49

32 m depth m 67213.49 67213.49 73934.84 73934.84

33 m depth m 73934.83 73934.83 81328.31 81328.31

34 m depth m 81328.32 81328.32 89461.15 89461.15

35 m depth m 89461.15 89461.15 98407.27 98407.27

36 m depth m 98407.27 98407.27 108248.00 108248.00

37 m depth m 108248.00 108248.00 119072.80 119072.80

38 m depth m 119072.81 119072.81 130980.09 130980.09

39 m depth m 130980.08 130980.08 144078.09 144078.09

40 m depth m 144078.10 144078.10 158485.91 158485.91

B Clayey Soil ( 10m dia.


Well )

(I) Depth below bed level upto


3.0 M m 15240.94 15240.94 16765.04 16765.04

(ii) Beyond 3m upto 10m depth


m 20370.07 20370.07 22407.08 22407.08

Chapter-21 Page 318 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(iii) 11 m depth
m 22458.01 22458.01 24703.81 24703.81

12 m depth m 23580.91 23580.91 25939.00 25939.00

13 m depth m 24759.96 24759.96 27235.96 27235.96

14 m depth m 25997.96 25997.96 28597.76 28597.76

15 m depth m 27297.86 27297.86 30027.65 30027.65

16 m depth m 28662.75 28662.75 31529.03 31529.03

17 m depth m 30095.89 30095.89 33105.48 33105.48

18 m depth m 31600.68 31600.68 34760.75 34760.75

19 m depth m 33180.71 33180.71 36498.78 36498.78

20 m depth m 34839.75 34839.75 38323.73 38323.73

(iv) 21 m depth m 44586.58 44586.58 49045.24 49045.24

22 m depth m 47930.56 47930.56 52723.62 52723.62

23 m depth m 51525.35 51525.35 56677.89 56677.89

24 m depth m 55389.75 55389.75 60928.73 60928.73

25 m depth m 59543.99 59543.99 65498.39 65498.39

26 m depth m 64009.79 64009.79 70410.77 70410.77

27 m depth m 68810.53 68810.53 75691.58 75691.58

28 m depth m 73971.31 73971.31 81368.44 81368.44

29 m depth m 79519.16 79519.16 87471.08 87471.08

30 m depth m 85483.10 85483.10 94031.41 94031.41

(v) 31 m depth m 90270.16 90270.16 99297.18 99297.18

32 m depth m 99297.17 99297.17 109226.89 109226.89

33 m depth m 109226.88 109226.88 120149.57 120149.57

34 m depth m 120149.57 120149.57 132164.53 132164.53

35 m depth m 132164.52 132164.52 145380.97 145380.97

36 m depth m 145380.97 145380.97 159919.07 159919.07

37 m depth m 159919.07 159919.07 175910.98 175910.98

38 m depth m 175910.98 175910.98 193502.08 193502.08

Chapter-21 Page 319 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

39 m depth m 193502.08 193502.08 212852.29 212852.29

40 m depth m 212852.28 212852.28 234137.51 234137.51

C Soft Rock (10m dia well)

Depth in soft rock strata


m 27666.90 27666.90 30433.59 30433.59
upto 3m

D Hard Rock ( 10m dia well )

Depth in Hard rock strata up


m 35064.23 46969.52 38570.65 50475.94
to 3 m

21.17 Sinking of 11 m external


diameter well ( other than
pneumatic method of
sinking ) through all types of
strata namely sandy soil,
clayey soil and rock as
shown against each case,
complete as per drawing
and technical specifications.
Depth of sinking is
reckoned from bed level.

A Sandy Soil

(i) Depth below bed level upto


3.0 M m 26535.77 26535.77 29189.35 29189.35

(ii) Beyond 3m upto 10m depth


m 21911.83 21911.83 24103.01 24103.01

(iii) 11 m depth
m 23007.42 23007.42 25308.16 25308.16

12 m depth m 24157.79 24157.79 26573.57 26573.57

13 m depth m 25365.68 25365.68 27902.25 27902.25

14 m depth m 26633.96 26633.96 29297.36 29297.36

15 m depth m 27965.66 27965.66 30762.23 30762.23

16 m depth m 29363.94 29363.94 32300.33 32300.33

17 m depth m 30832.14 30832.14 33915.35 33915.35

Chapter-21 Page 320 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
18 m depth m 32373.75 32373.75 35611.13 35611.13

19 m depth m 33992.44 33992.44 37391.68 37391.68

20 m depth m 35692.06 35692.06 39261.27 39261.27

(iv) 21 m depth m 46042.75 46042.75 50647.03 50647.03

22 m depth m 49495.96 49495.96 54445.56 54445.56

23 m depth m 53208.16 53208.16 58528.98 58528.98

24 m depth m 57198.77 57198.77 62918.65 62918.65

25 m depth m 61488.67 61488.67 67637.54 67637.54

26 m depth m 66100.32 66100.32 72710.35 72710.35

27 m depth m 71057.84 71057.84 78163.62 78163.62

28 m depth m 76387.19 76387.19 84025.91 84025.91

29 m depth m 82116.23 82116.23 90327.85 90327.85

30 m depth m 88274.94 88274.94 97102.43 97102.43

(v) 31 m depth m 97102.44 97102.44 106812.68 106812.68

32 m depth m 106812.68 106812.68 117493.95 117493.95

33 m depth m 117493.96 117493.96 129243.36 129243.36

34 m depth m 129243.35 129243.35 142167.69 142167.69

35 m depth m 142167.68 142167.68 156384.45 156384.45

36 m depth m 156384.46 156384.46 172022.91 172022.91

37 m depth m 172022.90 172022.90 189225.19 189225.19

38 m depth m 189225.19 189225.19 208147.71 208147.71

39 m depth m 208147.72 208147.72 228962.49 228962.49

40 m depth m 228962.48 228962.48 251858.73 251858.73

B Clayey Soil ( 11m dia.


Well )

(I) Depth below bed level upto


3.0 M m 25366.02 25366.02 27902.62 27902.62

(ii) Beyond 3m upto 10m depth


m 42337.40 42337.40 46571.14 46571.14

Chapter-21 Page 321 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(iii) 11 m depth m 46676.99 46676.99 51344.69 51344.69

12 m depth m 49010.84 49010.84 53911.92 53911.92

13 m depth m 51461.38 51461.38 56607.52 56607.52

14 m depth m 54034.45 54034.45 59437.90 59437.90

15 m depth m 56736.17 56736.17 62409.79 62409.79

16 m depth m 59572.98 59572.98 65530.28 65530.28

17 m depth m 62551.63 62551.63 68806.79 68806.79

18 m depth m 65679.21 65679.21 72247.13 72247.13

19 m depth m 68963.17 68963.17 75859.49 75859.49

20 m depth m 72411.33 72411.33 79652.46 79652.46

(iv) 21 m depth m 92669.26 92669.26 101936.19 101936.19

22 m depth m 99619.46 99619.46 109581.41 109581.41

23 m depth m 107090.93 107090.93 117800.02 117800.02

24 m depth m 115122.75 115122.75 126635.03 126635.03

25 m depth m 123756.96 123756.96 136132.66 136132.66

26 m depth m 133038.74 133038.74 146342.61 146342.61

27 m depth m 143016.64 143016.64 157318.30 157318.30

28 m depth m 153742.89 153742.89 169117.18 169117.18

29 m depth m 165273.60 165273.60 181800.96 181800.96

30 m depth m 177669.13 177669.13 195436.04 195436.04

(v) 31 m depth m 187618.60 187618.60 206380.46 206380.46

32 m depth m 206380.45 206380.45 227018.50 227018.50

33 m depth m 227018.50 227018.50 249720.35 249720.35

34 m depth m 249720.35 249720.35 274692.39 274692.39

35 m depth m 274692.38 274692.38 302161.62 302161.62

36 m depth m 302161.62 302161.62 332377.78 332377.78

37 m depth m 332377.79 332377.79 365615.57 365615.57

38 m depth m 365615.57 365615.57 402177.13 402177.13

Chapter-21 Page 322 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
39 m depth m 402177.12 402177.12 442394.83 442394.83

40 m depth m 442394.83 442394.83 486634.31 486634.31

C Soft Rock (11m dia well)

Depth in soft rock strata


upto 3m m 61896.90 61896.90 68086.59 68086.59

D Hard Rock ( 11m dia well )

Depth in Hard rock strata up


to 3 m m 78612.29 83551.81 86473.52 91413.04

21.18 Sinking of 12 m
external diameter well
(other than pneumatic
method of sinking)
through all types of
strata namely sandy soil,
clayey soil and rock as
shown against each case,
complete as per drawing
and technical
specifications. Depth of
sinking is reckoned from
bed level.The rate inclusive
of dewatering.

A Sandy Soil

(i) Depth below bed level upto


m 55388.53 55388.53 60927.38 60927.38
3.0 M

(ii) Beyond 3m upto 10m depth


m 62926.54 62926.54 69219.19 69219.19

(iii) 11 m depth m 66072.87 66072.87 72680.15 72680.15

12 m depth m 69376.51 69376.51 76314.16 76314.16

13 m depth m 72845.34 72845.34 80129.87 80129.87

14 m depth m 76487.61 76487.61 84136.37 84136.37

15 m depth m 80311.99 80311.99 88343.19 88343.19

16 m depth m 84327.59 84327.59 92760.35 92760.35

17 m depth m 88543.97 88543.97 97398.37 97398.37

18 m depth m 92971.17 92971.17 102268.29 102268.29


Chapter-21 Page 323 CSR-2020
CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

19 m depth m 97619.73 97619.73 107381.70 107381.70

20 m depth m 102500.72 102500.72 112750.79 112750.79

(iv) 21 m depth m 132225.92 132225.92 145448.51 145448.51

22 m depth m 142142.87 142142.87 156357.16 156357.16

23 m depth m 152803.58 152803.58 168083.94 168083.94

24 m depth m 164263.85 164263.85 180690.24 180690.24

25 m depth m 176583.64 176583.64 194242.00 194242.00

26 m depth m 189827.41 189827.41 208810.15 208810.15

27 m depth m 204064.46 204064.46 224470.91 224470.91

28 m depth m 219369.30 219369.30 241306.23 241306.23

29 m depth m 235822.00 235822.00 259404.20 259404.20

30 m depth m 253508.64 253508.64 278859.50 278859.50

(v) 31 m depth m 278859.50 278859.50 306745.45 306745.45

32 m depth m 306745.45 306745.45 337420.00 337420.00

33 m depth m 337420.00 337420.00 371162.00 371162.00

34 m depth m 371161.99 371161.99 408278.19 408278.19

35 m depth m 408278.20 408278.20 449106.02 449106.02

36 m depth m 449106.01 449106.01 494016.61 494016.61

37 m depth m 494016.61 494016.61 543418.27 543418.27

38 m depth m 543418.27 543418.27 597760.10 597760.10

39 m depth m 597760.10 597760.10 657536.11 657536.11

40 m depth m 657536.11 657536.11 723289.72 723289.72

B Clayey Soil ( 12m dia.


Well )

(I) Depth below bed level upto


m 61866.71 61866.71 68053.38 68053.38
3.0 M

(ii) Beyond 3m upto 10m depth


m 103104.94 103104.94 113415.43 113415.43

(iii) 11 m depth m 113673.20 113673.20 125040.52 125040.52

Chapter-21 Page 324 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
12 m depth m 119356.86 119356.86 131292.55 131292.55

13 m depth m 125324.70 125324.70 137857.17 137857.17

14 m depth m 131590.94 131590.94 144750.03 144750.03

15 m depth m 138170.49 138170.49 151987.54 151987.54

16 m depth m 145079.01 145079.01 159586.91 159586.91

17 m depth m 152332.96 152332.96 167566.26 167566.26

18 m depth m 159949.61 159949.61 175944.57 175944.57

19 m depth m 167947.09 167947.09 184741.80 184741.80

20 m depth m 176344.44 176344.44 193978.88 193978.88

(iv) 21 m depth m 225678.90 225678.90 248246.79 248246.79

22 m depth m 242604.81 242604.81 266865.29 266865.29

23 m depth m 260800.18 260800.18 286880.20 286880.20

24 m depth m 280360.19 280360.19 308396.21 308396.21

25 m depth m 301387.20 301387.20 331525.92 331525.92

26 m depth m 323991.24 323991.24 356390.36 356390.36

27 m depth m 348290.58 348290.58 383119.64 383119.64

28 m depth m 374412.36 374412.36 411853.60 411853.60

29 m depth m 402493.29 402493.29 442742.62 442742.62

30 m depth m 432680.29 432680.29 475948.32 475948.32

(v) 31 m depth m 456910.38 456910.38 502601.42 502601.42

32 m depth m 502601.42 502601.42 552861.56 552861.56

33 m depth m 552861.56 552861.56 608147.72 608147.72

34 m depth m 608147.72 608147.72 668962.49 668962.49

35 m depth m 668962.50 668962.50 735858.75 735858.75

36 m depth m 735858.76 735858.76 809444.64 809444.64

37 m depth m 809444.63 809444.63 890389.09 890389.09

38 m depth m 890389.09 890389.09 979428.00 979428.00

39 m depth m 979428.00 979428.00 1077370.80 1077370.80

Chapter-21 Page 325 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
40 m depth m 1077370.80 1077370.80 1185107.88 1185107.88

C Soft Rock(12m dia well)

Depth in soft rock strata


upto 3m m 144194.09 144194.09 158613.49 158613.49

D Hard Rock (12m dia well)

Depth in Hard rock strata up


m 182271.79 182271.79 200498.97 200498.97
to 3 m

21.19 Sinking of Twin D Type


well (other than pneumatic
method of sinking) through
all types of strata namely
sandy soil, clayey soil and
rock as shown against
each case, complete as
per drawing and technical
specifications. Depth of
sinking is reckoned from
bed level.The rate
inclusive of dewatering
(Well size 12 m x 6 m)

A Sandy Soil

(i) Depth below bed level upto


m 12496.05 12496.05 13745.66 13745.66
3.0 M

(ii) Beyond 3m upto 10m depth


m 13516.34 13516.34 14867.98 14867.98

(iii) 11 m depth m 14192.16 14192.16 15611.38 15611.38

12 m depth m 14901.77 14901.77 16391.95 16391.95

13 m depth m 15646.86 15646.86 17211.55 17211.55

14 m depth m 16429.20 16429.20 18072.12 18072.12

15 m depth m 17250.66 17250.66 18975.73 18975.73

16 m depth m 18113.19 18113.19 19924.51 19924.51

17 m depth m 19018.85 19018.85 20920.74 20920.74

18 m depth m 19969.79 19969.79 21966.77 21966.77

Chapter-21 Page 326 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

19 m depth m 20968.28 20968.28 23065.11 23065.11

20 m depth m 22016.69 22016.69 24218.36 24218.36

(iv) 21 m depth m 28402.00 28402.00 31242.20 31242.20

22 m depth m 30532.00 30532.00 33585.20 33585.20

23 m depth m 32822.00 32822.00 36104.20 36104.20

24 m depth m 35283.00 35283.00 38811.30 38811.30

25 m depth m 37929.00 37929.00 41721.90 41721.90

26 m depth m 40774.00 40774.00 44851.40 44851.40

27 m depth m 43832.00 43832.00 48215.20 48215.20

28 m depth m 47120.00 47120.00 51832.00 51832.00

29 m depth m 50654.00 50654.00 55719.40 55719.40

30 m depth m 54453.00 54453.00 59898.30 59898.30

(v) 31 m depth m 59898.00 59898.00 65887.80 65887.80

32 m depth m 65888.00 65888.00 72476.80 72476.80

33 m depth m 72476.00 72476.00 79723.60 79723.60

34 m depth m 79724.00 79724.00 87696.40 87696.40

35 m depth m 87696.00 87696.00 96465.60 96465.60

36 m depth m 96466.00 96466.00 106112.60 106112.60

37 m depth m 106113.00 106113.00 116724.30 116724.30

38 m depth m 116724.00 116724.00 128396.40 128396.40

39 m depth m 128396.00 128396.00 141235.60 141235.60

40 m depth m 141236.00 141236.00 155359.60 155359.60

B Clayey Soil ( Twin D Type


well )

(I) Depth below bed level upto


3.0 M m 14812.65 14812.65 16293.91 16293.91

(ii) Beyond 3m upto 10m depth


m 22586.42 22586.42 24845.07 24845.07

Chapter-21 Page 327 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(iii) 11 m depth m 24902.00 24902.00 27392.20 27392.20

12 m depth m 26147.00 26147.00 28761.70 28761.70

13 m depth m 27454.00 27454.00 30199.40 30199.40

14 m depth m 28827.00 28827.00 31709.70 31709.70

15 m depth m 30268.00 30268.00 33294.80 33294.80

16 m depth m 31781.00 31781.00 34959.10 34959.10

17 m depth m 33370.00 33370.00 36707.00 36707.00

18 m depth m 35039.00 35039.00 38542.90 38542.90

19 m depth m 36791.00 36791.00 40470.10 40470.10

20 m depth m 38630.00 38630.00 42493.00 42493.00

(iv) 21 m depth m 49437.80 49437.80 54381.58 54381.58

22 m depth m 53145.64 53145.64 58460.20 58460.20

23 m depth m 57131.56 57131.56 62844.72 62844.72

24 m depth m 61416.43 61416.43 67558.07 67558.07

25 m depth m 66022.66 66022.66 72624.93 72624.93

26 m depth m 70974.36 70974.36 78071.80 78071.80

27 m depth m 76297.44 76297.44 83927.18 83927.18

28 m depth m 82019.75 82019.75 90221.73 90221.73

29 m depth m 88171.24 88171.24 96988.36 96988.36

30 m depth m 94784.08 94784.08 104262.49 104262.49

(v) 31 m depth m 100091.99 100091.99 110101.19 110101.19

32 m depth m 110101.19 110101.19 121111.31 121111.31

33 m depth m 121111.31 121111.31 133222.44 133222.44

34 m depth m 133222.44 133222.44 146544.68 146544.68

35 m depth m 146544.68 146544.68 161199.15 161199.15

36 m depth m 161199.16 161199.16 177319.08 177319.08

37 m depth m 177319.07 177319.07 195050.98 195050.98

38 m depth m 195050.98 195050.98 214556.08 214556.08

Chapter-21 Page 328 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
39 m depth m 214556.08 214556.08 236011.69 236011.69

40 m depth m 236011.68 236011.68 259612.85 259612.85

C Soft Rock(Twin D Type


well)

Depth in soft rock strata m 30742.65 30742.65 33816.91 33816.91


upto 3m
D Hard Rock ( Twin D Type
well )

Depth in Hard rock strata up


to 3 m m 38343.26 40401.39 42177.59 44235.72

21.20 Sand Filling in Wells


complete as per Drawing
and Technical cum 163.71 1154.32 180.08 1170.69
Specifications.

21.21 Providing Steel Liner 10 mm


thick for Curbs and 6 mm
thick for Steining of Wells
including Fabricating and
MT 19964.08 68835.13 21960.49 70831.54
Setting out as per Detailed
Drawing.

21.22 Bored cast-in-situ M35


grade R.C.C. Pile excluding
Reinforcement complete as
per Drawing and Technical
Specifications and removal m 6451.62 9725.94 7096.78 10371.10
of excavated earth with all
lifts and lead upto 1000 m.

21.23 Bored cast-in-situ M35


grade R.C.C. Pile excluding
Reinforcement complete as
per Drawing and Technical
Specifications and removal m 7480.82 12194.17 8228.90 12942.25
of excavated earth with all
lifts and lead upto 1000 m.

Chapter-21 Page 329 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.24 Pile Load Test on single
Vertical Pile in
accordance with
IS:2911(Part-IV) (The
rates are for estimate
purpose only.)

a) Initial and routine load MT 0.00 834.26 0.00 0.00


test
b) Lateral load test MT 0.00 6852.85 0.00 0.00

21.25 Cement Concrete for


Reinforced Concrete in Pile
Cap complete as per
Drawing and Technical
Specification

A RCC Grade M20

(i) Using Concrete Mixer cum 1601.11 4957.11 1761.22 5117.22

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 879.30 4235.30 967.23 4323.23
Pump

B RCC Grade M25

(i) Using Concrete Mixer cum 1489.27 5205.36 1638.20 5354.29

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 901.63 4617.72 991.79 4707.88
Pump

C RCC Grade M30

(i) Using Concrete Mixer cum 1492.23 5255.91 1641.45 5405.14

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 904.58 4668.27 995.04 4758.72
Pump

D RCC Grade M35

(i) Using Concrete Mixer cum 1498.13 5357.01 1647.94 5506.83

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 910.48 4769.37 1001.53 4860.41
Pump

Chapter-21 Page 330 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.26 Levelling Course for Pile
cap

Providing and laying of PCC


M15 levelling course
100mm thick below the pile cum 1185.35 4100.51 1303.88 4219.04
cap.

21.27 Supplying, Fitting and


Placing un coated HYSD
bar Reinforcement in
Foundation complete as MT 4766.48 59413.67 5243.13 59890.32
per Drawing and Technical
Specifications.

SUB STRUCTURE

21.28 Brick masonry work in 1:3 in


sub-structure complete
excluding pointing and
plastering, as per drawing cum 1963.04 6399.81 2159.34 6596.11
and Technical
Specifications

21.29 Pointing with cement mortar


(1:3 ) on brick work in
substructure as per Sqm 122.69 135.52 134.96 147.79
Technical Specifications

21.30 Plastering with cement


mortar (1:3 ) on brick work
in sub-structure as per Sqm 122.69 184.29 134.96 196.56
Technical Specifications

21.31 Stone masonry work in


cement mortar 1:3 for
substructure complete as
per drawing and Technical
Specifications

A Random Rubble Masonry


cum 2419.40 5310.53 2661.34 5552.47

B Coursed rubble masonry


cum 2811.59 5678.55 3092.75 5959.71
(first sort )

C Ashlar masonry(first sort)


cum 4146.18 7151.89 4560.80 7566.51

Chapter-21 Page 331 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.32 Plain/Reinforced cement
concrete in sub-structure
complete as per drawing
and Technical
Specifications

A PCC Grade M15

Height upto 5m Cum 1726.83 4644.06 1899.52 4816.74

B PCC Grade M20

Height upto 5m cum 1794.27 5148.18 1973.70 5327.60

C PCC Grade M25

Height upto 5m

(i) Using Concrete Mixer cum 1847.52 5544.97 2032.28 5729.72

cum With Batching Plant, Transit


Mixer and Concrete Pump cum 1202.23 4901.22 1322.45 5021.44

Height 5m to 10m

(i) Using Concrete Mixer cum 2112.39 5809.84 2323.63 6021.08

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1443.72 5142.71 1588.09 5287.08

Height above 10m

(i) Using Concrete Mixer cum 2443.48 6140.92 2687.83 6385.27

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1745.58 5444.58 1920.14 5619.13

D PCC Grade M30

Height upto 5m

(i) Using Concrete Mixer cum 1853.30 5587.99 2038.63 5773.32

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1207.44 4940.06 1328.18 5060.80
Pump

Height 5m to 10m

(i) Using Concrete Mixer cum 2120.48 5855.17 2332.53 6067.22

Chapter-21 Page 332 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(ii) Using Batching Plant,
Transit Mixer and Concrete cum 1451.02 5183.64 1596.12 5328.74
Pump

Height above 10m

(i) Using Concrete Mixer cum 2454.45 6189.15 2699.90 6434.59

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1755.49 5488.11 1931.04 5663.66
Pump

E RCC Grade M20

Height upto 5m

(i) Using Concrete Mixer cum 1800.19 5195.51 1980.21 5375.53

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1154.49 4548.77 1269.94 4664.22

Height 5m to 10m

(i) Using Concrete Mixer cum 2046.13 5441.44 2250.74 5646.05

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1376.89 4771.17 1514.58 4908.86

Height above 10m

(i) Using Concrete Mixer cum 2353.55 5748.86 2588.90 5984.22

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1654.89 5049.17 1820.37 5214.65

F RCC Grade M25

Height upto 5m

(i) Using Concrete Mixer cum 1854.08 5597.08 2039.49 5782.49

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1208.39 4950.34 1329.22 5071.18

Height 5m to 10m

(i) Using Concrete Mixer cum 2094.83 5837.82 2304.31 6047.30

Chapter-21 Page 333 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
(ii) With Batching Plant, Transit
Mixer and Concrete Pump cum 1427.94 5169.90 1570.74 5312.70

Height above 10m

(i) Using Concrete Mixer cum 2455.94 6198.94 2701.54 6444.53

(ii) With Batching Plant, Transit


Mixer and Concrete Pump cum 1757.28 5499.24 1933.01 5674.97

G RCC Grade M-30

Height upto 5m

(i) Using Concrete Mixer


cum 1857.29 5620.98 2043.02 5806.71

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1211.75 4975.44 1332.93 5096.61
Pump

Height 5m to 10m

(i) Using Concrete Mixer cum 2065.59 5837.75 2272.15 6044.31

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1401.86 5165.55 1542.05 5305.74
Pump

Height above 10m

(i) Using Concrete Mixer


cum 2361.25 6124.94 2597.37 6361.06

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1671.70 5435.38 1838.87 5602.55
Pump

H RCC Grade M-35

Height upto 5m

(i) Using Concrete Mixer cum 1872.05 5730.93 2059.25 5918.14

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1226.51 5085.39 1349.16 5208.04
Pump

Height 5m to 10m

Chapter-21 Page 334 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7

(i) Using Concrete Mixer cum 2036.86 5895.74 2240.54 6099.43

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1377.23 5236.12 1514.96 5373.84
Pump

Height above 10m

(i) Using Concrete Mixer cum 2284.07 6142.95 2512.47 6371.36

(ii) Using Batching Plant,


Transit Mixer and Concrete cum 1603.32 5462.20 1763.65 5622.53
Pump

21.33 Supplying, fitting and


placing HYSD bar
reinforcement in sub-
structure complete as per MT 4995.38 59642.57 5494.91 60142.11
drawing and Technical
Specifications.

21.34 Supplying, fitting and


placing Mild steel
reinforcement complete in
sub-structure as per MT 4089.97 53417.03 4498.97 53826.03
drawing and Technical
Specification

21.35 Providing weep holes in


Brick masonry/Plain/
Reinforced concrete
abutment, wing wall/ return
wall with 100 mm dia PVC
pipe, extending through the
full width of the structure MT 16.44 249.68 18.09 251.32
with slope of 1V :20H
towards drawing foce.
Complete as per drawing
and Technical
Specifications

21.36 Back filling behind


abutment, wing wall and
return wall complete as per
drawing and Technical
Specification

A Granular material Cum 422.48 1477.47 464.72 1519.72

Chapter-21 Page 335 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
B Sandy material cum 422.48 1413.10 464.72 1455.34

21.37 Providing and laying of Filter media


with granular materials/stone
crushed aggregates satisfying the
requirements laid down in clause
2504.2.2. of MoRTH specifications
to a thickness of not less than 600
mm with smaller size towards the
soil and bigger size towards the
wall and provided over the entire Cum 451.02 1464.06 496.12 1509.16
surface behind abutment, wing wall
and return wall to the full height
compacted to a firm condition
complete as per drawing and
Technical Specification.

21.38 Supplying, fitting and fixing in


position true to line and level cast
steel rocker bearing conforming to
IRC: 83(Pt.-1) section IX and Tonn
clause 2003 of MoRTH e 3.50 643.18 3.85 643.53
specifications complete including
all accessories as per drawing and
Technical Specifications.

21.39 Supplying, fitting and fixing in


position true to line and level forged
steel roller bearing conforming to
IRC: 83(Pt.-1) section IX and
clause 2003 of MoRTH Tonn 3.50 515.24 3.85 515.59
specifications complete including e
all accessories as per drawing and
Technical Specifications.

21.40 Supplying, fitting and fixing in


position true to line and level sliding
plate bearing with PTFE surface
sliding on stainless steel complete
including all accessories as per Tonn
drawing and Technical e 10.93 330.77 12.02 331.87
Specifications and BS: 5400,
section 9.1 & 9.2 (for PTFE) and
clause 2004 of MoRTH
Specifications.

Chapter-21 Page 336 CSR-2020


CSR−2020−Final
Sr. Descripition Unit Zone-A Zone-B
No. Through Through
Labour Rate Labour Rate
Rate Rate
1 2 3 4 5 6 7
21.41 Supplying, fitting and fixing in
position true to line and level
elastomeric bearing conforming to
IRC: 83 (Part-II) section IX and
clause 2005 of MoRTH cum 0.05 0.69 0.05 0.69
specifications complete including
all accessories as per drawing and
Technical Specifications.

21.42 Supplying, fitting and fixing in


position true to line and level POT-
PTFE bearing consisting of a metal
piston supported by a disc or
unreinforced elastomer confined
within a metal cylinder, sealing
rings, dust seals, PTFE surface
sliding against stainless steel
mating surface, complete assembly
to be of cast steel/fabricated Tonn
structural steel, metal and e 4.60 106.95 5.06 107.41
elastomer elements to be as per
IRC: 83 part-I & II respectively and
other parts conforming to BS: 5400,
section 9.1 & 9.2 and clause 2006
of MoRTH Specifications complete
as per drawing and approved
Technical Specifications.

Chapter-21 Page 337 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 22
BRIDGES - SUPER STRUCTURE & PROTECTION WORK
Notes :-
1 Rates under this chapter are based on PPC cement, however where OPC cement is to be used, additional
rate @ Rs. 20/- per bag may be added.

2 The rates for all materials include carriage up to 5km., additional carriage be adjusted accordingly while
deriving landing rates.

3 The rates of bitumen are based as on 01.07.2020, difference be adjusted as on date while preparing landing
rates for estimate

4 All rates for concrete include cost for Tools, Plant, vibrators & admixture wherever necessary as per
MORT&H guide lines

5 Separate rates for different heights for super structure has been added in this chapter, payment be made
accordingly.

6 Rates for concrete include transportation of concrete with transit mixture up to 5 km, additional carriage if any
be added as per rates under chapter 10 for carriage of concrete by transit mixture

7 Rates for Pre stressed & Pre tensioned girders includes all costs for casting yard, casing pipes, HT strands,
concrete, centering & shuttering , curing, transportation from yard to site and launching & placement with
hydra cranes.

8 All rates include cost for water, if supplied by the department, the rates be reduced accordingly.

9 The rates of steel of item No. 22.2, 22.7, 22.12, 22.10 are inclusive of wastage, overlaps, couplings, welded
joints,spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing,
shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement
as per section 1600 of MORT&H specification.

Sr. No. Descripition Zone-A Zone-B


Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
22.1 Furnishing and Placing Reinforced/
Prestressed cement concrete in super-
structure as per drawing and Technical
Specification

A RCC Grade M20 Case I

Using Concrete Mixer


(a) For solid slab super-structure

(i) Height up to 5m cum 2414.39 5807.63 2655.83 6049.07

(ii) Height 5m to 10m cum 2721.65 6114.89 2993.81 6387.06

(iii) Height above 10m cum 3028.91 6422.15 3331.80 6725.04

(b) For T-beam & slab

(i) Height up to 5m cum 2721.65 6114.89 2993.81 6387.06

(ii) Height 5m to 10m cum 3028.91 6422.15 3331.80 6725.04


(iii) Height above 10m cum 3336.17 6729.41 3669.78 7063.03

Using Batching Plant, Transit Mixer and


Concrete Pump

Chapter-22 Page 338 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) For Solid slab super-structure-
including centering and shuttering

(i) Height up to 5m cum 1710.55 5105.04 1881.60 5276.09

(ii) Height 5m to 10m cum 1988.56 5383.05 2187.42 5581.91

(iii) Height above 10m cum 2266.58 5661.06 2493.23 5887.72

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 1988.56 5383.05 2187.42 5581.91

(ii) Height 5m to 10m cum 2266.58 5661.06 2493.23 5887.72

(iii) Height above 10m cum 2544.59 5939.07 2799.05 6193.53


B RCC Grade M25

Using Concrete Mixer

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 2522.82 6265.81 2775.10 6518.09

(ii) Height 5m to 10m cum 2857.19 6600.18 3142.90 6885.90

(iii) Height above 10m cum 3191.55 6934.55 3510.71 7253.70

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2857.19 6600.18 3142.90 6885.90

(ii) Height 5m to 10m cum 3191.55 6934.55 3510.71 7253.70

(iii) Height above 10m cum 3525.92 7268.91 3878.51 7621.50

Using Batching Plant, Transit Mixer and


Concrete Pump

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 1818.34 5560.50 2000.17 5742.33

(ii) Height 5m to 10m cum 2123.30 5865.46 2335.63 6077.79

(iii) Height above 10m cum 2428.26 6170.42 2671.08 6413.25

Chapter-22 Page 339 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) For T-beam & slab-including
centering and shuttering

(i) Height up to 5m cum 2123.30 5865.46 2335.63 6077.79

(ii) Height 5m to 10m cum 2428.26 6170.42 2671.08 6413.25

(iii) Height above 10m cum 2733.22 6475.38 3006.54 6748.70

C RCC Grade M 30-For solid slab.

Using Concrete Mixer

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 2529.23 6292.92 2782.16 6545.85

(ii) Height 5m to 10m cum 2865.21 6628.89 3151.73 6915.41

(iii) Height above 10m cum 3201.18 6964.86 3521.29 7284.98

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2865.21 6628.89 3151.73 6915.41

(ii) Height 5m to 10m cum 3201.18 6964.86 3521.29 7284.98

(iii) Height above 10m cum 3537.15 7300.83 3890.86 7654.55

Using Batching Plant, Transit Mixer and


Concrete Pump

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 1825.01 5588.70 2007.51 5771.20

(ii) Height 5m to 10m cum 2131.64 5895.32 2344.80 6108.49

(iii) Height above 10m cum 2438.27 6201.95 2682.09 6445.78

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2131.64 5895.32 2344.80 6108.49

(ii) Height 5m to 10m cum 2438.27 6201.95 2682.09 6445.78

(iii) Height above 10m cum 2744.90 6508.58 3019.38 6783.07

Chapter-22 Page 340 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
D RCC/PSC Grade M35-for solid slab

Using Concrete Mixer

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 2421.41 6280.29 2663.55 6522.43

(ii) Height 5m to 10m cum 2764.76 6623.64 3041.23 6900.12

(iii) Height above 10m cum 3108.11 6966.99 3418.92 7277.80

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2764.76 6623.64 3041.23 6900.12

(ii) Height 5m to 10m cum 3108.11 6966.99 3418.92 7277.80

(iii) Height above 10m cum 3451.46 7310.34 3796.60 7655.49

(c) For box girder and balanced


cantilever-including centering and
shuttering

(i) Height up to 5m cum 3794.81 7653.69 4174.29 8033.17

(ii) Height 5m to 10m cum 4481.50 8340.39 4929.66 8788.54

(iii) Height above 10m cum 5168.20 9027.09 5685.02 9543.91

Using Batching Plant, Transit Mixer and


Concrete Pump

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 1728.92 5587.80 1901.81 5760.70

(ii) Height 5m to 10m cum 2042.93 5901.81 2247.22 6106.10

(iii) Height above 10m cum 2356.93 6215.82 2592.63 6451.51

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2042.93 5901.81 2247.22 6106.10

(ii) Height 5m to 10m cum 2356.93 6215.82 2592.63 6451.51

(iii) Height above 10m cum 2670.94 6529.82 2938.04 6796.92

Chapter-22 Page 341 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) For box girder and balanced
cantilever-including centering and
shuttering

(i) Height up to 5m cum 2984.95 6843.83 3283.44 7142.33

(ii) Height 5m to 10m cum 3612.96 7471.84 3974.26 7833.14

(iii) Height above 10m cum 4240.97 8099.86 4665.07 8523.96

E RCC/PSC Grade M-40

Using Concrete Mixer

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 2712.67 6650.56 2983.94 6921.82

(ii) Height 5m to 10m cum 3070.25 7008.14 3377.27 7315.16

(iii) Height above 10m cum 3427.83 7365.72 3770.61 7708.50

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 3070.25 7008.14 3377.27 7315.16

(ii) Height 5m to 10m cum 3427.83 7365.72 3770.61 7708.50

(iii) Height above 10m cum 3785.41 7723.30 4163.95 8101.84

Using Batching Plant, Transit Mixer and


Concrete Pump

(a) For Solid slab super-structure-


including centering and shuttering

(i) Height up to 5m cum 1777.00 5755.94 1954.70 5933.65

(ii) Height 5m to 10m cum 2101.00 6079.94 2311.10 6290.04

(iii) Height above 10m cum 2424.99 6403.93 2667.49 6646.43

(b) For T-beam & slab-including


centering and shuttering

(i) Height up to 5m cum 2101.00 6079.94 2311.10 6290.04

(ii) Height 5m to 10m cum 2424.99 6403.93 2667.49 6646.43

(iii) Height above 10m cum 2748.99 6727.93 3023.89 7002.83

Chapter-22 Page 342 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) For cast-in-situ box girder, segment
construction and balanced
cantilever- including centering and
shuttering

(i) Height up to 5m cum 2101.00 6079.94 2311.10 6290.04

(ii) Height 5m to 10m cum 2424.99 6403.93 2667.49 6646.43

(iii) Height above 10m cum 2748.99 6727.93 3023.89 7002.83

F PSC Grade M-45

(a) For Solid/ voided slab super-


structure-including centering and
shuttering

(i) Height up to 5m cum 1702.74 5904.75 1873.01 6075.02

(ii) Height 5m to 10m cum 2044.03 6246.03 2248.43 6450.44

(iii) Height above 10m cum 2385.32 6587.32 2623.85 6825.85

(b) For T-beam & slab including


launching of precast girders by
launching truss upto 40 m span.21-
31percent of cost of
concrete including centering and
shuttering.

(i) Height up to 5m cum 2044.03 6246.03 2248.43 6450.44

(ii) Height 5m to 10m cum 2385.32 6587.32 2623.85 6825.85

(iii) Height above 10m cum 2726.60 6928.61 2999.26 7201.27

(c) For cast-in-situ box girder, segment


construction and balanced
cantilever- including centering and
shuttering

(i) Height up to 5m cum 3067.89 7269.90 3374.68 7576.69

(ii) Height 5m to 10m cum 3750.46 7952.47 4125.51 8327.52

(iii) Height above 10m cum 4433.04 8635.05 4876.34 9078.35

G PSC Grade M-50

(a) For cast-in-situ box girder, segment


construction and balanced
cantilever- including centering and
shuttering

Chapter-22 Page 343 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(i) Height up to 5m cum 3086.09 7447.43 3394.70 7756.04

(ii) Height 5m to 10m cum 3793.37 8154.71 4172.71 8534.05

(iii) Height above 10m cum 4500.65 8861.99 4950.71 9312.05

H PSC Grade M- 55- Using 515 Kg /cum


cement

(a) For cast-in-situ box girder, segment


construction and balanced
cantilever- including centering and
shuttering

(i) Height up to 5m cum 3221.55 7832.51 3543.71 8154.66

(ii) Height 5m to 10m cum 3967.53 8578.49 4364.28 8975.24

(iii) Height above 10m cum 4713.51 9324.47 5184.86 9795.82

22.2 Supplying, fitting and placing HYSD bar


reinforcement in super-structure complete
as per drawing and technical specifications. MT 6531.42 61330.61 7184.56 61983.76

22.3 High tensile steel wires/strands including all


accessories for stressing, stressing
operations and grouting complete as per MT 17364.59 137193.85 19101.05 138930.30
drawing and Technical Specifications

22.4 Mastic Asphalt

A Providing and laying 6 mm thick


mastic asphalt wearing course on
top of deck slab excluding prime
coat with paving grade bitumen sqm 64.64 252.11 71.10 258.58
meeting the requirements given in
MOST Drg. No SD/200.

Chapter-22 Page 344 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
B Providing and laying 12 mm thick
mastic asphalt wearing course on
top of deck slab excluding prime
coat with paving grade bitumen
meeting the requirements given in
table 500-29, prepared by using
mastic cooker and laid to required
level and slope after cleaning the
surface, including providing antiskid
surface with bitumen precoated fine
grained hard stone chipping of 9.5
mm nominal size at the rate of sqm 135.16 283.65 148.67 297.17
0.005cum per 10 sqm and at an
approximate spacing of 10 cm
center to center in both directions,
pressed into surface when the
temperature of surfaces not less
than 100 deg. C, protruding 1 mm to
4 mm over mastic surface, all
complete as per clause 515.

22.5 Construction of precast RCC railing of M30


Grade , aggregate size not exceeding 12
mm, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical
post not to exceed 2000 mm, leaving m 344.54 1319.87 379.00 1354.33
adequate space between vertical post for
expansion, complete as per approved
drawings and technical specifications.

22.6 A Construction of RCC railing of


M30 Grade concrete, in-situ with 20
mm nominal size aggregate, true to
line and grade, tolerance of vertical
RCC post not to exceed 1 in 500,
centre to centre spacing between
vertical post not to exceed
2000 mm, leaving adequate
m 287.49 1262.82 316.24 1291.57
space between vertical post
for expansion, complete as per
approved standard plans of
MoRTH vide drawing no. SD/202.
and technical specifications.the rate
is inclusive of steel

Chapter-22 Page 345 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
B Construction of RCC railing of M20
Grade concrete , in-situ with 20 mm
nominal size aggregate, true to line
and grade, tolerance of vertical
RCC post not to exceed 1 in 500,
centre to centre spacing between
vertical post not to exceed 2000
mm, leaving adequate space m 230.84 613.98 253.93 637.07
between vertical post for expansion,
complete as per approved drawings
No 24 of PWD and technical
specifications (without steel
reinforcement).

C Construction of RCC railing of M25


Grade concrete , in-situ with 20 mm
nominal size aggregate, true to line
and grade, tolerance of vertical
RCC post not to exceed 1 in 500,
centre to centre spacing between
vertical post not to exceed 2000
m 224.45 647.08 246.90 669.53
mm, leaving adequate space
between vertical post for expansion,
complete as per approved drawings
No 24 of PWD and technical
specifications (without steel
reinforcement).

0.00 0.00 0.00 0.00

22.7 Providing, fitting and fixing mild steel


railing complete as per drawing and
Technical Specification m 414.79 2620.66 456.27 2662.14

22.8 A Drainage Spouts complete as per


drawing no. SD/205 and
Technical specification with 6
meter long GI 100 mm dia No 545.19 5745.73 599.71 5800.25
drainage GI light grade pipe (For
ROB,s)

B Drainage Spouts complete as per


drawing no. SD/205 and
Technical specification with 0.6
No 216.68 973.14 238.35 994.81
meter long GI 100 mm dia drainage
GI light grade pipe (For Bridges)

22.9 PCC M15 Grade,as leveling course below


approach slab complete as per drawing and cum 1401.94 4319.17 1542.14 4459.36
Technical specification

Chapter-22 Page 346 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

22.10 Reinforced cement concrete approach slab


using M-30 grade concrete , including
reinforcement and formwork complete as cum 1122.16 7293.76 1234.38 7405.97
per drawing and Technical specification

22.11 Providing using M-40 grade concrete ,


precasting, transportation and placing in
position precast pretensioned concrete cum 6596.88 22350.95 7256.56 23010.64
girders as per drawing and technical
specifications

22.12 Crash Barriers

A Provision of an Reinforced cement


concrete crash barrier at the edges
of the Bridge,road, approaches to
bridge structures and medians,
constructed with M-40 grade
concrete , with HYSD
reinforcement conforming to IRC:21
and dowel bars 25 mm dia, 450 mm
long at expansion joints filled with
pre-moulded asphalt filler board,
m 1305.02 3393.60 1435.52 3524.10
keyed to the structure on which it is
built and installed as per design
given in the enclosure to MOST
circular No. RW/NH - 33022/1/94-
DO III dated 24 June 1994 as per
dimensions in the approved drawing
and at locations directed by the
Engineer, all as specified-with
concrete mixture.

B Provision of an Reinforced cement


concrete crash barrier at the edges
of the Bridge,road, approaches to
bridge structures and medians,
constructed with M-40 grade
concrete , as per dimensions in the
PWD stanadard drawing No m 527.80 2892.31 580.59 2945.09
27.Section 1,Including form work
but excluding steel reinforcement-
and at locations directed by the
Engineer, all as specified-with
concrete mixture.

Chapter-22 Page 347 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
c Provision of an Reinforced cement
concrete crash barrier at the edges
of the Bridge,road, approaches to
bridge structures and medians,
constructed with M-40 grade
concrete , as per dimensions in the
Punjab PWD stanadard drawing No m 1109.95 5967.10 1220.94 6078.09
27.Section 2,Including form work
but excluding steel reinforcement-
and at locations directed by the
Engineer, all as specified-with
concrete mixture.

D Provision of an Reinforced cement


concrete crash barrier at the edges
of the Bridge,road, approaches to
bridge structures and medians,
constructed with M-40 grade
concrete using cement , as per
dimensions in the PWD stanadard
m 822.22 3458.32 904.44 3540.54
drawing No 27.Section 3,Including
form work but excluding steel
reinforcement-and at locations
directed by the Engineer, all as
specified-with concrete mixture.

E Provision of an Reinforced cement


concrete crash barrier at the edges
of the Bridge,road, approaches to
bridge structures and medians,
constructed with M-40 grade
concrete , as per dimensions in the
PWD stanadard drawing No m 3118.29 6426.97 3430.12 6738.80
27.Section 4,Including form work
but excluding steel reinforcement-
and at locations directed by the
Engineer, all as specified-with
concrete mixure.

Chapter-22 Page 348 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
F Providing and erecting a "W" metal
beam crash barrier comprising of 3
mm thick corrugated sheet metal
beam rail, 70 cm above road/ground
level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 1.8 m
high, 1.1 m below ground/road level,
all steel parts and fitments to be
m 210.26 3112.92 231.29 3133.94
galvanised by hot dip process, all
fittings to conform to IS:1367 and
IS:1364, metal beam rail to be fixed
on the vertical post with a spacer of
channel section 150 x 75 x 5 mm,
330 mm long complete as per
clause 810

Painting on concrete surface

22.13 Providing and applying 2 coats of water


based cement paint to unplastered concrete
surface after cleaning the surface of dirt,
dust, oil, grease, efflorescence and applying sqm 31.93 120.59 35.12 123.79
paint @ of 1 litre for 2 sqm.

Burried Joint

22.14 Providing and laying a burried expansion


joint, expansion gap being 20 mm, covered
with 12 mm thick, 200 mm wide galvanised
weldable structural steel plate as per IS:
2062, placed symmetrical to centre line of
the joint, resting freely over the top surface m 28.96 953.17 31.85 956.06
of the deck concrete, welding of 8 mm dia.
100 mm long galvanised nails spaced 300
mm c/c along the centre line of the plate, all
as specified in clause 2604.

22.15 Filler joint

(i) Providing & fixing 2 mm thick


corrugated copper plate in
expansion joint complete as per m 49.98 15539.69 54.98 15544.69
drawing & Technical Specification.

Chapter-22 Page 349 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(ii) Providing & fixing 20 mm thick
compressible fibre board in
expansion joint complete as per m 10.00 132.83 11.00 133.83
drawing & Technical Specification.

(iii) Providing and fixing in position 20


mm thick premoulded joint filler in
expansion joint for fixed ends of
simply supported spans not
exceeding 10 m to cater for a m 14.48 374.91 15.93 376.36
horizontal movement upto 20 mm,
covered with sealant complete as
per drawing and technical
specifications.

(iV) Providing and filling joint


sealing compound as per
drawings and technical
m 28.12 33.13 30.93 35.95
specifications with coarse sand
and 6 per cent bitumen by
weight-10 mm depth

Asphaltic Plug joint

22.16 Providing and laying of asphaltic plug joint to


provide for horizontal movement of 25 mm
and vertical movement of 2 mm, depth of
joint varying from 75 mm to 100 mm, width
varying from 500 mm to 750 mm (in traffic
direction), covered with a closure plate of
200mm x 6mm of weldable structural steel
conforming to IS: 2062, asphaltic plug to m 90.57 799.66 99.63 808.72
consist of polymer modified bitumen binder,
carefully selected single size aggregate of
12.5 mm nominal size and a heat resistant
foam caulking/backer rod, all as per
approved drawings and specifications.

Chapter-22 Page 350 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
22.17 Providing and laying of an elastomeric slab
steel expansion joint, catering to right or
skew (less than 20 deg., moderately curved
with maximum horizontal movement upto 50
mm, complete as per approved drawings
and standard specifications to be installed
by the manufacturer/supplier or their
M 72.87 13373.20 80.16 13380.49
authorised representative ensuring
compliance to the manufacturer's
instructions for installation and clause 2606
of MoRTH specifications for road & bridge
works.

22.18 Providing and laying of compression seal


joint consisting of steel armoured nosing at
two edges of the joint gap suitably anchored
to the deck concrete and a preformed
chloroprene elastomer or closed cell foam
joint sealer compressed and fixed into the M 43.72 7567.59 48.10 7571.96
joint gap with special adhesive binder to
cater for a horizontal movement upto 40 mm
and vertical movement of 3 mm.

22.19 Providing and laying of a strip seal


expansion joint catering to maximum
horizontal movement upto 70 mm, complete
as per approved drawings and standard
specifications to be installed by the
M 59.33 4714.45 65.27 4720.38
manufacturer/supplier or their authorised
representative ensuring compliance to the
manufacturer's instructions for installation.

22.20 Providing and laying of a modular strip Box


seal expansion joint including anchorage
catering to a horizontal movement beyond
70 mm and upto 140mm, complete as per
approved drawings and standard
specifications to be installed by the M 91.54 38092.46 100.69 38101.62
manufacturer/supplier or their authorised
representative ensuring compliance to the
manufacturer's instructions for installation.

Chapter-22 Page 351 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
22.21 Providing and laying of a modular strip box
seal expansion joint catering to a horizontal
movement beyond 140mm and upto
210mm, complete as per approved
drawings and standard specifications to be
M 84.32 69752.69 92.75 69761.12
installed by the manufacturer/supplier or
their authorised representative ensuring
compliance to the manufacturer's
instructions for installation.

BRIDGE TRAINING AND PROTECTION WORKS

22.22 Providing and laying boulders apron on


river bed for protection against scour
with stone boulders weighing not less
than 18 kg each complete as per
drawing and Technical specification. cum 658.97 1884.38 724.87 1950.28
Including excavation for trimming for
preparation of bed.
Boulder Laid Dry Without Wire Crates.

22.23 Boulder Apron Laid in Wire Crates

A Providing and laying of boulder


apron laid in wire crates made with
4mm dia GI wire confoming to IS:
280 & IS:4826 in 100mm x 100mm
mesh (weaved diagonally) including
10 per cent extra for laps and joints
cum 465.98 2493.91 512.58 2540.50
laid with stone boulders weighing
not less than 18 kg, Including
excavation for trimming for
prepration of bed Boulder Apron
Laid in Wire Crates

B Providing and laying of boulder


apron laid in wire crates made with
4mm dia GI wire confoming to IS:
280 & IS:4826 in 150mm x 150mm
mesh (weaved diagonally) including
cum 465.98 2192.91 512.58 2239.51
10 per cent extra for laps and joints
laid with stone boulders weighing
not less than 18 kg, Including
excavation for trimming.

Cement Concrete Blocks (size 0.5 x


0.5 x 0.5 m)

Chapter-22 Page 352 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
22.24 Providing and laying of apron with cement
concrete blocks of size 0.5x0.5x0.5 m cast
in-situ and made with nominal mix of M-15
grade cement concrete with a minimum cum 1401.94 4319.17 1542.14 4459.36
cement content of 275 kg/cum as per IRC:
21-2000.

22.25 Providing and laying Pitching on


slopes laid over prepared filter
media including boulder apron laid
dry in front of toe of embankment cum 658.97 1884.38 724.87 1950.28
complete as per drawing and
Technical specifications

22.26 Providing and laying Filter


material underneath pitching in
slopes complete as per drawing
and Technical specification
Includes Mazdoor required for cum 711.99 1820.65 783.19 1891.85
trimming of slope to proper profile
and preparation of bed.

22.27 Providing and laying Flooring


complete as per drawing and
Technical specifications laid over
cement concert bedding.Includes
cum 3078.95 6533.24 3386.85 6841.13
cement mortar for laying and
filling of joints.
Rubble stone laid in cement mortar
1:3

22.28 Dry Rubble Flooring


cum 1203.56 2428.97 1323.92 2549.33

22.29 Flexible Apron :Construction of


flexible apron 1 m thick comprising
of loose stone boulders weighing
cum 734.72 1960.13 808.19 2033.60
not less than 18 kg beyond curtain
wall.

Chapter-22 Page 353 CSR-2020


CSR−2020−Final
Sr. No. Descripition Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
22.30 Providing and construction of a
gabian structure for retaining earth
with segments of wire crates of size
7 m x 3 m x 0.6 m each divided into
1.5 m compartments by cross
netting, made from 4 mm
galvanised steel wire @ 32 kg per
10 sqm having minimum tensile
strength of 300 Mpa conforming to
cum 321.22 2757.26 353.35 2789.39
IS:280 and galvanizing coating
conforming to IS:4826, woven into
mesh with double twist, mesh size
not exceeding 100 x 100 mm, filled
with boulders with least dimension
of 200 mm, all loose ends to be tied
with 4 mm galvanised steel wire

22.31 Providing and constructing gabian


structures for erosion control, river
training works and protection works
with wire crates of size 2 m x 1 m x
0.3 m each divided into 1m
compartments by cross netting,
made from 4 mm galvanised steel
wire @ 32 kg per 10 sqm having
minimum tensile strength of 300
Mpa conforming to IS:280 and cum 337.29 4271.69 371.02 4305.42
galvanizing coating conforming to
IS:4826, woven into mesh with
double twist, mesh size not
exceeding 100 mm x 100 mm, filled
with boulders with least dimension
of 200 mm, all loose ends to be
securely tied with 4 mm galvanised
steel wire.

Chapter-22 Page 354 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 23

RIVER AND CANAL PROTECTION WORK

Note:-

(i) The rates for carriage of materials manually upto 0.50 km and by mechanical means  for 
every km lead have been given. The actual lead is to be paid if the lead is in fraction , the 
rate is to be worked out by interpolation.

Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

23.1 Cutting Pilchi, farash and sarkanda and


carriage to work lead two K.M. including
loading and unloading:-

(a)  Loose
cum 135.00 135.00 149.00 149.00

(b) Compacted in rolls of required


cum 563.00 563.00 619.00 619.00
diameter and length.

23.2 Loading pilchi, farash and sarkanda in boats


within 15 meters:-

(a) Loose
Cum 31.00 31.00 34.00 34.00

(b) Compacted in rolls
Cum 68.00 68.00 75.00 75.00

23.3 Carriage of Pilchi, farash and sarkanda by


boats including loading and unloading:-

(a) Loose:-

(i) One K.M.
Cum 41.00 41.00 45.00 45.00

(ii) Two K.M.
Cum 76.00 76.00 84.00 84.00

(iii) Three K.M.
Cum 102.00 102.00 112.00 112.00

(iv) Four K.M.
Cum 124.00 124.00 136.00 136.00

(v) Five K.M.
Cum 143.00 143.00 157.00 157.00

Chapter-23 Page 355 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
(vi) Subsequent K.M.  per K.M.
Cum 15.00 15.00 17.00 17.00

(b) Compacted:-

(i) One K.M.
Cum 99.00 99.00 109.00 109.00

(ii) Two K.M.
Cum 184.00 184.00 202.00 202.00

(iii) Three K.M.
Cum 245.00 245.00 270.00 270.00

(iv) Four K.M.
Cum 299.00 299.00 329.00 329.00

(v) Five K.M.
Cum 356.00 356.00 392.00 392.00

(vi) Subsequent K.M.  per K.M.
Cum 38.00 38.00 42.00 42.00

23.4 Unloading pilchi, farash and sarkanda from


boats and carriage  to yard up to one K.M.:-                                                                                                             

(a) Loose
Cum 68.00 68.00 75.00 75.00

(b) Compacted 
Cum 169.00 169.00 186.00 186.00

23.5 Making pilchi, farash or sarkanda rolls


excluding supply of materials:-

(a) 20 cm or 23 cm dia and 9 mtr long
Each 118.00 118.00 130.00 130.00

(b) 15 cm dia and 9 mtr long       
Each 79.00 79.00 87.00 87.00

( c ) 15 cm dia and 1.5 m long
Each 9.00 9.00 10.00 10.00

Note:- (i) The payment under item No. 23.5 is not to be made in addition to those of item No. 


23.1(b), 23.8, 23.9 and 23.10.

23.6 Making 0.75 mtr dia and 5.5 mtr long pilchi
rolls for permeable spurs. Each 533.00 533.00 586.00 586.00

Chapter-23 Page 356 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

23.7 Launching the above and placing in position.
Each 379.00 379.00 417.00 417.00

23.8 Pilchi, farash or sarkanda pitching on slope


with rolls 15 cm dia and 1.5 mtr long including
supply of pilchi involving carriage within 2
Sqm 592.00 592.00 651.00 651.00
K.M. and labour for making rolls.

Note:- (i) For above items, pitching shall be of 15cm dia. Layers of pilchi laid as header and 1.5. ms 


in length alternating with 15 cm covering of earth for consolidation including pegs and tying 
with wire (to be supplied by the department free of cost.)

23.9 Extra for carriage beyond 2 K.M. of pilchi


rolls 15 cm dia and 1.5 mtr long ( vide item
No. 23.8)

(a) 3rd KM
Sqm of 
pitching  47.00 47.00 52.00 52.00
surface

(b) Subsequent K.M. ( per K.M.)
sqm of 
pitching  29.00 29.00 32.00 32.00
surface

23.10 Pilchi, farash or sarkanda pitching one metre


Sqm of 
depth.
pitching  80 percent rate of item No. 23.8 & 23.9.
surface

23.11 Pilchi revetment including carriage up to 2


K.M. Sqm 228.00 228.00 251.00 251.00

23.12 Surface protection with pilchi mattress lead


up to 2 K.M. Sqm 158.00 158.00 174.00 174.00

23.13 Weaving mattresses of pilchi 30 cm thick.
Sqm 104.00 104.00 114.00 114.00

23.14 Rolling pilchi mattress to river edge and


floating after unrolling:-

Chapter-23 Page 357 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) area of mattress up to 200 Sqm.
Sqm 44.00 44.00 48.00 48.00

(b) area of mattress 200 sqm to 250 sq


Sqm 60.00 60.00 66.00 66.00
mtr. 

( c ) area of mattress above 250 Sqm.
Sqm 63.00 63.00 69.00 69.00

23.15 Laying Kahi mattress lead up to 2 K.M.
Sqm 142.00 142.00 156.00 156.00

23.16 Special Kahi revetment double lead up to 2


Sqm 293.00 293.00 322.00 322.00
K.M.

23.17 Gachi pitching with average thickness of 30


cm( joints to be broken) Sqm 142.00 142.00 156.00 156.00

23.18 Gachi pitching (done with slit clearance and


berm dressing) with thickness of 30 cm(
joints to be broken) Sqm 135.00 135.00 149.00 149.00

23.19 Fixing floating spurs in channels with material


from  canal plantation with in 2 K.M.:-

(a) up to F.S. depth 0.5 mtr
Each 3.00 3.00 3.00 3.00

(b) F.S. depth exceeding 0.50 mtr but up


Each 6.00 6.00 7.00 7.00
to 1.0 mtr

( c ) F.S. depth exceeding 1.0 mtr but up to


Each 9.00 9.00 10.00 10.00
1.25 mtr

(d) above 1.25 mtr F.S. depth.
Each 12.00 12.00 13.00 13.00

23.20 Stacking and bushing with canal plantation


within 2 Km.

(a) (i)  Pegs 1.0 m long, 5 cm dia
Each 4.00 4.00 4.00 4.00

(ii) Driving pegs 1.0 m long, 5 cm dia.
Each 2.00 2.00 2.00 2.00

(iii) Wattling brush wood between stakes


Metre of 
and   intertwining 6.00 6.00 7.00 7.00
One row

Chapter-23 Page 358 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

(b) (i)  Pegs 1.25 mtr long,7.5 cm dia


sharpened at one end Each 4.00 4.00 4.00 4.00

(ii) Driving pegs 1.25 m long, 7.5 cm dia.
Each 3.00 3.00 3.00 3.00

(iii) Wattling brush wood between stakes Metre of 


6.00 6.00 7.00 7.00
and intertwining one row

( c ) (i) Pegs 1.5 m long, 7.5 cm dia


Each 4.00 4.00 4.00 4.00
sharpened at one end

(ii) Driving pegs 1.5 m long, 7.5 cm dia.
Each 3.00 3.00 3.00 3.00

(iii) Wattling brush wood between stakes metre of 


8.00 8.00 9.00 9.00
and   intertwining One row

(d) (i)  Pegs 2.0 m long, 7.5 cm dia


Each 6.00 6.00 7.00 7.00
sharpened at one end

(ii) Driving pegs 2 mtr long, 7.5 cm dia.
Each 4.00 4.00 4.00 4.00

(iii) Wattling brush wood between stakes metre of 


11.00 11.00 12.00 12.00
and   intertwining One row

23.21 Filling brush wood only.
Cum 38.00 38.00 42.00 42.00

23.22 Filling cement bags with sand or earth and


sewing including cost of E.C bags and Each 5.00 10.00 6.00 11.00
strings.

23.23 Loading cement bags filled with sand or earth


in to trucks or boats with in 100 metres lead
Each 6.00 6.00 7.00 7.00

23.24 Carriage of sand filled in bags by boats:-

(a) 1st chain of 30 meters.
 100 Nos  47.00 47.00 52.00 52.00

(b) 2nd to 4th chain per chain of 30


 100  Nos  28.00 28.00 31.00 31.00
meters.

( c ) 5th and subsequent chains per chain


 100 Nos  19.00 19.00 21.00 21.00
of 30 meters.

Chapter-23 Page 359 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
23.25 Unloading from boats, bags filled with sand
and:-

(a) Placing in dry
Each 6.00 6.00 7.00 7.00

(b) Placing in water
Each 12.00 12.00 13.00 13.00

23.26 Filling cement bags with sand sewing and


laying in position within 30 meters in dry
Each
including cost of E.C bags and strings.                         9.00 16.00 10.00 17.00

23.27 Filling cement bags with sand, sewing and


laying in position within 30 meters in water
Each 16.00 22.00 18.00 24.00
including cost of E.C bags and strings.

23.28 Sewing empty cement  bags in to sheets.
Each 3.00 9.00 3.00 9.00

23.29 Weaving wire netting for wire crates


including binding sides and partitions to make
crate of 15 cm x 15 cm or 25 cm x 7.5 cm Sqm 53.00 182.00 58.00 187.00
mesh.

23.30 Filling brick bats in crates and hand packing.
Cum 112.00 742.00 123.00 753.00

23.31 Filling brick in crates and hand packing.
Cum 211.00 3231.00 232.00 3252.00

23.32 Filling stones or spalls into crates and hand


packing     Cum 292.00 1355.00 321.00 1384.00

23.33 Tipping wire crates including equipment.
Cum 211.00 211.00 232.00 232.00

23.34 Opening out old wire crates and remaking


after filling. Sqm 22.00 22.00 24.00 24.00

23.35 Labour for dismantling existing portion of old


protection work including cutting old trangger
and stacking old stones for re-use. Cum 244.00 244.00 268.00 268.00

Chapter-23 Page 360 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
23.36 Filling spaces and foundation with old stone
obtained from dismantling including labour
Cum 569.00 569.00 626.00 626.00
for dismantling.

23.37 Spreading wire crates over pitching


connecting with side protective walls inclusive
Sqm 64.00 64.00 70.00 70.00
of wire etc.

23.38 Wire crates of specified dimensions from all


directions of G.I. wire filled with boulders with
square cut faces against the wire.

(a) 4 mm dia G.I. wire 25 cm x 7.5 cm


Cum 470.00 470.00 517.00 517.00
mesh

(b) 4 mm dia G.I. wire 15 cm x 15 cm


mesh ( diagonal wise)   Cum 470.00 470.00 517.00 517.00

( c ) 4.75 mm dia G.I. wire 25 cm x 7.5 cm


mesh ( diagonal wise) Cum 470.00 470.00 517.00 517.00

(d) 4.75 mm dia G.I. wire 15 cm x 15 cm


mesh ( diagonal wise) Cum 470.00 470.00 517.00 517.00

( e ) 3.25 mm dia G.I. wire 25 cm x 7.5 cm


mesh ( diagonal wise) Cum 470.00 470.00 517.00 517.00

(f) 3.25 mm dia G.I. wire 15 cm x 15 cm


mesh ( diagonal wise)    Cum 470.00 470.00 517.00 517.00

Note:- (i) The through rate of item No. 23.38 is dependent on the  size of crate which varies as per 


the site conditions and design/ drawing.

23.39 Dumping stone
Cum 158.00 1221.00 174.00 1237.00

23.40 Extra for anchoring boat for dumping in


Cum 23.00 23.00 25.00 25.00
position.

23.41 Dismantling brush wood boulder bandh.
Cum 421.00 421.00 463.00 463.00

Chapter-23 Page 361 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
23.42 Stone or Kankar block pitching:-

(a) Horizontal
Cum 527.00 527.00 580.00 580.00

(b) On slopes of guide bandh and


Cum 677.00 677.00 745.00 745.00
protection works

23.43 Stone pitching top coping only
Cum 1171.00 2234.00 1288.00 2351.00

23.44 Filling stone or spall:-

(a) On level.
Cum 158.00 1221.00 174.00 1237.00

(b) On side slopes behind pitching.
Cum 167.00 1018.00 184.00 1035.00

23.45 Grouting stone filling or pitching:-

(a) With bajri or shingle.
Sqm 68.00 120.00 75.00 127.00

(b) With mortar.
Sqm 108.00 161.00 119.00 172.00

23.46 Grouting masonry joints of floors including


finishing:-

(a) When stones are up to 23 cm square    
Sqm 50.00 50.00 55.00 55.00

(b) When stones are more than 23 cm


square but under 45 cm square Sqm 33.00 33.00 36.00 36.00

Note:- (i) The through rate of the above item varies as per thickness of stone & richness of mix as 


per requirements.

23.47 Sand grouting stone apron with high pressure


hose. Sqm 9.00 9.00 10.00 10.00

Chapter-23 Page 362 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
23.48 Weaving- Coir Rope netting for Coir rope
crates including binding sides and partitions
to make crate of 22.5 cm x 22.5 cm mesh.
(including cost of coir rope) Size 10' x 8' x 4' Sqm 16.00 61.00 18.00 63.00
(min. weight per crate = 15.25 Kg)                                                                         

Note:- (i) The Chief Engineer in-charge of works concerned, may allow on works of temporary 


nature, the use of black annealed MS Wire number 6 or 8 SWG (4.75 mm or 4.00 mm) 
conforming to the relevant ISI specifications, in lieu of G.I. Wire.

Chapter-23 Page 363 CSR-2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 24

ROAD WORK
Notes :-
(i) The clauses of latest addition of MORT&H Specifications,which have been mentioned, may be
referred for detailed specifications and construction procedures. The rate mention only brief
description of work.

(ii) Unless otherwise stated, the rates include rehandling of materials within 100 metres.

(iii) The rates include the cost of working of road machinery including cost of fuels, lubricants, stores,
establishment, depreciation and interest charges. In case the machinery is provided by the
department, the working cost as mentioned shall be recovered from the contractor at the rates fixed
by the department as per chapter 2 of CSR.

(iv) All types of quarry materials have been taken from quarry with an average lead of 5 Km to work
site/plant site. If the lead increases/decreases from the quarry of cheapest landed rate at work
site/plant site, then rates will be adjusted accordingly.

(v) All type of Bitumen have been taken from Panipat/Bhatinda Refinery with an average round trip
lead of 20 Km (10 Km up and 10 Km down) to work site/plant site. The prevailing rates of bitumen
has been taken as on July 01, 2020. If the rate of bitumen increases/decreases or round trip lead is
more than 20 Km, then the bitumen rates will be adjusted accordingly and extra carriage for
bitumen beyond round trip lead 20 Km shall be paid as per chapter no. 5 (carriage of CSR under
heading carriage for bitumen).

(vi) Carriage of mixed material from plant site to work site is not included in the rates and it will be paid
as per chapter 5 of CSR. For bituminous items it will be paid 20% above the rates of item no. 5.2(i)
of chapter 5 of CSR. The carriage of wet mix macadam will be paid as per rates of item no. 5.2(i) of
chapter 5 of CSR.

(vii) Wherever any extra lead is involved for collection of material, the same shall be payable as per
chapter 5 of CSR.

(viii) Carriage of good earth for embankment construction/binding material has been taken as 1 km with
compensation of earth. If the lead increases then the rates will be adjusted accordingly.

(ix) The rates of item No. 24.37 to 24.57 are inclusive of all leads and nothing extra on account of
carriage is payable on these items except 24.41 (b,c,d).

(x) Lead has been included by transit mixer for batch plant mix concrete under item no. 24.58 to 24.60
has been taken for first 5 Kms. For lead beyond 5 Km, rates per cum/Km will be payable as chapter
no. 10 of CSR.

(xi) Road signage be used as follows:-

(a) High intensity Microprismatic grade Retro reflective sheeting Type XI wiil be used only for SH, NH/
Express way as per IRC -67 2012

(b) High intensity Microprismatic grade Retro reflective sheeting Type IV wiil be used for other roads
as per IRC -67 2012

Chapter-24 Page 364 CSR-2020


CSR−2020−Final
(xii) Bituminous material retrieved after milling road surface is the property of department and recovery
of this material must be deducted from the contractor's payment at rates as available in estimate for
landing rates for similar items.

(xiii) In case mechanical paver finisher is used instead of Hydrostatic paver finisher with sensor control
for execution of item no. 24.17 (a), 24.18 (a), 24.19 (a), 24.20 (a), 24.21 (a), 24.21 (b), 24.22 (a),
24.23 (a) over all rate will be deducted @ Rs. 65.00 per cum

Sr. Description Zone-A Zone-B


No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

24.1 Clearing Grass and Removal of Rubbish

Clearing grass and removal of rubbish up to a


distance of 50 meters outside the periphery of the
area as per technical clause 201 of MORT&H ha 24606.00 24606.00 27066.60 27066.60
specifications

24.2 Clearing and Grubbing Road Land

Clearing and grubbing road land including


uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or auctioned, up
to a lead of 1000 meters including removal and
disposal of top organic soil not exceeding 150 mm
in thickness as per technical clause 201 of
MORT&H specifications

A In area of Light Jungle (By Manual Means) ha 74184.00 74184.00 81602.40 81602.40

B In area of Thorny Jungle (By Manual Means)


ha 99155.14 99155.14 109070.66 109070.66

C In area of Light Jungle (By Mechanical Means)


ha 33500.00 33500.00 36849.90 36849.90

D In area of Thorny Jungle (By Mechanical Means)


ha 40900.00 40900.00 44990.00 44990.00

24.3 Dismantling of Flexible Pavements


(By Mechanical Means)

(a) Dismantling of flexible pavements thickness above


50mm by mechanical means and disposal of
dismantled materials up to a lead of 1000 meters,
stacking serviceable and unserviceable materials Cum. 292.00 292.00 321.20 321.20
separately as per technical clause 202 of
MORT&H specifications

24.3 Scarifying Existing Bituminous Surface to a depth


of 50mm by Mechanical Means

Chapter-24 Page 365 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(b) Scarifying the existing Bituminous road surface to


a depth of 50mm and disposal of scarified
material with in all lifts and lead upto 1000 meters Sqm 5.00 5.00 5.50 5.50

24.4 Compacting original ground below road crust

(a) Loosening, leveling and compacting original


ground up to a level of 500mm below road crust,
mixed with water at OMC, levelled, graded and
compacted in layers by rolling so as to achieve
minimum dry density as given in Table 300-2 for Cum. 65.00 65.00 71.50 71.50
sub grade construction as per technical clause
305 of MORT&H specifications

24.4 Compacting original ground below Embankment

(b) Loosening, leveling and compacting original


ground below embankment to facilitate placement
of first layer of embankment, scarified to a depth
of 150 mm, mixed with water at OMC and then
compacted by rolling so as to achieve minimum Cum. 28.00 28.00 30.80 30.80
dry density as given in Table 300-2 for
embankment construction as per technical clause
305 of MORT&H specifications

24.4 Compaction of Earth work

(c) Compaction of earth work & Preparation of sub


grade including loosening, leveling of earth
225mm thick top layer, rough dressing of soil, final
dressing of earth to give level, camber, watering,
rolling with road roller, compacting the bed to
achieve minimum dry density as given in the Sqm 6.00 6.00 6.60 6.60
Table 300-2 as per Technical clause 305 of
MORT&H specifications. (In case of link roads
earth work to be done by villagers)

24.5 Construction of Embankment with Good Quality


Earth obtained from Borrow pits

(a) Construction of embankment with good quality


earth obtained from borrow pits including
compensation of earth, loading, unloading,
carriage to site of work, spreading, grading to
required slope and compacting to meet Cum. 127.00 308.00 139.70 320.70
requirement of table 300-2 as per technical clause
305 of MORT&H specifications

Chapter-24 Page 366 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.5 Construction of Embankment with Earth obtained
from Roadway Cutting or Excavation

(b) Construction of embankment with earth obtained


from roadway cutting or excavation including
spreading, grading to required slope and
compacting to meet requirement of table 300-2 as Cum. 94.00 94.00 103.40 103.40
per technical clause 305 of MORT&H
specifications

24.5 Compaction

b (i) Extra for laying earth/fly ash as per specifications


in 20 cm. Layers and dressing but excluding cost Cum. 62.00 62.00 68.20 68.20
of rolling.

b (ii) Extra for watering the earth/fly ash laid in 20 cm


layers as per specifications for compaction. Cum. 15.00 15.00 16.50 16.50

b (iii) Extra for rolling to specifications. Cum. 17.00 17.00 18.70 18.70

24.6 Excavation for Roadway (By Manual Means)

(a) Excavation for roadway in soil by manual means


including carrying of cut earth to embankment site
with all lead and lifts up to 50m as per technical Cum. 185.00 185.00 203.50 203.50
clause 301 of MORT&H specifications

24.6 Excavation for Roadway (By Mechanical Means)

( b) Excavation for roadway in soil by mechanical


means with dozer including cutting and pushing
earth to embankment site with all lead and lifts up
to 100m including trimming bottom and side Cum. 58.00 58.00 63.80 63.80
slopes as per technical clause 301 of MORT&H
specifications

24.6 Excavation for Roadway (By Mechanical Means)

(c) Excavation in Soil (any type) using Hydraulic


Excavator CK 90 Excavation with hydraulic
excavator of 0.9 cum bucket capacity including
cutting trimming bottom and side slopes, in Cum. 32.00 32.00 35.20 35.20
accordance with requirements of lines, grades
and cross sections, including all lift and combined
lead up to 60 mtr.

24.7 Granular Sub-Base

Chapter-24 Page 367 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Construction of granular sub-base by providing
material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and Cum. 139.00 1194.00 152.90 1207.90
compacting with vibratory roller to achieve the
desired density, complete as per MORD technical
specifications

24.8 Granular Sub-Base (Table 400-1)

Construction of granular sub-base by providing


material as per grading-III ( Table 400-I of
MORT&H 5th revision), mixing in a mechanical
mix plant at OMC, spreading in uniform layers with
motor grader on prepared surface and compacting Cum. 189.08 1353.00 233.20 1374.20
with vibratory power roller to achieve the desired
density, complete as per technical clause 401 of
MORT&H specifications

24.9 Lime Treated Soil for Sub- Base

Laying and spreading soil on a prepared sub


grade, pulverising, mixing the spread soil in place
with rotavator with 3 per cent slaked lime with
minimum content of 70 per cent of CaO, grading
with motor grader and compacting with the road
roller at OMC to achieve at least 98 per cent of the Cum. 187.00 581.00 205.70 599.70
max dry density to form a layer of sub base
complete as per technical clause 402 of MORT&H
specifications

24.10 Making 50 mm x 50 mm Furrows

Making 50 mm x 50 mm furrows 45 degree to the


center line of the road and at one meter interval in
the existing bituminous wearing coarse including
sweeping and disposal of excavated material sqm. 5.00 5.00 5.50 5.50
within 1000 meters lead complete as per technical
(Full surface area will be measured for payment)

24.11 Water Bound Macadam Grading I

Chapter-24 Page 368 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) Providing, laying, spreading and compacting
stone aggregates of Grading I to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with
smooth wheeled roller 8-10 tonnes in stages to
proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill Cum. 460.13 1624.21 506.14 1670.22
up the interstices of coarse aggregate, watering
and compacting to the required density complete
as per technical clause 404 of MORT&H
specifications

24.11 Water Bound Macadam Grading I (without


screening for low volume Roads/undersigned
Roads)
(ii) Providing, laying, spreading and compacting
stone aggregates of Grading I to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with
smooth wheeled roller 8-10 tonnes in stages to
proper grade and camber, applying and brooming
requisite type of binding Materials to fill up the Cum. 460.13 1484.73 506.14 1530.74
interstices of coarse aggregate, watering and
compacting to the required density complete as
per technical specifications

24.12 Water Bound Macadam Grading II

(i) Providing, laying, spreading and compacting


stone aggregates of Grading II to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with
smooth wheeled roller 8-10 tonnes in stages to
proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill Cum. 460.13 1685.51 506.14 1731.52
up the interstices of coarse aggregate, watering
and compacting to the required density complete
as per technical clause 404 of MORT&H
specifications

24.12 Water Bound Macadam Grading II (without


screening for low volume Roads/undersigned
Roads

Chapter-24 Page 369 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(ii) Providing, laying, spreading and compacting
stone aggregates of Grading II to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with
smooth wheeled roller 8-10 tonnes in stages to
proper grade and camber, applying and brooming
requisite type of binding Materials to fill up the Cum. 460.13 1477.92 506.14 1523.93
interstices of coarse aggregate, watering and
compacting to the required density complete as
per technical specifications

24.13 Wet Mix Macadam

Providing, laying, spreading and compacting


graded stone aggregate to wet mix macadam
specification including premixing the Material with
water at OMC in mechanical mix plant, laying in
uniform layers with paver in sub- base / base
course on well prepared surface and compacting Cum. 257.01 1579.11 282.71 1604.81
with vibratory roller to achieve the desired density
complete as per technical clause 406 of MORT&H
specifications

24.14 Brick on end edging

Providing and laying of Brick on end edging


6.83cm wide, 11.11cm long and 22.86cm high half
brick deep including excavation, refilling and
Mtr. 12.81 71.84 14.09 73.12
disposal of surplus earth up to 50mtr complete as
per Punjab PWD specifications

24.15 Prime Coat @ 0.85kg per sqm

Providing and applying primer coat with bitumen


emulsion SS on prepared surface of granular
base including cleaning of road surface and
spraying primer at the rate of 0.85kg/sqm Sqm 1.80 32.11 1.98 32.29
complete as per technical clause 502 of MORT&H
specifications

24.16 Tack Coat @ 0.25kg per sqm

(a) Providing and applying tack coat with bitumen


emulsion RS using emulsion pressure distributor
at the rate of 0.25 kg per sqm on the prepared
bituminous surface/granular surface treated with sqm 1.69 10.65 1.86 10.82
prime coat after cleaning the surface complete as
per technical clause 503 of MORT&H
specifications

Chapter-24 Page 370 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.16 Tack Coat @ 0.40kg per sqm

(b) Providing and applying tack coat with penetration


grade bitumen VG-10 using bitumen pressure
distributor at the rate of 0.40 kg per sqm on the
prepared bituminous surface/granular surface sqm 1.92 15.18 2.11 15.37
treated with prime coat after cleaning the surface
complete as per technical specifications

24.16 Tack Coat @ 1.00 Kg per sqm ( for WBM patches


where surface dressing not applied)

(c) Providing and applying tack coat with penetration


grade bitumen VG-10 using bitumen pressure
distributor at the rate of 1.00 kg per sqm on the
prepared granular surface after cleaning the sqm 2.35 35.39 2.59 35.63
surface complete as per technical specifications

24.17 Bituminous Macadam 80mm to 100mm thickness


(Grading I)

(a) Providing and laying bituminous macadam 80mm


to 100mm thick with batch type hot mix plant using
crushed aggregates of specified grading premixed
with bituminous binder VG-30 @ 3.30%, laid over
a previously prepared surface with hydrostatic
paver finisher with sensor control to the required Cum 1428.02 5140.42 1570.82 5283.22
grade, level and alignment and rolled to achieve
the desired compaction complete as per technical
clause 504 of MORT&H specifications

24.17 Bituminous Macadam 80mm to 100mm thickness


(Grading I)

(b) Providing and laying bituminous macadam 80mm


to 100mm thick with Continuous type hot mix plant
using crushed aggregates of specified grading
premixed with bituminous binder VG-30 @ 3.30%,
laid over a previously prepared surface with paver
finisher mechanical to the required grade, level Cum 1332.00 5044.32 1465.20 5177.52
and alignment and rolled to achieve the desired
compaction complete as per technical clause 504
of MORT&H specifications

24.18 Bituminous Macadam 50mm to 75mm thickness


(Grading II)

Chapter-24 Page 371 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Providing and laying bituminous macadam 50mm
to 75mm thick with batch type hot mix plant using
crushed aggregates of specified grading premixed
with bituminous binder VG-30 @3.4%, laid over a
previously prepared surface with hydrostatic paver
finisher with sensor control to the required grade,
Cum 1428.02 5254.05 1570.82 5396.85
level and alignment and rolled to achieve the
desired compaction complete as per technical
clause 504 of MORT&H specifications

24.18 Bituminous Macadam 50mm to 75mm thickness


(Grading II)

(b ) Providing and laying bituminous macadam 50mm


to 75mm thick with Continuous type hot mix plant
using crushed aggregates of specified grading
premixed with bituminous binder VG-30 @3.4%,
laid over a previously prepared surface with paver
finisher Mechanical to the required grade, level Cum 1332.00 5158.04 1465.20 5291.24
and alignment and rolled to achieve the desired
compaction complete as per technical clause 504
of MORT&H specifications

24.19 Dense Graded Bituminous Macadam 80mm to


100mm thickness (Grading I)

(a) Providing and laying dense graded bituminous


macadam 80mm to 100mm thick with batch type
HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30
@ 4%, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and Cum 1501.25 6327.65 1651.37 6477.77
alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired
compaction complete as per technical clause 505
of MORT&H specifications

24.19 Dense Graded Bituminous Macadam 80mm to


100mm thickness (Grading I)

(b) Providing and laying dense graded bituminous


macadam 80mm to 100mm thick with Continuous
type hot mix plant using crushed aggregates of
specified grading, premixed with bituminous
binder VG-30 @ 4%, laying with a Paver Finisher
Mechanical to the required grade, level and Cum 1338.28 6164.68 1472.11 6298.51
alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired
compaction complete as per technical clause 505
of MORT&H specifications

Chapter-24 Page 372 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.20 Dense Graded Bituminous Macadam 50mm to
75mm thickness (Grading II)

(a) Providing and laying dense graded bituminous


macadam 50mm to 75mm thick with batch type
HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30
@ 4.5%, laying with a hydrostatic paver finisher
with sensor control to the required grade, level Cum 1501.25 6712.45 1651.37 6862.57
and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction complete as per technical
clause 505 of MORT&H specifications

24.20 Dense Graded Bituminous Macadam 50mm to


75mm thickness (Grading II)

(b) Providing and laying dense graded bituminous


macadam 50mm to 75mm thick with Continuous
type hot mix plant using crushed aggregates of
specified grading, premixed with bituminous
binder VG-30 @ 4.5%, laying with a Paver
Finisher Mechanical to the required grade, level
and alignment, rolling with smooth wheeled, Cum 1338.28 6549.48 1472.11 6683.31
vibratory and tandem rollers to achieve the
desired compaction complete as per technical
clause 505 of MORT&H specifications

24.21 Semi-Dense Bituminous Concrete 35mm to 40mm


thickness (Grading I)

(a) Providing and laying semi dense bituminous


concrete 35mm to 40mm thick with batch type
HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30
@ 4.5%, laying with a hydrostatic paver finisher
with sensor control to the required grade, level
Cum 1501.25 6743.92 1651.37 6894.04
and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction complete as per IRC-111
(2009) specifications

24.21 Semi-Dense Bituminous Concrete 35mm to 40mm


thickness (Grading I)

Chapter-24 Page 373 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) i Providing and laying semi dense bituminous
concrete 35mm to 40mm thick with Continuous
type hot mix plant using crushed aggregates of
specified grading, premixed with bituminous
binder VG-30 @ 4.5%, laying with a Paver
Finisher Mechanical to the required grade, level Cum 1338.28 6580.95 1472.11 6714.78
and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction complete as per IRC-111
(2009) specifications

24.21 Semi-Dense Bituminous Concrete 25mm to 30mm


thickness (Grading II)

(b) Providing and laying semi dense bituminous


concrete 25mm to 30mm thick with batch type
HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30
@ 5%, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and Cum 1501.25 7139.44 1651.37 7289.56
alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired
compaction complete as per IRC-111 (2009)
specifications

24.21 Semi-Dense Bituminous Concrete 25mm to 30mm


thickness (Grading II)

(b) i Providing and laying semi dense bituminous


concrete 25mm to 30mm thick with Continuous
type hot mix plant using crushed aggregates of
specified grading, premixed with bituminous
binder VG-30 @ 5%, laying with a Paver Finisher
Mechanical to the required grade, level and Cum 1338.28 6976.47 1472.11 7110.30
alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired
compaction complete as per IRC-111 (2009)
specifications

24.22 Bituminous Concrete 50mm to 65mm thickness


(Grading I)

Chapter-24 Page 374 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Providing and laying bituminous concrete 50mm
to 65mm thick with batch type hot mix plant using
crushed aggregates of specified grading,
premixed with bituminous binder VG-30 @ 5.20%,
laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem Cum 1532.69 7431.50 1685.96 7584.77
rollers to achieve the desired compaction
complete as per technical clause 507 of MORT&H
specifications

24.22 Bituminous Concrete 50mm to 65mm thickness


(Grading I)

(b) Providing and laying bituminous concrete 50mm


to 65mm thick with Continuous type hot mix plant
using crushed aggregates of specified grading,
premixed with bituminous binder VG-30 @ 5.2%,
laying with a Paver Finisher Mechanical to the
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to Cum 1344.90 7243.71 1479.39 7378.20
achieve the desired compaction complete as per
technical clause 507 of MORT&H specifications

24.23 Bituminous Concrete 30mm to 45mm thickness


(Grading II)

(a) Providing and laying bituminous concrete 30mm


to 45mm thick with batch type hot mix plant using
crushed aggregates of specified grading,
premixed with bituminous binder VG-30 @ 5.4%,
laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem Cum 1532.69 7597.56 1685.96 7750.83
rollers to achieve the desired compaction
complete as per technical clause 507 of MORT&H
specifications

24.23 Bituminous Concrete 30mm to 45mm thickness


(Grading II)

Chapter-24 Page 375 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Providing and laying bituminous concrete 30mm
to 45mm thick with Continuous type hot mix plant
using crushed aggregates of specified grading,
premixed with bituminous binder VG-30 @ 5.4%,
laying with a Paver Finisher Mechanical to the
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to Cum 1344.90 7409.77 1479.39 7544.26
achieve the desired compaction complete as per
technical clause 507 of MORT&H specifications

24.24 Surface Dressing

Providing and laying surface dressing in single


coat using crushed stone aggregates of specified
size on a layer of bituminous binder VG-10 @ 1kg
per sqm laid on prepared surface after cleaning
the road surface and rolling with 8-10 tonne sqm 17.08 58.95 18.79 60.66
smooth wheeled steel roller complete as per
technical clause 509 of MORT&H specifications

24.25 Open - Graded Premix Surfacing 20mm thickness

(a) Providing, laying and compaction of open - graded


premix surfacing of 20 mm thickness consisting of
crushed stone aggregates of specified grading
premixed in a Continuous type hot mix plant with
bituminous binder VG-10 @ 1.46kg per sqm, laid
with Paver Finisher Mechanical and rolling with a
sqm 24.84 97.06 27.32 99.54
smooth wheeled roller 8-10 tonne capacity,
finished to required level and grades complete as
per technical clause 510 of MORT&H
specifications

24.25 Open - Graded Premix Surfacing 20mm thickness

(b) Providing, laying and compaction of open - graded


premix surfacing of 20 mm thickness consisting of
crushed stone aggregates of specified grading
premixed in a Continuous type hot mix plant with
bituminous binder VG-30 @ 1.46kg per sqm, laid
with Paver Finisher Mechanical and rolling with a
sqm 24.84 98.53 27.32 101.01
smooth wheeled roller 8-10 tonne capacity,
finished to required level and grades complete as
per technical clause 510 of MORT&H
specifications

Chapter-24 Page 376 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.26 Close Graded Premix Surfacing/ Mixed Seal
Surfacing 20mm thickness (Type A)

(a) Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
Type A consisting of crushed stone aggregates of
specified grading premixed in a Continuous type
hot mix plant with bituminous binder VG-10 @
2.2kg per sqm, laying with Paver Finisher
Mechanical and rolling with a Smooth wheeled sqm 25.02 122.32 27.52 124.82
roller 8-10 tonne capacity, and finishing to
required level and grade complete as per
technical clause 508 of MORT&H specifications

24.26 Close Graded Premix Surfacing/ Mixed Seal


Surfacing 20mm thickness (Type A)

(b) Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
Type A consisting of crushed stone aggregates of
specified grading premixed in a Continuous type
hot mix plant with bituminous binder VG-30 @
2.2kg per sqm, laying with Paver Finisher
Mechanical and rolling with a Smooth wheeled sqm 25.02 124.54 27.52 127.04
roller 8-10 tonne capacity, and finishing to
required level and grade complete as per
technical clause 508 of MORT&H specifications

24.27 Close Graded Premix Surfacing/ Mixed Seal


Surfacing 20mm thickness (Type B)

(a) Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
Type B consisting of crushed stone aggregates of
specified grading premixed in a Continuous type
hot mix plant with bituminous binder VG-10 @
1.9kg per sqm, laying with Paver Finisher
Mechanical and rolling with a Smooth wheeled sqm 25.02 111.54 27.52 114.04
roller 8-10 tonne capacity, and finishing to
required level and grade complete as per
technical clause 508 of MORT&H specifications

24.27 Close Graded Premix Surfacing/ Mixed Seal


Surfacing 20mm thickness (Type B)

Chapter-24 Page 377 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Providing, laying and rolling of close-graded
premix surfacing material of 20 mm thickness
Type B consisting of crushed stone aggregates of
specified grading premixed in a Continuous type
hot mix plant with bituminous binder VG-30 @
1.9kg per sqm, laying with Paver Finisher
Mechanical and rolling with a Smooth wheeled sqm 25.02 113.47 27.52 115.97
roller 8-10 tonne capacity, and finishing to
required level and grade complete as per
technical clause 508 of MORT&H specifications

24.28 Seal Coat Type A

(a) Providing and laying seal coat type A (Liquid Seal


Coat) sealing the voids in a bituminous surface
using crushed stone aggregates and penetration
grade bitumen VG-10 @ 0.98kg per sqm laid to sqm 13.33 53.93 14.66 55.26
the specified levels, grade and cross fall complete
as per technical clause 511 of MORT&H
specifications

24.28 Seal Coat Type A

(b) Providing and laying seal coat type A (Liquid Seal


Coat) sealing the voids in a bituminous surface
using crushed stone aggregates and penetration
grade bitumen VG-30 @ 0.98kg per sqm laid to sqm 13.33 54.94 14.66 56.27
the specified levels, grade and cross fall complete
as per technical clause 511 of MORT&H
specifications

24.28 Seal Coat Type B

(c) Providing and laying of premix sand seal coat


premixed in Continuous type hot mix plant using
specified fine aggregates and penetration grade
bitumen VG-10 @ 0.68kg per sqm, laid to the
specified levels, grade and cross fall complete as sqm 12.72 39.08 13.99 40.35
per technical clause 511 of MORT&H
specifications

24.28 Seal Coat Type B

Chapter-24 Page 378 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Providing and laying of premix sand seal coat
premixed in Continuous type hot mix plant using
specified fine aggregates and penetration grade
bitumen VG-30 @ 0.68kg per sqm, laid to the
specified levels, grade and cross fall complete as sqm 12.17 39.17 13.39 40.39
per technical clause 511 of MORT&H
specifications

24.29 Mastic Asphalt 25mm thickness

Providing and laying 25 mm thick mastic asphalt


wearing course with paving grade bitumen 85/25
or 30/40 @10.2%, fine aggregates, coarse
aggregates, lime filler @ 17.92% of total mix,
prepared by using mastic cooker and laid to
required level and slope, including providing
antiskid surface with bitumen precoated fine
grained hard stone chipping at an approximate Sqm. 229.36 614.78 252.30 637.72
spacing of 10 cm center to center in both
directions, pressed into surface when the
temperature of surface is not less than 100
degree C, protruding 1 mm to 4 mm over mastic
surface complete as per technical clause 516 of
MORT&H specifications.

24.30 Slurry Seal Type II (4-6 mm thickness)

(a) Providing and laying slurry seal Type-II 4-6mm


thickness consisting of a mixture of fine
aggregates, portland cement filler, bituminous
emulsion SS-2 @ 10.50% and water on a road
surface including cleaning of surface, mixing of
slurry seal in a suitable mobile plant, laying and Sqm. 2.39 50.49 2.63 50.73
compacting to provide even riding surface
complete as per technical clause 512 of MORT&H
specifications

24.30 Slurry Seal Type-I (2-3mm thickness)

(b) Providing and laying slurry seal Type-I 2-3mm


thickness consisting of a mixture of fine
aggregates, portland cement filler, bituminous
emulsion SS-2 @ 13% and water on a road
surface including cleaning of surface, mixing of
slurry seal in a suitable mobile plant, laying and Sqm. 1.36 36.11 1.50 36.25
compacting to provide even riding surface
complete as per technical clause 512 of MORT&H
specifications

24.31 Fog Spray

Chapter-24 Page 379 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

Providing and applying low viscosity bitumen


emulsion SS-1 @ 0.75kg per sqm for sealing
cracks less than 3 mm wide or incipient fretting or
disintegration in an existing bituminous surfacing
complete as per technical clause 513 of MORT&H Sqm. 1.33 28.08 1.46 28.21
specifications

24.32 Crack Prevention Courses (Stress Absorbing


Membrane crack width less than 6mm)

(a) Laying of a stress absorbing membrane over a


cracked road surface after cleaning the road
surface, using modified binder CRMB-55
complying with clause 517 @ 0.90kg per sqm and
crushed stone aggregates of specified grading,
spraying binder and spreading crushed stone sqm 4.07 46.57 4.48 46.98
aggregates, sweeping the surface for uniform
spread of aggregates complete as per technical
clause 517 of MORT&H specifications

24.32 Crack Prevention Courses (Stress Absorbing


Membrane crack width 6mm to 9mm)

(b) Laying of a stress absorbing membrane over a


cracked road surface after cleaning the road
surface, using modified binder CRMB-55
complying with clause 517 @ 1.1kg per sqm and
crushed stone aggregates of specified grading,
spraying binder and spreading crushed stone sqm 4.07 54.01 4.48 54.42
aggregates, sweeping the surface for uniform
spread of aggregates complete as per technical
clause 517 of MORT&H specifications

24.32 Crack Prevention Courses (Stress Absorbing


Membrane crack width above 9mm and cracked
area above 50%)

(c) Laying of a stress absorbing membrane over a


cracked road surface after cleaning the road
surface, using modified binder CRMB-55
complying with clause 517 @ 1.5kg per sqm and
crushed stone aggregates of specified grading,
spraying binder and spreading crushed stone sqm 4.07 70.71 4.48 71.12
aggregates, sweeping the surface for uniform
spread of aggregates complete as per technical
clause 517 of MORT&H specifications

24.32 Crack Prevention Courses (Bitumen Impregnated


Geotextile)

Chapter-24 Page 380 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Laying of a bitumen impregnated geotextile layer
after cleaning the road surface, laid over a tack
coat of paving grade bitumen VG-10 @ 1.05kg per sqm 4.63 74.78 5.09 75.24
sqm complete as per technical clause 517 & 702
of MORT&H specifications

24.33 Restoration of Rain Cuts

Restoration of rain cuts with good quality earth


obtained from borrow pits including compensation
of earth, carriage, loading, unloading, clearing the
loose soil, benching for 300mm width, laying in
250mm thick layers and compacting with plate
compactor to restore the original alignment, levels Cum. 128.91 294.57 141.80 307.46
and slopes as per technical clause 3002 of
MORT&H specifications

24.34 Patch Work with Close Graded Premix Surfacing/


Mixed Seal Surfacing 20mm thickness (Type B)

(a) Providing and laying patch work with close-graded


premix surfacing material of 20 mm thickness
Type B using penetration grade bitumen VG-10 @
1.9kg per sqm and crushed stone aggregates of
specified grading after trimming the pot hole,
removal of failed material, including mixing in a
Continuous type hot mix plant, carriage of mixed sqm 33.50 124.35 36.85 127.70
material to site of work, laying by suitable means
and rolling with a smooth wheeled roller to match
the adjoining surface complete as per technical
clause 508 of MORT&H specifications

24.34 Patch Work with Close Graded Premix Surfacing/


Mixed Seal Surfacing 20mm thickness (Type B)

(b) Providing and laying patch work with close-graded


premix surfacing material of 20 mm thickness
Type B using penetration grade bitumen VG-30 @
1.9kg per sqm and crushed stone aggregates of
specified grading after trimming the pot hole,
removal of failed material, including mixing in a
Continuous type hot mix plant, carriage of mixed sqm 33.50 126.37 36.85 129.72
material to site of work, laying by suitable means
and rolling with a smooth wheeled roller to match
the adjoining surface complete as per technical
clause 508 of MORT&H specifications

Chapter-24 Page 381 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.34 Patch work with Open - Graded Premix Surfacing
20 mm thickness

(c) Providing and laying patch work with Open-graded


premix surfacing material of 20 mm thickness
consisting of crushed stone aggregates of
specified grading premixed in a Continuous type
hot mix plant with bituminous binder VG-10 @
1.46 kg per sqm, laid with paver and rolling with a sqm 33.24 108.92 36.56 112.24
smooth wheeled roller 8-10 tonne capacity,
finished to required level and grades complete as
per technical clauses 510 of MORTH&H
specifications.

24.35 Patch work Seal Coat Type B

Providing and laying of premix sand seal coat for


patch work premixed in Continuous type Hot mix
Plant using specified fine aggregates and
penetration grade bitumen VG-10 @ 0.68kg per
sqm, carriage of mixed material to site of work, sqm 14.25 43.41 15.67 44.83
laid to the specified levels, grade and cross fall
complete as per technical clauses 511 of
MORT&H specifications

24.36 Patch Work with Bituminous Macadam 50mm to


75mm thickness (Grading II)

(a) Providing and laying patch work with bituminous


macadam 50mm to 75mm thick using crushed
stone aggregates of specified grading premixed
with bituminous binder VG-30 @ 3.4% in
Continuous type hot mix plant, carriage of mixed
material to site of work, laid after trimming the pot Cum 1674.81 5692.20 1842.29 5859.68
hole, removal of failed material, laying by suitable
means and rolling with a smooth wheeled roller to
match the adjoining surface complete as per
technical clause 504 of MORT&H specifications

24.36 Patch work with Water Bound Macadam Grading


II (With Screening)

(b) Providing and laying patch work with stone


aggregates of Grading II laid to water bound
macadam specification after trimming the pot
hole, removal of failed material, hand packing,
applying and brooming requisite type of
screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and Cum. 690.19 1965.41 759.21 2034.43
rolling with smooth wheeled roller 8-10 tonnes to
match the adjoining surface complete as per
technical clause 404 of MORT&H specifications

Chapter-24 Page 382 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

24.36 Patch work with Water Bound Macadam Grading


II (Without Screening)

(c) Providing and laying patch work with stone


aggregates of Grading II laid to water bound
macadam specification after trimming the pot
hole, removal of failed material, hand packing,
applying and brooming requisite type of binding
materials to fill up the interstices of coarse
aggregate, watering and rolling with smooth Cum. 690.19 1757.82 759.21 1826.84
wheeled roller 8-10 tonnes to match the adjoining
surface complete as per technical clause 404 of
MORT&H specifications (Without Screening)

24.37 Ordinary Kilometer Stone for Plan Roads

(a) Reinforced cement concrete M-15 grade ordinary


kilometer stone of standard design as per IRC 8-
1980 fixing in position including painting and
printing etc. complete as per technical clause 804 Each 2325.99 3549.43 2558.59 3782.03
of MORT&H specifications

24.37 5th Kilometer Stone for Plan Roads

(b) Reinforced cement concrete M-15 grade 5th


kilometer stone of standard design as per IRC 8-
1980 fixing in position including painting and
printing etc. complete as per technical clause 804 Each 4089.42 6068.78 4498.36 6477.72
of MORT&H specifications

24.37 Kilometer Stone for Village Roads

(c) Reinforced cement concrete M-15 grade ordinary


kilometer stone of standard design for village
roads as per IRC 8-1980 fixing in position
including painting and printing etc. complete as Each 1739.45 2622.76 1913.39 2796.70
per technical clause 804 of MORT&H
specifications

24.38 200 meter Stone

Reinforced cement concrete M-15 grade 200


meter stone of standard design as per IRC 26-
1967 fixing in position including painting and
printing etc. complete as per technical clause 804 Each 452.39 624.87 497.63 670.11
of MORT&H specifications

Chapter-24 Page 383 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

24.39 Boundary Pillars

Reinforced cement concrete M-15 grade boundary


pillars of standard design as per IRC 25-1967
fixing in position including painting and printing
etc. complete as per technical clause 806 of Each 726.32 1302.15 798.95 1374.78
MORT&H specifications

24.40 Village Board

Reinforced cement concrete M-15 grade village


board of standard design fixing in position
including painting and printing etc. complete as Each 3635.12 5219.08 3998.63 5582.59
per PWD specifications

24.41 Precast Cement Concrete Kerb

(a) Providing and laying factory made rubber moulded


smooth finish cement concrete Kerb M-20 grade
250mm high with bottom width 165mm and top
width 115mm made over strong vibratory table M 79.76 357.56 87.74 365.54
and fixing with cement mortar 1:2 as per MORT&H
specifications

24.41 Cast in Situ Cement Concrete M20 Kerb

(b) Construction of cement concrete Kerb with top


and bottom width 115 and 165 mm respectively,
300 mm high in M 20 grade Kerb stone laid with
M 66.46 203.09 73.11 209.74
Kerb laying machine, all complete as per clause
408

24.41 Cast in Situ Cement Concrete M20 Kerb

(c) Construction of cement concrete Kerb with M 20


grade concrete Kerb stone laid with Kerb laying
machine, complete in all respect as per MORT&H
specifications cum 1582.36 4833.53 1740.60 4991.77

24.41 Cast in Situ Cement Concrete M 20 Kerb with


Channel

Chapter-24 Page 384 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Construction of cement concrete kerb with
channel with top and bottom width 115 and 165
mm respectively, 300 mm high in M 20 grade kerb
channel 300 mm wide, 50 mm thick in PCCM20
grade, sloped towards the kerb, kerb stone with M 113.83 336.34 125.21 347.72
channel laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause
409

24.42 Precast Cement Concrete Channel

Providing and laying factory made rubber moulded


smooth finish cement concrete Channel M-20
grade 300mm wide and 75mm thick made over
strong vibratory table and fixing with cement M 41.75 233.73 45.93 237.91
mortar 1:2 as per MORT&H specifications

24.43 1.2 Meter High G.I. Barbed Wire Fencing

(a) 1.2 meter high G.I. barbed wire fencing with 1.8
meter angle iron posts 40x40x6mm placed every
3 meters centre to centre 0.6 meter below ground
level, every 15th post, end post, corner post
suitably strutted and provided with 9 horizontal
lines and two diagonals interwoven with horizontal
wires fixed with GI staples, turn buckles etc. M 226.88 505.95 249.57 528.64
including foundation concrete 1:2:4 of size
0.30x0.30x0.75m for each post complete as per
technical clause 808 of MORT&H specifications

24.43 1.8 Meter High G.I. Barbed Wire Fencing

(b) 1.8 meter high G.I. barbed wire fencing with 2.4
meter angle iron posts 50x50x6mm placed every
3 meters centre to centre 0.6 meter below ground
level, every 15th post, end post, corner post
suitably strutted and provided with 12 horizontal
lines and two diagonals interwoven with horizontal
wires fixed with GI staples, turn buckles etc. M 238.73 645.12 262.60 668.99
including foundation concrete 1:2:4 of size
0.30x0.30x0.75m for each post complete as per
technical clause 808 of MORT&H specifications

Chapter-24 Page 385 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.44 Cautionary sign board 900x900x900mm triangular
as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 09 and as per IRC 67 2012
fixed over 4mm thick aluminum Composite
material (ACM) sheeting having aluminum skin
thickness of 0.4 to 0.5 mm on both sided and
fixing the same with suitable size aluminum alloy
rivets @ 200 mm c/c to back support frame of
25x25x3mm angle iron supported on a square
hollow steel section post 60x60x3.2mm
conforming to IS 4923 without cost of definition
plate firmly fixed to ground in foundation concrete
M-25 of size 0.45x0.45x0.75m for vertical post
complete as per clause 801 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4384.59 1012.91 4476.67

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4057.68 1012.91 4149.76

24.44 Cautionary sign board 600x600x600mm triangular


as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
fixed over 3mm thick aluminium Composite
material (ACM) sheeting having aluminium skin
thickness of 0.25 to 0.3 mm on both sided and
fixing the same with suitable size aluminium alloy
rivets @ 200 mm c/c to back support frame of
25x25x3mm angle iron supported on a square
hollow steel section post 60x60x3.2mmmm
conforming to IS 4923 without cost of definition
plate firmly fixed to ground in foundation concrete
M-25 of size 0.45x0.45x0.60m for vertical post
complete as per clause 801 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

Chapter-24 Page 386 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Using high intensity Microprismatic grade retro
reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3261.71 1012.91 3353.79

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3116.41 1012.91 3208.49

24.45 Mandatory sign board 900mm circular as per IRC


67- 2012 with high intensity Microprismatic
grade retro reflective Sheeting as per ASTM D
4956 – 09 and as per IRC 67 – 2012. Fixed over
4mm thick aluminium Composite material (ACM)
sheeting having aluminium skin thickness of 0.4 to
0.5 mm on both sided and fixing the same with
suitable size aluminium alloy rivets @ 200 mm c/c
to back support frame of 25x25x3mm angle iron
supported on a square hollow steel section post
60x60x3.2mm conforming to IS 4923 without cost
of definition plate firmly fixed to ground in
foundation concrete M-25 of size
0.45x0.45x0.60m for vertical post complete as per
clause 801 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 5760.91 1012.91 5852.99

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 5169.10 1012.91 5261.18

Chapter-24 Page 387 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.45 Mandatory sign board 600mm circular as per IRC
67- 2012 with high intensity Microprismatic
grade retro reflective Sheeting as per ASTM D
4956 – 09 and as per IRC 67 – 2012. Fixed over
3mm thick aluminium Composite material (ACM)
sheeting having aluminium skin thickness of 0.25
to 0.3 mm on both sided and fixing the same with
suitable size aluminium alloy rivets @ 200 mm c/c
to back support frame of 25x25x3mm angle iron
supported on a square hollow steel section post
60x60x3.2mm conforming to IS 4923 without cost
of definition plate firmly fixed to ground in
foundation concrete M-25 of size
0.45x0.45x0.60m for vertical post complete as per
clause 801 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 .

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3834.41 1012.91 3926.49

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3571.29 1012.91 3663.37

24.46 Informatory sign board 800x600mm rectangular


as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
fixed over 4mm thick aluminium Composite
material (ACM) sheeting having aluminium skin
thickness of 0.4 to 0.5 mm on both sided and
fixing the same with suitable size aluminium alloy
rivets @ 200 mm c/c to back support frame of
25x25x3mm angle iron supported on a square
hollow steel section post 60x60x3.2mm
conforming to IS 4923 without cost of definition
plate firmly fixed to ground in foundation concrete
M-25 of size 0.45x0.45x0.60m for vertical post
complete as per clause 801 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

Chapter-24 Page 388 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Using high intensity Microprismatic grade retro
reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4926.71 1012.91 5018.79

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4480.21 1012.91 4572.29

24.46 Informatory sign board 600x450mm rectangular


as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
fixed over 3mm thick aluminium Composite
material (ACM) sheeting having aluminium skin
thickness of 0.25 to 0.3 mm on both sided and
fixing the same with suitable size aluminium alloy
rivets @ 200 mm c/c to back support frame of
25x25x3mm angle iron supported on a square
hollow steel section post 60x60x3.2mm
conforming to IS 4923 without cost of definition
plate firmly fixed to ground in foundation concrete
M-25 of size 0.45x0.45x0.60m for vertical post
complete as per clause 801 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
Each 920.83 3747.59 1012.91 3839.67
09 and as per IRC 67 2012

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3496.00 1012.91 3588.08

Chapter-24 Page 389 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.46 Informatory sign board 600x600mm square as per
IRC 67- 2012 with high intensity Microprismatic
grade retro reflective Sheeting as per ASTM D
4956 – 09 and as per IRC 67 – 2012. with retro
reflective high intensity Microprismatic grade
sheeting fixed over 3mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.25 to 0.3 mm on
both sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 25x25x3mm angle iron
supported on a square hollow steel section post
60x60x3.2mm conforming to IS 4923 without cost
of definition plate firmly fixed to ground in
foundation concrete M-25 of size
0.45x0.45x0.60m for vertical post complete as per
clause 801 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 .

(c) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4188.22 1012.91 4280.30

c (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3853.33 1012.91 3945.41

Chapter-24 Page 390 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.47 Place Identification sign board 900x600mm
rectangular as per IRC 67- 2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012 fixed over 4mm thick aluminium
Composite material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 25x25x3mm angle iron
supported on two square hollow steel section
post 60x60x3.2mm conforming to IS 4923 firmly
fixed to ground in foundation concrete M-25 of
size 0.45x0.45x0.60m for vertical post complete
as per clause 801 of MORT&H specifications.
Supplier shall provide a warranty as per clause
6.9 of IRC 67-2012 for retro reflective sheeting &
a certified copy of test reports from an
independent test laboratory conforming to clause
6.7 of IRC 67-2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 1163.47 7072.23 1279.82 7188.58

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 1163.47 6569.91 1279.82 6686.26

24.48 Advance Direction sign board 900x900mm square


as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
fixed over 4mm thick aluminium Composite
material (ACM) sheeting having aluminium skin
thickness of 0.4 to 0.5 mm on both sided and
fixing the same with suitable size aluminium alloy
rivets @ 200 mm c/c to back support frame of
25x25x3mm angle iron supported on two square
hollow steel section post 60x60x3.2mm
conforming to IS 4923 firmly fixed to ground in
foundation concrete M-25 of size
0.60x0.60x0.75m for vertical post complete as per
clause 801 of MORT&H specifications . Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 .

Chapter-24 Page 391 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 1752.18 10295.88 1927.40 10471.10

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 1752.18 9541.94 1927.40 9717.16

24.48 Advance Direction sign board 1200x900mm


rectangular per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
grade sheeting fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 25x25x3mm angle iron
supported on two square hollow steel section
post 60x60x3.2mm conforming to IS 4923 firmly
fixed to ground in foundation concrete M-25 of
size 0.60x0.60x0.75m for vertical post complete
as per clause 801 of MORT&H specifications.
Supplier shall provide a warranty as per clause
6.9 of IRC 67-2012 for retro reflective sheeting &
a certified copy of test reports from an
independent test laboratory conforming to clause
6.7 of IRC 67-2012 .

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 2430.37 12316.29 2673.41 12559.33

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 2430.37 11311.66 2673.41 11554.70

Chapter-24 Page 392 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.48 Advance Direction sign board 1200x1200mm
rectangular as per IRC 67- 2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012. fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 25x25x3mm angle iron
supported on two square hollow steel section
post 60x60x3.2mm conforming to IS 4923 firmly
fixed to ground in foundation concrete M-25 of
size 0.60x0.60x0.75m for vertical post complete
as per clause 801 of MORT&H specifications.
Supplier shall provide a warranty as per clause
6.9 of IRC 67-2012 for retro reflective sheeting &
a certified copy of test reports from an
independent test laboratory conforming to clause
6.7 of IRC 67-2012 .

(c) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 2430.37 14454.84 2673.41 14697.88

c (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 2430.37 13115.30 2673.41 13358.34

24.48 Advance Direction sign board 1200x1800mm


rectangular as per IRC 67- 2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012. fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 25x25x3mm angle iron
supported on two square hollow steel section
post 60x60x3.2mm conforming to IS 4923 firmly
fixed to ground in foundation concrete M-25 of
size 0.60x0.60x0.75m for vertical post complete
as per clause 801 of MORT&H specifications.
Supplier shall provide a warranty as per clause
6.9 of IRC 67-2012 for retro reflective sheeting &
a certified copy of test reports from an
independent test laboratory conforming to clause
6.7 of IRC 67-2012 .

Chapter-24 Page 393 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Using high intensity Microprismatic grade retro
reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 2919.74 18873.29 3211.71 19165.26

d (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 2919.74 16864.00 3211.71 17155.97

24.49 Definition Plate 600x200mm rectangular as per as


per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
specifications. Fixed over 3mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.25 to 0.3 mm on
both sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame welded with vertical post of sign
board complete as per clause 801 of
MORT&Hspecifications. Supplier shall provide a
warranty as per clause 6.9 of IRC 67-2012 for
retro reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 141.66 758.41 155.83 772.58

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 141.66 646.78 155.83 660.95

24.50 Direction/Diversion Plate 900x300mm rectangular


as per IRC 67- 2012 with high intensity
Microprismatic grade retro reflective Sheeting as
per ASTM D 4956 – 09 and as per IRC 67 – 2012.
specifications. fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame fixed in position complete as per
clause 801 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 ..

Chapter-24 Page 394 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Using high intensity Microprismatic grade retro
reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 28.16 1279.28 30.98 1282.10

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 28.16 1027.67 30.98 1030.49

24.50 Direction/Diversion Plate 1800x300mm


rectangular as per IRC 67- 2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012. fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame fixed in position complete as per
clause 801 of MORT&H specifications.
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 28.16 2525.99 30.98 2528.81

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 28.16 2023.67 30.98 2026.49

24.51 Hazard Marker sign board 300x900mm


rectangular as per IRC 67- 2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 09 and IRC 67
2012, fixed over 4mm thick Aluminium Composite
Material (ACM) sheeting having skin thickness of
0.4 to 0.5 mm on both sided and fixing the same
with suitable size aluminium alloy rivets @ 200
mm c/c to back support frame of 25x25x3mm
angle iron supported on a square hollow steel
section post 60x60x3.2mm conforming to IS 4923
firmly fixed to ground including foundation
concrete M-25 of size 0.45x0.45x0.60m for vertical
post complete as per clause 801 of MORT&H
specifications

Chapter-24 Page 395 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Using high intensity Microprismatic grade retro
reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 4028.66 1012.91 4120.74

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 920.83 3777.05 1012.91 3869.13

24.52 Overhead sign board 6000x1500mm cantilever


type single sided as per IRC 67-2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012 fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 40x40x6mm angle iron
supported on designed single support system of
MS pipe and plates in the form of a cantilever type
truss made with 350NB pipe @50kg per mtr as
vertical support, 50NB pipe @ 4.50kg per mtr and
40NB pipe @ 3.61kg per mtr for truss including
base plates, gusset plates,designed RCC
foundation for fixing in ground complete as per
clause 802 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 42625.62 197904.63 46888.18 202167.19

a (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 42625.62 189532.60 46888.18 193795.16

Chapter-24 Page 396 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.52 Overhead sign board 6000x1500mm cantilever
type double sided as per IRC 67-2012 with high
intensity Microprismatic grade retro reflective
Sheeting as per ASTM D 4956 – 09 and as per
IRC 67 – 2012 fixed over 4mm thick Aluminium
Composite Material (ACM) sheeting having
aluminium skin thickness of 0.4 to 0.5 mm on both
sided and fixing the same with suitable size
aluminium alloy rivets @ 200 mm c/c to back
support frame of 40x40x6mm angle iron
supported on designed single support system of
MS pipe and plates in the form of a cantilever type
truss made with 350NB pipe @50kg per mtr as
vertical support, 50NB pipe @ 4.50kg per mtr and
40NB pipe @ 3.61kg per mtr for truss including
base plates, gusset plates,designed RCC
foundation for fixing in ground complete as per
clause 802 of MORT&H specifications. Supplier
shall provide a warranty as per clause 6.9 of IRC
67-2012 for retro reflective sheeting & a certified
copy of test reports from an independent test
laboratory conforming to clause 6.7 of IRC 67-
2012 ..

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 43954.23 246594.70 48349.65 250990.12

b (i) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 43954.23 229850.67 48349.65 234246.09

Chapter-24 Page 397 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.53 Overhead sign board 9000x1500mm simply
supported type double sided as per IRC 67-
2012 with high intensity Microprismatic grade
retro reflective Sheeting as per ASTM D 4956 –
09 and as per IRC 67 – 2012 fixed over 4mm
thick aluminium Composite material (ACM)
sheeting having aluminium skin thickness of 0.4 to
0.5 mm on both sided and fixing the same with
suitable size aluminium alloy rivets @ 200 mm c/c
to back support frame of 40x40x6mm angle iron
supported on designed double support system of
MS pipe and plates in the form of a simply
supported type truss made with 350NB pipe
@50kgper mtr as vertical support, 50NB pipe @
4.50kg per mtr and 40NB pipe @ 3.61kg per mtr
for truss including base plates, gusset plates,
designed RCC foundation for fixing in ground
complete as per clause 802 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012 .

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 72041.58 401553.69 79245.74 408757.85

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 Each 72041.58 376437.62 79245.74 383641.78

Chapter-24 Page 398 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.54 Overhead sign board 12000x1500mm simply
supported type double sided as per IRC 67-
2012 with high intensity Microprismatic grade
retro reflective Sheeting as per ASTM D 4956 –
09 and as per IRC 67 . fixed over 4mm thick
aluminium Composite material (ACM) sheeting
having aluminium skin thickness of 0.4 to 0.5 mm
on both sided and fixing the same with suitable
size aluminium alloy rivets @ 200 mm c/c to back
support frame of 40x40x6mm angle iron
supported on designed double support system of
MS pipe and plates in the form of a simply
supported type truss made with 350NB pipe
@50kg per mtr as vertical support, 50NB pipe @
4.50kg per mtr and 40NB pipe @ 3.61kg per mtr
for truss including base plates, gusset plates,
designed RCC foundation for fixing in ground
complete as per clause 802 of MORT&H
specifications. Supplier shall provide a warranty
as per clause 6.9 of IRC 67-2012 for retro
reflective sheeting & a certified copy of test
reports from an independent test laboratory
conforming to clause 6.7 of IRC 67-2012.

(a) Using high intensity Microprismatic grade retro


reflective Sheeting Type XI as per ASTM D 4956
09 and as per IRC 67 2012 Each 84337.68 483687.23 92771.45 492121.00

(b) Using high intensity Microprismatic grade retro


reflective Sheeting Type IV as per ASTM D 4956
09 and as per IRC 67 2012 1 84337.68 450199.13 92771.45 458632.90

24.55 Hume Pipe Road Indicator

Hume pipe road indicator of 350mm dia NP-2


hume pipe 1200mm high, 900mm above ground
level, 300mm embedded in ground in cement
concrete 1:4:8 of size 0.75x0.75x0.60m, filled with
earth and plugged from top with 300mm thick
cement concrete 1:2:4, painted with two coats Each 1006.50 2291.07 1107.15 2391.72
ready mixed exterior paint in black and white
strips fixed in position complete as per PWD
specifications

24.56 "W" Type Metal Beam Crash Barrier Single Sided

Chapter-24 Page 399 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Providing & erecting "W" type metal beam crash
barrier single sided comprising of 3mm thick
corrugated sheet metal beam rail 70cm above
road or ground level fixed on channel vertical post
150x75x5mm spaced 2mtr centre to centre
1.80mtr high, 1.1mtr below road or ground level,
all steel parts and fitments to be galvanized by hot
dip process, all fittings to conform to IS:1367 &
IS:1364, metal beam rail to be fixed on the vertical M 498.31 2618.44 548.14 2668.27
post with a spacer of channel section
150x75x5mm, 330mm long fixed firmly into ground
with vertical hydraulic self driving machine for
vertical post complete as per approved drawings
and technical clause IRC: 119-2015.

24.56 "W" Type Metal Beam Crash Barrier Double Sided

(b) Providing & erecting "W" type metal beam crash


barrier double sided comprising of 3mm thick
corrugated sheet metal beam rail 70cm above
road or ground level fixed on both sided on
channel vertical post 150x75x5mm spaced 2mtr
centre to centre 1.80mtr high, 1.1mtr below road
or ground level, all steel parts and fitments to be
galvanized by hot dip process, all fittings to
conform to IS:1367 & IS:1364, metal beam rails to M 632.23 4060.26 695.45 4123.48
be fixed on the vertical post with a spacer of
channel section 150x75x5mm, 330mm long on
both sides fixed firmly into ground with vertical
hydraulic self driving machine for vertical post
complete as per approved drawings and technical
clause IRC: 119-2015.

24.57 Road Marking with Thermoplastic Compound

Road marking with hot applied thermoplastic


compound 2.5mm thick including reflectorising
glass beads @ 0.25kg per sqm area as per
IRC:35 1997 complete as per technical clause sqm 22.28 616.67 24.51 618.90
803 of MORT&H specifications

24.58 Plain Cement Concrete Pavement

Chapter-24 Page 400 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Construction of unreinforced plain cement
concrete pavement in M-30 mix design over a
prepared sub base with OPC 43 grade
conforming to IS:383 mixed with concrete mixer
using batch type concrete mixer as per IS:1791,
laid in position, compacted with needle vibrator,
screed vibrator and plate vibrator, dewatering of cum 2069.92 5313.25 2276.91 5520.24
free water with vaccum pump, finishing the
surface with power floater, finishing to required
lines and grades as per drawings and technical
clause 1501 of MORD specifications

24.59 Dry Lean Cement Concrete Sub- base

Construction of dry lean cement concrete Sub-


base over a prepared sub-grade with coarse and
fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per
table 600-1, cement content not to be less than
150 kg/ cum, optimum moisture content to be
determined during trial length construction, cum 717.01 2825.92 788.71 2897.62
concrete strength not to be less than 10 Mpa at 7
days, mixed in a batching plant, transported to site
with transit mixer with lead up to 10 km., laid with
a paver with electronic sensor, compacting with 8-
10 tonnes vibratory roller, finishing and curing.

24.60 Cement Concrete Pavement

(a) Construction of un-reinforced M-30 grade


concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement
with Fly ash (subject to maximum 25% of cement
content) of concrete, coarse and fine aggregate
conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a fully
computerised batch mix plant as per approved mix
design, transported to site in transit mixer with
lead up to 10 km. laid with a fixed form or slip form
paver, spread, compacted and finished in a
continuous operation including provision of Cum 1022.55 5275.65 1124.80 5377.90
contraction, expansion, construction and
longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per clause 602 of MORT&H 5th
Revision

Chapter-24 Page 401 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

24.60 Cement Concrete Pavement

(b) Construction of un-reinforced M-30 grade


concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement of
concrete, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a fully computerised
batch mix plant as per approved mix design,
transported to site in transit mixer with lead up to
10 km. laid with a fixed form or slip form paver,
spread, compacted and finished in a continuous
operation including provision of contraction, Cum 1022.55 5599.48 1124.80 5701.73
expansion, construction and longitudinal joints,
joint filler, separation membrane, sealant primer,
joint sealant, debonding strip, dowel bar, tie rod,
admixtures as approved, curing compound,
finishing to lines and grades as per clause 602 of
MORT&H 5th Revision

24.60 Cement Concrete Pavement

(c) Construction of un-reinforced M-35 grade


concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement
with Fly ash (subject to maximum 25% of cement
content) of concrete, coarse and fine aggregate
conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a fully
computerised batch mix plant as per approved mix
design, transported to site in transit mixer with
lead up to 10 km. laid with a fixed form or slip
form paver, spread, compacted and finished in a
continuous operation including provision of Cum 1022.55 5513.21 1124.80 5615.46
contraction, expansion, construction and
longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per clause 602 of MORT&H 5th
Revision

24.60 Cement Concrete Pavement

Chapter-24 Page 402 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Construction of un-reinforced M-35 grade
concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement of
concrete, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a fully computerised
batch mix plant as per approved mix design,
transported to site in transit mixer with lead up to
10 km. laid with a fixed form or slip form paver,
spread, compacted and finished in a continuous
Cum 1022.55 5865.07 1124.80 5967.32
operation including provision of contraction,
expansion, construction and longitudinal joints,
joint filler, separation membrane, sealant primer,
joint sealant, debonding strip, dowel bar, tie rod,
admixtures as approved, curing compound,
finishing to lines and grades as per clause 602 of
MORT&H 5th Revision

24.60 Cement Concrete Pavement

(e) Construction of un-reinforced M-40 grade


concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement
with Fly ash (subject to maximum 25% of cement
content) of concrete, coarse and fine aggregate
conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a fully
computerised batch mix plant as per approved mix
design, transported to site in transit mixer with
lead up to 10 km. laid with a fixed form or slip form
paver, spread, compacted and finished in a
continuous operation including provision of Cum 1022.55 5663.71 1124.80 5765.96
contraction, expansion, construction and
longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per clause 602 of MORT&H 5th
Revision

24.60 Cement Concrete Pavement

Chapter-24 Page 403 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(f) Construction of un-reinforced M-40 grade
concrete pavement with dowel jointed over a
prepared sub base with 43 grade OPC cement of
concrete, coarse and fine aggregate conforming
to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a fully computerised
batch mix plant as per approved mix design,
transported to site in transit mixer with lead up to
10 km. laid with a fixed form or slip form paver,
spread, compacted and finished in a continuous
operation including provision of contraction, Cum 1022.55 6053.32 1124.80 6155.57
expansion, construction and longitudinal joints,
joint filler, separation membrane, sealant primer,
joint sealant, debonding strip, dowel bar, tie rod,
admixtures as approved, curing compound,
finishing to lines and grades as per clause 602 of
MORT&H 5th Revision

24.61 Fibre Board Expansion Joints

(a) Providing and fixing 25mm thick compressible mtr


fibre board in expansion joints complete as per
per
drawings and technical clause 2605 of MORT&H 0.35 5.41 0.38 5.44
specifications
cm
depth

24.61 Joint Sealing Compound

(b) Providing and filling joint sealing compound with


coarse sand and 6 percent bitumen by weight mtr
complete as per drawings and technical clause per
2.49 2.84 2.74 3.09
2605 of MORT&H specifications cm
depth

24.62 Rumble Strips with thermoplastic road marking

(a) Providing and making rumble strips 15-20mm high


at centre, 250mm wide placed at 1m centre to
centre over freshly laid bituminous layer by using
close graded premix surfacing material type B at
approved locations to control speed and marked
with 100mm wide white strips of thermoplastic
road marking paint. The close graded premix M 8.48 89.55 9.33 98.51
surfacing material type B shall conform to
technical clause 512 and thermoplastic road
marking paint shall conform to technical clause
803 of MORT&H specifications

Chapter-24 Page 404 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
24.62 Rumble Strips without thermoplastic road marking

(b) Providing and making rumble strips 15-20mm high


at centre, 250mm wide placed at 1m centre to
centre over freshly laid bituminous layer by using
close graded premix surfacing material type B at
approved locations to control speed. The close M 6.26 27.89 6.88 30.68
graded premix surfacing material type B shall
conform to technical clause 512 of MORT&H
specifications

24.63 Moulded Shank Road Stud

Supplying and fixing of single mould twin shank


reflective road studs made out of poly
carbonate/ABS moulded body and reflective
panels with micro prismatic lens or Glass Beeds
capable of providing total internal reflection of the
light entering the lens face with retro reflectance
and chromaticity values shall be as given in the
detailed specifications and the product shall
conform to ASTM D4280. The raised pavement
marker shall also meet all the testing conditions of
ASTM D4280 and fixed to the road surface using
the adhesive. Two cylindrical Polymer Shanks of
not less than 20 mm diameter and not less than
30 mm length shall be molded in the RPM body.
The marker shall support a load of 13635 Kg Each 81.31 243.71 89.44 251.84
tested in accordance with ASTM D4280. The
marker shall withstand flexural strength of 909 kgf
force in accordance with ASTM D4280. Marker
lenses shall be moulded of Polycarbonate or
methyl methecrylate conforming to ASTM D788.
The supplier shall provide a 2 years warranty for
satisfactory field performance as per clause
804.7.3 of MORT&H 5th revision specifications.

24.64 Flexible Median Marker

Chapter-24 Page 405 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Providing and Fixing of Flexible Median Markers
as per IRC 79:2019 which shall be made of
combination of tough, high impact resistant
molded thermoplastic body along with florescent
yellow color retro-reflective type XI sheeting with
minimum exposed reflective area 285 square mm
and with rebound property. The reflective sheeting
should confirm to Type XI Florescent Yellow
sheeting as per IRC 67 2012 and ASTM D4956-
11. The flexible median marker shall have overall
height of minimum 180 mm, body thickness of
minimum 2mm and shank depth of minimum
30mm. The retro-reflective sheeting shall be on
both sides of the Flexible Median Marker and shall
be edge protected with no exposed edges which
will prevent edge lifting, vandalism, sheeting
Each 16.44 239.32 18.08 240.96
damage, etc. The edge of sheeting should not
come out easily by putting nails, sharp objects etc.
The logo of the manufacturer shall be embossed
on either side of the body. The product design
has to with stand all natural impacts and should
not get damaged if any pedestrian stamp on top of
it intentionally or unintentionally. The product
should bend up to 90 degree on both sides
without breakage or damage.

24.65 Solar RPM/ Stud

Chapter-24 Page 406 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Providing and installation of solar cateye
produced from an engineered polymer selected
for superior impact resistance and weather-ability.
The top of the solar stud should be transparent for
solar charging and light output in active mode.
The base of the body shall be yellow or neutral
white as approved by Engineer In-charge. The
marker shall incorporate a solar panel (comprising
of solar cells) for converting solar energy into
electricity, a storage device for storing the energy,
LEDs for illumination and a design for providing
360 degree smooth illumination. The Solar stud
shall be round in shape for providing illumination
in all directions. The solar stud shall also have
high reflective lenses for conspicuity in passive
mode and dual shanks for improved road
presence. The solar studs are intended for Each 53.27 1173.27 58.60 1178.60
application directly onto pavement surfaces and
shall be applied with epoxy resin adhesives
designed for use with raised pavement markers
and as supplied by the marker manufacturer
separately. The solar cateye shall be of height: 65
± 2 mm & Maximum Diameter: 136 ± 4 mm. The
body of the solar cateye shall be resistant to dust
and water ingress as per IP 65 standards. The
marker shall support a load of 13635 Kg tested in
accordance with ASTM D4280.

24.66 Road Delineator/Vertical Guide Post Delineator

Chapter-24 Page 407 CSR-2020


CSR−2020−Final
Sr. Description Zone-A Zone-B
No. Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Providing and fixing of Standard Metal Delineator
as per IRC 79:2019 consisting of retro reflective
area in white color using full cube corner micro
prismatic non-metallic retro reflective sheeting on
each side conforming with IRC 67 2012 and
meeting the coefficient of retro reflection values as
per ASTM D 4956 Type XI table specification. The
delineator shall be painted with only black color
powder coat of minimum 40 microns thickness, on
top of which retro reflective sheeting only in white
colour shall be pasted on both sides. The
structure shall have height not less than 800 mm
above the ground, width not less than 100 mm Each 18.50 1175.25 20.35 1177.10
and shall extend not more than 300mm below the
ground while being installed. The delineator shall
have grooves across the length to make the
reflective sheets vandal-proof. The delineator is
meant for application on gaps in median, traffic
islands, dangerous bends, roundabouts, narrow
bridges etc. or as desired by site engineer.

24.67 Milling on Bitumen Surface

Dismantling of existing damaged Bitumen surface


by Cold Milling Machine upto 30 mm depth Sqm 32.32 32.32

Chapter-24 Page 408 CSR-2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 25
MAINTENANCE OF CANAL AND DRAIN
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
25.1 Clearance of weed, jalla, deela etc manually
from inner section of unlined channel

(a) Unlined (heavy growth)

(i) discharge upto 0.42 cumecs


mtr 27.00 27.00 30.00 30.00

(ii) discharge exceeding 0.42 but upto 1.42


cumecs mtr 39.00 39.00 43.00 43.00

(iii) discharge exceeding 1.42 but upto 2.83


cumecs mtr 54.00 54.00 59.00 59.00

(iv) discharge exceeding 2.83 cumecs


mtr 70.00 70.00 77.00 77.00

(b) Unlined (medium growth)

(i) discharge upto 0.42 cumecs


mtr 22.00 22.00 24.00 24.00

(ii) discharge exceeding 0.42 but upto 1.42


cumecs mtr 31.00 31.00 34.00 34.00

(iii) discharge exceeding 1.42 but upto 2.83


cumecs mtr 44.00 44.00 48.00 48.00

(iv) discharge exceeding 2.83 cumecs


mtr 56.00 56.00 62.00 62.00

(c ) Unlined (Light growth)

(i) discharge upto 0.42 cumecs


mtr 19.00 19.00 21.00 21.00

(ii) discharge exceeding 0.42 but upto 1.42


mtr 27.00 27.00 30.00 30.00
cumecs

(iii) discharge exceeding 1.42 but upto 2.83


mtr 38.00 38.00 42.00 42.00
cumecs

Chapter-25 Page 409 CSR-2020


CSR−2020−Final

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iv) discharge exceeding 2.83 cumecs mtr 49.00 49.00 54.00 54.00
Note: 1) Man days are taken as per actual progress assessed by the committee of Engineers constituted by
Chief Engineer, Canals.
2) In case of heavy weed, jalla, deela etc growth category, concerned SDO and Executive Engineer will
certify after physical verification.
3) In case of medium and light weed, jalla, deela etc growth category, concerned SDO will certify after
physical verification and concerned
Executive Engineer will also certify after satisfying himself.
4) The rate includes the proper disposal of weed, jalla, deela etc. also.

25.2 Clearance of weed, jalla, deela, sarkanda,jungle, butti, dhora, silts etc manually from inner section of lined channel

(a) Lined (heavy growth)

(i) discharge upto 0.283 cumecs


mtr 25.00 25.00 28.00 28.00

(ii) discharge exceeding 0.283 but upto


mtr 38.00 38.00 42.00 42.00
1.42 cumecs

(iii) discharge exceeding 1.42 but upto 2.83


mtr 51.00 51.00 56.00 56.00
cumecs

(iv) discharge exceeding 2.83 cumecs


mtr 64.00 64.00 70.00 70.00

(b) Lined (medium growth)

(i) discharge upto 0.283 cumecs


mtr 19.00 19.00 21.00 21.00

(ii) discharge exceeding 0.283 but upto


mtr 29.00 29.00 32.00 32.00
1.42 cumecs

(iii) discharge exceeding 1.42 but upto 2.83


mtr 38.00 38.00 42.00 42.00
cumecs

(iv) discharge exceeding 2.83 cumecs


mtr 48.00 48.00 53.00 53.00

(c ) Lined (Light growth)

(i) discharge upto 0.283 cumecs


mtr 13.00 13.00 14.00 14.00

Chapter-25 Page 410 CSR-2020


CSR−2020−Final

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(ii) discharge exceeding 0.283 but upto


mtr 19.00 19.00 21.00 21.00
1.42 cumecs

(iii) discharge exceeding 1.42 but upto 2.83


mtr 25.00 25.00 28.00 28.00
cumecs

(iv) discharge exceeding 2.83 cumecs


mtr 32.00 32.00 35.00 35.00

Note: 1) Man days are taken as per actual progress accessed by the committee of Engineers constituted by
Chief Engineer, Canals.
2) In case of heavy weed, jalla, deela, sarkanda, jungle, butti, dhora, silts etc. growth category, concerned
SDO and Executive Engineer will certify after physical verification.
3) In case of medium and light weed, jalla, deela, sarkanda, jungle, butti, dhora, silts etc growth category,
concerned SDO will certify after physical verification and concerned Executive
Engineer will also certify after satisfying himself.
4) The rate includes the proper disposal of weed, jalla, deela, sarkanda, jungle, butti, dhora, silts etc also.
5) Wherever there is no silt in the bed of the distributary/minor, rates should further be decreased by 40%
of that of normal norms of weed, jalla, deela, sarkanda, jungle, butti, dhora etc.
with silt.

25.3 Clearing weed growth manually from different


section of the drain

1 (a) Wet conditions (heavy)

(i) Bed width less than 7.62 mtr


sqm 14.00 14.00 15.00 15.00

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 16.00 16.00 18.00 18.00

(iii) Bed width more than 15.24 mtr


sqm 20.00 20.00 22.00 22.00

2 (a) Wet conditions (medium)

(i) Bed width less than 7.62 mtr


sqm 10.00 10.00 11.00 11.00

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 12.00 12.00 13.00 13.00

Chapter-25 Page 411 CSR-2020


CSR−2020−Final

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iii) Bed width more than 15.24 mtr
sqm 15.00 15.00 17.00 17.00

3 (a) Wet conditions (light)

(i) Bed width less than 7.62 mtr


sqm 7.00 7.00 8.00 8.00

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 8.00 8.00 9.00 9.00

(iii) Bed width more than 15.24 mtr


sqm 10.00 10.00 11.00 11.00

Note: Where it is not possible to manually clear the section of any drain, machinery rates will be applicable.

1 (b) dry conditions (heavy)

(i) Bed width less than 7.62 mtr


sqm 7.00 7.00 8.00 8.00

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 8.00 8.00 9.00 9.00

(iii) Bed width more than 15.24 mtr


sqm 9.00 9.00 10.00 10.00

2 (b) dry conditions (medium)

(i) Bed width less than 7.62 mtr


sqm 6.00 6.00 7.00 7.00

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 6.00 6.00 7.00 7.00

(iii) Bed width more than 15.24 mtr


sqm 7.00 7.00 8.00 8.00

3 (b) dry conditions (light)

(i) Bed width less than 7.62 mtr


sqm 4.00 4.00 4.00 4.00

Chapter-25 Page 412 CSR-2020


CSR−2020−Final

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(ii) Bed width 7.62 mtr to 15.24 mtr


sqm 4.00 4.00 4.00 4.00

(iii) Bed width more than 15.24 mtr sqm 4.00 4.00 4.00 4.00

Note: 1) Man days are taken as per actual progress assessed by the committee of Engineers constituted by
Chief Engineer, Drainage.
2) In case of heavy weed growth category, concerned SDO and Executive Engineer will certify after
physical verification.
3) In case of medium and light weed growth category, concerned SDO will certify after physical verification
and concerned Executive Engineer will also certify after
satisfying himself.

25.4 Running and maintenance of pumping set 8


H.P./ Generator set for dewatering
hours 36.37 40.00
arrangements complete in all respects

Note:- (i) The Engine with pumping set of 8 H.P.


will run 4 bores.

(ii) The generator set having engine of 8


H.P. coupled with alternator of 5 H.P. will
run motor of 4 H.P.

25.5 Making bore and installation of pumping set for


dewatering arrangements complete in all Rmt 53.00 58.00
respects

25.6 Making dewatering arrangement by pumping


set 4'' *4'' (Tractor driven) hour 787.00 866.00

25.7 Clearance of sarkanda, weed, jala, booti etc.


from wet drains by machinery having bed width

(i) Upto 20 feet


Sqm 15.00 15.00 17.00 17.00

(ii) More than 20 feet


Sqm 18.00 18.00 20.00 20.00

25.8 Removal/ Clearance of slush from wet drains by


mechanical means Cum 81.00 81.00 89.00 89.00

Chapter-25 Page 413 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 26
MISCELLANEOUS

Notes :-
(i) The rates given below are labour rates unless otherwise stated.

(ii) Unless otherwise stated, the labour rates include rehandling of materials within 100 m.

Sr. No. Description Unit Rate for Zone-A &


Zone-B

1 2 3 4

26.1 Cutting Girders with Hack-saw.

(a) Upto 300 mm depth. cut 180.00

(b) Above 300mm to 450mm depth. cut 210.00

26.2 Drilling holes in girders. each 20.00

26.3 Cutting/Fixing of copper sheets

(a) Cutting of copper sheets 15mm, thick flashing. m 68.00

(b) Fixing copper flashing into position. m 27.00

26.4 Assembling 40 mm. pressure pipes. m 15.00

26.5 Boring and fixing 40 mm pressure pipes. m 75.00

26.6 Boring for hand-pump in clay fitting strainer and pipe.

(a) Upto 75mm dia bore.

(i) From 0 to 15 m. m 89.70

(ii) Exceeding 15 m but upto 30 m. m 227.70

(iii) Exceeding 30 m. m 338.10

(b) Above 75mm dia bore but not exceeding 100mm.

(i) From 0 to 15 m. m 120.00

(ii) Exceeding 15 m but upto 30 m. m 282.90

(iii) Exceeding 30 m. m 338.10

Chapter-26 Page 414 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Zone-A &
Zone-B

1 2 3 4

26.7 Boring hand-pump in soil with admixture of shingle.

(a) Upto 75mm dia bore.

(i) From 0 to 15 m. m 158.70

(ii) Exceeding 15 m but upto 30 m. m 282.90

(iii) Exceeding 30 m. m 338.10

(b) Above 75mm dia. but not exceeding 100mm dia. bores

(i) From 0 to 15 m. m 179.40

(ii) Exceeding 15 m but upto 30 m. m 338.10

(iii) Exceeding 30 m. m 396.75

26.8 Hand pumps

(a) Pulling out pipe and filters.


m 27.60

(b) Lowering pipe in the hole up to 40mm dia.


m 27.60

(c) fixing head including clamps and handle.


each 138.00

26.9 Fixing F.I gauges flush with masonry including cost of hooks.
m 111.00

26.10 Fixing handles to iron rammers including cost of handles.


each 50.00

26.11 Cutting down trees, filling holes and levelling of ground, lopping
branches trimming, removal not exceeding 100 m stacking
clearing site.

(a) girth up to 60 cm
each 170.00

(b) girth more than 60 cm. but up to 120 cm.


each 303.00

(c) girth more than 120 cm. but up to 180 cm.


each 605.00

Chapter-26 Page 415 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Zone-A &
Zone-B

1 2 3 4
(d) girth more than 180 cm. but up to 250 cm.
each 1010.00

Note :- (i) The girth is to be measured 1.25 m above ground level.

(ii) When stumps are grubbed up in addition, take rates as


double the above rates for trees cut and grubbed.
payment for grubbing will only be made when specially
ordered by the Sub- Divisional officer in cases where it
is essential to remove the stumps.

(iii) Trees requiring to be cut will normally be sold as they


stand, the purchase price including the purchasers
liability to cut or grub and remove the tree from Govt.
Land.

(iv) Where these have not been sold, the trees cut and
removed will be the property of the Govt.

26.12 Felling trees, cutting and stacking fuel wood from plantation. qtl 70.00

26.13 Splitting fuel wood.


qtl 100.00

26.14 Supply of wooden pegs for levelling work from canal or road
plantation 40 mm to 50mm dia and 15cm to 23 cm long. 100 nos 170.00

26.15 Supply of wooden pegs for alignment work, 40 cm long 75mm


100 nos 675.00
dia from canal or road plantation.

26.16 Supply of bamboo jhandies 3 m to 3.5 m including iron shoes and


flags 40 cm Square painted black and white. each 170.00

26.17 Fixing glass pieces on top of walls.


m 44.00

26.18 Water allowance.

(a) for concrete, brick masonry in lime or cement mortar

(i) Where lead involved is 800 m to 1.6Km


cum 24.00

(ii) Where lead involved is above 1.6Km to 2.4 Km


cum 48.00

Chapter-26 Page 416 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Zone-A &
Zone-B

1 2 3 4
(b) For plastering in lime or cement mortar, pointing,
flooring :-

(i) Where lead involved is 800 m to 1.6Km


sqm 4.00

(ii) Where lead involved is above 1.6Km to 2.4 Km


sqm 7.00

Note :- The above rates are payable only where water is not available
locally and where fixing of hand pump is neither feasible nor
practically possible due to small amount of work and where water
is actually carried by carts or by mechanical transport.

26.19 Digging pits and fixing distance marks or boundary stones.


each 50.00

26.20 Supplying manure or compost, including carriage of 100 m.


cum 430.00

26.21 Ploughing two times.


hectare 3000.00

26.22 Filling 200 litres drums with diesel oil (not payable to diesel dealer)
each 14.00

26.23 Jungle clearance.


hectare 1076 to 5283

26.24 Ordinary jungle clearance of both banks of running distributaries,


minors and drains with discharge upto 9cum/s including
boundary road :-

(a) Discharge upto 1.5 cum/s km 1398 to 2151

(b) Discharge exceeding 1.5 cum/s but upto 4.5 cum/s km 2151 to 2796

(c) Discharge exceeding 4.5 cum/s. km 2796 to 3549

26.25 Jungle clearance on running canals and branches, and drains with
discharge more than 9 cum/s.

(i) Light km 8606.00

(ii) Medium km 10752.00

(iii) Heavy km 21504.00

Notes for Item No.26.21 to 26.23

Chapter-26 Page 417 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Rate for Zone-A &
Zone-B

1 2 3 4
(i) The rates are applicable to areas acquired for new
canals, and drains, extension of channels and for
construction of roads and Buildings.

(ii) The rate is to be decided by the Executive Engineer


according to density of jungle to be cleared.

(iii) The rates of item Nos. 26.36 to 26.38 are for


estimating purposes only.

26.26 Filling loose cement bags in empty cement bags weighing,


sewing and stacking with in 30m. bag 9.00

26.27 Filling cement bags with steam coal or kankar lime, sewing
including cost of string. Cum 98.00

26.28 Stencilling and bundling empty cement bags.


100 nos 41.00

26.29 Tempering of Kassies, Belchas, Khurpas and pick axes.


each 50.00

Chapter-26 Page 418 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 27
QUANTITIES OF MATERIALS
Note :-
One cement bag weighs 50 Kg and measures 0.03472 cum.

Sr. No. Description Unit Quantities


Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7

27.1 RCC/PCC Design mix with PPC


Cement and Coarse Sand :-

(i) M-20 cum 6.70 0.43 0.85

(ii) M-25 cum 7.50 0.43 0.85 5.00

(iii) M-30 cum 7.70 0.43 0.85 5.95

(iv) M-35 cum 8.50 0.43 0.85 6.68

(v) M-40 cum 8.90 0.43 0.85

(vi) 1:2:4 cum 6.50 0.45 0.90

Cement Fine Sand Coarse


(Bags) (cum) aggregate
s (cum)

Plain Cement Concrete :-

(i) 1:3:6 cum 4.50 0.47 0.94

(ii) 1:4:8 cum 3.50 0.48 0.96

(iii) 1:5:10 cum 2.80 0.49 0.98

(iv) 1:6:12 cum 2.35 0.495 0.99

(v) 1:8:16 cum 1.80 0.50 1.00

Lime (cum) Surkhi Ballast


(cum) (cum)
27.2 Lime concrete

(i) 1:2:8 (Brick ballast 40mm cum 0.13 0.26 1.00


gauge) (76 Kg)

(ii) 16:24:100 (Brick cum 0.16 0.24 1.00


ballast 30mm gauge) (93.54 Kg)

(iii) 16:24:100 (Brick cum 0.16 0.24 1.00


ballast 20mm gauge) (93.54 Kg)

Cement Sand Bricks


(Bags) (cum) (Nos)

Chapter-27 Page 419 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
27.3 (a) Brick work in cement sand
mortar with bricks of size
22.86 cmx11.11cmx6.83cm

(i) 1:2 cum 3.45 0.24 480

(ii) 1:3 cum 2.40 0.25 480

(iii) 1:4 cum 1.75 0.25 480

(iv) 1:5 cum 1.45 0.25 480

(v) 1:6 cum 1.20 0.25 480

(vi) 1:7 cum 1.00 0.25 480

Lime Qtl Surkhi (cu Bricks Sand


m) (Nos) (cum)

(b) Brick work laid in lime surkhi


mortar 1:2 with bricks of size
22.86cm x 11.11cm x 6.83cm

(i) 1:2 cum 0.70 0.24 480 -

(c) Brick work laid in lime, surkhi, cum 0.84 0.12 480 0.12
sand mortar 1:1:1 with bricks
of size 22.86cm x 11.11cm x
6.83cm

Cement Lime Sand Bricks


(Bags) (Qtl.) (cum) (Nos)
(d) Brick work laid in cement,
lime, sand mortar with bricks
of size 22.86cm x 11.11cm x
6.83cm

(i) 1:1:6 cum 1.20 0.29 0.25 480

(ii) 1:2:9 cum 0.80 0.39 0.25 480

(iii) 1:3:12 cum 0.61 0.44 0.25 480

(e) 115mm thick brick wall laid in


cement, lime, sand mortar
1:1:6 with bricks size of
22.86cm x 11.11cm x 6.83cm.

(i) 1:1:6 sqm 0.137 0.032 0.0286 55

Chapter-27 Page 420 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
Cement Sand Tiles
(Bags) (cum) (Nos)

27.4 (a) Brick work in cement sand


mortar with tiles size 22.86 cm
X 11.43cm x
3.81 cm

(i) 1:4 cum 2.85 0.40 780

(ii) 1:5 cum 2.30 0.40 780

(iii) 1:6 cum 1.90 0.40 780

Cement Sand Tiles


(Bags) (cum) (Nos)

(b) Brick work in cement sand


mortar with tiles size 30.48cm
X 15.24cm x 5.08 cm :-

(i) 1:4 cum 1.75 0.25 425

(ii) 1:6 cum 1.20 0.25 425

Cement Sand lime Bricks (Nos)


(Bags) (cum) (cum)
Pucca Sundried

27.5 Gilafi masonry with jibi face (1:5 cum 0.25 0.044 0.002 240 250
mortar)

27.6 Brick work laid in mortar with jibi face cum 0.32 0.054 - 480 -
(1.5 mortar)

Cement Sand Stone


(Bags) (cum) (cum)
27.7 Stone Masonry :

(i) Fine ashlar 1:3 cum 0.96 0.10 1.33

(ii) Fine ashlar 1:6 cum 0.48 0.10 1.33

(iii) Rough-tooled ashlar 1:3 cum 1.72 0.18 1.25

(iv) Rough-tooled ashlar 1:6 cum 0.86 0.18 1.25

(v) Block in course 1:4 cum 1.72 0.24 1.20

(vi) Block in course 1:5 cum 1.38 0.24 1.20

Chapter-27 Page 421 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7

(vii) Block in course 1:6 cum 1.15 0.24 1.20

(viii) Squared rubble masonry. 1:4 cum 2.15 0.30 1.10

(ix) Squared rubble masonry. 1:5 cum 1.72 0.30 1.10

(x) Squared rubble masonry. 1:6 cum 1.44 0.30 1.10

(xi) Random or polygonal rubble cum 1.67 0.35 1.10


1:6

(xii) Boulder masonry 1:6 cum 1.90 0.40 1.10

(xiii) Random or polygonal rubble cum 1.44 0.35 1.10


1:7

(xiv) Random or polygonal rubble cum 1.24 0.35 1.10


1:8
Cement Sand
(Bags) (cum)

27.8 (a) Cement plaster 6mm thick :-

(i) 1:2 sqm 0.10 0.008

(ii) 1:3 sqm 0.08 0.008

(iii) 1:4 sqm 0.06 0.008

(b) Cement plaster 10mm thick :-

(i) 1:2 sqm 0.15 0.01

(ii) 1:3 sqm 0.12 0.012

(iii) 1:4 sqm 0.09 0.012

(c) Cement plaster 12.50mm thick


:-

(i) 1:2 sqm 0.20 0.014

(ii) 1:3 sqm 0.16 0.016

(iii) 1:4 sqm 0.12 0.016

(iv) 1:5 sqm 0.094 0.016

(v) 1:6 sqm 0.078 0.016

Chapter-27 Page 422 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7

(d) Cement plaster 20mm thick :-

(i) 1:2 sqm 0.30 0.021

(ii) 1:3 sqm 0.24 0.024

(iii) 1:4 sqm 0.18 0.024

(iv) 1:5 sqm 0.14 0.024

(v) 1:6 sqm 0.117 0.024

(e) Cement plaster 25mm thick :-

(i) 1:2 sqm 0.40 0.028

(ii) 1:3 sqm 0.32 0.032

(iii) 1:4 sqm 0.24 0.032

(iv) 1:5 sqm 0.188 0.032

(v) 1:6 sqm 0.156 0.032

Cement Sand Lime


(Bags) (cum) (Kg)

27.9 (i) Cement lime plaster 12.5mm sqm 0.08 0.016 1.55
thick 1:1:6 mortar.

(ii) Cement lime plaster 25mm sqm 0.16 0.032 3.10


thick 1:1:6 mortar.

Lime (Kg) Surkhi


(cum)

27.10 (a) Lime plaster 12.5mm thick 2 sqm 4.95 0.0128


lime 3 surkhi.

Cement Sand Bitumen


(Bags) (cum) (kg)

(b)(i) 12.5 mm thick cement plaster sqm 0.16 0.016 1.65


damp proof course 1:3 with
two coats of bitumen laid hot
and sanded.

Chapter-27 Page 423 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
(ii) 20mm thick cement plaster sqm 0.24 0.024 1.65
damp proof course 1:3 with
two coats of bitumen laid hot
and sanded.

Good Earth Old Bhusa Cow


(cum) (Kg) Dung

(c)(i) Mud plaster 12.50mm thick sqm 0.35 23 L.S.


with gobri leeping.

(ii) Mud plaster 25mm thick with sqm 0.70 45 L.S.


gobri leeping.

Cement Sand
(Bags) (cum)
27.11 Flush or deep cement pointing on
brick walls or brick on edge flooring :-

(i) 1:2 sqm 0.044 0.003

(ii) 1:3 sqm 0.033 0.003

27.12 Flush cement pointing on flat brick


flooring :-

(i) 1:2 sqm 0.035 0.0024

27.13 Flush cement pointing on underside


of roof tiles :-

(30.48cm x 15.24cm x 5.08cm) sqm 0.026 0.0018


1:2 mortar

Lime (cum) Surkhi


(cum)

27.14 Lime pointing 2:3 flush or weathered sqm 0.0013 0.0023


and struck. (0.90 kg)

Cement Sand

27.15 Cement pointing 1:2 on stone walls :-

(i) Flush sqm 0.065 0.0046

(ii) Raised sqm 0.130 0.009

Chapter-27 Page 424 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
(iii) On stone slab pavement sqm 0.022 0.0015

27.16 Cement rendering on plaster 1mm sqm 0.025 -


thick.

Lime (kg)
27.17 White washing :-

(i) One coat sqm 0.15

(ii) Two coats sqm 0.25

(iii) Three coats sqm 0.35

27.18 Colour washing :-

(i) One coat sqm 0.10

(ii) Two coats sqm 0.20

Cement Sand Tiles Aggregates


(Bags) (cum) (Nos) (cum)

27.19 Second class mud roofing

(i) When space between battens sqm 0.24 0.027 22 0.0026


is filled with concrete blocks.

(ii) When space between battens sqm 0.23 0.026 22 -


is filled with wooden pieces.

27.20 Tile terracing on roof (Tile size sqm 0.035 0.0049 37 -


22.86 cm x 11.43 cm x
3.81 cm)

Paints
(Litres)

27.21 Painting :-

(i) Two coats of synthetic enamel sqm 0.145


paint on new wood or steel
work.

Chapter-27 Page 425 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
(ii) Two coats of ready, mixed sqm 0.122
paint on new wood or steel
work.

(iii) Two coats of synthetic enamel sqm 0.118


paint on old wood or steel
work.

(iv) Two coats of ready, mixed sqm 0.098


paint on old wood or steel
work.

(v) One coat of synthetic enamel sqm 0.065


paint on old wood or steel
work.

(vi) One coat of ready mixed paint sqm 0.054


on old wood or steel work.

(vii) Priming coat on wood work. sqm 0.061

(viii) Priming coat on new steel sqm 0.054


work.

Red lead Turpentin Linseed


Genuine e Oil Oil (Litre)
(Kg) (Litre)

(ix) Priming coat consisting of red sqm 0.085 0.0306 0.0306


lead mixed with linseed oil and
turpentine oil in equal
proportion or with genuine red
lead on steel work.

(x) Two coats on iron sheets with sqm 0.093 - -


roofing red, ready mixed paint
on new work to give an even
shade.

Red lead Turpentin Linseed


Genuine e Oil Oil (Litre)
(Kg) (Litre)

(xi) One coat on iron sheet with sqm 0.059 - -


roofing red, ready mixed paint
on old work to give an even
shade.

Chapter-27 Page 426 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
Paints
(Litres)

(xii) Two coats on iron sheets with sqm 0.15 - -


roofing white, grey or green
ready mixed paint on new
work to give an even shade.

(xiii) One coat on iron sheets with sqm 0.0947 - -


roofing white, grey or green
ready mixed paint on new
work to give an even shade.

(xiv) Two coats with aluminium sqm 0.093 - -


paint on new work to give an
even shade.

(xv) One coat with aluminium paint sqm 0.0445 - -


on new work to give an even
shade .

(xvi) Two coats with anti- corrosive sqm 0.1086 - -


bitumastic paint on new work
to give an even shade (with
black enamel paint).

(xvii) One coat with anti- corrosive sqm 0.0543 - -


bitumastic paints on old work
to give an even shade (with
black enamel paint)

27.22 Solignum or creosote paint :-

(i) Two coats sqm 0.069

(ii) One coat sqm 0.039

27.23 Distempering (dry or oil- bound)

(i) Two coats on new work. sqm 0.171

(ii) One coat on old work. sqm 0.073

(iii) Two coats on old work. sqm 0.146

Chapter-27 Page 427 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7

27.24 cement concrete 1:3:6 for filling in the


frame and cement concrete 1:2:4 for
lugs complete.

(i) 113mm x 60mm with 35 mm Mtr. 0.066 0.0055 0.011


wide single rebate

(ii) 151mmx 60mm with 35 mm Mtr. 0.0684 0.0062 0.0125


wide double rebate
Cement Sand Tiles (30.48cm x 15.24cm x
(bags) (cum) 5.08cm.) (Nos)

27.25 Double layer tile lining (13.36 cm sqm 0.355 0.049 40


thick)

27.26 Single layer tile lining sqm 0.273 0.040 20

Stone (cum) G.I. Wire No. 6 S.W.G (4.75 mm)

27.27 Filling stone in wire-crates (hand cum 1.00 3.3kg per sqm of wire netting 15cm mesh.
packed)

Stone (cum)

28.28 Stone pitching. cum 1.00


Shingle or
stone
aggregate s
(10mm) ring

28.29 Dry grouting dry stone pitching. cum 0.20

Cement
Mortar
(cum)

28.30 Cement mortar dry brick pitching or

(i) 7.5cm thick floor sqm 0.019

(ii) 11.50 cm thick floor sqm 0.029

Chapter-27 Page 428 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
Cement Sand Shingle or Aggregate
(bags) (cum) (cum)

28.31 Cement grouting stone ptiching :-

(i) 1:2:4 cum 1.45 0.10 0.20

(ii) 1:3:6 cum 0.96 0.10 0.20

Cement Sand 15 Total


(bags) (cum) percent Sand
extra (cum)
sand for
wastage
(cum)

28.32 Cement Sand mortar :-

(i) 1:2 cum 13.63 0.96 0.14 1.10

(ii) 1:3 cum 9.60 1.00 0.15 1.15

(iii) 1:4 cum 6.89 1.00 0.15 1.15

Cement Sand 15 Total


(bags) (cum) percent Sand
extra (cum)
sand for
wastage
(cum)

(iv) 1:5 cum 5.75 1.00 0.15 1.15

(v) 1:6 cum 4.80 1.00 0.15 1.15

No. of Cement in Sand Lime Surkhi


bricks of bags of 50 (cum) (quintal) (cum)
size Kg
22.86cm x (Bags)
11.11cm x
6.83cm
(Nos)

27.33 Flat brick paving laid dry over 25mm 10 364 -- 0.075 -- --
thick mud mortar grouted with sand. sqm

27.34 Dry brick on edge paving sand 10 575 -- 0.15 -- --


grouted over 50mm thick earth and sqm
mud plaster.

Chapter-27 Page 429 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
27.35 First class dry flat brick flooring 10 364 -- 0.075 -- --
templates over rammed and dressed sqm
foundations and to correct
longitudinal and cross slopes.

27.36 First class dry brick on edge flooring 10 575 -- 0.15 -- --


as described in item no. 27.38 sqm

27.37 First class flat brick paving or flooring


laid over and in lime mortar/in cement
sand mortar 1:5 or 1:6 etc.

(i) In & on lime mortar 10 383 -- -- 0.74 0.125


sqm

(ii) In & on cement sand mortar 10 383 0.599 0.144 -- --


1:6 sqm

(iii) In & on cement sand mortar 10 383 0.718 0.144 -- --


1:5 sqm

(iv) In & on cement sand mortar 10 383 0.860 0.144 -- --


1:4 sqm

27.38 First class brick on edge paving or


flooring laid over and in lime mortar/in
cement sand mortar 1:4, 1:5 or 1:6
etc.

(i) In & on lime mortar 10 617 -- -- 0.87 0.149


sqm

No. of Cement in Sand Lime Surkhi


bricks of bags of 50 (cum) (quintal) (cum)
size Kg
22.86cm x (Bags)
11.11cm x
6.83cm
(Nos)

(ii) In & on cement sand mortar 10 617 0.714 0.171 -- --


1:6 sqm

(iii) In & on cement sand mortar 10 617 0.856 0.171 -- --


1:5 sqm

(iv) In & on cement sand mortar 10 617 1.025 0.171 -- --


1:4 sqm

Chapter-27 Page 430 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Quantities
Cement Coarse Coarse Admixture (kg)
(Bags) Sand aggregate
(cum) s (cum)
1 2 3 4 5 6 7
No. of Cement in Sand
bricks of bags of 50 (cum)
size Kg
22.86cm x (Bags)
11.11cm x
6.83cm
(Nos)

27.39 Dry brick on edge paving sand 10 575 -- 0.15


grouted over 50mm thick rammed sqm

27.40 Flat brick or tile flooring laid in 10 383 3.01 0.668


cement sand mortar 1:4 on 100mm sqm

27.41 Brick on edge flooring laid in cement 10 617 2.725 1.570


sand mortar 1:4 in 75mm thick sqm

27.42 Flat brick or tile flooring laid dry over 10 383 0.70 0.13
bed of 6mm thick cement sand sqm

27.43 Laying flat road brick soiling in work. 10 383 -- --


sqm

27.44 Laying brick on edge soling in road 10 617 -- --


work. sqm

Chapter-27 Page 431 CSR-2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 28
WATER SUPPLY
Note :- 1. The rates for stringingout cast iron,A.C., P.V.C. ,D.I and H.D.P.E. pipes etc. provided
under this chapter includes the cost of jointing of pipes only. However the payment of
joints due to fixing of specials in the pipe line shall be paid extra.

Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

28.1 Excavation manually in trenches for pipe lines


with straight or open cutting in streets and
lanes in builtup area where width of street /
Lane from wall to wall is less than 3 meter
including trimming and dressing sides
levelling of beds of trenches to correct grade,
cutting joint holes, refilling
consolidation,watering , including the cost of
dewatering of rain water, diversion for traffic,
night signals. Providing & fixing caution
boards, watching, fencing, etc. and removal
of surplus soil from the site upto 15 meter
distance complete in all respects.

Note:
(a) Earth work upto 1.5 m. Depth

i All classes of soil except rocky Cum. 169.03 185.93

ii For Ordinary soil having gravel upto


Cum. 221.22 243.34
40%

iii For semi conglomerate soil of having


Cum. 221.22 243.34
gravel/Boulder upto 50%

(b) Exceeding 1.5 m depth but not exceeding


2.25 m depth

i All classes of soil except rocky


Cum. 175.10 192.61

ii For Ordinary soil having gravel upto


40% Cum. 227.29 250.02

iii For semi conglomerate soil of having


gravel/Boulder upto 50% Cum. 233.09 256.40

(c) Exceeding 2.25 m depth upto 3.00 m depth

i All classes of soil except rocky


Cum. 192.51 211.76

Chapter-28 Page 432 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
ii For Ordinary soil having gravel upto
40% Cum. 262.08 288.29

iii For semi conglomerate soil of having


gravel/Boulder upto 50% Cum. 349.06 383.97

(d) Exceeding 3.00 m depth upto 4.50 m depth

i All classes of soil except rocky Cum. 238.62 262.48

ii For Ordinary soil having gravel upto


40% Cum. 325.60 358.15

iii For semi conglomerate soil of having


gravel/Boulder upto 50% Cum. 447.36 492.10

(e) Exceeding 4.5 m depth upto 6.0 m depth

i All classes of soil except rocky Cum. 308.20 339.02

ii For Ordinary soil having gravel upto


Cum. 412.57 453.83
40%

iii For semi conglomerate soil of having


Cum. 586.52 645.17
gravel/Boulder upto 50%

(f) Exceeding 6.0m depth upto7.5 m depth

i All classes of soil except rocky Cum. 342.99 377.29

ii For Ordinary soil having gravel upto


Cum. 447.36 492.10
40%

iii For semi conglomerate soil of having


Cum. 638.71 702.58
gravel/Boulder upto 50%

Chapter-28 Page 433 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.2 Excavation by mechanical means(JCB or
Hydraulic excavator) in trenches for pipe lines
with straight or open cutting in streets or
open area including trimming and dressing
sides levelling of beds of trenches to correct
grade, cutting joint holes, refilling
consolidation,watering , including the cost of
dewatering of rain water, diversion for traffic,
night signals. providing & fixing caution
boards, crossing over trenches for access to
the houses, watching, fencing, etc. and
removal of surplus soil out side/inside the
town involving lead upto 15 meter complete in
all respect.

(a) Earth work upto 1.5 m. Depth for

i All classes of soil except rocky Cum. 99.10 109.01

ii For Ordinary soil having gravel upto


Cum. 124.43 136.88
40%

iii For semi conglomerate soil of having


Cum. 135.30 148.83
gravel/Boulder upto 50%

(b) Exceeding 1.5 m depth but not exceeding


2.25 m depth

i All classes of soil except rocky Cum. 106.34 116.98

ii For Ordinary soil having gravel upto


Cum. 126.25 138.87
40%

iii For semi conglomerate soil of having


gravel/Boulder upto 50% Cum. 135.30 148.83

(c) Exceeding 2.25 m depth upto 3.00 m depth

i All classes of soil except rocky Cum. 116.94 128.63

ii For Ordinary soil having gravel upto


Cum. 141.37 155.50
40%

iii For semi conglomerate soil of having


Cum. 201.08 221.19
gravel/Boulder upto 50%

(d) Exceeding 3.00 m depth upto 4.5 m depth

i All classes of soil except rocky Cum. 137.83 151.61

Chapter-28 Page 434 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

ii For Ordinary soil having gravel upto


Cum. 153.40 168.73
40%

iii For semi conglomerate soil of having


Cum. 251.12 276.23
gravel/Boulder upto 50%

(e) Exceeding 4.5 m depth upto 6.0 m depth

i All classes of soil except rocky Cum. 175.11 192.62

ii For Ordinary soil having gravel upto


Cum. 233.20 256.51
40%

iii For semi conglomerate soil of having


Cum. 327.12 359.83
gravel/Boulder upto 50%

(f) Exceeding 6.0m depth upto7.5 m depth

i All classes of soil except rocky Cum. 195.01 214.52

ii For Ordinary soil having gravel upto


Cum. 251.12 276.23
40%

iii For semi conglomerate soil of having


Cum. 357.88 393.67
gravel/Boulder upto 50%

28.3 A Extra for disposal of surplus soil on item No Rate for this item will be given as per
28.1 and 28.2 beyond 15 meters chapter of Carriage.

28.3 B Extra for lowering the sub soil water level Rate for this item will be given as per
chapter -29.

28.4 Extra for cutting Through Cement Concrete


Roads and their foundations including sorting
Rate for this item will be given as per
and stacking the soling at the site of work as
Chapter 8 of dismantling.
ordered by the Engineer-in-charge.

28.5 Extra for cutting through metalled Roads and


their foundation including sorting screening
and stacking the soling stone and road metal Rate for this item will be given as per
at the site of work as ordered by the Engineer- Chapter 24 of road work.
in-charge.

Chapter-28 Page 435 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.6 Consolidation of road cuts with hammers,
(a) hand rollers and laying of flat brick
soling/pavement (at formation level) complete SqMtr. Rate for this item will be given as per
so as to allow unobstructed traffic (with Chapter 24 of road work.
dismantled material at site).

28.6 Recondition road cuts with hammers, hand


(b) rollers and laying of stone metal / bajri in
soling / base coarse confirming to WBM
Rate for this item will be given as per
specifications (at formation level) complete so Cum
Chapter 24 of road work.
as to allow unobstructed traffic (with
dismantled material at site).

28.7 Providing, Stringing out, cutting, Jointing and


A testing of ISI Marked C.I. Pipes Class-LA per
IS:1536 and laying the same in trenches to
correct alignment and gradients,jointed with
rubber tyton joints fitted complete including all
cartage.

(a) 80mm i/d pipe lines laid complete Mtr 29.95 1091.29 32.94 1094.28

(b) 100mm i/d pipe lines laid complete Mtr 39.12 1356.45 43.03 1360.36

(c) 150mm i/d pipe lines laid complete Mtr 53.39 2151.84 58.73 2157.18

(d) 200mm i/d pipe lines laid complete Mtr 72.17 3115.77 79.39 3122.99

(e) 250mm i/d pipe lines laid complete Mtr 92.21 4123.09 101.43 4132.31

(f) 300mm i/d pipe lines laid complete Mtr 148.95 5254.79 163.84 5269.69

(g) 350mm i/d pipe lines laid complete Mtr 162.33 7565.61 178.57 7581.84

(h) 400mm i/d pipe lines laid complete Mtr 196.55 9208.43 216.20 9228.08

(i) 450mm i/d pipe lines laid complete Mtr 238.90 11093.34 262.79 11117.23

(j) 500mm i/d pipe lines laid complete Mtr 278.78 12970.84 306.66 12998.72

(k) 600mm i/d pipe lines laid complete Mtr 362.25 17211.71 398.48 17247.93

Chapter-28 Page 436 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

Note In case ISI marked CI pipe class-A as per IS 1536 is used, the through rate will be
(i) increased by 10% in item no 28.7-A

(ii) In case ISI marked CI pipe class-B as per IS 1536 is used, the through rate will be
increased by 20% in item no 28.7-A

28.7 Providing, Stringing out, cutting, Jointing and


B testing of ISI Marked D.I. Pipe (S&S) as per
IS 8329 and laying the same in trenches to
correct alignment and gradients, jointed with
rubber tyton joints fitted complete including all
cartage, cost of rubber ring.

A D.I. Pipe as per IS 8329 DI-K7

(a) 80mm i/d pipe lines laid complete Mtr 27.09 912.82 29.80 915.53

(b) 100mm i/d pipe lines laid complete Mtr 30.76 1098.43 34.35 1102.02

( c) 150mm i/d pipe lines laid complete Mtr 38.39 1613.56 38.03 1613.20

(d) 200mm i/d pipe lines laid complete Mtr 45.98 1987.50 50.72 1992.24

(e) 250mm i/d pipe lines laid complete Mtr 55.19 2756.30 60.61 2761.72

(f) 300mm i/d pipe lines laid complete Mtr 78.39 3388.96 85.48 3396.05

(g) 350mm i/d pipe lines laid complete Mtr 93.58 4326.33 101.85 4334.60

(h) 400mm i/d pipe lines laid complete Mtr 108.64 4848.01 118.07 4857.44

(i) 450mm i/d pipe lines laid complete Mtr 124.21 6021.55 134.83 6032.17

(j) 500mm i/d pipe lines laid complete Mtr 142.55 6860.48 154.54 6872.47

(k) 600mm i/d pipe lines laid complete Mtr 177.69 8739.00 192.09 8753.40

(l) 700mm i/d pipe lines laid complete Mtr 221.72 11832.28 239.08 11849.64

(m) 750mm i/d pipe lines laid complete Mtr 243.08 13754.48 261.96 13773.36

(n) 800mm i/d pipe lines laid complete Mtr 271.78 15611.68 292.88 15632.78

Chapter-28 Page 437 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(o) 900mm i/d pipe lines laid complete Mtr 321.94 18973.97 346.57 18998.60

(p) 1000mm i/d pipe lines laid complete


Mtr 376.21 22856.56 404.65 22885.00

B D.I. Pipe as per IS 8329 DI-K9


(a) 80mm i/d pipe lines laid complete Mtr 28.63 940.80 31.95 944.12

(b) 100mm i/d pipe lines laid complete Mtr 32.90 1226.05 36.62 1229.77

( c) 150mm i/d pipe lines laid complete Mtr 42.11 1774.14 46.51 1778.54

(d) 200mm i/d pipe lines laid complete Mtr 51.32 2407.36 56.39 2412.43

(e) 250mm i/d pipe lines laid complete Mtr 62.50 3196.06 68.38 3201.94

(f) 300mm i/d pipe lines laid complete Mtr 88.20 3965.65 97.57 3975.02

(g) 350mm i/d pipe lines laid complete Mtr 105.87 4736.68 116.98 4747.79

(h) 400mm i/d pipe lines laid complete Mtr 123.24 5522.49 136.04 5535.29

(i) 450mm i/d pipe lines laid complete Mtr 142.63 6719.00 157.29 6733.66

(j) 500mm i/d pipe lines laid complete Mtr 163.01 7693.00 179.64 7709.63

(k) 600mm i/d pipe lines laid complete Mtr 204.47 10240.91 224.90 10261.34

(l) 700mm i/d pipe lines laid complete Mtr 255.81 13012.63 280.93 13037.75

(m) 750mm i/d pipe lines laid complete Mtr 282.73 15200.09 310.34 15227.70

(n) 800mm i/d pipe lines laid complete Mtr 313.88 16565.90 344.57 16596.59

(o) 900mm i/d pipe lines laid complete Mtr 372.90 20470.27 409.07 20506.44

(p) 1000mm i/d pipe lines laid complete


Mtr 436.61 24541.11 478.71 24583.21

28.8 Extra for fixing of double flanged pipes in


vertical position for over head reservoir &
stand pipes, scaffolding, derricks, Jim poles,
tools and plants, ropes, guys, etc. Complete
as desired by Engineer-in-Charge.

(a) 80mm i/d pipe lines laid complete Mtr 78.82 86.70

(b) 100mm i/d pipe lines laid complete Mtr 103.28 113.61

(c) 125mm i/d pipe lines laid complete Mtr 141.95 156.14

(d) 150mm i/d pipe lines laid complete Mtr 178.01 195.82

Chapter-28 Page 438 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(e) 200mm i/d pipe lines laid complete Mtr 256.93 282.62

(f) 250mm i/d pipe lines laid complete Mtr 346.99 381.69

(g) 300mm i/d pipe lines laid complete Mtr 448.11 492.92

(h) 350mm i/d pipe lines laid complete Mtr 507.50 558.25

(i) 400mm i/d pipe lines laid complete Mtr 562.83 619.11

(j) 450mm i/d pipe lines laid complete Mtr 620.31 682.34

(k) 500mm i/d pipe lines laid complete Mtr 676.69 744.36

(l) 600mm i/d pipe lines laid complete Mtr 733.45 806.80

28.9 Providing, Stringing out, cutting Jointing &


testing A.C. Pipes ISI marked as per IS 1592-
2003 class-15 with suitable A C coupling
along the trenches and laying the same into
Trenches to correct alignment and gradients,
including all carriage complete.

(a) 80mm i/d pipe Mtr 31.85 120.64 35.04 123.83

(b) 100mm i/d pipe Mtr 45.51 165.61 50.06 170.16

(c) 150mm i/d pipe Mtr 58.44 309.11 64.29 314.95

(d) 200mm i/d pipe Mtr 94.33 543.43 103.76 552.86

(e) 250mm i/d pipe Mtr 134.96 794.11 148.46 807.61

28.10 Supplying and fixing of ISI Marked CI D-joint


(complete with nut, bolts & rubber ring) as per
IS:8794 for repair of pipe line including cutting
, jointing and testing etc. but excluding cost of
excavation complete.

a 80 mm Each 177.64 446.52 195.41 464.28

b 100 mm Each 213.18 558.22 234.50 579.54

c 150 mm Each 236.86 853.01 260.54 876.69

d 200 mm Each 260.56 1077.24 286.61 1103.29

e 250 mm Each 284.23 1352.20 312.66 1380.62

Chapter-28 Page 439 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.11 Providing, laying, jointing, fixing and testing
ISI Marked uPVC Pipe with G.I. specials as
per ISI-4985, including cost of G.I. specials
such as tees, bends, sockets, elbows etc.
testing inside building complete.

A uPVC Pipe 10 Kgf/cm2

a 20mm i/d Mtr. 64.44 87.88 70.89 94.33

b 25mm i/d Mtr. 80.38 116.74 88.42 124.78

c 32mm i/d Mtr. 94.83 154.61 104.31 164.10

d 40mm i/d Mtr. 101.89 191.62 112.08 201.80

e 50mm i/d Mtr. 109.98 249.59 120.98 260.59

B uPVC Pipe 6 Kgf/cm2

a 40mm i/d Mtr. 101.89 156.72 112.08 166.90

b 50mm i/d Mtr. 109.98 194.52 120.98 205.52

28.12 Providing and laying, jointing, fixing and


testing ISI Marked uPVC Pipe Lines as per
ISI 4985-2000, including specials such as
tees, bends, sockets, elbow etc., cutting,
testing (including cost of specials) in the
ground complete in all respects.

A uPVC Pipe 10 Kgf/cm2

a 20mm i/d Mtr. 21.56 39.96 23.72 42.12

b 25mm i/d Mtr. 28.13 56.68 30.95 59.49

c 32mm i/d Mtr. 39.17 86.12 43.08 90.04

d 40mm i/d Mtr. 44.83 115.33 49.32 119.81

e 50mm i/d Mtr. 46.56 156.22 51.21 160.88

B uPVC Pipe 6 Kgf/cm2

a 40mm i/d Mtr. 40.89 83.97 44.98 88.05

b 50mm i/d Mtr. 42.62 109.02 46.88 113.28

Chapter-28 Page 440 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.13 Providing, Laying , fixing & jointing of P.V.C.
Pipes as per ISI-4985 (ISI marked with the
prior approval of Engineer-in-Charge) along
the Trenches and laying the same in
Trenches to correct alignment and gradients,
cutting, jointing and testing complete as per
specifications.

i 63mm o/d pipe of 10 Kgf. / sqcm Mtr 10.33 147.39 11.36 148.43

ii 75mm o/d pipe of 10 Kgf. / sqcm Mtr 12.20 206.46 13.42 207.68

iii 90mm o/d pipe of 10 Kgf. / sqcm Mtr 14.60 290.01 16.07 291.47

iv 110mm o/d pipe of 10 Kgf. / sqcm Mtr 18.21 429.42 20.03 431.24

v 160mm o/d pipe of 10 Kgf. / sqcm Mtr 24.24 892.91 26.66 895.33

vi 200mm o/d pipe of 10 Kgf. / sqcm Mtr 35.69 1393.57 39.26 1397.14

vii 250mm o/d pipe of 10 Kgf. / sqcm Mtr 45.51 2194.99 50.06 2199.55

viii 110mm o/d pipe of 8 Kgf. / sqcm Mtr 18.21 379.77 20.03 381.59

ix 160mm o/d pipe of 8 Kgf. / sqcm Mtr 24.24 797.66 26.66 800.09

x 200mm o/d pipe of 8 Kgf. / sqcm Mtr 35.69 1237.97 39.26 1241.54

xi 250mm o/d pipe of 8 Kgf. / sqcm Mtr 45.51 2010.57 50.06 2015.12

xii 63mm o/d pipe of 6 Kgf. / sqcm Mtr 10.33 97.16 11.36 98.19

xiii 75mm o/d pipe of 6 Kgf. / sqcm Mtr 12.20 133.41 13.42 134.63

xiv 90mm o/d pipe of 6 Kgf. / sqcm Mtr 14.60 186.37 16.07 187.83

xv 110mm o/d pipe of 6 Kgf. / sqcm Mtr 18.21 266.00 20.03 267.82

xvi 160mm o/d pipe of 6 Kgf. / sqcm Mtr 24.24 552.99 26.66 555.41

xvii 200mm o/d pipe of 6 Kgf. / sqcm Mtr 35.69 897.39 39.26 900.96

xviii 250mm o/d pipe of 6 Kgf. / sqcm Mtr 45.51 1386.19 50.06 1390.74

xix 63mm o/d PVC pipe of 4 Kgf. / sqcm


Mtr 10.33 73.18 11.36 74.21

xx 75mm o/d PVC pipe of 4 Kgf. / sqcm Mtr 12.20 100.81 13.42 102.03

xxi 90mm o/d pipe of 4 Kgf. / sqcm Mtr 14.60 137.74 16.07 139.20

xxii 110mm o/d PVC pipe of 4 Kgf. / sqcm


Mtr 18.21 197.83 20.03 199.65

Chapter-28 Page 441 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

xxiii 160mm o/d PVC pipe of 4 Kgf. / sqcm


Mtr 24.24 408.57 26.66 411.00

xxiv 200mm o/d PVC pipe of 4 Kgf. / sqcm


Mtr 35.69 633.35 39.26 636.92

xxv 250mm o/d PVC pipe of 4 Kgf. / sqcm


Mtr 45.51 968.67 50.06 973.22

xxvi 90mm o/d PVC pipe of 2.5 Kgf. /


Mtr 14.60 93.83 16.07 95.29
sqcm

xxvii 110mm o/d PVC pipe of 2.5 Kgf. /


Mtr 18.41 137.58 20.25 139.42
sqcm

xxviii 160mm o/d PVC pipe of 2.5 Kgf. /


Mtr 24.24 271.15 26.66 273.57
sqcm

xxix 200mm o/d pipe of 2.5 Kgf. / sqcm Mtr 35.69 421.05 39.26 424.62

xxx 250mm o/d PVC pipe of 2.5 Kgf. /


Mtr 45.51 643.89 50.06 648.44
sqcm

28.14 Providing, laying ,fixing & jointing of ISI


Marked H.D.P.E. Pipes as per ISI - 4984-
1995 the Trenches and laying the same in
Trenches to correct alignment and gradients,
cutting, jointing and testing complete as per
specifications.

i 90mm o/d H.D.P.E pipe of 6 Kg. PE-


Mtr 12.24 359.55 13.47 360.78
63

ii 110mm o/d H.D.P.E pipe of 6 Kg. PE-


Mtr 13.92 521.68 15.31 523.07
63

iii 90mm o/d H.D.P.E pipe of 4 Kg. PE-


Mtr 12.24 239.04 13.47 240.27
63

iv 110mm o/d H.D.P.E pipe of 4 Kg. PE-


Mtr 13.92 356.51 15.31 357.90
63

28.15 Providing, Laying, fixing & jointing of ISI


Marked H.D.P.E. Pipes as per ISI - 4984-
1995 casting along the Trenches and laying
the same in Trenches to correct alignment
and gradients, cutting, jointing and testing
complete as per specifications.

A H.D.P.E pipe of 10 Kg. PE-80

Chapter-28 Page 442 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(a) 25mm o/d Mtr 5.69 38.70 6.26 39.27

(b) 32 mm o/d Mtr 6.76 59.24 7.44 59.92

( c) 40 mm o/d Mtr 7.84 92.48 8.62 93.26

(d) 50 mm o/d Mtr 8.92 140.09 9.81 140.98

(e) 63 mm o/d Mtr 9.99 217.33 10.99 218.33

(f) 75 mm o/d Mtr 11.17 305.68 12.28 306.79

(g) 90 mm o/d Mtr 12.24 432.00 13.47 433.23

(h) 110 mm o/d Mtr 13.31 635.32 14.64 636.65

(i) 125 mm o/d Mtr 14.37 809.88 15.81 811.31

(j) 140 mm o/d Mtr 15.46 1014.08 17.00 1015.63

(k) 160 mm o/d Mtr 16.53 1328.28 18.18 1329.93

(l) 180 mm o/d Mtr 17.61 1667.87 19.37 1669.63

(m) 200 mm o/d Mtr 18.68 2049.78 20.55 2051.65

(n) 225 mm o/d Mtr 19.76 2600.94 21.73 2602.92

(o) 250 mm o/d Mtr 20.82 3219.80 22.90 3221.88

(p) 280 mm o/d Mtr 21.90 4046.00 24.09 4048.19

(q) 315 mm o/d Mtr 22.97 5143.03 25.27 5145.32

( r) 355 mm o/d Mtr 24.05 6498.15 26.45 6500.56

(s) 400 mm o/d Mtr 25.12 8251.05 27.63 8253.56

(t) 450 mm o/d Mtr 26.20 10435.55 28.82 10438.17

(u) 500 mm o/d Mtr 27.26 12933.17 29.99 12935.90

(v) 560 mm o/d Mtr 28.34 16192.46 31.17 16195.30

(w) 630 mm o/d Mtr 29.42 20551.93 32.36 20554.87

B H.D.P.E pipe of 8 Kg. PE-80

(a) 32 mm o/d Mtr 6.76 51.62 7.44 52.30

(b) 40 mm o/d Mtr 7.84 77.24 8.62 78.03

( c) 50 mm o/d Mtr 8.92 115.55 9.81 116.44

Chapter-28 Page 443 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(d) 63 mm o/d Mtr 9.99 179.25 10.99 180.25

(e) 75 mm o/d Mtr 11.17 251.51 12.28 252.63

(f) 90 mm o/d Mtr 12.24 357.54 13.47 358.76

(g) 110 mm o/d Mtr 13.31 519.38 14.64 520.72

(h) 125 mm o/d Mtr 14.37 674.48 15.81 675.92

(i) 140 mm o/d Mtr 15.46 836.36 17.00 837.91

(j) 160 mm o/d Mtr 16.53 1091.32 18.18 1092.97

(k) 180 mm o/d Mtr 17.61 1371.67 19.37 1373.43

(l) 200 mm o/d Mtr 18.68 1690.10 20.55 1691.97

(m) 225 mm o/d Mtr 19.76 2135.47 21.73 2137.45

(n) 250 mm o/d Mtr 20.82 2644.31 22.90 2646.40

(o) 280 mm o/d Mtr 21.90 3305.50 24.09 3307.69

(p) 315 mm o/d Mtr 22.97 4169.78 25.27 4172.08

(q) 355 mm o/d Mtr 21.47 5287.97 23.62 5290.11

( r) 400 mm o/d Mtr 25.12 6753.12 27.63 6755.63

(s) 450 mm o/d Mtr 26.20 8489.10 28.82 8491.72

(t) 500 mm o/d Mtr 27.26 10605.87 29.99 10608.60

(u) 560 mm o/d Mtr 28.34 13272.76 31.17 13275.59

(v) 630 mm o/d Mtr 29.42 16785.94 32.36 16788.88

C H.D.P.E pipe of 6 Kg. PE-80

(a) 40 mm o/d Mtr 7.84 64.55 8.62 65.33

(b) 50 mm o/d Mtr 8.92 96.94 9.81 97.83

( c) 63 mm o/d Mtr 9.99 146.25 10.99 147.25

(d) 75 mm o/d Mtr 11.17 208.34 12.28 209.46

(e) 90 mm o/d Mtr 12.24 288.98 13.47 290.20

(f) 110 mm o/d Mtr 13.31 427.99 14.64 429.32

(g) 125 mm o/d Mtr 14.37 547.52 15.81 548.96

Chapter-28 Page 444 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(h) 140 mm o/d Mtr 15.46 688.25 17.00 689.80

(i) 160 mm o/d Mtr 16.53 896.67 18.18 898.33

(j) 180 mm o/d Mtr 17.61 1130.47 19.37 1132.23

(k) 200 mm o/d Mtr 18.68 1389.66 20.55 1391.53

(l) 225 mm o/d Mtr 19.76 1746.19 21.73 1748.17

(m) 250 mm o/d Mtr 20.82 2145.01 22.90 2147.09

(n) 280 mm o/d Mtr 21.90 2704.63 24.09 2706.82

(o) 315 mm o/d Mtr 22.97 3408.13 25.27 3410.43

(p) 355 mm o/d Mtr 24.05 4314.73 26.45 4317.14

(q) 400 mm o/d Mtr 25.12 5483.68 27.63 5486.20

( r) 450 mm o/d Mtr 26.20 6923.45 28.82 6926.07

(s) 500 mm o/d Mtr 27.26 8574.78 29.99 8577.51

(t) 560 mm o/d Mtr 28.34 10776.20 31.17 10779.04

(u) 630 mm o/d Mtr 29.42 13654.68 32.36 13657.62

D H.D.P.E pipe of 4 Kg. PE-80

(a) 50 mm o/d Mtr 8.92 69.00 9.81 69.89

(b) 63 mm o/d Mtr 9.99 104.78 10.99 105.78

( c) 75 mm o/d Mtr 11.17 141.50 12.28 142.62

(d) 90 mm o/d Mtr 12.24 204.36 13.47 205.58

(e) 110 mm o/d Mtr 13.31 292.58 14.64 293.91

(f) 125 mm o/d Mtr 14.37 371.50 15.81 372.94

(g) 140 mm o/d Mtr 15.46 459.76 17.00 461.30

(h) 160 mm o/d Mtr 16.53 600.47 18.18 602.13

(i) 180 mm o/d Mtr 18.35 763.08 20.18 764.91

(j) 200 mm o/d Mtr 18.68 928.45 20.55 930.32

(k) 225 mm o/d Mtr 19.76 1183.40 21.73 1185.38

(l) 250 mm o/d Mtr 20.82 1451.05 22.90 1453.13

Chapter-28 Page 445 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(m) 280 mm o/d Mtr 22.48 1816.62 24.73 1818.86

(n) 315 mm o/d Mtr 22.97 2307.95 25.27 2310.24

(o) 355 mm o/d Mtr 24.05 2892.97 26.45 2895.37

(p) 400 mm o/d Mtr 25.12 3664.16 27.63 3666.67

(q) 450 mm o/d Mtr 26.20 4646.94 28.82 4649.56

( r) 500 mm o/d Mtr 27.26 5718.55 29.99 5721.28

(s) 560 mm o/d Mtr 28.34 7179.48 31.17 7182.31

(t) 630 mm o/d Mtr 29.42 9084.71 32.36 9087.65

28.16 Providing,Laying , fixing & jointing of ISI


Marked H.D.P.E. Pipes as per ISI - 4984
along the Trenches and laying the same in
Trenches to correct alignment and gradients,
cutting, jointing and testing complete as per
specifications.

A H.D.P.E pipe of 10 Kg. PE-100

(a) 32 mm o/d Mtr 6.76 53.31 7.44 53.98

(b) 40 mm o/d Mtr 7.84 79.78 8.62 80.56

( c) 50 mm o/d Mtr 8.92 119.77 9.81 120.66

(d) 63 mm o/d Mtr 9.99 187.71 10.99 188.71

(e) 75 mm o/d Mtr 11.17 260.83 12.28 261.94

(f) 90 mm o/d Mtr 12.24 371.92 13.47 373.14

(g) 110 mm o/d Mtr 13.31 542.24 14.64 543.57

(h) 125 mm o/d Mtr 14.37 691.40 15.81 692.84

(i) 140 mm o/d Mtr 15.46 870.21 17.00 871.76

(j) 160 mm o/d Mtr 16.53 1133.63 18.18 1135.29

(k) 180 mm o/d Mtr 17.61 1430.91 19.37 1432.67

(l) 200 mm o/d Mtr 18.68 1762.04 20.55 1763.91

(m) 225 mm o/d Mtr 19.76 2220.11 21.73 2222.09

(n) 250 mm o/d Mtr 20.82 2737.40 22.90 2739.49

Chapter-28 Page 446 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(o) 280 mm o/d Mtr 21.90 3432.44 24.09 3434.63

(p) 315 mm o/d Mtr 23.72 4348.25 26.09 4350.62

(q) 355 mm o/d Mtr 24.05 5508.00 26.45 5510.40

( r) 400 mm o/d Mtr 25.12 7049.31 27.63 7051.83

(s) 450 mm o/d Mtr 26.20 8912.23 28.82 8914.85

(t) 500 mm o/d Mtr 27.26 11029.01 29.99 11031.74

(u) 560 mm o/d Mtr 28.34 13738.21 31.17 13741.05

(v) 630 mm o/d Mtr 29.42 17378.36 32.36 17381.30

B H.D.P.E pipe of 8 Kg. PE-100

(a) 40 mm o/d Mtr 7.84 67.08 8.62 67.87

(b) 50 mm o/d Mtr 8.92 100.32 9.81 101.21

( c) 63 mm o/d Mtr 9.99 152.16 10.99 153.16

(d) 75 mm o/d Mtr 11.17 215.97 12.28 217.08

(e) 90 mm o/d Mtr 12.24 301.67 13.47 302.90

(f) 110 mm o/d Mtr 13.31 444.92 14.64 446.25

(g) 125 mm o/d Mtr 14.37 564.46 15.81 565.90

(h) 140 mm o/d Mtr 15.46 716.18 17.00 717.73

(i) 160 mm o/d Mtr 16.53 930.52 18.18 932.18

(j) 180 mm o/d Mtr 17.61 1168.55 19.37 1170.31

(k) 200 mm o/d Mtr 18.68 1440.44 20.55 1442.31

(l) 225 mm o/d Mtr 19.76 1822.35 21.73 1824.33

(m) 250 mm o/d Mtr 20.82 2238.10 22.90 2240.18

(n) 280 mm o/d Mtr 21.90 2793.49 24.09 2795.68

(o) 315 mm o/d Mtr 22.97 3535.07 25.27 3537.37

(p) 355 mm o/d Mtr 24.05 4475.53 26.45 4477.93

(q) 400 mm o/d Mtr 25.12 5737.57 27.63 5740.09

( r) 450 mm o/d Mtr 26.20 7261.97 28.82 7264.59

Chapter-28 Page 447 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(s) 500 mm o/d Mtr 27.26 8930.22 29.99 8932.94

(t) 560 mm o/d Mtr 28.34 11199.35 31.17 11202.18

(u) 630 mm o/d Mtr 29.42 14137.05 32.36 14139.99

C H.D.P.E pipe of 6 Kg. PE-100

(a) 50 mm o/d Mtr 8.92 83.39 9.81 84.28

(b) 63 mm o/d Mtr 9.99 125.93 10.99 126.93

( c) 75 mm o/d Mtr 11.17 177.04 12.28 178.16

(d) 90 mm o/d Mtr 12.24 249.20 13.47 250.42

(e) 110 mm o/d Mtr 13.31 370.44 14.64 371.77

(f) 125 mm o/d Mtr 14.37 471.36 15.81 472.80

(g) 140 mm o/d Mtr 15.46 586.70 17.00 588.25

(h) 160 mm o/d Mtr 16.53 769.72 18.18 771.38

(i) 180 mm o/d Mtr 17.61 961.22 19.37 962.98

(j) 200 mm o/d Mtr 18.68 1186.56 20.55 1188.43

(k) 225 mm o/d Mtr 19.76 1500.76 21.73 1502.74

(l) 250 mm o/d Mtr 20.82 1848.81 22.90 1850.89

(m) 280 mm o/d Mtr 21.90 2306.87 24.09 2309.06

(n) 315 mm o/d Mtr 22.97 2908.82 25.27 2911.11

(o) 355 mm o/d Mtr 24.05 3688.48 26.45 3690.88

(p) 400 mm o/d Mtr 25.12 4713.56 27.63 4716.07

(q) 450 mm o/d Mtr 26.20 5975.60 28.82 5978.22

( r) 500 mm o/d Mtr 27.26 7373.05 29.99 7375.78

(s) 560 mm o/d Mtr 28.34 9168.26 31.17 9171.09

(t) 630 mm o/d Mtr 29.42 11581.27 32.36 11584.21

Chapter-28 Page 448 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.17 Providing, Stringing out, cutting, Jointing and
testing of THIN WALLED FLEXIBLE QUICK
COUPLING PIPES as per IS 11722/86 (ISI
marked with the prior approval of Engineer-in-
Charge)laying the same in trenches to correct
alignment and gradients, jointed with coupler
including cost of specials and all cartage
complete.

Quick Coupling Jointing pipe IS 11722/86

a 50.80mm o/d pipe lines laid complete


Mtr 9.82 378.71 10.80 379.69

b 63.50mm o/d pipe lines laid complete


Mtr 10.00 495.38 11.00 496.38

c 76.20mm o/d pipe lines laid complete


Mtr 10.20 547.36 11.22 548.38

d 101.60mm o/d pipe lines laid


Mtr 11.65 726.13 12.81 727.29
complete

e 127.00mm o/d pipe lines laid


Mtr 11.16 884.83 12.27 885.95
complete

f 152.40mm o/d pipe lines laid


Mtr 14.27 1062.68 15.70 1064.11
complete

g 203.40mm o/d pipe lines laid


Mtr 18.96 1986.35 20.86 1988.25
complete

h 254.00mm o/d pipe lines laid


Mtr 24.05 3156.34 26.45 3158.75
complete

i 304.80mm o/d pipe lines laid


Mtr 30.44 4229.28 33.49 4232.32
complete

28.18 Supplying, fixing and jointing PVC /


H.D.P.E pipe's specials complete as
desired by Engineer-in-Charge. Mtr

a For pipe lines laid inside habitation


5% Extra will be 5% Extra will be
taken for the taken for the
Mtr
respective i/d of respective i/d of
pipe. pipe.

Chapter-28 Page 449 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
b For pipe lines laid outside habitation
2% Extra will be 2% Extra will be
& in the open area/ field
taken for the taken for the
Mtr
respective i/d of respective i/d of
pipe. pipe.

28.19 CONCEALED IN WALL: Providing and


fixing Chlorinated Polyvinyl Chloride
(CPVC) pipes as per IS 15778 (ISI marked
with the prior approval of Engineer-in-
Charge), having thermal stability for hot &
cold water supply, including all CPVC
plain & brass threaded fittings i/c fixing
the pipe with clamps at 1.00 m spacing
including jointing of pipes & fittings, with
one step CPVC solvent cement and testing
of pipes complete as per direction of
Engineer-in-Charge.

a CPVC SDR 11 Pipe & fitting 16mm


Mtr 94.95 178.72 104.45 188.21
o/d

b SDR 11 CPVC pipes & fittings 20mm


Mtr 94.95 221.35 104.45 230.84
o/d

c CPVC SDR 11 Pipe & fitting 25mm


Mtr 94.95 285.75 104.45 295.24
o/d

d CPVC SDR 11 Pipe & fitting 32mm


Mtr 94.95 382.37 104.45 391.86
o/d

e CPVC SDR 11 Pipe & fitting 40mm


Mtr 94.95 505.27 104.45 514.77
o/d

f CPVC SDR 11 Pipe & fitting 50mm


Mtr 94.95 750.79 104.45 760.28
o/d

Chapter-28 Page 450 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.20 INTERNAL - EXPOSED ON WALL :
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes as per IS 15778 (ISI
marked with the prior approval of
Engineer-in-Charge), having thermal
stability for hot & cold water supply,
including all CPVC plain & brass threaded
fittings including fixing the pipe with
clamps at 1.00 m spacing including
jointing of pipes & fittings with one step
PVC solvent cement and testing of pipes
complete as per direction of Engineer-in-
Charge.

(a) SDR 11 CPVC pipes & fittings 16mm


Mtr 94.95 152.79 104.45 162.28
o/d

(b) SDR 11 CPVC pipes & fittings 20mm


Mtr 94.95 182.22 104.45 191.71
o/d

(c) SDR 11 CPVC pipes & fittings 25mm


Mtr 94.95 226.70 104.45 236.19
o/d

(d) SDR 11 CPVC pipes & fittings 32mm


Mtr 85.96 307.67 94.56 316.26
o/d

(e) SDR 11 CPVC pipes & fittings 40mm


Mtr 94.95 378.27 104.45 387.77
o/d

(f) SDR 11 CPVC pipes & fittings 50mm


Mtr 94.95 547.79 104.45 557.28
o/d

(g) CPVC Pipe Schd 40 & Schd 80


Mtr 121.30 954.95 133.43 967.08
fittings 65mm i/d

(h) CPVC Pipe Schd 40 & Schd 80


Mtr 121.30 1204.34 133.43 1216.47
fittings 80mm i/d

(i) CPVC pipes Schd 40 & Schd 80


Mtr 121.30 1653.64 133.43 1665.77
fittings 100mm i/d

28.21 Providing, Stringing out, cutting, Jointing and


testing of C.I. Double Flanged pipes with
casted flanged as per IS:7181, Class-B (ISI
marked with the prior approval of Engineer-in-
Charge) and laying the same in trenches to
correct alignment and gradients,jointed with
nut bolts and rubber insertion fitted complete
including all cartage.

a 80mm i/d pipe lines laid complete Mtr 49.27 1523.66 54.20 1528.59

Chapter-28 Page 451 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
b 100mm i/d pipe lines laid complete Mtr 64.55 1920.61 71.00 1927.06

c 125mm i/d pipe lines laid complete Mtr 71.03 2497.66 78.13 2504.77

d 150mm i/d pipe lines laid complete Mtr 86.92 3131.50 95.62 3140.19

e 200mm i/d pipe lines laid complete Mtr 115.63 4492.79 127.19 4504.35

f 250mm i/d pipe lines laid complete Mtr 146.83 6069.62 161.52 6084.30

g 300mm i/d pipe lines laid complete Mtr 214.02 7849.64 235.42 7871.04

h 350mm i/d pipe lines laid complete Mtr 253.02 10314.98 278.32 10340.28

i 400mm i/d pipe lines laid complete Mtr 306.60 12579.36 337.26 12610.02

j 450mm i/d pipe lines laid complete Mtr 372.88 15470.32 410.17 15507.60

k 500mm i/d pipe lines laid complete Mtr 434.24 18068.15 477.66 18111.58

l 600mm i/d pipe lines laid complete Mtr 570.27 26044.87 627.30 26101.90

28.22 Providing, Stringing out, cutting, Jointing and


testing of C.I. Double Flanged pipes with
screwed flanged as per IS:1536, class-B (ISI
marked with the prior approval of Engineer-in-
Charge) and laying the same in trenches to
correct alignment and gradients,including cost
of nut bolts and rubber insertion complete
including all cartage.

a 80mm i/d pipe lines laid complete Mtr 44.16 1262.98 48.58 1267.39

b 100mm i/d pipe lines laid complete Mtr 58.07 1409.04 63.88 1414.85

c 125mm i/d pipe lines laid complete Mtr 62.65 1860.64 68.92 1866.91

d 150mm i/d pipe lines laid complete Mtr 76.13 2242.55 83.74 2250.17

e 200mm i/d pipe lines laid complete Mtr 100.60 3271.36 110.66 3281.42

f 250mm i/d pipe lines laid complete Mtr 126.32 4399.39 138.96 4412.02

g 300mm i/d pipe lines laid complete Mtr 179.77 5690.87 197.75 5708.85

h 350mm i/d pipe lines laid complete Mtr 209.71 8181.04 230.68 8202.02

i 400mm i/d pipe lines laid complete Mtr 253.40 9954.67 278.74 9980.01

j 450mm i/d pipe lines laid complete Mtr 309.01 12005.27 339.91 12036.17

k 500mm i/d pipe lines laid complete Mtr 360.27 14052.79 396.30 14088.82

Chapter-28 Page 452 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
l 600mm i/d pipe lines laid complete Mtr 466.48 18713.58 513.13 18760.22

28.23 Providing, Stringing out, cutting, Jointing and


testing of ISI Marked D.I. Double Flanged
pipes with screwed flanged as per IS:8329-
2000, Class-K9 and laying the same in
trenches to correct alignment and
gradients,jointed with nut bolts and rubber
insertion joints fitted complete including all
cartage.

a 80mm i/d pipe lines laid complete Mtr 42.25 1675.32 46.47 1679.54

b 100mm i/d pipe lines laid complete Mtr 57.68 1848.34 63.45 1854.11

c 125mm i/d pipe lines laid complete Mtr 61.52 2334.33 67.67 2340.48

d 150mm i/d pipe lines laid complete Mtr 74.02 2723.73 81.42 2731.13

e 200mm i/d pipe lines laid complete Mtr 94.85 3582.95 104.34 3592.44

f 250mm i/d pipe lines laid complete Mtr 117.60 4872.75 129.36 4884.51

g 300mm i/d pipe lines laid complete Mtr 152.85 6235.64 168.13 6250.92

h 350mm i/d pipe lines laid complete Mtr 186.83 7846.88 205.51 7865.56

i 400mm i/d pipe lines laid complete Mtr 216.23 9441.48 237.85 9463.10

j 450mm i/d pipe lines laid complete Mtr 270.13 11193.62 297.15 11220.64

k 500mm i/d pipe lines laid complete Mtr 313.42 15303.95 344.76 15335.30

l 600mm i/d pipe lines laid complete Mtr 403.48 20165.89 443.83 20206.23

28.24 Supplying and laying C.I. specials as per


IS:1538 complete as desired by Engineer-in-
Charge conforming to ISI specifications.
Note: If C.I specials of ISI Marked is used
intead of specials confirming to ISI
Specifications , than 10% extra on rates of
this item will be paid.

a C.I. specials upto 300mm i/d Kg. 3.71 77.99 4.08 78.36

b C.I. specials above 300mm i/d Kg. 4.64 99.18 5.10 99.64

Chapter-28 Page 453 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.25 Supplying and laying D.I. specials/fittings as
per IS:9523-2000 (ISI marked with the prior
approval of Engineer-in-Charge), class K-12
suitable for tyton joint with external bitumen
coating and inside cement mortar lining,
scaffolding, tools and plants, ropes, guys, etc.
Complete in all respects.

a D.I. specials upto 300mm i/d Kg. 3.71 115.81 4.08 116.18

b D.I. specials above 300mm i/d Kg. 4.64 174.80 5.10 175.26

28.26 EXTERNAL IN THE GROUND : Providing


and fixing Chlorinated Polyvinyl Chloride
(CPVC) pipes as per IS 15778 (ISI marked
with the prior approval of Engineer-in-
Charge), having thermal stability for hot &
cold water supply including all CPVC plain
& brass threaded fittings. This includes
jointing of pipes & fittings with one step
CPVC solvent cement, & testing of joints
excluding cost of excavation complete as
per direction of Engineer-in-Charge.

a CPVC SDR 11 pipes & fittings 16mm


Mtr 75.20 135.62 82.72 143.14
o/d

b CPVC SDR 11 Pipe & fittings 20mm


Mtr 75.20 166.38 82.72 173.90
o/d

c CPVC SDR 11 pipe & Fittings 25mm


Mtr 75.20 212.84 82.72 220.35
o/d

d CPVC SDR 11 pipe & fittings 32mm


Mtr 75.92 283.28 83.52 290.87
o/d

e CPVC SDR 11 pipes & fittings 0/d


Mtr 75.20 371.21 82.72 378.73
40mm

f CPVC SDR 11 pipe & fittings 50mm


Mtr 75.20 548.33 82.72 555.85
o/d

g CPVC SChd 40pipe & Schd 80


Mtr 75.20 946.22 82.72 953.74
fittings ( 62.5 mm i/d)

h CPVC SChd 40pipe & Schd 80


Mtr 87.44 1219.03 96.18 1227.77
fittings ( 75 mm i/d)

I CPVC SChd 40pipe & Schd 80


Mtr 87.44 1688.48 96.18 1697.23
fittings ( 100 mm i/d)

Chapter-28 Page 454 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.27 Providing & fixing C.I/D.I Flanged end, stem
of SS (AIS 1410) and Bronze(gunmetal)
working parts Sluice Valves ISI marked
14846-2000, including jointing , testing & cost
of Nut ,Bolt & insertion sheet, all carriage
complete (with the approval of Engineer in-
charge).

A Class PN-1 as per ISI

(a) 80mm i/d Sluice Valves flanged Each 372.18 4205.64 409.39 4242.85

(b) 100mm i/d Sluice Valves flanged Each 434.29 5711.07 477.72 5754.50

( c) 150mm i/d Sluice Valves flanged Each 562.63 8461.49 618.90 8517.75

(d) 200mm i/d Sluice Valves flanged Each 696.74 14467.73 766.41 14537.41

(e) 250mm i/d Sluice Valves flanged Each 874.14 20973.48 961.55 21060.89

(f) 300mm i/d Sluice Valves flanged Each 1065.89 26271.54 1172.48 26378.13

(g) 350mm i/d Sluice Valves flanged Each 1254.86 46177.44 1380.35 46302.92

(h) 400mm i/d Sluice Valves flanged Each 1484.58 56112.28 1633.04 56260.73

(i) 450mm i/d Sluice Valves flanged Each 1543.80 65690.25 1698.18 65844.63

(j) 500mm i/d Sluice Valves flanged Each 1590.29 106966.22 1749.32 107125.25

(k) 600mm i/d Sluice Valves flanged Each 1985.93 124133.02 2184.52 124331.62

B Class PN-1.6 as per ISI

(a) 80mm i/d Sluice Valves flanged Each 372.18 4502.23 409.39 4539.45

(b) 100mm i/d Sluice Valves flanged Each 434.29 6111.01 477.72 6154.44

( c) 150mm i/d Sluice Valves flanged Each 562.63 9058.04 618.90 9114.30

(d) 200mm i/d Sluice Valves flanged Each 696.74 15521.35 766.41 15591.03

(e) 250mm i/d Sluice Valves flanged Each 874.14 22337.15 961.55 22424.57

(f) 300mm i/d Sluice Valves flanged Each 1065.89 27999.03 1172.48 28105.62

(g) 350mm i/d Sluice Valves flanged Each 1254.86 49363.53 1380.35 49489.01

(h) 400mm i/d Sluice Valves flanged Each 1484.58 60387.27 1633.04 60535.72

(i) 450mm i/d Sluice Valves flanged Each 1543.80 70683.63 1698.18 70838.01

Chapter-28 Page 455 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.28 Providing & fixing Fire Hydrants with jointing
including all carriages complete. (without Fire
Hydrant surface box) Size 80mm complete in
all respect.

(a) C.I Fire Hydrants 1S-908 Each 290.84 6770.93 319.93 6800.01

(b) C.I Fire Hydrants S.V. Type IS-909 Each 290.84 11887.03 319.93 11916.11

( c) C.I Fire Hydrants Stand Post Type IS-


Each 300.44 10621.62 330.48 10651.66
908

28.29 Providing & fixing Single air valve ISI Marked


as per IS-14845 including jointing , cost of nut
bolts & rubber insertion all carriages
complete.

(a) C.I Single air valve screwed (Size


Each 290.84 1757.59 319.93 1786.67
25mm)

(b) C.I Single air valve screwed (Size


Each 290.84 1913.04 319.93 1942.12
32mm)

( c) C.I Single air valve screwed (Size


Each 290.84 2261.73 319.93 2290.82
40mm)

(d) C.I Single air valve screwed (Size


Each 290.84 2387.76 319.93 2416.85
50mm)

(e) C.I Single air valve screwed (Size


Each 290.84 4278.23 319.93 4307.31
80mm)

28.30 Providing & fixing double air valve ISI


Marked as per IS-14845 including jointing
all carriages complete.

(a) C.I Double air valve (Size 40mm) Each 290.84 4426.67 319.93 4455.75

(b) C.I Double air valve (Size 50mm) Each 290.84 4636.71 319.93 4665.80

( c) C.I Double air valve (Size 65mm) Each 290.84 4859.37 319.93 4888.45

(d) C.I Double air valve (Size 80mm) Each 290.84 5350.90 319.93 5379.98

(e) C.I Double air valve (Size 100mm) Each 290.84 7468.22 319.93 7497.30

Chapter-28 Page 456 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.31 Proving & fixing ISI Marked Non-return valves
flanged end class PN-1.0 as per
IS:5312/2004 in pipe lines including jointing
& cost of Nut Bolt , rubber insertion etc.
complete.
Note: If Non-return valves class PN-1.6 is
used instead of class PN-1.0 , than 5% will
be paid extra.

A Class PN-1.0 as per ISI with rubber Flap

(a) 80mm i/d Non-return valve Each 372.18 3815.78 409.39 3853.00

(b) 100mm i/d Non-return valve Each 434.29 4897.75 477.72 4941.17

( c) 125mm i/d Non-return valve Each 471.81 7177.23 518.99 7224.41

(d) 150mm i/d Non-return valve Each 562.63 8339.67 618.90 8395.93

(e) 200mm i/d Non-return valve Each 696.74 15662.52 766.41 15732.19

(f) 250mm i/d Non-return valve Each 874.14 23118.54 961.55 23205.95

(g) 300mm i/d Non-return valve Each 1254.86 29923.02 1380.35 30048.51

(h) 350mm i/d Non-return valve Each 1359.19 50907.97 1495.11 51043.89

(i) 400mm i/d Non-return valve Each 1484.58 61019.11 1633.04 61167.56

(j) 450mm i/d Non-return valve Each 1543.80 71586.85 1698.18 71741.23

(k) 500mm i/d Non-return valve Each 1590.29 126072.61 1749.32 126231.64

B Class PN-1.0 as per ISI with gun metal flap

(a) 80mm i/d Non-return valve Each 372.18 4024.16 409.39 4061.38

(b) 100mm i/d Non-return valve Each 434.29 5115.35 477.72 5158.78

( c) 125mm i/d Non-return valve Each 471.81 7473.82 518.99 7521.00

(d) 150mm i/d Non-return valve Each 562.63 8730.35 618.90 8786.61

(e) 200mm i/d Non-return valve Each 696.74 16089.34 766.41 16159.01

(f) 250mm i/d Non-return valve Each 874.14 23995.73 961.55 24083.14

(g) 300mm i/d Non-return valve Each 1254.86 30839.68 1380.35 30965.17

(h) 350mm i/d Non-return valve Each 1359.19 53342.90 1495.11 53478.82

(i) 400mm i/d Non-return valve Each 1484.58 63944.72 1633.04 64093.18

Chapter-28 Page 457 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(j) 450mm i/d Non-return valve Each 1543.80 75013.23 1698.18 75167.61

(k) 500mm i/d Non-return valve Each 1590.29 126072.61 1749.32 126231.64

28.32 Providing, fixing and jointing Cast Iron surface


box for Sluice valve, Air valve, Fire hydrant
etc. including all carriages complete. Kg. 5.64 68.32 6.21 68.89

28.33 Providing & Fixiing C.I indicating plates of size


100mm x 100 mm for SV/FH including
synthetic enammel paint & letters in white
enamel paint, fixing in the ground with angle
Each 79.83 239.39 87.82 247.37
iron of size 25x25x5mm, 230mm height from
ground including conrete block complete in all
respect as directed by Engineer-in-charge

28.34 Providing ISI Marked G.M ferrule as per


IS:2692, drilling and tapping cast iron pipe
lines of all diametres and screwing in Ferrule
and connections complete in all respect.

(a) 10mm i/d Ferrule medium Each 148.04 400.10 162.85 414.91

(b) 15mm i/d Ferrule medium Each 169.90 457.81 186.89 474.80

(c) 20mm i/d Ferrule medium Each 345.36 665.76 379.90 700.30

( d) 15mm i/d Ferrule heavy duty Each 169.90 528.39 186.89 545.38

(e) 20mm i/d Ferrule heavy duty Each 345.36 839.42 379.90 873.95

(f) 25mm i/d Ferrule heavy duty Each 466.58 1558.85 513.24 1605.51

28.35 Providing ,laying, jointing, fixing and testing


ISI Marked G.I. Pipe (as per IS 1239) B-
Class including cost of specials (such as tees,
bends, sockets, elbows etc.) ,painting with
anti corrosive bitumastic paint, testing,
cutting, threading Inside building complete.

a 15mm i/d Mtr 69.08 205.07 75.99 211.98

b 20mm i/d Mtr 78.96 249.19 86.86 257.08

c 25mm i/d Mtr 88.83 314.79 97.71 323.67

d 32mm i/d Mtr 108.56 402.90 119.42 413.75

Chapter-28 Page 458 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
e 40mm i/d Mtr 118.43 457.69 130.27 469.53

f 50mm i/d Mtr 128.31 567.69 141.14 580.52

28.36 Providing and laying, jointing, fixing, testing


ISI Marked G.I. Pipe (as per IS 1239) B-
Class, including cost of Specials such as
tees, bends, sockets elbow etc., cutting,
threading and testing in trenches in the
ground complete.

a 15mm i/d Mtr 25.80 130.27 28.39 132.85

b 20mm i/d Mtr 28.39 162.50 31.23 165.33

c 25mm i/d Mtr 38.26 230.43 42.09 234.26

d 32mm i/d Mtr 58.76 300.26 64.63 306.14

e 40mm i/d Mtr 61.33 341.72 67.46 347.86

f 50mm i/d Mtr 63.92 430.97 70.31 437.37

g 65mm i/d Mtr 67.68 601.19 74.45 607.96

h 80mm i/d Mtr 69.08 770.31 75.99 777.22

i 100mm i/d Mtr 88.83 1115.36 97.71 1124.24

28.37 Providing and fixing Polyethelene-Aluminium-


Polyethelene (PE-AL-PE) Composite
Pressure Pipes conforming to IS - 15450 U.V.
stabilised with carbon black having thermal
stability for hot & cold water supply, capable
to withstand temperature up to 80°C including
all special fittings of composite material
(engineering plastic blend and brass inserts
wherever required ) e.g. elbows , tees,
reducers, couplers & connectors etc. with
clamps at 1.00 m spacing including testing of
pipes complete as per direction of the
engineer in charge.

Concealed work- including cutting chase &


making good the wall etc.

(a) 1216 (16 mm o/d) pipe Mtr 71.78 271.14 78.95 278.32

(b) 1620 (20 mm o/d) pipe Mtr 72.79 332.54 80.07 339.82

( c) 2025 (25 mm o/d) pipe Mtr 73.80 403.98 81.18 411.36

Chapter-28 Page 459 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(d) 2532 (32 mm o/d) pipe Mtr 74.81 495.51 82.29 502.99

(e) 3240 (40 mm o/d) pipe Mtr 75.81 687.48 83.39 695.06

(f) 4050 (50 mm o/d) pipe Mtr 76.82 839.27 84.50 846.95

28.38 Providing and fixing Polyethelene-Aluminium-


Polyethelene (PE-AL-PE) Composite
Pressure Pipes conforming to IS - 15450 -
2004 U.V. stabilised with carbon black having
thermal stability for hot & cold water supply,
capable to withstand temperature up to 80° C
including all special fittings of composite
material (engineering plastic blend & brass
inserts wherever required ) e.g. elbows ,tees
,reducers, couplers & connectors etc. with
trenching, refilling and testing of joints
complete as per direction of the engineer in
charge.
Internal work - Exposed on wall

a) 1216 (16 mm o/d) pipe Mtr 49.84 193.44 54.82 198.42

b) 1620 (20mm o/d) pipe Mtr 50.85 238.04 55.94 243.12

c) 2025 (25mm o/d) pipe Mtr 51.85 289.90 57.04 295.08

d) 2532 (32mm o/d) pipe Mtr 52.86 356.24 58.15 361.53

e) 3240 (40mm o/d) pipe Mtr 53.87 495.05 59.26 500.44

f) 4050 (50mm o/d) pipe Mtr 54.89 604.88 60.37 610.37

28.39 Providing and fixing 3 layer PP-R (Poly


A propylene Random copolymer) pipes (as per
IS:15801-2008) SDR 7.4 U V stabilized & anti -
microbial fusion welded, having thermal
stability for hot & cold water supply including
all PP-R plain & brass threaded polypropylene
random fittings i/c fixing the pipe with clamps
at 1.00 m spacing including testing of pipes
complete as per direction of Engineer in
Charge.

Concealed work- including cutting chase &


making good the wall etc.

a) PN - 16 Pipe, 16mm o/d Mtr 80.54 134.21 88.59 142.26

b) PN - 16 Pipe, 20mm o/d Mtr 82.90 151.74 91.19 160.03

c) PN - 16 Pipe, 25mm o/d Mtr 85.28 191.83 93.80 200.36

Chapter-28 Page 460 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

d) PN - 16 Pipe, 32mm o/d Mtr 86.45 257.66 95.10 266.31

e) PN - 16 Pipe, 40mm o/d Mtr 87.64 344.43 96.40 353.20

f) PN - 16 Pipe, 50mm o/d Mtr 88.83 491.09 97.71 499.97

28.39 Providing and fixing 3 layer PP-R (Poly


B propylene Random copolymer) pipes (as per
IS:15801-2008) SDR 7.4 U V stabilized & anti -
microbial fusion welded, having thermal
stability for hot & cold water supply including
all PP-R plain & brass threaded polypropylene
random fittings i/c trenching .refilling & testing
of joints complete as per direction of Engineer
in Charge.
Internal work - Exposed on wall

(a) PN- 16 Pipe, 16 mm o/d Mtr 69.37 115.75 76.31 122.68

b) PN- 16 Pipe, 20 mm o/d Mtr 70.50 130.00 77.55 137.05

c) PN- 16 Pipe, 25 mm o/d Mtr 71.64 163.72 78.80 170.89

d) PN- 16 Pipe, 32 mm o/d Mtr 72.20 220.16 79.41 227.38

e) PN- 16 Pipe, 40 mm o/d Mtr 72.77 294.69 80.04 301.97

f) PN- 16 Pipe, 50 mm o/d Mtr 73.33 420.97 80.66 428.30

28.40 Providing, fixing and jointing G.I Union


Couplings(of approved make with the
approval EIC) as per IS 1879 in G.I. Pipe
lines complete in all respect.

a) 15mm i/d G.I. Union Each 15.50 91.00 17.05 92.55

b) 20mm i/d G.I. Union Each 20.46 150.83 22.51 152.88

c) 25mm i/d G.I. Union Each 21.71 190.38 23.88 192.55

d) 32mm i/d G.I. Union Each 24.80 245.44 27.28 247.92

e) 40mm i/d G.I. Union Each 24.80 325.66 27.28 328.14

f) 50mm i/d G.I. Union Each 27.07 415.45 29.78 418.16

g) 65mm i/d G.I. Union Each 32.02 651.99 35.22 655.19

h) 80mm i/d G.I. Union Each 32.65 976.27 35.91 979.53

i) 100mm i/d G.I. Union Each 33.26 1501.11 36.59 1504.44

Chapter-28 Page 461 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

28.41 Providing and placing in position hand pump


of approved quality for 40 mm diametre G.I.
Each 118.45 936.91 130.30 948.75
pipe complete with all accessories.

28.42 Providing water connection with grooved


coupler and service coupler in Quick coupling
pipe line complete in all respect.

a) In 50.80mm outside diametre pipe


Each 116.07 789.98 127.67 801.59
line

b) In 63.50mm outside diametre pipe


Each 118.43 899.67 130.27 911.51
line

c) In 76.20 mm outside diametre pipe


Each 142.12 973.62 156.33 987.83
line

d) In 101.60mm outside diametre pipe


Each 144.49 1155.74 158.94 1170.19
line

e) In 152.40mm outside diametre pipe


Each 148.04 1600.84 162.85 1615.65
line

28.43 Providing, fixing and jointing ISI Marked Gun-


Metal peet valves (Heavy Pattern) as per IS
778 with hand wheels, on G.I. Pipe lines laid
in the ground or inside buildings including all
carriages complete.

a) 15mm i/d Gun Metal peet valve heavy


Each 28.18 403.40 31.00 406.22
pattern.

b) 20mm i/d Gun Metal peet valve heavy


Each 34.44 562.67 37.88 566.11
pattern.

c) 25mm i/d Gun Metal peet valve heavy


Each 38.75 772.96 42.63 776.84
pattern.

d) 32mm i/d Gun Metal peet valve heavy


Each 44.28 1181.93 48.71 1186.36
pattern.

e) 40mm i/d Gun Metal peet valve heavy


Each 51.67 1564.53 56.83 1569.70
pattern.

f) 50mm i/d Gun Metal peet valve heavy


Each 68.89 2407.42 75.78 2414.31
pattern.

g) 65mm i/d Gun Metal peet valve heavy


Each 88.57 3790.38 97.43 3799.24
pattern.

Chapter-28 Page 462 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

h) 80mm i/d Gun Metal peet valve heavy


Each 103.33 5778.70 113.66 5789.04
pattern.

i) 100mm i/d Gun Metal peet valve


Each 103.33 11131.85 113.66 11142.18
heavy pattern.

28.44 Providing, fixing and jointing Brass Ball valves


screwed with SS/BRASS ball & spindle &
Teflon seats, on G.I. Pipe lines including all
carriages complete.

a 15mm i/d Brass Ball valves Each 53.84 254.99 59.22 260.38

b 20mm i/d Brass Ball valves Each 65.80 338.63 72.38 345.21

c 25mm i/d Brass Ball valves Each 74.02 526.83 81.42 534.23

d 32mm i/d Brass Ball valves Each 84.59 848.51 93.05 856.97

e 40mm i/d Brass Ball valves Each 98.69 1045.86 108.56 1055.73

f 50mm i/d Brass Ball valves Each 131.59 1705.03 144.75 1718.19

28.45 Making connection with the existing G.I.


branch main up to 40mm size pipe including
cutting of existing pipe line, threading of pipe
lines from both ends and fixing of G.I Tee etc. Each 317.42 375.31 349.16 407.05
in the pipe line (including cost of G.I Tee)
complete in all respects.

28.46 Providing, fixing & jointing water meter of


approved make as per IS:779/94 in G.I. pipe
line including cutting and threading pipe
including cost of water meter but excluding
cost of specials in all respect complete.

a 15mm size Each 414.50 1221.96 455.95 1263.41

b 20mm size Each 426.36 1770.45 469.00 1813.09

c 25mm size Each 444.14 2337.47 488.55 2381.88

28.47 Providing & fixing Cast Iron suface box for


Peet Valve, Stop Cock including all carriages
Kg. 16.93 79.61 18.63 81.31
complete.

Chapter-28 Page 463 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.48 Providing and filling sand grading as per
specifications or fine grade around the
Cum. 21.82 652.90 24.00 655.09
various sizes of G.I. pipes in external work.

28.49 Bailing out water from the trenches for


making new connections in existing pipe lines
including cleaning trimming and dressing the
trenches to correct alignment and grade as
required by the Engineer-in-charge.

a Connection with pipe line Upto Each


300mm i/d connecti 947.82 1042.60
on.

b Connection with pipe line beyond Each


300mm i/d connecti 1421.73 1563.90
on.

28.50 Disinfecting water mains by flushing with


water containing bleaching powder at 0.5 gms
per litre of water and cleaning the same with
fresh water, operation to be repeated three
times including getting the sample of water
from the disinfected main tested in the
municipal laboratory.

a 80mm diametre C.I. pipe. Mtr 6.89 7.07 7.58 7.76

b 100mm diametre C.I. pipe. Mtr 8.99 9.26 9.89 10.16

c 125mm diametre C.I. pipe. Mtr 10.77 11.18 11.85 12.26

d 150mm diametre C.I. pipe. Mtr 13.06 13.66 14.37 14.97

e 200mm diametre C.I. pipe. Mtr 16.81 17.88 18.49 19.56

f 250mm diametre C.I. pipe. Mtr 21.10 22.78 23.21 24.89

g 300mm diametre C.I. pipe. Mtr 23.13 25.54 25.44 27.85

h 350mm diametre C.I. pipe. Mtr 25.33 28.60 27.87 31.13

i 400mm diametre C.I. pipe. Mtr 28.16 32.44 30.97 35.26

j 450mm diametre C.I. pipe. Mtr 29.90 35.32 32.89 38.31

k 500mm diametre C.I. pipe. Mtr 32.04 38.73 35.25 41.94

l 600mm diametre C.I. pipe. Mtr 36.89 46.50 40.58 50.19

Chapter-28 Page 464 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.51 Providing and placing in horizontal layers
filtering media screened, washed and
cleaned as described below:-

(a) Top Layer:Top layer :----- Fine sand


screened, cleaned and washed and
graded (effective size 0.2 to 0.4mm
with uniformity coefficient 2.00 to
Cum. 880.21 1669.08 968.23 1757.11
3.00) from Pathankot or other
approved source.

(b) Second Layer :----- Coarse sand


screened, cleaned and washed and
graded from 3mm to 6mm (from
Cum. 950.75 2037.00 1045.82 2132.07
Pathankot or approved equivalent
quarry).

(c) Third Layer :----- Bajri screened,


cleaned and washed and graded
from 6mm to 20mm (from Cum. 471.56 1398.01 518.71 1445.16
Pathankot or approved equivalent
quarry).

(d) Fourth Layer :----- Bajri (Coarse)


screened, cleaned and washed and
graded from 20mm to 25mm (from Cum. 527.51 1319.70 580.26 1372.45
Pathankot or approved equivalent
quarry).

(e) Bottom Layer :----- Broken stone,


screened, cleaned and washed and
graded from 50mm to 75mm (from Cum. 527.51 1305.09 580.26 1357.84
Pathankot or approved equivalent
quarry).

28.52 Painting G.I. Pipes and Specials with


synthetic enamel Paint in all shades as per
I.S.I. specification on existing or new work,
two coats paints including cleaning rubbing
surface, etc.

a 15mm & 20mm i/d G.I. Pipe Mtr 2.27 4.29 2.50 4.51

b 25mm & 32mm i/d G.I. Pipe Mtr 2.97 5.64 3.26 5.94

c 40mm & 50mm i/d G.I. Pipe Mtr 4.64 8.93 5.10 9.39

Chapter-28 Page 465 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.53 Repainting G.I. Pipes and Specials with
synthetic enamel Paint in all shades as per
I.S.I. specification on existing work, one coats
paints including cleaning rubbing surface, etc.

a 15mm & 20mm i/d G.I. Pipe Mtr 2.36 3.90 2.60 4.13

b 25mm & 32mm i/d G.I. Pipe Mtr 3.02 5.02 3.33 5.32

c 40mm & 50mm i/d G.I. Pipe Mtr 4.83 8.10 5.31 8.58

28.54 Painting G.I. Pipes and Specials with


Aluminium Paint Paint in all shades as per
I.S.I. specification on existing or new work,
two coats paints including cleaning rubbing
surface, etc.

a 15mm & 20mm i/d G.I. Pipe Mtr 2.98 4.14 3.28 4.44

b 25mm & 32mm i/d G.I. Pipe Mtr 3.88 5.44 4.26 5.83

c 40mm & 50mm i/d G.I. Pipe Mtr 6.06 8.56 6.67 9.16

28.55 Repainting G.I. Pipes and Specials with


Aluminium Paint Paint in all shades as per
I.S.I. specification on existing work, one coats
paints including cleaning rubbing surface, etc.

a 15mm & 20mm i/d G.I. Pipe Mtr 2.98 4.14 3.28 4.44

b 25mm & 32mm i/d G.I. Pipe Mtr 3.88 5.44 4.26 5.83

c 40mm & 50mm i/d G.I. Pipe Mtr 6.06 8.56 6.67 9.16

28.56 Cutting holes upto 23cm square through B.B.


in cement walls or stone masonary wall in
cement for pipes, and making good the same
& finishing according to existing finish where
required.

a Through wall 11.43 cm thick Each 167.46 184.21

b Through wall 22.86 cm thick Each 238.93 262.82

c Through wall 34.29 cm thick Each 305.97 336.57

d Through wall 45.72 cm thick Each 391.53 430.68

Chapter-28 Page 466 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

e Through wall 57.15 cm thick Each 419.78 461.75

f Through wall 68.58 cm thick Each 493.02 542.33

28.57 Cutting holes upto 23cm square for pipes in


flooring and roofs of bricks, tiles with lime
concrete or cement concrete and making
good the same & finishing according to
existing finish where required.

a Through floor or roof 7.5cm thick Each 89.17 98.09

b Through floor or roof 11.5cm thick Each 145.41 159.95

c Through floor or roof 15.00cm thick Each 175.93 193.52

d Through floor or roof 19.00cm thick Each 195.16 214.68

e Through floor or roof 22.50cm thick Each 199.94 219.94

28.58 Cutting holes upto 23cm square for pipes in


floor and roofs of cement concrete, reinforced
concrete or reinforced brick work and making
good the same & finishing according to
existing finish where required.

a Through floor or roof 7.5cm thick Each 81.22 89.34

b Through floor or roof 11.5cm thick Each 101.33 111.46

c Through floor or roof 15.00cm thick Each 158.29 174.12

d Through floor or roof 19.00cm thick Each 159.89 175.88

e Through floor or roof 22.50cm thick Each 164.67 181.14

28.59 Dismantling lead Caulked Joints of cast iron


Socketted Pipes, Valves and Specials by
heating the Joints including the cast of
Labour, Fuel and tools, etc., collecting the
lead taken out from the joints and ride back
the same to the Engineer-in-charge.

(a) 50mm i/d of pipes, valves and


Each 32.38 35.62
specials

(b) 65mm i/d of pipes, valves and


Each 32.58 35.84
specials

Chapter-28 Page 467 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(c) 80mm i/d of pipes, valves and
Each 63.02 69.32
specials

(d) 100mm i/d of pipes, valves and


Each 64.06 70.47
specials

(e) 125mm i/d of pipes, valves and


Each 67.02 73.72
specials

(f) 150mm i/d of pipes, valves and


Each 95.61 105.18
specials

(g) 175mm i/d of pipes, valves and


Each 118.87 130.75
specials

(h) 200mm i/d of pipes, valves and


Each 142.95 157.24
specials

(i) 225mm i/d of pipes, valves and


Each 158.86 174.75
specials

(j) 250mm i/d of pipes, valves and


Each 182.53 200.78
specials

(k) 300mm i/d of pipes, valves and


Each 220.29 242.32
specials

(l) 350mm i/d of pipes, valves and


Each 264.42 290.86
specials

(m) 375mm i/d of pipes, valves and


Each 272.59 299.84
specials

(n) 400mm i/d of pipes, valves and


Each 287.11 315.82
specials

(o) 450mm i/d of pipes, valves and


Each 369.99 406.99
specials

(p) 500mm i/d of pipes, valves and


Each 430.11 473.12
specials

(q) 525mm i/d of pipes, valves and


Each 461.04 507.14
specials

(r) 550mm i/d of pipes, valves and


Each 506.56 557.22
specials

(s) 600mm i/d of pipes, valves and


Each 552.08 607.29
specials

Chapter-28 Page 468 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.60 Dismantling flanged Joints for Cast iron
Pipes, Valves and specials complete in all
respects.

a 50mm, 65mm, 80mm, 100mm


internal diametre of pipe, valves or Each 18.95 20.85
special.

b 125mm, 150mm, 175mm, 200mm,


225mm and 250mm internal Each 39.08 42.98
diametre of pipe, valves or special.

c 300mm, 350mm and 375mm internal


diametre of pipe, valves or special. Each 78.18 85.99

d 400mm and 450mm internal diametre


Each 118.45 130.30
of pipe, valves or special.

e 500mm and 525mm internal diametre


Each 130.28 143.31
of pipe, valves or special.

f 550mm and 600mm internal diametre


Each 142.13 156.34
of pipe, valves or special.

28.61 Taking out dismantled Cast Iron flanged or


socketed / G.I/D.I Pipes valves and, specials
etc. out side from the trenches and Stacking
the same as desire by Engineer-in-charge
complete in all respects.

a Upto 100 mm internal diametre of


Mtr 9.41 10.35
pipe.

b Upto 200 mm internal diametre of


Mtr 10.35 11.38
pipe.

c Upto 300 mm internal diametre of


Mtr 12.23 13.45
pipe.

d Upto 450 mm internal diametre of


Mtr 14.11 15.52
pipe.

e Upto 600 mm internal diametre of


Mtr 15.05 16.56
pipe.

28.62 Dismantling cast Iron surface boxes for sluice


valves/Air valve and fire hydrants complete in
all respects. Each 67.74 74.51

Chapter-28 Page 469 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.63 Dismantling, disjointing, removal of G.I. pipe
lines, specials, valves and fittings complete in
all respects.

a 15mm internal diametre pipe line. Mtr 19.73 21.71

b 20mm internal diametre pipe line. Mtr 23.69 26.06

c 25mm internal diametre pipe line. Mtr 31.58 34.74

d 32mm internal diametre pipe line. Mtr 43.16 47.48

e 40mm internal diametre pipe line. Mtr 43.96 48.36

f 50mm internal diametre pipe line. Mtr 44.54 49.00

g 65mm internal diametre pipe line. Mtr 45.12 49.64

h 80mm internal diametre pipe line. Mtr 54.05 59.46

i 100mm internal diametre pipe line. Mtr 59.21 65.14

28.64 Construction of Gravel Pit outside the Pump


Chamber. (0.90m Dia.) as per standard
design & drawings of public health Each 7142.80 16836.95 7857.08 17551.23
department.

28.65 CONSTRUCTION OF V-NOTCH HAUDI.(size


1.80 m x 0.90 m) excluding cost V-notch as
per standard design & drawings of public Each 6092.95 14328.88 6702.24 14938.17
health department.

28.66 Construction of masonary Sluice Valve


Chamber excluding Sluice valve cover as per
standard design & drawings of public health
department.

a Size 0.6 m. x 0.6 m. Each 1726.76 5305.96 1899.44 5478.64

b Size 0.9 m. x 0.9 m. Each 2468.75 7828.67 2715.62 8075.54

Chapter-28 Page 470 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.67 Boring with 100 mm diametre casing pipe for
hand pump/ tube well in all soils except
ordinary hard rocks requiring blasting
including removing the casing pipe after the
hand pump/tube well is lowered and tested.

a Upto 6 mtr depth. Mtr 426.29 468.92

b Beyond 6 mtr and upto 12 mtr depth.


Mtr 502.54 552.80

c Beyond 12 mtr and upto 18 mtr depth.


Mtr 581.22 639.35

28.68 Providing and placing in position filters of 40


mm diametre G.I. pipe with brass strainer of
approved quality. Mtr 119.83 641.89 131.81 653.87

28.69 Providing and fixing and lowering G.I Pipe


(Medium) 40 mm i/d with filter excluding cost
of filter for shallow tube well including Mtr 62.79 319.94 69.07 326.22
cleaning and priming the tube well.

28.70 Providing, laying, fixing and testing M.S. pipe


lines as per IS-1239 and specials such as
tees, bends, sockets, elbows etc. in trenches
in the ground including cutting, threading and
testing etc. complete.

a 80 mm internal diameter (thickness


Mtr 98.69 670.67 108.56 680.54
4.05 mm)

b 100mm internal diameter (thickness


Mtr 98.69 935.19 108.56 945.06
4.50 mm)

c 150mm internal diametre (thickness


Mtr 148.04 1437.99 162.85 1452.80
4.85 mm)

d 200mm internal diametre (thickness


Mtr 148.04 2308.96 162.85 2323.77
6.00 mm)

28.71 Hand boring Horizontly for crossing of pipe


under road or any other obstacle by using
Auger/Bocki method.Including excavation ,
Mtr 850.46 935.51
stringing and jointing of pipe upto 160mm
complete

Chapter-28 Page 471 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.72 Boring with casing pipe for tubewell in all
soils except ordinary hard rocks requiring
blasting including removing the casing pipe
after the tube well is lowered & tested ,
equipment as requried such as hand boring
machine and its accessory, transportation to
site and vice versa etc. complete in all
respect.

a Boring with 150mm id Housing Pipe

Upto 150 m depth BGL.


Mtr. 853.92 939.31

b Boring with 200mm id Housing Pipe

Upto 150 m depth BGL. Mtr. 879.66 967.63

c Boring with 250mm id Housing Pipe

Upto 150 m depth BGL. Mtr. 893.42 982.77

d Boring with 300mm id Housing Pipe

Upto 150 m depth BGL. Mtr. 906.29 996.92

28.73 Extra for Boring beyond 150 m depth 30% Extra will be taken for the respective
i/d of boring of item No.28.72

28.74 A Supplying, lowering of MS Pipe as per


IS:4270-2001 including MS sockets having
dimensions as per IS code duly welded with
MS electrode to have extra strength to lower
the pipe into tubewell bore.

(a) 100mm nominal diameter (weight 14.5 kg


per metre) 5.40 mm thickness Mtr. 307.41 1258.55 338.15 1289.29

(b) 150mm nominal diameter (weight 21.6 kg


per metre) 5.4 mm thickness Mtr. 308.35 1705.86 339.18 1736.69

( c) 200mm nominal diameter (weight 33.6 kg


per metre) 6.4mm thickness Mtr. 309.29 2505.41 340.22 2536.34

( d) 200mm nominal diameter (weight 41.6 kg


per metre) 8.0 mm thickness Mtr. 309.29 3127.02 340.22 3157.95

Chapter-28 Page 472 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(e) 250mmnominal diameter (weight 52.3 kg


per metre) 8.0 mm thickness Mtr. 311.17 3863.01 342.29 3894.13

(f) 300mm nominal diameter (weight 62.3 kg


per metre) 8.0 mm thickness Mtr. 312.11 4586.85 343.32 4618.06

(g) 300mm nominal diameter (weight 77.4 kg


per metre) 9.50 mm thickness Mtr. 313.05 5288.56 344.36 5319.87

28.74 B Supplying, lowering of MS Pipe as per IS:


4270-2001 including MS sockets having
dimensions as per IS code duly welded with
MS electrode to have extra strength to lower
the pipe into tubewell bore complete in all
respect.

(a) 323.9 mm outer diameter (weight 47.04 kg


per metre) minimum 6.0 mm thickness Mtr. 313.05 3837.15 344.36 3868.45

(b) 355.6 mm outer diameter (weight 51.72 kg


per metre) mimimum 6.0 mm thickness Mtr. 318.70 4209.55 350.57 4241.42

28.75 A Supplying, Fixing & lowering of Stainless


Steel Cage type wire wound screen as per
IS:8110-2000 or latest ISI marked Duly
welded with suitable grade S.S welding
electrode.to lower the strainer into tubewell
bore.

a 150mm Steel Strainer (slot size


Mtr. 377.94 6452.52 415.74 6490.32
0.15/0.20mm) 5.0 mm thickness

b 150mm Steel Strainer (slot size 0.50mm)


Mtr. 377.94 5982.03 415.74 6019.82
5.00 mm thickness

c 150mm Steel Strainer (slot size 0.75mm)


Mtr. 377.94 5908.20 415.74 5946.00
5.00 mm thickness

d 150mm Steel Strainer (slot size 1.00mm)


Mtr. 377.94 5747.43 415.74 5785.23
5.0 mm thickness

e 150mm Steel Strainer (slot size 0.15mm)


Mtr. 377.94 8119.80 415.74 8157.59
6.30 mm thickness

Chapter-28 Page 473 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
f 150mm Steel Strainer (slot size
Mtr. 377.94 7633.44 415.74 7671.24
0.50mm)6.30 mm thickness

g 150mm Steel Strainer (slot size 0.75mm)


Mtr. 377.94 7348.77 415.74 7386.57
6.30 mm thickness

h 150mm Steel Strainer (slot size 1.00mm)


Mtr. 377.94 6814.94 415.74 6852.74
6.30 mm thickness

i 200mm Steel Strainer (slot size 0.15mm)


Mtr. 385.00 10445.15 423.50 10483.65
6.30 mm thickness

j 200mm Steel Strainer (slot size 0.50mm)


Mtr. 385.00 9469.84 423.50 9508.34
6.30 mm thickness

k 200mm Steel Strainer (slot size 0.75mm)


Mtr. 385.00 9085.00 423.50 9123.50
6.30 mm thickness

l 200mm Steel Strainer (slot size 1.00mm)


Mtr. 385.00 8743.63 423.50 8782.13
6.30 mm thickness

m 200mm Steel Strainer (slot size


Mtr. 385.00 13762.54 423.50 13801.04
0.15mm)8.00 mm thickness

n 200mm Steel Strainer (slot size


Mtr. 385.00 12576.32 423.50 12614.82
0.50mm)8.00 mm thickness

o 200mm Steel Strainer (slot size


Mtr. 385.00 11690.63 423.50 11729.13
0.75mm)8.00 mm thickness

p 200mm Steel Strainer (slot size


Mtr. 385.00 11326.91 423.50 11365.41
1.00mm)8.00 mm thickness

q 250mm Steel Strainer (slot size 0.15mm)


Mtr. 406.17 16258.84 446.78 16299.45
7.30 mm thickness

r 250mm Steel Strainer (slot size 0.50mm)


Mtr. 406.17 15833.15 446.78 15873.77
7.30 mm thickness

s 250mm Steel Strainer (slot size 0.75mm)


Mtr. 406.17 15773.83 446.78 15814.45
7.30 mm thickness

t 250mm Steel Strainer (slot size 1.00mm)


Mtr. 406.17 15170.21 446.78 15210.82
7.30 mm thickness

u 300mm Steel Strainer (slot size 0.15mm)


Mtr. 420.27 20102.97 462.30 20145.00
8.00 mm thickness

v 300mm Steel Strainer (slot size 0.50mm)


Mtr. 420.27 19254.26 462.30 19296.28
8.00 mm thickness

Chapter-28 Page 474 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

w 300mm Steel Strainer (slot size 0.75mm)


Mtr. 420.27 18700.68 462.30 18742.70
8.00 mm thickness

x 300mm Steel Strainer (slot size 1.00mm)


Mtr. 420.27 18634.76 462.30 18676.79
8.00 mm thickness

28.75 Supplying, Fixing & lowering of Stainless


AA Steel Socket as per IS:8110-2000 or latest
ISI marked Duly welded with suitable
grade S.S welding electrode.to lower the
strainer into tubewell bore complete in all
respect.

a 150mm internal diameter


No. 349.73 4123.00 384.70 4157.97

b 200mm internal diameter


No. 349.73 4877.90 384.70 4912.87

c 250mm internal diameter


No. 349.73 7142.63 384.70 7177.60

28.75 B Supplying, lowering 200mm inner dia Electric


Resistance welded (ERW) LOW CARBON
GALAVANIZED CAGE TYPE VEE Wire
WOUND SCREEN . It shall be of
Continuous trapezoidal wire spirally wound
around fabricated cage. The screen must
Consist of ‘V’ shaped (Wedge) profile wire of
various dimensions as per IS:8110-2000 with
latest amendments and material specification
as IS :280-7887-1992 Grades or AISI Grade
1012 & slot width will be 0.75mm, thickness
of pipe 8mm at T/Well site.

200mm internal diameter (slot size


0.75/1.0mm) 7.30 mm thickness Mtr. 406.17 9847.62 446.78 9888.23

28.76 Supplying, lowering & fixing of M.S Special


socket to connect S.S Strainer to M.S Pipe
duly welded with suitable grade welding
electrode complete in all respect.

(a) 100mm internal diameter Each 82.90 437.48 91.19 445.77

(b) 150mm internal diameter Each 94.74 565.82 104.21 575.29

Chapter-28 Page 475 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

( c) 200mm internal diameter Each 106.58 696.71 117.24 707.37

(d) 250mm internal diameter Each 118.45 825.09 130.30 836.93

(e) 300mm internal diameter Each 177.64 1003.32 195.41 1021.08

28.77 Supplying & fixing of M.S Clamp of size


150mm X 12mm made out of MS Flat 1.52m
long, suitable to fit Housing pipe including the Each 59.20 2673.23 65.12 2679.15
cost Nut & Bolts of Suitable size complete in
all respect.

28.78 Supplying at site Wooden Box of suitable size


with Lid & locking arrangment for preserving
Each 59.20 577.63 65.12 583.55
strata sample collected from the bore.

28.79 A Supplying & Fixing of bail plug of M.S pipe


complete with inverted U-hook attched to the
bottom plug complete in all respect.

(a) 100mm internal diameter (weight 14.5 kg


per metre) 5.40 mm thickness mtr 50.92 998.93 56.01 1004.02

(b) 150mm internal diameter (weight 21.6 kg


per metre) 5.4 mm thickness mtr 52.33 1441.49 57.56 1446.73

( c) 200mm internal diameter (weight 41.6 kg


per metre) 8.0 mm thickness mtr 53.74 2854.42 59.11 2859.79

(d) 250mm internal diameter (weight 52.3 kg


per metre) 8.00 mm thickness mtr 55.15 3564.74 60.66 3570.25

(e) 300mm internal diameter (weight 62.3 kg


per metre) 8.0 mm thickness mtr 55.15 4254.40 60.66 4259.92

28.79 B Supplying & Fixing of M.S pipe bail plug


suitable for 200 mm dia UPVC casing pipe
having thickness of socket as 12 mm ,length each 118.45 756.08 130.30 767.93
100 mm & base plate of 8 mm thick complete
in all respect.

Chapter-28 Page 476 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.79 C Providing and fixing M.S. taper / reducer
made out of 6 mm thick M.S. sheet complete
in all respect.

a Reducer 350mm x 200 mm EACH 236.86 2939.44 260.54 2963.12

b Reducer 300mm x 200 mm EACH 236.86 2805.54 260.54 2829.22

c Reducer 250mm x 150 mm EACH 236.86 2671.65 260.54 2695.34

28.80 Supplying & Fixing of well cap having thread


to fix on housing pipe complete in all respect.

(a) 100mm internal diameter EACH 82.90 258.29 91.19 266.58

(b) 150mm internal diameter EACH 94.74 396.52 104.21 405.99

( c) 200mm internal diameter EACH 106.58 738.23 117.24 748.89

(d) 250mm internal diameter EACH 118.45 1091.59 130.30 1103.44

(e) 300mm internal diameter EACH 130.28 1705.48 143.31 1718.51

(f) 350mm internal diameter EACH 130.28 2044.15 143.31 2057.18

28.81 Development and Stabilizing of the tubewell


with air compressor of required capacity as
directed by the engineer-in- charge including
cost of tools, appliances & consumable to the
satisfaction of Engineer-in-charge.

(a) Capacity of Air compressor 300 cfm at


250 PSI Hour 3001.17 3301.29

(b) Capacity of Air compressor 500 cfm at


150 PSI Hour 4665.14 5131.65

28.82 Development and Stabilizing of the tubewell


with submersible pump of required capacity
as directed by the engineer-in- charge
including cost of tools, appliances & Hour 1631.62 1794.78
consumable to the satisfaction of Engineer-in-
charge.

Chapter-28 Page 477 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.83 Collection of water sample from different
strata and testing of sample from approved
Each 280.38 308.42
laboratory (Phisical & chemical Analysis)

28.84 Testing of water sample for Heavy metal from


approved laboratory (Toxic material such as
Each 5677.68 6245.45
Arsenic, lead, mercury, pesticide etc.)

28.85 A Drilling of 675mm dia bore with Reverse


Rotatry Rig in all kinds of soil including the
cost of consumable stores, fuel oil and
transportation of rig to the site. complete in all
respect.

(a) Drilling of 675mm dia bore with Reverse


Rotatry Rig Upto 150 m depth BGL. Mtr 1247.89 1372.68

(b) Drilling of 675mm dia bore with Reverse


Rotatry Rig Beyond 150 m depth up to 300 Mtr 1638.08 1801.89
Mtr

( c) Drilling of 675mm dia bore with Reverse


Rotatry Rig Beyond 300 m depth up to Mtr 2028.28 2231.10
onward depth

28.85 B Drilling of 650mm dia bore with Reverse


Rotatry Rig in all kinds of soil including the
cost of consumable stores, fuel oil and
transportation of rig to the site. complete in all
respect.

(a) Drilling of 650mm dia bore with Reverse


Rotatry Rig Upto 150 m depth BGL. Mtr 1219.86 1341.85

(b) Drilling of 650 mm dia bore with Reverse


Rotatry Rig Beyond 150 m depth up to 300 Mtr 1593.22 1752.54
Mtr

( c) Drilling of 650mm dia bore with Reverse


Rotatry Rig Beyond 300 m depth BGL up to Mtr 1966.59 2163.24
onward depth

Chapter-28 Page 478 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.85 C Drilling of 600mm dia bore with Reverse
Rotatry Rig in all kinds of soil including the
cost of consumable stores, fuel oil and
transportation of rig to the site. complete in all
respect.

(a) Drilling of 600mm dia bore with Reverse


Rotatry Rig Upto 150 m depth BGL. Mtr 1191.81 1311.00

(b) Drilling of 600mm dia bore with Reverse


Rotatry Rig Beyond 150 m depth BGL up to Mtr 1553.97 1709.36
300 Mtr

(c ) Drilling of 600mm dia bore with Reverse


Rotatry Rig Beyond 300 m depth BGL to Mtr 1890.00 2079.00
onward depth

28.85D Drilling of 550mm dia bore with Reverse


Rotatry Rig in all kinds of soil including the
cost of consumable stores, fuel oil and
transportation of rig to the site. complete in all
respect.

a Drilling of 550mm dia bore with Reverse


Rotatry Rig Upto 150 m depth BGL. Mtr 1135.75 1249.32

b Drilling of 550mm dia bore with Reverse


Rotatry Rig Beyond 150 m depth BGL up to Mtr 1497.90 1647.69
300 Mtr

c Drilling of 550mm dia bore with Reverse


Rotatry Rig Beyond 300 m depth BGL to Mtr 1833.93 2017.33
onward depth

28.85E Drilling of 500mm dia bore with Reverse


Rotatry Rig in all kinds of soil including the
cost of consumable stores, fuel oil and
transportation of rig to the site. complete in all
respect.

a Drilling of 500mm dia bore with Reverse


Rotatry Rig Upto 150 m depth BGL. Mtr 1107.70 1218.47

b Drilling of 500mm dia bore with Reverse


Rotatry Rig Beyond 150 m depth BGL up to Mtr 1441.82 1586.00
300 Mtr

Chapter-28 Page 479 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

c Drilling of 500mm dia bore with Reverse


Rotatry Rig Beyond 300 m depth BGL to Mtr 1777.85 1955.64
onward depth

28.86 Making temporary water supply arrangement


for drilling of tubewell with reverse rotary rig
till completion of bore & packing of gravel

Depth of temporary bore up to 90 m Mtr 545.63 600.19

28.87 Making electric Logging of borehole with


electronic well logger including cost of Each 15848.57 17433.43
equipment at site etc.complete in all respect

28.88 Supplying at quarry site of gravel of 1/16" to


1/8" sizes including pouring and packing in
the annular space between the pipes
assembly and the bore.The gravel should be Cum 88.52 738.68 97.38 747.53
free from, dust,dirt, or the vegetable manner
as per IS 4097/1967 with latest amendments
(to be paid as per actual length of pipe)

28.89 Supplying and fixing mild steel centering


guides made out of 32mm x 6mm thick M.S. Each 56.45 290.79 62.09 296.44
bar complete in all respects.

28.90 Supplying,fixing and testing at site Automatic


electronic type water level indication system
with gun metal float sensor and electrical
cable suitable for three phase pump
Each 992.11 11360.62 1091.32 11459.83
submersible / monoblock to be fixed on
existing panel for OHSRs complete in all
respects.

28.91 Boring/drilling bore well of required dia for


casing/ strainer pipe, by suitable method
prescribed in IS: 2800 (part I), including
collecting samples from different strata,
preparing and submitting strata chart/bore
log, including hire & running charges of all Each
equipments, tools, plants & machineries
required for the job, all complete as per
direction of Engineer – in-charge, upto 90
metre depth below ground level.

A All types of soil.

Chapter-28 Page 480 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(a) 300 mm dia. Mtr 468.53 515.38

(b) 350 mm dia. Mtr 512.46 563.70

( c) 400 mm dia. Mtr 655.94 721.53

B Rocky Strata including Boulders Mtr

(a) 300 mm dia. Mtr 1048.60 1153.46

(b) 350 mm dia. Mtr 1085.62 1194.18

( c) 400 mm dia. Mtr 1209.75 1330.72

28.92 Supplying, assembling, lowering and fixing in


vertical position in bore well,unplasticized
PVC medium well casing (CM) pipe of
required dia, conforming to IS: 12818-2010,
including required hire and labour charges,
fittings & accessories etc. all complete, for all
depths, as per direction of Engineer – in-
charge.

(a) 100 mm nominal size dia. Mtr 24.43 496.01 26.87 498.46

(b) 150 mm nominal size dia. Mtr 25.52 1012.58 28.08 1015.14

( c) 200 mm nominal size dia. Mtr 26.62 1808.83 29.28 1811.49

28.93 Supplying, assembling, lowering and fixing in


vertical position in bore well unplasticized
PVC medium well screen (RMS) pipes with
ribs, conforming to IS:12818, including hire &
labour charges, fittings & accessories etc. all
complete, for all depths, as per direction of
Engineer-in-charge.

(a) 100 mm nominal size dia. Mtr 48.50 632.52 53.35 637.37

(b) 150 mm nominal size dia. Mtr 59.44 1344.64 65.38 1350.58

( c) 200 mm nominal size dia. Mtr 70.37 2565.43 77.41 2572.47

Chapter-28 Page 481 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.94 Providing and fixing factory made precast
RCC perforated drain covers, having concrete
of strength not less than M-25, of size 1000 x
450x50 mm, reinforced with 8 mm dia four
nos longitudinal & 9 nos cross sectional
T.M.T. hoop bars, including providing 50 mm
Each 103.84 1246.12 114.22 1256.50
dia perforations @ 100 to 125 mm c/c,
including providing edge binding with M.S.
flats of size 50 mm x 1.6 mm complete, all as
per direction of Engineer -in-charge.

28.95 A Jointing P.V.C. / H.D.P.E Pipes and specials


with PVC coupling and cement solvent
excluding the cost of PVC coupling and
cement solvent, including testing etc.
complete in all respect.

(a) 20 mm o/d pipe and specials each 9.48 10.42

(b) 25 mm o/d pipe and specials each 10.66 11.73

( c) 32 mm o/d pipe and specials each 11.26 12.38

(d) 40 mm o/d pipe and specials each 11.84 13.02

(e) 50 mm o/d pipe and specials each 12.43 13.68

(f) 63 mm o/d pipe and specials each 13.03 14.33

(g) 75 mm o/d pipe and specials each 14.21 15.63

(h) 90 mm o/d pipe and specials each 14.81 16.29

(i) 110 mm o/d pipe and specials each 15.40 16.94

(j) 125 mm o/d pipe and specials each 15.99 17.59

(k) 140 mm o/d pipe and specials each 16.58 18.23

(l) 160 mm o/d pipe and specials each 17.17 18.89

(m) 180 mm o/d pipe and specials each 17.76 19.54

(n) 200 mm o/d pipe and specials each 18.36 20.19

(o) 225 mm o/d pipe and specials each 18.95 20.85

(p) 250 mm o/d pipe and specials each 19.54 21.50

(q) 280 mm o/d pipe and specials each 20.14 22.15

Chapter-28 Page 482 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

( r) 315 mm o/d pipe and specials each 20.73 22.80

(s) 355 mm o/d pipe and specials each 21.31 23.44

(t) 400 mm o/d pipe and specials each 21.91 24.10

(u) 450 mm o/d pipe and specials each 22.50 24.75

(v) 500 mm o/d pipe and specials each 23.09 25.40

(w) 560 mm o/d pipe and specials each 23.69 26.06

(x) 630 mm o/d pipe and specials each 24.28 26.71

28.95 B Cutting P.V.C. / H.D.P.E Pipes and specials


and chipping or filing the cut surface to a
uniform finish complete: -

(a) 20 mm o/d pipe each 4.29 4.72

(b) 25 mm o/d pipe each 4.87 5.36

( c) 32 mm o/d pipe each 5.47 6.01

(d) 40 mm o/d pipe each 6.06 6.67

(e) 50 mm o/d pipe each 6.80 7.48

(f) 63 mm o/d pipe each 7.39 8.13

(g) 75 mm o/d pipe each 7.97 8.77

(h) 90 mm o/d pipe each 8.57 9.42

(i) 110 mm o/d pipe each 9.16 10.08

(j) 125 mm o/d pipe each 9.90 10.89

(k) 140 mm o/d pipe each 10.48 11.53

(l) 160 mm o/d pipe each 11.08 12.18

(m) 180 mm o/d pipe each 11.67 12.84

(n) 200 mm o/d pipe each 12.26 13.49

(o) 225 mm o/d pipe each 12.86 14.14

(p) 250 mm o/d pipe each 13.59 14.94

(q) 280 mm o/d pipe each 14.18 15.60

Chapter-28 Page 483 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

( r) 315 mm o/d pipe each 14.77 16.25

(s) 355 mm o/d pipe each 15.37 16.90

(t) 400 mm o/d pipe each 15.96 17.56

(u) 450 mm o/d pipe each 16.55 18.21

(v) 500 mm o/d pipe each 17.14 18.85

(w) 560 mm o/d pipe each 17.73 19.50

(x) 630 mm o/d pipe each 18.32 20.16

28.96 A Jointing of C.I. Pipes as per IS:1536, Valves


and specials with lead caulked joints
,excluding cost of lead and yarn but including
cost of labour fuel and tools etc tested
complete.

(a) 80mm i/d pipe lines each 115.49 127.04

(b) 100mm i/d pipe lines each 158.39 174.23

( c) 150mm i/d pipe lines each 201.76 221.93

(d) 200mm i/d pipe lines each 255.63 281.19

(e) 250mm i/d pipe lines each 305.20 335.72

(f) 300mm i/d pipe lines each 378.38 416.22

(g) 350mm i/d pipe lines each 421.08 463.18

(h) 400mm i/d pipe lines each 507.54 558.29

(i) 450mm i/d pipe lines each 614.76 676.23

(j) 500mm i/d pipe lines each 692.13 761.34

(k) 600mm i/d pipe lines each 886.05 974.66

28.96 B Jointing of C.I. Pipes as per IS:1536, Valves


and specials with lead caulked joints
,including cost of lead , yarn and cost of
labour fuel and tools etc with testing
complete.

(a) For 80mm i/d pipe lines each 88.83 544.36 97.71 553.24

(b) For 100mm i/d pipe lines each 118.43 728.34 130.27 740.18

Chapter-28 Page 484 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(c) For 150mm i/d pipe lines each 142.12 1059.53 156.33 1073.74

(d) For 200mm i/d pipe lines each 177.65 1389.04 195.42 1406.81

(e) For 250mm i/d pipe lines each 213.18 1729.46 234.50 1750.78

(f) For 300mm i/d pipe lines each 272.40 2125.42 299.63 2152.66

(g) For 350mm i/d pipe lines each 296.08 2467.75 325.69 2497.36

(h) For 400mm i/d pipe lines each 355.30 3011.23 390.83 3046.76

(i) For 450mm i/d pipe lines each 438.20 3579.41 482.02 3623.23

(j) For 500mm i/d pipe lines each 509.26 4103.23 560.19 4154.15

(k) For 600mm i/d pipe lines each 651.38 5090.91 716.52 5156.04

28.97 Cutting of C.I. Pipes , specials and chipping


or filing the surface to a uniform finish.

(a) 80mm i/d pipe lines each 41.14 45.25

(b) 100mm i/d pipe lines each 52.98 58.27

( c) 150mm i/d pipe lines each 67.63 74.39

(d) 200mm i/d pipe lines each 91.31 100.44

(e) 250mm i/d pipe lines each 116.40 128.04

(f) 300mm i/d pipe lines each 131.05 144.16

(g) 350mm i/d pipe lines each 156.14 171.75

(h) 400mm i/d pipe lines each 191.67 210.83

(i) 450mm i/d pipe lines each 230.00 253.00

(j) 500mm i/d pipe lines each 253.69 279.06

(k) 600mm i/d pipe lines each 318.52 350.37

28.98 Jointing of A.C. Pipes and specials with A.C


coupling or C.I detachable joint, fitting with
bolts and nuts of grooved ends ,excluding
cost of C.I D-Joint, A.C coupling rubber rings ,
bolts & nuts including testing etc complete in
all respect

Chapter-28 Page 485 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
(a) 80mm i/d pipe lines each 59.21 65.14

(b) 100mm i/d pipe lines each 88.83 97.71

( c) 150mm i/d pipe lines each 138.17 151.99

(d) 200mm i/d pipe lines each 236.87 260.56

(e) 250mm i/d pipe lines each 355.30 390.83

28.99 Cutting of A.C. Pipes and specials and


chipping or filing the cut surface to a uniform
finish complete in all respect

(a) 80mm i/d pipe lines each 30.31 33.34

(b) 100mm i/d pipe lines each 36.51 40.16

( c) 150mm i/d pipe lines each 42.72 46.99

(d) 200mm i/d pipe lines each 48.91 53.80

(e) 250mm i/d pipe lines each 55.12 60.63

28.100 Jointing of D.I. Pipe and Specials with rubber


tyton joints fitted complete excluding the cost
rubber gasket including testing etc complete
in all respect

(a) 80mm i/d pipe lines Each 82.90 91.19

(b) 100mm i/d pipe lines Each 88.83 97.71

( c) 150mm i/d pipe lines Each 94.75 104.23

(d) 200mm i/d pipe lines Each 100.67 110.73

(e) 250mm i/d pipe lines Each 106.59 117.25

(f) 300mm i/d pipe lines Each 118.43 130.27

(g) 350mm i/d pipe lines Each 130.28 143.31

(h) 400mm i/d pipe lines Each 142.12 156.33

(i) 450mm i/d pipe lines Each 153.97 169.36

(j) 500mm i/d pipe lines Each 165.80 182.39

(k) 600mm i/d pipe lines Each 177.65 195.42

Chapter-28 Page 486 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

(l) 700mm i/d pipe lines Each 189.49 208.44

(m) 750mm i/d pipe lines Each 201.33 221.46

(n) 800mm i/d pipe lines Each 225.02 247.52

(o) 900mm i/d pipe lines Each 248.71 273.58

(p) 1000mm i/d pipe lines Each 272.40 299.63

28.101 Cutting of D.I. Pipe and specials and chipping


or filing the cut surface to a uniform finish
complete in all respect

(a) 80mm i/d pipe lines Each 52.98 58.27

(b) 100mm i/d pipe lines Each 58.90 64.79

( c) 150mm i/d pipe lines Each 67.63 74.39

(d) 200mm i/d pipe lines Each 73.55 80.91

(e) 250mm i/d pipe lines Each 80.88 88.96

(f) 300mm i/d pipe lines Each 89.60 98.56

(g) 350mm i/d pipe lines Each 102.84 113.12

(h) 400mm i/d pipe lines Each 114.69 126.16

(i) 450mm i/d pipe lines Each 129.34 142.27

(j) 500mm i/d pipe lines Each 141.18 155.29

(k) 600mm i/d pipe lines Each 158.63 174.49

(l) 700mm i/d pipe lines Each 173.28 190.60

(m) 750mm i/d pipe lines Each 185.11 203.62

(n) 800mm i/d pipe lines Each 199.76 219.74

(o) 900mm i/d pipe lines Each 211.61 232.77

(p) 1000mm i/d pipe lines Each 232.18 255.39

28.102 Supplying and Fixing PVC Repair/service


saddle for repair of PVC pipe line excluding
the cost of excavation complete in all
respects.

Chapter-28 Page 487 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
a 90 mm i/d Each 124.01 227.45 136.41 239.85

b 110 mm i/d Each 155.00 273.16 170.50 288.66

c 160 mm i/d Each 186.00 364.50 204.60 383.10

28.103 Supplying and Fixing PVC Detachable joint


for reapair of PVC pipe line excluding the cost
of excavation complete in all respects.

a 90 mm i/d Each 62.00 158.85 68.20 165.05

b 110 mm i/d Each 93.00 211.39 102.31 220.69

c 160 mm i/d Each 124.01 285.43 136.41 297.83

d 250 mm i/d Each 155.00 424.05 170.50 439.55

28.104 Providing and installing in position of


A domestic water pressure boosting pump of
approved make (To the approval of Engineer-
in-charge) including all pump accessaries but
excluding cost of G.I pipe & specials
complete in all respects.

a) Pressure pump of 0.5 HP with 2700


LPH, 35meter head with C.I pump &
Each 1184.33 18594.76 1302.77 18713.20
19 litre capacity Tank

b) Pressure pump of 0.65 HP with 2700


LPH, 37meter head with SS pump &
Each 1184.33 20236.29 1302.77 20354.72
19 litre capacity Tank

c) Pressure pump of 1.0 HP with 3300


LPH, 50meter head with C.I pump &
Each 1184.33 20439.27 1302.77 20557.71
19 litre capacity Tank

d) Pressure pump of 0.8 HP with 4800


LPH, 40meter head with C.I pump & Each 1184.33 23845.21 1302.77 23963.64
19 litre capacity Tank

e) Pressure pump of 1.0 HP with 4800


LPH, 45meter head with SS pump & Each 1184.33 25302.39 1302.77 25420.83
19 litre capacity Tank

Chapter-28 Page 488 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
f) Pressure pump of 0.5 HP with 2000
LPH, 32meter head with C.I pump & Each 1184.33 10174.29 1302.77 10292.72
5 litre capacity Tank

28.104 Providing and installing in position premium


B range water pressure boosting pump (To the
approval of Engineer-in-charge) including all
pump accessaries but excluding cost of G.I
pipe & specials complete in all respects.

a) Pressure pump of 0.7 HP with 3100


LPH, 25.6 meter head with SS pump
& 24 litre capacity Tank Each 1184.33 31807.52 1302.77 31925.95
Model : CM 3-4

b) Pressure pump of 0.7 HP with 4700


LPH, 20.3meter head with SS pump
& 24 litre capacity Tank Each 1184.33 29765.13 1302.77 29883.56
Model : CM 5-3

c) Pressure pump of 0.9 HP with 4700


LPH, 27.3meter head with SS pump
& 24 litre capacity Tank Each 1184.33 36261.96 1302.77 36380.39
Model : CM 5-4

d) Pressure pump of 0.7 HP with 2000


LPH, 25 meter head with SS pump &
18 litre capacity Tank Each 1184.33 29163.32 1302.77 29281.75
Model : CM 3-3

e) Pressure pump of 0.4 HP with 2000


LPH, 18 meter head with SS pump &
8 litre capacity Tank Each 1184.33 26796.15 1302.77 26914.58

28.105 Providing, laying, fixing, testing and


commissioning of 'C' Class heavy duty MS
Pipe conforming to Indian Standard IS :
1239/3589 including fittings like tees, bends,
sockets, elbows, flanges, tapers, nuts bolts,
gaskets etc. in ground with anti corrosive
treatment with wrapping coating tape (4mm
pypkote tape) as per IS : 10221 including cost
of primer etc. excluding cost of excavation
and refilling complete in all resepcts.

a 100mm internal diameter


Mtr 214.35 1646.65 235.78 1668.08

Chapter-28 Page 489 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

b 150mm internal diameter


Mtr 293.29 2388.02 322.62 2417.35

c 200mm internal diameter


Mtr 372.25 3534.28 409.48 3571.50

28.106 Providing, laying, fixing, testing and


commissioning of 'C' Class heavy duty MS
Pipe conforming to Indian Standard IS :
1239/3589 including fittings like tees, bends,
sockets, elbows, flanges, tapers, nuts bolts,
gaskets etc. on surface and providing angle
iron support or cement concrete block as
support including painting with two or more
coats of synthetic enamel paint of required
shade complete in all respects.

a 100mm internal diameter Mtr 214.35 1440.86 235.78 1462.29

b 150mm internal diameter Mtr 293.29 2090.33 322.62 2119.66

c 200mm internal diameter Mtr 372.25 3166.86 409.48 3204.09

28.107 Providing, laying, fixing, testing and


commissioning of 'C' Class heavy duty MS
Pipe conforming to Indian Standard IS :
1239/3589 including fittings like tees, bends,
sockets, elbows, flanges, tapers, nuts bolts,
gaskets etc. fixing the pipe on the wall /
ceiling with suitable clamps and painting with
two or more coats of synthetic enamel paint
of required shade complete in all respects.

a 25mm internal diameter Mtr 49.81 298.01 54.79 302.99

b 32mm internal diameter Mtr 54.51 374.44 59.96 379.90

c 40mm internal diameter Mtr 73.32 445.94 80.65 453.27

d 50mm internal diameter Mtr 99.62 654.53 109.59 664.49

e 65mm internal diameter Mtr 127.84 816.57 140.62 829.36

f 80mm internal diameter Mtr 157.91 992.66 173.70 1008.45

g 100mm internal diameter Mtr 214.35 1440.86 235.78 1462.29

h 150mm internal diameter Mtr 293.29 2090.33 322.62 2119.66

i 200mm internal diameter Mtr 372.25 3166.86 409.48 3204.09

Chapter-28 Page 490 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.108 Supplying, Installation, Testing and
Commissioning of G.M Single headed hydrant
valve with instantaneous Gun metal peet
coupling of 63 mm dia with cast iron wheel ISI
marked conforming to IS 5290 (TypeA) with Each 177.64 6440.03 195.41 6457.79
blank Gunmetal Cap and chain including
orifice plate made of 6mm th Stainless steel
to keep the pressure not more than 3.5 per
sqcm at any point complete in all respects.

28.109 Supplying, Installation, Testing and


Commissioning of G.M Double headed
hydrant valve with instantaneous Gun metal
peet coupling of 63 mm dia with cast iron
wheel ISI marked conforming to IS 5290
(TypeA) with blank Gunmetal Cap and chain Each 177.64 12632.80 195.41 12650.57
including orifice plate made of 6mm th
Stainless steel to keep the pressure not more
than 3.5 per sqcm at any point complete in all
respects.

28.110 Supplying, Installation, Testing and


Commissioning 63 mm dia gun-metal Branch
Pipe (ISI marked) with 20mm (nominal
internal dia) size Gun metal nozzle
Each 71.06 1943.47 78.17 1950.58
confirming to IS 903, suitable for
instantaneous connection to interconnect
hose pipe coupling as required.

28.111 Supplying, Installation, Testing and


Commissioning of Single suction collecting
head with cast iron body, nose coupling (draw
out connection) with female outlet complete
bolts, nuts and rubber insertions, but without Each 236.86 4378.33 260.54 4402.02
100mm dia. MS suction pipe (with puddle
flange) with a foot valve, complete as
required.

28.112 Providing and fixing fire brigade inlet


connection of cast iron body with Gun metal
63mm dia instantaneous type male coupling
with built in check valves and 150mm dia
flanged outlet complete with bolts, nuts and
rubber insertions as per IS:904. (to be
connected to static tank).

a Four Way inlet connection Each 355.31 9249.06 390.84 9284.59

b Three Way inlet connection Each 355.31 7506.55 390.84 7542.08

Chapter-28 Page 491 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

c Two Way inlet connection Each 355.31 6239.28 390.84 6274.81

28.113 Supplying, Installation, Testing and


Commissioning of RRL FIRE hose Type A,
IS:636, 63mm dia x 15m long with gunmetal
male & female couplings (ISI marked) bound Each 118.45 4471.85 130.30 4483.70
& riveted to hose pipes with copper rivets and
copper wire as required.

28.114 Supplying, Installation, Testing and


Commissioning of Non-percolating flexible
CP HOSE as per IS:8423 / 1994 ISI marked
63mm dia x 15 m long complete with
Each 118.45 3984.09 130.30 3995.94
instantaneous type gun-metal 63 mm dia
male & female coupling (IS: 903) bound and
riveted to hose pipes.

28.115 Supplying, Installation, Testing and


Commissioning of First Aid-fire Hose reel with
MS construction spray painted in post office
red, confirming to IS 884 with upto date
amendments, complete with rubber hose pipe
(IS:444/1987) 20mm dia 30 meter long type- Each 710.60 9048.00 781.65 9119.06
2, hose reel Drum with bracket as per IS:884,
20mm dia GM nozzle and 20mm dia GM gate
valve as required complete with G.I pipe
connention with main pipe complete in all
respect.

28.116 Supplying, Installation, Testing and


Commissioning standard Fire Man's axe with
heavy insulated rubber conforming to IS 936 Each 28.21 805.85 31.03 808.67
complete in all respect.

28.117 Supplying, Installation, Testing and


Commissioning of weather proof cabinet for
hose fabricated out of 1.6mm thickness M.S.
sheet with front glass door having locking
arrangement, suitable to accommodate all the
necessary pipes, accessories, fittings etc
including painting the metal portion with one
coat of ready mixed primer paint and two
coats of synthetic enamel paint of approved
shade and quality, sign writing etc.

a 900 mm wide x 600 mm high x 500


mm deep Size (for Yard Hydrant) Each 473.74 5260.20 521.11 5307.57

Chapter-28 Page 492 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

b 600 mm wide x 600 mm high x 300


mm deep Size - (for RRL Reel) Each 355.31 4104.70 390.84 4140.23

c 750 mm wide x 600 mm high x 250


mm deep Size Each 355.31 4344.03 390.84 4379.56

d 1200 mm wide x 900 mm high x 400


mm deep Size Each 355.31 6737.26 390.84 6772.79

28.118 Supplying & fixing air vessel made out of


250mm. Dia, 8 mm thick MS sheet, 1200mm
height with air release valves on top and
flanged connection to risers, drain
arrangements with 25 mm dia gunmetal
Each 710.60 17412.02 781.65 17483.08
wheel valves, with required accessories,
pressure gauge and painting with synthetic
enamel paint of approved shade as required

28.119 Supplying & fixing air vessel made out


of450mm. Dia, 8 mm thick MS sheet,
2000mm height with air release valves on top
and flanged connection to risers, drain
arrangements with 50 mm dia gunmetal Each 829.05 23683.64 911.95 23766.54
wheel valves, with required accessories,
pressure gauge and painting with synthetic
enamel paint of approved shade as required

28.120 Providing and fixing of Pressure switch of


approved make in MS pipe line suitable for
line presure up 15kg/cm2 & including
Each 355.31 3606.33 390.84 3641.87
connection with main panel etc. as required
complete in all restect

28.121 Providing and fixing S.S Pressure Gauge


complete as required complete in all respect.

a Dial diameter 150mm calibration 0-16


Each 146.65 1027.61 161.32 1042.28
Kg

b Dial diameter 100mm calibration 0-16


Each 146.65 768.51 161.32 783.17
Kg

Chapter-28 Page 493 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.122 Supplying an Fixing Pendant / Upright type
sprinkler with quartzoid bulb, operating
temperature 68 / 79 degree centigrade of 15 Each 46.49 255.07 51.14 259.72
mm dia orifice sprinler head to approved by
UL/SN

28.123 Supplying and Fixing Sidewall Sprinkler rated


at 68 / 79degree centigrade, quartzoid bulb
type, 15 mm dia orifice sprinler head to Each 46.49 295.23 51.14 299.88
approved by UL/SN complete in all respect.

28.124 Providing and fixing of FIRE


EXTINGUISHER, ABC Powder type (stored
pressure) as per IS: 15683 complete with all
accessories as per Manufactures
Specification. ISI Mark complete in all
respect.

a 2 Kg. Capacity Each 124.01 1645.99 136.41 1658.39

b 4 Kg. Capacity Each 124.01 2161.24 136.41 2173.64

c 6 Kg. Capacity Each 124.01 2790.98 136.41 2803.38

28.125 Providing and fixing of FIRE


EXTINGUISHER, CO2 type as per IS: 15683
complete with all accessories as per
Manufactures Specification. ISI Mark
complete in all respect.

a 2 Kg. Capacity Each 124.01 4852.01 136.41 4864.41

b 3 Kg. Capacity Each 124.01 5768.03 136.41 5780.43

c 4.5 Kg. Capacity Each 124.01 6787.08 136.41 6799.48

28.126 Providing and fixing of FIRE


EXTINGUISHER, Mechanical Foam Type 9
ltr IS: 15683 Stored Pressure type complete
Each 124.01 2848.26 136.41 2860.66
with all accessories as per Manufactures
Specification. ISI Mark of approved make
complete in all respect.

28.127 Supplying and Installation control valve C/W


water motor gong complete with alarm Valve,
constant trim, water motor bell, 2No. Pressure
Gauge. All parts UL listed. Make Newage
complete in all respect.

a 150 mm control valve Each 434.00 30827.70 477.40 30871.10

Chapter-28 Page 494 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
b 100 mm control valve Each 434.00 26429.88 477.40 26473.28

28.128 Supplying, Laying, Testing and


Commissioning of ISI marked BUTTERFLY
VALVE PN 1.6, with Gun metal seal duly ISI
marked complete with rubber insertion, nuts,
bolts and washers, matching flanges of
required thickness, etc. complete as per
specifications.

a 80 mm i/d Each 236.86 2566.13 260.54 2589.82

b 100 mm i/d Each 296.08 3256.80 325.69 3286.41

c 150 mm i/d Each 355.31 5179.16 390.84 5214.70

d 200 mm i/d Each 414.50 8929.44 455.95 8970.89

28.129 Supplying, Installation, Testing and


Commissioning of cast iron flanged Y type
strainer with stainless steel mesh in PN-1.0
including cost of Nut Bolt , rubber insertion
complete in all respects.

a 150 mm i/d Each 177.64 7330.01 195.41 7347.77

b 200 mm i/d Each 236.86 14430.10 260.54 14453.79

28.130 Proving & fixing Dual plate check valve


flanged end class PN-1.6 as per IS with nitrile
seat SS shaft & springs in pipe lines including
jointing & cost of Nut Bolt , rubber insertion
etc. complete.

(a) 80mm i/d check valve . Each 236.86 3152.33 260.54 3176.02

(b) 100mm i/d check valve Each 296.08 4450.47 325.69 4480.08

(c) 150mm i/d check valve Each 355.31 7880.71 390.84 7916.24

(d) 200mm i/d check valve Each 414.50 12808.01 455.95 12849.46

28.131 Providing and fixing in position Cast Iron Foot


valves flanged ends with rubber sheat as per
IS 4038 including cost of Nut Bolt , rubber
insertion complete in all respect

a) 50mm i/d Cast Iron Foot valves Each 124.00 1464.55 136.39 1476.95

Chapter-28 Page 495 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7

b) 65mm i/d Cast Iron Foot valves Each 124.00 1659.48 136.39 1671.88

c) 80mm i/d Cast Iron Foot valves Each 155.00 2157.64 170.50 2173.14

d) 100mm i/d Cast Iron Foot valves Each 186.00 3452.32 204.60 3470.92

e) 150mm i/d Cast Iron Foot valves Each 217.00 6198.88 238.70 6220.58

28.132 Providing and fixing Vane type Water flow


switch in MS Pipe line for a service pressure
up to 450PSI , Minimum flow rate for alarm
10GPM (38 LPM ), Minimum surge 18 FPS
(5.5 m/s ) including connection with panel
complete in all respect

a For 50mm to 150 mm pipe line Each 3652.31 12691.83 4017.54 13057.06

b For 200mm pipe line Each 3948.39 14472.28 4343.23 14867.12

28.133 Providing and fixing Sprinkler flexible drops


stainless steel SS 304 C/W ½ “ NPT on
reducer thread, with Max. working pressure of
175 PSI , Test pressure 875 PSI ( BURST )
with branch line ( inlet ) 1” NPT female thread
, 01 No reducer , 01 no nipple , 02 no side
brackets, 01 no centre brackets etc. complete
set , unbraided UL listed complete in all
respect.

a 1000 mm length Each 118.45 1025.32 130.30 1037.17

b 1200 mm length Each 118.45 1128.96 130.30 1140.80

c 1500 mm length Each 118.45 1180.77 130.30 1192.62

28.134 Drilling of 625mm dia bore with Percussion


Rig (Telescopic Method) in all kinds of soil
including the cost of consumable stores, fuel
oil and transportation of rig to the site.
complete in all respect in Area of District
pathankot , Talwara and Nagal.

a Drilling of 625mm dia bore with


Percussion Rig (Telescopic Method) Mtr 10534.98 11588.48
Upto 150 m depth BGL.

Chapter-28 Page 496 CSR-2020


CSR−2020−Final
Sr. No. Description. Unit Zone-A Zone-B

Labour Through Labour Through


Rates Rates Rates Rates

1 2 3 4 5 6 7
28.135 Drilling of 400mm dia bore with Direct Rotatry
Rig in all kinds of soil including the cost of
consumable stores, fuel oil and transportation
of rig to the site. complete in all respect.

a Drilling of 400mm dia bore with Direct


Rotatry Rig Upto 200 m depth BGL. Mtr. 6474.43 7121.87

b Drilling of 400mm dia bore with


ReverseDirect Rig Beyond 150 m Mtr. 5472.30 6019.53
depth up to 300 Mtr

28.135A Drilling of450mm dia bore with Direct Rotatry


Rig in all kinds of soil including the cost of
consumable stores, fuel oil and transportation
of rig to the site. complete in all respect.

a Drilling of 450mm dia bore with Direct


Rotatry Rig Upto 150 m depth BGL.
Mtr. 6586.57 7245.23

b Drilling of 450mm dia bore with Direct


Rotatry Rig Beyond 150 m depth up
to 300 Mtr Mtr. 7033.08 7736.39

c Drilling of 450 mm dia bore with


Direct Rotatry Rig Beyond 300 m
depth up to onward depth Mtr. 7479.58 8227.54

28.135B Drilling of 500 mm dia bore with Direct Rotatry


Rig in all kinds of soil including the cost of
consumable stores, fuel oil and transportation
of rig to the site. complete in all respect.

a Drilling of 500mm dia bore with Direct


Rotatry Rig Upto 150 m depth BGL. Mtr. 6698.73 7368.60

b Drilling of 50 0mm dia bore with


Direct Rotatry Rig Beyond 150 m Mtr. 7145.23 7859.75
depth up to 300 Mtr

c Drilling of 500 mm dia bore with


Direct Rotatry Rig Beyond 300 m Mtr. 7591.73 8350.90
depth up to onward depth

Chapter-28 Page 497 CSR-2020


CSR−2020−Final
CHAPTER NO. 29
SEWERAGE AND DRAINAGE

1 Considering cost factor HDPE pipe sewer should be avoided to the best possible, It is
reccommended only for particular situations/ site conditions such as for crossing above and below
railway lines, roads, canals, drains, ponds and under sub soil water etc where direct heavy loads
are not comming on the pipes.

2 For Technical reasons UPVC pipes be prefered upto 400 mm i/d, being cheep, long life, requires
lesser self cleaning velocity, lesser gadients, available in bulk, leak proof joints, easy to install,
local sand is used in stead of PCC, hence reducing the depths of Main Pumping Stataions and
Sewerage Treatment Plants (As such the Costs) along with low maintainance cost ,

3 Where sewers are to be remain immersed under water for most of the time,in such conditions
RCC s/s pipes having HDPE lyning be prefered and in the worst situations HDPE sewer can be
used with prior approval of Technical Sanctioning Authority.

4 For the rising mains UPVC pipes upto 400 mm id, above 400 upto 1000 mm id HDPE and above
1000 mm id RCC s/s pipes having HDPE lininng be preffered. All joints must be tested before
back filling of earth for desired pressure to be leak proof. PCC blocks can be provided on joints of
RCC pipe's in rising mains.

5 Where ever at road crossings the required cover on pipe is less and are subjected to heavy
vehicular traffic, bridging on wells and drains crossings etc, pipes be protected by providing PCC
or RCC enclosures depending upon the site requirements.

6 When lump sum rate is quoted by contractor for any item of excavation work covered in CSR, the
work will be got executed as per PWD specifications and payment will be made only for sections
as per standad norms or sections taken in tender bid if any. Nothing extra will be payable to
contractor due to increase in section or change in nature of soil or change in nature of timbering
what so ever may be required to be done for the specified excavation work except dewatering of
sub soil water if required.

7 Through rates in Chapter 29 of PWD (CSR) for all pipe sewers are only for estimation purpose.
The Allotment Authority before the allotment of the works will have to verify the prevailing lowest
and reasonable rates throughout in the open market taking into accounts all discounts and
facilities etc. offered by the supplier/manfacturer for supply in bulk. The entire responsibility of
rates approval will rest on allotting authorities in person, where as the reccommendation received
by the allotting authority will not be a justification.

Note:1 Contractor must provide, fix and maintain sign boards, fencing of trenches indicator for the work
under execution, provision for diversion for traffic, protection of existing services i.e. telephone
cables ,electric lines, water supply lines and gas lines etc. night signals, profiles, pegs, sight rails,
boning rods, fixing and maintenance of caution boards and any other safety measure required at
site.

Note: 2 Untill unless specified in DNIT, the maximum width of trenches for payment purposes shall be as
given in PWD specification book, If actual width of trench is less than the specified, in this case
the actual volume of excavation shall be paid. If the actual width of trench is greater than specified
in this case only standard specified section will be paid.

Chapter-29 Page 499 CSR - 2020


CSR−2020−Final
Note: 3 Nothing extra will be payable in respect of item No. 29.1 to 29.5 for any seepage of water during
excavation work above spring level.

Note: 4 The rates of item No. 29.1 to 29.5 includes and cover the cost of removing trees, roots, kankars
and other hard materials met in excavation

Note: 5 If excavation for any sewer is carried out by 'cut and cover' i.e. sinking shaft and tunneling in
between, the contractor shall be paid for such work as if the trench had been opened for full
length, but no extra will be allowed other than the full measurement of trench. it will be entirely on
the discretion of Engineer in charge to permit the excavation by cut and cover method. Back filling
of shafts and tunnels must all times be carried throughly and to the satisfaction of Engineer in
charge.
Note: 6 If any excavation is abandoned due to change in alignment of sewer necessiated by any
obstruction such as pipes, electric/ telephone cables or other reason what so ever may be, the
contractor will be paid actual work done in that trench and back fillings etc.

Note: 7 Where Engineer in charge so directs earth filling in trenches will be carried out by mechanical
rammers, extra for compaction rate will be payable under road chapter.

Note: 8 No extra shall be payable in respect of item29.1 to 29.5 , due to other unforeseen dificulties,
hardness of soil, or surface and other factors. This rate does not include cuting through metalled
roads and sorting stacking of road metall, which will be paid separately.

Note: 9 Excavation from items 29.1 to 29.5 is to be done as per PWD specifications, standard sections
and contract drawings. In case of unavoidable circumstances where excavation is required with
open cutings, concerned Superintending Engineer to his satisfaction depending upon the nature
of soil and site conditions is competent grant prior approval for open cuting along with the side
slopes. This approval will be for particular street/ lane but not for the whole area. Section
approved by the Suprintending Engineer will be final.
Note: If road cuting is involved in excavation, then it's width should not be more than 115 mm beyond
10 edge of excavated trenches on each side. where width of road cut is required to be increased
than the standard widths, prior approval of the Superintending Engineis is required. In case road
cut done at site is more than norms/ approved by the Superintending Engineer, excess road cut
will not be payable. On the other hand cost of reconditioning of excess road cut must be
recovered from the contractor.

Note: Excavation work will be done manualy in built up street/ lane where wall to wall width is upto 3.0
11 metre. Where as in open area or built up street/ lane having wall to wall width more than 3.0
metre, excavation will be done by mechanical means. In case of unavoidable circumstances,if,
manual excavation is required other than the specified above, Superintending Engineer is
competent to permit after his personnel satisfacion subject to prior approval on the record. If prior
approval is not accorded for manual excavation then contractor will be paid as excavation by
mech. means and the contactor will have no claim for that.
Note: Where and which type of timbering is required to support sides of trench in particular street/ lane,
12 will be decided by the Engineer in charge depending upon nature of soil and site conditions
before laying sewer and .will also put on record the nature of soil and site condition, that is for first
2.0 metre depth of trench and further for subsequent band of 1.80 metre depths. In a particular
strip if nature of soil changes within the strip, then timbering be decided for this whole strip as
required for the worst soil met in that strip.

Chapter-29 Page 500 CSR - 2020


CSR−2020−Final
Note: Removal of surplus spoils/earth from the site of work if required, will be decided by the Engineer
13 in charge. He must take up tantative quantities in writting with Local Administrations (M.C./
N.A.C./ Panchyat/ Owner of the project) so that surplus spoils/ earth may be filled in public place
(the destination/ destinations). Before so fillings, levels of site be recorded with respect to fixed
bench mark near site and then again levels be recorded after filling. Record actual measurement
of earth filling and lead in measurement book (loading or unloading will not be payable). If local
administration do not response to repeated requests, then Engineer in charge will decide the
destination in public intrest and the record the reasons of his choice and paid accordinly.

Note: For RCC pipe sewers, width of khutti will be 1.25D (here D is outer diametre of pipe's barrell),
14 depth of khutti will be 0.5D, excavated bed of khutti will be 0.25D below the barrell of pipe. As
such packing below pipes will be 0.25D thick at centre and 0.5D at outer edges with top surface
horizontal. Each pipe can rest on both ends at precasted PCC blocks of PCC 1:2:4 having length
equal to 0.5D, width 0.1D and depth 0.25D and local sand can be used as packing material in
stead of lean concrete. Where as in case of PVC/ UPVC/ HDPE pipes used for sanitary/ storm
sewers/ rising mains, nominal section local dry sand 100 mm thick in bed and hounches can be
used instead of lean concreates. Since these pipes have lengths from 5.0 to 6.0 metres, hence 3
Nos PCC1:2:4 blocks of size 100x100 mm and length 0.5 D can be used to support each
pipe).Local sand and PCC blocks will be paid separately.

Note: To protect entry of earth, slush or mud into sewer lines/manhole chambers is contractor's
15 responsibility. If any mud, slush, debries etc. enters into sewers/ manholes that will be removed
by contractor at his own cost. Before commissioning Engineer in charge should confirm and
record that sewer lines are free from any type of debries/ earth/ slush etc. If contractor fails to do
so, then it should be got done at the risk and cost of the contractor,
Note: RCC plain ended pipes are strictly prohibited for sewerage works. Where RCC plain pipes are
16 used for some works other than sewerage, these will also be covered under rates of S/S pipes but
including the cost of RCC collar. For a collar two socket joints will be paid. In case spun yarn is
used instead of rubber ring nothing extra will be paid as rubber ring jointing is saved in that case.

Note: All the sewer lines will be got tested by contractor before filling. If there is any leakage or damage
17 during execution or after commissioning, the same will be rectified by the contractor at his own
cost, loss or damage what so ever may be shall be borne by the contractor.

Note: Dewatering of sub soil water if required at site, will be physically checked by Engineer in charge at
18 site with respect to bench mark before dewatering proccess and will be recorded in site order
book at regular intervals fortnightly along with the RDs by SDE and paid accordingly.The decision
of Engineer in charge will be final and binding on the contractor.

Note: Material defect, execution defect or other defects such as gradient etc if any on the part of the
19 contractor, found at later stage which could not be traced while execution due to hidden work and
are not part of maintenace, will remain the responsibility of the contractor to set right the same at
his own cost though he may have taken his all dues.

Note: Additional 1:2 cement sand mortar on tyton rubber joint of RCC pipes will be provided only if
20 Engineer in charge permitts so in writting considering the requirements, other wise contractor will
have no right to claim payment of cement sand mortar joint on tytone rubber joints. No cement
sand mortar joint will be paid on tytone rubber joints in of RCC S/S flush jointing pipes.

Note: If any plastic encapsulated orange colour safety footstep is fitted by the contractor in wall without
21 providing required PCC block, not only payment of PCC is to be deducted from the items rate but
nothing is to be paid for footstep so fixed and the work stands rejected. Any masonary work
carried out by contractor without fixing step simutaneously in the walls were required, would be
stand rejected because steps fitted on later stage will have loose grip and cause high risk to lives
of sewermen.

Chapter-29 Page 501 CSR - 2020


CSR−2020−Final
Note: The rates in CSR items are for "ISI" marked steel reinforced RCC pipes only having sockets
22 extended out side pipe's barrel. These rates do not cover unreinforced CC pipes and steel
reinforced RCC s/s pipes having male/ female barrel flush joints. Unreinforced cement concrete
pipes can only be used where BIS code permitts so and that too with prior approval of allotting
authority not less than Chief Engineer or Superintending Engineer (where S.E. is the highest
technical post ). The rates of Unreinforced cement concrete pipes and Reinforced pipes having
S/S flush joints be reduced than of CSR as per difference of the lowest rates in market.

Note: The Sewerage work shall not be treated as completed untill it's proper functioning is physically
23 checked by the Engineer in charge and is dully certified.

Note: The complete rates of manhole chambers and cast in situ sewers given in CSR and its RCC slabs
24 are only for estimation purposes, however payment of manhole chambers and cast in situ sewers
are to be made only as per indivisual items rates in PWD Common Shedule.

Note: Steel reinforcement provided in RCC slabs and other works should be as per structrural design
25 and be recorded at the spot as actual in measurement book before pouring cement concrete and
payment will be made only for actual steel consumed at site. Only Fe 500 is permitted for RCC
works.
Note: Steel shuttering is to be used for RCC slabs of manhole chambers at bottom, sides and
26 openings. Use of kucha shuttering or wooden shuttering is strictly prohibited. RCC slabs casted by
using kucha or wooden shuttring will stand rejected and be recasted by using steel shuttering,
nothing shall be paid for the rejected slabs on the other hands such slabs must be recasted by
using steel shutterings .

Note: For jointing in SW and RCC s/s pipes (without rubber ring) by using spun Jute yarn and cement
27 sand mortar, the one fourth length of groove inbetween socket and spigot is to be packed with
spun Jute yarn fully grouted in neat cement slurry and the remaining three fourth groove length is
to be filled with prescribed cement sand mortar with help of tools.

Note 28 Untill otherwise specified, the labour rate for various items of construction includes handling of
material within 100 metres. Through rate includes all rehandling of materials at site of work and no
payment is due to the contractor on this count.

Note 29 Through rates, given in the schedule, includes the carriage of material as follow: - (a) For
material such as timber, mild steel , electric goods, all types of pipes, all types of manhole covers,
all types of road gullies, PVC foot steps, ventilating column pipes , cement and spun yarn etc.
which have to be arranged by the contractor, the entire carriage is included in the rate irrespective
of the lead. Only for the materials bricks, brick ballast, bajri, sand, stone, bitumen and cinder,
extra lead involved beyond 5 km is payable as per carriage rates. ---------(b) For bricks through
rate includes carriage within radius of 5 km of site of work, if the source of bricks is within that
limit. In case the source is beyond 5 km of the site of work, the through rate includes carriage upto
first 5 km measured from source of bricks irrespective of the fact weather this initial distance
consists of Katcha and pucca or partly katcha and pucca. The lead beyond this initial 5 km will be
payable at the rates provided in Schedule of rates for the corresponding subsequent kilometres.
For this purpose the source of bricks shall be the nearest possible working killen or dump from
where the bricks can be obtained and source shall be certified as such by the Sub Divisional
Engineer in writting before releasing the payment.

Note 30 The through rate includes all octroi charges, toll tax, VAT, Labour Welfare Cess, turnover tax and
other local taxes etc., what so ever paid by the contractor to bring the material at site of work.

Note 31 Through rates include the wastage and beaking of various materials during construction.

Note 32 Unless otherwise specified, the labour rate includes the cost of water, tools and plants, labour and
material of scaffolding and cost of good earth for mud mortar or mud plaster where required.

Chapter-29 Page 502 CSR - 2020


CSR−2020−Final
Note 33 In case of works below ground level like basement of buildings and public health works such as
sewers and disposal works etc., the rates upto 4.0 metre below the ground level shall be the
same as for works in superstructure or first story. For depths greater than 4.0 metres, additional
rates for subsequent story will be added. For works which are not deeper than 1.50 metre from
the ground level, ordinary rates for works in foundation and plinth shall apply
Note 34 Where description of any item is too long, only essential portion may be written in estimates,
tender contracts and measurement books, although it will be deemed to cover the entire item as
described fully in Common shedule of rates, PWD specification and BIS codes.

Note 35 Abrivation of units, wherever occuring in Punjab PWD Common Schedule of Rates 2010 will be
applicable in revised CSR Chapter 29

Note 36 The CSR item rates are drived on the basis of daily wages fixed by Labour Department as per
minimum wages as on Sept 2019.

Note 37 Hire charges rates include all operational and maintenance charges such as cot of fuel, lubricants,
stores, establishment, depriciation and intrest charges. These rates are for estimation purpose
and not for hiring private machinary from the market for which competative tenders/ quotations
shall be called and approved by the competent authority. The output of machinary/ equipments
are for the compact quantities of the ralevent items and not for loose quantities.

Note 38 The rates of materials adopted for analysing the rates of various items of works includes cost of
any cases/ drums/ containers/ or any type of bags etc. and are not for obtaining supllies from the
market.

Note 39 For excavation works covered under chapter 29 separate rates have been given for streches at
various depths of excavation below ground levels and are to be paid accordingly. In these chapter
no lift will be converted into horizontal lead.

Note 40 Unless otherwise stated, the dismantalling rates include sorting and stacking dismentalled
material and removing the same within the distance of 100 metres. The rate cover the the cost of
all tools and plants, ladders, scaffolding and other adjuncts required or dismantalling. while
dismantaling also to take all necessary precautions of public property and keeping down the dust
and nuisance etc.

Note 41 The rates are including cost of steel shuteering. So only steel shuteering is to be used.

Note 42 The labour rates as well as through rates includes cost of curing and protection in bad weather
conditions.
Note 43 The rates in these chapters are by automatic batch mixing plants or RMC, by using vibrator. For
M20 and rich CC, mix should be got designed from competant lab with cement, fine and coarse
ingradients along with water ratio to be used.

Note 44 The rates of brick work covered under chapter 29 are by using first class bricks. Second class
bricks will not be permiited even by reducing the item rate.

Note 45 Through rates of mild steel placed in RCC where not covered through rate of RCC, includes
wastage and cost of binding wire.

Note 46 The rates of all items in CSR are in Indian Rupees, including all taxes and contractors profit.

Chapter-29 Page 503 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

29.1-A Excavation manually in trenches with straight


or open cutting in built up street/ lane having
wall to wall width of street/ lane upto 3.0
metre, for intramural sullage drains,
extramural intercepting drains and outfall
drains, storm water channels and other work
contingent or incident thereto, to full
dimensions and depth as shown on the
drawings or as shall be required by Engineer-
in-charge including dressing to correct
sections and dimensions according to
templates and levels, dewatering of rain
water, diversion of traffic. Providing and fixing
and maintenance of caution boards, fencing,
night signals, for leads upto 15m and for all
lifts and subsequent refilling, watering and
dressing upto groung level, including removal
of surplus spoil from the site upto 15 metre
distance complete in all respects.

i All classes of soil except rocky


Cum. 171.00 171.00 188.00 188.00

ii For Ordinary gravel soil having gravel


upto 40% Cum. 257.00 257.00 283.00 283.00

iii For semi conglomerate soil of having


gravel/boulder above 40% upto 50% Cum. 257.00 257.00 283.00 283.00

Chapter-29 Page 504 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.1 Excavation in trenches with straight or open
B cutting in streets, lanes or in open areas for
intramural sullage drains, intramural
intercepting drains and outfall drains storm
water channels and other work contingent or
incident thereto, by mecanical means (JCB or
Hydraulic excavator) including manually
dressing of bed, trimming of sides and sides
slopes to full dimensions and depth as shown
on the drawings or as shall be required by
Engineer-in-charge including dressing to
correct sections and dimensions according to
templates and levels, dewatering of rain
water, diversion of traffic, providing and fixing
and maintenance of caution boards, fencing,
night signals, watching etc. subsequent
refilling , watering and dressing upto ground
level for lead upto 15 m and for all lifts
including disposing surplus soils up to 15
metre complete in all respects.

A Depth upto 2.00 m.


i All kinds of soil except rocky
Cum. 89.00 89.00 98.00 98.00

ii For Ordinary soil having gravel up to


Cum. 101.00 101.00 111.00 111.00
40%

iii For Semi Conglomerate soil having


Cum. 108.00 108.00 119.00 119.00
gravel bolder above 40% up to 50%

29.2 Earth work in excavation for storage and


sedimentation tanks, high level tanks, filter
beds, clear water reservoirs, pump houses,
sumps, screening chambers and other similar
works having straight or open cuttings in
foundations trenches etc. with 3D Excavator/
JCB including manually dressing of bed,
trimming of sides and side slopes to full
dimension and depth as shown on the
drawings or as shall be required by Engineer-
in-charge, including dressing of bottom and
sides of trenches, stacking the excavated soil
clear from the excavation and subsequent
filling around plinth/structures including
watering dressing and disposal of surplus
soils as directed upto 15 metre complete in all
respects.

A Depth upto 1.5 m B.G.L

Chapter-29 Page 505 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

i All classes of soil except rocky


Cum. 84.00 83.00 92.00 91.00

ii For Ordinary gravel soil having gravel


Cum. 106.00 105.00 117.00 116.00
upto 40%

iii For semi conglomerate or soil of the


nature of pick and jumper work Cum. 113.00 112.00 124.00 123.00

B Where depths of excavation exceeds 2.0


metre below ground levels or total quantity of
excavation is more than 100 cum

Note Where depths of excavation exceeds


2.0 meter below ground levels or total Total excavation will be paid as per chapter
quantity of excavation is more than 100 6.21 and quantity of back filling quantity as per
item 4.1 (a)
cum

29.3 Extra for rehandling earth beyond 15 Extra for rehandling of earth if any beyond
metre on item No. 29.1, 29.2A, 29.4 specified lead, will be payable under item
and 29.5 5.1(i) for 2nd, 3rd and susequent chain upto
0.5 km with the prior approved by the
cum Engineer in charge depending upon site
conditionds. In case rehandling exceeds 0.5
km distance payment will be made as per item
5.2(i) after deducting the cost of first chain of
30 metre.

29.4 Excavation of trenches in a Streets, Lanes or


in Open Area for Storm Sewers and
Manholes to Full Depths as Shown in
Drawings,excluding Shoring, Timbering of
Poling Board Frame System Type, dressing
to correct sections and dewatering, provision
for diversion for traffic, protection of existing
services i.e. telephone cables ,electric lines,
water supply lines and gas lines.night signals,
profiles, Pegs, Sight rails, boning rods,
crossing over trenches for access to the
houses, watching, fencing etc., fixing and
maintenance of caution boards, refilling
trenches, watering of refill in 15 cm layers,
ramming and restoration of surface to original
conditions and removal of Surplus Spoil from
the Site of Works, for all Works other than
connections to Ventilating Shafts upto a Lead
of 15 mtr

A For depth not exceeding 2 m. below Ground


level

Chapter-29 Page 506 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
i All classes of soil except rocky
cum 224.00 224.00 246.00 246.00

ii For Ordinary gravel soil having gravel


upto 40% cum 313.00 313.00 344.00 344.00

iii For semi conglomerate soil of having


gravel/boulder above 40% upto 50% cum 257.00 256.00 283.00 282.00

B For depth not exceeding 2 metres but not


exceeding 3 metres below natural ground
level :

i All classes of soil except rocky


cum 251.00 251.00 276.00 276.00

ii For Ordinary gravel soil having gravel


cum 358.00 358.00 394.00 394.00
upto 40%

iii For semi conglomerate soil of having


cum 510.00 509.00 561.00 560.00
gravel/boulder above 40% upto 50%

C For depth exceeding 3 ms but not exceeding


4.5 ms below natural ground level

i All classes of soil except rocky


cum 298.00 298.00 328.00 328.00

ii For Ordinary gravel soil having gravel


cum 425.00 425.00 468.00 468.00
upto 40%

iii For semi conglomerate soil of having


cum 610.00 610.00 671.00 671.00
gravel/boulder above 40% upto 50%

D For depth exceeding 4.5 ms but not


exceeding 6 ms below natural ground level

i All classes of soil except rocky


cum 401.00 400.00 441.00 440.00

ii For Ordinary gravel soil having gravel


cum 559.00 559.00 615.00 615.00
upto 40%

iii For semi conglomerate soil of having


cum 817.00 817.00 899.00 899.00
gravel/boulder above 40% upto 50%

E For depth exceeding 6 ms but not exceeding


7.5 ms below natural ground level

Chapter-29 Page 507 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
i All classes of soil except rocky cum 454.00 454.00 499.00 499.00

ii For Ordinary gravel soil having gravel


cum 610.00 610.00 671.00 671.00
upto 40%

iii For semi conglomerate soil of having


cum 900.00 899.00 990.00 989.00
gravel/boulder above 40% upto 50%

F For depth exceeding 7.5 ms but not


exceeding 9 ms below natural ground level

i All classes of soil except rocky cum 530.00 530.00 583.00 583.00

ii For Ordinary gravel soil having gravel


cum 688.00 688.00 757.00 757.00
upto 40%

iii For semi conglomerate soil of having


cum 585.00 585.00 644.00 644.00
gravel/boulder above 40% upto 50%

29.5 Excavation in trenches with straight or open


cutting in streets, lanes or in open area with
3D/JCB or excavator including manually
dressing bed, trimming sides and side slopes
for sewers and manholes to full depths as
shown in drawings,including, dressing to
correct sections and dewatering, provision for
diversion for traffic, protection of existing
services i.e. telephone cables, electric lines,
water supply lines and gas lines etc. night
signals, profiles, pegs, sight rails, boning
rods, watching, etc., fixing and maintenance
of caution boards, fencing, refilling trenches,
watering, ramming and restoration of surface
to original level and removal of surplus spoil
from the site of works, upto one chain (15m)
complete in all respects.

a Depth not exceeding 3 m. BGL

i All kinds of soil except rocky cum 99.00 99.00 109.00 109.00

ii For Ordinary Soil having gravel 40% cum 134.00 134.00 147.00 147.00

iii For Semi Conglomerate soil having


gravel/boulder above 40% up to 50% cum 216.00 216.00 238.00 238.00

b For depth exceeding 3.00 m but not


exceeding 4.5 B.G.L

Chapter-29 Page 508 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

i All kinds of soil except rocky Cum. 115.00 115.00 127.00 127.00

ii For Ordinary Soil having gravel 40% Cum. 134.00 134.00 147.00 147.00

iii For Semi Conglomerate soil having


gravel/boulder above 40% up to 50% cum 216.00 216.00 238.00 238.00

c For depth exceeding 4.50 m but not


exceeding 6.00 B.G.L

i All kinds of soil except rocky


cum 162.00 162.00 178.00 178.00

ii For Ordinary Soil having gravel 40%


cum 210.00 210.00 231.00 231.00

iii For Semi Conglomerate soil having


gravel/boulder above 40% up to 50% cum 289.00 289.00 318.00 318.00

d For depth exceeding 6.00 m but not


exceeding 7.50 B.G.L

i All kinds of soil except rocky cum 169.00 169.00 186.00 186.00

ii for Ordinary Soil having gravel 40% cum 216.00 216.00 238.00 238.00

iii for Semi Conglomerate soil having


gravel/boulder above 40% up to 50% cum 306.00 305.00 337.00 336.00

e For depth exceeding 7.50 m but not


exceeding 9.00 B.G.L

i All kinds of soil except rocky cum 192.00 192.00 211.00 211.00

ii for Ordinary Soil having gravel 40% cum 250.00 250.00 275.00 275.00

iii for Semi Conglomerate soil having


cum 337.00 337.00 371.00 371.00
gravel/boulder above 40% up to 50%

The rates for excavation beyond 4.50 depth are same for manual as well as by mechanical
Note :-
mean

Chapter-29 Page 509 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.6 Extra over and above the rate of item No.
29.2, 29.4, 29.5 ( a to e) for lowering sub-soil
water level from its natural level, as decided
by the Engineer-in-charge, by every 0.30 m
depth (upto requisite depth), including cost of
bore holes machinery and carrying out the
work in safe manner complete in all respects.

It is assumed that 120 meters sewer will be


laid in one month. Boring on both sides
alternatively at 3 meters C/C and pumping of
water with 5.00 B.H.P motors working 24
hours onl 8 nos . Bores, 4 on each side of the
sewer will be sufficient to lower the sub soil
water level upto 2.1 mteres.

a For sewers below 760 mm i/d. m 821.00 821.00 903.00 903.00

b For Sewer 760mm i/d and above m 963.00 963.00 1059.00 1059.00

Note:1 In case of deep excavation for item no 29.2 above the excavation may be done giving
appropriate side slow which may be fixed by Engineer-in-charge.

Note:2 The rates for item No. 29.1 to 29.5 inclusive, cover the cost of removing tree and roots and
removal of kankare and other hard material met in the excavation

Note:-3 The maximum and minimum width of trenches and excavation for which payment shall be
admissible to the contractor shall be those laid down in the contract specification

Note:-4 The depth of spring level below ground level from where the wet sinking of excavation below
spring level is to be done will be decided by the Engineer-in-charge and the decision will be
final and binding on the contractor. Where ever water is depressed by pumping, rate shall be
for wet earth work if actually wet and not for work under standing or flowing water and
wetness allowance shall be payable only after obtaining the written approval of the
superintending Engineer.

Note:-5 If the excavation for any sewer shall be carried out by cut and cover i.e. sinking shafts and
tunneling in between, the contractor shall be paid for such work as if the trench had been
opened the full length, but no extra shall be allowed other than the full measurement of the
trench excavation @ of item No. 29.4. it will be intirely be at the discretion of the Engineer-in-
charge to permit excavation by cut and cover method. Back filling of shafts and tunnels must
be at all times be carried out throughly and to the satisfaction of Engineer-in-charge.

Chapter-29 Page 510 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
Note:-6 If any excavation of trenches in which timbering has not been done has to be abondoned
due to change of alignment of the sewer necessiated by any obstruction such as pipe line,
electric or telephone cables, wired poles comeing in the way of the sewer or for any other
cause what so ever the contractor will be paid @ 95.36, 131.32 and 139.14 per cum for all
classes of soil, except rocky, gravel solid and conglomerate solid respectively in plain or
submountainous area such excavation not with standingthat he may have made
arrangments the timbering of such trenches or actually brought it to the site payment for
abandoned treanches at the above rate will include for the back filling of the trenches in 15
cm layers, well watered and consolidatated and for the restoration of the site to its original
conditio.

29.7 A Wet Earth work

i i) Extra for wet earth work from bottom


of excavation upto level of sub soil water Cum 36.00 36.00 39.6 39.6

ii ii) Extra for wet earth work from level of


sub soil water upto 30 cm above Cum 18.00 18.00 19.8 19.8

29.7 B Extra for filling earth in 15 cm layers


and compaction

i For item no. 29.1 to 29.2 & 29.4 to 29.5


Cum 52.00 52.00 57.00 57.00

29.8 Provding and fixing timbering on face of


trenches if required for sewers and manholes
for item 29.4 and 29.5 irrespective of the
depth, measuring each timbered surfaces of
trench on which timbering is done.

A Type-I Simple form of timbering

i For trench heavy width up to 1 mtr sqm 15.00 57.00 17.00 59.00

ii For trench having width above 1m and


upto 2m sqm 15.00 82.00 17.00 84.00

iii For trench having width above 2m and


upto 3m sqm 15.00 107.00 17.00 109.00

iv For trench having width above 3m and


upto 4m sqm 15.00 133.00 17.00 135.00

B Type-II Poling board frame type


timbering
i For trench heavy width up to 1 mtr sqm 26.00 79.00 29.00 82.00

ii For trench having width above 1 mtr and


sqm 26.00 101.00 29.00 104.00
upto 2.0m

Chapter-29 Page 511 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

iii For trench having width above 2 mtr and


sqm 26.00 123.00 29.00 126.00
upto 3.0m

iv For trench having width above 3 mtr and


sqm 26.00 144.00 29.00 147.00
upto 4.0m

C Close board frame type (Confined )


timbering
i For trench heavy width up to 1 mtr sqm 35.00 101.00 39.00 105.00

ii For trench having width above 1 mtr and


sqm 35.00 123.00 39.00 127.00
upto 2.0m

iii For trench having width above 2 mtr and


sqm 35.00 145.00 39.00 149.00
upto 3.0m

iv For trench having width above 3 mtr and


sqm 35.00 166.00 39.00 170.00
upto 4.0m

29.9 Extra rate for shuttering in Confined Earth


work as per specifications & desired by
Engineer-in-Charge.
a For trenches having width upto 2.0m sqm 605.00 605.00 666.00 666.00

b For trenches having width above 2.0m


upto 3.00m sqm 610.00 610.00 671.00 671.00

c For trenches having width 3.00m upto


4.00m sqm 616.00 616.00 678.00 678.00

29.10 Providing & fixing steel Box timbering on


faces of trenches if required measuring each
sqm 181.00 207.00 199.00 225.00
surface of trench where shuttering is done up
to 4m depth.

29.11 Dismantling existing drains of different size


cunnets, section only excluding recovery of all
useable materials, stacking the same within
100 metre from site of dismantled works and
disposal of all rubish off site of works.

(a) House connection drains. m 19.00 19.00 21.00 21.00

(b) Type I drain. m 29.00 29.00 32.00 32.00

(c) Type II Drain m 67.00 67.00 74.00 74.00

Chapter-29 Page 512 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(d) Type III Drain m 85.00 85.00 94.00 94.00

(e) Type IV Drain m 100.00 100.00 110.00 110.00

Brick Flooring & Pitching

A Reimbursement to Drains & flooring in strips

29.12 Tega 7.5 cm thick formed of first class bricks


on end laid in cement sand mortar 1:5 and
projecting to a maximum height of not more
m 42.00 109.00 46.00 113.00
than 12.5 cm above top of drain along house
sides of drains where required for protection
of house walls.

29.13 Tega 11.50 cm thick formed of first class


bricks on end laid in cem. sand Mortar 1:5 m 54.00 153.00 59.00 158.00

29.14 First class flat brick 7.50 cm thick laid in


reimbursements in and on cement mortar 1:5
on sides of drains and in other work where
required over lime concrete or other m 49.00 333.00 54.00 338.00
foundations. All joints to be left completely
filled and struck flush.

29.15 First class flat brick 7.5 cms thick laid in re-
imbursement in and on 1:6 cement sand m 49.00 336.00 54.00 341.00
mortar.

29.16 First class flat brick 7.50 cm thick laid in


reimbursement in and on 1:5 cement sand m 49.00 333.00 54.00 338.00
mortar.

29.17 First class for brick 7.50 cm thick laid in


reimbursements in and on 1:4 cement sand m 49.00 343.00 54.00 348.00
mortar.

29.18 First class brick on edge 11.50 cm thick laid


in reimbursements in and on cement mortar
1:4 on sides of drains and in other work
where required over lime concrete or other m 49.00 498.00 54.00 503.00
foundation, all joints to be left complete filled
and struck flush.

29.19 First class brick on edge 11.50 cm thick laid


in reimbursements in and on 1:6 cement sand m 49.00 478.00 54.00 483.00
mortar.

Chapter-29 Page 513 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.20 First class brick on edge 11.50 cm thick laid
in reimbursements in and on 1:5 cement sand m 49.00 489.00 54.00 494.00
mortar.

29.21 First class brick on edge 11.50 cm thick laid


in reimbursements in and on 1:4 cement sand m 49.00 498.00 54.00 503.00
mortar.

B Flooring and Paving

29.22 First class dry flat brick flooring and paving in


ordinary bonded courses or in herring bond or
other special courses or bond laid to template
over rammed and dressed foundations and to
correct longitudinal and cross slopes as shall
be required by the Engineer-in-Charge. All sqm 60.00 280.00 66.00 286.00
joints shall be thoroughly filled with dry sand
grouting which shall be applied to a thickness
of not less 20mm over the surface of the
flooring and brushed into the joints. All joints
shall be fully filled with sand.

29.23 First class dry brick on edge flooring or paving


in ordinary bonded courses or in herring bond
or other special courses or bond, laid as sqm 70.00 419.00 77.00 426.00
described in item no. 29.22.

29.24 First class flat brick paving or flooring laid


over and in cement sand mortar 1:6 in
ordinary bonded courses or in herring bone or
other special courses, to templates, over
dressed foundation and to correct longitudinal sqm 74.00 328.00 81.00 335.00
and cross slopes as shall be required by the
Engineer-in-charge. All joints shall be filled
with mortar and struck flushed as the work
proceeds.

29.25 First class flat brick paving or flooring laid


over and in cement sand mortar 1:5 in
ordinary bonded courses or in herring bone or
other special courses, to templates, over
dressed foundation and to correct longitudinal sqm 74.00 331.00 81.00 338.00
and cross slopes as shall be required by the
Engineer-in-charge. All joints shall be filled
with mortar and struck flushed as the work
proceeds.

Chapter-29 Page 514 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.26 First class brick on edge paving or flooring
laid over and in cement sand mortar 1:6 in
ordinary bonded courses or in herring bone or
other special courses, to templates, over
dressed foundation and to correct longitudinal sqm 122.00 519.00 134.00 531.00
and cross slopes as shall be required by the
Engineer-in-charge. All joints shall be filled
with mortar and struck flushed as the work
proceeds.

29.27 First class brick on edge paving or flooring


laid over and in cement sand mortar 1:5 in
ordinary bonded courses or in herring bone or
other special courses, to templates, over
dressed foundation and to correct longitudinal sqm 118.00 520.00 130.00 532.00
and cross slopes as shall be required by the
Engineer-in-charge. All joints shall be filled
with mortar and struck flushed as the work
proceeds.

29.28 First class brick on edge paving or flooring


laid over and in cement sand mortar 1:4 in
ordinary bonded courses or in herring bone or
other special courses, to templates, over
dressed foundation and to correct longitudinal
sqm 118.00 525.00 130.00 537.00
and cross slopes as shall be required by the
Engineer-in-charge. All joints shall be filled
with mortar and struck flushed as the work
proceeds.

29.29 Extra over and above the rates for items No.
29.22 to 29.28 inclusive for pitching on the
slope to sullage drains above cunnettes and sqm 16.00 16.00 18.00 18.00
to storm water channels, etc. where required.

29.30 Brick ballast well or over burnt, broken and


screened through a 32mm x 32mm square
mesh screen laid consolidated and rammed
to a finished thickness of 50mm to template sqm 32.00 76.00 35.00 79.00
and levels to correct longitudinal slopes cross
slopes cambers, etc. under paving or flooring.

29.31 Brick ballast well or over burnt, broken and


screened through a 32mm x 32mm square
mesh screen laid consolidated and rammed sqm 48.00 118.00 53.00 123.00
to a finished thickness of 75mm as above.

Chapter-29 Page 515 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.32 Clay concrete, consisting or 100 parts by
volume of well burnt or over burnt brick ballast
screened through 32mm x 32mm square
mesh screen mixed with 33 parts by volume
of fine Puddle clay, thoroughly mixed, laid
consolidated and rammed to a finished sqm 28.00 72.00 31.00 75.00
thickness of 50mm to template and levels and
to a correct longitudinal slopes, cross slopes,
cambers, etc. under paving or flooring as
shall be required by the Engineer-in-Charge.

29.33 Clay concrete as above but laid consolidated


and rammed to a finished thickness of 75mm Sqm 33.00 99.00 36.00 102.00
as above.

29.34 Providing & fixing 560 mm, 500 mm and 450


mm internal diametre circular or 450 mm x
600 mm clear inside opening rectangular
RCC manhole cover and frame ISI marked as
per IS:12592-2002 including carriage from the
stores of the Engineer-in-charge to site of
work, loading, unloading including stacking
and setting the same to correct lines over
manholes including cement concrete copping
(M:20) around the frame etc. Dia of steel for
lifting hook is 16mm. (for EHD and HD).

A RCC Man hole cover with Frame

a 560mm i/d RCC man hole cover with


frame as per ISI

i Extra Heavy duty each 296.00 2128.00 326.00 2158.00

ii Heavy duty each 296.00 1942.00 326.00 1972.00

iii Medium duty each 296.00 1709.00 326.00 1739.00

iv Light duty each 296.00 1538.00 326.00 1568.00

b 500mm i/d RCC man hole cover with


frame as per ISI

i Extra Heavy duty each 284.00 2019.00 312.00 2047.00

ii Heavy duty each 284.00 1823.00 312.00 1851.00

Chapter-29 Page 516 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
iii Medium duty each 284.00 1561.00 312.00 1589.00

iv Light duty each 284.00 1390.00 312.00 1418.00

c 450mm i/d RCC man hole cover with


frame as per ISI

i Extra Heavy duty each 250.00 1735.00 275.00 1760.00

ii Heavy duty each 250.00 1631.00 275.00 1656.00

iii Medium duty each 250.00 1342.00 275.00 1367.00

iv Light duty each 250.00 1172.00 275.00 1197.00

d 455 x 610 mm rectangular clear


opening RCC man hole cover with

i Extra Heavy duty each 250.00 2129.00 275.00 2154.00

ii Heavy duty each 250.00 1853.00 275.00 1878.00

iii Medium duty each 250.00 1497.00 275.00 1522.00

iv Light duty each 250.00 1316.00 275.00 1341.00

29.35 Foot Rest for Manhole.

Chapter-29 Page 517 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
Providing orange colour safety footrest
of minimum 6mm thick plastic
encapsulated as per IS:10910 on 12mm
dia steel bar confirming to IS: 1786
having minimun cross section as 23mm
x 25mm and over all minimum length
263mm and width as 165mm with
minimum 112mm space between
protruted legs having 2mm tread on top
surface by ribbing or chequering besides
necessary and adequate anchoring each 61.00 209.00 67.00 215.00
projections on tail length on 138 mm as
per standard drawing and suitable to
with stand the bend test and chemical
resistance test as per specification and
having manufacturer's permanent
identification mark to be visible even
after fixing, including fixing in manholes
with 230x150x75cm cement concrete
block 1:2:4 (1 cement: 2 sand: 4 stone
aggragate) complete as per design.

29.36 Providing and fixing RCC manhole covers


only
A 560mm i/d RCC man hole cover only
as per ISI

i Extra Heavy duty each 48.00 1188.00 53.00 1193.00

ii Heavy duty each 48.00 1110.00 53.00 1115.00

iii Medium duty each 48.00 874.00 53.00 879.00

iv Medium duty each 48.00 769.00 53.00 774.00

B 500mm i/d RCC man hole cover only


as per ISI

i Extra Heavy duty each 48.00 1110.00 53.00 1115.00

ii Heavy duty each 48.00 1057.00 53.00 1062.00

iii Medium duty each 48.00 821.00 53.00 826.00

iv Medium duty each 48.00 743.00 53.00 748.00

C 450mm i/d RCC man hole cover only


as per ISI

Chapter-29 Page 518 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
i Extra Heavy duty each 48.00 1018.00 53.00 1023.00

ii Heavy duty each 48.00 965.00 53.00 970.00

iii Medium duty each 48.00 716.00 53.00 721.00

iv Light duty each 48.00 703.00 53.00 708.00

d 455 x 610 mm rectangular RCC man


hole cover only as per ISI

i Extra Heavy duty each 48.00 1302.00 53.00 1307.00

ii Heavy duty each 48.00 1216.00 53.00 1221.00

iii Medium duty each 48.00 956.00 53.00 961.00

iv Light duty each 48.00 841.00 53.00 846.00

29.37 Providing and Erection of cast RCC


ventilating column having minimum 200mm
internal diametre including excavation,
basescolumns, caps, cowls or wire domes,
etc. complete including carriage from the
stores of the Engineer-In-Charge of works, to
sites of works, loading and unloading fixing
and jointing and setting the same in position
complete in all respects.

a 11 m. Height each 23162.00 60242.00 25478.00 62558.00

b 9.10 m. Height each 18745.00 50428.00 20620.00 52303.00

PAINTING VENT SHAFTS

29.38 Finishing RCC vent shafts minimum 200mm


internal Diametre with exterior decorative
cement based paints on new work two coats
to give and even finish.

a 11 m. Height R.C.C. ventilator shaft each 960.00 1188.00 1056.00 1284.00

b 9 m. Height R.C.C. ventilator shaft each 786.00 973.00 865.00 1052.00

29.39 Finishing RCC vent shaft of minimum


200mm internal Diametre with exterior
decorative cement based paints on old work
one coat to give an even shade.

Chapter-29 Page 519 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
a 11 m. Height R.C.C. ventilator shaft each 640.00 711.00 704.00 775.00

b 9 m. Height R.C.C. ventilator shaft each 524.00 582.00 576.00 634.00

29.40 Construction of standard RCC cum bricks


circular sewers complete in all respects as
per drawing design and specifications PCC
1:2:4, RCC M-20, brick work of innner ring in
1:2 cement sand mortar, outer ring in 1:5
cement sand mortar, total inner plaster 12.5
mm thick using 1:2 cement sand mortar with
1 mm thick neat cement rendring, steel
reinforcement TMT Fe 500, 3mm thick steel
form work, complete in all respects by using
mechanical mixer and vibrator.

Type - I (Sewer for lower sub soil water tables


A / dry conditions)

a 760mm i/d P.T. sewer m 2637.00 8095.00 2901.00 8359.00

b 915mm i/d P.T. sewer m 3044.00 9267.00 3348.00 9571.00

c 990mm i/d P.T. sewer m 7223.00 25924.00 7945.00 26646.00

d 1065mm i/d P.T. sewer m 3444.00 10433.00 3788.00 10777.00

e 1145mm i/d P.T. sewer m 3676.00 11182.00 4044.00 11550.00

f 1220mm i/d P.T. sewer m 3875.00 11581.00 4263.00 11969.00

g 1295mm i/d P.T. sewer m 4098.00 12430.00 4508.00 12840.00

h 1370mm i/d P.T. sewer m 4306.00 13045.00 4737.00 13476.00

i 1450mm i/d P.T. sewer m 4517.00 13663.00 4969.00 14115.00

j 1525mm i/d P.T. sewer m 4725.00 14277.00 5198.00 14750.00

B Type II (Under Medium Sub - Soil water


conditions)

a 760mm i/d P.T. sewer m 2672.00 8428.00 2939.00 8695.00

b 915mm i/d P.T. sewer m 3061.00 9563.00 3367.00 9869.00

c 990mm i/d P.T. sewer m 3256.00 10143.00 3582.00 10469.00

d 1065mm i/d P.T. sewer m 3444.00 10694.00 3788.00 11038.00

e 1145mm i/d P.T. sewer m 4080.00 12807.00 4488.00 13215.00

f 1220mm i/d P.T. sewer m 4267.00 13351.00 4694.00 13778.00

Chapter-29 Page 520 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

g 1295mm i/d P.T. sewer m 4149.00 13711.00 4564.00 14126.00

h 1370mm i/d P.T. sewer m 5114.00 16284.00 5625.00 16795.00

i 1450mm i/d P.T. sewer m 5352.00 17027.00 5887.00 17562.00

j 1525mm i/d P.T. sewer m 5585.00 17739.00 6144.00 18298.00

C Type III (Under High Sub - Soil water


conditions)

a 760mm i/d P.T. sewer m 3227.00 10603.00 3550.00 10926.00

b 915mm i/d P.T. sewer m 3966.00 12907.00 4363.00 13304.00

c 990mm i/d P.T. sewer m 4241.00 13780.00 4665.00 14204.00

d 1065mm i/d P.T. sewer m 4214.00 14314.00 4635.00 14735.00

e 1145mm i/d P.T. sewer m 4221.00 15261.00 4643.00 15683.00

f 1220mm i/d P.T. sewer m 5158.00 17186.00 5674.00 17702.00

g 1295mm i/d P.T. sewer m 5429.00 18067.00 5972.00 18610.00

h 1370mm i/d P.T. sewer m 5704.00 18963.00 6274.00 19533.00

i 1450mm i/d P.T. sewer m 5990.00 19894.00 6589.00 20493.00

j 1525mm i/d P.T. sewer m 6263.00 20483.00 6889.00 21109.00

Salt Glazed Stone ware Pipes sewers and


Drains

Chapter-29 Page 521 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.41 Providing, lowering, cutting & jointing salt
glazed stone ware pipes and specials ISI
marked as per IS: 651-2007 class Sp-1 into
trenches for all depths and laying out the
same to correct alignment, gradients, levels
etc., cutting of concrete beds and joints holes,
supporting the pipes and specials, in correct
position in a suitable rigid manner while the
same are being jointed and until the
surrounding benching, haunching and
envelopes are completed including jointing of
pipes and specials in trenches, using cement
sand mortar 1:1 and best spun Jute yarn as
per IS:1887, finishing and trowelling of each
joint at an angle of 45 degree with the
longitudinal axes of pipe, watering, keeping
the joint covered and wetted till the same are
cured, testing the sewerage line for leakage
and making all leakages and defects good as
laid in the contract specification, chipping and
finishing the cut surface to uniform finish to
the entire satisfaction of engineer-in-charge
Including all cartage etc complete in all
respects.

a 100mm i/d pipe m 159.00 285.00 175.00 301.00

b 150mm i/d pipe m 205.00 423.00 226.00 444.00

c 200mm i/d pipe m 212.00 487.00 233.00 508.00

d 250mm i/d pipe m 400.00 928.00 440.00 968.00

e 300mm i/d pipe m 461.00 1264.00 507.00 1310.00

f 400mm i/d pipe m 485.00 2549.00 534.00 2598.00

g 450mm i/d pipe m 647.00 3056.00 712.00 3121.00

j 600mm i/d pipe m 691.00 5852.00 760.00 5921.00

Chapter-29 Page 522 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.42 Providing, lowering in trenches to correct
gradient and allignments, jointing with tytone
rubber joint and cutting of RCC S/S pipes
having inside HDPE. lining ISI marekd as per
ISI code IS:458-2003 into trenches for all
depths and laying out the same to correct
alignment, gradients, levels etc.,cutting of
concrete beds and joints holes, supporting the
pipes and specials in correct position in a
suitable rigid manner while the same are
being jointed and until the surrounding
benchings, haunches and envelopes are
completed. The pipes shall rest on the beds
at all joints through their lengths and to
ensure this, testing the pipes for leakage and
making good the same leakage and all
defects to the entire satisfaction of the
Engineer incharge including all cartage etc
copmplete in all respects.

A R.C.C. pipe with inside H.D.P.E. lining


class- NP-3

a 400mm i/d pipe with inside H.D.P.E.


m 500.00 3390.00 550.00 3440.00
lining

b 450mm i/d pipe with inside H.D.P.E.


m 586.00 4068.00 645.00 4127.00
lining

c 500mm i/d pipe with inside H.D.P.E.


m 660.00 4734.00 726.00 4800.00
lining

d 600mm i/d pipe with inside H.D.P.E.


m 811.00 5696.00 892.00 5777.00
lining

e 700mm i/d pipe with inside H.D.P.E.


m 920.00 7485.00 1012.00 7577.00
lining

f 800mm i/d pipe with inside H.D.P.E.


m 1131.00 8978.00 1244.00 9091.00
lining

g 900mm i/d pipe with inside H.D.P.E.


m 1360.00 10700.00 1496.00 10836.00
lining

h 1000mm i/d pipe with inside H.D.P.E.


m 1499.00 12103.00 1649.00 12253.00
lining

i 1100mm i/d pipe with inside H.D.P.E.


m 1822.00 14533.00 2004.00 14715.00
lining

j 1200mm i/d pipe with inside H.D.P.E.


m 1982.00 15843.00 2180.00 16041.00
lining

Chapter-29 Page 523 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
k 1400mm i/d pipe with inside H.D.P.E.
m 1982.00 20954.00 2180.00 21152.00
lining

l 1600mm i/d pipe with inside H.D.P.E.


m 1982.00 24654.00 2180.00 24852.00
lining

m 1800mm i/d pipe with inside H.D.P.E.


m. 1982.00 28585.00 2180.00 28783.00
lining

n 2000mm i/d pipe with inside H.D.P.E.


m. 1982.00 35207.00 2180.00 35405.00
lining

o 2200mm i/d pipe with inside H.D.P.E.


m. 1982.00 40239.00 2180.00 40437.00
lining

p 2400mm i/d pipe with inside H.D.P.E.


m. 1982.00 44593.00 2180.00 44791.00
lining

q 2600mm i/d pipe with inside H.D.P.E.


m. 1982.00 53645.00 2180.00 53843.00
lining

B R.C.C. pipe with inside H.D.P.E. lining


class- NP-4

a 400mm i/d pipe with inside H.D.P.E.


m. 500.00 3542.00 550.00 3592.00
lining

b 450mm i/d pipe with inside H.D.P.E.


m. 586.00 4275.00 645.00 4334.00
lining

c 500mm i/d pipe with inside H.D.P.E.


m 660.00 4996.00 726.00 5062.00
lining

d 600mm i/d pipe with inside H.D.P.E.


m 811.00 6186.00 892.00 6267.00
lining

e 700mm i/d pipe with inside H.D.P.E.


m 920.00 8088.00 1012.00 8180.00
lining

f 800mm i/d pipe with inside H.D.P.E.


m 1131.00 10162.00 1244.00 10275.00
lining

g 900mm i/d pipe with inside H.D.P.E.


m 1360.00 11837.00 1496.00 11973.00
lining

h 1000mm i/d pipe with inside H.D.P.E.


m 1499.00 13514.00 1649.00 13664.00
lining

i 1100mm i/d pipe with inside H.D.P.E.


m 1822.00 16361.00 2004.00 16543.00
lining

j 1200mm i/d pipe with inside H.D.P.E.


m 1982.00 17829.00 2180.00 18027.00
lining

Chapter-29 Page 524 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
k 1400mm i/d pipe with inside H.D.P.E.
m 1982.00 23777.00 2180.00 23975.00
lining

l 1600mm i/d pipe with inside H.D.P.E.


m 1982.00 27445.00 2180.00 27643.00
lining

m 1800mm i/d pipe with inside H.D.P.E.


m 1982.00 32693.00 2180.00 32891.00
lining

n 2000mm i/d pipe with inside H.D.P.E.


m 1982.00 38464.00 2180.00 38662.00
lining

o 2200mm i/d pipe with inside H.D.P.E.


m 1982.00 44814.00 2180.00 45012.00
lining

p 2400mm i/d pipe with inside H.D.P.E.


m 1982.00 51797.00 2180.00 51995.00
lining

q 2600mm i/d pipe with inside H.D.P.E.


m 1982.00 59532.00 2180.00 59730.00
lining

29.43 Providing, laying in trenches to correct


gradient and alignment and jointing of UPVC
pipes having ISI specification IS:15328-2003
class-SN-8 marked make Supreme, Finolex,
Kissan, Jain, Prince or equivalent good on
them and laying the same in trenches to
correct alignment and gradients, cutting and
jointing, testing for water tightness and
making good the leakages and defects
including cost of specials (Specials and
Solvent should be of same make as that of
pipes) complete in all respects.

a 110mm o/d pipe m 23.00 360.00 25.00 362.00

b 125mm o/d pipe m 23.00 412.00 25.00 414.00

c 160mm o/d pipe m 31.00 753.00 34.00 756.00

d 200mm o/d pipe m 45.00 1180.00 50.00 1185.00

e 250mm o/d pipe m 55.00 1810.00 61.00 1816.00

f 315mm o/d pipe m 71.00 2802.00 78.00 2809.00

Chapter-29 Page 525 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.44 Providing, laying in trenches and jointing of
HDPE pipes having ISI specification
IS:14333, PE100, class PN-6 marked on
them, make Reliance/ Hasti / Dura-Line ,
laying the same in trenches to correct
alignment and gradients, cutting and jointing
testing for water tightness and making good
the leakages and defects including cost of
specials complete in all respects.

a 110mm o/d pipe m 23.00 616.00 25.00 618.00

b 125mm o/d pipe m 23.00 783.00 25.00 785.00

c 160mm o/d pipe m 31.00 1272.00 34.00 1275.00

d 200mm o/d pipe m 45.00 1981.00 50.00 1986.00

e 250mm o/d pipe m 55.00 3067.00 61.00 3073.00

f 315mm o/d pipe m 71.00 4839.00 78.00 4846.00

g 400mm o/d pipe m 71.00 7922.00 78.00 7929.00

h 500mm o/d pipe m 71.00 12323.00 78.00 12330.00

i 630mm o/d pipe m 71.00 19467.00 78.00 19474.00

j 710mm o/d pipe m 71.00 24685.00 78.00 24692.00

k 800mm o/d pipe m 71.00 31294.00 78.00 31301.00

l 900mm o/d pipe m 71.00 39620.00 78.00 39627.00

m 1000mm o/d pipe m 71.00 48931.00 78.00 48938.00

29.45 Extra over the rate laid down in this schedule


for cement concrete work for making and
finishing benching and complicated floor work
in manholes including formation of channels Sqm 111.00 111.00 122.00 122.00
and bulldozing and smooth finishing the
surface accurately to templete.

Chapter-29 Page 526 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.46 Providing, lowering in trenches to correct
gradient and alignment, jointing with tyton
rubber joint and cutting of reinforced cement
concrete spigot and socketed pipes and
specials with rubber ring ISI marekd as per
IS code IS 458-2003 into trenches for all
depths and laying out the same to correct
alignment, gradients, levels etc. cutting of
concrete beds and joints holes, supporting the
pipes and specials in correct position in a
suitable rigid manner while the same are
being jointed and until the surrounding
benchings, haunches and envelopes are
completed. The pipes shall rest on the beds
at all joints through their lengths and fixing of
rubber ring, facing, testing the pipes for
leakage and making good the same leakage
and all defects to the entire satisfaction of the
Engineer-in-charge including all cartage etc.

A R.C.C. Pipe P -1
a 100mm i/d pipe m 54.00 508.00 59.00 513.00

b 150mm i/d pipe m 72.00 588.00 79.00 595.00

c 200mm i/d pipe m 92.00 670.00 101.00 679.00

d 250mm i/d pipe m 106.00 767.00 117.00 778.00

e 300mm i/d pipe m 122.00 1030.00 134.00 1042.00

f 400mm i/d pipe m 335.00 1532.00 369.00 1566.00

g 450mm i/d pipe m 380.00 1784.00 418.00 1822.00

h 500mm i/d pipe m 430.00 2164.00 473.00 2207.00

i 600mm i/d pipe m 512.00 3030.00 563.00 3081.00

j 700mm i/d pipe m 622.00 3470.00 684.00 3532.00

k 800mm i/d pipe m 758.00 4309.00 834.00 4385.00

l 900mm i/d pipe m 882.00 5837.00 970.00 5925.00

m 1000mm i/d pipe m 1067.00 6641.00 1174.00 6748.00

Chapter-29 Page 527 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
n 1100mm i/d pipe m 1248.00 7854.00 1373.00 7979.00

o 1200mm i/d pipe m 1423.00 8607.00 1565.00 8749.00

B R.C.C. Pipe NP -2

a 100mm i/d pipe m 54.00 417.00 59.00 422.00

b 150mm i/d pipe m 72.00 485.00 79.00 492.00

c 200mm i/d pipe m 92.00 555.00 101.00 564.00

d 250mm i/d pipe m 106.00 635.00 117.00 646.00

e 300mm i/d pipe m 126.00 852.00 139.00 865.00

f 400mm i/d pipe m 335.00 1292.00 369.00 1326.00

g 450mm i/d pipe m 380.00 1503.00 418.00 1541.00

h 500mm i/d pipe m 430.00 1817.00 473.00 1860.00

i 600mm i/d pipe m 512.00 2527.00 563.00 2578.00

j 700mm i/d pipe m 622.00 2901.00 684.00 2963.00

k 800mm i/d pipe m 758.00 3599.00 834.00 3675.00

l 900mm i/d pipe m 882.00 4846.00 970.00 4934.00

m 1000mm i/d pipe m 1067.00 5526.00 1174.00 5633.00

n 1100mm i/d pipe m 1248.00 6533.00 1373.00 6658.00

o 1200mm i/d pipe m 1423.00 7500.00 1565.00 7642.00

p 1400mm i/d pipe m 2196.00 10123.00 2416.00 10343.00

q 1600mm i/d pipe m 2783.00 12692.00 3061.00 12970.00

r 1800mm i/d pipe m 3218.00 15109.00 3540.00 15431.00

s 2000mm i/d pipe m 3370.00 17409.00 3707.00 17746.00

Chapter-29 Page 528 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
t 2200mm i/d pipe m 3993.00 20508.00 4392.00 20907.00

C R.C.C. Pipe NP -3

a 100mm i/d pipe m 54.00 522.00 59.00 527.00

b 150mm i/d pipe m 72.00 574.00 79.00 581.00

c 200mm i/d pipe m 92.00 733.00 101.00 742.00

d 250mm i/d pipe m 106.00 939.00 117.00 950.00

e 300mm i/d pipe m 126.00 1287.00 139.00 1300.00

f 400mm i/d pipe m 511.00 2636.00 562.00 2687.00

g 450mm i/d pipe m 580.00 3108.00 638.00 3166.00

h 500mm i/d pipe m 653.00 3585.00 718.00 3650.00

i 600mm i/d pipe m 805.00 4321.00 886.00 4402.00

j 700mm i/d pipe m 915.00 5184.00 1007.00 5276.00

k 800mm i/d pipe m 1134.00 6397.00 1247.00 6510.00

l 900mm i/d pipe m 1376.00 7863.00 1514.00 8001.00

m 1000mm i/d pipe m 1514.00 8973.00 1665.00 9124.00

n 1100mm i/d pipe m 1859.00 10485.00 2045.00 10671.00

o 1200mm i/d pipe m 2022.00 11422.00 2224.00 11624.00

p 1400mm i/d pipe m 2196.00 14397.00 2416.00 14617.00

q 1600mm i/d pipe m 2783.00 18261.00 3061.00 18539.00

r 1800mm i/d pipe m 3218.00 22259.00 3540.00 22581.00

s 2000mm i/d pipe m 3370.00 27071.00 3707.00 27408.00

t 2200mm i/d pipe m 3993.00 34801.00 4392.00 35200.00

Chapter-29 Page 529 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
u 2400mm i/d pipe m 4580.00 39613.00 5038.00 40071.00

v 2600mm i/d pipe m 5485.00 44743.00 6034.00 45292.00

D R.C.C. Pipe NP -4

a 100mm i/d pipe m 54.00 577.00 59.00 582.00

b 150mm i/d pipe m 72.00 626.00 79.00 633.00

c 200mm i/d pipe m 92.00 830.00 101.00 839.00

d 250mm i/d pipe m 106.00 1094.00 117.00 1105.00

e 300mm i/d pipe m 126.00 1600.00 139.00 1613.00

f 400mm i/d pipe m 511.00 2703.00 562.00 2754.00

g 450mm i/d pipe m 580.00 3157.00 638.00 3215.00

h 500mm i/d pipe m 653.00 3669.00 718.00 3734.00

i 600mm i/d pipe m 805.00 4874.00 886.00 4955.00

j 700mm i/d pipe m 915.00 5912.00 1007.00 6004.00

k 800mm i/d pipe m 1134.00 7202.00 1247.00 7315.00

l 900mm i/d pipe m 1376.00 9391.00 1514.00 9529.00

m 1000mm i/d pipe m 1514.00 10583.00 1665.00 10734.00

n 1100mm i/d pipe m 1859.00 12410.00 2045.00 12596.00

o 1200mm i/d pipe m 1832.00 13327.00 2015.00 13510.00

p 1400mm i/d pipe m 2196.00 18684.00 2416.00 18904.00

q 1600mm i/d pipe m 2783.00 23097.00 3061.00 23375.00

r 1800mm i/d pipe m 3218.00 29278.00 3540.00 29600.00

s 2000mm i/d pipe m 3370.00 35438.00 3707.00 35775.00

t 2200mm i/d pipe m 3993.00 45268.00 4392.00 45667.00

Chapter-29 Page 530 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

u 2400mm i/d pipe m 4580.00 48420.00 5038.00 48878.00

v 2600mm i/d pipe m 5485.00 58532.00 6034.00 59081.00

29.47 Extra for providing 1:2 cement sand mortar on


tytone rubber joint of RCC pipes having
sockets extended out of barrel, in trenches
including facing trowelling and finishing the
joints at the angle of 45 degree with faces of
socket keeping joints wet till cured, testing the
pipe joints for leakproof and making good all
leakage and defects as per specifications.

I NP1, NP2 and P-1 S/S joints pipes having


internal dia meter:-

a 100mm i/d pipe each 68.00 76.00 75.00 83.00

b 150mm i/d pipe each 91.00 100.00 100.00 109.00

c 200mm i/d pipe each 113.00 125.00 124.00 136.00

d 250mm i/d pipe each 136.00 149.00 150.00 163.00

e 300mm i/d pipe each 152.00 168.00 167.00 183.00

f 400mm i/d pipe each 169.00 187.00 186.00 204.00

g 450mm i/d pipe each 186.00 206.00 205.00 225.00

h 500mm i/d pipe each 203.00 224.00 223.00 244.00

i 600mm i/d pipe each 219.00 243.00 241.00 265.00

j 700mm i/d pipe each 236.00 262.00 260.00 286.00

k 800mm i/d pipe each 253.00 281.00 278.00 306.00

l 900mm i/d pipe each 270.00 300.00 297.00 327.00

m 1000mm i/d pipe each 286.00 318.00 315.00 347.00

n 1100mm i/d pipe each 303.00 337.00 333.00 367.00

o 1200mm i/d pipe each 320.00 356.00 352.00 388.00

p 1400mm i/d pipe each 353.00 393.00 388.00 428.00

Chapter-29 Page 531 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

q 1600mm i/d pipe each 387.00 431.00 426.00 470.00

r 1800mm i/d pipe each 420.00 469.00 462.00 511.00

s 2000mm i/d pipe each 454.00 506.00 499.00 551.00

t 2200mm i/d pipe each 487.00 544.00 536.00 593.00

II NP-3 & NP4 Pipes S/S joints having internal


dia meter of pipe:-

a 100mm i/d pipe each 68.00 76.00 75.00 83.00

b 150mm i/d pipe each 91.00 100.00 100.00 109.00

c 200mm i/d pipe each 113.00 125.00 124.00 0.00

d 250mm i/d pipe each 136.00 149.00 150.00 163.00

e 300mm i/d pipe each 152.00 168.00 167.00 183.00

f 400mm i/d pipe each 169.00 187.00 186.00 204.00

g 450mm i/d pipe each 186.00 206.00 205.00 225.00

h 500mm i/d pipe each 203.00 224.00 223.00 244.00

i 600mm i/d pipe each 219.00 243.00 241.00 265.00

j 700mm i/d pipe each 236.00 262.00 260.00 286.00

k 800mm i/d pipe each 253.00 281.00 278.00 306.00

l 900mm i/d pipe each 270.00 300.00 297.00 327.00

m 1000mm i/d pipe each 286.00 318.00 315.00 347.00

n 1100mm i/d pipe each 303.00 337.00 333.00 367.00

o 1200mm i/d pipe each 320.00 356.00 352.00 388.00

p 1400mm i/d pipe each 353.00 394.00 388.00 429.00

q 1600mm i/d pipe each 387.00 431.00 426.00 470.00

r 1800mm i/d pipe each 420.00 469.00 462.00 511.00

s 2000mm i/d pipe each 454.00 506.00 499.00 551.00

t 2200mm i/d pipe each 487.00 544.00 536.00 593.00

u 2400mm i/d pipe each 521.00 582.00 573.00 634.00

Chapter-29 Page 532 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
v 2600mm i/d pipe each 554.00 619.00 609.00 674.00

29.48 A Making soak pit 2.5 m outer Diametre 3.0


metre deep 230mm thick 1:5 brick work
honey comb with bricks of Ist Class and S.W.
drain pipe 100 mm Diametre, 1.8 m long
complete as per standard design.

With F.P.S. bricks


1 Soak
4133.00 22331.00 4546.00 22744.00
Pit

29.48 B Constructing soak pit 1.20x1.20x1.6 m deep,


230mm thick 1:5 brick work honey comb with
bricks of Ist Class filled with brickbats 1 Soak
285.00 1438.00 314.00 1467.00
including S.W. drain pipe 100 mm Diametre Pit
and 1.20 m long complete as per standard
design.

29.49 Providing & Fixing RCC Road Gully grating &


frame

a RCC Road Gully grating & frame size


610mm*457mm each 367.00 1442.00 404.00 1479.00

b RCC Road Gully grating & frame size


610mm*300mm each 367.00 1186.00 404.00 1223.00

c RCC Road Gully grating & frame size


457mm*457mm each 367.00 1271.00 404.00 1308.00

29.50 Constructing Punjab Standard Drain, type


house connection complete consisting of
cement concrete drain moulded and laid over
lime concrete foundation, rendered and
finished smooth with 6mm thick rendering m 76.00 156.00 84.00 164.00
concrete to be of 1:2½:5 parts by volume of
cement :sand: stone bajri and rendering to be
1:1 cement sand mortar.

29.51 Constructing Punjab standard drain type I as


m 114.00 225.00 125.00 236.00
above.

29.52 Constructing Punjab standard drain type II as


m 263.00 583.00 289.00 609.00
above.

29.53 Constructing Punjab standard drain type III as


m 371.00 765.00 408.00 802.00
above.

29.54 Constructing Punjab standard drain type IV as


m 475.00 945.00 523.00 993.00
above.

Chapter-29 Page 533 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.55 Constructing brick masonry manhole in
cement mortar 1:5 ( 1 cement : 5 coarse sand
) R.C.C. top slab 20cm thick using M-20 mix
by using mixer and vibrator, TMT Fe500 @
80.00 kg/per cum, foundation concrete 1:4:8
mix (1 cement: 4 coarse sand : 8 graded
stone aggregate 40mm nominal size) inside
plastering 12mm thick with cement mortar 1:3
(1 cement: 3 coarse sand) finished with
floating coat of neat cement and making
40mm thick benching in cement concrete
1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20mm nominal size) finished
with a floating coat of neat cement, Orange
coloured PVC steps including RCC cover with
frame complete as per standard design
complete in all respects.

a Inside size 75x120 cm and 120 cm deep


each 6245.00 23066.00 6870.00 23691.00

b Inside size 90x150 cm and 120 cm deep


each 7776.00 29224.00 8554.00 30002.00

c Inside size 120x180 cm and 120 cm


each 9719.00 37847.00 10691.00 38819.00
deep

d Inside size 150x180 cm and 120 cm


each 11100.00 41408.00 12210.00 42518.00
deep

29.56 Constructing brick masonry manhole in


cement mortar 1:5 ( 1 cement : 5 coarse sand
) with RCC core wall between masonary,
R.C.C. top slab 20mm thick using M-20 mix,
foundation concrete 1:4:8 mix (1 cement: 4
coarse sand : 8 graded stone aggregate
40mm nominal size) inside plastering 12mm
thick with cement mortar 1:3 (1 cement: 3
coarse sand) finished with floating coat of
neat cement and making benching in cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20mm nominal size)
finished with a floating coat of neat cement,
Orange coloured PVC steps including RCC
cover with frame internal
dimensions.complete as per standard design.
(In water logged area).

a Inside size 75x120 cm and 120 cm deep


each 10609.00 40187.00 11670.00 41248.00

Chapter-29 Page 534 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
b Inside size 90x150 cm and 120 cm deep
each 12399.00 47495.00 13639.00 48735.00

c Inside size 120x180 cm and 120 cm


each 15082.00 57087.00 16590.00 58595.00
deep

d Inside size 150x180 cm and 120 cm


each 17097.00 62972.00 18807.00 64682.00
deep

29.57 Extra payable for every 0.30 m additional


depth of manhole chamber in item 29.85 upto
1.80 m increase in depth.

a Inside size 75x120 cm each


Depth of 1482.00 5316.00 1630.00 5464.00
0.30 m.
b Inside size 90x150 cm each
Depth of 1700.00 6026.00 1870.00 6196.00
0.30 m.
c Inside size 120x180 cm each
Depth of 2051.00 7269.00 2256.00 7474.00
0.30 m.
d Inside size 150x180 cm each
Depth of 2211.00 7798.00 2432.00 8019.00
0.30 m.

29.58 Extra payable for every 0.30 m additional


depth of manhole chamber in item 29.55 upto
1.80 m increase in depth.

a Inside size 75x120 cm each


Depth of 704.00 2220.00 774.00 2290.00
0.30 m.
b Inside size 90x150 cm each
Depth of 831.00 2596.00 914.00 2679.00
0.30 m.
c Inside size 120x180 cm each
Depth of 1014.00 3149.00 1115.00 3250.00
0.30 m.
d Inside size 150x180 cm each
Depth of 1099.00 3400.00 1209.00 3510.00
0.30 m.

29.59 Extra payable for every 0.30 m additional


depth of manhole chamber in item 29.55
beyond 1.80 m upto 3.60 m beyond
addiational depth.

a Inside size 75x120 cm each


Depth of 743.00 2374.00 817.00 2448.00
0.30 m.
b Inside size 90x150 cm each
Depth of 884.00 2801.00 972.00 2889.00
0.30 m.
c Inside size 120x180 cm each
Depth of 898.00 3148.00 988.00 3238.00
0.30 m.

Chapter-29 Page 535 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
d Inside size 150x180 cm each
Depth of 1138.00 3553.00 1252.00 3667.00
0.30 m.

29.60 Construction of brick masonry inspection


chambers size as given below upto 0.60
metre average depth in 1:5 cement sand
mortar, C.C.1:4:8 ( 150mm thick) in
foundation, cement concrete 1:2:4 benching
12.50mm thick cement plaster 1:2 with a
floating coat of 1mm thick of neat cement,
R.C.C. 1:2:4 slabs 100mm thick cement
concrete topping 50mm thick with 455mm x
455mm, 455mm x 610mm inside R.C.C.
inspection chamber cover and frame (Weight
as per I.S.I specifications) painted with 3
coats of black bitumastic paint conforming to
I.S.I complete as per standard design.

(a) Size 450mm x 450mm inside with RCC


455mm x 455mm cover and frame light
each 2126.00 9931.00 2339.00 10144.00
duty double seal

(b) 450mm x 600mm inside with 455mm x


610mm cover and frame light duty
each 2902.00 11505.00 3192.00 11795.00
double seal

(c) 600mm x 900mm inside with 455mm x


455mm cover and frame light duty
each 3804.00 13583.00 4184.00 13963.00
double seal

29.61 Extra for every 0.30 metre depth of


inspection chamber.

(a) 450mm x 450mm inside each


Depth of 405.00 1160.00 446.00 1201.00
0.30 m.

(b) 450mm x 600mm inside each


Depth of 456.00 1293.00 502.00 1339.00
0.30 m.

(c) 600mm x 900mm inside each


Depth of 627.00 1749.00 690.00 1812.00
0.30 m.

Chapter-29 Page 536 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.62 Constructing Brick masonry ventilating
chambers as per standard drawing including
dressing of beds and sides of chamber to
exact profiles 15cm. C.C 1:6:12 (150mm
thick) in foundation, first class brick work laid
in cement sand mortar 1:5, cement concrete
1:2:4 for reinforced concrete work in slab, each 4,853.00 13,134.00 5,338.00 13,619.00
12.5mm thick cement plaster 1:2 rendered
with a floating coat of neat cement 1mm thick
over exposed brick tablet and inside walls,
lime pointing 2:3 on outside complete and as
required by the Engineer-In-Charge.

29.63 Constructing brick masonry road gully


chambers as per standard drawings (as per
sizes given below) including dressing of beds
and sides of chambers to exact profiles,
15cm thick C.C 1:6:12 in foundation, first
class brick work laid in cement sand mortar
1:5, 40mm thick cement concrete 1:2:4
topping inside the chamber with a floating
coat of 1.5mm thick neat cement laid in one
operation to the topping, the entire inner
surface of the chamber rendered with neat
cement not less than 12.50mm in thickness of
1:2 cement sand plaster and finished with a
floating coat of neat cement 1mm thick left
absolutely smooth polished and correct to
template including cost of precasted RCC
road gully grating and frame including paint
with coal tar (as specified in item No. 29.74)
complete and to the requirement of the

A Single Road Gully chamber

a Size 610mm x 457mm x 800mm each 1795.00 5981.00 1975.00 6161.00

b Size 610mm x 457mm x 1105mm each 2188.00 7371.00 2407.00 7590.00

B Double Road Gully Chamber

a Size 1448mm x 457mm x 800mm each 3201.00 10521.00 3521.00 10841.00

b Size 1448mm x 457mm x 1105mm each 3853.00 12754.00 4238.00 13139.00

29.64 Reduction for every 7.50cm depth of road


gully chamber from the rate of item No.
29.92 above :-

(a) Single Road Gully Chamber each 99.00 310.00 109.00 320.00

(b) Double Road Gully Chamber each 165.00 510.00 182.00 527.00

Chapter-29 Page 537 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.65 Making connection of drain or sewer line with
existing manhole including breaking into and
making good the walls, floors with cement
concrete 1:2:4 mix (1 cement: 2 coarse sand :
4 graded stone aggregate 20 mm nominal
size) cement plastered on both sides with
cement mortar 1:2 (1 cement : 2 coarse sand)
finished with a floating coat of neat cement
and making necessary channels for the drain
etc. complete.

a For pipes 100 to 250 mm Diametre One


connectio 286.00 336.00 315.00 365.00
n

b For pipes 300 to 450 mm Diametre One


connectio 379.00 467.00 417.00 505.00
n

29.66 Dismantling of manhole chamber including


R.C.C. top slab, C.I. cover with frame
including stacking of useful materials near the
site including disposal of unserviceable
material within 100 m. as desired by Engineer-
in-charge.

a Rectangular manhole 75x120 cm and


each 1797.00 1797.00 1977.00 1977.00
45 cm deep

b Rectangular manhole 90x150 cm and


each 2415.00 2415.00 2657.00 2657.00
45 cm deep

c Rectangular manhole 120x180 cm and


each 3156.00 3156.00 3472.00 3472.00
45 cm deep

d Rectangular manhole 150x180 cm and


each 3604.00 3604.00 3964.00 3964.00
45 cm deep

29.67 Extra for depth of manholes dismantled for


additional depth of 0.300 m. including
disposal of dismantled material within 100 m.
as desired by Engineer-in-charge.

a Rectangular manhole 75x120 cm each 227.00 227.00 250.00 250.00

b Rectangular manhole 90x150 cm each 269.00 269.00 296.00 296.00

c Rectangular manhole 120x180 cm each 331.00 331.00 364.00 364.00

d Rectangular manhole 150x180 cm each 358.00 358.00 394.00 394.00

Chapter-29 Page 538 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.68 Raising RCC slab of all thickness on Man
hole chamber to desired height and placing
back in position after raising the Manhole
(Raising depth of Brick Work and Plaster will
be paid extra as per CSR Item.)

a Inside size 75x120 cm each 2220.00 4987.00 2442.00 5209.00

b Inside size 90x150 cm each 3083.00 6856.00 3391.00 7164.00

c Inside size 120x180 cm each 4588.00 10131.00 5047.00 10590.00

d Inside size 150x180 cm each 5531.00 12105.00 6084.00 12658.00

29.69 Dismantling of old S.W. pipes including


breaking of joints and bed concrete stacking
of useful materials and disposal of
unserviceable materials within 100 m. as
desired by Engineer-in-Charge.
a 100 mm Diametre m 48.00 48.00 53.00 53.00

b 150 mm Diametre m 54.00 54.00 59.00 59.00

c 200 mm Diametre m 57.00 57.00 63.00 63.00

d 230 mm Diametre m 59.00 59.00 65.00 65.00

e 250 mm Diametre m 60.00 60.00 66.00 66.00

f 300 mm Diametre m 64.00 64.00 70.00 70.00

g 350 mm Diametre m 74.00 74.00 81.00 81.00

h 400 mm Diametre m 80.00 80.00 88.00 88.00

i 450 mm Diametre m 84.00 84.00 92.00 92.00

29.70 Disilting all types of main sewers 760 mm


and onwards internal dia by silt clearing
machines addopting all safety measures and m 408.00 408.00 449.00 449.00
disposal of silt upto 5km complete in all
respects.

29.71 Disilting of manhole including all safety


measures, cost of container T & P and
disposal of silt upto 5km complete in all
respects.
a Depth upto 3 m. cum 1719.00 1719.00 1891.00 1891.00

b Depth above 3 m. cum 2293.00 2293.00 2522.00 2522.00

Chapter-29 Page 539 CSR - 2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
29.72 Making connection of newly laid sewer in
walls of existing manhole of fully charge
sewer including cost of pluging sewer,
desilting, removal of sullage water and
making good of khudda

A Sewer connections upto 300 mm id One


Connecti 6060.00 6060.00 6666.00 6666.00
on

B Sewer connection above 300 mm i/d One


and upto 700 mm i/d Connecti 11547.00 11547.00 12702.00 12702.00
on

C All type of connections above 760 mm One


i/d and above Connecti 18830.00 18830.00 20713.00 20713.00
on

29.73 Extra for making connections of all sizes


newly laid sewers within benching of fully
charged sewers including pluging of sewer,
dewatering & desilting of manholes etc.
complete in all respects.
A with existing sewer of 300 mm id and One
below Connecti 704.00 704.00 774.00 774.00
on

B With existing sewer above 300 mm i/d One


upto 700 mm i/d Connecti 1646.00 1646.00 1811.00 1811.00
on

C With existing sewer of 760 mm i/d and One


above Connecti 2640.00 2640.00 2904.00 2904.00
on

29.74 Providing & Fixing Monolithically pre-casted


RCC Inspection chamber of RCC M-25 grade
with Manhole frame cover of 450 mm i/d of each 2611.00 8728.00 2872.00 8989.00
Grade MD-10 as per IS 12592

Chapter-29 Page 540 CSR - 2020


CSR−2020−Final

CHAPTER NO. 30
SANITARY INSTALLATIONS
Notes:-

(i) All the labour rates provided under this chapter includes the carriage of material within a distance
of 100mtr from the site.

(ii) The labour as well as through rates provided under this chapter include the wastage and
breakage of various material during construction

(iii) Provision has been made under this chapter for sanitary fittings of approved make presently
available in the market. In this connection the Superintending Engineer will circulate from time to
time the list of sanitary fittings of best Indian manufacture (approved by the department). Sanitary
fittings of approved make (to the approval of Engineer-in-charge) will only be allowed to be used
while executing the work.

(iv) Material defect, execution defect or other defects if any on the part of the contractor, found at
later stage which could not be traced while execution of work and are not part of maintenace, will
remain the responsibility of the contractor to set right the same at his own cost, though he may
have taken all his dues.

Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

Providing and fixing in position set of EWC


and WHB size 46x36 cm for Handicapped
person of approved make (to the approval of
the Engineer-in-charge) consisting of matching
30.1 cistern, one pair mounting brackets, seat each 3316.00 63972.00 3648.00 64304.00
cover, one no. hinges rail 76cm and 4 no. grab
rails 60cm complete in all respect and to the
entire satisfaction of Engineer-in-charge.

30.2 Providing and fixing in position Chinaware


Indian Orisa water closet size 580x440 mm of
approved make (to the approval of the
Engineer-in-charge) consisting of 10 ltr. PVC
flushing cistern ISI makred including cost of each 1559.00 5323.00 1715.00 5479.00
PVC long bend 32 mm dia complete in all
respect and to the entire satisfaction of
Engineer-in-charge.

Chapter-30 Page 541 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.3 Providing and fixing in position Chinaware
Floor Mounted One Piece EWC type with
matching chinaware cistern 10 ltr. Capacity.
(without cistern fitting) with P trap or S trap of
approved make (to the approval of the
Engineer-in-charge) and seat cover complete
in all respect and to the entire satisfaction of
Engineer-in-charge.

a) Chinaware Floor Mounted One Piece


EWC type with matching chinaware
cistern 10 ltr. Capacity (without cistern
fitting) size 62x37x67 cm with P trap or S each 1480.00 10048.00 1628.00 10196.00
trap and seat cover complete in all
respect.

b) Chinaware Floor Mounted One Piece


EWC rim less type with matching
chinaware cistern 10 ltr. Capacity.
(without cistern fitting) size 69x36x74 cm each 1550.00 16520.00 1705.00 16675.00
with P trap or S trap and seat cover
complete in all respect.

30.4 Providing and fixing in position Chinaware


European type water closet P trap or S trap of
approved make (to the approval of the
Engineer-in-charge) consisting of 10 ltr. PVC
flushing cistern ISI marked, PVC short bend each 1494.00 4780.00 1643.00 4929.00
32 mm dia including cost of seat cover
complete in all respect and to the entire
satisfaction of Engineer-in-charge.

30.5 Providing and fixing in position Chinaware


extended wall mounted E. W.C. type suite
(size 66 x 46 x 77.5 cm ) with P trap or S trap
of approved make (to the approval of the
Engineer-in-charge) with or without 10 ltr.
chinaware matching flushing cistern and seat
cover complete in all respect and to the entire
satisfaction of Engineer-in-charge.

a) Chinaware extended wall mounted E


W.C. with matching chinaware cistern each 1649.00 13199.00 1814.00 13364.00
and seat cover complete in all respect.

b) Chinaware wall mounted E.W.C without


cistern including seat cover complete in each 1494.00 9868.00 1643.00 10017.00
all respect.

Chapter-30 Page 542 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

30.6 (A) Providing and fixing PVC Cistern 10 Ltr.


Capacity ISI marked IS 7231:1994( size
32.5x47.6x15.5 cm) of approved make(to the each 178.00 1467.00 196.00 1485.00
approval of the Engineer-in-charge) including
PVC fittings complete.

30.6 (B) (i) Providing and fixing vitreous Chinware


chinware 10 Ltr. Capacity with PVC
internal fitting (Size 34.x 50 x 22.5 cm) of
approved make(to the approval of the each 296.00 4079.00 326.00 4109.00
Engineer-in-charge) including PVC
fittings and brackets complete.

(ii) Providing and fixing Chinware Cistern


(Dual flush) 10 Ltr. Capacity with PVC
internal fitting. (Size 38x43x17.5 cm) of
approved make(to the approval of the each 296.00 4913.00 326.00 4943.00
Engineer-in-charge) including PVC
fittings and brackets complete.

(iii) Providing and fixing PVC accessory


fittings in Chinaware flushing cistern 10 each 118.00 936.00 130.00 948.00
Litres capacity complete.

(iv) Providing and fixing PVC accessory


fittings for dual flush Chinaware flushing
each 296.00 1636.00 326.00 1666.00
cistern 10 Litres capacity complete.

(v) Providing and fixing PVC accessory


fittings for dual flush suitable for
extended wall mounted Chinaware each 284.00 2087.00 312.00 2115.00
flushing cistern complete.

30.6 (C Providing and fixing in position concealed


cistern including flushing plate of approved
make (to the approval of the Engineer-in- each 1184.00 9369.00 1302.00 9487.00
charge) complete in all respect.

30.7 (A) Providing and fixing C.P. brass 32mm long


bend complete each 43.00 759.00 47.00 763.00

30.7 (B) Providing and fixing C.P. brass 32mm short


bend complete each 43.00 423.00 47.00 427.00

Chapter-30 Page 543 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.7 (C Extra for providing and fixing C.P. Brass long
flush bend 32mm instead of PVC long bend. each --- 471.37 --- 471.37

30.7 (D) Extra for providing and fixing C.P. Brass short
flush bend 32mm instead of PVC short bend. each --- 257.41 --- 257.41

30.8 Providing and fixing jet spray with 2'-6" long


PVC pipe.

a) With C.P. Brass nut


each 118.00 476.00 130.00 488.00

b) With PTMT nut


each 118.00 362.00 130.00 374.00

30.9 Providing and fixing plastic hygenic seat cover


with lid complete.

a) Plastic Seat Cover Premium star


white/pastel/special colour each 83.00 765.00 91.00 773.00

b) Seat Cover Constellation Soft Close Star


white each 83.00 1431.00 91.00 1439.00

30.10 Providing and fixing in position Chinaware


(a) Indian Orisa water closet size 580x440 mm
of approved make (to the approval of the each 1438.00 3729.00 1582.00 3873.00
Engineer-in-charge) complete in all respect

30.10 Providing and fixing in position Chinaware


(b) European type water closet P trap or S trap of
approved make (to the approval of the each 902.00 2949.00 992.00 3039.00
Engineer-in-charge) complete in all respect.

30.11 Providing and fixing in position Metropole flush


valve push type 32mm size dual flow
(Concealed body) with exposed shut off each 237.00 3250.00 261.00 3274.00
provision and round plate complete in all
respect.

30.12 Providing and fixing in position CP Brass Grab


Bar of approved make (to the approval of the
Engineer-in-charge) fixed in to wall with brass each 148.00 1672.00 163.00 1687.00
screws complete in all respect.

Chapter-30 Page 544 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.13 Providing and fixing in position SS Grab Bar
Grade 304 of approved make (to the approval
of the Engineer-in-charge) fixed in to wall with
brass screws complete in all respect.

a) 35mm dia 225mm (9”) long


each 148.00 982.00 163.00 997.00

b) 35mm dia 300mm (12”) long


each 148.00 1066.00 163.00 1081.00

c) 35mm dia 450mm (18”) long


each 148.00 1218.00 163.00 1233.00

d) 35mm dia 600mm (24”) long


each 148.00 1319.00 163.00 1334.00

e) 35mm dia 900mm (36”) long


each 148.00 1740.00 163.00 1755.00

f) 35mm dia 1200mm (48”) long


each 148.00 2667.00 163.00 2682.00

g) Foldable U Type 762mm long


each 148.00 6315.00 163.00 6330.00

30.14 Extra for providing and fixing 10 litres capacity


(a) Chinaware low level flushing cistern with PVC
internal fitting, instead of 10 litres capacity each --- 2572.77 --- 2572.77
PVC flushing cistern.

30.14 Extra for providing and fixing 10 litres capacity


(b) Chinaware low level dual flushing cistern with
PVC internal fitting, instead of 10 litres each --- 3433.25 --- 3433.25
capacity PVC flushing cistern.

30.15 Providing & fixing in position vitreous


Chinware white Indian make flat back or
angular lipped front small urinals size
265x315x440mm approved make (to the each 1184.00 2987.00 1302.00 3105.00
approval of the Engineer-in-charge) with C.P.
brass tube connection 300 mm long complete
in all respect.

Chapter-30 Page 545 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.16 Providing and fixing in position vitreous
Chinaware white lIndian make large flat back
or angular lipped front urinal 375 x 390 x 590
mm of approved make (to the approval of the
Engineer-in-charge) consisting of C.P. brass each 1184.00 6551.00 1302.00 6669.00
Urinal waste Coupling dome type 32mm outer
length 75 mm , C.P. brass Urinal Spreader
Ocular-Regular and C.P. brass tube
connection 300 mm long complete.

30.17 Providing and fixing in position vitreous


(A) Chinaware white Senso urinal size 37 x 39 x
61 cm of approved make (to the approval of
Engineer-in-charge) consisting of C.P. brass each 1184.00 19356.00 1302.00 19474.00
Urinal waste Coupling dome type 32mm outer
length 75 mm complete in all respect.

30.17 Providing and fixing in position Vitreous


(B) Chinaware white urinal with concealed or in
built P-trap (size 310x370x640 mm) with built
in water seal, outlet to wall and water inlet from each 1184.00 10544.00 1302.00 10662.00
back of approved make (to the approval of
Engineer-in-charge) complete in all respect.

30.18 A Providing and fixing in position Sensor electric


for urinal of approved make (to the approval of
Engineer-in-charge) complete in all respect. each 155.00 6473.00 171.00 6489.00

30.18 B Providing and fixing in position Sensor Battery


Operated for urinal of approved make (to the
approval of Engineer-in-charge) complete in all each 155.00 6052.00 171.00 6068.00
respect.

30.19 Extra for providing and fixing G.I. 32mm waste


(a) pipe for urinal including elbow, reducer etc
each 118.00 423.00 130.00 435.00
complete in all respect.

30.19 Extra for providing and fixing G.I. 40mm waste


(b) pipe including elbow, reducer etc complete in
each 118.00 466.00 130.00 478.00
all respect.

30.20 Providing and fixing P.V.C Waste Pipe


Collapsiable 32mm complete in all respect. each 62.00 113.00 68.00 119.00

Chapter-30 Page 546 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

30.21 Providing and fixing partition for different type


(A) of urinals.

i) Chittor Black Slabs 19-20mm thick


marble partition each 296.00 711.00 326.00 741.00
size 375mm x 750mm

ii) 19 to 20 mm thick Granite stone partition


size 375mm x 750mm each 296.00 1079.00 326.00 1109.00

iii) Toughned Glass Partition 8mm


thickness size 450 x 900 mm C/S each 296.00 6025.00 326.00 6055.00

30.21 Vitreous white Chinaware Partition


(B)

i) Small partitions size 69 x 16.5 x 32.5 cm


each 296.00 2284.00 326.00 2314.00

ii) Large partition size 75 x 16.5 x 36.5 cm


each 296.00 4652.00 326.00 4682.00

30.22 Providing and fixing in position C.P. brass


Tumbler Holder of approved make (to the
approval of Engineer-in-charge ) fixed into wall
each 83.00 778.00 91.00 786.00
with rawl plugs and C.P brass screws
complete in all respect.

30.23 Providing and fixing C.P. brass Urinal


Spreader Ocular-Regular complete with fittings
for urinals complete. each 83.00 437.00 91.00 445.00

30.24 Providing and fixing Stainless steel health


faucet complete in all respect. each 118.00 1139.00 130.00 1151.00

30.25 Providing & fixing in position Water Cooler


without Stablizer of approved make (to the
approval of Engineer-in-charge ) including
carriage complete in all respect.

Chapter-30 Page 547 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

(a) Water Cooler Full Steel Body 40/80 ltr


Capacity without Stablizer each 533.00 31289.00 586.00 31342.00

(b) Water Cooler Full Steel Body 60/80 ltr


Capacity without Stablizer each 533.00 32935.00 586.00 32988.00

c) Water Cooler Semi Steel Body 80/120 ltr


Capacity without Stablizer each 533.00 35682.00 586.00 35735.00

d) Water Cooler Full Steel Body 150/150 ltr


without Stablizer each 533.00 44470.00 586.00 44523.00

30.26 Providing & fixing in position Water Dispenser


Top Loading (with refrigration capacity 15 ltr)
of approved make (to the approval of Engineer-
in-charge ) dispensing hot/cold/ambient water each 148.00 8646.00 163.00 8661.00
including cost of two no. 20 ltrs packaged
drinking water bottles and carriage complete in
all respect.

30.27 Providing & fixing in position Commercial RO


without reservoir with four no cartridge/
membrane having flow rate 50 ltr/hr with 6
stage purification process of approved make each 592.00 38184.00 651.00 38243.00
(to the approval of Engineer-in-charge )
including carriage and fixing in position
complete in all respect.

30.28 Providing & fixing in position UV filter having


flow rate 200 ltr/hr with 3 stage purification
process having 16 watt UV lamp and 35 Watt
power rating of approved make (to the each 296.00 12691.00 326.00 12721.00
approval of Engineer-in-charge ) including
carriage and fixing in position complete in all
respect.

30.29 Providing and fixing PTMT 15 mm Urinal


spreader of approved make (to the approval of
Engineer-in-charge) size 95x69x100 mm with
1/2" BSP thread and shapes, weighing not less each 74.00 221.00 81.00 228.00
than 60gms. complete in all respect.

Chapter-30 Page 548 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.30 Providing and fixing PTMT urinal cock of
approved make (to the approval of Engineer-in-
charge) 15 mm nominal bore, 80mm long. 42
mm high and 30mm wide with BSP female each 74.00 221.00 81.00 228.00
threads weighing not less than 48gms of
approved quality and colour complete in all
respect.

30.31 Providing and fixing in position vitreous


chinaware white lavatory suites of approved
make (to the approval of Engineer-in-charge)
including Rack Bolt Screw Pair 115mm long
without CP fittings complete in all respect.

i) Size 450mmx300mm
each 592.00 1699.00 651.00 1758.00

ii) Size 550 mm x 400 mm x 815 mm


each 592.00 1943.00 651.00 2002.00

iii) Size 630 mm x 450 mm x 830 mm


each 592.00 3527.00 651.00 3586.00

iv) Size 500 mm x 400 mm x 820 mm


each 592.00 1783.00 651.00 1842.00

v) Size 560mm x 430mm x 820 mm


each 592.00 2247.00 651.00 2306.00

vi) Size 560mm x 410mm (above counter


oval) each 592.00 2698.00 651.00 2757.00

vii) Size 49 cm dia (above counter round)


each 592.00 3103.00 651.00 3162.00

viii) Size 630mm x 500mm (above counter


oval) each 592.00 4459.00 651.00 4518.00

ix) Size 560mm x 450mm (Under counter


oval) each 592.00 2690.00 651.00 2749.00

x) size 44cm dia (under counter round)


each 592.00 2783.00 651.00 2842.00

xi) Table Top (size 49 x 40 x 15 cm)


each 592.00 8301.00 651.00 8360.00

Chapter-30 Page 549 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
xii) Table Top round (size 40.5 x 40.5 x 14
cm) each 592.00 7155.00 651.00 7214.00

xiii) Table Top square (size 39 x 39 x 15 cm)


each 592.00 7466.00 651.00 7525.00

xiv) Size 460mm x 330mm x 805 mm


each 592.00 1826.00 651.00 1885.00

30.32 Providing and fixing in position vitreous


chinaware white lavatory suites of approved
make (to the approval of Engineer-in-charge)
consisting of C.P. brass waste 32mm dia with
one C.P. brass pillar tap including Rack Bolt
Screw Pair 115mm long complete in all
respect.

i) Size 450mmx300mm
each 829.00 3369.00 912.00 3452.00

ii) Size 550 mm x 400 mm x 815 mm


each 829.00 3614.00 912.00 3697.00

iii) Size 630 mm x 450 mm x 830 mm


each 829.00 5197.00 912.00 5280.00

iv) Size 500mm x 400 mm x 820 mm


each 829.00 3454.00 912.00 3537.00

v) Size 560mm x 430mm x 820 mm


each 829.00 3917.00 912.00 4000.00

vi) Size 560mm x 410mm (above counter


oval) each 922.00 4306.00 1014.00 4398.00

vii) Size 49 cm dia (above counter round)


each 922.00 4710.00 1014.00 4802.00

viii) Size 630mm x 500mm (above counter


oval) each 922.00 6067.00 1014.00 6159.00

ix) Size 560mm x 450mm (Under counter


oval) each 922.00 4297.00 1014.00 4389.00

x) size 44cm dia (under counter round)


each 922.00 4390.00 1014.00 4482.00

Chapter-30 Page 550 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
xi) Table Top (size 49 x 40 x 15 cm)
each 592.00 8301.00 651.00 8360.00

xii) Table Top round (size 40.5 x 40.5 x 14


each 592.00 7155.00 651.00 7214.00
cm)

xiii) Table Top square (size 39 x 39 x 15 cm)


each 592.00 7466.00 651.00 7525.00

xiv) Size 460mm x 330mm x 805 mm


each 829.00 3496.00 912.00 3579.00

30.33 Providing and fixing in position 15mm C.P.


Pillar cock foam flow of approved make (to
the approval of Engineer-in-charge) each 78.00 935.00 86.00 943.00

30.34 Providing and fixing in position C.P. Brass


Auto close Pillar Cock of approved make (to
the approval of Engineer-in-charge) each 78.00 2504.00 86.00 2512.00

30.35 Providing and fixing in position C.P. Brass


Auto close bib Cock of approved make (to the
approval of Engineer-in-charge) each 78.00 2355.00 86.00 2363.00

30.36 Providing and fixing in position C.P. Brass


Urinal button flusher 15 mm of approved make
(to the approval of Engineer-in-charge) each 78.00 2391.00 86.00 2399.00

30.37 Providing and fixing in position C.P brass


basin mixer without pop-up waste system with
450 mm long flexible hose of approved make
each 124.00 2864.00 136.00 2876.00
(to the approval of Engineer-in-charge)
complete in all respect.

30.38 Providing and fixing in position C.P brass


basin mixer without pop-up waste system with
450 mm long flexible hose of approved make
(to the approval of Engineer-in-charge) instead each 124.00 2007.00 136.00 2019.00
of C.P. brass pillar tap complete in all respect.

Chapter-30 Page 551 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.39 Providing and fixing in position C.P brass
Single Lever basin mixer without Popup waste
with 450 mm Long Braided Hoses approved
each 124.00 2914.00 136.00 2926.00
make (to the approval of Engineer-in-charge)
complete in all respect.

30.40 Providing and fixing in position CP Brass


single lever surgical mixer with swinging spout
approved make (to the approval of Engineer-in- each 124.00 5454.00 136.00 5466.00
charge) complete in all respect.

30.41 Providing and fixing in position C.P elbow


(A) action pillar tap of approved make (to the
approval of Engineer-in-charge) complete in all each 78.00 2110.00 86.00 2118.00
respect.

30.41 Providing and fixing in position C.P elbow


(B) action bib tap of approved make (to the
approval of Engineer-in-charge) complete in all each 78.00 1819.00 86.00 1827.00
respect.

30.42 Providing and fixing in position 32 mm dia G.I


(A) waste pipe embedded in wall upto floor level
including cost of fittings complete as required each 226.00 619.00 249.00 642.00
by the Engineer-in-charge.

30.42 Providing and fixing 40 mm i/d G.I waste pipe


B) embedded in walls upto floor level as required
by the Engineer-in-Charge each 226.00 662.00 249.00 685.00

30.43 Providing and fixing vitreous chinaware


pedestal of approved make (to the approval of
Engineer-in-charge) for wash hand basin
complete in all respect.

i) Vitreous chinaware standard white


pedestal for wash hand basin. each 62.00 2010.00 68.00 2016.00

ii) Vitreous chinaware standard white half


pedestal for wash hand basin. each 62.00 1465.00 68.00 1471.00

30.44 Providing and fixing in position C.P. brass


bottle trap 32mm dia with 40 mm seal of
approved make (to the approval of Engineer-in- each 124.00 1122.00 136.00 1134.00
charge) complete in all respect.

Chapter-30 Page 552 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

30.45 Providing and fixing PTMT Bottle trap 31mm


single piece moulded with height of 270mm,
effective length of tail pipe 260mm from the
centre of the waste coupling 77mm breadth
with 25mm minimum water seal, weighing not each 124.00 542.00 136.00 554.00
less than 260gms of approved make (to the
approval of Engineer-in-charge) for wash
hand basin and sink complete in all respect..

30.46 Providing & fixing in position 15 mm i/d C.P


brass wall mixer of approved make (to the
approval of Engineer-in-charge ) complete in
all respect.

a) C.P brass wall mixer with Telephonic


each 118.00 3766.00 130.00 3778.00
Shower

b) C.P. brass wall mixer without telephonic


each 118.00 2895.00 130.00 2907.00
shower

30.47 Providing and fixing in position stainless steel


sinks of approved make (to the approval of
Engineer-in-charge) 1mm thick,grade-304
(18/8) with waste coupling complete in all
respect.

(a) Rectangular Sink with Deluxe Border


Single Bowl Overall Size 700 mm x 555
mm x 230 mm each 1590.00 7740.00 1749.00 7899.00

(b) Rectangular Sink with Deluxe Border


Single Bowl Overall Size 555 mm x
475mm x 200 mm each 1590.00 6481.00 1749.00 6640.00

(c) Sink with drain board overall size


1070x464mm bowl size
430x355x200mm and waste coupling each 1590.00 8304.00 1749.00 8463.00

Chapter-30 Page 553 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Double bowl Sink without drain board
Overall size 1114 x 490 mm with bowl
size 460x385x200mm including waste each 1590.00 13811.00 1749.00 13970.00
coupling

(e) Double bowl Sink without drain board


Overall size 1330x515
bowl size 560x410x200mm each 1590.00 14803.00 1749.00 14962.00

30.48 Providing & fixing in postion C.P. brass Sink


Cock with swinging spout (wall mounted) of
approved make (to the approval of Engineer-in- each 78.00 1461.00 86.00 1469.00
charge) complete in all respect.

30.49 Providing & fixing in postion C.P. brass Sink


Cock swinging casted spout (table mounted)
of approved make (to the approval of Engineer- each 78.00 1819.00 86.00 1827.00
in-charge) complete in all respect.

30.50 Providing & fixing in position C.P brass Sink


mixer swivel spout (Wall mounted) of
approved make (to the approval of Engineer-in- each 124.00 2959.00 136.00 2971.00
charge) complete in all respect.

30.51 Providing & fixing in position C.P brass Sink


mixer swinging spout (table mounted) with
450mm long flexible hose of approved make each 124.00 3063.00 136.00 3075.00
(to the approval of Engineer-in-charge)
complete in all respect.

30.52 Providing & Fixing in postion CP Brass bath


tub spout with wall flange of approved make
(to the approval of Engineer-in-charge) each 78.00 1257.00 86.00 1265.00
complete in all respect.

30.53 Providing & Fixing in postion CP Brass Spout


Operated Pillar Tap with base flange (for foot
operated valve) of approved make (to the each 155.000 1613.000 171.00 1629.00
approval of Engineer-in-charge) complete in
all respect.

Chapter-30 Page 554 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.54 Providing and Fixing in position Glass shower
enclosure L shaped 8mm thick with chrome
finish with sliding door and entry from the front
of approved make (to the approval of Engineer-
in-charge) complete in all respect.

a) 1200x800 x 1950mm
each 1749.00 27022.00 1924.00 27197.00

b) 1200x900 x 1950mm
each 1749.00 27508.00 1924.00 27683.00

c) 1200x1000 x 1950mm
each 1749.00 27994.00 1924.00 28169.00

30.55 Providing and fixing in position vitreous


Chinaware white laboratory sinks of approved
make (to the approval of Engineer-in-charge)
consisting of a pair of brackets, C.P. brass
waste 40mm complete in all respect.

(a) Size 450 mm x 300 mm x 150 mm


each 1590.00 4741.00 1749.00 4900.00

(b) Size 470mmx370mmx180mm


each 1590.00 6426.00 1749.00 6585.00

30.56 Providing and fixing in position C.P. brass


A overhead shower 1 flow with shower arm with
15mm i/d inlet of approved make (to the each 95.00 1025.00 105.00 1035.00
approval of Engineer-in-charge) complete in all
respect.

30.56 Providing and fixing in position C.P. brass


B overhead shower 1 flow without shower arm
with 15mm i/d inlet of approved make (to the each 95.00 821.00 105.00 831.00
approval of Engineer-in-charge) complete in all
respect.

30.56 C Providing and fixing in position C.P. brass


overhead shower round or square 1 flow
without shower arm with 15mm i/d inlet of
approved make (to the approval of Engineer-in-
charge) complete in all respect.

i) CP Brass rain Fall Shower without arm


4" round each 95.00 1020.00 105.00 1030.00

Chapter-30 Page 555 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

ii) CP Brass rain Fall Shower without arm


6" round each 95.00 1433.00 105.00 1443.00

iii) CP Brass rain Fall Shower without arm


8" round each 95.00 2063.00 105.00 2073.00

iv) CP Brass rain Fall Shower without arm


4" square each 95.00 1134.00 105.00 1144.00

v) CP Brass rain Fall Shower without arm


6" square each 95.00 1673.00 105.00 1683.00

vi) CP Brass rain Fall Shower without arm


8" square each 95.00 2363.00 105.00 2373.00

30.56 D Providing and fixing in position C.P. brass


overhead shower arm chrome round or
square with 15mm i/d inlet of approved make
(to the approval of Engineer-in-charge)
complete in all respect.

i) CP Brass rain Fall Shower arm 15"


length round chrome each 95.00 1193.00 105.00 1203.00

ii) CP Brass rain Fall Shower arm 18"


length round chrome each 95.00 1297.00 105.00 1307.00

iii) CP Brass rain Fall Shower arm 24"


length round chrome each 95.00 1905.00 105.00 1915.00

iv) CP Brass rain Fall Shower arm 15"


length square chrome each 95.00 1487.00 105.00 1497.00

v) CP Brass rain Fall Shower arm 18"


length square chrome each 95.00 1587.00 105.00 1597.00

vi) CP Brass rain Fall Shower arm 24"


length square chrome each 95.00 2345.00 105.00 2355.00

Chapter-30 Page 556 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.57 Providing and fixing in position paper holders
of approved make (to the approval of Engineer-
in-charge ) fixed in to wall with C.P brass
screws complete in all respect.

(a) C.P. brass toilet paper holder


each 95.00 1084.00 105.00 1094.00

30.58 Providing and fixing in position towel rails /


ring of approved make (to the approval of
Engineer-in-charge ) fixed in with rawl plugs
embedded in walls with brass screws
complete in all respect.

(a) C.P. brass towel Rails size 15mm dia


610mm long each 178.00 1539.00 196.00 1557.00

(b) C.P brass towel ring


each 95.00 911.00 105.00 921.00

(c) Acrylic towel Rails size 20mm dia


600mm long each 178.00 409.00 196.00 427.00

(d) C.P. brass towel bracket (610mm long)


each 178.00 3285.00 196.00 3303.00

30.59 Providing and fixing in position C.P. Acrylic


shelf with C.P.bracket and guard rails of
approved make (to the approval of Engineer-in-
charge ) fixed in with rawl plugs and C.P brass
screws complete in all respect.

(a) CP brass Acrylic Shelf size


560mmx130mm each 95.00 1669.00 105.00 1679.00

(b) C.P. brass Glass Corner with rail 8 mm


thickness and height 250 mm each 95.00 979.00 105.00 989.00

30.60 Providing and fixing in position C.P. brass


soap dish of approved make (to the approval
of Engineer-in-charge ) fixed into wall with rawl each 95.00 843.00 105.00 853.00
plugs and C.P brass screws complete in all
respect.

Chapter-30 Page 557 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.61 Providing & Fixing in position 5mm thick
bevelled edge mirror of superior glass (of
approved make) complete with 4mm thick
hard board backing fixed in with rawl plugs
50mm, C.P. brass screws and washers and
S/S Studs on top complete in all respect (as
required by the Engineer-in- Charge)

(a) Size 600mmx450mm


each 296.00 1199.00 326.00 1229.00

(b) Size 550mmx400mm


each 296.00 1116.00 326.00 1146.00

(c ) Size 1500mmx600mm or any other size


each 355.00 2767.00 391.00 2803.00

30.62 Providing & Fixing in position plastic moulded


A frame mirror Size 550mmx400mm with 4mm
thick hard board backing of required shape
fixed in position with rawl plugs, C.P. brass each 178.00 682.00 196.00 700.00
screws and washers complete in all respect

30.62 Providing & Fixing in position mirror of superior


B glass Size 1500mm x600mm or any other
required size (of approved quality) and of
required shape and size with high quality
polystyrene moulding frame of 40 to 50mm
size (of approved quality and shade) with 4mm sqm 355.00 2241.00 391.00 2277.00
thick hardboard backing fixed in with rawl
plugs 50mm, C.P. brass screws and washers
complete in all respect

30.63 Providing & Fixing in position C.P./Aluminium


Khunti of approved make (to the approval of
Engineer-in-charge ) fixed into wall with C.P.
brass screws and rawl plugs etc. complete in
all respect.

(a) C.P. Brass khunti with 3 pegs


each 95.00 367.00 105.00 377.00

(b) C.P. Brass khunti with 4 pegs


each 95.00 458.00 105.00 468.00

Chapter-30 Page 558 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

(c) C.P. Brass khunti with 6 pegs


each 95.00 639.00 105.00 649.00

(d) Aluminium khunti with 3 pegs


each 95.00 179.00 105.00 189.00

(e) Aluminium khunti with 4 pegs


each 95.00 192.00 105.00 202.00

(f) Aluminium khunti with 6 pegs


each 95.00 257.00 105.00 267.00

30.64 Providing & Fixing in position C.P. Brass


A flange Dome of approved make (to the
approval of Engineer-in-charge ) under various each 12.00 63.00 13.00 64.00
fixtures complete in all respect.

30.64 Providing & Fixing in position C.P. Brass


B extension piece 25mm long to 100mm long of
approved make (to the approval of Engineer-in-
charge )with various fixtures complete in all
respect.

i) C.P. Brass extension piece, 25mm long


to 50mm long each 31.00 107.00 34.00 110.00

ii) C.P. Brass extension piece 75mm long


each 31.00 174.00 34.00 177.00

iii) C.P. Brass extension piece 100 mm long


each 31.00 216.00 34.00 219.00

30.64 Providing & Fixing in position C.P. Brass Hexa


C Nipple 15mm of approved make (to the
each 31.00 83.00 34.00 86.00
approval of Engineer-in-charge ) complete in
all respect.

30.65 Providing & Fixing in postion 15 mm i/d bib


A cock of approved make (to the approval of
Engineer-in-charge )complete in all respect.

(i) C.P. brass Bib cock long nose/ long body


foam flow without flange each 78.00 1153.00 86.00 1161.00

Chapter-30 Page 559 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

(ii) C.P. brass Bib cock foam flow without


flange each 78.00 917.00 86.00 925.00

(iii) C.P. brass Bib cock self closing


each 78.00 524.00 86.00 532.00

(iv) Brass Bib cock/Stop cock 15mm x


400gm each 43.00 423.00 47.00 427.00

(v) Brass Nozel Bib cock 15mm x 250gm.


each 43.00 338.00 47.00 342.00

(vi) PTMT Tap/Bib cock


each 43.00 193.00 47.00 197.00

(vii) PTMT Pillar tap


each 43.00 287.00 47.00 291.00

(viii) PTMT push cock


each 43.00 161.00 47.00 165.00

30.65 Providing & Fixing in postion C.I.bib cock as


B per IS:210 with stainless steel spindle of
approved make (to the approval of Engineer-in-
charge ) complete in all respect.

(i) 15mm i/d


each 43.00 187.00 47.00 191.00

(ii) 20mm i/d


each 43.00 275.00 47.00 279.00

(iii) 25mm i/d


each 43.00 392.00 47.00 396.00

30.66 Providing & Fixing in postion stop cock / Angle


valve of approved make (to the approval of
Engineer-in-charge ) complete in all respect.

(a) C.P.brass 15mm stop cock Male and


each 78.00 803.00 86.00 811.00
female end

(b) C.P.brass 15mm Concealed stop cock


with flange. each 124.00 1204.00 136.00 1216.00

Chapter-30 Page 560 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) C.P.brass 15mm Angle valve without
each 78.00 826.00 86.00 834.00
flange

(d) C.P.brass 20mm concealed stop cock


with flange each 124.00 1399.00 136.00 1411.00

(e) PTMT 15mm stop cock Male and female


end each 78.00 233.00 86.00 241.00

(f) PTMT 15mm Concealed stop cock with


flange. each 124.00 345.00 136.00 357.00

(g) PTMT 15mm Angle valve


each 62.00 234.00 68.00 240.00

(h) PTMT 20mm stop cock


each 62.00 241.00 68.00 247.00

(i) PTMT 20mm concealed stop cock with


flange each 124.00 369.00 136.00 381.00

30.67 Providing & Fixing in postion liquid soap


container of approved make (to the approval of
Engineer-in-charge ) complete in all respect.

(a) C.P. brass liquid soap container


each 95.00 1855.00 105.00 1865.00

(b) Acrylic liquid soap container


each 95.00 1013.00 105.00 1023.00

30.68 Providing & fixing 15 mm C.P brass laboratory


cock swan neck of approved make (to the
approval of Engineer-in-charge ) complete in
all respect.

(a) Laboratory cock swan neck One Way


each 95.00 1350.00 105.00 1360.00

(b) Laboratory cock swan neck Two Way


each 95.00 1687.00 105.00 1697.00

(c) Laboratory cock swan neck Three Way


each 95.00 2024.00 105.00 2034.00

Chapter-30 Page 561 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7

30.69 Providing and fixing in position premium range


C.P. Brass Fittings and accessories of
approved make (to the approval of Engineer-in-
charge ) complete in all respect.

Note:-To be provided only for VIP


Installations and with prior approval of the
Engineer-in-charge.

A) C.P. Brass fittings:

i) C.P. Brass Pillar Cock foam flow


each 78.00 1900.00 86.00 1908.00

ii) C.P. brass Bib cock with Wall flange


each 78.00 1608.00 86.00 1616.00

iii) C.P.brass 15mm Angular stop cock with


Wall flange each 78.00 1025.00 86.00 1033.00

iv) C.P. brass 15mm Concealed stop cock


with adjustable wall flange with
each 124.00 1533.00 136.00 1545.00
seal.(Outer +Inner Body)

v) C.P. brass 3-Hole Basin Mixer Without


Popup Waste System each 124.00 4207.00 136.00 4219.00

vi) C.P. Brass Wall mixer with Non


telephonic shower arrangement. each 118.00 4347.00 130.00 4359.00

vii) C.P brass Sink mixer with swinging


spout.(wall mounted) each 124.00 4012.00 136.00 4024.00

viii) C.P brass Sink mixer with regular spout


table mounted with 450mm long flexible each 124.00 3186.00 136.00 3198.00
hose

ix) C.P. brass Sink Cock with regular


swinging spout and wall mounted each 78.00 2362.00 86.00 2370.00

Chapter-30 Page 562 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
x) C.P. brass overhead shower Φ180mm
round shape single flow with shower arm
with 20mm i/d Inlet and 300mm long
each 95.00 3837.00 105.00 3847.00
round shape with 900 bend with flange.

B) C.P. Brass Accessories:

i) C.P. brass towel rail 600 mm long


each 178.00 1320.00 196.00 1338.00

ii) C.P brass towel ring square


each 95.00 1115.00 105.00 1125.00

iii) C.P. brass soap dish holder with glass


dish each 95.00 654.00 105.00 664.00

iv) C.P. brass toilet roll holder with flap


each 95.00 1115.00 105.00 1125.00

v) C.P. Glass Shelf 600mm long


each 95.00 1115.00 105.00 1125.00

vi) C.P. brass towel rack 600mm long with


lower hangers each 178.00 2802.00 196.00 2820.00

30.70 Providing and fixing divertors of approved


make (to the approval of Engineer-in-charge )
for bath and shower system complete in all
respect.

a) Single lever concealed divertor of bath


and shower system (with body and upper
part) each 211.00 4584.00 232.00 4605.00

b) Single lever concealed divertor for bath


and shower system (high flow) (with
body and upper part) each 211.00 4067.00 232.00 4088.00

c) Single lever concealed divertor for bath


and shower system (3 inlet flow) with
body and upper part each 211.00 4997.00 232.00 5018.00

Chapter-30 Page 563 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
30.71 Providing and fixing in position C.P. brass
(A) Foot operated auto closing valve for Basin
taps and spouts (Table mounted)with two
900x1200mm long braided hoses with 15mm each 296.00 2751.00 326.00 2781.00
nuts of approved make (to the approval of
Engineer-in-charge)

30.72 Providing and fixing in position C.P. Brass


(B) Foot operated auto closing valve with
pressmatic Basin taps only with plug (Table
mounted)with two 900x1200mm long braided each 296.00 2823.00 326.00 2853.00
hoses with 15mm nuts of approved make (to
the approval of Engineer-in-charge)

30.72 Providing & fixing in position PVC flexible tube


connection of approved make (to the approval
of Engineer-in-charge ) complete in all respect.

(a) PVC tube connection of size 15 mm x


300 mm with C.P. Brass nut each 59.00 174.00 65.00 180.00

(b) PVC tube connection of size 15 mm x


450 mm with C.P. Brass nut each 59.00 182.00 65.00 188.00

(c) PVC tube connection of size 15 mm x


300 mm with PTMT nut each 59.00 108.00 65.00 114.00

(d) PVC tube connection of size 15 mm x


375 mm with PTMT nut each 59.00 116.00 65.00 122.00

(e) PVC tube connection of size 15 mm x


450 mm with PTMT nut each 59.00 120.00 65.00 126.00

(f) PVC tube connection of size 15 mm x


600 mm with C.P. Brass nut each 59.00 196.00 65.00 202.00

(g) PVC tube connection of size 15 mm x


900 mm with C.P. Brass nut each 59.00 228.00 65.00 234.00

Chapter-30 Page 564 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate
1 2 3 4 5 6 7
(h) PVC tube connection of size 15 mm x
600 mm with PTMT nut each 59.00 132.00 65.00 138.00

(i) PVC tube connection of size 15 mm x


900 mm with PTMT nut each 59.00 159.00 65.00 165.00

(j) PVC tube connection of size 15 mm x


1200 mm with C.P. Brass nut each 59.00 270.00 65.00 276.00

(k) PVC tube connection of size 15 mm x


1200 mm with PTMT nut each 59.00 192.00 65.00 198.00

30.73 Providing & fixing in position C.P. copper tube


connection of approved make (to the approval
of Engineer-in-charge ) complete in all respect.

(a) C.P. copper tube connection of size


15 mm x 300 mm with C.P. Brass nut
each 59.00 312.00 65.00 318.00

(b) C.P. copper tube connection of size


15 mm x 450 mm with C.P. Brass nut
each 59.00 346.00 65.00 352.00

(c) C.P. copper tube connection of size


15 mm x 600 mm with C.P. Brass nut
each 59.00 421.00 65.00 427.00

30.73 B Providing & fixing in position C.P. brass tube


connection braided SS304 of approved make
(to the approval of Engineer-in-charge )
complete in all respect.

i) CP Brass Flexible tube Connection


Braided SS304 of size 15mm x 600 mm each 59.00 251.00 65.00 257.00
long

ii) CP Brass Flexible tube Connection


Braided SS304 of size 15mm x 900mm each 59.00 309.00 65.00 315.00
long

Chapter-30 Page 565 CSR-2020


CSR−2020−Final

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
30.74 (i) Providing and fixing in position H.C.I. soil waste
vent or antisyphonage pipes to I.S.I. specification
of E.D.C manufacture or of any other reputed
firm including cutting, jointing, wastage, but
excluding cost of lead jointing.

a 150mm i/d H.C.I. pipe lines laid complete


m. 117.00 1965.00 129.00 1977.00

b 100mm i/d H.C.I. pipe lines laid complete


m. 117.00 1206.53 129.00 1218.00

c 75mm i/d H.C.I. pipe lines laid complete


m. 117.00 1012.36 129.00 1024.00

d 50mm i/d H.C.I. pipe lines laid complete


m. 117.00 794.89 129.00 807.00

30.74 Providing and fixing in position Centrifugally cast


ii iron soil waste vent or antisyphonage pipes
single socket to I.S.I. specification of E.D.C
manufacture or of any other reputed firm
including cutting, jointing, wastage, but excluding
cost of lead jointing.

a 150mm i/d single socket Centrifugally cast


iron pipe lines laid complete m. 117.00 1926.70 129.00 1938.00

b 100mm i/d single socket Centrifugally cast


iron pipe lines laid complete m. 117.00 1019.09 129.00 1031.00

c 75 mm i/d single socket Centrifugally cast


iron pipe lines laid complete m. 117.00 877.42 129.00 889.00

30.74 Providing and fixing in position singel socket


iii SWR UPVC soil waste or antisyphonage pipes
as per IS 13592 of E.D.C manufacture or of any
other reputed firm including cutting, jointing,
wastage, but excluding cost of jointing.

30.74 Single Socket Type A


iii

a 160mm o/d single socket SWR UPVC pipe


lines laid complete m. 117.00 519.27 129.00 531.00

Chapter-30 Page 566 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
b 110mm o/d single socket SWR UPVC pipe
lines laid complete m. 117.00 297.79 129.00 309.00

c 90mm o/d single socket SWR UPVC pipe


lines laid complete m. 117.00 255.18 129.00 267.00

d 75mm o/d single socket SWR UPVC pipe


lines laid complete m. 117.00 218.24 129.00 230.00

B Single Socket Type B

a 160mm o/d SWR UPVC pipe lines laid


complete m. 117.00 612.37 129.00 624.00

b 110mm o/d SWR UPVC pipe lines laid


complete m. 117.00 376.04 129.00 388.00

c 90mm o/d SWR UPVC pipe lines laid


complete m. 117.00 327.19 129.00 339.00

d 75mm o/d SWR UPVC pipe lines laid


complete m. 117.00 291.24 129.00 303.00

30.75 Providing and fixing in position C.I. gully trap


cover weighing approximately 7.26 kg and frame
for gully trap chamber clear opening size 300mm
x 300mm and out side size 330mmx330mm Each 149.00 732.67 164.00 748.00
including painting the exposed surface with 3
coats of black bitumastic superior paint of
approved manufacture etc.

30.76 Providing and fixing in position gratings 150mm x


150mm for gully trap.

a H.C.I. grating including painting with black


bitumastic superior paint of approved Each 19.00 96.36 21.00 98.00
manufacture three coats.

b PVC grating (P.T.M.T.) Each 19.00 83.41 21.00 85.00

30.77 Providing lead caulked joints to H.C.I. pipes and


(A) specials conforming to I.S.I. Specification of
E.L.C. manufacture or any other reputed firm
including cost of lead yarn,fuel and tools etc.

(a) 150mm i/d (1.60 kg.) Each 178.00 448.06 196.00 466.00

(b) 100mm i/d (1.36 kg.) Each 154.00 370.11 169.00 386.00

Chapter-30 Page 567 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) 75mm i/d (1.13 kg.) Each 118.00 305.16 130.00 317.00

30.77 B Providing drip seal joint to H.C.I. pipes and


specials including cost of drip seal, yarn and tool
etc. of approved mate to the approval of
Engineer in Charge.

(a) 150mm i/d Each 101.00 150.48 111.00 161.00

(b) 100mm i/d Each 89.00 129.96 98.00 139.00

(c) 75mm i/d Each 77.00 107.77 85.00 115.00

30.77 C Providing PVC solvent cement joints to SWR


Pipes and specials including cost of PVC solvent
cement and tools etc of approved make (to the
approval of Engineer-in-charge )

(a) 160mm o/d Each 101.00 115.28 111.00 125.00

(b) 110mm o/d Each 89.00 96.13 98.00 105.00

(c) 90mm o/d Each 77.00 81.36 85.00 89.00

(d) 75mm o/d Each 77.00 79.91 85.00 88.00

30.78 Providing & Fixing in position M.S or heavy flat


iron clamps made out of M.S flat iron not less
than 5 mm of the approved design for fixing C.I.
soil waste, vent or antisyhonage pipes to walls
complete in all respects including cutting and
making good the walls and floors etc. and
painting.

(a) M.S. Holder bats clamps for 100mm i/d


Each 47.00 206.15 52.00 211.00
H.C.I. pipes

(b) M.S. Holder bats clamps for 75mm i/d


Each 47.00 192.54 52.00 197.00
H.C.I. pipes

Chapter-30 Page 568 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
30.79 Providing and fixing H.C.I. Floor traps
conforming to I.S.I. Specification of reputed firm
of the self cleaning design with S.S. grating with
frame with or without vent arm and including
cement concrete 1:2:4 under and around the
floor trap where required upto floor level
complete in all respects including cutting and
making good the walls and floors,etc.

(a) With 100mm x 75mm i/d Floor Trap


Each 118.00 756.57 130.00 768.00
(weighing 4.0 Kg)

(b) With 100mm x 75mm i/d Floor Trap


Each 118.00 989.58 130.00 1001.00
(weighing 5.8 Kg)

30.79 A Providing and fixing Centrifugally cast iron Floor


traps conforming to I.S.I. Specification (IS:3989)
of approved make (to the approval of Engineer-in-
charge) of the self cleaning design with C.P.
brass hinged grating with frame with or without
vent arm and including cement concrete 1:2:4
under and around the floor trap where required
upto floor level complete in all respects including
cutting and making good the walls and floors,etc.
minimum depth of water should be 150mm with
a minimum seal 50mm.

(a) 100mm x 75mm i/d 300 mm long Each 118.00 1255.28 130.00 1267.00

(b) 100mm x 75mm i/d 450 mm long Each 118.00 1299.74 130.00 1312.00

(c) 100mm x 75mm i/d 600 mm long Each 118.00 1622.72 130.00 1635.00

(d) 100mm x 75mm i/d deep seal Each 118.00 984.02 130.00 996.00

30.80 Providing and fixing in position SS Grating with


frame of approved make (to the approval of
engineer in charge) complete in all respects. Each 31.00 110.66 34.00 114.00

30.81 (i) Providing and fixing in position H.C.I special for


soil waste vent or anti syphonage pipes to I.S.I
specifications of E.L.C manufacture or any other
reputed firm including cutting and wastage etc.
cutting holes in walls roofs or floors etc. and
making good to its original condition but
excluding cost of lead joining.

A For 100mm i/d pipes

Chapter-30 Page 569 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

i 100mm i/d H.C.I. Heal Rest Bend Each 59.00 635.38 65.00 641.00

ii 100mm i/d Door Tee Each 59.00 932.81 65.00 939.00

iii 100mm i/d Plain Tee Each 59.00 834.76 65.00 841.00

iv 100mm i/d door Bend Each 59.00 635.38 65.00 641.00

v 100mm i/d Bend plain Each 59.00 518.59 65.00 524.00

vi 100mm i/d Cowls Each 11.00 400.16 12.00 401.00

vii 100mm i/d Collars Each 59.00 361.05 65.00 367.00

viii Off sets 75mm Projection Each 59.00 626.57 65.00 632.00

ix 100mm i/d Off sets 150mm projection Each 59.00 754.35 65.00 760.00

x 100mm i/d P-Trap Each 59.00 870.02 65.00 876.00

B For 75mm i/d pipes

i 75mm i/d H.C.I. Heal Rest Bend Each 59.00 518.59 65.00 524.00

ii 75mm i/d Door Tee Each 59.00 746.64 65.00 753.00

iii 75mm i/d Plain Tee Each 59.00 626.57 65.00 632.00

iv 75mm i/d Door Bend Each 59.00 498.76 65.00 505.00

v 75mm i/d Bend plain Each 59.00 421.65 65.00 428.00

vi 75mm i/d Cowls Each 11.00 283.39 12.00 284.00

vii 75mm i/d Collars Each 59.00 293.85 65.00 300.00

viii Off sets 75mm Projection Each 59.00 469.02 65.00 475.00

ix Off sets 150mm Projection


Each 59.00 628.76 65.00 635.00

Chapter-30 Page 570 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
30.81 Providing and fixing in position Centrifugally cast
(ii) iron special for soil waste vent or anti syphonage
pipes to I.S.I specifications of E.L.C manufacture
or any other reputed firm including cutting and
wastage etc. cutting holes in walls roofs or floors
etc. and making good to its original condition but
excluding cost of lead joining.

A For 100mm i/d pipes

i 100mm i/d Centrifugally cast iron Heal Rest


Bend Each 59.00 584.51 65.00 590.00

ii 100mm i/d Door Tee


Each 59.00 746.88 65.00 753.00

iii 100mm i/d Plain Tee


Each 59.00 671.60 65.00 678.00

iv 100mm i/d Door Bend


Each 59.00 558.20 65.00 564.00

v 100mm i/d Bend plain


Each 59.00 492.87 65.00 499.00

vi 100mm i/d Cowls


Each 11.00 372.38 12.00 373.00

vii 100mm i/d Collars


Each 59.00 431.17 65.00 437.00

viii 100mm i/d Off sets 75mm projection


Each 59.00 549.11 65.00 555.00

ix Off sets 150mm projection


Each 59.00 620.79 65.00 627.00

x 100mm i/d P-Trap


Each 59.00 819.47 65.00 825.00

B For 75mm i/d pipes

i 75mm i/d Centrifugally cast iron Heal Rest


Bend Each 59.00 444.79 65.00 451.00

ii 75mm i/d Door Tee


Each 59.00 517.36 65.00 523.00

iii 75mm i/d Plain Tee


Each 59.00 467.45 65.00 473.00

iv 75mm i/d Door Bend


Each 59.00 405.76 65.00 412.00

v 75mm i/d Bend plain


Each 59.00 351.33 65.00 357.00

vi 75mm i/d Cowls


Each 11.00 300.71 12.00 302.00

vii 75mm i/d Collars


Each 59.00 327.75 65.00 334.00

Chapter-30 Page 571 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

viii Off sets 75mm projection


Each 59.00 378.56 65.00 384.00

ix Off sets 150mm projection


Each 59.00 460.21 65.00 466.00

30.81 Providing and fixing in position SWR UPVC


(iii) special for soil waste vent or anti syphonage
pipes as per as per IS - 14735 including cutting
and wastage etc. cutting holes in walls roofs or
floors etc. and making good to its original
condition but excluding cost of lead joining.

A For 160mm o/d pipes

i Single Tee with Door Each 59.00 504.85 65.00 511.00

ii Single Tee Each 59.00 429.03 65.00 435.00

iii Door Elbow 90 degree (all side socket) Each 36.00 321.13 40.00 325.00

iv Elbow 90 degree (all side socket) Each 36.00 300.07 40.00 304.00

v Vent Cowl Each 11.00 67.74 12.00 69.00

vi Coupler Each 36.00 204.87 40.00 208.00

vii Single Y-Junction Each 59.00 558.77 65.00 565.00

viii Reducing Tee 160mm x 110mm Each 83.00 384.50 91.00 393.00

ix Reducing Door Tee 160mm x 110mm Each 83.00 416.51 91.00 425.00

x Reducing Single Y 160mm x 110mm Each 83.00 471.27 91.00 480.00

B For 110mm o/d pipes

i Door Cap Each 3.10 69.75 3.00 70.00

ii Single Tee With Door Each 59.00 224.32 65.00 230.00

iii Single Tee Each 59.00 195.68 65.00 202.00

iv Door Elbow 90 Degree (All side socketed)


Each 36.00 188.03 40.00 192.00

v Elbow 90 Degree (All side socketed) Each 36.00 154.31 40.00 158.00

Chapter-30 Page 572 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
vi Vent Cowls Each 11.00 43.09 12.00 44.00

vii Reducer 110mm x 75mm Each 24.00 86.05 26.00 88.00

viii Coupler Each 36.00 105.45 40.00 109.00

ix P Trap/Floor Trap 110mm x 110mm Each 59.00 321.20 65.00 327.00

x P Trap/Floor Trap 110mm x 75mm Each 59.00 294.25 65.00 300.00

xi Single Y-Junction Each 59.00 227.70 65.00 234.00

xii Single Y-Junction with door Each 59.00 290.89 65.00 297.00

xiii Double Y-Junction Each 83.00 314.59 91.00 323.00

xiv Double Y-Junction with door Each 83.00 379.44 91.00 388.00

xv 110x75 Reducer Tee Each 59.00 188.10 65.00 194.00

xvi Cross Tee/Double Tee Each 83.00 243.80 91.00 252.00

xvii Nahani trap without jali 110mmx110mm Each 59.00 172.93 65.00 179.00

xviii Nahani trap without jali 110mmx90mm Each 59.00 163.67 65.00 170.00

xix Nahani trap without jali 110mmx75mm Each 59.00 150.19 65.00 156.00

xx Reducing Tee Ring Type 110mm x 90mm


Each 59.00 223.48 65.00 229.00
with door bend

C For 90mm o/d pipes

i Door Cap
Each 31.00 66.37 34.00 69.00

ii Single Tee With Door


Each 59.00 205.79 65.00 212.00

iii Single Tee


Each 59.00 175.47 65.00 181.00

iv Door elbow 90 degree (all side socket)


Each 36.00 136.63 40.00 140.00

v Elbow 90 degree (all side socket)


Each 37.00 114.71 41.00 118.00

vi Vent Cowls
each 11.00 35.72 12.00 37.00

Chapter-30 Page 573 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(vii) Cross Plain Tee
each 83.00 217.69 91.00 226.00

(viii) Coupler (Description Changed)


each 36.00 103.78 40.00 107.00

(ix) Single Y-Junction


each 59.00 197.37 65.00 203.00

D For 75mm o/d pipes

(i) Door Cap


each 31.00 57.95 34.00 61.00

(ii) Single Tee With Door (Description


Changed) each 59.00 151.03 65.00 157.00

(iii) Single Tee (Description Changed)


each 59.00 132.50 65.00 138.00

(iv) Door elbow 90 degree (all side socket)


(Description Changed) each 36.00 77.66 40.00 81.00

(v) Elbow 90 degree (all side socket)


(Description Changed) each 36.00 70.92 40.00 75.00

(vi) Vent Cowls (Description Changed)


each 11.00 29.83 12.00 31.00

(vii) Coupler (Description Changed)


each 36.00 70.92 40.00 75.00

(viii) P Trap/Floor Trap 75mm x 75mm


each 59.00 195.68 65.00 202.00

(ix) Single Y-Junction


each 59.00 143.44 65.00 149.00

(x) Single Y-Junction with door


each 59.00 173.78 65.00 180.00

(xi) Double Y-Junction


each 83.00 200.84 91.00 209.00

(xii) Double Y-Junction with door


each 83.00 252.24 91.00 261.00

(xiii) Cross Tee/Double Tee


each 59.00 168.72 65.00 175.00

Chapter-30 Page 574 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
30.82 Providing and laying water proofing treatment to
vertical and horizontal surfaces of depressed
portions of W.C., kitchen and the like consisting
of:
i) Ist course of applying cement slurry @ 4.4 Kg/
sqm mixed with water proofing compound
conforming to IS : 2645 in recommended
proportions including rounding off junction of
vertical and horizontal surface.
ii) IInd course of 20 mm cement plaster 1:3 (1
cement : 3 coarse sand) mixed with water 10sqm 2808.00 5005.85 3089.00 5287.00
proofing compound in recommended proportion
including rounding off junction of vertical and
horizontal surface.
iii) IIIrd course of applying blown or residual
bitumen applied hot at 1.7 kg per sqm of area.
iv) IVth course of 400 micron thick PVC sheet.
(Overlaps at joints of PVC sheet should be 100
mm wide and pasted to each other with bitumen
@ 1.7 Kg/sqm).

30.83 Providing and laying water proofing treatment in


sunken portion of WCs, bathroom etc., by
applying cement slurry mixed with water proofing
cement compound consisting of applying : a)
First layer of slurry of cement @ 0.488 kg /sqm
mixed with water proofing cement compound @
0.253 kg/sqm. This layer will be allowed to air
cure for 4 hours. b) Second layer of slurry of
cement @ 0.242 kg/ sqm mixed with water 10sqm 2530.00 3187.12 2783.00 3505.84
proofing cement compound @ 0.126 kg/ sqm.
This layer will be allowed to air cure for 4 hours
followed with water curing for 48 hours. The rate
includes preparation of surface, treatment and
sealing of all joints, corners, junctions of pipes
and masonry with polymer mixed slurry.

30.84 Providing opening of required size & shape for


wash basin/ kitchen sink in kitchen platform,
vanity counter and similar location in marble/
granite/ stone work, including necessary holes
each 962.00 1058.20
for pillar taps etc. including moulding, rubbing
and polishing of cut edges etc. complete.

30.85 Cutting chase in brick walls in cement or in floor


for embedding G.I. or C.I pipes line and making
good the same to its original condition.

Chapter-30 Page 575 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Size 75 mm x 75 mm
m 69.00 76.00

(b) Size 150 mm x 150 mm


m 114.00 125.00

(c) Size 75 mm x 50 mm
m 57.00 63.00

(d) Size 225 mm x 225 mm


m 171.00 188.00

30.86 Dismantling H.C.I Soil pipes including disposal


as desired by the Engineer-in-Charge.

(a) 100mm i/d H.C.I. pipe m 25.00 28.00

(b) 75mm i/d H.C.I. pipe m 24.00 26.00

(c) 50mm i/d H.C.I. pipe m 24.00 26.00

30.87 Dismantling H.C.I specials including


dismantalling of lead joints including cartage /
disposal within 5 Km.

(a) 100mm i/d H.C.I. specials


each 33.00 36.00

(b) 75mm i/d H.C.I. specials


each 26.00 29.00

(c) 50mm i/d H.C.I. specials


each 26.00 29.00

30.88 Dismantling Sanitary fixtures such as


Eurpoean/Indian/Orissa W.C., PVC / China ware
cistern, Wash Hand Basin, Urinal Pot, Sinks and
CP Fittings and disposal of dismantled material
within a distance of 100 Mtr. complete in all
respect as required by Engineer-in-Charge.

(a) Eurpoean/Indian/Orissa W.C.,


each 219.00 241.00

(b) PVC / China Ware Cistern


each 164.00 180.00

(c ) Wash Hand Basin / Urinal Pot


each 109.00 120.00

(d) Stainless Steel Sink /Mosaic Sink


each 314.00 345.00

(e) CP Bib Cock/Angle Cock/Stop


Cock/Shower/Bottle Trap each 24.00 26.00

(f) Wall mixer / Sink Mixer / Basin Mixer /


Concealed Stop Cock each 55.00 61.00

Chapter-30 Page 576 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(g) Bathroom Assessories such as Soap Dish,


Towel Rail, Towel Ring, Towel Bracket,
Mirror, Toilet Paper Holder, Seat Cover, Jet
Pressure and all other accessories.
each 22.00 24.00

30.89 Dismantling heavy flat iron clamps including


cartage / disposal within 5 Km.

(a) 100mm i/d Clamps


each 21.00 23.00

(b) 75mm i/d Clamps


each 23.00 25.00

(c) 50mm i/d Clamps


each 23.00 25.00

30.90 Painting H.C.I soil waste and vent pipes and


fitting with black bitumastic ISI marked paint of
approved make (to the approval of Engineer-in-
charge) one coat on old work.

(a) 100mm i/d H.C.I. Pipe m 6.93 19.53 8.00 20.00

(b) 75mm i/d H.C.I. Pipe m 5.05 14.21 6.00 15.00

30.91 Painting H.C.I soil waste and vent pipes and


fitting with black bitumastic ISI marked paint of
approved make (to the approval of Engineer-in-
charge) two coats on new work.

(a) 100mm i/d H.C.I. Pipe


m 10.92 33.43 12.00 35.00

(b) 75mm i/d H.C.I. Pipe


m 7.94 24.32 9.00 25.00

30.92 Painting H.C.I soil waste and vent pipes and


fitting with I.S.I marked quality synthetic enamel
paints in all shades of approved make (to the
approval of Engineer-in-charge) on old work one
coat paint including rubbing down old work.

(a) 100mm i/d H.C.I. Pipe


m 6.19 19.80 7.00 20.00

(b) 75mm i/d H.C.I. Pipe


m 4.50 20.29 5.00 21.00

30.93 Painting H.C.I soil waste and vent pipes and


fitting with I.S.I marked quality synthetic enamel
paints in all shades of approved make (to the
approval of Engineer-in-charge) on old work two
coat paint including rubbing down old work.

Chapter-30 Page 577 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(a) 100mm i/d H.C.I. Pipe


m 11.67 29.39 13.00 31.00

(b) 75mm i/d H.C.I. Pipe


m 8.49 21.38 9.00 22.00

30.94 Dismantling of wall tiles at any floor of the


building, laid in cement mortar including scraping
of cement plaster and disposal of malba at a sqm 104.00 114.00
suitable place within a distance of 100 Mtrs of the
complex complete in all respect.

30.95 Dismantling of floor tiles at any floor of the


building, laid in cement mortar including
dismantling of cement concrete base and
disposal of malba at a suitable place within a sqm 108.00 119.00
distance of 100 Mtrs of the complex complete in
all respect.

Internal Water Supply

30.96 Providing and fixing in position automatic brass


Ball Cock in tanks.

A Plastic Ball Cock with rod and Plastic


Ball

(i) 15mm i/d


each 59.00 279.92 65.00 286.00

(ii) 20mm i/d


each 59.00 386.08 65.00 392.00

(iii) 25mm i/d


each 59.00 669.13 65.00 675.00

(iv) 32mm i/d


each 82.00 909.32 90.00 918.00

(v) 40mm i/d


each 82.00 1103.08 90.00 1111.00

(vi) 50mm i/d


each 82.00 1588.33 90.00 1597.00

B Brass Ball Cock with rod and Plastic


Ball

(i) 15mm i/d


each 55.00 489.76 61.00 495.00

(ii) 20mm i/d


each 55.00 574.15 61.00 580.00

(iii) 25mm i/d


each 55.00 902.69 61.00 908.00

Chapter-30 Page 578 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iv) 32mm i/d
each 82.00 1518.73 90.00 1527.00

(v) 40mm i/d


each 82.00 1707.29 90.00 1715.00

(vi) 50mm i/d


each 82.00 2928.20 90.00 2936.00

30.97 Providing & placing in position on terrace (at all


A floor levels) HDPE water storage tanks of
approved make (to the approval of Engineer -in-
charge) with cover with suitable locking
arrangement and making necessary holes for
inlet, outlet and over flo pipes but without fittings
and base support for tank.

(i) Triple Layer Tanks Litre 0.56 10.80 1.00 11.00

(ii) Double Layer Tanks Litre 0.56 8.72 1.00 9.00

30.97 Providing & fixing in position on terrace (at all


B floor levels) HDPE tank cover for water storage
tanks of approved make (to the approval of
Engineer -in-charge) complete in all respect.

(i) Upto 500 ltr capacity tank


each 49.07 308.28 54.00 313.00

(ii) For 1000 ltr capacity tank and above


each 49.07 373.08 54.00 378.00

30.98 Providing and fixing in position G.I. Tank Nipple


of approved make (to the approval of Engineer-in-
charge) in PVC Water storage tanks complete in
all respect.

(a) G.I. tank nipple 15mm i/d


each 22.00 91.85 24.00 94.00

(b) G.I. tank nipple 20mm i/d


each 22.00 118.10 24.00 120.00

(c ) G.I. tank nipple 25mm i/d


each 27.00 188.72 30.00 191.00

(d) G.I. tank nipple 32mm i/d


each 33.00 266.11 36.00 269.00

(e) G.I. tank nipple 40mm i/d


each 55.00 357.95 61.00 363.00

(f) G.I. tank nipple 50mm i/d


each 55.00 535.84 61.00 541.00

Chapter-30 Page 579 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
DRAINAGE

30.99 Providing and fixing in position gully traps fixed in


cement concrete 1:4:8 complete with Grating
150mm x 150mm, cover and frame clear
opening 300mm x 300mm and out of side size
330mm x 330mm and chamber including cost of
all bricks work in cement morter 1:5 cement
concrete 1:2:4 in coping around cover and frame
etc. as per standard design minimum depth of
water should be 150 mm with a minimum seal
50mm.

(a) 100mm internal Diametre S.W.gully trap


with H.C.I. grating and cast iron cover
weighing approximately 7.26 kg. and frame
clear opening 300mm x 300mm and out of each 255.00 1832.00 281.00 1858.00
side size 330mm x 330mm

(b) 100mm internal Diametre H.C.I. gully trap


with H.C.I. grating and cast iron cover
weighing approximately 7.26 kg. and frame
each 255.00 2341.34 281.00 2367.00
clear opening 300mm x 300mm and out of
side size 330mm x 330mm

(c) 150mm internal Diametre S.W.gully trap


with H.C.I. grating and cast iron cover
weighing approximately 7.26 kg. and frame
each 255.00 1844.94 281.00 1870.00
clear opening 300mm x 300mm and out of
side size 330mm x 330mm

30.100 Providing and fixing in position vitreous


Chinaware white channel of approved make (to
the approval of Engineer-in-charge) of size 600
each 66.00 484.90 73.00 492.00
mmx100mm including laying and fixing in
cement concrete 1:2:4 complete in all respect.

30.101 Providing and fixing in postion storage type


automatic electric water heater pressure / non
pressure type thermostatically controlled, single
phase, vertical wall mounted of approved make
(to the approval of Engineer-in-charge) with
thermostats, inner container of stainless steel
complete with 1 Mtr. three core flexible cord with
plug, non return valve and pressure release
valve complete including fixing and testing
complete in all respect.

Chapter-30 Page 580 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) 25 litre capacity water heater each 438.00 8850.56 482.00 8894.00

(b) 35 litre capacity water heater each 656.00 12738.75 722.00 12804.00

(c) 50 litre capacity water heater each 711.00 14700.22 782.00 14771.00

30.101 Providing and fixing in postion storage type


(A) automatic electric water heater pressure type
thermostatically controlled, single phase wall
mounted of approved make (to the approval of
Engineer-in-charge) with thermostats, inner
container of stainless steel, Inner glass lining
with B-Rating minimum 3 stars complete with 1
Mtr. three core flexible cord with plug, non return
valve and pressure release valve complete
including fixing and testing complete in all
respect.

a Vertical type

(i) 15 litre capacity water heater


each 328.00 10793.90 361.00 10827.00

(ii) 25 litre capacity water heater


each 438.00 12594.65 482.00 12638.00

(iii) 40 litre capacity water heater


each 656.00 13396.64 722.00 13462.00

(iv) 60 litre capacity water heater


each 711.00 16250.83 782.00 16322.00

(v) 80 litre capacity water heater


each 766.00 18521.81 843.00 18598.00

b Horizontal type

(i) 15 litre capacity water heater


each 328.00 10268.99 361.00 10302.00

(ii) 25 litre capacity water heater


each 438.00 12069.74 482.00 12114.00

(iii) 40 litre capacity water heater


each 656.00 13396.64 722.00 13462.00

(iv) 60 litre capacity water heater


each 711.00 16250.83 782.00 16322.00

(v) 80 litre capacity water heater


each 766.00 18521.81 843.00 18598.00

Chapter-30 Page 581 CSR-2020


CSR−2020−Final
CSR−2020−Final
CHAPTER NO. 31
MAINTENANCE OF BUILDINGS AND FURNITURE
Notes :-
(i) Unless otherwise stated, the labour rates include rehandling of materials within 100 mtr.

Sr. Description Unit Zone-A Zone-B


No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
31.1 Repairs to plaster in patches of Area 2.5
sqm and under including cutting the patch
in proper shape and preparing and
plastering the surface of the walls
complete including disposal of rubbish
to the dumping ground within 50 Metres
lead
(a) With cement mortar 1:4 (1 cement:
4 sand) Taking area 2.5 sqm sqm 99.00 150.00 109.00 159.90

(b) With cement mortar 1:7 (1 cement:


7 sand) Taking area 2.5 sqm sqm 99.00 132.00 109.00 142.00

(c) With cement lime mortar 1:1:7 (


cement:1: lime putty:7 fine sand) sqm 99.00 151.00 109.00 161.00
Taking area 2.5 sqm
31.2 Fixing chowkhats in existing opening
including embedding chowkhats in floors
or walls, cutting masonry for hold fasts
embedding hold fasts in cement concrete
holes with cement concrete 1:3:6,
painting two coats of bitumen to sides of
chowkhats and making good the
damages to walls and floors as required
complete including disposal of rubbish to
the dumping ground within 50 m lead
(a) Door chowkhats (1.22 m x 2.06 m)
each 419.00 488.00 461.00 530.00

(b) Window chowkhats size


1.52mx1.22m each 354.00 419.00 389.00 454.00

(c) Clerestorey window chowkhats


(1.22 m x 0.45 m) each 301.00 337.00 331.00 367.00

31.3 Making the opening in brick masonry


including dismantling, fixing, chowkhats in
floor or walls, cutting masonry & fixing
hold fasts in cement concrete 1:3:6,
painting two coats of coal tar to sides of
chowkhats and making good the
damages to walls and floors complete to
match the existing surface :--
(a) For Door chowkhats (1.22 m x 2.06
m) each 831.00 964.00 914.00 1047.00

(b) For window chowkat (size 1.52m x


1.22m) each 694.00 834.00 763.00 903.00

Chapter-31 Page 582 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
(c) For Clerestory window (size 1.22 m
x 0.46 m each 571.00 641.00 628.00 698.00

31.4 Providing and fixing wooden cleats of size


and 100mmx75mmx50mm to doors and
windows with approved mild steel fittings
including removal of old cleats where
necessary including painting, polishing
or bees waxing to match the existing
shade :-

(a) Ist class Teak wood cleats with


steel hinges and screws each 78.00 170.00 86.00 178.00

(b) Ist class Deodar wood cleats with


steel hinges and screws each 78.00 169.00 86.00 177.00

(c) Sal wood cleats with steel hinges


and screws each 78.00 142.00 86.00 150.00

(d) Ist class kail wood cleats with steel


hinges and screws each 78.00 148.00 86.00 156.00

(e) Red Meranthi wood cleats with


steel hinges and screws each 78.00 132.00 86.00 140.00

31.5 Renewing glass panes with putty and


nails wherever necessary
(a) Glass Panes weighing 8.44 Kg/sqm
sqm 185.00 228.00 204.00 247.00

(b) Glass panes weighing 10.75


Kg/sqm sqm 185.00 610.00 204.00 629.00

(c) Frosted glass panes weighing 8.44


Kg/sqm sqm 185.00 578.00 204.00 597.00

31.6 Renewing glass panes with wooden fillets


wherever necessary
(a) Glass panes weighing 8.44 Kg/sqm
sqm 179.00 669.00 197.00 687.00

(b) Glass panes weighing 10.75


Kg/sqm sqm 179.00 764.00 197.00 782.00

(c) Frosted glass Panes weighing


8.44Kg/sqm sqm 179.00 733.00 197.00 751.00

31.7 Renewing glass panes and refixing


existing wooden fillets
(a) Glass panes weighing 8.44 Kg/sqm
sqm 111.00 398.00 122.00 409.00

(b) Glass panes weighing 10.75


kg/sqm sqm 111.00 493.00 122.00 504.00

(c) Frosted glass Panes weighing


8.44Kg/sqm sqm 139.00 490.00 153.00 504.00

Chapter-31 Page 583 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
31.8 Supplying and fixing new wooden fillets
wherever necessary
(a) Ist class teak wood fillets
3.20mx0.0125mx0.0125m mtr 18.00 50.00 20.00 52.00

(b) Ist class Deodar wood fillets 3.20m


x 0.0125m x 0.0125m mtr 18.00 49.00 20.00 51.00

(c) Ist class Kail wood fillets 3.20m x


0.0125m x 0.0125m Mtr 18.00 40.00 20.00 42.00

(d) Red Meranthi wood fillets


3.20mx0.0125mx0.0125m mtr 18.00 33.00 20.00 35.00

31.9 Renewal of old putty of glass panes

(a) Refixing old glass panes with putty and


Nails sqm 139.00 178.00 153.00 192.00

(b) Fixing old glass panes with wooden fillets


sqm 67.00 67.00 74.00 74.00

31.10 Providing and fixing 16mm M.S. fan


clamps of standard shape and size in
existing R.C.C. slab including cutting and
each 278.00 324.00 306.00 352.00
making good and painting exposed
portion of the clamps complete

31.11 Regrading terracing of mud plaster


covered with tiles or bricks in cement by
dismantling tiles or bricks, removing mud
plaster, preparing the surface of mud
plaster to proper, slope, relaying mud
plaster Gobri leaping and tiles or bricks
grouted in cement mortar 1:3 (1 cement sqm 382.00 401.00 420.00 439.00
and 3 fine sand) including replacing
unserviceable tiles, or bricks with new
over and disposal of unserviceable
material to the dumping ground within 50
m lead (The cost of new tiles or bricks
excluded).
31.12 Providing and fixing cotton string 6mm dia
Metre (machine made) including
supplying and fixing, wherever necessary,
the plate and ring as per existing fitting or
as required of the clerestorey window

(a) Mild steel plate and ring


each 71.00 544.00 78.00 551.00

(b) Brass plate and ring


each 71.00 544.00 78.00 551.00

Chapter-31 Page 584 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
31.13 Renewing wooden battens in roof
including making good the holes in wall
and painting with oil type wood
preservative of approved brand and
manufacture complete including
removal of rubbish to the dumping
ground with in 50 Metre lead
(a) Salwood Battens
cum 7477.00 136747.00 8225.00 137495.00

(b) First class deodar wood battens


cum 7477.00 214526.00 8225.00 215274.00

(c) Ist class Kail wood battens


cum 7477.00 155370.00 8225.00 156118.00

(d) Red meramthi wood battens


cum 7477.00 108655.00 8225.00 109403.00

(e) Yelow meramthi wood battens


cum 7477.00 105391.00 8225.00 106139.00

(f) Golden meramthi wood battens


cum 7477.00 94827.00 8225.00 95575.00

31.14 Renewing wooden beams in roofs


including making good the holes in wall
and painting with oil type wood
preservative of approved brand and
manufacture complete including removal
of rubbish to the dumping ground within
50 m lead.
(a) Sal wood Battens (Length
4mx0.228mx0.127 cum 5980.00 135249.00 6578.00 135847.00

(b) Ist class deodar wood beams


cum 5980.00 213029.00 6578.00 213627.00

(c) Hollock wood beams


cum 5980.00 116964.00 6578.00 117562.00

(d) Kail wood beams


cum 5980.00 153872.00 6578.00 154470.00

(e) Above 4 metre and upto 5.00 metre


length
(i) Sal wood beams
cum 7779.00 137749.00 8557.00 138527.00

(ii) Ist class deodar wood beams


cum 7779.00 214828.00 8557.00 215606.00

(iii) Ist class kail wood beams


cum 7779.00 155671.00 8557.00 156449.00

(iv) HOLLOCK WOOD BEAMS


cum 7779.00 118763.00 8557.00 119541.00

(v) RED MERANRHI BEAMS


cum 7779.00 108957.00 8557.00 109735.00

Chapter-31 Page 585 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
(vi) YELLOW MERANRHI BEAMS
cum 7779.00 105693.00 8557.00 106471.00

(vii) GOLDEN CHAMP BEAMS


cum 7779.00 81018.00 8557.00 81796.00

31.15 Renewing 100mm dia. 2.5 m long sal


wood Ballies post embedded 60cm in the
ground in a hole 45cm. dia. and 70cm
deep, filled with cement concrete 1:5:10
(1 cement, 5 fine sand, 10 stone
aggregate) (40 mm. nominal size)
including necessary excavation cement each 648.00 1113.00 713.00 1178.00
concrete foundation & painting two coats
with oil type wood preservative of
approved brand and manufacture
complete, including disposal of rubbish to
the dumping ground within 50 m lead.

31.16 Raking out joints in lime or cement mortar


and preparing the surface for repointing
or replastering including disposal of
rubish to the dumping ground within 50 m sqm 152.00 203.00 167.00 218.00
lead (excluding the cost of scraping of
plaster and replastering).

31.17 Extra for making opening or recesses in


A.C. corrugated/ semi corrugated sheet
roofing of girth not more than 1 Metre

(a) Those exceeding 100 square


centiMetre in area each 465.00 1115.00 512.00 1162.00

(b) Those exceeding 100 square


centimetre but not exceeding 400 each 620.00 1524.00 682.00 1586.00
Sq. cm in area
(c) Those exceeding 400 square
centimetre in area each 775.00 1858.00 853.00 1936.00

31.18 Flush pointing with cement sand mortar


1:3 (1 cement:3 fine sand) mixed with 5%
crude oil by weight of cement for flat tile
bricks or top of mud plaster
a With brick tiles
sqm 72.00 101.00 79.00 108.00
b With modular brick tiles
sqm 72.00 98.00 79.00 105.00
31.19 Spirit or Wax polishing .

(a) Tabels

(i) Tables (area up to 0.5 Sqm)


Each 222.00 - 244.00

Chapter-31 Page 586 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
(II) Tables (area 0.5 to 1 Sqm)
Each - 349.00 - 384.00
(III) Dinning Tables with Chares (Up to
Each - 1500.00 - 1650.00
8 Nos)
(iv) Tables Pedestal Type
Each - 228.00 - 251.00
(v) Teapoy
Each - 920.00 - 1012.00
(vi) Peg table
Each - 254.00 - 279.00
(vii) Side Board.
Sqm - 355.00 391.00
(b) Chairs

(i) Office with caned back


each - 190.00 - 209.00
(ii) Office with wooden back
each - 222.00 - 244.00
(iii) Dining with caned back
each - 190.00 - 209.00
(iv) Dining with wooden back
each - 222.00 - 244.00
(v) Easy chair
each - 254.00 - 279.00
(vi) Sofa with wooden Arms
each - 444.00 - 488.00
(vii) Sofa chair with wooden Arms
each - 286.00 - 315.00
(viii) Cane sofa III Seater (Varnish )
each - 400.00 - 440.00
(ix) Cane sofa chair (Varnish )
each - 190.00 - 209.00
(c) Almirah or chest of drawers
Each - 1000.00 - 1100.00
(d) Hat and coat stand
Each - 63.00 - 69.00
(e) Office side rack
each - 159.00 - 69.00
(f)Book case of almirah with glazed
each - 762.00 - 838.00
shutters
(g) Commode
each - 190.00 - 209.00
(h) Towel stand
each - 25.00 - 28.00
(i) Bed-steads
each - 203.00 - 223.00
(j) Hat-pegs
Per set - 63.00 - 69.00
(k) Pelmets of doors/windows
sqm - 254.00 - 279.00
31.20 Painting one coat of I.S.I marked quality
paint.
(a) Wooden patras for bath room.
Each - 150.00 - 165.00
(b) Towel stand
each - 150.00 - 165.00

Chapter-31 Page 587 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
(c) Pelmets of doors and windows
Each - 41.00 - 45.00
31.21 Re-canning of chairs with artificial (Plastic
cane)

(a) Easy chairs back and seat (Single


variety) each - 701.00 - 771.00

(b) Office chair back and seat (Single


variety) each - 600.00 - 660.00

(c) Office chair seat only (Single


variety) each - 400.00 - 440.00

(d) Office chair back (Double variety)


each - 301.00 - 331.00

(e) Office chair seat (Double variety)


each - 301.00 - 331.00
31.22 Washing

(a) Durries
Sqm - 20.00 - 22.00
(b) Linen 100
- 600.00 - 660.00
pieces
(c) Bed sheet single
each - 25.00 - 28.00
(d) Bed sheet double
each - 41.00 - 45.00
(e) Pillow cover
each - 10.00 - 11.00
(f) Towel each - 10.00 - 11.00
(g) Napkin each - 5.00 - 6.00
(h) Quilt cover each - 41.00 - 45.00
(j) Apron each - 15.00 - 17.00
(k) Safe Cover Set of - 76.00 - 84.00
Three
(l) Door Curtain above 2.75 Mtr. each - 63.00 - 69.00
(m) Door Curtain up to 2.75mtr. Per Seat - 57.00 - 63.00
(n) Window Curtains Each - 34.00 - 37.00
31.23 Upholstering

(a) Restuffing easy of Sofa Chair


Each - 527.00 - 580.00
(Market Rate)
(b) Restuffing sofa Per Seat - 1015.00 - 1117.00
(c) Recovering easy of sofa chair with
cloth Each - 444.00 - 488.00

(d) Recovering sofa with cloth Each - 952.00 - 1047.00


(e) Recovering and restuffing easy or
sofa chairs Each - 666.00 - 733.00

Chapter-31 Page 588 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
(f) Re-stuffing and Re-converting sofa Per Seat - 635.00 - 699.00
31.24 Dry Cleaning

(a) Woolen Blanket


Each - 254.00 - 279.00
(b) Woolen Carpet
Sqm - 127.00 - 140.00
(c) Door Curtains (Market Rate)
Each - 127.00 - 140.00
(d) Window Curtains
Each - 100.00 - 110.00
(e) Bed cover Single
Each - 80.00 - 88.00
(f) Bed cover double
Each - 140.00 - 154.00
31.25 Shampooing with Machine

(a) Sofa Set


Per Seat - 209.00 - 230.00
(b) Woolen Carpet
Sqm - 80.00 - 88.00
(c) Dewan Cushioned
Each - 350.00 - 385.00
31.26 Cleaning of glass panes both sides Sqm (to
be
measured - 15.00 - 17.00
on one
side only
31.27 Cleaning of joinery with surf soda and Sqm (to
application of oil thereafter. be
measured - 10.00 - 11.00
on Both
sides
31.28 Cleaning of switch boards. (Market Rate)
Each - 2.00 - 2.00

31.29 Cleaning and polishing brass fittings with


brasso. Each - 10.00 - 11.00

31.30 Cleaning of terazzo floors with tartaric


acid with granite finish including machine Sqm - 121.00 - 133.00
charge.

31.31 Tailoring of curtains


Metre - 105.00 - 116.00

31.32 Providing and fixing railing for curtains.

(a) C' Type


Metre 552.00 - 607.00

(b) I' Type


Metre 500.00 - 550.00

31.33 Providing and fixing curtain rail 1.90cm


chrome-plated with end bracket. Including Metre 301.00 - 331.00
sockets and brackets

Chapter-31 Page 589 CSR_2020


CSR−2020−Final
Sr. Description Unit Zone-A Zone-B
No.
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 5 6
31.34 Providing and fixing steel rings chrome-
plated 3.80 cm. dia. for curtains. (Market each 6.00 - 7.00
Rate)
31.35 Providing and fixing plastic rings 3.80cm.
dia. With hooks for curtains. each 4.00 - 4.00

31.36 Providing and fixing double scaffolding


system (cup lock type) on the exterior
side, up to seven story height made with
40 mm dia M.S. tube 1.5 m centre to
centre, horizontal & vertical tubes joining
with cup & lock system with M.S. tubes,
M.S. tube challies, M.S.clamps and M.S.
staircase system in the scaffolding for
working platform etc. and maintaining it in
a serviceable condition for the required
duration as approved and removing it
there after .The scaffolding system shall
be stiffened with bracings, runners,
connection with the building etc wherever sqm 206.00 227.00
required for inspection of work at required
locations with essential safety features for
the workmen etc. complete as per
directions and approval of Engineerin-
charge .The elevational area of the
scaffolding shall be measured for
payment purpose .The payment will be
made once irrespective of duration of
scaffolding.
Note: - This item to be used for
maintenance work judicially, necessary
deduction for scaffolding in the existing
item to be done.

Chapter-31 Page 590 CSR_2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 32
HORTICULTURE
Notes :-

(i) The rates given under this chapter are subject to the P.W.D. specifications.

(ii) Stacks of well decayed farm yard manure 32.5 cm in height, shall be measured and paid for 30
cm height.

(iii) The through rates for planting and maintenance are excluding the cost of irrigation water since
water is available in most of buildings. Wherever water is not available, cost may be included from
item no. 32.52 and quantity may be decided as per specifications, soil type and season.

(iv) The rates noted below are applicable for gardening works in lawns of the buildings, road sides,
high slopes, canal embankments and arboriculture. The depth required to be excavated for
planting of trees/grass etc. shall be decided by the Engineer-in-charge considering the size of root
ball, site and climatic conditions. In exceptional conditions, any deviation from standard
specification shall be paid/ deducted accordingly.

(v) The procurement of earth/sludge or manure shall be from the sources as specified by the
Engineer-in-charge. In case these are imported from a distant place longer than the ones
specified in the items, additional rates shall be paid.

(vi) Rates are inclusive of loading unloading charges unless specified.

(vii) The cost of saplings of trees /shrubs potted plants and specimen plant or grass etc., of higher
specification, if specifically procured for planting shall be paid separately.

(viii) The cost of specialized items for irrigation systems which are not included in this chapter, if
specifically procured, shall be paid separately.

Sr. No. Description Unit Zone-A Zone-B


Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.1 Supplying and stacking at site of work well
decayed farm yard manure from approved site of
work including screening through sieve of I.S. cum 62.00 625.00 68.00 631.00
designation 16 mm with 5 km lead.

32.2 Supplying at site of work good quality top soil,


free from debris and weeds, from approved site cum - 557.00 - 557.00
of work with 5 km lead.

32.3 Supplying of good earth/ soil-less media and/or


organic matter, preparation of top dressing
mixture or pot media

Chapter-32 Page 591 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Screening farm yard manure through
sieve of I.S. designation 16 mm and
cum 85.00 668.00 94.00 677.00
mixing with good earth in ratio of 1:1.

(b) Screening manure through sieve of I.S.


designation 16 mm and mixing with good
cum 85.00 666.00 94.00 675.00
earth in ratio of 1:2.

(c) Screening manure through sieve of I.S.


designation 16 mm and mixing with good
earth and cocopeat in ratio of 2:1:1, cum 85.00 1135.00 94.00 1144.00
adding fertilizers to make potting media.

(d) Mixture of sand and vermicompost in


ratio 1:1 cum 24.00 2878.00 26.00 2880.00

(e) Mixture of neem cake powder and sand


in ratio 1:3 cum 24.00 4646.00 26.00 4648.00

(f) Mixture of cocopeat, vermiculite and


perlite in ratio of 2:1:1, adding fertilizers
to make potting media. cum 24.00 4317.00 26.00 4319.00

32.4 Site clearance

(a) Excavation in dumped stone or malba


including stacking of unserviceable
material separately and disposal of
unserviceable material. Lead up to 50 m cum 332.00 332.00 365.00 365.00
and lift up to 1.5 m, disposed material to
be neatly dressed in all kinds of soils.

(b) Surface dressing of ground including


removing rank vegetation and inequalities
not exceeding 15 cm deep and disposal
of rubbish, lead up to 50 m and lift up to sqm 15.00 15.00 17.00 17.00
1.5 m in all kinds of soil.

(c) Clearing jungle manually including


uprooting rank vegetation, grass, woody
vegetation up to 30 cm girth measured at
height of 1 m above ground level and sqm 7.96 7.96 8.76 8.76
removal of rubbish up to distance of 50 m
outside the periphery of the area cleared

Chapter-32 Page 592 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Felling trees of the girth (measured at a
height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material, disposal of each 237.00 237.00 261.00 261.00
unserviceable material and filling in pits
and repressions - Beyond 30 cm girth up
to and including 60 cm girth.

(e) Felling trees of the girth (measured at a


height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material, disposal of each 1066.00 1066.00 1173.00 1173.00
unserviceable material and filling in pits
and repressions - Beyond 60 cm girth up
to and including 120 cm girth.

(f) Felling trees of the girth (measured at a


height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material, disposal of
each 4976.00 4976.00 5474.00 5474.00
unserviceable material and filling in pits
and repressions - Beyond 120 cm girth
up to and including 240 cm girth.

(g) Felling trees of the girth (measured at a


height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material, disposal of each 9952.00 9952.00 10947.00 10947.00
unserviceable material and filling in pits
and repressions - Above 240 cm girth.

32.5 Rough grassing including uprooting rank


vegetation and weeds by digging the area to a
depth of 15 cm, removing all weeds and other
growth with roots by forking repeatedly, breaking
clods, mixing fertilizer, levelling and dressing for
planting new grass, including disposal of all sqm 23.00 28.00 25.00 30.00
rubbish with all leads and lifts, planting doob
grass in rows 15 cm apart in both directions,
watering and maintenance till first mowing.

Chapter-32 Page 593 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.6 Maintenance of rough grassing including
fertilizer application, watering and mowing for
sqm 20.00 20.00 22.00 22.00
one year.

32.7 Grassing of grounds with doob grass including


uprooting rank vegetation and weeds by digging
the area to a depth of 15 cm, removing all weeds
and other growth with roots by forking
repeatedly, breaking clods, mixing fertilizer,
rough dressing and then fine dressing for sqm 27.00 35.00 30.00 38.00
planting new grass, including disposal of all
rubbish with all leads and lifts, planting grass
roots in rows 10 cm apart in both directions,
watering, weeding and maintenance till turf is
formed

32.8 Maintenance of grassy grounds including


fertilizer application, watering, weeding, top
dressing with good earth and manure mixture,
maintaining fine level, regular mowing and sqm 25.00 30.00 28.00 33.00
removal of rubbish with all lifts and leads.

32.9 Fine grassing including uprooting rank


vegetation and weeds by digging the area to a
depth of 30 cm, removing all weeds and other
growth with roots by forking repeatedly, breaking
clods, rough dressing, flooding with water,
uprooting fresh growth after 10 to 15 days,
mixing fertilizer and then fine dressing for
planting new grass, including disposal of all
rubbish with all leads and lifts, watering,
weeding and maintenance for 30 days or till thick
lawn is formed.

(a) Planting Selection no. 1 grass roots in


rows 5 cm apart in both directions. sqm 45.00 69.00 50.00 74.00

(b) Planting Selection no. 1 grass roots in


rows 7.5 cm apart in both directions. sqm 41.00 56.00 45.00 60.00

(c) Planting Selection no. 1 grass roots in


rows 10 cm apart in both directions. sqm 40.00 51.00 44.00 55.00

Chapter-32 Page 594 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(d) Providing and fixing Selection no. 1 grass
turf with earth 50mm to 60 mm thickness
and ramming with required wooden tools, sqm 42.00 125.00 46.00 129.00
rolling with light roller to make the surface
smooth and even.

(e) Planting Neelgiri/ Mexican grass roots in


rows 5 cm apart in both directions. sqm 45.00 114.00 50.00 119.00

(f) Planting Neelgiri/ Mexican grass roots in


rows 7.5 cm apart in both directions. sqm 41.00 83.00 45.00 87.00

(g) Planting Neelgiri/ Mexican grass roots in


rows 10 cm apart in both directions. sqm 40.00 70.00 44.00 74.00

(h) Providing and fixing Neelgiri/ Mexican


grass turf with earth 50mm to 60 mm
thickness and ramming with required
wooden tools, rolling with light roller to sqm 42.00 278.00 46.00 282.00
make the surface smooth and even.

32.10 Maintenance of fine grass lawn for one year


including fertilizer application, watering, weeding,
top dressing with good earth and manure
mixture, maintaining fine level, regular mowing sqm 44.00 49.00 48.00 53.00
and removal of rubbish with all lifts and leads.

32.11 Removal of weeds from lawn grass.

(a) Weeding out of lawn, where weeds are


up to 50%, by removal of all weeds and
other wild growth with roots by forking
sqm 15.00 15.00 17.00 17.00
including disposal of garden rubbish with
all loads and lifts complete.

(b) Weeding out of lawn, where weeds are


up to 25%, by removal of all weeds and
other wild growth with roots by forking sqm 7.74 7.74 8.51 8.51
including disposal of garden rubbish with
all loads and lifts complete.

(c) Broadleaf Weed control in garden using


weedicide, once, including cost of sqm 0.10 0.25 0.11 0.26
chemical.

Chapter-32 Page 595 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(d) Nutgrass (Motha) control in garden using


weedicide, once, including cost of sqm 0.10 0.56 0.11 0.57
chemical.

32.12 Renovating lawns including weeding, cheeling


the grass, forking the ground, top dressing with
mixture of good earth and manure 1:1, mixing
the same with forked soil, watering and
maintaining the lawn for 30 days or more till the sqm 27.00 43.00 30.00 46.00
grass forms a thick lawn free from weeds and fit
for mowing and disposal of rubbish as directed

32.13 Digging of pits in all kinds of soil & refilling the


same, with the excavated earth mixed with well
decayed farm yard manure @ 30% of pit volume cum 208.00 388.00 229.00 409.00
and insecticide for termite control

32.14 Supplying and planting permanent trees in


prepared pits and watering each 5.16 170.00 5.68 171.00

32.15 Maintenance of tree including fertilization,


application of insecticide, watering, weeding,
training, pruning, disposal of debris and other
activities.

(a) Maintenance of trees for the 1st year each 629.00 704.00 692.00 767.00

(b) Maintenance of trees for the 2nd year each 420.00 545.00 462.00 587.00

(c) Maintenance of trees for the 3rd year each 314.00 477.00 345.00 508.00

(d) Maintenance of trees for the 4th and 5th


each 189.00 428.00 208.00 447.00
year (Cost per year)

(e) Maintenance of trees for 6th year


each 126.00 217.00 139.00 230.00
onwards (Cost per year)

32.16 Pruning, trimming, shaping of mature trees


/shrubs (ht 15 feet and above) including removal each 66.00 66.00 73.00 73.00
of cut materials up to 50m lead.

32.17 Staking of Trees

(a) Providing and fixing single stake for a


tree with bamboo 38 mm dia, 1.50 m long each 6.45 125.00 7.10 126.00

Chapter-32 Page 596 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(b) Providing and fixing double stake for tree


with bamboos 38 mm dia, 1.50 m long each 13.00 250.00 14.00 251.00

(c) Three point guying of large palms and


trees with coir ropes each 17.00 163.00 19.00 165.00

32.18 Supplying and planting permanent shrubs in


prepared pits and watering each 2.58 66.00 2.84 66.00

32.19 Maintenance of shrubs for one year including


training, pruning, fertilization, application of
insecticide, watering and weeding.

(a) Individual shrubs each 157.00 210.00 173.00 226.00

(b) Shrubs planted in groups making


continuous block. sqm 252.00 311.00 277.00 336.00

32.20 Planting specimen plants in prepared pits and


watering each 10.00 1406.00 11.00 1407.00

32.21 Maintenance of specimen plants for one year


including, fertilization, application of insecticide, each 629.00 824.00 692.00 887.00
watering and weeding.

32.22 Planting seasonal flower in beds

(a) Planting seedlings including digging of


beds to 15 cm depth and mixing FYM,
fertilizer and insecticides, planting of sqm 36.00 259.00 40.00 263.00
seedlings at 20cm distance from plant to
plant and row to row.

(b) Planting seasonals at flowering stage in


beds including digging of beds to 15 cm
depth and mixing FYM, fertilizer and
sqm 36.00 1020.00 40.00 1024.00
insecticides, planting at 20cm distance
from plant to plant and row to row.

32.23 Maintenance of seasonal flower beds including


digging of beds to 15 cm depth mixing FYM,
fertilizer and insecticides, planting of sapling at
sqm 176.00 792.00 194.00 810.00
20cm distance from plant to plant and row to
row, three times a year.

Chapter-32 Page 597 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

32.24 Planting bulbous flower beds including digging of


beds to 15 cm depth and mixing FYM, fertilizer
and insecticides, planting of sapling at 30cm
sqm 36.00 565.00 40.00 569.00
distance from plant to plant and row to row.

32.25 Maintenance of bulbous flower beds including


digging of beds to 15 cm depth mixing FYM,
fertilizer and insecticides, planting of sapling at
sqm 145.00 1174.00 160.00 1189.00
30cm distance from plant to plant and row to
row, twice a year.

32.26 Planting ground covers (ordinary) including


digging of beds to 15 cm depth and mixing
FYM, fertilizer and insecticides, planting of
sqm 53.00 277.00 58.00 282.00
sapling at 25cm distance from plant to plant and
row to row.

32.27 Maintenance of ground cover (ordinary) for one


year including application of FYM, fertilizer,
insecticides, pruning and casualty replacement
sqm 139.00 201.00 153.00 215.00

32.28 Planting ground covers (special) including


digging of beds to 15 cm depth and mixing
FYM, fertilizer and insecticides, planting of
sqm 53.00 676.00 58.00 681.00
sapling at 25cm distance from plant to plant and
row to row.

32.29 Maintenance of ground cover (special) for one


year including application of FYM, fertilizer,
insecticides, pruning and casualty replacement
sqm 150.00 251.00 165.00 266.00

32.30 Planting Rose beds including digging of beds to


15 cm depth and mixing FYM, fertilizer and
insecticides, triangular planting of sapling at
sqm 36.00 174.00 40.00 178.00
60cm distance from plant to plant and row to
row.

32.31 Maintenance of Rose beds for one year


including application of FYM, fertilizer,
insecticides, pruning and casualty replacement sqm 97.00 157.00 107.00 167.00

Chapter-32 Page 598 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

32.32 Planting edging plants around beds, lawn or


along paths including of digging trench 45 cm
wide to 15 cm depth and mixing FYM, fertilizer
m 16.00 114.00 18.00 116.00
and insecticides, planting of sapling at 20cm
distance from plant to plant.

32.33 Maintenance of edging plants for one year


including application of FYM, fertilizer,
insecticides, pruning and casualty replacement m 50.00 74.00 55.00 79.00

32.34 Planting hedge including digging of trench 60 cm


wide to 15 cm depth and mixing FYM, fertilizer
and insecticides, planting of sapling at 30cm m 18.00 165.00 20.00 167.00
distance from plant to plant in two rows.

32.35 Maintenance of hedge plants for one year


including application of FYM, fertilizer,
insecticides, pruning and casualty replacement m 129.00 167.00 142.00 180.00

32.36 Providing black nursery polybags filled with


mixture of screened manure and good earth in
the ratio 1:2 filled to full volume.

(a) Polybag size 10 cm dia x 15 cm height each 0.53 1.55 0.58 1.60

(b) Polybag size 15 cm dia x 20 cm height each 2.10 5.04 2.31 5.25

(c) Polybag size 25 cm dia x 30 cm height each 8.74 20.00 9.61 21.00

(d) Polybag size 35 cm dia x 35 cm height each 20.00 47.00 22.00 49.00

(e) Polybag size 45 cm dia x 45 cm height each 42.00 97.00 46.00 101.00

32.37 Providing earthen pots at site of work, filling with


mixture of screened manure, good earth and
cocopeat in the ratio 2:1:1 as specified.

(a) 15 cm size of pots filled to full volume. each 1.22 35.00 1.34 35.00

(b) 20 cm size of pots filled to full volume. each 2.14 59.00 2.35 59.00

(c) 25 cm size of pots filled to full volume each 4.21 79.00 4.63 79.00

(d) 30 cm size of pots filled to full volume each 7.20 102.00 7.92 103.00

Chapter-32 Page 599 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.38 Providing cement pots at site of work, filling
2/3rd volume with mixture of good earth and
screened manure and cocopeat in the ratio
2:1:1.

(a) 30 cm size of pots each 6.71 97.00 7.38 98.00

(b) 35 cm size of pots each 11.00 160.00 12.00 161.00

(c) 45 cm size of pots each 23.00 260.00 25.00 262.00

(d) 50 cm size of pots each 31.00 388.00 34.00 391.00

(e) 60 cm size of pots each 54.00 569.00 59.00 574.00

32.39 Providing plastic pot with base plate at site of


work, filling with mixture of good earth and
screened manure and cocopeat in the ratio
2:1:1.

(a) 15 cm size of pots filled to full volume each 1.22 17.00 1.34 17.00

(b) 20 cm size of pots filling to full volume


each 2.14 34.00 2.35 34.00

(c) 25 cm size of pots filled to full volume


each 4.21 67.00 4.63 67.00

(d) 30 cm size of pots filled to full volume


each 7.20 110.00 7.92 111.00

(e) 35 cm size of pots filled to 2/3 of volume.


each 11.00 134.00 12.00 135.00

(f) 40 cm size of pots filled to 2/3 of volume.


each 16.00 214.00 18.00 216.00

(g) 45 cm size of pots filled to 2/3 of volume.


each 23.00 324.00 25.00 326.00

(h) 50 cm size of pots filled to 2/3 of volume.


each 31.00 511.00 34.00 514.00

(i) 60 cm size of pots filled to 2/3 of volume.


each 54.00 932.00 59.00 937.00

Chapter-32 Page 600 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

32.40 Supplying seasonal flowers in earthen pots at


site of work, as specified by Engineer-in-charge

(a) Seasonal flower seedlings in 20 cm size


of pots each 1.98 79.00 2.18 79.00

(b) Seasonal flower seedlings in 25 cm size


of pots each 3.43 111.00 3.77 111.00

(c) Planting and supplying seasonal plants in


flowering stage in 25 cm size of pots each 2.86 183.00 3.15 183.00

32.41 Supplying Dahlia/Chrysanthemum plants in


earthen pots at site of work, as specified by
Engineer-in-charge

(a) Korean/ Spray type chrysanthemum


cuttings in 25 cm size of pots, 3 cuttings each 3.43 96.00 3.77 96.00
in each pot.

(b) Ball type Dahlia/Chrysanthemum


cuttings in 25 cm size of pots each 3.43 81.00 3.77 81.00

(c) Planting and supplying


Dahlia/Chrysanthemum plants in each 2.86 386.00 3.15 386.00
flowering stage in 25 cm size of pots

32.42 Maintenance of seasonal plants, Dahlia and


each 3.78 17.00 4.16 17.00
Chrysanthemum in pots for one month

32.43 Supplying pot plant in 30 cm pots with plastic


plate for indoor display at site of work.

(a) In plastic pot each 10.00 243.00 11.00 244.00

(b) In earthen pot each 10.00 235.00 11.00 236.00

32.44 Maintenance of indoor pot plants for one year. each 252.00 280.00 277.00 305.00

32.45 Supplying specimen pot plant in 45 cm plastic


pots with plastic plate for indoor display at site of each 26.00 908.00 29.00 911.00
work.

32.46 Maintenance of indoor specimen pot plants for


one year. each 630.00 729.00 693.00 792.00

Chapter-32 Page 601 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

32.47 Supplying plant in 30 cm cement pots for


outdoor display at site of work. each 17.00 287.00 19.00 289.00

32.48 Maintenance of outdoor pot plants for one year. each 473.00 504.00 520.00 551.00

32.49 Supplying specimen pot plant in 45 cm cement


pots for outdoor display at site of work. each 26.00 919.00 29.00 922.00

32.50 Maintenance of outdoor specimen pot plants for


one year. each 630.00 728.00 693.00 791.00

32.51 Preparation of mounds of various size and


shapes including supply of good earth, in layers
not exceeding 20 cm in depth, breaking of clods, cum 320.00 899.00 352.00 931.00
watering each layer, dressing etc, lead up to 50
m and lift up to 1.5 m complete as per directions
of Engineer-in-charge
32.52 Watering of trees, shrubs, ground covers etc. per
through tractor tanker of 6000 litre capacity tank 494.00 529.00 543.00 578.00
including cost of water with all leads and lifts. er

32.53 Anti termite treatment of lawns, mature trees.

(a) Treatment of lawn area through


Imidacloprid 30.5% SC including cost of sqm 0.20 4.27 0.22 4.29
chemical.
(b) Treatment around mature trees by
digging holes 30 cm deep and 4 cm dia,
6 to 7 holes around tree using 1% each 10.00 97.00 11.00 98.00
chemical emulsion of Chlorpyrifos 20%
EC in @ 1.5 litre per hole twice including
32.54 Edging of paths/ beds with bricks/tiles laid dry,
including required excavation, refilling,
consolidating with hand and spreading surplus
earth neatly within lead of 50 m.
(a) Bricks laid lengthwise with half brick
depth m 5.62 37.00 6.18 38.00

(b) Alternate bricks laid horizontally and


vertically m 6.08 47.00 6.69 48.00

(c) Vertical bricks, half brick projecting above


ground m 6.08 70.00 6.69 71.00

(d) Brick inclined at 60 deg to horizontal m 6.08 60.00 6.69 61.00

(e) Tiles laid lengthwise with half tile depth m 5.64 38.00 6.20 39.00

Chapter-32 Page 602 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(f) Alternate tiles laid horizontally and


vertically m 6.08 48.00 6.69 49.00

32.55 Providing and fixing of white river (Stone)


pebbles size of 2" to 2.50" dia in natural colour at
sqm 62.00 684.00 68.00 690.00
site of work including loading, unloading and
carriage

32.56 Clearing herbaceous wild growth

(a) Clearing by manual labour, collection and


sqm 4.20 4.20 4.62 4.62
disposal of undesirable material.

(b) From central verge, narrow road berm or


uneven area with brush cutter, collection sqm 1.50 1.50 1.65 1.65
and disposal of undesirable material.

(c) From open areas with shrub master and


brush cutter, collection and disposal of ha 6678.00 6678.00 7346.00 7346.00
undesirable material.

32.57 Supply and installation of garden bench

(a) Chair type garden bench with L-shaped


sides made of reinforced concrete (M-
30), thickness 100 mm, overall height
1000 mm, base width 620 mm. Back and
seat shall consist of 5 Nos. reinforced
concrete planks 1500 mm x 100 mm x 50
mm one plank 1500 mm x 200 mm x 50 each 73.00 5299.00 80.00 5306.00
mm. Seating height of the bench shall be
450 mm. The bench shall be fixed with
nuts on concrete mount, all holes sealed
after assembly and installation

(b) Rectangular garden bench with h-shaped


sides made of reinforced concrete (M-
30), thickness 100 mm, back height 750
mm, base width 450 mm. Back and seat
shall consist of rectangular reinforced
concrete planks 1500 mm x 350 mm x 50 each 99.00 3964.00 109.00 3974.00
mm. Seating height of the bench shall be
450 mm. The bench shall be fixed with
nuts on concrete mount, all holes sealed
after assembly and installation

Chapter-32 Page 603 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) Cast Iron bench of 1800 mm length, 900
mm width, 450 mm seating height, sides
made of cast iron. Seat and back shall be
made of 10 strips of M.S. pipes 63 mm x
25 mm of 14 gauge with one M.S. Flat 25
x 10 mm welded at the centre, below and
back of the seat and back rest. Spray each 99.00 12518.00 109.00 12528.00
painted with approved brand paint. Fixed
by grouting with 1:2:4 cement concrete
(Minimum weight of each bench 105 kg)

32.58 Supply of wooden planter covers for indoor pot


plants.

(a) Wooden planter 420mm x 420mm x


420mm, consisting of 4 panels each
made of 4 Nos wooden slats of size 420
mm x 38 mm x 38 mm, 20 Nos wooden
slats of 420 mm x 38 mm x 25 mm, and 4
Nos water proof plywood sheets 4 mm each 757.00 1718.00 833.00 1794.00
thick of size 344 mm x 382 mm fixed on
inner side of each panel fixed with nails,
one coat of primer and two coats of
enamel paint.

(b) Wooden planter for 10 inch pot, outer


size 330mm x 330mm x 320mm, made of
30 mm x 20 mm horizontal wooden slats
and 30 mm x 30 mm vertical slats fixed
each 1530.00 2242.00 1683.00 2395.00
with nails, finished with spirit polish and
varnish as per specifications complete.

(c) Wooden planter for 12 inch pot, outer


size 400mm x 400mm x 360mm, made of
40 mm x 20 mm horizontal wooden slats
and 30 mm x 30 mm vertical slats fixed each 2050.00 3164.00 2255.00 3369.00
with nails, finished with spirit polish and
varnish as per specifications complete.

(d) Wooden planter for 18 inch pot, outer


size 600mm x 600mm x 600mm, made of
55 mm x 20 mm horizontal wooden slats
and 40 mm x 40 mm vertical slats fixed each 2619.00 5412.00 2881.00 5674.00
with nails, finished with spirit polish and
varnish as per specifications complete.

Chapter-32 Page 604 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.59 Half brick circular tree guard in Ist class bricks
internal dia 1.25 mtr. And height 1.2 mtrs above
ground and 0.20 mtrs. Below ground bottom two
courses laid dry and top three courses in cement each 260.00 1742.00 286.00 1768.00
mortar (1:6) i.e. 1 cement and 6 sand and the
intermediate course.

32.60 Providing and fixing bamboo tree guard with 4


No. legs of bamboo sticks of 25mm dia and 1.5
metre length. Rings of bamboos duly attached
to the legs with nuts bolts and washers. Legs up each 52.00 638.00 57.00 643.00
to 30cm dipped in bitumen.

32.61 PCC tree-guard with appropriate reinforcement


with MS bars of 8mm, 6mm and 4mm, having
four panels of equal size and specification,
consisting of overall height of 1800 mm and each 76.00 2279.00 84.00 2287.00
overall width of 620 mm including all carriage.

32.62 Providing and fixing steel tree guard

(a) MS circular tree guard 60 cm dia and 1.8


mtrs. height above ground level formed of
4 Nos. of angle irons of 25 x 25 x 3 mm
2.10 m long, 4 Nos. 25mm x 3mm, 1.5 m
long vertical MS flat welded to 3 no. 25
mm x 6mm M.S flat iron rings in two
halves bolted together with 8mm dia & 30 each 1306.00 2501.00 1437.00 2632.00
mm long bolts and fixing 250 mm X 100
mm iron plate, fixed in ground with 1:2:4
cement concrete, complete in all
respects.

(b) MS circular tree guard with wire mesh,


having 4 No. legs of angle iron size
25x25x3mm, 1.80 mtr. height, 3 No rings
of M.S Flats of 25 x 6 mm, 60cm dia and
fixing of wire mesh size 50x75mm. Tree
guard in two halves bolted together with each 1438.00 2906.00 1582.00 3050.00
8mm dia & 30 mm long bolts, and fixing
250 mm X 100 mm iron plate, fixed in
ground with 1:2:4 cement concrete,
complete in all respects.

Chapter-32 Page 605 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) M.S. Bar circular iron tree guard 60 cm
dia, 1.8 m total height, formed of 3 Nos.
of MS Round Bars 12 mm dia. 1.9 m
long, wire mesh 50 x 75 mm welded to 3
no. 8 mm M.S. Bars rings, fixed in each 926.00 1978.00 1019.00 2071.00
ground with 1:2:4 cement concrete,
complete in all respects.

(d) M.S. Flat iron tree guard 45 cm square


and 1.8 mtrs. height above ground level
formed of 4 Nos. of angle irons of 25 x 25
x 3 mm 2.1 m long, 5 Nos. 25mm x 3mm
horizontal MS flats welded to verticals on
each side. Tree guard in two halves each 1023.00 1963.00 1125.00 2065.00
bolted together with 8mm dia & 30 mm
long bolts, fixed in ground with 1:2:4
cement concrete, complete in all
respects.

(e) M.S. Flat iron tree guard 45 cm square


and 1.8 mtrs. height above ground level
formed of 4 Nos. of angle irons of 25 x 25
x 3 mm 2.1 m long, 5 Nos. 25mm x 3mm
horizontal MS flats welded to verticals on
each side, wire mesh 50 x 75 mm welded
each 1158.00 2425.00 1274.00 2541.00
to angles and flats. Tree guard in two
halves bolted together with 8mm dia & 30
mm long bolts, fixed in ground with 1:2:4
cement concrete, complete in all
respects.

(f) M.S. Flat iron tree guard 45 cm square


and 0.8 mtrs. height above ground level
formed of 4 Nos. of angle irons of 25 x 25
x 3 mm 1.1 m long, 2 Nos. 25mm x 3mm
horizontal MS flats welded to verticals on
each side. Tree guard in two halves each 522.00 1027.00 574.00 1079.00
bolted together with 8mm dia & 30 mm
long bolts, fixed in ground with 1:2:4
cement concrete, complete in all
respects.

32.63 Removing, repairing and refixing steel tree guard


with 1:2:4 cement concrete

(a) MS circular tree guard 60 cm dia and 1.8


mtrs. height in two halves bolted together each 247.00 409.00 272.00 434.00

Chapter-32 Page 606 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) MS circular tree guard with wire mesh,
1.80 mtr. height, in two halves bolted
together. each 257.00 428.00 283.00 454.00

(c) M.S. Bar circular iron tree guard 60 cm


dia, 1.8 m total height, with wire mesh,
welded. each 300.00 423.00 330.00 453.00

(d) M.S. Flat iron tree guard 45 cm square


and 1.8 mtrs. Height, in two halves
bolted together. each 245.00 400.00 270.00 425.00

(e) M.S. Flat iron tree guard 45 cm square


and 1.8 mtrs. Height with wire mesh wire
mesh, in two halves bolted together. each 260.00 426.00 286.00 452.00

32.64 Providing and fixing bamboo jaffery/ fencing


consisting of superior quality 25 mm dia
(Average) half cut bamboo placed vertically and
fixed together with three numbers horizontal
running members of Sal wood in scantling of sqm 129.00 1563.00 142.00 1576.00
section 50 x 25 mm, fixed with nails and 4 mm
gauge G.I. wire on existing support complete as
per directions of Engineer-in-charge.

32.65 Providing and fixing of garden fencing of green


hexagonal net.

(a) Fixing of fencing with MS angles 25 x 25


x 3 mm, 1.5 m above ground fixed 30 cm
in ground at 3m with cement concrete
1:2:4. Net to be fixed with nut bolts with
washer at three places and one 4 mm GI sqm 39.00 281.00 43.00 285.00
wire running through the net at top and
bottom for stability and strength.

(b) Fixing of fencing with MS angles 25 x 25


x 3 mm frame, vertical members 1.5 m
above ground fixed 30 cm in ground at
sqm 371.00 896.00 408.00 933.00
2m with cement concrete 1:2:4. Net to be
fixed with nut bolts and washers.

Chapter-32 Page 607 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.66 Providing and fixing vertical garden panels on
aluminium tube (50 x25 x 1.5 mm) frame, fixed
on wall, with growing media of cocopeat, perlite
and vermiculite 2:1:1, amended with fertilizers
and plants as specified by the engineer in
charge and drip irrigation system complete in all

(a) Indoor vertical garden sqm 410.00 8778.00 451.00 8819.00

(b) Outdoor vertical garden sqm 410.00 7915.00 451.00 7956.00

32.67 Maintenance of vertical garden for one year,


complete with replacement of plants, panels,
drip equipment etc., replenishing decomposed
media, watering and fertilization.

(a) Indoor vertical garden sqm 93.00 1019.00 102.00 1028.00

(b) Outdoor vertical garden sqm 93.00 932.00 102.00 941.00

32.68 Supply and installation of inline drip irrigation

(a) LDPE Emitting Pipe 16 mm; Class 2 (0.6


m x 1 to 4 Lph), Anti-rodent, complete m 1.96 17.00 2.16 17.00
with all accessories.

(b) LDPE Emitting Pipe 16 mm; Class 2 (0.5


m x 1 to 4 Lph), Anti-rodent, complete m 1.96 17.00 2.16 17.00
with all accessories.

(c) LDPE Emitting Pipe 16 mm; Class 2 (0.4


m x 1 to 4 Lph), Anti-rodent, complete m 1.96 19.00 2.16 19.00
with all accessories.

(d) LDPE Emitting Pipe 16 mm; Class 2 (0.3


m x 1 to 4 Lph), Anti-rodent, complete m 1.96 19.00 2.16 19.00
with all accessories.

(e) LDPE Emitting Pipe 16 mm; Class 2 (0.6


m x 1 to 4 Lph), complete with all m 1.96 15.00 2.16 15.00
accessories.

(f) LDPE Emitting Pipe 16 mm; Class 2 (0.5


m x 1 to 4 Lph), complete with all m 1.96 17.00 2.16 17.00
accessories.

Chapter-32 Page 608 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(g) LDPE Emitting Pipe 16 mm; Class 2 (0.4
m x 1 to 4 Lph), complete with all m 1.96 18.00 2.16 18.00
accessories.

(h) LDPE Emitting Pipe 16 mm; Class 2 (0.3


m x 1 to 4 Lph), complete with all
accessories. m 1.96 19.00 2.16 19.00

(i) LDPE Emitting Pipe 16 mm; Class 2 (0.6


m x 1 to 4 Lph), pressure compensating,
complete with all accessories. m 1.96 19.00 2.16 19.00

(j) LDPE Emitting Pipe 16 mm; Class 2 (0.5


m x 1 to 4 Lph), pressure compensating,
complete with all accessories. m 1.96 21.00 2.16 21.00

(k) LDPE Emitting Pipe 16 mm; Class 2 (0.4


m x 1 to 4 Lph), pressure compensating,
complete with all accessories. m 1.96 21.00 2.16 21.00

(l) LDPE Emitting Pipe 16 mm; Class 2 (0.3


m x 1 to 4 Lph), pressure compensating,
complete with all accessories. m 1.96 22.00 2.16 22.00

(m) LDPE Emitting Pipe 16 mm; Class 2 (0.6


m x 1 to 4 Lph), pressure compensating,
Anti siphoning, complete with all m 1.96 23.00 2.16 23.00
accessories.

(n) LDPE Emitting Pipe 16 mm; Class 2 (0.5


m x 1 to 4 Lph), pressure compensating,
Anti siphoning, complete with all m 1.96 23.00 2.16 23.00
accessories.

(o) LDPE Emitting Pipe 16 mm; Class 2 (0.4


m x 1 to 4 Lph), pressure compensating,
Anti siphoning, complete with all m 1.96 24.00 2.16 24.00
accessories.

(p) LDPE Emitting Pipe 16 mm; Class 2 (0.3


m x 1 to 4 Lph), pressure compensating,
Anti siphoning, complete with all m 1.96 24.00 2.16 24.00
accessories.

Chapter-32 Page 609 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
32.69 Supply and installation of drip irrigation lines with
external emitters/ micro-sprinklers/bubblers

(a) LDPE lateral Pipe 16 mm; Class 2 2.5


kg/cm2, complete with all accessories. m 1.96 18.00 2.16 18.00

(b) Installation of pressure compensating


drip emitters each 4.10 10.00 4.51 10.00

(c) Installation of pressure compensating


Non leakage drip emitters each 4.10 12.00 4.51 12.00

(d) Installation of Non pressure


compensating drip emitters each 4.10 9.00 4.51 9.00

(e) Micro sprinkler having 1.5-4 m throw


radius with stake, vinyl tubing and all each 12.00 121.00 13.00 122.00
other accessories

(f) Installation of adjustable flow bubbler with


all accessories complete. each 12.00 462.00 13.00 463.00

32.70 Supply and installation of pop up sprinklers

(a) Pop up Impact Rotors 3/4" inlet and


radius ranging from 7-12 m with
interchangeable nozzles and all each 29.00 1157.00 32.00 1160.00
accessories complete and setting flow
rate as directed.

(b) Pop up geared rotors 3/4" inlet and radius


ranging from 7-12 m with interchangeable
nozzles and all accessories complete and each 29.00 1286.00 32.00 1289.00
setting flow rate as directed.

(c) Pop up Spray heads 1/2" inlet and radius


ranging from 3-5 m with interchangeable
nozzles and all accessories complete and each 29.00 449.00 32.00 452.00
setting flow rate as directed.

32.71 Supply and installation of Rain Gun

Chapter-32 Page 610 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Rain Gun with throw radius of 14-22 m,
with interchangeable nozzles and arc
adjustment and all accessories complete
each 273.00 9908.00 300.00 9935.00

(b) Rain Gun with throw radius of 20-35 m,


with interchangeable nozzles and arc
adjustment and all accessories complete
each 273.00 39524.00 300.00 39551.00

(c) Portable system Rain Gun with throw


radius of 14-22 m, interchangeable
nozzles, arc adjustment, stand and all
accessories complete each 273.00 13466.00 300.00 13493.00

32.72 Supply and installation of filters/ pressure relief


valve for drip/ sprinkler system

(a) Sand/Media filter 25 cum/hr, with back


each 273.00 32451.00 300.00 32478.00
wash and bypass

(b) Sand/Media filter 40 cum/hr, with back


each 273.00 38887.00 300.00 38914.00
wash and bypass

(c) Sand/Media filter 50 cum/hr, with back


each 273.00 55619.00 300.00 55646.00
wash and bypass

(d) Disc filter 15 cum/hr, with flush valve each 273.00 4392.00 300.00 4419.00

(e) Disc filter 25 cum/hr, with flush valve each 273.00 7224.00 300.00 7251.00

(f) Disc filter 50 cum/hr, with flush valve each 273.00 8640.00 300.00 8667.00

(g) Hydrocyclone/ Sand separator 10-16


each 273.00 7996.00 300.00 8023.00
cum/hr, with flush valve

(h) Hydrocyclone/ Sand separator 12-30


each 273.00 11214.00 300.00 11241.00
cum/hr, with flush valve

(i) Hydrocyclone/ Sand separator 20-40


each 273.00 12887.00 300.00 12914.00
cum/hr, with flush valve

Chapter-32 Page 611 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(j) Supply and installation of hydraulic
pressure relief valve for pressure each 78.00 11662.00 86.00 11670.00
regulation of irrigation system

32.73 Supply and installation of artificial grass with


tape, adhesive and all accessories, complete

(a) 40 mm artificial turf sqm 21.00 838.00 23.00 840.00

(b) 35 mm artificial turf sqm 21.00 678.00 23.00 680.00

(c) 25 mm artificial turf sqm 21.00 600.00 23.00 602.00

(d) 20 mm artificial turf sqm 21.00 510.00 23.00 512.00

(e) 10 mm artificial turf sqm 21.00 394.00 23.00 396.00

32.74 Installation of green roof structural layers on


already waterproofed roof deck

(a) Base layers for Extensive and semi-


intensive green roof consisting of 1 mm
thick root barrier, 25 mm layer of water
borne stone aggregate (6 mm size) and 2 sqm 34.00 279.00 37.00 282.00
layers of geotextile (120 gsm and 200
gsm) but excluding plant substrate

(b) Base layers for Extensive and semi-


intensive green roof consisting of 1 mm
thick root barrier, 20 mm drain cell and
120 gsm geotextile but excluding plant sqm 33.00 467.00 36.00 470.00
substrate

(c) Base layers for Intensive green roof


consisting of 1 mm thick root barrier, 50
mm layer of water borne stone aggregate
(6 mm size) and 2 layers of geotextile sqm 34.00 299.00 37.00 302.00
(120 gsm and 200 gsm) but excluding
plant substrate.

(d) Base layers for intensive green roof


consisting of 1 mm thick root barrier, 30
mm drain cell and 200 gsm geotextile but sqm 33.00 567.00 36.00 570.00
excluding plant substrate

Chapter-32 Page 612 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B
Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(e) Supply and installation of light weight
plant substrate as specified.
cum 83.00 6346.00 91.00 6354.00

(f) Supply and installation of medium weight


plant substrate as specified.
cum 118.00 3455.00 130.00 3467.00

(g) Supply and installation of amended soil


for plant substrate as specified.
cum 136.00 1335.00 150.00 1349.00

(h) Supply and installation of non woven coir


mat minimum 600 gsm without netting,
latex bound as water absorption and sqm 1.00 116.00 1.00 116.00
storage layer for green roof.

32.75 Providing and fixing pair of Plastic dustbins 100


litre volume each, of two different colours, for dry
and wet waste, made of virgin plastic to be
mounted on MS rectangular hollow section 50 x
25 x 3 mm frames pivoted on 3 MS square each 2907.00 12753.00 3198.00 13044.00
hollow section verticals, 1 m above ground, one
35 cm RHS welded to each vertical member at
base and grouted in 180 x 40 x 30 cm 1:2:4
cement concrete.

Chapter-32 Page 613 CSR-2020


CSR−2020−Final
CSR−2020−Final

CHAPTER NO. 33

Green Buildings
Notes :-

(i) Unless otherwise stated, the labour rates include the cost of rehandling of materials within 100
metres.

(ii) The Labour rate given in this chapter include the cost of water, tools & plants, scaffolding
(including Labour & Materials), where ever required.

Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.01 Providing and fixing thermal insulation on
external wall with CFC Free closed cell, high
performance rigid Polyurethane Foam(PUF)
Insulation Slab conforming to IS: 12436
having density not less than 36±2 kg/m3,
thermal conductivity (K-value) 0.021 W/m.K
measured at 10 deg. C mean temperature and
classified as “not easily ignitable” per BS: 476,
Part-5, fixed with the help of adhesive (patch
applied) & PVC fastener to the wall surface
and all complete as per the instruction of
engineer-in-charge

(a) 40 mm thick Polyurethane foam(PUF)


rigid insulation board sqm 30.00 1083.00 33.00 1086.00

(b) 50 mm thick Polyurethane foam(PUF)


rigid insulation board sqm 30.00 1254.00 33.00 1257.00

33.02 Providing and applying thermal insulation on


external wall with impervious sprayed CFC
free, closed cell rigid Polyurethane foam wall
insulation conforming to IS-12432 Part III
(density of foam being 35±5 kg/m3, thermal
conductivity (K- value) 0.023 W/m.K over a
coat of polyurethane primer applied @ 6-8
sqm per litre and covering it externally as per
specs and direction of engineer-in- charge.

(a) 40 mm thick PUF Spray


sqm 296.00 993.00 326.00 1022.60

(b) 50 mm thick PUF Spray


sqm 296.00 1135.00 326.00 1164.60

Chapter-33 Page 614 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.03 Providing & fixing on external side of finished
external wall, extruded polystyrene (XPS)
thermal insulating boards with ship lap joining
on length side, (having thermal conductivity of
0.028 W/m.K on 90 days aging at 24 deg.C as
per ASTM C518, compressive strength of over
250 kpa as per ASTM D1621, tensile strength
of over 300 kpa as per ASTM D1623 and has
flammability of Class B2 as per DIN 4102,
water absorption of less than 1% as per ASTM
D2842) with the help of a minimum 2 mm
thick polymerized mortar adhesive &
mountings as per manufacturer's guidelines;
over the installed XPS boards, providing &
laying a 3-4 mm thick finishing layer of
polymerized mortar base coat with fibre glass
mesh of min. 150 gsm embedded in it using
notched trowel as per manufacturer's
guidelines and as per the instruction of
engineer-in- charge.

(a) 25 mm thick Extruded polystyrene rigid


insulation board sqm 44.00 506.00 48.00 510.40

(b) 50 mm thick Extruded polystyrene rigid


insulation board sqm 44.00 903.00 48.00 907.40

(c) 75 mm thick Extruded polystyrene rigid


insulation board sqm 44.00 1300.00 48.00 1304.40

(d) 100 mm thick Extruded polystyrene


rigid insulation board sqm 44.00 1696.00 48.00 1700.40

33.04 Providing and fixing between 2 layers of brick


work/ concrete walls, thermal insulation with
CFC free closed cell, high performance rigid
Polyurethane Foam (PUF) insulation slab
conforming to IS: 12436 having density not
less than 36±2kg/m3, thermal conductivity (K-
value) 0.021 W/m.K measured at 10 deg.
C mean temperature and classified as “not
easily ignitable” per BS: 476, Part-5 fixed to
the wall with the screw, raw plug and washers
etc. and holding in position with crisscross GI
wire, in staggered form and all complete as
per specs or directions of engineer-in-charge.

Chapter-33 Page 615 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(a) 40 mm thick Polyurethane foam(PUF)
rigid insulation board sqm 30.00 759.00 33.00 762.00

(b) 50 mm thick Polyurethane foam(PUF)


rigid insulation board sqm 30.00 930.00 33.00 933.00

33.05 Providing and injecting/pouring CFC free


closed cell, high performance rigid
Polyurethane foam between 2 layers of brick
work/ concrete walls having thermal insulation
not more than 0.024 W/m.K, core density
35±5 kg/m3 (conforming to IS-13205) and
water absoption not more than 2.5%, inside
wall cavity after making injection ports at 60
cm center to center. The insulation foam shall
be injected with the help of high pressure
specially designed foaming machine like
gusmer/graco or equivalent in dry brick wall
cavity including plugging of holes and all
complete as per the instruction of engineer-in-
charge.

(a) 40 mm thick PUF Spray


sqm 437.00 1056.00 481.00 1099.70

(b) 50 mm thick PUF Spray


sqm 437.00 1198.00 481.00 1241.70

33.06 Providing and fixing thermal insulation with


resin bonded Rock wool between 2 layers of
brick work/ concrete walls conforming to IS:
8183 and density 48 kg/m3 having thermal
conductivity value of not more than 0.043
W/m.K, wrapped in 200G virgin polythene
bags fixed to the wall with the screw, rawl plug
and washers and held in position by crisscross
GI wire etc. and all complete as per specs or
directions of engineer-in-charge.

(a) 25 mm thick Resin bonded Rock wool


sqm 59.00 282.00 65.00 287.90

(b) 50 mm thick Resin bonded Rock wool


sqm 59.00 291.00 65.00 296.90

(c) 65 mm thick Resin bonded Rock wool


sqm 59.00 346.00 65.00 351.90

Chapter-33 Page 616 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

(d) 75 mm thick Resin bonded Rock wool


sqm 59.00 411.00 65.00 416.90

33.07 Providing and fixing between 2 layers of brick


work/ concrete walls thermal insulation with
Resin Bonded Fibre glass wool conforming to
IS: 8183 having density 48 kg/m3, wrapped in
200G Virgin Polythene Bags fixed to wall with
screw, rawl plug & washers and held in
position by criss crossing GI wire etc.
complete as per directions of Engineer-in-
Charge.

(a) 12 mm thick Resin bonded Glass wool


sqm 59.00 227.00 65.00 232.90

(b) 25 mm thick Resin bonded Glass wool


sqm 59.00 262.00 65.00 267.90

(c) 50 mm thick Resin bonded Glass wool


sqm 59.00 323.00 65.00 328.90

33.08 Providing and fixing between 2 layers of brick


work/ concrete walls extruded polystyrene
(XPS) thermal insulating boards with ship lap
joining on length side, (having thermal
conductivity of 0.028 W/m.K on 90 days aging
at 24 deg.C as per ASTM C518, compressive
strength of over 250 kpa as per ASTM D1621,
tensile strength of over 300 kpa as per ASTM
D1623 and has flammability of Class B2 as
per DIN 4102, water absorption of less than
1% as per ASTM D2842 fixed with suitable
water based adhesive and fastener, complete
in all respect as per the direction of Engineer-
in-Charge.

(a) 50 mm thick Extruded polystyrene rigid


insulation board sqm 30.00 885.00 33.00 888.00

(b) 75 mm thick Extruded polystyrene rigid


insulation board sqm 30.00 1313.00 33.00 1316.00

(c) 100 mm thick Extruded polystyrene


rigid insulation board sqm 30.00 1740.00 33.00 1743.00

Chapter-33 Page 617 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

33.09 Providing and fixing thermal insulation of


ceiling (under deck insulation) with Resin
Bonded Rockloyd Rockwool (Non
Combustible Grade) conforming to IS: 8183
and density 48 kg/ m3, wrapped in 200 G
Virgin Polythene bags fixed to ceiling with
metallic cleats (50x50x3 mm) @ 60 cm and
wire mesh of 12.5mm x 24gauge wire mesh,
for top most ceiling of building and all
complete as per engineer in charge

(a) 25 mm thick Resin bonded Rock wool


sqm 175.00 503.00 193.00 520.50

(b) 50 mm thick Resin bonded Rock wool


sqm 175.00 512.00 193.00 529.50

(c) 65 mm thick Resin bonded Rock wool


sqm 175.00 568.00 193.00 585.50

(d) 75 mm thick Resin bonded Rock wool


sqm 175.00 633.00 193.00 650.50

33.10 Providing and laying on smooth roof surface


with CFC free, closed cell free Rigid
Polyurethane foam slab over deck insulation
conforming to IS -12436 (density of foam
being 36±2 kg/m3) having thermal conductivity
not more than 0.024 W/m.K, over a coat of
cold adhesive like CPRX compound, laying
400 G polythene sheet over PUF slab and
providing a wearing course of 40 mm thick
cement screed 1: 2 : 4 (1 cement : 2 coarse
sand : 4 stone aggregate 20 mm nominal size)
in chequered rough finish, in panels of 2.5 m x
2.5 m and embedding with 24 G wire netting
and sealing the joints with polymerized mastic,
all complete as per direction of engineer-in-
charge

(a) 40 mm thick Polyurethane foam( PUF)


rigid insulation board sqm 296.00 1367.00 326.00 1396.60

(b) 50 mm thick Polyurethane foam (PUF)


rigid insulation board sqm 296.00 1538.00 326.00 1567.60

(c) 60 mm thick Polyurethane foam (PUF)


rigid insulation board sqm 296.00 1665.00 326.00 1694.60

Chapter-33 Page 618 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7

(d) 70 mm thick Polyurethane foam (PUF)


rigid insulation board sqm 296.00 1835.00 326.00 1864.60

33.11 Providing and laying roof insulation with


impervious sprayed, closed cell CFC free
Rigid Polyurethane foam over deck insulation
conforming to IS - 12432 Pt. III (density of
foam being 40-45 kg/cum), over a coat of
polyurethane primer applied @ 6-8 sqm per
litre,laying 400G polythene sheet over PUF
spray and providing a wearing course of
40mm thick cement screed 1 : 2 :4 (1 cement
: 2 coarse sand : 4 stone aggregate 20mm
nominal size) in chequred rough finish,in
panels of 2.5m x 2.5 m and embedding with
24 G wire netting and sealing the joints with
polymerised mastic and all complete as per
direction of Engineer-in-Charge.

(a) 40 mm thick PUF Spray


sqm 296.00 1189.00 326.00 1218.60

(b) 50 mm thick PUF Spray


sqm 296.00 1322.00 326.00 1351.60

(c) 60 mm thick PUF Spray


sqm 296.00 1454.00 326.00 1483.60

(d) 70 mm thick PUF Spray


sqm 296.00 1586.00 326.00 1615.60

Chapter-33 Page 619 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.12 Providing and laying on smooth roof surface
with extruded polystyrene (XPS) thermal
insulating boards with ship lap joining on
length side, (having thermal conductivity of
0.028 W/m.K on 90 days aging at 24 deg.C as
per ASTM C518, compressive strength of over
250 kpa as per ASTM D1621, tensile strength
of over 300 kpa as per ASTM D1623 and has
flammability of Class B2 as per DIN 4102,
water absorption of less than 1% as per ASTM
D2842, over a coat of cold adhesive like
CPRX compound, laying 400 G polythene
sheet over PUF slab and providing a wearing
course of 40 mm thick cement screed 1: 2 : 4
(1 cement : 2 coarse sand : 4 stone aggregate
20 mm nominal size) in chequered rough
finish, in panels of 2.5 m x 2.5 m and
embedding with 24 G wire netting and sealing
the joints with polymerized mastic, all
complete as per direction of engineer-in-
charge

(a) 50 mm thick Extruded polystyrene rigid


insulation board sqm 296.00 1431.00 326.00 1460.60

(b) 75 mm thick Extruded polystyrene rigid


insulation board sqm 296.00 1827.00 326.00 1856.60

(c) 100 mm thick Extruded polystyrene


rigid insulation board sqm 296.00 2224.00 326.00 2253.60

33.13 Providing and applying two coats of High


Albedo paint having minimum Solar Reflective
Index (SRI) 108 (with solar reflectance &
thermal emittance tested as per ASTM C 1549
and ASTM C 1371 respectively), VOC less
than 10 cc/gm. The coating thickness and the
methodology of application shall be strictly as
per manufacturer's specifications and as
sqm 59.00 273.00 65.00 278.90
approved by Engineer-in-Charge. Surface
preparation includes cleaning with metal wire
brush to remove all dust, fungus etc., washing
with water all complete. The contractor shall
give guarantee for the perfomance of SRI and
also the durabitity of coating, all complete as
per direction of Engineer-in-Charge

Chapter-33 Page 620 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.14 Providing and fixing Heat Resistant Terrace
Tiles (300 mm x 300 mm x 20 mm) with SRI
(solar refractive index) > 78, solar reflection >
0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm
thick cement sand mortar in the ratio of 1:4 (1
cement : 4 coarse sand) and grouting the sqm 293.00 1180.00 322.00 1209.30
joints with mix of white cement & marble
powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete,
including providing skirting upto 150 mm
height along the parapet walls in the same
manner

33.15 Providing and Fixing Single Glazing with 6mm


thick glass with high perfromance coating as
per relevent codal provisions as per sqm 1122.00 2551.00 1234.00 2663.20
satisfaction of Engineer-in-Charge.

33.16 Providing and fixing double glazed


hermetically sealed glazing in aluminium
windows, ventilators and partition etc. with 6
mm thick clear float glass both side, having 12
mm air gap, including providing EPDM gasket,
sqm 402.00 3734.00 442.00 3774.20
perforated aluminium spacers, desiccants,
sealant (Both primary and secondary sealant)
etc. as per specifications, drawings and
direction of Engineer-in-charge complete.

Chapter-33 Page 621 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.17 Providing, assembling and supplying vision glass
panels (IGUs) comprising of hermetically-sealed 6-
12- 6 mm insulated glass (double glazed) vision
panel units of size and shape as required and
specified, comprising of an outer heat
strengthened float glass 6mm thick, of approved
colour and shade with reflective soft coating on
surface # 2 of approved colour and shade, an inner
Heat strengthened clear float glass 6mm thick,
spacer tube 12mm wide, dessicants, including
primary seal and secondary seal (structural
silicone sealant) etc. all complete for the required
performances, as per the Architectural drawings,
as per the approved shop drawings, as specified
and as directed by the Engineer-in-Charge. The
IGUs shall be assembled in the factory/ workshop
of the glass processor. For payment, only the sqm 402.00 3572.00 442.00 3612.20
actual area of glass on face # 1 of the glass panels
(excluding the areas of the grooves and weather
silicone sealant) provided and fixed in position,
shall be measured in sqm. (i) Coloured tinted float
glass 6mm thick substrate with reflective soft
coating on face # 2, + 12mm Airgap + 6mm Heat
Strengthened clear Glass of approved make
having properties as visible Light transmittance
(VLT) of 25 to 35 %, Light reflection internal 10 to
15%, light reflection external 10 to 20 %, shading
coefficient (0.25- 0.28) and U value of 3.0 to 3.3
W/m2 degree K etc. The properties of performance
glass shall be decided by technical sanctioning
authority as per the site requirement.

Chapter-33 Page 622 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.18 Providing and fixing factory made uPVC white
colour casement/casement cum fixed glazed
windows comprising of uPVC multi-chambered
frame, sash and mullion (where ever required)
extruded profiles duly reinforced with 1.60 ± 0.2
mm thick galvanized mild steel section made from
roll forming process of required length (shape &
size according to uPVC profile), uPVC extruded
glazing beads of appropriate dimension, EPDM
gasket, stainless steel (SS 304 grade) friction
hinges, zinc alloy (white powder coated) casement
handles, G.I fasteners 100 x 8 mm size for fixing
frame to finished wall, plastic packers, plastic caps
and necessary stainless steel screws etc. Profile of
frame & sash shall be mitered cut and fusion
welded at all corners, mullion (if required) shall be
also fusion welded including drilling of holes for
fixing hardware and drainage of water etc. After
fixing frame the gap between frame and adjacent
finished wall shall be filled with weather proof
silicon sealant over backer rod of required size and
of approved quality, all complete as per approved
drawing & direction of Engineer-in-Charge. (Single
/ double glass panes and silicon sealant shall be
paid separately) Note: For uPVC frame, sash and
mullion extruded profiles minus 5% tolerance in
dimension i.e. in depth & width of profile shall be
acceptable. Variation in profile dimension on
higher side shall be accepted but no extra payment
on this account shall be made.

(a) Casement window single panel with


S.S. friction hinges (300 x 19 x 1.9
mm), made of (small series) frame 47
x 50 mm & sash 47 x 68 mm both
having wall thickness of 1.9 ± 0.2 mm sqm 1184.00 9172.00 1302.00 9290.40
and single glass pane glazing bead of
appropriate dimension. (Area of
window upto 0.75 sqm.)

(b) Casement window double panels with


S.S. friction hinges (300 x 19 x 1.9
mm) made of (small series) frame 47
x 50 mm, sash 47 x 68 mm & mullion
47 x 68 mm all having wall thickness of sqm 1184.00 8437.00 1302.00 8555.40
1.9 ± 0.2 mm and single glazing bead
of appropriate dimension. (Area of
window above 0.75 sqm upto 1.50
sqm)

Chapter-33 Page 623 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
(c) Casement window double panels with
top fixed with S.S. friction hinges (350
x 19 x 1.9 mm) made of (small series)
frame 47 x 50 mm, sash 47 x 68 mm &
mullion 47 x 68 mm all having wall sqm 1184.00 6481.00 1302.00 6599.40
thickness of 1.9 ± 0.2 mm and single
glazing bead of appropriate dimension.
( Area of window upto 2.50 sqm).

(d) Casement window single panel with


S.S. friction hinges (400 x 19 x 1.9
mm) made of (big series)frame 67 x 60
mm & sash 67 x 80 mm both having
wall thickness of 2.3 ± 0.2 mm and sqm 1184.00 8700.00 1302.00 8818.40
single glazing bead / double glazing
bead of appropriate dimension. (Area
of window above 0.75 sqm.

(e) Casement window double panels with


S.S. friction hinges (350 x 19 x 1.9
mm) made of (big series)frame 67 x 60
mm & sash / mullion 67 x 80 mm both
having wall thickness of 2.3 ± 0.2 mm sqm 1184.00 9036.00 1302.00 9154.40
and single glazing bead/ double glazing
bead of appropriate dimension. (Area
of window above 1.50 sqm).

(f) Casement cum fixed panel window


having both end single casement
panel, middle fixed panels and at top
completely fixed ventilator with S.S
friction hinges (350 x 19 x 1.9) made of
(big series) frame 67 x 60 mm , sash
67 x 80 mm & mullion 67 x 80 mm all sqm 1184.00 6882.00 1302.00 7000.40
having wall thickness of 2.3 ± 0.2 mm
and single glazing bead/double glazing
bead of appropriate dimension. (Area
of window above 3.00 sqm upto 5.00
sqm).

(g) Fixed window / ventilator made of


(small series) frame 47 x 50 mm &
mullion 47 x 68 mm both having wall
thickness of 1.9 ± 0.2 mm and single sqm 1184.00 6259.00 1302.00 6377.40
glazing bead of appropriate dimension.
(Area upto 0.75 sqm)

Chapter-33 Page 624 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.19 Providing and fixing factory made uPVC white colour
casement/ Casement cum fixed glazed door comprising
of uPVC multi-chambered frame, sash and mullion
(where ever required) extruded profiles duly reinforced
with 1.60 ± 0.2 mm thick galvanized mild steel section
made from roll forming process of required length (shape
& size according to uPVC profile), uPVC extruded
glazing beads of appropriate dimension, EPDM gasket,
zinc alloy (white powder coated) 3D hinges and one
handle on each side of panels along with zinc plated mild
steel multi point locking having transmission gear,
cylinder with keeps and one side key, G.I fasteners 100 x
8 mm size for fixing frame to finished wall and necessary
stainless steel screws, etc. Profile of frame & sash shall
be mitered cut and fusion welded at all corners, mullion (if
required) shall be also fusion welded including drilling of
holes for fixing hardware's and drainage of water etc.
After fixing frame the gap between frame and adjacent
finished wall shall be filled with weather proof silicon sqm 1184.00 8839.00 1302.00 8957.40
sealent over backer rod of required size and of approved
quality, all complete as per approved drawing & direction
of Engineer-in-Charge. (Single / double glass panes and
silicon sealent shall be paid separately). Casement door
with 3D hinges made of (big series) frame 67 x 64 mm &
sash 67 x 110 mm both having wall thickness of 2.3 ± 0.2
mm and single glazing bead / double glazing bead of
appropriate dimension. (Area of door upto 2.00 sqm).
Note: For uPVC frame, sash and mullion extruded
profiles minus 5% tolerance in dimension i.e. in depth &
width of profile shall be acceptable. Variation in profile
dimension in higher side shall be accepted but no extra
payment on this account shall be made.

Chapter-33 Page 625 CSR-2020


CSR−2020−Final
Sr. No. Description Unit Zone-A Zone-B

Labour Through Labour Through


Rate Rate Rate Rate

1 2 3 4 5 6 7
33.20 Providing and fixing in position, 200 mm thick
factory made Expanded Polystyrene Core
(EPS Core) wall panels consisting of EPS
core sandwiched between two Engineered
sheets of welded wire fabric mesh duly
finished with shortcrete materials on outer
faces. The fabric mesh shall be made of 3 mm
dia G.I. wire mesh with 50 mm pitch in both
the directions and on both faces of the wall,
kept at 120-135 mm gap and connected by
the zig zag G.I. wire of 3 mm dia at alternate
row by welding (at an angle ranging from 50-
70 degree) . The EPS core shall consist of
sqm 658.00 3814.00 724.00 3879.80
100 mm thick EPS of density not less than 20
kg/ per cum. Both the outer faces of the panel
shall be finished by applying the layer of 50
mm thick cement mortar 1:3 {1 cement: 3
coarse sand (not having more than 40% stone
chips of size upto 6 mm)} with the help of
shotcreting/guniting equipment etc at a
pressure not less than 1 bar (100Kn/m2) and
both surfaces finished with trowel. Fixing
operations of wall panels shall be completed
in all respect as per drawings and
specifications and under the overall direction
of the Engineer-in-charge

Chapter-33 Page 626 CSR-2020


CSR−2020−Final
CSR−2020−Final
COMMON SCHEDULE OF RATES
CHAPTER NO.34
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.01 RECESSED HGW CONDUIT PIPE WIRING
SYSTEM WITH MODULAR SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge welded conduit pipe 20mm/
25mm dia (1.6mm thick) ISI Marked, recessed
in wall etc., complete with powder
coated/anodized concealed metal boxes
(1.6mm thick with Brass lugs) required for
suitable number of modules (Modular
accessories) for having Step type electronic
fan regulators (two module) 100watts, bell
push, 6Amp. 2/3 universal socket
(shuttered), 16/20Amp. combined/ universal
Socket (shuttered), 6/10Amp. Switches,
16/20Amp. switches with indicator etc. and
covered with Frame Plate etc., PVC
connector (For Fan Box and Call Bell), PVC
Bush, Steel Hooks, Sheet metal fan box
(1.6mm thick shape hexagonal), CI Circular
junction Boxes (Four way 1½" deep for walls
and 3" deep for ceiling), bonding to earth
with PVC insulated copper conductor single
core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc. including the cost of above material,
cutting and filling up of chases (with
finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 307.00 1167.00 338.00 1197.70

(i) b Wiring fan point (With fan box) Each 307.00 1261.00 338.00 1291.70

(ii) Wiring light point Each 254.00 888.00 279.00 913.40

(iii) Wiring call-bell point Each 254.00 883.00 279.00 908.40

(iv) Wiring 6Amp. wall socket point Each 204.00 668.00 224.00 688.40

(v) Wiring 6Amp. Plug control comprising wall


Each 175.00 388.00 193.00 405.50
socket point

(vi) Wiring 16/20Amp. power plug control point Each 204.00 438.00 224.00 458.40

(vii) Wiring light point without control switch. Each 145.00 429.00 160.00 443.50

(viii) Wiring light point with double control


Each 350.00 1607.00 385.00 1642.00
switches.

Chapter-34 Page 627 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.01 RECESSED AIR CONDITIONER SUPPLY
TERMINAL POINT (USED FOR HGW, PVC
CONDUIT & HDPE PIPE WIRING SYSTEM
WITH MODULAR ACCESSORIES):

(ix) Wiring air conditioner supply terminal


point recessed in wall etc., complete with
powder coated/anodized concealed
metal boxes required for suitable
number of modules (Modular
accessories) for having 25Amp.
combined/ universal Socket (shuttered)
and modular motor starter 25Amp.
(2Module), covered with Frame Plate and
other petty material etc. including the
cost of above material, cutting and filling
up of chases (with finishing the surface):-

Wiring AC supply terminal point having


1No. 25Amp. universal Socket (shuttered)
erected at AC height and 1No. Motor starter Each 204.00 654.00 224.00 674.40
25Amp. erected at switchboard height.

34.01 RECESSED COMPUTER SUPPLY


TERMINAL POINTS (USED FOR HGW,
PVC CONDUIT & HDPE PIPE WIRING
SYSTEM WITH MODULAR
ACCESSORIES):

(x) Wiring Computer supply terminal points


recessed in wall etc., complete with
powder coated/anodized concealed
metal boxes required for suitable
number of modules (Modular
accessories) for having 6Amp. 2/3
universal socket (shuttered), 16/20Amp.
combined/ universal Socket (shuttered),
6/10/16/20Amp. Switches and blanking
plate etc., and covered with Frame Plate
and other petty material etc. including
the cost of above material, cutting and
filling up of chases (with finishing the
surface):-

(a) Wiring Computer terminal point having 3


Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16 Amp. switch with Each 204.00 560.00 224.00 580.40
indicator and 1No. blanking plate (Modular
accessories).

Chapter-34 Page 628 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(b) Wiring Computer terminal point having 2


Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16/20Amp. universal
Socket (shuttered) and 2Nos. 16/20Amp. Each 204.00 654.00 224.00 674.40
switch with indicator (Modular accessories).

(c) Wiring Computer terminal point having 3


Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16/20Amp. universal
Socket (shuttered), 2Nos. 16/20Amp. switch Each 291.00 875.00 320.00 904.10
with indicator and 2Nos. blanking plate
(Modular accessories).

34.01 RECESSED TV, TELEPHONE &


NETWORKING SOCKETS OUTLET
POINTS (USED FOR HGW, PVC
CONDUIT & HDPE PIPE WIRING SYSTEM
WITH MODULAR ACCESSORIES):

(xi) Supply and erection of TV socket,


Telephone socket and Networking
socket points in powder coated/anodized
concealed metal boxes recessed in wall
required for suitable number of modules
(Modular accessories) for having TV
sockets, Telephone sockets RJ11 &
Networking socket RJ45 (one module),
covered with Frame Plate and other petty
material etc., including the cost of above
material, cutting and filling up of chases
(with finishing the surface):-

(a) Wiring TV socket point (one module) Each 175.00 280.00 193.00 297.50

(b) Wiring Telephone socket point RJ11 (one


module) Each 175.00 281.00 193.00 298.50

(c) Wiring Networking socket point RJ45 (one


module) Each 175.00 365.00 193.00 382.50

Chapter-34 Page 629 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.02 RECESSED PVC CONDUIT PIPE WIRING
SYSTEM WITH MODULAR SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge PVC conduit pipe 20mm/ 25mm
dia. (ISI Marked) recessed in wall etc.,
complete with powder coated/anodized
concealed metal boxes (1.6mm thick with
Brass lugs) required for suitable number of
modules (Modular accessories) for having
Step type electronic fan regulators (two
module) 100watts, bell push, 6Amp. 2/3
universal socket (shuttered), 16/20Amp.
combined/ universal Socket (shuttered),
6/10Amp. Switches, 16/20Amp. switches with
indicator etc. and covered with Frame Plate
etc., PVC connector (For Fan Box and Call
Bell), Steel Hooks, Sheet metal fan box
(1.6mm thick shape hexagonal), Circular
junction Boxes (Four way PVC 1½" deep for
walls and CI 3" deep for ceiling), bonding to
earth with PVC insulated copper conductor
single core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc., including the cost of above material,
cutting and filling up of chases (with
finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 189.00 829.00 208.00 847.90

(i) b Wiring fan point (With fan box) Each 189.00 919.00 208.00 937.90

(ii) Wiring light point Each 155.00 579.00 171.00 594.50

(iii) Wiring call-bell point Each 155.00 565.00 171.00 580.50

(iv) Wiring 6Amp. wall socket point Each 130.00 470.00 143.00 483.00

(v) Wiring 6Amp. Plug control comprising wall


Each 87.00 282.00 96.00 290.70
socket point

(vi) Wiring 16/20Amp. power plug control point Each 130.00 363.00 143.00 376.00

(vii) Wiring light point without control switch. Each 73.00 254.00 80.00 261.30

(viii) Wiring light point with double control


switches. Each 175.00 1007.00 193.00 1024.50

Chapter-34 Page 630 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.03 RECESSED HDPE PIPE WIRING SYSTEM
WITH MODULAR SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked), overall
1.5sq. mm, 1100volts grade to be laid in
HDPE electrical conduit pipe 20mm/25mm
dia. ISI Marked, recessed in wall etc.,
complete with powder coated/anodized
concealed metal boxes (1.6mm thick with
Brass lugs) required for suitable number of
modules (Modular accessories) for having
Step type electronic fan regulators (two
module) 100watts, bell push, 6Amp. 2/3
universal socket (shuttered), 16/20Amp.
combined/ universal Socket (shuttered),
6/10Amp. Switches, 16/20Amp. switches with
indicator etc. and covered with Frame Plate
etc., PVC connector (For Fan Box and Call
Bell), PVC Bush, Steel Hooks, Sheet metal
fan box (1.6mm thick shape hexagonal), CI
Circular junction Boxes (Four way 1½" deep
for walls and 3" deep for ceiling), bonding to
earth with PVC insulated copper conductor
single core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc., including the cost of above material,
cutting and filling up of chases (with
finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 189.00 865.00 208.00 883.90

(i) b Wiring fan point (With fan box) Each 189.00 955.00 208.00 973.90

(ii) Wiring light point Each 155.00 874.00 171.00 889.50

(iii) Wiring call-bell point Each 155.00 775.00 171.00 790.50

(iv) Wiring 6Amp. wall socket point Each 130.00 575.00 143.00 588.00

(v) Wiring 6Amp. Plug control comprising wall


socket point Each 87.00 443.00 96.00 451.70

(vi) Wiring 16/20Amp. power plug control point Each 130.00 363.00 143.00 376.00

(vii) Wiring light point without control switch. Each 73.00 359.00 80.00 366.30

(viii) Wiring light point with double control


switches. Each 175.00 1382.00 193.00 1399.50

Chapter-34 Page 631 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.04 RECESSED HGW CONDUIT PIPE WIRING
SYSTEM WITH FLUSH PIANO TYPE
SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge welded conduit pipe 20mm/
25mm dia (1.6mm thick) ISI Marked recessed
in wall etc., complete with powder
coated/anodized concealed metal boxes
(1.6mm thick with Brass lugs) required for
having (Flush/ Piano type accessories) Step
type electronic fan regulators 100watts
(socket size), bell push, 5Pin 6Amp. sockets
(4Module Box), 16Amp. universal sockets
(6Module Box), 6/16/20Amp. Switches etc.
and covered with brown bakelite white
glazed translucent backside painted sheet
3mm thick etc., PVC connector (For Fan Box
and Call Bell), PVC Bush, Steel Hooks, Sheet
metal fan box (1.6mm thick shape
hexagonal), CI Circular junction Boxes (Four
way 1½" deep for walls and 3" deep for
ceiling), bonding to earth with PVC insulated
copper conductor single core FR cable (ISI
marked) 1sq. mm, 1100volts grade (For
6Amp. wall socket & plug control point) and
other petty material etc., including the cost of
above material, cutting and filling up of
chases (with finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 307.00 1092.00 338.00 1122.70

(i) b Wiring fan point (With fan box) Each 307.00 1186.00 338.00 1216.70

(ii) Wiring light point Each 254.00 858.00 279.00 883.40

(iii) Wiring call-bell point Each 254.00 837.00 279.00 862.40

(iv) Wiring 6Amp. wall socket point Each 204.00 616.00 224.00 636.40

(v) Wiring 6Amp. Plug control comprising wall


Each 175.00 335.00 193.00 352.50
socket point

(vi) Wiring 16/20Amp. power plug control point Each 204.00 394.00 224.00 414.40

(vii) Wiring light point without control switch. Each 145.00 429.00 160.00 443.50

(viii) Wiring light point with double control


switches. Each 350.00 1480.00 385.00 1515.00

Chapter-34 Page 632 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.05 RECESSED PVC CONDUIT PIPE WIRING
SYSTEM WITH FLUSH PIANO TYPE
SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge PVC conduit pipe 20mm/ 25mm
dia (ISI Marked) recessed in wall etc.,
complete with powder coated/anodized
concealed metal boxes (1.6mm thick with
Brass lugs) required for having (Flush/ Piano
type accessories) Step type electronic fan
regulators 100watts (socket size), bell push,
5Pin 6Amp. sockets (4Module Box),
16/20Amp. universal sockets (6Module Box),
6/16/20Amp. Switches etc. and covered with
brown bakelite white glazed translucent
backside painted sheet 3mm thick etc., PVC
connector (For Fan Box and Call Bell), Steel
Hooks, Sheet metal fan box (1.6mm thick
shape hexagonal), Circular junction Boxes
(Four way PVC 1½" deep for walls and CI 3"
deep for ceiling), bonding to earth with PVC
insulated copper conductor single core FR
cable (ISI marked) 1sq. mm, 1100volts grade
(For 6Amp. wall socket & plug control point)
and other petty material etc., including the
cost of above material, cutting and filling up
of chases (with finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 189.00 785.00 208.00 803.90

(i) b Wiring fan point (With fan box) Each 189.00 844.00 208.00 862.90

(ii) Wiring light point Each 155.00 549.00 171.00 564.50

(iii) Wiring call-bell point Each 155.00 506.00 171.00 521.50

(iv) Wiring 6Amp. wall socket point Each 130.00 418.00 143.00 431.00

(v) Wiring 6Amp. Plug control comprising wall


Each 87.00 229.00 96.00 237.70
socket point

(vi) Wiring 16/20Amp. power plug control point Each 130.00 319.00 143.00 332.00

(vii) Wiring light point without control switch. Each 73.00 254.00 80.00 261.30

(viii) Wiring light point with double control


Each 175.00 880.00 193.00 897.50
switches.

Chapter-34 Page 633 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.06 RECESSED HDPE PIPE WIRING SYSTEM
WITH FLUSH PIANO TYPE SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked), overall
1.5sq. mm, 1100volts grade to be laid in
HDPE conduit pipe 20mm/25mm dia. (ISI
Marked), recessed in wall etc., complete with
powder coated/anodized concealed metal
boxes (1.6mm thick with Brass lugs) required
for having (Flush/ Piano type accessories)
Step type electronic fan regulators 100watts
(socket size), bell push, 5Pin 6Amp. sockets
(4Module Box), 16Amp. universal sockets
(6Module Box), 6/16/20Amp. Switches etc.
and covered with brown bakelite white
glazed translucent backside painted sheet
3mm thick etc., PVC connector (For Fan Box
and Call Bell), Steel Hooks, Sheet metal fan
box (1.6mm thick shape hexagonal), Circular
junction Boxes (Four way PVC 1½" deep for
walls and CI 3" deep for ceiling), bonding to
earth with PVC insulated copper conductor
single core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc., including the cost of above material,
cutting and filling up of chases (with
finishing the surface):-

(i) a Wiring fan point (Without fan box) Each 189.00 789.00 208.00 807.90

(i) b Wiring fan point (With fan box) Each 189.00 880.00 208.00 898.90

(ii) Wiring light point Each 155.00 781.00 171.00 796.50

(iii) Wiring call-bell point Each 155.00 729.00 171.00 744.50

(iv) Wiring 6Amp. wall socket point Each 130.00 515.00 143.00 528.00

(v) Wiring 6Amp. Plug control comprising wall


Each 87.00 244.00 96.00 252.70
socket point

(vi) Wiring 16/20Amp. power plug control point Each 130.00 299.00 143.00 312.00

(vii) Wiring light point without control switch. Each 73.00 359.00 80.00 366.30

(viii) Wiring light point with double control


switches. Each 175.00 1300.00 193.00 1317.50

Chapter-34 Page 634 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.07 SURFACE HGW CONDUIT PIPE WIRING
SYSTEM WITH MODULAR SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked), overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge welded conduit pipe
20mm/25mm dia (1.6mm thick) ISI Marked
installed on surface etc., complete with PVC
boxes (Plastic on surface boxes) required for
suitable number of modules (Modular
accessories) for having Step type electronic
fan regulators (two module) 100watts, bell
push, 6Amp. 2/3 universal socket (shuttered),
16/20Amp. combined/ universal Socket
(shuttered), 6/10Amp. Switches, 16/20Amp.
switches with indicator etc. and covered with
Frame Plate etc., PVC connector (For Fan
Box and Call Bell), PVC Bush, GI saddle
clamp, CI Circular junction Boxes (Four way
1½" deep for walls), bonding to earth with
PVC insulated copper conductor single core
FR cable (ISI marked) 1sq. mm, 1100volts
grade (For 6Amp. wall socket & plug control
point) and other petty material etc., including
the cost of above material and painting as
required:-

(i) Wiring fan point (Without fan box) Each 198.00 1066.00 218.00 1085.80

(ii) Wiring light point Each 148.00 761.00 163.00 775.80

(iii) Wiring call-bell point Each 148.00 782.00 163.00 796.80

(iv) Wiring 6Amp. wall socket point Each 118.00 592.00 130.00 603.80

(v) Wiring 6Amp. Plug control comprising wall


socket point Each 98.00 318.00 108.00 327.80

(vi) Wiring 16/20Amp. power plug control point Each 118.00 359.00 130.00 370.80

(vii) Wiring light point without control switch. Each 98.00 359.00 108.00 368.80

(viii) Wiring light point with double control


Each 198.00 1420.00 218.00 1439.80
switches.

Chapter-34 Page 635 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.07 SURFACE AIR CONDITIONER SUPPLY
TERMINAL POINTS (USED FOR HGW,
PVC CONDUIT & HDPE PIPE WIRING
SYSTEM WITH MODULAR
ACCESSORIES):

(ix) Supply and erection of air conditioner


supply terminal point on surface on wall
etc., complete with PVC boxes (Plastic
on surface boxes) required for suitable
number of modules (Modular
accessories) for having 25Amp.
combined/ universal Socket (shuttered)
and modular motor starter 25Amp. (2
Module), covered with Frame Plate etc.,
& including the cost of above material
and other petty material with necessary
connections etc.:-

Wiring AC supply terminal point having


1No. 25Amp. universal Socket (shuttered)
erected at AC height and 1No. Motor starter Each 118.00 574.00 130.00 585.80
25Amp. erected at switchboard height.

34.07 SURFACE COMPUTER SUPPLY


TERMINAL POINTS (USED FOR HGW,
PVC CONDUIT & HDPE PIPE WIRING
SYSTEM WITH MODULAR
ACCESSORIES):

(x) Wiring Computer supply terminal points


on surface on wall etc., complete with
PVC boxes (Plastic on surface boxes)
required for suitable number of modules
(Modular accessories) for having 6Amp.
2/3 universal socket (shuttered),
16/20Amp. combined/ universal Socket
(shuttered), 6/10/16/20Amp. Switches and
blanking plate, covered with Frame Plate
etc., & including the cost of above
material and other petty material with
necessary connections etc.:-

(a) Wiring Computer terminal point having 3


Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16 Amp. switch with Each 118.00 480.00 130.00 491.80
indiicator and 1No. blanking plate

Chapter-34 Page 636 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Wiring Computer terminal point having 2
Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16/20Amp. universal Each 118.00 574.00 130.00 585.80
Socket (shuttered), 2Nos. 16/20Amp. switch
with indiicator

(c) Wiring Computer terminal point having 3


Nos. 6Amp. 2/3 universal socket
(shuttered), 1No. 16/20Amp. universal
Socket (shuttered), 2Nos. 16/20Amp. switch Each 169.00 783.00 186.00 799.90
with indiicator and 2Nos. blanking plate

34.07 SURFACE TV, TELEPHONE &


NETWORKING SOCKETS OUTLET
POINTS (USED FOR HGW, PVC
CONDUIT & HDPE PIPE WIRING SYSTEM
WITH MODULAR ACCESSORIES):

(xi) Wiring TV socket, Telephone socket and


Networking socket points on surface
etc., complete with PVC boxes (Plastic
on surface boxes) required for suitable
number of modules (Modular
accessories) for having TV sockets,
Telephone sockets RJ11 & Networking
socket RJ45 (one module), covered with
Frame Plate etc., & including the cost of
above material and other petty material
with necessary connections etc.:-

(a) Wiring TV socket point (one module) Each 118.00 230.00 130.00 241.80

(b) Wiring Telephone socket point RJ11 (one


module) Each 95.00 208.00 105.00 217.50

(c) Wiring Networking socket point RJ45 (one


module) Each 118.00 315.00 130.00 326.80

Chapter-34 Page 637 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.07A SURFACE PVC CONDUIT PIPE WIRING
SYSTEM WITH MODULAR SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge PVC conduit pipe 20mm/ 25mm
dia (ISI Marked) installed on surface etc.,
complete with PVC boxes (Plastic on surface
boxes) required for suitable number of
modules (Modular accessories) for having
Step type electronic fan regulators (two
module) 100watts, bell push, 6Amp. 2/3
universal socket (shuttered), 16/20Amp.
combined/ universal Socket (shuttered),
6/10Amp. Switches, 16/20Amp. switches with
indicator etc. and covered with Frame Plate
etc., PVC connector (For Fan Box and Call
Bell), MS saddle clamp, PVC Circular junction
Boxes (Four way 1½" deep for walls),
bonding to earth with PVC insulated copper
conductor single core FR cable (ISI marked)
1sq. mm, 1100volts grade (For 6Amp. wall
socket & plug control point) and other petty
material etc., including the cost of above
material and painting as required:-

(i) Wiring fan point (Without fan box) Each 198.00 846.00 218.00 865.80

(ii) Wiring light point Each 148.00 540.00 163.00 554.80

(iii) Wiring call-bell point Each 148.00 563.00 163.00 577.80

(iv) Wiring 6Amp. wall socket point Each 118.00 469.00 130.00 480.80

(v) Wiring 6Amp. Plug control comprising wall


Each 98.00 300.00 108.00 309.80
socket point

(vi) Wiring 16/20Amp. power plug control point Each 118.00 381.00 130.00 392.80

(vii) Wiring light point without control switch. Each 98.00 265.00 108.00 274.80

(viii) Wiring light point with double control


switches. Each 169.00 834.00 186.00 850.90

Chapter-34 Page 638 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.07B SURFACE PVC CONDUIT PIPE WIRING
SYSTEM WITH FLUSH PIANO TYPE
SWITCHES:

Wiring in PVC insulated copper conductor


single core FR cable (ISI marked) overall
1.5sq. mm, 1100volts grade to be laid in
heavy gauge PVC conduit pipe 20mm/ 25mm
dia (ISI Marked) installed on surface etc.,
complete with PVC boxes (Plastic on surface
boxes) required for having (Flush/ Piano type
accessories) Step type electronic fan
regulators 100watts (socket size), bell push,
5Pin 6Amp. (4Module Box), 16Amp. universal
sockets (6Module Box), 6/16/20Amp.
Switches etc. and covered with brown
bakelite white glazed translucent backside
painted sheet 3mm thick etc., PVC connector
(For Fan Box and Call Bell), MS saddle
clamp, PVC Circular junction Boxes (Four
way 1½" deep for walls), bonding to earth
with PVC insulated copper conductor single
core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc., including the cost of above material and
painting as required:-

(i) Wiring fan point (Without fan box) Each 198.00 769.00 218.00 788.80

(ii) Wiring light point Each 148.00 509.00 163.00 523.80

(iii) Wiring call-bell point Each 148.00 516.00 163.00 530.80

(iv) Wiring 6Amp. wall socket point Each 118.00 407.00 130.00 418.80

(v) Wiring 6Amp. Plug control comprising wall


Each 98.00 238.00 108.00 247.80
socket point

(vi) Wiring 16/20Amp. power plug control point Each 118.00 315.00 130.00 326.80

(vii) Wiring light point without control switch. Each 98.00 265.00 108.00 274.80

(viii) Wiring light point with double control


switches. Each 169.00 744.00 186.00 760.90

Chapter-34 Page 639 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.08 REPLACEMENT OF WIRES, COVER FRAMES,
MODULAR SWITCHES, CONCEALED METAL
BOXES AND OTHER ACCESSORIES IN THE
EXISTING RECESSED CONDUIT PIPE
WIRING SYSTEM (WITH MODULAR TYPE
ACCESSORIES) Derived from 34.01:

Replacement of PVC insulated copper


conductor single core FR cable (ISI marked)
overall 1.5sq. mm, 1100volts grade to be laid
in existing heavy gauge welded conduit pipe
20 mm/25 mm dia (1.6mm thick) ISI Marked,
recessed in wall etc., complete with powder
coated/anodized concealed metal boxes
(1.6mm thick with Brass lugs) required for
suitable number of modules (Modular
accessories) for having Step type electronic
fan regulators (two module) 100watts, bell
push, 6Amp. 2/3 universal socket (shuttered),
16/20Amp. combined/ universal Socket
(shuttered), 6/10Amp. Switches, 16/20Amp.
switches with indicator etc. and covered with
Frame Plate etc., PVC connector (For Fan
Box and Call Bell), PVC Bush, bonding to
earth with PVC insulated copper conductor
single core FR cable (ISI marked) 1sq. mm,
1100volts grade (For 6Amp. wall socket &
plug control point) and other petty material
etc. including the cost of above material,
cutting and filling up of chases (with
finishing the surface):- (Derived From CSR
34.01)

(i) a Wiring fan point (Without fan box) Each 147.00 666.00 162.00 680.70

(i) b Wiring fan point (With fan box) Each 147.00 701.00 162.00 715.70

(ii) Wiring light point Each 127.00 376.00 140.00 388.70

(iii) Wiring call-bell point Each 127.00 397.00 140.00 409.70

(iv) Wiring 6Amp. wall socket point Each 108.00 369.00 119.00 379.80

(v) Wiring 6Amp. Plug control comprising wall


socket point Each 107.00 292.00 118.00 302.70

(vi) Wiring 16/20Amp. power plug control point Each 204.00 438.00 224.00 458.40

(vii) Wiring light point without control switch. Each 70.00 132.00 77.00 139.00

(viii) Wiring light point with double control


Each 147.00 672.00 162.00 686.70
switches.

Chapter-34 Page 640 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.08A REPLACEMENT OF WIRES, SHEETS,
SWITCHES AND OTHER ACCESSORIES
IN THE EXISTING RECESSED CONDUIT
PIPE WIRING SYSTEM (WITH FLUSH
PIANO TYPE ACCESSORIES) Derived
From CSR 34.03:

Replacement of PVC insulated copper


conductor single core FR cable (ISI marked)
overall 1.5sq. mm, 1100volts grade to be laid
in existing heavy gauge welded conduit pipe
20 mm/25 mm dia (1.6mm thick) ISI Marked,
recessed in wall etc., complete with (Flush/
Piano type accessories) Step type electronic
fan regulators 100watts (socket size), bell
push, 5Pin 6Amp., 16Amp. universal sockets,
6/16/20Amp. Switches etc. and covered with
brown bakelite white glazed translucent
backside painted sheet 3mm thick etc., PVC
connector (For Fan Box and Call Bell), PVC
Bush, Brass Screws, bonding to earth with
PVC insulated copper conductor single core
FR cable (ISI marked) 1sq. mm, 1100volts
grade (For 6Amp. wall socket & plug control
point) and other petty material etc. including
the cost of above material and repair of
chases (with finsihing the surface):- (Derived
From CSR 34.03)

(i) a Wiring fan point (Without fan box) Each 118.00 525.00 130.00 536.80

(i) b Wiring fan point (With fan box) Each 118.00 560.00 130.00 571.80

(ii) Wiring light point Each 98.00 291.00 108.00 300.80

(iii) Wiring call-bell point Each 98.00 293.00 108.00 302.80

(iv) Wiring 6Amp. wall socket point Each 79.00 259.00 87.00 266.90

(v) Wiring 6Amp. Plug control comprising wall


Each 47.00 154.00 52.00 158.70
socket point

(vi) Wiring 16/20Amp. power plug control point Each 47.00 189.00 52.00 193.70

(vii) Wiring light point without control switch. Each 47.00 109.00 52.00 113.70

(viii) Wiring light point with double control


Each 118.00 512.00 130.00 523.80
switches.

Chapter-34 Page 641 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.09 PVC INSULATED FR COPPER
CONDUCTOR CABLES:

Supply and erection of PVC insulated FR


single core Unsheathed copper
conductor cable (ISI marked) suitable
upto 1100 volts grade confirm to
IS:694/1990 left bare in pipe or casing of
suitable size complete in all respect as
desired by the Engineer-in-charge:-

(i) Overall size 1sq.mm (Un-sheathed) Metre 6.00 14.00 7.00 14.60

(ii) Overall size 1.5sq.mm (Un-sheathed) Metre 6.00 18.00 7.00 18.60

(iii) Overall size 2.5sq.mm (Un-sheathed) Metre 7.00 27.00 8.00 27.70

(iv) Overall size 4sq.mm (Un-sheathed) Metre 7.00 39.00 8.00 39.70

(v) Overall size 6sq.mm (Un-sheathed) Metre 7.00 54.00 8.00 54.70

(vi) Overall size 10sq.mm (Un-sheathed) Metre 9.00 88.00 10.00 88.90

(vii) Overall size 16sq.mm (Un-sheathed) Metre 9.00 137.00 10.00 137.90

(viii) Overall size 25sq.mm (Un-sheathed) Metre 12.00 216.00 13.00 217.20

(ix) Overall size 35sq.mm (Un-sheathed) Metre 12.00 297.00 13.00 298.20

(x) Overall size 50sq.mm (Un-sheathed) Metre 12.00 415.00 13.00 416.20

(xi) Overall size 70sq.mm (Un-sheathed) Metre 12.00 585.00 13.00 586.20

34.09 PVC INSULATED PVC SHEATHED FR


ROUND FLEXIBLE COPPER
CONDUCTOR CABLE:

(xii) Supply and erection of PVC insulated


PVC sheathed FR (2Core) round flexible
wire with copper conductor cable (ISI
marked) confirm to IS:694/1990 left bare
in pipe or on surface with cleats of
suitable size complete in all respect as
desired by the Engineer-in-charge:-

(a) Overall size 0.5sq.mm (16/0.20mm), 2Core


Metre 4.00 19.00 4.00 19.40

(b) Overall size 0.75sq.mm (24/0.20mm),


Metre 4.00 23.00 4.00 23.40
2Core

Chapter-34 Page 642 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) Overall size 1.0sq.mm (32/0.20mm), 2Core
Metre 4.00 27.00 4.00 27.40

(d) Overall size 1.5sq.mm (48/0.20mm), 2Core


Metre 4.00 35.00 4.00 35.40

(e) Overall size 2.5sq.mm (50/0.25mm), 2Core


Metre 6.00 55.00 7.00 55.60

(f) Overall size 4.0sq.mm (84/0.3mm), 2Core


Metre 6.00 81.00 7.00 81.60

(g) Overall size 6.0sq.mm (56/0.3mm), 2Core


Metre 6.00 114.00 7.00 114.60

34.09 (xiii) Supply and erection of PVC insulated


PVC sheathed (3 core) round flexible
wire with copper conductor (FR) cable
(ISI marked) confirm to IS:694/1990 left
bare in pipe or casing of suitable size
complete in all respect as desired by the
Engineer-in-charge:-

(a) Overall size 1.0sq.mm (32/0.20mm), 3Core


Metre 6.00 36.00 7.00 36.60

(b) Overall size 1.5sq.mm (48/0.20mm), 3Core


Metre 6.00 49.00 7.00 49.60

(c) Overall size 2.5sq.mm (50/0.25mm), 3Core


Metre 7.00 76.00 8.00 76.70

(d) Overall size 4.0sq.mm (84/0.3mm), 3Core


Metre 7.00 113.00 8.00 113.70

(e) Overall size 6.0sq.mm (56/0.3mm), 3Core


Metre 7.00 164.00 8.00 164.70

34.09 (xiv) Supply and erection of XLPE/ PVC


insulated PVC sheathed (10 core)
unarmoured copper conductor cable (ISI
marked) confirm to IS:7098 (PART-I),
1988 loose in the existing trench or pipe
with suitable size of copper thimbles/
lugs complete in all respect as desired
by the Engineer-in-charge:-

(a) Overall size 1.5sq.mm (10 Core) Metre 15.00 173.00 17.00 174.50

(b) Overall size 2.5sq.mm (10 Core) Metre 15.00 258.00 17.00 259.50

Chapter-34 Page 643 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.10 XLPE INSULATED LT CABLES:

34.10 XLPE INSULATED ARMOURED CABLES


A (UNDERGROUND):

Supply, laying and erection of aluminium


conductor XLPE insulated PVC sheathed
armoured and served cable 1100 volts
grade as per IS:7098 (Part-1)1988 to be
laid 1metre below ground level including
excavation, sand cushioning, covering
with sand & First Class bricks and back
filling the trench etc., of the required size
as per PWD General Specifications:-

(i) Overall size 6sq.mm (2Core) Armoured


Metre 99.00 348.00 109.00 357.90
(Underground)

(ii) Overall size 10sq.mm (2Core) Armoured


Metre 99.00 360.00 109.00 369.90
(Underground)

(iii) Overall size 16sq.mm (2Core) Armoured


Metre 99.00 373.00 109.00 382.90
(Underground)

(iv) Overall size 25sq.mm (2Core) Armoured


Metre 107.00 384.00 118.00 394.70
(Underground)

(v) Overall size 35sq.mm (2Core) Armoured


Metre 107.00 403.00 118.00 413.70
(Underground)

(vi) Overall size 50sq.mm (2Core) Armoured


Metre 107.00 431.00 118.00 441.70
(Underground)

(vii) Overall size 4sq.mm (3Core) Armoured


Metre 99.00 344.00 109.00 353.90
(Underground)

(viii) Overall size 6sq.mm (3Core) Armoured


Metre 99.00 354.00 109.00 363.90
(Underground)

(ix) Overall size 10sq.mm (3Core) Armoured


Metre 99.00 372.00 109.00 381.90
(Underground)

(x) Overall size 16sq.mm (3Core) Armoured


Metre 99.00 378.00 109.00 387.90
(Underground)

(xi) Overall size 25sq.mm (3Core) Armoured


Metre 107.00 410.00 118.00 420.70
(Underground)

(xii) Overall size 35sq.mm (3Core) Armoured


Metre 107.00 440.00 118.00 450.70
(Underground)

(xiii) Overall size 50sq.mm (3Core) Armoured


Metre 107.00 478.00 118.00 488.70
(Underground)

Chapter-34 Page 644 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xiv) Overall size 70sq.mm (3Core) Armoured
Metre 116.00 550.00 128.00 561.60
(Underground)

(xv) Overall size 95sq.mm (3Core) Armoured


Metre 116.00 610.00 128.00 621.60
(Underground)

(xvi) Overall size 120sq.mm (3Core) Armoured


Metre 145.00 699.00 160.00 713.50
(Underground)

(xvii) Overall size 150sq.mm (3Core) Armoured


Metre 145.00 783.00 160.00 797.50
(Underground)

(xviii) Overall size 185sq.mm (3Core) Armoured


Metre 145.00 883.00 160.00 897.50
(Underground)

(xix) Overall size 240sq.mm (3Core) Armoured


Metre 164.00 1057.00 180.00 1073.40
(Underground)

(xx) Overall size 300sq.mm (3Core) Armoured


Metre 164.00 1204.00 180.00 1220.40
(Underground)

(xxi) Overall size 400sq.mm (3Core) Armoured


Metre 164.00 1435.00 180.00 1451.40
(Underground)

(xxii) Overall size 25sq.mm (3½ Core) Armoured


Metre 107.00 424.00 118.00 434.70
(Underground)

(xxiii) Overall size 35sq.mm (3½ Core) Armoured


Metre 107.00 458.00 118.00 468.70
(Underground)

(xxiv) Overall size 50sq.mm (3½ Core) Armoured


Metre 107.00 507.00 118.00 517.70
(Underground)

(xxv) Overall size 70sq.mm (3½ Core) Armoured


Metre 116.00 591.00 128.00 602.60
(Underground)

(xxvi) Overall size 95sq.mm (3½ Core) Armoured


Metre 116.00 652.00 128.00 663.60
(Underground)

(xxvii) Overall size 120sq.mm (3½ Core) Armoured


Metre 145.00 766.00 160.00 780.50
(Underground)

(xxviii) Overall size 150sq.mm (3½ Core) Armoured


Metre 145.00 846.00 160.00 860.50
(Underground)

(xxix) Overall size 185sq.mm (3½ Core) Armoured


Metre 145.00 973.00 160.00 987.50
(Underground)

(xxx) Overall size 240sq.mm (3½ Core) Armoured


Metre 164.00 1158.00 180.00 1174.40
(Underground)

(xxxi) Overall size 300sq.mm (3½ Core) Armoured


Metre 164.00 1340.00 180.00 1356.40
(Underground)

(xxxii) Overall size 400sq.mm (3½ Core) Armoured


Metre 164.00 1608.00 180.00 1624.40
(Underground)
Chapter-34 Page 645 CSR-2020
CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xxxiii) Overall size 500sq.mm (3½ Core) Armoured


Metre 179.00 2075.00 197.00 2092.90
(Underground)

(xxxiv) Overall size 630sq.mm (3½ Core) Armoured


Metre 179.00 2687.00 197.00 2704.90
(Underground)

(xxxv) Overall size 6sq.mm (4Core) Armoured


Metre 107.00 372.00 118.00 382.70
(Underground)

(xxxvi) Overall size 10sq.mm (4Core) Armoured


Metre 107.00 392.00 118.00 402.70
(Underground)

(xxxvii) Overall size 16sq.mm (4Core) Armoured


Metre 107.00 403.00 118.00 413.70
(Underground)

(xxxviii) Overall size 25sq.mm (4Core) Armoured


Metre 107.00 434.00 118.00 444.70
(Underground)

(xxxix) Overall size 35sq.mm (4Core) Armoured


Metre 107.00 476.00 118.00 486.70
(Underground)

(xl) Overall size 50sq.mm (4Core) Armoured


Metre 107.00 529.00 118.00 539.70
(Underground)

(xli) Overall size 70sq.mm (4Core) Armoured


Metre 116.00 621.00 128.00 632.60
(Underground)

(xlii) Overall size 95sq.mm (4Core) Armoured


Metre 116.00 690.00 128.00 701.60
(Underground)

(xliii) Overall size 120sq.mm (4Core) Armoured


Metre 145.00 806.00 160.00 820.50
(Underground)

(xliv) Overall size 150sq.mm (4Core) Armoured


Metre 145.00 914.00 160.00 928.50
(Underground)

(xlv) Overall size 185sq.mm (4Core) Armoured


Metre 145.00 1055.00 160.00 1069.50
(Underground)

(xlvi) Overall size 240sq.mm (4Core) Armoured


Metre 164.00 1275.00 180.00 1291.40
(Underground)

(xlvii) Overall size 300sq.mm (4Core) Armoured


Metre 164.00 1464.00 180.00 1480.40
(Underground)

(xlviii) Overall size 400sq.mm (4Core) Armoured


Metre 164.00 1765.00 180.00 1781.40
(Underground)

(xlix) Overall size 500sq.mm (4Core) Armoured


Metre 179.00 2284.00 197.00 2301.90
(Underground)

(xlx) Overall size 630sq.mm (4Core) Armoured


Metre 179.00 2961.00 197.00 2978.90
(Underground)

Chapter-34 Page 646 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.10 XLPE INSULATED ARMOURED CABLES
B (LOOSE):

Supply, laying and erection of aluminium


conductor XLPE insulated PVC sheathed
armoured and served cable 1100 volts
grade as per IS 7098 (Part-1)1988 to be
laid loose in the existing trench or pipe
as per PWD General Specifications:-

(i) Overall size 6sq.mm (2Core) Armoured


Metre 15.00 76.00 17.00 77.50
(Loose)

(ii) Overall size 10sq.mm (2Core) Armoured


Metre 15.00 88.00 17.00 89.50
(Loose)

(iii) Overall size 16sq.mm (2Core) Armoured


Metre 15.00 100.00 17.00 101.50
(Loose)

(iv) Overall size 25sq.mm (2Core) Armoured


Metre 15.00 103.00 17.00 104.50
(Loose)

(v) Overall size 35sq.mm (2Core) Armoured


Metre 15.00 123.00 17.00 124.50
(Loose)

(vi) Overall size 50sq.mm (2Core) Armoured


Metre 15.00 150.00 17.00 151.50
(Loose)

(vii) Overall size 4sq.mm (3Core) Armoured


Metre 15.00 72.00 17.00 73.50
(Loose)

(viii) Overall size 6sq.mm (3Core) Armoured


Metre 15.00 82.00 17.00 83.50
(Loose)

(ix) Overall size 10sq.mm (3Core) Armoured


Metre 15.00 100.00 17.00 101.50
(Loose)

(x) Overall size 16sq.mm (3Core) Armoured


Metre 15.00 106.00 17.00 107.50
(Loose)

(xi) Overall size 25sq.mm (3Core) Armoured


Metre 15.00 129.00 17.00 130.50
(Loose)

(xii) Overall size 35sq.mm (3Core) Armoured


Metre 15.00 159.00 17.00 160.50
(Loose)

(xiii) Overall size 50sq.mm (3Core) Armoured


Metre 15.00 197.00 17.00 198.50
(Loose)

(xiv) Overall size 70sq.mm (3Core) Armoured


Metre 23.00 269.00 25.00 271.30
(Loose)

(xv) Overall size 95sq.mm (3Core) Armoured


Metre 23.00 329.00 25.00 331.30
(Loose)

Chapter-34 Page 647 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xvi) Overall size 120sq.mm (3Core) Armoured


Metre 40.00 406.00 44.00 410.00
(Loose)

(xvii) Overall size 150sq.mm (3Core) Armoured


Metre 40.00 491.00 44.00 495.00
(Loose)

(xviii) Overall size 185sq.mm (3Core) Armoured


Metre 40.00 590.00 44.00 594.00
(Loose)

(xix) Overall size 240sq.mm (3Core) Armoured


Metre 58.00 762.00 64.00 767.80
(Loose)

(xx) Overall size 300sq.mm (3Core) Armoured


Metre 58.00 909.00 64.00 914.80
(Loose)

(xxi) Overall size 400sq.mm (3Core) Armoured


Metre 58.00 1140.00 64.00 1145.80
(Loose)

(xxii) Overall size 25sq.mm (3½ Core) Armoured


Metre 15.00 143.00 17.00 144.50
(Loose)

(xxiii) Overall size 35sq.mm (3½ Core) Armoured


Metre 15.00 177.00 17.00 178.50
(Loose)

(xxiv) Overall size 50sq.mm (3½ Core) Armoured


Metre 15.00 226.00 17.00 227.50
(Loose)

(xxv) Overall size 70sq.mm (3½ Core) Armoured


Metre 23.00 310.00 25.00 312.30
(Loose)

(xxvi) Overall size 95sq.mm (3½ Core) Armoured


Metre 23.00 370.00 25.00 372.30
(Loose)

(xxvii) Overall size 120sq.mm (3½ Core) Armoured


Metre 40.00 473.00 44.00 477.00
(Loose)

(xxviii) Overall size 150sq.mm (3½ Core) Armoured


Metre 40.00 553.00 44.00 557.00
(Loose)

(xxix) Overall size 185sq.mm (3½ Core) Armoured


Metre 40.00 680.00 44.00 684.00
(Loose)

(xxx) Overall size 240sq.mm (3½ Core) Armoured


Metre 58.00 863.00 64.00 868.80
(Loose)

(xxxi) Overall size 300sq.mm (3½ Core) Armoured


Metre 58.00 1045.00 64.00 1050.80
(Loose)

(xxxii) Overall size 400sq.mm (3½ Core) Armoured


Metre 58.00 1313.00 64.00 1318.80
(Loose)

(xxxiii) Overall size 500sq.mm (3½ Core) Armoured


Metre 72.00 1780.00 79.00 1787.20
(Loose)

Chapter-34 Page 648 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xxxiv) Overall size 630sq.mm (3½ Core) Armoured
Metre 72.00 2392.00 79.00 2399.20
(Loose)

(xxxv) Overall size 6sq.mm (4Core) Armoured


Metre 15.00 91.00 17.00 92.50
(Loose)

(xxxvi) Overall size 10sq.mm (4Core) Armoured


Metre 15.00 111.00 17.00 112.50
(Loose)

(xxxvii) Overall size 16sq.mm (4Core) Armoured


Metre 15.00 123.00 17.00 124.50
(Loose)

(xxxviii) Overall size 25sq.mm (4Core) Armoured


Metre 15.00 154.00 17.00 155.50
(Loose)

(xxxix) Overall size 35sq.mm (4Core) Armoured


Metre 15.00 195.00 17.00 196.50
(Loose)

(xl) Overall size 50sq.mm (4Core) Armoured


Metre 15.00 248.00 17.00 249.50
(Loose)

(xli) Overall size 70sq.mm (4Core) Armoured


Metre 23.00 339.00 25.00 341.30
(Loose)

(xlii) Overall size 95sq.mm (4Core) Armoured


Metre 23.00 409.00 25.00 411.30
(Loose)

(xliii) Overall size 120sq.mm (4Core) Armoured


Metre 40.00 513.00 44.00 517.00
(Loose)

(xliv) Overall size 150sq.mm (4Core) Armoured


Metre 40.00 621.00 44.00 625.00
(Loose)

(xlv) Overall size 185sq.mm (4Core) Armoured


Metre 40.00 763.00 44.00 767.00
(Loose)

(xlvi) Overall size 240sq.mm (4Core) Armoured


Metre 58.00 980.00 64.00 985.80
(Loose)

(xlvii) Overall size 300sq.mm (4Core) Armoured


Metre 58.00 1169.00 64.00 1174.80
(Loose)

(xlviii) Overall size 400sq.mm (4Core) Armoured


Metre 58.00 1470.00 64.00 1475.80
(Loose)

(xlix) Overall size 500sq.mm (4Core) Armoured


Metre 72.00 1989.00 79.00 1996.20
(Loose)

(xlx) Overall size 630sq.mm (4Core) Armoured


Metre 72.00 2666.00 79.00 2673.20
(Loose)

Chapter-34 Page 649 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.10 XLPE INSULATED UN-ARMOURED
C CABLES (ON SURFACE):

Supply, laying and erection of aluminium


conductor XLPE insulated PVC sheathed
Un-armoured and served cable 1100
volts grade as per IS 7098 (Part-1)1988 to
be laid (On Surface) as per PWD General
Specifications:-

(i) Overall size 6sq.mm (2Core) Un-armoured


Metre 17.00 65.00 19.00 66.70
(On-Surface)

(ii) Overall size 10sq.mm (2Core) Un-armoured


Metre 17.00 72.00 19.00 73.70
(On-Surface)

(iii) Overall size 16sq.mm (2Core) Un-armoured


Metre 17.00 82.00 19.00 83.70
(On-Surface)

(iv) Overall size 25sq.mm (2Core) Un-armoured


Metre 17.00 99.00 19.00 100.70
(On-Surface)

(v) Overall size 35sq.mm (2Core) Un-armoured


Metre 17.00 118.00 19.00 119.70
(On-Surface)

(vi) Overall size 50sq.mm (2Core) Un-armoured


Metre 17.00 143.00 19.00 144.70
(On-Surface)

(vii) Overall size 4sq.mm (3Core) Un-armoured


Metre 17.00 62.00 19.00 63.70
(On-Surface)

(viii) Overall size 6sq.mm (3Core) Un-armoured


Metre 17.00 70.00 19.00 71.70
(On-Surface)

(ix) Overall size 10sq.mm (3Core) Un-armoured


Metre 17.00 82.00 19.00 83.70
(On-Surface)

(x) Overall size 16sq.mm (3Core) Un-armoured


Metre 17.00 99.00 19.00 100.70
(On-Surface)

(xi) Overall size 25sq.mm (3Core) Un-armoured


Metre 17.00 125.00 19.00 126.70
(On-Surface)

(xii) Overall size 35sq.mm (3Core) Un-armoured


Metre 17.00 152.00 19.00 153.70
(On-Surface)

(xiii) Overall size 50sq.mm (3Core) Un-armoured


Metre 17.00 191.00 19.00 192.70
(On-Surface)

(xiv) Overall size 70sq.mm (3Core) Un-armoured


Metre 26.00 264.00 29.00 266.60
(On-Surface)

(xv) Overall size 95sq.mm (3Core) Un-armoured


Metre 26.00 318.00 29.00 320.60
(On-Surface)

Chapter-34 Page 650 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xvi) Overall size 120sq.mm (3Core) Un-


Metre 46.00 406.00 51.00 410.60
armoured (On-Surface)

(xvii) Overall size 150sq.mm (3Core) Un-


Metre 46.00 489.00 51.00 493.60
armoured (On-Surface)

(xviii) Overall size 185sq.mm (3Core) Un-


Metre 46.00 594.00 51.00 598.60
armoured (On-Surface)

(xix) Overall size 240sq.mm (3Core) Un-


Metre 69.00 768.00 76.00 774.90
armoured (On-Surface)

(xx) Overall size 300sq.mm (3Core) Un-


Metre 69.00 926.00 76.00 932.90
armoured (On-Surface)

(xxi) Overall size 400sq.mm (3Core) Un-


Metre 69.00 1143.00 76.00 1149.90
armoured (On-Surface)

(xxii) Overall size 25sq.mm (3½ Core) Un-


Metre 17.00 140.00 19.00 141.70
armoured (On-Surface)

(xxiii) Overall size 35sq.mm (3½ Core) Un-


Metre 17.00 170.00 19.00 171.70
armoured (On-Surface)

(xxiv) Overall size 50sq.mm (3½ Core) Un-


Metre 17.00 217.00 19.00 218.70
armoured (On-Surface)

(xxv) Overall size 70sq.mm (3½ Core) Un-


Metre 26.00 299.00 29.00 301.60
armoured (On-Surface)

(xxvi) Overall size 95sq.mm (3½ Core) Un-


Metre 26.00 363.00 29.00 365.60
armoured (On-Surface)

(xxvii) Overall size 120sq.mm (3½ Core) Un-


Metre 46.00 467.00 51.00 471.60
armoured (On-Surface)

(xxviii) Overall size 150sq.mm (3½ Core) Un-


Metre 46.00 552.00 51.00 556.60
armoured (On-Surface)

(xxix) Overall size 185sq.mm (3½ Core) Un-


Metre 46.00 679.00 51.00 683.60
armoured (On-Surface)

(xxx) Overall size 240sq.mm (3½ Core) Un-


Metre 69.00 874.00 76.00 880.90
armoured (On-Surface)

(xxxi) Overall size 300sq.mm (3½ Core) Un-


Metre 69.00 1056.00 76.00 1062.90
armoured (On-Surface)

(xxxii) Overall size 400sq.mm (3½ Core) Un-


Metre 69.00 1310.00 76.00 1316.90
armoured (On-Surface)

(xxxiii) Overall size 500sq.mm (3½ Core) Un-


Metre 80.00 1690.00 88.00 1698.00
armoured (On-Surface)

Chapter-34 Page 651 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xxxiv) Overall size 630sq.mm (3½ Core) Un-
Metre 72.00 2258.00 79.00 2265.20
armoured (On-Surface)

(xxxv) Overall size 6sq.mm (4Core) Un-armoured


Metre 17.00 78.00 19.00 79.70
(On-Surface)

(xxxvi) Overall size 10sq.mm (4Core) Un-armoured


Metre 17.00 94.00 19.00 95.70
(On-Surface)

(xxxvii) Overall size 16sq.mm (4Core) Un-armoured


Metre 17.00 115.00 19.00 116.70
(On-Surface)

(xxxviii) Overall size 25sq.mm (4Core) Un-armoured


Metre 17.00 147.00 19.00 148.70
(On-Surface)

(xxxix) Overall size 35sq.mm (4Core) Un-armoured


Metre 17.00 185.00 19.00 186.70
(On-Surface)

(xl) Overall size 50sq.mm (4Core) Un-armoured


Metre 17.00 236.00 19.00 237.70
(On-Surface)

(xli) Overall size 70sq.mm (4Core) Un-armoured


Metre 26.00 328.00 29.00 330.60
(On-Surface)

(xlii) Overall size 95sq.mm (4Core) Un-armoured


Metre 26.00 402.00 29.00 404.60
(On-Surface)

(xliii) Overall size 120sq.mm (4Core) Un-


Metre 46.00 512.00 51.00 516.60
armoured (On-Surface)

(xliv) Overall size 150sq.mm (4Core) Un-


Metre 46.00 622.00 51.00 626.60
armoured (On-Surface)

(xlv) Overall size 185sq.mm (4Core) Un-


Metre 46.00 760.00 51.00 764.60
armoured (On-Surface)

(xlvi) Overall size 240sq.mm (4Core) Un-


Metre 69.00 981.00 76.00 987.90
armoured (On-Surface)

(xlvii) Overall size 300sq.mm (4Core) Un-


Metre 69.00 1182.00 76.00 1188.90
armoured (On-Surface)

(xlviii) Overall size 400sq.mm (4Core) Un-


Metre 69.00 1469.00 76.00 1475.90
armoured (On-Surface)

(xlix) Overall size 500sq.mm (4Core) Un-


Metre 80.00 1895.00 88.00 1903.00
armoured (On-Surface)

(xlx) Overall size 630sq.mm (4Core) Un-


Metre 80.00 2524.00 88.00 2532.00
armoured (On-Surface)

Chapter-34 Page 652 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.10 XLPE INSULATED UN-ARMOURED
D CABLES (LOOSE):

Supply, laying and erection of aluminium


conductor XLPE insulated PVC sheathed
Un-armoured and served cable 1100
volts grade as per IS 7098 (Part-1)1988 to
be laid loose in the existing trench or
pipe as per PWD General Specifications:-

(i) Overall size 6sq.mm (2Core) Un-armoured


Metre 12.00 50.00 13.00 51.20
(Loose)

(ii) Overall size 10sq.mm (2Core) Un-armoured


Metre 12.00 58.00 13.00 59.20
(Loose)

(iii) Overall size 16sq.mm (2Core) Un-armoured


Metre 12.00 68.00 13.00 69.20
(Loose)

(iv) Overall size 25sq.mm (2Core) Un-armoured


Metre 12.00 84.00 13.00 85.20
(Loose)

(v) Overall size 35sq.mm (2Core) Un-armoured


Metre 12.00 103.00 13.00 104.20
(Loose)

(vi) Overall size 50sq.mm (2Core) Un-armoured


Metre 12.00 129.00 13.00 130.20
(Loose)

(vii) Overall size 4sq.mm (3Core) Un-armoured


Metre 12.00 48.00 13.00 49.20
(Loose)

(viii) Overall size 6sq.mm (3Core) Un-armoured


Metre 12.00 55.00 13.00 56.20
(Loose)

(ix) Overall size 10sq.mm (3Core) Un-armoured


Metre 12.00 68.00 13.00 69.20
(Loose)

(x) Overall size 16sq.mm (3Core) Un-armoured


Metre 12.00 84.00 13.00 85.20
(Loose)

(xi) Overall size 25sq.mm (3Core) Un-armoured


Metre 12.00 110.00 13.00 111.20
(Loose)

(xii) Overall size 35sq.mm (3Core) Un-armoured


Metre 12.00 137.00 13.00 138.20
(Loose)

(xiii) Overall size 50sq.mm (3Core) Un-armoured


Metre 12.00 177.00 13.00 178.20
(Loose)

(xiv) Overall size 70sq.mm (3Core) Un-armoured


Metre 17.00 246.00 19.00 247.70
(Loose)

(xv) Overall size 95sq.mm (3Core) Un-armoured


Metre 17.00 300.00 19.00 301.70
(Loose)

Chapter-34 Page 653 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xvi) Overall size 120sq.mm (3Core) Un-


Metre 35.00 383.00 39.00 386.50
armoured (Loose)

(xvii) Overall size 150sq.mm (3Core) Un-


Metre 35.00 467.00 39.00 470.50
armoured (Loose)

(xviii) Overall size 185sq.mm (3Core) Un-


Metre 35.00 572.00 39.00 575.50
armoured (Loose)

(xix) Overall size 240sq.mm (3Core) Un-


Metre 54.00 741.00 59.00 746.40
armoured (Loose)

(xx) Overall size 300sq.mm (3Core) Un-


Metre 54.00 899.00 59.00 904.40
armoured (Loose)

(xxi) Overall size 400sq.mm (3Core) Un-


Metre 54.00 1115.00 59.00 1120.40
armoured (Loose)

(xxii) Overall size 25sq.mm (3½ Core) Un-


Metre 12.00 125.00 13.00 126.20
armoured (Loose)

(xxiii) Overall size 35sq.mm (3½ Core) Un-


Metre 12.00 155.00 13.00 156.20
armoured (Loose)

(xxiv) Overall size 50sq.mm (3½ Core) Un-


Metre 12.00 202.00 13.00 203.20
armoured (Loose)

(xxv) Overall size 70sq.mm (3½ Core) Un-


Metre 17.00 280.00 19.00 281.70
armoured (Loose)

(xxvi) Overall size 95sq.mm (3½ Core) Un-


Metre 17.00 344.00 19.00 345.70
armoured (Loose)

(xxvii) Overall size 120sq.mm (3½ Core) Un-


Metre 35.00 445.00 39.00 448.50
armoured (Loose)

(xxviii) Overall size 150sq.mm (3½ Core) Un-


Metre 35.00 529.00 39.00 532.50
armoured (Loose)

(xxix) Overall size 185sq.mm (3½ Core) Un-


Metre 35.00 657.00 39.00 660.50
armoured (Loose)

(xxx) Overall size 240sq.mm (3½ Core) Un-


Metre 54.00 846.00 59.00 851.40
armoured (Loose)

(xxxi) Overall size 300sq.mm (3½ Core) Un-


Metre 54.00 1029.00 59.00 1034.40
armoured (Loose)

(xxxii) Overall size 400sq.mm (3½ Core) Un-


Metre 54.00 1283.00 59.00 1288.40
armoured (Loose)

(xxxiii) Overall size 500sq.mm (3½ Core) Un-


Metre 66.00 1662.00 73.00 1668.60
armoured (Loose)

Chapter-34 Page 654 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xxxiv) Overall size 630sq.mm (3½ Core) Un-
Metre 66.00 2230.00 73.00 2236.60
armoured (Loose)

(xxxv) Overall size 6sq.mm (4Core) Un-armoured


Metre 12.00 64.00 13.00 65.20
(Loose)

(xxxvi) Overall size 10sq.mm (4Core) Un-armoured


Metre 12.00 80.00 13.00 81.20
(Loose)

(xxxvii) Overall size 16sq.mm (4Core) Un-armoured


Metre 12.00 100.00 13.00 101.20
(Loose)

(xxxviii) Overall size 25sq.mm (4Core) Un-armoured


Metre 12.00 132.00 13.00 133.20
(Loose)

(xxxix) Overall size 35sq.mm (4Core) Un-armoured


Metre 12.00 171.00 13.00 172.20
(Loose)

(xl) Overall size 50sq.mm (4Core) Un-armoured


Metre 12.00 221.00 13.00 222.20
(Loose)

(xli) Overall size 70sq.mm (4Core) Un-armoured


Metre 17.00 309.00 19.00 310.70
(Loose)

(xlii) Overall size 95sq.mm (4Core) Un-armoured


Metre 17.00 383.00 19.00 384.70
(Loose)

(xliii) Overall size 120sq.mm (4Core) Un-


Metre 35.00 490.00 39.00 493.50
armoured (Loose)

(xliv) Overall size 150sq.mm (4Core) Un-


Metre 35.00 600.00 39.00 603.50
armoured (Loose)

(xlv) Overall size 185sq.mm (4Core) Un-


Metre 35.00 737.00 39.00 740.50
armoured (Loose)

(xlvi) Overall size 240sq.mm (4Core) Un-


Metre 54.00 954.00 59.00 959.40
armoured (Loose)

(xlvii) Overall size 300sq.mm (4Core) Un-


Metre 54.00 1154.00 59.00 1159.40
armoured (Loose)

(xlviii) Overall size 400sq.mm (4Core) Un-


Metre 54.00 1442.00 59.00 1447.40
armoured (Loose)

(xlix) Overall size 500sq.mm (4Core) Un-


Metre 66.00 1868.00 73.00 1874.60
armoured (Loose)

(xlx) Overall size 630sq.mm (4Core) Un-


Metre 66.00 2497.00 73.00 2503.60
armoured (Loose)

Chapter-34 Page 655 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.10 XLPE INSULATED ARMOURED CABLES
E (ON SURFACE):

Supply, laying and erection of aluminium


conductor XLPE insulated PVC sheathed
armoured and served cable 1100 volts
grade as per IS:7098 (Part-1)1988 to be
laid (On Surface) as per PWD General
Specifications:-

(i) Overall size 6sq.mm (2Core) Armoured (On-


Metre 23.00 93.00 25.00 95.30
Surface)

(ii) Overall size 10sq.mm (2Core) Armoured


Metre 23.00 105.00 25.00 107.30
(On-Surface)

(iii) Overall size 16sq.mm (2Core) Armoured


Metre 23.00 117.00 25.00 119.30
(On-Surface)

(iv) Overall size 25sq.mm (2Core) Armoured


Metre 23.00 120.00 25.00 122.30
(On-Surface)

(v) Overall size 35sq.mm (2Core) Armoured


Metre 23.00 140.00 25.00 142.30
(On-Surface)

(vi) Overall size 50sq.mm (2Core) Armoured


Metre 23.00 167.00 25.00 169.30
(On-Surface)

(vii) Overall size 4sq.mm (3Core) Armoured (On-


Metre 23.00 89.00 25.00 91.30
Surface)

(viii) Overall size 6sq.mm (3Core) Armoured (On-


Metre 23.00 99.00 25.00 101.30
Surface)

(ix) Overall size 10sq.mm (3Core) Armoured


Metre 23.00 117.00 25.00 119.30
(On-Surface)

(x) Overall size 16sq.mm (3Core) Armoured


Metre 23.00 123.00 25.00 125.30
(On-Surface)

(xi) Overall size 25sq.mm (3Core) Armoured


Metre 23.00 147.00 25.00 149.30
(On-Surface)

(xii) Overall size 35sq.mm (3Core) Armoured


Metre 23.00 175.00 25.00 177.30
(On-Surface)

(xiii) Overall size 50sq.mm (3Core) Armoured


Metre 23.00 215.00 25.00 217.30
(On-Surface)

(xiv) Overall size 70sq.mm (3Core) Armoured


Metre 32.00 288.00 35.00 291.20
(On-Surface)

(xv) Overall size 95sq.mm (3Core) Armoured


Metre 32.00 348.00 35.00 351.20
(On-Surface)

Chapter-34 Page 656 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xvi) Overall size 120sq.mm (3Core) Armoured
Metre 55.00 431.00 61.00 436.50
(On-Surface)

(xvii) Overall size 150sq.mm (3Core) Armoured


Metre 55.00 515.00 61.00 520.50
(On-Surface)

(xviii) Overall size 185sq.mm (3Core) Armoured


Metre 55.00 616.00 61.00 621.50
(On-Surface)

(xix) Overall size 240sq.mm (3Core) Armoured


Metre 80.00 798.00 88.00 806.00
(On-Surface)

(xx) Overall size 300sq.mm (3Core) Armoured


Metre 80.00 944.00 88.00 952.00
(On-Surface)

(xxi) Overall size 400sq.mm (3Core) Armoured


Metre 80.00 1175.00 88.00 1183.00
(On-Surface)

(xxii) Overall size 25sq.mm (3½ Core) Armoured


Metre 23.00 161.00 25.00 163.30
(On-Surface)

(xxiii) Overall size 35sq.mm (3½ Core) Armoured


Metre 23.00 195.00 25.00 197.30
(On-Surface)

(xxiv) Overall size 50sq.mm (3½ Core) Armoured


Metre 23.00 244.00 25.00 246.30
(On-Surface)

(xxv) Overall size 70sq.mm (3½ Core) Armoured


Metre 32.00 328.00 35.00 331.20
(On-Surface)

(xxvi) Overall size 95sq.mm (3½ Core) Armoured


Metre 32.00 389.00 35.00 392.20
(On-Surface)

(xxvii) Overall size 120sq.mm (3½ Core) Armoured


Metre 55.00 499.00 61.00 504.50
(On-Surface)

(xxviii) Overall size 150sq.mm (3½ Core) Armoured


Metre 55.00 578.00 61.00 583.50
(On-Surface)

(xxix) Overall size 185sq.mm (3½ Core) Armoured


Metre 55.00 706.00 61.00 711.50
(On-Surface)

(xxx) Overall size 240sq.mm (3½ Core) Armoured


Metre 80.00 898.00 88.00 906.00
(On-Surface)

(xxxi) Overall size 300sq.mm (3½ Core) Armoured


Metre 80.00 1080.00 88.00 1088.00
(On-Surface)

(xxxii) Overall size 400sq.mm (3½ Core) Armoured


Metre 80.00 1349.00 88.00 1357.00
(On-Surface)

(xxxiii) Overall size 500sq.mm (3½ Core) Armoured


Metre 91.00 1812.00 100.00 1821.10
(On-Surface)

(xxxiv) Overall size 630sq.mm (3½ Core) Armoured


Metre 91.00 2425.00 100.00 2434.10
(On-Surface)
Chapter-34 Page 657 CSR-2020
CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xxxv) Overall size 6sq.mm (4Core) Armoured (On-


Metre 23.00 108.00 25.00 110.30
Surface)

(xxxvi) Overall size 10sq.mm (4Core) Armoured


Metre 23.00 129.00 25.00 131.30
(On-Surface)

(xxxvii) Overall size 16sq.mm (4Core) Un-armoured


Metre 23.00 140.00 25.00 142.30
(On-Surface)

(xxxviii) Overall size 25sq.mm (4Core) Armoured


Metre 23.00 171.00 25.00 173.30
(On-Surface)

(xxxix) Overall size 35sq.mm (4Core) Armoured


Metre 23.00 212.00 25.00 214.30
(On-Surface)

(xl) Overall size 50sq.mm (4Core) Armoured


Metre 23.00 266.00 25.00 268.30
(On-Surface)

(xli) Overall size 70sq.mm (4Core) Armoured


Metre 32.00 358.00 35.00 361.20
(On-Surface)

(xlii) Overall size 95sq.mm (4Core) Armoured


Metre 32.00 427.00 35.00 430.20
(On-Surface)

(xliii) Overall size 120sq.mm (4Core) Armoured


Metre 55.00 539.00 61.00 544.50
(On-Surface)

(xliv) Overall size 150sq.mm (4Core) Armoured


Metre 55.00 647.00 61.00 652.50
(On-Surface)

(xlv) Overall size 185sq.mm (4Core) Armoured


Metre 55.00 788.00 61.00 793.50
(On-Surface)

(xlvi) Overall size 240sq.mm (4Core) Armoured


Metre 80.00 1015.00 88.00 1023.00
(On-Surface)

(xlvii) Overall size 300sq.mm (4Core) Armoured


Metre 80.00 1204.00 88.00 1212.00
(On-Surface)

(xlviii) Overall size 400sq.mm (4Core) Armoured


Metre 80.00 1506.00 88.00 1514.00
(On-Surface)

(xlix) Overall size 500sq.mm (4Core) Armoured


Metre 91.00 2022.00 100.00 2031.10
(On-Surface)

(xlx) Overall size 630sq.mm (4Core) Armoured


Metre 91.00 2698.00 100.00 2707.10
(On-Surface)

Chapter-34 Page 658 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.11 HEAVY GAUGE WELDED CONDUIT
PIPES:

Supply & erection of Heavy guage


welded conduit pipe (ISI marked) as per
IS:9537:Part-II for wiring purposes
including bends, junction boxes, Steel
hooks, GI saddle clamps and other petty
materials etc., where necessary
including painting as per PWD General
Specifications:-

(i) HGW Conduit Pipe 20mm dia. (1.6mm


Metre 9.00 74.00 10.00 74.90
thick) On Surface

(ii) HGW Conduit Pipe 25mm dia. (1.6mm


Metre 9.00 92.00 10.00 92.90
thick) On Surface

(iii) HGW Conduit Pipe 32mm dia. (1.6mm


Metre 12.00 134.00 13.00 135.20
thick) On Surface

(iv) HGW Conduit Pipe 40mm dia. (2mm thick)


Metre 12.00 152.00 13.00 153.20
On Surface

(v) HGW Conduit Pipe 50mm dia. (2mm thick)


Metre 12.00 203.00 13.00 204.20
On Surface

(vi) HGW Conduit Pipe 20mm dia. (1.6mm


Metre 23.00 90.00 25.00 92.30
thick) Flushed

(vii) HGW Conduit Pipe 25mm dia. (1.6mm


Metre 23.00 107.00 25.00 109.30
thick) Flushed

(viii) HGW Conduit Pipe 32mm dia. (1.6mm


Metre 29.00 153.00 32.00 155.90
thick) Flushed

(ix) HGW Conduit Pipe 40mm dia. (2mm thick)


Metre 29.00 171.00 32.00 173.90
Flushed

(x) HGW Conduit Pipe 50mm dia. (2mm thick)


Metre 29.00 224.00 32.00 226.90
Flushed

(xi) Supply & erection of 19/20mm dia. M.S.


conduit pipe (1.6mm thick), White painted Metre 24.00 100.00 26.00 102.40
suspension rod for ceiling fan.

Chapter-34 Page 659 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.12 PVC, HDPE PIPES & PVC FLEXIBLE
PIPES:

Supply & erection of PVC Conduit Pipes


(ISI marked) as per IS9537:Part-III &
HDPE pipes (ISI marked) as per
IS:4984:1995 for wiring purposes
including bends, junction boxes, Steel
hooks, M.S. saddle clamps and other
petty materials etc., as per PWD General
Specifications:-

(i) Heavy Gauge PVC Conduit Pipe 20mm dia.


Metre 6.00 32.00 7.00 32.60
(On Surface)

(ii) Heavy Gauge PVC Conduit Pipe 25mm dia.


Metre 6.00 39.00 7.00 39.60
(On Surface)

(iii) Heavy Gauge PVC Conduit Pipe 32mm


Metre 9.00 59.00 10.00 59.90
dia.(On Surface)

(iv) Heavy Gauge PVC Conduit Pipe 40mm dia.


Metre 9.00 75.00 10.00 75.90
(On Surface)

(v) Heavy Gauge PVC Conduit Pipe 50mm dia.


Metre 9.00 107.00 10.00 107.90
(On Surface)

(vi) Medium Gauge PVC Conduit Pipe 20mm


Metre 6.00 27.00 7.00 27.60
dia. (On Surface)

(vii) Medium Gauge PVC Conduit Pipe 25mm


Metre 6.00 34.00 7.00 34.60
dia. (On Surface)

(viii) Medium Gauge PVC Conduit Pipe 32mm


Metre 9.00 53.00 10.00 53.90
dia. (On Surface)

(ix) Heavy Gauge PVC Conduit Pipe 20mm dia.


Metre 14.00 41.00 15.00 42.40
(Flushed)

(x) Heavy Gauge PVC Conduit Pipe 25mm dia.


Metre 14.00 48.00 15.00 49.40
(Flushed)

(xi) Heavy Gauge PVC Conduit Pipe 32mm dia.


Metre 14.00 66.00 15.00 67.40
(Flushed)

(xii) Heavy Gauge PVC Conduit Pipe 40mm dia.


Metre 19.00 87.00 21.00 88.90
(Flushed)

(xiii) Heavy Gauge PVC Conduit Pipe 50mm dia.


Metre 19.00 120.00 21.00 121.90
(Flushed)

(xiv) Medium Gauge PVC Conduit Pipe 20mm


Metre 14.00 37.00 15.00 38.40
dia. (Flushed)

Chapter-34 Page 660 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xv) Medium Gauge PVC Conduit Pipe 25mm
Metre 14.00 43.00 15.00 44.40
dia. (Flushed)

(xvi) Medium Gauge PVC Conduit Pipe 32mm


Metre 14.00 60.00 15.00 61.40
dia. (Flushed)

(xvii) HDPE Electrical Conduit Pipe 20mm dia.


Metre 6.00 39.00 7.00 39.60
(On Surface)

(xviii) HDPE Electrical Conduit Pipe 25mm dia.


Metre 6.00 50.00 7.00 50.60
(On Surface)

(xix) HDPE Electrical Conduit Pipe 32mm dia.


Metre 9.00 62.00 10.00 62.90
(On Surface)

(xx) HDPE Electrical Conduit Pipe 40mm dia.


Metre 9.00 67.00 10.00 67.90
(On Surface)

(xxi) HDPE Electrical Conduit Pipe 20mm dia.


Metre 14.00 48.00 15.00 49.40
(Flushed)

(xxii) HDPE Electrical Conduit Pipe 25mm dia.


Metre 14.00 59.00 15.00 60.40
(Flushed)

(xxiii) HDPE Electrical Conduit Pipe 32mm dia.


Metre 14.00 69.00 15.00 70.40
(Flushed)

(xxiv) HDPE Electrical Conduit Pipe 40mm dia.


Metre 19.00 79.00 21.00 80.90
(Flushed)

34.12 (xxv) Supply and erection of PVC flexible pipe


complete without compression glands,
locking arrangement, check-nuts as
required:-

(a) PVC Flexible Pipe 20mm dia. Metre 4.00 12.00 4.00 12.40

(b) PVC Flexible Pipe 25mm dia. Metre 4.00 17.00 4.00 17.40

(c) PVC Flexible Pipe 32mm dia. Metre 5.00 26.00 6.00 26.50

(d) PVC Flexible Pipe 40mm dia. Metre 5.00 33.00 6.00 33.50

34.12 (xxvi) Supply and erection of Compression


glands, Locking arrangement, Check-
nuts for PVC flexible pipe complete with
as required:-

(a) PVC compression Socket gland 20mm dia.


Each 6.00 17.00 7.00 17.60

(b) PVC compression Socket gland 25mm dia.


Each 6.00 21.00 7.00 21.60

Chapter-34 Page 661 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) PVC compression Socket gland 32mm dia.
Each 8.00 25.00 9.00 25.80

(d) PVC compression Socket gland 40mm dia.


Each 8.00 31.00 9.00 31.80

34.12 (xxvii) Supply & erection of PVC Casing 'n'


Capping (Double Lock) ISI marked for
wiring purposes including cost of bends
(L), (U), (T) & inspection boxes etc.,
where necessary including other petty
material:-

(a) PVC Casing 'n' Capping Size 20mm x


Metre 6.00 23.00 7.00 23.60
12mm

(b) PVC Casing 'n' Capping Size 25mm x


Metre 6.00 30.00 7.00 30.60
16mm

(c) PVC Casing 'n' Capping Size 38mm x


Metre 9.00 55.00 10.00 55.90
16mm

(d) PVC Casing 'n' Capping Size 50mm x


Metre 9.00 66.00 10.00 66.90
16mm

34.13 GALVANIZED IRON PIPES AND G.I.


EARTHING

Supply & erection of G.I. pipe (A-Class)


as per IS:1239 (Part-I) 2004 including
sockets, bends, inspection boxes, Steel
hooks, GI saddle clamps and other petty
materials etc., where necessary
including painting as per PWD General
Specifications:-

(i) Galvanized Iron Pipe 15mm dia. (A-class)


Metre 12.00 115.00 13.00 116.20
On surface

(ii) Galvanized Iron Pipe 20mm dia. (A-class)


Metre 12.00 146.00 13.00 147.20
On surface

(iii) Galvanized Iron Pipe 25mm dia. (A-class)


Metre 12.00 194.00 13.00 195.20
On surface

(iv) Galvanized Iron Pipe 32mm dia. (A-class)


Metre 16.00 243.00 18.00 244.60
On surface

(v) Galvanized Iron Pipe 40mm dia. (A-class)


Metre 16.00 302.00 18.00 303.60
On surface

(vi) Galvanized Iron Pipe 50mm dia. (A-class)


Metre 16.00 381.00 18.00 382.60
On surface

Chapter-34 Page 662 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(vii) Galvanized Iron Pipe 15mm dia. (A-class)
Metre 26.00 127.00 29.00 129.60
Flushed

(viii) Galvanized Iron Pipe 20mm dia. (A-class)


Metre 26.00 158.00 29.00 160.60
Flushed

(ix) Galvanized Iron Pipe 25mm dia. (A-class)


Metre 26.00 206.00 29.00 208.60
Flushed

(x) Galvanized Iron Pipe 32mm dia. (A-class)


Metre 29.00 254.00 32.00 256.90
Flushed

(xi) Galvanized Iron Pipe 40mm dia. (A-class)


Metre 29.00 311.00 32.00 313.90
Flushed

(xii) Galvanized Iron Pipe 50mm dia. (A-class)


Metre 29.00 391.00 32.00 393.90
Flushed

34.13 G.I. EARTHING:

(xiii) Earthing with G.I. wire/ rope in G.I. pipe


partly recessed and partly on surface
complete with 150cm long 50mm dia. G.I.
earth pipe (Cutting threads and 36 Nos.
holes, 1cm dia. to make a mesh around
the GI Pipe) with G.I. reducing socket
including erection of the same, 4.50
metre (14.76 feet) below ground level
with 20Kg. charcoal & salt mixture etc.,
up to 8 metre in length (including boring
& refilling).

(a) Earthing with 8 S.W.G. (4mm dia.) G.I. wire


in 15mm dia G.I. pipe with G.I. reducing
Each 971.00 2518.00 1068.00 2615.10
socket 50mm x 15mm (upto 8Metre in
length)

(b) Earthing with 7/14 S.W.G. (7/2.18mm dia.)


G.I. rope in 20mm dia G.I. pipe with G.I.
reducing socket 50mm x 20mm (upto Each 971.00 2800.00 1068.00 2897.10
8Metre in length)

(c) Earthing with 7/12 S.W.G. (7/2.80mm dia.)


G.I. rope in 20mm dia G.I. pipe with G.I.
reducing socket 50mm x 20mm (upto Each 971.00 2863.00 1068.00 2960.10
8Metre in length)

Chapter-34 Page 663 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.13 (xiv) Earthing with G.I. wire/ rope in G.I. pipe
partly recessed and partly on surface
complete with 150cm long 50mm dia. G.I.
earth pipe (Cutting threads and 36 Nos.
holes, 1cm dia. to make a mesh around
the GI Pipe) and with G.I. reducing
socket including erection of the same,
10.50 metre (34.44 feet) below ground
level with 20Kg. charcoal & salt mixture
etc., up to 14 metre in length (including
boring & refilling).

(a) Earthing with 8 S.W.G. (4mm dia.) G.I. wire


in 15mm dia G.I. pipe with G.I. reducing
socket 50mm x 15mm (upto 14Metre in Each 1661.00 3820.00 1827.00 3986.10
length)

(b) Earthing with 7/14 S.W.G. (7/2.18mm dia.)


G.I. rope in 20mm dia G.I. pipe with G.I.
Each 1661.00 4299.00 1827.00 4465.10
reducing socket 50mm x 20mm (upto
14Metre in length)

(c) Earthing with 7/12 S.W.G. (7/2.80mm dia.)


G.I. rope in 20mm dia G.I. pipe with G.I.
Each 1661.00 4409.00 1827.00 4575.10
reducing socket 50mm x 20mm (upto
14Metre in length)

34.13 (xv) Earthing earth rod 20 mm dia for


providing earth connections upto line
earth with G.I. Wire 8 S.W.G. (4mm dia.).
The rod shall be tapered at one end and
flatted on other end. The hole size 10mm
dia shall be drilled on the flatened side
for facilitating connection with G.I. wire
and thimble etc. The rod shall be erected
in ground upto complete length
vertically:-

(a) GI Earth rod 20 mm dia., 3 mtr. Long Each 404.00 968.00 444.00 1008.40

(b) GI Earth rod 20 mm dia., 4.5 mtr. Long Each 577.00 1367.00 635.00 1424.70

(c) GI Earth rod 20 mm dia., 6 mtr. Long Each 749.00 1831.00 824.00 1905.90

34.13 G.I. EARTHING WIRE/ ROPE (AS


ADDITIONAL LENGTH):

(xvi) Fixing additional length of earthing with


G.I. wire/ rope in G.I. pipe (On Surface)
with sockets, elbows and MS saddle
clamps including painting etc.

Chapter-34 Page 664 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(a) Additional length G.I. wire 8 S.W.G. (4mm
dia.) in 15mm dia. G.I. pipe (On Surface) Metre 14.00 125.00 15.00 126.40

(b) Additional length G.I. rope 7/14 S.W.G.


(7/2.18mm dia.) in 20mm dia. G.I. pipe (On Metre 14.00 164.00 15.00 165.40
Surface)

(c) Additional length G.I. rope 7/12 S.W.G.


(7/2.80mm dia.) in 20mm dia. G.I. pipe (On Metre 14.00 172.00 15.00 173.40
Surface)

34.13 (xvii) Fixing additional length of earthing with


G.I. wire/ rope in G.I. pipe (Flushed in
wall and floor) with sockets, elbows and
Steel hooks including the cost of cutting
and filling up of chases (with finishing
the surface):-

(a) Additional length G.I. wire 8 S.W.G. (4mm


dia.) in 15mm dia. G.I. pipe (Flushed) Metre 42.00 151.00 46.00 155.20

(b) Additional length G.I. wire 7/14 S.W.G.


(7/2.18mm dia.) in 20mm dia. G.I. pipe Metre 42.00 190.00 46.00 194.20
(Flushed)

(c) Additional length G.I. wire 7/12 S.W.G.


(7/2.80mm dia.) in 20mm dia. G.I. pipe Metre 42.00 198.00 46.00 202.20
(Flushed)

34.13 BONDING TO EARTH WITH G.I. WIRE/


ROPE:

(xviii) Bonding to existing earth with G.I. wire/


rope in heavy gauge (1.6mm thick)
welded conduit pipe (On Surface) with
bends, junction boxes, MS saddle
clamps including painting etc.

(a) Bonding with G.I. wire 8S.W.G. (4mm dia) in


HGW conduit pipe 20mm dia. (on surface) Metre 8.00 77.00 9.00 77.80

(b) Bonding with G.I. rope 7/14S.W.G.


(7/2.18mm dia) in HGW conduit pipe 20mm Metre 8.00 86.00 9.00 86.80
dia. (on surface)

(c) Bonding with G.I. rope 7/12S.W.G.


(7/2.80mm dia) in HGW conduit pipe 25mm Metre 8.00 108.00 9.00 108.80
dia. (on surface)

Chapter-34 Page 665 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.13 (xix) Bonding to existing earth with G.I. wire/
rope in heavy gauge (1.6mm thick)
welded conduit pipe (Flushed in wall)
with bends, junction boxes and Steel
hooks including the cost of cutting and
filling up of chases (with finishing the
surface):-

(a) Bonding with G.I. wire 8S.W.G. (4mm dia) in


HGW conduit pipe 20mm dia. (Flushed). Metre 42.00 109.00 46.00 113.20

(b) Bonding with G.I. rope 7/14S.W.G.


(7/2.18mm dia) in HGW conduit pipe 20mm Metre 42.00 117.00 46.00 121.20
dia. (Flushed)

(c) Bonding with G.I. rope 7/12S.W.G.


(7/2.80mm dia) in HGW conduit pipe 25mm Metre 42.00 170.00 46.00 174.20
dia. (Flushed)

34.13 (xx) Bonding to existing earth with 8S.W.G.


(4mm dia) G.I. wire fixed with stapples on Metre 5.00 12.00 6.00 12.50
wall.

Chapter-34 Page 666 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.14 COPPER EARTHING:

8 SWG COPPER EARTHING :

(i) Earthing with 8 SWG (4mm dia.)


electrolytic copper wire thimbled (1No.
copper thimble with suitable size steel
bolt, washers & double nut) with 30cm x
60cm x 2mm thick copper plate (made
cylindrical) burried below ground level in
the hole of excavation having bore dia.
125mm and surrounded by salt &
charcoal dust mixture (20 kg.) including
fixing the copper wire run through 20mm
dia. G.I. pipe (A-Class) recessed in wall
and in floor etc., up to suitable Length in
metre (including bore Length). G.I. pipe
20mm dia. (A-class) of suitable Length
should be laid in the hole of excavation 1
feet below ground level and having GI
Reducer 50mm x 20mm with PVC Cap
(For pouring water) fixed on the top level
of the pipe. 300mm x 300mm x 300mm
deep haudi of First class bricks finished
with 1:4 cement plaster and haudi
covered with cast iron lid having size
300mm x 300mm (Heavy) around the
hole of excavation:-

(a) Earthing with 8 SWG (4mm dia.) copper


wire thimbled with 30cm x 60cm x 2mm
thick copper plate burried 4.50 metre (14.76
feet) below ground level (up to 8metre in Each 867.00 5744.00 954.00 5830.70
Length) with G.I. pipe 20mm dia. (A-class),
3metre long

(b) Earthing with 8 SWG (4mm dia.) copper


wire thimbled with 30cm x 60cm x 2mm
thick copper plate burried 10.50 metre
Each 1557.00 7556.00 1713.00 7711.70
(34.44 feet) below ground level (up to
14metre in Length) with G.I. pipe 20mm dia.
(A-class), 9metre long

(c) Earthing with 8 SWG (4mm dia.) copper


wire thimbled with 30cm x 60cm x 2mm
thick copper plate burried 19.50 metre
(63.96 feet) below ground level (up to Each 2591.00 10273.00 2850.00 10532.10
23metre in Length) with G.I. pipe 20mm dia.
(A-class), 18metre long

Chapter-34 Page 667 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.14 COPPER EARTHING (Upto 8 metre in
Length):

(ii) Earthing with electrolytic Copper Tape


rivetted (with 5Nos. copper rivets)/Steel
Nut & bolts (with 4Nos. 32mm long, 8mm
thick with washer and double nut) to
30cm x 120cm x 2mm thick copper plate
(made cylindrical) burried 4.50 metre
(14.76 feet) below ground level in the
hole of excavation having bore dia.
125mm and surrounded by salt &
charcoal dust mixture (20 kg.) including
fixing the Copper Tape recessed in wall
and in floor etc., up to 8metre in Length
(including bore Length). G.I. pipe 20mm
dia. (A-class), 3metre long should be laid
in the hole of excavation 1 feet below
ground level and having GI Reducer
50mm x 20mm with PVC Cap (For
pouring water) fixed on the top level of
the pipe. 300mm x 300mm x 300mm deep
haudi of First class bricks finished with
1:4 cement plaster and haudi covered
with cast iron lid having size 300mm x
300mm (Heavy) around the hole of
excavation:-

(a) Earthing with 20mm x 3mm Copper Tape


(upto 8Metre in Length) Each 867.00 9309.00 954.00 9395.70

(b) Earthing with 25mm x 3mm Copper Tape


Each 867.00 9906.00 954.00 9992.70
(upto 8Metre in Length)

(c) Earthing with 30mm x 3mm Copper Tape


(upto 8Metre in Length) Each 867.00 10595.00 954.00 10681.70

(d) Earthing with 25mm x 5mm Copper Tape


(upto 8Metre in Length) Each 954.00 12181.00 1049.00 12276.40

(e) Earthing with 40mm x 5mm Copper Tape


(upto 8Metre in Length) Each 954.00 15393.00 1049.00 15488.40

Chapter-34 Page 668 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.14 COPPER EARTHING (Upto 14 metre in
Length):

(iii) Earthing with electrolytic Copper Tape


rivetted (with 5Nos. copper rivets)/Steel
Nut & bolts (with 4Nos. 32mm long, 8mm
thick with washer and double nut) to
30cm x 120cm x 2mm thick copper plate
(made cylindrical) burried 10.50 metre
(34.44 feet) below ground level in the
hole of excavation having bore dia.
125mm and surrounded by salt &
charcoal dust mixture (20 kg.) including
fixing the Copper Tape recessed in wall
and in floor etc., up to 14metre in Length
(including bore Length). G.I. pipe 20mm
dia. (A-class), 9metre long should be laid
in the hole of excavation 1 feet below
ground level and having GI Reducer
50mm x 20mm with PVC Cap (For
pouring water) fixed on the top level of
the pipe. 300mm x 300mm x 300mm deep
haudi of First class bricks finished with
1:4 cement plaster and haudi covered
with cast iron lid having size 300mm x
300mm (Heavy) around the hole of
excavation:-

(a) Earthing with 20mm x 3mm Copper Tape


(upto 14Metre in Length) Each 1557.00 12654.00 1713.00 12809.70

(b) Earthing with 25mm x 3mm Copper Tape


(upto 14Metre in Length) Each 1557.00 13778.00 1713.00 13933.70

(c) Earthing with 30mm x 3mm Copper Tape


(upto 14Metre in Length) Each 1557.00 14902.00 1713.00 15057.70

(d) Earthing with 25mm x 5mm Copper Tape


(upto 14Metre in Length) Each 1644.00 17613.00 1808.00 17777.40

(e) Earthing with 40mm x 5mm Copper Tape


(upto 14Metre in Length) Each 1644.00 23235.00 1808.00 23399.40

Chapter-34 Page 669 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.14 COPPER EARTHING (Upto 23 metre in
Length):

(iv) Earthing with electrolytic Copper Tape


rivetted (with 5Nos. copper rivets)/Steel
Nut & bolts (with 4Nos. 32mm long, 8mm
thick with washer and double nut) to
30cm x 120cm x 2mm thick copper plate
(made cylindrical) burried 19.50 metre
(63.96 feet) below ground level in the
hole of excavation having bore dia.
125mm and surrounded by salt &
charcoal dust mixture (20 kg.) including
fixing the Copper Tape recessed in wall
and in floor etc., up to 23metre in Length
(including bore Length). G.I. pipe 20mm
dia. (A-class), 18metre long should be
laid in the hole of excavation 1 feet
below ground level and having GI
Reducer 50mm x 20mm with PVC Cap
(For pouring water) fixed on the top level
of the pipe. 300mm x 300mm x 300mm
deep haudi of First class bricks finished
with 1:4 cement plaster and haudi
covered with cast iron lid having size
300mm x 300mm (Heavy) around the
hole of excavation:-

(a) Earthing with 20mm x 3mm Copper Tape


(upto 23Metre in Length) Each 2591.00 17670.00 2850.00 17929.10

(b) Earthing with 25mm x 3mm Copper Tape


(upto 23Metre in Length) Each 2591.00 19518.00 2850.00 19777.10

(c) Earthing with 30mm x 3mm Copper Tape


(upto 23Metre in Length) Each 2591.00 21365.00 2850.00 21624.10

(d) Earthing with 25mm x 5mm Copper Tape


(upto 23Metre in Length) Each 2679.00 25762.00 2947.00 26029.90

(e) Earthing with 40mm x 5mm Copper Tape


(upto 23Metre in Length) Each 2679.00 34997.00 2947.00 35264.90

Chapter-34 Page 670 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.14 COPPER EARTHING STRIP (As
Additional Length):

(v) Fixing additional Length of earthing with


Copper Tape (On Surface/Flushed) with
petty material as required etc.:-

(a) Additional Length 20mm x 3mm thick


Copper Tape Metre 24.00 351.00 26.00 353.40

(b) Additional Length 25mm x 3mm thick


Metre 24.00 432.00 26.00 434.40
Copper Tape

(c) Additional Length 30mm x 3mm thick


Metre 24.00 511.00 26.00 513.40
Copper Tape

(d) Additional Length 25mm x 5mm thick


Metre 30.00 705.00 33.00 708.00
Copper Tape

(e) Additional Length 40mm x 5mm thick


Copper Tape Metre 30.00 1106.00 33.00 1109.00

34.14 (vi) Fixing additional Length of earthing with


8 S.W.G. (4mm dia.) copper wire in G.I.
pipe with sockets, elbows, steel hooks
and GI saddle clamps including painting
etc.:-

(a) Additional Length copper wire 8 S.W.G.


(4mm dia.) in 20mm dia. G.I. pipe (On Metre 19.00 221.00 21.00 222.90
Surface)

(b) Additional Length copper wire 8 S.W.G.


(4mm dia.) in 20mm dia. G.I. pipe (Flushed) Metre 33.00 233.00 36.00 236.30

34.14 BONDING TO EARTH WITH COPPER


WIRE:

(vii) Bonding to existing earth with copper


wire in heavy gauge (1.6mm thick)
welded conduit pipe with bends, junction
boxes, steel hooks and MS saddle
clamps including painting etc.:-

(a) Bonding with copper wire 8S.W.G. (4mm


dia) in HGW conduit pipe 20mm dia. (on Metre 12.00 140.00 13.00 141.20
surface)

Chapter-34 Page 671 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Bonding with copper wire 8S.W.G. (4mm
dia) in HGW conduit pipe 20mm dia. Metre 31.00 157.00 34.00 160.10
(Flushed)

34.14 (viii) Bonding to existing earth with 8S.W.G.


(4mm dia) copper wire behind casing or Metre 5.00 75.00 6.00 75.50
fixed with stapples on wall.

34.15 SUPPLY AND ERECTION OF WIRING


ACCESSORIES:

Supply and erection of switches, sockets


and other accessories (flush piano type/
modular accessories) in the existing
bakelite/ modular cover frame including
fixing & connections and petty material
etc.,:-

(i) One Way 6amp. Switch Flush Piano type Each 8.00 21.00 9.00 21.80

(ii) Two Way 6amp. Switch Flush Piano type Each 8.00 26.00 9.00 26.80

(iii) Single Pole 16/20amp. Switch with indicator


Each 12.00 63.00 13.00 64.20
Flush Piano type

(iv) One Way 6amp. Bell Push Each 8.00 26.00 9.00 26.80

(v) 5pin 6amp. Wall Socket Flush Piano type Each 10.00 30.00 11.00 31.00

(vi) 16amp. Universal Wall Socket Flush Piano


Each 16.00 62.00 18.00 63.60
type

(vii) Step type Fan Regulator Flush Piano type


Each 10.00 164.00 11.00 165.00
(Switch size)

(viii) Step type Fan Regulator Flush Piano type


Each 10.00 208.00 11.00 209.00
(Socket size)

(ix) Telephone Socket Flush Piano type (Switch


Each 8.00 35.00 9.00 35.80
size)

(x) TV Socket Flush Piano type (Switch size) Each 8.00 28.00 9.00 28.80

(xi) 6/10amp. One Way Modular Switch (One


Each 8.00 37.00 9.00 37.80
Module)

(xii) 6/10amp. Two Way Modular Switch (One


Each 8.00 52.00 9.00 52.80
Module)

(xiii) 16/20amp. One Way Modular Switch with


Each 12.00 80.00 13.00 81.20
Indicator (One Module)

Chapter-34 Page 672 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xiv) 6/10amp. One Way Modular Bell Push (One
Each 8.00 57.00 9.00 57.80
Module)

(xv) 6amp. 2/3 Universal Modular Shuttered


Each 10.00 56.00 11.00 57.00
Socket (two Module)

(xvi) 16/20amp. Universal Modular Shuttered


Each 16.00 100.00 18.00 101.60
Socket (two Module)

(xvii) 25amp. Universal Modular Shuttered Socket


Each 16.00 109.00 18.00 110.60
(two Module)

(xviii) Step type Modular Electronic Fan Regulator


Each 10.00 203.00 11.00 204.00
100watts (One Module)

(xix) Step type Modular Electronic Fan Regulator


Each 10.00 247.00 11.00 248.00
100watts (Two Module)

(xx) Modular TV Socket (One Module) Each 8.00 51.00 9.00 51.80

(xxi) Modular Telephone Socket (RJ-11) One


Each 8.00 52.00 9.00 52.80
Module

(xxii) Modular RJ-45 Modem Jack for Computer


Each 21.00 148.00 23.00 150.10
(One Module)

(xxiii) Modular Motor Starter 25Amp. (Two


Each 12.00 237.00 13.00 238.20
Module)

(xxiv) Modular MCB 20Amp. (Two Module) Each 12.00 221.00 13.00 222.20

(xxv) Modular Blanking Plate (One Module) Each 4.00 16.00 4.00 16.40

(xxvi) Ceiling Rose (Flush Piano type) Each 8.00 30.00 9.00 30.80

(xxvii) Bakelite Batten Holder (Large size) Each 8.00 34.00 9.00 34.80

(xxviii) Call Bell 220/230 volts AC Ding Dong Each 16.00 109.00 18.00 110.60

(xxix) 3 Pin Plug Top 6Amp. (ISI marked) Each 6.00 38.00 7.00 38.60

(xxx) 3 Pin Plug Top 16Amp. (ISI marked) Each 6.00 55.00 7.00 55.60

(xxxi) 3 Pin Plug Top 25Amp. (ISI marked) Each 6.00 57.00 7.00 57.60

34.15 (xxxii) Supply and erection of Modular Cover


Frame (Complete set) on the existing
metal box including fixing and
connection of existing switches and
sockets and other petty material etc:-

(a) Modular Cover Frame One or Two Module Each 8.00 34.00 9.00 34.80

(b) Modular Cover Frame Three Module Each 9.00 44.00 10.00 44.90

Chapter-34 Page 673 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(c) Modular Cover Frame Four Module Each 10.00 49.00 11.00 50.00

(d) Modular Cover Frame Six Module Each 12.00 63.00 13.00 64.20

(e) Modular Cover Frame Eight Module Each 16.00 83.00 18.00 84.60

(f) Modular Cover Frame Twelve Module Each 21.00 119.00 23.00 121.10

34.15 (xxxiii) BAKELITE SHEET:

(a) Supply and erection of brown bakelite sheet


white glazed translucent backside painted
3mm thick (thickness not less than 3mm)
on the existing metal box including cutting, Sq. 0.59 1.28 1.00 1.34
fixing and connection of existing switches inch
and sockets and other petty material etc.

(b) Supply and erection of brown bakelite sheet


white glazed translucent backside painted
3mm thick (thickness not less than 3mm) Sq.
on the existing metal box/ metal inspection inch 0.19 0.95 0.21 0.97
boxes including fixing and other petty
material etc.

34.15 (xxxiv) Supply and erection of Concealed Metal


Boxes of various sizes (1/2M, 3M, 4M,
6M, 8M, 12M, 16/18M) with brass lugs
recessed in wall for mounting modular
accessories including fixing and other
petty material etc., including the cost of
cutting and filling up of chases (with
finishing the surface):-

(a) Powder Coated Concealed Metal Box with


Each 14.00 53.00 15.00 54.40
Brass Lugs One/Two Module

(b) Powder Coated Concealed Metal Box with


Each 14.00 59.00 15.00 60.40
Brass Lugs Three Module

(c) Powder Coated Concealed Metal Box with


Each 14.00 67.00 15.00 68.40
Brass Lugs four Module

(d) Powder Coated Concealed Metal Box with


Each 16.00 83.00 18.00 84.60
Brass Lugs Six Module

(e) Powder Coated Concealed Metal Box with


Each 16.00 92.00 18.00 93.60
Brass Lugs Eight Module

(f) Powder Coated Concealed Metal Box with


Each 23.00 125.00 25.00 127.30
Brass Lugs Twelve Module

Chapter-34 Page 674 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(g) Powder Coated Concealed Metal Box with
Brass Lugs Sixteen/ Eighteen Module Each 23.00 168.00 25.00 170.30
(16/18 Module)

34.15 (xxxv) Supply and erection of Plastic surface


boxes of various sizes (1/2M, 3M, 4M,
6M, 8M, 12M) on surface on wall for
mounting modular accessories including
fixing and other petty material etc.:-

(a) Plastic Surface Box for Modular


Each 8.00 50.00 9.00 50.80
Accessories One/Two Module

(b) Plastic Surface Box for Modular


Each 8.00 60.00 9.00 60.80
Accessories Three Module

(c) Plastic Surface Box for Modular


Each 8.00 66.00 9.00 66.80
Accessories Four Module

(d) Plastic Surface Box for Modular


Each 10.00 86.00 11.00 87.00
Accessories Six Module

(e) Plastic Surface Box for Modular


Each 10.00 115.00 11.00 116.00
Accessories Eight Module

(f) Plastic Surface Box for Modular


Each 16.00 148.00 18.00 149.60
Accessories Twelve Module

34.15 CAPACITORS & BALL BEARINGS:

(xxxvi) Supply and erection of Capacitors of


different capacity for ceiling fans,
exhaust fan & street light fittings etc.:-

(a) Capacitor 2µF Each 8.00 27.00 9.00 27.80

(b) Capacitor 2.5µF Each 8.00 30.00 9.00 30.80

(c) Capacitor 4µF Each 10.00 43.00 11.00 44.00

(d) Capacitor 6µF Each 10.00 56.00 11.00 57.00

(e) Capacitor 10µF Each 12.00 64.00 13.00 65.20

(f) Capacitor 20µF Each 12.00 116.00 13.00 117.20

34.15 (xxxvi Supply and erection of Ball Bearing of


i) different sizes for ceiling fans and
exhaust fan etc.:-

(a) Ball Bearing 6201 Each 31.00 70.00 34.00 73.10

(b) Ball Bearing 6202 Each 31.00 70.00 34.00 73.10

Chapter-34 Page 675 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.15 PLASTIC DISTRIBUTION BOARDS:

(xxxvi Supply and erection of Plastic enclosure


ii) DB's of various sizes on surface on wall
for mounting MCB's SP/ DP/ FP including
fixing and other petty material etc.:-

(a) Plastic enclosure MCB DB 2way Each 12.00 102.00 13.00 103.20

(b) Plastic enclosure MCB DB 4way Each 21.00 152.00 23.00 154.10

34.15 PVC CHANNEL (uPVC TRUNKING):

(xxxix) Supply and erection of PVC Channel


(uPVC Trunking) with cover of various
sizes (On Surface) on wall, Flat angle,
internal & external angle, Flat Tee, End
cap and mounting boxes including the
cost of joint cover, fixing and other petty
material etc.:-

(a) PVC Channel (uPVC Trunking) 50mm x


Metre 12.00 398.00 13.00 399.20
50mm

(b) PVC Channel (uPVC Trunking) 100mm x


Metre 21.00 734.00 23.00 736.10
50mm

(c) Flat Angle 50mm x 50mm Each 8.00 154.00 9.00 154.80

(d) Flat Angle 100mm x 50mm Each 8.00 231.00 9.00 231.80

(e) External Angle 50mm x 50mm Each 8.00 169.00 9.00 169.80

(f) External Angle 100mm x 50mm Each 8.00 186.00 9.00 186.80

(g) Internal Angle 50mm x 50mm Each 8.00 158.00 9.00 158.80

(h) Internal Angle 100mm x 50mm Each 8.00 281.00 9.00 281.80

(i) Flat Tee 50mm x 50mm Each 8.00 109.00 9.00 109.80

(j) Flat Tee 100mm x 50mm Each 8.00 212.00 9.00 212.80

(k) End Cap 50mm x 50mm Each 8.00 72.00 9.00 72.80

(l) End Cap 100mm x 50mm Each 8.00 108.00 9.00 108.80

(m) Mounting Box 1-3 Module Each 12.00 111.00 13.00 112.20

(n) Mounting Box 4-5 Module Each 12.00 132.00 13.00 133.20

(o) Mounting Box 8 Module Each 12.00 214.00 13.00 215.20

Chapter-34 Page 676 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.16 MINIATURE CIRCUIT BREAKERS/
RCBO's/ RCCB's:

34.16 MINIATURE CIRCUIT BREAKERS:


A

Supply and erection of Miniature Circuit


Breaker MCB's for circuit protection
against overload and short circuit
current fault suitable for 240/ 415 volts
50cycles AC supply with breaking
capacity of 10kA, Curve-C and low watt
losses as per IS/IEC 60898-1, energy
limitation class-3, true contact
indication, label holder facility in the
existing MCB distribution board as per
PWD General Specifications including
connections with suitable size of
thimbles/lugs:-

(i) MCB Single Pole 0.5-4amp. (10kA, Curve-


Each 12.00 209.00 13.00 210.20
C)

(ii) MCB Single Pole 6-32amp. (10kA, Curve-C)


Each 12.00 134.00 13.00 135.20

(iii) MCB Single Pole 40amp. (10kA, Curve-C)


Each 12.00 278.00 13.00 279.20

(iv) MCB Single Pole 50, 63amp. (10kA, Curve-


Each 12.00 321.00 13.00 322.20
C)

(v) MCB Double Pole 0.5-4amp. (10kA, Curve-


Each 18.00 539.00 20.00 540.80
C)

(vi) MCB Double Pole 6-32amp. (10kA, Curve-


Each 18.00 408.00 20.00 409.80
C)

(vii) MCB Double Pole 40amp. (10kA, Curve-C)


Each 18.00 555.00 20.00 556.80

(viii) MCB Double Pole 50, 63amp. (10kA, Curve-


Each 18.00 654.00 20.00 655.80
C)

(ix) MCB Triple Pole 0.5-4amp. (10kA, Curve-C)


Each 25.00 756.00 28.00 758.50

(x) MCB Triple Pole 6-32amp. (10kA, Curve-C)


Each 25.00 605.00 28.00 607.50

(xi) MCB Triple Pole 40amp. (10kA, Curve-C) Each 25.00 836.00 28.00 838.50

(xii) MCB Triple Pole 50, 63amp. (10kA, Curve-


Each 25.00 932.00 28.00 934.50
C)

Chapter-34 Page 677 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xiii) MCB Four Pole 0.5-4amp. (10kA, Curve-C) Each 31.00 1040.00 34.00 1043.10

(xiv) MCB Four Pole 6-32amp. (10kA, Curve-C) Each 31.00 834.00 34.00 837.10

(xv) MCB Four Pole 40amp. (10kA, Curve-C) Each 31.00 1077.00 34.00 1080.10

(xvi) MCB Four Pole 50, 63amp. (10kA, Curve-C)


Each 31.00 1231.00 34.00 1234.10

34.16 RCBO's:
B

Supply and erection of RCBO (Residual


Current Breaker Overload) for Earth
leakage, overload and short circuit
protection suitable for 240/415 volts 50
cycles AC supply with breaking capacity
of 10kA as per IEC 61009 in the existing
MCB distribution board as per PWD
General Specifications including
connections with suitable size of
thimbles/lugs:-

(i) RCBO Double Pole 16/25amp., Sensitivity


Each 18.00 2326.00 20.00 2327.80
30mA

(ii) RCBO Double Pole 32amp., Sensitivity


Each 18.00 2440.00 20.00 2441.80
30mA

(iii) RCBO Double Pole 40amp., Sensitivity


Each 18.00 2993.00 20.00 2994.80
30mA

(iv) RCBO Double Pole 63amp., Sensitivity


Each 18.00 3543.00 20.00 3544.80
30mA

(v) RCBO Double Pole 16/25amp., Sensitivity


Each 18.00 2405.00 20.00 2406.80
100/300mA

(vi) RCBO Double Pole 32amp., Sensitivity


Each 18.00 2526.00 20.00 2527.80
100/300mA

(vii) RCBO Double Pole 40amp., Sensitivity


Each 18.00 3072.00 20.00 3073.80
100/300mA

(viii) RCBO Double Pole 63amp., Sensitivity


Each 18.00 3775.00 20.00 3776.80
100/300mA

(ix) RCBO Four Pole 16/25amp., Sensitivity


Each 31.00 3079.00 34.00 3082.10
30mA

(x) RCBO Four Pole 32amp., Sensitivity 30mA


Each 31.00 3183.00 34.00 3186.10

Chapter-34 Page 678 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xi) RCBO Four Pole 40amp., Sensitivity 30mA
Each 31.00 3229.00 34.00 3232.10

(xii) RCBO Four Pole 63amp., Sensitivity 30mA


Each 31.00 3815.00 34.00 3818.10

(xiii) RCBO Four Pole 16/25amp., Sensitivity


Each 31.00 3294.00 34.00 3297.10
100mA

(xiv) RCBO Four Pole 32amp., Sensitivity 100mA


Each 31.00 3329.00 34.00 3332.10

(xv) RCBO Four Pole 40amp., Sensitivity 100mA


Each 31.00 3422.00 34.00 3425.10

(xvi) RCBO Four Pole 63amp., Sensitivity 100mA


Each 31.00 3886.00 34.00 3889.10

(xvii) RCBO Four Pole 16/25amp., Sensitivity


Each 31.00 3394.00 34.00 3397.10
300mA

(xviii) RCBO Four Pole 32amp., Sensitivity 300mA


Each 31.00 3394.00 34.00 3397.10

(xix) RCBO Four Pole 40amp., Sensitivity 300mA


Each 31.00 3461.00 34.00 3464.10

(xx) RCBO Four Pole 63amp., Sensitivity 300mA


Each 31.00 3886.00 34.00 3889.10

34.16 RCCB's:
C

Supply and erection of RCCB (Residual


Current Circuit Breaker) for Earth
leakage protection suitable for 240/415
volts 50 cycles AC supply with breaking
capacity of 10kA as per IEC 61008-1 in
the existing MCB distribution board as
per PWD General Specifications
including connections with suitable size
of thimbles/lugs:-

(i) RCCB Double Pole 16/25amp., Sensitivity


Each 18.00 1608.00 20.00 1609.80
30mA

(ii) RCCB Double Pole 32/40amp., Sensitivity


Each 18.00 1772.00 20.00 1773.80
30mA

(iii) RCCB Double Pole 63amp., Sensitivity


Each 18.00 2104.00 20.00 2105.80
30mA

(iv) RCCB Double Pole 16/25amp., Sensitivity


Each 18.00 1701.00 20.00 1702.80
100mA

Chapter-34 Page 679 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(v) RCCB Double Pole 32/40amp., Sensitivity
Each 18.00 1772.00 20.00 1773.80
100mA

(vi) RCCB Double Pole 63amp., Sensitivity


Each 18.00 2276.00 20.00 2277.80
100mA

(vii) RCCB Double Pole 16/25amp., Sensitivity


Each 18.00 1716.00 20.00 1717.80
300mA

(viii) RCCB Double Pole 32/40amp., Sensitivity


Each 18.00 1859.00 20.00 1860.80
300mA

(ix) RCCB Double Pole 63amp., Sensitivity


Each 18.00 2312.00 20.00 2313.80
300mA

(x) RCCB Four Pole 16/25amp., Sensitivity


Each 31.00 2113.00 34.00 2116.10
30mA

(xi) RCCB Four Pole 32/40amp., Sensitivity


Each 31.00 2166.00 34.00 2169.10
30mA

(xii) RCCB Four Pole 63amp., Sensitivity 30mA Each 31.00 2396.00 34.00 2399.10

(xiii) RCCB Four Pole 16/25amp., Sensitivity


Each 31.00 2198.00 34.00 2201.10
100mA

(xiv) RCCB Four Pole 32/40amp., Sensitivity


Each 31.00 2229.00 34.00 2232.10
100mA

(xv) RCCB Four Pole 63amp., Sensitivity 100mA


Each 31.00 2463.00 34.00 2466.10

(xvi) RCCB Four Pole 16/25amp., Sensitivity


Each 31.00 2212.00 34.00 2215.10
300mA

(xvii) RCCB Four Pole 32/40amp., Sensitivity


Each 31.00 2293.00 34.00 2296.10
300mA

(xviii) RCCB Four Pole 63amp., Sensitivity 300mA


Each 31.00 2505.00 34.00 2508.10

Chapter-34 Page 680 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.17 SHEET METAL DOUBLE DOOR
DISTRIBUTION BOARD FOR MCB's/
RCBO's/ RCCB's:

Supply and erection of sheet metal


Double Door Distribution Boards IP 43-
IK09 metal door (dust protected) as per
IS 8623-1&3, IEC 61439-1&3 suitable for
flush mounting with fully insulated
copper busbars, shrouded neutral bars,
earth bars, cement spill protector, color-
coded interconnecting wire set, cable
ties, blanking plates and circuit
identifications label and of required no.
of ways for mounting miniature circuit
breakers/ RCBO's/ RCCB's in the
distribution board (For SP&N
distribution board with provision DP
MCB's/ RCCB's/ RCBO's as incomer and
SP MCB's as outgoings and for TP&N
horizontal distribution board with
provision TPN/ FP MCB's/ RCCB's/
RCBO's as incomer and SP MCB's as
outgoings) as per PWD General
specifications including connections
with suitable size of thimbles and
bonding to existing earth etc:-

(i) SP&N Double Door Distribution Board 4 way


Each 117.00 909.00 129.00 920.70
each

(ii) SP&N Double Door Distribution Board 8 way


Each 145.00 1169.00 160.00 1183.50
each

(iii) SP&N Double Door Distribution Board 12


Each 175.00 1484.00 193.00 1501.50
way each

(iv) SP&N Double Door Distribution Board 16


Each 175.00 1786.00 193.00 1803.50
way each

(v) TP&N Horizontal Double Door Distribution


Each 219.00 2406.00 241.00 2427.90
Board 4 way each

(vi) TP&N Horizontal Double Door Distribution


Each 292.00 2965.00 321.00 2994.20
Board 6 way each

(vii) TP&N Horizontal Double Door Distribution


Each 292.00 3540.00 321.00 3569.20
Board 8 way each

(viii) TP&N Horizontal Double Door Distribution


Each 350.00 4910.00 385.00 4945.00
Board 12 way each

(ix) TP&N Vertical Double Door Distribution


Each 219.00 5585.00 241.00 5606.90
Board 4 way each

Chapter-34 Page 681 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(x) TP&N Vertical Double Door Distribution
Each 292.00 7031.00 321.00 7060.20
Board 8 way each

(xi) TP&N Vertical Double Door Distribution


Each 350.00 8823.00 385.00 8858.00
Board 12 way each

(xii) AC Plug and Socket SP&N with provision of


Each 117.00 727.00 129.00 738.70
One Single Pole MCB 20amp.

(xiii) AC Plug and Socket TP&N with provision of


Each 145.00 1454.00 160.00 1468.50
One Triple Pole MCB 20amp.

(xiv) AC Plug and Socket TP&N with provision of


Each 145.00 1994.00 160.00 2008.50
One Triple Pole MCB 30/32amp.

34.17 (xv) Supply and erection of sheet metal


double door Phase segregated
distribution boards IP 43-IK09 metal door
(dust protected) as per IS:8623-1&3,
IEC61439-1&3 suitable for flush
mounting with fully insulated copper
busbars for each phase, 3 Nos. shrouded
neutral bars, 3 Nos. earth bars, cement
spill protector, color-coded
interconnecting wire set, cable ties,
blanking plates and circuit
identifications label, compartmentalizing
each phase (separated incomer, sub
incomer & outgoing) and of required no.
of ways for mounting FP MCB's as
incomer, DP/RCBO's/RCCB's as sub
incomer and SP MCB's as outgoings in
the distribution board as per PWD
General specifications including
connections with suitable size of
thimbles and bonding to existing earth
etc.:-

(a) TP&N Double Door Phase Segregated


Each 219.00 5209.00 241.00 5230.90
Distribution Board 4 way each

(b) TP&N Double Door Phase Segregated


Each 292.00 5919.00 321.00 5948.20
Distribution Board 6 way each

(c) TP&N Double Door Phase Segregated


Each 292.00 6738.00 321.00 6767.20
Distribution Board 8 way each

(d) TP&N Double Door Phase Segregated


Each 350.00 8389.00 385.00 8424.00
Distribution Board 12 way each

Chapter-34 Page 682 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.17 (xvi) Supply and erection of sheet metal
double door vertical distribution boards
IP 43-IK09 metal door (dust protected) as
per IS:8623-1&3, IEC 61439-1&3 suitable
for flush mounting with fully insulated
copper busbars for each phase, 2 Nos.
shrouded neutral bars, 2Nos. earth bars,
cement spill protector, color-coded
interconnecting wire set, cable ties,
blanking plates and circuit
identifications label and of required no.
of ways for mounting MCCB's as
incomer and outgoings SP/TP miniature
circuit breakers in the distribution board
as per PWD General specifications
including connections with suitable size
of thimbles and bonding to existing earth
etc.:-

(a) TP&N Double Door Vertical DB's 4 way


each (With provision of FP MCCB upto Each 437.00 6305.00 481.00 6348.70
125amp)

(b) TP&N Double Door Vertical DB's 8 way


each (With provision of FP MCCB upto Each 577.00 7981.00 635.00 8038.70
125amp.)

(c) TP&N Double Door Vertical DB's 12 way


each (With provision of FP MCCB upto Each 699.00 10521.00 769.00 10590.90
125amp.)

(d) TP&N Double Door Vertical DB's 4 way


each (With provision of FP MCCB 160amp) Each 437.00 6886.00 481.00 6929.70

(e) TP&N Double Door Vertical DB's 8 way


each (With provision of FP MCCB 160amp.) Each 577.00 8587.00 635.00 8644.70

(f) TP&N Double Door Vertical DB's 12 way


each (With provision of FP MCCB 160amp.) Each 699.00 11359.00 769.00 11428.90

(g) TP&N Double Door Vertical DB's 4 way


each (With provision of FP MCCB 200- Each 437.00 10700.00 481.00 10743.70
250amp.)

(h) TP&N Double Door Vertical DB's 8 way


each (With provision of FP MCCB 200- Each 577.00 13143.00 635.00 13200.70
250amp.)

Chapter-34 Page 683 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) TP&N Double Door Vertical DB's 12 way
each (With provision of FP MCCB 200- Each 699.00 14138.00 769.00 14207.90
250amp.)

34.17 (xvii) Supply and erection of sheet metal Cable


End Box (Make is same as MCB
Distribution Board) mounting on the top
or bottom of the MCB Distribution Board
(Either Horizontal or Vertical) to keep
loose wires & cables as per PWD General
specifications including petty materials
etc as required:-

(a) Cable End Box for SPN 4Way Each 117.00 426.00 129.00 437.70

(b) Cable End Box for SPN 8 Way Each 145.00 496.00 160.00 510.50

(c) Cable End Box for SPN 12 Way Each 175.00 584.00 193.00 601.50

(d) Cable End Box for SPN 16 Way Each 175.00 631.00 193.00 648.50

(e) Cable End Box for TPN 4 Way Each 219.00 783.00 241.00 804.90

(f) Cable End Box for TPN 6 Way Each 292.00 881.00 321.00 910.20

(g) Cable End Box for TPN 8 Way Each 292.00 1003.00 321.00 1032.20

(h) Cable End Box for TPN 12 Way Each 350.00 1218.00 385.00 1253.00

(i) Cable End Box for TPN Vertical 4/8/12Way


Each 219.00 1316.00 241.00 1337.90

34.18 SHEET METAL IRON CLAD SWITCHES:

Supply and erection of sheet metal Iron


Clad Switches on existing surface with
G.I. bolts & nuts/ rag bolts and nuts etc.,
according to the size of holes in the
body of the enclosure including
connections with suitable size of
thimbles and bonding to the existing
earth as Per PWD General
Specifications:-

(i) ICDP Switch 32amp., 415volts Each 198.00 1158.00 218.00 1177.80

(ii) ICDP Switch 63amp., 415volts Each 198.00 2008.00 218.00 2027.80

(iii) ICDP Switch 100amp., 415volts Each 237.00 3886.00 261.00 3909.70

(iv) ICDP Switch 200amp., 415volts Each 237.00 10554.00 261.00 10577.70

(v) ICTPN Switch 32amp., 415volts Each 237.00 1362.00 261.00 1385.70

Chapter-34 Page 684 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(vi) ICTPN Switch 63amp., 415volts Each 237.00 2904.00 261.00 2927.70

(vii) ICTPN Switch 100amp., 415volts Each 296.00 4927.00 326.00 4956.60

(viii) ICTPN Switch 200amp., 415volts Each 474.00 7161.00 521.00 7208.40

(ix) ICTPN Switch 320amp., 415volts Each 790.00 10054.00 869.00 10133.00

(x) ICTPN Switch 400amp., 415volts Each 790.00 12723.00 869.00 12802.00

34.18 PORCELAIN FUSE UNITS:

(xi) Supply and erection of Porcelain Fuse


Unit with Extension Strip on existing
surface with G.I. bolts & nuts/ rag bolts
and nuts etc., including connections
with suitable size of thimbles and
bonding to the existing earth as Per PWD
General Specifications :-

(a) Porcelain Fuse Unit 16Amp., 240volts Each 39.00 77.00 43.00 80.90

(b) Porcelain Fuse Unit 32Amp., 415volts Each 39.00 163.00 43.00 166.90

(c) Porcelain Fuse Unit 63Amp., 415volts, Each 39.00 278.00 43.00 281.90

(d) Porcelain Fuse Unit 100Amp., 415volts with


Each 59.00 555.00 65.00 560.90
Extension Strip

(e) Porcelain Fuse Unit 200Amp., 415volts with


Each 59.00 1108.00 65.00 1113.90
Extension Strip

(f) Porcelain Fuse Unit 320Amp., 415volts with


Each 98.00 1741.00 108.00 1750.80
Extension Strip

(g) Porcelain Fuse Unit 400Amp., 415volts with


Each 98.00 2004.00 108.00 2013.80
Extension Strip

(h) Porcelain Fuse Unit 500Amp., 415volts with


Each 98.00 2334.00 108.00 2343.80
Extension Strip

Chapter-34 Page 685 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.19 SHEET METAL IRON CLAD
CHANGEOVER SWITCHES:

Supply and erection of sheet metal Iron


Clad Changeover Switch on existing
surface with G.I. bolts & nuts/rag bolts
and nuts etc., according to the size of
holes in the body of the switch including
connections with suitable size of
thimbles and bonding to the existing
earth as per PWD General Specifications:-

(i) ICDP Changeover Switch 32amp., 415volts


Each 237.00 1230.00 261.00 1253.70

(ii) ICDP Changeover Switch 63amp., 415volts


Each 237.00 2423.00 261.00 2446.70

(iii) ICDP Changeover Switch 100amp.,


Each 296.00 7841.00 326.00 7870.60
415volts

(iv) ICDP Changeover Switch 200amp.,


Each 296.00 10697.00 326.00 10726.60
415volts

(v) IC Four Pole Changeover Switch 32amp.,


Each 296.00 1645.00 326.00 1674.60
415volts

(vi) IC Four Pole Changeover Switch 63amp.,


Each 296.00 3332.00 326.00 3361.60
415volts

(vii) IC Four Pole Changeover Switch 100amp.,


Each 474.00 5635.00 521.00 5682.40
415volts

(viii) IC Four Pole Changeover Switch 200amp.,


Each 790.00 8736.00 869.00 8815.00
415volts

(ix) IC Four Pole Changeover Switch 320amp.,


Each 888.00 15877.00 977.00 15965.80
415volts

(x) IC Four Pole Changeover Switch 400amp.,


Each 888.00 20444.00 977.00 20532.80
415volts

Chapter-34 Page 686 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.20 SHEET METAL BUS BAR CHAMBERS
(COPPER STRIPS):

Supply and erection of sheet metal bus-


bar chamber (factory fabricated) duly
powder coated on existing surface with
required 4Nos. of tin plated copper bus-
bar strips of suitable length and cross-
sectional area mounted on DMC/ SMC
moulds at sufficient distance, enclosure
made of M.S. sheet 1.6mm thick with
hinged cover and lock, fitted with dust
excluding gaskets and secured with
sufficient no. of cadmium plated iron
screws and of given overall dimensions
and to be fixed with G.I. bolts and nuts/
rag bolts and nuts etc. complete with all
accessories including connections with
suitable size of thimbles, bonding to the
existing earth and painting etc. as
desired by the Engineer-in-charge at site:-

(i) Bus Bar Chamber 63amp., 415volts Overall


Dimensions (300mm x 345mm x 120mm) Each 296.00 3975.00 326.00 4004.60
nominal

(ii) Bus Bar Chamber 63amp., 415volts Overall


Dimensions (350mm x 450mm x 150mm) Each 296.00 4648.00 326.00 4677.60
nominal

(iii) Bus Bar Chamber 100amp., 415volts


Overall Dimensions (300mm x 345mm x Each 391.00 4700.00 430.00 4739.10
120mm) nominal

(iv) Bus Bar Chamber 100amp., 415volts


Overall Dimensions (350mm x 450mm x Each 391.00 5331.00 430.00 5370.10
150mm) nominal

(v) Bus Bar Chamber 100amp., 415volts


Overall Dimensions (455mm x 455mm x Each 391.00 6339.00 430.00 6378.10
150mm) nominal

(vi) Bus Bar Chamber 200amp., 415volts


Overall Dimensions (350mm x 450mm x Each 474.00 6254.00 521.00 6301.40
150mm) nominal

(vii) Bus Bar Chamber 200amp., 415volts


Overall Dimensions (455mm x 455mm x Each 474.00 7598.00 521.00 7645.40
150mm) nominal

Chapter-34 Page 687 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(viii) Bus Bar Chamber 200amp., 415volts
Overall Dimensions (610mm x 510mm x Each 592.00 9313.00 651.00 9372.20
215mm) nominal

(ix) Bus Bar Chamber 200amp., 415volts


Overall Dimensions (780mm x 510mm x Each 592.00 11036.00 651.00 11095.20
215mm) nominal

34.21 SWITCH DISCONNECTOR FUSE UNIT:

34.21 SWITCH DISCONNECTOR FUSE UNIT


A (Without Sheet Enclosure):

Supply and erection of Switch


Disconnector Fuse Unit with HRC Fuses
(Suitable for DIN HRC Fuses) in the
existing Cubical Panel Confirms to IS
13947 (Part-III), IEC 60947-3 complete
with G.I. Bolts, Nuts & Connections on
both sides of switch with suitable size of
thimbles, including cost of DIN HRC
fuses as per PWD General Specifications
(Panel mounting Cubicle type):-

(i) SDF TP&N 32Amp., 415volts Each 296.00 1818.00 326.00 1847.60

(ii) SDF TP&N 63Amp., 415volts Each 296.00 2303.00 326.00 2332.60

(iii) SDF TP&N 100Amp., 415volts Each 391.00 4173.00 430.00 4212.10

(iv) SDF TP&N 125Amp., 415volts Each 391.00 4423.00 430.00 4462.10

(v) SDF TP&N 160Amp., 415volts Each 391.00 5392.00 430.00 5431.10

(vi) SDF TP&N 200Amp., 415volts Each 391.00 6069.00 430.00 6108.10

(vii) SDF TP&N 250Amp., 415volts Each 592.00 7585.00 651.00 7644.20

(viii) SDF TP&N 320Amp., 415volts Each 592.00 9972.00 651.00 10031.20

(ix) SDF TP&N 400Amp., 415volts Each 592.00 11022.00 651.00 11081.20

(x) SDF TP&N 630Amp., 415volts Each 888.00 17945.00 977.00 18033.80

(xi) SDF Four Pole 63Amp., 415volts Each 296.00 2345.00 326.00 2374.60

(xii) SDF Four Pole 100Amp., 415volts Each 391.00 3717.00 430.00 3756.10

(xiii) SDF Four Pole 125Amp., 415volts Each 391.00 4599.00 430.00 4638.10

(xiv) SDF Four Pole 200Amp., 415volts Each 391.00 6071.00 430.00 6110.10

(xv) SDF Four Pole 250Amp., 415volts Each 592.00 7327.00 651.00 7386.20

Chapter-34 Page 688 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xvi) SDF Four Pole 320Amp., 415volts Each 592.00 9738.00 651.00 9797.20

(xvii) SDF Four Pole 400Amp., 415volts Each 592.00 11214.00 651.00 11273.20

(xviii) SDF Four Pole 630Amp., 415volts Each 888.00 15007.00 977.00 15095.80

34.21 SWITCH DISCONNECTOR FUSE UNIT


B (With Sheet Enclosure):

Supply and erection of Switch


Disconnector Fuse Unit with HRC Fuses
(Suitable for DIN HRC Fuses) in sheet
enclosure on the existing surface
Confirms to IS 13947 (Part-III), IEC 60947-
3 complete with G.I. Bolts, Nuts &
Connections on both sides of switch
with suitable size of thimbles, including
cost of DIN HRC fuses as per PWD
General Specifications:-

(i) SDF TP&N 32Amp., 415volts (With Sheet


Each 296.00 2814.00 326.00 2843.60
Enclosure)

(ii) SDF TP&N 63Amp., 415volts (With Sheet


Each 296.00 3298.00 326.00 3327.60
Enclosure)

(iii) SDF TP&N 100Amp., 415volts (With Sheet


Each 391.00 5165.00 430.00 5204.10
Enclosure)

(iv) SDF TP&N 125Amp., 415volts (With Sheet


Each 391.00 5419.00 430.00 5458.10
Enclosure)

(v) SDF TP&N 160Amp., 415volts (With Sheet


Each 391.00 7145.00 430.00 7184.10
Enclosure)

(vi) SDF TP&N 200Amp., 415volts (With Sheet


Each 391.00 7800.00 430.00 7839.10
Enclosure)

(vii) SDF TP&N 250Amp., 415volts (With Sheet


Each 592.00 9338.00 651.00 9397.20
Enclosure)

(viii) SDF TP&N 320Amp., 415volts (With Sheet


Each 592.00 12017.00 651.00 12076.20
Enclosure)

(ix) SDF TP&N 400Amp., 415volts (With Sheet


Each 592.00 13067.00 651.00 13126.20
Enclosure)

(x) SDF TP&N 630Amp., 415volts (With Sheet


Each 888.00 20571.00 977.00 20659.80
Enclosure)

Chapter-34 Page 689 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.22 ON LOAD CHANGEOVER SWITCH:

34.22 ON LOAD CHANGEOVER SWITCH


A (Without Sheet Enclosure):

Supply and erection of On Load Change


over Switch with advance neutral UNIT
(Panel mounting Cubical type) in the
existing Cubical Panel Confirms to IS
13947 (Part-3) complete with G.I. Bolts,
Nuts & Connections on both sides of
switch with suitable size of thimbles as
per PWD General Specifications:-

(i) On Load Change Over Switch Four Pole


Each 296.00 3325.00 326.00 3354.60
63amp., 415volts

(ii) On Load Change Over Switch Four Pole


Each 391.00 4366.00 430.00 4405.10
100amp., 415volts

(iii) On Load Change Over Switch Four Pole


Each 391.00 6303.00 430.00 6342.10
125amp., 415volts

(iv) On Load Change Over Switch Four Pole


Each 391.00 6838.00 430.00 6877.10
160amp., 415volts

(v) On Load Change Over Switch Four Pole


Each 391.00 8106.00 430.00 8145.10
200amp., 415volts

(vi) On Load Change Over Switch Four Pole


Each 592.00 11810.00 651.00 11869.20
250amp., 415volts

(vii) On Load Change Over Switch Four Pole


Each 592.00 12436.00 651.00 12495.20
320amp., 415volts

(viii) On Load Change Over Switch Four Pole


Each 592.00 17826.00 651.00 17885.20
400amp., 415volts

(ix) On Load Change Over Switch Four Pole


Each 888.00 21151.00 977.00 21239.80
630amp., 415volts

(x) On Load Change Over Switch Four Pole


Each 1184.00 31462.00 1302.00 31580.40
800amp., 415volts

(xi) On Load Change Over Switch Four Pole


Each 1184.00 52686.00 1302.00 52804.40
1000amp., 415volts

Chapter-34 Page 690 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.22 ON LOAD CHANGEOVER SWITCH (With
B Sheet Enclosure):

Supply and erection of On Load Change


over Switch with advance neutral UNIT in
sheet enclosure on the existing surface.
(Confirms to IS 13947 (Part-3). complete
with G.I. Bolts, Nuts etc. according to the
size of holes in the body of the enclosure
& Connections on both sides of switch
with suitable size of thimbles as per
PWD General Specifications:-

(i) On Load Change Over Switch Four Pole


Each 296.00 4409.00 326.00 4438.60
63amp., 415volts (With Sheet Enclosure)

(ii) On Load Change Over Switch Four Pole


100amp., 415volts (With Sheet Enclosure) Each 391.00 5642.00 430.00 5681.10

(iii) On Load Change Over Switch Four Pole


125amp., 415volts (With Sheet Enclosure) Each 391.00 8248.00 430.00 8287.10

(iv) On Load Change Over Switch Four Pole


160amp., 415volts (With Sheet Enclosure) Each 391.00 8787.00 430.00 8826.10

(v) On Load Change Over Switch Four Pole


200amp., 415volts (With Sheet Enclosure) Each 391.00 10051.00 430.00 10090.10

(vi) On Load Change Over Switch Four Pole


250amp., 415volts (With Sheet Enclosure) Each 592.00 14293.00 651.00 14352.20

(vii) On Load Change Over Switch Four Pole


320amp., 415volts (With Sheet Enclosure) Each 592.00 14920.00 651.00 14979.20

(viii) On Load Change Over Switch Four Pole


400amp., 415volts (With Sheet Enclosure) Each 592.00 21424.00 651.00 21483.20

(ix) On Load Change Over Switch Four Pole


630amp., 415volts (With Sheet Enclosure) Each 888.00 24749.00 977.00 24837.80

(x) On Load Change Over Switch Four Pole


800amp., 415volts (With Sheet Enclosure) Each 1184.00 36813.00 1302.00 36931.40

(xi) On Load Change Over Switch Four Pole


1000amp., 415volts (With Sheet Enclosure) Each 1184.00 67290.00 1302.00 67408.40

Chapter-34 Page 691 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.23 LT PANELS & MCCB's (MOULDED CASE
CIRCUIT BREAKERS):

34.23 LT PANELS:
A

Designing, Supply, Erection, Testing &


commissioning of indoor Type LT cubical panel
enclosure (dust, vermin and interchangeable
modules with facilites for extensions or reduction
as per the space or requirments). The Panel shall
be suitable for operation at 415+6% Volts, 50HZ, 3
phase 4 wire & earth system. The assembly
manufacturer should be ISO approved and CPRI
tested for short circuit of (minimum 50kA) as well
as IP degree of protection (IP 54/55).
Fabrication:- Panel shall be made from 14/16 SWG
CRCA sheet, conforming to IS 8623/1977-82. The
sheet metal used for the fabrication of control
panel will be 2mm for load bearing member’s door
and fittings plates etc. the partitions and other non
load bearing members will be fabricated out of
1.6mm sheet, the sheet will be of mild steel CRCA
type. The base channel will be made out of 75 x 40
x 5mm rolled channel.

The door should be double folded without edge


and the gasket should be ‘S’ type puffed neutral
rubber gasket for long life. The hinges of the door
should be bolted type with double hole
arrangement. The panel door lock should be quick
openable type spring loaded. There should not be
any special tool or key to open the lock. Minimum
depth 400mm / wide 300 mm for busbar/ Cable ally
at the front of the panel. The panel will be free
standing floor mounting type having provision for
cable entry from bottom/top with cable glands etc.

The fabrication should be such that all the member


i.e. vertical/horizontal should be detachable type
i.e. total bolted. In case of any changes required at
site. it should be possible then and their self
without any cutting or welding. The fabrication of
the panel in 3B construction fully
compartmentalized type i.e. bus bar chamber as
well as the cable chamber should be totally
isolated from the feeder chamber. Where there
crossing of the wire or bus links. It should have
proper rubber gourmets or non-hygroscopic
material. No live part should be in visible
condition.

Chapter-34 Page 692 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
Painting:- The sheet metal is sprayed with
corrosion resistant etch Primer. The finishing
treatment shall be applicable with air drying
paint (7/9 tank Powder coated process
should present in company pemises) after
necessary putty work .
Busbars:-The panel shall be provided with
TPN aluminium busbar of suitable size
according to the size of MCCB's. Busbar
shall be of high conductivity (53% to 58%)
E91-E Grade aluminium (1A/Sq.mm). All
Busbar will be air insulated with codified in
Red, Yellow, Blue & Black as per standard
for cable termination with the help of
extended busbar only with proper adjustable
cable supports. The main busbar would be
supported upon non-hygroscopic SMC/DMC
supports.

Metering:-The panel shall be completed with


digital metering unit (with selector switches,
voltmeter & ammeter) epoxy insulator,
gasket, PVC sleeves, CT's & L.E.D. type
indicator etc.
Manufacturer of Panel should be CPRI
Approved (Approval not older then 5 years)
& ISO certified (Manufacturer workshop as
per ISO 9001: 2015 standard) The Concerned
contractor shall be approved the detailed
drawing of panel with complete specification
from the Engineer in charge at site.
Detail of capacities of MCCB's to be installed
in the cubical panel Enclosure (Excluding the
cost of MCCB's) as per following:-

(i) LT Panel enclosure having space for 1No.


Incomer MCCB 160Amp. and 4Nos.
outgoing MCCB's 40amp. to 100amp. Each 1749.00 51684.00 1924.00 51858.90
according to the requirement at site
(Approx. size 1825 x 900 x 300mm)

(ii) LT Panel enclosure having space for 1No.


Incomer MCCB 200Amp. and 4Nos.
outgoing MCCB's 40amp. to 100amp. Each 1749.00 61143.00 1924.00 61317.90
according to the requirement at site
(Approx. size 1825 x 1000 x 300mm)

(iii) LT Panel enclosure having space for 1No.


Incomer MCCB 250Amp. and 6Nos.
outgoing MCCB's 40amp. to 125amp. Each 2313.00 79453.00 2544.00 79684.30
according to the requirement at site
(Approx. size 1300 x 1650 x 400mm)

Chapter-34 Page 693 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iv) LT Panel enclosure having space for 1No.
Incomer MCCB 250Amp. and 8Nos.
outgoing MCCB's 40amp. to 100amp. Each 2877.00 91461.00 3165.00 91748.70
according to the requirement at site
(Approx. size 1575 x 1700 x 400mm)

(v) LT Panel enclosure having space for 1No.


Incomer MCCB 400Amp. and 4Nos.
outgoing MCCB's 100amp. to 160amp. Each 2313.00 76976.00 2544.00 77207.30
according to the requirement at site
(Approx. size 2025 x 1100 x 400mm)

(vi) LT Panel enclosure having space for 1No.


Incomer MCCB 400Amp. and 8Nos.
outgoing MCCB's 40amp. to 160amp. Each 3442.00 106178.00 3786.00 106522.20
according to the requirement at site
(Approx. size 1750 x 1750 x 400mm)

(vii) LT Panel enclosure having space for 1No.


Incomer MCCB 400Amp. and 10Nos.
outgoing MCCB's 40amp. to 160amp. Each 4006.00 117700.00 4407.00 118100.60
according to the requirement at site
(Approx. size 2025 x 1800 x 400mm)

(viii) LT Panel enclosure having space for 1No.


Incomer MCCB 630Amp. and 6Nos.
outgoing MCCB's 40amp. to 160amp. Each 3442.00 95099.00 3786.00 95443.20
according to the requirement at site
(Approx. size 1475 x 1800 x 400mm)

(ix) LT Panel enclosure having space for 1No.


Incomer MCCB 630Amp. and 6Nos.
outgoing MCCB's 40amp. to 250amp.
(Option: MCCB 200-250amp.= 1No. and Each 4006.00 95663.00 4407.00 96063.60
MCCB's 40-100amp.= 5Nos.) according to
the requirement at site (Approx. size 1475 x
1800 x 400mm)

(x) LT Panel enclosure having space for 1No.


Incomer MCCB 630Amp. and 6Nos.
outgoing MCCB's 40amp. to 250amp.
(Option: MCCB 200-250amp.= 2Nos. and Each 4006.00 95663.00 4407.00 96063.60
MCCB's 40-100amp.= 4Nos.) according to
the requirement at site (Approx. size 1475 x
1800 x 400mm)

Chapter-34 Page 694 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.23 MCCB's (FOR PANELS & SHEET
B ENCLOSURE):

Supply and erection of Moulded Case


Circuit Breaker (Panel mounting Cubical
type) in the existing Cubical Panel
(confirm to IEC:60947-2) having
Ics=100% Icu, 100% neutral with
spreader terminal links, Extended rotary
handle and relevant PWD general
specifications complete with G.I. Bolts,
Nuts & Connection on both sides of
MCCB with suitable size of thimbles etc:-

(i) MCCB Four Pole 40amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 296.00 5251.00 326.00 5280.60
Setting

(ii) MCCB Four Pole 63/80/100amp., 415volts,


≥25kA Fixed Magnetic and Adjustable Each 296.00 5251.00 326.00 5280.60
Thermal Setting

(iii) MCCB Four Pole 125amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 6334.00 430.00 6373.10
Setting

(iv) MCCB Four Pole 160amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 7635.00 430.00 7674.10
Setting

(v) MCCB Four Pole 200amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 9480.00 430.00 9519.10
Setting

(vi) MCCB Four Pole 250amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 592.00 10425.00 651.00 10484.20
Setting

(vii) MCCB Four Pole 250amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 592.00 17645.00 651.00 17704.20
and Magnetic Setting

(viii) MCCB Four Pole 400amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 592.00 23901.00 651.00 23960.20
and Magnetic Setting

(ix) MCCB Four Pole 630amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 888.00 26020.00 977.00 26108.80
and Magnetic Setting

Chapter-34 Page 695 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.23 MCCB's (MOULDED CASE CIRCUIT
C BREAKER):

Supply and erection of Moulded Case


Circuit Breaker (Panel mounting Cubical
type) in the existing Cubical Panel
(confirm to IEC:60947-2) having
Ics=100% Icu, 100% neutral with
spreader links and relevant PWD general
specifications complete with G.I. Bolts,
Nuts & Connection on both sides of
MCCB with suitable size of thimbles etc:-

(i) MCCB Four Pole 40amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 296.00 4493.00 326.00 4522.60
Setting

(ii) MCCB Four Pole 63/80/100amp., 415volts,


≥25kA Fixed Magnetic and Adjustable Each 296.00 4493.00 326.00 4522.60
Thermal Setting

(iii) MCCB Four Pole 125amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 5576.00 430.00 5615.10
Setting

(iv) MCCB Four Pole 160amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 6877.00 430.00 6916.10
Setting

(v) MCCB Four Pole 200amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 391.00 8722.00 430.00 8761.10
Setting

(vi) MCCB Four Pole 250amp., 415volts, ≥25kA


Fixed Magnetic and Adjustable Thermal Each 592.00 9667.00 651.00 9726.20
Setting

(vii) MCCB Four Pole 250amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 592.00 17500.00 651.00 17559.20
and Magnetic Setting

(viii) MCCB Four Pole 400amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 592.00 23143.00 651.00 23202.20
and Magnetic Setting

(ix) MCCB Four Pole 630amp., 415volts, ≥36kA


Microprocessor Based Adjustable Thermal Each 888.00 25262.00 977.00 25350.80
and Magnetic Setting

Chapter-34 Page 696 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.23 MS SHEET ENCLOSURE FOR MCCB's:
D

(i) Supply & Erection of indoor type MCCB


enclosure of suitable size having
provision for MCCB with extended rotary
handle. The Enclosure shall be made
from 14/16 SWG CRCA sheet, confirming
to IS 8623/1977-82. The door should be
double folded without edge and the
gasket should be ‘S’ type puffed neutral
rubber gasket for long life. The hinges of
the door should be bolted type with
double hole arrangement. The Enclosure
door lock should be quick openable type
spring loaded. There should not be any
special tool or key to open the lock. The
Enclosure will be wall mounting type
having provision for cable entry from
bottom/top with cable glands etc. The
sheet metal is sprayed with corrosion
resistant etch primer. The finishing
treatment shall be applicable with air
drying paint (7/9 tank Powder coated
process should present in company
pemises) after necessary putty work:-

(a) MS Sheet Enclosure having provision for


MCCB 40-160Amp.with extended rotary
handle (Approx. Size 500mm x 300mm x Each 296.00 2266.00 326.00 2295.60
200mm)

(b) MS Sheet Enclosure having provision for


MCCB 200-630Amp.with extended rotary
handle (Approx. Size 750mm x 300mm x Each 395.00 4218.00 435.00 4257.50
250mm)

Chapter-34 Page 697 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.24 AIR CIRCUIT BREAKERS:

Supply & erection of Air circuit-breaker


of suitable ampere rating at 415V, 50Hz, 4
Pole Electrical draw-out type with inbuilt
microprocessor based trip sytem with
thermal memory, zone selective
interlocking, pre trip alarm, individual
fault indicating LED, O/C, S/C,
Instantaneous & E/F internal protection,
Impulse withstand voltage 12kV, rated
insulation voltage 1000V, rated
operational voltage 690V, fully rated
neutral, protection against overload &
shortcircuit with setting at 50%-100%-
OFF, suitability for isolation as per IEC
60947-2. The ACB should be capable for
recording 10 fault history, LCD Display of
current & voltage, Icu = Ics = Icw (1 Sec.)
= 50kA with no derating upto 50 degree
celcius on the existing industrial panel
(With terminal adapter on load and line
side of breaker), including bonding to
the existing earth and making necessary
connections with suitable size of
thimbles as required by the Engineer-in-
Charge at site and as per PWD General
Specifications:-

(i) Air Circuit Breaker Four Pole, 800amp.,


Each 3497.00 127590.00 3847.00 127939.70
415volts (Electrical Draw-Out Type)

(ii) Air Circuit Breaker Four Pole, 1000amp.,


Each 3934.00 134016.00 4327.00 134409.40
415volts (Electrical Draw-Out Type)

(iii) Air Circuit Breaker Four Pole, 1250amp.,


Each 4372.00 153565.00 4809.00 154002.20
415volts (Electrical Draw-Out Type)

(iv) Air Circuit Breaker Four Pole, 1600amp.,


Each 4809.00 164768.00 5290.00 165248.90
415volts (Electrical Draw-Out Type)

(v) Air Circuit Breaker Four Pole, 2000amp.,


Each 5246.00 192592.00 5771.00 193116.60
415volts (Electrical Draw-Out Type)

(vi) Air Circuit Breaker Four Pole, 2500amp.,


Each 5683.00 219723.00 6251.00 220291.30
415volts (Electrical Draw-Out Type)

(vii) Air Circuit Breaker Four Pole, 3200amp.,


Each 6120.00 275966.00 6732.00 276578.00
415volts (Electrical Draw-Out Type)

Chapter-34 Page 698 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.25 CABLE TRAY:

Supply and erection of MS perforated


cable tray (MS Sheet thickness 2mm)
with DA gray paint on the existing
surface with the help of MS angle iron
support (to be painted with approved
paint) of size 50mm x 50mm x 6mm thick
to be fixed with fastners/ nut & bolts etc.,
complete in all respect as desired by the
Engineer-in-charge and as per PWD
General Specifications:-

(i) Cable Tray Size 150mm x 50mm x 50mm


Metre 154.00 723.00 169.00 738.40
(2mm thick)

(ii) Cable Tray Size 300mm x 50mm x 50mm


Metre 195.00 987.00 215.00 1006.50
(2mm thick)

(iii) Cable Tray Size 450mm x 50mm x 50mm


Metre 268.00 1290.00 295.00 1316.80
(2mm thick)

34.26 AUTOMATIC VOLTAGE STABLIZER,


TIMER:

34.26 AUTOMATIC VOLTAGE STABLIZER:


A

Supply and erection of Single phase


copper wound Automatic voltage
stablizer of suitable capacity
electronically controlled circuit with
input voltage 140-260 volts single phase
AC supply and output voltage 220 ± 5%
volts single phase AC supply having
main silicon core copper wound step up
transformer with suitable nos. of turns
on primary side and secondary side the
transformer should be fully insulated
inside the MS sheet box of suitable size.
There should be power control relay and
single pole MCB (C-curve, 10kA) of
suitable capacity complete with internal
copper wiring along with amp. meter and
volt meter, high voltage cut off 280 volt
input (240 volt output) and 90 volt
maximum boost and overloading
protection to be provided:-

(i) Automatic Voltage Stablizer 2 KVA Each 118.00 3657.00 130.00 3668.80

(ii) Automatic Voltage Stablizer 3 KVA Each 118.00 4541.00 130.00 4552.80

Chapter-34 Page 699 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iii) Automatic Voltage Stablizer 4 KVA Each 118.00 5222.00 130.00 5233.80

(iv) Automatic Voltage Stablizer 5 KVA Each 198.00 5981.00 218.00 6000.80

(v) Automatic Voltage Stablizer 7.5 KVA Each 395.00 8900.00 435.00 8939.50

(vi) Automatic Voltage Stablizer 10 KVA Each 592.00 10458.00 651.00 10517.20

34.26 TIMER:
B

(i) S/E of Microprocessor Based Street


Light Controller with digital time switch
daily programmed with stand by lithium
battery with back up of 6 years with min.
time between 2 switching operations is 1
minute, three pole power contactors 40A.
with coil voltage 220-230V AC with 1 no.
aux. contact NO, MCB 2 pole 40amp. (C-
Curve, 10kA) & power wiring with single
core PVC insulated FR cable 10 sq. mm
and control wiring with PVC insulated FR
cable 1 sq. mm, 1 no. two position
selector switch to bypass timer and
other accessories & petty material (din
rail, 4 pole bakelite terminal strip 63A/
440V AC, required nut bolts) should be
fixed on bakelite sheet 6mm thick to be
mounted in a IP54 surface/ flush
mounting powder coated sheet metal
(1.60mm thick) cabinet having size
450mm x 600mm x 150mm to switch ‘ON’
all the 3 phases & switch ‘OFF’ 3 phases
pre-fixed timings complete in all respect
as per satisfaction of Engineer-in-
charge:-

(a) Street Light Controller (For Three Single


Phase Circuits) with 3 Nos. Three Pole
Power Contactors 40A, 1 no. aux. contactor
6 amp. (2NO+2NC) with coil voltage 220V
Each 592.00 14581.00 651.00 14640.20
AC, 3 Nos. MCB 2 Pole 40amp. (C-
Curve,10kA) & petty material (Din rail, 2
Nos. 4 pole bakelite terminal strip 63A/
440V AC, required nut bolts)

(b) Street Light Controller (For Single Phase


Circuit) with 1 No. Three Pole Power
Contactor 40A, 1 No. MCB 2 Pole 40amp.
Each 391.00 8917.00 430.00 8956.10
(C-Curve,10kA) & petty material (Din rail, 1
No. 4 pole bakelite terminal strip 63A/ 440V
AC, required nut bolts)

Chapter-34 Page 700 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.27 PAINTING INCLUDING LABOUR AND
MATERIAL:

(i) Painting of Ceiling fan complete with blades,


canopy and suspension rod with two coats Each 40.00 130.00 44.00 134.00
of approved paint (With brush).

(ii) Painting of Steel tubular pole with


brackets with two coats of aluminium
paint (With brush):-

(a) Overall Length 7 Metre Each 76.00 205.00 84.00 212.60

(b) Overall Length 8 Metre Each 87.00 236.00 96.00 244.70

(c) Overall Length 8.5 to 9 Metre Each 102.00 257.00 112.00 267.20

(d) Overall Length 9.5 to 10 Metre Each 125.00 300.00 138.00 312.50

34.27 (iii) Painting of Galvanized iron pipe pole


including bracket with two coats of
aluminium paint (With brush):-

(a) Overall Length 4 Metre Each 45.00 97.00 50.00 101.50

(b) Overall Length 6.1 Metre Each 63.00 160.00 69.00 166.30

34.27 (iv) Painting of G.I./ Conduit pipes with two


coats of approved paint (With brush)
including cleaning the surface etc.:-

(a) Painting of G.I. Pipe 15mm and Conduit


Metre 6.00 10.00 7.00 10.60
Pipe 20mm dia.

(b) Painting of G.I. Pipe 20mm and Conduit


Metre 6.00 11.00 7.00 11.60
Pipe 25mm dia.

(c) Painting of G.I. Pipe 25mm and Conduit


Metre 6.00 12.00 7.00 12.60
Pipe 32mm dia.

(d) Painting of G.I. Pipe 32mm and Conduit


Metre 8.00 17.00 9.00 17.80
Pipe 40mm dia.

(e) Painting of G.I. Pipe 40mm and Conduit


Metre 8.00 19.00 9.00 19.80
Pipe 50mm dia.

(f) Painting of G.I. Pipe 50mm dia. Metre 11.00 24.00 12.00 25.10

(g) Painting of G.I. Pipe 65mm dia. Metre 11.00 28.00 12.00 29.10

(h) Painting of G.I. Pipe 80mm dia. Metre 14.00 33.00 15.00 34.40

(i) Painting of G.I. Pipe 100mm dia. Metre 14.00 36.00 15.00 37.40

Chapter-34 Page 701 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.28 ERECTION, REPAIR AND REWINDING OF
FANS:

34.28 ERECTION OF FANS:


A
(i) Erection of Ceiling/ Cabin/ Exhaust fan
having connection with PVC insulated
PVC sheathed two single core copper
conductor (FR) cable 0.75sq.mm
complete:-

(a) Erection of Ceiling fan Each 59.00 78.00 65.00 83.90

(b) Erection of Cabin fan on the wall Each 47.00 61.00 52.00 65.70

(c) Erection of Exhaust fan with louver shutter


Each 118.00 234.00 130.00 245.80
on the wall/ window grill

34.28 (ii) Erection of light fixtures on wall/ ceiling


A having connection with PVC insulated
PVC sheathed two single core copper
conductor (FR) cable 0.75sq.mm
complete:-

(a) Erection of 1X20/28/36/40W Box Type


(LED/ Fluorescent) light fixture Each 59.00 80.00 65.00 85.90

(b) Erection of 1X28/36/40W and 2X28/36/40W


Mirror optics (LED/ Fluorescent) light fixture Each 79.00 104.00 87.00 111.90

34.28 REPAIR AND REWINDING OF CEILING/


B EXHAUST FANS:

Providing Full stator rewinding of a


Ceiling fan/ Exhaust fan (Capacitor type)
with super enamelled copper wire
including cleaning & insulating the stator
slots, sleeving, soldering, wrapping of
cotton tape, varnishing, re-assembling &
testing etc., complete:-

(i) Rewinding of Ceiling Fan 900mm Sweep Each 296.00 473.00 326.00 502.60

(ii) Rewinding of Ceiling Fan 1200mm Sweep Each 296.00 524.00 326.00 553.60

(iii) Rewinding of Ceiling Fan 1400mm Sweep Each 296.00 573.00 326.00 602.60

(iv) Rewinding of Exhaust Fan 300mm Sweep


Each 296.00 476.00 326.00 505.60

Chapter-34 Page 702 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(v) Rewinding of Exhaust Fan 380mm Sweep
Each 391.00 670.00 430.00 709.10

(vi) Rewinding of Exhaust Fan 450mm Sweep


Each 592.00 922.00 651.00 981.20

34.29 GI PIPE POLES & BRACKETS:

34.29 GI PIPE POLES:


A

Supply and erection of G.I. pipe ‘A’


quality of suitable length and dia.
confirming to IS:1239 (Part-I) 1979,
including fixing up to a given depth
below G/L, the hole of excavation about
30cm dia. and given depth to be filled in
up to 15cm below G/L with 1:2:4 cement
concrete including painting of pole with
two coats of approved aluminium paint
as required:-

(i) G.I. Pipe Pole 4 metre Long, Dia. 65mm,


Planting Depth 80cm with Pit Depth 95cm. Each 742.00 2759.00 816.00 2833.20

(ii) G.I. Pipe Pole 6.1 metre Long, Dia. 80mm,


Planting Depth 120cm with Pit Depth Each 892.00 4426.00 981.00 4515.20
135cm.

(iii) G.I. Pipe Pole 6.1 metre Long, Dia. 100mm,


Planting Depth 120cm with Pit Depth Each 892.00 5799.00 981.00 5888.20
135cm.

34.29 SINGLE ARM BRACKETS FOR GI PIPE


B POLE:

(i) Supply and erection of G.I. Pipe 40mm


dia. (A-class) Single arm bracket of
suitable length give a total overhang at a
tentative angle of 100/105º, the bracket
should be fixed on the top of the GI pipe
pole having top outer dia. 80mm/100mm
with GI reducer of suitable size with two
coats of an approved aluminium paint
complete in all respect as approved by
the Engineer-in-charge at site:-

(a) Single Arm Bracket 1 metre Long with G.I.


Each 110.00 887.00 121.00 898.00
Reducer 80mm x 40mm

Chapter-34 Page 703 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(b) Single Arm Bracket 1.5 metre Long with G.I.
Each 110.00 1021.00 121.00 1032.00
Reducer 80mm x 40mm

(c) Single Arm Bracket 1 metre Long with G.I.


Each 110.00 913.00 121.00 924.00
Reducer 100mm x 40mm

(d) Single Arm Bracket 1.5 metre Long with G.I.


Each 110.00 1047.00 121.00 1058.00
Reducer 100mm x 40mm

34.29 (ii) Supply and erection of G.I. Pipe (A-


B Class) Single arm bracket of suitable
length to give a total overhang at a
tentative angle of 100/105º, the bracket
should be fixed on the existing surface/
wall with 2nos. MS flat clamp 25mm x
5mm, 30cm long and 4nos. fastner 10mm
x 75mm long with two coats of an
approved aluminium paint complete in
all respect as approved by the Engineer-
in-charge at site:-

(a) Single Arm Bracket 1 metre Long G.I. Pipe


Each 133.00 582.00 146.00 595.30
40mm Dia.

(b) Single Arm Bracket 1.5 metre Long G.I.


Each 133.00 723.00 146.00 736.30
Pipe 40mm Dia.

(c) Single Arm Bracket 2 metre Long G.I. Pipe


Each 133.00 858.00 146.00 871.30
40mm Dia.

(d) Single Arm Bracket 1 metre Long G.I. Pipe


Each 162.00 680.00 178.00 696.20
50mm Dia.

(e) Single Arm Bracket 1.5 metre Long G.I.


Each 162.00 855.00 178.00 871.20
Pipe 50mm Dia.

(f) Single Arm Bracket 2 metre Long G.I. Pipe


Each 162.00 1021.00 178.00 1037.20
50mm Dia.

Chapter-34 Page 704 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.29 SINGLE/ DOUBLE/ TRIPLE/ FOUR/ SIX
C ARMS BRACKET FOR STEEL TUBULAR
POLE:

(i) Supply and erection of G.I. Pipe 50mm


dia. (Medium) Single/ Double/ Triple arm
bracket of suitable length welded with
MS canopy 80mm inner dia., outer dia
89.5mm (Medium), 450mm long suitable
for 3 stepped steel tubular swaged and
welded pole with top outer section dia.
76.1mm. The MS canopy should have
3no. holes for fixing the bracket at the
top end of the pole with the help of 3Nos.
½" x 1½" size nut bolt fully threaded. The
bracket should have MS sheet (1.62mm
thick) ring of 89.5mm dia. for covering
the top end of the canopy. The MS
canopy and GI bracket should be welded
at tentative angle 105º (105 degree)
inclination with MS sheet 5mm thick
triangular in shape having dimensions
225/300/375mm x 150mm x 5mm thick
(225mm for 1.5m, 300mm for 2m &
375mm for 2.5m long bracket) with two
coats of an approved aluminium paint as
desired by Engineer-in-charge at site:-

(a) Single Arm Bracket 1 metre Long for Steel


Each 171.00 1429.00 188.00 1446.10
Tubular Pole (7 to 8m)

(b) Single Arm Bracket 1.5 metre Long for Steel


Each 171.00 1633.00 188.00 1650.10
Tubular Pole (7 to 8m)

(c) Single Arm Bracket 2 metre Long for Steel


Each 171.00 1869.00 188.00 1886.10
Tubular Pole (7 to 8m)

(d) Single Arm Bracket 2.5 metre Long for Steel


Each 171.00 2104.00 188.00 2121.10
Tubular Pole (7 to 8m)

(e) Double Arm Bracket 1 metre Long for Steel


Each 226.00 2278.00 249.00 2300.60
Tubular Pole (7 to 8m)

(f) Double Arm Bracket 1.5 metre Long for


Each 226.00 2684.00 249.00 2706.60
Steel Tubular Pole (7 to 8m)

(g) Double Arm Bracket 2 metre Long for Steel


Each 226.00 3155.00 249.00 3177.60
Tubular Pole (7 to 8m)

(h) Double Arm Bracket 2.5 metre Long for


Each 226.00 3626.00 249.00 3648.60
Steel Tubular Pole (7 to 8m)

Chapter-34 Page 705 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(i) Triple Arm Bracket 1 metre Long for Steel
Each 272.00 3118.00 299.00 3145.20
Tubular Pole (7 to 8m)

(j) Triple Arm Bracket 1.5 metre Long for Steel


Each 272.00 3726.00 299.00 3753.20
Tubular Pole (7 to 8m)

(k) Triple Arm Bracket 2 metre Long for Steel


Each 272.00 4432.00 299.00 4459.20
Tubular Pole (7 to 8m)

(l) Triple Arm Bracket 2.5 metre Long for Steel


Each 272.00 5138.00 299.00 5165.20
Tubular Pole (7 to 8m)

34.29 (ii) Supply and erection of G.I. Pipe 50mm


C dia. (Medium) Single/ Double/ Triple/
Four/ Six arm bracket of suitable length
welded with MS canopy 125mm inner
dia., outer dia 140.8mm (Medium),
450mm long suitable for 3 stepped steel
tubular swaged and welded pole with top
outer section dia. 114.3mm. The MS
canopy should have 3no. holes for fixing
the bracket at the top end of the pole
with the help of 3Nos. ½" x 1½" size nut
bolt fully threaded. The bracket should
have MS sheet (1.62mm thick) ring of
140.8mm dia. for covering the top end of
the canopy. The MS canopy and GI
bracket should be welded at tentative
angle 105º (105 degree) inclination with
MS sheet 5mm thick triangular in shape
having dimensions 225/300/375mm x
150mm x 5mm thick (225mm for 1.5m,
300mm for 2m & 375mm for 2.5m long
bracket) with two coats of an approved
aluminium paint as desired by Engineer-
in-charge at site:-

(a) Single Arm Bracket 1 metre Long for Steel


Each 171.00 1643.00 188.00 1660.10
Tubular Pole (8.5 to 11m)

(b) Single Arm Bracket 1.5 metre Long for Steel


Each 171.00 1848.00 188.00 1865.10
Tubular Pole (8.5 to 11m)

(c) Single Arm Bracket 2 metre Long for Steel


Each 171.00 2083.00 188.00 2100.10
Tubular Pole (8.5 to 11m)

(d) Single Arm Bracket 2.5 metre Long for Steel


Each 171.00 2319.00 188.00 2336.10
Tubular Pole (8.5 to 11m)

(e) Double Arm Bracket 1 metre Long for Steel


Each 226.00 2492.00 249.00 2514.60
Tubular Pole (8.5 to 11m)

(f) Double Arm Bracket 1.5 metre Long for


Each 226.00 2899.00 249.00 2921.60
Steel Tubular Pole (8.5 to 11m)

Chapter-34 Page 706 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(g) Double Arm Bracket 2 metre Long for Steel


Each 226.00 3369.00 249.00 3391.60
Tubular Pole (8.5 to 11m)

(h) Double Arm Bracket 2.5 metre Long for


Each 226.00 3840.00 249.00 3862.60
Steel Tubular Pole (8.5 to 11m)

(i) Triple Arm Bracket 1 metre Long for Steel


Each 272.00 3332.00 299.00 3359.20
Tubular Pole (8.5 to 11m)

(j) Triple Arm Bracket 1.5 metre Long for Steel


Each 272.00 3940.00 299.00 3967.20
Tubular Pole (8.5 to 11m)

(k) Triple Arm Bracket 2 metre Long for Steel


Each 272.00 4646.00 299.00 4673.20
Tubular Pole (8.5 to 11m)

(l) Triple Arm Bracket 2.5 metre Long for Steel


Each 272.00 5353.00 299.00 5380.20
Tubular Pole (8.5 to 11m)

(m) Four Arm Bracket 1 metre Long for Steel


Each 331.00 4185.00 364.00 4218.10
Tubular Pole (8.5 to 11m)

(n) Four Arm Bracket 1.5 metre Long for Steel


Each 331.00 4994.00 364.00 5027.10
Tubular Pole (8.5 to 11m)

(o) Four Arm Bracket 2 metre Long for Steel


Each 331.00 5936.00 364.00 5969.10
Tubular Pole (8.5 to 11m)

(p) Four Arm Bracket 2.5 metre Long for Steel


Each 331.00 6878.00 364.00 6911.10
Tubular Pole (8.5 to 11m)

(q) Six Arm Bracket 1 metre Long for Steel


Each 451.00 5560.00 496.00 5605.10
Tubular Pole (8.5 to 11m)

(r) Six Arm Bracket 1.5 metre Long for Steel


Each 451.00 6773.00 496.00 6818.10
Tubular Pole (8.5 to 11m)

(s) Six Arm Bracket 2 metre Long for Steel


Each 451.00 8186.00 496.00 8231.10
Tubular Pole (8.5 to 11m)

(t) Six Arm Bracket 2.5 metre Long for Steel


Each 451.00 9598.00 496.00 9643.10
Tubular Pole (8.5 to 11m)

Chapter-34 Page 707 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.29 (iii) Supply and erection of G.I. Pipe 50mm
C dia. (Medium) Single/ Double/ Triple/
Four/ Six arm bracket of suitable length
welded with MS canopy 179.7mm inner
dia., outer dia 193.7mm (Medium),
450mm long suitable for 3 stepped steel
tubular swaged and welded pole with top
outer section dia. 139.7 to 165.1mm. The
MS canopy should have 3no. holes for
fixing the bracket at the top end of the
pole with the help of 3Nos. ½" x 1½" size
nut bolt fully threaded. The bracket
should have MS sheet (1.62mm thick)
ring of 193.7 dia. for covering the top end
of the canopy. The MS canopy and GI
bracket should be welded at tentative
angle 105º (105 degree) inclination with
MS sheet 5mm thick triangular in shape
having dimensions 225/300/375mm x
150mm x 5mm thick (225mm for 1.5m,
300mm for 2m & 375mm for 2.5m long
bracket) with two coats of an approved
aluminium paint as desired by Engineer-
in-charge at site:-

(a) Single Arm Bracket 1 metre Long for Steel


Each 171.00 1813.00 188.00 1830.10
Tubular Pole (12 to 16m)

(b) Single Arm Bracket 1.5 metre Long for Steel


Each 171.00 2017.00 188.00 2034.10
Tubular Pole (12 to 16m)

(c) Single Arm Bracket 2 metre Long for Steel


Each 171.00 2252.00 188.00 2269.10
Tubular Pole (12 to 16m)

(d) Single Arm Bracket 2.5 metre Long for Steel


Each 171.00 2488.00 188.00 2505.10
Tubular Pole (12 to 16m)

(e) Double Arm Bracket 1 metre Long for Steel


Each 226.00 2662.00 249.00 2684.60
Tubular Pole (12 to 16m)

(f) Double Arm Bracket 1.5 metre Long for


Each 226.00 3068.00 249.00 3090.60
Steel Tubular Pole (12 to 16m)

(g) Double Arm Bracket 2 metre Long for Steel


Each 226.00 3539.00 249.00 3561.60
Tubular Pole (12 to 16m)

(h) Double Arm Bracket 2.5 metre Long for


Each 226.00 4009.00 249.00 4031.60
Steel Tubular Pole (12 to 16m)

(i) Triple Arm Bracket 1 metre Long for Steel


Each 272.00 3502.00 299.00 3529.20
Tubular Pole (12 to 16m)

(j) Triple Arm Bracket 1.5 metre Long for Steel


Each 272.00 4109.00 299.00 4136.20
Tubular Pole (12 to 16m)
Chapter-34 Page 708 CSR-2020
CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(k) Triple Arm Bracket 2 metre Long for Steel


Each 272.00 4815.00 299.00 4842.20
Tubular Pole (12 to 16m)

(l) Triple Arm Bracket 2.5 metre Long for Steel


Each 272.00 5522.00 299.00 5549.20
Tubular Pole (12 to 16m)

(m) Four Arm Bracket 1 metre Long for Steel


Each 331.00 4354.00 364.00 4387.10
Tubular Pole (12 to 16m)

(n) Four Arm Bracket 1.5 metre Long for Steel


Each 331.00 5164.00 364.00 5197.10
Tubular Pole (12 to 16m)

(o) Four Arm Bracket 2 metre Long for Steel


Each 331.00 6105.00 364.00 6138.10
Tubular Pole (12 to 16m)

(p) Four Arm Bracket 2.5 metre Long for Steel


Each 331.00 7047.00 364.00 7080.10
Tubular Pole (12 to 16m)
34.29 ROUND BRACKET OF 5' (5 FEET) DIA.:
C

(iv) Supply and erection of G.I. Pipe 50mm dia.


(Medium) Round bracket to make a ring of
5' (5 feet) dia. (1.52 metre long) with 3nos.
inclined member 3' (3 feet) long welded with
MS canopy 125mm inner dia., outer dia
140.8mm (medium), 450mm long suitable
for 3 stepped steel tubular swaged and
welded pole with top outer section dia.
114.3mm. The MS canopy should have 3no.
holes for fixing the bracket at the top end of
the pole with the help of 3Nos. ½" x 1½"
size nut bolt fully threaded. The bracket Each 649.00 6595.00 714.00 6659.90
should have MS sheet (1.62mm thick) ring
of 140.8mm dia. for covering the top end of
the canopy. The MS canopy and GI bracket
should be welded at an angel according to
the size of ring inclination with MS sheet
5mm thick triangular in shape having
dimensions 375mm x 150mm x 5mm thick
with two coats of an approved aluminium
paint as desired by Engineer-in-charge at
site.

Chapter-34 Page 709 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.29 (v) Supply and erection of G.I. Pipe 50mm dia.
C (Medium) Round bracket to make a ring of
5' (5 feet) dia. (1.52 metre long) with 3nos.
inclined member 3' (3 feet) long welded with
MS canopy 179.7mm inner dia., outer dia
193.7mm (medium), 450mm long suitable
for 3 stepped steel tubular swaged and
welded pole with top outer section dia. 139.7
to 165.1mm. The MS canopy should have
3no. holes for fixing the bracket at the top
end of the pole with the help of 3Nos. ½" x
1½" size nut bolt fully threaded. The bracket Each 649.00 6765.00 714.00 6829.90
should have MS sheet (1.62mm thick) ring
of 193.7mm dia. for covering the top end of
the canopy. The MS canopy and GI bracket
should be welded at an angel according to
the size of ring inclination with MS sheet
5mm thick triangular in shape having
dimensions 375mm x 150mm x 5mm thick
with two coats of an approved aluminium
paint as desired by Engineer-in-charge at
site.

34.29 Supply and erection of G.I. pipe along


D the pole fixed with 2Nos. MS flat clamp
of size 50mm x 6mm thick for protection
of under ground cables (upto 3 metre in
length):-

(i) Galvanized Iron Pipe 50mm dia. (A-class) Each 245.00 1268.00 270.00 1292.50

Chapter-34 Page 710 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.30 GALVANIZED STEEL OCTAGONAL
POLES FOR WIND VELOCITY OF 169
Km/ HOUR:

Supply and erection of Galvanized Steel


Octagonal Pole (Sheet thickness 3mm)
designed to withstand wind speed 169km/
hour of suitable length (Raw material
confiming to IS-5986 (FE-510), BSEN-10025S-
355J or ASTM-572A (GR-50)) and thickness of
galvanization (70mm thick) conforming to
IS:2629/ IS:2633/ IS:4759, BSEN-ISO-1461-
1991 OR ASTM-A123/A123M-02. The pole
shall be in single piece hot dip galvanized
and shall be tapered towards the top. The
bottom section shall have openable slot with
exterior surface door & shall have suitable
locking arrangement for housing three
phase 4wire cable connection, bakelite sheet,
MCB, loop in and out arrangement for
incoming/ outgoing cables. There shall be
suitable arrangement for earthing. Rigid Base
plate of suitable size and thickness shall be
welded inside and outside at the bottom of
pole with provision for fixing 4 foundation
bolts. The octagonal pole shall be bolted on a
pre- cast foundation with a set of four
foundation bolts for greater rigidity. The
foundation shall be erected over cement
concrete M20 with steel of given size as per
design of original pole manufacturer to fixed
up to a required planting depth below ground
level as required:-

(i) Galvanized Octagonal Pole Overall Length 4


metre, Top dia.(A/F) 70mm & Bottom dia.
(A/F) 130mm, Foundation size below G/L
550mm x 550mm x 900mm, 4Nos.
Foundation Bolts size 16mm dia., Each 814.00 11265.00 895.00 11346.40
Length≥450mm with Base Plate Dimensions
200mm x 200mm x 12mm Thick

(ii) Galvanized Octagonal Pole Overall Length 5


metre (Sheet thickness 3mm), Top dia.(A/F)
70mm and Bottom dia. (A/F) 130mm,
Foundation size below G/L 550mm x
550mm x 1200mm, 4Nos. Foundation Bolts Each 910.00 13430.00 1001.00 13521.00
size 16mm dia., Length≥600mm with Base
Plate Dimensions 200mm x 200mm x
12mm Thick

Chapter-34 Page 711 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iii) Galvanized Octagonal Pole Overall Length 6


metre (Sheet thickness 3mm), Top dia.(A/F)
70mm and bottom dia. (A/F) 130mm,
Foundation size below G/L 550mm x
550mm x 1200mm, 4Nos. Foundation Bolts Each 910.00 15500.00 1001.00 15591.00
size 20mm dia., Length≥600mm with Base
Plate Dimensions 220mm x 220mm x
12mm Thick

(iv) Galvanized Octagonal Pole Overall Length 7


metre (Sheet thickness 3mm), Top dia.(A/F)
70mm and bottom dia. (A/F) 130mm,
Foundation size below G/L 550mm x
550mm x 1400mm, 4Nos. Foundation Bolts Each 1232.00 18050.00 1355.00 18173.20
size 20mm dia., Length≥700mm with Base
Plate Dimensions 240mm x 240mm x
16mm Thick

(v) Galvanized Octagonal Pole Overall Length 8


metre (Sheet thickness 3mm), Top dia.(A/F)
70mm and bottom dia. (A/F) 135mm,
Foundation size below G/L 550mm x
550mm x 1500mm, 4Nos. Foundation Bolts Each 1232.00 19863.00 1355.00 19986.20
size 20mm dia., Length≥750mm with Base
Plate Dimensions 240mm x 240mm x
16mm Thick

(vi) Galvanized Octagonal Pole Overall Length 9


metre (Sheet thickness 3mm), Top dia.(A/F)
70mm and bottom dia. (A/F) 155mm,
Foundation size below G/L 600mm x
600mm x 1700mm, 4Nos. Foundation Bolts Each 1615.00 24546.00 1777.00 24707.50
size 24mm dia., Length≥750mm with Base
Plate Dimensions 275mm x 275mm x
16mm Thick

(vii) Galvanized Octagonal Pole Overall Length


10 metre (Sheet thickness 3mm), Top
dia.(A/F) 70mm and bottom dia. (A/F)
175mm, Foundation size below G/L 600mm
x 600mm x 1800mm, 4Nos. Foundation Each 1615.00 26586.00 1777.00 26747.50
Bolts size 24mm dia., Length≥750mm with
Base Plate Dimensions 275mm x 275mm x
16mm Thick

Chapter-34 Page 712 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(viii) Galvanized Octagonal Pole Overall Length
11 metre (Sheet thickness 3mm), Top
dia.(A/F) 90mm and bottom dia. (A/F)
210mm, Foundation size below G/L 600mm
x 600mm x 2000mm, 4Nos. Foundation Each 2180.00 31408.00 2398.00 31626.00
Bolts size 24mm dia., Length≥750mm with
Base Plate Dimensions 300mm x 300mm x
20mm Thick

(ix) Galvanized Octagonal Pole Overall Length


12 metre (Sheet thickness 3mm), Top
dia.(A/F) 90mm and bottom dia. (A/F)
240mm, Foundation size below G/L 650mm
x 650mm x 2200mm, 4Nos. Foundation Each 2180.00 40347.00 2398.00 40565.00
Bolts size 24mm dia., Length≥850mm with
Base Plate Dimensions 320mm x 320mm x
20mm Thick

34.30 GALVANIZED OCTAGONAL POLE


BRACKETS:

SINGLE/ DOUBLE ARM BRACKETS:

(x) Supply and erection of bracket for


galvanized octagonal pole, the bracket
should be fixed on the top of the pole
having top outer dia. 70mm to 90mm
(A/F) complete in all respect as approved
by the Engineer-in-charge at site:-

(a) Single arm bracket 0.5 metre long for


Each 118.00 1272.00 130.00 1283.80
galvanized octagonal pole

(b) Single arm bracket 1 metre long for


Each 118.00 1490.00 130.00 1501.80
galvanized octagonal pole

(c) Single arm bracket 1.5 metre long for


Each 148.00 2063.00 163.00 2077.80
galvanized octagonal pole

(d) Single arm bracket 2 metre long for


Each 148.00 2423.00 163.00 2437.80
galvanized octagonal pole

(e) Double arm bracket 0.5 metre long for


Each 148.00 1703.00 163.00 1717.80
galvanized octagonal pole

(f) Double arm bracket 1 metre long for


Each 148.00 2285.00 163.00 2299.80
galvanized octagonal pole

(g) Double arm bracket 1.5 metre long for


Each 169.00 2306.00 186.00 2322.90
galvanized octagonal pole

Chapter-34 Page 713 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(h) Double arm bracket 2 metre long for
Each 169.00 3930.00 186.00 3946.90
galvanized octagonal pole

34.31 3-STEPPED STEEL TUBULAR POLE:

Supply and erection of 3-Stepped steel


tubular swaged and welded pole (410-SP-
Mpa) of suitable length confirming to
IS: 2713- (PART-II)-1980 (Steel tubes
confirming to IS: 1161-1979, UTS 42 kgf/
Sq.mm) to fix up to a required planting
depth below ground level in a hole of
excavation about 45 cm dia. and
suitable depth to fill up to 15 cm below
G/L with 1:2:4 cement concrete mixture
including painting of pole with two coats
of approved aluminium paint as
required:-
(i) Overall length 7 metre, with planting depth
1.25 metre, length of sections 4 metre, 1.5
metre and 1.5 metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 114.3mm x 4.5mm, 88.9mm x
4.05mm and 76.1mm x 3.25mm (Bottom, Each 931.00 6741.00 1024.00 6834.10
Middle and Top respectively) with
approximate weight 73 kg. (410 SP-2) and
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.
(ii) Overall length 7.5 metre, with planting
depth 1.25 metre, length of sections 4.5
metre, 1.5 metre and 1.5 metre (Bottom,
Middle and Top respectively), Outer dia and
thickness of sections 114.3mm x 4.5mm,
88.9mm x 4.05mm and 76.1mm x 3.25mm Each 931.00 7138.00 1024.00 7231.10
(Bottom, Middle and Top respectively) with
approximate weight 79 kg. (410 SP-5) base
Plate weight 7.5 kg. of size 12mm thick
about 30 cm dia.

(iii) Overall length 8 metre, with planting depth


1.5 metre, length of sections 4.5 metre, 1.75
metre and 1.75 metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 139.7mm x 4.5mm, 114.3mm x
3.65mm and 88.9mm x 3.25mm (Bottom, Each 931.00 8666.00 1024.00 8759.10
Middle and Top respectively) with
approximate weight 101 kg. (410 SP-13)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

Chapter-34 Page 714 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iv) Overall length 8 metre, with planting depth
1.5 metre, length of sections 4.5 metre, 1.75
metre and 1.75 metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 139.7mm x 5.4mm, 114.3mm x
4.5mm and 88.9mm x 3.25mm (Bottom, Each 931.00 9832.00 1024.00 9925.10
Middle and Top respectively) with
approximate weight 119 kg. (410 SP-15)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(v) Overall length 8.5 metre, with planting


depth 1.5 metre, length of sections 5 metre,
1.75 metre and 1.75 metre (Bottom, Middle
and Top respectively), Outer dia and
thickness of sections 165.1mm x 4.50mm,
139.7mm x 4.5mm , 114.3mm x 3.65mm Each 1181.00 11489.00 1299.00 11607.10
(Bottom, Middle and Top respectively) with
approximate weight 141 kg. (410 SP-22)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(vi) Overall length 9 metre, with planting depth


1.5 metre, length of sections 5 metre, 2
metre and 2metre (Bottom, Middle and Top
respectively), Outer dia and thickness of
sections 114.3mm x 5.4mm, 88.9mm x
4.85mm and 76.1mm x 3.25mm (Bottom, Each 1181.00 9409.00 1299.00 9527.10
Middle and Top respectively) with
approximate weight 108 kg. (410 SP-27)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(vii) Overall length 9 metre, with planting depth


1.5 metre, length of sections 5 metre, 2
metre and 2metre (Bottom, Middle and Top
respectively), Outer dia and thickness of
sections 165.1mm x 4.85mm, 139.7mm x
4.5mm and 114.3mm x 3.65mm (Bottom, Each 1181.00 12339.00 1299.00 12457.10
Middle and Top respectively) with
approximate weight 154 kg. (410 SP-32)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

Chapter-34 Page 715 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 34 5 6 7
(viii) Overall length 9.5 metre, with planting
depth 1.8 metre, length of sections 5 metre,
2.25 metre and 2.25 metre (Bottom, Middle
and Top respectively), Outer dia and
thickness of sections 165.1mm x 4.85mm,
139.7mm x 4.5mm and 114.3mm x 3.65mm Each 1181.00 12736.00 1299.00 12854.10
(Bottom, Middle and Top respectively) with
approximate weight 160 kg. (410 SP-38)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(ix) Overall length 10 metre, with planting depth


1.8 metre, length of sections 5.20 metre, 2.4
metre and 2.4metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 165.1mm x 4.85mm, 139.7mm x
4.5mm and 114.3mm x 3.65mm (Bottom, Each 1181.00 13397.00 1299.00 13515.10
Middle and Top respectively) with
approximate weight 168 kg. (410 SP-44)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(x) Overall length 11 metre, with planting depth


1.8 metre, length of sections 5.6 metre, 2.7
metre and 2.7metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 165.1mm x 5.4mm, 139.7mm x
4.5mm and 114.3mm x 3.65mm (Bottom, Each 1181.00 15098.00 1299.00 15216.10
Middle and Top respectively) with
approximate weight 194 kg. (410 SP-54)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(xi) Overall length 12 metre, with planting depth


2 metre, length of sections 5.8 metre, 3.1
metre and 3.1metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 193.7mm x 5.4mm, 165.1mm x
4.5mm and 139.7mm x 4.5mm (Bottom, Each 1369.00 19558.00 1506.00 19694.90
Middle and Top respectively) with
approximate weight 259 kg. (410 SP-62)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

Chapter-34 Page 716 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xii) Overall length 13 metre, with planting depth
2 metre, length of sections 5.8 metre, 3.6
metre and 3.6metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 219.1mm x 5.6mm, 193.7mm x
4.85mm and 165.1mm x 4.5mm (Bottom, Each 1557.00 24508.00 1713.00 24663.70
Middle and Top respectively) with
approximate weight 333 kg. (410 SP-71)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

(xiii) Overall length 16 metre, with planting depth


2.3 metre, length of sections 7 metre, 4.5
metre and 4.5metre (Bottom, Middle and
Top respectively), Outer dia and thickness
of sections 219.1mm x 5.6mm, 193.7mm x
4.85mm and 165.1mm x 4.50mm (Bottom, Each 1745.00 29410.00 1920.00 29584.50
Middle and Top respectively) with
approximate weight 403 kg. (410 SP-79)
base Plate weight 7.5 kg. of size 12mm
thick about 30 cm dia.

34.32 PCC POLES:

Supply and erection of pre-stressed


cement concrete pole of suitable length
with a given planting depth confirming to
IS-1678/ 1960/1978 below ground level in
excavated pit of suitable dimensions
complete in all respect as approved by
Engineer-in-charge at site:-

(i) PCC Pole Overall Length 8 metre, Planting


Each 950.00 3282.00 1045.00 3377.00
depth 1.5 metre, W/L 200 kg.

(ii) PCC Pole Overall Length 9 metre, Planting


Each 1136.00 3702.00 1250.00 3815.60
depth 1.5 metre, W/L 200 kg.

(iii) PCC Pole Overall Length 11 metre, Planting


Each 1322.00 7463.00 1454.00 7595.20
depth 1.80 metre, W/L 400 kg

34.33 LAYING OF UNDER GROUND CABLES,


DISMANTALLING & ERECTION OF
POLES AND CEMENT CONCRETE
MUFFS:

(i) Laying of under ground cable to be laid 1


metre below ground level including
excavation, sand cushioning, covering with Metre 93.00 238.00 102.00 247.30
sand & First class bricks and back filling the
trench etc.

Chapter-34 Page 717 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(ii) Labour for dismantling G.I. pipe pole upto
Each 437.00 437.00 481.00 480.70
length 6.1 m.

(iii) Labour for dismantling 3-stepped steel


Each 1439.00 1439.00 1583.00 1582.90
tubular pole upto 16m.

34.33 (iv) Erection of G.I. Pipe/ 3-Stepped Steel


tubular pole in suitable planting depth
below ground level in a hole of
excavation and suitable depth to filled in
up to 15 cm below G/L with 1:2:4 cement
concrete mixture but excluding cost of
pole including two coats of approved
aluminium paint etc:-

(a) Erection of G.I. pipe pole upto 6 m length


(hole of excavation about 30 cm dia.) Each 386.00 825.00 425.00 863.60

(b) Erection of 3-stepped steel tubular pole upto


10 m length (hole of excavation about 45 Each 575.00 1643.00 633.00 1700.50
cm dia.)

34.33 CEMENT CONCRETE MUFFS:

(v) Making of cement concrete muff of


overall size 450mmdia., suitable length
(15cm below ground level) with 1:2:4
cement concrete mixture. The muff is to
be made around the steel tubular pole/
GI pipe pole. The outer surface of the
muff shall be finished with 1:2 cement
plaster with two coats of white
snowcem complete in all respect as
approved and desired by the Engineer in-
Charge at site:-

(a) Cement Concrete Muff of Overall Size


Each 146.00 381.00 161.00 395.60
450mm dia., 45cm long

(b) Cement Concrete Muff of Overall Size


Each 175.00 501.00 193.00 518.50
450mm dia., 60cm long

(c) Cement Concrete Muff of Overall Size


Each 219.00 653.00 241.00 674.90
600mm dia., 60cm long

Chapter-34 Page 718 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.33 (vi) Making of Cement Concrete muff of
suitable size and length with 1:2:4
cement concrete mixture. The muff is to
be made around the steel tubular pole
sufficient to completely flush a SMC
Junction Box (Glass Fibre reinforced
polyester sheet moulding compound)
confirming to IS:14772, inner dimensions
250mm x 200mm x 100mm with ± 10%
tolerance in size & hinged water tight
cover with locking arrangement having
1No. terminal strip with 4Nos. terminals
& 1No. Single pole MCB of required
capacity fixed on din bar (Din Bar
Provision for 2Nos. MCB's). The SMC
junction box is to be fixed with the pole
by a MS flat clamp of size 20mm x 2mm
thick. PVC pipe 40mm dia. (2No.x0.60m)
should be provided for incoming and
outgoing cables. The outer surface of the
muff shall be finished with pure cement
& two coats of white snowcem complete
in all respect as approved and desired
by the Engineer In-Charge at site:-

(a) Cement Concrete Muff of Overall Size


450mm dia., 80cm Long with making an
extra collar (If pole installed in Centre verge/
Footpath) will be provided with 1:2:4 cement
Sand & concrete mixture around the Steel Each 291.00 1984.00 320.00 2013.10
tubular pole. The size of collar (height is
40cm & dia. is 45cm including pole dia i.e.
168.3mm)

(b) Cement Concrete Muff of Overall Size


450mm dia., 80cm Long Each 219.00 1662.00 241.00 1683.90

(c) Cement Concrete Muff of Overall Size


600mm dia., 80cm Long with making an
extra collar (If pole installed in Centre verge/
Footpath) will be provided with 1:2:4 cement
Sand & concrete mixture around the Steel Each 350.00 2278.00 385.00 2313.00
tubular pole. The size of collar (height is
40cm & dia. is 60cm including pole dia i.e.
168.3mm)

(d) Cement Concrete Muff of Overall Size


600mm dia., 80cm Long Each 292.00 2095.00 321.00 2124.20

Chapter-34 Page 719 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.33 (vii) Supply and erection of SMC Junction
Box (Glass Fibre reinforced polyester
sheet moulding compound) confirm to
IS:14772 (Recessed/ On surface),
robustly constructed, safe & shock
proof, rust & tamper proof of suitable
inner & outer dimensions with ± 10%
tolerance in size & hinged water tight
cover with locking arrangement having
1No. terminal strip with 4Nos. terminals
& 1No. Single pole MCB of required
capacity fixed on din bar (Din Bar
Provision for 2Nos. MCB's) complete in
all respect as approved and desired by
the Engineer In-Charge at site:-

(a) SMC Junction Box (Glass Fibre reinforced


polyester sheet moulding compound)
confirm to IS:14772, inner dimensions Each 118.00 724.00 130.00 735.80
140mm x 140mm x 95mm with hinged
water tight cover with locking arrangement

(b) SMC Junction Box (Glass Fibre reinforced


polyester sheet moulding compound)
confirm to IS:14772, inner dimensions
200mm x 140mm x 95mm with hinged Each 118.00 804.00 130.00 815.80
water tight cover with locking arrangement

(c) SMC Junction Box (Glass Fibre reinforced


polyester sheet moulding compound)
confirm to IS:14772, inner dimensions
250mm x 200mm x 100mm with hinged Each 148.00 1091.00 163.00 1105.80
water tight cover with locking arrangement

Chapter-34 Page 720 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.33 SMC GLASS FIBRE INSPECTION
BOXES:

(viii) Supply and erection of SMC Junction


Box (Glass Fibre reinforced polyester
sheet moulding compound) confirming
to IS:14772, (Recessed/ On surface),
robustly constructed, safe & shock
proof, rust & tamper proof of suitable
inner & outer dimensions with ± 10%
tolerance in size & hinged water tight
cover with locking arrangement
complete in all respect as approved and
desired by the Engineer In-Charge at
site:-

(a) SMC Junction Box (Glass Fibre reinforced


polyester sheet moulding compound)
confirm to IS:14772, inner dimensions
300mm x 200mm x 105mm with hinged Each 197.00 1045.00 217.00 1064.70
water tight cover with locking arrangement

(b) SMC Junction Box (Glass Fibre reinforced


polyester sheet moulding compound)
confirm to IS:14772, inner dimensions
380mm x 225mm x 140mm with hinged Each 197.00 1510.00 217.00 1529.70
water tight cover with locking arrangement

34.34 OVER HEAD DISTRIBUTION ALUMINIUM


CABLES, ACSR CONDUCTORS,
CLAMPS, JUMPERS & JOINT KITS:

(i) Wiring over-head line in PVC insulated &


PVC sheathed two single core aluminium
conductor cable overall 1100 volts grade
binding with G.I. wire 2mm dia. (14 SWG)
with brass/ aluminium link clips
complete in all respect as approved and
desired by the Engineer In-Charge at
site.

(a) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 4mm² Metre 8.00 28.00 9.00 28.80
(1/1.40mm) Twin Core

(b) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 6mm² Metre 8.00 33.00 9.00 33.80
(1/1.40mm) Twin Core

Chapter-34 Page 721 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(c) PVC insulated & PVC sheathed aluminium
conductor cable Overall Size 10mm² Metre 11.00 45.00 12.00 46.10
(1/1.40mm) Twin Core

(d) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 16mm² Metre 11.00 68.00 12.00 69.10
(1/1.40mm) Twin Core

34.34 (ii) Wiring over-head line in PVC insulated &


PVC sheathed two single core aluminium
conductor cable overall 1100 volts grade
complete in all respect as approved and
desired by the Engineer In-Charge at
site.

(a) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 4mm² Metre 6.00 22.00 7.00 22.60
(1/1.40mm) Twin Core

(b) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 6mm² Metre 6.00 27.00 7.00 27.60
(1/1.40mm) Twin Core

(c) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 10mm² Metre 8.00 38.00 9.00 38.80
(1/1.40mm) Twin Core

(d) PVC insulated & PVC sheathed aluminium


conductor cable Overall Size 16mm² Metre 8.00 61.00 9.00 61.80
(1/1.40mm) Twin Core

34.34 DIE CAST ALUMINIUM CLAMPS (T-LINE):

(iii) Supply & erection of Die-cast aluminium


clamp for making T-Line end terminal/
ends including cost of nuts & bolts etc.
complete in all respect as approved by
the Engineer-in-Charge:-

(a) Dead end clamps of die-cast aluminium size


Each 118.00 339.00 130.00 350.80
20-100sq. mm

(b) PG die-cast aluminium clamp suitable for


Each 118.00 181.00 130.00 192.80
ACSR conductor size 30-50sq. mm

(c) PG di-cast aluminium clamp suitable for


Each 118.00 222.00 130.00 233.80
ACSR conductor size 80-100sq. mm

Chapter-34 Page 722 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.34 JUMPERS FOR OVERHAED LINES:

(iv) Supply & erection of PVC insulated PVC


sheathed aluminium conductor single
core cable for providing jumpering
arrangement on overhead lines:-

(a) Overall Size 50sq. mm (Aluminium Jumper)


Metre 59.00 121.00 65.00 126.90

(b) Overall Size 70sq. mm (Aluminium Jumper)


Metre 59.00 141.00 65.00 146.90

(c) Overall Size 120sq. mm (Aluminium


Metre 59.00 199.00 65.00 204.90
Jumper)

34.34 (v) Supply stringing and sagging of


aluminium conductor steel reinforced
(ACSR) on poles including binding with
insulators using aluminium wires
complete as desired by the Engineer in
charge of the site:-

(a) ACSR-WEASEL conductor (30 sq. mm)


Metre 7.00 32.00 8.00 32.70
Size (6/2.55 Al.+1/2.55mm GI)

(b) ACSR-RABIT conductor (50 sq. mm)


Metre 10.00 52.00 11.00 53.00
Size (6/3.35 Al.+1/3.35mm GI)

(c) ACSR-RACOON conductor (80 sq. mm)


Metre 14.00 75.00 15.00 76.40
Size (6/4.09 Al.+1/4.09mm GI)

(d) ACSR-DOG conductor (100 sq. mm)


Metre 16.00 95.00 18.00 96.60
Size (6/4.55 Al.+1/4.55mm GI)

34.34 S/E of LT Cast Resin type/ Heat


A Shrinkable Termination Kit for Outdoor/
Indoor supply of 1.1 KV grade PVC/XLPE
cable as desired by the Engineer in
charge of the site:-

(i) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3 Core 16 sq. Each 148.00 410.00 163.00 424.80
mm - 25 sq. mm

(ii) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3 Core 35 sq. Each 148.00 445.00 163.00 459.80
mm - 70 sq. mm

(iii) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3 Core 95 sq. Each 296.00 617.00 326.00 646.60
mm - 185 sq. mm

Chapter-34 Page 723 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iv) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3 Core 240 Each 498.00 1000.00 548.00 1049.80
sq. mm - 300 sq. mm

(v) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3½/4 Core Each 148.00 445.00 163.00 459.80
25 sq. mm - 50 sq. mm

(vi) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3½/4 Core Each 296.00 617.00 326.00 646.60
70 sq. mm - 150 sq. mm

(vii) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3½/4 Core Each 296.00 731.00 326.00 760.60
185sq.mm

(viii) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3½/4 Core Each 496.00 998.00 546.00 1047.60
240sq.mm - 300sq.mm

(ix) Outdoor/Indoor Cast Resin Type


Termination Kit for Cable Size 3½/4 Core Each 496.00 1100.00 546.00 1149.60
400 sq. mm

(x) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 148.00 877.00 163.00 891.80
10-16sq.mm

(xi) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 148.00 1089.00 163.00 1103.80
25-50sq.mm

(xii) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 296.00 1303.00 326.00 1332.60
70-150sq.mm

(xiii) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 296.00 1626.00 326.00 1655.60
185sq.mm

(xiv) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 496.00 1867.00 546.00 1916.60
225-300sq.mm

(xv) Heat Shrinkable Outdoor/ Indoor End


Termination Kit for Cable Size 3½/4 Core Each 496.00 2188.00 546.00 2237.60
400-630sq.mm

Chapter-34 Page 724 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.34 S/E of LT Straight Through Joint Kit Cast
B Resin type for 1.1 KV grade PVC/XLPE
cable as desired by the Engineer in
charge of the site:-

(i) Straight Through Joint Kit Resin Cast type


for Cable Size 2 Core 16 sq. mm - 35 sq. Each 118.00 562.00 130.00 573.80
mm

(ii) Straight Through Joint Kit Resin Cast type


for Cable Size 2 Core 50 sq. mm - 70 sq. Each 118.00 614.00 130.00 625.80
mm

(iii) Straight Through Joint Kit Resin Cast type


for Cable Size 3 Core 16 sq. mm - 25 sq. Each 237.00 680.00 261.00 703.70
mm

(iv) Straight Through Joint Kit Resin Cast type


for Cable Size 3 Core 35 sq. mm - 50 sq. Each 237.00 733.00 261.00 756.70
mm

(v) Straight Through Joint Kit Resin Cast type


for Cable Size 3 Core 70 sq. mm Each 237.00 753.00 261.00 776.70

(vi) Straight Through Joint Kit Resin Cast type


Each 391.00 1097.00 430.00 1136.10
for Cable Size 3 Core 95 sq. mm

(vii) Straight Through Joint Kit Resin Cast type


for Cable Size 3 Core 120 sq. mm - 150 sq. Each 391.00 1169.00 430.00 1208.10
mm

(viii) Straight Through Joint Kit Resin Cast type


Each 391.00 1490.00 430.00 1529.10
for Cable Size 3 Core 185 sq. mm

(ix) Straight Through Joint Kit Resin Cast type


for Cable Size 3 Core 240 sq. mm Each 592.00 1928.00 651.00 1987.20

(x) Straight Through Joint Kit Resin Cast type


Each 592.00 2196.00 651.00 2255.20
for Cable Size 3 Core 300 sq. mm

(xi) Straight Through Joint Kit Resin Cast type


for Cable Size 3½ Core 25 sq. mm - 35 sq. Each 237.00 733.00 261.00 756.70
mm

(xii) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 50 sq. mm Each 237.00 753.00 261.00 776.70

(xiii) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 70 sq. mm Each 237.00 943.00 261.00 966.70

(xiv) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 95 sq. mm Each 391.00 1169.00 430.00 1208.10

Chapter-34 Page 725 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xv) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 120 sq. mm - 150 Each 391.00 1490.00 430.00 1529.10
sq. mm

(xvi) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 185 sq. mm Each 391.00 1572.00 430.00 1611.10

(xvii) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 240 sq. mm Each 592.00 2196.00 651.00 2255.20

(xviii) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 300 sq. mm Each 592.00 2459.00 651.00 2518.20

(xix) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 400 sq. mm Each 592.00 2966.00 651.00 3025.20

(xx) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 500 sq. mm Each 592.00 3368.00 651.00 3427.20

(xxi) Straight Through Joint Kit Resin Cast type


for Cable Size 3½/4 Core 630 sq. mm Each 592.00 3852.00 651.00 3911.20

34.35 OVER HEAD DISTRIBUTION


INSULATORS, STAY SETS & CRADLE
GUARDS:

INSULATORS:

(i) Supply and erection of insulators


confirming to IS-2544 & 5350 (Test
Certificates of CPRI) includes supply and
erection of nuts bolts and other
accessories whatsoever required at site
for fixing it to the structure pole. The job
is to be completed as approved by
Engineer-in-charge:-

(a) Egg/ Strain Insulator Each 59.00 111.00 65.00 116.90

(b) 11kV Pin Insulator with G.I. Pin Each 59.00 202.00 65.00 207.90

(c) 11kV Disc Insulator Each 118.00 591.00 130.00 602.80

(d) Shackle Insulator (Medium) Each 59.00 157.00 65.00 162.90

(e) 11kV Lightning Arrester with clamps of


Each 118.00 3359.00 130.00 3370.80
required size (With seprate earth)

Chapter-34 Page 726 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.35 STAY SETS:

(ii) Supply and erection of Stay Set


consisiting of 19/20mm dia.of suitable
length G.I. stay rod duly threaded upto
300mm at one end and shaped on the
other end. MS plate size 30cm x 30cm x
6mm with 20mm dia. hole drilled in the
centre of the plate G.I. stay wire size 7/10
SWG, G.I. thimble for stay binding,
Egg/Strain insulator, MS elbow made out
of 16mm plain sheet and a 20cm long
piece of 50mm x 50mm x 6mm angle iron
made to the shape as approved by
Engineer-in-charge. Stay set complete
shall be fixed to the pole by providing
suitable size full clamps made out 50mm
x 6mm size MS flat with required number
of nut and bolts 16mm dia. on one end
and shall be embedded on the other end.
The stay plate shall be covered with
cement concrete having total volume of
the concrete not less that 0.042Cum. The
job shall include excavation of pit and
back filling and after pouring concrete
with excavated soil etc. as
approved/desired by the the Engineer-in-
charge:-

(a) Stay Set consisiting of 19/20mm dia., 1.8


Each 592.00 2609.00 651.00 2668.20
metre Long G.I. Stay Rod

(b) Stay Set consisiting of 19/20mm dia., 2.4


Each 592.00 2953.00 651.00 3012.20
metre Long G.I. Stay Rod

34.35 CRADLE GUARD:

(iii) Supply & erection of cradle guard


suitable for overhead lines as required at
site as approved by Engineer-in-charge:-

(a) Cradle Guard for 2 Lines Overhead Line Each 47.00 69.00 52.00 73.70

(b) Cradle Guard for 4 Lines Overhead Line Each 47.00 72.00 52.00 76.70

Chapter-34 Page 727 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.36 XLPE INSULATED HT CABLES:

34.36 XLPE INSULATED HT ARMOURED


A CABLES (UNDERGROUND):

Supply & laying of Circular Aluminium


Conductor screened with extruded
semiconducting compound, XLPE
insulated, insulation screened with
extruded semiconducting combination in
combination with copper tape (0.3KA for
1sec.) cores laid up, FR PVC inner
sheathed, galvanized steel strip
armoured and overall FR PVC sheathed
cable confirming to IS:7098 (Part-2), 2011
working voltage 11KV(E) grade to be laid
1.50 meter below ground level including
excavation, sand cushioning, covering
with sand & First class bricks and back
filling the trench etc., of the required
size:-

(i) HT Cable Overall size 35sq.mm (3Core) Metre 124.00 743.00 136.00 755.40

(ii) HT Cable Overall size 50sq.mm (3Core) Metre 124.00 799.00 136.00 811.40

(iii) HT Cable Overall size 70sq.mm (3Core) Metre 133.00 899.00 146.00 912.30

(iv) HT Cable Overall size 95sq.mm (3Core) Metre 133.00 1005.00 146.00 1018.30

(v) HT Cable Overall size 120sq.mm (3Core) Metre 177.00 1154.00 195.00 1171.70

(vi) HT Cable Overall size 150sq.mm (3Core) Metre 177.00 1246.00 195.00 1263.70

(vii) HT Cable Overall size 185sq.mm (3Core) Metre 177.00 1390.00 195.00 1407.70

(viii) HT Cable Overall size 240sq.mm (3Core) Metre 196.00 1615.00 216.00 1634.60

(ix) HT Cable Overall size 300sq.mm (3Core) Metre 196.00 1816.00 216.00 1835.60

(x) HT Cable Overall size 400sq.mm (3Core) Metre 196.00 2183.00 216.00 2202.60

Chapter-34 Page 728 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.36 XLPE INSULATED HT ARMOURED
B CABLES (LOOSE):

Supply & laying of Circular Aluminium


Conductor screened with extruded
semiconducting compound, XLPE
insulated, insulation screened with
extruded semiconducting combination in
combination with copper tape (0.3KA for
1sec.) cores laid up, FR PVC inner
sheathed, galvanized steel strip
armoured and overall FR PVC sheathed
cable confirming to IS:7098 (Part-2), 2011
working voltage 11KV(E) grade to be
laid loose in the existing trench or pipe:-

(i) HT Cable Overall size 35sq.mm (3Core) Metre 15.00 445.00 17.00 446.50

(ii) HT Cable Overall size 50sq.mm (3Core) Metre 15.00 501.00 17.00 502.50

(iii) HT Cable Overall size 70sq.mm (3Core) Metre 23.00 601.00 25.00 603.30

(iv) HT Cable Overall size 95sq.mm (3Core) Metre 23.00 707.00 25.00 709.30

(v) HT Cable Overall size 120sq.mm (3Core) Metre 32.00 821.00 35.00 824.20

(vi) HT Cable Overall size 150sq.mm (3Core) Metre 32.00 913.00 35.00 916.20

(vii) HT Cable Overall size 185sq.mm (3Core) Metre 32.00 1057.00 35.00 1060.20

(viii) HT Cable Overall size 240sq.mm (3Core) Metre 40.00 1270.00 44.00 1274.00

(ix) HT Cable Overall size 300sq.mm (3Core) Metre 40.00 1472.00 44.00 1476.00

(x) HT Cable Overall size 400sq.mm (3Core) Metre 40.00 1838.00 44.00 1842.00

34.36 S/E of Heat shrinkable cable end


C termination/ Straight through joint kit for
11 KVA /6.6 KV (E) XLPE Cables as
approved & desired by Enginer in
charge:-

(i) Heat Shrinkable End Termination for cable


size 35 sq. mm, 3Core (Indoor Type) Each 148.00 1881.00 163.00 1895.80

(ii) Heat Shrinkable End Termination for cable


size 50-95 sq. mm, 3Core (Indoor Type) Each 296.00 2123.00 326.00 2152.60

(iii) Heat Shrinkable End Termination for cable


size 120-185 sq. mm, 3Core (Indoor Type) Each 296.00 2558.00 326.00 2587.60

Chapter-34 Page 729 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(iv) Heat Shrinkable End Termination for cable


size 240-400 sq. mm, 3Core (Indoor Type) Each 496.00 3143.00 546.00 3192.60

(v) Heat Shrinkable End Termination for cable


size 35 sq. mm, 3Core (Outdoor Type) Each 148.00 2219.00 163.00 2233.80

(vi) Heat Shrinkable End Termination for cable


size 50-95 sq. mm, 3Core (Outdoor Type) Each 296.00 2457.00 326.00 2486.60

(vii) Heat Shrinkable End Termination for cable


size 120-185 sq. mm, 3Core (Outdoor Type) Each 296.00 3115.00 326.00 3144.60

(viii) Heat Shrinkable End Termination for cable


size 240-400 sq. mm, 3Core (Outdoor Type) Each 496.00 3711.00 546.00 3760.60

(ix) Heat Shrinkable type Straight Through Joint


Kit for cable size 35 sq. mm, 3Core Each 237.00 6212.00 261.00 6235.70

(x) Heat Shrinkable type Straight Through Joint


Kit for cable size 50-95 sq. mm, 3Core Each 391.00 6927.00 430.00 6966.10

(xi) Heat Shrinkable type Straight Through Joint


Kit for cable size 120-185 sq. mm, 3Core Each 391.00 7524.00 430.00 7563.10

(xii) Heat Shrinkable type Straight Through Joint


Kit for cable size 240-400 sq. mm, 3Core Each 592.00 8757.00 651.00 8816.20

34.37 DOUBLE WALLED CORRUGATED (DWC)


HDPE PIPES:

34.37 Supply and erection of Double Walled


A Corrugated (DWC) HDPE pipe to be laid
1mtr. below ground level including
excavation placing the pipe in position
and back filling with excavated soil etc.
of the required size:-

(i) Double Walled Corrugated HDPE Pipe 50/


Metre 74.00 127.00 81.00 134.40
38mm (Outer/ Inner dia.)

(ii) Double Walled Corrugated HDPE Pipe 63/


Metre 74.00 148.00 81.00 155.40
51mm (Outer/ Inner dia.)

Chapter-34 Page 730 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iii) Double Walled Corrugated HDPE Pipe
Metre 74.00 189.00 81.00 196.40
90/76mm (Outer/ Inner dia.)

(iv) Double Walled Corrugated HDPE Pipe 120/


Metre 74.00 276.00 81.00 283.40
103.5mm (Outer/ Inner dia.)

(v) Double Walled Corrugated HDPE Pipe 160/


Metre 74.00 324.00 81.00 331.40
136mm (Outer/ Inner dia.)

(vi) Double Walled Corrugated HDPE Pipe 180/


Metre 74.00 405.00 81.00 412.40
152mm (Outer/ Inner dia.)

(vii) Double Walled Corrugated HDPE Pipe 200/


Metre 74.00 478.00 81.00 485.40
170mm (Outer/ Inner dia.)

34.37 Supply and erection of Double Walled


B Corrugated (DWC) HDPE pipe to be laid
1/2mtr. below ground level including
excavation placing the pipe in position
and back filling with excavated soil etc.
of the required size:-

(i) Double Walled Corrugated HDPE Pipe 50/


Metre 42.00 95.00 46.00 99.20
38mm (Outer/ Inner dia.)

(ii) Double Walled Corrugated HDPE Pipe 63/


Metre 42.00 116.00 46.00 120.20
51mm (Outer/ Inner dia.)

(iii) Double Walled Corrugated HDPE Pipe


Metre 42.00 157.00 46.00 161.20
90/76mm (Outer/ Inner dia.)

(iv) Double Walled Corrugated HDPE Pipe 120/


Metre 42.00 244.00 46.00 248.20
103.5mm (Outer/ Inner dia.)

(v) Double Walled Corrugated HDPE Pipe 160/


Metre 42.00 292.00 46.00 296.20
136mm (Outer/ Inner dia.)

(vi) Double Walled Corrugated HDPE Pipe 180/


Metre 42.00 373.00 46.00 377.20
152mm (Outer/ Inner dia.)

(vii) Double Walled Corrugated HDPE Pipe 200/


Metre 42.00 446.00 46.00 450.20
170mm (Outer/ Inner dia.)

Chapter-34 Page 731 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.38 SHEET METAL CUBICAL PEDESTAL,
TOWER STRUCTURES, HT & LT LINE
ITEMS, MS CHANNELS, BRASS
GLANDS, ALUMINIUM & COPPER
THIMBLES:

CUBICAL PEDESTAL:

(i) Supply and erection of Sheet metal cubical


pedestal made from 50mmx50mmx6mm thick
MS angle iron frame with 5 sides welded &
covered with MS sheet 2mm thick & front
side hinged with 4" hinges & locking system
with single/ double door openable placed on
MS strip of size 12.5mm x 2.5mm thick
welded with MS sheet, 4Nos. legs of
50mmx50mmx6mm thick MS angle iron each
of 600mm long with MS sheet
100mmx100mmx6mm thick at the bottom end
of the legs. Front door welded x-sectionally
with MS flat 25mmx5mm. The front side with
MS sheet each 75mm wide & a bend of 75mm
width outwards & inwards on all sides with
tappered top 200mm high and pedestal with 4
Nos. supporting members each of MS flat
50mmx6mm thick according to cubical size
duly welded & complete pedestal to be
painted with 1 coat of red oxide & 2 coats of
paint & bonding to the existing earth. The
Pedestal platform should be filled with 1:2:4
cement concrete mixture and erected
150mm high from the top of the cement
concrete platform. The job is to be completed
as approved by Engineer-in-charge:-

(a) Cubical Size 900mm high, 600mm wide and


350mm deep with platform dimensions Each 1411.00 8571.00 1552.00 8712.10
700mm x 450mm x 450mm

(b) Cubical Size 1200mm high, 900mm wide


and 350mm deep with platform dimensions Each 1552.00 12173.00 1707.00 12328.20
1000mm x 450mm x 450mm

(c) Cubical Size 1200mm high, 1000mm wide


and 500mm deep with platform dimensions Each 1693.00 14555.00 1862.00 14724.30
1100mm x 600mm x 450mm

(d) Cubical Size 1400mm high, 1200mm wide


and 500mm deep with platform dimensions Each 1975.00 17673.00 2173.00 17870.50
1300mm x 600mm x 450mm

Chapter-34 Page 732 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(e) Cubical Size 1200mm high, 1500mm wide
and 350mm deep with platform dimensions Each 2257.00 17997.00 2483.00 18222.70
1600mm x 450mm x 450mm

(f) Cubical Size 1200mm high, 1800mm wide


and 350mm deep with platform dimensions Each 2257.00 20330.00 2483.00 20555.70
1900mm x 450mm x 450mm

34.38 M.S. JUNCTION BOX FOR STREET


LIGHT:

(ii) Supply and erection of M.S. Junction box


of suitable size made from M.S. Sheet 16
SWG (1.60mm thick). Junction box
should have one locking arrangement
and 2 nos. hinges on front side. It should
have 1 No. Brass terminal connecting
strip, 1 No. Kit kat 16 Amp/240 Volts
along with M.S. Flat 20mm x 2mm clamp
with nuts and bolts for fixing on the pole.
The junction box should be painted with
one coat of good quality primer and two
coats of post office red enamel paint
inside and outside complete in all
respect:-

(a) M.S. Junction Box 205mm x 155mm x


Each 160.00 597.00 176.00 613.00
95mm

(b) M.S. Junction Box 300mm x 200mm x


Each 160.00 689.00 176.00 705.00
100mm

Chapter-34 Page 733 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.38 MS TOWER STRUCTURE:

(iii) Supply and erection of M.S. angle iron


structure upto 8.4 meter high 1500mm base
& 750mm at the top & 6Nos. horizontal
support of M.S. angle iron 50mm x 50mm x
5mm from G/L of length 1.46 m x 4, 1.33m x
4, 1.24 m x 4, 1.11 m x 4, 0.98m x 4 &
0.84m x 4 from bottom to top resp., 6 Nos.
inclined angle support of M.S. angle iron
50mm x 50mm x 5mm from G/Lof length
1.87m x 8, 1.79m x 8, 1.70m x 8, 1.64m x8,
1.54m x 8 & 1.31 mtr x 8 from bottom to top
resp., 2 Nos. horizontal support for ladder of
M.S. angle iron 30mm x 30mm x 5mm of
lengths 1.10m & 1.35m to be welded with
M.S. angle iron 65mm x 65mm x 6mm.,
4Nos. vertical angle support for the raising Each 2257.00 50008.00 2483.00 50233.70
of tower of M.S. angle iron 65mm x 65mm x
6mm for the fixing of the above horizontal
and vertical supports of length 8.4m each
and for the fixing of octagonal platform on it.
The vertical angle supports to be welded
with M.S. base plates of thickness 20mm
&10mm each of size 200mm x 200mm
4Nos.each under the base plate, spacer of
M.S. Flat 40mm x 5mm (24Nos.) for inclined
angles to be erected with nuts & bolts 16mm
dia (176Nos.). The job is to be completed as
approved by Engineer-in-charge.

34.38 MS TOWER LADDER:

(iv) Supply and erection of M.S. Tower Ladder


suitable for tower structure of height 8.4mtr.
made from M.S. Angle iron 30mm x 30mm x
5mm of length 6.94mtr with 24Nos. steps made
from M.S. Rods of 16mm dia. for climbing on the 1975.00 5949.00 2173.00 6146.50
tower/ octagonal platform. Each rod should be
300mm long and welded with vertical M.S. angle
iron of tower ladder.

Chapter-34 Page 734 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.38 MS OCTAGONAL TOP OF TOWER:

(v) Supply and erection of M.S. Octagonal top


of the tower structure of height 8.4mtr. &
base consists of 8 sides of M.S. angle iron
40mm x 40mm x 5mm. Out of 8 sides, 4
sides of length 760mm and 4 sides of length
700mm.The octagonal top of 8 Nos. vertical
supports each of length 840mm for
mounting railing on it. The top end of the
railing of 8 sides for fixing the fittings on it.
Out of 8 sides, 4 sides of length 830mm & 4
sides of length 650mm. The platform of the
octagonal top of mesh made from M.S.
Square bars 8mm dia of weight 41 Kg. The
platform of opening (double door) with
Each 1975.00 13605.00 2173.00 13802.50
frame of M.S. Angle iron 40mm x 40mm x
5mm with locking arrangement. The
octagonal top of railing made from M.S. Flat
40mmx5mm having 8 sides between the top
& bottom (in middle). Out of 8 sides, 4 sides
of length 830mm and 4 sides of length
650mm. The whole platform of base made
from M.S. Channel 75mmx40mmx4mm
fixed x-sectionally having lengths 1750mm x
2 , 460mm x 2 and 760mm x 4 for fixing the
opening system platform mesh etc on it.

Chapter-34 Page 735 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
34.38 FOUNDATION FOR TOWER HEIGHT 8.4
MTR. AND BASE 1500MM X 1500MM:

(vi) Making of foundation 2050mm deep


suitable for tower of height 8.4mtr and base
1500mm x 1500mm with 100mm (4")
cement concrete 1:5:10 with brick blast
40mm guage. Foundation should have
Reinforced cement concrete M-20
mechnically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator with centering and
shuttering complete in all respect.
Foundation should have cold twisted
deformed bars for slab reinforcement
(10mm dia.), columns (12mm dia.) and
rings (8mm dia.).For slab reinforcement,
there should be 8 Nos. steel bars each of Each 1411.00 20311.00 1552.00 20452.10
length 1000mm for each column for bottom
and top seperately. For R.C.C. Column,
there should be 6Nos. vertical steel bars
each of length 2100mm and 8 Nos. rings of
dia 300mm each for each column. At the top
of each column there should be 10mm thick
M.S. Base plate size 200mm x 200mm.
Foundation should have the provision of
M.S. Nuts and bolts of size 20mm dia
700mm long 4Nos. for each column for
fixing the tower on it. Foundation should be
150mm above ground level.

34.38 HT & LT LINE ITEMS:

(vii) Supply & erection of 11kV GO switch


confirming to ISI specifications. The item
includes supply and erection of operating
pipe and handle arrangement of MS flat
50mm x 6mm and channels 75mm x 40mm
sheet. The GO switch is to be fitted with
locking arrangement so as it locks upward Each 874.00 8986.00 961.00 9073.40
on 'ON' position and locks downward in
'OFF' position. The entire GO switch
assembly/unit should be properly earthed
and the job is to be completed as approved
by Engineer-in-charge.

(viii) Supply & erection of 'D' iron clamp 50mm x


6mm flat iron complete with fixing bolts and
nuts (16mm x 200mm) including making Each 59.00 156.00 65.00 161.90
holes in the pole as approved by Engineer-
in-charge.

Chapter-34 Page 736 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(ix) Supply & erection of 'V' shape cross arm of


MS channel 75mm x 40mm as per standard
drawing. The item include supply and
erection of half clamp made out of 50mm x Each 118.00 545.00 130.00 556.80
6mm flat including cost of nut and bolts as
approved by Engineer-in-charge.

(x) Supply & erection of 11kV Top Hamper


made out of MS flat 50mm x 6mm as per
standard drawing. The item includes supply
and erection of nut and bolts (19mmx Each 118.00 329.00 130.00 340.80
125mm) as required. The job is to be
completed as approved by Engineer-in-
charge.

34.38 MISCELLANEOUS ITEMS:

COOLER STAND:

(xi) Supply and erection of M.S. Cooler stand


made from M.S. Angle iron 40mm x 40mm x
5mm having dimensions of base 700mm x
700mm and top 700mm x 700mm on which
cooler is to be fixed. M.S. Angle iron ( 4Nos. Each 339.00 1992.00 373.00 2025.90
) legs of stand should be 700mm high. The
stand should be painted with one coat of
primer and two coats of approved paint.

34.38 M.S. FLAT/ CHANNEL BRACKETS:

(xii) Supply and erection of M.S. Flat bracket


made from 50mm x 6mm of length 600mm
and width 300mm for installing metal halide
flood light fitting on it. Bracket should be
fixed with the existing pipe of cover shed Each 212.00 625.00 233.00 646.20
with M.S. Flat clamp of size 50mm x 6mm
The bracket should be painted with one coat
of primer and two coats of approved paint.

(xiii) Supply and erection of M.S. Channel


bracket made from 100mm x 50mm of
length 600mm and height 600mm with M.S.
angle iron 40mm x 40mm x 5mm for
installing metal halide flood light fitting on it. Each 212.00 1057.00 233.00 1078.20
Bracket should be fixed/ welded with the
existing pipe of cover shed. The bracket
should be painted with one coat of primer
and two coats of approved paint.

Chapter-34 Page 737 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(xiv) Supply and erection of MS sheet metal box
(1mm thick) of length 1225mm, breadth
400mm, height 425mm with MS angle iron
40mm x 40mm x 5mm frame at the base of
the box for storing metal halide flood light Each 847.00 4294.00 932.00 4378.70
fitting in it. Sheet metal should have top
portion hinged with 6" (6 inch) hinges and
divided into equal 8 compartments with
sheet 1mm thick.

34.38 MS CHANNELS/ FLATS:

(xv) Supply and Erection of MS angle iron


(Channel)/ MS Flats of suitable size with
cutting, bending and necessary holes as
desired by Engineer-in-charge at site:-

(a) MS angle iron size 50mm x 50mm x 5mm


Metre 103.00 281.00 113.00 291.30
thick

(b) MS angle iron size 50mm x 50mm x 6mm


Metre 103.00 312.00 113.00 322.30
thick

(c) MS angle iron size 30mm x 30mm x 5mm


Metre 103.00 206.00 113.00 216.30
thick

(d) MS angle iron size 40mm x 40mm x 5mm


Metre 103.00 239.00 113.00 249.30
thick

(e) MS angle iron size 100mm x 50mm x 6mm


Metre 124.00 503.00 136.00 515.40
thick

(f) MS angle iron size 75mm x 40mm x 4mm


Metre 124.00 397.00 136.00 409.40
thick

(g) MS flat iron size 50mm x 5mm thick Metre 31.00 124.00 34.00 127.10

(h) MS flat iron size 40mm x 5mm thick Metre 31.00 92.00 34.00 95.10

(i) MS flat iron size 25mm x 5mm thick Metre 31.00 78.00 34.00 81.10

34.38 Supply and erection of heavy duty


A aluminium thimbles/lugs for cable end
termination duly crimped including
making necessary connections
completely:-

(i) Aluminium thimble cable Core size 4 -


Each 12.00 13.00 13.00 14.20
6sq.mm

(ii) Aluminium thimble cable Core size 10 -


Each 12.00 14.00 13.00 15.20
16sq.mm

Chapter-34 Page 738 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iii) Aluminium thimble cable Core size 25 -
Each 12.00 17.00 13.00 18.20
35sq.mm

(iv) Aluminium thimble cable Core size


Each 20.00 27.00 22.00 29.00
50sq.mm

(v) Aluminium thimble cable Core size


Each 20.00 30.00 22.00 32.00
70sq.mm

(vi) Aluminium thimble cable Core size


Each 20.00 35.00 22.00 37.00
95sq.mm

(vii) Aluminium thimble cable Core size


Each 24.00 43.00 26.00 45.40
120sq.mm

(viii) Aluminium thimble cable Core size


Each 24.00 52.00 26.00 54.40
150sq.mm

(ix) Aluminium thimble cable Core size


Each 24.00 62.00 26.00 64.40
185sq.mm

(x) Aluminium thimble cable Core size


Each 47.00 100.00 52.00 104.70
240sq.mm

(xi) Aluminium thimble cable Core size


Each 47.00 116.00 52.00 120.70
300sq.mm

(xii) Aluminium thimble cable Core size


Each 47.00 157.00 52.00 161.70
400sq.mm

(xiii) Aluminium thimble cable Core size


Each 59.00 212.00 65.00 217.90
500sq.mm

(xiv) Aluminium thimble cable Core size


Each 59.00 278.00 65.00 283.90
630sq.mm

(xv) Aluminium thimble cable Core size


Each 59.00 354.00 65.00 359.90
800sq.mm

(xvi) Aluminium thimble cable Core size


Each 59.00 467.00 65.00 472.90
1000sq.mm

34.38 Supply and erection of heavy duty


B Copper thimbles/lugs for cable end
termination duly crimped including
making necessary connections etc.
completely:-

(i) Copper thimble cable Core size 4 - 6sq.mm


Each 12.00 18.00 13.00 19.20

(ii) Copper thimble cable Core size 10 -


Each 12.00 22.00 13.00 23.20
16sq.mm

Chapter-34 Page 739 CSR-2020


CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7
(iii) Copper thimble cable Core size 25 -
Each 12.00 34.00 13.00 35.20
35sq.mm

(iv) Copper thimble cable Core size 50sq.mm Each 20.00 55.00 22.00 57.00

(v) Copper thimble cable Core size 70sq.mm Each 20.00 74.00 22.00 76.00

(vi) Copper thimble cable Core size 95sq.mm Each 20.00 102.00 22.00 104.00

(vii) Copper thimble cable Core size 120sq.mm Each 24.00 138.00 26.00 140.40

34.38 Supply and erection of heavy duty brass


C single compression gland for cable end
termination duly complete with
checknuts etc. including making
necessary connections:-

(i) Brass Gland for Aluminium cable 2/3 Core


Each 30.00 51.00 33.00 54.00
size 2.5sq.mm

(ii) Brass Gland for Aluminium cable 2/3/4 Core


Each 30.00 54.00 33.00 57.00
size 4sq.mm

(iii) Brass Gland for Aluminium cable 2/3/4 Core


Each 30.00 61.00 33.00 64.00
size 6sq.mm

(iv) Brass Gland for Aluminium cable 2/3/4 Core


Each 47.00 83.00 52.00 87.70
size 10sq.mm

(v) Brass Gland for Aluminium cable 2/3/4 Core


Each 47.00 103.00 52.00 107.70
size 16sq.mm

(vi) Brass Gland for Aluminium cable 2/3/3½/4


Each 47.00 114.00 52.00 118.70
Core size 25-35sq.mm

(vii) Brass Gland for Aluminium cable 2/3/3½/4


Each 59.00 142.00 65.00 147.90
Core size 50sq.mm

(viii) Brass Gland for Aluminium cable 3/3½/4


Each 59.00 151.00 65.00 156.90
Core size 70sq.mm

(ix) Brass Gland for Aluminium cable 3/3½/4


Each 79.00 199.00 87.00 206.90
Core size 95-120sq.mm

(x) Brass Gland for Aluminium cable 3/3½/4


Each 79.00 232.00 87.00 239.90
Core size 150sq.mm

(xi) Brass Gland for Aluminium cable 3/3½/4


Each 79.00 275.00 87.00 282.90
Core size 185sq.mm

(xii) Brass Gland for Aluminium cable 3/3½/4


Each 118.00 356.00 130.00 367.80
Core size 240sq.mm

(xiii) Brass Gland for Aluminium cable 3/3½/4


Each 118.00 407.00 130.00 418.80
Core size 300sq.mm
Chapter-34 Page 740 CSR-2020
CSR−2020−Final
Sr. No. Description Zone-A Zone-B
Unit Labour Through Labour Through
Rate Rate Rate Rate
1 2 3 4 5 6 7

(xiv) Brass Gland for Aluminium cable 3/3½/4


Each 118.00 506.00 130.00 517.80
Core size 400sq.mm

(xv) Brass Gland for Aluminium cable 3½/4 Core


Each 148.00 653.00 163.00 667.80
size 500sq.mm

(xvi) Brass Gland for Aluminium cable 3½/4 Core


Each 148.00 787.00 163.00 801.80
size 630sq.mm

34.39 DISMANTLING WIRING POINTS &


FITTINGS:

Dismantling old wiring points including


necessary repairs to wall etc:-

(i) Fan, light or call bell point Each 12.00 12.00 13.00 13.20

(ii) Wall socket, power plug point Each 9.00 9.00 10.00 9.90

(iii) Removal of existing Tube fitting etc. Each 18.00 18.00 20.00 19.80

(iv) Removal of existing Ceiling fans/ Exhaust


Each 23.00 24.00 25.00 26.30
fans