INSULATION RFI C

SL NO RFI NO INSPECTION/ INSPECTION TEST / ACTIVITY


TEST ITEM

MFC-DLM-AK- HOT INSULATION MATERIAL RECIVING&INSPECTION OF HOT INSULATION


1
I-001 MATERIAL MATERIALS (40mm,50mm,60mm,70mm,80mm.)

MFC-DLM-AK- HOT INSULATION MATERIAL RECIVING&INSPECTION OF HOT INSULATION


2
I-002 MATERIAL MATERIALS(40mm,50mm,70mm.)

MFC-DLM-AK- HOT INSULATION MATERIAL RECIVING&INSPECTION OF HOT INSULATION


3
I-003 MATERIAL MATERIALS (40mm,50mm,60mm,70mm,80mm&100mm)

4 MFC-DLM-AK- HOT INSULATION MATERIAL RECIVING&INSPECTION OF HOT INSULATION


I-004 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


5
I-005 MATERIAL MATERIALS (70mm,80mm,100mm)12",16",18",24",2-0",1.5".

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


6
I-006 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


7
I-007 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


8
I-008 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


9
I-009 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


10
I-010 MATERIAL MATERIALS
MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
11
I-011 MATERIAL MATERIALS

INSULATION MATERIAL RECEIVING & INSPECTION OF HOT & COLD


MFC-DLM-AK-
12 ACCESSORY INSULATION ACCESSORY MATERIALS(Foster-90-66 A&B,95-
I-012
MATERIAL 44,30-45N)

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT PIR INSULATION
13 I-013 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
14
I-014 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


15
I-015 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


16
I-016 MATERIAL MATERIALS

INSULATION
MATERIAL RECEIVING & INSPECTION OF HOT & COLD
MFC-DLM-AK- ACCESSORY &
17 INSULATION ACCESSORY & ALUMINUM SHEET 3003 (0.6mmT)
I-017 JACKETING STUCCO EMBOSED WITH POLYSURLYN MB MATERIALS
MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


18 I-018 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
19
I-019 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


20
I-020 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


21 I-021 MATERIAL MATERIALS

22 MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


I-022 MATERIAL MATERIALS
MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
23
I-023 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


24
I-024 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


25 I-025 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


26
I-026 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


27
I-027 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


28
I-028 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


29
I-029 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


30 I-030 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
31
I-031 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT FIBERFRAX


32
I-032 MATERIAL DURABLANKET INSULATION MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


33 I-033 MATERIAL MATERIALS

34 MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
I-034 MATERIAL MATERIALS
MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
35
I-035 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
36
I-036 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
37 I-037 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT PIR INSULATION
38
I-038 MATERIAL MATERIALS

HOT / COLD
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF HOT/COLD ALUMINUM
39 INSULATION
I-039 STUCCO EMBOSSED MATERIALS
MATERIAL

HOT / COLD MATERIAL RECEIVING & INSPECTION OF HOT/COLD ACCESSORY


MFC-DLM-AK-
40 INSULATION & IWR701 AP PRIMARY VAPOUR BARRIER 1000 mm X 15mm
I-040 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR MATERIALS
41
I-041 MATERIAL DENSITY 32 KG/M3 UNFACED

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT PIR MATERIALS
42 I-042 MATERIAL DENSITY 40 KG/M3 UNFACED

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR MATERIALS
43
I-043 MATERIAL DENSITY 32 KG/M3 UNFACED

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR MATERIALS
44
I-044 MATERIAL DENSITY 32 KG/M3 UNFACED

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


45 I-045 MATERIAL MATERIALS

46 MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF FOAMGLAS INSULATION


I-046 MATERIAL MATERIALS
MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR MATERIALS
47
I-047 MATERIAL DENSITY 32 KG/M3 UNFACED

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


48
I-048 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF VAPOR BARRIER FOR
49 I-049 MATERIAL COLD INSULATION MATERIALS

ACCESSORY
MFC-DLM-AK- MATERIAL FOR MATERIAL RECEIVING & INSPECTION OF ACCESSORIES &
50
I-050 INSULATION JACKETING INSULATION MATERIALS
WORKS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
51
I-051 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT FIBERFRAX


52
I-052 MATERIAL DURABLANKET HOT INSULATION MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
53
I-053 MATERIAL MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


54 I-054 MATERIAL INSULATION MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


55
I-055 MATERIAL INSULATION MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


56
I-056 MATERIAL INSULATION MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


57 I-057 MATERIAL INSULATION MATERIALS

SURFACE
58 MFC-DLM- PREPARATION SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
AK-I-058 INSULATION (TP-1607-01-HT-001)8"4"6"2"
INSPECTION
SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
59 PREPARATION
I-059 INSULATION (TP-1607-01-HT-001)8"4"6"2"
INSPECTION
EQUIPMENT INSPECTION FOR INSULATION WORKS SUCH AS
BENDING MACHINE MANUAL, SHEARING MANUAL LIGHT,
EQUIPMENT FOR
MFC-DLM-AK- ROLLER MANUAL LIGHT, ROLLER ELECTRIC/BELT, FORMING
60 INSULATION
I-060 MACHINE LOCKEDGE (STRAIGHT/CURVED), GROOVING MACHINE
WORKS 3PCS., GROVING MACHINE MANUAL, UNCOILER MACHINE,
UNROLL DEVICE MANUAL.
ACCESSORY
MATERIAL RECEIVING & INSPECTION OF ACCESSORIES FOR
MFC-DLM-AK- MATERIAL FOR
61 I-061 INSULATION INSULATION WORKS SUCH AS WIRE, BANDS, RIVETS, BAND SEAL,
SCREWS, FILAMENT TAPE, GYPSUM CEMENT
WORKS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


62
I-062 MATERIAL INSULATION MATERIALS

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA & SAUDI
63
I-063 MATERIAL ROCKWOOL HOT INSULATION MATERIALS

MFC-DLM-AK- INSULATION PARTIAL INSPECTION OF INSULATION PRIOR TO METAL


64
I-064 INSPECTION JACKETING (TP-1607-01-HT-001)4"2"

MATERIAL
MFC-DLM-AK- INSPECTION OF MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
65
I-065 HOT INSULATION MATERIAL
MATERIAL
MATERIAL
MFC-DLM-AK- INSPECTION OF MATERIAL RECEIVING & INSPECTION OF ACCESSORIES SUCH AS
66 I-066 ACCESSORIES FOR FOSTER 95-44, FOSTER 30-45N , FOSTER 90-66A & FOSTER 90-
66B FOR INSULATION WORKS
INSULATION

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF FUJAIRA HOT


67
I-067 MATERIAL INSULATION MATERIAL

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
68 PREPARATION
I-068 INSULATION (TP-1607-01-HT-004)8"6"4"2"
INSPECTION

MFC-DLM-AK- INSULATION INSPECTION OF REMAINING INSULATED LINE PRIOR TO METAL


69 I-069 INSPECTION JACKETING (TP-1607-01-HT-001)8"6"

70 MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


I-070 MATERIAL MATERIAL
MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-
71
I-071 INSPECTION 1607-01-HT-004)8"6"4"2"

MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-


72
I-072 INSPECTION 1607-01-HT-004)4"2"

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


73 I-073 MATERIAL MATERIAL

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
74 PREPARATION INSULATION EXCEPT WELD JOINT (TP-1507-01-HT-014)8"
I-074-A INSPECTION

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
75 PREPARATION INSULATION EXCEPT WELD JOINT
I-075-A
INSPECTION (TP-1507-01-HT-029)8"

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
76 PREPARATION INSULATION EXCEPT WELD JOINT
I-076-A INSPECTION (TP-1507-01-HT-030)8"

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
77 PREPARATION INSULATION EXCEPT WELD JOINT
I-077-A INSPECTION (TP-1507-01-HT-030)8"

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


78 I-078 MATERIAL MATERIAL

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
79
I-079 MATERIAL MATERIAL DENSITY 32 kg/m3

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING
80 OF METAL
I-080 (TP-1607-01-HT-001)8"6"4"2"
CLADDING

MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-


81 I-081 INSPECTION 1507-01-HT-014)8"

82 MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-


I-082 INSPECTION 1507-01-HT-029)8"
MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-
83
I-083 INSPECTION 1507-01-HT-030)8"

MFC-DLM-AK- INSULATION INSPECTION OF INSULATION PRIOR TO METAL JACKETING (TP-


84
I-084 INSPECTION 1507-01-HT-013)8"

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
85 I-085 PREPARATION INSULATION EXCEPT WELD JOINT (TP-1607-02-HT-016) 6"4"
INSPECTION

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
86 PREPARATION
I-086 INSPECTION INSULATION EXCEPT WELD JOINT (TP-1607-02-HT-017)6"4"

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
87 PREPARATION
I-087 INSULATION EXCEPT WELD JOINT (TP-1607-02-HT-018)6"4"
INSPECTION

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
88 PREPARATION
I-088 INSPECTION INSULATION EXCEPT WELD JOINT (TP-1607-02-HT-019)6"4"

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (TP-1607-01-HT-
89 OF METAL
I-089 CLADDING 004)8"6"4"2"

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


90 I-090 MATERIAL MATERIAL

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
91
I-091 MATERIAL MATERIAL

INSPECTION OF INSULATION PRIOR TO METAL JACKETING


MFC-DLM-AK- INSULATION
92 EXCEPT WELD JOINT (TP-1607-
I-092 INSPECTION
02-HT-016)6"4"

INSPECTION OF INSULATION PRIOR TO METAL JACKETING


MFC-DLM-AK- INSULATION
93 I-093 INSPECTION EXCEPT WELD JOINT (TP-1607-
02-HT-017)6"4"

INSPECTION OF INSULATION PRIOR TO METAL JACKETING


94 MFC-DLM-AK- INSULATION EXCEPT WELD JOINT (TP-1607-
I-094 INSPECTION
02-HT-018) 6"4"
INSPECTION OF INSULATION PRIOR TO METAL JACKETING
MFC-DLM-AK- INSULATION
95 EXCEPT WELD JOINT (TP-1607-
I-095 INSPECTION
02-HT-019)6"4"

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
96 PREPARATION
I-096 INSULATION EXCEPT WELD JOINT [TP-1452-00-HT-001(P)]30"16"
INSPECTION

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


97 I-097 MATERIAL MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


98
I-098 MATERIAL MATERIAL

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
99
I-099 MATERIAL MATERIAL

INSPECTION OF INSULATION PRIOR TO METAL JACKETING


MFC-DLM-AK- INSULATION
100 EXCEPT WELD JOINT [TP-1452-
I-100 INSPECTION 00-HT-001(P)]30"16"

MATERIAL RECEIVING & INSPECTION OF IWR 701 AP PRIMRY


MFC-DLM-AK- COLD INSULATION
101 VAPOR BARRIER , PIB SHEET 1000mmW, BANDS & ALUMINUM
I-101 MATERIAL 3003 STUCCO EMBOSED with POLYSURLYN MB MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


102 I-102 MATERIAL MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


103
I-103 MATERIAL MATERIAL

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
104
I-104 MATERIAL MATERIAL

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
105 I-105 PREPARATION INSULATION EXCEPT WELD JOINT [TP-1453-00-HT-
INSPECTION 001(P)]18"20"24"30"

106 MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
I-106 MATERIAL MATERIAL
INSPECTION OF INSULATION PRIOR TO METAL JACKETING
MFC-DLM-AK- INSULATION
107 EXCEPT WELD JOINT [TP-1453-
I-107 INSPECTION
00-HT-001(P)] 18"20"24"30"

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


108
I-108 MATERIAL MATERIAL

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
109 I-109 PREPARATION INSULATION EXCEPT WELD JOINT [TP-1455-00-HT-001(P)12"16"
INSPECTION

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
110 PREPARATION
I-110 INSPECTION INSULATION EXCEPT WELD JOINT [TP-1452-00-HT-019(P)30"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
111
I-111 INSPECTION (TP-1507-01-HT-013) 8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
112
I-112 INSPECTION (TP-1507-01-HT-014)8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
113
I-113 INSPECTION (TP-1507-01-HT-029)8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
114 I-114 INSPECTION (TP-1507-01-HT-030)8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
115
I-115 INSPECTION (TP-1607-02-HT-016)6"4"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
116
I-116 INSPECTION (TP-1607-02-HT-017)6"4"

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
117 I-117 INSPECTION (TP-1607-02-HT-018)6"4"

118 MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
I-118 INSPECTION (TP-1607-02-HT-019)6"4"
INSPECTION OF INSULATION PRIOR TO METAL JACKETING
MFC-DLM-AK- INSULATION
119 EXCEPT WELD JOINT [TP-1455-
I-119 INSPECTION
00-HT-001(P)12"16"

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
120 PREPARATION INSULATION EXCEPT WELD JOINT [TP-1454-00-HT-
I-120
INSPECTION 001(P)16"18"30"

INSPECTION OF INSULATION PRIOR TO METAL JACKETING


MFC-DLM-AK- INSULATION
121 I-121 INSPECTION EXCEPT WELD JOINT [TP-1455-
00-HT-001(P)]12"16"

INSPECTION OF INSULATION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
122 INSULATION EXCEPT WELD JOINT [TP-1454-00-HT-
I-122 INSPECTION 001(P)]16"18"30"

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
123 PREPARATION INSULATION EXCEPT WELD JOINT [TP-1507-01-HT-001
I-123
INSPECTION (Pipe sizes: 6", 8")

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


124
I-124 MATERIAL MATERIAL

INSPECTION OF INSULATION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
125 JACKETING EXCEPT WELD JOINT [TP-1452-00-HT-019 (P) (Pipe
I-125 INSPECTION size: 30")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
126 I-126 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINT [TP-1607-02-
INSPECTION HT-006 (Pipe size: 12")

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


127 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINT [TP-1507-01-
I-127
INSPECTION HT-001 (Pipe sizes: 8")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
128 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINT [TP-1456-00-
I-128
INSPECTION HT-001 (P) (Pipe sizes: 4", 6", 10", 18", 20")

INSPECTION OF INSULATION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
129 I-129 INSPECTION JACKETING EXCEPT WELD JOINT [TP-1507-01-HT-001 (Pipe sizes:
6", 8")

PARTIAL INSPECTION OF INSULATION PRIOR TO APPLICATION


130 MFC-DLM-AK- INSULATION OF METAL JACKETING EXCEPT WELD JOINT [TP-1607-02-HT-006]
I-130 INSPECTION
(Pipe sizes: 12")
HOT / COLD
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF HOT PIR Density
131 INSULATION
I-131 40kg/m3 and COLD PIR Density 32kg/m3 INSULATION MATERIAL
MATERIAL

MATERIAL RECEIVING & INSPECTION OF IWR 701 AP PRIMRY


MFC-DLM-AK- COLD INSULATION
132 VAPOR BARRIER , PIB SHEET 1000mmW, BANDS & ALUMINUM
I-132 MATERIAL
3003 STUCCO EMBOSED with POLYSURLYN MB MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


133 I-133 MATERIAL MATERIAL

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
134 PREPARATION TOAPPLICATION OF INSULATION ON HYDROTESTED LINE @
I-134 INSPECTION TP-1453-00-HT-013 (Pipe sizes: 18")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
135
I-135 INSPECTION [TP-1452-00-HT-019(P) (Pipe size: 30")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
136
I-136 INSPECTION [TP-1452-00-HT-001(P)] (Pipe size: 30", 16")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
137 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-137 INSPECTION 1654-00-HT-001 (P) Pipe sizes: 18"(HEADER)

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL JACKETING EXCEPT WELD JOINT
138 I-138 INSPECTION [TP-1453-00-HT-001(P)] (Pipe sizes: 18", 20", 24", 30")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL JACKETING EXCEPT WELD


139
I-139 INSPECTION JOINTT [TP-1454-00-HT-001(P)] (Pipe sizes: 16", 18", 30")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
140 METAL CLADIING EXCEPT WELD JOINT [TP-1456-00-HT-001 (P)
I-140 INSPECTION
(Pipe sizes: 4", 6", 10", 18", 20")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
141 I-141 INSPECTION METAL CLADIING ON HYDROTESTED LINE @
TP-1453-00-HT-013 (Pipe sizes: 18")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


142 MFC-DLM-AK- PREPARATION TOAPPLICATION OF INSULATION ON HYDROTESTED LINE @
I-142
INSPECTION TP-1453-00-HT-013 (Pipe sizes: 2")
PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
143 METAL CLADIING EXCEPT WELD JOINT TP-1654-00-HT-001 (P)
I-143 INSPECTION
(Pipe sizes: 6", 14", 18")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
144 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @
I-144
INSPECTION TP-1616-00-HT-001 (P) (Pipe sizes: 30")

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


145 I-145 MATERIAL MATERIAL

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
146 METAL CLADDING ON HYDROTESTED LINE @ TP-1453-00-HT-
I-146 INSPECTION 013 (Pipe sizes: 2", 1")

PARTIAL INSULATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK- INSULATION
147 METAL CLADDING EXCEPT WELD JOINT @ TP-1616-00-HT-001
I-147 INSPECTION
(P) (Pipe sizes: 30")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
148 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-148 INSPECTION 1616-00-HT-002 (P) (Pipe sizes: 16")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
149 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-149 INSPECTION 1506-01-HT-001 (Pipe sizes: 6", 8"")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
150 I-150 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-009
INSPECTION (Pipe sizes: 16",8")

SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- SURFACE INSULATION ON HYDROTESTED LINE @
151 PREPARATION
I-151 TP-1623-01-HT-025
INSPECTION
(Pipe sizes: 14",1")
PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION METAL CLADDING EXCEPT WELD JOINT @
152
I-152 INSPECTION TP-1616-00-HT-002 (P) (Pipe
sizes: 16")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
153 I-153 INSPECTION BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-009 (Pipe
sizes: 16",8")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


154 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1623-01-HT-024 (Pipe
I-154
INSPECTION sizes: 14",1")
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
155 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-008
I-155
INSPECTION (Pipe sizes: 16",8")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
156 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-156
INSPECTION 1623-01-HT-007 (P) (Pipe sizes: 8", 10")

HOT / COLD
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
157 I-157 INSULATION 32kg/m3 INSULATION MATERIAL
MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


158
I-158 MATERIAL MATERIAL

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
159 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-159
INSPECTION 1623-01-HT-008 (P) (Pipe sizes: 8")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
160 BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-009 (Pipe
I-160 INSPECTION sizes: 16",8")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
161 CLADDING EXCEPT WELD JOINT @ TP-1623-01-HT-007 (P) (Pipe
I-161 INSPECTION sizes: 8", 10")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
162 I-162 INSPECTION METAL CLADDING EXCEPT WELD JOINT @ TP-1506-01-HT-001
(Pipe sizes: 6", 8"")

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


163 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-163
INSPECTION 1606-02-HT-006 (Pipe sizes: 12")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
164 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-009 (Pipe
I-164 INSPECTION
sizes: 16",8")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
165 I-165 INSPECTION BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-008 (Pipe
sizes: 16",8")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


166 MFC-DLM-AK- INSULATION BARRIER ON HYDROTESTED LINE @
I-166 INSPECTION
TP-1623-01-HT-024 (Pipe sizes: 14",1")
INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR
MFC-DLM-AK- INSULATION
167 BARRIER ON HYDROTESTED LINE @ TP-1623-01-HT-025 (Pipe
I-167 INSPECTION
sizes: (Pipe sizes: 14",1")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
168 METAL CLADDING EXCEPT WELD JOINT @ TP-1623-01-HT-008
I-168 INSPECTION
(P) (Pipe sizes: 8")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
169 I-169 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
INSPECTION 1453-00-HT-001 (Pipe sizes: 30", 24", 16")

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


170
I-170 MATERIAL MATERIAL

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
171 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-008 (Pipe
I-171 INSPECTION
sizes: 16",8")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
172 CLADDING ON HYDROTESTED LINE @ TP-1623-01-HT-024 (Pipe
I-172 INSPECTION sizes: 14",1")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
173 CLADDING ON HYDROTESTED LINE @ TP-1623-01-HT-025 (Pipe
I-173 INSPECTION sizes: (Pipe sizes: 14",1")

INSULATION INSPECTION PRIOR TOAPPLICATION OFMETAL


MFC-DLM-AK- INSULATION
174 I-174 INSPECTION CLADDING EXCEPT WELD JOINT @ TP-1453-00-HT-001 (Pipe
sizes: 30)

PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK- SURFACE TOAPPLICATION OF INSULATION EXCEPT WELD JOINT ON TP-
175 PREPARATION
I-175 1625-00-HT-002 (Pipe sizes: 36", 30", 24",20", 16") MAIN
INSPECTION
HEADER

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
176 OF METAL
I-176 @ TP-1714-00-HT-009 (Pipe sizes: 16",8")
CLADDING

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
177 I-177 INSPECTION METAL CLADDING EXCEPT WELD JOINT @ TP-1606-02-HT-006
(Pipe sizes: 12")

178 MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
I-178 INSPECTION [TP-1506-01-HT-001] (Pipe sizes: 8", 6")
MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
179
I-179 INSPECTION @ TP-1616-00-HT-001 (P) (Pipe sizes: 30")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
180
I-180 INSPECTION @ TP-1654-00-HT-001 (P) (Pipe sizes: 6", 14", 18")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
181 I-181 INSPECTION METAL CLADDING EXCEPT WELD JOINT ON TP-1625-00-HT-002
(Pipe sizes: 36") MAIN HEADER

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
182
I-182 INSPECTION @ TP-1616-00-HT-002 (P) on (Pipe sizes: 16") Main Header

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
183 OF METAL
I-183 @ TP-1714-00-HT-008 (Pipe sizes: 16",8")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


184 OF METAL
I-184 CLADDING @ TP-1623-01-HT-024 (Pipe sizes: 14",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
185 OF METAL
I-185 CLADDING @ TP-1623-01-HT-025 (Pipe sizes: (Pipe sizes: 14",1")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
186 I-186 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
INSPECTION 1506-01-HT-001 (Pipe sizes: 8"")

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


187 METAL CLADDING EXCEPT WELD JOINT ON TP-1625-00-HT-002
I-187 INSPECTION
(Pipe sizes: 36", 30", 24",20", 16") MAIN HEADER

INSULATION INSPECTION PRIOR TOAPPLICATION OFMETAL


MFC-DLM-AK- INSULATION
188 CLADDING EXCEPT WELD JOINT @ 1453-00-HT-001 (Pipe sizes:
I-188 INSPECTION
30)

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
189 I-189 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
INSPECTION 1452-00-HT-001 (Pipe sizes: 36", 30")

190 MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
I-190 INSPECTION @ TP-1453-00-HT-013 (P) on (Pipe sizes: 18", 2", 1")
MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
191
I-191 INSPECTION @ [TP-1456-00-HT-001 (P) (Pipe sizes: 4", 6", 10", 18", 20")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
192
I-192 INSPECTION @ [TP-1455-00-HT-001 (P) (Pipe sizes: 12", 16")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
193 I-193 INSPECTION METAL CLADDING EXCEPT WELD JOINT ON TP-1452-00-HT-001
(Pipe sizes: 36", 30")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
194 METAL CLADDING EXCEPT WELD JOINT ON TP-1506-01-HT-001
I-194 INSPECTION (Pipe sizes: 8")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
195
I-195 INSPECTION @ TP-1623-01-HT-007 (P) (Pipe sizes: 8", 10")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
196
I-196 INSPECTION @ TP-1623-01-HT-008 (P) (Pipe sizes: 8")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
197 PREPARATION TOAPPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
I-197 INSPECTION 1682-01-HT-005 (Pipe sizes: 8", 2")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
198 I-198 PREPARATION TOAPPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
INSPECTION 1682-01-HT-009 (Pipe sizes: 8", 2")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
199
I-199 INSPECTION @ [TP-1606-02-HT-006] (Pipe sizes: 12")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
200
I-200 INSPECTION @ [TP-1607-02-HT-006] (Pipe sizes: 12")

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
201 I-201 INSPECTION @ [TP-1507-01-HT-001](Pipe sizes: 8", 6")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


202 MFC-DLM-AK- PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-202
INSPECTION 1456-00-HT-001 (Pipe sizes: 36", 24", 20", 6", 4")
INSULATION INSPECTION PRIOR TO APPLICATION OF OF METAL
MFC-DLM-AK- INSULATION
203 CLADDING ON HYDROTESTED LINE @ TP-1682-01-HT-005 (Pipe
I-203 INSPECTION
sizes: 8", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF OF METAL


MFC-DLM-AK- INSULATION
204 CLADDING ON HYDROTESTED LINE @ TP-1682-01-HT-009 (Pipe
I-204 INSPECTION
sizes: 8", 2")

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF IWR 701 AP PRIMRY
205 I-205 MATERIAL VAPOR BARRIER , BANDS, BAND SEALS, TOGGLE LATCH

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
206 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-021
I-206 INSPECTION (Pipe sizes: 30", 20", 6", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
207 CLADDING EXCEPT WELD JOINT @ TP-1456-00-HT-001 (Pipe
I-207 INSPECTION
sizes: 36", 24", 12", 6", 4")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
208 CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-021 (Pipe
I-208 INSPECTION sizes: 30", 20", 6", 2")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
209 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
I-209 INSPECTION 1506-01-HT-001 (Pipe sizes: 6" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR


MFC-DLM-AK-
210 I-210 PREPARATION TOAPPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-
INSPECTION 1506-02-HT-001 (Pipe sizes: 6" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


211 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1507-01-HT-010
I-211
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
212 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1506-01-HT-010
I-212
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
213 I-213 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1505-01-HT-010
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


214 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1504-01-HT-010
I-214
INSPECTION (Pipe sizes: 2" )
SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF
MFC-DLM-AK-
215 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1503-01-HT-010
I-215
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
216 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1502-01-HT-010
I-216
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
217 I-217 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1501-01-HT-010
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
218 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1514-01-HT-009
I-218 INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
219 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1511-01-HT-009
I-219
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
220 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1691-01-HT-027
I-220 INSPECTION (Pipe sizes: 24", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
221 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-006
I-221 INSPECTION (Pipe sizes: 10", 6" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
222 I-222 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1683-02-HT-025
INSPECTION (Pipe sizes: 8", 6", 3" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


223 CLADDING ON HYDROTESTED LINE @ TP-1507-01-HT-010
I-223 INSPECTION
(Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
224 CLADDING ON HYDROTESTED LINE @ TP-1506-01-HT-010
I-224 INSPECTION
(Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
225 I-225 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1505-01-HT-010
(Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


226 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1504-01-HT-010
I-226 INSPECTION
(Pipe sizes: 2" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
227 CLADDING ON HYDROTESTED LINE @ TP-1503-01-HT-010
I-227 INSPECTION
(Pipe sizes: 2" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
228 2ND LAYER EXCEPT WELD JOINT @ TP-1506-01-HT-001 (Pipe
I-228 INSPECTION
sizes: 6", 8")

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
229 I-229 INSPECTION 2ND LAYER EXCEPT WELD JOINT @ TP-1506-02-HT-001 (Pipe
sizes: 6" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
230 2ND LAYER ON HYDROTESTED LINE @ TP-1691-01-HT-027
I-230 INSPECTION (Pipe sizes: 24", 2", 1" )

INSULATION INSPECTION PRIOR TOAPPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
231 BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-006 (Pipe
I-231 INSPECTION
sizes: 10", 6" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- INSULATION
232 OF 2ND LAYER ON HYDROTESTED LINE @ TP-1683-02-HT-025
I-232 INSPECTION (Pipe sizes: 8", 6", 3" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELDED


233
I-233 INSPECTION JOINT @ TP-1506-01-HT-001 (Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
234 I-234 INSPECTION BARRIER ON HYDROTESTED LINE @ TP-1683-02-HT-025 (Pipe
sizes: 8", 6", 3" )

MFC-DLM-AK- INSULATION VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


235 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-006
I-235 INSPECTION
(Pipe sizes: 10", 6" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
236 VAPOR BARRIER ON HYDROTESTED LINE @ TP-1691-01-HT-027
I-236 INSPECTION
(Pipe sizes: 24", 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
237 I-237 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1502-01-HT-010
(Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


238 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1501-01-HT-010
I-238 INSPECTION
(Pipe sizes: 2" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
239 CLADDING ON HYDROTESTED LINE@ TP-1514-01-HT-009 (Pipe
I-239 INSPECTION
sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
240 CLADDING ON HYDROTESTED LINE @ TP-1511-01-HT-009
I-240 INSPECTION
(Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
241 I-241 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1452-00-HT-019
INSPECTION (Pipe sizes: 30", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
242 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1455-00-HT-004
I-242 INSPECTION (Pipe sizes: 16", 2", 1" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
243 METAL CLADDING EXCEPT WELD JOINT @ TP-1506-01-HT-
I-243 INSPECTION
001(Pipe sizes: 6", 8")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
244 METAL CLADDING EXCEPT WELD JOINT @ TP-1506-02-HT-001
I-244 INSPECTION (Pipe sizes: 6" )

FINAL INSPECTION PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT


MFC-DLM-AK-
245 OF METAL ON TP-1625-00-HT-002 (Pipe sizes: 36", 30", 24",20", 16") MAIN
I-245 CLADDING HEADER

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
246 I-246 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JPINT @ TP-1454-
INSPECTION 00-HT-001 (T) (Pipe sizes: 30" )

MFC-DLM-AK- FINAL INSPECTION PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD JOINT
247 OF METAL
I-247 @ TP-1453-00-HT-001 (Pipe sizes: 30)
CLADDING

FINAL INSPECTION
MFC-DLM-AK- PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD
248 OF METAL
I-248 JOINT ON TP-1452-00-HT-001 (Pipe sizes: 36", 30")
CLADDING

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
249 I-249 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1691-01-HT-027
(Pipe sizes: 24", 2", 1" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


250 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINE @ TP-1683-02-HT-025
I-250 INSPECTION
(Pipe sizes: 8", 6", 3" )
MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
251
I-251 MATERIAL MATERIALS

MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
252
I-252 MATERIAL MATERIALS

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
253 I-253 OF METAL @ TP-1714-00-HT-006 (Pipe sizes: 10", 6" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING INCLUDING VALVES


MFC-DLM-AK-
254 OF METAL BOX & FLANGE BOX ON HYDROTESTED LINE @ TP-1682-01-HT-
I-254 CLADDING 005 (Pipe sizes: 8", 2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING INCLUDING VALVES


MFC-DLM-AK-
255 OF METAL BOX & FLANGE BOX ON HYDROTESTED LINE @ TP-1682-01-HT-
I-255
CLADDING 009 (Pipe sizes: 8", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
256 INSULATION 2ND LAYER ON HYDROTESTED LINE @ TP-1452-
I-256 INSPECTION 00-HT-019 (Pipe sizes: 30", 1", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
257 CLADDING ON HYDROTESTED LINE @ TP-1455-00-HT-004
I-257 INSPECTION (Pipe sizes: 16", 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
258 I-258 INSPECTION CLADDING EXCEPT WELD JOINT @ TP-1454-00-HT-001 (T) (Pipe
sizes: 30" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


259 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-023
I-259
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
260 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-024
I-260
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
261 I-261 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-025
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


262 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-021
I-262
INSPECTION (Pipe sizes: 30", 20", 6", 2" )
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
263 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-026
I-263
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
264 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-027
I-264
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
265 I-265 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-028
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
266 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-027
I-266 INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
267 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-026
I-267
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
268 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-023
I-268 INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
269 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-023
I-269 INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
270 I-270 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-023
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


271 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-025
I-271
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
272 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-026
I-272
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
273 I-273 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-027
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


274 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-028
I-274
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
275 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1603-02-HT-026
I-275
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
276 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-027
I-276
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
277 I-277 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1601-02-HT-027
INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
278 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-023
I-278 INSPECTION (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
279 CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-021 (Pipe
I-279 INSPECTION
sizes: 30", 20", 6", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
280 CLADDING ON HYDROTESTED LINE @ TP-1452-00-HT-019
I-280 INSPECTION (Pipe sizes: 30", 1", 0.75" )

FINAL INSPECTION PARTIAL FINAL INSPECTION OF COLD METAL CLADDING ON


MFC-DLM-AK-
281 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-025 (Pipe sizes: 8", 6",
I-281 CLADDING 3" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
282 I-282 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-021
INSPECTION (Pipe sizes: 30", 20", 6", 2" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


283 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-
I-283
INSPECTION 021(Pipe sizes: 30", 20", 6", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
284 CLADDING ON HYDROTESTED LINE @ TP-1605-02-HT-021
I-284 INSPECTION
(Pipe sizes: 30", 20", 6", 2" )

MFC-DLM-AK- FINAL INSPECTION PARTIAL FINAL INSPECTION OF METAL CLADDING ON


285 I-285 OF METAL HYDROTESTED LINE @ TP-1691-01-HT-027 (Pipe sizes: 24" )
CLADDING

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


286 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-
I-283
INSPECTION 021(Pipe sizes: 30", 20", 6", 2" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
287 CLADDING ON HYDROTESTED LINE @ TP-1605-02-HT-021
I-284 INSPECTION
(Pipe sizes: 30", 20", 6", 2" )

FINAL INSPECTION
MFC-DLM-AK- PARTIAL FINAL INSPECTION OF METAL CLADDING ON
288 OF METAL
I-285 HYDROTESTED LINE @ TP-1691-01-HT-027 (Pipe sizes: 24" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
289 I-286 OF METAL @ TP-1455-00-HT-004 (Pipe sizes: 16", 2", 1" )
CLADDING

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
290 CLADDING ON HYDROTESTED LINE @ TP-1604-02-HT-021
I-287 INSPECTION (Pipe sizes: 30", 20", 6", 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
291 OF METAL
I-288 @ @ TP-1607-02-HT-021 (Pipe sizes: 30", 20", 6", 2")
CLADDING

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
292 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1661-01-HT-026
I-289 INSPECTION (Pipe sizes: 36", 2", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
293 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-018
I-290 INSPECTION (Pipe sizes: 8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
294 I-291 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-016
INSPECTION (Pipe sizes: 8" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


295 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-014
I-292
INSPECTION (Pipe sizes: 8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
296 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-012
I-293
INSPECTION (Pipe sizes: 8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
297 I-294 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-010
INSPECTION (Pipe sizes: 8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


298 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1685-00-HT-008
I-295
INSPECTION (Pipe sizes: 8" )
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
299 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-021
I-296
INSPECTION (Pipe sizes: 30", 20", 6", 2")

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- INSULATION
300 OF VAPOR BARRIER ON HYDROTESTED LINE @ TP-1661-01-HT-
I-297 INSPECTION
026 (Pipe sizes: 36", 2", 1", 0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
301 I-298 OF METAL @ TP-1452-00-HT-019 (Pipe sizes: 30", 1", 0.75" )
CLADDING

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
302 CLADDING ON HYDROTESTED LINE @ TP-1661-01-HT-026
I-299 INSPECTION (Pipe sizes: 36", 2", 1", 0.75" )

FINAL INSPECTION
MFC-DLM-AK- PARTIAL INSPECTION OF METAL CLADDING ON HYDROTESTED
303 OF METAL
I-300 LINE @ TP-1661-01-HT-026 (Pipe sizes: 36", 2", 1", 0.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION PARTIAL INSPECTION OF METAL CLADDING, EXCEPT WELD


304 OF METAL
I-301 CLADDING JOINT @ TP-1506-01-HT-001 (Pipe sizes: 6", 8")

FINAL INSPECTION
MFC-DLM-AK- PARTIAL INSPECTION OF METAL CLADDING, EXCEPT WELD
305 OF METAL
I-302 CLADDING JOINT @ TP-1506-02-HT-001 (Pipe sizes: 6")

MFC-DLM-AK- FINAL INSPECTION PARTIAL INSPECTION OF METAL CLADDING, EXCEPT WELD


306 I-303 OF METAL JOINT @ TP-1454-00-HT-001 (T) (Pipe sizes: 30" )
CLADDING

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


307
I-304 MATERIAL MATERIALS

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
308 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1603-02-HT-021
I-305
INSPECTION (Pipe sizes: 30", 20", 6", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
309 I-306 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-021 (Pipe
sizes: 30", 20", 6", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


310 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-018
I-307 INSPECTION
(Pipe sizes: 8" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
311 CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-016
I-308 INSPECTION
(Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
312 CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-014
I-309 INSPECTION
(Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
313 I-310 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-012
(Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
314 CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-010
I-311 INSPECTION (Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
315 CLADDING ON HYDROTESTED LINE @ TP-1685-00-HT-008
I-312 INSPECTION
(Pipe sizes: 8" )

HOT / COLD
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF HOT/COLD ALUMINUM
316 INSULATION
I-313 MATERIAL STUCCO EMBOSSED MATERIALS

HOT / COLD MATERIAL RECEIVING & INSPECTION OF HOT/COLD ACCESSORY


MFC-DLM-AK-
317 INSULATION & IWR701 AP PRIMARY VAPOUR BARRIER 1000 mm X 15mm
I-314 MATERIAL MATERIALS

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
318 I-315 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1603-02-HT-021 (Pipe
sizes: 30", 20", 6", 2")

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


319 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1683-01-HT-003
I-316
INSPECTION (Pipe sizes: 18", 12", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
320 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1681-00-HT-011
I-317
INSPECTION (Pipe sizes: 36", 1" )

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


321 I-318 MATERIAL MATERIALS

FINAL INSPECTION
322 MFC-DLM-AK- OF METAL PARTIAL FINAL INSPECTION OF HOT METAL CLADDING EXCEPT
I-319 WELD JOINT @ TP-1456-00-HT-001 (Pipe sizes: 36", 24", 12", 6")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED
323 OF METAL
I-320 LINE @ TP-1685-00-HT-018 (Pipe sizes: 8" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED
324 OF METAL
I-321 LINE @ TP-1685-00-HT-016 (Pipe sizes: 8" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED
325 I-322 OF METAL LINE @ TP-1685-00-HT-014 (Pipe sizes: 8" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED
326 OF METAL
I-323 CLADDING LINE @ TP-1685-00-HT-012 (Pipe sizes: 8" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED
327 OF METAL
I-324 LINE @ TP-1685-00-HT-010 (Pipe sizes: 8" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF HOT METAL CLADDING ON HYDROTESTED


328 OF METAL
I-325 CLADDING LINEE @ TP-1685-00-HT-008 (Pipe sizes: 8" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
329 BARRIER ON HYDROTESTED LINE @ TP-1681-00-HT-011 (Pipe
I-326 INSPECTION sizes: 36", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
330 I-327 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1661-01-HT-002 (Pipe
INSPECTION sizes: 36", 0.75")

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


331 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1607-02-HT-030
I-328
INSPECTION (Pipe sizes: 8', 4", 3", 1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
332 BARRIER ON HYDROTESTED LINE @ TP-
I-329 INSPECTION
1683-01-HT-003 (18",12",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER APPLICATION PRIOR TO APPLICATION OF METAL


333 I-330 INSPECTION CLADDING ON HYDROTESTED LINE @
TP-1681-00-HT-011 (36",1" )

INSULATIO IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


334 MFC-DLM-AK- INSULATION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1661-01-HT-002
I-331 INSPECTION
(36",0.75" )
VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- VAPOR BARRIER
335 CLADDING ON HYDROTESTED LINE @ TP-1683-01-HT-003 (Pipe
I-332 INSPECTION
sizes: 18", 12", 1" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
336 CLADDING ON HYDROTESTED LINE @ TP-1661-01-HT-002 (Pipe
I-333 INSPECTION
sizes: 36", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
337 I-334 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-030
INSPECTION (Pipe sizes:8", 4", 3", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
338 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-044
I-335 INSPECTION (Pipe sizes: 6", 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
339 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-045
I-336
INSPECTION (Pipe sizes: 6", 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
340 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-051
I-337 INSPECTION (Pipe sizes: 6", 2" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
341 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-1714-
I-338 INSPECTION 00-HT-007 (Pipe sizes: 36", 24", 18" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
342 I-339 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINT @ TP-1714-
INSPECTION 00-HT-010 (Pipe sizes: 36", 24" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


343 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1704-02-HT-043
I-340
INSPECTION (Pipe sizes: 36", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
344 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1615-01-HT-001
I-341
INSPECTION (Pipe sizes: 8", 6", 4", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
345 I-342 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-030 (Pipe
sizes: 8", 4", 3", 1" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


346 MFC-DLM-AK- INSULATION VAPOR BARRIER EXCEPT WELD JOINT @ TP-1714-00-HT-007
I-343 INSPECTION
(Pipe sizes: 36", 24", 18" )
INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
347 VAPOR BARRIER EXCEPT WELD JOINT @ TP-1714-00-HT-010
I-344 INSPECTION
(Pipe sizes: 36", 24" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
348 OF METAL
I-345 @ TP-1681-00-HT-011 (Pipe sizes: 36", 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
349 I-346 OF METAL @ TP-1683-01-HT-003 (Pipe sizes: 18", 12", 1" )
CLADDING

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
350 OF METAL CLADDING EXCEPT WELD JOINT @ TP-1714-00-HT-007
I-347 INSPECTION (Pipe sizes: 36", 24", 18" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
351 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-030
I-348
INSPECTION (Pipe sizes:8", 4", 3", 1" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
352 METAL CLADDINGT ON HYDROTESTED LINE @ TP-1615-01-HT-
I-349 INSPECTION 001 (Pipe sizes: 8", 6", 4", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
353 CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-030 (Pipe
I-350 INSPECTION sizes: 8", 4", 3", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
354 I-351 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-044 (Pipe
sizes: 6", 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


355 CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-045 (Pipe
I-352 INSPECTION
sizes: 6", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
356 CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-051 (Pipe
I-353 INSPECTION
sizes: 6", 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
357 I-354 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-030
INSPECTION (Pipe sizes:8", 4", 3", 1" )

FINAL INSPECTION
358 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
I-355 @ TP-1661-01-HT-002 (Pipe sizes: 36", 0.75" )
CLADDING
INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
359 METAL CLADDINGT ON HYDROTESTED LINE @ TP-1615-01-HT-
I-349 INSPECTION
001 (Pipe sizes: 8", 6", 4", 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
360 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1681-00-HT-021
I-356
INSPECTION (Pipe sizes: 30", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF 2nd LAYER


MFC-DLM-AK- INSULATION
361 I-357 INSPECTION ON HYDROTESTED LINE @ TP-1681-00-HT-021 (Pipe sizes: 30",
1" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
362 2nd LAYER ON HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe
I-358 INSPECTION sizes: 36", 2", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
363 EXCEPT WELD JOINT @ TP-1714-00-HT-010 (Pipe sizes: 36",
I-359 INSPECTION
24" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
364 METAL CLADDING ON HYDROTESTED LINE @ TP-1604-02-HT-030
I-360 INSPECTION (Pipe sizes: 8", 4", 3", 1" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
365 METAL CLADDING ON HYDROTESTED LINE @ TP-1605-02-HT-
I-361 INSPECTION 030 (Pipe sizes: 8", 4", 3", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- VAPOR BARRIER
366 I-362 INSPECTION BARRIER ON HYDROTESTED LINE @ TP-1681-00-HT-021 (Pipe
sizes: 30", 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


367 OF METAL
I-363 @ TP-1625-00-HT-044 (Pipe sizes: 6", 2")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
368 OF METAL
I-364 @ TP-1625-00-HT-045 (Pipe sizes: 6", 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


369 I-365 OF METAL @ TP-1625-00-HT-051 (Pipe sizes: 6", 2")
CLADDING

370 MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
I-366 MATERIAL MATERIALS
INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
371 3rd LAYER ON HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe
I-367 INSPECTION
sizes: 36", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
372 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-027
I-368
INSPECTION (Pipe sizes: 20", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
373 I-369 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-028
INSPECTION (Pipe sizes: 20", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
374 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-004
I-370 INSPECTION (Pipe sizes: 12" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
375 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-005
I-371
INSPECTION (Pipe sizes: 6" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
376 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-007
I-372 INSPECTION (Pipe sizes: 16" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
377 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-008
I-373 INSPECTION (Pipe sizes: 8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
378 I-374 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-009
INSPECTION (Pipe sizes: 6" )

MFC-DLM-AK- INSULATION INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


379 3rd LAYER ON HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe
I-375 INSPECTION
sizes: 36", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
380 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1615-01-HT-004
I-376
INSPECTION (Pipe sizes: 8", 2", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
381 I-377 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1452-00-HT-001
INSPECTION (Pipe sizes: 36", 30", 20", 18")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


382 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-027 (Pipe
I-378 INSPECTION
sizes: 20", 2", 1" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
383 CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-028 (Pipe
I-379 INSPECTION
sizes: 20", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
384 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-025
I-380
INSPECTION (Pipe sizes: 20", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
385 I-381 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-026
INSPECTION (Pipe sizes: 20", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-
386 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1601-02-HT-021
AK-I-382 INSPECTION (Pipe sizes: 30", 20", 6", 2")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
387 CLADDING ON HYDROTESTED LINE @ TP-1681-00-HT-021 (Pipe
I-383 INSPECTION
sizes: 30", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
388 BARRIER ON HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe
I-384 INSPECTION sizes: 36", 2", 1" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
389 2nd Layer EXCEPT WELDING JOINT LINE @ TP-1452-00-HT-001
I-385 INSPECTION (Pipe sizes: 36", 30", 20", 18" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
390 I-386 INSPECTION 2nd Layer EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-009
(Pipe sizes: 6" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


391 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1452-00-HT-001
I-387
INSPECTION (Pipe sizes: 24", 20", 18" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
392 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1601-02-HT-021
I-388
INSPECTION (Pipe sizes: 30", 20", 6", 2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


393 I-389 OF METAL @ TP-1606-02-HT-030 (Pipe sizes: 8", 4", 3", 1" )
CLADDING

FINAL INSPECTION
394 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
I-390 @ TP-1607-02-HT-030 (Pipe sizes: 8", 4", 3", 1" )
CLADDING
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
395 CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-026 (Pipe
I-391 INSPECTION
sizes: 20", 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
396 CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-026 (Pipe
I-392 INSPECTION
sizes: 20", 2", 1" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
397 I-393 INSPECTION VAPOR BARRIER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-
004 (Pipe sizes: 12")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
398 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-007
I-394 INSPECTION (Pipe sizes: 16")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
399 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-008
I-395 INSPECTION
(Pipe sizes: 8")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
400 BARRIER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-009
I-396 INSPECTION (Pipe sizes: 6" )

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
401 METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1452-00-
I-397 INSPECTION HT-001 (Pipe sizes: 36", 30", 20", 18")

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
402 I-398 INSPECTION 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-1452-00-HT-001
(Pipe sizes: 24", 20", 18")

MFC-DLM-AK- INSULATION PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


403 APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT LINE
I-399 INSPECTION
@ TP-1452-00-HT-001 (Pipe sizes: 24", 20", 18" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
404 CLADDING ON HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe
I-400 INSPECTION
sizes: 36", 2", 1" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
405 I-401 INSPECTION OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
01-HT-004 (Pipe sizes: 12" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


406 MFC-DLM-AK- INSULATION VAPOR BARRIER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-
I-402 INSPECTION
007 (Pipe sizes: 16" )
PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
407 VAPOR BARRIER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-
I-403 INSPECTION
008 (Pipe sizes: 8" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
408 OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
I-404 INSPECTION
01-HT-009 (Pipe sizes: 6" )

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT FIBERFRAX


409 I-405 MATERIAL DURABLANKET HOT INSULATION MATERIALS

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
410 CLADDING ON HYDROTESTED LINE @ TP-1615-01-HT-004 (Pipe
I-406 INSPECTION sizes: 8", 2", 1", 0.75")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
411 OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
I-407 INSPECTION
01-HT-007 (Pipe sizes: 16")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
412 OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
I-408 INSPECTION 01-HT-008 (Pipe sizes: 8" )

SURFACE PARTIAL SURFACE INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
413 PREPARATION INSULATION EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-
I-409 INSPECTION 004 (Pipe sizes: 12")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
414 I-410 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT LINE @
INSPECTION TP-1691-01-HT-005 (Pipe sizes: 6")

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


415 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT LINE @
I-411
INSPECTION TP-1705-01-HT-005 (Pipe sizes: 6")

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
416 APPLICATION OF 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-
I-412 INSPECTION
1705-01-HT-005 (Pipe sizes: 20" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
417 I-413 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1601-02-HT-021 (Pipe
sizes: 30", 20", 6", 2")

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


418 MFC-DLM-AK- INSULATION APPLICATION OF 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-
I-414 INSPECTION
1705-01-HT-005 (Pipe sizes: 20" )
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
419 OF METAL
I-415 @ TP-1681-00-HT-021 (Pipe sizes: 30", 1" )
CLADDING

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
420 PREPARATION INSULATION ON HYDRTESTED LINE @ TP-1603-02-HT-030 (Pipe
I-416
INSPECTION sizes: 8", 4", 3", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
421 I-417 OF METAL @ TP-1625-00-HT-027 (Pipe sizes: 20", 2", 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
422 OF METAL
I-418 CLADDING @ TP-1625-00-HT-028 (Pipe sizes: 20", 2", 1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT WELD
423
I-419 INSPECTION JOINT @ TP-1714-00-HT-007 (Pipe sizes: 36", 24", 18" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT WELD
424
I-420 INSPECTION JOINT @ TP-1714-00-HT-010 (Pipe sizes: 36", 24" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
425 PREPARATION INSULATION ON HYDRTESTED LINE @ TP-1603-02-HT-030 (Pipe
I-421 INSPECTION sizes: 8", 4", 3", 1" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
426 I-422 INSPECTION APPLICATION OF 3rd LAYER EXCEPT WELDING JOINT LINE @ TP-
1705-01-HT-005 (Pipe sizes: 20" )

MFC-DLM-AK- INSULATION PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


427 APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT LINE
I-423 INSPECTION
@ TP-1691-01-HT-005 (Pipe sizes: 6" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
428 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT LINE @
I-424
INSPECTION TP-1452-00-HT-001 (Pipe sizes: 6", 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
429 I-425 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT LINE @
INSPECTION TP-1691-01-HT-007 (Pipe sizes: 16" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


430 MFC-DLM-AK- INSULATION APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT LINE
I-426 INSPECTION
@ TP-1705-01-HT-005 (Pipe sizes: 20" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
431 CLADDING ON HYDRTESTED LINE @ TP-1603-02-HT-030 (Pipe
I-427 INSPECTION
sizes: 8", 4", 3", 1" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
432 APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT LINE
I-428 INSPECTION
@ TP-1691-01-HT-004 (Pipe sizes: 12" )

PARTIALVAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
433 I-429 INSPECTION METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1705-01-
HT-005 (Pipe sizes: 20" )

PARTIALVAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
434 METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-01-
I-430 INSPECTION HT-005 (Pipe sizes: 6" )

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


435
I-431 MATERIAL MATERIALS

MATERIAL
MFC-DLM-AK- INSPECTION OF MATERIAL RECEIVING & INSPECTION OF IWR 701 AP PRIMRY
436
I-432 ACCESSORIES FOR VAPOR BARRIER , BANDS
INSULATION

INSULATION INSPECTION PRIOR TO APPLICATION OF 2nd LAYER


MFC-DLM-AK- INSULATION
437 EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-007 (Pipe sizes:
I-433 INSPECTION 16" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
438 I-434 PREPARATION INSULATION EXCEPT WELDING JOINT @ TP-1704-02-HT-002
INSPECTION (Pipe sizes: 16" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


439 OF METAL
I-435 @ TP-1625-00-HT-025 (Pipe sizes: 20", 2", 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
440 OF METAL
I-436 @ TP-1625-00-HT-026 (Pipe sizes: 20", 2", 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


441 I-437 OF METAL @ TP-1605-02-HT-030 (Pipe sizes: 8", 4", 3", 1" )
CLADDING

FINAL INSPECTION
442 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
I-438 @ TP-1604-02-HT-030 (Pipe sizes: 8", 4", 3", 1" )
CLADDING
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
443 PREPARATION INSULATION HYDROTESTED LINE @ TP-1704-02-HT-002 (Pipe
I-439
INSPECTION sizes: 16" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
444 OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
I-440 INSPECTION
01-HT-004 (Pipe sizes: 12" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
445 I-441 INSPECTION BARRIER EXCEPT WELDING JOINT LINE @ TP-1691-01-HT-007
(Pipe sizes: 16" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
446 2nd LAYER EXCEPT WELDING JOINT LINE @ TP-1452-00-HT-001
I-442 INSPECTION (Pipe sizes: 6", 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
447 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-443
INSPECTION 1705-01-HT-003 (Pipe sizes: 6" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
448 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-444 INSPECTION 1453-00-HT-001 (Pipe sizes: 24", 8", 4" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
449 APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT LINE
I-445 INSPECTION @ TP-1452-00-HT-001 (Pipe sizes: 6", 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
450 I-446 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1456-00-HT-001 (Pipe sizes:30", 20", 16", 12", 10", 8" )

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


451 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1625-
I-447
INSPECTION 00-HT-016 (Pipe sizes: 16", 2", 1" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
452 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1625-
I-448
INSPECTION 00-HT-017 (Pipe sizes: 16", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


453 I-449 OF METAL @ TP-1602-02-HT-021 (Pipe sizes: 30", 20", 6", 2")
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


454 MFC-DLM-AK- PARTIAL FINAL WELDING JOINT LINE @ TP-1452-00-HT-001 (Pipe sizes: 36", 30",
I-450 INSPECTION
20", 18" )
PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION
MFC-DLM-AK- VAPOR BARRIER
455 OF METAL CLADDING EXCEPT WELDING JOINT LINE @ TP-1691-
I-451 INSPECTION
01-HT-007 (Pipe sizes: 16" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
456 2nd LAYER EXCEPT WELDING JOINT @ TP-1704-02-HT-002 (Pipe
I-452 INSPECTION
sizes: 16" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
457 I-453 INSPECTION APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
TP-1453-00-HT-001 (Pipe sizes: 24", 8", 4" )

PARTIAL FINAL INSPECTION OF METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
458 HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe sizes: 36", 2",
I-454 INSPECTION 1" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
459 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-455
INSPECTION 1683-03-HT-015 (Pipe sizes: 16", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
460 PREPARATION INSULATION HYDROTESTED LINE @ TP-1625-00-HT-050 (Pipe
I-456 INSPECTION sizes: 6", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
461 PREPARATION INSULATION HYDROTESTED LINE @ TP-1616-00-HT-028 (Pipe
I-457 INSPECTION sizes: 8", 4", 1", 0.75" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
462 I-458 INSPECTION APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
TP-1456-00-HT-001 (Pipe sizes:30", 20", 16", 12", 10", 8" )

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


463 3nd LAYER EXCEPT WELDING JOINT @ TP-1704-02-HT-002 (Pipe
I-459 INSPECTION
sizes: 16" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
464 CLADDING HYDROTESTED LINE @ TP-1602-02-HT-030 (Pipe
I-460 INSPECTION
sizes: 8", 4", 3", 1" ))

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
465 I-461 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1714-00-HT-047 (Pipe sizes: 12" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


466 MFC-DLM-AK- INSULATION APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
I-462 INSPECTION
TP-1456-00-HT-001 (Pipe sizes:30", 20", 16", 12", 10", 8" )
PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
467 METAL CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-
I-463 INSPECTION
016 (Pipe sizes: 16", 2", 1" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
468 METAL CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-
I-464 INSPECTION
017 (Pipe sizes: 16", 2", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDINGT ON HYDROTESTED
469 I-465 OF METAL LINE @ TP-1615-01-HT-001 (Pipe sizes: 8", 6", 4", 2" )
CLADDING

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
470 PREPARATION INSULATION ON HYDRTESTED LINE @ TP-1601-02-HT-030 (Pipe
I-466 INSPECTION sizes: 8", 4", 3", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
471 CLADDING HYDROTESTED LINE @ TP-1625-00-HT-050 (Pipe
I-467 INSPECTION
sizes: 6", 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
472 CLADDING HYDROTESTED LINE @ TP-1616-00-HT-028 (Pipe
I-468 INSPECTION sizes: 8", 4", 1", 0.75" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
473 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-469 INSPECTION 1704-02-HT-003 (Pipe sizes: 6" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
474 I-470 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1704-02-HT-036 (Pipe sizes: 6" )

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


475 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-471
INSPECTION 1683-02-HT-016 (Pipe sizes: 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
476 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-472
INSPECTION 1452-00-HT-001 (Pipe sizes: 20" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
477 I-473 INSPECTION VAPOR BARRIER EXCEPT WELDING JOINT @ TP-1704-02-HT-002
(Pipe sizes: 16" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


478 MFC-DLM-AK- INSULATION APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
I-474 INSPECTION
TP-1456-00-HT-001 (Pipe sizes:30", 20", 16", 12", 10", 8" )
SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO
MFC-DLM-AK-
479 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-475
INSPECTION 1714-00-HT-023 (Pipe sizes: 16", 10" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
480 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-476
INSPECTION 1714-00-HT-013 (Pipe sizes: 24", 20", 12" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
481 I-477 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1714-00-HT-012 (Pipe sizes: 24",14", 12", 8" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
482 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-478 INSPECTION 1704-02-HT-001 (Pipe sizes: 12",10", 8", 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
483 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-479
INSPECTION 1704-02-HT-028 (Pipe sizes: 10" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
484 APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
I-474-A INSPECTION TP-1456-00-HT-001 (Pipe sizes:30", 20", 16", 12", 10", 8" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
485 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-475-A INSPECTION 1714-00-HT-023 (Pipe sizes: 16", 10" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
486 I-476-A PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1714-00-HT-013 (Pipe sizes: 24", 20", 12" )

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


487 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-477-A
INSPECTION 1714-00-HT-012 (Pipe sizes: 24",14", 12", 8" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
488 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-478-A
INSPECTION 1704-02-HT-001 (Pipe sizes: 12",10", 8", 4" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
489 I-479-A PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1704-02-HT-028 (Pipe sizes: 10" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


490 MFC-DLM-AK- INSULATION 2ND LAYER EXCEPT WELDING JOINT @ TP-1452-00-HT-001 (Pipe
I-480 INSPECTION
sizes: 20" )
PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO
MFC-DLM-AK- INSULATION
491 APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT @ TP-
I-481 INSPECTION
1714-00-HT-012 (Pipe sizes: 24",14", 12", 8" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
492 APPLICATION OF 2ND LAYER, EXCEPT WELDING JOINT @ TP-
I-482 INSPECTION
1705-01-HT-003 (Pipe sizes: 6" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
493 I-483 INSPECTION OF METAL CLADDING EXCEPT WELDING JOINT @ TP-1704-02-HT-
002 (Pipe sizes: 16" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
494 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-484 INSPECTION 1625-00-HT-005 (Pipe sizes: 10"

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
495 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-485
INSPECTION 1625-00-HT-029 (Pipe sizes: 8"

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
496 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-486 INSPECTION 1625-00-HT-030 (Pipe sizes: 8"

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
497 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-487 INSPECTION 1625-00-HT-031 (Pipe sizes: 8"

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
498 I-488 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1625-00-HT-032 (Pipe sizes: 8"

MFC-DLM-AK- INSULATION PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


499 APPLICATION OF METAL CLADDING EXCEPT WELDING JOINT @
I-489 INSPECTION
TP-1452-00-HT-001 (Pipe sizes: 20" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
500 APPLICATION OF VAPOR BARRIER, EXCEPT WELDING JOINT @
I-490 INSPECTION
TP-1705-01-HT-003 (Pipe sizes: 6" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


501 I-491 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-004 (Pipe sizes: 12" )

502 MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT
I-492 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-005 (Pipe sizes: 6" )
PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
503 METAL CLADDING EXCEPT WELDING JOINT @ TP-1625-00-HT-
I-493 INSPECTION
005 (Pipe sizes: 10"

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
504 METAL CLADDING EXCEPT WELDING JOINT @ TP-1625-00-HT-
I-494 INSPECTION
029 (Pipe sizes: 8"

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
505 I-495 INSPECTION METAL CLADDING EXCEPT WELDING JOINT @ TP-1625-00-HT-
030 (Pipe sizes: 8"

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
506 METAL CLADDING EXCEPT WELDING JOINT @ TP-1625-00-HT-
I-496 INSPECTION 031 (Pipe sizes: 8"

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
507 METAL CLADDING EXCEPT WELDING JOINT@ TP-1625-00-HT-032
I-497 INSPECTION
(Pipe sizes: 8"

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
508 VAPOR BARRIER EXCEPT WELDING JOINT @ TP-1714-00-HT-023
I-498 INSPECTION (Pipe sizes: 16", 10" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
509 OF METAL CLADDING EXCEPT WELDING JOINT @ TP-1714-00-HT-
I-499 INSPECTION 012 (Pipe sizes: 24",14", 12", 8" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
510 I-500 INSPECTION APPLICATION OF 2ND LAYER, EXCEPT WELDING JOINT @ TP-
1683-02-HT-016 (Pipe sizes: 4" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


511
I-501 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-007 (Pipe sizes: 16" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER OF METAL CLADDING @ TP-1714-00-HT-023 (Pipe sizes: 16", 10"
512
I-502 INSPECTION
)

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
513 I-503 INSPECTION OF METAL CLADDING, EXCEPT WELDING JOINT @ TP-1705-01-
HT-003 (Pipe sizes: 6" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


514 MFC-DLM-AK- INSULATION VAPOR BARRIER, EXCEPT WELDING JOINT @ TP-1683-02-HT-016
I-504 INSPECTION
(Pipe sizes: 4" )
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
515 PREPARATION INSULATION ON HYDROTESTED @ TP-1625-00-HT-015 (Pipe
I-505
INSPECTION sizes: 16", 3", 2", 1")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
516 PREPARATION INSULATION ON HYDROTESTED @ TP-1614-01-HT-003 (Pipe
I-506
INSPECTION sizes: 8", 6", 4", 1", 0.75")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


517 I-507 INSPECTION WELDING JOINT LINE @ TP-1705-01-HT-005 (Pipe sizes: 20" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED
518 OF METAL
I-508 CLADDING LINE @ TP-1615-01-HT-004 (Pipe sizes: 8", 2", 1", 0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED
519 OF METAL
I-509 LINE @ TP-1606-02-HT-021 (Pipe sizes: 30", 20", 6", 2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED


520 OF METAL
I-510 CLADDING LINE @ TP-1625-00-HT-017 (Pipe sizes: 16", 2", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED
521 OF METAL
I-511 CLADDING LINE @ TP-1625-00-HT-016 (Pipe sizes: 16", 2", 1" )

PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
522 I-512 INSPECTION APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT @ TP-
1714-00-HT-013 (Pipe sizes: 24", 20", 12" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


523 PREPARATION INSULATION ON HYDROTESTED @ TP-1625-00-HT-018 (Pipe
I-513
INSPECTION sizes:16", 3", 2" 1" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
524 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED @ TP-1625-00-
I-514
INSPECTION HT-016 And TP-1625-00-HT-017 (Pipe sizes: 3" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


525 I-515 INSPECTION WELDING JOINT @ TP-1625-00-HT-005 (Pipe sizes: 10"

526 MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT
I-516 INSPECTION WELDING JOINT @ TP-1625-00-HT-029 (Pipe sizes: 8"
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT
527
I-517 INSPECTION WELDING JOINT @ TP-1625-00-HT-030 (Pipe sizes: 8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


528
I-518 INSPECTION WELDING JOINT @ TP-1625-00-HT-031 (Pipe sizes: 8"

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


529 I-519 INSPECTION WELDING JOINT @ TP-1625-00-HT-032 (Pipe sizes: 8"

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING HYDROTESTED LINE


MFC-DLM-AK-
530 OF METAL INCLUDING VALVE BOX @ TP-1616-00-HT-028 (Pipe sizes: 8", 4",
I-520 CLADDING 1", 0.75" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
531 2nd LAYER EXCEPT WELDING JOINT @ TP-1704-02-HT-036 (Pipe
I-521 INSPECTION
sizes: 6" )

MFC-DLM-AK- VAPOR BARRIER PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


532 OF METAL CLADDING EXCEPT WELDING JOINT @ TP-1714-00-HT-
I-522 INSPECTION 013 (Pipe sizes: 24", 20", 12" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
533 OF METAL CLADDING, EXCEPT WELDING JOINT @ TP-1683-02-
I-523 INSPECTION HT-016 (Pipe sizes: 4" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


534 I-524 OF METAL @ TP-1625-00-HT-050 (Pipe sizes: 6", 2", 1" )
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


535
I-525 INSPECTION WELDING JOINT @ TP-1452-00-HT-001 (Pipe sizes: 20" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
536 VAPOR BARRIER EXCEPT WELDING JOINT @ TP-1704-02-HT-036
I-526 INSPECTION
(Pipe sizes: 6" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
537 I-527 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1615-01-HT-003 (Pipe
INSPECTION sizes: 8", 6", 4", 1", 0.75")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


538 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1625-00-HT-015 (Pipe sizes:
I-528 INSPECTION
16", 3", 2", 1")
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
539 CLADDING ON HYDROTESTED @ TP-1625-00-HT-018 (Pipe
I-529 INSPECTION
sizes:16", 3", 2" 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
540 CLADDING ON HYDROTESTED @ TP-1625-00-HT-016 And TP-
I-530 INSPECTION
1625-00-HT-017 (Pipe sizes: 3" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
541 I-531 PREPARATION INSULATION, EXCEPT WELDING JOINT @ TP-1704-02-HT-005
INSPECTION (Pipe sizes: 16", 10")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
542 PREPARATION INSULATION, EXCEPT WELDING JOINT @ TP-1691-01-HT-024
I-532 INSPECTION (Pipe sizes: 6")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
543 OF METAL CLADDING EXCEPT WELDING JOINT @ TP-1704-02-HT-
I-533 INSPECTION
036 (Pipe sizes: 6" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


544
I-534 INSPECTION WELDING JOINT @ TP-1705-01-HT-003 (Pipe sizes: 6" )

HOT / COLD
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF HOT/COLD ALUMINUM
545 INSULATION
I-535 MATERIAL STUCCO EMBOSSED MATERIAL

INSULATION INSPECTION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- INSULATION
546 I-536 INSPECTION OF 2ND LAYER, EXCEPT WELDING JOINT @ TP-1691-01-HT-024
(Pipe sizes: 6")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


547
I-537 INSPECTION WELDING JOINT @ TP-1714-00-HT-023 (Pipe sizes: 16", 10" )

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
548 INSULATION
I-538 32kg/m3 INSULATION MATERIAL
MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


549 I-539 MATERIAL MATERIAL

PARTIAL INSULATION INSPECTION INSPECTION PRIOR TO


550 MFC-DLM-AK- INSULATION APPLICATION OF VAPOR BARRIER, EXCEPT WELDING JOINT @
I-540 INSPECTION
TP-1691-01-HT-024 (Pipe sizes: 6")
PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, 2nd &
MFC-DLM-AK- INSULATION
551 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER, EXCEPT
I-541 INSPECTION
WELDING JOINT @ TP-1704-02-HT-005 (Pipe sizes: 16", 10")

PARTIAL VAPOR BARRIER INSPECTION INSPECTION PRIOR TO


MFC-DLM-AK- VAPOR BARRIER
552 APPLICATION OF METAL CLADDING, EXCEPT WELDING JOINT @
I-542 INSPECTION
TP-1691-01-HT-024 (Pipe sizes: 6")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
553 I-543 OF METAL @ TP-1601-02-HT-021 (Pipe sizes: 30", 20", 6", 2")
CLADDING

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
554 CLADDING ON HYDROTESTED @ TP-1614-01-HT-003 (Pipe sizes:
I-544 INSPECTION 8", 6", 4", 1", 0.75")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
555 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1613-01-HT-003 (Pipe
I-545
INSPECTION sizes: 8", 6", 4", 1", 0.75")

INSULATION IN-PROCESS INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
556 METAL CLADDINGON HYDROTESTED LINE @ TP-1615-01-HT-003
I-546 INSPECTION (Pipe sizes: 8", 6", 4", 1", 0.75")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
557 PREPARATION INSULATION EXCEPT WELDING JOINT @ TP-1683-02-HT-008
I-547 INSPECTION (Pipe sizes: 10")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDRTESTED LINE


558 I-548 OF METAL @ TP-1603-02-HT-030 (Pipe sizes: 8", 4", 3", 1" )
CLADDING

MFC-DLM- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDRTESTED LINE


559 OF METAL
AK-I-549 @ TP-1602-02-HT-030 (Pipe sizes: 8", 4", 3", 1" ))
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


560
I-550 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-004 (Pipe sizes: 12" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


561 I-551 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-005 (Pipe sizes: 6" )

562 MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT
I-552 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-007 (Pipe sizes: 16" )
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT
563
I-553 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-008 (Pipe sizes: 8" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


564
I-554 INSPECTION WELDING JOINT LINE @ TP-1691-01-HT-009 (Pipe sizes: 6" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


565 I-555 INSPECTION WELDING JOINT LINE @ TP-1704-02-HT-002 (Pipe sizes: 16" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
566 CLADDING HYDROTESTEDLINE @ TP-1613-01-HT-003 (Pipe sizes:
I-556 INSPECTION 8", 6", 4", 1", 0.75")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
567 CLADDING, EXCEPT WELDING JOINT @ TP-1704-02-HT-005 (Pipe
I-557 INSPECTION
sizes: 16", 10")

PARTIAL FINAL INSPECTION OF METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
568 HYDRTESTED LINE @ TP-1602-02-HT-030 (Pipe sizes: 8", 4", 3",
I-558 INSPECTION 1" ))

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
569 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-559 INSPECTION 1714-00-HT-026 (Pipe sizes: 18", 14" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
570 I-560 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1704-02-HT-035 (Pipe sizes: 8" )

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


571 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-561
INSPECTION 1705-01-HT-002 (Pipe sizes: 16" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
572 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1612-01-HT-003 (Pipe
I-562
INSPECTION sizes: 8", 6", 4", 1", 0.75")

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, 2nd &


MFC-DLM-AK- INSULATION
573 I-563 INSPECTION 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER, EXCEPT
WELDING JOINT @ TP-1683-02-HT-008 (Pipe sizes: 10")

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, & 2nd


574 MFC-DLM-AK- INSULATION LAYER INSULATION PRIOR TO VAPOR BARRIER, EXCEPT
I-564 INSPECTION
WELDING JOINT @ TP-1704-02-HT-035 (Pipe sizes: 8" )
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED @
575 OF METAL
I-565 TP-1625-00-HT-016 (Pipe sizes: 3" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED @
576 OF METAL
I-566 TP-1625-00-HT-015 (Pipe sizes: 16", 3", 2", 1")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- PARTIAL FINAL INSPECTION OF METAL CLADDING ON
577 I-567 OF METAL HYDROTESTED @ TP-1625-00-HT-018 (Pipe sizes:16", 3", 2" 1")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED @
578 OF METAL
I-568 CLADDING TP-1601-02-HT-030 (Pipe sizes: 8", 4", 3", 1")

PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


MFC-DLM-AK- PARTIAL FINAL
579 WELDING JOINT LINE @ TP-1452-00-HT-001(Pipe sizes: 24", 20",
I-569 INSPECTION
18", 6", 4")

PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT


MFC-DLM-AK- PARTIAL FINAL
580 WELDING JOINT LINE @ TP-1456-00-HT-001 (Pipe sizes:30", 20",
I-570 INSPECTION 16", 12", 10", 8")

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
581 CLADDING, EXCEPT WELDING JOINT @ TP-1683-02-HT-008 (Pipe
I-571 INSPECTION sizes: 10")

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
582 I-572 INSPECTION CLADDING, EXCEPT WELDING JOINT, EXCEPT WELDING JOINT @
TP-1704-02-HT-035 (Pipe sizes: 8" )

MFC-DLM-AK- SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


583 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-573
INSPECTION 1714-00-HT-003 (Pipe sizes: 3" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
584 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-574
INSPECTION 1661-01-HT-001 (Pipe sizes: 3" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
585 I-575 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1661-01-HT-005 (Pipe sizes: 10" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


586 MFC-DLM-AK- PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-576
INSPECTION 1451-00-HT-001 (Pipe sizes: 36", 30", 20" )
PARTIAL INSULATION IN-PROCESS INSPECTION PRIOR TO
MFC-DLM-AK- INSULATION
587 APPLICATION OF VAPOR BARRIER EXCEPT WELDING JOINT @ TP-
I-577 INSPECTION
1714-00-HT-026 (Pipe sizes: 18", 14" )

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st & 2nd


MFC-DLM-AK- INSULATION
588 LAYER INSULATION PRIOR TO VAPOR BARRIER @ TP-1705-01-HT-
I-578 INSPECTION
002 (Pipe sizes: 16" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
589 I-579 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1456-00-HT-007 (Pipe sizes: 12" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING, HYDROTESTED LINE
590 OF METAL
I-580 CLADDING @ TP-1615-01-HT-003 (Pipe sizes: 8", 6", 4", 1", 0.75")

PARTIAL FINAL INSPECTION OF METAL CLADDING,


MFC-DLM-AK- PARTIAL FINAL
591 HYDROTESTED LINE @ TP-1614-01-HT-003 (Pipe sizes: 8", 6",
I-581 INSPECTION
4", 1", 0.75")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING, HYDROTESTED LINE


592 OF METAL
I-582 CLADDING @ TP-1613-01-HT-003 (Pipe sizes: 8", 6", 4", 1", 0.75")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
593 METAL CLADDING, EXCEPT WELDING JOINT @ TP-1456-00-HT-
I-583 INSPECTION 007 (Pipe sizes: 12" )

PARTIAL IN-PROCESS INSPECTION PRIOR TO APPLICATION OF OF


MFC-DLM-AK- INSULATION
594 I-584 INSPECTION 2ND LAYER, EXCEPT WELDING JOINT @ TP-1451-00-HT-001
(Pipe sizes: 36", 30", 20" )

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


595 VAPOR BARRIER, EXCEPT WELDING JOINT @ TP-1714-00-HT-003
I-585 INSPECTION
(Pipe sizes: 3" )

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
596 OF METAL CLADDING, EXCEPT WELDING JOINT @ TP-1714-00-
I-586 INSPECTION
HT-026 (Pipe sizes: 18", 14" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
597 I-587 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1683-03-HT-017 (Pipe sizes: 18", 16")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


598 MFC-DLM-AK- PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-588
INSPECTION 1683-03-HT-019 (Pipe sizes: 20")
SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO
MFC-DLM-AK-
599 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-589
INSPECTION 1704-02-HT-005 (Pipe sizes: 10", 12")

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, 2nd &


MFC-DLM-AK- INSULATION
600 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER, @ TP-1683-
I-590 INSPECTION
03-HT-017 (Pipe sizes: 18", 16")

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, 2nd &


MFC-DLM-AK- INSULATION
601 I-591 INSPECTION 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER, @ TP-1683-
03-HT-019 (Pipe sizes: 20")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK- VAPOR BARRIER
602 OF METAL CLADDING, EXCEPT WELDING JOINT @ TP-1714-00-
I-592 INSPECTION HT-003 (Pipe sizes: 3" )

MFC-DLM-AK- VAPOR BARRIER PARTIAL VAPOR BARRIER INSPECTION PRIOR TO METAL


603
I-593 INSPECTION CLADDING @ TP-1705-01-HT-002 (Pipe sizes: 16" )

PARTIAL FINAL INSPECTION OF METAL CLADDING, EXCEPT


MFC-DLM-AK- PARTIAL FINAL
604 WELDING JOINT, EXCEPT WELDING JOINT @ TP-1704-02-HT-035
I-594 INSPECTION (Pipe sizes: 8" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
605 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-595 INSPECTION 1683-03-HT-015 (Pipe sizes: 30", 20" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
606 I-596 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1683-02-HT-016 (Pipe sizes: 4" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


607 OF METAL
I-597 @ TP-1507-01-HT-010 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
608 OF METAL
I-598 @ TP-1506-01-HT-010 (Pipe sizes: 2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


609 I-599 OF METAL @ TP-1505-01-HT-010 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION
610 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
I-600 @ TP-1504-01-HT-010 (Pipe sizes: 2" )
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
611 OF METAL
I-601 @ TP-1503-01-HT-010 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
612 OF METAL
I-602 LINE @ TP-1502-01-HT-010 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
613 I-603 OF METAL @ TP-1501-01-HT-010 (Pipe sizes: 2" )
CLADDING

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
614 INSULATION
I-604 MATERIAL 32kg/m3 INSULATION MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


615
I-605 MATERIAL MATERIAL

PARTIAL VAPOR VARIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
616 CLADDING,EXCEPT WELDING JOINT @ TP-1683-03-HT-017 (Pipe
I-606 INSPECTION sizes: 18", 16")

PARTIAL VAPOR VARIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
617 CLADDING,EXCEPT WELDING JOINT @ TP-1683-03-HT-019 (Pipe
I-607 INSPECTION sizes: 20")

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st, 2nd &


MFC-DLM-AK- INSULATION
618 I-608 INSPECTION 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER, EXCEPT
WELDING JOINT @ TP-1683-03-HT-015 (Pipe sizes: 30", 20" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


619 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1607-01-HT-003 (Pipe
I-609
INSPECTION sizes: 8", 6", 4", 1", 0.75")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
620 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1606-01-HT-003 (Pipe
I-610
INSPECTION sizes: 8", 6", 4", 1", 0.75")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
621 I-611 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
INSPECTION 1661-01-HT-003 (Pipe sizes: 36" )

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


622 MFC-DLM-AK- PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-612
INSPECTION 1683-02-HT-026 (Pipe sizes: 8" )
SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO
MFC-DLM-AK-
623 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-613
INSPECTION 1704-02-HT-035 (Pipe sizes: 10", 8", 4" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
624 CLADDING HYDROTESTED LINE @ TP-1612-01-HT-003 (Pipe sizes:
I-614 INSPECTION
8", 6", 4", 1", 0.75")

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
625 I-615 INSPECTION METAL CLADDING, EXCEPT WELDING JOINT @ TP-1451-00-HT-
001 (Pipe sizes: 36", 30", 20" )

PARTIAL INSPECTION IN-PROCESS APPLICATION OF 1st & 2nd


MFC-DLM-AK- INSULATION
626 LAYER INSULATION PRIOR TO VAPOR BARRIER, EXCEPT WELDING
I-616 INSPECTION JOINT @ TP-1661-01-HT-003 (Pipe sizes: 36" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
627 PREPARATION INSULATION HYDROTESTEDLINE @ TP-1605-01-HT-003 (Pipe
I-617
INSPECTION sizes: 8", 4",2", 1")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
628 CLADDING HYDROTESTED LINE @ TP-1607-01-HT-003 (Pipe sizes:
I-618 INSPECTION 8", 4",2", 1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION, EXCEPT WELDING JOINT
629
I-619 INSPECTION @ TP-1456-00-HT-007 (Pipe sizes: 12" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION, EXCEPT WELDING JOINT
630 I-620 INSPECTION @ TP-1451-00-HT-001 (Pipe sizes: 36", 30", 20" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION, EXCEPT WELDING JOINT
631
I-621 INSPECTION @ TP-1714-00-HT-026 (Pipe sizes: 18", 14" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION, EXCEPT WELDING JOINT
632
I-622 INSPECTION @ TP-1714-00-HT-003 (Pipe sizes: 3" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION,EXCEPT WELDING JOINT


633 I-623 INSPECTION @ TP-1683-03-HT-017 (Pipe sizes: 18", 16")

634 MFC-DLM-AK- PARTIAL FINAL PARTIAL METAL CLADDING INSPECTION,EXCEPT WELDING JOINT
I-624 INSPECTION @ TP-1683-03-HT-019 (Pipe sizes: 20")
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
635 CLADDING HYDROTESTED LINE @ TP-1606-01-HT-003 (Pipe sizes:
I-625 INSPECTION
8", 4", 1")

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
636 CLADDING, EXCEPT WELDING JOINT @ TP-1683-03-HT-015
I-626 INSPECTION
(Pipe sizes: 30", 20" )

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
637 I-627 INSPECTION CLADDING, EXCEPT WELDING JOINT @ TP-1661-01-HT-003
(Pipe sizes: 36" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING,


638
I-628 INSPECTION EXCEPT WELDING JOINT @ TP-1683-02-HT-008 (Pipe sizes: 10")

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
639 PREPARATION APPLICATION OF INSULATION EXCEPT WELDING JOINT @ TP-
I-629
INSPECTION 1704-02-HT-005 (Pipe sizes: 16")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
640 PREPARATION INSULATION HYDROTESTED LINE @ TP-1604-01-HT-003 (Pipe
I-630 INSPECTION sizes: 8", 4",2", 1")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
641 CLADDING HYDROTESTED LINE @ TP-1605-01-HT-003 (Pipe sizes:
I-631 INSPECTION 8", 4", 1")

SURFACE PARTIAL IN-PROCESS INSULATION INSPECTION PRIOR TO VAPOR


MFC-DLM-AK-
642 I-632 PREPARATION BARRIER APPLICATION, EXCEPT WELDING JOINT @ TP-1683-02-
INSPECTION HT-026 (Pipe sizes: 8" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD )METAL CLADDING,


643 EXCEPT WELDING JOINTS @ TP-1705-01-HT-002 (Pipe sizes: 16"
I-633 INSPECTION
)

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
644 PREPARATION APPLICATION OF INSULATION ON TP-1607-02-HT-020 (Pipe sizes:
I-634
INSPECTION 12",8")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED


645 I-635 OF METAL LINE @ TP-1612-01-HT-003 (Pipe sizes: 8", 6", 4", 1", 0.75")
CLADDING

646 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


I-636 INSPECTION HYDROTESTED LINE @ TP-1604-01-HT-003 (Pipe sizes: 8", 4", 1")
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
647 PREPARATION INSULATION HYDROTESTED LINE @ TP-1601-01-HT-003 (Pipe
I-637
INSPECTION sizes: 8", 4",2", 1")

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
648 INSULATION
I-638 32kg/m3 INSULATION MATERIAL
MATERIAL

SURFACE PARTIAL SURFACE PREPARATION INSPECTION PRIOR TO


MFC-DLM-AK-
649 I-639 PREPARATION APPLICATION OF INSULATION ON ( HOT DA ) TP-1451-00-HT-
INSPECTION 001 (Pipe sizes: 36",30",20")

PARTIAL FINAL INSPECTION OF ( COLD) METAL CLADDING


MFC-DLM-AK- PARTIAL FINAL
650 EXCEPT WELDING JOINT @ TP-1714-00-HT-013 (Pipe sizes: 24",
I-640 INSPECTION 20", 12" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING,


MFC-DLM-AK- PARTIAL FINAL
651 EXCEPT WELDING JOINT @ TP-1704-02-HT-005 (Pipe sizes: 16",
I-641 INSPECTION
10")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING HYDROTESTED LINE @


652 OF METAL
I-642 CLADDING TP-1607-01-HT-003 (Pipe sizes: 8", 4",2", 1")

PARTIAL INSPECTION OF INSULATION PRIOR TO METAL


MFC-DLM-AK- INSULATION
653 CLADDING, EXCEPT WELDING JOINTS ON TP-1607-02-HT-020
I-643 INSPECTION (Pipe sizes: 12",8")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING,


MFC-DLM-AK- PARTIAL FINAL
654 I-644 INSPECTION EXCEPT WELDING JOINT @ TP-1661-01-HT-003 (Pipe sizes:
36" )

MFC-DLM-AK- INSULATION PARTIAL IN-PROCESS INSPECTION APPLICATION OF 1st ,2nd &


655 3rd LAYER INSULATION PRIOR TO VAPOR BARRIER EXCEPT
I-645 INSPECTION
WELDING JOINT @ TP-1704-02-HT-005 (Pipe sizes: 16",12" )

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
656 CLADDING, EXCEPT WELDING JOINT @ TP-1683-02-HT-026
I-646 INSPECTION
(Pipe sizes: 8" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


657 I-647 INSPECTION HYDROTESTED LINE @ TP-1601-01-HT-003 (Pipe sizes: 8", 4", 1")

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO INSULATION ON


658 MFC-DLM-AK- PREPARATION LINE, WELDING JOINT & SUPPORT @ HYDROTESTED LINE TP-
I-648
INSPECTION 1452-00-HT-001 (T/P ) 36",30"24",20",18",16"12",6"4",2",1",.75"
IN-PROCESS INSPECTION OF 1st & 2nd LAYER INSULATION PRIOR
MFC-DLM-AK- INSULATION TO METAL CLADDING ON LINE, WELDING JOINT & SUPPORT @
659
I-649 INSPECTION HYDROTESTED LINE TP-1452-00-HT-001 (T/P )
36",30"24",20",18",16"12",6"4",2",1",.75"

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING,


MFC-DLM-AK- PARTIAL FINAL
660 EXCEPT WELDING JOINT @ TP-1683-03-HT-015 (Pipe sizes: 30",
I-650 INSPECTION
20" )

PARTIAL INSPECTION VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
661 I-651 INSPECTION CLADDING, EXCEPT WELDING JOINT @ TP-1704-02-HT-005 (Pipe
sizes: 16",12" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING HYDROTESTED LINE @
662 OF METAL
I-652 CLADDING TP-1606-01-HT-003 (Pipe sizes: 8", 4",2", 1")

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK-
663 PREPARATION OF INSULATION EXCEPT WELDING JOINT @ TP-1714-00-HT-047
I-653
INSPECTION (Pipe sizes: 12",20" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
664 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1603-01-HT-003 (Pipe
I-654 INSPECTION sizes: 8", 4",2", 1")

IN-PROCESS INSPECTION OF 1st & 2nd LAYER INSULATION PRIOR


MFC-DLM-AK- INSULATION TO METAL CLADDING ON LINE, WELDING JOINT & SUPPORT @
665
I-655 INSPECTION HYDROTESTED LINE TP-1452-00-HT-001 (T/P )
36",30"24",20",18",16"12",6"4",2",1",.75"

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


666 I-656 OF METAL @ TP-1605-01-HT-003 (Pipe sizes: 8", 4", 1")
CLADDING

MFC-DLM-AK- PIR (COLD) MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
667 INSULATION
I-657 32kg/m3 INSULATION MATERIAL
MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION


668
I-658 MATERIAL MATERIAL

IN-PROCESS INSPECTION OF 1st & 2nd LAYER INSULATION PRIOR


MFC-DLM-AK- INSULATION TO METAL CLADDING ON LINE, WELDING JOINT & SUPPORT @
669 I-659 INSPECTION HYDROTESTED LINE TP-1452-00-HT-001 (T/P )
36",30"24",20",18",16"12",6"4",2",1",.75"

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING,


670 MFC-DLM-AK- PARTIAL FINAL EXCEPT WELDING JOINTS ON TP-1607-02-HT-020 (Pipe sizes:
I-660 INSPECTION
12",8")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
671 OF METAL
I-661 @ TP-1604-01-HT-003 (Pipe sizes: 8", 4", 1")
CLADDING

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT )


MFC-DLM-AK-
672 PREPARATION PRIOR TO INSULATION, EXCEPT WELDING JOINTS ON TP-1606-
I-662
INSPECTION 02-HT-020 (Pipe sizes: 12",8")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
673 I-663 PREPARATION INSULATION HYDROTESTED LINE @ TP-1611-01-HT-003 (Pipe
INSPECTION sizes: 8", 4",2", 1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
674 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1515-01-HT-031 (Pipe
I-664 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
675 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1515-01-HT-030 (Pipe
I-665
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
676 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1514-01-HT-031 (Pipe
I-666 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
677 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1514-01-HT-030 (Pipe
I-667 INSPECTION sizes: 6", 3",3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


678 I-668 OF METAL @ TP-1601-01-HT-003 (Pipe sizes: 8", 4", 1")
CLADDING

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


679 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1513-01-HT-031 (Pipe
I-669
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
680 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1513-01-HT-030 (Pipe
I-670
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
681 I-671 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1512-01-HT-031 (Pipe
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


682 MFC-DLM-AK- PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1512-01-HT-030 (Pipe
I-672
INSPECTION sizes: 6", 3",3/4")
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
683 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1511-01-HT-031 (Pipe
I-673
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
684 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1511-01-HT-030 (Pipe
I-674
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
685 I-675 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1501-01-HT-028 (Pipe
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
686 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1501-01-HT-027 (Pipe
I-676 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
687 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1502-01-HT-028 (Pipe
I-677
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
688 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1502-01-HT-027 (Pipe
I-678 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
689 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1506-01-HT-028 (Pipe
I-679 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
690 I-680 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1506-01-HT-027 (Pipe
INSPECTION sizes: 6", 3",3/4")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


691 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1507-01-HT-028 (Pipe
I-681
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
692 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1507-01-HT-027 (Pipe
I-682
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
693 I-683 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1614-02-HT-028 (Pipe
INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


694 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1614-02-HT-025 (Pipe
I-684
INSPECTION sizes: 2",1.5",3/4")
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
695 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1614-02-HT-023 (Pipe
I-685
INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
696 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1613-02-HT-028 (Pipe
I-686
INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
697 I-687 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1613-02-HT-025 (Pipe
INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
698 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1613-02-HT-023 (Pipe
I-688 INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
699 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1612-02-HT-028 (Pipe
I-689
INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
700 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-028 (Pipe
I-690 INSPECTION sizes: 2",1.5",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
701 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1501-01-HT-008 (Pipe
I-691 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
702 I-692 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1501-01-HT-009 (Pipe
INSPECTION sizes: 2")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


703 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1514-01-HT-008 (Pipe
I-693
INSPECTION sizes: 2")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
704 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1512-01-HT-008 (Pipe
I-694
INSPECTION sizes: 2")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
705 I-695 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1511-01-HT-008 (Pipe
INSPECTION sizes: 2")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


706 MFC-DLM-AK- PREPARATION INSULATION EXCEPT WELDING JOINTS & SUPPORT @ 1451-00-
I-696
INSPECTION HT-001 (20" LINE )
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
707 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1451-00-HT-003 (Pipe
I-697
INSPECTION sizes: 30",20",16",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
708 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1451-00-HT-004 (Pipe
I-698
INSPECTION sizes: 30",20",16",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
709 I-699 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1603-02-HT-024 (Pipe
INSPECTION sizes: 2",1.5",1",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
710 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1704-02-HT-032 (Pipe
I-700 INSPECTION sizes: 10",8",3")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
711 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1705-01-HT-028 (Pipe
I-701
INSPECTION sizes: 12",4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
712 PREPARATION INSULATION EXCEPT WELD JOINTS ON LINE @ TP-1705-01-HT-
I-702 INSPECTION 012 (Pipe sizes: 12")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
713 PREPARATION INSULATION EXCEPT WELD JOINTS ON LINE @ TP-1714-00-HT-
I-703 INSPECTION 007 (Pipe sizes: 36",24")

PARTIAL IN-PROCESS 1st & 2nd LAYER INSULATION INSPECTION


MFC-DLM-AK- INSULATION
714 I-704 INSPECTION PRIOR TO METAL CLADDING EXCEPT WELDING JOINTS &
SUPPORT @ 1451-00-HT-001 ( 36",30",20" )

MFC-DLM-AK- INSULATION PARTIAL IN-PROCESS 1st & 2nd LAYER INSULATION INSPECTION
715 PRIOR TO METAL CLADDING EXCEPT WELDING JOINTS &
I-704 INSPECTION
SUPPORT @ 1451-00-HT-001 ( 36",30",20" )

PARTIAL IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION


MFC-DLM-AK- INSULATION
716 PRIOR TO APPLICATION OF VAPOR BARRIER EXCEPT WELDING
I-705 INSPECTION
JOINT @ TP-1714-00-HT-047 (Pipe sizes: 12",20" )

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
717 I-706 INSPECTION HYDROTESTED LINE @ TP-1611-01-HT-003 (Pipe sizes: 8", 4",2",
1")

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


718 MFC-DLM-AK- PREPARATION INSULATION, EXCEPT WELDING JOINTS ON TP-1605-02-HT-020
I-707
INSPECTION (Pipe sizes: 12",8")
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
719 PREPARATION HYDROTESTED ON TP-1505-02-HT-001 (Pipe sizes:
I-708
INSPECTION 12",10",6",4",2",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
720 HYDROTESTED LINE @ TP-1603-01-HT-003 (Pipe sizes: 8", 4",2",
I-709 INSPECTION
1")

PARTIAL VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
721 I-710 INSPECTION CLADDING EXCEPT WELDING JOINT @ TP-1714-00-HT-047 (Pipe
sizes: 12",20" )

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
722 METAL CLADDING ON HYDROTESTED LINE @ TP-1451-00-HT-003
I-711 INSPECTION (Pipe sizes: 30",20",16",1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
723 METAL CLADDING ON HYDROTESTED LINE @ TP-1451-00-HT-004
I-712 INSPECTION
(Pipe sizes: 30",20",16",1")

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
724 CLADDING, EXCEPT WELDING JOINTS ON TP-1606-02-HT-020
I-713 INSPECTION (Pipe sizes: 12",8")

IN-PROCESS INSULATION INSPECTION 1st & 2nd LAYER PRIOR TO


MFC-DLM-AK- INSULATION
725 APPLICATION OF VAAPOR BARRIER ON HYDROTESTED LINE @
I-714 INSPECTION TP-1705-01-HT-028 (Pipe sizes: 12",4")

IN-PROCESS INSULATION INSPECTION 1st & 2nd LAYER PRIOR TO


MFC-DLM-AK- INSULATION
726 I-715 INSPECTION APPLICATION OF VAPOR BARRIER EXCEPT WELD JOINTS ON LINE
@ TP-1705-01-HT-012 (Pipe sizes: 12")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


727 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1705-01-HT-006 (Pipe
I-716
INSPECTION sizes: 24",1")

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK-
728 PREPARATION OF INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1683-
I-717
INSPECTION 02-HT-022 (Pipe sizes: 8")

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK-
729 I-718 PREPARATION OF INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1683-
INSPECTION 02-HT-001 (Pipe sizes: 2")

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


730 MFC-DLM-AK- PREPARATION OF INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1683-
I-719
INSPECTION 02-HT-002 (Pipe sizes: 6",4",3", 2")
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
731 PREPARATION INSULATION ON HYDROTESTED @ TP-1504-02-HT-001 (Pipe
I-720
INSPECTION sizes: 12",10",6",4",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
732 ON HYDROTESTED LINE @ TP-1505-02-HT-001 (Pipe sizes:
I-721 INSPECTION
12",10",6",4",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
733 I-722 PREPARATION INSULATION ON HYDROTESTED @ TP-1621-01-HT-030 (Pipe
INSPECTION sizes: 102",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
734 PREPARATION INSULATION ON HYDROTESTED @ TP-1626-00-HT-008 (Pipe
I-723 INSPECTION sizes: 2",.75" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
735 PREPARATION INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1621-01-
I-724
INSPECTION HT-010 (Pipe sizes: 30" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
736 PREPARATION INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1507-01-
I-725 INSPECTION HT-008 (Pipe sizes: 8".75" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
737 VAPOR BARRIER EXCEPT WELD JOINTS ON LINE @ TP-1714-00-
I-726 INSPECTION HT-007 (Pipe sizes: 36",24")

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
738 I-727 INSPECTION CLADDING, EXCEPT WELDING JOINTS ON TP-1605-02-HT-020
(Pipe sizes: 12",8")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


739 PREPARATION INSULATION ON HYDROTESTED @ TP-1506-02-HT-001 (Pipe
I-728
INSPECTION sizes: 12",10",6",4",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
740 PREPARATION INSULATION ON VISUAL TEST @ TP-1506-01-HT-008 (Pipe sizes:
I-729
INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
741 I-730 PREPARATION INSULATION ON VISUAL TEST @ TP-1505-01-HT-008 (Pipe sizes:
INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


742 MFC-DLM-AK- PREPARATION INSULATION ON VISUAL TEST @ TP-1515-01-HT-006 (Pipe sizes:
I-731
INSPECTION 10",.75" )
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
743 PREPARATION INSULATION ON HYDROTESTED @ TP-1671-02-HT-005 (Pipe
I-732
INSPECTION sizes: 6",3",2",1" )

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK-
744 PREPARATION OF INSULATION EXCEPT WELDING JOINT @ TP-1714-00-HT-025
I-733
INSPECTION (Pipe sizes: 8" )

PARTIAL IN-PROCESS 1ST & 2ND LAYER INSULATION INSPECTION


MFC-DLM-AK- INSULATION
745 I-734 INSPECTION PRIOR TO APPLICATION OF VAPOR BARRIER EXCEPT WELDING
JOINT @ TP-1704-02-HT-003 (Pipe sizes: 6" )

PARTIAL IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION


MFC-DLM-AK- INSULATION
746 PRIOR TO APPLICATION OF VAPOR BARRIER EXCEPT WELDING
I-735 INSPECTION JOINT @ TP-1704-02-HT-001 (Pipe sizes: 12",10", 8", 4" )

PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
747 VAPOR BARRIER EXCEPT WELD JOINTS ON LINE @ TP-1714-00-
I-736 INSPECTION
HT-007 (Pipe sizes: 36",24")

PARTIAL IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION


MFC-DLM-AK- INSULATION
748 PRIOR TO APPLICATION OF VAPOR BARRIER EXCEPT WELDING
I-737 INSPECTION JOINT @ TP-1714-00-HT-025 (Pipe sizes: 8" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
749 OF METAL
I-738 CLADDING @ TP-1611-01-HT-003 (Pipe sizes: 8", 4",2", 1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
750 I-739 INSPECTION CLADDING ON HYDROTESTED @ TP-1504-02-HT-001 (Pipe sizes:
12",10",6",4",2",1" )

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO


751 METAL CLADDING EXCEPT WELD JOINTS & SUPPORT @ TP-1621-
I-740 INSPECTION
01-HT-010 (Pipe sizes: 30" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
752 CLADDING ON HYDROTESTED @ TP-1621-01-HT-030 (Pipe sizes:
I-741 INSPECTION
102",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


753 I-742 INSPECTION HYDROTESTED LINE @ TP-1626-00-HT-008 (Pipe sizes: 2")

PARTIAL FINAL INSPECTION OF METAL CLADDING FROM COL. TO


754 MFC-DLM-AK- PARTIAL FINAL COL. 31 ON HYDROTESTED LINE @ TP-1452-00-HT-001 (Pipe
I-743 INSPECTION
sizes: 30", 18",16",2", 1")
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
755 PREPARATION INSULATION ON VISUAL TEST @ TP-1503-01-HT-008 (Pipe sizes:
I-744
INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
756 PREPARATION INSULATION ON VISUAL TEST @ TP-1504-01-HT-008 (Pipe sizes:
I-745
INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
757 I-746 PREPARATION INSULATION ON VISUAL TEST @ TP-1511-01-HT-006 (Pipe sizes:
INSPECTION 10",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
758 PREPARATION INSULATION ON VISUAL TEST @ TP-1512-01-HT-006 (Pipe sizes:
I-747 INSPECTION 10",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
759 PREPARATION INSULATION ON VISUAL TEST @ TP-1513-01-HT-006 (Pipe sizes:
I-748
INSPECTION 10",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
760 PREPARATION INSULATION ON VISUAL TEST @ TP-1514-01-HT-006 (Pipe sizes:
I-749 INSPECTION 10",.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
761 OF METAL
I-750 CLADDING @ TP-1602-02-HT-030 (Pipe sizes: 8", 4",3", 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


762 I-751 OF METAL @ TP-1603-01-HT-003 (Pipe sizes: 8", 4",2", 1")
CLADDING

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


763 PREPARATION INSULATION ON HYDROTESTED @ TP-1615-02-HT-021 (Pipe
I-752
INSPECTION sizes: 36",24",8",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
764 HYDROTESTED LINE @ TP-1452-00-HT-001 (Pipe sizes:
I-753 INSPECTION
20",16",10",6", 4",2",1",075")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
765 I-754 PREPARATION INSULATION ON HYDROTESTED @ TP-1626-00-HT-005 (Pipe
INSPECTION sizes: 14",8",3" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


766 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1616-00-HT-012 (Pipe
I-755
INSPECTION sizes: 2",1",.75" )
SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
767 PREPARATION INSULATION EXCEPT WELD JOINTS @ TP-1456-00-HT-001 (Pipe
I-756
INSPECTION sizes: 36",30",24"12",6",4" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
768 PREPARATION INSULATION EXCEPT WELD JOINTS @ TP-1453-00-HT-001 (Pipe
I-757
INSPECTION sizes: 30",24" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
769 I-758 PREPARATION INSULATION EXCEPT WELD JOINTS @ TP-1455-00-HT-001 (Pipe
INSPECTION sizes: 12" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL INSPECTION OF METAL CLADDING EXCEPT WELD


770
I-759 INSPECTION JOINTS ON LINE @ TP-1714-00-HT-007 (Pipe sizes: 36",24")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
771 PREPARATION
I-760 ON HYDROTESTED @ TP-1423-00-HT-009 (Pipe sizes: 2",075" )
INSPECTION

PARTIAL INSPECTION OF VAPOR BARRIER PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
772 CLADDING EXCEPT WELD JOINTS ON LINE @ TP-1705-01-HT-012
I-761 INSPECTION (Pipe sizes: 12")

NSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
773 CLADDING ON HYDROTESTED @ TP-1671-02-HT-005 (Pipe sizes:
I-762 INSPECTION 6",3",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAAL


MFC-DLM-AK- INSULATION
774 I-763 INSPECTION CLADDING ON VISUAL TEST @ TP-1507-01-HT-008 (Pipe sizes:
8",.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


775 PREPARATION INSULATION ON HYDROTESTED @ TP-1501-02-HT-001 (Pipe
I-764
INSPECTION sizes: 12",10",6",4",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
776 PREPARATION INSULATION ON HYDROTESTED @ TP-1502-02-HT-001 (Pipe
I-765
INSPECTION sizes: 12",10",6",4",2",1" )

INSULATION 1st LAYER INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
777 I-766 INSPECTION 2nd LAYER INSULATION ON HYDROTESTED LINE @ TP-1705-01-
HT-006 (Pipe sizes: 24",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


778 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1506-02-HT-001 (Pipe sizes:
I-767 INSPECTION
12",10",6",4",2",1" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
779 CLADDING ON HYDROTESTED @ TP-1505-01-HT-008 (Pipe sizes:
I-768 INSPECTION
6",3",2",1" )

INSULATION 2nd LAYER INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
780 VAPOR BARRIER ON HYDROTESTED LINE @ TP-1705-01-HT-006
I-769 INSPECTION
(Pipe sizes: 24",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
781 I-770 PREPARATION INSULATION ON HYDROTESTED @ TP-1691-01-HT-001 (Pipe
INSPECTION sizes: 18",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
782 PREPARATION INSULATION ON HYDROTESTED @ TP-1705-01-HT-007 (Pipe
I-771 INSPECTION sizes: 24",1" )

IN-PROCESS INSULATION INSPECTION 1st,2nd & 3rd LAYER


MFC-DLM-AK- INSULATION
783 PRIOR TO APPLICATION OF VAPOR BARRIER ON HYDROTESTED
I-772 INSPECTION
LINE @ TP-1683-02-HT-024 (Pipe sizes: 2",1.5",3/4")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
784 CLADDING ON VISUAL TEST @ TP-1506-01-HT-008 (Pipe sizes:
I-773 INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
785 PREPARATION INSULATION ON VISUAL TEST @ TP-1502-01-HT-008 (Pipe sizes:
I-774 INSPECTION 8",.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


786 I-775 INSPECTION ON HYDROTESTED @ TP-1423-00-HT-009 (Pipe sizes: 2",075" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR


787 TO METAL CLADDING ON HYDROTESTED @ TP-1501-02-HT-001
I-776 INSPECTION
(Pipe sizes: 12",10",6",4",2",1" )

INSULATION INSPECTION OF ( HOT )


MFC-DLM-AK- INSULATION
788 PRIOR TO METAL CLADDING ON HYDROTESTED @ TP-1502-02-
I-777 INSPECTION
HT-001 (Pipe sizes: 12",10",6",4",2",1" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR


MFC-DLM-AK-
789 I-778 PREPARATION TO INSULATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-
INSPECTION 1615-02-HT-019 (Pipe sizes: 6" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


790 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1615-02-HT-020 (Pipe
I-779
INSPECTION sizes: 6",3",1" )
SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK-
791 PREPARATION INSULATION ON HYDROTESTED @ TP-1683-02-HT-015 (Pipe
I-780
INSPECTION sizes: 8",3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
792 PREPARATION INSULATION ON HYDROTESTED @ TP-1705-01-HT-015 (Pipe
I-781
INSPECTION sizes: 8",6",4",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
793 I-782 PREPARATION INSULATION ON HYDROTESTED @ TP-1651-00-HT-005 (Pipe
INSPECTION sizes: 2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
794 PREPARATION INSULATION ON HYDROTESTED @ TP-1503-02-HT-001 (Pipe
I-783 INSPECTION sizes: 12",10",6",4",2",1" )

IN-PROCESS INSULATION INSPECTION OF ( HOT ) PRIOR


MFC-DLM-AK- INSULATION
795 TO METAL CLADDING ON HYDROTESTED @ TP-1615-02-HT-021
I-784 INSPECTION
(Pipe sizes: 36",24",8",2" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
796 PREPARATION INSULATION ON HYDROTESTED @ TP-1683-03-HT-023 (Pipe
I-785 INSPECTION sizes: 6",4",3",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO


MFC-DLM-AK-
797 PREPARATION INSULATION ON HYDROTESTED @ TP-1466-00-HT-015 (Pipe
I-786 INSPECTION sizes: 16",6",1" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
798 I-787 PREPARATION INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1683-01-
INSPECTION HT-001 (Pipe sizes: 6",10" )

MFC-DLM-AK- SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


799 PREPARATION INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1681-00-
I-788
INSPECTION HT-013 (Pipe sizes: 8" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
800 PREPARATION INSULATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-1614-
I-789
INSPECTION 02-HT-019 (Pipe sizes: 6" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
801 I-790 PREPARATION INSULATION ON HYDROTESTED @ TP-1626-00-HT-006 (Pipe
INSPECTION sizes: 14",3" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


802 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1503-02-HT-001 (Pipe sizes:
I-791 INSPECTION
12",10",6",4",2",1" )
SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK-
803 PREPARATION INSULATION ON HYDROTESTED @ TP-1681-00-HT-012 (Pipe
I-792
INSPECTION sizes: 30",1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
804 OF METAL HYDROTESTED LINE @ TP-1505-02-HT-001 (Pipe sizes:
I-793
CLADDING 12",10",6",4",2",1")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
805 I-794 OF METAL HYDROTESTED @ TP-1504-02-HT-001 (Pipe sizes:
CLADDING 12",10",6",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
806 OF METAL
I-795 CLADDING @ TP-1626-00-HT-008 (Pipe sizes: 2")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
807 OF METAL
I-796 HYDROTESTED @ TP-1671-02-HT-005 (Pipe sizes: 6",3",2",1" )
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
808 HYDROTESTED LINE @ TP-1452-00-HT-001 (Pipe sizes:
I-797 INSPECTION 36",30",24",12",18",2",1",075")

IN-PROCESS INSULATION 1st & 2nd Layer INSPECTION OF


MFC-DLM-AK- INSULATION
809 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
I-798 INSPECTION 1691-01-HT-001 (Pipe sizes: 18",1" )

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
810 I-799 INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
1705-01-HT-007 (Pipe sizes: 24",1" )

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


811 BARRIER EXCEPT WELD JOINTS & SUPPORT @ TP-1681-00-HT-
I-800 INSPECTION
013 (Pipe sizes: 8" )

PARTIAL INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
812 BARRIER EXCEPT WELD JOINTS & SUPPORT @ TP-1683-01-HT-
I-801 INSPECTION
001 (Pipe sizes: 6",10" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


813 I-802 OF METAL HYDROTESTED @ TP-1423-00-HT-009 (Pipe sizes: 2",075" )
CLADDING

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


814 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1507-02-HT-001 (Pipe
I-803
INSPECTION sizes: 12",10",6",4",2",1" )
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
815 PREPARATION INSULATION ON HYDROTESTED @ TP-1606-02-HT-001 (Pipe
I-804
INSPECTION sizes: 30",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
816 PREPARATION INSULATION ON HYDROTESTED @ TP-1605-02-HT-001 (Pipe
I-805
INSPECTION sizes: 30",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
817 I-806 PREPARATION INSULATION ON HYDROTESTED @ TP-1604-02-HT-001 (Pipe
INSPECTION sizes: 30",2",1" )

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
818 CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1615-02-
I-807 INSPECTION HT-019 (Pipe sizes: 6" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
819 CLADDING ON HYDROTESTED @ TP-1615-02-HT-020 (Pipe sizes:
I-808 INSPECTION
6",3",1" )

PARTIAL VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- VAPOR BARRIER
820 METAL CLADDING EXCEPT WELD JOINTS & SUPPORT @ TP-1681-
I-809 INSPECTION 00-HT-013 (Pipe sizes: 8" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
821 BARRIER ON HYDROTESTED @ TP-1681-00-HT-012 (Pipe sizes:
I-810 INSPECTION 30",1" )

PARTIAL VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- VAPOR BARRIER
822 I-811 INSPECTION METAL CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-
1683-01-HT-001 (Pipe sizes: 6",10" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


823 PREPARATION INSULATION ON HYDROTESTED @ TP-1683-02-HT-010 (Pipe
I-812
INSPECTION sizes: 10",12" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
824 PREPARATION INSULATION ON HYDROTESTED @ TP-1704-02-HT-018 (Pipe
I-813
INSPECTION sizes: 3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
825 I-814 PREPARATION INSULATION ON HYDROTESTED @ TP-1705-01-HT-009 (Pipe
INSPECTION sizes: 24",12" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


826 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED @ TP-1681-00-HT-012 (Pipe sizes:
I-815 INSPECTION
30",1" )
PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
827 CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1614-02-
I-816 INSPECTION
HT-019 (Pipe sizes: 6" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
828 CLADDING ON HYDROTESTED @ TP-1507-02-HT-001 (Pipe sizes:
I-817 INSPECTION
12",10",6",4",2",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
829 I-818 PREPARATION ON HYDROTESTED @ TP-1602-02-HT-001 (Pipe sizes: 30",2",1" )
INSPECTION

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


830
I-819 INSPECTION VISUAL TEST LINE @ TP-1501-01-HT-008 (Pipe sizes: 6", 3",3/4")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
831 CLADDING ON VISUAL TEST @ TP-1503-01-HT-008 (Pipe sizes:
I-820 INSPECTION
8",.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
832 CLADDING ON VISUAL TEST @ TP-1504-01-HT-008 (Pipe sizes:
I-821 INSPECTION 8",.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
833 CLADDING ON VISUAL TEST @ TP-1502-01-HT-008 (Pipe sizes:
I-822 INSPECTION 8",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
834 I-823 PREPARATION INSULATION ON HYDROTESTED @ TP-1705-01-HT-009 (Pipe
INSPECTION sizes: 24",12" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


835 PREPARATION INSULATION ON HYDROTESTED @ TP-1515-02-HT-001 (Pipe
I-824
INSPECTION sizes: 12",8", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
836 PREPARATION INSULATION ON HYDROTESTED @ TP-1625-00-HT-007 (Pipe
I-825
INSPECTION sizes: 10",2" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
837 I-826 PREPARATION INSULATION ON HYDROTESTED @ TP-1614-02-HT-020 (Pipe
INSPECTION sizes: 6",3",1" )

838 MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON
I-827 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-006 (Pipe sizes: 24",1")
PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
839 INSULATION
I-828 32kg/m3 INSULATION MATERIAL
MATERIAL

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
840 PREPARATION ON HYDROTESTED @ TP-1603-02-HT-001 (Pipe sizes:
I-829
INSPECTION 30",2",1",0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
841 I-830 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-021 (Pipe sizes: 30",
CLADDING 20", 6", 2" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
842 OF METAL HYDROTESTED LINE @ TP-1604-02-HT-021 (Pipe sizes: 30",
I-831 CLADDING 20", 6", 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
843 OF METAL
I-832 HYDROTESTED @ TP-1621-01-HT-030 (Pipe sizes: 102",2",1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


844 OF METAL
I-833 CLADDING HYDROTESTED LINE @ TP-1705-01-HT-006 (Pipe sizes: 24",1")

INSULATION INSPECTION 1st LAYER OF ( COLD ) PRIOR TO 2nd


MFC-DLM-AK- INSULATION
845 LAYER INSULATION ON HYDROTESTED @ TP-1683-03-HT-023
I-834 INSPECTION (Pipe sizes: 6",4",3",2",1" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
846 I-835 PREPARATION INSULATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-1613-
INSPECTION 02-HT-019 (Pipe sizes:6" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


847 OF METAL
I-836 @ TP-1603-02-HT-021 (Pipe sizes: 30", 20", 6", 2")
CLADDING

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
848 CLADDING ON HYDROTESTED @ TP-1614-02-HT-020 (Pipe sizes:
I-837 INSPECTION
6",3",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
849 I-838 INSPECTION CLADDING ON HYDROTESTED @ TP-1515-02-HT-001 (Pipe sizes:
12",8", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


850 MFC-DLM-AK- PREPARATION ON HYDROTESTED LINE @ TP-1616-00-HT-010 (Pipe sizes: 3",2"
I-839
INSPECTION )
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
851 PREPARATION ON HYDROTESTED LINE @ TP-1731-01-HT-014 (Pipe sizes: 3",1"
I-840
INSPECTION )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
852 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1731-01-HT-017 (Pipe
I-841
INSPECTION sizes: 12",8",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
853 I-842 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1731-01-HT-024 (Pipe
INSPECTION sizes: 2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
854 CLADDING ON HYDROTESTED @ TP-1616-00-HT-012 (Pipe sizes:
I-843 INSPECTION 2",1",.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
855 CLADDING ON HYDROTESTED @ TP-1626-00-HT-006 (Pipe sizes:
I-844 INSPECTION
14",3" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
856 CLADDING ON VISUAL TEST @ TP-1511-01-HT-006 (Pipe sizes:
I-845 INSPECTION 10",.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
857 CLADDING ON VISUAL TEST @ TP-1512-01-HT-006 (Pipe sizes:
I-846 INSPECTION 10",.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


858 I-847 INSPECTION ON VISUAL TEST @ TP-1513-01-HT-006 (Pipe sizes: 10",.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


859 CLADDING ON VISUAL TEST @ TP-1514-01-HT-006 (Pipe sizes:
I-848 INSPECTION
10",.75" )

INSULATION INSPECTION 2nd LAYER OF ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
860 VAPOR BARRIER ON HYDROTESTED @ TP-1683-03-HT-023 (Pipe
I-849 INSPECTION
sizes: 6",4",3",2",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


861 I-836-A OF METAL @ TP-1603-02-HT-021 (Pipe sizes: 30", 20", 6", 2")
CLADDING

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


862 MFC-DLM-AK- INSULATION CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1613-02-
I-850 INSPECTION
HT-019 (Pipe sizes: 6" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
863 CLADDING ON HYDROTESTED LINE @ TP-1616-00-HT-010 (Pipe
I-851 INSPECTION
sizes: 3",2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
864 CLADDING ON HYDROTESTED LINE @ TP-1731-01-HT-014 (Pipe
I-852 INSPECTION
sizes: 3",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAAL


MFC-DLM-AK- INSULATION
865 I-853 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1731-01-HT-017 (Pipe
sizes:12",8",1",0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
866 CLSDDING ON HYDROTESTED LINE @ TP-1731-01-HT-024 (Pipe
I-854 INSPECTION sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAAL CLADDING ON


867
I-855 INSPECTION VISUAL TEST LINE @ TP-1515-01-HT-031 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


868
I-856 INSPECTION VISUAL TEST LINE @ TP-1515-01-HT-030 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


869
I-857 INSPECTION VISUAL TEST LINE @ TP-1514-01-HT-031 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


870 I-858 INSPECTION VISUAL TEST LINE @ TP-1514-01-HT-030 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


871 PREPARATION INSULATION ON HYDROTESTED @ TP-1613-02-HT-020 (Pipe
I-859
INSPECTION sizes: 6",3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


872
I-860 INSPECTION VISUAL TEST LINE @ TP-1513-01-HT-031 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


873 I-861 INSPECTION VISUAL TEST LINE @ TP-1513-01-HT-030 (Pipe sizes: 6", 3",3/4")

874 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


I-862 INSPECTION VISUAL TEST LINE @ TP-1512-01-HT-031 (Pipe sizes: 6", 3",3/4")
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON
875
I-863 INSPECTION VISUAL TEST LINE @ TP-1512-01-HT-030 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


876
I-864 INSPECTION VISUAL TEST LINE @ TP-1511-01-HT-031 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


877 I-865 INSPECTION VISUAL TEST LINE @ TP-1511-01-HT-030 (Pipe sizes: 6", 3",3/4")

SURFACE
MFC-DLM-AK- PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
878 PREPARATION
I-866 INSPECTION ON HYDROTESTED @ TP-1616-00-HT-009 (Pipe sizes: 2",1" )

SURFACE
MFC-DLM-AK- PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
879 PREPARATION
I-867 ON HYDROTESTED @ TP-1621-01-HT-023 (Pipe sizes: 6",2",1" )
INSPECTION

SURFACE PRE- INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
880 PREPARATION INSULATION ON HYDROTESTED @ TP-1632-02-HT-007 (Pipe
I-868 INSPECTION sizes: 36" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
881 OF METAL
I-869 CLADDING HYDROTESTED @ TP-1616-00-HT-012 (Pipe sizes: 2",1",.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


882 I-870 OF METAL HYDROTESTED @ TP-1626-00-HT-006 (Pipe sizes: 14",3" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
883 OF METAL
I-871 LINE @ TP-1501-01-HT-008 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
884 OF METAL
I-872 @ TP-1503-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
885 I-873 OF METAL @ TP-1504-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING

FINAL INSPECTION
886 MFC-DLM-AK- OF METAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
I-874 @ TP-1502-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAAL CLADDING ON VISUAL
887 OF METAL
I-875 TEST @ TP-1507-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
888 OF METAL
I-876 @ TP-1505-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
889 I-877 OF METAL @ TP-1506-01-HT-008 (Pipe sizes: 8",.75" )
CLADDING

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
890 PREPARATION INSULATION ON HYDROTESTED @ TP-1512-02-HT-001 (Pipe
I-878 INSPECTION sizes: 12",8", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
891 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1504-01-HT-028 (Pipe
I-879
INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
892 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1504-01-HT-027 (Pipe
I-880 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
893 PREPARATION INSULATION ON HYDROTESTED @ TP-1705-01-HT-008 (Pipe
I-881 INSPECTION sizes: 24",12",2" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO


MFC-DLM-AK-
894 I-882 PREPARATION INSULATION ON HYDROTESTED @ TP-1423-00-HT-030 (Pipe
INSPECTION sizes: 2",3,0.75" )

MFC-DLM-AK- SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


895 PREPARATION INSULATION ON HYDROTESTED @ TP-1531-01-HT-003 (Pipe
I-883
INSPECTION sizes: 18",1",2" )

INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
896 CLADDING ON HYDROTESTED @ TP-1632-02-HT-007 (Pipe sizes:
I-884 INSPECTION
36" )

SURFACE IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK-
897 I-885 PREPARATION ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
INSPECTION 1705-01-HT-008 (Pipe sizes: 24",12",2" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


898 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1683-02-HT-030 (Pipe
I-886
INSPECTION sizes: 8",2" )
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
MFC-DLM-AK-
899 OF METAL HYDROTESTED @ TP-1503-02-HT-001 (Pipe sizes:
I-887
CLADDING 12",10",6",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
900 OF METAL
I-888 HYDROTESTED @ TP-1681-00-HT-012 (Pipe sizes: 30",1" )
CLADDING

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO APPLICATION


MFC-DLM-AK-
901 I-889 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1621-01-HT-003
INSPECTION (Pipe sizes: 3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


902
I-890 INSPECTION VISUAL TEST LINE @ TP-1501-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


903
I-891 INSPECTION VISUAL TEST LINE @ TP-1501-01-HT-027 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


904
I-892 INSPECTION VISUAL TEST LINE @ TP-1502-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


905
I-893 INSPECTION VISUAL TEST LINE @ TP-1502-01-HT-027 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


906 I-894 INSPECTION VISUAL TEST LINE @ TP-1506-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


907
I-895 INSPECTION VISUAL TEST LINE @ TP-1506-01-HT-027 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


908
I-896 INSPECTION VISUAL TEST LINE @ TP-1507-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


909 I-897 INSPECTION VISUAL TEST LINE @ TP-1507-01-HT-027 (Pipe sizes: 6", 3",3/4")

PIR (COLD)
910 MFC-DLM-AK- INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
I-898 32kg/m3 INSULATION MATERIAL
MATERIAL
MATERIAL RECEIVING & INSPECTION OF HOT & COLD FOSTER
(HOT & COLD)
MFC-DLM-AK- 95-44 ELASTORAL SEALANT, FOSTER 30-45N FOAMSEAL SEALANT
911 INSULATION
I-899 & FOSTER 90-66 CRYOGENIC ADHESIVE COATING ( A+B)
MATERIAL
MATERIALS

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
912 PREPARATION INSULATION ON HYDROTESTED @ TP-1531-01-HT-003 (Pipe
I-883-A
INSPECTION sizes: 18",1",2" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
913 I-887-A OF METAL HYDROTESTED @ TP-1503-02-HT-001 (Pipe sizes:
CLADDING 12",10",6",4",2",1" )

IN-PROCESS INSULATION 1st,2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
914 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
I-900 INSPECTION 1705-01-HT-009 (Pipe sizes: 24",12" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
915 CLADDING ON HYDROTESTED @ TP-1625-00-HT-007 (Pipe sizes:
I-901 INSPECTION
10",2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
916 CLADDING ON HYDROTESTED @ TP-1613-02-HT-020 (Pipe sizes:
I-902 INSPECTION 6",3",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
917 CLADDING ON HYDROTESTED @ TP-1512-02-HT-001 (Pipe sizes:
I-903 INSPECTION 12",8", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
918 I-904 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1505-01-HT-028 (Pipe
INSPECTION sizes: 6", 3",3/4")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


919 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1505-01-HT-027 (Pipe
I-905
INSPECTION sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


920
I-906 INSPECTION VISUAL TEST LINE @ TP-1504-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


921 I-907 INSPECTION VISUAL TEST LINE @ TP-1504-01-HT-027 (Pipe sizes: 6", 3",3/4")

922 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


I-908 INSPECTION ON HYDROTESTED @ TP-1616-00-HT-009 (Pipe sizes: 2",1" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING
923
I-909 INSPECTION ON HYDROTESTED @ TP-1621-01-HT-023 (Pipe sizes: 6",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


924
I-910 INSPECTION VISUAL TEST LINE @ TP-1505-01-HT-027 (Pipe sizes: 6", 3",3/4")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
925 I-911 INSPECTION CLADDING ON HYDROTESTED @ TP-1683-03-HT-023 (Pipe
sizes:6",4",3",2",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO INSULATION ON


MFC-DLM-AK-
926 PREPARATION HYDROTESTED LINE @ TP-1602-01-HT-003 (Pipe sizes: 8", 4",2",
I-912 INSPECTION 1")

SURFACE PARTIAL PRE-INSULATION INSPECTION PRIOR TO APPLICATION


MFC-DLM-AK-
927 PREPARATION OF INSULATION EXCEPT WELD JOINTS & SUPPORT @ TP-1623-
I-913
INSPECTION 01-HT-008 (Pipe sizes: 6",8",10",16",24", 30",36",42")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
928 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1503-01-HT-028 (Pipe
I-914 INSPECTION sizes: 6", 3",3/4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
929 PREPARATION INSULATION ON VISUAL TEST LINE @ TP-1503-01-HT-027 (Pipe
I-915 INSPECTION sizes: 6", 3",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


930 I-916 INSPECTION VISUAL TEST LINE @ TP-1505-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO APPLICATION


931 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-037
I-917
INSPECTION (Pipe sizes: 72",18")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
932 PREPARATION INSULATION ON HYDROTESTED @ TP-1681-00-HT-006 (Pipe
I-918
INSPECTION sizes: 36" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
933 I-919 PREPARATION INSULATION ON SUPPORT OF HYDROTESTED LINE @ TP-1681-
INSPECTION 00-HT-011 (Pipe sizes: 36" )

934 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


I-920 INSPECTION VISUAL TEST LINE @ TP-1503-01-HT-028 (Pipe sizes: 6", 3",3/4")
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON
935
I-921 INSPECTION VISUAL TEST LINE @ TP-1503-01-HT-027 (Pipe sizes: 6", 3",3/4")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
936 OF METAL HYDROTESTED @ TP-1507-02-HT-001 (Pipe sizes:
I-922
CLADDING 12",10",6",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
937 I-923 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-014 (Pipe sizes: 3",1" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAAL CLADDING ON


MFC-DLM-AK-
938 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-017 (Pipe sizes:
I-924 CLADDING 12",8",1",0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLSDDING ON
939 OF METAL
I-925 HYDROTESTED LINE @ TP-1731-01-HT-024 (Pipe sizes: 2" )
CLADDING

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
940 BARRIER ON HYDROTESTED @ TP-1681-00-HT-006 (Pipe sizes:
I-926 INSPECTION 36" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
941 BARRIER ON SUPPORT OF HYDROTESTED LINE @ TP-1681-00-
I-927 INSPECTION HT-011 (Pipe sizes: 36" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
942 I-928 INSPECTION CLADDING ON HYDROTESTED @ TP-1531-01-HT-003 (Pipe sizes:
18",1",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


943 CLADDING ON HYDROTESTED @ TP-1423-00-HT-030 (Pipe sizes:
I-929 INSPECTION
2",3,0.75" )

INSULATION INSPECTION 1st LAYER ( COLD ) PRIOR TO 2nd


MFC-DLM-AK- INSULATION
944 LAYER INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-
I-930 INSPECTION
037 (Pipe sizes: 72",18")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
945 I-931 INSPECTION HYDROTESTED LINE @ TP-1602-01-HT-003 (Pipe sizes: 8", 4",2",
1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


946 MFC-DLM-AK- INSULATION CLADDING ON VISUAL TEST @ TP-1515-01-HT-006 (Pipe sizes:
I-932 INSPECTION
10",.75" )
MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF (HOT) MINERAL FIBER
947
I-933 MATERIAL BLANKET Density 100kg/m3 INSULATION MATERIAL

INSULATION INSPECTION 2nd LAYER ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
948 BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-037 (Pipe
I-934 INSPECTION
sizes: 72",18")

SURFACE PARTIAL PRE-INSULATION INSPECTION ( COLD ) PRIOR TO


MFC-DLM-
949 AK-I-935 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
INSPECTION 1705-01-HT-010 (Pipe sizes: 20",1")

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
950 PREPARATION INSULATION ON HYDROTESTED @ TP-1507-01-HT-034 (Pipe
I-936 INSPECTION sizes: 3",1" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
951 PREPARATION INSULATION ON HYDROTESTED @ TP-1504-01-HT-034 (Pipe
I-937
INSPECTION sizes: 3",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
952 OF METAL
I-938 CLADDING @ TP-1514-01-HT-006 (Pipe sizes: 10",.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
953 OF METAL
I-939 CLADDING @ TP-1513-01-HT-006 (Pipe sizes: 10",.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
954 I-940 OF METAL @ TP-1512-01-HT-006 (Pipe sizes: 10",.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
955 OF METAL
I-941 @ TP-1511-01-HT-006 (Pipe sizes: 10",.75" )
CLADDING

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
956 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-037 (Pipe
I-942 INSPECTION
sizes: 72",18")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
957 I-943 INSPECTION CLADDING ON HYDROTESTED @ TP-1507-01-HT-034 (Pipe sizes:
3",1" )

IINSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


958 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1504-01-HT-034 (Pipe sizes:
I-944 INSPECTION
3",1" )
SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
959 PREPARATION
I-945 ON HYDROTESTED @ TP-1672-01-HT-001 (Pipe sizes: 0.75" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
960 PREPARATION
I-946 ON HYDROTESTED @ TP-1702-01-HT-001 (Pipe sizes: 3",1" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
961 I-947 PREPARATION ON HYDROTESTED @ TP-1712-01-HT-004 (Pipe sizes: 6",4",1" )
INSPECTION

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
962 OF METAL
I-948 CLADDING @ TP-1515-01-HT-006 (Pipe sizes: 10",.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
963 PREPARATION ON HYDROTESTED @ TP-1511-02-HT-001 (Pipe sizes: 12",8",
I-949
INSPECTION 6",3",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
964 PREPARATION
I-950 INSPECTION ON HYDROTESTED @ TP-1505-01-HT-034 (Pipe sizes: 3",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
965 PREPARATION
I-951 INSPECTION ON HYDROTESTED @ TP-1506-01-HT-034 (Pipe sizes: 3",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
966 I-952 INSPECTION CLADDING ON HYDROTESTED @ TP-1681-00-HT-006 (Pipe sizes:
36" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


967 CLADDING ON SUPPORT OF HYDROTESTED LINE @ TP-1681-00-
I-953 INSPECTION
HT-011 (Pipe sizes: 36" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
968 CLADDING ON HYDROTESTED @ TP-1705-01-HT-008 (Pipe sizes:
I-954 INSPECTION
24",12",2" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
969 I-955 INSPECTION CLADDING ON HYDROTESTED @ TP-1705-01-HT-009 (Pipe sizes:
24",12" )

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


970 MFC-DLM-AK- PREPARATION INSULATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-1531-
I-956
INSPECTION 01-HT-001 (Pipe sizes: 18",8" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
971 CLADDING ON HYDROTESTED @ TP-1672-01-HT-001 (Pipe sizes:
I-957 INSPECTION
0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
972 CLADDING ON HYDROTESTED @ TP-1702-01-HT-001 (Pipe sizes:
I-958 INSPECTION
3",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
973 I-959 INSPECTION CLADDING ON HYDROTESTED @ TP-1511-02-HT-001 (Pipe sizes:
12",8", 6",3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


974
I-960 INSPECTION ON HYDROTESTED @ TP-1505-01-HT-034 (Pipe sizes: 3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


975
I-961 INSPECTION ON HYDROTESTED @ TP-1506-01-HT-034 (Pipe sizes: 3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
976 PREPARATION INSULATION ON HYDROTESTED @ TP-1404-00-HT-002 (Pipe
I-962 INSPECTION sizes: 30",20",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
977 PREPARATION INSULATION ON HYDROTESTED @ TP-1404-00-HT-007 (Pipe
I-963 INSPECTION sizes: 30",20",1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK-
978 I-964 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
INSPECTION 1701-01-HT-011 (Pipe sizes: 1",2",6",10",12")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


979 PREPARATION INSULATION ON HYDROTESTED @ TP-1502-01-HT-034 (Pipe
I-965
INSPECTION sizes: 3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
980 PREPARATION INSULATION ON HYDROTESTED @ TP-1513-01-HT-038 (Pipe
I-966
INSPECTION sizes: 3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
981 I-967 PREPARATION INSULATION ON HYDROTESTED @ TP-1514-01-HT-038 (Pipe
INSPECTION sizes: 3",1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


982 MFC-DLM-AK- OF METAL HYDROTESTED @ TP-1515-02-HT-001 (Pipe sizes: 12",8", 6",3",1"
I-968
CLADDING )
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
MFC-DLM-AK-
983 OF METAL HYDROTESTED @ TP-1501-02-HT-001 (Pipe sizes:
I-969
CLADDING 12",10",6",4",2",1" )

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
984 EXCEPT WELD JOINTS & SUPPORT @ TP-1615-02-HT-019 (Pipe
I-970 INSPECTION
sizes: 6" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
985 I-971 OF METAL HYDROTESTED @ TP-1615-02-HT-020 (Pipe sizes: 6",3",1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
986 OF METAL
I-972 CLADDING HYDROTESTED @ TP-1614-02-HT-020 (Pipe sizes: 6",3",1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
987 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1683-02-HT-022
I-973
INSPECTION (Pipe sizes: 8",10",3",1.5",1")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK-
988 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
I-974 INSPECTION 1691-01-HT-004 (Pipe sizes: 1",12")

SURFACE PARTIAL PRE-INSULATION INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK-
989 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
I-975 INSPECTION 1705-00-HT-010 (Pipe sizes: 20",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


990 I-976 INSPECTION ON HYDROTESTED @ TP-1404-00-HT-002 (Pipe sizes: 30",20",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


991
I-977 INSPECTION ON HYDROTESTED @ TP-1404-00-HT-007 (Pipe sizes: 30",20",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


992
I-978 INSPECTION ON HYDROTESTED @ TP-1502-01-HT-034 (Pipe sizes: 3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


993 I-979 INSPECTION ON HYDROTESTED @ TP-1513-01-HT-038 (Pipe sizes: 3",1" )

994 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


I-980 INSPECTION ON HYDROTESTED @ TP-1514-01-HT-038 (Pipe sizes: 3",1" )
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
995
I-981 INSPECTION HYDROTESTED @ TP-1705-01-HT-008 (Pipe sizes: 24",12",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
996 OF METAL
I-982 HYDROTESTED @ TP-1705-01-HT-009 (Pipe sizes: 24",12" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
997 I-983 OF METAL HYDROTESTED @ TP-1615-02-HT-021 (Pipe sizes: 36",24",8",2" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
998 OF METAL HYDROTESTED @ TP-1512-02-HT-001 (Pipe sizes: 12",8", 6",3",1"
I-984 CLADDING )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
999 OF METAL
I-985 HYDROTESTED @ TP-1616-00-HT-009 (Pipe sizes: 2",1" )
CLADDING

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1000 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
I-986 INSPECTION 1683-02-HT-015 (Pipe sizes: 8",3",1" )

IN-PROCESS INSULATION 1st & 2nd INSPECTION OF ( COLD )


MFC-DLM-AK- INSULATION
1001 PRIOR TO INSULATION ON HYDROTESTED @ TP-1705-01-HT-015
I-987 INSPECTION (Pipe sizes: 8",6",4",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1002 I-988 PREPARATION ON HYDROTESTED @ TP-1605-02-HT-027 (Pipe sizes:
INSPECTION 1.5",1",0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


1003 PREPARATION ON HYDROTESTED @ TP-1602-02-HT-028 (Pipe sizes:
I-989
INSPECTION 1.5",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1004 PREPARATION ON HYDROTESTED @ TP-1601-02-HT-028 (Pipe sizes:
I-990
INSPECTION 1.5",1",0.75" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1005 I-991 PREPARATION ON HYDROTESTED @ TP-1601-02-HT-020 (Pipe sizes:
INSPECTION 12",8",4",2",1" )

SURFACE
1006 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
I-992 ON HYDROTESTED @ TP-1672-01-HT-011 (Pipe sizes: 4",0.75" )
INSPECTION
SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1007 PREPARATION
I-993 ON HYDROTESTED @ TP-1712-02-HT-004 (Pipe sizes: 4",3" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1008 PREPARATION
I-994 ON HYDROTESTED @ TP-1712-02-HT-016 (Pipe sizes: 2" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1009 I-995 PREPARATION ON HYDROTESTED @ TP-1672-01-HT-012 (Pipe sizes: 3",1" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1010 PREPARATION
I-996 INSPECTION ON HYDROTESTED @ TP-1702-02-HT-010 (Pipe sizes: 1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1011 PREPARATION
I-997 ON HYDROTESTED @ TP-1702-01-HT-011 (Pipe sizes: 2" )
INSPECTION

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1012 ON HYDROTESTED @ TP-1601-02-HT-020 (Pipe sizes:
I-998 INSPECTION 12",8",4",2",1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
1013 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1513-01-HT-009
I-999 INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
1014 I-1000 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1515-01-HT-009
INSPECTION (Pipe sizes: 2" )

MFC-DLM- SURFACE PARTIAL PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


1015 PREPARATION INSULATION ON HYDROTESTED @ TP-1602-02-HT-020 (Pipe
AK-I-1001
INSPECTION sizes: 12",8" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
1016 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1623-01-HT-023
I-1002
INSPECTION (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TOAPPLICATION OF


MFC-DLM-AK-
1017 I-1003 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1471-00-HT-018
INSPECTION (Pipe sizes: 3",1",2" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


1018 MFC-DLM-AK- PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-004
I-1004
INSPECTION (Pipe sizes: 3",1")
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1019
I-1005 INSPECTION HYDROTESTED @ TP-1625-00-HT-007 (Pipe sizes: 10",2" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1020 CLADDING ON HYDROTESTED @ TP-1683-02-HT-015 (Pipe sizes:
I-1006 INSPECTION
8",3",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TOMETAL


MFC-DLM-AK- VAPOR BARRIER
1021 I-1007 INSPECTION CLADDING ON HYDROTESTED @ TP-1705-01-HT-015 (Pipe sizes:
8",6",4",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1022 OF METAL
I-1008 CLADDING HYDROTESTED @ TP-1531-01-HT-003 (Pipe sizes: 18",1",2" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1023 OF METAL HYDROTESTED LINE @ TP-1602-01-HT-003 (Pipe sizes: 8", 4",2",
I-1009
CLADDING 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT PIR ) METAL CLADDING ON


1024 OF METAL
I-1010 CLADDING HYDROTESTED @ TP-1632-02-HT-007 (Pipe sizes: 36" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1025 OF METAL
I-1011 CLADDING HYDROTESTED LINE @ TP-1616-00-HT-010 (Pipe sizes: 3",2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1026 I-1012 OF METAL HYDROTESTED @ TP-1404-00-HT-002 (Pipe sizes: 30",20",1" )
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1027
I-1013 INSPECTION HYDROTESTED @ TP-1613-02-HT-020 (Pipe sizes: 6",3",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
1028 OF METAL
I-1014 LINE @ TP-1513-01-HT-031 (Pipe sizes: 6", 3",3/4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL


1029 I-1015 OF METAL TEST LINE @ TP-1513-01-HT-030 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
1030 MFC-DLM-AK- OF METAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
I-1016 LINE @ TP-1511-01-HT-031 (Pipe sizes: 6", 3",3/4")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON VISUAL TEST
1031 OF METAL
I-1017 LINE @ TP-1511-01-HT-030 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT PIR ) METAL CLADDING ON
1032 OF METAL
I-1018 HYDROTESTED @ TP-1423-00-HT-030 (Pipe sizes: 2",3,0.75" )
CLADDING

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1033 I-1019 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1683-03-HT-015
INSPECTION (Pipe sizes: 30",20",10",2"1")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1034 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1683-02-HT-026
I-1020 INSPECTION (Pipe sizes: 6",8",1")

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1035 PREPARATION ON HYDROTESTED @ TP-1602-02-HT-020 (Pipe sizes:
I-1021
INSPECTION 12",8",4",2",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1036 CLADDING ON HYDROTESTED @ TP-1705-01-HT-007 (Pipe sizes:
I-1022 INSPECTION 24",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1037
I-1023 INSPECTION HYDROTESTED LINE @ TP-1513-01-HT-009 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1038 I-1024 INSPECTION HYDROTESTED LINE @ TP-1515-01-HT-009 (Pipe sizes: 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1039 OF METAL
I-1025 HYDROTESTED @ TP-1683-02-HT-015 (Pipe sizes: 8",3",1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1040 OF METAL
I-1026 HYDROTESTED @ TP-1705-01-HT-015 (Pipe sizes: 8",6",4",1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1041 I-1027 OF METAL HYDROTESTED @ TP-1511-02-HT-001 (Pipe sizes: 12",8", 6",3",1"
CLADDING )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


1042 MFC-DLM-AK- PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1691-01-HT-007
I-1028
INSPECTION (Pipe sizes: 1",16")
SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION
MFC-DLM-AK-
1043 PREPARATION OF INSULATION (TP-1606-01-HT-004) (Pipe Sizes: 8", 6', 4",
I-1029
INSPECTION 2",1",0.75")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION ( COLD ) PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL &
1044
I-1030 INSPECTION SUPPORT, HYDROTESTED LINE @ TP-1683-03-HT-015 (Pipe sizes:
30",20",10",2"1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1045 I-1031 INSPECTION PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT,
HYDROTESTED LINE @ TP-1683-02-HT-026 (Pipe sizes: 6",8",1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1046 PRIOR TO VAPOR BARRIER ON HYDROTESTED LINE @ TP-1691-
I-1032 INSPECTION 01-HT-007 (Pipe sizes: 1",16")

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1047 PREPARATION INSULATION ON HYDROTESTED @ TP-1702-01-HT-004 (Pipe
I-1033
INSPECTION sizes: 1.5" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1048 PREPARATION INSULATION ON HYDROTESTED @ TP-1672-02-HT-005 (Pipe
I-1034 INSPECTION sizes: 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1049 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-038
I-1035 INSPECTION (Pipe sizes: 2")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1050 I-1036 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1731-01-HT-006
INSPECTION (Pipe sizes: 2",1.5",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1051 ON HYDROTESTED @ TP-1602-02-HT-020 (Pipe sizes:
I-1037 INSPECTION
12",8",4",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION


MFC-DLM-AK-
1052 PREPARATION OF INSULATION (TP-1606-01-HT-001) (Pipe Sizes: 8", 6', 4",
I-1038
INSPECTION 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1053 I-1039 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-038
INSPECTION (Pipe sizes: 2")

SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR) PRIOR TO


1054 MFC-DLM-AK- PREPARATION INSULATION (TP-1423-00-HT-001) (Pipe
I-1040
INSPECTION Sizes: 2",1",0.75")
SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR) PRIOR TO
MFC-DLM-AK-
1055 PREPARATION INSULATION (TP-1645-00-HT-070) (Pipe
I-1041
INSPECTION Sizes: 2",1",0.75")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1056 PREPARATION
I-1042 (TP-1702-01-HT-009) (Pipe Sizes: 6",2",1")
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1057 I-1043 PREPARATION (TP-1712-01-HT-007) (Pipe Sizes: 1")
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1058 PREPARATION
I-1044 INSPECTION (TP-1662-01-HT-013) (Pipe Sizes: 3",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1059 CLADDING ON HYDROTESTED @ TP-1672-01-HT-001 (Pipe sizes:
I-1045 INSPECTION
0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1060
I-1046 INSPECTION ON (TP-1606-01-HT-004) (Pipe Sizes: 8", 6', 4", 2",1",0.75")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1061
I-1047 INSPECTION ON (TP-1606-01-HT-001) (Pipe Sizes: 8", 6', 4", 2",1",0.75")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1062 I-1048 PREPARATION (TP-1702-01-HT-020) (Pipe Sizes: 3")
INSPECTION

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION


1063 PREPARATION
I-1049 (TP-1702-01-HT-002) (Pipe Sizes: 1")
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1064 PREPARATION
I-1050 (TP-1702-02-HT-012) (Pipe Sizes: 3",2")
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1065 I-1051 PREPARATION (TP-1712-02-HT-001) (Pipe Sizes: 1")
INSPECTION

SURFACE
1066 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
I-1052 (TP-1671-02-HT-011) (Pipe Sizes: 2")
INSPECTION
SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1067 PREPARATION
I-1053 (TP-1672-03-HT-001) (Pipe Sizes: 3")
INSPECTION

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1068 PREPARATION ON HYDROTESTED @ TP-1612-02-HT-020 (Pipe sizes:
I-1054
INSPECTION 12",8",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1069 I-1055 OF METAL HYDROTESTED @ TP-1404-00-HT-007 (Pipe sizes: 30",20",1" )
CLADDING

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1070 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1683-03-HT-011
I-1056 INSPECTION (Pipe sizes: 20",1")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1071 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1743-00-HT-002
I-1057
INSPECTION (Pipe sizes: 2")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1072 PREPARATION
I-1058 INSPECTION (TP-1672-02-HT-010) (Pipe Sizes: 3",1")

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1073 PREPARATION INSULATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-1612-
I-1059 INSPECTION 02-HT-019 (Pipe sizes: 6" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1074 I-1060 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1512-01-HT-009
INSPECTION (Pipe sizes: 2" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


1075 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1621-01-HT-010
I-1061
INSPECTION (Pipe sizes: 30",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1076 CLADDING ON HYDROTESTED @ TP-1672-02-HT-005 (Pipe sizes:
I-1062 INSPECTION
1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON


1077 I-1063 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-038 (Pipe sizes: 2")

INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON


1078 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1731-01-HT-006 (Pipe sizes:
I-1064 INSPECTION
2",1.5",1")
INSULATION INSPECTION OF ( HOT PIR) PRIOR TO METAL
MFC-DLM-AK- INSULATION
1079 CLADDING ON (TP-1423-00-HT-001) (Pipe
I-1065 INSPECTION
Sizes: 2",1",0.75")

INSULATION INSPECTION OF ( HOT PIR) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1080 CLADDING ON (TP-1645-00-HT-070) (Pipe
I-1066 INSPECTION
Sizes: 2",1",0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1081 I-1067 INSPECTION CLADDING ON HYDROTESTED @ TP-1702-01-HT-004 (Pipe sizes:
1.5" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1082 PREPARATION ON HYDROTESTED @ TP-1607-02-HT-020 (Pipe sizes:
I-1068 INSPECTION 12",8",4",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1083 ON (TP-1702-01-HT-009) (Pipe Sizes:
I-1069 INSPECTION
6",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1084
I-1070 INSPECTION ON (TP-1712-01-HT-007) (Pipe Sizes: 1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1085 ON (TP-1662-01-HT-013) (Pipe Sizes:
I-1071 INSPECTION 3",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1086 I-1072 INSPECTION ON (TP-1702-01-HT-020) (Pipe Sizes: 3")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1087
I-1073 INSPECTION ON (TP-1702-01-HT-002) (Pipe Sizes: 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1088
I-1074 INSPECTION ON (TP-1702-02-HT-012) (Pipe Sizes: 3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1089 I-1075 INSPECTION ON (TP-1712-02-HT-001) (Pipe Sizes: 1")

1090 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


I-1076 INSPECTION ON (TP-1671-02-HT-011) (Pipe Sizes: 2")
MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING
1091
I-1077 INSPECTION ON (TP-1672-03-HT-001) (Pipe Sizes: 3")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1092 ON HYDROTESTED @ TP-1612-02-HT-020 (Pipe sizes:
I-1078 INSPECTION
12",8",4",2",1" )

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1093 I-1079 INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINE @
TP-1683-03-HT-011 (Pipe sizes: 20",1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1094 PRIOR TO VAPOR BARRIER ON ON HYDROTESTED LINE @ TP-
I-1080 INSPECTION 1743-00-HT-002 (Pipe sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1095
I-1081 INSPECTION ON (TP-1672-02-HT-010) (Pipe Sizes: 3",1")

SURFACE PRE-INSULATION INSPECTION ON WELD JOINTS, SPOOL &


MFC-DLM-AK-
1096 PREPARATION SUPPORT PRIOR TO APPLICATION OF INSULATION @ TP-1683-
I-1082 INSPECTION 02-HT-008 (Pipe sizes: 10")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1097 PREPARATION INSULATION @ TP-1705-01-HT-014 (Pipe sizes:
I-1083 INSPECTION 16",12",10",2",1")

SURFACE
MFC-DLM- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1098 AK-I-1084 PREPARATION ON TP-1672-03-HT-002 (Pipe sizes: 1" )
INSPECTION

MFC-DLM-AK- SURFACE PARTIAL PRE-INSULATION INSPECTION ( COLD ) PRIOR TO


1099 PREPARATION APPLICATION OF INSULATION EXCEPT WELD JOINTS & SUPPORT
I-1085
INSPECTION @ TP-1714-00-HT-016 (Pipe sizes: 72")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1100 PREPARATION
I-1086 ON TP-1712-02-HT-002 (Pipe sizes: 8" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO
1101 I-1087 PREPARATION INSULATION ON TP-1713-00-HT-003 (Pipe sizes: 10" )
INSPECTION

SURFACE
1102 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
I-1088 ON TP-1702-02-HT-017 (Pipe sizes: 3" )
INSPECTION
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1662-01-
1103 OF METAL
I-1089 HT-013) (Pipe Sizes: 3"2",1")
CLADDING

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1104 PREPARATION INSULATION ON TP-1611-02-HT-019 (Pipe sizes: 12",10",
I-1090
INSPECTION 6",3",1" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1105 I-1091 PREPARATION ON HYDROTESTED @ TP-1611-02-HT-020 (Pipe sizes:
INSPECTION 12",8",4",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1106
I-1092 INSPECTION HYDROTESTED LINE @ TP-1512-01-HT-009 (Pipe sizes: 2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1107 ON HYDROTESTED @ TP-1607-02-HT-020 (Pipe sizes:
I-1093 INSPECTION
12",8",4",2",1" )

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1108 CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1612-02-
I-1094 INSPECTION HT-019 (Pipe sizes: 6" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1109 PREPARATION
I-1095 INSPECTION INSULATION @ TP-1691-01-HT-005 (Pipe sizes: 8",6",3",1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1110 I-1096 PREPARATION INSULATION @ TP-1691-01-HT-009 (Pipe sizes: 6",3",1")
INSPECTION

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1111 PREPARATION
I-1097 INSULATION @ TP-1691-01-HT-003 (Pipe sizes: 3",1",0.75")
INSPECTION

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1112 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1705-01-HT-010
I-1098
INSPECTION (Pipe sizes: 20",1")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1113 I-1099 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1705-01-HT-005
INSPECTION (Pipe sizes: 20",10", 8",6",3",1")

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1114 MFC-DLM-AK- INSULATION CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1531-01-
I-1100 INSPECTION
HT-001 (Pipe sizes: 18",8" )
SURFACE PRE- INSULATION INSPECTION OF (HOT PIR ) PRIOR TO
MFC-DLM-AK-
1115 PREPARATION INSULATION ON HYDROTESTED @ TP-1712-02-HT-007 (Pipe
I-1101
INSPECTION sizes: 36" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1116 PREPARATION OF INSULATION ON WELD JOINTS, SPOOL & SUPPORT
I-1102
INSPECTION HYDROTESTED LINES @ TP-1683-02-HT-016 (Pipe sizes: 4",3")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1117 I-1103 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1731-01-HT-006 (Pipe
sizes: 2",1.5",1")

MFC-DLM- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1118
AK-I-1104 INSPECTION ON TP-1672-03-HT-002 (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1119
I-1105 INSPECTION ON TP-1712-02-HT-002 (Pipe sizes: 8" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


1120
I-1106 INSPECTION CLADDING ON TP-1713-00-HT-003 (Pipe sizes: 10" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1121
I-1107 INSPECTION ON TP-1702-02-HT-017 (Pipe sizes: 3" )

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1122 I-1108 INSPECTION CLADDING ON TP-1611-02-HT-019 (Pipe sizes: 12",10",
6",3",1" )

MFC-DLM-AK- SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


1123 PREPARATION ON HYDROTESTED @ TP-1513-02-HT-001 (Pipe sizes:
I-1109
INSPECTION 12",8",6",3",2",1" )

SURFACE PRE- INSULATION INSPECTION OF (HOT ) PRIOR TO


MFC-DLM-AK-
1124 PREPARATION INSULATION ON HYDROTESTED @ TP-1621-01-HT-022 (Pipe
I-1110
INSPECTION sizes: 6",2",1" )

SURFACE PRE- INSULATION INSPECTION OF (HOT ) PRIOR TO


MFC-DLM-AK-
1125 I-1111 PREPARATION INSULATION ON HYDROTESTED LINES @ TP-1625-00-HT-006
INSPECTION (Pipe sizes: 10",2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1126 MFC-DLM-AK- INSULATION ON HYDROTESTED @ TP-1611-02-HT-020 (Pipe sizes:
I-1112 INSPECTION
12",8",4",2",1" )
INSULATION 1st LAYER INSPECTION PRIOR TO 2nd LAYER
MFC-DLM-AK- INSULATION
1127 INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1691-
I-1113 INSPECTION
01-HT-005 (Pipe sizes: 8",6",3",1")

INSULATION 1st LAYER INSPECTION PRIOR TO 2nd LAYER


MFC-DLM-AK- INSULATION
1128 INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1691-
I-1114 INSPECTION
01-HT-009 (Pipe sizes: 6",3",1")

MFC-DLM-AK- INSULATION INSULATION 1st LAYER INSPECTION PRIOR TO 2nd LAYER


1129 I-1115 INSPECTION INSULATION @ TP-1691-01-HT-003 (Pipe sizes: 3",1",0.75")

INSULATION 1st LAYER INSPECTION ( COLD ) PRIOR TO 2nd


MFC-DLM-AK- INSULATION
1130 LAYER INSULATION ON WELD JOINTS, SPOOL & SUPPORT,
I-1116 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-010 (Pipe sizes: 20",1")

INSULATION 1st LAYER INSPECTION ( COLD ) PRIOR TO 2nd


MFC-DLM-AK- INSULATION LAYER INSULATION ON WELD JOINTS, SPOOL & SUPPORT,
1131
I-1117 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-005 (Pipe sizes: 20",10",
8",6",3",1")

INSULATION 1st LAYER INSPECTION PRIOR TO 2nd LAYER


MFC-DLM-AK- INSULATION
1132 INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-
I-1118 INSPECTION 02-HT-008 (Pipe sizes: 10")

INSULATION 1st LAYER INSPECTION PRIOR TO 2nd LAYER


MFC-DLM-AK- INSULATION
1133 INSULATION ON HYDROTESTED LINES @ TP-1705-01-HT-014
I-1119 INSPECTION (Pipe sizes: 16",12",10",2",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON (TP-1702-


1134 I-1120 OF METAL 01-HT-009) (Pipe Sizes: 6",2",1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION ( COLD ) METAL CLADDING ON HYDROTESTED


1135 OF METAL
I-1121 LINE @ TP-1731-01-HT-006 (Pipe sizes: 2",1.5",1")
CLADDING

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1136
I-1122 INSPECTION ON TP-1611-02-HT-019 (Pipe sizes: 12",10", 6",3",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1137 I-1123 INSPECTION CLADDING ON EXCEPT WELD JOINTS & SUPPORT @ TP-1612-02-
HT-019 (Pipe sizes: 12",10", 6",3",1" )

PIR (COLD)
1138 MFC-DLM-AK- INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
I-1124 32kg/m3 INSULATION MATERIAL
MATERIAL
INSULATION 2nd LAYER INSPECTION PRIOR TO VAPOR BARRIER
MFC-DLM-AK- INSULATION
1139 ON WELD JOINTS, SPOOL & SUPPORT @ TP-1691-01-HT-005
I-1125 INSPECTION
(Pipe sizes: 8",6",3",1")

INSULATION 2nd LAYER INSPECTION PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
1140 ON WELD JOINTS, SPOOL & SUPPORT @ TP-1691-01-HT-009
I-1126 INSPECTION
(Pipe sizes: 6",3",1")

MFC-DLM-AK- INSULATION INSULATION 2nd LAYER INSPECTION PRIOR TO VAPOR BARRIER


1141 I-1127 INSPECTION @ TP-1691-01-HT-003 (Pipe sizes: 3",1",0.75")

IN-PROCESS INSULATION 2nd & 3rd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1142 PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT,
I-1128 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-010 (Pipe sizes: 20",1")

IN-PROCESS INSULATION 2nd & 3rd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT,
1143
I-1129 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-005 (Pipe sizes: 20",10",
8",6",3",1")

IN-PROCESS INSULATION 2nd & 3rd LAYER INSPECTION PRIOR


MFC-DLM-AK- INSULATION
1144 TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-
I-1130 INSPECTION 1683-02-HT-008 (Pipe sizes: 10")

IN-PROCESS INSULATION 2nd & 3rd LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
1145 VAPOR BARRIER ON HYDROTESTED LINES @ TP-1705-01-HT-014
I-1131 INSPECTION (Pipe sizes: 16",12",10",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1146 I-1132 INSPECTION CLADDING ON HYDROTESTED @ TP-1513-02-HT-001 (Pipe sizes:
12",8",6",3",2",1" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


1147 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1691-01-HT-029
I-1133
INSPECTION (Pipe sizes: 8",4",1")

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1148 EXCEPT WELD JOINTS & SUPPORT @ TP-1531-01-HT-001 (Pipe
I-1134 INSPECTION
sizes: 18",8" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1149 I-1135 OF METAL HYDROTESTED @ TP-1602-02-HT-020 (Pipe sizes:
CLADDING 12",8",4",2",1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1150 MFC-DLM-AK- OF METAL HYDROTESTED @ TP-1601-02-HT-020 (Pipe sizes: 12",8",4",2",1"
I-1136
CLADDING )
INSULATION INSPECTION OF (HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
1151 CLADDING ON HYDROTESTED @ TP-1621-01-HT-022 (Pipe sizes:
I-1137 INSPECTION
6",2",1" )

INSULATION INSPECTION OF (HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1152 CLADDING ON HYDROTESTED LINES @ TP-1625-00-HT-006 (Pipe
I-1138 INSPECTION
sizes: 10",2" )

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1153 I-1139 PREPARATION ON HYDROTESTED @ TP-1514-02-HT-001 (Pipe sizes:
INSPECTION 12",8",6",3",2",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1154
I-1140 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-028 (Pipe sizes: 12",4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1155 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1704-
I-1141
INSPECTION 02-HT-005 (Pipe sizes: (Pipe sizes: 24",16",10", 12",8",1",0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1156 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1714-
I-1142 INSPECTION 00-HT-003 (Pipe sizes: 30",14",4",3",1" )

SURFACE
MFC-DLM-AK- PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1157 PREPARATION
I-1143 INSPECTION ON HYDROTESTED @ TP-1621-01-HT-027 (Pipe sizes: 4",2",1" )

SURFACE
MFC-DLM-AK- PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1158 I-1144 PREPARATION ON HYDROTESTED @ TP-1624-01-HT-002 (Pipe sizes: 6" )
INSPECTION

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1159 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1701-
I-1145
INSPECTION 01-HT-009 (Pipe sizes: 12", 1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1160
I-1146 INSPECTION HYDROTESTED @ TP-1705-01-HT-007 (Pipe sizes: 24",1" )

FINAL INSPECTION
MFC-DLM- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED
1161 AK-I-1147 OF METAL LINE @ TP-1704-02-HT-043 (Pipe sizes: 36", 2", 1" )
CLADDING

INSULATION INSPECTION OF (HOT PIR ) PRIOR TO METAL


1162 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1712-02-HT-007 (Pipe sizes:
I-1148 INSPECTION
36" )
SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1163 PREPARATION
I-1149 INSULATION ON @ TP-1714-00-HT-027 (Pipe sizes: 24", 12")
INSPECTION

SURFACE PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1164 PREPARATION ON HYDROTESTED @ TP-1671-02-HT-006 (Pipe sizes:
I-1150
INSPECTION 20",14",10",2",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1165 I-1151 PREPARATION INSULATION ON @ TP-1705-01-HT-020 (Pipe sizes: 16", 1")
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1166 PREPARATION
I-1152 INSPECTION INSULATION ON @ TP-1683-02-HT-028 (Pipe sizes: 4")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1167 PREPARATION INSULATION ON @ TP-1683-02-HT-009 (Pipe sizes:
I-1153
INSPECTION 12",2",10",8",1")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1168 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINE @
I-1154 INSPECTION TP-1683-02-HT-022 (Pipe sizes: 8",10",3",1.5",1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1169 ( COLD ) PRIOR TO PRIOR TO VAPOR BARRIER ON HYDROTESTED
I-1155 INSPECTION @ TP-1683-02-HT-030 (Pipe sizes: 8",2" )

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1170 I-1156 INSPECTION PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT
HYDROTESTED LINES @ TP-1683-02-HT-016 (Pipe sizes: 4",3")

MFC-DLM-AK- INSULATION IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION
1171 ( COLD ) PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL &
I-1157 INSPECTION
SUPPORT @ TP-1683-03-HT-015 (Pipe sizes: 30",20",10",2"1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1172 PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT
I-1158 INSPECTION
@ TP-1683-02-HT-026 (Pipe sizes: 6",8",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1173 I-1159 PREPARATION INSULATION ON EXCEPT WELD JOINTS, SPOOL & SUPPORT @
INSPECTION TP-1683-02-HT-002 (Pipe sizes: 6",4",3", 2",1.5")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


1174 MFC-DLM-AK- INSULATION PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT
I-1160 INSPECTION
@ TP-1704-02-HT-005 (Pipe sizes: 24",16",10", 12",8",1",0.75")
INSULATION INSPECTION PRIOR TO VAPOR BARRIER ON WELD
MFC-DLM-AK- INSULATION
1175 JOINTS,SPOOL & SUPPORT @ TP-1714-00-HT-003 (Pipe sizes: 3"
I-1161 INSPECTION
)

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1176 PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT
I-1162 INSPECTION
@ TP-1704-02-HT-005 (Pipe sizes: 16", 10")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1177 I-1163 INSPECTION PRIOR TO VAPOR BARRIER ON WELD JOINTS, SPOOL & SUPPORT
@ TP-1701-01-HT-009 (Pipe sizes: 12", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1178 WELD JOINTS, SPOOL & SUPPORT @ TP-1691-01-HT-009 (Pipe
I-1164 INSPECTION sizes: 6",3",1")

VAPOR BARRIER INSPECTION PRIOR TO VAPOR BARRIER ON


MFC-DLM-AK- VAPOR BARRIER
1179 WELD JOINTS, SPOOL & SUPPORT @ TP-1691-01-HT-005 (Pipe
I-1165 INSPECTION
sizes: 8",6",3",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1180 CLADDING ON HYDROTESTED LINE @ TP-1691-01-HT-007 (Pipe
I-1166 INSPECTION sizes: 1",16")

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON


1181
I-1167 INSPECTION HYDROTESTED LINE @ TP-1691-01-HT-004 (Pipe sizes: 1",12")

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1182 I-1168 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1691-01-HT-029
(Pipe sizes: 8",4",1")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1183 WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-008 (Pipe
I-1169 INSPECTION
sizes: 10")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1184 WELD JOINTS,SPOOL & SUPPORT @ TP-1714-00-HT-003 (Pipe
I-1170 INSPECTION
sizes: 3" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1185 I-1171 PREPARATION INSULATION ON @ TP-1701-03-HT-006 (Pipe sizes: 10",8",6",
INSPECTION 2",1")

SURFACE
1186 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
I-1172 INSULATION ON @ TP-1683-03-HT-003 (Pipe sizes: 30",1")
INSPECTION
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1187 PREPARATION INSULATION ON @ TP-1704-02-HT-011 (Pipe sizes: 12",
I-1173
INSPECTION 10",3",1.5",1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1188 PREPARATION
I-1174 INSULATION ON @ TP-1683-02-HT-041 (Pipe sizes: 4",2",3",1")
INSPECTION

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TOMETAL


MFC-DLM-AK- VAPOR BARRIER
1189 I-1175 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1691-01-HT-004 (Pipe
sizes: 1",12")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1190 CLADDING ON HYDROTESTED LINE @ TP-1691-01-HT-029 (Pipe
I-1176 INSPECTION sizes: 8",4",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON


1191
I-1177 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-004 (Pipe sizes: 3",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION ON WELD


MFC-DLM-AK-
1192 PREPARATION JOINTS,SPOOL & SUPPORT @ TP-1705-01-HT-012 (Pipe sizes:
I-1178 INSPECTION 12",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1193 ON HYDROTESTED @ TP-1514-02-HT-001 (Pipe sizes:
I-1179 INSPECTION 12",8",6",3",2",1" )

INSULATION 1st, 2nd & 3rd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1194 I-1180 INSPECTION BARRIER ON WELD JOINTS,SPOOL & SUPPORT @ TP-1705-01-HT-
012 (Pipe sizes: 12",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1606-01-


1195 OF METAL
I-1181 HT-004) (Pipe Sizes: 8", 6', 4", 2",1",0.75")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1606-01-
1196 OF METAL
I-1182 HT-001) (Pipe Sizes: 8", 6', 4", 2",1",0.75")
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1197 I-1183 INSPECTION HYDROTESTED @ TP-1681-00-HT-006 (Pipe sizes: 36" )

FINAL INSPECTION
1198 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON WELD JOINTS,
I-1184 SPOOL & SUPPORT @ TP-1691-01-HT-009 (Pipe sizes: 6",3",1")
CLADDING
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON WELD JOINTS,
MFC-DLM-AK-
1199 OF METAL SPOOL & SUPPORT @ TP-1691-01-HT-005 (Pipe sizes:
I-1185
CLADDING 8",6",3",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION ( COLD ) METAL CLADDING ON HYDROTESTED
1200 OF METAL
I-1186 LINE @ TP-1691-01-HT-007 (Pipe sizes: 1",16")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION ( COLD ) OF METAL CLADDING ON
1201 I-1187 OF METAL HYDROTESTED LINE @ TP-1691-01-HT-004 (Pipe sizes: 1",12")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON GOLDEN JOINTS,


MFC-DLM-AK-
1202 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-043 (Pipe sizes: 36", 2",
I-1188 CLADDING 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION ( COLD ) OF METAL CLADDING ON
1203 OF METAL
I-1189 HYDROTESTED LINE @ TP-1691-01-HT-029 (Pipe sizes: 8",4",1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT PIR) METAL CLADDING ON (TP-
1204 OF METAL
I-1190 CLADDING 1423-00-HT-001) (Pipe Sizes: 2",1",0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT PIR) METAL CLADDING ON (TP-
1205 OF METAL
I-1191 CLADDING 1645-00-HT-070) (Pipe Sizes: 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1206 I-1192 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1681-
INSPECTION 00-HT-013 (Pipe sizes: 8",6",4",2",1",0.75")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1207 WELD JOINTS, SPOOL & SUPPORT @ TP-1701-01-HT-009 (Pipe
I-1193 INSPECTION
sizes: 12", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1208 WELD JOINTS,SPOOL & SUPPORT @ TP-1705-01-HT-012 (Pipe
I-1194 INSPECTION
sizes: 12",1")

IN-PROCES INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1209 I-1195 INSPECTION PRIOR TO VAPOR BARRIER OF INSULATION ON @ TP-1705-01-
HT-020 (Pipe sizes: 16", 1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


1210 MFC-DLM-AK- VAPOR BARRIER CLADDING ON WELD JOINTS, SPOOL & SUPPORT, HYDROTESTED
I-1196 INSPECTION
LINE @ TP-1705-01-HT-010 (Pipe sizes: 20",1")
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON
MFC-DLM-AK- VAPOR BARRIER
1211 HYDROTESTED LINES @ TP-1705-01-HT-014 (Pipe sizes:
I-1197 INSPECTION
16",12",10",2",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1212 CLADDING ON WELD JOINTS, SPOOL & SUPPORT, HYDROTESTED
I-1198 INSPECTION
LINE @ TP-1705-01-HT-005 (Pipe sizes: 20",10", 8",6",3",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
1213 I-1199 OF METAL @ TP-1691-01-HT-027 (Pipe sizes: 30",24",2",1" )
CLADDING

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1214 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-
I-1200 INSPECTION 1683-02-HT-010 (Pipe sizes: 10",12",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1215 CLADDING ON HYDROTESTED @ TP-1683-02-HT-030 (Pipe sizes:
I-1201 INSPECTION
8",2" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1216 CLADDING ON WELD JOINTS, SPOOL & SUPPORT HYDROTESTED
I-1202 INSPECTION LINES @ TP-1683-02-HT-016 (Pipe sizes: 4",3")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1217 WELD JOINTS, SPOOL & SUPPORT @ TP-1704-02-HT-005 (Pipe
I-1203 INSPECTION sizes: 16", 10")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1218 I-1204 INSPECTION CLADDING ON WELD JOINTS, SPOOL & SUPPORT, HYDROTESTED
LINE @ TP-1683-02-HT-026 (Pipe sizes: 6",8",1")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


1219 CLADDING ON HYDROTESTED LINE @ TP-1683-02-HT-022 (Pipe
I-1205 INSPECTION
sizes: 8",10",3",1.5",1")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION


MFC-DLM-AK- INSULATION
1220 PRIOR TO VAPOR BARRIER ON @ TP-1683-02-HT-009 (Pipe sizes:
I-1206 INSPECTION
12",2",10",8",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1221 I-1207 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-
INSPECTION 02-HT-001 (Pipe sizes: 2")

1222 MFC-DLM-AK- INSULATION IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO
I-1208 INSPECTION VAPOR BARRIER ON @ TP-1683-02-HT-028 (Pipe sizes: 4")
SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO
MFC-DLM-AK-
1223 PREPARATION INSULATION ON HYDROTESTED LINES @ TP-1423-00-HT-037
I-1209
INSPECTION (Pipe sizes: 3",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1224 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-02-HT-029 (Pipe
I-1210
INSPECTION sizes: 16",2")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER ON EXCEPT


MFC-DLM-AK- INSULATION
1225 I-1211 INSPECTION WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-002 (Pipe
sizes: 6",4",3", 2",1.5")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1226
I-1212 INSPECTION ON HYDROTESTED @ TP-1624-01-HT-002 (Pipe sizes: 6" )

INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1227 BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-
I-1213 INSPECTION
HT-001 (Pipe sizes: 2")

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1228 PREPARATION INSULATION, EXCEPT WELDING JOINTS ON TP-1603-02-HT-020
I-1214 INSPECTION (Pipe sizes: 12",8")

PARTIAL INSULATION 1st & 2nd LAYER INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
1229 PRIOR TO VAPOR BARRIER, EXCEPT WELD JOINTS & SUPPORT @
I-1215 INSPECTION TP-1714-00-HT-016 (Pipe sizes: 72")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1230 I-1216 PREPARATION ON HYDROTESTED LINE TP-1452-00-HT-001-A (Pipe sizes:
INSPECTION 2",0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


1231 PREPARATION
I-1217 ON HYDROTESTED LINE TP-1452-00-HT-001-B (Pipe sizes: 2")
INSPECTION

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1232 CLADDING ON HYDROTESTED LINE @ TP-1743-00-HT-002 (Pipe
I-1218 INSPECTION
sizes: 2")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON WELD


MFC-DLM-AK- INSULATION
1233 I-1219 INSPECTION JOINTS,SPOOL & SUPPORT OF HYDROTESTED LINE @ TP-1621-
01-HT-010 (Pipe sizes: 30",2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1234 MFC-DLM-AK- VAPOR BARRIER EXCEPT WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-002
I-1220 INSPECTION
(Pipe sizes: 6",4",3", 2",1.5")
MFC-DLM-AK- INSULATION INSULATION1st,2nd & 3RD LAYER INSPECTION PRIOR TOVAPOR
1235
I-1221 INSPECTION BARRIER ON @ TP-1683-02-HT-041 (Pipe sizes: 4",2",3",1")

MFC-DLM-AK- INSULATION INSULATION 1st & 2nd INSPECTION PRIOR TO VAPOR BARRIER
1236
I-1222 INSPECTION ON @ TP-1701-03-HT-006 (Pipe sizes: 10",8",6", 2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1237 I-1223 INSPECTION CLADDING ON HYDROTESTED @ TP-1671-02-HT-006 (Pipe sizes:
20",14",10",2",1" )

INSULATION 1st & 2nd LAYER INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1238 PRIOR TO VAPOR BARRIER ON HYDROTESTED LINE @ TP-1701-
I-1224 INSPECTION 01-HT-011 (Pipe sizes: 1",2",6",10",12")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1239
I-1225 INSPECTION ON HYDROTESTED @ TP-1712-01-HT-004 (Pipe sizes: 6",4",1" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1240 CLADDING ON HYDROTESTED LINE @ TP-1683-03-HT-011 (Pipe
I-1226 INSPECTION sizes: 20",1")

SURFACE
MFC-DLM- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1241 PREPARATION
AK-I-1227 INSPECTION HYDROTESTED ON TP-1603-02-HT-020 (Pipe sizes: 1.5")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1242 I-1228 PREPARATION INSULATION ON HYDROTESTED LINES TP-1681-00-HT-017 (Pipe
INSPECTION sizes: 30",1")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1243 PREPARATION INSULATION ON HYDROTESTED LINES TP-1714-00-HT-077 (Pipe
I-1229
INSPECTION sizes: 36",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1244 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-002 (Pipe
I-1230
INSPECTION sizes: 30",3",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1245 I-1231 PREPARATION ON HYDROTESTED LINES TP-1683-02-HT-056 (Pipe sizes:
INSPECTION 12",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1246 MFC-DLM-AK- INSULATION ON HYDROTESTED LINE TP-1452-00-HT-001-A (Pipe sizes:
I-1232 INSPECTION
2",0.75")
MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING
1247
I-1233 INSPECTION ON HYDROTESTED LINE TP-1452-00-HT-001-B (Pipe sizes: 2")

PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1248 CLADDING, EXCEPT WELDING JOINTS ON TP-1603-02-HT-020
I-1234 INSPECTION
(Pipe sizes: 12",8")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1249 I-1235 PREPARATION HYDROTESTED ON TP-1672-01-HT-010 (Pipe sizes: 1.5")
INSPECTION

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1250 VAPOR BARRIER ON HYDROTESTED LINES TP-1683-02-HT-029
I-1236 INSPECTION (Pipe sizes: 16",2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1251 CLADDING ON HYDROTESTED @ TP-1683-02-HT-010 (Pipe sizes:
I-1237 INSPECTION
10",12",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION


MFC-DLM-AK-
1252 PREPARATION OF INSULATION (TP-1603-01-HT-001) (Pipe Sizes: 8", 6', 4",
I-1238 INSPECTION 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION


MFC-DLM-AK-
1253 PREPARATION OF INSULATION (TP-1603-01-HT-004) (Pipe Sizes: 8", 6', 4",
I-1239 INSPECTION 2",1",0.75")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON @


1254 I-1240 INSPECTION TP-1683-02-HT-028 (Pipe sizes: 4")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON @


1255
I-1241 INSPECTION TP-1683-02-HT-009 (Pipe sizes: 12",2",10",8",1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1256 WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-001 (Pipe
I-1242 INSPECTION
sizes: 2")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING OF


1257 I-1243 INSPECTION INSULATION ON @ TP-1705-01-HT-020 (Pipe sizes: 16", 1")

FINAL INSPECTION
1258 MFC-DLM-AK- OF METAL FINAL INSPECTION OF (HOT PIR ) METAL CLADDING ON
I-1244 HYDROTESTED @ TP-1712-02-HT-007 (Pipe sizes: 36" )
CLADDING
INSULATION INSPECTION PRIOR TO METAL CLADDING ON
MFC-DLM-AK- INSULATION
1259 HYDROTESTED LINE @ TP-1471-00-HT-018 (Pipe sizes:
I-1245 INSPECTION
3",1",2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1260 CLADDING ON HYDROTESTED @ TP-1626-00-HT-005 (Pipe sizes:
I-1246 INSPECTION
14",8",3" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1261 I-1247 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-01-HT-002 (Pipe
INSPECTION sizes: 20",2",1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION
1262 PREPARATION
I-1248 INSPECTION ON (TP-1621-01-HT-017) (Pipe Sizes: 20",12",10", 6'')

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION


MFC-DLM-AK-
1263 PREPARATION ON WELD JOINTS, SPOOL & SUPPORT (TP-1507-01-HT-001) (Pipe
I-1249
INSPECTION Sizes: 10",8", 6', 4", 3",2",1",0.75")

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
1264 INSULATION
I-1250 MATERIAL 32kg/m3 INSULATION MATERIAL

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1265 BARRIER ON HYDROTESTED LINES TP-1683-01-HT-002 (Pipe
I-1251 INSPECTION sizes: 20",2",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1266 I-1252 INSPECTION CLADDING ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-03-
HT-015 (Pipe sizes: 30",20",10",2"1")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


1267 CLADDING ON HYDROTESTED LINES TP-1683-01-HT-002 (Pipe
I-1253 INSPECTION
sizes: 20",2",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
1268 OF METAL
I-1254 @ TP-1471-00-HT-018 (Pipe sizes: 3",1",2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1269 I-1255 OF METAL HYDROTESTED @ TP-1626-00-HT-005 (Pipe sizes: 14",8",3" )
CLADDING

FINAL INSPECTION
1270 MFC-DLM-AK- OF METAL FINAL INSPECTION OF (HOT ) METAL CLADDING ON
I-1256 HYDROTESTED LINES @ TP-1625-00-HT-006 (Pipe sizes: 10",2" )
CLADDING
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON EXCEPT
MFC-DLM-AK-
1271 OF METAL WELD JOINTS & SUPPORT @ TP-1611-02-HT-019 (Pipe sizes:
I-1257
CLADDING 12",10", 6",3",1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1272 OF METAL HYDROTESTED @ TP-1607-02-HT-020 (Pipe sizes:
I-1258
CLADDING 12",8",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1273 I-1259 OF METAL HYDROTESTED LINES TP-1683-01-HT-002 (Pipe sizes: 20",2",1")
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION ( COLD ) METAL CLADDING ON


1274
I-1260 INSPECTION HYDROTESTED LINE @ TP-1683-03-HT-011 (Pipe sizes: 20",1")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1275 OF METAL HYDROTESTED @ TP-1611-02-HT-020 (Pipe sizes: 12",8",4",2",1"
I-1261
CLADDING )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TOMETAL CLADDING


1276
I-1262 INSPECTION ON HYDROTESTED @ TP-1712-01-HT-004 (Pipe sizes: 6",4",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


1277
I-1263 INSPECTION ON HYDROTESTED @ TP-1672-01-HT-011 (Pipe sizes: 4",0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


1278 I-1264 INSPECTION ON HYDROTESTED @ TP-1672-01-HT-012 (Pipe sizes: 3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


1279
I-1265 INSPECTION ON HYDROTESTED @ TP-1702-02-HT-010 (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


1280
I-1266 INSPECTION ON HYDROTESTED @ TP-1702-01-HT-011 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


1281 I-1267 INSPECTION HYDROTESTED ON TP-1672-01-HT-010 (Pipe sizes: 1.5")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1282 MFC-DLM-AK- PARTIAL FINAL WELD JOINTS, SPOOL & SUPPORT, HYDROTESTED LINE @ TP-
I-1268 INSPECTION
1705-01-HT-005 (Pipe sizes: 20",10", 8",6",3",1")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1702-01-
1283 OF METAL
I-1269 HT-001) (Pipe Sizes: 3")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT ) METAL CLADDING ON
1284 OF METAL
I-1270 HYDROTESTED @ TP-1672-01-HT-011 (Pipe sizes: 4",0.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT ) METAL CLADDING ON
1285 I-1271 OF METAL HYDROTESTED @ TP-1672-01-HT-012 (Pipe size: 3",1")
CLADDING

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT) PRIOR TO INSULATION
1286 PREPARATION
I-1272 INSPECTION ON TP-1702-02-HT-008 (Pipe sizes: 1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT) PRIOR TO INSULATION
1287 PREPARATION
I-1273 ON TP-1702-02-HT-020 (Pipe sizes: 2" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT) PRIOR TO INSULATION
1288 PREPARATION
I-1274 INSPECTION ON TP-1672-02-HT-013 (Pipe sizes: 2" )

SURFACE PRE-INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION


MFC-DLM-AK-
1289 PREPARATION ON HYDROTESTED LINES TP-1731-01-HT-007 (Pipe sizes:
I-1275 INSPECTION 8",4",2",1")

SURFACE PRE-INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION


MFC-DLM-AK-
1290 I-1276 PREPARATION ON HYDROTESTED LINES TP-1704-02-HT-027 (Pipe sizes:
INSPECTION 16",12",1")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF (HOT) PRIOR TO INSULATION


1291 PREPARATION ON WELD JOINTS,SPOOL & SUPPORT @ TP-1615-02-HT-019 (Pipe
I-1277
INSPECTION sizes: 12",10", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1292 PREPARATION ON HYDROTESTED LINES TP-1731-01-HT-022 (Pipe sizes:
I-1278
INSPECTION 20",10",2", 6",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1293 I-1279 PREPARATION ON HYDROTESTED LINES TP-1705-01-HT-001 (Pipe sizes:
INSPECTION 16",10",6")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1294 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-030 (Pipe
I-1280
INSPECTION sizes: 2")
SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION
MFC-DLM-AK-
1295 PREPARATION ON HYDROTESTED LINES TP-1683-02-HT-014 (Pipe sizes:
I-1281
INSPECTION 8",6",3",2")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION
1296 PREPARATION
I-1282 ON HYDROTESTED LINES TP-1705-01-HT-019 (Pipe sizes: 2")
INSPECTION

MFC-DLM-AK- INSULATION INSULATION 1st LAYER INSPECTION OF ( HOT ) PRIOR TO 2nd


1297 I-1283 INSPECTION LAYER INSULATION ON TP-1702-02-HT-008 (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1298 PREPARATION ON HYDROTESTED LINES TP-1503-01-HT-034 (Pipe sizes: 3",2",1"
I-1284 INSPECTION )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1299 PREPARATION ON HYDROTESTED LINES TP-1602-01-HT-001 (Pipe sizes:
I-1285
INSPECTION 8",6",4",2",1",1.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1300
I-1286 INSPECTION ON TP-1702-02-HT-020 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1301
I-1287 INSPECTION ON TP-1672-02-HT-013 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT ) PRIOR TO METAL CLADDING


1302 I-1288 INSPECTION ON HYDROTESTED @ TP-1712-02-HT-016 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1303
I-1289 INSPECTION VISUAL TEST LINE @ TP-1514-01-HT-008 (Pipe sizes: 2")

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1304 TO VAPOR BARRIER ON HYDROTESTED LINES TP-1705-01-HT-019
I-1290 INSPECTION
(Pipe sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1305 I-1291 INSPECTION VISUAL TEST LINE @ TP-1512-01-HT-008 (Pipe sizes: 2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


1306 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINES TP-1705-01-HT-019 (Pipe
I-1292 INSPECTION
sizes: 2")
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON
1307
I-1293 INSPECTION VISUAL TEST LINE @ TP-1511-01-HT-008 (Pipe sizes: 2")

INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1308 ON HYDROTESTED LINES (TP-1603-01-HT-001) (Pipe Sizes: 8", 6',
I-1294 INSPECTION
4", 2",1",0.75")

INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1309 I-1295 INSPECTION ON HYDROTESTED LINES (TP-1603-01-HT-004) (Pipe Sizes: 8", 6',
4", 2",1",0.75")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION OF ( HOT)


MFC-DLM-AK- INSULATION PRIOR TO METAL CLADDING ON WELD JOINTS, SPOOL &
1310
I-1296 INSPECTION SUPPORT (TP-1507-01-HT-001) (Pipe Sizes: 10",8", 6', 4",
3",2",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1311 OF METAL HYDROTESTED @ TP-1513-02-HT-001 (Pipe sizes:
I-1297
CLADDING 12",8",6",3",2",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1312 OF METAL
I-1298 CLADDING HYDROTESTED LINES TP-1705-01-HT-019 (Pipe sizes: 2")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1313 PREPARATION
I-1299 INSPECTION ON HYDROTESTED LINE TP-1712-01-HT-005 (Pipe sizes: 1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1314 I-1300 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-02-HT-021 (Pipe
INSPECTION sizes: 2")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1315 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-02-HT-019 (Pipe
I-1301
INSPECTION sizes: 2")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1316 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-007 (Pipe
I-1302
INSPECTION sizes: 10",8",3",2")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1317 I-1303 PREPARATION INSULATION ON HYDROTESTED LINES TP-1691-01-HT-025 (Pipe
INSPECTION sizes: 2",1")

SURFACE
1318 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
I-1304 ON HYDROTESTED LINE TP-1712-02-HT-014 (Pipe sizes: 4")
INSPECTION
SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1319 PREPARATION
I-1305 ON HYDROTESTED LINE TP-1712-01-HT-012 (Pipe sizes: 2")
INSPECTION

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1320 ON HYDROTESTED LINE @ TP-1621-01-HT-003 (Pipe sizes:
I-1306 INSPECTION
3",2")

INSULATION 1st, 2nd & 3rd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1321 I-1307 INSPECTION BARRIER ON HYDROTESTED LINE @ TP-1704-02-HT-032 (Pipe
sizes: 10",8",3")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1322 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-004 (Pipe
I-1308 INSPECTION sizes: 3",1")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1323 BARRIER ON HYDROTESTED @ TP-1651-00-HT-005 (Pipe sizes:
I-1309 INSPECTION
2",1" )

INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF ( COLD )


MFC-DLM-AK- INSULATION
1324 PRIOR TOVAPOR BARRIER ON HYDROTESTED @ TP-1683-03-HT-
I-1310 INSPECTION 023 (Pipe sizes: 6",4",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1325
I-1311 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-023 (Pipe sizes: 2" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1326 I-1312 PREPARATION INSULATION ON HYDROTESTED LINES TP-1681-00-HT-009 (Pipe
INSPECTION sizes: 2")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1327 PREPARATION INSULATION ON HYDROTESTED LINES TP-1681-00-HT-008 (Pipe
I-1313
INSPECTION sizes: 2",1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1328 PREPARATION
I-1314 ON HYDROTESTED LINE TP-1672-01-HT-017 (Pipe sizes: 3",1")
INSPECTION

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TOMETAL


MFC-DLM-AK- VAPOR BARRIER
1329 I-1315 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1701-01-HT-011 (Pipe
sizes: 1",2",6",10",12")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1330 MFC-DLM-AK- VAPOR BARRIER HYDROTESTED LINE @ TP-1603-02-HT-024 (Pipe sizes:
I-1316 INSPECTION
2",1.5",3/4")
VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL
MFC-DLM-AK- VAPOR BARRIER
1331 CLADDING ON HYDROTESTED @ TP-1651-00-HT-005 (Pipe
I-1317 INSPECTION
sizes:2",1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1332 CLADDING ON HYDROTESTED @ TP-1691-01-HT-001 (Pipe sizes:
I-1318 INSPECTION
18",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1333 I-1319 INSPECTION HYDROTESTED LINE @ TP-1704-02-HT-032 (Pipe sizes: 10",8",3")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1334 CLADDING ON HYDROTESTED @ TP-1683-03-HT-023 (Pipe sizes:
I-1320 INSPECTION 6",4",3",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1335 CLADDING ON HYDROTESTED LINES TP-1503-01-HT-034 (Pipe
I-1321 INSPECTION
sizes: 3",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1336 PREPARATION INSULATION ON HYDROTESTED LINES TP-1602-01-HT-001 (Pipe
I-1322 INSPECTION sizes: 8",6",4",2",1",1.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1337 PREPARATION INSULATION ON WELD JOINTS,SPOOL & SUPPORT @ TP-1614-
I-1323 INSPECTION 02-HT-019 (Pipe sizes: 12",10", 6",3",1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT) METAL CLADDING ON
1338 I-1324 OF METAL HYDROTESTED LINES (TP-1603-01-HT-004) (Pipe Sizes: 8", 6', 4",
CLADDING 2",1",0.75")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT) METAL CLADDING ON


1339 OF METAL HYDROTESTED LINES (TP-1603-01-HT-001) (Pipe Sizes: 8", 6', 4",
I-1325
CLADDING 2",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1340 OF METAL HYDROTESTED @ TP-1514-02-HT-001 (Pipe sizes:
I-1326
CLADDING 12",8",6",3",2",1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1341 I-1327 OF METAL HYDROTESTED @ TP-1671-02-HT-006 (Pipe sizes:
CLADDING 20",14",10",2",1" )

FINAL INSPECTION
1342 MFC-DLM-AK- OF METAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
I-1328 HYDROTESTED @ TP-1683-03-HT-023 (Pipe sizes: 6",4",3",2",1" )
CLADDING
SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK-
1343 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-02-HT-014 (Pipe
I-1329
INSPECTION sizes: 3",2")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1344 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-02-HT-018 (Pipe
I-1330
INSPECTION sizes: 16",8",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1345 I-1331 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-017 (Pipe
INSPECTION sizes: 18",16",14",12",10",6",3",1.5",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1346 PREPARATION INSULATION ON HYDROTESTED LINES TP-1503-01-HT-034 (Pipe
I-1332 INSPECTION sizes: 3",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1347 PREPARATION INSULATION ON HYDROTESTED LINES TP-1501-01-HT-034 (Pipe
I-1333
INSPECTION sizes: 3",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION


MFC-DLM-AK-
1348 PREPARATION OF INSULATION (TP-1602-01-HT-004) (Pipe Sizes: 8", 6', 4",
I-1334 INSPECTION 2",1",0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT ) METAL CLADDING ON
1349 OF METAL
I-1335 CLADDING HYDROTESTED @ TP-1702-01-HT-011 (Pipe sizes: 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1671-02-


1350 I-1336 OF METAL HT-011) (Pipe Sizes: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1351 OF METAL
I-1337 HYDROTESTED @ TP-1672-01-HT-001 (Pipe sizes: 0.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1672-03-
1352 OF METAL
I-1338 HT-001) (Pipe Sizes: 3")
CLADDING

PARTIAL INSULATION INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1353 I-1339 INSPECTION EXCEPT WELD JOINTS & SUPPORT @ TP-1623-01-HT-008 (Pipe
sizes: 6",8",10",16",24", 30",36",42")

FINAL INSPECTION FINAL INSPECTION PRIOR OF METAL CLADDING ON WELD


1354 MFC-DLM-AK- OF METAL JOINTS,SPOOL & SUPPORT OF HYDROTESTED LINE @ TP-1621-
I-1340
CLADDING 01-HT-010 (Pipe sizes: 30",2",1" )
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1355
I-1341 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-003 (Pipe sizes: 3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1356
I-1342 INSPECTION ON HYDROTESTED @ TP-1621-01-HT-027 (Pipe sizes: 4",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1357 I-1343 PREPARATION INSULATION ON HYDROTESTED LINES TP-1604-01-HT-001 (Pipe
INSPECTION sizes: 8",6",4",2",1",1.75" )

SURFACE PRE- INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1358 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-
I-1344 INSPECTION 03-HT-019 (Pipe sizes: 20",16",4",2",1",0.75")

INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1359 CLADDING ON HYDROTESTED LINES @ TP-1423-00-HT-037 (Pipe
I-1345 INSPECTION
sizes: 3",2",1")

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
1360 INSULATION
I-1346 MATERIAL 32kg/m3 INSULATION MATERIAL

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1361 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-038 (Pipe
I-1347 INSPECTION sizes: 2")

PARTIAL VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1362 I-1348 INSPECTION CLADDING, EXCEPT WELD JOINTS & SUPPORT @ TP-1714-00-HT-
016 (Pipe sizes: 72")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR BARRIER


1363
I-1349 INSPECTION ON HYDROTESTED LINES TP-1681-00-HT-009 (Pipe sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR BARRIER


1364
I-1350 INSPECTION ON HYDROTESTED LINES TP-1681-00-HT-008 (Pipe sizes: 2",1")

INSULATION 1st LAYER INSPECTION OF ( COLD ) PRIOR TO 2nd


MFC-DLM-AK- INSULATION
1365 I-1351 INSPECTION LAYER INSULATION ON HYDROTESTED LINES TP-1683-02-HT-014
(Pipe sizes: 3",2")

INSULATION 1st LAYER INSPECTION OF ( COLD ) PRIOR TO 2nd


1366 MFC-DLM-AK- INSULATION LAYER INSULATION ON HYDROTESTED LINES TP-1683-02-HT-018
I-1352 INSPECTION
(Pipe sizes: 16",8",2",1")
IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF
MFC-DLM-AK- INSULATION
1367 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-
I-1353 INSPECTION
1683-03-HT-017 (Pipe sizes: 18",16",14",12",10",6",3",1.5",1")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING,


MFC-DLM-AK- PARTIAL FINAL
1368 EXCEPT WELD JOINTS & SUPPORT @ TP-1714-00-HT-016 (Pipe
I-1354 INSPECTION
sizes: 72")

PARTIAL VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- VAPOR BARRIER
1369 I-1355 INSPECTION METAL CLADDING, EXCEPT WELD JOINTS & SUPPORT @ TP-1714-
00-HT-016 (Pipe sizes: 72")

PARTIAL FINAL INSPECTION OF METAL CLADDING EXCEPT WELD


MFC-DLM-AK- PARTIAL FINAL
1370 JOINTS & SUPPORT @ TP-1623-01-HT-008 (Pipe sizes:
I-1356 INSPECTION 6",8",10",16",24", 30",36",42")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1371
I-1357 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-038 (Pipe sizes: 2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT PIR ) METAL CLADDING ON


1372 OF METAL
I-1358 CLADDING HYDROTESTED LINES @ TP-1423-00-HT-037 (Pipe sizes: 3",2",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1373 OF METAL
I-1359 CLADDING TP-1503-01-HT-028 (Pipe sizes: 6", 3",3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1374 I-1360 OF METAL TP-1503-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE
1375 OF METAL
I-1361 @ TP-1504-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1376 OF METAL
I-1362 TP-1504-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1377 I-1363 OF METAL TP-1502-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
1378 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
I-1364 TP-1502-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE
1379 OF METAL
I-1365 @ TP-1501-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1380 OF METAL
I-1366 TP-1501-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1381 I-1367 INSPECTION CLADDING ON HYDROTESTED LINES TP-1681-00-HT-009 (Pipe
sizes: 2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1382 CLADDING ON HYDROTESTED LINES TP-1681-00-HT-008 (Pipe
I-1368 INSPECTION sizes: 2",1")

INSULATION 2nd LAYER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1383 VAPOR BARRIER INSULATION ON HYDROTESTED LINES TP-1683-
I-1369 INSPECTION
02-HT-014 (Pipe sizes: 3",2")

INSULATION 2nd LAYER INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1384 VAPOR BARRIER ON HYDROTESTED LINES TP-1683-02-HT-018
I-1370 INSPECTION (Pipe sizes: 16",8",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION


MFC-DLM-AK-
1385 PREPARATION ON HYDROTESTED LINES (TP-1604-01-HT-004) (Pipe Sizes: 8", 6',
I-1371 INSPECTION 4", 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION


MFC-DLM-AK-
1386 I-1372 PREPARATION ON HYDROTESTED LINES (TP-1511-01-HT-038) (Pipe Sizes:
INSPECTION 3",2",1")

MFC-DLM-AK- SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1387 PREPARATION INSULATION HYDROTESTED ON TP-1621-01-HT-015 (Pipe sizes:
I-1373
INSPECTION 2")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1388 PREPARATION
I-1374 HYDROTESTED ON TP-1712-01-HT-009 (Pipe sizes: 6",2")
INSPECTION

MFC-DLM-AK- FINAL INSPECTION


PARTIAL FINAL INSPECTION OF( COLD ) METAL CLADDING ON
1389 I-1375 OF METAL WELD JOINTS, SPOOL & SUPPORT HYDROTESTED LINES @ TP-
CLADDING 1683-02-HT-016 (Pipe sizes: 4",3")

FINAL INSPECTION PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1390 MFC-DLM-AK- OF METAL WELD JOINTS, SPOOL & SUPPORT @ TP-1683-03-HT-015 (Pipe
I-1376
CLADDING sizes: 30",20",10",2"1")
MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1391
AK-I-1377 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-038 (Pipe sizes: 2")

MFC-DLM-AK- PARTIAL FINAL FINAAL INSPECTION OF ( HOT ) METAL CLADDING ON


1392
I-1378 INSPECTION HYDROTESTED @ TP-1702-01-HT-004 (Pipe sizes: 1.5" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1393 I-1379 OF METAL HYDROTESTED @ TP-1712-01-HT-004 (Pipe sizes: 6",4",1" )
CLADDING

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON TP-1672-03-


1394
AK-I-1380 INSPECTION HT-002 (Pipe sizes: 1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1395 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-014 (Pipe
I-1381 INSPECTION
sizes: 3",2")

VAPOR BARRIER INSPECTION OF (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1396 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-018 (Pipe
I-1382 INSPECTION sizes: 16",8",2",1")

INSULATION INSPECTION OF (COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
1397 ON HYDROTESTED LINES TP-1731-01-HT-007 (Pipe sizes:
I-1383 INSPECTION 8",4",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1398 I-1384 PREPARATION ON HYDROTESTED LINES TP-1662-01-HT-005 (Pipe sizes:
INSPECTION 10",2",1")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1399 PREPARATION INSULATION ON HYDROTESTED LINES TP-1662-01-HT-030 (Pipe
I-1385
INSPECTION sizes: 10",6",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1400 PREPARATION ON HYDROTESTED LINES TP-1662-01-HT-009 (Pipe sizes:
I-1386
INSPECTION 18",12",3",2",1")

SURFACE PRE-INSULATION INSPECTION OF (COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1401 I-1387 PREPARATION ON HYDROTESTED LINES TP-1701-01-HT-002 (Pipe sizes:
INSPECTION 24",2",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1402 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-027 (Pipe
I-1388
INSPECTION sizes: 10",6",1")
SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK-
1403 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-004 (Pipe
I-1389
INSPECTION sizes: 12",10",6",3",1.5")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1404 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-009 (Pipe
I-1390
INSPECTION sizes: 4",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1405 I-1391 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-014 (Pipe
INSPECTION sizes: 30",18",16",14",1")

INSULATION 1st & 2nd LAYER INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK- INSULATION
1406 METAL CLADDING HYDROTESTED ON TP-1712-01-HT-009 (Pipe
I-1392 INSPECTION sizes: 6",2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1407 CLADDING ON HYDROTESTED LINES TP-1731-01-HT-007 (Pipe
I-1393 INSPECTION
sizes: 8",4",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1408 PREPARATION ON HYDROTESTED LINES TP-1701-01-HT-003 (Pipe sizes:
I-1394 INSPECTION 48",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO INSULATION


MFC-DLM-AK-
1409 PREPARATION ON HYDROTESTED LINES (TP-1515-01-HT-038) (Pipe Sizes:
I-1395 INSPECTION 3",2",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1410 I-1396 OF METAL HYDROTESTED @ TP-1702-01-HT-004 (Pipe sizes: 1.5" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1411 OF METAL
I-1397 HYDROTESTED LINES TP-1731-01-HT-007 (Pipe sizes: 8",4",2",1")
CLADDING

MFC-DLM-AK- INSULATION PARTIAL INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1412
I-1398 INSPECTION CLADDING HYDROTESTED ON TP-1621-01-HT-015 (Pipe sizes: 2")

INSULATION 1st, 2nd & 3rd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1413 I-1399 INSPECTION BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-1683-03-
HT-019 (Pipe sizes: 20",16",4",2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1414 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINES TP-1714-00-HT-040 (Pipe
I-1400
INSPECTION sizes: 6",2")
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
1415 PREPARATION INSULATION ON HYDROTESTED LINES TP-1731-01-HT-021 (Pipe
I-1401
INSPECTION sizes: 20",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO


MFC-DLM-AK-
1416 PREPARATION INSULATION ON HYDROTESTED LINES TP-1744-01-HT-014 (Pipe
I-1402
INSPECTION sizes: 2")

INSULATION 1st & 2ND LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1417 I-1403 INSPECTION TO VAPOR BARRIER ON HYDROTESTED LINES TP-1683-03-HT-002
(Pipe sizes: 30",3",2",1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING


1418
I-1404 INSPECTION HYDROTESTED ON TP-1621-01-HT-015 (Pipe sizes: 2")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING


1419
I-1405 INSPECTION HYDROTESTED ON TP-1712-01-HT-009 (Pipe sizes: 6",2")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1420 BAARRIER ON HYDROTESTED LINES TP-1662-01-HT-005 (Pipe
I-1406 INSPECTION sizes: 10",2",1")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1421 BARRIER ON HYDROTESTED LINES TP-1662-01-HT-030 (Pipe
I-1407 INSPECTION sizes: 10",6",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1422 I-1408 INSPECTION CLADDING ON HYDROTESTED LINES TP-1662-01-HT-009 (Pipe
sizes: 18",12",3",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


1423 CLADDING ON HYDROTESTED LINES TP-1683-03-HT-027 (Pipe
I-1409 INSPECTION
sizes: 10",6",1")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1424 (COLD ) PRIOR TOVAPOR BARRIER ON HYDROTESTED LINES TP-
I-1410 INSPECTION
1701-01-HT-002 (Pipe sizes: 24",2",0.75")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1425 I-1411 INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-
1704-02-HT-004 (Pipe sizes: 12",10",6",3",1.5")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


1426 MFC-DLM-AK- INSULATION ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-
I-1412 INSPECTION
1704-02-HT-009 (Pipe sizes: 4",1")
PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK- INSULATION
1427 INSULATION ON HYDROTESTED LINES TP-1704-02-HT-014 (Pipe
I-1413 INSPECTION
sizes: 30",18",16",14",1")

IN-PROCESS INSULATION INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1428 TOVAPOR BARRIER ON HYDROTESTED LINES TP-1701-01-HT-003
I-1414 INSPECTION
(Pipe sizes: 48",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO MEETAL


MFC-DLM-AK- INSULATION
1429 I-1415 INSPECTION CLADDING ON HYDROTESTED LINES TP-1602-01-HT-001 (Pipe
sizes: 8",6",4",2",1",1.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1430
I-1416 INSPECTION ON (TP-1602-01-HT-004) (Pipe Sizes: 8", 6', 4", 2",1",0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1431 CLADDING ON HYDROTESTED LINES TP-1604-01-HT-001 (Pipe
I-1417 INSPECTION
sizes: 8",6",4",2",1",1.75" )

INSULATION INSPECTION OF ( HOT) PRIOR TOMETAL CLADDING


MFC-DLM-AK- INSULATION
1432 ON HYDROTESTED LINES (TP-1604-01-HT-004) (Pipe Sizes: 8", 6',
I-1418 INSPECTION 4", 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1433 PREPARATION INSULATION ON HYDROTESTED LINES TP-1506-01-HT-001 (Pipe
I-1419 INSPECTION sizes: 10",8",6",3",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO


MFC-DLM-AK-
1434 I-1420 PREPARATION INSULATION ON HYDROTESTED LINES TP-1711-01-HT-001 (Pipe
INSPECTION sizes: 1", 0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1435 PREPARATION INSULATION ON HYDROTESTED LINES TP-1714-00-HT-042 (Pipe
I-1421
INSPECTION sizes: 2")

SURFACE
MFC-DLM-AK- VAPOR INSPECTION OF (COLD ) PRIOR TO METAL CLADDING ON
1436 PREPARATION
I-1422 HYDROTESTED LINES TP-1683-03-HT-002 (Pipe sizes: 30",3",2"1")
INSPECTION

INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1437 I-1423 INSPECTION CLADDING ON HYDROTESTED LINES TP-1744-01-HT-014 (Pipe
sizes: 2")

1438 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) METAL CLADDING


I-1424 INSPECTION HYDROTESTED ON TP-1731-01-HT-021 (Pipe sizes: 20, 2",1")
PARTIAL FINAL INSPECTION OF ( COLD) METAL CLADDING
MFC-DLM-AK- PARTIAL FINAL
1439 HYDROTESTED ON TP-1704-02-HT-005 (Pipe sizes: 1",10",12",16"
I-1425 INSPECTION
,24")

PARTIAL FINAL INSPECTION OF ( COLD) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1440 WELD JOINTS,SPOOL & SUPPORT ON HYDROTESTED @ TP-1705-
I-1426 INSPECTION
01-HT-010 (Pipe sizes: (20",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( COLD) PRIOR TO VAPOR BARRIER


1441 I-1427 INSPECTION ON HYDROTESTED LINES TP-1714-00-HT-040 (Pipe sizes: 6", 2")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1442 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-0019(Pipe
I-1428 INSPECTION sizes: 16",14",4",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1443 PREPARATION INSULATION ON HYDROTESTED LINES TP-1712-01-HT-006 (Pipe
I-1429
INSPECTION sizes: ,1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1444 PREPARATION INSULATION ON HYDROTESTED LINES TP-1601-02-HT-001 (Pipe
I-1430 INSPECTION sizes: ,30",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1445 PREPARATION INSULATION ON HYDROTESTED LINES TP-1605-02-HT-020 (Pipe
I-1431 INSPECTION sizes: ,12",8",4",2",1")

PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK- INSULATION
1446 I-1432 INSPECTION INSULATION ON HYDROTESTED LINES TP-1507-01-HT-007 (Pipe
sizes: 8")

MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR
1447 TO VAPOR BARRIER ON HYDROTESTED LINES TP-1704-02-HT-011
I-1433 INSPECTION
(Pipe sizes: 12",10",,3",1.5",1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1448 PREPARATION INSULATION ON HYDROTESTED LINES TP-1671-02-HT-001 (Pipe
I-1434
INSPECTION sizes: 2",1",0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1449 I-1435 PREPARATION INSULATION ON HYDROTESTED LINES TP-1662-01-HT-014 (Pipe
INSPECTION sizes: 3", 1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1450 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINES TP-1672-03-HT-002 (Pipe
I-1436
INSPECTION sizes: 1")
MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) METAL CLADDING
1451
I-1437 INSPECTION HYDROTESTED ON TP-1515-01-HT-038 (Pipe sizes: 3",1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( HOT) METAL CLADDING


1452
I-1438 INSPECTION HYDROTESTED ON TP-1612-02-HT-020 (Pipe sizes: 6",3",1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD) METAL CLADDING


1453 I-1439 INSPECTION HYDROTESTED ON TP-1683-03-HT-002 (Pipe sizes: 30",3" ,2",1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1454 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-041 (Pipe
I-1440 INSPECTION sizes: 4",3",2",1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1455 CLADDING ON HYDROTESTED LINES TP-1704-02-HT-011 (Pipe
I-1441 INSPECTION
sizes: 12",10",3",1.5",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1456 CLADDING ON HYDROTESTED LINES TP-1672-03-HT-002 (Pipe
I-1442 INSPECTION sizes: 1")

INSULATION 1st & 2nd layer INSPECTION OF (COLD) PRIOR TO


MFC-DLM-AK- INSULATION
1457 VAPOR BARRIER ON HYDROTESTED LINES TP-1683-03-HT-
I-1443 INSPECTION 003(Pipe sizes: 30",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1458 I-1444 PREPARATION INSULATION ON HYDROTESTED LINES TP-1662-01-HT-005 (Pipe
INSPECTION sizes: (10",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1459 CLADDING ON HYDROTESTED LINES TP-1621-01-HT-017 (Pipe
I-1445 INSPECTION
sizes: 20",12"10",6"")

SURFACE INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK-
1460 PREPARATION CLADDING ON HYDROTESTED LINES TP-1672-01-HT-017 (Pipe
I-1446
INSPECTION sizes: 3",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1461 I-1447 INSPECTION CLADDING ON HYDROTESTED LINES TP-1712-01-HT-005 (Pipe
sizes: 1")

FINAL INSPECTION
1462 MFC-DLM-AK- OF METAL FINAL INSPECTION OF (HOT) METAL CLADDING ON
I-1448 HYDROTESTED LINES TP-1712-02-HT-001 (Pipe sizes: 1")
CLADDING
PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
SURFACE
MFC-DLM-AK- INSULATION ON HYDROTESTED LINES ON WELD
1463 PREPARATION
I-1449 JOINTS,SUPPORT & SPOOL TP-1455-00-HT-001 (Pipe sizes:
INSPECTION
(10",2")
PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
SURFACE
MFC-DLM-AK- INSULATION ON HYDROTESTED LINES ON WELD
1464 PREPARATION
I-1450 JOINTS,SUPPORT & SPOOL TP-1662-01-HT-012 (Pipe sizes:
INSPECTION (3",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD) PRIOR TO


MFC-DLM-AK-
1465 I-1451 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-030 (Pipe
INSPECTION sizes: (12",8",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1466 CLADDING ON HYDROTESTED LINES TP-1712-01-HT-005 (Pipe
I-1452 INSPECTION sizes: 1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1467 CLADDING ON HYDROTESTED LINES TP-1511-01-HT-038 (Pipe
I-1453 INSPECTION
sizes: 3", 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


1468 OF METAL
I-1454 CLADDING HYDROTESTED LINES TP-1672-01-HT-010 (Pipe sizes: 1.5")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING ON
1469 OF METAL
I-1455 CLADDING HYDROTESTED LINES TP-1672-03-HT-002 (Pipe sizes: 1.5")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


1470 I-1456 OF METAL HYDROTESTED LINES TP-1712-02-HT-002 (Pipe sizes: 8")
CLADDING

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


1471 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1616-00-HT-011
I-1457
INSPECTION (Pipe sizes: 6", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1472 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1603-02-HT-020
I-1458
INSPECTION (Pipe sizes: 12",8",4",2",1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) MEETAL CLADDING ON
1473 I-1459 OF METAL HYDROTESTED LINES TP-1602-01-HT-001 (Pipe sizes:
CLADDING 8",6",4",2",1",1.75" )

FINAL INSPECTION
1474 MFC-DLM-AK- OF METAL FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1602-01-
I-1460 HT-004) (Pipe Sizes: 8", 6', 4", 2",1",0.75")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING HYDROTESTED
1475 OF METAL
I-1461 ON TP-1612-02-HT-020 (Pipe sizes: 6",3",1")
CLADDING

MFC-DLM-AK- PARTIAL FINAL FINAL INSPECTION OF ( HOT PIR ) METAL CLADDING ON TP-1713-
1476
I-1462 INSPECTION 00-HT-003 (Pipe sizes: 10" )

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1477 I-1463 INSPECTION ( HOT ) PRIOR TO METAL CLADDING ON HYDROTESTED LINES TP-
1506-01-HT-001 (Pipe sizes: 10",8",6",3",2",1")

IN-PROCESS INSULATION 1st & 2nd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
1478 ( HOT ) PRIOR TO METAL CLADDING ON HYDROTESTED LINES TP-
I-1464 INSPECTION 1507-01-HT-007 (Pipe sizes: 8")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1479 WELD JOINTS, SPOOL & SUPPORT @ TP-1683-03-HT-019 (Pipe
I-1465 INSPECTION
sizes: 20",16",4",2",1",0.75")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1480 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-029 (Pipe
I-1466 INSPECTION sizes: 16",2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1481 CLADDING ON HYDROTESTED LINES TP-1683-03-HT-017 (Pipe
I-1467 INSPECTION sizes: 18",16",14",12",10",6",3",1.5",1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1482 I-1468 OF METAL HYDROTESTED LINES TP-1604-01-HT-001 (Pipe sizes:
CLADDING 8",6",4",2",1",1.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT) METAL CLADDING ON


1483 OF METAL HYDROTESTED LINES (TP-1604-01-HT-004) (Pipe Sizes: 8", 6', 4",
I-1469
CLADDING 2",1",0.75")

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1484 HYDROTESTED LINES TP-1621-01-HT-017 (Pipe sizes:
I-1470 INSPECTION
20",12"10",6"")

INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF ( COLD )


MFC-DLM-AK- INSULATION
1485 I-1471 INSPECTION PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-1683-02-
HT-056 (Pipe sizes: 12",2",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1486 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1616-00-HT-011 (Pipe sizes: 6", 2", 1"
I-1472 INSPECTION
)
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1487 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1704-
I-1473
INSPECTION 02-HT-035 (Pipe sizes: 10", 8", 6",4",3",2",1" )

SURFACE PRE- INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1488 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1705-
I-1474
INSPECTION 01-HT-002 (Pipe sizes: 18",16",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1489 I-1475 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1661-
INSPECTION 01-HT-003 (Pipe sizes: 36",30",24",3",2" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1490 PREPARATION
I-1476 INSPECTION INSULATION @ TP-1683-02-HT-031 (Pipe sizes: 2",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1491 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1714-
I-1477
INSPECTION 00-HT-047 (Pipe sizes: 1",2",3",6",12",14",20",30" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1492 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-056 (Pipe
I-1478 INSPECTION sizes: 12",2",1")

INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1493 BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-1705-01-
I-1479 INSPECTION HT-002 (Pipe sizes: 18",16",1" )

INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1494 I-1480 INSPECTION BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-1661-01-
HT-003 (Pipe sizes: 36",30",24",3",2" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1495 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1704-
I-1481
INSPECTION 02-HT-035 (Pipe sizes: 10", 8", 6",4",3",2",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1496 PREPARATION
I-1482 INSULATION ON @ TP-1683-02-HT-028 (Pipe sizes: 4")
INSPECTION

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER @ TP-1683-


1497 I-1483 INSPECTION 02-HT-031 (Pipe sizes: 2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1498 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1607-02-HT-001 (Pipe
I-1484
INSPECTION sizes: 30",2",1" )
INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR TO
MFC-DLM-AK- INSULATION
1499 VAPOR BARRIER ON HYDROTESTED LINES TP-1683-03-HT-030
I-1485 INSPECTION
(Pipe sizes: 2")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1500 BARRIER ON HYDROTESTED LINES TP-1683-02-HT-019 (Pipe
I-1486 INSPECTION
sizes: 2")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1501 I-1487 INSPECTION BARRIER ON HYDROTESTED LINES TP-1683-02-HT-021 (Pipe
sizes: 2")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1502 PREPARATION
I-1488 INSPECTION INSULATION ON @ TP-1683-03-HT-020 (Pipe sizes: 3",1.5",1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1503 PREPARATION
I-1489 INSULATION ON @ TP-1683-03-HT-009 (Pipe sizes: 16",2",1")
INSPECTION

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1504 PREPARATION INSULATION ON @ TP-1683-02-HT-003 (Pipe sizes:
I-1490 INSPECTION 3",2",1",0.75")

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT PIR) PRIOR TO


MFC-DLM-AK-
1505 PREPARATION INSULATION ON HYDROTESTED @ TP-1491-00-HT-002 (Pipe
I-1491 INSPECTION sizes: 3",2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- VAPOR BARRIER
1506 I-1492 INSPECTION WELD JOINTS, SPOOL & SUPPORT @ TP-1705-01-HT-002 (Pipe
sizes: 18",16",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1507 WELD JOINTS, SPOOL & SUPPORT @ TP-1661-01-HT-003 (Pipe
I-1493 INSPECTION
sizes: 36",30",24",3",2" )

INSULATION 1st, 2nd & 3rd LAYER INSPECTION PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1508 BARRIER ON WELD JOINTS, SPOOL & SUPPORT @ TP-1704-02-
I-1494 INSPECTION
HT-035 (Pipe sizes: 10", 8", 6",4",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR
1509 I-1495 INSPECTION BARRIER ON @ TP-1683-02-HT-028 (Pipe sizes: 4")

1510 MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING @ TP-
I-1496 INSPECTION 1683-02-HT-031 (Pipe sizes: 2",1" )
VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL
MFC-DLM-AK- VAPOR BARRIER
1511 CLADDING ON HYDROTESTED LINES TP-1683-03-HT-030 (Pipe
I-1497 INSPECTION
sizes: 2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1512 CLADDING ON HYDROTESTED LINES TP-1683-02-HT-019 (Pipe
I-1498 INSPECTION
sizes: 2")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1513 I-1499 INSPECTION CLADDING ON HYDROTESTED LINES TP-1683-02-HT-021 (Pipe
sizes: 2")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1514 CLADDING ON HYDROTESTED LINES TP-1731-01-HT-022 (Pipe
I-1500 INSPECTION sizes: 20",10",2", 6",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1515 PREPARATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-017 (Pipe
I-1501
INSPECTION sizes: 30",3",1")

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1516 TO VAPOR BARRIER ON HYDROTESTED LINES TP-1704-02-HT-
I-1502 INSPECTION 019(Pipe sizes: 16",14",4",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1517 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1625-
I-1503 INSPECTION 00-HT-030 (Pipe sizes: 8"

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1518 I-1504 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1625-
INSPECTION 00-HT-031 (Pipe sizes: 8",1")

MFC-DLM-AK- SURFACE PRE- INSULATION INSPECTION PRIOR TO APPLICATION OF


1519 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1625-
I-1505
INSPECTION 00-HT-032 (Pipe sizes: 8",1")

MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR
1520
I-1506 INSPECTION BARRIER ON @ TP-1683-03-HT-020 (Pipe sizes: 3",1.5",1")

INSULATION 1st, @2nd & 3rd LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
1521 I-1507 INSPECTION VAPOR BARRIER ON @ TP-1683-03-HT-009 (Pipe sizes:
16",2",1")

1522 MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR
I-1508 INSPECTION BARRIER ON @ TP-1683-02-HT-003 (Pipe sizes: 3",2",1",0.75")
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON
MFC-DLM-AK- VAPOR BARRIER
1523 WELD JOINTS, SPOOL & SUPPORT @ TP-1704-02-HT-035 (Pipe
I-1509 INSPECTION
sizes: 10", 8", 6",4",3",2",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON @


1524
I-1510 INSPECTION TP-1683-02-HT-028 (Pipe sizes: 4")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1525 I-1511 PREPARATION INSULATION ON HYDROTESTED LINES TP-1606-02-HT-020 (Pipe
INSPECTION sizes: ,12",8",4",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1526 PREPARATION ON HYDROTESTED LINES TP-1541-00-HT-001 (Pipe sizes:
I-1512 INSPECTION 3",2",1.5",075")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1527 PREPARATION INSULATION ON HYDROTESTED LINES TP-1541-00-HT-002 (Pipe
I-1513
INSPECTION sizes: 3",2",1.5",075")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1528 OF METAL
I-1514 CLADDING HYDROTESTED @ TP-1683-02-HT-010 (Pipe sizes: 10",12",1" )

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1529 WELD JOINTS, SPOOL & SUPPORT @ TP-1683-03-HT-019 (Pipe
I-1515 INSPECTION sizes: 20",16",4",2",1",0.75")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1530 I-1516 INSPECTION HYDROTESTED LINES TP-1683-03-HT-017 (Pipe sizes:
18",16",14",12",10",6",3",1.5",1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1531 WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-008 (Pipe
I-1517 INSPECTION
sizes: 10")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON @


1532
I-1518 INSPECTION TP-1683-02-HT-009 (Pipe sizes: 12",2",10",8",1")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1533 I-1519 INSPECTION WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-001 (Pipe
sizes: 2")

FINAL INSPECTION
1534 MFC-DLM-AK- OF METAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
I-1520 HYDROTESTED LINES TP-1683-02-HT-056 (Pipe sizes: 12",2",1")
CLADDING
PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
MFC-DLM-AK- PARTIAL FINAL
1535 EXCEPT WELD JOINTS, SPOOL & SUPPORT @ TP-1683-02-HT-002
I-1521 INSPECTION
(Pipe sizes: 6",4",3", 2",1.5")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1536 HYDROTESTED LINES @ TP-1705-01-HT-014 (Pipe sizes:
I-1522 INSPECTION
16",12",10",2",1")

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
1537 I-1523 INSULATION 32kg/m3 INSULATION MATERIAL
MATERIAL

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1538 ON WELD JOINTS,SPOOL & SUPPORT @ TP-1615-02-HT-019 (Pipe
I-1524 INSPECTION sizes: 12",10", 6",3",1" )

PARTIAL INSULATION INSPECTION OF (HOT PIR) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1539 CLADDING ON HYDROTESTED @ TP-1491-00-HT-002 (Pipe sizes:
I-1525 INSPECTION
3",2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING HYDROTESTED


1540 OF METAL
I-1526 CLADDING ON TP-1731-01-HT-021 (Pipe sizes: 20, 2",1")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1541 BARRIER ON HYDROTESTED LINES TP-1691-01-HT-025 (Pipe
I-1527 INSPECTION sizes: 2",1")

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1542 I-1528 INSPECTION TO VAPOR BARRIER ON HYDROTESTED LINES TP-1683-03-HT-007
(Pipe sizes: 10",8",3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON WELD


1543 JOINTS, SPOOL & SUPPORT @ TP-1625-00-HT-030 (Pipe sizes:
I-1529 INSPECTION
8"

INSULATION INSPECTION PRIOR TO METAL CLADDING ON WELD


MFC-DLM-AK- INSULATION
1544 JOINTS, SPOOL & SUPPORT @ TP-1625-00-HT-031 (Pipe sizes:
I-1530 INSPECTION
8",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON WELD


MFC-DLM-AK- INSULATION
1545 I-1531 INSPECTION JOINTS, SPOOL & SUPPORT @ TP-1625-00-HT-032 (Pipe sizes:
8",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1546 MFC-DLM-AK- INSULATION ON HYDROTESTED LINES TP-1606-02-HT-020 (Pipe sizes: ,
I-1532 INSPECTION
12",8",4",2",1")
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
1547 PREPARATION ON EXCEPT WELD JOINTS & SUPPORT @ TP-1611-02-HT-019-RT1
I-1533
INSPECTION (Pipe sizes: 6",3",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1548 PREPARATION ON HYDROTESTED LINES TP-1704-02-HT-040 (Pipe sizes:
I-1534
INSPECTION 12",1",075")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION
1549 I-1535 PREPARATION ON HYDROTESTED LINES TP-1681-00-HT-020 (Pipe sizes: 24",1")
INSPECTION

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1550 PREPARATION INSULATION ON HYDROTESTED @ TP-1614-02-HT-021 (Pipe
I-1536 INSPECTION sizes: 36",24",8",2" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1551 PREPARATION INSULATION ON HYDROTESTED @ TP-1614-02-HT-001 (Pipe
I-1537
INSPECTION sizes: 36",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1552 PREPARATION INSULATION ON HYDROTESTED @ TP-1615-02-HT-001 (Pipe
I-1538 INSPECTION sizes: 36",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1553 PREPARATION INSULATION ON HYDROTESTED @ TP-1632-02-HT-003 (Pipe
I-1539 INSPECTION sizes: 8",0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF HOT METAL CLADDING ON VISUAL TEST
1554 I-1540 OF METAL LINE @ TP-1506-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF HOT METAL CLADDING ON VISUAL TEST
1555 OF METAL
I-1541 LINE @ TP-1506-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1556 OF METAL
I-1542 TP-1507-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
1557 I-1543 OF METAL TP-1507-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
1558 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING ON VISUAL TEST LINE @
I-1544 TP-1505-01-HT-027 (Pipe sizes: 6", 3",3/4")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON VISUAL TEST
1559 OF METAL
I-1545 LINE @ TP-1505-01-HT-028 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON VISUAL TEST
1560 OF METAL
I-1546 LINE @ TP-1512-01-HT-031 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON VISUAL TEST
1561 I-1547 OF METAL LINE @ TP-1512-01-HT-030 (Pipe sizes: 6", 3",3/4")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT) METAL CLADDING ON (TP-1702-01-
1562 OF METAL
I-1548 CLADDING HT-020) (Pipe Sizes: 3")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1563 OF METAL HYDROTESTED LINES TP-1731-01-HT-022 (Pipe sizes: 20",10",2",
I-1549
CLADDING 6",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1564 CLADDING ON HYDROTESTED LINES TP-1662-01-HT-014 (Pipe
I-1550 INSPECTION sizes: 3", 1")

INSULATION INSPECTION OF ( HOT PIR ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1565 CLADDING ON HYDROTESTED LINES TP-1711-01-HT-001 (Pipe
I-1551 INSPECTION sizes: 1", 0.75")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1566 I-1552 INSPECTION ON HYDROTESTED LINE TP-1712-02-HT-014 (Pipe sizes: 4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1567
I-1553 INSPECTION ON HYDROTESTED LINE TP-1712-01-HT-012 (Pipe sizes: 2")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1568 CLADDING ON HYDROTESTED LINES ON WELD JOINTS,SUPPORT
I-1554 INSPECTION
& SPOOL TP-1662-01-HT-012 (Pipe sizes: (3",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1569 I-1555 INSPECTION ON HYDROTESTED LINES TP-1671-02-HT-001 (Pipe sizes:
2",1",0.75")

1570 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


I-1556 INSPECTION ON HYDROTESTED LINES TP-1712-01-HT-006 (Pipe sizes: ,1")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON WELD JOINTS,
1571 OF METAL
I-1557 SPOOL & SUPPORT @ TP-1625-00-HT-030 (Pipe sizes: 8"
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF HOT METAL CLADDING ON WELD JOINTS,
1572 OF METAL
I-1558 SPOOL & SUPPORT @ TP-1625-00-HT-031 (Pipe sizes: 8",1")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1573 I-1559 OF METAL HYDROTESTED LINES @ TP-1705-01-HT-014 (Pipe sizes:
CLADDING 16",12",10",2",1")

PARTIAL FINAL INSPECTION OF COLD METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1574 WELD JOINTS,SPOOL & SUPPORT @ TP-1714-00-HT-003 (Pipe
I-1560 INSPECTION sizes: 30",14", 3",0.75" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
1575 ON HYDROTESTED LINES TP-1541-00-HT-001 (Pipe sizes:
I-1561 INSPECTION
3",2",1.5",075")

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
1576 ON HYDROTESTED LINES TP-1541-00-HT-002 (Pipe sizes:
I-1562 INSPECTION 3",2",1.5",075")

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1577 TO VAPOR BARRIER ON HYDROTESTED LINES TP-1681-00-HT-017
I-1563 INSPECTION (Pipe sizes: 30",1")

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1578 I-1564 INSPECTION TO VAPOR BARRIER ON HYDROTESTED LINES TP-1705-01-HT-001
(Pipe sizes: 16",10",6")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1579 PREPARATION INSULATION ON WELD JOINTS, SPOOL & SUPPORT @ TP-1704-
I-1565
INSPECTION 02-HT-002 (Pipe sizes: 10",16",30",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1580 CLADDING ON HYDROTESTED LINES TP-1541-00-HT-001 (Pipe
I-1566 INSPECTION
sizes: 3",2",1.5",075")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1581 I-1567 INSPECTION CLADDING ON HYDROTESTED LINES TP-1541-00-HT-002 (Pipe
sizes: 3",2",1.5",075")

INSULATION INSPECTION OF ( HOT ) PRIOR TOMETAL


1582 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1614-02-HT-021 (Pipe sizes:
I-1568 INSPECTION
36",24",8",2" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING
MFC-DLM-AK- INSULATION
1583 ON HYDROTESTED LINES ON WELD JOINTS,SUPPORT & SPOOL
I-1569 INSPECTION
TP-1455-00-HT-001 (Pipe sizes: (10",2")

SURFACE PARTIAL PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1584 PREPARATION INSULATION HYDROTESTED ON TP-1621-01-HT-015 (Pipe sizes:
I-1570
INSPECTION 2")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1585 I-1571 PREPARATION ON HYDROTESTED @ TP-1612-02-HT-021 (Pipe sizes:
INSPECTION 36",24",8",2" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1586 PREPARATION
I-1572 INSPECTION INSULATION @ TP-1714-00-HT-073 (Pipe sizes: 10",6",3",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1587 PREPARATION INSULATION @ TP-1683-02-HT-027 (Pipe sizes:
I-1573
INSPECTION 12",8",6",3",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1588 PREPARATION ON HYDROTESTED @ TP-1731-01-HT-010 (Pipe sizes:
I-1574 INSPECTION 18",3",2",1" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
1589 PREPARATION
I-1575 INSPECTION ON HYDROTESTED @ TP-1702-01-HT-019 (Pipe sizes: 6",3" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1590 I-1576 PREPARATION INSULATION @ TP-1681-00-HT-010 (Pipe sizes:
INSPECTION 36",12",10",3",2",1" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1591 PREPARATION INSULATION @ TP-1705-01-HT-011 (Pipe sizes:
I-1577
INSPECTION 14",10",3",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1592 PREPARATION ON HYDROTESTED @ TP-1747-04-HT-001 (Pipe sizes: 6",4",2",
I-1578
INSPECTION 1",0.75" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT ) PRIOR TO INSULATION
1593 I-1579 PREPARATION ON HYDROTESTED @ TP-1463-00-HT-009 (Pipe sizes: 2",1" )
INSPECTION

SURFACE
1594 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION
I-1580 ON HYDROTESTED @ TP-1746-00-HT-001 (Pipe sizes: 3" )
INSPECTION
SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO
MFC-DLM-AK-
1595 PREPARATION INSULATION ON HYDROTESTED LINES TP-1605-01-HT-001 (Pipe
I-1581
INSPECTION sizes: 8",6",4",2",1",1.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1596 OF METAL
I-1582 HYDROTESTED @ TP-1691-01-HT-001 (Pipe sizes: 18",1" )
CLADDING

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
1597 I-1583 INSULATION 32kg/m3 INSULATION MATERIAL
MATERIAL

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1598 PREPARATION
I-1584 INSPECTION INSULATION @ TP-1632-02-HT-005 (Pipe sizes: 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1599 OF METAL
I-1585 HYDROTESTED @ TP-1705-01-HT-007 (Pipe sizes: 24",1" )
CLADDING

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1600 PREPARATION INSULATION ON HYDROTESTED @ TP-1612-02-HT-001 (Pipe
I-1586 INSPECTION sizes: 36",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1601 PREPARATION INSULATION ON HYDROTESTED @ TP-1611-02-HT-001 (Pipe
I-1587 INSPECTION sizes: 36",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1602 I-1588 PREPARATION INSULATION @ TP-1731-01-HT-005 (Pipe sizes:
INSPECTION 10",6",3",1",0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT) PRIOR TO APPLICATION


1603 PREPARATION OF INSULATION (TP-1605-01-HT-004) (Pipe Sizes: 8", 6', 4",
I-1589
INSPECTION 2",1",0.75")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1604 PREPARATION
I-1590 INSULATION @ TP-1704-02-HT-021 (Pipe sizes: 12",8",1" )
INSPECTION

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1605 I-1591 PREPARATION INSULATION @ TP-1704-02-HT-023 (Pipe sizes: 12",8",1" )
INSPECTION

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1606 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1611-02-HT-021 (Pipe
I-1592
INSPECTION sizes: 36",24",8",2" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING
1607
I-1593 INSPECTION ON HYDROTESTED @ TP-1604-02-HT-001 (Pipe sizes: 30",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1608 CLADDING ON HYDROTESTED @ TP-1606-02-HT-001 (Pipe sizes:
I-1594 INSPECTION
30",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


1609 I-1595 INSPECTION ON HYDROTESTED @ TP-1605-02-HT-001 (Pipe sizes: 30",2",1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1610 CLADDING ON HYDROTESTED @ TP-1607-02-HT-001 (Pipe sizes:
I-1596 INSPECTION 30",2",1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1611 PREPARATION ON HYDROTESTED LINES TP-1681-00-HT-023 (Pipe sizes:
I-1597
INSPECTION 2",4",10")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1612 PREPARATION
I-1598 INSPECTION INSULATION (HOT) @ TP-1604-02-HT-022 (Pipe sizes: ,2",1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL-FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1613
I-1599 INSPECTION HYDROTESTED @ TP-1491-00-HT-002 (Pipe sizes: 2",3",4" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1614 I-1600 PREPARATION INSULATION (HOT) @ TP-1613-02-HT-026 (Pipe sizes: ,2",1.5" )
INSPECTION

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1615 PREPARATION INSULATION ON HYDROTESTED LINES TP-1701-03-HT-009 (Pipe
I-1601
INSPECTION sizes: 12",14")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1616 PREPARATION
I-1602 INSULATION (HOT) @ TP-1613-02-HT-027 (Pipe sizes: ,2",1.5" )
INSPECTION

INSULATION 1st & 2nd LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1617 I-1603 INSPECTION TO VAPOR BARRIER ON HYDROTESTED LINES TP-1714-00-HT-073
(Pipe sizes: 6",10",3")

PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1618 MFC-DLM-AK- INSULATION INSULATION ON HYDROTESTED LINES TP-1704-02-HT-019 (Pipe
I-1604 INSPECTION
sizes: 14",4")
MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION PRIOR TO VAPOR
1619
I-1605 INSPECTION BARRIER ON @ TP-1681-00-HT-023 (Pipe sizes: 2"4",,10")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1620 ON HYDROTESTED LINES TP-1615-02-HT-001 (Pipe sizes: ,
I-1606 INSPECTION
36",2",1")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1621 I-1607 PREPARATION INSULATION ON HYDROTESTED LINES TP-1662-01-HT-031 (Pipe
INSPECTION sizes: 10",2")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON @


1622
I-1608 INSPECTION TP-1661-01-HT-003 (Pipe sizes: 36",24",3")

PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1623 CLADDING ON HYDROTESTED LINES TP-1605-01-HT-001 (Pipe
I-1609 INSPECTION
sizes: 8",6",4",2",1",1.75" )

PRE- INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1624 CLADDING ON HYDROTESTED @ TP-1603-02-HT-001 (Pipe sizes:
I-1610 INSPECTION 30",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1625 PREPARATION INSULATION ON HYDROTESTED LINES TP-1683-03-HT-014 (Pipe
I-1611 INSPECTION sizes: 6",2",3",1.5")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1626 I-1612 PREPARATION INSULATION ON HYDROTESTED LINES TP-1662-01-HT-004 (Pipe
INSPECTION sizes: 8",4",2")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1627 PREPARATION
I-1613 INSULATION (HOT) @ TP-1661-01-HT-004 (Pipe sizes: ,2",16" )
INSPECTION

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1628 PREPARATION INSULATION (HOT) @ TP-1661-01-HT-021 (Pipe sizes: ,
I-1614
INSPECTION 12",8"3" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1629 I-1615 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1601-01-HT-004
INSPECTION (Pipe sizes: ,8",4",2",6" )

SURFACE INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1630 MFC-DLM-AK- PREPARATION CLADDING ON HYDROTESTED LINES TP-1604-02-HT-020 (Pipe
I-1616
INSPECTION sizes: ,12",8",4",2",1")
SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1631 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1601-01-HT-001
I-1617
INSPECTION (Pipe sizes: ,8",4",2",6" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1632 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1704-02-HT-044
I-1618
INSPECTION (Pipe sizes: 2")

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1633 I-1619 PREPARATION ON HYDROTESTED LINES TP-1714-00-HT-013 (Pipe sizes:
INSPECTION 24",12",30",10")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1634 PREPARATION INSULATION (HOT) @ TP-1613-02-HT-001 (Pipe sizes: ,
I-1620 INSPECTION 36",2"1" )

SURFACE PRE-INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION


MFC-DLM-AK-
1635 PREPARATION ON HYDROTESTED LINES TP-1691-01-HT-006 (Pipe sizes:
I-1621
INSPECTION 8",12",6",2")

SURFACE PRE-INSULATION INSPECTION OF (COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1636 PREPARATION ON HYDROTESTED LINES TP-1704-02-HT-033 (Pipe sizes: 8", 6",
I-1622 INSPECTION 2", 1")

VAPOR BARRIER INSPECTION OF (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1637 CLADDING ON HYDROTESTED LINES TP-1705-01-HT-001 (Pipe
I-1623 INSPECTION sizes: 16",10",6")

IN-PROCESS 1st & 2nd layer INSULATION INSPECTION OF ( COLD


MFC-DLM-AK- INSULATION
1638 I-1624 INSPECTION ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-1704-
02-HT-040 (Pipe sizes: 12",2", 1",075")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1639
I-1625 INSPECTION @ TP-1701-03-HT-006 (Pipe sizes: 10",8",6", 2",1")

IN-PROCESS INSULATION INSPECTION ON 1st & 2nd LAYER OF


MFC-DLM-AK- INSULATION
1640 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-
I-1626 INSPECTION
1683-03-HT-014 (Pipe sizes: 6",2",3",1.5")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1641 AK-I-1627 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-003 (Pipe sizes: 3",2")

1642 MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


AK-I-1628 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-023 (Pipe sizes: 6",2",1" )
MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1643
AK-I-1629 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-004 (Pipe sizes: 3",1")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF (HOT) METAL CLADDING ON


1644
AK-I-1630 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-023 (Pipe sizes: 2" )

FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM- PARTIAL FINAL
1645 AK-I-1631 INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-022 (Pipe sizes:
8",10",3",1.5",1")

FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM- PARTIAL FINAL
1646 HYDROTESTED LINE @ TP-1701-01-HT-011 (Pipe sizes:
AK-I-1632 INSPECTION 1",2",6",10",12")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF (HOT ) METAL CLADDING ON


1647
AK-I-1633 INSPECTION HYDROTESTED @ TP-1712-02-HT-016 (Pipe sizes: 2" )

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


1648
AK-I-1634 INSPECTION HYDROTESTED LINE @ TP-1704-02-HT-032 (Pipe sizes: 10",8",3")

INSULATION INSPECTION OF (HOT ) PRIOR METAL CLADDING


MFC-DLM-AK- PARTIAL FINAL
1649 ON HYDROTESTED LINE @ TP-1603-02-HT-024 (Pipe sizes:
I-1635 INSPECTION 2",1.5",3/4")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1650 AK-I-1636 INSPECTION HYDROTESTED @ TP-1651-00-HT-005 (Pipe sizes:2",1")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1651 HYDROTESTED LINES TP-1662-01-HT-009 (Pipe sizes:
AK-I-1637 INSPECTION
18",12",3",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1652 ON HYDROTESTED LINES TP-1605-02-HT-020 (Pipe sizes: ,
I-1638 INSPECTION
12",8",4",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT) PRIOR TO METAL CLADDING


1653 I-1639 INSPECTION (TP-1605-01-HT-004) (Pipe Sizes: 8", 6', 4", 2",1",0.75")

FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1654 MFC-DLM- PARTIAL FINAL HYDROTESTED @ TP-1506-02-HT-001 (Pipe sizes:
AK-I-1640 INSPECTION
12",10",6",4",2",1" )
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1655 OF METAL
I-1641 HYDROTESTED LINE @ TP-1683-02-HT-001 (Pipe sizes: 2")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1656 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-002 (Pipe sizes: 6",4",3",
I-1642
CLADDING 2",1.5")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1657 I-1643 OF METAL HYDROTESTED @ TP-1683-02-HT-008 (Pipe sizes: 10")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1658 OF METAL HYDROTESTED LINE@ TP-1683-02-HT-009 (Pipe sizes:
I-1644 CLADDING 12",2",10",8",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF( COLD ) METAL CLADDING ON
1659 OF METAL
I-1645 HYDROTESTED LINES @ TP-1683-02-HT-016 (Pipe sizes: 4",3")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1660 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-022 (Pipe sizes:
I-1646 CLADDING 8",10",3",1.5",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1661 OF METAL
I-1647 CLADDING HYDROTESTED LINE @ TP-1683-02-HT-026 (Pipe sizes: 6",8",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


1662 I-1648 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-028 (Pipe sizes: 4")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1663 OF METAL
I-1649 HYDROTESTED LINES TP-1683-02-HT-029 (Pipe sizes: 16",2")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1664 OF METAL
I-1650 HYDROTESTED @ TP-1683-02-HT-030 (Pipe sizes: 8",2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION PRIOR TO METAL CLADDING @ TP-1683-02-


1665 I-1651 OF METAL HT-031 (Pipe sizes: 2",1" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1666 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1683-03-HT-015 (Pipe sizes:
I-1652
CLADDING 30",20",10",2"1")
FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
MFC-DLM-AK-
1667 OF METAL HYDROTESTED LINES TP-1683-03-HT-017 (Pipe sizes:
I-1653
CLADDING 18",16",14",12",10",6",3",1.5",1")

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK-
1668 OF METAL HYDROTESTED LINE @ TP-1683-03-HT-019 (Pipe sizes:
I-1654
CLADDING 20",16",4",2",1",0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD) METAL CLADDING HYDROTESTED
1669 I-1655 OF METAL ON TP-1704-02-HT-005 (Pipe sizes: 24",16",10", 12",8",1",0.75")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK-
1670 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-035 (Pipe sizes: 10", 8",
I-1656 CLADDING 6",4",3",2",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1671 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1611-01-HT-001 (Pipe
I-1657
INSPECTION sizes:8",6",2", 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1672 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1611-01-HT-004 (Pipe
I-1658 INSPECTION sizes:8",6", 2", 1", 075")

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARIER ON


1673
I-1659 INSPECTION HYDROTESTED LINE @ TP-1704-02-HT-044 (Pipe sizes: 2")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING ON


1674 I-1660 INSPECTION TP-1683-03-HT-009 (Pipe sizes: 16",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) @


1675
I-1661 INSPECTION TP-1613-02-HT-001 (Pipe sizes: ,36",2"1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1676 CLADDING ON HYDROTESTED @ TP-1611-02-HT-001 (Pipe sizes:
I-1662 INSPECTION
36",2",1",0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1677 I-1663 INSPECTION CLADDING ON HYDROTESTED @ TP-1612-02-HT-001 (Pipe sizes:
36",2",1",0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1678 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1612-02-HT-021 (Pipe sizes:
I-1664 INSPECTION
36",24",8",2" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO PRIOR TO
MFC-DLM-AK- INSULATION
1679 METAL CLADDING ON HYDROTESTED @ TP-1614-02-HT-001
I-1665 INSPECTION
(Pipe sizes: 36",2",1",0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1680 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1614-01-HT-001(Pipe
I-1666
INSPECTION sizes:8",6",2", 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1681 I-1667 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1614-01-HT-004(Pipe
INSPECTION sizes:8",6",2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1682 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1613-01-HT-001(Pipe
I-1668 INSPECTION sizes:8",6",2", 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1683 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1613-01-HT-004(Pipe
I-1669
INSPECTION sizes:8",6",2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1684 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1404-00-HT-001(Pipe
I-1670 INSPECTION sizes:8",6",2", 1", 0.75")

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1685 HYDROTESTED LINE @ TP-1603-02-HT-020 (Pipe sizes:
I-1671 INSPECTION 12",8",4",2",1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1686 I-1672 OF METAL HYDROTESTED LINES TP-1605-02-HT-020 (Pipe sizes: ,
CLADDING 12",8",4",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


1687 ON WELD JOINTS,SPOOL & SUPPORT @ TP-1614-02-HT-019
I-1673 INSPECTION
(Pipe sizes: 12",10", 6",3",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF( HOT ) METAL CLADDING ON HYROTESTED
1688 OF METAL
I-1674 LINE @ TP-1615-02-HT-019 (Pipe sizes: 12",10", 6",3",1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1689 I-1675 OF METAL HYDROTESTED LINES TP-1606-02-HT-020 (Pipe sizes: ,
CLADDING 12",8",4",2",1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1690 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINES TP-1614-01-HT-001 (Pipe
I-1676 INSPECTION
sizes: ,8",6",2",1.5",1",0.75")
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
1691 CLADDING ON HYDROTESTED LINES TP-1614-01-HT-004 (Pipe
I-1677 INSPECTION
sizes: ,8",6",2",1.5",1",0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1692 CLADDING ON HYDROTESTED LINES TP-1613-01-HT-001 (Pipe
I-1678 INSPECTION
sizes: ,8",6",2",1.5",1",0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1693 I-1679 INSPECTION CLADDING ON HYDROTESTED LINES TP-1613-01-HT-004 (Pipe
sizes: ,8",6",2",1.5",1",0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1694 CLADDING ON HYDROTESTED LINES TP-1404-00-HT-001 (Pipe
I-1680 INSPECTION sizes: ,16",10")

FINAL INSPECTION FINAL INSPECTION OF ( HOT) METAL CLADDING ON


MFC-DLM-AK-
1695 OF METAL HYDROTESTED LINES (TP-1506-01-HT-001) (Pipe Sizes: 10", 8",
I-1681
CLADDING 6', 4", 3",2",1",0.75")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
1696 PREPARATION
I-1682 INSPECTION INSULATION (HOT) @ TP-1506-01-HT-007 (Pipe sizes: ,8",2"1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1697 PREPARATION INSULATION (HOT) @ TP-1606-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1683 INSPECTION 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1698 I-1684 PREPARATION INSULATION (HOT) @ TP-1601-02-HT-022 (Pipe sizes: ,3", 2", 1",
INSPECTION 0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING ON


1699 HYDROTESTED LINE @ TP-1601-01-HT-001 (Pipe sizes: ,
I-1685 INSPECTION
8",4",2",6" )

INSULATION INSPECTION PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1700 HYDROTESTED LINE @ TP-1601-01-HT-004 (Pipe sizes: ,
I-1686 INSPECTION
8",4",2",6" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1701 I-1687 INSPECTION CLADDING ON HYDROTESTED LINESTP-1604-02-HT-020 (Pipe
sizes: ,12",8",4",2",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


1702 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINE @ TP-1704-02-HT-044 (Pipe
I-1688 INSPECTION
sizes: 2")
IN-PROCESS 1ST & 2ND LAYER INSULATION INSPECTION OF
MFC-DLM-AK- INSULATION
1703 ( COLD ) PRIOR TO METAL CLADDING ON HYDROTESTED LINES
I-1689 INSPECTION
TP-1704-02-HT-033 (Pipe sizes: 8", 6", 2", 1")

INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION ON


MFC-DLM-AK- INSULATION
1704 HYDROTESTED LINES TP-1714-00-HT-013 (Pipe sizes: 30",20",
I-1690 INSPECTION
24", 14, 12",10", 1")

IN-PROCESS 1ST, 2ND LAYER INSULATION INSPECTION OF


MFC-DLM-AK- INSULATION
1705 I-1691 INSPECTION ( COLD ) PRIOR TO METAL CLADDING ON HYDROTESTED LINES
TP-1691-01-HT-006 (Pipe sizes:12", 8",6",2", 1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1706 PREPARATION INSULATION (HOT) @ TP-1671-02-ht-002 (Pipe sizes: 30", 20",
I-1692 INSPECTION 14", 2", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1707 PREPARATION INSULATION (HOT) @ TP-1662-01-HT-008 (Pipe sizes: ,3",
I-1693
INSPECTION 2",1.5", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1708 PREPARATION INSULATION (HOT) @ TP-1602-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1694 INSPECTION 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1709 PREPARATION INSULATION (HOT) @ TP-1603-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1695 INSPECTION 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1710 I-1696 PREPARATION INSULATION (HOT) @ TP-1605-02-HT-022 (Pipe sizes: ,3", 2", 1",
INSPECTION 0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1711 PREPARATION
I-1697 INSULATION (HOT) @ TP-1512-01-HT-038 (Pipe sizes: ,3", 1" )
INSPECTION

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1712 PREPARATION INSULATION (HOT) @ TP-1501-01-HT-034 (Pipe sizes: ,3", 2",
I-1698
INSPECTION 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1713 I-1699 PREPARATION INSULATION (COLD) @ TP-1704-02-HT-004 (Pipe sizes: 12",
INSPECTION 10",6", 4", 2", 1.5" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1714 MFC-DLM-AK- PREPARATION INSULATION (COLD) @ TP-1731-01-HT-015 (Pipe sizes: 3", 2",
I-1700
INSPECTION 1", 0.75" )
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1715 PREPARATION INSULATION (COLD) @ TP-1731-01-HT-016 (Pipe sizes: 3", 2", 1"
I-1701
INSPECTION )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1716 PREPARATION INSULATION (COLD) @ TP-1714-00-HT-043 (Pipe sizes: 36", 24",
I-1702
INSPECTION 10", 2", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1717 I-1703 PREPARATION INSULATION (COLD) @ TP-1714-00-HT-045 (Pipe sizes: 42", 24",
INSPECTION 2" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1718 METAL CLADDING @ TP-1501-01-HT-034 (Pipe sizes: ,3", 2",
I-1704 INSPECTION 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO APPLICATION


MFC-DLM-AK-
1719 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1704-02-HT-010
I-1705
INSPECTION (Pipe sizes: 3", 1.5", 1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
1720 PREPARATION
I-1706 INSPECTION INSULATION @ TP-1615-02-HT-022 (Pipe sizes: ,3", 2", 1" )

INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1721 HYDROTESTED LINE @ TP-1611-01-HT-001 (Pipe sizes:8",6",2",
I-1707 INSPECTION 1.5", 1", 0.75")

INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1722 I-1708 INSPECTION HYDROTESTED LINE @ TP-1611-01-HT-004 (Pipe sizes:8",6",2",
1.5", 1", 0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1723 PREPARATION INSULATION ON HYDROTESTED @ TP-1613-02-HT-021 (Pipe
I-1709
INSPECTION sizes: 36",24",8",2" )

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION (COLD)


MFC-DLM-AK- INSULATION
1724 PRIOR TO APPLICATION OF VAPOR BARRIER INSULATION @ TP-
I-1710 INSPECTION
1704-02-HT-021 (Pipe sizes: 12",8",1" )

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION PRIOR


MFC-DLM-AK- INSULATION
1725 I-1711 INSPECTION TO APPLICATION OF VAPOR BARRIER @ TP-1704-02-HT-023
(Pipe sizes: 12",8",1" )

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION


1726 MFC-DLM-AK- INSULATION OF( COLD) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES
I-1712 INSPECTION
TP-1704-02-HT-030 (Pipe sizes: (12",8",2",1")
INSULATION INSPECTION (COLD ) PRIOR TO APPLICATION OF
MFC-DLM- INSULATION
1727 VAPOR BARRIER @ TP-1681-00-HT-010 (Pipe sizes:
AK-I-1713 INSPECTION
36",12",10",3",2",1", 075" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1728 CLADDING ON HYDROTESTED LINES TP-1714-00-HT-013 (Pipe
I-1714 INSPECTION
sizes: 30",20", 24", 14, 12",10", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1729 I-1715 INSPECTION CLADDING ON HYDROTESTED LINES TP-1691-01-HT-006 (Pipe
sizes:12", 8",6",2", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1730 CLADDING ON HYDROTESTED LINES TP-1704-02-HT-033 (Pipe
I-1716 INSPECTION sizes: 8", 6", 2", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1731 CLADDING ON HYDROTESTED LINES TP-1704-02-HT-040 (Pipe
I-1717 INSPECTION
sizes: 12",2", 1",075")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1732 CLADDING ON HYDROTESTED LINES TP-1683-03-HT-014 (Pipe
I-1718 INSPECTION sizes: 6",2",3",1.5")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


1733
I-1719 INSPECTION CLADDING (HOT) @ TP-1512-01-HT-038 (Pipe sizes: ,3", 1" )

INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1734 I-1720 INSPECTION VAPOR BARRIER @ TP-1662-01-HT-008 (Pipe sizes: ,3", 2",1.5",
1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


1735 CLADDING ON HYDROTESTED LINES @ TP-1704-02-HT-021
I-1721 INSPECTION
(Pipe sizes: 12",8",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1736 CLADDING ON HYDROTESTED LINES @ TP-1704-02-HT-023
I-1722 INSPECTION
(Pipe sizes: 12",8",1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1737 I-1723 INSPECTION CLADDING ON HYDROTESTED LINES@ TP-1704-02-HT-030 (Pipe
sizes: (12",8",2",1")

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION


1738 MFC-DLM-AK- INSULATION OF( COLD) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES @
I-1724 INSPECTION
TP-1714-00-HT-043 (Pipe sizes: 36", 24", 10", 2", 1" )
IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION
MFC-DLM-AK- INSULATION
1739 OF( COLD) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES @
I-1725 INSPECTION
TP-1714-00-HT-045 (Pipe sizes: 42", 24", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1740 CLADDING (HOT) @ TP-1601-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1726 INSPECTION
0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1741 I-1727 INSPECTION CLADDING (HOT) @ TP-1604-02-HT-022 (Pipe sizes: ,3", 2", 1",
0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1742 CLADDING (HOT) @ TP-1605-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1728 INSPECTION 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1743 CLADDING (HOT) @ TP-1606-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1729 INSPECTION
0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


1744
I-1730 INSPECTION CLADDING (HOT) @ TP-1613-02-HT-027 (Pipe sizes: ,2",1.5" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


1745
I-1731 INSPECTION CLADDING (HOT) @ TP-1613-02-HT-026 (Pipe sizes: ,2",1.5" )

INSULATION IN-PROCESS 1ST & 2ND LAYER INSPECTION PRIOR


MFC-DLM-AK- INSULATION
1746 I-1732 INSPECTION TO APPLICATION OF METAL CLADDING (HOT) @ TP-1506-01-HT-
007 (Pipe sizes: ,8",2"1" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1747 PREPARATION INSULATION (HOT) @ TP-1607-02-HT-022 (Pipe sizes: ,3", 2",
I-1733
INSPECTION 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1748 PREPARATION INSULATION (COLD) @ TP-1714-00-HT-047 (Pipe sizes: ,20",
I-1734
INSPECTION 14", 12", 6", 3", 2", 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1749 I-1735 OF METAL HYDROTESTED LINES @ TP-1601-01-HT-001 (Pipe sizes: ,
CLADDING 8",4",2",6" , 1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1750 MFC-DLM-AK- OF METAL HYDROTESTED LINES @ TP-1601-01-HT-004 (Pipe sizes: ,
I-1736
CLADDING 8",4",2",6", 1" )
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
MFC-DLM-AK-
1751 OF METAL HYDROTESTED LINES @ TP-1604-02-HT-020 (Pipe sizes: ,
I-1737
CLADDING 12",8",4",2",1")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1752 OF METAL HYDROTESTED LINES @ TP-1615-02-HT-001 (Pipe sizes: ,
I-1738
CLADDING 36",2",1")

FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM- PARTIAL FINAL
1753 AK-I-1739 INSPECTION HYDROTESTED LINES @ TP-1604-02-HT-020 (Pipe sizes: ,
12",8",4",2",1")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1754 OF METAL HYDROTESTED LINES @ @ TP-1603-02-HT-020 (Pipe sizes:
I-1740 CLADDING 12",8",4",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (COLD) METAL CLADDING ON
1755 OF METAL
I-1741 HYDROTESTED LINE @ TP-1704-02-HT-032 (Pipe sizes: 10",8",3")
CLADDING

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-
1756 PREPARATION INSULATION (HOT) @ TP-1611-01-HT-001 (Pipe sizes: 8",6".2",
AK-I-1742 INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-
1757 PREPARATION INSULATION (HOT) @ TP-1611-01-HT-004 (Pipe sizes: 8",6".2",
AK-I-1743 INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1758 I-1744 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1623-02-HT-
INSPECTION 002 (Pipe sizes: ,4" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1759 PREPARATION INSULATION (HOT) @ TP-1612-01-HT-001 (Pipe sizes: 8",6".2",
I-1745
INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1760 PREPARATION INSULATION (HOT) @ TP-1612-01-HT-004 (Pipe sizes: 8",6".2",
I-1746
INSPECTION 1.5", 1", 0.75" )

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1761 I-1747 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-043
(Pipe sizes: 36", 24", 10", 2", 1" )

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


1762 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-045 (Pipe
I-1748 INSPECTION
sizes: 42", 24", 2" )
INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING ON
MFC-DLM-AK- INSULATION
1763 HYDROTESTED LINE @ TP-1671-02-HT-002 (Pipe sizes: 30", 20",
I-1749 INSPECTION
14", 2", 1" )

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1764 CLADDING ON HYDROTESTED LINE @ TP-1683-03-HT-007 (Pipe
I-1750 INSPECTION
sizes: 10",8",3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (COLD) PRIOR TO VAPOR BARRIER ON


1765 I-1751 INSPECTION HYDROTESTED LINE @ TP-1701-03-HT-009 (Pipe sizes: 12",14")

INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1766 HYDROTESTED LINE @ TP-1731-01-HT-016 (Pipe sizes: 3", 2", 1"
I-1752 INSPECTION )

INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1767 HYDROTESTED LINE @ TP-1731-01-HT-015 (Pipe sizes: 3", 2",
I-1753 INSPECTION
1", 0.75" )

MATERIAL MATERIAL RECEIVING & INSPECTION OF IWR 701 AP PRIMRY


MFC-DLM-AK-
1768 RECEIVING VAPOR BARRIER & ALUMINUM 3003 STUCCO EMBOSED with
I-1754 INSPECTION POLYSURLYN MB MATERIAL

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1769 PREPARATION ON HYDROTESTED LINE @ TP-1613-02-HT-019 (Pipe sizes: 12",
I-1755 INSPECTION 10", 6", 3", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1770 I-1756 PREPARATION ON HYDROTESTED LINE @ TP-1612-02-HT-019 (Pipe sizes: 12",
INSPECTION 10", 6", 3", 1", 0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


1771 PREPARATION ON HYDROTESTED LINE @ TP-1614-02-HT-026 (Pipe sizes: 2",
I-1757
INSPECTION 1.5", 0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1772 PREPARATION ON HYDROTESTED LINE @ TP-1614-02-HT-027 (Pipe sizes: 2",
I-1758
INSPECTION 1.5", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1773 I-1759 PREPARATION INSULATION (COLD) @ TP-1691-01-HT-002 (Pipe sizes: ,24", 3",
INSPECTION 1", )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1774 MFC-DLM-AK- PREPARATION INSULATION (COLD) @ TP-1701-01-HT-007 (Pipe sizes: ,10",8",
I-1760
INSPECTION 6", 2", 1" )
INSULATION 1st & 2nd Layer INSPECTION OF ( COLD ) PRIOR
MFC-DLM-AK- INSULATION
1775 TO VAPOR BARRIER ON HYDROTESTED LINES @ TP-1704-02-HT-
I-1761 INSPECTION
019 (Pipe sizes: 14",4")

INSULATION 1st & 2nd Layer INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1776 TO VAPOR BARRIER ON HYDROTESTED LINES @ TP-1704-02-HT-
I-1762 INSPECTION
018 (Pipe sizes: 3",1", 0.75" )

INSULATION 1st & 2nd Layer INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1777 I-1763 INSPECTION TO VAPOR BARRIER ON HYDROTESTED LINES @ TP-1704-02-HT-
027 (Pipe sizes: 16", 12", 1", )

INSULATION 1st & 2nd Layer INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1778 TO VAPOR BARRIER ON HYDROTESTED LINES @TP-1704-02-HT-
I-1764 INSPECTION 017 (Pipe sizes: 30",3",1")

INSULATION 1st & 2nd Layer INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
1779 TO VAPOR BARRIER ON HYDROTESTED LINES @ TP-1662-01-HT-
I-1765 INSPECTION
004 (Pipe sizes: 8",4",2")

VAPOR BARRIER INSPECTION (COLD) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1780 CLADDING ON HYDROTESTED LINE @ TP-1701-03-HT-009 (Pipe
I-1766 INSPECTION sizes: 12",14")

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION (COLD)


MFC-DLM-AK- INSULATION
1781 PRIOR TO APPLICATION OF VAPOR BARRIER ON HYDROTESTED
I-1767 INSPECTION LINE @ TP-1704-02-HT-010 (Pipe sizes: 3",1.5" ,1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1782 I-1768 INSPECTION ON HYDROTESTED LINE FOR WELD JOINTS & SUPPORT AND
SPOOL @ TP-1611-02-HT-019-RT1 (Pipe sizes: 6",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON WELD


1783 OF METAL JOINTS,SPOOL & SUPPORT @ TP-1614-02-HT-019 (Pipe sizes:
I-1769
CLADDING 12",10", 6",3",1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON WELD


MFC-DLM-AK-
1784 OF METAL JOINTS,SPOOL & SUPPORT @ TP-1614-02-HT-001 (Pipe sizes:
I-1770
CLADDING 36",2",1",0.75" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1785 I-1771 INSPECTION CLADDING ON HYDROTESTED LINES TP-1704-02-HT-019 @ (Pipe
sizes: 14",4")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


1786 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINES @ TP-1704-02-HT-018 (Pipe
I-1772 INSPECTION
sizes: 3",1", 0.75" )
VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL
MFC-DLM-AK- VAPOR BARRIER
1787 CLADDING ON HYDROTESTED LINES @ TP-1691-01-HT-003 (Pipe
I-1773 INSPECTION
sizes: 3",1",0.75")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1788 CLADDING ON HYDROTESTED LINES @ TP-1704-02-HT-027 (Pipe
I-1774 INSPECTION
sizes: 16", 12", 1", )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1789 I-1775 INSPECTION CLADDING ON HYDROTESTED LINES @ TP-1704-02-HT-017 (Pipe
sizes: 30",3",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1790 CLADDING ON HYDROTESTED LINES @ TP-1662-01-HT-004 (Pipe
I-1776 INSPECTION sizes: 8",4",2")

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1791 OF METAL HYDROTESTED LINES TP-1704-02-HT-011 (Pipe sizes:
I-1777
CLADDING 12",10",3",1.5",1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1792 OF METAL HYDROTESTED LINES FOR WELD JOINTS & SUPPORT AND SPOOL
I-1778 CLADDING @ TP-1611-02-HT-019 / 019-RT1 (Pipe sizes: 12",10", 6",3",1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1793 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1672-01-HT-
I-1779 INSPECTION 010 (Pipe sizes: ,3", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1794 I-1780 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1672-01-HT-015
INSPECTION (Pipe sizes: 6", 4", 2" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1795 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1712-01-HT-012
I-1781
INSPECTION (Pipe sizes: 2" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1796 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1404-00-HT-001
I-1782
INSPECTION (Pipe sizes: 16", 10", 8", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1797 I-1783 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1731-01-HT-
INSPECTION 038 (Pipe sizes: 8", 4",2",1", )

VAPOR BARRIER INSPECTION(COLD) PRIOR TO APPLICATION OF


1798 MFC-DLM-AK- VAPOR BARRIER METAL CLADDING ON HYDROTESTED LINE @ TP-1704-02-HT-
I-1784 INSPECTION
010 (Pipe sizes: 3",1.5" ,1")
FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
MFC-DLM-AK-
1799 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-019 @ (Pipe sizes:
I-1785
CLADDING 14",4")

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1800 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-018 (Pipe sizes: 3",1",
I-1786
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1801 I-1787 OF METAL HYDROTESTED LINES @ TP-1691-01-HT-003 (Pipe sizes:
CLADDING 3",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1802 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-027 (Pipe sizes: 16", 12",
I-1788 CLADDING 1", )

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1803 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-017 (Pipe sizes:
I-1789
CLADDING 30",3",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1804 OF METAL
I-1790 CLADDING HYDROTESTED LINES @TP-1662-01-HT-004 (Pipe sizes: 8",4",2")

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1805 OF METAL HYDROTESTED LINES @ TP-1701-03-HT-006 (Pipe sizes:
I-1791 CLADDING 10",8",6", 2",1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1806 I-1792 PREPARATION INSULATION (HOT) @ TP-1612-02-HT-022 on 3", 2", 1", 0.75"
INSPECTION Line

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1807 PREPARATION INSULATION (HOT) @ TP-1614-02-HT-022 on 3", 2", 1", 0.75"
I-1793
INSPECTION Line

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1808 PREPARATION INSULATION (HOT) @ TP-1614-02-HT-030 on 1.5", 1", 0.75"
I-1794
INSPECTION Line

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1809 I-1795 PREPARATION INSULATION (HOT) @ TP-1662-01-HT-017 (Pipe sizes: 20", 2",
INSPECTION 1", )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1810 MFC-DLM-AK- PREPARATION INSULATION (HOT) @ TP-1662-01-HT-018 (Pipe sizes: 20", 2", 1"
I-1796
INSPECTION )
INSULATION INSPECTION (COLD ) PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
1811 VAPOR BARRIER @ TP-1681-00-HT-010 (Pipe sizes:
I-1797 INSPECTION
36",12",10",3",2",1", 075" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


1812
I-1798 INSPECTION METAL CLADDING @ TP-1615-02-HT-022 (Pipe sizes: 3",2", 1",)

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1813 I-1799 INSPECTION METAL CLADDING @ TP-1602-02-HT-022 (Pipe sizes: ,3", 2", 1",
0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1814 METAL CLADDING @ TP-1603-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-1800 INSPECTION 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1815 METAL CLADDING @ TP-1611-02-HT-021 (Pipe sizes:
I-1801 INSPECTION
36",24",8",2" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1816 METAL CLADDING @ TP-1612-01-HT-001 (Pipe sizes: 8",6".2",
I-1802 INSPECTION 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1817 METAL CLADDING @ TP-1612-01-HT-004 (Pipe sizes: 8",6".2",
I-1803 INSPECTION 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1818 I-1804 INSPECTION METAL CLADDING @ TP-1613-02-HT-019 (Pipe sizes: 12", 10",
6", 3", 1", 0.75")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


1819 METAL CLADDING @ TP-1612-02-HT-019 (Pipe sizes: 12", 10",
I-1805 INSPECTION
6", 3", 1", 0.75")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


1820
I-1806 INSPECTION METAL CLADDING @ TP-1601-02-HT-001 (Pipe sizes: ,30",2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


1821 I-1807 INSPECTION METAL CLADDING @ TP-1602-02-HT-001 (Pipe sizes: 30",2",1" )

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON WELD


1822 MFC-DLM-AK- OF METAL JOINTS,SPOOL & SUPPORT @ TP-1705-01-HT-012 (Pipe sizes:
I-1808
CLADDING 12",1")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1823 OF METAL
I-1809 HYDROTESTED LINE @ TP-1701-03-HT-009 (Pipe sizes: 12",14")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON WELD


MFC-DLM-AK-
1824 OF METAL JOINTS, SPOOL & SUPPORT @ TP-1701-01-HT-009 (Pipe sizes:
I-1810
CLADDING 12", 1")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1825 I-1811 PREPARATION ON HYDROTESTED LINE FOR WELD JOINTS, SUPPORT & SPOOL @
INSPECTION TP-1683-01-HT-001 (Pipe sizes: 10", 8",6", 4", 3", 2", 1" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1826 PREPARATION ON HYDROTESTED LINE @ TP-1661-01-HT-006 (Pipe sizes: 18",
I-1812 INSPECTION 12",6", 2", 1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1827 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1681-00-HT-016
I-1813
INSPECTION (Pipe sizes: 36", 28", 1", 0.75" )

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION
1828 PREPARATION
I-1814 INSPECTION ON HYDROTESTED LINE @ TP-1506-01-HT-009 (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1829 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1507-01-HT-009
I-1815 INSPECTION (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1830 I-1816 PREPARATION ON HYDROTESTED LINE @ TP-1603-02-HT-027 (Pipe sizes: 1",
INSPECTION 0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


1831 PREPARATION ON HYDROTESTED LINE @ TP-1603-02-HT-023 (Pipe sizes: 1",
I-1817
INSPECTION 0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1832 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1505-01-HT-009
I-1818
INSPECTION (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1833 I-1819 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1503-01-HT-009
INSPECTION (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1834 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1504-01-HT-009
I-1820
INSPECTION (Pipe sizes: 1" )
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1835 PREPARATION INSULATION (HOT) @ TP-1611-02-HT-022 on 3", 2", 1", 0.75"
I-1821
INSPECTION Line

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1836 PREPARATION INSULATION (HOT) @ TP-1613-02-HT-022 on 3", 2", 1", 0.75"
I-1822
INSPECTION Line

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1837 I-1823 INSPECTION CLADDING (HOT) on HYDROTESTED LINE @ TP-1404-00-HT-001
(Pipe sizes: 16", 10", 8", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-
1838 PREPARATION ON HYDROTESTED LINE @ TP-1701-01-HT-005 (Pipe sizes: 20",
AK-I-1824 INSPECTION 14", 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
1839 BARRIER (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-027
I-1825 INSPECTION
(Pipe sizes: 24", 12", 1")

FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM- PARTIAL FINAL
1840 HYDROTESTED LINES @ TP-1731-01-HT-016 (Pipe sizes: 3", 2",
AK-I-1826 INSPECTION 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1841 CLADDING (HOT) @ TP-1662-01-HT-018 (Pipe sizes: 20", 2", 1"
I-1827 INSPECTION )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1842 I-1828 INSPECTION CLADDING (HOT) ON HYDROTESTED LINES @ TP-1662-01-HT-
017 (Pipe sizes: 20", 2", 1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION (COLD ) PRIOR TO APPLICATION OF


1843 METAL CLADDING ON HYDROTESTED LINES @ TP-1681-00-HT-
I-1829 INSPECTION
010 (Pipe sizes: 36",12",10",3",2",1", 075" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1844 CLADDING (HOT) ON HYDROTESTED LINES@ TP-1614-02-HT-022
I-1830 INSPECTION
on 3", 2", 1", 0.75" Line

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1845 I-1831 INSPECTION CLADDING (HOT) ON HYDROTESTED LINES @ TP-1612-02-HT-
022 on 3", 2", 1", 0.75" Line

1846 MFC-DLM-AK- INSULATION INSULATION 2nd Layer INSPECTION OF ( HOT ) PRIOR TO METAL
I-1832 INSPECTION CLADDING ON TP-1702-02-HT-008 (Pipe sizes: 1" )
INSULATION 1ST& 2ND LAYER INSPECTION PRIOR TO
MFC-DLM-AK- INSULATION
1847 APPLICATION OF VAPOR BARRIER (COLD) @ TP-1714-00-HT-047
I-1833 INSPECTION
(Pipe sizes: ,30", 20", 14", 12", 6", 3", 2", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1848 PREPARATION INSULATION (HOT) @ TP-1731-01-HT-010 (Pipe sizes: 18", 3",
I-1834
INSPECTION 2", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING HYDROTESTED
1849 I-1835 OF METAL ON TP-1712-01-HT-009 (Pipe sizes: 6",2")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1850 OF METAL HYDROTESTED LINES @ TP-1731-01-HT-016 (Pipe sizes: 3", 2",
I-1836 CLADDING 1" )

PARTIAL FINAL INSPECTION OF (COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1851 HYDROTESTED LINES @ TP-1681-00-HT-010 (Pipe sizes:
I-1837 INSPECTION
36",12",10",3",2",1", 075" )

PARTIAL FINAL INSPECTION OF (COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1852 HYDROTESTED LINES @ TP-1683-03-HT-014 (Pipe sizes:
I-1838 INSPECTION 6",2",3",1.5")

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
1853 PREPARATION ON HYDROTESTED LINE @ TP-1701-01-HT-005 (Pipe sizes: 20",
I-1839 INSPECTION 14", 2", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1854 I-1840 PREPARATION INSULATION (COLD) @ TP-1714-00-HT-044 (Pipe sizes: 36",12",
INSPECTION 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1855
I-1841 INSPECTION ON HYDROTESTED LINE @ TP-1506-01-HT-009 (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1856
I-1842 INSPECTION ON HYDROTESTED LINE@ TP-1507-01-HT-009 (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1857 I-1843 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1617-00-HT-
INSPECTION 001 (Pipe sizes: 12", 8", 6", 4", 2", 1", 0.75" )

INSULATION 1st & 2nd LAYER INSPECTION ( COLD ) PRIOR TO


1858 MFC-DLM-AK- INSULATION VAPOR BARRIER ON HYDROTESTED LINE FOR WELD JOINTS,
I-1844 INSPECTION SUPPORT & SPOOL @ TP-1683-01-HT-001 (Pipe sizes: 10", 8",6",
4", 3", 2", 1" )
MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION (COLD) PRIOR TO METAL
1859
I-1845 INSPECTION CLADDING ON @ TP-1683-02-HT-003 (Pipe sizes: 3",2",1",0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1860 METAL CLADDING on HYDROTESTED LINE @ TP-1623-02-HT-002
I-1846 INSPECTION
(Pipe sizes: ,4" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1861 I-1847 OF METAL HYDROTESTED LINE@ TP-1614-01-HT-003 (Pipe sizes: 8", 6", 4",
CLADDING 1", 0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1862 OF METAL
I-1848 CLADDING HYDROTESTED LINE@ TP-1507-01-HT-009 (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1863 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1625-00-HT-
I-1849
INSPECTION 001 (Pipe sizes: 3", 2", 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1864 OF METAL
I-1850 CLADDING HYDROTESTED LINE @ TP-1712-01-HT-007 (Pipe Sizes: 1")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
1865 CLADDING (COLD) @ TP-1714-00-HT-047 (Pipe sizes: ,30", 20",
I-1851 INSPECTION 14", 12", 6", 3", 2", 1", 0.75" )

PIR (COLD)
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF COLD PIR Density
1866 I-1852 INSULATION 32kg/m3 INSULATION MATERIAL
MATERIAL

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT FIBERFRAX


1867
I-1853 MATERIAL DURABLANKET HOT INSULATION MATERIALS

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1868 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1632-03-HT-
I-1854
INSPECTION 001 (GACC) (Pipe sizes: 4" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1869 I-1855 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1631-04-HT-
INSPECTION 050 (GACC) (Pipe sizes: 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1870 MFC-DLM-AK- PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1631-04-HT-
I-1856
INSPECTION 049 (GACC) (Pipe sizes: 1" )
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1871 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1681-00-HT-
I-1857
INSPECTION 007 (Pipe sizes: 36", 28", 12", 10", 1" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1872 BARRIER ON HYDROTESTED LINE @ TP-1681-00-HT-016 (Pipe
I-1858 INSPECTION
sizes: 36", 28", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1873 I-1859 INSPECTION ON HYDROTESTED LINE (HOT) @ TP-1613-02-HT-022 on 3", 2",
1", 0.75" Line

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1874 ON HYDROTESTED LINE @ TP-1611-02-HT-022 on 3", 2", 1",
I-1860 INSPECTION 0.75" Line

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
1875 HYDROTESTED LINE (HOT) @ TP-1614-02-HT-030 on 1.5", 1",
I-1861 INSPECTION
0.75" Line

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1876 ON HYDROTESTED LINE @ TP-1661-01-HT-006 (Pipe sizes: 18",
I-1862 INSPECTION 12",6", 2", 1" )

INSULATION 1ST & 2ND LAYER INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1877 VAPOR BARRIER ON HYDROTESTED LINE @ TP-1701-01-HT-005
I-1863 INSPECTION (Pipe sizes: 20", 14", 2", 1" )

INSULATION 1ST & 2ND LAYER INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
1878 I-1864 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1714-00-HT-044
(Pipe sizes: 36",12", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


1879 CLADDING (HOT) @ TP-1731-01-HT-010 (Pipe sizes: 18", 3", 2",
I-1865 INSPECTION
1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM- INSULATION
1880 CLADDING (HOT) @ TP-1661-01-HT-006 (Pipe sizes: 18", 12",6",
AK-I-1866 INSPECTION
2", 1" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINE FOR WELD JOINTS, SUPPORT
1881 I-1867 INSPECTION & SPOOL @ TP-1683-01-HT-001 (Pipe sizes: 10", 8",6", 4", 3", 2",
1" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1882 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINES TP-1714-00-HT-013 (Pipe sizes: 30",20",
I-1868 INSPECTION
24", 14, 12",10", 1")
SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
1883 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-
I-1869
INSPECTION 026 (Pipe sizes: 20", 18", 10", 14", 8", 6", 3",2", 1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1884 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1681-00-HT-
I-1870
INSPECTION 018 (Pipe sizes: 10", 6",4", 2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1885 I-1871 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1683-02-HT-
INSPECTION 023 (Pipe sizes: 10", 4", 3", 2", 1")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1886 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1683-02-HT-
I-1872 INSPECTION 024 (Pipe sizes: 10", 6", 2")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1887 PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1684-01-HT-
I-1873
INSPECTION 001 (Pipe sizes: 30", 8", 2", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1888 CLADDDING ON HYDROTESTED LINES TP-1714-00-HT-073 (Pipe
I-1874 INSPECTION sizes: 10", 6",3", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1889 CLADDDING ON HYDROTESTED @ TP-1681-00-HT-023 (Pipe
I-1875 INSPECTION sizes: 0.75",1", 3", 2", 4",6",10")

INSULATION 1st & 2nd LAYER INSPECTION (COLD) PRIOR TO


MFC-DLM-AK- INSULATION
1890 I-1876 INSPECTION APPLICATION OF VAPOR BARRIER @ TP-1683-02-HT-027 (Pipe
sizes: 12",8",6",3",1",0.75" )

MFC-DLM-AK- INSULATION INSULATION 1st & 2nd LAYER INSPECTION (COLD) PRIOR TO
1891 APPLICATION OF VAPOR BARRIER @ TP-1731-01-HT-005 (Pipe
I-1877 INSPECTION
sizes: 10",6",3",1",0.75")

IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1892 METAL CLADDING (HOT) on HYDROTESTED LINE @ TP-1625-00-
I-1878 INSPECTION
HT-001 (Pipe sizes: 3", 2", 1", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1893 I-1879 INSPECTION CLADDING (HOT) on HYDROTESTED LINE @ TP-1617-00-HT-001
(Pipe sizes: 12", 8", 6", 4", 2", 1", 0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1894 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1614-02-HT-027 (Pipe
I-1880 INSPECTION
sizes: 2", 1.5", 0.75")
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING
MFC-DLM-AK- INSULATION
1895 ON HYDROTESTED LINE @ TP-1614-02-HT-026 (Pipe sizes: 2",
I-1881 INSPECTION
1.5", 0.75")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


1896
I-1882 INSPECTION METAL CLADDING @ TP-1632-02-HT-005 (Pipe sizes: 1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1897 I-1883 INSPECTION CLADDING ON HYDROTESTED @ TP-1632-02-HT-003 (Pipe sizes:
8",0.75" )

PARTIAL FINAL INSPECTION OF (COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1898 HYDROTESTED LINE @ TP-1714-00-HT-045 (Pipe sizes: 42", 24",
I-1884 INSPECTION 2" )

PARTIAL FINAL INSPECTION OF (COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1899 HYDROTESTED LINE @ TP-1714-00-HT-043 (Pipe sizes: 36",
I-1885 INSPECTION
24", 10", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1900 OF METAL HYDROTESTED LINES TP-1605-01-HT-001 (Pipe sizes:
I-1886 CLADDING 8",6",4",2",1",0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1901 OF METAL HYDROTESTED LINES TP-1605-01-HT-004 (Pipe Sizes: 8", 6', 4",
I-1887 CLADDING 2",1",0.75")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1902 I-1888 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-023 (Pipe sizes:
CLADDING 12",8",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT PIR ) METAL CLADDING ON TP-1713-
1903 OF METAL
I-1889 00-HT-003 (Pipe sizes: 10" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1904 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-015 (Pipe sizes: 3", 2",
I-1890
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
1905 I-1891 OF METAL HYDROTESTED LINE @ TP-1404-00-HT-001 (Pipe sizes: 16", 10",
CLADDING 8", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


1906 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1613-02-HT-001 (Pipe sizes: ,36",2"1"
I-1892
CLADDING )
FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
MFC-DLM-AK-
1907 OF METAL HYDROTESTED LINES TP-1691-01-HT-006 (Pipe sizes: 12",
I-1893
CLADDING 8",6",2", 1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING @


1908
I-1894 INSPECTION TP-1714-00-HT-047 (Pipe sizes: 20", 12", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1909 I-1895 PREPARATION INSULATION (HOT) on HYDROTESTED LINE @ TP-1616-00-HT-
INSPECTION 002 (Pipe sizes: 16", 12", 2", 1" )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1910 PREPARATION INSULATION (HOT) @ TP-1611-02-HT-026 (Pipe sizes: 2", 1.5",
I-1896 INSPECTION 0.75' )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1911 PREPARATION INSULATION (HOT) @ TP-1611-02-HT-027 (Pipe sizes: 2", 1.5",
I-1897
INSPECTION 0.75' )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1912 PREPARATION INSULATION (HOT) @ TP-1612-02-HT-026 (Pipe sizes: 2", 1.5",
I-1898 INSPECTION 0.75' )

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
1913 PREPARATION INSULATION (HOT) @ TP-1612-02-HT-027 (Pipe sizes: 2", 1.5",
I-1899 INSPECTION 0.75' )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1914 I-1900 OF METAL HYDROTESTED LINES TP-1714-00-HT-073 (Pipe sizes: 10", 6",3",
CLADDING 1")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


1915 HYDROTESTED @ TP-1681-00-HT-023 (Pipe sizes: 0.75",1", 3",
AK-I-1901 INSPECTION
2", 4",6",10")

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
1916 METAL CLADDING @ TP-1683-02-HT-027 (Pipe sizes:
I-1902 INSPECTION
12",8",6",3",1",0.75" )

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
1917 I-1903 INSPECTION METAL CLADDING @ TP-1731-01-HT-005 (Pipe sizes:
10",6",3",1",0.75")

SURFACE PRE-INSULATION INSPECTION PRIOR TO APPLICATION OF


1918 MFC-DLM-AK- PREPARATION INSULATION (COLD) on HYDROTESTED LINE @ TP-1683-03-HT-
I-1904
INSPECTION 004 (Pipe sizes: 24", 1")
VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL
MFC-DLM-AK- VAPOR BARRIER
1919 CLADDING ON HYDROTESTED LINES TP-1681-00-HT-017 (Pipe
I-1905 INSPECTION
sizes: 30",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER


1920
I-1906 INSPECTION ON HYDROTESTED LINES TP-1681-00-HT-020 (Pipe sizes: 24",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1921 I-1907 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-044 (Pipe
sizes: 36",12", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1922 CLADDING (HOT) on HYDROTESTED LINE @ TP-1616-00-HT-002
I-1908 INSPECTION (Pipe sizes: 16", 12", 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK-
1923 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-010 (Pipe sizes: 3",1.5" ,
I-1909
CLADDING 1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (COLD) METAL CLADDING ON
1924 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-027 (Pipe sizes:
I-1910 CLADDING 12",8",6",3",1",0.75" )

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK-
1925 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-030 (Pipe sizes:
I-1911 CLADDING (12",8",2",1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1926 I-1912 OF METAL HYDROTESTED LINES @ TP-1704-02-HT-021 (Pipe sizes:
CLADDING 12",8",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


1927 CLADDING ON HYDROTESTED LINES TP-1681-00-HT-020 (Pipe
I-1913 INSPECTION
sizes: 24",1")

VAPOR BARRIER INSPECTION OF (COLD) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
1928 CLADDING ON HYDROTESTED LINES TP-1683-03-HT-003(Pipe
I-1914 INSPECTION
sizes: 30",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1929 I-1915 INSPECTION CLADDING ON VISUAL TEST LINE @ TP-1501-01-HT-009 (Pipe
sizes: 1")

1930 MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


I-1916 INSPECTION ON HYDROTESTED LINE @ TP-1503-01-HT-009 (Pipe sizes: 1" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
1931 CLADDING ON HYDROTESTED LINE @ TP-1504-01-HT-009 (Pipe
I-1917 INSPECTION
sizes: 1" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1932 CLADDING ON HYDROTESTED LINE @ TP-1505-01-HT-009 (Pipe
I-1918 INSPECTION
sizes: 1" )

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF (HOT) METAL CLADDING @ TP-1612-02-


1933 AK-I-1919 INSPECTION HT-019 (Pipe sizes: 12", 10", 6", 3", 1", 0.75")

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF (HOT) METAL CLADDING @ TP-1613-02-


1934
AK-I-1920 INSPECTION HT-019 (Pipe sizes: 12", 10", 6", 3", 1", 0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
1935 OF METAL
I-1921 HYDROTESTED LINES TP-1681-00-HT-017 (Pipe sizes: 30",1")
CLADDING

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1936 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1466-00-HT-016 (GA)
I-1922 INSPECTION (Pipe sizes: 18", 8", 6" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1937 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1631-04-HT-027 (GA)
I-1923 INSPECTION (Pipe sizes: 8", 4", 3" )

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1938 I-1924 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1744-01-HT-010 (GA)
INSPECTION (Pipe sizes: 2", 1", 0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1939 PREPARATION INSULATION ON HYDROTESTED @ TP-1683-03-HT-013 (Pipe
I-1925
INSPECTION sizes: 18", 14", 2", 1" )

SURFACE PRE-INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION


MFC-DLM-AK-
1940 PREPARATION ON HYDROTESTED @ TP-1683-03-HT-021 (Pipe sizes: 16", 12",
I-1926
INSPECTION 2", 1" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


MFC-DLM-AK-
1941 I-1927 PREPARATION INSULATION ON HYDROTESTED @ TP-1714-00-HT-023 (Pipe
INSPECTION sizes: 30", 24", 18", 16", 14", 12", 10", 8", 6", 4",2", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1942 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1661-01-HT-007 (T) (Pipe
I-1928
INSPECTION sizes: 18", 14", 2", 1" )
PARTIAL FINAL INSPECTION OF ( COLD ) PRIOR TO METAL
MFC-DLM-AK- PARTIAL FINAL
1943 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-044 (Pipe
I-1929 INSPECTION
sizes: 36",12", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT DA ) METAL CLADDING @ TP-1506-
1944 OF METAL
I-1930 01-HT-007 (Pipe sizes: ,8",2"1" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK-
1945 I-1931 OF METAL HYDROTESTED @ TP-1681-00-HT-023 (Pipe sizes: 0.75",1", 3",
CLADDING 2", 4",6",10")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING @ TP-1612-02-
1946 OF METAL
I-1932 CLADDING HT-019 (Pipe sizes: 12", 10", 6", 3", 1", 0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING @ TP-1613-02-
1947 OF METAL
I-1933 HT-019 (Pipe sizes: 12", 10", 6", 3", 1", 0.75")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
1948 OF METAL HYDROTESTED LINES @ TP-1601-01-HT-001 (Pipe sizes: ,
I-1934 CLADDING 8",4",2",6" , 1" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
1949 OF METAL HYDROTESTED LINES @ TP-1601-01-HT-004 (Pipe sizes: ,
I-1935 CLADDING 8",4",2",6", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1950 I-1936 OF METAL HYDROTESTED LINE @ TP-1506-01-HT-009 (Pipe sizes: 1" )
CLADDING

MFC-DLM- PARTIAL FINAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


1951
AK-I-1937 INSPECTION HYDROTESTED LINE @ TP-1506-01-HT-007 (Pipe sizes: ,8",2"1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1952 CLADDNG ON HYDROTESTED LINE (HOT) @ TP-1661-01-HT-021
I-1938 INSPECTION
(Pipe sizes: ,12",8"3" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1953 I-1939 INSPECTION CLADDING (HOT) on HYDROTESTED LINE @ TP-1672-01-HT-015
(Pipe sizes: 6", 4", 2" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


1954 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED @ TP-1463-00-HT-009 (Pipe sizes:
I-1940 INSPECTION
2",1" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
1955 CLADDING ON HYDROTESTED @ TP-1747-04-HT-001 (Pipe sizes:
I-1941 INSPECTION
6",4",2", 1.5", 1",0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1956 CLADDING ON HYDROTESTED @ TP-1746-00-HT-001 (Pipe sizes:
I-1942 INSPECTION
3", 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
1957 I-1943 INSPECTION CLADDING (HOT) on HYDROTESTED LINE @ TP-1712-01-HT-012
(Pipe sizes: 2" )

MFC-DLM- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1958
AK-I-1944 INSPECTION ON HYDROTESTED @ TP-1746-00-HT-001 (Pipe sizes: 3" )

MFC-DLM- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1959
AK-I-1945 INSPECTION ON HYDROTESTED @ TP-1712-01-HT-012 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1960
I-1946 INSPECTION ON HYDROTESTED @ TP-1702-01-HT-019 (Pipe sizes: 6",3" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1961 ON HYDROTESTED@ TP-1601-02-HT-027 (Pipe sizes: 1.5", 1",
I-1947 INSPECTION 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
1962 I-1948 INSPECTION ON HYDROTESTED @ TP-1602-02-HT-023 (Pipe sizes: 1.5", 1",
0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


1963
I-1949 INSPECTION ON HYDROTESTED @ TP-1466-00-HT-015 (Pipe sizes: 16",6",1" )

MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF (HOT) MINERAL FIBER
1964
I-1950 MATERIAL BLANKET Density 100kg/m3 INSULATION MATERIAL

MATERIAL RECEIVING & INSPECTION OF HOT & COLD


(HOT & COLD)
MFC-DLM-AK- INSULATION ANCELLARY MATERIAL SUCH AS FOSTER 95-44
1965 I-1951 INSULATION ELASTORAL SEALANT, BAND, BAND SEAL, RIVETS, SCREW,
MATERIAL
TOGGLE & LATCH

SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1966 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1661-01-HT-025 (T) (Pipe
I-1952
INSPECTION sizes: 36", 30", 1")
SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO
MFC-DLM-AK-
1967 PREPARATION APPLICATION OF INSULATION, HYDROTESTED LINE @ TP-1691-
I-1953
INSPECTION 01-HT-024 (Pipe sizes: 12", 10", 8", 6", 2", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
1968 PREPARATION APPLICATION OF INSULATION ON HYDROTESTED LINE @ TP-
I-1954
INSPECTION 1601-02-HT-023 (Pipe sizes: 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION


MFC-DLM-AK-
1969 I-1955 PREPARATION OF INSULATION ON HYDROTESTED LINE @ TP-1601-02-HT-024
INSPECTION (Pipe sizes: 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
1970 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-024 (Pipe
I-1956 INSPECTION sizes: 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
1971 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1604-02-HT-024 (Pipe
I-1957
INSPECTION sizes: 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
1972 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-024 (Pipe
I-1958 INSPECTION sizes: 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
1973 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-024 (Pipe
I-1959 INSPECTION sizes: 1.5", 1", 0.75")

INSULATION 1st, 2nd & 3rd Layer INSPECTION OF ( COLD )


MFC-DLM-AK- INSULATION
1974 I-1960 INSPECTION PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-1683-03-HT-
013 (Pipe sizes: 18", 14", 2", 1" )

MFC-DLM-AK- INSULATION INSULATION 1st, 2nd & 3rd Layer INSPECTION OF ( COLD )
1975 PRIOR TO VAPOR BARRIER ON HYDROTESTED @ TP-1683-03-HT-
I-1961 INSPECTION
021 (Pipe sizes: 16", 12", 2", 1" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR


MFC-DLM-AK- INSULATION
1976 BARRIER ON HYDROTESTED @ TP-1714-00-HT-023 (Pipe sizes:
I-1962 INSPECTION
30", 24", 18", 16", 14", 12", 10", 8", 6", 4",2", 1", 0.75" )

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
1977 I-1963 INSPECTION CLADDING ON HYDROTESTED @ TP-1661-01-HT-007 (T) (Pipe
sizes: 18", 14", 2", 1" )

1978 MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF (HOT) MINERAL FIBER
I-1964 MATERIAL BLANKET and PIPE COVER INSULATION MATERIAL
FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON
MFC-DLM-AK-
1979 OF METAL HYDROTESTED LINE @ TP-1612-01-HT-001 (Pipe sizes: 8",6".2",
I-1965
CLADDING 1.5", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1980 OF METAL HYDROTESTED LINE @ TP-1612-01-HT-004 (Pipe sizes: 8",6".2",
I-1966
CLADDING 1.5", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1981 I-1967 OF METAL HYDROTESTED LINE @ TP-1611-01-HT-001 (Pipe sizes: 8",6".2",
CLADDING 1.5", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1982 OF METAL HYDROTESTED LINE @ TP-1611-01-HT-004 (Pipe sizes: 8",6".2",
I-1968 CLADDING 1.5", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1983 OF METAL HYDROTESTED LINE TP-1614-01-HT-001 (Pipe sizes: ,
I-1969
CLADDING 8",6",2",1.5",1",0.75")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING ON
1984 OF METAL HYDROTESTED LINE TP-1614-01-HT-004 (Pipe sizes: ,
I-1970 CLADDING 8",6",2",1.5",1",0.75")

PARTIAL FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
1985 HYDROTETSED @ TP-1731-01-HT-010 (Pipe sizes: 18", 3", 2", 1"
I-1971 INSPECTION )

SURFACE PRE-INSULATION INSPECTION OF (COLD) PRIOR TO INSULATION


MFC-DLM-AK-
1986 I-1972 PREPARATION ON HYDROTESTED @ TP-1701-01-HT-010 (T) (Pipe sizes: 30",
INSPECTION 24", 20", 3" 2", 1", 0.75")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION OF ( COLD ) PRIOR TO


1987 PREPARATION INSULATION ON HYDROTESTED @ TP-1714-00-HT-080 (T) (Pipe
I-1973
INSPECTION sizes: 14", 12", 6", 1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
1988 PREPARATION ON HYDROTESTED @ TP-1747-07-HT-001 (T) (Pipe sizes: 2", 1",
I-1974
INSPECTION 0.75")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK-
1989 I-1975 PREPARATION INSULATION ON HYDROTESTED @ TP-1747-01-HT-001 (T) (Pipe
INSPECTION sizes: 3", 1")

SURFACE PRE-INSULATION INSPECTION OF ( HOT ) PRIOR TO


1990 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED @ TP-1635-00-HT-001 (T) (Pipe
I-1976
INSPECTION sizes: 2", 1")
INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
1991 METAL CLADDING ON HYDROTESTED LINE @ TP-1601-02-HT-024
I-1977 INSPECTION
(Pipe sizes: 1.5", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1992 OF METAL HYDROTESTED LINE TP-1613-01-HT-001 (Pipe sizes: ,
I-1978
CLADDING 8",6",2",1.5",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1993 I-1979 OF METAL HYDROTESTED LINE TP-1613-01-HT-004 (Pipe sizes: ,
CLADDING 8",6",2",1.5",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
1994 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-001 (Pipe sizes:
I-1980 CLADDING 36",2",1",0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1995 METAL CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-024
I-1981 INSPECTION
(Pipe sizes: 1.5", 1", 0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1996 METAL CLADDING ON HYDROTESTED LINE @ TP-1604-02-HT-024
I-1982 INSPECTION (Pipe sizes: 1.5", 1", 0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1997 METAL CLADDING ON HYDROTESTED LINE @ TP-1605-02-HT-024
I-1983 INSPECTION (Pipe sizes: 1.5", 1", 0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
1998 I-1984 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-024
(Pipe sizes: 1.5", 1", 0.75")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


1999 CLADDING ON HYDROTESTED @ TP-1683-03-HT-013 (Pipe sizes:
I-1985 INSPECTION
18", 14", 2", 1" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED @ TP-1683-03-HT-021 (Pipe sizes:
2000
I-1986 INSPECTION
16", 12", 2", 1" )

INSULATION INSPECTION OF ( COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
2001 I-1987 INSPECTION ON HYDROTESTED @ TP-1661-01-HT-025 (T) (Pipe sizes: 36",
30", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


2002 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED @ TP-1714-00-HT-023 (Pipe sizes:
I-1988 INSPECTION
30", 24", 18", 16", 14", 12", 10", 8", 6", 4",2", 1", 0.75" )
INSULATION INSPECTION OF (COLD) PRIOR TO VAPOR BARRIER
MFC-DLM-AK- INSULATION
2003 ON HYDROTESTED @ TP-1701-01-HT-010 (T) (Pipe sizes: 30",
I-1989 INSPECTION
24", 20", 3" 2", 1", 0.75")

INSULATION 1ST & 2ND LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
2004 TO VAPOR BARRIER ON HYDROTESTED @ TP-1714-00-HT-080 (T)
I-1990 INSPECTION
(Pipe sizes: 14", 12", 6", 1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
2005 I-1991 INSPECTION CLADDING ON HYDROTESTED @ TP-1747-07-HT-001 (T) (Pipe
sizes: 2", 1", 0.75")

INSULATION INSPECTION OF ( HOT ) PRIOR TO META ON HYL


MFC-DLM-AK- INSULATION
2006 CLADDING HYDROTESTED @ TP-1747-01-HT-001 (T) (Pipe sizes:
I-1992 INSPECTION 3", 1")

INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL


MFC-DLM-AK- INSULATION
2007 CLADDING ON HYDROTESTED @ TP-1635-00-HT-001 (T) (Pipe
I-1993 INSPECTION
sizes: 2", 1")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2008 CLADDING ON HYDROTESTED @ TP-1661-01-HT-025 (T) (Pipe
I-1994 INSPECTION sizes: 36", 30", 1")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION OF (HOT) PRIOR TO INSULATION
2009 PREPARATION
I-1995 INSPECTION ON HYDROTESTED @ TP-1616-00-HT-002 (P) (Pipe sizes: 16")

INSULATION 1st, 2nd & 3rd Layer INSPECTION (COLD ) PRIOR TO


MFC-DLM-AK- INSULATION APPLICATION OF VAPOR BARRIER ( HYDROTESTED) ON WELD
2010 I-1996 INSPECTION JOINTS, SPOOL & SUPPORT @ TP-1704-02-HT-002 (Pipe sizes:
10",16",30",1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


2011 CLADDING ON HYDROTESTED LINE @ TP-1701-01-HT-005 (Pipe
I-1997 INSPECTION
sizes: 20", 14", 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2012 OF METAL HYDROTESTED LINE @ TP-1616-00-HT-002 (A) (Pipe sizes: 16",
I-1998
CLADDING 12", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
2013 I-1999 OF METAL HYDROTESTED LINE @ TP-1617-00-HT-001 (Pipe sizes: 12", 8",
CLADDING 6", 4", 2", 1", 0.75" )

2014 MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF (HOT) MINERAL FIBER
I-2000 MATERIAL BLANKET INSULATION MATERIAL
SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
2015 PREPARATION ON HYDROTESTED LINE @ TP-1611-02-HT-028 (Pipe sizes: 1.5",
I-2001
INSPECTION 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2016 PREPARATION ON HYDROTESTED LINE @ TP-1714-00-HT-002 (Pipe sizes: 12",
I-2002
INSPECTION 6" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2017 I-2003 PREPARATION ON HYDROTESTED LINE @ TP-1731-01-HT-002 (T) (Pipe sizes:
INSPECTION 16",4", 3", 2", 1" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM- VAPOR BARRIER
2018 CLADDING ON HYDROTESTED @ TP-1701-01-HT-010 (T) (Pipe
AK-I-2004 INSPECTION sizes: 30", 24", 20", 3" 2", 1", 0.75")

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2019 CLADDING ON HYDROTESTED @ TP-1714-00-HT-080 (T) (Pipe
I-2005 INSPECTION
sizes: 14", 12", 6", 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


2020
I-2006 INSPECTION ON HYDROTESTED @ TP-1616-00-HT-002 (P) (Pipe sizes: 16")

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2021 METAL CLADDING ( HYDROTESTED) ON WELD JOINTS, SPOOL &
I-2007 INSPECTION SUPPORT @ TP-1704-02-HT-002 (Pipe sizes: 10",16",30",1" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2022 I-2008 INSPECTION HYDROTESTED LINE @ TP-1701-01-HT-005 (Pipe sizes: 20", 14",
2", 1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


2023 CLADDING (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-027
I-2009 INSPECTION
(Pipe sizes: 24", 12", 1")

INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2024 VAPOR BARRIER, HYDROTESTED LINE @ TP-1691-01-HT-024
I-2010 INSPECTION
(Pipe sizes: 12", 10", 8", 6", 2", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2025 I-2011 INSPECTION ON HYDROTESTED LINE @ TP-1601-02-HT-023 (Pipe sizes:
1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


2026 MFC-DLM-AK- INSULATION ON HYDROTESTED LINE @ TP-1605-02-HT-024 (Pipe sizes: 1.5",
I-2012 INSPECTION
1", 0.75")
SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION
MFC-DLM-AK-
2027 PREPARATION ON HYDROTESTED LINE @ TP-1683-03-HT-025 (Pipe sizes: 16",
I-2013
INSPECTION 12", 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2028 PREPARATION ON HYDROTESTED LINE @ TP-1681-00-HT-022(T) (Pipe sizes: 4",
I-2014
INSPECTION 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2029 I-2015 PREPARATION ON HYDROTESTED LINE @ TP-1661-01-HT-010 (T) (Pipe sizes:
INSPECTION 12", 8", 6",4", 1", 0.75" )

PARTIAL FINAL INSPECTION OF (COLD ) METAL CLADDING


MFC-DLM-AK- PARTIAL FINAL
2030 ( HYDROTESTED) ON WELD JOINTS, SPOOL & SUPPORT @ TP-
I-2016 INSPECTION 1704-02-HT-002 (Pipe sizes: 10",16",30",1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2031 PREPARATION ON HYDROTESTED LINE @ TP-1661-01-HT-009 (T) (Pipe sizes:
I-2017
INSPECTION 4", 2", 1" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2032 PREPARATION ON HYDROTESTED LINE @ TP-1615-02-HT-023 (A) (Pipe sizes:
I-2018 INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2033 PREPARATION ON HYDROTESTED LINE @ TP-1625-00-HT-002 (A) (Pipe sizes:
I-2019 INSPECTION 1.5", 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2034 I-2020 OF METAL HYDROTESTED @ TP-1614-02-HT-021 (Pipe sizes: 36",24",8",2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING @ TP-1731-01-


2035 OF METAL
I-2021 HT-005 (Pipe sizes: 10",6",3",1",0.75")
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


2036
I-2022 INSPECTION HYDROTESTED LINES TP-1683-03-HT-003(Pipe sizes: 30",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) on


MFC-DLM-AK- PARTIAL FINAL
2037 I-2023 INSPECTION HYDROTESTED LINE @ TP-1625-00-HT-001 (Pipe sizes: 3", 2",
1", 0.75" )

IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


2038 MFC-DLM-AK- INSULATION VAPOR BARRIER (COLD) on HYDROTESTED LINE @ TP-1683-03-
I-2024 INSPECTION
HT-004 (Pipe sizes: 24", 1")
MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION (COLD) PRIOR TO METAL
2039
I-2025 INSPECTION CLADDING ON @ TP-1683-03-HT-020 (Pipe sizes: 3",1.5",1")

INSULATION 1ST & 2ND LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
2040 APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED LINE
I-2026 INSPECTION
@ TP-1681-00-HT-018 (Pipe sizes: 10", 6",4", 2", 1", 0.75")

IN-PROCESS VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- VAPOR BARRIER
2041 I-2027 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1681-00-HT-
016 (Pipe sizes: 36", 28", 1", 0.75" )

INSULATION 1ST & 2ND LAYER INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
2042 APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED LINE
I-2028 INSPECTION @ TP-1681-00-HT-007 (Pipe sizes: 36", 28", 12", 10", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2043 BARRIER (COLD) on HYDROTESTED LINE @ TP-1731-01-HT-038
I-2029 INSPECTION
(Pipe sizes: 8", 4",2",1", )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2044 PREPARATION ON HYDROTESTED LINE @ TP-1704-02-HT-003 (Pipe sizes: 8",
I-2030 INSPECTION 6",3",2", 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2045 PREPARATION ON HYDROTESTED LINE @ TP-1714-00-HT-025 (Pipe sizes:
I-2031 INSPECTION 12",10", 8", 4", 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2046 I-2032 PREPARATION ON HYDROTESTED LINE @ TP-1704-02-HT-006 (Pipe sizes:
INSPECTION 30",12", 10",2", 1" 0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


2047 PREPARATION ON HYDROTESTED LINE @ TP-1682-01-HT-006 (Pipe sizes: 24",
I-2033
INSPECTION 16", 1", )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2048 PREPARATION ON HYDROTESTED LINE @ TP-1682-01-HT-003 (Pipe sizes: 24",
I-2034
INSPECTION 16", 2", 1",0.75" )

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
2049 I-2035 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1661-01-HT-010
(T) (Pipe sizes: 12", 8", 6",4", 1", 0.75" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


2050 MFC-DLM-AK- VAPOR BARRIER CLADDING (COLD) on HYDROTESTED LINE @ TP-1681-00-HT-018
I-2036 INSPECTION
(Pipe sizes: 10", 6",4", 2", 1", 0.75")
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON @
2051
I-2037 INSPECTION TP-1683-03-HT-020 (Pipe sizes: 3",1.5",1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON @


2052
I-2038 INSPECTION TP-1681-00-HT-020 (Pipe sizes: 24",1")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2053 I-2039 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-027 (Pipe sizes: 24", 12",
1")

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2054 HYDROTESTED LINE @ TP-1681-00-HT-016 (Pipe sizes: 36", 28",
I-2040 INSPECTION 1", 0.75" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2055 HYDROTESTED LINE @ TP-1683-01-HT-001 (Pipe sizes: 24", 12",
I-2041 INSPECTION
1")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2056 CLADDING (COLD) on HYDROTESTED LINE @ TP-1681-00-HT-007
I-2042 INSPECTION (Pipe sizes: 36", 28", 12", 10", 1" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2057 CLADDING (COLD) on HYDROTESTED LINE @ TP-1731-01-HT-
I-2043 INSPECTION 038 (Pipe sizes: 8", 4",2",1", )

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2058 I-2044 INSPECTION METAL CLADDING, HYDROTESTED LINE @ TP-1691-01-HT-024
(Pipe sizes: 12", 10", 8", 6", 2", 1", 0.75" )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


2059 PREPARATION ON HYDROTESTED LINE @ TP-1631-01-HT-001 (T) (Pipe sizes:
I-2045
INSPECTION 64", 56", 24", 3", 2", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2060 PREPARATION ON HYDROTESTED LINE @ TP-1661-01-HT-022 (T) (Pipe sizes:
I-2046
INSPECTION 16", 2", 1" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2061 I-2047 PREPARATION ON HYDROTESTED LINE @ TP-1662-01-HT-019 (T) (Pipe sizes:
INSPECTION 2" )

SURFACE
2062 MFC-DLM-AK- PREPARATION PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION ON
I-2048 HYDROTESTED LINE @ TP-1662-01-HT-020 (T) (Pipe sizes: 2" )
INSPECTION
SURFACE PRE-INSULATION INSPECTION ( COLD) PRIOR TO INSULATION
MFC-DLM-AK-
2063 PREPARATION ON HYDROTESTED LINE @ TP-1704-02-HT-041 (T) (Pipe sizes:
I-2049
INSPECTION 4", 2", 1" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2064 CLADDING ON HYDROTESTED LINE @ TP-1661-01-HT-010 (T)
I-2050 INSPECTION
(Pipe sizes: 12", 8", 6",4", 1", 0.75" )

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2065 I-2051 INSPECTION METAL CLADDING, HYDROTESTED LINE @ TP-1691-01-HT-024
(Pipe sizes: 12", 10", 8", 6", 2", 1", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2066 BARRIER (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-026
I-2052 INSPECTION (Pipe sizes: 20", 18", 10", 14", 8", 6", 3",2", 1")

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2067 METAL CLADDING, HYDROTESTED LINE @ TP-1683-03-HT-004
I-2053 INSPECTION
(Pipe sizes: 24", 1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2068 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-026 (Pipe sizes: 2", 1.5",
I-2054 CLADDING 0.75")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2069 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-027 (Pipe sizes: 2", 1.5",
I-2055 CLADDING 0.75")

SURFACE PRE-INSULATION INSPECTION (COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2070 I-2056 PREPARATION ON HYDROTESTED LINE @ TP-1683-01-HT-004 (T) (Pipe sizes:
INSPECTION 10", 8", 6", 1", )

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION (COLD ) PRIOR TO INSULATION


2071 PREPARATION ON HYDROTESTED LINE @ TP-1683-01-HT-005 (T) (Pipe sizes:
I-2057
INSPECTION 12", 10", 6", 3", 1", )

SURFACE PRE-INSULATION INSPECTION (COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2072 PREPARATION ON HYDROTESTED LINE @ TP-1661-01-HT-009 (T) (Pipe sizes:
I-2058
INSPECTION 4", 2", 1" )

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2073 I-2059 INSPECTION CLADDING ON HYDROTESTED @ TP-1701-01-HT-010 (T) (Pipe
sizes: 30", 24", 20", 3" 2", 1", 0.75")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


2074 MFC-DLM-AK- VAPOR BARRIER CLADDING (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-
I-2060 INSPECTION
026 (Pipe sizes: 20", 18", 10", 14", 8", 6", 3",2", 1")
IN-PROCESS INSULATION 1st, 2nd & 3rd Layer INSPECTION PRIOR
MFC-DLM-AK- INSULATION
2075 TO APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED
I-2061 INSPECTION
LINE @ TP-1683-02-HT-023 (Pipe sizes: 10", 4", 3", 2", 1")

IN-PROCESS INSULATION 1st, 2nd & 3rd Layer INSPECTION PRIOR


MFC-DLM-AK- INSULATION
2076 TO APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED
I-2062 INSPECTION
LINE @ TP-1683-02-HT-024 (Pipe sizes: 10", 6", 2")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (COLD) METAL CLADDING, HYDROTESTED
2077 I-2063 OF METAL LINE @ TP-1731-01-HT-038 (Pipe sizes: 8", 4",2",1", )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (COLD) METAL CLADDING, HYDROTESTED
2078 OF METAL
I-2064 CLADDING LINE @ TP-1683-03-HT-004 (Pipe sizes: 24", 1")

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINES ON WELD JOINTS,SUPPORT & SPOOL TP-
2079
I-2065 INSPECTION 1455-00-HT-001 (GA) & (P) (Pipe sizes: 16", 12",8", 6", 2", 1.5",
1", 0.75" )

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING on


MFC-DLM-AK- PARTIAL FINAL
2080 HYDROTESTED LINE @ TP-1681-00-HT-007 (Pipe sizes: 36", 28",
I-2066 INSPECTION 12", 10", 1" )

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING on


MFC-DLM-AK- PARTIAL FINAL
2081 HYDROTESTED LINE @ TP-1681-00-HT-018 (Pipe sizes: 10", 6",
I-2067 INSPECTION 4", 2", 1", 075" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2082 I-2068 PREPARATION ON HYDROTESTED LINE @ TP-1683-03-HT-006 (T) (Pipe sizes:
INSPECTION 24",16", 2", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


2083 ON HYDROTESTED LINE @ TP-1625-00-HT-002 (A) (Pipe sizes:
I-2069 INSPECTION
1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2084 PREPARATION ON HYDROTESTED LINE @ TP-1615-02-HT-025 (A) (Pipe sizes:
I-2070
INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2085 I-2071 PREPARATION ON HYDROTESTED LINE @ TP-1615-02-HT-026 (A) (Pipe sizes:
INSPECTION 1.5", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


2086 MFC-DLM-AK- PREPARATION ON HYDROTESTED LINE @ TP-1615-02-HT-027 (A) (Pipe sizes:
I-2072
INSPECTION 1.5", 1", 0.75" )
SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
2087 PREPARATION ON HYDROTESTED LINE @ TP-1615-02-HT-028 (A) (Pipe sizes:
I-2073
INSPECTION 1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2088 ON HYDROTESTED LINE @ TP-1615-02-HT-023 (A) (Pipe sizes:
I-2074 INSPECTION
1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2089 I-2075 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1613-02-HT-
021 (Pipe sizes: 36",24", 8", 2")

INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
2090 ON HYDROTESTED LINE @ TP-1661-01-HT-009 (T) (Pipe sizes:
I-2076 INSPECTION 4", 2", 1" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2091 CLADDING (COLD) on HYDROTESTED LINE @ TP-1683-02-HT-023
I-2077 INSPECTION
(Pipe sizes: 10", 4", 3", 2", 1")

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2092 CLADDING (COLD) on HYDROTESTED LINE @ TP-1683-02-HT-024
I-2078 INSPECTION (Pipe sizes: 10", 6", 2")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2093 OF METAL HYDROTESTED LINES@ TP-1614-02-HT-022 on 3", 2", 1", 0.75"
I-2079 CLADDING Line

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2094 I-2080 OF METAL HYDROTESTED @ TP-1611-02-HT-001 (Pipe sizes: 36",2",1",0.75"
CLADDING )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2095 OF METAL
I-2081 HYDROTESTED LINE @ TP-1615-02-HT-022 (Pipe sizes: 3",2", 1",)
CLADDING

FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2096 HYDROTESTED LINE @ TP-1611-02-HT-021 (Pipe sizes:
I-2082 INSPECTION
36",24",8",2" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2097 I-2083 PREPARATION ON HYDROTESTED LINE @ TP-1681-00-HT-025 (T) (Pipe sizes:
INSPECTION 30", 24", 20",14", 12", 3",1", 0.75" )

INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER


2098 MFC-DLM-AK- INSULATION ON HYDROTESTED LINE @ TP-1683-03-HT-006 (T) (Pipe sizes:
I-2084 INSPECTION
24",16", 2", 1" )
SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION
MFC-DLM-AK-
2099 PREPARATION ON HYDROTESTED LINE @ TP-1662-01-HT-015 (T) (Pipe sizes:
I-2085
INSPECTION 20", 10", 8", 4", 2", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-
2100 PREPARATION ON HYDROTESTED LINE @ TP-1632-02-HT-002 (GA) (Pipe sizes:
AK-I-2086
INSPECTION 6", 2", 1" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2101 I-2087 PREPARATION ON HYDROTESTED LINE @ TP-1631-04-HT-028 (GA) (Pipe sizes:
INSPECTION 6", 4", 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION ( HOT ) PRIOR TO INSULATION


MFC-DLM-AK-
2102 PREPARATION ON HYDROTESTED LINE @ TP-1631-04-HT-040 (GA) (Pipe sizes:
I-2088 INSPECTION 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2103 PREPARATION ON HYDROTESTED LINE @ TP-1683-02-HT-040 (T) (Pipe sizes:
I-2089
INSPECTION 4", 3", 2", 1" )

SURFACE PRE-INSULATION INSPECTION ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2104 PREPARATION ON HYDROTESTED LINE @ TP-1714-00-HT-024 (T) (Pipe sizes:
I-2090 INSPECTION 4", 3", 2", 1" )

INSULATION 1st & 2nd Layer INSPECTION ( HOT ) PRIOR TO


MFC-DLM-AK- INSULATION
2105 METAL CLADDING ON HYDROTESTED LINE @ TP-1682-01-HT-
I-2091 INSPECTION 006 (Pipe sizes: 24", 16", 1", )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (COLD ) METAL CLADDING on
2106 I-2092 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-023 (Pipe sizes: 10", 4",
CLADDING 3", 2", 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF(COLD) METAL CLADDING on


2107 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-024 (Pipe sizes: 10", 6",
I-2093
CLADDING 2")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2108 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-023 (A) (Pipe sizes: 1.5",
I-2094
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (COLD ) METAL CLADDING ON
2109 I-2095 OF METAL HYDROTESTED LINES @ TP-1683-03-HT-014 (Pipe sizes:
CLADDING 6",2",3",1.5")

PARTIAL FINAL INSPECTION OF(COLD) METAL CLADDING


2110 MFC-DLM-AK- PARTIAL FINAL (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-026 (Pipe
I-2096 INSPECTION
sizes: 20", 18", 10", 14", 8", 6", 3",2", 1")
INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
2111 METAL CLADDING ON HYDROTESTED LINE @ TP-1614-02-HT-023
I-2097 INSPECTION
(Pipe sizes: ,1.5",1",3/4")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2112 METAL CLADDING ON HYDROTESTED LINE @ TP-1614-02-HT-025
I-2098 INSPECTION
(Pipe sizes: 1.5", 1",,3/4")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2113 I-2099 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1614-02-HT-028
(Pipe sizes: 1.5",1",3/4")

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2114 ON HYDROTESTED LINE @ TP-1615-02-HT-025 (A) (Pipe sizes:
I-2100 INSPECTION 1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2115 ON HYDROTESTED LINE @ TP-1615-02-HT-026 (A) (Pipe sizes:
I-2101 INSPECTION
1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2116 ON HYDROTESTED LINE @ TP-1615-02-HT-027 (A) (Pipe sizes:
I-2102 INSPECTION 1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2117 ON HYDROTESTED LINE @ TP-1615-02-HT-028 (A) (Pipe sizes:
I-2103 INSPECTION 1.5", 1", 0.75" )

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
2118 I-2104 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1683-01-HT-005
(T) (Pipe sizes: 12", 10", 6", 3", 1", )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


2119 CLADDING ON HYDROTESTED LINE @ TP-1701-01-HT-002 (Pipe
I-2105 INSPECTION
sizes: 24",2",0.75")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2120 CLADDING ON HYDROTESTED LINE @ TP-1661-01-HT-009 (T)
I-2106 INSPECTION
(Pipe sizes: 4", 2", 1" )

IN-PROCESS 1st & 2nd LAYER INSULATION INSPECTION ( COLD )


MFC-DLM-AK- INSULATION
2121 I-2107 INSPECTION PRIOR TO VAPOR BARRIER ON HYDROTESTED LINE @ TP-1681-
00-HT-025 (T) (Pipe sizes: 30", 24", 20",14", 12", 3",1", 0.75" )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


2122 MFC-DLM-AK- VAPOR BARRIER CLADDING ON HYDROTESTED LINE @ TP-1683-03-HT-006 (T)
I-2108 INSPECTION
(Pipe sizes: 24",16", 2", 1" )
SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO
MFC-DLM-AK-
2123 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1704-
I-2109
INSPECTION 02-HT-028 (Pipe sizes: 10",8", 6",3", 2",1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2124 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1631-
I-2110
INSPECTION 04-HT-042 (Pipe sizes: 3", 2", )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2125 I-2111 INSPECTION ON HYDROTESTED LINE @ TP-1603-02-HT-023 (Pipe sizes: 1.5",
1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2126 METAL CLADDING ON HYDROTESTED LINE @ TP-1604-02-HT-
I-2112 INSPECTION 023 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2127 METAL CLADDING ON HYDROTESTED LINE @ TP-1605-02-HT-
I-2113 INSPECTION
023 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2128 METAL CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-
I-2114 INSPECTION 023 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION ( HOT)PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2129 METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
I-2115 INSPECTION 023 (Pipe sizes: 1.5", 1", 0.75" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2130 I-2116 INSPECTION HYDROTESTED LINE @ TP-1683-03-HT-006 (T) (Pipe sizes:
24",16", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2131 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-025 (A) (Pipe sizes: 1.5",
I-2117
CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2132 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-026 (A) (Pipe sizes: 1.5",
I-2118
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2133 I-2119 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-027 (A) (Pipe sizes: 1.5",
CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2134 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1615-02-HT-028 (A) (Pipe sizes: 1.5",
I-2120
CLADDING 1", 0.75" )
INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
2135 METAL CLADDING (HOT) @ TP-1607-02-HT-022 (Pipe sizes: ,3",
I-2121 INSPECTION
2", 1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2136 ON HYDROTESTED LINE @ TP-1603-02-HT-027 (Pipe sizes: 1",
I-2122 INSPECTION
0.75" )

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
2137 I-2123 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1683-01-HT-004
(T) (Pipe sizes: 10", 8", 6", 1", )

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2138 CLADDING ON HYDROTESTED LINE @ TP-1683-01-HT-005 (T)
I-2124 INSPECTION (Pipe sizes: 12", 10", 6", 3", 1", )

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


MFC-DLM-AK- INSULATION
2139 VAPOR BARRIER ON HYDROTESTED LINE @ TP-1681-00-HT-
I-2125 INSPECTION
022(T) (Pipe sizes: 4", 1")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
2140 CLADDING (HOT) on HYDROTESTED LINE @ TP-1632-03-HT-001
I-2126 INSPECTION (GA) (Pipe sizes: 4")

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2141 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1771-
I-2127 INSPECTION 00-HT-018 (GA) (Pipe sizes: 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2142 I-2128 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1634-
INSPECTION 00-HT-025 (GA) (Pipe sizes: 2", 1" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


2143 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1634-
I-2129
INSPECTION 00-HT-024 (GA) (Pipe sizes: 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2144 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1631-
I-2130
INSPECTION 01-HT-003 (Pipe sizes: 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2145 I-2131 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1452-
INSPECTION 00-HT-018 (Pipe sizes: 3", 2", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2146 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1612-02-HT-021 (A) (Pipe sizes: 36",
I-2132
CLADDING 24", 8", 2" )
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
MFC-DLM-AK-
2147 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-022 (A) (Pipe sizes: 3",
I-2133
CLADDING 2", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2148 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-026 (Pipe sizes: 2", 1.5"
I-2134
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2149 I-2135 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-027 (Pipe sizes: 2", 1.5",
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2150 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-023 (Pipe sizes: 2", 1.5",
I-2136 CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2151 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-025 (Pipe sizes: 2", 1.5",
I-2137
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF( HOT ) METAL CLADDING ON
2152 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-028 (Pipe sizes: 2", 1.5",
I-2138 CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2153 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-030 (Pipe sizes: 2", 1.5",
I-2139 CLADDING 1", 0.75" )

INSULATION INSPECTION ( COLD ) PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
2154 I-2140 INSPECTION ON HYDROTESTED LINE @ TP-1714-00-HT-002 (T) (Pipe sizes:
12", 6" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


2155 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1641-
I-2141
INSPECTION 00-HT-023 (GA) (Pipe sizes: 36", 2" )

VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2156 CLADDING ON HYDROTESTED LINE @ TP-1683-01-HT-004 (T)
I-2142 INSPECTION
(Pipe sizes: 10", 8", 6", 1", )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


2157 I-2143 INSPECTION HYDROTESTED @ TP-1661-01-HT-009 (T) (Pipe sizes: 4", 2", 1" )

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


2158 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED @ TP-1661-01-HT-010 (T) (Pipe sizes: 12", 8",
I-2144 INSPECTION
6",4", 1", 0.75" )
PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON
MFC-DLM-AK- PARTIAL FINAL
2159 HYDROTESTED @ TP-1661-01-HT-025 (T) (Pipe sizes: 36", 30",
I-2145 INSPECTION
1")

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING ON


MFC-DLM-AK-
2160 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-026 (Pipe sizes: 36", 2",
I-2146
CLADDING 1", 0.75" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2161 I-2147 INSPECTION HYDROTESTED LINE @ TP-1683-01-HT-005 (T) (Pipe sizes: 12",
10", 6", 3", 1", )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2162 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1682-
I-2148 INSPECTION 01-HT-002 (T) (Pipe sizes: 36", 2",1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2163 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1632-
I-2149
INSPECTION 01-HT-003 (G) (Pipe sizes: 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2164 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1631-
I-2150 INSPECTION 04-HT-030 (GA) (Pipe sizes: 2", 1" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2165 METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
I-2151 INSPECTION 024 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2166 I-2152 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
025 (Pipe sizes: 1.5", 1", 0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


2167 METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
I-2153 INSPECTION
026 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2168 METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
I-2154 INSPECTION
027 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION 1st & 2nd LAYER INSPECTION (COLD) PRIOR TO


MFC-DLM-AK- INSULATION
2169 I-2155 INSPECTION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1704-02-HT-003
(Pipe sizes: 8", 6",3",2", 1.5", 1", 0.75" )

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING ON


2170 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1683-01-HT-004 (T) (Pipe sizes: 10",
I-2156 INSPECTION
8", 6", 1", )
VAPOR BARRIER INSPECTION (COLD ) PRIOR TO METAL
MFC-DLM-AK- VAPOR BARRIER
2171 CLADDING ON HYDROTESTED LINE @ TP-1714-00-HT-002 (T)
I-2157 INSPECTION
(Pipe sizes: 12", 6" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) @


2172
I-2158 INSPECTION TP-1611-02-HT-027 (Pipe sizes: 2", 1.5", 0.75' )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) @


2173 I-2159 INSPECTION TP-1611-02-HT-026 (Pipe sizes: 2", 1.5", 0.75' )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2174 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1611-
I-2160 INSPECTION 02-HT-023 (Pipe sizes: 2", 1.5",1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2175 ON HYDROTESTED LINE @ TP-1611-02-HT-028 (Pipe sizes: 2",
I-2161 INSPECTION
1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2176 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1611-
I-2162 INSPECTION 02-HT-025 (Pipe sizes: 2", 1.5",1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2177 PREPARATION APPLICATION OF INSULATION HYDROTESTED LINE @ TP-1612-
I-2163 INSPECTION 02-HT-023 (Pipe sizes: 2", 1.5",1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-
2178 AK-I-2164 OF METAL HYDROTESTED LINE @ TP-1625-00-HT-002 (A) (Pipe sizes: 12",
CLADDING 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


2179 OF METAL HYDROTESTED LINE @ TP-1611-02-HT-022 on 3", 2", 1", 0.75"
I-2165
CLADDING Line

FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


MFC-DLM-AK-
2180 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-022 on 3", 2", 1", 0.75"
I-2166
CLADDING Line

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF( HOT ) METAL CLADDING ON


2181 I-2167 OF METAL HYDROTESTED LINE @ TP-1512-01-HT-038 (Pipe sizes: ,3", 1" )
CLADDING

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


2182 MFC-DLM-AK- INSULATION ON HYDROTESTED LINE @ TP-1612-02-HT-026 (Pipe sizes: 2",
I-2168 INSPECTION
1.5", 1", 0.75" )
INSULATION INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- INSULATION
2183 CLADDING (HOT) @ TP-1612-02-HT-027 (Pipe sizes: 2", 1.5",
I-2169 INSPECTION
0.75' )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2184 ON HYDROTESTED LINE @ TP-1612-02-HT-028 (Pipe sizes: 2",
I-2170 INSPECTION
1.5", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2185 I-2171 PREPARATION APPLICATION OF INSULATION @ TP-1454-00-HT-001 (A) (Pipe
INSPECTION sizes: 12", 10", 2", 1" )

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2186 PREPARATION APPLICATION OF INSULATION @ TP-1631-02-HT-004(GA) (Pipe
I-2172 INSPECTION sizes: 4", 3/4")

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2187 ON HYDROTESTED LINE @ TP-1682-01-HT-003 (Pipe sizes: 24",
I-2173 INSPECTION
16", 2", 1",0.75" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2188 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-003 (ARCC)
I-2174 INSPECTION (Pipe sizes: 4", 3", 2" )

INSULATION INSPECTION (HOT) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2189 HYDROTESTED LINE @ TP-1682-01-HT-002 (T) (Pipe sizes: 36",
I-2175 INSPECTION 2",1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2190 I-2176 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-006 (A) (Pipe
INSPECTION sizes: 3", 2" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


2191 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-007 (A) (Pipe
I-2177
INSPECTION sizes: 3", 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2192 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-008 (A) (Pipe
I-2178
INSPECTION sizes: 3", 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2193 I-2179 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-011 (A) (Pipe
INSPECTION sizes: 3", 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


2194 MFC-DLM-AK- PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-012 (A) (Pipe
I-2180
INSPECTION sizes: 3", 2" )
SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO
MFC-DLM-AK-
2195 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-013 (A) (Pipe
I-2181
INSPECTION sizes: 3", 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2196 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-014 (A) (Pipe
I-2182
INSPECTION sizes: 3", 2" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2197 I-2183 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-015 (A) (Pipe
INSPECTION sizes: 3", 2" )

INSULATION 1ST & 2ND LAYER INSPECTION OF ( COLD ) PRIOR


MFC-DLM-AK- INSULATION
2198 TO VAPOR BARRIER ON HYDROTESTED LINES TP-1714-00-HT-077
I-2184 INSPECTION (Pipe sizes: 36",2",1")

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2199 ON HYDROTESTED LINE TP-1611-02-HT-023 (Pipe sizes: 2",
I-2185 INSPECTION
1.5",1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2200 ON HYDROTESTED LINE @ TP-1611-02-HT-025 (Pipe sizes: 2",
I-2186 INSPECTION 1.5",1", 0.75" )

INSULATION INSPECTION ( HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2201 ON HYDROTESTED LINE @ TP-1612-02-HT-023 (Pipe sizes: 2",
I-2187 INSPECTION 1.5",1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2202 I-2188 OF METAL HYDROTESTED LINE @ TP-1611-02-HT-028 (Pipe sizes: 2", 1.5",
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) @ TP-1611-02-


2203 OF METAL
I-2189 HT-026 (Pipe sizes: 2", 1.5", 0.75' )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) @ TP-1611-02-
2204 OF METAL
I-2190 HT-027 (Pipe sizes: 2", 1.5", 0.75' )
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2205 I-2191 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-026 (Pipe sizes: 2", 1.5",
CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2206 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1612-02-HT-027 (Pipe sizes: 2", 1.5",
I-2192
CLADDING 0.75' )
FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
MFC-DLM-AK-
2207 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-028 (Pipe sizes: 2", 1.5",
I-2193
CLADDING 1", 0.75" )

PARTIAL FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2208 HYDROTESTED LINE @ TP-1682-01-HT-003 (Pipe sizes: 24", 16",
I-2194 INSPECTION
2", 1",0.75" )

PARTIAL FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
2209 I-2195 INSPECTION HYDROTESTED LINE @ TP-1714-00-HT-023 (Pipe sizes: 30",
24", 18", 16", 14", 12", 10", 8", 6", 4",2", 1", 0.75" )

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2210 PREPARATION APPLICATION OF INSULATION @ TP-1704-02-HT-015(T) (Pipe
I-2196 INSPECTION sizes: 48", 42", 40", 36", 24", 2", 1")

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2211 PREPARATION APPLICATION OF INSULATION @ TP-1632-03-HT-002 (Pipe
I-2197
INSPECTION sizes: 1" )

SURFACE
MFC-DLM-AK- SURFACE PREPARATION INSPECTION (HOT) PRIOR TO
2212 PREPARATION
I-2198 INSPECTION APPLICATION OF INSULATION @ TP-1454-00-HT-001 (T)

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2213 PREPARATION APPLICATION OF INSULATION @ TP-1731-01-HT-020 (T)
I-2199 INSPECTION Debutanizer (Pipe sizes: 10", 4", 1" )

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2214 I-2200 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-005 (A) (Pipe
INSPECTION sizes: 3", 2" )

MFC-DLM-AK- SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


2215 PREPARATION APPLICATION OF INSULATION @ TP-1471-00-HT-010 (A) (Pipe
I-2201
INSPECTION sizes: 3", 2" )

VAPOR BARRIER INSPECTION OF ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2216 CLADDING ON HYDROTESTED LINES TP-1714-00-HT-077 (Pipe
I-2202 INSPECTION
sizes: 36",2",1")

VAPOR BARRIER INSPECTION ( COLD ) PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2217 I-2203 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1681-00-HT-022(T)
(Pipe sizes: 4", 1" )

INSULATION 1st & 2nd Layer INSPECTION ( COLD ) PRIOR TO


2218 MFC-DLM-AK- INSULATION VAPOR BARRIER ON HYDROTESTED LINE @ TP-1704-02-HT-006
I-2204 INSPECTION
(Pipe sizes: 30",12", 10",2", 1" 0.75" )
SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO
MFC-DLM-AK-
2219 PREPARATION APPLICATION OF INSULATION @ TP-1671-01-HT-001(T) (Pipe
I-2205
INSPECTION sizes: 36", 30",2",1")

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2220 PREPARATION APPLICATION OF INSULATION @ TP-1662-01-HT-003(T) (Pipe
I-2206
INSPECTION sizes: 6", 4", 3", 2", 1")

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2221 I-2207 PREPARATION APPLICATION OF INSULATION @ TP-1691-01-HT-008(T) (Pipe
INSPECTION sizes: 8", 6", 4", 3", 2", 1", 0.75",)

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2222 PREPARATION APPLICATION OF INSULATION @ TP-1661-01-HT-011(T) (Pipe
I-2208 INSPECTION sizes: 36",2",1",0.75")

SURFACE SURFACE PREPARATION INSPECTION (COLD) PRIOR TO


MFC-DLM-AK-
2223 PREPARATION APPLICATION OF INSULATION @ TP-1704-02-HT-013(T) (Pipe
I-2209
INSPECTION sizes: 24",2", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM-
2224 OF METAL HYDROTESTED LINE TP-1611-02-HT-023 (Pipe sizes: 2", 1.5",1",
AK-I-2210 CLADDING 0.75" )

FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


MFC-DLM- PARTIAL FINAL
2225 HYDROTESTED LINE @ TP-1611-02-HT-025 (Pipe sizes: 2",
AK-I-2211 INSPECTION 1.5",1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2226 I-2212 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-023 (Pipe sizes: 2",
CLADDING 1.5",1", 0.75" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF( HOT ) METAL CLADDING ON
2227 HYDROTESTED LINE @ TP-1625-00-HT-002 (A) (Pipe sizes: 12",
I-2213 INSPECTION
2", 1" )

INSULATION 1st & 2nd Layer INSPECTION OF ( HOT ) PRIOR TO


MFC-DLM-AK- INSULATION
2228 METAL CLADDING ON HYDROTESTED LINE @ TP-1631-04-HT-
I-2214 INSPECTION
027 (GA) (Pipe sizes: 8", 4", 3" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
2229 I-2215 INSPECTION CLADDING (HOT) on HYDROTESTED LINE @ TP-1631-04-HT-049
(GA) (Pipe sizes: 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


2230 MFC-DLM-AK- INSULATION CLADDING (HOT) on HYDROTESTED LINE @ TP-1631-04-HT-050
I-2216 INSPECTION
(GA) (Pipe sizes: 1" )
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
2231 CLADDING ON HYDROTESTED LINE @ TP-1744-01-HT-010 (GA)
I-2217 INSPECTION
(Pipe sizes: 2", 1", 0.75" )

INSULATION 1st, 2nd & 3rd Layer INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
2232 APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED LINE
I-2218 INSPECTION
@ TP-1684-01-HT-001 (Pipe sizes: 30", 8", 2", 1")

INSULATION 1st & 2nd layer INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED LINE
2233 I-2219 INSPECTION @ TP-1714-00-HT-024 (T) (Pipe sizes: 36", 30", 14", 12", 6", 4",
1",. 0.75" )

INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2234 VAPOR BARRIER @ TP-1661-01-HT-011(T) (Pipe sizes:
I-2220 INSPECTION 36",2",1",0.75")

INSULATION 1st , 2nd & 3rd layer INSPECTION PRIOR TO


MFC-DLM-AK- INSULATION
2235 APPLICATION OF VAPOR BARRIER (COLD) on HYDROTESTED LINE
I-2221 INSPECTION
@ TP-1704-02-HT-013(T) (Pipe sizes: 24",2", 1", 0.75")

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2236 PREPARATION APPLICATION OF INSULATION @ TP-1601-02-HT-025(A) (Pipe
I-2222 INSPECTION sizes: 1.5", 1",0.75")

SURFACE SURFACE PREPARATION INSPECTION (HOT) PRIOR TO


MFC-DLM-AK-
2237 PREPARATION APPLICATION OF INSULATION @ TP-1601-02-HT-026(A) (Pipe
I-2223 INSPECTION sizes: 1.5", 1",0.75")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
2238 I-2224 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1613-02-HT-025 (Pipe
sizes: 2",1.5", 1",3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING (HOT) @ TP-
2239 OF METAL
I-2225 1601-02-HT-022 (Pipe sizes: ,3", 2", 1", 0.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING @ TP-1601-02-
2240 OF METAL
I-2226 HT-001 (Pipe sizes: ,30",2",1")
CLADDING

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- INSULATION
2241 I-2227 INSPECTION CLADDING ON HYDROTESTED LINE @ TP-1613-02-HT-028 (Pipe
sizes: 2",1.5", 1" ,3/4")

INSULATION INSPECTION PRIOR TO APPLICATION OF METAL


2242 MFC-DLM-AK- INSULATION CLADDING ON HYDROTESTED LINE @ TP-1613-02-HT-023 (Pipe
I-2228 INSPECTION
sizes: 2",1.5, 1",3/4")
INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL
MFC-DLM-AK- INSULATION
2243 CLADDING ON HYDROTESTED @ TP-1601-02-HT-028 (Pipe sizes:
I-2229 INSPECTION
1.5",1",0.75" )

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-
2244 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1456-00-HT-007
AK-I-2230
INSPECTION (Pipe sizes: 36",12",8", 4",3", 2", 1" )

INSULATION INSPECTION OF (HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2245 I-2231 INSPECTION ON HYDROTESTED @ TP-1731-01-HT-002 (T) (Pipe sizes:
16",4", 3", 2", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF (HOT ) PRIOR TO METAL CLADDING


2246
I-2232 INSPECTION ON HYDROTESTED @ TP-1712-02-HT-004 (Pipe sizes: 4",3" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2247 CLADDING (COLD) on HYDROTESTED LINE @ TP-1704-02-HT-006
I-2233 INSPECTION
(Pipe sizes: 30",12", 10",2", 1" 0.75" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2248 CLADDING (COLD) on HYDROTESTED LINE @ TP-1714-00-HT-024
I-2234 INSPECTION (T) (Pipe sizes: 36", 30", 14", 12", 6", 4", 1",. 0.75" )

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


MFC-DLM-AK- VAPOR BARRIER
2249 CLADDING (COLD) on HYDROTESTED LINE @ TP-1661-01-HT-
I-2235 INSPECTION 011(T) (Pipe sizes: 36",2",1",0.75")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2250 I-2236 OF METAL HYDROTESTED @ TP-1601-02-HT-023 (Pipe sizes: 1.5",1",0.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2251 OF METAL
I-2237 HYDROTESTED @ TP-1601-02-HT-024 (Pipe sizes: 1.5",1",0.75" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2252 OF METAL
I-2238 HYDROTESTED @ TP-1601-02-HT-027 (Pipe sizes: 1.5",1",0.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2253 I-2239 OF METAL HYDROTESTED @ TP-1601-02-HT-028 (Pipe sizes: 1.5",1",0.75" )
CLADDING

VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL


2254 MFC-DLM-AK- VAPOR BARRIER CLADDING (COLD) on HYDROTESTED LINE @ TP-1704-02-HT-
I-2240 INSPECTION
013(T) (Pipe sizes: 24",2", 1", 0.75")
VAPOR BARRIER INSPECTION PRIOR TO APPLICATION OF METAL
MFC-DLM-AK- VAPOR BARRIER
2255 CLADDING (COLD) on HYDROTESTED LINE @ TP-1681-00-HT-025
I-2241 INSPECTION
(T) (Pipe sizes: 30", 24", 20",14", 12", 3",1", 0.75" )

INSULATION 1st & 2nd Layer INSPECTION (COLD) PRIOR TO


MFC-DLM-AK- INSULATION
2256 APPLICATION OF VAPOR BARRIER @ TP-1691-01-HT-008(T)
I-2242 INSPECTION
(Pipe sizes: 8", 6", 4", 3", 2", 1", 0.75",)

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2257 I-2243 INSPECTION METAL CLADDING @ TP-1601-02-HT-025(A) (Pipe sizes: 1.5",
1",0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2258 METAL CLADDING @ TP-1601-02-HT-026(A) (Pipe sizes: 1.5",
I-2244 INSPECTION 1",0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2259 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1681-00-HT-001 (Pipe
I-2245
INSPECTION sizes: 36", 30",2", 1")

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2260 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe
I-2246 INSPECTION sizes: 30", 12", 10", 8", 6", 4", 3", 2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2261 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1701-01-HT-004 (Pipe
I-2247 INSPECTION sizes: 24", 20",18", 16", 14",2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2262 I-2248 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1471-00-HT-009 (Pipe
INSPECTION sizes: 3", 2")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


2263 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1471-00-HT-001 (Pipe
I-2249
INSPECTION sizes: 3", 2")

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING


MFC-DLM- INSULATION
2264 ON HYDROTESTED @ TP-1456-00-HT-007 (Pipe sizes:
AK-I-2250 INSPECTION
36",12",8", 4",3", 2", 1" )

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2265 I-2251 INSPECTION ON HYDROTESTED @ TP-1454-01-HT-001 (A) (Pipe sizes: 12",
10", 2", 1" )

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING


2266 MFC-DLM-AK- INSULATION ON HYDROTESTED @ TP-1454-01-HT-001 (T) (Pipe sizes: 3", 2",
I-2252 INSPECTION
0.75" )
INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING
MFC-DLM-AK- INSULATION
2267 ON HYDROTESTED @ TP-1631-04-HT-030 (GA) (Pipe sizes: 2",
I-2253 INSPECTION
1" )

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
2268 HYDROTESTED @ TP-1466-00-HT-016 (GA) (Pipe sizes: 18", 8",
I-2254 INSPECTION
6" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


2269 I-2255 INSPECTION HYDROTESTED @ TP-1634-00-HT-024 (GA) (Pipe sizes: 2", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


2270
I-2256 INSPECTION HYDROTESTED @ TP-1634-00-HT-025 (GA) (Pipe sizes: 2", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2271 OF METAL
I-2257 HYDROTESTED @ TP-1514-01-HT-030 (Pipe sizes: 6",3",0.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2272 OF METAL
I-2258 CLADDING HYDROTESTED @ TP-1514-01-HT-031 (Pipe sizes: 6",3",0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2273 OF METAL
I-2259 CLADDING HYDROTESTED @ TP-1515-01-HT-030 (Pipe sizes: 6",3",0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2274 I-2260 OF METAL HYDROTESTED @ TP-1515-01-HT-031 (Pipe sizes: 6",3",0.75" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( HOT ) METAL CLADDING ON


2275 OF METAL
I-2261 HYDROTESTED @ TP-1714-00-HT-002 (Pipe sizes: 12", 6" )
CLADDING

PARTIAL FINAL INSPECTION OF (COLD) METAL CLADDING on


MFC-DLM-AK- PARTIAL FINAL
2276 HYDROTESTED LINE @ TP-1704-02-HT-013(T) (Pipe sizes:
I-2262 INSPECTION
24",2", 1", 0.75")

INSULATION 1st & 2nd Layer INSPECTION (COLD) PRIOR TO


MFC-DLM-AK- INSULATION
2277 I-2263 INSPECTION APPLICATION OF VAPOR BARRIER ON HYDROTESTED LINE @ TP-
1701-01-HT-007(T) (Pipe sizes: 10", 8", 6", 3", 2", 1", 0.75",)

INSULATION 1st & 2nd Layer INSPECTION (COLD) PRIOR TO


2278 MFC-DLM-AK- INSULATION APPLICATION OF VAPOR BARRIER ON HYDROTESTED LINE @ TP-
I-2264 INSPECTION
1704-02-HT-028(T) (Pipe sizes: 10", 8", 6", 3", 2", 1", 0.75",)
IN-PROCESS INSULATION 1st, 2nd & 3rd Layer INSPECTION
MFC-DLM-AK- INSULATION
2279 (COLD) PRIOR TO APPLICATION OF VAPOR BARRIER @ TP-1704-
I-2265 INSPECTION
02-HT-015(T) (Pipe sizes: 48", 42", 40", 36", 24", 2", 1")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2280 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-025(A)
I-2266
INSPECTION (Pipe sizes: 1.5", 1",0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2281 I-2267 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1602-02-HT-026(A)
INSPECTION (Pipe sizes: 1.5", 1",0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2282 METAL CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-
I-2268 INSPECTION 027(A) (Pipe sizes: 1.5", 1",0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2283 METAL CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-
I-2269 INSPECTION
028(A) (Pipe sizes: 1.5", 1",0.75")

MATERIAL
MFC-DLM-AK- INSPECTION OF MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
2284
I-2270 HOT INSULATION MATERIAL
MATERIAL

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2285 METAL CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-
I-2271 INSPECTION 025(A) (Pipe sizes: 1.5", 1",0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2286 I-2272 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1602-02-HT-
026(A) (Pipe sizes: 1.5", 1",0.75")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2287 OF METAL HYDROTESTED LINE @ TP-1601-02-HT-025(A) (Pipe sizes: 1.5",
I-2273
CLADDING 1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2288 OF METAL HYDROTESTED LINE @ TP-1601-02-HT-026(A) (Pipe sizes: 1.5",
I-2274
CLADDING 1",0.75")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING ON
2289 I-2275 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-027(A) (Pipe sizes: 1.5",
CLADDING 1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2290 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1602-02-HT-028(A) (Pipe sizes: 1.5",
I-2276
CLADDING 1",0.75")
FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON
MFC-DLM-AK-
2291 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-022(A) (Pipe sizes: 3",
I-2277
CLADDING 2", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2292 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-023(A) (Pipe sizes: 1.5",
I-2278
CLADDING 1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2293 I-2279 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-024(A) (Pipe sizes: 1.5",
CLADDING 1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2294 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-023 (Pipe sizes: 2",1.5,
I-2280 CLADDING 1",3/4")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2295 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-025 (Pipe sizes: 2",1.5",
I-2281
CLADDING 1",3/4")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING ON
2296 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-028 (Pipe sizes: 2",1.5",
I-2282 CLADDING 1" ,3/4")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2297 METAL CLADDING ON HYDROTESTED LINE @ TP-1662-01-HT-
I-2283 INSPECTION 019(T) (Pipe sizes: 2")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2298 I-2284 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1662-01-HT-
020(T) (Pipe sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


2299 METAL CLADDING ON HYDROTESTED LINE @ TP-1661-01-HT-
I-2285 INSPECTION
022(T) (Pipe sizes: 16", 2", 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


2300
I-2286 INSPECTION HYDROTESTED @ TP-1471-00-HT-012 (A) (Pipe sizes: 3", 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


2301 I-2287 INSPECTION HYDROTESTED @ TP-1471-00-HT-013 (A) (Pipe sizes: 3", 2" )

2302 MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


I-2288 INSPECTION HYDROTESTED @ TP-1471-00-HT-014 (A) (Pipe sizes: 3", 2" )
FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON
MFC-DLM-AK-
2303 OF METAL HYDROTESTED LINE @TP-1602-02-HT-025(A) (Pipe sizes: 1.5",
I-2289
CLADDING 1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


MFC-DLM-AK-
2304 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-026(A) (Pipe sizes: 1.5",
I-2290
CLADDING 1",0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( HOT ) METAL CLADDING ON
2305 I-2291 OF METAL HYDROTESTED @ TP-1606-02-HT-001 (Pipe sizes: 30",2",1" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF (COLD) METAL CLADDING on


MFC-DLM-AK-
2306 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-011(T) (Pipe sizes:
I-2292 CLADDING 36",2",1",0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2307 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-021 (Pipe sizes: 36",24",
I-2293
CLADDING 8", 2")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
2308 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-023 (Pipe sizes: 1.5", 1",
I-2294 CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2309 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-024 (Pipe sizes: 1.5", 1",
I-2295 CLADDING 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
2310 I-2296 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-025 (Pipe sizes: 1.5", 1",
CLADDING 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


2311 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-026 (Pipe sizes: 1.5", 1",
I-2297
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2312 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-027 (Pipe sizes: 1.5", 1",
I-2298
CLADDING 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
2313 I-2299 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-022 (Pipe sizes: ,3", 2",
CLADDING 1", 0.75" )

2314 MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


I-2300 INSPECTION HYDROTESTED @ TP-1471-00-HT-015 (A) (Pipe sizes: 3", 2" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON
2315
I-2301 INSPECTION HYDROTESTED @ TP-1471-00-HT-005 (A) (Pipe sizes: 3", 2" )

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2316 METAL CLADDING ON HYDROTESTED LINE @ TP-1701-01-HT-
I-2302 INSPECTION
007(T) (Pipe sizes: 10", 8", 6", 3", 2", 1", 0.75",)

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2317 I-2303 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1704-02-HT-
028(T) (Pipe sizes: 10", 8", 6", 3", 2", 1", 0.75",)

VAPOR BARRIER INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK- VAPOR BARRIER
2318 METAL CLADDING ON HYDROTESTED LINE @ TP-1704-02-HT-
I-2304 INSPECTION 015(T) (Pipe sizes: 48", 42", 40", 36", 24", 2", 1")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2319 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-005(P)
I-2305
INSPECTION (Pipe sizes: 12", 10",3")

SURFACE
MFC-DLM-AK- PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
2320 PREPARATION
I-2306 INSPECTION INSULATION ON HYDROTESTED LINE @ TP-1453-00-HT-001(GA)

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2321 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1625-00-HT-002 (P)
I-2307 INSPECTION (Pipe sizes: 36", 30", 24",20", 16")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2322 I-2308 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1712-01-HT-017 (T)
INSPECTION (Pipe sizes: 12", 8", 4", 3")

MFC-DLM-AK- SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


2323 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1682-01-HT-007 (T)
I-2309
INSPECTION (Pipe sizes: 4", 2", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2324 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1682-01-HT-008 (T)
I-2310
INSPECTION (Pipe sizes: 6", 1",)

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2325 I-2311 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1714-00-HT-030 (T)
INSPECTION (Pipe sizes: 12", 8", 4", 3")

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


2326 MFC-DLM-AK- PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1701-01-HT-006 (T)
I-2312
INSPECTION (Pipe sizes: 8",1")
INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF
MFC-DLM-AK- INSULATION
2327 METAL CLADDING ON HYDROTESTED LINE @ TP-1607-02-HT-
I-2313 INSPECTION
028 (Pipe sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
2328 HYDROTESTED @ TP-1606-02-HT-026 (Pipe sizes: 1.5", 1",
I-2314 INSPECTION
0.75")

INSULATION INSPECTION (HOT ) PRIOR TO METAL CLADDING ON


MFC-DLM-AK- INSULATION
2329 I-2315 INSPECTION HYDROTESTED @ TP-1607-02-HT-026 (Pipe sizes: 1.5", 1",
0.75")

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2330 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1641-00-HT-024 (GA)
I-2316 INSPECTION (Pipe sizes: 6",4",3",2", 1")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2331 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-025
I-2317
INSPECTION (Pipe sizes: 1.5", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2332 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1606-02-HT-028
I-2318 INSPECTION (Pipe sizes: 1.5", 1", 0.75")

PARTIAL FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK- PARTIAL FINAL
2333 HYDROTESTED LINE @ TP-1704-02-HT-028(T) (Pipe sizes: 10",
I-2319 INSPECTION 8", 6", 3", 2", 1", 0.75",)

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF (HOT) METAL CLADDING on
2334 I-2320 OF METAL HYDROTESTED LINE @ TP-1606-02-HT-023 (Pipe sizes: 1.5", 1",
CLADDING 0.75")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


2335 OF METAL HYDROTESTED LINE @ TP-1606-02-HT-024 (Pipe sizes: 1.5", 1",
I-2321
CLADDING 0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2336 OF METAL HYDROTESTED LINE @ TP-1606-02-HT-022 (Pipe sizes: ,3", 2",
I-2322
CLADDING 1", 0.75" )

FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM- PARTIAL FINAL
2337 AK-I-2323 INSPECTION HYDROTESTED LINE @ TP-1454-00-HT-001 (A) (Pipe sizes: 12",
10", 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


2338 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1602-02-HT-001 (Pipe sizes:
I-2324
CLADDING 30",2",1" )
FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on
MFC-DLM-AK-
2339 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-001 (Pipe sizes:
I-2325
CLADDING 30",2",1" )

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK-
2340 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-028 (Pipe sizes: 1.5",
I-2326
CLADDING 1", 0.75" )

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2341 I-2327 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1624-02-HT-001(GA)
INSPECTION (Pipe sizes: 8", 3")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2342 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1453-00-HT-011(GA)
I-2328 INSPECTION (Pipe sizes: 2", 1.5" , 1",)

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2343 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1744-02-HT-008(GA)
I-2329
INSPECTION (Pipe sizes: 4", 1.5",1")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2344 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1631-04-HT-037 (GA)
I-2330 INSPECTION (Pipe sizes: 2")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2345 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1631-04-HT-034 (GA)
I-2331 INSPECTION (Pipe sizes: 1")

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2346 I-2332 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1631-04-HT-035 (GA)
INSPECTION (Pipe sizes: 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


2347 METAL CLADDING ON HYDROTESTED LINE @ TP-1625-00-HT-
I-2333 INSPECTION
005 (P) (Pipe sizes: 12", 10", 3")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2348 METAL CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-
I-2334 INSPECTION
025 (Pipe sizes: 1.5", 1", 0.75")

INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK- INSULATION
2349 I-2335 INSPECTION METAL CLADDING ON HYDROTESTED LINE @ TP-1606-02-HT-
028 (Pipe sizes: 1.5", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING on


2350 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1606-02-HT-026 (Pipe sizes: 1.5", 1",
I-2336
CLADDING 0.75")
FINAL INSPECTION OF (HOT) METAL CLADDING on
MFC-DLM- PARTIAL FINAL
2351 HYDROTESTED LINE @ TP-1607-02-HT-026 (Pipe sizes: 1.5", 1",
AK-I-2337 INSPECTION
0.75")

PARTIAL FINAL INSPECTION OF (HOT) METAL CLADDING on


MFC-DLM-AK- PARTIAL FINAL
2352 HYDROTESTED LINE @ TP-1454-00-HT-001 (A) (Pipe sizes: 12",
I-2338 INSPECTION
10", 2", 1" )

SURFACE PRE-INSULATION INSPECTION (HOT) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2353 I-2339 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1531-01-HT-001
INSPECTION (Pipe sizes: 18", 16", 14", 10", 6", 3", 1", 0.75")

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2354 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1662-01-HT-002(T)
I-2340 INSPECTION (Pipe sizes: 6", 3",1" )

SURFACE PRE-INSULATION INSPECTION (COLD) PRIOR TO APPLICATION OF


MFC-DLM-AK-
2355 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1662-01-HT-001(T)
I-2341
INSPECTION (Pipe sizes: 14", 10", 2",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2356 OF METAL
I-2342 CLADDING HYDROTESTED LINE @ TP-1511-01-HT-009 (Pipe sizes: 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING ON
2357 OF METAL
I-2343 CLADDING HYDROTESTED LINE @ TP-1512-01-HT-009 (Pipe sizes: 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2358 I-2344 OF METAL HYDROTESTED LINE @ TP-1513-01-HT-009 (Pipe sizes: 2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2359 OF METAL
I-2345 HYDROTESTED LINE @ TP-1514-01-HT-009 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING ON
2360 OF METAL
I-2346 HYDROTESTED LINE @ TP-1515-01-HT-009 (Pipe sizes: 2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF (HOT) METAL CLADDING ON


2361 I-2347 OF METAL HYDROTESTED @ TP-1471-00-HT-012 (A) (Pipe sizes: 3", 2" )
CLADDING

FINAL INSPECTION
2362 MFC-DLM-AK- OF METAL FINAL INSPECTION OF (HOT) META CLADDING HYDROTESTED @
I-2348 TP-1471-00-HT-013 (A) (Pipe sizes: 3", 2" )
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) META CLADDING HYDROTESTED @
2363 OF METAL
I-2349 TP-1471-00-HT-014 (A) (Pipe sizes: 3", 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) META CLADDING HYDROTESTED @
2364 OF METAL
I-2350 TP-1471-00-HT-015 (A) (Pipe sizes: 3", 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF (HOT) METAL CLADDING ON
2365 I-2351 OF METAL HYDROTESTED @ TP-1471-00-HT-005 (A) (Pipe sizes: 3", 2" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF ( COLD ) METAL CLADDING ON
2366 OF METAL
I-2352 CLADDING HYDROTESTED LINE @ TP-1714-00-HT-004 (Pipe sizes: 3",1")

SURFACE PRE-SURFACE INSPECTION OF ( COLD ) PRIOR TO INSULATION


MFC-DLM-AK-
2367 PREPARATION ON HYDROTESTED LINE @ TP-1701-03-HT-010 (Pipe sizes:
I-2353
INSPECTION 6",2",1")

INSULATION INSPECTION OF(HOT) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2368 HYDROTESTED LINE @ TP-1604-02-HT-025 (Pipe sizes: 1.5",
I-2354 INSPECTION 1", 0.75" )

INSULATION INSPECTION OF (HOT) PRIOR TO METAL CLADDING


MFC-DLM-AK- INSULATION
2369 HYDROTESTED LINE @ TP-1604-02-HT-028 (Pipe sizes: 1.5",
I-2355 INSPECTION 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2370 I-2356 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-022 (Pipe sizes: ,3", 2",
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2371 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-024 (Pipe sizes: 1.5", 1",
I-2357
CLADDING 0.75")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2372 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-023 (Pipe sizes: 1.5",
I-2358
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2373 I-2359 OF METAL HYDROTESTED @ TP-1605-02-HT-001 (Pipe sizes: 30",2",1" )
CLADDING

FINAL INSPECTION
2374 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
I-2360 HYDROTESTED @ TP-1604-02-HT-001 (Pipe sizes: 30",2",1" )
CLADDING
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2375 OF METAL HYDROTESTED @ TP-1604-02-HT-022 (Pipe sizes: ,3", 2", 1",
I-2361
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2376 OF METAL HYDROTESTED @ TP-1604-02-HT-023 (Pipe sizes: 1.5", 1",
I-2362
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2377 I-2363 OF METAL HYDROTESTED @ TP-1604-02-HT-024 (Pipe sizes: 1.5", 1",
CLADDING 0.75")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2378 OF METAL HYDROTESTED @ TP-1604-02-HT-025 (Pipe sizes: 1.5", 1",
I-2364 CLADDING 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) on


MFC-DLM-AK- PARTIAL FINAL
2379 HYDROTESTED LINE @ TP-1704-02-HT-006 (Pipe sizes: 30",12",
I-2365 INSPECTION
10",2", 1" 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) on


MFC-DLM-AK- PARTIAL FINAL
2380 HYDROTESTED LINE @ TP-1714-00-HT-024 (T) (Pipe sizes: 36",
I-2366 INSPECTION 30", 14", 12", 6", 4", 1",. 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM- PARTIAL FINAL
2381 HYDROTESTED LINE @ TP-1671-02-HT-002 (Pipe sizes: 30", 20",
AK-I-2367 INSPECTION 14", 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
2382 AK-I-2368 OF METAL HYDROTESTED @ TP-1606-02-HT-027 (Pipe sizes: 1.5", 1",
CLADDING 0.75" )

MFC-DLM-AK- INSULATION IN-PROCESS INSULATION INSPECTION PRIOR TO METAL


2383 CLADDING (HOT) ON HYDROTESTED LINE @ TP-1731-01-HT-020
I-2369 INSPECTION
(T) Debutanizer (Pipe sizes: 10", 4", 1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2384 HYDROTESTED LINE @ TP-1605-02-HT-028 (Pipe sizes:
I-2370 INSPECTION
2",1.5",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2385 I-2371 INSPECTION HYDROTESTED @ TP-1605-02-HT-027 (Pipe sizes: 1.5",1",0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2386 MFC-DLM-AK- INSULATION HYDROTESTED @ TP-1604-02-HT-026 (Pipe sizes: 1.5", 1",
I-2372 INSPECTION
0.75" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2387 HYDROTESTED @ TP-1604-02-HT-027 (Pipe sizes: 1.5", 1",
I-2373 INSPECTION
0.75" )

IN-PROCESS INSULATION INSPECTION PRIOR TO VAPOR BARRIER


MFC-DLM-AK- INSULATION
2388 (COLD) ON HYDROTESTED LINE @ TP-1671-01-HT-001(T) (Pipe
I-2374 INSPECTION
sizes: 36", 30",2",1")

FINAL INSPECTION PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) on


MFC-DLM-AK-
2389 I-2375 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-025 (T) (Pipe sizes: 30",
CLADDING 24", 20",14", 12", 3",1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2390 OF METAL HYDROTESTED LINE @ TP-1625-00-HT-005 (P) (Pipe sizes: 12",
I-2376 CLADDING 10", 3")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2391 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1453-00-HT-001 (PCMC)
I-2377
INSPECTION ( PIPE SIZE : 18", 10", 2", 1", 3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2392 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-076 (TCC)
I-2378 INSPECTION ( PIPE SIZE : 72", 66", 24", 18", 8", 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2393 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1711-01-HT-014 (TCC) ( PIPE
I-2379 INSPECTION SIZE : 48", 36", 24", 2", 1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2394 I-2380 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1681-00-HT-001 (GA) (Pipe
INSPECTION sizes: 30",2", 3/4")

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2395 PREPARATION HYDROTESTED LINE @ TP-1605-02-HT-025 (Pipe sizes: 1.5",
I-2381
INSPECTION 1", 0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2396 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1605-02-HT-026 (Pipe
I-2382
INSPECTION sizes: 1.5", 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2397 I-2383 INSPECTION HYDROTESTED LINE @ TP-1681-00-HT-001 (TCC) (Pipe sizes: 36",
30",2", 1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2398 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1681-00-HT-001 (TCC) (Pipe sizes: 36",
I-2384 INSPECTION
30",2", 1")
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2399 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-028 (Pipe sizes:
I-2385
CLADDING 2",1.5",3/4")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2400 OF METAL
I-2386 HYDROTESTED @ TP-1605-02-HT-027 (Pipe sizes: 1.5",1",0.75" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2401 I-2387 OF METAL HYDROTESTED @ TP-1604-02-HT-026 (Pipe sizes: 1.5", 1",
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2402 OF METAL HYDROTESTED @ TP-1604-02-HT-027 (Pipe sizes: 1.5", 1",
I-2388 CLADDING 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2403 HYDROTESTED LINE @ TP-1671-02-HT-002 (Pipe sizes: 30",
I-2389 INSPECTION
20",14", 2",1")

IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2404 CLADDING (COLD) ON HYDROTESTED LINE @ TP-1671-01-HT-
I-2390 INSPECTION 001(T) (Pipe sizes: 36", 30",2",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2405 HYDROTESTED LINE @ TP-1631-04-HT-028 (GA) (Pipe sizes: 6",
I-2391 INSPECTION 4", 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2406 I-2392 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-040 (GA) (Pipe sizes:
1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2407
I-2393 INSPECTION HYDROTESTED LINE @ TP-1632-01-HT-003 (G) (Pipe sizes: 2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2408 (COLD) ON HYDROTESTED LINES TP-1701-01-HT-003 (Pipe sizes:
I-2394 INSPECTION
48",2",1")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2409 I-2395 INSPECTION HYDROTESTED LINE @ TP-1701-01-HT-004 (Pipe sizes: 24",
20",18", 16", 14",2", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2410 MFC-DLM- OF METAL HYDROTESTED LINE @ TP-1603-02-HT-022 (Pipe sizes: ,3", 2",
AK-I-2396
CLADDING 1", 0.75" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2411 OF METAL HYDROTESTED LINE @ TP-1603-02-HT-023 (Pipe sizes: 1.5", 1",
I-2397
CLADDING 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2412 OF METAL HYDROTESTED LINE @ TP-1603-02-HT-024 (Pipe sizes:
I-2398
CLADDING 2",1.5",3/4")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2413 I-2399 OF METAL HYDROTESTED LINE @ TP-1603-02-HT-027 (Pipe sizes: 1", 0.75" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2414 OF METAL HYDROTESTED @ TP-1603-02-HT-001 (Pipe sizes: 30",2",1",0.75"
I-2400 CLADDING )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2415 OF METAL HYDROTESTED LINE @ TP-1671-01-HT-001(T) (Pipe sizes: 36",
I-2401
CLADDING 30",2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2416 PREPARATION (HOT) ON HYDROTESTED @ TP-1603-02-HT-025 (Pipe sizes:
I-2402 INSPECTION 1",0.5" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2417 PREPARATION (HOT) ON HYDROTESTED @ TP-1603-02-HT-028 (Pipe sizes:
I-2403 INSPECTION 2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2418 I-2404 PREPARATION (COLD) ON HYDROTESTED @ TP-1683-03-HT-028 (Pipe sizes:
INSPECTION 20",18",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2419 HYDROTESTED LINE @ TP-1603-02-HT-026 (Pipe sizes: 1.5",
I-2405 INSPECTION
1", 0.75" )

SURFACE IN-PROCESS INSULATION INSPECTION PRIOR TO METAL


MFC-DLM-AK-
2420 PREPARATION CLADDING (HOT) ON HYDROTESTED LINE @ TP-1531-01-HT-001
I-2406
INSPECTION (ARCC) (Pipe sizes: 6",3",1")

INSULATION
MATERIAL RECEIVING & INSPECTION OF HOT & COLD
MFC-DLM-AK- ACCESSORY &
2421 I-2407 JACKETING INSULATION ACCESSORY & ALUMINUM SHEET 3003 (0.6mmT)
STUCCO EMBOSED WITH POLYSURLYN MB MATERIALS
MATERIAL

2422 MFC-DLM-AK- COLD INSULATION MATERIAL RECEIVING & INSPECTION OF COLD PIR INSULATION
I-2408 MATERIAL MATERIALS
PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK- PARTIAL FINAL
2423 HYDROTESTED LINE @ TP-1704-02-HT-015(T) (Pipe sizes: 48",
I-2409 INSPECTION
42", 40", 36", 24", 2", 1")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2424
I-2410 INSPECTION HYDROTESTED LINES TP-1705-01-HT-001 (Pipe sizes: 16",10",6")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
2425 I-2411 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-011 (Pipe sizes: 36" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2426 OF METAL HYDROTESTED LINE @ TP-1701-01-HT-011 (Pipe sizes:
I-2412 CLADDING 1",2",6",10",12")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2427 HYDROTESTED LINE @ TP-1691-01-HT-024 (Pipe sizes: 12", 10",
I-2413 INSPECTION
8", 6", 2", 1", 0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2428 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1681-00-HT-002 (Pipe Size:
I-2414 INSPECTION 36", 2", 1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2429 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1452-00-HT-016 (Pipe Size:
I-2415 INSPECTION 3", 2", 1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2430 I-2416 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1731-01-HT-001 (Pipe Size:
INSPECTION 8", 4", 3",2")

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2431 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1731-01-HT-003 (Pipe Size:
I-2417
INSPECTION 2")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2432 HYDROTESTED LINE @ TP-1714-00-HT-025 (Pipe sizes: 12",10",
I-2418 INSPECTION
8", 4", 1" )

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2433 I-2419 INSPECTION HYDROTESTED LINE @ TP-1683-03-HT-025 (Pipe sizes: 16", 12",
1" )

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2434 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe sizes: 30", 12",
I-2420 INSPECTION
10", 8", 6", 4", 3", 2", 1", 0.75")
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2435 HYDROTESTED LINE @ TP-1682-01-HT-008 (T) (Pipe sizes: 6",
I-2421 INSPECTION
1",)

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2436 (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-003 (Pipe
I-2422 INSPECTION
sizes: 8", 6",3",2", 1.5", 1", 0.75" )

INSULATION INSPECTION PRIOR TOMETAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2437 I-2423 INSPECTION HYDROTESTED LINE @ TP-1631-01-HT-001 (T) (Pipe sizes: 64",
56", 24", 3", 2", 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM- INSULATION
2438 HYDROTESTED LINE @ TP-1662-01-HT-001(T) (Pipe sizes: 14",
AK-I-2424 INSPECTION 10", 2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2439 HYDROTESTED LINE @ TP-1662-01-HT-015 (T) (Pipe sizes: 20",
I-2425 INSPECTION
10", 8", 4", 2", 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2440 HYDROTESTED LINE @ TP-1711-01-HT-014 (TCC) ( PIPE SIZE : 48",
I-2426 INSPECTION 36", 24", 2", 1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2441 OF METAL HYDROTESTED LINE @ TP-1683-01-HT-004 (T) (Pipe sizes: 10",
I-2427 CLADDING 8", 6", 1", )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2442 I-2428 OF METAL HYDROTESTED LINE @ TP-1683-01-HT-005 (T) (Pipe sizes: 12",
CLADDING 10", 6", 3", 1", )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2443 OF METAL HYDROTESTED @ TP-1661-01-HT-009 (T) (Pipe sizes: 4", 2",
I-2429
CLADDING 1" )

FINAL INSPECTION
MFC-DLM- FINAL INSPECTION OF METAL CLADDING (HOT) on
2444 OF METAL
AK-I-2430 HYDROTESTED LINE @ TP-1632-03-HT-001 (GA) (Pipe sizes: 4" )
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2445 I-2431 INSPECTION HYDROTESTED LINE @ TP-1731-01-HT-020 (T) Debutanizer
(Pipe sizes: 10", 4", 1" )

2446 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


I-2432 INSPECTION HYDROTESTED LINE @ TP-1681-00-HT-002 (Pipe Size: 36", 2", 1")
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
2447
I-2433 INSPECTION HYDROTESTED LINE @ TP-1452-00-HT-016 (Pipe Size: 3", 2", 1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2448 HYDROTESTED LINE @ TP-1731-01-HT-001 (Pipe Size: 8", 4",
I-2434 INSPECTION
3",2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2449 I-2435 INSPECTION HYDROTESTED LINE @ TP-1731-01-HT-003 (Pipe Size: 2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2450 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-025 (Pipe
I-2436 INSPECTION sizes: 12",10", 8", 4", 1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2451 (COLD) ON HYDROTESTED LINE @ TP-1683-03-HT-025 (Pipe
I-2437 INSPECTION
sizes: 16", 12", 1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2452 (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe
I-2438 INSPECTION sizes: 30", 12", 10", 8", 6", 4", 3", 2", 1", 0.75")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2453 (COLD) ON HYDROTESTED LINE @ TP-1701-01-HT-004 (Pipe
I-2439 INSPECTION sizes: 24", 20",18", 16", 14",2", 1", 0.75")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2454 I-2440 INSPECTION HYDROTESTED LINE @ TP-1662-01-HT-002(T) (Pipe sizes: 6",
3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2455
I-2441 INSPECTION HYDROTESTED @ TP-1603-02-HT-025 (Pipe sizes: 1",0.5" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2456
I-2442 INSPECTION HYDROTESTED @ TP-1603-02-HT-028 (Pipe sizes: 2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2457 I-2443 PREPARATION (HOT) ON HYDROTESTED @ TP-1662-01-HT-016 (Pipe sizes:
INSPECTION 8",6",1",0.75",0.5" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2458 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe sizes: 30", 12",
I-2444 INSPECTION
10", 8", 6", 4", 3", 2", 1", 0.75")
PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK- PARTIAL FINAL
2459 HYDROTESTED LINE @ TP-1701-01-HT-007(T) (Pipe sizes: 10",
I-2445 INSPECTION
8", 6", 3", 2", 1", 0.75",)

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) on


MFC-DLM-AK-
2460 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-007 (Pipe sizes: 36", 28",
I-2446
CLADDING 12", 10", 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2461 I-2447 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-016 (Pipe sizes: 36", 28",
CLADDING 1", 0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2462 OF METAL
I-2448 CLADDING HYDROTESTED @ TP-1603-02-HT-025 (Pipe sizes: 1",0.5" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2463 OF METAL HYDROTESTED LINE @ TP-1603-02-HT-026 (Pipe sizes: 1.5",
I-2449
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2464 OF METAL
I-2450 CLADDING HYDROTESTED @ TP-1603-02-HT-028 (Pipe sizes: 2",1",0.75" )

FINAL INSPECTION FINAL INSPECTION PRIOR TO METAL CLADDING (HOT)


MFC-DLM-AK-
2465 OF METAL HYDROTESTED LINE @ TP-1604-02-HT-028 (Pipe sizes: 1.5",
I-2451 CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


2466 I-2452 OF METAL @ TP-1606-02-HT-025 (Pipe sizes: 1.5", 1", 0.75")
CLADDING

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2467 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1531-01-HT-001 (ARCC)
I-2453
INSPECTION (Pipe sizes: 6",3",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2468 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-012 (T) (Pipe
I-2454
INSPECTION sizes: 2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2469 I-2455 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-017 (T) (Pipe
INSPECTION sizes: 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2470 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1453-00-HT-008 (G) (Pipe
I-2456
INSPECTION sizes: 24",16",4",1")
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON
2471
I-2457 INSPECTION HYDROTESTED LINE @ TP-1701-01-HT-006 (T) (Pipe sizes: 8",1")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2472 HYDROTESTED LINE @ TP-1662-01-HT-001(T) (Pipe sizes: 14",
I-2458 INSPECTION
10", 2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2473 I-2459 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1662-01-HT-002(T) (Pipe
sizes: 6", 3",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2474 HYDROTESTED @ TP-1662-01-HT-016 (Pipe sizes:
I-2460 INSPECTION 8",6",1",0.75",0.5" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2475 HYDROTESTED LINE @ TP-1531-01-HT-001 (PCMC) (Pipe sizes:
I-2461 INSPECTION
18", 16", 14", 10", 6", 3", 1", 0.75")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2476 HYDROTESTED LINE @ TP-1714-00-HT-030 (T) (Pipe sizes: 12",
I-2462 INSPECTION 8", 4", 3")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2477 HYDROTESTED LINE @ TP-1452-00-HT-018 (Pipe sizes: 3", 2",
I-2463 INSPECTION 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM- INSULATION
2478 AK-I-2464 INSPECTION HYDROTESTED LINE @ TP-1452-00-HT-018 (Pipe sizes: 3", 2",
1", 0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2479
I-2465 INSPECTION HYDROTESTED LINE @ TP-1631-01-HT-003 (Pipe sizes: 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2480 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-028(T) (Pipe sizes: 10",
I-2466
CLADDING 8", 6", 3", 2", 1", 0.75",)

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2481 I-2467 OF METAL HYDROTESTED LINE @ TP-1682-01-HT-002 (T) (Pipe sizes: 36",
CLADDING 2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2482 MFC-DLM-AK- VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1701-01-HT-006 (T) (Pipe
I-2468 INSPECTION
sizes: 8",1")
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2483 HYDROTESTED LINE @ TP-1471-00-HT-011 (A) (Pipe sizes: 3",
I-2469 INSPECTION
2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2484 HYDROTESTED LINE @ TP-1712-01-HT-017 (T) (Pipe sizes: 12",
I-2470 INSPECTION
8", 4", 3")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2485 I-2471 INSPECTION HYDROTESTED LINE @ TP-1471-00-HT-010 (A) (Pipe sizes: 3",
2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2486 HYDROTESTED LINE @ TP-1471-00-HT-003 (ARCC) (Pipe sizes:
I-2472 INSPECTION 4", 3", 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2487 HYDROTESTED LINE @ TP-1453-00-HT-011(GA) (Pipe sizes: 2",
I-2473 INSPECTION
1.5" , 1",)

SURFACE SURFACE PREPARATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
2488 PREPARATION INSULATION ON HYDROTESTED LINE @ TP-1456-00-HT-007
I-2474 INSPECTION (Pipe sizes: 36",12",8", 4",3", 2", 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2489 PREPARATION ON HYDROTESTED LINE @ TP-1456-00-HT-001 (T) (Pipe sizes:
I-2475 INSPECTION 24",20",18", 16",", 12", 6",4",3",2",0.75" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2490 I-2476 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1662-01-HT-001(T) (Pipe
sizes: 14", 10", 2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2491 HYDROTESTED LINE @ TP-1531-01-HT-001 (ARCC) (Pipe sizes:
I-2477 INSPECTION
6",3",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2492
I-2478 INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-012 (T) (Pipe sizes: 2",1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2493 I-2479 INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-017 (T) (Pipe sizes: 2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2494 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1453-00-HT-008 (G) (Pipe sizes:
I-2480 INSPECTION
24",16",4",1")
INSULATION
MATERIAL RECEIVING & INSPECTION OF HOT & COLD
MFC-DLM-AK- ACCESSORY &
2495 INSULATION ACCESSORY & ALUMINUM SHEET 3003 (0.6mmT)
I-2481 JACKETING
STUCCO EMBOSED WITH POLYSURLYN MB MATERIALS
MATERIAL

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2496
I-2482 INSPECTION HYDROTESTED LINE @ TP-1701-01-HT-006 (T) (Pipe sizes: 8",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2497 I-2483 INSPECTION HYDROTESTED LINE @ TP-1662-01-HT-001(T) (Pipe sizes: 14",
10", 2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2498 HYDROTESTED LINE @ TP-1662-01-HT-002(T) (Pipe sizes: 6",
I-2484 INSPECTION 3",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2499 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1462-00-HT-001 (T) (Pipe
I-2485
INSPECTION sizes: 2", 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2500 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1682-01-HT-010 (T) (Pipe
I-2486 INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2501 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1631-02-HT-003 (GA) (Pipe
I-2487 INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2502 I-2488 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-001 (Pipe
INSPECTION sizes: 1" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2503 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1454-00-HT-001 (Pipe
I-2489
INSPECTION sizes: 14",10",8",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) HYDROTESTED
2504 OF METAL
I-2490 LINE @ TP-1705-01-HT-005 (Pipe sizes: 20",10", 8",6",3",1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2505 I-2491 OF METAL HYDROTESTED @ TP-1661-01-HT-025 (T) (Pipe sizes: 36", 30",
CLADDING 1")

FINAL INSPECTION
2506 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
I-2492 HYDROTESTED LINE @ TP-1714-00-HT-003 (Pipe sizes: 3" )
CLADDING
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2507 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1455-00-HT-002 (GA) (Pipe
I-2493
INSPECTION sizes: 16",12",4",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2508 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1453-00-HT-009 (GA) (Pipe
I-2494
INSPECTION sizes: 20",16",4",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2509 I-2495 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1463-00-HT-001 (T) (Pipe
INSPECTION sizes: 3",1",1",0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2510 HYDROTESTED @ TP-1662-01-HT-016 (Pipe sizes:
I-2496 INSPECTION 8",6",1",0.75",0.5" )

MATERIAL RECIVING&INSPECTION OF HOT INSULATION


MFC-DLM-AK- HOT INSULATION
2511 MATERIALS, ROCKWOOL PIPE COVER
I-2497 MATERIAL
(40mm,50mm,60mm,70mm,90mm.)

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD)


MFC-DLM-AK- INSULATION
2512 HYDROTESTED LINE @ TP-1641-00-HT-023 (GA) (Pipe sizes: 36",
I-2498 INSPECTION 2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2513 (COLD) @ TP-1691-01-HT-008(T) (Pipe sizes: 8", 6", 4", 3", 2",
I-2499 INSPECTION 1", 0.75",)

IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- VAPOR BARRIER
2514 I-2500 INSPECTION CLADDING (COLD) HYDROTESTED LINE @ TP-1641-00-HT-023
(GA) (Pipe sizes: 36", 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2515 OF METAL HYDROTESTED @ TP-1661-01-HT-010 (T) (Pipe sizes: 12", 8",
I-2501
CLADDING 6",4", 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2516 OF METAL HYDROTESTED LINES TP-1704-02-HT-033 (Pipe sizes: 8", 6", 2",
I-2502
CLADDING 1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2517 I-2503 OF METAL HYDROTESTED LINE @ TP-1641-00-HT-023 (GA) (Pipe sizes: 36",
CLADDING 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2518 MFC-DLM-AK- PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-034 (Pipe
I-2504
INSPECTION sizes: 12", 8", 6",4",2",1",0.75" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2519 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1705-01-HT-003 (Pipe
I-2505
INSPECTION sizes: 10", 8", 6",4",3",2",1",0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2520 HYDROTESTED LINE @ TP-1682-01-HT-007 (T) (Pipe sizes: 4", 2",
I-2506 INSPECTION
1", 0.75")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2521 I-2507 INSPECTION HYDROTESTED LINE @ TP-1744-02-HT-008(GA) (Pipe sizes: 4",
1.5",1")

IN-PROCESS INSULATION 1st, 2nd & 3rd LAYER INSPECTION OF


MFC-DLM-AK- INSULATION
2522 ( COLD ) PRIOR TO VAPOR BARRIER ON HYDROTESTED LINES TP-
I-2508 INSPECTION 1704-02-HT-004 (Pipe sizes: 12",10",6",3",1.5")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2523 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1621-01-HT-001 (A) (Pipe
I-2509
INSPECTION sizes: 30")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2524 HYDROTESTED LINE @ TP-1631-02-HT-003 (GA) (Pipe sizes:
I-2510 INSPECTION 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2525
I-2511 INSPECTION HYDROTESTED LINE @ TP-1651-00-HT-001 (Pipe sizes: 1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2526 I-2512 INSPECTION HYDROTESTED LINE @ TP-1454-00-HT-001 (GA) (Pipe sizes:
30",20"14",10",8",3",2"1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2527 (COLD) ON HYDROTESTED LINES TP-1704-02-HT-004 (Pipe sizes:
I-2513 INSPECTION
12",10",6",3",1.5")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2528
I-2514 INSPECTION HYDROTESTED LINE @ TP-1682-01-HT-010 (T) (Pipe sizes: 1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2529 I-2515 INSPECTION HYDROTESTED LINE @ TP-1462-00-HT-001 (T) (Pipe sizes: 2",
1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2530 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1463-00-HT-001 (T) (Pipe sizes:
I-2516 INSPECTION
3",1",1",0.75" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2531 OF METAL HYDROTESTED LINE @ TP-1682-01-HT-008 (T) (Pipe sizes: 6",
I-2517
CLADDING 1",)

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2532 OF METAL HYDROTESTED LINE @ TP-1682-01-HT-007 (T) (Pipe sizes: 4", 2",
I-2518
CLADDING 1", 0.75")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) @ TP-
2533 I-2519 INSPECTION 1691-01-HT-008(T) (Pipe sizes: 8", 6", 4", 3", 2", 1", 0.75",)

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2534 HYDROTESTED LINES TP-1662-01-HT-009 (Pipe sizes:
I-2520 INSPECTION 18",12",3",2",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2535 HYDROTESTED LINE @ TP-1453-00-HT-009 (GA) (Pipe sizes:
I-2521 INSPECTION
20",16",4",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2536 HYDROTESTED LINE @ TP-1455-00-HT-002 (GA) (Pipe sizes:
I-2522 INSPECTION 16",12",4",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT)


MFC-DLM-AK- INSULATION
2537 HYDROTESTED LINE @ TP-1471-00-HT-008 (A) (Pipe sizes: 3",
I-2523 INSPECTION 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2538 I-2524 INSPECTION HYDROTESTED LINE @ TP-1471-00-HT-009 (Pipe sizes: 3", 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2539
I-2525 INSPECTION HYDROTESTED LINE @ TP-1471-00-HT-001 (Pipe sizes: 3", 2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2540 HYDROTESTED LINE @ TP-1471-00-HT-006 (A) (Pipe sizes: 3",
I-2526 INSPECTION
2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2541 I-2527 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-034 (GA) (Pipe sizes: 1")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2542 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1641-00-HT-024 (GA) (Pipe sizes:
I-2528 INSPECTION
6",4",3",2", 1")
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2543 OF METAL HYDROTESTED LINES @ TP-1662-01-HT-017 (Pipe sizes: 20", 2",
I-2529
CLADDING 1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2544
I-2530 INSPECTION HYDROTESTED LINE @ TP-1681-00-HT-002 (Pipe Size: 36", 2", 1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2545 I-2531 OF METAL HYDROTESTED LINES @ TP-1681-00-HT-010 (Pipe sizes:
CLADDING 36",12",10",3",2",1", 075" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2546 HYDROTESTED LINE @ TP-1531-01-HT-001 (ARCC) (Pipe sizes:
I-2532 INSPECTION 6",3",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2547 PREPARATION (HOT) @ TP-1731-01-HT-020 (GA) Debutanizer (Pipe sizes:
I-2533
INSPECTION 10" )

SURFACE
MFC-DLM-AK- SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
2548 PREPARATION
I-2534 INSPECTION (HOT) @ TP-1621-02-HT-001 (A) Debutanizer (Pipe sizes: 10" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2549
I-2535 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-035 (GA) (Pipe sizes: 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2550 I-2536 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-037 (GA) (Pipe sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2551 HYDROTESTED LINE @ TP-1771-00-HT-018 (GA) (Pipe sizes: 2",
I-2537 INSPECTION
1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2552
I-2538 INSPECTION HYDROTESTED LINES TP-1662-01-HT-031 (Pipe sizes: 10",2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2553 I-2539 INSPECTION HYDROTESTED LINE @ TP-1453-00-HT-001 (PCMC) ( PIPE SIZE :
18", 10", 2", 1", 3/4")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2554 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1744-02-HT-008(GA) (Pipe sizes: 4",
I-2540
CLADDING 1.5",1")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2555 OF METAL
I-2541 HYDROTESTED LINE @ TP-1632-01-HT-003 (G) (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2556 OF METAL HYDROTESTED LINE @ TP-1662-01-HT-018 (Pipe sizes: 20", 2",
I-2542
CLADDING 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2557 I-2543 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-028 (GA) (Pipe sizes: 6",
4", 1", 0.75" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2558
I-2544 INSPECTION HYDROTESTED @ TP-1631-04-HT-030 (GA) (Pipe sizes: 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2559 HYDROTESTED LINE @ TP-1453-00-HT-001 (PCMC) ( PIPE SIZE :
I-2545 INSPECTION
18", 10", 2", 1", 3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2560
I-2546 INSPECTION HYDROTESTED LINE @ TP-1631-04-HT-042 (Pipe sizes: 3", 2", )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2561 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-058 (T) (Pipe
I-2547 INSPECTION sizes: 3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2562 I-2548 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-057 (T) (Pipe
INSPECTION sizes: 3/4",1/2")

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2563 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-03-HT-018 (T) (Pipe
I-2549
INSPECTION sizes: 6",4",3",2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2564 PREPARATION ON HYDROTESTED LINE @ TP-1456-00-HT-001 (ARCC) (Pipe
I-2550
INSPECTION sizes: 8",6",4",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2565 I-2551 INSPECTION HYDROTESTED LINE @ TP-1632-03-HT-002 (Pipe sizes: 1" )

2566 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) @


I-2552 INSPECTION TP-1661-01-HT-004 (Pipe sizes: ,2",16" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2567 HYDROTESTED LINE @ TP-1625-00-HT-002 (P) (Pipe sizes: 36",
I-2553 INSPECTION
30", 24",20", 16")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2568
I-2554 INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-020 (Pipe sizes: 1.5")

IN-PROCESS INSULATION 1ST & 2ND LAYER INSPECTION PRIOR


MFC-DLM-AK- INSULATION
2569 I-2555 INSPECTION TO VAPOR BARRIER (COLD) @ TP-1691-01-HT-002 (Pipe sizes: ,
24", 3", 1", )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2570
I-2556 INSPECTION HYDROTESTED LINE @ TP-1453-00-HT-001(GA)

IN-PROCESS INSULATION INSPECTION PRIOR TO METAL


MFC-DLM-AK- INSULATION
2571 CLADDING (HOT) ON HYDROTESTED LINE @ TP-1456-00-HT-001
I-2557 INSPECTION
(ARCC) (Pipe sizes: 8",6",4",3",2",1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2572 OF METAL
I-2558 CLADDING HYDROTESTED LINE @ TP-1631-04-HT-042 (Pipe sizes: 3", 2", )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2573 OF METAL
I-2559 CLADDING HYDROTESTED LINE @ TP-1623-02-HT-002 (Pipe sizes: ,4" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2574 I-2560 INSPECTION HYDROTESTED LINE @ TP-1682-01-HT-006 (Pipe sizes: 24", 16",
1", )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2575 (COLD) ON HYDROTESTED LINES TP-1662-01-HT-031 (Pipe sizes:
I-2561 INSPECTION
10",2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2576 HYDROTESTED LINE @ TP-1471-00-HT-007 (A) (Pipe sizes: 3",
I-2562 INSPECTION
2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2577 I-2563 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-030 (T) (Pipe
sizes: 12", 8", 4", 3")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2578 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1662-01-HT-
I-2564 INSPECTION
003(T) (Pipe sizes: 6", 4", 3", 2", 1")
IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO METAL
MFC-DLM-AK-
2579 INSULATION CLADDING (HOT) ON HYDROTESTED LINE @ TP-1456-00-HT-001
I-2565
INSPECTION (T) (Pipe sizes: 24",20",18", 16",", 12", 6",4",3",2",0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2580 HYDROTESTED LINE @ TP-1714-00-HT-025 (Pipe sizes: 12",10",
I-2566 INSPECTION
8", 4", 1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2581 I-2567 INSPECTION HYDROTESTED LINE @ TP-1453-00-HT-001(GA)(TCC)

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2582 HYDROTESTED LINE @ TP-1531-01-HT-001 (ARCC) (Pipe sizes:
I-2568 INSPECTION 6",3",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2583 HYDRO TESTED LINE @ TP-1731-01-HT-020 (GA) Debutanizer
I-2569 INSPECTION
(Pipe sizes: 10" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2584 HYDRO TESTED LINE @ TP-1621-02-HT-001 (A) Debutanizer
I-2570 INSPECTION (Pipe sizes: 10" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2585 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-020 (Pipe
I-2571 INSPECTION sizes: 1.5")

IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO MMETAL


MFC-DLM-AK- VAPOR BARRIER
2586 I-2572 INSPECTION CLADDING (COLD) @ TP-1691-01-HT-002 (Pipe sizes: ,24", 3",
1", )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2587
I-2573 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-001 (A) (Pipe sizes: 30")

INSULATIONINSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2588 HYDROTESTED LINE @ TP-1683-02-HT-034 (Pipe sizes: 12", 8",
I-2574 INSPECTION
6",4",2",1",0.75" )

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2589 I-2575 INSPECTION HYDROTESTED LINE @ TP-1705-01-HT-003 (Pipe sizes: 10", 8",
6",4",3",2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2590 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-01-HT-006 (Pipe
I-2576
INSPECTION sizes: 2" )
IN-PROCESS VAPOR IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL
MFC-DLM-AK-
2591 BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-
I-2577
INSPECTION 034 (Pipe sizes: 12", 8", 6",4",2",1",0.75" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2592 (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-001 (Pipe
I-2578 INSPECTION
sizes: 36" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2593 I-2579 INSPECTION HYDROTESTED LINE @ TP-1456-00-HT-001 (T) (Pipe sizes:
24",20",18", 16",", 12", 6",4",3",2",0.75" )

PARTIIAL SURFACE INSPECTION PRIOR TO INSTALLATION OF


MFC-DLM-AK- PARTIAL SURFACE
2594 INSULATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-
I-2580 INSPECTION 016 (Pipe sizes: 72",36",20",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2595 HYDROTESTED LINE @ TP-1605-02-HT-025 (Pipe sizes: 1.5",
I-2581 INSPECTION
1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2596 HYDROTESTED LINE @ TP-1605-02-HT-026 (Pipe sizes: 1.5",
I-2582 INSPECTION 1", 0.75" )

IN-PROCESS VAPOR IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
2597 BARRIER CLADDING (COLD) ON HYDROTESTED LINES TP-1662-01-HT-030
I-2583 INSPECTION (Pipe sizes: 10",6",2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2598 I-2584 PREPARATION (HOT) ON HYDROTESTED LINES TP-1712-01-HT-019 (T) (Pipe
INSPECTION sizes: 4",1")

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2599 PREPARATION (HOT) ON HYDROTESTED LINES TP-1712-02-HT-010 (T) (Pipe
I-2585
INSPECTION sizes: 1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2600 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1612-02-HT-025 (Pipe
I-2586
INSPECTION sizes: 2",1.5", 1",3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2601 I-2587 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1654-00-HT-001 (Pipe
INSPECTION sizes: 24",20", 14",12",10",8",6",2",3/4")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2602 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1662-01-HT-002(T) (Pipe sizes: 6",
I-2588
CLADDING 3",1" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK- PARTIAL FINAL
2603 HYDROTESTED LINE @ TP-1683-02-HT-034 (Pipe sizes: 12", 8",
I-2589 INSPECTION
6",4",2",1",0.75" )

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2604 HYDROTESTED LINE @ TP-1705-01-HT-011 (Pipe sizes:
I-2590 INSPECTION
14",10",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2605 I-2591 INSPECTION HYDROTESTED @ TP-1683-03-HT-028 (Pipe sizes: 20",18",2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2606 (COLD) ON HYDROTESTED LINE @ TP-1662-01-HT-003(T) (Pipe
I-2592 INSPECTION sizes: 6", 4", 3", 2", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2607 (COLD) ON HYDROTESTED LINE @ TP-1705-01-HT-003 (Pipe
I-2593 INSPECTION
sizes: 10", 8", 6",4",3",2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2608 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1631-01-HT-001 (T) (Pipe
I-2594 INSPECTION sizes: 3", 0.75" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2609 (COLD) ON HYDROTESTED LINE @ TP-1662-01-HT-008 (Pipe
I-2595 INSPECTION sizes: ,3", 2",1.5", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2610 I-2596 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1631-02-HT-
004(GA) (Pipe sizes: 4", 3/4")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2611 (COLD) ON HYDROTESTED LINE @ TP-1641-00-HT-024 (GA) (Pipe
I-2597 INSPECTION
sizes: 6",4",3",2", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2612 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-012 (T) (Pipe
I-2598 INSPECTION
sizes: 2",1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2613 I-2599 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-017 (T) (Pipe
sizes: 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2614 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-040
I-2600 INSPECTION
(T) (Pipe sizes: 4", 3", 2", 1" )
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING
MFC-DLM-AK- VAPOR BARRIER
2615 (COLD) ON HYDROTESTED LINES TP-1691-01-HT-025 (Pipe sizes:
I-2601 INSPECTION
2",1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2616 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-025 (Pipe sizes: 1.5",
I-2602
CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2617 I-2603 OF METAL HYDROTESTED LINE @ TP-1605-02-HT-026 (Pipe sizes: 1.5",
CLADDING 1", 0.75" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2618 OF METAL HYDROTESTED LINE @ TP-1606-02-HT-028 (Pipe sizes: 1.5", 1",
I-2604 CLADDING 0.75")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2619 HYDROTESTED LINE @ TP-1462-00-HT-001 (T) (Pipe sizes: 2",
I-2605 INSPECTION
1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2620 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1454-00-HT-001 (T) (Pipe
I-2606 INSPECTION size : 30",20",18",16",12",10"3",2"3/4")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2621 HYDROTESTED LINE @ TP-1624-02-HT-001(GA) (Pipe sizes: 8",
I-2607 INSPECTION 3")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-
2622 AK-I-2608 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1661-00-HT-001 (A) (Pipe
INSPECTION sizes: 3", 2",1" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2623 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1531-01-HT-001 (GA) (Pipe
I-2609
INSPECTION sizes: 3", 2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2624 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-003 (T) (Pipe
I-2610
INSPECTION sizes: 3", 2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2625 I-2611 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1652-00-HT-012 (GA) (Pipe
INSPECTION sizes: 10", 4",3", 1.5" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2626 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1531-02-HT-001 (GA) (Pipe
I-2612
INSPECTION sizes: 18", 8",6", 4",3",2",1" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2627 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1761-00-HT-006 (GA) (Pipe
I-2613
INSPECTION sizes: 3" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2628 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1463-00-HT-001 (GA) (Pipe
I-2614
INSPECTION sizes: 6", 3",2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2629 I-2615 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1661-01-HT-005 (T) (Pipe
INSPECTION sizes: 10", 8",6",4",2",1.5",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2630 HYDROTESTED LINE @ TP-1612-02-HT-025 (Pipe sizes: 2",1.5",
I-2616 INSPECTION 1",3/4")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2631 OF METAL HYDROTESTED LINES TP-1683-02-HT-018 (Pipe sizes:
I-2617
CLADDING 16",8",2",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2632 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1701-03-HT-010
I-2618 INSPECTION (Pipe sizes: 6",2",1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2633 (COLD) ON HYDROTESTED LINES TP-1704-02-HT-009 (Pipe sizes:
I-2619 INSPECTION 4",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2634 I-2620 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-041
(T) (Pipe sizes: 4", 2", 1" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2635 (COLD) ON HYDROTESTED LINES TP-1714-00-HT-040 (Pipe sizes:
I-2621 INSPECTION
6", 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2636 BARRIER (COLD) ON HYDROTESTED LINES TP-1714-00-HT-042
I-2622 INSPECTION
(Pipe sizes: 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2637 I-2623 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1456-00-HT-001 (PCMC)
INSPECTION (Pipe sizes: 20", 18",16", 10" 8", 6", 4", 3", 2", 3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2638 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1652-00-HT-006 (T) (Pipe
I-2624
INSPECTION sizes: 2",1.5" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2639 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1531-03-HT-002 (GA) (Pipe
I-2625
INSPECTION sizes: 8",6",4",3",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2640 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1461-00-HT-001 (T) (Pipe
I-2626
INSPECTION sizes: 3",2",1",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2641 I-2627 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1451-00-HT-001 (T) (Pipe
INSPECTION sizes: 20",10",8",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2642 HYDROTESTED LINE @ TP-1705-01-HT-002 (Pipe sizes:
I-2628 INSPECTION 18",16",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2643 HYDROTESTED LINE @ TP-1463-00-HT-001 (T) (Pipe sizes:
I-2629 INSPECTION
3",1",1",0.75" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT)


2644
I-2630 INSPECTION HYDROTESTED ON TP-1515-01-HT-038 (Pipe sizes: 3",1")

MFC-DLM- PARTIAL FINAL PARTIALFINAL INSPECTION OF METAL CLADDING (HOT) ON


2645
AK-I-2631 INSPECTION HYDROTESTED @ TP-1513-01-HT-038 (Pipe sizes: 3",1" )

MFC-DLM- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2646 AK-I-2632 INSPECTION HYDROTESTED @ TP-1514-01-HT-038 (Pipe sizes: 3",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2647 HYDROTESTED LINE @ TP-1683-02-HT-057 (T) (Pipe sizes:
I-2633 INSPECTION
3/4",1/2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


2648
I-2634 INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-058 (T) (Pipe sizes: 3/4")

INSULATION INSPECTION PRIOR TO VAPOR BARRIER (COLD) ON


MFC-DLM-AK- INSULATION
2649 I-2635 INSPECTION HYDROTESTED LINE @ TP-1683-03-HT-018 (T) (Pipe sizes:
6",4",3",2",1")

PARTIAL PARTIAL INSULATION INSPECTION PRIOR TO VAPOR BARRIER


2650 MFC-DLM-AK- INSULATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-016 (Pipe
I-2636
INSPECTION sizes: 72",42",36",20",16",1" )
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING
MFC-DLM-AK- VAPOR BARRIER
2651 (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-041 (T) (Pipe
I-2637 INSPECTION
sizes: 4", 2", 1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2652 (COLD) on HYDROTESTED LINE @ TP-1684-01-HT-001 (Pipe
I-2638 INSPECTION
sizes: 30", 8", 2", 1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2653 I-2639 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1701-03-HT-010 (Pipe
sizes: 6",2",1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2654 (COLD) ON HYDROTESTED LINE @ TP-1705-01-HT-011 (Pipe
I-2640 INSPECTION sizes: 14",10",3",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2655 HYDROTESTED LINE @ TP-1652-00-HT-012 (GA) (Pipe sizes:
I-2641 INSPECTION
10", 4",3", 1.5" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2656 HYDROTESTED LINE @ TP-1531-02-HT-001 (GA) (Pipe sizes:
I-2642 INSPECTION 18", 8",6", 4",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2657
I-2643 INSPECTION HYDROTESTED LINE @ TP-1761-00-HT-006 (GA) (Pipe sizes: 3" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2658 I-2644 INSPECTION HYDROTESTED LINE @ TP-1463-00-HT-001 (GA) (Pipe sizes: 6",
3",2",1",0.75" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2659 HYDROTESTED LINE @ TP-1661-01-HT-005 (T) (Pipe sizes: 10",
I-2645 INSPECTION
8",6",4",2",1.5",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2660 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-025 (Pipe sizes: 2",1.5",
I-2646
CLADDING 1",3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2661 I-2647 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-020 (Pipe sizes: 1.5")
CLADDING

INSULATION MATERIAL RECEIVING & INSPECTION OF HOT & COLD


2662 MFC-DLM-AK- ACCESSORY & INSULATION. SS 304 BAND 13mm X 0.5mm Thk. & ALUMINUM
I-2648 JACKETING SHEET 3003 (0.6mmT) STUCCO EMBOSED WITH POLYSURLYN MB
MATERIAL MATERIALS
MFC-DLM-AK- HOT INSULATION MATERIAL RECEIVING & INSPECTION OF HOT INSULATION
2663
I-2649 MATERIAL MATERIALS (40mm,50mm,60mm)

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2664 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001 (A) (Pipe
I-2650
INSPECTION sizes: 2", 1.5" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2665 I-2651 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002 (A) (Pipe
INSPECTION sizes: 2", 1.5" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2666 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-012 (T) (Pipe
I-2652 INSPECTION sizes: 2", 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2667 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-014 (Pipe
I-2653
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2668 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1454-00-HT-001 (P) (Pipe
I-2654 INSPECTION sizes: 30", 18",24",16",10",2",0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2669 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1531-01-HT-005 (P) (Pipe
I-2655 INSPECTION sizes: 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2670 I-2656 OF METAL HYDROTESTED @ TP-1714-00-HT-080 (T) (Pipe sizes: 14", 12",
CLADDING 6", 1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) on


2671 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-024 (T) (Pipe sizes: 36",
I-2657
CLADDING 30", 14", 12", 6", 4", 1",. 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2672 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1631-01-HT-001
I-2658 INSPECTION
(T) (Pipe sizes: 3", 0.75" )

MFC-DLM-AK- PARTIAL VAPOR


PARTIAL VAPOR BARRIER INSPECTION PRIOR TO METAL
2673 I-2659 BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-
INSPECTION 016 (Pipe sizes: 72",42",36",20",16",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2674 MFC-DLM-AK- VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1631-01-HT-001 (T) (Pipe
I-2660 INSPECTION
sizes: 3", 0.75" )
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING
MFC-DLM-AK- VAPOR BARRIER
2675 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-057 (T) (Pipe
I-2661 INSPECTION
sizes: 3/4",1/2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2676 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-058 (T) (Pipe
I-2662 INSPECTION
sizes: 3/4")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
2677 I-2663 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-001 (Pipe sizes: 36" )
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2678 HYDROTESTED LINE @ TP-1705-01-HT-003 (Pipe sizes: 10", 8",
I-2664 INSPECTION 6",4",3",2",1",0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2679 HYDROTESTED LINE @ TP-1454-00-HT-001 (P) (Pipe sizes: 30",
I-2665 INSPECTION
18",24",16",10",2",0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2680 HYDROTESTED LINE @ TP-1531-01-HT-005 (P) (Pipe sizes: 1",
I-2666 INSPECTION 0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2681 PREPARATION (HOT) on HYDROTESTED LINE @ TP-1466-00-HT-003 (T) (Pipe
I-2667 INSPECTION sizes: 8", 4", 3", 2", 0.75" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2682 I-2668 PREPARATION (HOT) on HYDROTESTED LINE @ TP-1453-00-HT-010 (GA) (Pipe
INSPECTION sizes: 28", 16", 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2683 HYDROTESTED LINE @ TP-1456-00-HT-007 (Pipe sizes:
I-2669 INSPECTION
36",12",8", 4",3", 2", 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2684 PREPARATION (HOT) on HYDROTESTED LINE @ TP-1654-00-HT-001 (GA) (Pipe
I-2670
INSPECTION sizes: 24",20",18", 2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2685 I-2671 INSPECTION (COLD) ON HYDROTESTED LINES TP-1714-00-HT-042(T) (Pipe
sizes: 2")

FINAL INSPECTION
2686 MFC-DLM- OF METAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
AK-I-2672 HYDROTESTED LINES TP-1683-02-HT-019 (Pipe sizes: 2")
CLADDING
FINAL INSPECTION
MFC-DLM- FINAL INSPECTION OF METAL CLADDING (COLD) ON
2687 OF METAL
AK-I-2673 HYDROTESTED LINES TP-1683-02-HT-021 (Pipe sizes: 2")
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2688 HYDROTESTED LINE @ TP-1631-01-HT-001 (T) (Pipe sizes: 3",
I-2674 INSPECTION
0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2689 I-2675 INSPECTION HYDROTESTED LINE @ TP-1456-00-HT-007 (Pipe sizes:
36",12",8", 4",3", 2", 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2690 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1461-00-HT-001 (A) (Pipe
I-2676 INSPECTION sizes: 3",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2691 (COLD) ON HYDROTESTED LINE @ TP-1683-03-HT-018 (T) (Pipe
I-2677 INSPECTION
sizes: 6",4",3",2",1")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2692 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-040 (T) (Pipe
I-2678 INSPECTION sizes: 4", 3", 2", 1" )

INSULATION INSPECTION PRIOR TO VAPOR TO APPLICATION


MFC-DLM-AK- INSULATION
2693 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-012
I-2679 INSPECTION (T) (Pipe sizes: 2", 1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2694 I-2680 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001
(A) (Pipe sizes: 2", 1.5" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2695 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002
I-2681 INSPECTION
(A) (Pipe sizes: 2", 1.5" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2696 (COLD) ON HYDROTESTED LINE @ TP-1631-02-HT-004(GA)
I-2682 INSPECTION
(Pipe sizes: 4", 3/4")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2697 I-2683 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-018 (Pipe sizes: 10", 6",
CLADDING 4", 2", 1", 075" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2698 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1704-02-HT-003 (Pipe sizes: 8",
I-2684 INSPECTION
6",3",2", 1.5", 1", 0.75" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
2699 HYDROTESTED LINE @ TP-1453-00-HT-008 (G) (Pipe sizes:
I-2685 INSPECTION
24",16",4",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2700 HYDROTESTED LINE @ TP-1531-03-HT-002 (GA) (Pipe sizes:
I-2686 INSPECTION
8",6",4",3",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2701 I-2687 INSPECTION HYDROTESTED LINE @ TP-1461-00-HT-001 (T) (Pipe sizes:
3",2",1",0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2702 HYDROTESTED LINE @ TP-1461-00-HT-001 (A) (Pipe sizes:
I-2688 INSPECTION 3",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2703
I-2689 INSPECTION HYDROTESTED LINE @ TP-1744-01-HT-006 (Pipe sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2704 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1462-00-HT-001 (GA) (Pipe
I-2690 INSPECTION Size: 4",3",2",1.5",1",0.75")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2705 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-002 (GA) (Pipe
I-2691 INSPECTION Size: 3")

INSULATION INSPECTION PRIOR TO METALCLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2706 I-2692 INSPECTION HYDROTESTED LINE @ TP-1654-00-HT-001 (P) (Pipe sizes:
24",20", 14",12",10",8",6",2",3/4")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) on


2707 HYDROTESTED LINE @ TP-1654-00-HT-001 (GA) (Pipe sizes:
I-2693 INSPECTION
24",20",18", 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2708
I-2694 INSPECTION HYDROTESTED LINES TP-1712-02-HT-010 (T) (Pipe sizes: 1")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2709 I-2695 INSPECTION HYDROTESTED LINES TP-1712-01-HT-019 (T) (Pipe sizes: 4",1")

FINAL INSPECTION
2710 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
I-2696 HYDROTESTED LINE @ TP-1744-01-HT-006 (Pipe sizes: 2" )
CLADDING
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2711 OF METAL HYDROTESTED LINE @ TP-1744-01-HT-010 (GA) (Pipe sizes: 2",
I-2697
CLADDING 1", 0.75" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2712
I-2698 INSPECTION HYDROTESTED LINE @ TP-1452-00-HT-016 (Pipe Size: 3", 2", 1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2713 I-2699 INSPECTION HYDROTESTED LINE @ TP-1455-00-HT-002 (GA) (Pipe sizes:
16",12",4",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2714 HYDROTESTED LINE @ TP-1453-00-HT-009 (GA) (Pipe sizes:
I-2700 INSPECTION 20",16",4",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2715 HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe sizes: 30", 12",
I-2701 INSPECTION
10", 8", 6", 4", 3", 2", 1", 0.75")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2716 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1714-00-HT-011 (T) (Pipe
I-2702 INSPECTION sizes: 14",12",6",4",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2717 (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001 (A) (Pipe
I-2703 INSPECTION sizes: 2", 1.5" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2718 I-2704 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002 (A) (Pipe
sizes: 2", 1.5" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2719 (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-012 (T) (Pipe
I-2705 INSPECTION
sizes: 2", 1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2720 HYDROTESTED LINE @ TP-1454-00-HT-001 (T) (Pipe size :
I-2706 INSPECTION
30",20",18",16",12",10"3",2"3/4")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2721 I-2707 INSPECTION HYDROTESTED LINE @ TP-1462-00-HT-001 (GA) (Pipe Size:
4",3",2",1.5",1",0.75")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2722 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1466-00-HT-003 (GA) (Pipe sizes: 3",
I-2708 INSPECTION
2",1" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) on
MFC-DLM-AK- INSULATION
2723 HYDROTESTED LINE @ TP-1466-00-HT-003 (T) (Pipe sizes: 8", 4",
I-2709 INSPECTION
3", 2", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2724 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-014
I-2710 INSPECTION
(Pipe sizes: 2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2725 I-2711 INSPECTION (COLD) ON HYDROTESTED @ TP-1683-03-HT-028 (Pipe sizes:
20",18",2",1" )

INSULATION INSPECTION PRIOR TO APPLICATION VAPOR


MFC-DLM- INSULATION
2726 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-014
AK-I-2712 INSPECTION (Pipe sizes: 2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2727 (COLD) ON HYDROTESTED LINES TP-1704-02-HT-014 (Pipe sizes:
I-2713 INSPECTION
30",18",16",14",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2728 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-076
I-2714 INSPECTION (TCC) ( PIPE SIZE : 72", 66", 24", 18", 8", 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2729
I-2715 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-002 (GA) (Pipe Size: 3")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM- INSULATION
2730 AK-I-2716 INSPECTION HYDROTESTED LINE @ TP-1632-02-HT-002 (GA) (Pipe sizes: 6",
2", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2731 HYDROTESTED LINE @ TP-1681-00-HT-001 (GA) (Pipe sizes:
I-2717 INSPECTION
30",2", 3/4")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2732 HYDROTESTED LINE @ TP-1714-00-HT-011 (T) (Pipe sizes:
I-2718 INSPECTION
14",12",6",4",1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2733 I-2719 INSPECTION HYDROTESTED LINE @ TP-1682-01-HT-010 (T) (Pipe sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2734 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1652-00-HT-003 (GA) (Pipe
I-2720
INSPECTION sizes: 24",20",18",6",2" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2735 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1631-02-HT-001 (GA) (Pipe
I-2721
INSPECTION sizes: 48",42",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2736 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1631-01-HT-004 (GA) (Pipe
I-2722
INSPECTION sizes: 64",60",24",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2737 I-2723 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1714-00-HT-014 (T) (Pipe
INSPECTION sizes: 48",30",18",16",14",10",8",6",3",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2738 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-007 (T) (Pipe
I-2724 INSPECTION sizes: 36",30",20",14",12",6" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2739 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-063 (T) (Pipe
I-2725
INSPECTION sizes: 20",14",10" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2740 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-008 (T) (Pipe
I-2726 INSPECTION sizes: 36" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2741 HYDROTESTED LINE @ TP-1714-00-HT-030 (T) (Pipe sizes: 12",
I-2727 INSPECTION 8", 4", 3")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2742 I-2728 INSPECTION HYDROTESTED @ TP-1701-01-HT-010 (T) (Pipe sizes: 30", 24",
20", 3" 2", 1", 0.75")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2743 HYDROTESTED LINE @ TP-1462-00-HT-001 (GA) (Pipe Size:
I-2729 INSPECTION
4",3",2",1.5",1",0.75")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2744 HYDROTESTED LINE @ TP-1654-00-HT-001 (P) (Pipe sizes:
I-2730 INSPECTION
24",20", 14",12",10",8",6",2",3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2745 I-2731 PREPARATION (HOT) ON HYDROTESTED LINE @ 1632-01-HT-002 (GA) (Pipe
INSPECTION sizes: 6",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2746 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1652-00-HT-006 (T) (Pipe sizes:
I-2732 INSPECTION
2",1.5" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2747 HYDROTESTED LINE @ TP-1451-00-HT-001 (T) (Pipe sizes:
I-2733 INSPECTION
20",10",8",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) on


MFC-DLM-AK- INSULATION
2748 HYDROTESTED LINE @ TP-1453-00-HT-010 (GA) (Pipe sizes: 28",
I-2734 INSPECTION
16", 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2749 I-2735 INSPECTION HYDROTESTED LINE @ TP-1531-01-HT-001 (GA) (Pipe sizes: 3",
2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2750 PREPARATION ON HYDROTESTED LINE @ TP-1456-00-HT-001 (ARCC) (Pipe
I-2736 INSPECTION sizes: 6",4",3",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2751 HYDROTESTED LINE @ TP-1652-00-HT-003 (GA) (Pipe sizes:
I-2737 INSPECTION
24",20",18",6",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2752 HYDROTESTED LINE @ TP-1456-00-HT-001 (PCMC) (Pipe sizes:
I-2738 INSPECTION 20", 18",16", 10" 8", 6", 4", 3", 2", 3/4")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2753 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-016 (Pipe
I-2739 INSPECTION sizes: 72",42",36",20",16",12",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2754 I-2740 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1721-03-HT-002 (Pipe
INSPECTION sizes: 6",2" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2755 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-076 (TCC)
I-2741 INSPECTION
( PIPE SIZE : 72", 66", 24", 18", 8", 2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2756 (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-014 (Pipe
I-2742 INSPECTION
sizes: 2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2757 I-2743 INSPECTION HYDROTESTED LINE @ TP-1454-00-HT-001 (T) (Pipe size :
30",20",18",16",12",10"3",2"3/4")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2758 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1531-02-HT-001 (GA) (Pipe sizes:
I-2744 INSPECTION
18", 8",6", 4",3",2",1" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
2759 HYDROTESTED LINE @ TP-1461-00-HT-001 (T) (Pipe sizes:
I-2745 INSPECTION
3",2",1",0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2760 HYDROTESTED LINE @ TP-1466-00-HT-003 (GA) (Pipe sizes: 8",
I-2746 INSPECTION
4", 3", 2", 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2761 I-2747 INSPECTION HYDROTESTED LINE @ TP-1531-03-HT-002 (GA) (Pipe sizes:
8",6",4",3",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2762 HYDROTESTED LINE @ TP-1631-02-HT-001 (GA) (Pipe sizes:
I-2748 INSPECTION 48",42",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2763 HYDROTESTED LINE @ TP-1631-01-HT-004 (GA) (Pipe sizes:
I-2749 INSPECTION
64",60",24",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2764 HYDROTESTED LINE @ TP-1714-00-HT-014 (T) (Pipe sizes:
I-2750 INSPECTION 48",30",18",16",14",10",8",6",3",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2765
I-2751 INSPECTION HYDROTESTED LINE @ 1632-01-HT-002 (GA) (Pipe sizes: 6",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2766 I-2752 INSPECTION HYDROTESTED LINE @ TP-1456-00-HT-001 (ARCC) (Pipe sizes:
6",4",3",2",1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2767 HYDROTESTED LINE @ TP-1652-00-HT-006 (T) (Pipe sizes:
I-2753 INSPECTION
2",1.5" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2768 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-007
I-2754 INSPECTION
(T) (Pipe sizes: 36",30",20",14",12",6" )

INSULATION INSPECTI ON PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2769 I-2755 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-063
(T) (Pipe sizes: 20",14",10" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2770 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-008
I-2756 INSPECTION
(T) (Pipe sizes: 36" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-
2771 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-014 (T) (Pipe
AK-I-2757
INSPECTION sizes: 36",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2772 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-001 (T) (Pipe
I-2758
INSPECTION sizes: 3",2",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2773 I-2759 OF METAL HYDROTESTED @ TP-1466-00-HT-016 (GA) (Pipe sizes: 18", 8",
CLADDING 6" )

IN-PROCESS VAPOR IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
2774 BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-
I-2760 INSPECTION 007 (T) (Pipe sizes: 36",30",20",14",12",6" )

IN-PROCESS VAPOR IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
2775 BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-
I-2761
INSPECTION 063 (T) (Pipe sizes: 20",14",10" )

MFC-DLM-AK- IN-PROCESS VAPOR IN-PROCESS VAPOR BARRIER INSPECTION PRIOR TO METAL


2776 BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-
I-2762 INSPECTION 008 (T) (Pipe sizes: 36" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2777 HYDROTESTED LINE @ TP-1624-02-HT-001(GA) (Pipe sizes: 8",
I-2763 INSPECTION 3")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2778 I-2764 INSPECTION HYDROTESTED LINE @ TP-1456-00-HT-001 (PCMC) (Pipe sizes:
20", 18",16", 10" 8", 6", 4", 3", 2", 3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2779 OF METAL HYDROTESTED @ TP-1731-01-HT-002 (T) (Pipe sizes: 16",4",
I-2765
CLADDING 3", 2", 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2780 OF METAL HYDROTESTED LINE @ TP-1662-01-HT-001(T) (Pipe sizes: 14",
I-2766
CLADDING 10", 2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2781 I-2767 INSPECTION (COLD) ON HYDROTESTED LINES TP-1662-01-HT-005 (Pipe sizes:
10",2",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2782 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-016
I-2768 INSPECTION
(Pipe sizes: 72",42",36",20",16",12",1" )
IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO METAL
MFC-DLM-AK-
2783 INSULATION CLADDING (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-001
I-2769
INSPECTION (T) (Pipe sizes: 3",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2784 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-002 (T) (Pipe
I-2770
INSPECTION sizes: 36",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2785 I-2771 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1623-01-HT-010 (GA)
INSPECTION (Pipe sizes: 22",20",14" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2786 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-001 (GA)
I-2772 INSPECTION (Pipe sizes: 3",2" )

IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
2787 INSULATION VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-
I-2773
INSPECTION HT-002 (T) (Pipe sizes: 36",2" )

IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
2788 INSULATION VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1623-01-
I-2774 INSPECTION HT-010 (GA) (Pipe sizes: 22",20",14" )

IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


MFC-DLM-AK-
2789 INSULATION VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1661-01-
I-2775 INSPECTION HT-001 (GA) (Pipe sizes: 3",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2790 I-2776 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1771-00-HT-002(T) (Pipe
INSPECTION sizes: 2")

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2791 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-016 (Pipe
I-2777 INSPECTION
sizes: 72",42",36",20",16",12",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2792 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-020 (T) Debutanizer
I-2778
CLADDING (Pipe sizes: 10", 4", 1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2793 I-2779 OF METAL HYDROTESTED LINE @ TP-1631-04-HT-040 (GA) (Pipe sizes:
CLADDING 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2794 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1507-01-HT-001-RT1 (A)
I-2780
INSPECTION (Pipe Sizes: 10",8", 6', 4", 3",2",1",0.75")
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
2795 HYDROTESTED LINE @ TP-1531-01-HT-001 (GA) (Pipe sizes: 3",
I-2781 INSPECTION
2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2796 HYDROTESTED LINE @ TP-1531-01-HT-001 (PCMC) (Pipe sizes:
I-2782 INSPECTION
18", 16", 14", 10", 6", 3", 1", 0.75")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2797 I-2783 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-002 (T) (Pipe
sizes: 36",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2798 (COLD) ON HYDROTESTED LINE @ TP-1623-01-HT-010 (GA)
I-2784 INSPECTION (Pipe sizes: 22",20",14" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2799 (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-001 (GA)
I-2785 INSPECTION
(Pipe sizes: 3",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2800 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1771-00-HT-
I-2786 INSPECTION 002(T) (Pipe sizes: 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2801 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1456-00-HT-001 (GA) (Pipe
I-2787 INSPECTION Sizes: 36",30",24",20",16",14",12",2",1.5",1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-
2802 AK-I-2788 OF METAL HYDROTESTED LINE @ TP-1683-01-HT-001 (Pipe sizes: 10",
CLADDING 8",6", 4", 3", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2803 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-063 (T) (Pipe sizes:
I-2789
CLADDING 20",14",10" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2804 OF METAL HYDROTESTED LINE @ TP-1683-03-HT-002 (Pipe sizes: 30",3" ,
I-2790
CLADDING 2",1")

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2805 I-2791 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-026 (Pipe sizes: 20", 18",
CLADDING 10", 14", 8", 6", 3",2", 1")

IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO METAL


2806 MFC-DLM-AK- INSULATION CLADDING (HOT) ON HYDROTESTED LINE @ TP-1507-01-HT-001-
I-2792
INSPECTION RT1 (A) (Pipe Sizes: 10",8", 6', 4", 3",2",1",0.75")
IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO METAL
MFC-DLM-AK-
2807 INSULATION CLADDING (HOT) ON HYDROTESTED LINE @ TP-1456-00-HT-001
I-2793
INSPECTION (GA) (Pipe Sizes: 36",30",24",20",16",14",12",2",1.5",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2808 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-01-HT-007 (Pipe Sizes:
I-2794
INSPECTION 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2809 I-2795 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-02-HT-004 (Pipe Sizes:
INSPECTION 3",2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2810 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1721-02-HT-044 (Pipe
I-2796 INSPECTION Sizes: 2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2811 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-023 (Pipe sizes: 30",
I-2797
CLADDING 24", 18", 16", 14", 12", 10", 8", 6", 4",2", 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
2812 OF METAL HYDROTESTED LINE @ TP-1683-03-HT-007 (Pipe sizes:
I-2798 CLADDING 10",8",3",2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2813 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-001 (Pipe Size: 8", 4",
I-2799 CLADDING 3",2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2814 I-2800 OF METAL HYDROTESTED LINES TP-1714-00-HT-042(T) (Pipe sizes: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2815 OF METAL
I-2801 HYDROTESTED LINES TP-1714-00-HT-040 (Pipe sizes: 6", 2")
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2816 HYDROTESTED LINE @ TP-1714-00-HT-016 (Pipe sizes:
I-2802 INSPECTION
72",42",36",20",16",12",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2817 I-2803 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-001 (Pipe Sizes:
INSPECTION 3"2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2818 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1651-00-HT-009 (Pipe Sizes:
I-2804
INSPECTION 30",2")
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2819 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1651-00-HT-008 (Pipe Sizes:
I-2805
INSPECTION 30",24",4",2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2820 (COLD) ON HYDROTESTED LINE @ TP-1771-00-HT-002(T) (Pipe
I-2806 INSPECTION
sizes: 2")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2821 I-2807 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1721-03-HT-002
(Pipe sizes: 6",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2822 OF METAL
I-2808 CLADDING HYDROTESTED @ TP-1712-02-HT-016 (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2823
I-2809 INSPECTION HYDROTESTED LINE @ TP-1744-01-HT-007 (Pipe Sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2824
I-2810 INSPECTION HYDROTESTED LINE @ TP-1744-02-HT-004 (Pipe Sizes: 3",2")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2825 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1721-02-HT-044
I-2811 INSPECTION (Pipe Sizes: 2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2826 I-2812 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-002 (GA)
INSPECTION (Pipe sizes: 36",30",4",2" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2827 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1621-01-HT-002 (A) (Pipe
I-2813
INSPECTION sizes: 36" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2828 HYDROTESTED LINE @ TP-1456-00-HT-001 (ARCC) (Pipe sizes:
I-2814 INSPECTION
6",4",3",2",1" )

MARK-UP DEMONSTRATION OF APPLICATION OF SONOPROOF


MFC-DLM-AK- MARK-UP
2829 I-2815 DEMONSTRATION NOISE BARRIER (HOT) ON HYDROTESTED LINE @ TP-1714-00-
HT-014 (T) (Pipe sizes: 48",30",18" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2830 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1705-01-HT-002 (Pipe sizes:
I-2816
CLADDING 18",16",1" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2831 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-01-HT-008 (GA) (Pipe
I-2817
INSPECTION Sizes: 8",2")

SURFACE SURFACE INSPECTION PIRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2832 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-01-HT-002 (GA) (Pipe
I-2818
INSPECTION Sizes: 6",2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2833 I-2819 PREPARATION (HOT) ON HYDROTESTED LINES TP-1506-01-HT-001 RT1 (Pipe
INSPECTION sizes: 10",8",6",3",2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2834 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-001 (T) (Pipe
I-2820 INSPECTION sizes: 3",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2835 OF METAL HYDROTESTED LINE @ TP-1652-00-HT-012 (GA) (Pipe sizes:
I-2821
CLADDING 10", 4",3", 1.5" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
2836 OF METAL HYDROTESTED LINE @ TP-1461-00-HT-001 (A) (Pipe sizes:
AK-I-2822 CLADDING 3",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2837 HYDROTESTED LINE @ TP-1456-00-HT-001 (ARCC) (Pipe sizes:
I-2823 INSPECTION 8",6",4",3",2",1" )

MFC-DLM- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2838 AK-I-2824 INSPECTION HYDROTESTED LINE @ TP-1721-03-HT-002 (Pipe sizes: 6",2" )

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2839 (COLD) ON HYDROTESTED LINE @ TP-1721-03-HT-002 (Pipe
I-2825 INSPECTION
sizes: 6",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2840 HYDROTESTED LINE @ TP-1461-00-HT-001 (A) (Pipe sizes:
I-2826 INSPECTION
3",2",1 )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2841 I-2827 INSPECTION HYDROTESTED LINES TP-1541-00-HT-001 (Pipe sizes:
3",2",1.5",075")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2842 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINES TP-1541-00-HT-002 (Pipe sizes:
I-2828 INSPECTION
3",2",1.5",075")
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2843 HYDROTESTED LINE @ TP-1744-01-HT-008 (GA) (Pipe Sizes:
I-2829 INSPECTION
8",2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2844 HYDROTESTED LINE @ TP-1744-01-HT-002 (GA) (Pipe Sizes:
I-2830 INSPECTION
6",2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2845 I-2831 INSPECTION HYDROTESTED LINES TP-1506-01-HT-001 RT1 (Pipe sizes:
10",8",6",3",2",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2846 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-001
I-2832 INSPECTION (T) (Pipe sizes: 3",2" )

MATERIAL RECIVING & INSPECTION OF HOT INSULATION


MFC-DLM-AK- HOT INSULATION
2847 MATERIALS, ROCKWOOL PIPE COVER
I-2833 MATERIAL
(40mm,50mm,65mm,80mm,100mm.)

MATERIAL RECIVING & INSPECTION OF HOT/COLD ACCOUSTIC


MFC-DLM- HOT INSULATION
2848 INSULATION MATERIALS, PHONISOL BM0040 SOUND BARRIER
AK-I-2834 MATERIAL (1250mm x 5mtr)

VAPOR BARRIER INSPECTIION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2849 (COLD) ON HYDROTESTED LINE @ TP-1661-01-HT-001 (T) (Pipe
I-2835 INSPECTION sizes: 3",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2850 I-2836 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-002
(GA) (Pipe sizes: 36",30",4",2" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2851 HYDROTESTED LINE @ TP-1714-00-HT-016 (Pipe sizes:
I-2837 INSPECTION
72",42",36",20",16",12",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2852 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-009 (Pipe
I-2838
INSPECTION Sizes: 30",2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2853 I-2839 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-008 (Pipe
INSPECTION Sizes: 30",24",4",2")

2854 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


I-2840 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-001 (GA) (Pipe Sizes: 3"2")
MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
2855
I-2841 INSPECTION HYDROTESTED LINE @ TP-1721-03-HT-002 (Pipe sizes: 6",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2856 OF METAL
I-2842 HYDROTESTED LINES TP-1683-03-HT-027 (Pipe sizes: 10",6",1")
CLADDING

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2857 I-2843 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1622-00-HT-002 (GA) (Pipe
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2858 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1652-00-HT-002 (Pipe
I-2844 INSPECTION sizes: 20" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2859 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1616-00-HT-001 (A) (Pipe
I-2845
INSPECTION sizes: 30",24",18",12",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2860 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1623-01-HT-020 (Pipe
I-2846 INSPECTION Sizes: 6")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
2861 OF METAL
I-2847 CLADDING HYDROTESTED LINES TP-1683-03-HT-003 (Pipe sizes: 30",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2862 I-2848 INSPECTION HYDROTESTED LINE @ TP-1704-02-HT-007 (T) (Pipe sizes:
36",30",20",14",12",6" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) @ TP-
2863
I-2849 INSPECTION 1661-01-HT-004 (Pipe sizes: ,2",16" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2864 HYDROTESTED LINE @ TP-1662-01-HT-015 (T) (Pipe sizes: 20",
I-2850 INSPECTION
10", 8", 4", 2", 1", 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2865 I-2851 INSPECTION HYDROTESTED LINE @ TP-1541-00-HT-001 (A) (Pipe sizes: 2",
1.5" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2866 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1541-00-HT-002 (A) (Pipe sizes: 2",
I-2852 INSPECTION
1.5" )
MATERIAL RECIVING & INSPECTION OF HOT/COLD ACCOUSTIC
MFC-DLM-AK- INSULATION
2867 INSULATION MATERIALS, PHONISOL BM0040 SOUND BARRIER
I-2853 MATERIAL
(1250mm x 5mtr)

MATERIAL RECIVING & INSPECTION OF HOT/COLD ACCOUSTIC


MFC-DLM-AK- INSULATION
2868 INSULATION MATERIALS, SONOPROOF SOUND BARRIER (1m x
I-2854 MATERIAL
2m x 3mm thk)

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2869 I-2855 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1606-02-HT-006 (A) (Pipe
INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2870 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1607-02-HT-006 RT1 (A)
I-2856 INSPECTION (Pipe sizes: 36",24",12",8",6",1" )

PARTIAL SURFACE INSPECTION PRIOR TO INSTALLATION OF


MFC-DLM-AK- PARTIAL SURFACE INSULATION (HOT) EXCLUDING WELD JOINT AND SUPPORTS ON
2871
I-2857 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-002 (T) (Pipe sizes:
3",2",1" )

PATIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2872 HYDROTESTED LINE @ TP-1744-01-HT-002 (GA) (Pipe Sizes:
I-2858 INSPECTION 6",2")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2873 HYDROTESTED LINE @ TP-1652-00-HT-003 (GA) (Pipe sizes:
I-2859 INSPECTION 24",20",18",6",2" )

PARTIAL FINAL INSPECTION OFMETAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2874 I-2860 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-001 (T) (Pipe sizes:
3",2",1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2875 HYDROTESTED LINE @ TP-1507-01-HT-001-RT1 (A) (Pipe Sizes:
I-2861 INSPECTION
10",8", 6', 4", 3",2",1",0.75")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2876 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-009
I-2862 INSPECTION
(Pipe Sizes: 30",2")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2877 I-2863 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-008
(Pipe Sizes: 30",24",4",2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


2878 MFC-DLM-AK- VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-002 (GA)
I-2864 INSPECTION
(Pipe sizes: 36",30",4",2" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2879 HYDROTESTED LINE @ TP-1622-00-HT-002 (GA) (Pipe sizes:
I-2865 INSPECTION
2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2880
I-2866 INSPECTION HYDROTESTED LINE @ TP-1652-00-HT-002 (Pipe sizes: 20" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2881 I-2867 INSPECTION HYDROTESTED LINE @ TP-1616-00-HT-001 (A) (Pipe sizes:
30",24",18",12",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2882
I-2868 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-020 (Pipe Sizes: 6")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2883 (COLD) ON HYDROTESTED LINE @ TP-1721-02-HT-044 (Pipe
I-2869 INSPECTION
Sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2884
I-2870 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-002 (A) (Pipe sizes: 36" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
2885 OF METAL HYDROTESTED LINE @ TP-1744-01-HT-008 (GA) (Pipe Sizes:
AK-I-2871 CLADDING 8",2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
2886 AK-I-2872 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-022(T) (Pipe sizes: 16",
CLADDING 2", 1")

MFC-DLM- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2887 OF METAL HYDROTESTED @ TP-1661-01-HT-007 (T) (Pipe sizes: 18",
AK-I-2873
CLADDING 12",6", 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM- PARTIAL FINAL
2888 HYDROTESTED LINE @ TP-1661-01-HT-006 (Pipe sizes: 18",
AK-I-2874 INSPECTION
12",6", 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM- PARTIAL FINAL
2889 AK-I-2875 INSPECTION HYDROTESTED LINE @ TP-1661-01-HT-021 (Pipe sizes: ,12",8"3"
)

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2890 MFC-DLM- PARTIAL FINAL HYDROTESTED LINE @ TP-1661-01-HT-005 (T) (Pipe sizes: 10",
AK-I-2876 INSPECTION
8",6",4",2",1.5",1" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-
2891 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe
AK-I-2877
INSPECTION sizes: 36",30",24",20",18",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2892 HYDROTESTED LINE @ TP-1622-00-HT-002 (GA) (Pipe sizes:
I-2878 INSPECTION
2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2893 I-2879 INSPECTION HYDROTESTED LINE @ TP-1652-00-HT-002 (Pipe sizes: 20" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2894 HYDROTESTED LINE @ TP-1616-00-HT-001 (A) (Pipe sizes:
I-2880 INSPECTION 30",24",18",12",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2895
I-2881 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-020 (Pipe Sizes: 6")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2896 (COLD) ON HYDROTESTED LINE @ TP-1721-02-HT-044 (Pipe
I-2882 INSPECTION Sizes: 2")

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2897
I-2883 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-002 (A) (Pipe sizes: 36" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2898 I-2884 OF METAL HYDROTESTED LINE @ TP-1744-01-HT-008 (GA) (Pipe Sizes:
CLADDING 8",2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2899 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-022(T) (Pipe sizes: 16",
I-2885
CLADDING 2", 1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2900 OF METAL HYDROTESTED @ TP-1661-01-HT-007 (T) (Pipe sizes: 18",
I-2886
CLADDING 12",6", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2901 I-2887 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-006 (Pipe sizes: 18",
CLADDING 12",6", 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2902 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1661-01-HT-021 (Pipe sizes: ,12",8"3"
I-2888 INSPECTION
)
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
2903 HYDROTESTED LINE @ TP-1661-01-HT-005 (T) (Pipe sizes: 10",
I-2889 INSPECTION
8",6",4",2",1.5",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2904 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe
I-2890
INSPECTION sizes: 36",30",24",20",18",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2905 I-2891 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001 (GA)
INSPECTION (Pipe sizes: 3",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2906 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002 (GA)
I-2892 INSPECTION (Pipe sizes: 3",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2907 OF METAL
I-2893 HYDROTESTED LINES TP-1662-01-HT-014 (Pipe sizes: 3", 1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) @ TP-1505-01-


2908 OF METAL
I-2894 CLADDING HT-009 (Pipe sizes: 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) on
2909 OF METAL
I-2895 CLADDING HYDROTESTED LINE @ TP-1632-03-HT-001 (GA) (Pipe sizes: 4" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2910 I-2896 INSPECTION HYDROTESTED LINE @ TP-1661-01-HT-012 (T) (Pipe sizes: 2",
1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2911
I-2897 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-001 (GA) (Pipe Sizes: 3"2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2912 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010 (Pipe
I-2898
INSPECTION sizes: 36",24",18",16",14",10",4" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2913 I-2899 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-008 (Pipe
Sizes: 30",24",4",2")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2914 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1606-02-HT-006 (A) (Pipe sizes:
I-2900 INSPECTION
36",24",12",8",6",1" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
2915 HYDROTESTED LINE @ TP-1607-02-HT-006 RT1 (A) (Pipe sizes:
I-2901 INSPECTION
36",24",12",8",6",1" )

PATIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2916 HYDROTESTED LINE @ TP-1631-02-HT-004(GA) (Pipe sizes: 4",
I-2902 INSPECTION
3/4")

PARTIAL FINAL INSPECTION OF METAL CLADDING ( HOT ) PRIOR


MFC-DLM-AK- PARTIAL FINAL
2917 I-2903 INSPECTION TO METAL CLADDING ON HYDROTESTED LINES TP-1507-01-HT-
007 (Pipe sizes: 8")

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


2918
I-2904 INSPECTION HYDROTESTED LINE @ 1632-01-HT-002 (GA) (Pipe sizes: 6",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2919 HYDROTESTED LINE @ TP-1456-00-HT-001 (GA) (Pipe Sizes:
I-2905 INSPECTION
36",30",24",20",16",14",12",2",1.5",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2920 HYDROTESTED LINE @ TP-1704-02-HT-041 (T) (Pipe sizes: 4",
I-2906 INSPECTION 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2921 HYDROTESTED LINE @ TP-1661-01-HT-001 (T) (Pipe sizes: 3",2"
I-2907 INSPECTION )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2922 I-2908 INSPECTION HYDROTESTED LINE @ TP-1661-01-HT-001 (GA) (Pipe sizes:
3",2" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


2923 HYDROTESTED @ TP-1683-03-HT-021 (Pipe sizes: 16", 12", 2",
I-2909 INSPECTION
1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2924 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-031 (T) (Pipe
I-2910
INSPECTION sizes: 2" )

MATERIAL RECIVING & INSPECTION OF HOT INSULATION


MFC-DLM-AK- HOT INSULATION
2925 I-2911 MATERIAL MATERIALS, ROCKWOOL PIPE COVER & BLANKET
(40mm,50mm,65mm,70mm,80mm,100mm.)

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2926 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe sizes:
I-2912 INSPECTION
36",30",24",20",18",2",1" )
INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR
MFC-DLM-AK- INSULATION
2927 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001
I-2913 INSPECTION
(GA) (Pipe sizes: 3",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2928 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002
I-2914 INSPECTION
(GA) (Pipe sizes: 3",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
2929 I-2915 OF METAL HYDROTESTED LINE @ TP-1761-00-HT-006 (GA) (Pipe sizes: 3" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2930 OF METAL HYDROTESTED LINE @ TP-1624-02-HT-001(GA) (Pipe sizes: 8",
I-2916 CLADDING 3")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2931 HYDROTESTED LINES TP-1506-01-HT-001 RT1 (Pipe sizes:
I-2917 INSPECTION
10",8",6",3",2",1")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2932 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010
I-2918 INSPECTION (Pipe sizes: 36",24",18",16",14",10",4" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2933 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-031
I-2919 INSPECTION (T) (Pipe sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2934 I-2920 PREPARATION (HOT) ON HYDROTESTED LINE @ 1631-01-HT-002 (GA) (Pipe
INSPECTION sizes: 80",66",60",42",2" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2935 PREPARATION (HOT) ON HYDROTESTED LINE @ 1682-01-HT-004 (GA) (Pipe
I-2921
INSPECTION sizes: 36",10",,2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2936 PREPARATION (HOT) ON HYDROTESTED LINE @ 1623-01-HT-015 (GA) (Pipe
I-2922
INSPECTION sizes: 3" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2937 I-2923 PREPARATION (HOT) ON HYDROTESTED LINE @ 1627-00-HT-002 (GA) (Pipe
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2938 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ 1631-02-HT-002 (GA) (Pipe
I-2924
INSPECTION sizes: 54",2" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
2939 PREPARATION (HOT) ON HYDROTESTED LINE @ 1623-01-HT-019 (GA) (Pipe
I-2925
INSPECTION sizes: 20" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2940 PREPARATION (COLD) ON HYDROTESTED LINE @ 1623-01-HT-019 (GA) (Pipe
I-2926
INSPECTION sizes: 6" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
2941 I-2927 OF METAL HYDROTESTED LINES TP-1704-02-HT-004 (Pipe sizes:
CLADDING 12",10",6",3",1.5")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) on


MFC-DLM-AK- PARTIAL FINAL
2942 HYDROTESTED LINE @ TP-1466-00-HT-003 (T) (Pipe sizes: 4",3",
I-2928 INSPECTION 2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2943 PREPARATION (COLD) ON HYDROTESTED LINE @ 1704-02-HT-036 (GA) (Pipe
I-2929
INSPECTION sizes: 6",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2944 (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-001 (GA)
I-2930 INSPECTION (Pipe sizes: 3",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2945 (COLD) ON HYDROTESTED LINE @ TP-1541-00-HT-002 (GA)
I-2931 INSPECTION (Pipe sizes: 3",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2946 I-2932 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010 (Pipe
sizes: 36",24",18",16",14",10",4" )

MFC-DLM- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2947 OF METAL HYDROTESTED LINE @ TP-1683-03-HT-018 (T) (Pipe sizes:
AK-I-2933
CLADDING 6",4",3",2",1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2948 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-006 RT1 (A) (Pipe sizes:
I-2934
CLADDING 36",24",12",8",6",1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
2949 I-2935 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-005 (T) (Pipe sizes: 10",
CLADDING 8",6",4",2",1.5",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


2950 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1661-01-HT-021 (Pipe sizes: ,12",8"3"
I-2936
CLADDING )
PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK- PARTIAL FINAL
2951 HYDROTESTED LINE @ TP-1651-00-HT-002 (GA) (Pipe sizes:
I-2937 INSPECTION
36",30",4",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2952 HYDROTESTED LINE @ TP-1651-00-HT-002 (T) (Pipe sizes:
I-2938 INSPECTION
36",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2953 I-2939 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1453-00-HT-001B (Pipe
INSPECTION sizes: 30",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2954 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1605-02-HT-006 (A) (Pipe
I-2940 INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2955 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-011 (Pipe
I-2941
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2956 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-003 (GA)
I-2942 INSPECTION (Pipe sizes: 30",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2957 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1651-00-HT-003 (GA) (Pipe
I-2943 INSPECTION sizes: 30",20",6",4" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2958 I-2944 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-036 (TCC)
INSPECTION (Pipe sizes: 6",2" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


2959 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1613-02-HT-006 (A) (Pipe
I-2945
INSPECTION sizes: 36",30",20",14",10",8",6" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2960 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1701-03-HT-001 (T) (Pipe
I-2946
INSPECTION sizes: 12" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) @ TP-1691-01-


2961 I-2947 OF METAL HT-002 (Pipe sizes: ,24", 3", 1", )
CLADDING

2962 MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
I-2948 INSPECTION HYDROTESTED LINE @ TP-1621-01-HT-002 (A) (Pipe sizes: 36" )
VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING
MFC-DLM-AK- VAPOR BARRIER
2963 (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-031 (T) (Pipe
I-2949 INSPECTION
sizes: 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2964 HYDROTESTED LINE @ 1631-01-HT-002 (GA) (Pipe sizes:
I-2950 INSPECTION
80",66",60",42",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2965 I-2951 INSPECTION HYDROTESTED LINE @ 1682-01-HT-004 (GA) (Pipe sizes:
36",10",,2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2966
I-2952 INSPECTION HYDROTESTED LINE @ 1623-01-HT-015 (GA) (Pipe sizes: 3" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2967
I-2953 INSPECTION HYDROTESTED LINE @ 1627-00-HT-002 (GA) (Pipe sizes: 2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2968
I-2954 INSPECTION HYDROTESTED LINE @ 1631-02-HT-002 (GA) (Pipe sizes: 54",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2969
I-2955 INSPECTION HYDROTESTED LINE @ 1623-01-HT-019 (GA) (Pipe sizes: 20" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2970 I-2956 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ 1623-01-HT-019
(GA) (Pipe sizes: 6" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2971 BARRIER (COLD) ON HYDROTESTED LINE @ 1704-02-HT-036
I-2957 INSPECTION
(GA) (Pipe sizes: 6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2972 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1781-00-HT-001 (Pipe
I-2958
INSPECTION sizes: 3" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-
2973 AK-I-2959 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1605-02-HT-006 (GA&TCC)
INSPECTION (Pipe sizes: 24",20",16",14",12",10",8",4".2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2974 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1662-01-HT-008 (Pipe sizes: ,3",
I-2960
CLADDING 2",1.5", 1" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2975 OF METAL HYDROTESTED LINE @ TP-1662-01-HT-015 (T) (Pipe sizes: 20",
I-2961
CLADDING 10", 8", 4", 2", 1", 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2976 HYDROTESTED LINE @ TP-1623-01-HT-010 (GA) (Pipe sizes:
I-2962 INSPECTION
22",20",14" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2977 I-2963 INSPECTION HYDROTESTED LINE @ TP-1451-00-HT-001 (T) (Pipe sizes:
20",10",8",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
2978 HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe sizes:
I-2964 INSPECTION 36",30",24",20",18",2",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2979 HYDROTESTED LINE @ TP-1651-00-HT-003 (GA) (Pipe sizes:
I-2965 INSPECTION
30",20",6",4" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
2980 HYDROTESTED LINE @ TP-1613-02-HT-006 (A) (Pipe sizes:
I-2966 INSPECTION 36",30",20",14",10",8",6" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2981
I-2967 INSPECTION HYDROTESTED LINE @ TP-1701-03-HT-001 (T) (Pipe sizes: 12" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2982 I-2968 INSPECTION HYDROTESTED LINE @ TP-1453-00-HT-001B (Pipe sizes: 30",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


2983 HYDROTESTED LINE @ TP-1605-02-HT-006 (A) (Pipe sizes:
I-2969 INSPECTION
36",24",12",8",6",1" )

INSULAITON INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2984 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-011
I-2970 INSPECTION
(Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
2985 I-2971 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-003
(GA) (Pipe sizes: 30",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2986 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-036
I-2972 INSPECTION
(TCC) (Pipe sizes: 6",2" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
2987
I-2973 INSPECTION HYDROTESTED LINE @ TP-1781-00-HT-001 (Pipe sizes: 3" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2988 OF METAL HYDROTESTED LINE @ TP-1531-01-HT-001 (PCMC) (Pipe sizes:
I-2974
CLADDING 18", 16", 14", 10", 6", 3", 1", 0.75")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
2989 I-2975 OF METAL HYDROTESTED LINE @ TP-1606-02-HT-006 (A) (Pipe sizes:
CLADDING 36",24",12",8",6",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2990 HYDROTESTED LINE @ TP-1541-00-HT-001 (GA) (Pipe sizes:
I-2976 INSPECTION 3",2" )

PARTIAL FINAL INSPECTION OF METAL CALADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
2991 HYDROTESTED LINE @ TP-1541-00-HT-002 (GA) (Pipe sizes:
I-2977 INSPECTION
3",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
2992 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-012 (GA&TCC)
I-2978 INSPECTION (Pipe sizes: 24",20",16",14",12",10",8",4".2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2993 (COLD) ON HYDROTESTED LINE @ 1623-01-HT-019 (GA) (Pipe
I-2979 INSPECTION sizes: 6" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2994 I-2980 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-003 (GA)
(Pipe sizes: 30",2" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


2995 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1681-00-HT-013
I-2981 INSPECTION
(Pipe sizes: 8",6",4",2",1",0.75")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2996 (COLD) ON HYDROTESTED LINE @ TP-1651-00-HT-009 (Pipe
I-2982 INSPECTION
Sizes: 30",2")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
2997 I-2983 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1691-01-HT-011 (Pipe
sizes: 2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


2998 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1683-03-HT-018 (T) (Pipe sizes:
I-2984
CLADDING 6",4",3",2",1")
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
2999 OF METAL HYDROTESTED LINE @ TP-1744-01-HT-002 (GA) (Pipe Sizes:
I-2985
CLADDING 6",2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3000 OF METAL HYDROTESTED LINE @ TP-1531-02-HT-001 (GA) (Pipe sizes:
I-2986
CLADDING 18", 8",6", 4",3",2",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3001 I-2987 INSPECTION (COLD) ON HYDROTESTED LINE @ 1704-02-HT-036 (GA) (Pipe
sizes: 6",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3002 (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-036 (TCC)
I-2988 INSPECTION (Pipe sizes: 6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3003 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1452-00-HT-020 (TCC)
I-2989
INSPECTION (Pipe sizes: 36"1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3004 (COLD) ON HYDROTESTED LINE @ TP-1681-00-HT-013 (Pipe
I-2990 INSPECTION sizes: 8",6",4",2",1",0.75")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3005 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-012
I-2991 INSPECTION (GA&TCC) (Pipe sizes: 24",20",16",14",12",10",8",4".2" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3006 I-2992 OF METAL HYDROTESTED LINE @ TP-1452-00-HT-018 (Pipe sizes: 3", 2",
CLADDING 1", 0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3007 OF METAL
I-2993 HYDROTESTED LINE @ TP-1744-02-HT-004 (Pipe Sizes: 3",2")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3008 OF METAL HYDROTESTED LINE @ TP-1453-00-HT-009 (GA) (Pipe sizes:
I-2994
CLADDING 20",16",4",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3009 I-2995 INSPECTION HYDROTESTED LINE @ 1682-01-HT-004 (GA) (Pipe sizes:
36",10",,2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3010 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1621-03-HT-002 (GA) (Pipe
I-2996
INSPECTION sizes: 2" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
3011 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007 (Pipe
I-2997
INSPECTION sizes: 36",24",18")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3012 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-012 (GA&TCC)
I-2998 INSPECTION
(Pipe sizes: 24",20",16",14",12",10",8",4".2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3013 I-2999 INSPECTION HYDROTESTED LINE @ TP-1452-00-HT-020 (TCC) (Pipe sizes:
36"1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3014 OF METAL HYDROTESTED LINE @ TP-1531-03-HT-002 (GA) (Pipe sizes:
I-3000 CLADDING 8",6",4",3",2",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3015 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-040 (T) (Pipe sizes: 4",
I-3001
CLADDING 3", 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3016 OF METAL
I-3002 CLADDING HYDROTESTED LINES TP-1683-02-HT-041 (Pipe sizes: 4",3",2",1")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3017 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-006 (GA) (Pipe
I-3003 INSPECTION sizes: 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3018 I-3004 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-012 (T) (Pipe sizes: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3019 OF METAL
I-3005 HYDROTESTED LINE @ TP-1683-02-HT-017 (T) (Pipe sizes: 2")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3020 OF METAL HYDROTESTED LINE @ TP-1616-00-HT-001 (A) (Pipe sizes:
I-3006
CLADDING 30",24",18",12",2" )

SURFACE
MFC-DLM-AK- SURFACE INSPECTION PRIOR TO INSTALLATION OF FALVE &
3021 I-3007 PREPARATION FLUNGE BOX (HOT) LEAK TEST ACCEPTED @ SYSTEM-1607-01
INSPECTION

SURFACE
3022 MFC-DLM-AK- PREPARATION SURFACE INSPECTION PRIOR TO INSTALLATION OF FALVE &
I-3008 FLUNGE BOX (HOT) LEAK TEST ACCEPTED @ SYSTEM-1606-01
INSPECTION
PARTIAL SURFACE INSPECTION PRIOR TO INSTALLATION OF
MFC-DLM-AK- PARTIAL SURFACE INSULATION (HOT) EXCLUDING WELD JOINT AND SUPPORTS ON
3023
I-3009 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-002 (GA) (Pipe sizes:
3",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3024 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1682-01-HT-011 (T) (Pipe
I-3010
INSPECTION sizes: 36",18" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3025 I-3011 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1744-01-HT-003 (GA) (Pipe
INSPECTION sizes: 20",14",12",3",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3026 OF METAL
I-3012 CLADDING HYDROTESTED LINE @ 1627-00-HT-002 (GA) (Pipe sizes: 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
3027 OF METAL
I-3013 (HOT) @ TP-1634-00-HT-025 (GA) (Pipe sizes: 2", 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE


3028 OF METAL
I-3014 CLADDING (HOT) @ TP-1634-00-HT-024 (GA) (Pipe sizes: 2", 1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED LINE
3029 OF METAL
I-3015 CLADDING (HOT) @ TP-1631-04-HT-027 (GA) (Pipe sizes: 8", 4", 3" )

MFC-DLM-AK- FINAL INSPECTION PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


3030 I-3016 OF METAL HYDROTESTED @ TP-1651-00-HT-005 (Pipe sizes:2",1")
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


3031 HYDROTESTED LINE @ TP-1662-01-HT-003(T) (Pipe sizes: 6",
I-3017 INSPECTION
4", 3", 2", 1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3032 HYDROTESTED LINE @ TP-1541-00-HT-001 (GA) (Pipe sizes:
I-3018 INSPECTION
3",2" )

PARTIAL FINAL INSPECTION OF METAL CALADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3033 I-3019 INSPECTION HYDROTESTED LINE @ TP-1541-00-HT-002 (GA) (Pipe sizes:
3",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3034 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1605-02-HT-006 (A) (Pipe sizes:
I-3020
CLADDING 36",24",12",8",6",1" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
3035 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-032 (T) (Pipe
I-3021
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3036 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1604-02-HT-006 (A) (Pipe
I-3022
INSPECTION sizes: 36",24",12",8",6",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3037 I-3023 INSPECTION HYDROTESTED LINE @ TP-1621-03-HT-002 (GA) (Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3038 HYDROTESTED LINE @ TP-1682-01-HT-011 (T) (Pipe sizes:
I-3024 INSPECTION 36",18" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3039 HYDROTESTED LINE @ TP-1744-01-HT-003 (GA) (Pipe sizes:
I-3025 INSPECTION
20",14",12",3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3040
I-3026 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-006 (GA) (Pipe sizes: 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3041 OF METAL
I-3027 CLADDING HYDROTESTED @ TP-1631-04-HT-030 (GA) (Pipe sizes: 2", 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3042 I-3028 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-002 (Pipe Size: 36", 2", 1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3043 OF METAL
I-3029 HYDROTESTED LINE @ TP-1621-01-HT-002 (A) (Pipe sizes: 36" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3044 OF METAL
I-3030 HYDROTESTED LINE @ TP-1652-00-HT-002 (Pipe sizes: 20" )
CLADDING

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3045 I-3031 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1682-01-HT-001 (T) (Pipe
INSPECTION sizes: 36",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


3046 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-032
I-3032 INSPECTION
(T) (Pipe sizes: 2" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
3047 HYDROTESTED LINE @ TP-1604-02-HT-006 (A) (Pipe sizes:
I-3033 INSPECTION
36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3048 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1721-02-HT-017 (GA) (Pipe
I-3034
INSPECTION sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3049 I-3035 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-001 (GA)
INSPECTION (Pipe sizes: 36",24",4",2" )

PARTIAL SURFACE INSPECTION PRIOR TO INSTALLATION OF


MFC-DLM-AK- PARTIAL SURFACE
3050 INSULATION (COLD) ON HYDROTESTED LINE @ TP-1641-00-HT-
I-3036 INSPECTION 026 (GA) (Pipe sizes: 36" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3051 HYDROTESTED LINE @ TP-1714-00-HT-012 (GA&TCC) (Pipe
I-3037 INSPECTION
sizes: 24",20",16",14",12",10",8",4".2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3052 HYDROTESTED LINE @ TP-1681-00-HT-013 (Pipe sizes:
I-3038 INSPECTION 8",6",4",2",1",0.75")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3053 HYDROTESTED LINE @ TP-1714-00-HT-010 (Pipe sizes:
I-3039 INSPECTION 36",24",18",16",14",10",4" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
3054 I-3040 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-022(T) (Pipe sizes: 4",
CLADDING 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) HYDROTESTED


3055 OF METAL
I-3041 LINE @ TP-1632-02-HT-005 (Pipe sizes: 1" )
CLADDING

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3056 HYDROTESTED LINE @ TP-1682-01-HT-001 (T) (Pipe sizes:
I-3042 INSPECTION
36",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3057 I-3043 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007
(Pipe sizes: 36",24",18")

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


3058 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-001
I-3044 INSPECTION
(GA) (Pipe sizes: 36",24",4",2" )
PARTIAL PARTIAL INSULATION INSPECTION PRIOR TO APPLICATION OF
MFC-DLM-AK-
3059 INSULATION VAPOR BARRIER (COLD) ON HYDROTESTED LINE @ TP-1641-00-
I-3045
INSPECTION HT-026 (GA) (Pipe sizes: 36" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3060
I-3046 INSPECTION HYDROTESTED LINE @ TP-1721-02-HT-017 (GA) (Pipe sizes: 2" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


3061 I-3047 INSPECTION HYDROTESTED LINES TP-1662-01-HT-005 (Pipe sizes: 10",2",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3062 HYDROTESTED LINE @ TP-1683-02-HT-003 (Pipe sizes:
I-3048 INSPECTION 3",2",1",0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3063 OF METAL
I-3049 HYDROTESTED LINE (TP-1672-02-HT-010) (Pipe Sizes: 3",1")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-
3064 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-008 (Pipe Sizes:
AK-I-3050 CLADDING 30",24",4",2")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3065 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-008 (Pipe sizes:
I-3051 INSPECTION 36",30",24",20",16",12", 10", 8", 6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3066 I-3052 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1731-01-HT-042 (Pipe sizes:
INSPECTION 2" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3067 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-029 (Pipe
I-3053
INSPECTION sizes: 4" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3068 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007 (Pipe
I-3054 INSPECTION
sizes: 36",24",18")

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3069 I-3055 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-001 (GA)
(Pipe sizes: 36",24",4",2" )

PARTIAL VAPOR PARTIAL VAPOR BARRIER INSPECTION PRIOR TO METAL


3070 MFC-DLM-AK- BARRIER CLADDING (COLD) ON HYDROTESTED LINE @ TP-1641-00-HT-
I-3056
INSPECTION 026 (GA) (Pipe sizes: 36" )
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3071 OF METAL
I-3057 HYDROTESTED LINES TP-1691-01-HT-025 (Pipe sizes: 2",1")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3072 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-027 (Pipe sizes: 24", 12",
I-3058
CLADDING 1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3073 I-3059 OF METAL HYDROTESTED LINE @ TP-1456-00-HT-007 (Pipe sizes:
CLADDING 36",12",8", 4",3", 2", 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3074 HYDROTESTED LINE @ TP-1613-02-HT-006 (A) (Pipe sizes:
I-3060 INSPECTION 36",30",20",14",10",8",6" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3075 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1743-00-HT-001 (Pipe
I-3061
INSPECTION sizes: 2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3076 HYDROTESTED LINE @ TP-1744-01-HT-003 (GA) (Pipe sizes:
I-3062 INSPECTION 20",14",12",3",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3077 OF METAL
I-3063 CLADDING HYDROTESTED LINE @ TP-1701-01-HT-006 (T) (Pipe sizes: 8",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3078 I-3064 OF METAL HYDROTESTED LINE @ TP-1691-01-HT-011 (Pipe sizes: 2" )
CLADDING

MFC-DLM-AK- VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


3079 (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-032 (T) (Pipe
I-3065 INSPECTION
sizes: 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3080 HYDROTESTED LINE @ TP-1623-01-HT-008 (Pipe sizes:
I-3066 INSPECTION
36",30",24",8", 6" )

MFC-DLM-AK- INSULATION INSULATIONINSPECTION PRIOR TO METAL CLADDING (HOT) ON


3081 I-3067 INSPECTION HYDROTESTED LINE @ TP-1731-01-HT-042 (Pipe sizes: 2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


3082 MFC-DLM-AK- INSULATION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-029
I-3068 INSPECTION
(Pipe sizes: 4" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK-
3083 OF METAL HYDROTESTED LINES TP-1704-02-HT-040 (Pipe sizes: 12",2",
I-3069
CLADDING 1",075")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3084 OF METAL HYDROTESTED LINE @ TP-1613-02-HT-006 (A) (Pipe sizes:
I-3070
CLADDING 36",30",20",14",10",8",6" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3085 I-3071 OF METAL HYDROTESTED LINES TP-1662-01-HT-031 (Pipe sizes: 10",2")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING ( HOT ) PRIOR TO


MFC-DLM-
3086 OF METAL METAL CLADDING ON HYDROTESTED LINES TP-1507-01-HT-007
AK-I-3072 CLADDING (Pipe sizes: 8")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3087 OF METAL HYDROTESTED LINE @ TP-1507-01-HT-001-RT1 (A) (Pipe Sizes:
I-3073
CLADDING 10",8", 6', 4", 3",2",1",0.75")

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3088 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1682-02-HT-004 (GA) (Pipe
I-3074 INSPECTION sizes: 20" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3089 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-004 (Pipe
I-3075 INSPECTION sizes: 36",20",6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3090 I-3076 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007 (Pipe
INSPECTION sizes: 24")

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3091 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1614-02-HT-006 RT1 (A)
I-3077
INSPECTION (Pipe sizes: 36",30",20",14",10",8",6" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3092 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-008 (GA&TCC)
I-3078
INSPECTION (Pipe sizes: 30",24",20", 16",12",10",6",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3093 I-3079 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1704-02-HT-029 (Pipe
sizes: 4" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3094 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-007 (T) (Pipe
I-3080
INSPECTION sizes: 12"10" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
3095 HYDROTESTED LINE @ TP-1625-00-HT-005 (P) (Pipe sizes: 12",
I-3081 INSPECTION
10", 3")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3096 HYDROTESTED LINE @ TP-1641-00-HT-026 (GA) (Pipe sizes: 36"
I-3082 INSPECTION
)

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3097 I-3083 INSPECTION HYDROTESTED LINE @ TP-1463-00-HT-001 (GA) (Pipe sizes: 6",
3",2",1",0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3098 HYDROTESTED LINE @ TP-1704-02-HT-036 (TCC&GA) (Pipe
I-3084 INSPECTION sizes: 6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3099 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1615-02-HT-006 RT1 (A)
I-3085
INSPECTION (Pipe sizes: 36",30",20",14",10",8",6" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING METAL CLADDING
3100 OF METAL (COLD) ON HYDROTESTED LINE @ TP-1683-02-HT-032 (T) (Pipe
I-3086 CLADDING sizes: 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3101 OF METAL
I-3087 CLADDING HYDROTESTED LINE @ TP-1744-01-HT-007 (Pipe Sizes: 2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3102 I-3088 OF METAL HYDROTESTED LINE @ TP-1731-01-HT-003 (Pipe Size: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3103 OF METAL HYDROTESTED LINE @ TP-1453-00-HT-011(GA) (Pipe sizes: 2",
I-3089
CLADDING 1.5" , 1",)

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3104 OF METAL
I-3090 HYDROTESTED LINE @ TP-1623-01-HT-002 (GA) (Pipe Size: 3")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3105 I-3091 OF METAL HYDROTESTED LINE @ TP-1781-00-HT-001 (GA) (Pipe sizes: 3" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3106 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1641-00-HT-024 (GA) (Pipe sizes:
I-3092
CLADDING 6",4",3",2", 1")
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
3107 HYDROTESTED LINE @ TP-1682-02-HT-004 (GA) (Pipe sizes: 20"
I-3093 INSPECTION
)

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3108 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-004
I-3094 INSPECTION
(Pipe sizes: 36",20",6",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3109 I-3095 INSPECTION BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007
(Pipe sizes: 24")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3110 HYDROTESTED LINE @ TP-1614-02-HT-006 RT1 (A) (Pipe sizes:
I-3096 INSPECTION 36",30",20",14",10",8",6" )

INSULATION INSPECTION PIRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3111 HYDROTESTED LINE @ TP-1623-01-HT-008 (GA&TCC) (Pipe sizes:
I-3097 INSPECTION
30",24",20", 16",12",10",6",2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3112 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1625-00-HT-002 (Pipe sizes:
I-3098 INSPECTION 10" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3113 (COLD) ON HYDROTESTED LINE @ TP-1682-02-HT-004 (Pipe
I-3099 INSPECTION sizes: 36",20",6",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3114 I-3100 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-007 (Pipe
sizes: 24")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3115 OF METAL HYDROTESTED LINE @ TP-1744-01-HT-003 (GA) (Pipe sizes:
I-3101
CLADDING 20",14",12",3",2",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3116 OF METAL HYDROTESTED LINE @ TP-1661-01-HT-012 (T) (Pipe sizes: 2",
I-3102
CLADDING 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3117 I-3103 OF METAL HYDROTESTED LINE @ TP-1621-03-HT-002 (GA) (Pipe sizes: 2" )
CLADDING

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3118 MFC-DLM-AK- INSULATION HYDROTESTED LINE @ TP-1623-01-HT-007 (T) (Pipe sizes:
I-3104 INSPECTION
12"10" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
3119
I-3105 INSPECTION HYDROTESTED LINE @ TP-1625-00-HT-002 (Pipe sizes: 10" )

PARTIAL INSULATION INSPECTION PRIOR TO METAL CLADDING


PARTIAL
MFC-DLM-AK- (HOT) EXCLUDING WELD JOINT AND SUPPORTS ON
3120 INSULATION
I-3106 HYDROTESTED LINE @ TP-1466-00-HT-002 (T) (Pipe sizes:
INSPECTION 3",2",1" )
PARTIAL INSULATION INSPECTION PRIOR TO METAL CLADDING
PARTIAL
MFC-DLM-AK- (HOT) EXCLUDING WELD JOINT AND SUPPORTS ON
3121 I-3107 INSULATION HYDROTESTED LINE @ TP-1466-00-HT-002 (GA) (Pipe sizes:
INSPECTION
3",2",1" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3122 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1743-00-HT-001
I-3108 INSPECTION (Pipe sizes: 2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3123 OF METAL HYDROTESTED LINE @ TP-1654-00-HT-001 (PCMC&GA) (Pipe
I-3109
CLADDING sizes: 24",20",18" 14",12",10",8",6",2",3/4")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3124 OF METAL
I-3110 CLADDING HYDROTESTED LINE @ TP-1743-00-HT-002 (Pipe sizes: 2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3125 OF METAL HYDROTESTED LINE @ TP-1604-02-HT-006 (A) (Pipe sizes:
I-3111 CLADDING 36",24",12",8",6",1" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3126 I-3112 INSPECTION (COLD) ON HYDROTESTED LINE @ TP-1743-00-HT-001 (Pipe
sizes: 2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3127 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-003 (GA) (Pipe sizes:
I-3113
CLADDING 30",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3128 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-003 (GA) (Pipe sizes:
I-3114
CLADDING 30",20",6",4" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3129 I-3115 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-008 (GA&TCC) (Pipe sizes:
30",24",20", 16",12",10",6",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


3130 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1714-00-HT-007 (GA&TCC) (Pipe sizes:
I-3116 INSPECTION
36",24",18")
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
3131 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1602-02-HT-006 (A) (Pipe
I-3117
INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3132 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1603-02-HT-006 (A) (Pipe
I-3118
INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3133 I-3119 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-002
INSPECTION (TCC&PCMC) (Pipe sizes: 3",2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3134 OF METAL
I-3120 CLADDING HYDROTESTED LINE @ 1623-01-HT-015 (GA) (Pipe sizes: 3" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3135 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-008 (Pipe Sizes:
I-3121
CLADDING 30",24",4",2")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3136 HYDROTESTED LINE @ TP-1614-02-HT-006 RT1 (A) (Pipe sizes:
I-3122 INSPECTION 36",30",20",14",10",8",6")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3137 HYDROTESTED LINE @ TP-1602-02-HT-006 (A) (Pipe sizes:
I-3123 INSPECTION 36",24",12",8",6",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3138 I-3124 INSPECTION HYDROTESTED LINE @ TP-1603-02-HT-006 (A) (Pipe sizes:
36",24",12",8",6",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3139 HYDROTESTED LINE @ TP-1466-00-HT-002 (TCC&ARCC) (Pipe
I-3125 INSPECTION
sizes: 3",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3140 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1601-02-HT-006 (A) (Pipe
I-3126
INSPECTION sizes: 36",24",12",8",6",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3141 I-3127 INSPECTION HYDROTESTED LINE @ TP-1682-01-HT-001 (T) (Pipe sizes:
36",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


3142 MFC-DLM-AK- PARTIAL FINAL HYDROTESTED LINE @ TP-1625-00-HT-002 (PMCMC&TCC)) (Pipe
I-3128 INSPECTION
sizes: 36", 30", 24",20", 16",10")
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK- PARTIAL FINAL
3143 HYDROTESTED LINE @ TP-1623-01-HT-007 (T) (Pipe sizes:
I-3129 INSPECTION
12"10" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


3144
I-3130 INSPECTION HYDROTESTED LINE @ 1623-01-HT-019 (GA) (Pipe sizes: 20" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING ON


3145 I-3131 INSPECTION HYDROTESTED @ TP-1632-02-HT-003 (Pipe sizes: 8" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


3146
I-3132 INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-006 (GA) (Pipe sizes: 2" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3147 PREPARATION (HOT) ON HYDROTESTED LINE @ 1623-01-HT-008 (PCMC) (Pipe
I-3133
INSPECTION sizes: 6",8" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3148 OF METAL HYDROTESTED LINES TP-1506-01-HT-001 RT1 (Pipe sizes:
I-3134 CLADDING 10",8",6",3",2",1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3149 OF METAL HYDROTESTED LINE @ TP-1622-00-HT-002 (GA) (Pipe sizes:
I-3135 CLADDING 2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3150 I-3136 INSPECTION HYDROTESTED LINE @ TP-1601-02-HT-006 (A) (Pipe sizes:
36",24",12",8",6",1" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3151 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1611-02-HT-006 (A) (Pipe
I-3137
INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3152 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1612-02-HT-006 (A) (Pipe
I-3138
INSPECTION sizes: 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3153 I-3139 PREPARATION (HOT) ON HYDROTESTED LINE @ 1631-03-HT-010 (GA) (Pipe
INSPECTION sizes: 42",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3154 MFC-DLM-AK- OF METAL HYDROTESTED @ TP-1506-02-HT-001 (Pipe sizes:
I-3140
CLADDING 12",10",6",4",2",1" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
3155 OF METAL HYDROTESTED @ TP-1606-02-HT-027 (Pipe sizes: 1.5", 1",
I-3141
CLADDING 0.75" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3156 HYDROTESTED LINE @ TP-1451-00-HT-004 (Pipe sizes:
I-3142 INSPECTION
30",20",16",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3157 I-3143 INSPECTION HYDROTESTED LINE @ TP-1451-00-HT-003 (Pipe sizes:
30",20",16",1")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3158 HYDROTESTED LINE @ 1623-01-HT-008 (PCMC) (Pipe sizes:
I-3144 INSPECTION 6",8" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) on


MFC-DLM-AK-
3159 OF METAL HYDROTESTED LINE @ TP-1607-02-HT-026 (Pipe sizes: 1.5", 1",
I-3145
CLADDING 0.75")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
3160 OF METAL HYDROTESTED @ TP-1502-02-HT-001 (Pipe sizes:
AK-I-3146 CLADDING 12",10",6",4",2",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3161 OF METAL HYDROTESTED LINE @ TP-1625-00-HT-005 (P) (Pipe sizes: 12",
I-3147 CLADDING 10", 3")

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3162 I-3148 INSPECTION HYDROTESTED LINE @ TP-1615-02-HT-006 RT1 (A) (Pipe sizes:
36",30",20",14",10",8",6" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3163 OF METAL
I-3149 HYDROTESTED LINE @ TP-1705-01-HT-028 (Pipe sizes: 12",4")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3164 OF METAL HYDROTESTED LINE @ TP-1614-02-HT-006 RT1 (A) (Pipe sizes:
I-3150
CLADDING 36",30",20",14",10",8",6" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3165 I-3151 OF METAL HYDROTESTED LINES TP-1683-03-HT-030 (Pipe sizes: 2")
CLADDING

FINAL INSPECTION
3166 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
I-3152 HYDROTESTED LINE @ TP-1743-00-HT-001 (Pipe sizes: 2" )
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3167 OF METAL
I-3153 HYDROTESTED LINES TP-1681-00-HT-009 (Pipe sizes: 2")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3168 OF METAL
I-3154 HYDROTESTED LINE @ TP-1771-00-HT-002(T) (Pipe sizes: 2")
CLADDING

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3169 I-3155 INSPECTION HYDROTESTED LINE @ TP-1611-02-HT-006 (A) (Pipe sizes:
36",24",12",8",6",1" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3170 HYDROTESTED LINE @ TP-1612-02-HT-006 (A) (Pipe sizes:
I-3156 INSPECTION 36",24",12",8",6",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3171
I-3157 INSPECTION HYDROTESTED LINE @ 1631-03-HT-010 (GA) (Pipe sizes: 42",2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3172 OF METAL
I-3158 CLADDING HYDROTESTED LINE @ TP-1683-03-HT-011 (Pipe sizes: 20",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3173 OF METAL
I-3159 CLADDING HYDROTESTED @ TP-1705-01-HT-010 (Pipe sizes: (20",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3174 I-3160 OF METAL HYDROTESTED @ TP-1613-02-HT-020 (Pipe sizes: 6",3",1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3175 OF METAL
I-3161 HYDROTESTED LINES @ TP-1662-01-HT-012 (Pipe sizes: (3",2",1")
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING ON


MFC-DLM-AK- PARTIAL FINAL
3176 HYDROTESTED @ TP-1502-02-HT-001 (Pipe sizes:
I-3162 INSPECTION
12",10",6",4",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3177 I-3163 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1451-00-HT-007 (GA) (Pipe
INSPECTION sizes: 3",2",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3178 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1623-01-HT-007 (GA) (Pipe
I-3164
INSPECTION sizes: 30",24",10",6",2" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
3179 PREPARATION (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010 (GA) (Pipe
I-3165
INSPECTION sizes: 24",16" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3180 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-002 (GA) (Pipe
I-3166
INSPECTION sizes: 3",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3181 I-3167 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-002 (TCC&ARCC) (Pipe
sizes: 3",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3182 HYDROTESTED LINE @ TP-1602-02-HT-006 (A) (Pipe sizes:
I-3168 INSPECTION 36",24",12",8",6",1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


3183
I-3169 INSPECTION HYDROTESTED LINE @ TP-1651-00-HT-009 (Pipe Sizes: 30",2")

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3184 HYDROTESTED LINE @ TP-1682-02-HT-001 (GA) (Pipe sizes:
I-3170 INSPECTION 36",24",4",2" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT&COLD)


MFC-DLM-AK- PARTIAL FINAL
3185 ON HYDROTESTED LINE @ TP-1682-02-HT-004 (GA) (Pipe sizes:
I-3171 INSPECTION 36",20",6",2" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3186 I-3172 INSPECTION HYDROTESTED LINE @ TP-1451-00-HT-007 (GA) (Pipe sizes:
3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3187 HYDROTESTED LINE @ TP-1623-01-HT-007 (GA) (Pipe sizes:
I-3173 INSPECTION
30",24",10",6",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF VAPOR


MFC-DLM-AK- INSULATION
3188 BARRIER (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010
I-3174 INSPECTION
(GA) (Pipe sizes: 24",16" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3189 I-3175 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1511-02-HT-002 (A) (Pipe
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3190 MFC-DLM-AK- PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1512-02-HT-002 (A) (Pipe
I-3176
INSPECTION sizes: 1" )
SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION
MFC-DLM-AK-
3191 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1513-02-HT-002 (A) (Pipe
I-3177
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3192 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1514-02-HT-002 (A) (Pipe
I-3178
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3193 I-3179 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1515-02-HT-002 (A) (Pipe
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3194 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1501-02-HT-002 (A) (Pipe
I-3180 INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3195 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1502-02-HT-002 (A) (Pipe
I-3181
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3196 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1503-02-HT-002 (A) (Pipe
I-3182 INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3197 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1504-02-HT-002 (A) (Pipe
I-3183 INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3198 I-3184 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1505-02-HT-002 (A) (Pipe
INSPECTION sizes: 1" )

MFC-DLM-AK- SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3199 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1506-02-HT-002 (A) (Pipe
I-3185
INSPECTION sizes: 1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3200 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1507-02-HT-002 (A) (Pipe
I-3186
INSPECTION sizes: 1" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
3201 I-3187 OF METAL HYDROTESTED LINE @ TP-1651-00-HT-002 (GA) (Pipe sizes:
CLADDING 36",30",4",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3202 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1641-00-HT-026 (GA) (Pipe sizes: 36"
I-3188
CLADDING )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
3203 OF METAL HYDROTESTED LINE @ TP-1623-01-HT-007 (TCC,PCMC&GACC)
I-3189
CLADDING (Pipe sizes: 30",24",12",10",6",2" )

VAPOR BARRIER INSPECTION PRIOR TO METAL CLADDING


MFC-DLM-AK- VAPOR BARRIER
3204 (COLD) ON HYDROTESTED LINE @ TP-1714-00-HT-010 (GA) (Pipe
I-3190 INSPECTION
sizes: 24",16" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3205 I-3191 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-002 (GA) (Pipe sizes:
3",2",1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3206
I-3192 INSPECTION HYDROTESTED LINE @ TP-1511-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3207
I-3193 INSPECTION HYDROTESTED LINE @ TP-1512-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3208
I-3194 INSPECTION HYDROTESTED LINE @ TP-1513-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3209
I-3195 INSPECTION HYDROTESTED LINE @ TP-1514-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3210 I-3196 INSPECTION HYDROTESTED LINE @ TP-1515-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON TP-
3211
I-3197 INSPECTION 1683-03-HT-009 (Pipe sizes: 16",2",1")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3212 HYDROTESTED LINE @ 1623-01-HT-008 (PCMC) (Pipe sizes:
I-3198 INSPECTION
6",8" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3213 I-3199 INSPECTION HYDROTESTED LINE @ TP-1501-02-HT-002 (A) (Pipe sizes: 1" )

3214 MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


I-3200 INSPECTION HYDROTESTED LINE @ TP-1502-02-HT-002 (A) (Pipe sizes: 1" )
MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
3215
I-3201 INSPECTION HYDROTESTED LINE @ TP-1503-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3216
I-3202 INSPECTION HYDROTESTED LINE @ TP-1504-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3217 I-3203 INSPECTION HYDROTESTED LINE @ TP-1505-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3218
I-3204 INSPECTION HYDROTESTED LINE @ TP-1506-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


3219
I-3205 INSPECTION HYDROTESTED LINE @ TP-1507-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3220 OF METAL
I-3206 CLADDING HYDROTESTED LINE @ TP-1701-03-HT-010 (Pipe sizes: 6",2",1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-
3221 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-036 (TCC&GA) (Pipe
AK-I-3207 CLADDING sizes: 6",2" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3222 I-3208 OF METAL HYDROTESTED LINE @ TP-1721-03-HT-002 (Pipe sizes: 6",2" )
CLADDING

MFC-DLM- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3223 OF METAL HYDROTESTED @ TP-1683-03-HT-013 (Pipe sizes: 18", 14", 2",
AK-I-3209
CLADDING 1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK- PARTIAL FINAL
3224 HYDROTESTED LINE @ TP-1705-01-HT-011 (Pipe sizes:
I-3210 INSPECTION
14",10",3",2",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-
3225 AK-I-3211 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-006 RT1 (A) (Pipe sizes:
CLADDING 36",30",20",14",10",8",6" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3226 MFC-DLM- OF METAL HYDROTESTED LINE @ TP-1714-00-HT-012 (GA&TCC) (Pipe
AK-I-3212
CLADDING sizes: 24",20",16",14",12",10",8",4".2" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK-
3227 OF METAL HYDROTESTED LINE @ TP-1681-00-HT-013 (Pipe sizes:
I-3213
CLADDING 8",6",4",2",1",0.75")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3228 HYDROTESTED LINE @ TP-1615-02-HT-006 RT1 (A) (Pipe sizes:
I-3214 INSPECTION
36",30",20",14",10",8",6" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3229 I-3215 INSPECTION HYDROTESTED LINE @ TP-1466-00-HT-002 (GA) (Pipe sizes:
3",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK- PARTIAL FINAL
3230 HYDROTESTED LINE @ TP-1603-02-HT-006 (A) (Pipe sizes:
I-3216 INSPECTION 36",24",12",8",6",1" )

SURFACE SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK-
3231 PREPARATION (HOT) ON HYDROTESTED LINE @ TP-1711-01-HT-004 (TCC)
I-3217
INSPECTION (Pipe sizes: .2" )

ACOUSTIC
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF NOISE BARRIER FOR
3232 INSULATION
I-3218 MATERIAL HOT & COLD ACOUSTIC (SONOPROOF: 3mm & 4mm)

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3233 OF METAL HYDROTESTED LINE @ TP-1652-00-HT-006 (T) (Pipe sizes:
I-3219 CLADDING 2",1.5" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3234 I-3220 OF METAL HYDROTESTED @ TP-1662-01-HT-016 (Pipe sizes:
CLADDING 8",6",1",0.75",0.5" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF ( COLD ) METAL CLADDING ON


3235 OF METAL
I-3221 HYDROTESTED @ TP-1681-00-HT-006 (Pipe sizes: 36" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3236 OF METAL
I-3222 HYDROTESTED LINES TP-1705-01-HT-001 (Pipe sizes: 16",10",6")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
3237 I-3223 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-003 (Pipe sizes: 8",
CLADDING 6",3",2", 1.5", 1", 0.75" )

INSULATION INSPECTION PRIOR TO APPLICATION OF NIOISE


3238 MFC-DLM- INSULATION BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-
AK-I-3224 INSPECTION
01-HT-004 (GA) (Pipe sizes: 64",60",24",2" )
INSULATION INSPECTION PRIOR TO APPLICATION OF NOISE
MFC-DLM- INSULATION
3239 BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-
AK-I-3225 INSPECTION
02-HT-001 (GA) (Pipe sizes: 48",42",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF NOISE


MFC-DLM- INSULATION
3240 BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ 1631-03-
AK-I-3226 INSPECTION
HT-010 (GA) (Pipe sizes: 42",2" )

INSULATION INSPECTION PIRIOR TO APPLICATION OF NOISE


MFC-DLM- INSULATION
3241 AK-I-3227 INSPECTION BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1623-
01-HT-008 (GA) (Pipe sizes: 20",2" )

SURFACE SURFACE INSPECTION PRIORTO INSTALLATION OF INSULATION


MFC-DLM-
3242 PREPARATION (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-03-HT-001
AK-I-3228 INSPECTION (GA) (Pipe sizes: 42", 36", 24" )

IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS


MFC-DLM-AK- INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
3243
I-3224-A INSPECTION HYDROTESTED LINE @ TP-1631-01-HT-004 (GA) (Pipe sizes:
64",60",24",2" )
IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS
MFC-DLM-AK- INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
3244
I-3225-A INSPECTION HYDROTESTED LINE @ TP-1631-02-HT-001 (GA) (Pipe sizes:
48",42",2" )

IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS


MFC-DLM-AK- INSULATION
3245 INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
I-3226-A INSPECTION HYDROTESTED LINE @ 1631-03-HT-010 (GA) (Pipe sizes: 42",2")

IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS


MFC-DLM-AK- INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
3246 I-3227-A INSPECTION HYDROTESTED LINE @ TP-1623-01-HT-008 (GA) (Pipe sizes:
20",2" )

MFC-DLM- SURFACE SURFACE INSPECTION PRIORTO INSTALLATION OF INSULATION


3247 PREPARATION (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-03-HT-001
AK-I-3228-A
INSPECTION (GA) (Pipe sizes: 42", 36", 24" )

IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS


MFC-DLM-AK- INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
3248
I-3229 INSPECTION HYDROTESTED LINE @ 1631-01-HT-002 (GA) (Pipe sizes:
80",66",60",42",2" )
IN-PROCESS NOISE BARRIER OF 3MM+4MM THICKNESS
MFC-DLM-AK- INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT ACOUSTIC) ON
3249 I-3230 INSPECTION HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe sizes:
36",30",24",20",18",2",1" )

FINAL INSPECTION
3250 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (COLD) ON
I-3231 HYDROTESTED @ TP-1651-00-HT-005 (Pipe sizes:2",1")
CLADDING
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3251 OF METAL
I-3232 HYDROTESTED LINE @ TP-1625-00-HT-032 (Pipe sizes: 8",1")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3252 OF METAL
I-3233 HYDROTESTED LINE @ TP-1491-00-HT-002 (Pipe sizes: 2",3",4" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3253 I-3234 OF METAL HYDROTESTED LINE @ TP-1615-02-HT-006 RT1 (A) (Pipe sizes:
CLADDING 36",30",20",14",10",8",6" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3254 OF METAL HYDROTESTED LINE @ TP-1602-02-HT-006 (A) (Pipe sizes:
I-3235 CLADDING 36",24",12",8",6",1" )

IN-PROCESS NOISE BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK- NOISE BARRIER
3255 CLADDING (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-
I-3236 INSPECTION
01-HT-001 (T) (Pipe sizes: 64", 56", 24", 3", 2", 1", 0.75" )

INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON


MFC-DLM-AK- INSULATION
3256 HYDROTESTED LINE @ TP-1711-01-HT-004 (TCC) (Pipe sizes: .2"
I-3237 INSPECTION )

INSULATION INSPECTION PRIOR TO APPLICATION OF NOISE


MFC-DLM-AK- INSULATION
3257 BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-
I-3238 INSPECTION 03-HT-001 (GA) (Pipe sizes: 42", 36", 24" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3258 I-3239 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-038 (Pipe sizes: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3259 OF METAL HYDROTESTED LINE @ TP-1603-02-HT-006 (A) (Pipe sizes:
I-3240
CLADDING 36",24",12",8",6",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


MFC-DLM-AK-
3260 PARTIALFINAL ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-01-HT-004 (GA)
I-3241
(Pipe sizes: 64",60",24",2")

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


MFC-DLM-AK-
3261 I-3242 PARTIALFINAL ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-02-HT-001 (GA)
(Pipe sizes: 48",42",2" )

PARTIAL FINAL INSPECTION OF METALCLADDING (HOT


3262 MFC-DLM-AK- PARTIALFINAL ACOUSTIC) ON HYDROTESTED LINE @ 1631-03-HT-010 (GA)
I-3243
(Pipe sizes: 42",2" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
3263 PARTIALFINAL HYDROTESTED LINE @ TP-1612-02-HT-006 (A) (Pipe sizes:
I-3244
36",24",12",8",6",1" )

MFC-DLM- FINAL INSPECTION OF METAL CLADDING (COLD) ON


3264 FINAL INSPECTION
AK-I-3245 HYDROTESTED LINE @ TP-1704-02-HT-044 (Pipe sizes: 2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3265 I-3246 OF METAL HYDROTESTED LINE @ TP-1601-02-HT-006 (A) (Pipe sizes:
CLADDING 36",24",12",8",6",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3266 PARTIALFINAL HYDROTESTED LINE @ TP-1611-02-HT-006 (A) (Pipe sizes:
I-3247 36",24",12",8",6",1" )

FINAL INSPECTION OF METAL CALADDING (COLD) ON


MFC-DLM-
3267 FINAL INSPECTION HYDROTESTED LINE @ TP-1541-00-HT-002 (GA) (Pipe sizes:
AK-I-3248
3",2" )

MFC-DLM- FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON


3268 FINAL INSPECTION
AK-I-3249 HYDROTESTED LINE @ TP-1623-01-HT-008 (Pipe sizes: 20",2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3269 OF METAL HYDROTESTED LINE @ TP-1623-01-HT-008 (GA&TCC) (Pipe sizes:
I-3250 CLADDING 30",24",20", 16",12",10",6",2" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
3269 I-3251 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-007 (GA&TCC) (Pipe sizes:
CLADDING 36",24",18")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3269 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-010 (GA&TCC) (Pipe
I-3252
CLADDING sizes: 36",24",18",16",14",10",4" )

IN-PROCESS NOISE IN-PROCESS NOISE BARRIER 1ST & 2ND LAYER INSPECTION
MFC-DLM-AK- PRIOR TO METALCLADDING (HOT ACOUSTIC) ON HYDROTESTED
3269 BARRIER
I-3253 LINE @ TP-1714-00-HT-014 (T) (Pipe sizes:
INSPECTION
48",30",18",16",14",10",8",6",3",2" )

SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK- SURFACE
3269 I-3254 INSPECTION (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1451-00-HT-023
(GA) (Pipe sizes: 24" )

SURFACE INSPECTION PRIORTO INSTALLATION OF INSULATION


3269 MFC-DLM-AK- SURFACE (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-03-HT-001
I-3255 INSPECTION
(GA) (Pipe sizes: 42", 36", 24" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK-
3270 OF METAL HYDROTESTED LINE @ TP-1714-00-HT-012 (GA&TCC) (Pipe
I-3256
CLADDING sizes: 24",20",16",14",12",10",8",4".2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) HYDROTESTED
3271 OF METAL
I-3257 LINE @ TP-1704-02-HT-002 (Pipe sizes: 10",16",30",1" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3272 I-3258 OF METAL HYDROTESTED @ TP-1683-03-HT-013 (Pipe sizes: 18", 14", 2",
CLADDING 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3273 OF METAL HYDROTESTED LINE @ TP-1612-02-HT-006 (A) (Pipe sizes:
I-3259 CLADDING 36",24",12",8",6",1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3274 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-003 (Pipe sizes:
I-3260
CLADDING 3",2",1",0.75")

FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-
3275 FINAL INSPECTION HYDROTESTED LINE @ TP-1683-02-HT-034 (Pipe sizes: 12", 8",
AK-I-3261 6",4",2",1",0.75" )

MFC-DLM- FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON


3276 FINAL INSPECTION
AK-I-3262 HYDROTESTED LINE @ TP-1623-01-HT-008 (Pipe sizes: 20",2" )

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (COLD) ON
3277 I-3263 OF METAL HYDROTESTED LINE @ TP-1683-02-HT-034 (Pipe sizes: 12", 8",
CLADDING 6",4",2",1",0.75" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3278 OF METAL
I-3264 HYDROTESTED LINE @ TP-1691-01-HT-031 (T) (Pipe sizes: 2" )
CLADDING

IN-PROCESS NOISE IN-PROCESS NOISE BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
3279 BARRIER CLADDING (HOT ACOUSTIC) ON HYDROTESTED LINE @ 1631-02-
I-3265
INSPECTION HT-002 (GA) (Pipe sizes: 54",2" )

INSULATION INSPECTION PRIOR TO APPLICATION OF NOISE


MFC-DLM-AK- INSULATION
3280 I-3266 INSPECTION BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1451-
00-HT-023 (GA) (Pipe sizes: 24" )

IN-PROCESS IN-PROCESS INSULATION INSPECTION PRIOR TO APPLICATION OF


3281 MFC-DLM-AK- INSULATION NOISE BARRIER (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-
I-3267
INSPECTION 1631-03-HT-001 (GA) (Pipe sizes: 42", 36", 24" )
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON
MFC-DLM-AK-
3282 OF METAL HYDROTESTED @ TP-1747-07-HT-001 (T) (Pipe sizes: 2", 1",
I-3268
CLADDING 0.75")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3283 OF METAL
I-3269 HYDROTESTED @ TP-1747-01-HT-001 (T) (Pipe sizes: 3", 1")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3284 I-3270 OF METAL HYDROTESTED @ TP-1747-04-HT-001 (Pipe sizes: 6",4",2",
CLADDING 1",0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3285 OF METAL
I-3271 CLADDING HYDROTESTED @ TP-1463-00-HT-009 (Pipe sizes: 2",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3286 OF METAL
I-3272 HYDROTESTED @ TP-1746-00-HT-001 (Pipe sizes: 3" )
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


MFC-DLM-AK- PARTIAL FINAL
3287 ACOUSTIC) ON HYDROTESTED LINE @ 1631-02-HT-002 (GA)
I-3273 INSPECTION (Pipe sizes: 54",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3288 OF METAL
I-3274 CLADDING HYDROTESTED @ TP-1672-02-HT-005 (Pipe sizes: 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3289 I-3275 OF METAL HYDROTESTED LINES TP-1712-02-HT-010 (T) (Pipe sizes: 1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3290 OF METAL
I-3276 HYDROTESTED LINE @ TP-1662-01-HT-019(T) (Pipe sizes: 2")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3291 OF METAL
I-3277 HYDROTESTED LINE @ TP-1662-01-HT-020(T) (Pipe sizes: 2")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3292 I-3278 OF METAL HYDROTESTED LINE @ TP-1611-02-HT-006 (A) (Pipe sizes:
CLADDING 36",24",12",8",6",1" )

PARTIAL FINAL OF METAL CLADDING (HOT ACOUSTIC) ON


3293 MFC-DLM-AK- AUCUSTIC PARTIAL HYDROTESTED LINE @ TP-1451-00-HT-001 (GA) (Pipe sizes:
I-3279 FINAL
36",30",24",20",18",2",1" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT
MFC-DLM-AK- AUCUSTIC PARTIAL
3294 ACOUSTIC) ON HYDROTESTED LINE @ TP-1714-00-HT-014 (T)
I-3280 FINAL
(Pipe sizes: 48",30",18",16",14",10",8",6",3",2" )

NOISE BARRIER INSPECTION PRIOR TO METAL CLADDING (HOT


MFC-DLM-AK- NOISE BARRIER
3295 ACOUSTIC) ON HYDROTESTED LINE @ TP-1451-00-HT-023 (GA)
I-3281 INSPECTION
(Pipe sizes: 24")

IN-PROCESS NOISE IN-PROCESS NOISE BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
3296 I-3282 BARRIER CLADDING (HOT ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-
INSPECTION 03-HT-001 (GA) (Pipe sizes: 42", 36", 24" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (COLD) ON
3297 OF METAL
I-3283 CLADDING HYDROTESTED LINES TP-1681-00-HT-008 (Pipe sizes: 2",1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING ON HYDROTESTED
3298 OF METAL
I-3284 (HOT) @ TP-1632-02-HT-003 (Pipe sizes: 8" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3299 OF METAL
I-3285 CLADDING HYDROTESTED LINE @ TP-1771-00-HT-018 (GA) (Pipe sizes: 2")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3300 OF METAL HYDROTESTED LINES TP-1662-01-HT-030 (Pipe sizes:
I-3286 CLADDING 10",6",2",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3301 I-3287 OF METAL HYDROTESTED LINES TP-1662-01-HT-005 (Pipe sizes: 10",2",1")
CLADDING

MFC-DLM-AK- PARTIAL FINAL PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


3302 ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-03-HT-001 (GA)
I-3288 INSPECTION
(Pipe sizes: 42", 36", 24" )

NOISE BARRIER INSPECTION PRIOR TO METAL CLADDING (HOT


MFC-DLM-AK- NOISE BARRIER
3303 ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-01-HT-003 (Pipe
I-3289 INSPECTION
sizes: 2" )

NOISE BARRIER INSPECTION PRIOR TO METAL CLADDING (HOT)


MFC-DLM-AK- NOISE BARRIER
3304 I-3290 INSPECTION ON HYDROTESTED LINE @ TP-1631-02-HT-003 (GA) (Pipe sizes:
2" )

SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


3305 MFC-DLM-AK- SURFACE (HOT) ON HYDROTESTED LINE @ TP-1466-00-HT-001 RT1 (Pipe
I-3291 INSPECTION
Size: 3")
FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3306 OF METAL
I-3292 HYDROTESTED LINE @ TP-1631-04-HT-035 (GA) (Pipe sizes: 1")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3307 OF METAL
I-3293 HYDROTESTED LINE @ TP-1631-04-HT-037 (GA) (Pipe sizes: 2")
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON
3308 I-3294 OF METAL HYDROTESTED LINE @ TP-1631-01-HT-003 (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON


MFC-DLM-AK-
3309 OF METAL HYDROTESTED LINE @ TP-1631-02-HT-003 (GA) (Pipe sizes:
I-3295 CLADDING 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3310 OF METAL
I-3296 HYDROTESTED LINE @ TP-1631-04-HT-034 (GA) (Pipe sizes: 1")
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3311 OF METAL HYDROTESTED LINE @ TP-1471-00-HT-010 (A) (Pipe sizes: 3",
I-3297 CLADDING 2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3312 OF METAL
I-3298 CLADDING HYDROTESTED LINE @ TP-1471-00-HT-009 (Pipe sizes: 3", 2")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) HYDROTESTED


3313 I-3299 OF METAL LINE @ TP-1471-00-HT-008 (A) (Pipe sizes: 3", 2" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3314 OF METAL
I-3300 HYDROTESTED LINE @ TP-1506-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3315 OF METAL
I-3301 HYDROTESTED LINE @ TP-1507-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3316 I-3302 OF METAL HYDROTESTED LINE @ TP-1504-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

FINAL INSPECTION
3317 MFC-DLM-AK- OF METAL FINAL INSPECTION OF METAL CLADDING (HOT) ON
I-3303 HYDROTESTED LINE @ TP-1503-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT
MFC-DLM-AK- PARTIAL FINAL
3318 ACOUSTIC) ON HYDROTESTED LINE @ TP-1631-01-HT-001 (T)
I-3304 INSPECTION
(Pipe sizes: 64", 56", 24", 3", 2", 1", 0.75" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3319 OF METAL
I-3305 HYDROTESTED LINE TP-1611-02-HT-023 (Pipe sizes: 1.5" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3320 I-3306 FINAL INSPECTION HYDROTESTED LINE @ TP-1611-02-HT-025 (Pipe sizes: 1.5"" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING(HOT) ON
3321 OF METAL
I-3307 CLADDING HYDROTESTED @ TP-1506-01-HT-034 (Pipe sizes: 3",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING(HOT) ON
3322 OF METAL
I-3308 HYDROTESTED @ TP-1507-01-HT-034 (Pipe sizes: 3",1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3323 OF METAL
I-3309 CLADDING HYDROTESTED LINES TP-1712-01-HT-006 (Pipe sizes: ,1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3324 OF METAL
I-3310 CLADDING HYDROTESTED LINE @ TP-1514-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3325 I-3311 OF METAL HYDROTESTED LINE @ TP-1515-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3326 OF METAL
I-3312 HYDROTESTED LINE @ TP-1501-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3327 OF METAL
I-3313 HYDROTESTED LINE @ TP-1502-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

MFC-DLM- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3328 AK-I-3314 FINAL INSPECTION HYDROTESTED LINE @ TP-1503-02-HT-002 (A) (Pipe sizes: 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3329 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1704-02-HT-001 (Pipe sizes: 30", 12",
I-3315
CLADDING 10", 8", 6", 4", 3", 2", 1", 0.75")
FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON
MFC-DLM-AK-
3330 OF METAL HYDROTESTED LINE @ TP-1662-01-HT-008 (Pipe sizes: ,3",
I-3316
CLADDING 2",1.5", 1" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3331 OF METAL HYDROTESTED LINE @ TP-1704-02-HT-036 (TCC&GA) (Pipe
I-3317
CLADDING sizes: 6",2" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3332 I-3318 OF METAL HYDROTESTED @ TP-1504-01-HT-034 (Pipe sizes: 3",1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3333 OF METAL
I-3319 CLADDING HYDROTESTED @ TP-1505-01-HT-034 (Pipe sizes: 3",1" )

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3334 OF METAL
I-3320 HYDROTESTED LINES TP-1503-01-HT-034 (Pipe sizes: 3",2",1" )
CLADDING

ACOUSTIC
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF NOISE BARRIER FOR
3335 INSULATION
I-3321 MATERIAL HOT & COLD ACOUSTIC (SONOPROOF: 3mm & 4mm)

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3336 OF METAL
I-3322 CLADDING HYDROTESTED LINE @ TP-1505-02-HT-002 (A) (Pipe sizes: 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3337 I-3323 OF METAL HYDROTESTED LINE @ TP-1511-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3338 OF METAL
I-3324 HYDROTESTED LINE @ TP-1512-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3339 OF METAL
I-3325 HYDROTESTED LINE @ TP-1513-02-HT-002 (A) (Pipe sizes: 1" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION


FINAL INSPECTION OF METAL CLADDING (HOT) ON
3340 I-3326 OF METAL HYDROTESTED LINE @ TP-1471-00-HT-006 (A) (Pipe sizes: 3",
CLADDING 2" )

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3341 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1471-00-HT-007 (A) (Pipe sizes: 3",
I-3327
CLADDING 2" )
PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT
MFC-DLM-AK- PARTIAL FINAL
3342 ACOUSTIC) ON HYDROTESTED LINE @ 1631-01-HT-002 (GA)
I-3328 INSPECTION
(Pipe sizes: 80",66",60",42",2" )

IN-PROCESS NOISE IN-PROCESS NOISE BARRIER INSPECTION PRIOR TO METAL


MFC-DLM-AK-
3343 BARRIER CLADDING (HOT) ON HYDROTESTED LINE @ TP-1681-00-HT-001
I-3329
INSPECTION (TCC) (Pipe sizes: 36", 30",2", 1")

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON
3344 I-3330 OF METAL HYDROTESTED LINE @ TP-1451-00-HT-023 (GA) (Pipe sizes: 24" )
CLADDING

FINAL INSPECTION
MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON
3345 OF METAL
I-3331 CLADDING HYDROTESTED LINE TP-1452-00-HT-001-A (Pipe sizes: 2",0.75")

MFC-DLM- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3346 FINAL INSPECTION
AK-I-3332 HYDROTESTED LINE TP-1452-00-HT-001-B (Pipe sizes: 2")

ACOUSTIC
MFC-DLM-AK- MATERIAL RECEIVING & INSPECTION OF NOISE BARRIER FOR
3347 INSULATION
I-3333 MATERIAL HOT & COLD ACOUSTIC (SONOPROOF: 3mm & 4mm)

SURFACE INSPECTION PRIOR TO INSTALLATION OF INSULATION


MFC-DLM-AK- SURFACE
3348 (HOT) ON HYDROTESTED LINE @ TP-1747-04-HT-001-RT1 (Pipe
I-3334 INSPECTION sizes: 6" ,1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


3349 I-3335 OF METAL HYDROTESTED @ TP-1702-01-HT-019 (Pipe sizes: 6",3" )
CLADDING

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3350 OF METAL
I-3336 HYDROTESTED LINE @ TP-1721-02-HT-017 (GA) (Pipe sizes: 2" )
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


MFC-DLM-AK-
3351 OF METAL HYDROTESTED @ TP-1683-03-HT-021 (Pipe sizes: 16", 12", 2",
I-3337
CLADDING 1" )

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (COLD) ON


3352 I-3338 OF METAL HYDROTESTED LINES TP-1704-02-HT-009 (Pipe sizes: 4",1")
CLADDING

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) on


3353 MFC-DLM-AK- OF METAL HYDROTESTED LINE @ TP-1453-00-HT-010 (GA) (Pipe sizes: 28",
I-3339
CLADDING 16", 2" )
INSULATION INSPECTION PRIOR TO METAL CLADDING (HOT) ON
MFC-DLM-AK- INSULATION
3354 HYDROTESTED LINE @ TP-1747-04-HT-001-RT1 (Pipe sizes: 6" ,
I-3340 INSPECTION
1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) ON


MFC-DLM-AK-
3355 OF METAL HYDROTESTED LINE @ TP-1747-04-HT-001-RT1 (Pipe sizes: 6" ,
I-3341
CLADDING 1")

FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT ACOUSTIC) ON


MFC-DLM-AK-
3356 I-3342 OF METAL HYDROTESTED LINE @ TP-1631-03-HT-001 (GA) (Pipe sizes:
CLADDING 42", 36", 24" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


MFC-DLM-AK- PARTIAL FINAL
3357 ACOUSTIC) ON HYDROTESTED LINE @ TP-1451-00-HT-001 (GA)
I-3343 INSPECTION (Pipe sizes: 36",30",24",20",18",2",1" )

PARTIAL FINAL INSPECTION OF METAL CLADDING (HOT


MFC-DLM-AK- PARTIAL FINAL
3358 ACOUSTIC) ON HYDROTESTED LINE @ TP-1681-00-HT-001 (TCC)
I-3344 INSPECTION
(Pipe sizes: 36", 30",2", 1")

MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3359 FINAL INSPECTION
I-3345 HYDROTESTED LINES TP-1511-01-HT-038 (Pipe sizes: 3", 1")

MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3360 FINAL INSPECTION
I-3346 HYDROTESTED @ TP-1513-01-HT-038 (Pipe sizes: 3",1" )

MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) ON


3361 I-3347 FINAL INSPECTION HYDROTESTED @ TP-1514-01-HT-038 (Pipe sizes: 3",1" )

MFC-DLM-AK- FINAL INSPECTION OF METAL CLADDING (HOT) HYDROTESTED


3362 FINAL INSPECTION
I-3348 ON TP-1515-01-HT-038 (Pipe sizes: 3",1")

MFC-DLM-AK- FINAL INSPECTION FINAL INSPECTION OF METAL CLADDING (HOT) @ TP-1501-01-


3363
I-3349 HT-034 (Pipe sizes: 3", 2", 1" )

MFC-DLM-AK- INSULATION INSULATION INSPECTION OF ( HOT ) PRIOR TO METAL CLADDING


3364 I-3350 INSPECTION ON HYDROTESTED @ TP-1502-01-HT-034 (Pipe sizes: 3",2",1" )
ON RFI Control Record (AKIO)
INSP.
CHECKLIST GRADE PACKAGE SUB SYSTEM SUB SYSTEM/ DATE OF
NO. LOCATION / AREA INSPECTION
(H/W/S)
KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W 26-Nov-13
SIDE OF DAELIM
OFFICE
KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W 27-Nov-13
SIDE OF DAELIM
OFFICE
KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W 29-Nov-13
SIDE OF DAELIM
OFFICE
KIC MATERIAL
SMIC-I-6011 W STORAGE AREA WEST 3-Dec-13
SIDE OF DAELIM
OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 4-Dec-13
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 7-Dec-13
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 9-Dec-13
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 10-Dec-13
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 11-Dec-13
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 14-Dec-13
SITE OFFICE
KIC STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 17-Dec-13
SITE OFFICE

KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 19-Dec-13
JUWAYMAH
WAREHOUSE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 22-Dec-13
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 22-Dec-13
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 24-Dec-13
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 26-Dec-13
WESTSIDE OF DAELIM
SITE OFFICE

KIC MATERIAL
SMIC-I-6011 W STORAGE AREA IN 28-Dec-13
JUBAIL

KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 29-Dec-13
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 29-Dec-13
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 30-Dec-13
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 31-Dec-13
SITE OFFICE
KIC MATERIAL
SMIC-I-6011 W STORAGE AREA 1-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 4-Jan-14
SITE OFFICE

KIC STORAGE AREA


SMIC-I-6011 W WESTSIDE OF DAELIM 4-Jan-14
SITE OFFICE

KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 6-Jan-14
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 8-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 11-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 12-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 13-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 20-Jan-14
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 21-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE

KIC MATERIAL
SMIC-I-6011 W STORAGE AREA 23-Jan-14
Juaymah Warehouse

KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W WESTSIDE OF DAELIM 26-Jan-14
SITE OFFICE
KIC MATERIAL
SMIC-I-6011 W STORAGE AREA 29-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 29-Jan-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE WESTSIDE
SMIC-I-6011 W 3-Feb-14
OF DAELIM SITE
OFFICE MFC
KIC MATERIAL
STORAGE WESTSIDE
SMIC-I-6011 W OF DAELIM SITE 5-Feb-14
OFFICE MFC
KIC MATERIAL
STORAGE WESTSIDE
SMIC-I-6011 W 5-Feb-14
OF DAELIM SITE
OFFICE MFC
KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W 6-Feb-14
OF DAELIM SITE
OFFICE (MFC)

KIC CAMP
SMIC-I-6011 W 6-Feb-14
WAREHOUSE

KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W 15-Feb-14
OF DAELIM SITE
OFFICE (MFC)
KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W OF DAELIM SITE 15-Feb-14
OFFICE (MFC)
KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W 17-Feb-14
OF DAELIM SITE
OFFICE (MFC)
KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W 22-Feb-14
OF DAELIM SITE
OFFICE (MFC)
KIC MATERIAL
STORAGE WESTSIDE
SMIC-I-6011 W OF DAELIM SITE 26-Feb-14
OFFICE MFC

KIC MATERIAL
SMIC-I-6011 W STORAGE JUAYMAH 27-Feb-14
WAREHOUSE
KIC STORAGE
MATERIAL WEST SIDE
SMIC-I-6011 W 1-Mar-14
OF DAELIM SITE
OFFICE MFC
KIC MATERIAL
STORAGE WESTSIDE
SMIC-I-6011 W 3-Mar-14
OF DAELIM SITE
OFFICE MFC

KIC WAREHOUSE
SMIC-I-6011 W AREA, KING FAISAL 6-Mar-14
WEST ST. - JUBAIL

KIC WAREHOUSE
SMIC-I-6011 W AREA, KING FAISAL 6-Mar-14
WEST ST. - JUBAIL

KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 10-Mar-14
WESTSIDE OF DAELIM
SITE OFFICE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 11-Mar-14
JUWAYMA
WAREHOUSE
KIC MATERIAL
STORAGE AREA
SMIC-I-6011 W 12-Mar-14
WESTSIDE OF DAELIM
SITE OFFICE

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 12-Mar-14

MFC SITE BESIDE


SMIC-I-6011 W 16-Mar-14
FLARE AREA

MFC SITE BESIDE


SMIC-I-6011 W 18-Mar-14
FLARE AREA

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 19-Mar-14

SMIC-I-6012 W F-1170 (FUEL AND 22-Mar-14


BURNER SYSTEM)
F-1170 (FUEL AND
SMIC-I-6012 W 1607-01-HT-001 1607-01 24-Mar-14
BURNER SYSTEM)

KIC MATERIAL
STORAGE AREA
NIL W 24-Mar-14
WESTSIDE OF DAELIM
SITE OFFICE (MFC )

SMIC-I-6011 W KIC SITE STOCKROOM 25-Mar-14

KIC MATERIAL
STORAGE BESIDE
SMIC-I-6011 W 27-Mar-14
DAELIM SITE OFFICE
WESTSIDE

MFC SITE BESIDE


SMIC-I-6011 W 27-Mar-14
FLARE AREA

F-1170 (FUEL AND


SMIC-I-6013 S 1607-01-HT-001 1607-01 29-Mar-14
BURNER SYSTEM)

MFC SITE BESIDE


SMIC-I-6011 W 29-Mar-14
FLARE AREA

KIC WAREHOUSE @
SMIC-I-6011 W JUWAYMA 29-Mar-14

MFC SITE BESIDE


SMIC-I-6011 W 31-Mar-14
FLARE AREA

F-1170 (FUEL AND


SMIC-I-6012 W 1607-01-HT-004 1607-01 31-Mar-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6013 S 1607-01-HT-001 1607-01 BURNER SYSTEM) 1-Apr-14

SMIC-I-6011 W MFC SITE BESIDE 1-Apr-14


FLARE AREA
F-1170 (FUEL AND
SMIC-I-6013 S 1607-01-HT-004 1607-01 April 02 to April 03, 2014
BURNER SYSTEM)

F-1170 (FUEL AND 5-Apr-14 ~


SMIC-I-6013 S 1607-01-HT-004 1607-01
BURNER SYSTEM) 10-Apr-14

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 5-Apr-14

F-1170 BFW, STEAM


SMIC-I-6012 W 1507-01-HT-014 1507-01 9-Apr-14
DRUM & SVH SIDE

F-1170 BFW, STEAM


SMIC-I-6012 W 1507-01-HT-029 1507-01 9-Apr-14
DRUM & SVH SIDE

F-1170 BFW, STEAM


SMIC-I-6012 W 1507-01-HT-030 1507-01 9-Apr-14
DRUM & SVH SIDE

F-1170 BFW, STEAM


SMIC-I-6012 W 1507-01-HT-030 1507-01 9-Apr-14
DRUM & SVH SIDE

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 9-Apr-14

KIC Material Storage


SMIC-I-6011 W WEST SIDE OF DAELIM 10-Apr-14
OFFICE (MFC)

F-1170 (FUEL AND


SMIC-I-6014 W 1607-01-HT-001 1607-01 12-Apr-14
BURNER SYSTEM)

F-1170 BFW (STEAM 12-Apr-14 ~


SMIC-I-6013 S 1507-01-HT-014 1507-01 DRUM & SVH SIDE) 17-Apr-14

SMIC-I-6013 S 1507-01-HT-029 1507-01 F-1170 BFW (STEAM 12-Apr-14 ~


DRUM & SVH SIDE) 17-Apr-14
F-1170 BFW (STEAM 12-Apr-14 ~
SMIC-I-6013 S 1507-01-HT-030 1507-01
DRUM & SVH SIDE) 17-Apr-14

F-1170 BFW (STEAM 12-Apr-14 ~


SMIC-I-6013 S 1507-01-HT-013 1507-01
DRUM & SVH SIDE) 17-Apr-14

F-1607-02
SMIC-I-6012 S 1607-02-HT-016 1607-02 F-1170 Process 13-Apr-14

F-1607-02
SMIC-I-6012 S 1607-02-HT-017 1607-02 13-Apr-14
F-1170 Process

F-1607-02
SMIC-I-6012 S 1607-02-HT-018 1607-02 13-Apr-14
F-1170 Process

F-1607-02
SMIC-I-6012 S 1607-02-HT-019 1607-02 13-Apr-14
F-1170 Process

F-1170 (FUEL AND


SMIC-I-6014 W 1607-01-HT-004 1607-02 13-Apr-14
BURNER SYSTEM)

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 14-Apr-14

KIC LAYDOWN AREA


SMIC-I-6011 W (WEST SIDE OF DAELIM 14-Apr-14
OFFICE)

F-1607-02 16-APR-14 ~
SMIC-I-6013 S 1607-02-HT-016 1607-02
F-1170 Process 17-Apr-14

F-1607-02 16-APR-14 ~
SMIC-I-6013 S 1607-02-HT-017 1607-02 F-1170 Process 17-Apr-14

SMIC-I-6013 S 1607-02-HT-018 1607-02 F-1607-02 16-APR-14 ~


F-1170 Process 17-Apr-14
F-1607-02 16-APR-14 ~
SMIC-I-6013 S 1607-02-HT-019 1607-02
F-1170 Process 17-Apr-14

[1452-SH Steam (42


SMIC-I-6012 S 1452-00-HT-001 1452-00 16-Apr-14
bar)]

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 17-Apr-14

KIC Material Storage


SMIC-I-6011 W WEST SIDE OF DAELIM 17-Apr-14
OFFICE (MFC)

KIC LAYDOWN AREA


SMIC-I-6011 W (WEST SIDE OF DAELIM 18-Apr-14
OFFICE)

F-1607-02 20-Apr-14 ~
SMIC-I-6013 S 1452-00-HT-001 1452-00
F-1170 Process 24-Apr-14

KIC STORAGE AREA


SMIC-I-6011 W (BESIDE KIC MAIN 20-Apr-14
OFFICE, JUBAIL)

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 21-Apr-14

MFC SITE BESIDE


SMIC-I-6011 W 23-Apr-14
FLARE AREA

KIC WAREHOUSE @
SMIC-I-6011 W 23-Apr-14
JUWAYMA

SMIC-I-6012 S 1453-00-HT-001 1453-00 E W Main Pipe Rack 24-Apr-14

SMIC-I-6011 W MFC SITE BESIDE 25-Apr-14


FLARE AREA
26-Apr-14~
SMIC-I-6013 S 1453-00-HT-001 1453-00 E W Main Pipe Rack
01-May-14

MFC SITE BESIDE


SMIC-I-6011 W 27-Apr-14
FLARE AREA

SMIC-I-6012 S 1455-00 E /W Main Pipe Rack 30-Apr-14

SMIC-I-6012 S 1452-00 E /W Main Pipe Rack 30-Apr-14

F-1170 (FUEL AND


SMIC-I-6014 S 1507-01-HT-013 1507-01 30-Apr-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6014 S 1507-01-HT-014 1507-01 30-Apr-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6014 S 1507-01-HT-029 1507-01 30-Apr-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6014 S 1507-01-HT-030 1507-01 BURNER SYSTEM) 30-Apr-14

F-1170 (FUEL AND


SMIC-I-6014 S 1607-02-HT-016 1607-02 30-Apr-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6014 S 1607-02-HT-017 1607-02 30-Apr-14
BURNER SYSTEM)

F-1170 (FUEL AND


SMIC-I-6014 S 1607-02-HT-018 1607-02 BURNER SYSTEM) 30-Apr-14

SMIC-I-6014 S 1607-02-HT-019 1607-02 F-1170 (FUEL AND 30-Apr-14


BURNER SYSTEM)
SMIC-I-6013 S 1455-00-HT-001 1455-00 E W Main Pipe Rack 1-May-14

SMIC-I-6012 S 1454-00-HT-001 1454-00 E W Main Pipe Rack 1-May-14

3-May-14 ~
SMIC-I-6013 S 1455-00-HT-001 1455-00 E W Main Pipe Rack 8-May-14

3-May-14 ~
SMIC-I-6013 S 1454-00-HT-001 1454-00 E W Main Pipe Rack
8-May-14

F-1507-01 BFW, Steam


SMIC-I-6012 S 1507-01-HT-001 1507-01 6-May-14
Drum & SVH Side

MFC SITE BESIDE


SMIC-I-6011 W 6-May-14
FLARE AREA

6-May-14 ~
SMIC-I-6013 S 1452-00-HT-019 1452-00 E W Main Pipe Rack
8-May-14

F-1507-01 BFW, Steam


SMIC-I-6012 S 1607-02-HT-006 1607-02 Drum & SVH Side 8-May-14
(Furnace Area)

F-1170 Process,
SMIC-I-6012 S 1507-01-HT-001 1507-01 8-May-14
Furnace Area

SMIC-I-6012 S 1456-00-HT-001 1456-00 E W Main Pipe Rack 10-May-14

F-1507-01 BFW, Steam 10-May-14 ~


SMIC-I-6013 S 1507-01-HT-001 1507-01 Drum & SVH Side 15-May-14
(Furnace Area)

SMIC-I-6013 S 1607-02-HT-006 1607-02 F-1170 Process, 11-May-14


Furnace Area
KIC WAREHOUSE @
SMIC-I-6011 W 12-May-14
JUWAYMA

KIC STORAGE AREA


SMIC-I-6011 W (BESIDE KIC MAIN 12-May-14
OFFICE, JUBAIL)

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 13-May-14

SMIC-I-6012 S 1453-00-HT-013 1453-00 HOT MP PIPE RACT 14-May-14

SMIC-I-6014 S 1452-00-HT-019 1452-00 E W Main Pipe Rack 14-May-14

SMIC-I-6014 S 1452-00-HT-001 1452-00 E W Main Pipe Rack 14-May-14

SMIC-I-6012 S 1654-00-HT-001 1654-00 EW PIPE RACT 14-May-14

SMIC-I-6014 S 1453-00-HT-001 1453-00 E W Main Pipe Rack 15-May-14

SMIC-I-6014 S 1454-00-HT-001 1454-00 E W Main Pipe Rack 15-May-14

18-May-14 ~
SMIC-I-6013 S 1456-00-HT-001 1456-00 E W Main Pipe Rack
22-Apr-14

18-May-14 ~
SMIC-I-6013 S 1453-00-HT-013 1453-00 E W Main Pipe Rack 22-Apr-14

SMIC-I-6012 S 1453-00-HT-013 1453-00 EW PIPE RACK 18-May-14


18-May-14 ~
SMIC-I-6013 S 1654-00-HT-001 1654-00 E W Main Pipe Rack
22-Apr-14

SMIC-I-6012 S 1616-00-HT-001 1616-00 EW PIPE RACT 18-May-14

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 18-May-14

SMIC-I-6013 S 1453-00-HT-013 1453-00 E W Main Pipe Rack May 19-22, 2014

SMIC-I-6013 S 1616-00-HT-001 1616-00 E W Main Pipe Rack May 19-22, 2014

1616- Furnace Gas


Feed Prep
SMIC-I-6012 S 1616-00-HT-002 1616-00 20-May-14
(EW
Main Pipe Rack)

F-1160 BFW, Steam


SMIC-I-6012 S 1506-01-HT-001 1506-01 Drum & SVH Side 20-May-14
(Furnace Area)

1714-00 : C3R
SMIC-I-6012 S 1714-00-HT-009 1714-00 Refrigeration (Unit: G1, 21-May-14
Area: A)

1714-00 : C3R
SMIC-I-6012 S 1623-01-HT-025 1623-01 Refrigeration (Unit: G1, 21-May-14
Area: A)

1616- Furnace Gas


Feed Prep
SMIC-I-6013 S 1616-00-HT-002 1616-00 21-May-14
(EW
Main Pipe Rack )

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-009 1714-00 Refrigeration (Unit: G1, 22-May-14
Area: A)

1623-01 : Water
SMIC-I-6015 S 1623-01-HT-024 1623-01 Quench System (Unit: 22-May-14
G1, Area: A)
1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-008 1714-00 Refrigeration (Unit: G1, 22-May-14
Area: A)

1623 Water Quench


SMIC-I-6012 S 1623-01-HT-007 1623-01 22-May-14
System

MFC SITE BESIDE


SMIC-I-6011 W FLARE AREA 22-May-14

MFC SITE BESIDE


SMIC-I-6011 W 22-May-14
FLARE AREA

1623 Water Quench


SMIC-I-6012 S 1623-01-HT-008 1623-01 System (EW PIPE 24-May-14
RACK)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-009 1714-00 Refrigeration (Unit: G1, 24-May-14
Area: A)

1623 Water Quench


SMIC-I-6013 S 1623-01-HT-007 1623-01 System (EW PIPE 24-May-14
RACK)

F-1160 BFW, Steam


SMIC-I-6013 S 1506-01-HT-001 1506-01 Drum & SVH Side 24-May-14
( Furnace Area)

F-1160 BFW, Steam


SMIC-I-6012 S 1606-02-HT-006 1616-02 Drum & SVH Side 24-May-14
( Furnace Area)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-009 1714-00 Refrigeration (Unit: G1, 26-May-14
Area: A)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-008 1714-00 Refrigeration (Unit: G1, 26-May-14
Area: A)

1623-01 : C3R
SMIC-I-6016 S 1623-01-HT-024 1623-01 Refrigeration (Unit: G1, 26-May-14
Area: A)
1623-01 : C3R
SMIC-I-6016 S 1623-01-HT-025 1623-01 Refrigeration (Unit: G1, 26-May-14
Area: A)

1623-01 Water Quench


SMIC-I-6013 S 1623-01-HT-008 1623-01 System (EW PIPE 26-May-14
RACK)

1453-00 : SM Steam
SMIC-I-6012 S 1453-00-HT-001 1453-00 ( N/S Pipe Rack; 26-May-14
Area: A)

HOT INSULATION MFC SITE BESIDE


SMIC-I-6011 W 26-May-14
MATERIAL FLARE AREA

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-008 1714-00 Refrigeration (Unit: G1, 27-May-14
Area: A)

1714-00 : C3R
SMIC-I-6017 S 1623-01-HT-024 1714-00 Refrigeration (Unit: G1, 27-May-14
Area: A)

1714-00 : C3R
SMIC-I-6017 S 1623-01-HT-025 1714-00 Refrigeration (Unit: G1, 27-May-14
Area: A)

1453-00 : SM Steam
SMIC-I-6013 S 1453-00-HT-001 1453-00 ( N/S Pipe Rack; 27-May-14
Area: A)

1625-00 : DILUTION
SMIC-I-6012 S 1625-00-HT-002 1625-00 STEAM GENERATION ( 27-May-14
E/W PIPE RACK)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-009 1714-00 Refrigeration (Unit: G1, 27-May-14
Area: A)

F-1160 BFW, Steam


SMIC-I-6013 S 1606-02-HT-006 1606-02 Drum & SVH Side 28-29 May-14
(Furnace Area)

F-1160 BFW, Steam


SMIC-I-6014 S 1506-01-HT-001 1506-01 Drum & SVH Side 28-May-14
(Furnace Area)
SMIC-I-6014 S 1616-00-HT-001 1616-01 EW PIPE RACK 28-May-14

SMIC-I-6014 S 1654-00-HT-001 1654-00 EW PIPE RACK 28-May-14

1625-00 : DILUTION
SMIC-I-6013 S 1625-00-HT-002 1625-00 STEAM GENERATION 29-May-14
(E/W PIPE RACK)

1616- Furnace Gas


SMIC-I-6014 S 1616-00-HT-002 1616-00 Feed Prep (EW Main 29-May-14
Pipe Rack)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-008 1714-00 Refrigeration (Unit: G1, 30-May-14
Area: A)

1714-00 : C3R
SMIC-I-6018 W 1623-01-HT-024 1621-01 Refrigeration (Unit: G1, 30-May-14
Area: A)

1714-00 : C3R
SMIC-I-6018 W 1623-01-HT-025 1623-01 Refrigeration (Unit: G1, 30-May-14
Area: A)

F-1160 BFW, Steam


SMIC-I-6012 S 1506-01-HT-001 1506-01 Drum & SVH Side 31-May-14
(Furnace Area)

1625-00 : DILUTION 31 May 14 ~


SMIC-I-6013 S 1625-00-HT-002 1625-00 STEAM GENERATION
5 June 14
(E/W PIPE RACK)

1453-00 : SM Steam
SMIC-I-6013 S 1453-00-HT-001 1453-00 ( N/S Pipe Rack; Area: 31 May 14 ~
5 June 14
A)

1452-00 : SH Steam
SMIC-I-6012 S 1452-00-HT-001 1452-00 Line @ NS Pipe Rack 1-Jun-14

1453-SM Steam
SMIC-I-6014 S 1453-00-HT-013 1453-00 (EW 1-Jun-14
Main Pipe Rack )
1456-SLL Steam
SMIC-I-6014 S 1456-00-HT-001 1456-00 (EW 1-Jun-14
Main Pipe Rack )

1455-SL Steam
SMIC-I-6014 S 1455-00-HT-001 1455-00 (EW 1-Jun-14
Main Pipe Rack )

1452-00 : SH Steam 02 June 14 ~


SMIC-I-6013 S 1452-00-HT-001 1452-00 Line @ NS Pipe Rack 5 June 14

F-1160 BFW, Steam


02 June 14 ~
SMIC-I-6013 S 1506-01-HT-001 1506-01 Drum & SVH Side
( Furnace Area) 5 June 14

1623 Water Quench


SMIC-I-6014 S 1623-01-HT-007 1623-01 System (EW PIPE 2-Jun-14
RACK)

1623 Water Quench


SMIC-I-6014 S 1623-01-HT-008 1623-01 System (EW PIPE 2-Jun-14
RACK)

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-005 1682-01 Reactors @ Area A, 3-Jun-14
Unit M1

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-009 1682-01 Reactors @ Area A, 3-Jun-14
Unit M1

F-1160 Process,
SMIC-I-6014 S 1606-02-HT-006 1606-02 3-Jun-14
Furnace Area

F-1170 Process,
SMIC-I-6014 S 1607-02-HT-006 1607-02 3-Jun-14
Furnace Area

F-1160 BFW, Steam


SMIC-I-6014 S 1507-01-HT-001 1507-01 Drum & SVH Side 3-Jun-14
(Furnace Area)

SMIC-I-6012 S 1456-00-HT-001 1456-00 1456-00 : SLL Steam 4-Jun-14


Line @ NS Pipe Rack
1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-005 1682-01 Reactors @ Area A, 04-05 June 2014
Unit M1

1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-009 1682-01 Reactors @ Area A, 04-05 June 2014
Unit M1

IWR 701 AP Primary


KIC STORAGE AREA
Vapor Barrier
SMIC-I-6011 W 1000mmW, Bands, Band (BESIDE KIC MAIN 5-Jun-14
OFFICE, JUBAIL)
Seals , Toggle and Latch

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-021 1607-02 Process ( Furnace 6-Jun-14
Area )

1456-00 : SLL Steam 07-Jun-14-


SMIC-I-6013 S 1456-00-HT-001 1456-00
Line @ NS Pipe Rack 12-Jun-14

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-021 1607-02 Process ( Furnace 8-Jun-14
Area )

1506-01 : F-1160 BFW,


SMIC-I-6012 S 1506-01-HT-001 1506-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1506-02 : F-1160 DS,


SMIC-I-6012 S 1506-02-HT-001 1506-02 S10 & Decoking Area 8-Jun-14
(Furnace Area)

1507-01 : F-1170 BFW,


SMIC-I-6012 S 1507-01-HT-010 1507-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1506-01 : F-1160 BFW,


SMIC-I-6012 S 1506-01-HT-010 1506-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1505-01 : F-1150 BFW,


SMIC-I-6012 S 1505-01-HT-010 1505-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1504-01 : F-1140 BFW,


SMIC-I-6012 S 1504-01-HT-010 1504-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)
1503-01 : F-1130 BFW,
SMIC-I-6012 S 1503-01-HT-010 1503-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1502-01 : F-1120 BFW,


SMIC-I-6012 S 1502-01-HT-010 1502-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1501-01 : F-1110 BFW,


SMIC-I-6012 S 1501-01-HT-010 1501-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1521-01 : F-1240 BFW,


SMIC-I-6012 S 1514-01-HT-009 1514-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1511-01 : F-1210 BFW,


SMIC-I-6012 S 1511-01-HT-009 1511-01 Steam Drum & SVH 8-Jun-14
Side (Furnace Area)

1691-01 : Deethanizer
SMIC-I-6012 S 1691-01-HT-027 1691-01 8-Jun-14
Area: A; Unit-F2

1714: 00 ; C3R
SMIC-I-6012 S 1714-00-HT-006 1714-00 Refrigeration Area: A; 8-Jun-14
Unit-F3

1683: 02 ; Secondary
SMIC-I-6012 S 1683-02-HT-006 1683-02 Methanizers Area: A; 8-Jun-14
Unit-F4

1507-01 : F-1170 BFW,


SMIC-I-6013 S 1507-01-HT-010 1507-01 Steam Drum & SVH 9-Jun-14
Side (Furnace Area)

1506-01 : F-1160 BFW,


SMIC-I-6013 S 1506-01-HT-010 1506-01 Steam Drum & SVH 9-Jun-14
Side (Furnace Area)

1505-01 : F-1150 BFW,


SMIC-I-6013 S 1505-01-HT-010 1505-01 Steam Drum & SVH 9-Jun-14
Side (Furnace Area)

1504-01 : F-1140 BFW,


SMIC-I-6013 S 1504-01-HT-010 1504-01 Steam Drum & SVH 9-Jun-14
Side (Furnace Area)
1503-01 : F-1130 BFW,
SMIC-I-6013 S 1503-01-HT-010 1503-01 Steam Drum & SVH 9-Jun-14
Side (Furnace Area)

1506-01 : F-1160 BFW,


9-Jun-14 ~
SMIC-I-6013 S 1506-01-HT-001 1506-01 Steam Drum & SVH
12-Jun-14
Side (Furnace Area)

1506-02 : F-1160 DS,


9-Jun-14 ~
SMIC-I-6013 S 1506-02-HT-001 1506-02 S10 & Decoking Area 12-Jun-14
(Furnace Area)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-027 1691-01 9-Jun-14
Area: A; Unit-F2

1714: 00 ; C3R
SMIC-I-6016 S 1714-00-HT-006 1714-00 Refrigeration Area: A; 9-Jun-14
Unit-F3

1683: 02 ; Secondary
SMIC-I-6016 S 1683-02-HT-025 1683-02 Methanizers Area: A; 9-Jun-14
Unit-F4

F-1160 BFW, Steam


SMIC-I-6014 S 1506-01-HT-001 1506-01 Drum & SVH Side 9-Jun-14
(Furnace Area)

1683: 02 ; Secondary
SMIC-I-6016 S 1683-02-HT-025 1683-02 Methanizers Area: A; 10-Jun-14
Unit-F4

1714: 00 ; C3R
SMIC-I-6017 S 1714-00-HT-006 1714-00 Refrigeration Area: A; 10-Jun-14
Unit-F3

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-027 1691-01 10-Jun-14
Area: A; Unit-F2

1502-01 : F-1120 BFW,


SMIC-I-6013 S 1502-01-HT-010 1502-01 Steam Drum & SVH 10-Jun-14
Side (Furnace Area)

1501-01 : F-1110 BFW,


SMIC-I-6013 S 1501-01-HT-010 1501-01 Steam Drum & SVH 10-Jun-14
Side (Furnace Area)
1521-01 : F-1240 BFW,
SMIC-I-6013 S 1514-01-HT-009 1514-01 Steam Drum & SVH 10-Jun-14
Side (Furnace Area)

1511-01 : F-1210 BFW,


SMIC-I-6013 S 1511-01-HT-009 1511-01 Steam Drum & SVH 10-Jun-14
Side (Furnace Area)

1452-00 : SH Steam
SMIC-I-6012 S 1452-00-HT-019 1452-00 (EW Pipe Rack ) 10-Jun-14

1452-00 : SL Steam
SMIC-I-6012 S 1455-00-HT-004 1455-00 10-Jun-14
(EW Pipe Rack )

1506-01 : F-1160 BFW,


SMIC-I-6013 S 1506-01-HT-001 1506-01 Steam Drum & SVH 11-12June 2014
Side (Furnace Area)

1506-02 : F-1160 DS,


SMIC-I-6013 S 1506-02-HT-001 1506-02 S10 & Decoking Area 11-12June 2014
(Furnace Area)

1625-00 : DILUTION
SMIC-I-6014 S 1625-00-HT-002 1625-00 STEAM GENERATION ( 11-Jun-14
E/W PIPE RACK)

1454-00 : S10 Steam


SMIC-I-6012 S 1454-00-HT-001 1454-00 (N/S Pipe Rack ) 11-Jun-14

1453-00 : SM Steam
SMIC-I-6014 S 1453-00-HT-001 1453-00 11-Jun-14
( N/S Pipe Rack;
Area: A)

1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 11-Jun-14
Line @ NS Pipe Rack

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-027 1691-01 Area: A; Unit-F2 11-Jun-14

1683: 02 ; Secondary
SMIC-I-6016 S 1683-02-HT-025 1683-02 Methanizers Area: A; 11-Jun-14
Unit-F4
HOT INSULATION KIC MATERIAL
SMIC-I-6011 W 11-Jun-14
MATERIAL STORAGE FLARE AREA

COLD INSULATION KIC MATERIAL


SMIC-I-6011 W 11-Jun-14
MATERIAL STORAGE FLARE AREA

1714: 00 ; C3R
SMIC-I-6018 W 1714-00-HT-006 1714-00 Refrigeration Area: A; 12-Jun-14
Unit-F3

1682-01 : Acetylene
SMIC-I-6014 W 1682-01-HT-005 1682-01 Reactors @ Area A, 12-Jun-14
Unit M1

1682-01 : Acetylene
SMIC-I-6014 W 1682-01-HT-009 1682-01 Reactors @ Area A, 12-Jun-14
Unit M1

1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-019 1452-00 13-Jun-14
(EW Pipe Rack )

1452-00 : SL Steam
SMIC-I-6013 S 1455-00-HT-004 1455-00 13-Jun-14
(EW Pipe Rack )

1454-00 : S10 Steam


SMIC-I-6013 S 1454-00-HT-001 1454-00 (N/S Pipe Rack ) 13-Jun-14

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-023 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-024 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-025 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1606-02 : F-1160
SMIC-I-6012 S 1606-02-HT-021 1606-02 Process (Gas Furnace 13-Jun-14
Area)
1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-026 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-027 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-028 1607-02 Process (Gas Furnace 13-Jun-14
Area)

1606-02 : F-1160
SMIC-I-6012 S 1606-02-HT-027 1606-02 Process (Gas Furnace 13-Jun-14
Area)

1606-02 : F-1160
SMIC-I-6012 S 1606-02-HT-026 1606-02 Process (Gas Furnace 13-Jun-14
Area)

1606-02 : F-1160
SMIC-I-6012 S 1606-02-HT-023 1606-02 Process (Gas Furnace 13-Jun-14
Area)

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-023 1605-02 Process (Gas Furnace 14-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-023 1604-02 Process (Gas Furnace 14-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-025 1604-02 Process (Gas Furnace 14-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-026 1604-02 Process (Gas Furnace 14-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-027 1604-02 Process (Gas Furnace 14-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-028 1604-02 Process (Gas Furnace 14-Jun-14
Area)
1603-02 : F-1130
SMIC-I-6012 S 1603-02-HT-026 1603-02 Process (Gas Furnace 14-Jun-14
Area)

1602-02 : F-1120
SMIC-I-6012 S 1602-02-HT-027 1602-02 Process (Gas Furnace 14-Jun-14
Area)

1601-02 : F-1120
SMIC-I-6012 S 1601-02-HT-027 1601-02 Process (Gas Furnace 14-Jun-14
Area)

1602-02 : F-1120
SMIC-I-6012 S 1602-02-HT-023 1602-02 Process (Gas Furnace 14-Jun-14
Area)

1606-02 : F-1160
SMIC-I-6013 S 1606-02-HT-021 1606-02 Process (Gas Furnace 15-Jun-14
Area)

1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-019 1452-00 15-Jun-14
(EW Pipe Rack )

1683: 02 ; Secondary
SMIC-I-6018 W 1683-02-HT-025 1683-02 Methanizers Area: A; 16-Jun-14
Unit-F4

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-021 1605-02 Process (Gas Furnace 16-Jun-14
Area)

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-021 1604-02 Process (Gas Furnace 17-Jun-14
Area)

1605-02 : F-1150
SMIC-I-6013 S 1605-02-HT-021 1605-02 Process (Gas Furnace 17-18 June, 2014
Area)

1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-027 1691-01 Area: A; Unit-F2 17-Jun-14

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-021 1604-02 Process (Gas Furnace 17-Jun-14
Area)
1605-02 : F-1150
SMIC-I-6013 S 1605-02-HT-021 1605-02 Process (Gas Furnace 17-18 June, 2014
Area)

1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-027 1691-01 17-Jun-14
Area: A; Unit-F2

1452-00 : SL Steam
SMIC-I-6014 W 1455-00-HT-004 1455-00 (EW Pipe Rack ) 18-Jun-14

1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-021 1604-02 Process (Gas Furnace 18-19 June, 2014
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-021 1607-02 Process ( Furnace 18-Jun-14
Area )

1616-01 : HP-
SMIC-I-6015 S 1661-01-HT-026 1661-01 Depropanizer (Area: A , 18-Jun-14
Unit: F1 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-018 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-016 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-014 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-012 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-010 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6012 S 1685-00-HT-008 1685-00 Purification PSA, 18-Jun-14
(Area:A, Unit:F4 )
1602-02 : F-1120
SMIC-I-6012 S 1602-02-HT-21 1602-02 Process ( Furnace 19-Jun-14
Area )

1616-01 : HP-
SMIC-I-6016 S 1661-01-HT-026 1661-01 Depropanizer (Area: A , 20-Jun-14
Unit: F1)

1452-00 : SH Steam
SMIC-I-6014 W 1452-00-HT-019 1452-00 (EW Pipe Rack) 20-Jun-14

1616-01 : HP-
SMIC-I-6017 S 1661-01-HT-026 1661-01 Depropanizer (Area: A , 20-Jun-14
Unit: F1)

1616-01 : HP-
SMIC-I-6018 S 1661-01-HT-026 1661-01 Depropanizer (Area: A , 20-Jun-14
Unit: F1)

1506-01 : F-1160 BFW,


SMIC-I-6014 S 1506-01-HT-001 1506-01 Steam Drum & SVH 22-Jun-14
Side (Furnace Area)

1506-02 : F-1160 BFW,


SMIC-I-6014 S 1506-02-HT-001 1506-02 Steam Drum & SVH 22-Jun-14
Side (Furnace Area)

1454-00 : S10 Steam


SMIC-I-6014 S 1454-00-HT-001 1454-00 (N/S Pipe Rack ) 22-Jun-14

HOT INSULATION KIC MATERIAL


SMIC-I-6011 W 22-Jun-14
MATERIAL STORAGE FLARE AREA

1603-02 : F-1130
SMIC-I-6012 S 1603-02-HT-021 1603-02 Process ( Furnace 23-Jun-14
Area )

1602-02 : F-1120
SMIC-I-6013 S 1602-02-HT-021 1602-02 Process ( Furnace 23-Jun-14
Area )

1685-00 : H2
SMIC-I-6013 S 1685-00-HT-018 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )
1685-00 : H2
SMIC-I-6013 S 1685-00-HT-016 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6013 S 1685-00-HT-014 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6013 S 1685-00-HT-012 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6013 S 1685-00-HT-010 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6013 S 1685-00-HT-008 1685-00 Purification PSA, 23-Jun-14
(Area:A, Unit:F4 )

HOT / COLD INSULATION KIC CAMP


SMIC-I-6011 W 24 June '14
MATERIAL WAREHOUSE

HOT / COLD INSULATION KIC CAMP


SMIC-I-6011 W 24 June '14
MATERIAL WAREHOUSE

1603-02 : F-1130
SMIC-I-6013 S 1603-02-HT-021 1603-02 Process (Furnace Area) 25-Jun-14

1683-01: Primary
SMIC-I-6015 S 1683-01-HT-003 1683-01 Demethanizers (Area: 26-Jun-14
A, Unit: F3 )

1681-00: Deprop
SMIC-I-6015 S 1681-00-HT-011 1681-00 O/H System (Area: A, 26-Jun-14
Unit: F3 )

HOT INSULATION KIC MATERIAL


SMIC-I-6011 W MATERIAL STORAGE FLARE AREA 27-Jun-14

SMIC-I-6014 S 1456-00-HT-001 1456-00 1456-00 : SLL Steam 27-Jun-14


Line @ NS Pipe Rack
1685-00 : H2
SMIC-I-6014 W 1685-00-HT-018 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6014 W 1685-00-HT-016 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6014 W 1685-00-HT-014 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6014 W 1685-00-HT-012 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6014 W 1685-00-HT-010 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1685-00 : H2
SMIC-I-6014 W 1685-00-HT-008 1685-00 Purification PSA, 28-Jun-14
(Area:A, Unit:F4 )

1681-00: Deprop
SMIC-I-6016 S 1681-00-HT-011 1681-00 O/H System (Area: A, 29-Jun-14
Unit: F3 )

1661-01 : HP
SMIC-I-6015 S 1661-01-HT-002 1661-01 Depropanizer ( Area: A, 29-Jun-14
Unit: F1)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-030 1607-02 Process ( Gas Furnace 29-Jun-14
Area)

1683-01: Primary
Demethanizers
SMIC-I-6016 S 1683-01-HT-003 1683-01 1-Jul-14
( Area: A,
Unit: F3 )
1681-00: Deprop O/H
System
SMIC-I-6017 S 1681-00-HT-011 1681-00 (Area:: A,Unit: 1-Jul-14
F3 )
1661-01: HP
SMIC-I-6016 S 1661-01-HT-002 1661-01 Depropanizer 1-Jul-14
( Area: A
Unit: F1 )
1683-01: Primary
SMIC-I-6017 S 1683-01-HT-003 1683-01 Demethanizers (Area: 2-Jul-14
A, Unit: F3 )

1661-01 : HP
SMIC-I-6017 S 1661-01-HT-002 1661-01 Depropanizer ( Area: A, 2-Jul-14
Unit: F1)

1607-02 : F-1170
SMIC-I-6012 S 1606-02-HT-030 1606-02 Process ( Gas Furnace 2-Jul-14
Area)

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-044 1625-00 Steam Generation 2-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-045 1625-00 Steam Generation 2-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-051 1625-00 Steam Generation 2-Jul-14
( Area: B2, Unit H3 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-007 1714-00 Refrigeration (Area: A, 3-Jul-14
NS Pipe Rack )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-010 1714-00 Refrigeration (Area: A, 3-Jul-14
NS Pipe Rack )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-043 1704-02 Refrigeration : (Area: 3-Jul-14
A, Unit: F3 )

1615-01 : F-1250 Fuel


SMIC-I-6012 S 1615-01-HT-001 1615-01 & Burner System 3-Jul-14
( Liquid Furnace )

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-030 1607-02 Process (Gas Furnace 3-Jul-14
Area)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-007 1714-00 Refrigeration (Area: A, 3-Jul-14
NS Pipe Rack )
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-010 1714-00 Refrigeration (Area: A, 3-Jul-14
NS Pipe Rack )

1681-00: Deprop
SMIC-I-6018 W 1681-00-HT-011 1681-00 O/H System (Area: A, 3-Jul-14
Unit: F3 )

1683-01: Primary
SMIC-I-6018 W 1683-01-HT-003 1683-01 Demethanizers (Area: 4-Jul-14
A, Unit: F3 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-007 1714-00 Refrigeration (Area: A, 4-Jul-14
NS Pipe Rack )

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-030 1605-01 Process ( Gas Furnace 5-Jul-14
Area)

1615-01 : F-1250 Fuel


5-Jul-14 ~
SMIC-I-6013 S 1615-01-HT-001 1615-01 & Burner System
(Liquid Furnace ) 7-Jul-14

1606-02 : F-1160
SMIC-I-6013 S 1606-02-HT-030 1606-02 Process ( Gas Furnace 6-Jul-14
Area)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-044 1625-00 Steam Generation 6-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-045 1625-00 Steam Generation 6-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-051 1625-00 Steam Generation 6-Jul-14
( Area: B2, Unit H3 )

1604-02 : F-1140
SMIC-I-6012 S 1604-02-HT-030 1604-02 Process ( Gas Furnace 6-Jul-14
Area)

1661-01 : HP
SMIC-I-6018 W 1661-01-HT-002 1661-01 Depropanizer ( Area: A, 6-Jul-14
Unit: F1)
1615-01 : F-1250 Fuel
5-Jul-14 ~
SMIC-I-6013 S 1615-01-HT-001 1615-01 & Burner System
7-Jul-14
(Liquid Furnace )

1681-00: Deprop
SMIC-I-6015 S 1681-00-HT-021 1681-00 O/H System (Area: A, 7-Jul-14
Unit: F3 )

1681-00: Deprop O/H


SMIC-I-6016 S 1681-00-HT-021 1681-00 System (Area: A, Unit: 9-Jul-14
F3 )

1704-02 : C2
9-Jul-14 ~
SMIC-I-6016 S 1704-02-HT-043 1704-02 Refrigeration : (Area:
A, Unit: F2) 10-Jul-14

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-010 1714-00 Refrigeration (Area: A, 9-Jul-14
NS Pipe Rack)

1604-02 : F-1140
9-Jul-14 ~
SMIC-I-6013 S 1604-02-HT-030 1604-02 Process ( Gas Furnace
Area) 10-Jul-14

1605-02 : F-1150
9-Jul-14 ~
SMIC-I-6013 S 1605-02-HT-030 1605-02 Process ( Gas Furnace
Area) 10-Jul-14

1681-00: Deprop
SMIC-I-6017 S 1681-00-HT-021 1681-00 O/H System (Area: A, 10-Jul-14
Unit: F3 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-044 1625-00 Steam Generation 10-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-045 1625-00 Steam Generation 10-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-051 1625-00 Steam Generation 10-Jul-14
( Area: B2, Unit H3 )

SMIC-I-6011 W KIC MATERIAL 11-Jul-14


STORAGE FLARE AREA
1704-02 : C2
SMIC-I-6016 S 1704-02-HT-043 1704-02 Refrigeration : ( Area: 11-Jul-14
A, Unit: F2 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-027 1625-00 Steam Generation 11-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-028 1625-00 Steam Generation 11-Jul-14
( Area: B2, Unit H3 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-004 1691-01 11-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-005 1691-01 11-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-007 1691-01 11-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-008 1691-01 11-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-009 1691-01 ( Area:A, Unit: F2 ) 11-Jul-14

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-043 1704-02 Refrigeration : ( Area: 12-14 July, 2014
A, Unit: F2 )

1615-01 : F-1250 Fuel


SMIC-I-6012 S 1615-01-HT-004 1615-01 & Burner System (Gas 12-Jul-14
Furnace Area )

1452-00: SH Steam
SMIC-I-6012 S 1452-00-HT-001 1452-00 (Area: A, Unit: V1) 12-Jul-14

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-027 1625-00 Steam Generation 13-Jul-14
( Area: B2, Unit H3 )
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-028 1625-00 Steam Generation 13-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-025 1625-00 Steam Generation 13-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-026 1625-00 Steam Generation 13-Jul-14
( Area: B2, Unit H3 )

1601-02 : F-1110
SMIC-I-6012 S 1601-02 Process ( Furnace 13-Jul-14
Area )

1681-00: Deprop
SMIC-I-6017 S 1681-00-HT-021 1681-00 O/H System (Area: A, 13-Jul-14
Unit: F3 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-043 1704-02 Refrigeration : (Area: 14-Jul-14
A, Unit: F2)

1452-00: SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 14-16 July, 2014
(Area: A, Unit: V1)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-009 1691-01 (Area:A, Unit: F2) 14-15 July, 2014

1452-00: SH Steam
SMIC-I-6012 S 1452-00-HT-001 1452-00 (Area: A, Unit: V1 & 14-Jul-14
V2)

1601-02 : F-1110
SMIC-I-6012 S 1601-02-HT-021 1601-02 14-Jul-14
Process (Furnace Area)

1606-02 : F-1160
SMIC-I-6014 W 1606-02-HT-030 1606-02 Process ( Gas Furnace 14-Jul-14
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-030 1607-02 Process (Gas Furnace 14-Jul-14
Area)
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-026 1625-00 Steam Generation 14-Jul-14
(Area: B2, Unit H3)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-026 1625-00 Steam Generation 14-Jul-14
(Area: B2, Unit H3)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-004 1691-01 ( Area:A, Unit: F2 ) 15-Jul-14

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-007 1691-01 15-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-008 1691-01 15-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-009 1691-01 15-Jul-14
( Area:A, Unit: F2 )

1452-00: SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 15-17 July, 2014
(Area: A, Unit: V1)

1452-00: SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 (Area: A, Unit: V1 & 15-16 July, 2014
V2)

1452-00: SH Steam 16 Jul 14 ~


SMIC-I-6013 S 1452-00-HT-001 1452-00 (Area: A, Unit: V1 &
17Jul 14
V2)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-043 1704-02 Refrigeration : (Area: 16-Jul-14
A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-004 1691-01 (Area:A, Unit: F2) 16-Jul-14

SMIC-I-6016 S 1691-01-HT-007 1691-01 1691-01 : Deethanizer 16-Jul-14


(Area:A, Unit: F2)
1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-008 1691-01 16-Jul-14
(Area:A, Unit: F2)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-009 1691-01 16-Jul-14
(Area:A, Unit: F2)

HOT INSULATION KIC Material Storage


SMIC-I-6011 W MATERIAL Beside Flare Area 16-Jul-14

1615-01 : F-1250 Fuel


SMIC-I-6013 S 1615-01-HT-004 1615-01 & Burner System (Gas 17-Jul-14
Furnace Area )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-007 1691-01 17-Jul-14
( Area:A, Unit: F2)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-008 1691-01 17-Jul-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-004 1691-01 17-Jul-14
( Area:A, Unit: L3 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-005 1691-01 (Area:A, Unit: L3, L4 ) 17-Jul-14

1705 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-005 1705-01 17-Jul-14
( Area:A, Unit: F2 )

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-005 1705-01 18-Jul-14
( Area:A, Unit: F2 )

1601-02 : F-1110
SMIC-I-6013 S 1601-02-HT-021 1601-02 Process ( Furnace 18-Jul-14
Area )

SMIC-I-6016 S 1705-01-HT-005 1705-01 1705-01 : C2 Splitter 19-Jul-14 ~


( Area:A, Unit: F2 ) 21-Jul-14
1681-00: Deprop
SMIC-I-6018 W 1681-00-HT-021 1681-00 O/H System (Area: A, 19-Jul-14
Unit: F3 )

1603-02 : F-1130
SMIC-I-6012 S 1603-02-HT-030 1603-02 Process ( Gas Furnace 19-Jul-14
Area)

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-027 1625-00 Steam Generation 19-Jul-14
( Area: B2, Unit H3 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-028 1625-00 Steam Generation 19-Jul-14
( Area: B2, Unit H3 )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-007 1714-00 Refrigeration ( Area: A, 19-Jul-14
NS Pipe Rack )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-010 1714-00 Refrigeration (Area: A, 19-Jul-14
NS Pipe Rack)

1603-02 : F-1130
SMIC-I-6012 S 1603-02-HT-030 1603-02 Process ( Gas Furnace 20-Jul-14
Area)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-005 1705-01 ( Area:A, Unit: F2 ) 20-21 July, 2014

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-005 1691-01 (Area:A, Unit: F2, L3, 20-21 July, 2014
L4)

1452-00: SH Steam
SMIC-I-6012 S 1452-00-HT-001 1452-00 (Area: A, Unit: N1 & 20-Jul-14
G2)

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-007 1691-01 (Area:A, Unit: F3, L3) 20-Jul-14

SMIC-I-6016 S 1705-01-HT-005 1705-01 1705-01 : C2 Splitter 20-21 July, 2014


( Area:A, Unit: F2 )
1603-02 : F-1130
SMIC-I-6013 S 1603-02-HT-030 1603-02 Process ( Gas Furnace 21-Jul-14
Area)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-004 1691-01 21-Jul-14
( Area:A, Unit: L3 )

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-005 1705-01 ( Area:A, Unit: F2 ) 21-Jul-14

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-005 1691-01 ( Area:A, Unit: F2, L3, 21-Jul-14
L4 )

HOT INSULATION KIC MATERIAL


SMIC-I-6011 W 21-Jul-14
MATERIAL STORAGE FLARE AREA

MATERIAL INSPECTION
KIC STORAGE AREA
ON ACCESSORIES &
SMIC-I-6011 W (BESIDE KIC MAIN 21-Jul-14
VAPOR BARRIER FOR OFFICE, JUBAIL)
INSULATION

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-007 1691-01 22-Jul-14
( Area:A, Unit: F2 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 22-Jul-14
Unit: L3, L4 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-025 1625-00 Steam Generation 22-Jul-14
( Area: B2, Unit H3 )

1626-00 : Dilution
SMIC-I-6014 W 1625-00-HT-026 1625-00 Steam Generation 22-Jul-14
( Area: B2, Unit H3 )

1605-02 : F-1150
SMIC-I-6014 W 1605-02-HT-030 1605-02 Process ( Gas Furnace 22-Jul-14
Area)

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-030 1604-02 Process ( Gas Furnace 22-Jul-14
Area)
1704-02 : C2
SMIC-I-6015 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 22-Jul-14
Unit: L3, L4 )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-004 1691-01 23-Jul-14
( Area:A, Unit: L3 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-007 1691-01 ( Area:A, Unit: F3, L3 ) 23-Jul-14

1452-00: SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 (Area: A, Unit: N1 & 23-Jul-14
G2)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-003 1705-01 23-Jul-14
(Area: A, Unit: L3 & L4)

1453-00 : SM (Area: A,
SMIC-I-6012 S 1453-00-HT-001 1453-00 23-Jul-14
Unit: V1, V2)

1452-00: SH Steam
SMIC-I-6013 S 1452-00-HT-001 1452-00 (Area: A, Unit: N1 & 23-24 July, 2014
G2)

1456-00 : SLL (Area: A,


SMIC-I-6012 S 1456-00-HT-001 1456-00 Unit: V1, V4, N1, N2, 23-Jul-14
G3)

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-016 1625-00 Steam Generation 23-Jul-14
(Area: B2, Unit: H3)

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-017 1625-00 Steam Generation 23-Jul-14
(Area: B2, Unit: H3)

1602-02 : F-1120
SMIC-I-6014 W 1602-02-HT-021 1602-02 Process ( Furnace 23-Jul-14
Area )

SMIC-I-6014 S 1452-00-HT-001 1452-00 1452-00: SH Steam 23-Jul-14


(Area: A, Unit: V1)
1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-007 1691-01 24-Jul-14
( Area:A, Unit: F3, L3 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 24-Jul-14
Unit: L3, L4 )

1453-00 : SM (Area: A,
SMIC-I-6013 S 1453-00-HT-001 1453-00 Unit: V1, V2) 24-26 July, 2014

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-043 1704-02 Refrigeration : ( Area: 24-Jul-14
A, Unit: F2 )

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-015 1683-03 Wash and Cold Box 24-Jul-14
( Area: A, Unit: F4 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-050 1625-00 Steam Generation 24-Jul-14
(Area: B2, Unit: H3)

1616-00 : Furnace Gas


SMIC-I-6012 S 1616-00-HT-028 1616-00 Feed Prep ( Area: B2, 24-Jul-14
Unit: H4 )

1456-00 : SLL (Area: A,


SMIC-I-6013 S 1456-00-HT-001 1456-00 Unit: V1, V4, N1, N2, 25-Jul-14
G3)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-002 1704-02 Refrigeration (Area: A, 25-Jul-14
Unit: L3, L4)

1602-02 : F-1120
SMIC-I-6013 S 1602-02-HT-030 1602-02 Process (Gas Furnace 25-Jul-14
Area)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-047 1714-00 Refrigeration (Area:A, 25-Jul-14
Unit: L3, L4)

1456-00 : SLL (Area: A,


SMIC-I-6013 S 1456-00-HT-001 1456-00 Unit: V1, V4, N1, N2, 26-28 July, 2014
G3)
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-016 1625-00 Steam Generation 26-Jul-14
(Area: B2, Unit: H3)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-017 1625-00 Steam Generation 26-Jul-14
(Area: B2, Unit: H3)

1615-01 : F-1250 Fuel


SMIC-I-6013 W 1615-01-HT-001 1615-01 & Burner System 26-Jul-14
( Liquid Furnace )

1601-02 : F-1110
SMIC-I-6012 S 1601-02-HT-030 1601-02 Process ( Gas Furnace 26-Jul-14
Area)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-050 1625-00 Steam Generation 27-Jul-14
(Area: B2, Unit: H3)

1616-00 : Furnace Gas


SMIC-I-6013 S 1616-00-HT-028 1616-00 Feed Prep ( Area: B2, 27-Jul-14
Unit: H4 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-003 1704-02 Refrigeration ( Area: A, 27-Jul-14
Unit: L3, L4 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-036 1704-02 Refrigeration ( Area: A, 27-Jul-14
Unit: L2, L3 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 27-Jul-14
Unit: L4 )

1452-00 : SH ( Area: A,
SMIC-I-6012 S 1452-00-HT-001 1452-00 27-Jul-14
Unit: W5 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 27-Jul-14
Unit: L3, L4 )

1601-02 : F-1110
SMIC-I-6013 S 1456-00 Process ( Gas Furnace 28-Jul-14
Area)
1714-00 : C3R
SMIC-I-6015 S 1714-00 Refrigeration ( Area: A, 28-Jul-14
Unit: L3)

1714-00 : C3R
SMIC-I-6015 S 1714-0 Refrigeration ( Area: A, 28-Jul-14
Unit: L3, L4)

1714-00 : C3R
SMIC-I-6015 S 1714-00 Refrigeration ( Area: A, 28-Jul-14
Unit: L2, L3)

1704-02 : C2
SMIC-I-6015 S 1704-02 Refrigeration ( Area: A, 28-Jul-14
Unit: L3, L4 )

1704-02 : C2
SMIC-I-6015 S Refrigeration ( Area: A, 28-Jul-14
Unit: L3 )

1601-02 : F-1110
SMIC-I-6013 S 1456-00-HT-001 1456-00 Process ( Gas Furnace 29-Jul-14
Area)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 29-Jul-14
Unit: L3)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-013 1714-00 Refrigeration ( Area: A, 29-Jul-14
Unit: L3, L4)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-012 1714-00 Refrigeration ( Area: A, 29-Jul-14
Unit: L2, L3)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-001 1704-02 Refrigeration ( Area: A, 29-Jul-14
Unit: L3, L4 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-028 1704-02 Refrigeration ( Area: A, 29-Jul-14
Unit: L3 )

SMIC-I-6013 S 1452-00-HT-001 1452-00 1452-00 : SH ( Area: A, 30-Jul-14


Unit: W5 )
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-012 1714-00 Refrigeration ( Area: A,30-31 July, 2014
Unit: L2, L3)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-003 1705-01 30-31 July, 2014
(Area: A, Unit: L3 & L4)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 30-Jul-14
Unit: L3, L4 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-005 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-029 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-030 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-031 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-032 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1452-00 : SH ( Area: A,
SMIC-I-6013 S 1452-00-HT-001 1452-00 30-31 July, 2014
Unit: W5 )

1705-01 : C2 Splitter 30-31 July, 2014


SMIC-I-6016 S 1705-01-HT-003 1705-01
(Area: A, Unit: L3 & L4)

1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-004 1625-01 ( Area:A, Unit: L3 ) 30-Jul-14

SMIC-I-6018 S 1691-01-HT-005 1691-01 1691-01 : Deethanizer 30-Jul-14


( Area:A, Unit: L3, L4 )
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-005 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-029 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-030 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-031 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-032 1625-00 Steam Generation 30-Jul-14
( Area: B2, Unit: H3 )

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 31-Jul-14
Unit: L3)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-012 1714-00 Refrigeration ( Area: A, 31-Jul-14
Unit: L2, L3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 31-Jul-14
Unit: L4 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-007 1691-01 31-Jul-14
(Area:A, Unit: F3, L3)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 1-Aug-14
Unit: L3)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-003 1705-01 (Area: A, Unit: L3 & L4) 1-Aug-14

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 1-Aug-14
Unit: L4 )
1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-015 1625-00 Steam Generation 1-Aug-14
( Area: B2, Unit: H3 )

1614-01: F-1240 Fuel &


SMIC-I-6012 S 1614-01-HT-003 1614-01 Burner System ( Area: 1-Aug-14
B2, Unit: H3 )

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-005 1705-01 ( Area:A, Unit: F2 ) 2-Aug-14

1615-01 : F-1250 Fuel


SMIC-I-6014 W 1615-01-HT-004 1615-01 & Burner System (Gas 2-Aug-14
Furnace Area )

1606-02 : F-1160
SMIC-I-6014 W 1606-02-HT-021 1606-02 Process (Gas Furnace 2-Aug-14
Area)

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-017 1625-00 Steam Generation 2-Aug-14
(Area: B2, Unit: H3)

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-016 1625-00 Steam Generation 2-Aug-14
(Area: B2, Unit: H3)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-013 1714-00 Refrigeration ( Area: A,
03-05 August, 2014
Unit: L3, L4)

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-018 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
1625-00-HT-016 1625-
SMIC-I-6012 S 1625-00 Steam Generation 3-Aug-14
00-HT-017
(Area: B2, Unit: H3)

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-005 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-029 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )
1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-030 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-031 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-032 1625-00 Steam Generation 3-Aug-14
( Area: B2, Unit: H3 )

1616-00 : Furnace Gas


SMIC-I-6014 W 1616-00-HT-028 1616-00 Feed Prep ( Area: B2, 3-Aug-14
Unit: H4 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-036 1704-02 Refrigeration ( Area: A, 4-Aug-14
Unit: L2, L3 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-013 1714-00 Refrigeration ( Area: A, 4-Aug-14
Unit: L3, L4)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 4-Aug-14
Unit: L4 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-050 1625-00 Steam Generation 4-Aug-14
(Area: B2, Unit: H3)

1452-00 : SH ( Area: A,
SMIC-I-6014 S 1452-00-HT-001 1452-00 4-Aug-14
Unit: W5 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-036 1704-02 Refrigeration ( Area: A, 4-Aug-14
Unit: L2, L3 )

1615-01: F-1250 Fuel &


SMIC-I-6012 S 1615-01-HT-003 1615-01 Burner System (GAS 4-Aug-14
FURNACE)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-015 1625-00 Steam Generation 4-Aug-14
( Area: B2, Unit: H3 )
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-018 1625-00 Steam Generation 4-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
1625-00-HT-016 1625-
SMIC-I-6013 S 1625-00 Steam Generation 4-Aug-14
00-HT-017
(Area: B2, Unit: H3)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 5-Aug-14
Unit: L3, L4)

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-024 1691-01 5-Aug-14
(Area: A, Unit: L3)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-036 1704-02 Refrigeration ( Area: A, 5-Aug-14
Unit: L2, L3 )

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-003 1705-01 5-Aug-14
(Area: A, Unit: L3 & L4)

HOT / COLD INSULATION KIC CAMP


SMIC-I-6011 W 5-Aug-14
MATERIAL WAREHOUSE, Jubail

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-024 1691-01 (Area: A, Unit: L3) 5-Aug-14

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 5-Aug-14
Unit: L3)

BESIDE MFC DAELIM


MAIN OFFICE / MFC
SMIC-I-6011 W 5-Aug-14
SITE BESIDE FLARE
AREA
BESIDE MFC DAELIM
MAIN OFFICE / MFC
SMIC-I-6011 W SITE BESIDE FLARE 5-Aug-14
AREA

SMIC-I-6016 S 1691-01-HT-024 1691-01 1691-01 : Deethanizer 6-Aug-14


(Area: A, Unit: L3)
1704-02 : C2
6-Aug-14 ~
SMIC-I-6016 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A,
7-Aug-14
Unit: L3, L4)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-024 1691-01 6-Aug-14
(Area: A, Unit: L3)

1601-02 : F-1110
SMIC-I-6014 W 1601-02-HT-021 1601-02 Process ( Furnace 6-Aug-14
Area )

1614-01: F-1240 Fuel &


SMIC-I-6013 S 1614-01-HT-003 1614-01 Burner System ( Area: 6-Aug-14
B2, Unit: H3 )

1613-01: F-1230 Fuel &


SMIC-I-6012 S 1613-01-HT-003 1613-01 Burner System (GAS 6-Aug-14
FURNACE)

1615-01: F-1250 Fuel & 6-Aug-14 ~


SMIC-I-6013 S 1615-01-HT-003 1615-01 Burner System (GAS
FURNACE) 7-Aug-14

1683-02: 1683-02 :
Secondary
SMIC-I-6015 S 1683-02-HT-008 1683-02 7-Aug-14
Methanizers ( Area: A,
Unit: F3 )

1603-02 : F-1130
SMIC-I-6014 W 1603-02-HT-030 1603-02 Process ( Gas Furnace 7-Aug-14
Area)

1602-02 : F-1120
SMIC-I-6014 W Process ( Gas Furnace 7-Aug-14
Area)

1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-004 1691-01 7-Aug-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-005 1691-01 ( Area:A, Unit: F2 ) 7-Aug-14

SMIC-I-6018 S 1691-01-HT-007 1691-01 1691-01 : Deethanizer 7-Aug-14


( Area:A, Unit: F2 )
1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-008 1691-01 7-Aug-14
( Area:A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-009 1691-01 7-Aug-14
( Area:A, Unit: F2 )

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 7-Aug-14
Unit: L3, L4 )

1613-01: F-1230 Fuel &


SMIC-I-6013 S 1613-01-HT-003 1613-01 Burner System (GAS 7-Aug-14
FURNACE)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 8-Aug-14
Unit: L3, L4)

1602-02 : F-1120
SMIC-I-6014 S 1602-02-HT-030 1602-02 Process ( Gas Furnace 8-Aug-14
Area)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-026 1714-00 Refrigeration ( Area: A, 8-Aug-14
Unit: L3)

1704-02 : C2R
SMIC-I-6015 S 1704-02-HT-035 1704-02 Refrigeration ( Area: A, 8-Aug-14
Unit: L3, L4)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-002 1705-01 8-Aug-14
( Area: A, Unit: L3, L4)

1612-01: F-1220 Fuel &


SMIC-I-6012 S 1612-01-HT-003 1612-01 Burner System (GAS 9-Aug-14
FURNACE)

1683-02 : Secondary 10-Aug-14 ~


SMIC-I-6016 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 14-Aug-14
Unit: F3, L4 )

1704-02 : C2R
SMIC-I-6016 S 1704-02-HT-035 1704-02 Refrigeration ( Area: A, 10-Aug-14 ~
14-Aug-14
Unit: L3, L4)
1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-016 1625-00 Steam Generation 10-Aug-14
(Area: B2, Unit: H3)

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-015 1625-00 Steam Generation 10-Aug-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-018 1625-00 Steam Generation 10-Aug-14
( Area: B2, Unit: H3 )

1601-02 : F-1110
SMIC-I-6014 W 1601-02-HT-030 1601-02 Process ( Gas Furnace 10-Aug-14
Area)

1452-00: SH Steam
SMIC-I-6014 S 1452-00-HT-001 1452-00 (Area: A, Unit: V1, V2, 10-Aug-14
N1 & G2)

1456-00 : SLL (Area: A,


SMIC-I-6014 S 1456-00-HT-001 1456-00 Unit: V1, V4, N1, N2, 10-Aug-14
G3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 11-Aug-14
Unit: F3, L4 )

1704-02 : C2R
SMIC-I-6017 S 1704-02-HT-035 1704-02 Refrigeration ( Area: A, 11-Aug-14
Unit: L3, L4)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 11-Aug-14
Unit: L3)

1661-01 : HP-
SMIC-I-6015 S 1661-01-HT-001 1661-01 Depropanizer ( Area: 11-Aug-14
A, Unit: L2, L3, L4 )

1661-01 : HP-
SMIC-I-6015 S 1661-01-HT-005 1661-01 Depropanizer ( Area: 11-Aug-14
A, Unit: L3 )

1451-00 : SVH STEAM


SMIC-I-6012 S 1451-00-HT-001 1451-00 LINE ( Area: A, Unit: 11-Aug-14
L2, L3)
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-026 1714-00 Refrigeration ( Area: A,
12-13 August, 2014
Unit: L3)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-002 1705-01 12-13 August, 2014
( Area: A, Unit: L3, L4)

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-007 1456-00 ( Area: A, Unit: G3 ) 12-Aug-14

1615-01: F-1250 Fuel &


SMIC-I-6014 W 1615-01-HT-003 1615-01 Burner System (GAS 12-Aug-14
FURNACE)

1614-01: F-1240 Fuel &


SMIC-I-6014 S 1614-01-HT-003 1614-01 Burner System ( Area: 12-Aug-14
B2, Unit: H3 )

1613-01: F-1230 Fuel &


SMIC-I-6014 W 1613-01-HT-003 1613-01 Burner System (GAS 12-Aug-14
FURNACE)

1456-00 : SLL Steam


SMIC-I-6013 S 1456-00-HT-007 1456-00 12-Aug-14
( Area: A, Unit: G3 )

1451-00 : SVH STEAM


SMIC-I-6013 S 1451-00-HT-001 1451-00 LINE ( Area: A, Unit:13-14 August, 2014
L2, L3)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 13-Aug-14
Unit: L3)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-026 1714-00 Refrigeration ( Area: A, 13-Aug-14
Unit: L3)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-017 1683-03 Wash and Cold Box 13-Aug-14
( Area: A, Unit: F3, L4 )

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-019 1683-03 Wash and Cold Box 13-Aug-14
( Area: A, Unit: F3, L4 )
1704-02 : C2R
SMIC-I-6015 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 13-Aug-14
Unit: F3)

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-017 1683-03 Wash and Cold Box 14-Aug-14
( Area: A, Unit: F3, L4 )

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-019 1683-03 Wash and Cold Box 14-Aug-14
( Area: A, Unit: F3, L4 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 14-Aug-14
Unit: L3)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-002 1705-01 14-Aug-14
( Area: A, Unit: L3, L4)

1704-02 : C2R
SMIC-I-6018 S 1704-02-HT-035 1704-02 Refrigeration ( Area: A, 14-Aug-14
Unit: L3, L4)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-015 1683-03 Wash and Cold Box 14-Aug-14
( Area: A, Unit: F3 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 14-Aug-14
Unit: F3 )

1507-01 : F-1170 BFW,


SMIC-I-6014 W 1507-01-HT-010 1507-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

1506-01 : F-1160 BFW,


SMIC-I-6014 W 1506-01-HT-010 1506-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

1505-01 : F-1150 BFW,


SMIC-I-6014 W 1505-01-HT-010 1505-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

1504-01 : F-1140 BFW,


SMIC-I-6014 W 1504-01-HT-010 1504-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)
1503-01 : F-1130 BFW,
SMIC-I-6014 W 1503-01-HT-010 1506-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

1502-01 : F-1120 BFW,


SMIC-I-6014 W 1502-01-HT-010 1502-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

1501-01 : F-1110 BFW,


SMIC-I-6014 W 1501-01-HT-010 1501-01 Steam Drum & SVH 14-Aug-14
Side (Furnace Area)

PIR (COLD) MFC SITE BESIDE


SMIC-I-6011 W 15-Aug-14
INSULATION MATERIAL FLARE AREA

HOT INSULATION MFC SITE BESIDE


SMIC-I-6011 W 15-Aug-14
MATERIAL FLARE AREA

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-017 1683-03 Wash and Cold Box 16-Aug-14
( Area: A, Unit: F3, L4 )

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-019 1683-03 Wash and Cold Box 16-Aug-14
( Area: A, Unit: F3, L4 )

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-015 1683-03 Wash and Cold Box 16-18 August, 2014
( Area: A, Unit: F3 )

1607-01: F-1170 Fuel &


SMIC-I-6012 S 1607-01-HT-003 1607-01 Burner System 16-Aug-14
(FURNACE)

1606-01: F-1160 Fuel &


SMIC-I-6012 S 1606-01-HT-003 1606-01 Burner System 16-Aug-14
(FURNACE)

1661-01 : HP
SMIC-I-6015 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 16-Aug-14
Unit: L3 )

1661-01 : HP
SMIC-I-6015 S 1683-02-HT-026 1683-02 Depropanizer ( Area: A, 16-Aug-14
Unit: F3, L3 )
1661-01 : HP
SMIC-I-6015 S 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 16-Aug-14
Unit: F3, )

1612-01: F-1220 Fuel &


SMIC-I-6013 S 1612-01-HT-003 1612-01 Burner System 17-Aug-14
(FURNACE)

1451-00 : SVH STEAM


SMIC-I-6013 S 1451-00-HT-001 1451-00 LINE ( Area: A, Unit: 17-Aug-14
L2, L3)

1661-01 : HP
SMIC-I-6016 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A,
17-18 August, 2014
Unit: L3 )

1605-01: F-1150 Fuel &


SMIC-I-6012 S 1605-01-HT-003 1605-01 Burner System 17-Aug-14
( FURNACE)

1607-01: F-1170 Fuel &


SMIC-I-6013 S 1607-01-HT-003 1607-01 Burner System 18-Aug-14
(FURNACE)

1456-00 : SLL Steam


SMIC-I-6014 S 1456-00-HT-007 1456-00 18-Aug-14
( Area: A, Unit: G3 )

1451-00 : SVH STEAM


SMIC-I-6014 S 1451-00-HT-001 1451-00 LINE ( Area: A, Unit: 18-Aug-14
L2, L3)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-026 1714-00 Refrigeration ( Area: A, 18-Aug-14
Unit: L3)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 18-Aug-14
Unit: L3)

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-017 1683-03 Wash and Cold Box 18-Aug-14
( Area: A, Unit: F3, L4 )

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-019 1683-03 Wash and Cold Box 18-Aug-14
( Area: A, Unit: F3, L4 )
1606-01: F-1160 Fuel &
SMIC-I-6013 S 1606-01-HT-003 1606-01 Burner System 19-Aug-14
(FURNACE)

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-015 1683-03 Wash and Cold Box 19-Aug-14
( Area: A, Unit: F3 )

1661-01 : HP
SMIC-I-6017 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 19-Aug-14
Unit: L3 )

1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 19-Aug-14
Unit: F3, L4 )

1704-02 : C2R
SMIC-I-6015 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 19-Aug-14
Unit: F3)

1604-01: F-1140 Fuel &


SMIC-I-6012 S 1604-01-HT-003 1604-01 Burner System 19-Aug-14
(FURNACE)

1605-01: F-1150 Fuel &


SMIC-I-6013 S 1605-01-HT-003 1605-01 Burner System 21-Aug-14
(FURNACE)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-026 1683-02 Methanizers ( Area: A, 21-Aug-14
Unit: F3, L4 )

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-002 1705-01 21-Aug-14
( Area: A, Unit: L3, L4)

1607-02: F-1170 Fuel &


SMIC-I-6012 S 1607-02-HT-020 1607-02 Burner System 22-Aug-14
(FURNACE)

1612-01: F-1220 Fuel &


SMIC-I-6014 W 1612-01-HT-003 1612-01 Burner System 22-Aug-14
(FURNACE)

1604-01: F-1140 Fuel &


SMIC-I-6013 S 1604-01-HT-003 1604-01 Burner System 22-Aug-14
(FURNACE)
1601-01: F-1110 Fuel &
SMIC-I-6012 S 1601-01-HT-003 1601-01 Burner System 22-Aug-14
(FURNACE)

PIR (COLD) MFC SITE BESIDE


SMIC-I-6011 W 22-Aug-14
INSULATION MATERIAL FLARE AREA

1451-00: SVH Steam


SMIC-I-6012 S 1451-00-HT-001 1451-00 Area A, (Unit L1,V2) 23-Aug-14

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-013 1714-00 Refrigeration ( Area: A, 23-Aug-14
Unit: L3, L4)

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 23-Aug-14
Unit: L3, L4)

1607-01: F-1170 Fuel &


SMIC-I-6014 W 1607-01-HT-003 1607-01 Burner System 23-Aug-14
(FURNACE)

1607-02: F-1170
SMIC-I-6013 S 1607-02-HT-020 1607-02 24-Aug-14
Process

1661-01 : HP
SMIC-I-6018 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 24-Aug-14
Unit: L3 )

1704-02 : C2R
SMIC-I-6016 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A,
24-25 August, 2014
Unit: F3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-026 1683-02 Methanizers ( Area: A, 24-Aug-14
Unit: F3, L4 )

1601-01: F-1110 Fuel &


SMIC-I-6013 S 1601-01-HT-003 1601-01 Burner System 25-Aug-14
(FURNACE)

SMIC-I-6012 S 1452-00-HT-001 1452-00 1452-00 : SH Steam 25-Aug-14


25-Aug-14 ~
SMIC-I-6013 S 1452-00-HT-001 1452-00 1452-00 : SH Steam
28-Aug-14

1683-03 : Methane
Wash and Cold Box
SMIC-I-6018 S 1683-03-HT-015 1683-03 26-Aug-14
( Area: A,
Unit: F3 )

1704-02 : C2R
SMIC-I-6017 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 27-Aug-14
Unit: F3)

1606-01: F-1160 Fuel &


SMIC-I-6014 W 1606-01-HT-003 1606-01 Burner System 27-Aug-14
(FURNACE)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-047 1714-00 Refrigeration ( Area:A, 28-Aug-14
Unit: F3 )

1603-01: F-1130 Fuel &


SMIC-I-6012 S 1603-01-HT-003 1603-01 Burner System 28-Aug-14
(FURNACE)

SMIC-I-6013 S 1452-00-HT-001 1452-00 1452-00 : SH Steam 29-Aug-14

1605-01: F-1150 Fuel &


SMIC-I-6014 W 1605-01-HT-003 1605-01 Burner System 29-Aug-14
(FURNACE)

PIR (COLD) MFC SITE BESIDE


SMIC-I-6011 W 29-Aug-14
INSULATION MATERIAL FLARE AREA

HOT INSULATION MFC SITE BESIDE


SMIC-I-6011 W 29-Aug-14
MATERIAL FLARE AREA

30-Aug-14 ~
SMIC-I-6013 S 1452-00-HT-001 1452-00 1452-00 : SH Steam 4-Sep-14

SMIC-I-6014 S 1607-02-HT-020 1507-02 1607-02: F-1170 30-Aug-14


Process
1604-01: F-1140 Fuel &
SMIC-I-6014 W 1604-01-HT-003 1604-01 Burner System 31-Aug-14
(FURNACE)

1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-020 1606-02 31-Aug-14
Process

1611-01: F-1210 Fuel &


SMIC-I-6012 S 1611-01-HT-003 1611-01 Burner System 3-Sep-14
(FURNACE)

1515-01: F-1250
SMIC-I-6012 S 1515-01-HT-031 1515-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1515-01: F-1250
SMIC-I-6012 S 1515-01-HT-030 1515-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1514-01: F-1240
SMIC-I-6012 S 1514-01-HT-031 1514-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1514-01: F-1240
SMIC-I-6012 S 1514-01-HT-030 1514-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1601-01: F-1110 Fuel &


SMIC-I-6014 W 1601-01-HT-003 1601-01 Burner System 3-Sep-14
(FURNACE)

1513-01: F-1230
SMIC-I-6012 S 1513-01-HT-031 1513-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1513-01: F-1230
SMIC-I-6012 S 1513-01-HT-030 1513-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6012 S 1512-01-HT-031 1512-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6012 S 1512-01-HT-030 1512-01 BFW,Steam Drums & 3-Sep-14
SVH Side (FURNACE)
1511-01: F-1210
SMIC-I-6012 S 1511-01-HT-031 1511-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1511-01: F-1210
SMIC-I-6012 S 1511-01-HT-030 1511-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1501-01: F-1110
SMIC-I-6012 S 1501-01-HT-028 1501-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1501-01: F-1110
SMIC-I-6012 S 1501-01-HT-027 1501-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6012 S 1502-01-HT-028 1502-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6012 S 1502-01-HT-027 1502-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1506-01: F-1160
SMIC-I-6012 S 1506-01-HT-028 1506-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1506-01: F-1160
SMIC-I-6012 S 1506-01-HT-027 1506-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6012 S 1507-01-HT-028 1507-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6012 S 1507-01-HT-027 1507-01 BFW,Steam Drums & 4-Sep-14
SVH Side (FURNACE)

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-028 1614-02 PROCESS (FURNACE) 5-Sep-14

SMIC-I-6012 S 1614-02-HT-025 1614-02 1614-02: F-1240 5-Sep-14


PROCESS (FURNACE)
1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-023 1614-02 5-Sep-14
PROCESS (FURNACE)

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-028 1613-02 5-Sep-14
PROCESS (FURNACE)

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-025 1613-02 PROCESS (FURNACE) 5-Sep-14

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-023 1613-02 6-Sep-14
PROCESS (FURNACE)

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-028 1612-02 6-Sep-14
PROCESS (FURNACE)

1605-02: F-1150
SMIC-I-6012 S 1605-02-HT-028 1605-02 6-Sep-14
PROCESS (FURNACE)

1501-01: F-1110
SMIC-I-6012 S 1501-01-HT-008 1501-01 BFW,Steam Drums & 6-Sep-14
SVH Side (FURNACE)

1501-01: F-1110
SMIC-I-6012 S 1501-01-HT-009 1501-01 BFW,Steam Drums & 6-Sep-14
SVH Side (FURNACE)

1514-01: F-1240
SMIC-I-6012 S 1514-01-HT-008 1514-01 BFW,Steam Drums & 6-Sep-14
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6012 S 1512-01-HT-008 1512-01 BFW,Steam Drums & 6-Sep-14
SVH Side (FURNACE)

1511-01: F-1210
SMIC-I-6012 S 1511-01-HT-008 1511-01 BFW,Steam Drums & 6-Sep-14
SVH Side (FURNACE)

SMIC-I-6012 S 1451-00-HT-001 1451-00 1451-00: SVH Steam 7-Sep-14


Area A, (Unit W5)
1451-00: SVH Steam
SMIC-I-6012 S 1451-00-HT-003 1451-00 ( Area A 7-Sep-14
L2 )

1451-00: SVH Steam


SMIC-I-6012 S 1451-00-HT-004 1451-00 7-Sep-14
( Area A L2 )

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-024 1603-02 PROCESS (FURNACE) 7-Sep-14

1704-02 : C2R
SMIC-I-6015 S 1704-02-HT-032 1704-02 Refrigeration ( Area: A, 7-Sep-14
Unit: F1)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-028 1705-01 7-Sep-14
( Area: A, Unit: F2)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-012 1705-01 ( Area: A, Unit: 7-Sep-14
F2)

1714-00 : C2R
SMIC-I-6015 S 1714-00-HT-007 1714-00 Refrigeration 7-Sep-14
( Area: A, Unit: L2)

1451-00: SVH Steam


7-Sep-14 ~
SMIC-I-6013 S 1451-00-HT-001 1451-00 Area A, (Unit 10-Sep-14
L1,V2,W5)

1451-00: SVH Steam 7-Sep-14 ~


SMIC-I-6013 S 1451-00-HT-001 1451-00 Area A, (Unit
10-Sep-14
L1,V2,W5)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-047 1714-00 Refrigeration ( Area:A, 8-Sep-14
Unit: L3,L4, F3 )

1611-01: F-1210 Fuel &


SMIC-I-6013 S 1611-01-HT-003 1611-01 Burner System 8-Sep-14
(FURNACE)

SMIC-I-6012 S 1605-02-HT-020 1605-02 1605-02: F-1150 8-Sep-14


Process
1505-02: F-1150 DS,
SMIC-I-6012 S 1505-02-HT-001 1505-02 8-Sep-14
S10 & Decoking Air

1603-01: F-1130 Fuel &


SMIC-I-6013 S 1603-01-HT-003 1603-01 Burner System 9-Sep-14
(FURNACE)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-047 1714-00 Refrigeration ( Area:A, 9-Sep-14
Unit: L3,L4, F3 )

1451-00: SVH Steam


SMIC-I-6013 S 1451-00-HT-003 1451-00 ( Area A 9-10 Sep. 2014
L2 )

1451-00: SVH Steam


SMIC-I-6013 S 1451-00-HT-004 1451-00 9-10 Sep. 2014
( Area A L2 )

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-020 1606-02 10-Sep-14
Process

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-028 1705-01 ( Area: A, 10-12 Sept. 2014
Unit: F2)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-012 1705-01 ( Area: A, Unit:10-12 Sept. 2014
F2)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-006 1705-01 ( Area: A, Unit: 10-Sep-14
F2)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-022 1683-02 Methanizers 10-Sep-14
( Area: A, Unit: F3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-001 1683-02 Methanizers 10-Sep-14
( Area: A, Unit: F3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-002 1683-02 Methanizers 10-Sep-14
( Area: A, Unit: F3)
1504-02: F-1140 DS,
SMIC-I-6012 S 1504-02-HT-001 1504-02 11 Sept. 2014
S10 & Decoking Air

1505-02: F-1150 DS,


SMIC-I-6013 S 1505-02-HT-001 1505-02 11 Sept. 2014
S10 & Decoking Air

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-030 1621-01 Tower & QO System 14-Sep-14

1626-00: Dilusion
SMIC-I-6012 S 1626-00-HT-008 1626-00 14-Sep-14
Steam Concerntrator

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-010 1621-01 14-Sep-14
Tower & QO System

1507-01: BFW, Steam


SMIC-I-6012 S 1507-01-HT-008 1507-01 14-Sep-14
Drum&SVH Side

1714-00 : C2R
Refrigeration
SMIC-I-6016 S 1714-00-HT-007 1714-00 15 Sept. 2014
( Area: A, Unit:
L2)

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-020 1605-02 Process 15 Sept. 2014

1506-02: F-1160 DS,


SMIC-I-6012 S 1506-02-HT-001 1506-02 15 Sept. 2014
S10 & Decoking Air

1506-01: F-1160 BFW,


SMIC-I-6012 S 1506-01-HT-008 1506-01 Steam Drum & SVH 15 Sept. 2014
Side

1505-01: F-1150 BFW,


SMIC-I-6012 S 1505-01-HT-008 1505-01 Steam Drum & SVH 15 Sept. 2014
Side

1515-01: F-1250 BFW,


SMIC-I-6012 S 1515-01-HT-006 1515-01 Steam Drum & SVH 15 Sept. 2014
Side
1671-02: Deprop O/H
SMIC-I-6012 S 1671-02-HT-005 1671-02 15 Sept. 2014
Compressor

1704-02 : C2
SMIC-I-6015 S 1714-00-HT-025 1714-00 Refrigeration ( Area: A, 15 Sept. 2014
Unit: L3, L4 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-003 1704-02 Refrigeration ( Area: A,15-17 Sept. 2014
Unit: L3, L4 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-001 1704-02 Refrigeration ( Area: A,15-17 Sept. 2014
Unit: L3, L4 )

1714-00 : C2R
Refrigeration
SMIC-I-6017 S 1714-00-HT-007 1714-00 15 Sept. 2014
( Area: A, Unit:
L2)

1704-02 : C2
SMIC-I-6016 S 1714-00-HT-025 1714-00 Refrigeration ( Area: A,15-17 Sept. 2014
Unit: L3, L4 )

1611-01: F-1210 Fuel &


SMIC-I-6014 W 1611-01-HT-003 1611-01 Burner System 16 Sept. 2014
(FURNACE)

1504-02: F-1140 DS,


SMIC-I-6013 S 1504-02-HT-001 1504-02 S10 & Decoking Air 16 Sept. 2014

1621-01: Oil quench


SMIC-I-6013 S 1621-01-HT-010 1621-01 16 Sept. 2014
Tower & QO System

1621-01: Oil quench


SMIC-I-6013 S 1621-01-HT-030 1621-01 16 Sept. 2014
Tower & QO System

1626-00 :Dilution
SMIC-I-6013 S 1626-00-HT-008 1626-00 Steam Concerntrator 16 Sept. 2014

1452-00: SH Steam
SMIC-I-6014 S 1452-00-HT-001 1451-00 ( Area: A, Unit: 16 Sept. 2014
T1,T2 Col. To Col. 31)
1503-01: F-1130 BFW,
SMIC-I-6012 S 1503-01-HT-008 1503-01 Steam Drum & SVH 16 Sept. 2014
Side

1504-01: F-1140 BFW,


SMIC-I-6012 S 1504-01-HT-008 1504-01 Steam Drum & SVH 16 Sept. 2014
Side

1511-01: F-1210 BFW,


SMIC-I-6012 S 1511-01-HT-006 1511-01 Steam Drum & SVH 16 Sept. 2014
Side

1512-01: F-1220 BFW,


SMIC-I-6012 S 1512-01-HT-006 1512-01 Steam Drum & SVH 16 Sept. 2014
Side

1513-01: F-1230 BFW,


SMIC-I-6012 S 1513-01-HT-006 1513-01 Steam Drum & SVH 16 Sept. 2014
Side

1514-01: F-1240 BFW,


SMIC-I-6012 S 1514-01-HT-006 1514-01 Steam Drum & SVH 16 Sept. 2014
Side

1602-02: F-1120
SMIC-I-6014 W 1602-02-HT-030 1602-02 18 Sept. 2014
Process ( Gas Furnace )

1603-01: F-1130 Fuel &


SMIC-I-6014 W 1603-01-HT-003 1603-01 Burner System 18 Sept. 2014
(FURNACE)

1615-02:F-1250
SMIC-I-6012 S 1615-02-HT-021 1615-02 18 Sept. 2014
Process ( Furnace )

1452-00: SH Steam
SMIC-I-6014 S 1452-00-HT-001 1452-00 ( Area: A, Unit:W5, 18 Sept. 2014
N1,G2 )

1626-00: Dilution
SMIC-I-6012 S 1626-00-HT-005 1626-00 Steam Concerntrator 18 Sept. 2014

SMIC-I-6012 S 1616-00-HT-012 1616-00 1616-00: Furnace Gas 18 Sept. 2014


Feed Prep
1456-00: SLL Steam
SMIC-I-6012 S 1456-00-HT-001 1456-00 ( Area : A, 18 Sept. 2014
Unit: L1,L4,K1,K2)

1453-00: SM Steam
SMIC-I-6012 S 1453-00-HT-001 1453-00 ( Area : A, 18 Sept. 2014
Unit:L1, L2)

1455-00: SL Steam
SMIC-I-6012 S 1455-00-HT-001 1455-00 ( Area : A, 18 Sept. 2014
Unit: L1)

1714-00 : C2R
Refrigeration
SMIC-I-6018 S 1714-00-HT-007 1714-00 18 Sept. 2014
( Area: A, Unit:
L2)
1423-00: Cooling
Water Chem
SMIC-I-6012 S 1423-00-HT-009 1423-00 18 Sept. 2014
Addititives
( Area : A, Unit: V6)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-012 1705-01 ( Area: A, Unit: 18 Sept. 2014
F2)

1671-02: Deprop O/H


SMIC-I-6013 S 1671-02-HT-005 1671-02 18 Sept. 2014
Compressor

1507-01: BFW, Steam


SMIC-I-6013 S 1507-01-HT-008 1507-01 Drum & SVH Side 18 Sept. 2014

1506-02: F-1160 DS,


SMIC-I-6012 S 1501-02-HT-001 1501-02 19 Sept. 2014
S10 & Decoking Air

1506-02: F-1160 DS,


SMIC-I-6012 S 1502-02-HT-001 1502-02 19 Sept. 2014
S10 & Decoking Air

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-006 1705-01 ( Area: A, Unit: 19 Sept. 2014
F2)

SMIC-I-6013 S 1506-02-HT-001 1506-02 1506-02: F-1160 DS, 19 Sept. 2014


S10 & Decoking Air
1671-02: Deprop O/H
SMIC-I-6013 S 1505-01-HT-008 1505-01 19 Sept. 2014
Compressor

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-006 1705-01 ( Area: A, Unit: 20 Sept. 2014
F2)

1691-01: Deethanizer
SMIC-I-6015 S 1691-01-HT-001 1691-01 ( Area: A, Unit:F2) 20 Sept. 2014

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-007 1705-01 20 Sept. 2014
( Area: A, Unit:F2)

1683-02: Secondary
SMIC-I-6016 S 1683-02-HT-024 1683-02 Methanizer ( Area: 20-22 Sept. 2014
A, Unit:F4)

1506-01: F-1160 BFW,


SMIC-I-6013 S 1506-01-HT-008 1506-01 Steam Drum & SVH 20-22 Sept. 2014
Side

1502-01: F-1120 BFW,


SMIC-I-6012 S 1502-01-HT-008 1502-01 Steam Drum & SVH 21 Sept. 2014
Side

1423-00: Cooling
Water Chem
SMIC-I-6013 S 1423-00-HT-009 1453-00 Addititives 21 Sept. 2014
( Area : A, Unit: V6)

1501-02: F-1110 DS,


SMIC-I-6013 S 1501-02-HT-001 1501-02 21 Sept. 2014
S10 & Decoking Air

1501-02: F-1120 DS,


SMIC-I-6013 S 1502-02-HT-001 1502-02 21 Sept. 2014
S10 & Decoking Air

1615-02: F-1250
SMIC-I-6012 S 1615-02-HT-019 1615-02 Process ( Furnace ) 21 Sept. 2014

SMIC-I-6012 S 1615-02-HT-020 1615-02 1615-02: F-1250 21 Sept. 2014


Process ( Furnace )
1683-02: Secondary
Methanizer
SMIC-I-6015 S 1683-02-HT-015 1683-02 21 Sept. 2014
(
Area: A, Unit:F4)

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-015 1705-01 21 Sept. 2014
( Area: A, Unit:F3)

1651-00: Dryers
SMIC-I-6015 S 1651-00-HT-005 1651-00 ( Area: 21 Sept. 2014
A, Unit:F1)

1503-02: F-1130 DS,


SMIC-I-6012 S 1503-02-HT-001 1503-02 21 Sept. 2014
S10 & Decoking Air

1615-02:F-1250
SMIC-I-6013 S 1615-02-HT-021 1615-02 21-23 Sept. 2014
Process ( Furnace )

1683-03: Methane
wash and Cold box
SMIC-I-6015 S 1683-03-HT-023 1683-03 22 Sept. 2014
( Area: A, Unit:F4)

1466-00: CH
SMIC-I-6012 S 1466-00-HT-015 1466-00 Condensate ( Area: A , 22 Sept. 2014
Unit: T1)
1683-01: Primary
Demethanizers
SMIC-I-6015 S 1683-01-HT-001 1683-01 22 Sept. 2014
( Area: A,
Unit:L4,L3,F3,F1)
1681-00: Deprop O/H
System
SMIC-I-6015 S 1681-00-HT-013 1681-00 22 Sept. 2014
( Area:
A, Unit:L4,L3,F3,F1)

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-019 1614-02 22 Sept. 2014
Process ( Furnace )

1626-00:Dilution
SMIC-I-6012 S 1626-00-HT-006 1626-00 Steam Concerntrator 22 Sept. 2014
( Area: A , Unit: H2)

SMIC-I-6013 S 1503-02-HT-001 1503-02 1503-02: F-1130 DS, 21 Sept. 2014


S10 & Decoking Air
1681-00: Deprop O/H
System
SMIC-I-6015 S 1681-00-HT-012 1681-00 22 Sept. 2014
( Area:
A, Unit:F3)

1505-02: F-1150 DS,


SMIC-I-6014 W 1505-02-HT-001 1505-02 22 Sept. 2014
S10 & Decoking Air

1504-02: F-1140 DS,


SMIC-I-6014 W 1504-02-HT-001 1504-02 S10 & Decoking Air 22 Sept. 2014

1626-00 :Dilution
SMIC-I-6014 W 1626-00 22 Sept. 2014
1626-00- Steam Concerntrator
HT-008

1671-02: Deprop O/H


SMIC-I-6014 W 1671-02-HT-005 1671-02 22 Sept. 2014
Compressor

1452-00: SH Steam
SMIC-I-6014 S 1452-00-HT-001 1452-00 ( Area: A, Unit:W5, 22 Sept. 2014
L1,L2 )

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-001 1691-01 23-25 Sept. 2014
( Area: A, Unit:F2)

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-007 1705-01 ( Area: A, Unit:F2) 23-25 Sept. 2014

1681-00: Deprop O/H


System
SMIC-I-6016 S 1681-00-HT-013 1681-00 23 Sept. 2014
( Area:
A, Unit:L4,L3,F3,F1)
1683-01: Primary
Demethanizers
SMIC-I-6016 S 1683-01-HT-001 1683-01 23 Sept. 2014
( Area: A,
Unit:L4,L3,F3,F1)
1423-00: Cooling
Water Chem
SMIC-I-6014 W 1423-00-HT-009 1423-00 Addititives 23 Sept. 2014
( Area : A, Unit: V6)

SMIC-I-6012 S 1507-02-HT-001 1507-02 1507-02: F-1170 DS, 24 Sept. 2014


S10 & Decoking Air
1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-001 1606-02 24 Sept. 2014
Process ( Furnace )

1605-02: F-1150
SMIC-I-6012 S 1605-02-HT-001 1605-02 24 Sept. 2014
Process ( Furnace )

1604-02: F-1140
SMIC-I-6012 S 1604-02-HT-001 1604-02 Process ( Furnace ) 24 Sept. 2014

1615-02: F-1250
SMIC-I-6013 S 1615-02-HT-019 1615-02 24 Sept. 2014
Process ( Furnace )

1615-02: F-1250
SMIC-I-6013 S 1615-02-HT-020 1615-02 24 Sept. 2014
Process ( Furnace )

1681-00: Deprop O/H


System
SMIC-I-6017 S 1681-00-HT-013 1681-00 24 Sept. 2014
( Area:
A, Unit:L4,L3,F3,F1)
1681-00: Deprop O/H
System
SMIC-I-6016 S 1681-00-HT-012 1681-00 24 Sept. 2014
( Area:
A, Unit:F3)
1683-01: Primary
Demethanizers
SMIC-I-6017 S 1683-01-HT-001 1683-01 24 Sept. 2014
( Area: A,
Unit:L4,L3,F3,F1)
1683-02: Secondary
Methanizer
SMIC-I-6015 S 1683-02-HT-010 1683-02 24 Sept. 2014
( Area: A, Unit:F3)
1683-02: Secondary
Methanizer
SMIC-I-6015 S 1704-02-HT-018 1704-02 24 Sept. 2014
( Area: A, Unit:F3)

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-009 1705-01 24 Sept. 2014
( Area: A, Unit:F2)

1681-00: Deprop O/H


SMIC-I-6017 S 1681-00-HT-012 1681-00 System 24 Sept. 2014
( Area:
A, Unit:F3)
1614-02: F-1240
SMIC-I-6013 S 1614-02-HT-019 1614-02 25 Sept. 2014
Process ( Furnace )

1507-02: F-1170 DS,


SMIC-I-6013 S 1507-02-HT-001 1507-02 25 Sept. 2014
S10 & Decoking Air

1602-02: F-1120
SMIC-I-6012 S 1602-02-HT-001 1602-02 Process ( Furnace ) 25 Sept. 2014

1501-01: F-1110
SMIC-I-6013 S 1501-01-HT-008 1501-01 BFW,Steam Drums & 25 Sept. 2014
SVH Side (FURNACE)

1503-01: F-1130 BFW,


SMIC-I-6013 S 1503-01-HT-008 1503-01 Steam Drum & SVH 25 Sept. 2014
Side

1504-01: F-1140 BFW,


SMIC-I-6013 S 1504-01-HT-008 1504-01 Steam Drum & SVH 25 Sept. 2014
Side

1502-01: F-1120 BFW,


SMIC-I-6013 S 1502-01-HT-008 1502-01 Steam Drum & SVH 25 Sept. 2014
Side

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-009 1705-01 24 Sept. 2014
( Area: A, Unit:F2)

1515-02: F-1250
SMIC-I-6012 S 1515-02-HT-001 1515-02 26 Sept. 2014
DS,S10 & Decoking Air

1625-00: Dilution
SMIC-I-6012 S 1625-00-HT-007 1625-00 26 Sept. 2014
Steam Generation

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-020 1614-02 Process ( Furnace ) 26 Sept. 2014

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-006 1705-01 ( Area: A, Unit: 26 Sept. 2014
F2)
PIR (COLD) MFC SITE BESIDE
SMIC-I-6011 W 26 Sept. 2014
INSULATION MATERIAL FLARE AREA

1603-02: F-1240
SMIC-I-6012 S 1603-02-HT-001 1603-02 27 Sept. 2014
Process ( Furnace )

1605-02 : F-1150
SMIC-I-6014 W 1605-02-HT-021 1605-02 Process (Gas Furnace 27 Sept. 2014
Area)

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-021 1604-02 Process (Gas Furnace 27 Sept. 2014
Area)

1621-01: Oil quench


SMIC-I-6014 W 1621-01-HT-030 1621-01 27 Sept. 2014
Tower & QO System

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-006 1705-01 ( Area: A, Unit: 27 Sept. 2014
F2)

1683-03: Methane
wash and Cold box
SMIC-I-6016 S 1683-03-HT-023 1683-03 28 Sept. 2014
( Area: A, Unit:F4)

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-019 1613-02 Process 28 Sept. 2014
( Furnace )

1603-02 : F-1130
SMIC-I-6014 W Process 28 Sept. 2014
( Furnace Area )

1614-02: F-1240
SMIC-I-6013 S 1614-02-HT-020 1614-02 Process 28 Sept. 2014
( Furnace )

1515-02: F-1250
SMIC-I-6013 S 1515-02-HT-001 1615-02 DS,S10 & Decoking Air 28 Sept. 2014

SMIC-I-6012 S 1616-00-HT-010 1616-00 1616-00: Furnace Gas 28 Sept. 2014


Feed Prep
1731-01: Debutanizer
SMIC-I-6012 S 1731-01-HT-014 1731-01 ( Area 28 Sept. 2014
A,Unit V4)

1731-01: Debutanizer
SMIC-I-6012 S 1731-01-HT-017 1731-01 ( Area 28 Sept. 2014
A,Unit V4)

1731-01: Debutanizer
SMIC-I-6012 S 1731-01-HT-024 1731-01 ( Area 28 Sept. 2014
A,Unit V4)

1616-00: Furnace Gas


SMIC-I-6013 S 1616-00-HT-012 1616-00 28 Sept. 2014
Feed Prep

1626-00:Dilution
SMIC-I-6013 S 1626-00-HT-006 1626-00 Steam Concerntrator 28 Sept. 2014
( Area: A , Unit: H2)

1511-01: F-1210 BFW,


SMIC-I-6013 S 1511-01-HT-006 1511-01 Steam Drum & SVH 28 Sept. 2014
Side

1512-01: F-1220 BFW,


SMIC-I-6013 S 1512-01-HT-006 1512-01 Steam Drum & SVH 28 Sept. 2014
Side

1513-01: F-1230 BFW,


SMIC-I-6013 S 1513-01-HT-006 1513-01 Steam Drum & SVH 28 Sept. 2014
Side

1514-01: F-1240 BFW,


SMIC-I-6013 S 1514-01-HT-006 1514-01 Steam Drum & SVH 28 Sept. 2014
Side

1683-03: Methane
wash and Cold box
SMIC-I-6016 S 1683-03-HT-023 1683-03 28 Sept. 2014
( Area: A, Unit:F4)

1603-02 : F-1130
SMIC-I-6014 W 1603-02-HT-021 1603-02 Process ( Furnace 29 Sept. 2014
Area )

SMIC-I-6013 S 1613-02-HT-019 1613-02 1613-02: F-1230 29 Sept. 2014


Process ( Furnace )
1616-00: Furnace Gas
SMIC-I-6013 S 1616-00-HT-010 1616-00 29 Sept. 2014
Feed Prep

1731-01: Debutanizer
SMIC-I-6013 S 1731-01-HT-014 1731-01 29 Sept. 2014
( Area A,Unit V4)

1731-01: Debutanizer
SMIC-I-6013 S 1731-01-HT-017 1731-01 ( Area A,Unit V4) 29 Sept. 2014

1731-01: Debutanizer
SMIC-I-6013 S 1731-01-HT-024 1731-01 29 Sept. 2014
( Area A,Unit V4)

1515-01: F-1250
SMIC-I-6013 S 1515-01-HT-031 1515-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1515-01: F-1250
SMIC-I-6013 S 1515-01-HT-030 1515-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1514-01: F-1240
SMIC-I-6013 S 1514-01-HT-031 1514-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1514-01: F-1240
SMIC-I-6013 S 1514-01-HT-030 1514-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-020 1613-02 29 Sept. 2014
Process ( Furnace )

1513-01: F-1230
SMIC-I-6013 S 1513-01-HT-031 1513-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1513-01: F-1230
SMIC-I-6013 S 1513-01-HT-030 1513-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6013 S 1512-01-HT-031 1512-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)
1512-01: F-1220
SMIC-I-6013 S 1512-01-HT-030 1512-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1511-01: F-1210
SMIC-I-6013 S 1511-01-HT-031 1511-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1511-01: F-1210
SMIC-I-6013 S 1511-01-HT-030 1511-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1616-00: Furnace Gas


SMIC-I-6012 S 1616-00-HT-009 1616-00 Feed Prep ( Area B2 29 Sept. 2014
Unit H4)

1621-01: Oil Quench


SMIC-I-6012 S 1621-01-HT-023 1621-01 Tower & QO System 29 Sept. 2014
(Area B2, Unit H2 )

1632-02: CGC Stm


Turbine Surface
SMIC-I-6015 S 1632-02-HT-007 1632-02 29 Sept. 2014
Condensate (Area A,
Unit W5 )

1616-00: Furnace Gas


SMIC-I-6014 W 1616-00-HT-012 1616-00 29 Sept. 2014
Feed Prep

1626-00:Dilution
SMIC-I-6014 W 1626-00-HT-006 1626-00 Steam Concerntrator 29 Sept. 2014
( Area: A , Unit: H2)

1501-01: F-1110
SMIC-I-6014 W 1501-01-HT-008 1501-01 BFW,Steam Drums & 29 Sept. 2014
SVH Side (FURNACE)

1503-01: F-1130 BFW,


SMIC-I-6014 W 1503-01-HT-008 1503-01 Steam Drum & SVH 29 Sept. 2014
Side

1504-01: F-1140 BFW,


SMIC-I-6014 W 1504-01-HT-008 1504-01 Steam Drum & SVH 29 Sept. 2014
Side

1502-01: F-1120 BFW,


SMIC-I-6014 W 1502-01-HT-008 1502-01 Steam Drum & SVH 29 Sept. 2014
Side
1507-01: BFW, Steam
SMIC-I-6014 W 1507-01-HT-008 1507-01 29 Sept. 2014
Drum & SVH Side

1505-01: F-1150 BFW,


SMIC-I-6014 W 1505-01-HT-008 1505-01 Steam Drum & SVH 29 Sept. 2014
Side

1506-01: F-1160 BFW,


SMIC-I-6014 W 1506-01-HT-008 1506-01 Steam Drum & SVH 29 Sept. 2014
Side

1512-02: F-1220
SMIC-I-6012 S 1512-02-HT-001 1512-02 30 Sept. 2014
DS,S10 & Decoking Air

1504-01: F-1140
SMIC-I-6012 S 1504-01-HT-028 1504-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6012 S 1504-01-HT-027 1504-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-008 1705-01 30 Sept. 2014
( Area: A, Unit:F2)

1423-00: Cooling
SMIC-I-6012 S 1423-00-HT-030 1423-00 Water Chem Additives 30 Sept. 2014
(Area A, Unit V6 )

1531-01: BFV (Area A,


SMIC-I-6012 S 1531-01-HT-003 1531-01 30 Sept. 2014
Unit T1 )

1632-02: CGC Stm


Turbine Surface
SMIC-I-6013 S 1632-02-HT-007 1632-02 30 Sept. 2014
Condensate (Area A,
Unit W5 )

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-008 1705-01 30 Sept. 2014
( Area: A, Unit:F2)

1683-02: Secondary
SMIC-I-6015 S 1683-02-HT-030 1683-02 Methanizer 30 Sept. 2014
( Area: A, Unit:F3)
1503-02: F-1130 DS,
SMIC-I-6014 W 30 Sept. 2014
S10 & Decoking Air

1681-00: Deprop O/H


System
SMIC-I-6018 W 1681-00-HT-012 1681-00 30 Sept. 2014
( Area:
A, Unit:F3)

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-003 1621-01 Tower & QO System 30 Sept. 2014

1501-01: F-1110
SMIC-I-6013 S 1501-01-HT-028 1501-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1501-01: F-1110
SMIC-I-6013 S 1501-01-HT-027 1501-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6013 S 1502-01-HT-028 1502-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6013 S 1502-01-HT-027 1502-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1506-01: F-1160
SMIC-I-6013 S 1506-01-HT-028 1506-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1506-01: F-1160
SMIC-I-6013 S 1506-01-HT-027 1506-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6013 S 1507-01-HT-028 1507-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6013 S 1507-01-HT-027 1507-01 BFW,Steam Drums & 30 Sept. 2014
SVH Side (FURNACE)

SMIC-I-6011 W PIR (COLD) MFC SITE BESIDE 30 Sept. 2014


INSULATION MATERIAL FLARE AREA
(HOT & COLD) JUAYMAH KIC
SMIC-I-6011 W 30 Sept. 2014
INSULATION MATERIAL WAREHOUSE

1531-01: BFV (Area A,


SMIC-I-6012 S 1531-01-HT-003 1531-01 01 OCT.,'14
Unit T1 )

1503-02: F-1130 DS,


SMIC-I-6014 S 1503-02-HT-001 1503-02 S10 & Decoking Air 01 OCT.,'14

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-009 1705-01 01-03 OCT.,'14
( Area: A, Unit:F2)

1625-00: Dilution
SMIC-I-6013 S 1625-00-HT-07 1625-00 01 OCT.,'14
Steam Generation

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-020 1613-02 01 OCT.,'14
Process ( Furnace )

1512-02: F-1220
SMIC-I-6013 S 1512-02-HT-001 1512-02 01 OCT.,'14
DS,S10 & Decoking Air

1504-01: F-1140
SMIC-I-6012 S 1505-01-HT-028 1505-01 BFW,Steam Drums & 01 OCT.,'14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6012 S 1505-01-HT-027 1505-01 BFW,Steam Drums & 01 OCT.,'14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6013 S 1504-01-HT-028 1504-01 BFW,Steam Drums & 01 OCT.,'14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6013 S 1504-01-HT-027 1504-01 BFW,Steam Drums & 01 OCT.,'14
SVH Side (FURNACE)

1616-00: Furnace Gas


SMIC-I-6013 S 1616-00-HT-009 1616-00 Feed Prep ( Area B2 01 OCT.,'14
Unit H4)
1621-01: Oil Quench
SMIC-I-6013 S 1621-01-HT-023 1621-01 Tower & QO System 01 OCT.,'14
(Area B2, Unit H2 )

1504-01: F-1140
SMIC-I-6013 S 1505-01-HT-027 1505-01 BFW,Steam Drums & 01 OCT.,'14
SVH Side (FURNACE)

1683-03: Methane
wash and Cold box
SMIC-I-6017 S 1683-03-HT-023 1683-03 01 OCT.,'14
( Area: A, Unit:F4)

1602-01: F-1120 Fuel &


SMIC-I-6012 S 1602-01-HT-003 1602-01 Burner System 01 OCT.,'14
(FURNACE)

1623-01: Water
Quench System ( Area:
SMIC-I-6012 S 1623-01-HT-008 1623-01 01 OCT.,'14
A, Unit :
K1,K2,L1,L2,L3,W3 )

1503-01: F-1130
SMIC-I-6012 S 1503-01-HT-028 1503-01 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)

1503-01: F-1130
SMIC-I-6012 S 1503-01-HT-027 1503-01 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)

1505-01: F-1150
SMIC-I-6013 S 1505-01-HT-028 1505-01 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6012 S 1714-00-HT-037 1714-00 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)

1705-01: C2 Splitter
SMIC-I-6015 S 1681-00-HT-006 1681-00 02 OCT.,'14
( Area: A, Unit:F2)

1681-00: Deprop O/H


SMIC-I-6015 S 1681-00-HT-011 1681-00 System ( Area: A, Unit: 02 OCT.,'14
F3)

1503-01: F-1130
SMIC-I-6013 S 1503-01-HT-028 1503-01 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)
1503-01: F-1130
SMIC-I-6013 S 1503-01-HT-027 1503-01 BFW,Steam Drums & 02 OCT.,'14
SVH Side (FURNACE)

1507-02: F-1170 DS,


SMIC-I-6014 W 1507-02-HT-001 1507-02 02 OCT.,'14
S10 & Decoking Air

1731-01: Debutanizer
SMIC-I-6014 W 1731-01-HT-014 1731-01 ( Area A,Unit V4) 02 OCT.,'14

1731-01: Debutanizer
SMIC-I-6014 W 1731-01-HT-017 1731-01 02 OCT.,'14
( Area A,Unit V4)

1731-01: Debutanizer
SMIC-I-6014 W 1731-01-HT-024 1731-01 02 OCT.,'14
( Area A,Unit V4)

1705-01: C2 Splitter
SMIC-I-6016 S 1681-00-HT-006 1681-00 02 OCT.,'14
( Area: A, Unit:F2)

1681-00: Deprop O/H


SMIC-I-6016 S 1681-00-HT-011 1681-00 System ( Area: A, Unit: 02 OCT.,'14
F3)

1531-01: BFV (Area A,


SMIC-I-6013 S 1531-01-HT-003 1531-01 Unit T1 ) 02 OCT.,'14

1423-00: Cooling
SMIC-I-6013 S 1423-00-HT-030 1423-00 Water Chem Additives 02 OCT.,'14
(Area A, Unit V6 )

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-037 1714-00 Refrigeration ( Area: A, 03 OCT.,'14
Unit:V2 )

1602-01: F-1120 Fuel &


SMIC-I-6013 S 1602-01-HT-003 1602-01 Burner System 03 OCT.,'14
(FURNACE)

1515-01: F-1250 BFW,


SMIC-I-6013 S 1515-01-HT-006 1515-01 Steam Drum & SVH 03 OCT.,'14
Side
HOT INSULATION MFC SITE BESIDE
SMIC-I-6011 W 03 OCT.,'14
MATERIAL FLARE AREA

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-037 1714-00 Refrigeration ( Area: A, 04 OCT.,'14
Unit:V2 )

1705-01: C2 Splitter
SMIC-I-6015 S ( Area: A, Unit: F2,L3 ) 04 OCT.,'14

1507-01: F-1170 BFW,


SMIC-I-6012 S 1507-01-HT-034 1507-01 Steam Drums & SVH 04 OCT.,'14
Side (Area A, Unit T1 )

1504-01: F-1140 BFW,


SMIC-I-6012 S 1504-01-HT-034 1504-01 Steam Drums & SVH 04 OCT.,'14
Side (Area A, Unit T1 )

1514-01: F-1240 BFW,


SMIC-I-6014 W 1514-01-HT-006 1514-01 Steam Drum & SVH 04 OCT.,'14
Side

1513-01: F-1230 BFW,


SMIC-I-6014 W 1513-01-HT-006 1513-01 Steam Drum & SVH 04 OCT.,'14
Side

1512-01: F-1220 BFW,


SMIC-I-6014 W 1512-01-HT-006 1512-01 Steam Drum & SVH 04 OCT.,'14
Side

1511-01: F-1210 BFW,


SMIC-I-6014 W 1511-01-HT-006 1511-01 Steam Drum & SVH 04 OCT.,'14
Side

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-037 1714-00 Refrigeration ( Area: A, 04 OCT.,'14
Unit:V2 )

1507-01: F-1170 BFW,


SMIC-I-6013 S 1507-01-HT-034 1507-01 Steam Drums & SVH 05 OCT.,'14
Side

1504-01: F-1140 BFW,


SMIC-I-6013 S 1504-01-HT-034 1504-01 Steam Drums & SVH 05 OCT.,'14
Side
1672-01: Deprop O/H
SMIC-I-6012 S 1672-01-HT-001 1672-01 05 OCT.,'14
turbine

1702-01: C2R Stm


SMIC-I-6012 S 1702-01-HT-001 1702-01 05 OCT.,'14
Turbine

1712-01: C3R Stm


SMIC-I-6012 S 1712-01-HT-004 1712-01 Turbine 05 OCT.,'14

1515-01: F-1250 BFW,


SMIC-I-6014 W 1515-01-HT-006 1515-01 Steam Drum & SVH 05 OCT.,'14
Side

1511-02: F-1210
SMIC-I-6012 S 1511-02-HT-001 1511-02 05 OCT.,'14
DS,S10 & Decoking Air

1505-01: F-1150 BFW,


SMIC-I-6012 S 1505-01-HT-034 1505-01 Steam Drums & SVH 05 OCT.,'14
Side

1506-01: F-1160 BFW,


SMIC-I-6012 S 1506-01-HT-034 1506-01 Steam Drums & SVH 05 OCT.,'14
Side

1705-01: C2 Splitter
SMIC-I-6017 S 1681-00-HT-006 1705-01 06 OCT.,'14
( Area: A, Unit:F2)

1681-00: Deprop O/H


SMIC-I-6017 S 1681-00-HT-011 1681-00 System ( Area: A, Unit: 06 OCT.,'14
F3)

1705-01: C2 Splitter
SMIC-I-6017 S 1705-01-HT-008 1705-01 06 OCT.,'14
( Area: A, Unit:F2)

1705-01: C2 Splitter
SMIC-I-6017 S 1705-01-HT-009 1705-01 06 OCT.,'14
( Area: A, Unit:F2)

SMIC-I-6012 S 1531-01-HT-001 1531-01 1531-01: BFV ( Area: A, 06 OCT.,'14


Unit : T1,T2,T3 )
1672-01: Deprop O/H
SMIC-I-6013 S 1672-01-HT-001 1672-01 06 OCT.,'14
turbine

1702-01: C2R Stm


SMIC-I-6013 S 1702-01-HT-001 1702-01 06 OCT.,'14
Turbine

1511-02: F-1210
SMIC-I-6013 S 1511-02-HT-001 1511-02 DS,S10 & Decoking Air 06 OCT.,'14

1505-01: F-1150 BFW,


SMIC-I-6013 S 1505-01-HT-034 1505-01 Steam Drums & SVH 06 OCT.,'14
Side

1506-01: F-1160 BFW,


SMIC-I-6013 S 1506-01-HT-034 1506-01 Steam Drums & SVH 06 OCT.,'14
Side

1404-00: Decoke Air


SMIC-I-6012 S 1404-00-HT-002 1404-00 06 OCT.,'14
(Area: B2, Unit: H4 )

1404-00: Decoke Air


SMIC-I-6012 S 1404-00-HT-007 1404-00 06 OCT.,'14
(Area: B2, Unit: H4 )

1701-01: C2R
SMIC-I-6015 S 1701-01-HT-011 1701-01 Compressor ( Area: A, 06 OCT.,'14
Unit:F2 )

1502-01: F-1120 BFW,


SMIC-I-6012 S 1505-01-HT-034 1505-01 Steam Drums & SVH 06 OCT.,'14
Side

1502-01: F-1120 BFW,


SMIC-I-6012 S 1513-01-HT-038 1513-01 Steam Drums & SVH 06 OCT.,'14
Side

1502-01: F-1120 BFW,


SMIC-I-6012 S 1514-01-HT-038 1514-01 Steam Drums & SVH 06 OCT.,'14
Side

SMIC-I-6014 W 1515-02-HT-001 1515-02 1515-02: F-1250 06 OCT.,'14


DS,S10 & Decoking Air
1501-02: F-1110 DS,
SMIC-I-6014 W 1501-02-HT-001 1501-02 06 OCT.,'14
S10 & Decoking Air

1615-02: F-1250
SMIC-I-6014 S 1615-02-HT-019 1615-02 06 OCT.,'14
Process ( Furnace )

1615-02: F-1250
SMIC-I-6014 W 1615-02-HT-020 1615-02 Process ( Furnace ) 06 OCT.,'14

1614-02: F-1240
SMIC-I-6014 W 1614-02-HT-020 1614-02 06 OCT.,'14
Process ( Furnace )

1683-02: C2R
SMIC-I-6015 S 1683-02-HT-022 1683-02 Compressor ( Area: A, 06 OCT.,'14
Unit:F3 )

1691-01: C2R
SMIC-I-6015 S 1691-01-HT-004 1691-01 Compressor ( Area: A, 06 OCT.,'14
Unit:F2 )

1705-01: C2 Splitter
SMIC-I-6015 S 1705-00-HT-010 1705-00 ( Area: A, Unit: 07 OCT.,'14
F2,L3 )

1404-00: Decoke Air


SMIC-I-6013 S 1404-00-HT-002 1404-00 (Area: B2, Unit: H4 ) 07 OCT.,'14

1404-00: Decoke Air


SMIC-I-6013 S 1404-00-HT-007 1404-00 07 OCT.,'14
(Area: B2, Unit: H4 )

1502-01: F-1120 BFW,


SMIC-I-6013 S 1502-01-HT-034 1502-01 Steam Drums & SVH 07 OCT.,'14
Side

1502-01: F-1120 BFW,


SMIC-I-6013 S 1513-01-HT-038 1513-01 Steam Drums & SVH 07 OCT.,'14
Side

1502-01: F-1120 BFW,


SMIC-I-6013 S 1514-01-HT-038 1514-01 Steam Drums & SVH 07 OCT.,'14
Side
1705-01: C2 Splitter
SMIC-I-6018 S 1705-01-HT-008 1705-01 07 OCT.,'14
( Area: A, Unit:F2)

1705-01: C2 Splitter
SMIC-I-6018 W 1705-01-HT-009 1705-01 07 OCT.,'14
( Area: A, Unit:F2)

1615-02:F-1250
SMIC-I-6014 W 1615-02-HT-021 1615-02 Process ( Furnace ) 07 OCT.,'14

1512-02: F-1220
SMIC-I-6014 W 1512-02-HT-001 1512-02 07 OCT.,'14
DS,S10 & Decoking Air

1616-00: Furnace Gas


SMIC-I-6014 W 1616-00-HT-009 1616-00 Feed Prep ( Area B2 07 OCT.,'14
Unit H4)

1683-02: Secondary
Methanizer
SMIC-I-6016 S 1683-02-HT-015 1683-02 8--9 OCT.,'14
(
Area: A, Unit:F4)

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-015 1705-01 8--9 OCT.,'14
( Area: A, Unit:F3)

1605-02: F-1150
SMIC-I-6012 S 1605-02-HT-027 1605-02 Process 8-Oct-14

1602-02: F-1120
SMIC-I-6012 S 1602-02-HT-028 1602-02 8-Oct-14
Process

1605-02: F-1110
SMIC-I-6012 S 1601-02-HT-028 1601-02 8-Oct-14
Process

1601-02: F-1110
SMIC-I-6012 S 1601-02-HT-020 1601-02 Process ( Furnace ) 8-Oct-14

1672-01: Deprop O/H


SMIC-I-6012 S 1672-01-HT-011 1672-01 turbine ( Area A. Unit 8-Oct-14
V1)
1712-02: C3R Stm
turbine Surface
SMIC-I-6012 S 1712-02-HT-004 1712-02 8-Oct-14
Condensate ( Area A.
Unit V2)
1712-02: C3R Stm
turbine Surface
SMIC-I-6012 S 1712-02-HT-016 1712-02 8-Oct-14
Condensate ( Area A.
Unit V2S)

1672-01: Deprop O/H


SMIC-I-6012 S 1672-01-HT-012 1672-01 turbine ( Area A. Unit 8-Oct-14
V1)

1702-02: C2R Stm


turbine Surface
SMIC-I-6012 S 1702-02-HT-010 1702-02 8-Oct-14
Condensate ( Area A.
Unit V1)

1702-01: C2R Stm


SMIC-I-6012 S 1702-01-HT-011 1702-01 turbine ( Area A. Unit 8-Oct-14
V1)

1601-02: F-1110
SMIC-I-6013 S 1601-02-HT-020 1601-02 9-Oct-14
Process ( Furnace )

1513-01 : F-1230 BFW,


SMIC-I-6012 S 1513-01-HT-009 1513-01 Steam Drum & SVH 9-Oct-14
Side (Furnace Area)

1515-01 : F-1250 BFW,


SMIC-I-6012 S 1515-01-HT-009 1515-01 Steam Drum & SVH 9-Oct-14
Side (Furnace Area)

1602-02: F-1120
SMIC-I-6012 S 1602-02 9-Oct-14
Process ( Furnace )

1623-01: Water
SMIC-I-6012 S 1623-01-HT-023 1623-01 Quench System ( Area: 9-Oct-14
B2,Unit: H2)

1471-00: Furnace
SMIC-I-6012 S 1471-00-HT-018 1471-00 Blowdown ( Area: A, 9-Oct-14
Unit: W3)

SMIC-I-6015 S 1714-00-HT-004 1714-00 1705-01: C2 Splitter 9-Oct-14


( Area: A, Unit: V2)
1625-00: Dilution
SMIC-I-6014 S 1625-00-HT-007 1625-00 9-Oct-14
Steam Generation

1683-02: Secondary
Methanizer
SMIC-I-6017 S 1683-02-HT-015 1683-02 9-Oct-14
(
Area: A, Unit:F4)

1705-01: C2 Splitter
SMIC-I-6017 S 1705-01-HT-015 1705-01 ( Area: A, Unit:F3) 9-Oct-14

1531-01: BFV (Area A,


SMIC-I-6014 W 1531-01-HT-003 1531-01 9-Oct-14
Unit T1 )

1602-01: F-1120 Fuel &


SMIC-I-6014 W 1602-01-HT-003 1602-01 Burner System 9-Oct-14
(FURNACE)

1632-02: CGC Stm


Turbine Surface
SMIC-I-6014 W 1632-02-HT-007 1632-02 9-Oct-14
Condensate (Area A,
Unit W5 )

1616-00: Furnace Gas


SMIC-I-6014 W 1616-00-HT-010 1616-00 9-Oct-14
Feed Prep

1404-00: Decoke Air


SMIC-I-6014 W 1604-00-HT-002 1604-00 (Area: B2, Unit: H4 ) 9-Oct-14

1613-02: F-1230
SMIC-I-6014 S 1613-02-HT-020 1613-02 9-Oct-14
Process ( Furnace )

1513-01: F-1230
SMIC-I-6014 W 1513-01-HT-031 1513-01 BFW,Steam Drums & 9-Oct-14
SVH Side (FURNACE)

1513-01: F-1230
SMIC-I-6014 W 1513-01-HT-030 1513-01 BFW,Steam Drums & 9-Oct-14
SVH Side (FURNACE)

1511-01: F-1210
SMIC-I-6014 W 1511-01-HT-031 1511-01 BFW,Steam Drums & 9-Oct-14
SVH Side (FURNACE)
1511-01: F-1210
SMIC-I-6014 W 1511-01-HT-030 1511-01 BFW,Steam Drums & 9-Oct-14
SVH Side (FURNACE)

1423-00: Cooling
SMIC-I-6014 W 1423-00-HT-030 1423-00 Water Chem Additives 9-Oct-14
(Area A, Unit V6 )

1683-03: Methane
Wash and Cold Box
SMIC-I-6015 S 1683-03-HT-015 1683-03 ( Area: A, 10-Oct-14
Unit: F3,L4,F4)
1683-02: Secondary
Methanizers
SMIC-I-6015 S 1683-02-HT-026 1683-02 10-Oct-14
( Area: A, Unit:
F3,L4)

1602-02: F-1120
SMIC-I-6012 S 1602-02-HT-020 1602-02 10-Oct-14
Process ( Furnace )

1705-01: C2 Splitter
SMIC-I-6017 S 1705-01-HT-007 1705-01 10-Oct-14
( Area: A, Unit:F2)

1513-01 : F-1230 BFW,


SMIC-I-6013 S 1513-01-HT-009 1613-01 Steam Drum & SVH 11-Oct-14
Side (Furnace Area)

1515-01 : F-1250 BFW,


SMIC-I-6013 S 1515-01-HT-009 1515-01 Steam Drum & SVH 11-Oct-14
Side (Furnace Area)

1683-02: Secondary
Methanizer
SMIC-I-6018 W 1683-02-HT-015 1683-02 11-Oct-14
(
Area: A, Unit:F4)

1705-01: C2 Splitter
SMIC-I-6018 W 1705-01-HT-015 1705-01 11-Oct-14
( Area: A, Unit:F3)

1511-02: F-1210
SMIC-I-6014 W 1511-02-HT-001 1511-02 DS,S10 & Decoking Air 11-Oct-14

1691-01: Dethanizer
SMIC-I-6015 S 1691-01-HT-007 1691-01 ( Area: A, Unit: 11-Oct-14
F2,F3,L3)
1602-01: F-1120 (FUEL
SMIC-I-6012 S 1606-01-HT-004 1606-01 12-Oct-14
AND BURNER SYSTEM)

1683-03: Methane
Wash and Cold Box
SMIC-I-6016 S 1683-03-HT-015 1683-03 12-14 OCT.,'14
( Area: A,
Unit: F3,L4,F4)
1683-02: Secondary
Methanizers
SMIC-I-6016 S 1683-02-HT-026 1683-02 ( Area: A, Unit: 12-14 OCT.,'14
F3,L4)

1691-01: Dethanizer
SMIC-I-6016 S 1691-01-HT-007 1691-01 ( Area: A, Unit: 12-14 OCT.,'14
F2,F3,L3)

1702-01: C2R Stm


SMIC-I-6012 S 1702-01-HT-004 1702-01 Turbine 12-Oct-14
( Area:A, Unit:V1)

1672-02: Deprop O/H


Turbine Surface
SMIC-I-6012 S 1672-02-HT-005 1672-02 12-Oct-14
Condensate( Area:A,
Unit:V1)

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-038 1714-00 Refigerationr 12-Oct-14
( Area: A, Unit: V2)

1731-01: Debutanizer
SMIC-I-6015 S 1731-01-HT-006 1731-01 ( Area: A, Unit: 12-Oct-14
V4)

1602-02: F-1120
SMIC-I-6013 S 1602-02-HT-020 1606-02 12-Oct-14
Process ( Furnace )

1602-01: F-1120 (FUEL


SMIC-I-6012 S 1606-01-HT-001 1602-01 12-Oct-14
AND BURNER SYSTEM)

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-038 1714-00 Refigerationr 12-Oct-14
( Area: A, Unit: V2)

1423-00: Cooling
SMIC-I-6012 S 1423-00-HT-001 1423-00 Water Chem Additives 12-Oct-14
( Area: A, Unit:V6)
1645-00: Spent Caustic
SMIC-I-6012 S 1645-00-HT-070 1645-00 Treatment Common 12-Oct-14
( Area: A, Unit:V6)

1702-01: C2R Stm


SMIC-I-6012 S 1702-01-HT-009 1702-01 Turbine ( Area:A, 12-Oct-14
Unit:V1)

1712-00: C3R Stm


SMIC-I-6012 S 1712-01-HT-007 1712-00 Turbine ( Area: A, 12-Oct-14
Unit:V2)

1662-01: LP
SMIC-I-6012 S 1662-01-HT-013 1662-01 Depropanizer ( Area:A, 12-Oct-14
Unit: F1)

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-001 1672-01 13 OCT.,'14
turbine

1606-01: F-1160 (FUEL


SMIC-I-6013 S 1606-01-HT-004 1606-01 13 OCT.,'14
AND BURNER SYSTEM)

1606-01: F-1160 (FUEL


SMIC-I-6013 S 1606-01-HT-001 1606-01 13 OCT.,'14
AND BURNER SYSTEM)

1702-00: C2R Stm


SMIC-I-6012 S 1702-01-HT-020 1702-01 Turbine ( Area: A, 13 OCT.,'14
Unit:V1)

1702-01: C2R Stm


SMIC-I-6012 S 1702-01-HT-002 1702-01 Turbine ( Area: A, 13 OCT.,'14
Unit:V1)

1702-02: C2R Stm


Turbine Surface
SMIC-I-6012 S 1702-02-HT-012 1702-02 13 OCT.,'14
Condensate ( Area: A,
Unit:V1)
1712-02: C3R Stm
Turbine Surface
SMIC-I-6012 S 1712-02-HT-001 1712-02 Condensate ( Area: A, 13 OCT.,'14
Unit:V2)

1671-02: Deprop O/H


SMIC-I-6012 S 1671-02-HT-011 1671-02 Compressor ( Area: A, 13 OCT.,'14
Unit:V1)
1672-03: Deprop O/H
Turbine Vaccum
SMIC-I-6012 S 1672-03-HT-001 1672-03 13 OCT.,'14
System ( Area: A,
Unit:V1)

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-020 1612-02 13 OCT.,'14
Process ( Furnace )

1404-00: Decoke Air


SMIC-I-6014 W 1404-00-HT-007 1404-00 (Area: B2, Unit: H4 ) 13 OCT.,'14

1683-03: Methane
SMIC-I-6015 S 1683-03-HT-011 1683-03 Wash and Cold Box 13 OCT.,'14
( Area: A, Unit: F3 )

1743-00: LBD Header


SMIC-I-6015 S 1743-00-HT-002 1743-00 ( Area: A, Unit: F4 13 OCT.,'14
)

1672-02: Deprop O/H


turbine Surface
SMIC-I-6012 S 1672-02-HT-010 1672-02 13 OCT.,'14
Condensate ( Area: A,
Unit:V1)

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-019 1612-02 14-Oct-14
Process ( Furnace )

1512-01 : F-1220 BFW,


SMIC-I-6012 S 1512-01-HT-009 1512-01 Steam Drum & SVH 14-Oct-14
Side (Furnace Area)

1621-01 : Oil Quench


SMIC-I-6012 S 1621-01-HT-010 1621-01 Tower & QO System 14-Oct-14
(aREA: B2, Unit: H1)

1672-02: Deprop O/H


Turbine Surface
SMIC-I-6013 S 1672-02-HT-005 1672-02 14-Oct-14
Condensate( Area:A,
Unit:V1)
1714-00: C3R
Refigerationr
SMIC-I-6016 S 1714-00-HT-038 1714-00 ( Area: 14-Oct-14
A, Unit: V2)

1731-01: Debutanizer
SMIC-I-6016 S 1731-01-HT-006 1731-01 ( Area: A, Unit: 14-Oct-14
V4)
1423-00: Cooling
SMIC-I-6013 S 1423-00-HT-001 1423-00 Water Chem Additives 14-Oct-14
( Area: A, Unit:V6)

1645-00: Spent Caustic


SMIC-I-6013 S 1645-00-HT-070 1645-00 Treatment Common 14-Oct-14
( Area: A, Unit:V6)

1702-01: C2R Stm


Turbine
SMIC-I-6013 S 1702-01-HT-004 1702-01 ( Area:A, 14-Oct-14
Unit:V1)

1607-02: F-1170
SMIC-I-6012 S 1607-02-HT-020 1607-02 14-Oct-14
Process ( Furnace )

1702-01: C2R Stm


SMIC-I-6013 S 1702-01-HT-009 1702-01 Turbine ( Area:A, 14-Oct-14
Unit:V1)

1712-00: C3R Stm


SMIC-I-6013 S 1712-01-HT-007 1712-00 Turbine ( Area: A, 14-Oct-14
Unit:V2)

1662-01: LP
SMIC-I-6013 S 1662-01-HT-013 1662-01 Depropanizer ( Area:A, 14-Oct-14
Unit: F1)

1702-00: C2R Stm


SMIC-I-6013 S 1702-01-HT-020 1702-00 Turbine ( Area: A, 14-Oct-14
Unit:V1)

1702-01: C2R Stm


SMIC-I-6013 S 1702-01-HT-002 1702-01 Turbine ( Area: A, 14-Oct-14
Unit:V1)

1702-02: C2R Stm


Turbine Surface
SMIC-I-6013 S 1702-02-HT-012 1702-02 14-Oct-14
Condensate ( Area: A,
Unit:V1)
1712-02: C3R Stm
Turbine Surface
SMIC-I-6013 S 1712-02-HT-001 1712-02 Condensate ( Area: A, 14-Oct-14
Unit:V2)

1671-02: Deprop O/H


SMIC-I-6013 S 1671-02-HT-011 1671-02 Compressor ( Area: A, 14-Oct-14
Unit:V1)
1672-03: Deprop O/H
Turbine Vaccum
SMIC-I-6013 S 1672-03-HT-001 1672-03 14-Oct-14
System ( Area: A,
Unit:V1)

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-020 1612-02 14-Oct-14
Process ( Furnace )

1683-03: Methane
Wash and Cold Box
SMIC-I-6016 S 1683-03-HT-011 1683-03 14-16 OCT.,'14
( Area: A, Unit: F3 )

1743-00: LBD Header


SMIC-I-6016 S 1743-00-HT-002 1743-00 ( Area: A, Unit: F4 14-15 OCT.,'14
)

1672-02: Deprop O/H


turbine Surface
SMIC-I-6013 S 1672-02-HT-010 1672-02 14-Oct-14
Condensate ( Area: A,
Unit:V1)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 14-Oct-14
Unit: F3, L4 )

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-014 1705-01 ( Area: A, Unit: 14-Oct-14
F2,F3, L3,L4 )

1672-03: Deprop O/H


turbine Vacuum
SMIC-I-6012 S 1672-03-HT-002 1672-03 System ( Area: A,Unit: 15-Oct-14
V1 )
1714-00: C3R
Refrigeration
SMIC-I-6015 S 1714-00-HT-016 1714-00 15-Oct-14
( Area: A, Unit:
F2,F3,V2 )
1712-02: C3R Stm
turbine Surface
SMIC-I-6012 S 1712-02-HT-002 1712-02 15-Oct-14
Condensate ( Area:
A,Unit: V2 )

1713-00: C3R
SMIC-I-6012 S 1713-00-HT-003 1713-00 Compressor Lube Oil 15-Oct-14
( Area: A,Unit: V2 )

1702-02: C2R Stm


SMIC-I-6012 S 1702-02-HT-017 1702-02 turbine Surface 15-Oct-14
Condensate ( Area:
A,Unit: V1 )
1662-01: LP
SMIC-I-6014 W 1662-01-HT-013 1662-01 Depropanizer ( Area:A, 15-Oct-14
Unit: F1)

1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-019 1611-02 15-Oct-14
Process ( Furnace )

1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-020 1611-02 Process ( Furnace ) 15-Oct-14

1512-01 : F-1220 BFW,


SMIC-I-6013 S 1512-01-HT-009 1512-01 Steam Drum & SVH 15-Oct-14
Side (Furnace Area)

1607-02: F-1170
SMIC-I-6013 S 1607-02-HT-020 1607-02 15-Oct-14
Process ( Furnace )

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-019 1612-02 15-Oct-14
Process ( Furnace )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-005 1661-01 ( Area: A, Unit: 15-Oct-14
F2,F3, L3,L4 )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-009 1691-01 ( Area: A, Unit: F2 ) 15-Oct-14

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-003 1691-01 15-Oct-14
( Area: A, Unit: F2 )

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-010 1705-01 ( Area: A, Unit: 15-Oct-14
F3,L4 )

1705-01: C2 Splitter
SMIC-I-6015 S 1705-01-HT-005 1705-01 ( Area: A, Unit: F2 ) 15-Oct-14

SMIC-I-6013 S 1531-01-HT-001 1531-01 1531-01: BFV ( Area: A, 16 OCT.,'14


Unit : T1,T2,T3 )
1712-02: C3R Stm
Turbine Surface
SMIC-I-6012 S 1712-02-HT-007 1712-02 16 OCT.,'14
Condensate ( Area: A,
Unit: V2 )
1683-02: Secondary
Methanizers
SMIC-I-6015 S 1683-02-HT-016 1683-02 16 OCT.,'14
( Area: A, Unit:
F3,F4,L4 )

1731-01: Debutanizer
SMIC-I-6017 S 1731-01-HT-006 1731-01 ( Area: A, Unit: 16 OCT.,'14
V4)

1672-03: Deprop O/H


turbine Vacuum
SMIC-I-6013 S 1672-03-HT-002 1672-03 16 OCT.,'14
System ( Area: A,Unit:
V1 )
1712-02: C3R Stm
turbine Surface
SMIC-I-6013 S 1712-02-HT-002 1712-02 16 OCT.,'14
Condensate ( Area:
A,Unit: V2 )

1713-00: C3R
SMIC-I-6013 S 1713-00-HT-003 1713-00 Compressor Lube Oil 16 OCT.,'14
( Area: A,Unit: V2 )

1702-02: C2R Stm


turbine Surface
SMIC-I-6013 S 1702-02-HT-017 1702-02 16 OCT.,'14
Condensate ( Area:
A,Unit: V1 )

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-019 1611-02 Process ( Furnace ) 16 OCT.,'14

1513-02: F-1230
SMIC-I-6012 S 1513-02-HT-001 1513-02 16 OCT.,'14
Process ( Furnace )

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-022 1621-01 Tower & QO System 16 OCT.,'14
( Area: B2, Unit: H2 )

1625-00: Dilution
SMIC-I-6012 S 1625-00-HT-006 1625-00 Steam Generation 16 OCT.,'14
( Area: B2, Unit: H2 )

SMIC-I-6013 S 1611-02-HT-020 1611-02 1611-02: F-1210 16 OCT.,'14


Process ( Furnace )
1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-005 1691-01 ( Area: A, Unit: 16 OCT.,'14
F2,F3, L3,L4 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-009 1691-01 16 OCT.,'14
( Area: A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-003 1691-01 ( Area: A, Unit: F2 ) 16 OCT.,'14

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-010 1705-01 ( Area: A, Unit: 16 OCT.,'14
F3,L4 )

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-005 1705-01 16 OCT.,'14
( Area: A, Unit: F2 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 16 OCT.,'14
Unit: F3, L4 )

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-014 1705-01 ( Area: A, Unit: 16 OCT.,'14
F2,F3, L3,L4 )

1702-01: C2R Stm


SMIC-I-6014 W 1702-01-HT-009 1702-01 Turbine ( Area:A, 17-Oct-14
Unit:V1)

1731-01: Debutanizer
SMIC-I-6018 W 1731-01-HT-006 1731-01 ( Area: A, Unit: 17-Oct-14
V4)

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-019 1611-02 17-Oct-14
Process ( Furnace )

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-019 1612-02 Process ( Furnace ) 17-Oct-14

SMIC-I-6011 W PIR (COLD) MFC SITE BESIDE 17-Oct-14


INSULATION MATERIAL FLARE AREA
1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-005 1691-01 ( Area: A, Unit: 18-Oct-14
F2,F3, L3,L4 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-009 1691-01 18-Oct-14
( Area: A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-003 1691-01 ( Area: A, Unit: F2 ) 18-Oct-14

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-010 1705-01 ( Area: A, Unit: 18-20 OCT.,'14
F3,L4 )

1705-01: C2 Splitter
SMIC-I-6016 S 1705-01-HT-005 1705-01 18-20 OCT.,'14
( Area: A, Unit: F2 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 18-20 OCT.,'14
Unit: F3, L4 )

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-014 1705-01 ( Area: A, Unit: 18-20 OCT.,'14
F2,F3, L3,L4 )

1513-02: F-1230
SMIC-I-6013 S 1513-02-HT-001 1513-02 Process ( Furnace ) 18-Oct-14

1691-01: Deethanizer
SMIC-I-6015 S 1691-01-HT-029 1691-01 ( Area: A, Unit: 18-Oct-14
F2 )

1531-01: BFV ( Area: A,


SMIC-I-6014 S 1531-01-HT-001 1531-01 18-Oct-14
Unit : T1,T2,T3 )

1602-02: F-1120
SMIC-I-6014 W 1602-02-HT-020 1602-02 Process ( Furnace ) 18-Oct-14

SMIC-I-6014 W 1601-02-HT-020 1601-02 1601-02: F-1110 18-Oct-14


Process ( Furnace )
1621-01: Oil quench
SMIC-I-6013 S 1621-01-HT-022 1621-01 Tower & QO System 18-Oct-14
( Area: B2, Unit: H2 )

1625-00: Dilution
SMIC-I-6013 S 1625-00-HT-006 1625-00 Steam Generation 18-Oct-14
( Area: B2, Unit: H2 )

1514-02: F-1240
SMIC-I-6012 S 1514-02-HT-001 1514-02 Process ( Furnace ) 19-Oct-14

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-028 1705-01 ( Area: A, 19-Oct-14
Unit: F2)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 19-Oct-14
Unit: F1,F3,L3, L4,V1)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 19-Oct-14
Unit: L3)

1621-01: Oil Quench


SMIC-I-6012 S 1621-01-HT-027 1621-01 Tower & QO System 19-Oct-14
( Area B2, Unit H1 )

1624-01: Process
SMIC-I-6012 S 1624-01-HT-002 1624-01 Condensate System 19-Oct-14
( Area B2, Unit H2 )

1701-01 : C2R
SMIC-I-6015 S 1701-01-HT-009 1701-01 Compressor ( Area: A, 19-Oct-14
Unit: F2)

1705-01: C2 Splitter
SMIC-I-6018 S 1705-01-HT-007 1705-01 19-Oct-14
( Area: A, Unit:F2)

1704-02 : C2
SMIC-I-6018 W Refrigeration : ( Area: 19-Oct-14
A, Unit: F2 )

1712-02: C3R Stm


SMIC-I-6013 S 1712-02-HT-007 1712-02 Turbine Surface 19-Oct-14
Condensate ( Area: A,
Unit: V2 )
1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-027 1714-00 Refrigeration ( Area: A, 19-Oct-14
Unit: V2)

1671-02: Deprop O/H


SMIC-I-6012 S 1671-02-HT-006 1671-02 Compressor ( Area A, 19-Oct-14
Unit V1 )

1705-01 : C2
SMIC-I-6015 S 1705-01-HT-020 1705-01 SplitterRefrigeration 19-Oct-14
( Area: A, Unit: V2)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 19-Oct-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-009 1683-02 Methanizers ( Area: A, 19-Oct-14
Unit: F3,L4,V3)

1683-02: C2R
19-Oct-14 ~
SMIC-I-6016 S 1683-02-HT-022 1683-02 Compressor ( Area: A,
Unit:F3 ) 21-Oct-14

1683-02: Secondary
Methanizer 19-Oct-14 ~
SMIC-I-6016 S 1683-02-HT-030 1683-02
21-Oct-14
( Area: A, Unit:F3)
1683-02: Secondary
Methanizers 19-Oct-14 ~
SMIC-I-6016 S 1683-02-HT-016 1683-02 ( Area: A, Unit: 21-Oct-14
F3,F4,L4 )
1683-03: Methane
Wash and Cold Box 19-Oct-14 ~
SMIC-I-6016 S 1683-03-HT-015 1683-03
( Area: A, 21-Oct-14
Unit: F3,L4,F4)
1683-02: Secondary
Methanizers 19-Oct-14 ~
SMIC-I-6016 S 1683-02-HT-026 1683-02
( Area: A, Unit: 21-Oct-14
F3,L4)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-002 1683-02 Methanizers 19 OCT.,'14
( Area: A, Unit: F3)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 19-Oct-14 ~
21-Oct-14
Unit: F1,F3,L3, L4,V1)
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 19 OCT.,'14
Unit: L3)

1704-02 : C2
19-Oct-14 ~
SMIC-I-6016 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A,
21-Oct-14
Unit: L3, L4)

1701-01 : C2R
19-Oct-14 ~
SMIC-I-6016 S 1701-01-HT-009 1701-01 Compressor ( Area: A, 21-Oct-14
Unit: F2)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-009 1691-01 20-Oct-14
( Area: A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-005 1691-01 ( Area: A, Unit: 20-Oct-14
F2,F3, L3,L4 )

1691-01: Dethanizer
SMIC-I-6017 S 1691-01-HT-007 1691-01 ( Area: A, Unit: 20-Oct-14
F2,F3,L3)

1701-01: C2R
SMIC-I-6016 S 1691-01-HT-004 1691-01 Compressor ( Area: A, 20-Oct-14
Unit:F2 )

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-029 1691-01 ( Area: A, Unit: 20-Oct-14
F2 )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 20-Oct-14
Unit: F3, L4 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 20-Oct-14
Unit: L3)

1701-03 : Ethylene
SMIC-I-6015 S 1701-03-HT-006 1701-03 Product ( Area: A, Unit: 20-Oct-14
F2)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-003 1683-03 Wash and Cold Box 20-Oct-14
( Area: A, Unit: F3)
1704-02 : C2
SMIC-I-6015 S 1704-02-HT-011 1704-02 Refrigeration ( Area: A, 20-Oct-14
Unit: F2)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-041 1683-02 Methanizer ( Area: A, 20-Oct-14
Unit: F3)

1701-01: C2R
SMIC-I-6017 S 1691-01-HT-004 1691-01 Compressor ( Area: A, 20-Oct-14
Unit:F2 )

1691-01: Deethanizer
SMIC-I-6017 S 1691-01-HT-029 1691-01 ( Area: A, Unit: 20-Oct-14
F2 )

1705-01: C2 Splitter
SMIC-I-6016 S 1714-00-HT-004 1714-00 20-Oct-14
( Area: A, Unit: V2)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-012 1705-01 ( Area: A, Unit: 20-Oct-14
F2)

1514-02: F-1240
SMIC-I-6013 S 1514-02-HT-001 1514-02 20-Oct-14
Process ( Furnace )

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-012 1705-01 ( Area: A, Unit: 20-Oct-14
F2)

1606-01: F-1160 (FUEL


SMIC-I-6014 W 1606-01-HT-004 1606-01 20-Oct-14
AND BURNER SYSTEM)

1606-01: F-1160 (FUEL


SMIC-I-6014 W 1606-01-HT-001 1606-01 20-Oct-14
AND BURNER SYSTEM)

1705-01: C2 Splitter
SMIC-I-6018 S 1681-00-HT-006 1681-00 20-Oct-14
( Area: A, Unit:F2)

SMIC-I-6018 W 1691-01-HT-009 1691-01 1691-01 : Deethanizer 20-Oct-14


( Area: A, Unit: F2 )
1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-005 1691-01 ( Area: A, Unit: 20-Oct-14
F2,F3, L3,L4 )

1691-01: Dethanizer
SMIC-I-6018 W 1691-01-HT-007 1691-01 ( Area: A, Unit: 20-Oct-14
F2,F3,L3)

1701-01: C2R
SMIC-I-6018 W 1691-01-HT-004 1691-01 Compressor ( Area: A, 20-Oct-14
Unit:F2 )

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-043 1704-02 Refrigeration : ( Area: 20-Oct-14
A, Unit: F2 )

1691-01: Deethanizer
SMIC-I-6018 W 1691-01-HT-029 1691-01 ( Area: A, Unit: 20-Oct-14
F2 )

1423-00: Cooling
SMIC-I-6014 W 1423-00-HT-001 1423-00 Water Chem Additives 20-Oct-14
( Area: A, Unit:V6)

1645-00: Spent Caustic


SMIC-I-6014 W 1645-00-HT-070 1645-00 Treatment Common 20-Oct-14
( Area: A, Unit:V6)

1681-00: Deprop O/H


SMIC-I-6015 S 1681-00-HT-013 1681-00 System ( Area: A, 21-Oct-14
Unit:L4,L3,F3,F1)

1701-01 : C2R
SMIC-I-6017 S 1701-01-HT-009 1701-01 Compressor ( Area: A, 21-Oct-14
Unit: F2)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-012 1705-01 21-Oct-14
( Area: A, Unit: F2)

1705-01 : C2
21-Oct-14 ~
SMIC-I-6016 S 1705-01-HT-020 1705-01 SplitterRefrigeration 22-Oct-14
( Area: A, Unit: V2)

SMIC-I-6017 S 1705-01-HT-010 1705-01 1705-01: C2 Splitter 21-Oct-14


( Area: A, Unit: F3,L4 )
1705-01 : C2 Splitter (
SMIC-I-6017 S 1705-01-HT-014 1705-01 Area: A, Unit: F2,F3, 21-Oct-14
L3,L4 )

1705-01: C2 Splitter
SMIC-I-6017 S 1705-01-HT-005 1705-01 21-Oct-14
( Area: A, Unit: F2 )

1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-027 1691-01 Area: A; Unit-F2 21-Oct-14

1683-02: Secondary
21-Oct-14 ~
SMIC-I-6016 S 1683-02-HT-010 1683-02 Methanizer ( Area: A,
Unit:F3) 22-Oct-14

1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-030 1683-02 Methanizer ( Area: A, 21-Oct-14
Unit:F3)

1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-016 1683-02 Methanizers ( Area: A, 21-Oct-14
Unit: F3,F4,L4 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 21-Oct-14
Unit: L3, L4)

1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-026 1683-02 Methanizers ( Area: A, 21-Oct-14
Unit: F3,L4)

1683-02: C2R
SMIC-I-6017 S 1683-02-HT-022 1683-02 Compressor ( Area: A, 21-Oct-14
Unit:F3 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-009 1683-02 Methanizers ( Area: A, 21-Oct-14 ~
22-Oct-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-001 1683-02 Methanizers ( Area: A, 21-Oct-14
Unit: F3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 21-Oct-14 ~
22-Oct-14
Unit: F3,L4,V3)
1423-00: Cooling
SMIC-I-6012 S 1423-00-HT-037 1423-00 Water Chem Additive 21-Oct-14
( Area: A, Unit:V6)

1681-00: Deprop O/H


SMIC-I-6015 S 1683-02-HT-029 1683-02 System ( Area: A, 21-Oct-14
Unit:L4,L3,F3,F1)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-002 1683-02 Methanizers ( Area: A, 21-Oct-14
Unit: F3)

1624-01: Process
SMIC-I-6016 S 1624-01-HT-002 1624-01 Condensate System 21-Oct-14
( Area B2, Unit H2 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-001 1683-02 Methanizers ( Area: A, 21-Oct-14
Unit: F3)

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-020 1603-02 21 OCT.,'14
Process

1714-00: C3R
Refrigeration
SMIC-I-6016 S 1714-00-HT-016 1714-00 22-Oct-14
(Area: A, Unit:
F2,F3,V2)

1452-00: SH STEAM
SMIC-I-6012 S 1452-00-HT-001 1452-00 ( Area: A,Unit: V1) 22-Oct-14

1452-00: SH STEAM
SMIC-I-6012 S 1452-00-HT-001 1452-00 22-Oct-14
( Area: A,Unit: V1)

1743-00: LBD Header


SMIC-I-6017 S 1743-00-HT-002 1743-00 ( Area: A, Unit: F4 22-Oct-14
)

1621-01 : Oil Quench


SMIC-I-6013 S 1621-01-HT-010 1621-01 Tower & QO System 22-Oct-14
(aREA: B2, Unit: H1)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-002 1683-02 Methanizers 22-Oct-14
( Area: A, Unit: F3)
1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-041 1683-02 Methanizer ( Area: A, 22-23 OCT.,'14
Unit: F3)

1701-03 : Ethylene
SMIC-I-6016 S 1701-03-HT-006 1701-03 Product ( Area: A, Unit: 22-Oct-14
F2)

1671-02: Deprop O/H


SMIC-I-6013 S 1671-02-HT-006 1671-02 Compressor ( Area A, 22-Oct-14
Unit V1 )

1701-01: C2R
SMIC-I-6016 S 1701-01-HT-011 1701-01 Compressor ( Area: A, 22-Oct-14
Unit:F2 )

1712-01: C3R Stm


SMIC-I-6013 S 1712-01-HT-004 1712-01 22-Oct-14
Turbine

1683-03: Methane
Wash and Cold Box
SMIC-I-6017 S 1683-03-HT-011 1683-03 22-Oct-14
( Area: A, Unit: F3 )

1672-01: Deprop O/H


SMIC-I-6012 S 1603-02-HT-020 1603-02 turbine ( Area: A, Unit: 22-Oct-14
V1)

1681-00: Deprop O/H


System
SMIC-I-6015 S 1681-00-HT-017 1681-00 ( Area: 22-Oct-14
A, Unit:F3)
1714-00: C3R
Refrigeration
SMIC-I-6015 S 1714-00-HT-077 1714-00 22-Oct-14
( Area: A, Unit:V2)
1683-03: Metane wash
and Cold box
SMIC-I-6015 S 1683-03-HT-002 1683-03 22-Oct-14
( Area: A, Unit:F3,L4)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-056 1683-02 Methanizers 23-Oct-14
( Area: A, Unit: F3)

SMIC-I-6013 S 1452-00-HT-001 1452-00 1452-00: SH STEAM 23-Oct-14


( Area: A,Unit: V1)
1452-00: SH STEAM
SMIC-I-6013 S 1452-00-HT-001 1452-00 23-Oct-14
( Area: A,Unit: V1)

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-020 1603-02 23-Oct-14
Process

1672-01: Deprop O/H


SMIC-I-6012 S 1672-01-HT-010 1672-01 turbine ( Area: A, Unit: 23-Oct-14
V1)

1681-00: Deprop O/H


System
SMIC-I-6016 S 1683-02-HT-029 1683-02 23-Oct-14
( Area:
A, Unit:L4,L3,F3,F1)
1683-02: Secondary
Methanizer 23-Oct-14 ~
SMIC-I-6017 S 1683-02-HT-010 1683-02
24-Oct-14
( Area: A, Unit:F3)

1603-01: F-1130 (FUEL


SMIC-I-6012 S 1603-01-HT-001 1603-01 23-Oct-14
AND BURNER SYSTEM)

1603-01: F-1130 (FUEL


SMIC-I-6012 S 1603-01-HT-004 1603-01 23-Oct-14
AND BURNER SYSTEM)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 23-Oct-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-009 1683-02 Methanizers ( Area: A, 23-Oct-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-001 1683-02 Methanizers 23-Oct-14
( Area: A, Unit: F3)

1705-01 : C2
SMIC-I-6017 S 1705-01-HT-020 1705-01 SplitterRefrigeration 23-Oct-14
( Area: A, Unit: V2)

1712-02: C3R Stm


SMIC-I-6014 W 1712-02-HT-007 1712-02 Turbine Surface 23-Oct-14
Condensate ( Area: A,
Unit: V2 )
1471-00: Furnace
SMIC-I-6013 S 1471-00-HT-018 1471-00 Blowdown ( Area: A, 24-Oct-14
Unit: W3)

1626-00: Dilution
SMIC-I-6013 S 1626-00-HT-005 1626-00 24-Oct-14
Steam Concerntrator

1683-01 : Primary
Demethanizers
SMIC-I-6015 S 1683-01-HT-002 1683-01 ( Area: A, Unit: 24-Oct-14
F3)

1621-01: Oil Quench


SMIC-I-6012 S 1621-01-HT-017 1621-01 24-Oct-14
Tower & QO System

1507-01: F-1170 BFW,


SMIC-I-6012 S 1507-01-HT-001 1507-01 24-Oct-14
Stm Drum & SVH Side

PIR (COLD) MFC SITE BESIDE


SMIC-I-6011 W 24-Oct-14
INSULATION MATERIAL FLARE AREA

1683-01 : Primary
Demethanizers
SMIC-I-6016 S 1683-01-HT-002 1683-01 24-Oct-14
( Area: A, Unit:
F3)
1683-03: Methane
Wash and Cold Box
SMIC-I-6017 S 1683-03-HT-015 1683-03 ( Area: A, 25-Oct-14
Unit: F3,L4,F4)
1683-01 : Primary
Demethanizers
SMIC-I-6017 S 1683-01-HT-002 1683-01 25-Oct-14
( Area: A, Unit:
F3)

1471-00: Furnace
SMIC-I-6014 W 1471-00-HT-018 1471-00 Blowdown ( Area: A, 25-Oct-14
Unit: W3)

1626-00: Dilution
SMIC-I-6014 W 1626-00-HT-005 1626-00 Steam Concerntrator 25-Oct-14

1625-00: Dilution
SMIC-I-6014 W 1625-00-HT-006 1625-00 Steam Generation 25-Oct-14
( Area: B2, Unit: H2 )
1611-02: F-1210
SMIC-I-6014 W 1611-02-HT-019 1611-02 25-Oct-14
Process ( Furnace )

1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-020 1607-02 25-Oct-14
Process ( Furnace )

1683-01 : Primary
Demethanizers
SMIC-I-6018 W 1683-01-HT-002 1683-01 ( Area: A, Unit: 25-Oct-14
F3)
1683-03: Methane
Wash and Cold Box
SMIC-I-6018 S 1683-03-HT-011 1683-03 25-Oct-14
( Area: A, Unit: F3 )

1611-02: F-1210
SMIC-I-6014 W 1611-02-HT-020 1611-02 25-Oct-14
Process ( Furnace )

1712-01: C3R Stm


SMIC-I-6013 S 1712-01-HT-004 1712-01 26-Oct-14
Turbine

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-011 1672-01 turbine ( Area A. Unit 26-Oct-14
V1)

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-012 1672-01 turbine ( Area A. Unit 26-Oct-14
V1)

1702-02: C2R Stm


turbine Surface
SMIC-I-6013 S 1702-02-HT-010 1702-02 26-Oct-14
Condensate ( Area A.
Unit V1)

1702-01: C2R Stm


SMIC-I-6013 S 1702-01-HT-011 1702-01 turbine ( Area A. Unit 26-Oct-14
V1)

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-010 1672-01 turbine ( Area: A, Unit: 26-Oct-14
V1)

SMIC-I-6018 S 1705-01-HT-005 1705-01 1705-01: C2 Splitter 26-Oct-14


( Area: A, Unit: F2 )
1702-01: C2R Stm
SMIC-I-6014 W 1702-01-HT-001 1702-01 Turbine ( Area: A, 26-Oct-14
Unit:V1)

1672-01: Deprop O/H


SMIC-I-6014 W 1672-01-HT-011 1672-01 turbine ( Area A. Unit 26-Oct-14
V1)

1672-01: Deprop O/H


SMIC-I-6014 W 1672-01-HT-012 1672-01 turbine ( Area A. Unit 26-Oct-14
V1)

1702-02: CER Stm


Turbine Surface
SMIC-I-6012 S 1702-02-HT-008 1702-02 26-Oct-14
Condansate (Area: A ,
Unit:V1)
1702-02: CER Stm
Turbine Surface
SMIC-I-6012 S 1702-02-HT-020 1702-02 26-Oct-14
Condansate (Area: A ,
Unit:V1)
1672-02: DEPROP O/H
Turbine Surface
SMIC-I-6012 S 1672-02-HT-013 1672-02 26-Oct-14
Condansate (Area: A ,
Unit:V1)

1731-01 :
SMIC-I-6015 S 1731-01-HT-007 1731-01 Debuthanizers ( Area: 26-Oct-14
A, Unit:V4)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-027 1704-02 Refrigeration ( Area: A, 26-Oct-14
Unit:F2)

1615-02: F-1250
SMIC-I-6012 S 1615-02-HT-019 1615-02 26-Oct-14
Process ( Furnace )

1731-01: Debutanizer (
SMIC-I-6012 S 1731-01-HT-022 1731-01 27-Oct-14
Area: A, Unit: V4 )

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-001 1705-01 ( Area: A, 27-Oct-14
Unit:F2)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-030 1683-03 wash and Cold box 27-Oct-14
( Area: A,
Unit:F3)
1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-014 1683-02 Methanizers 27-Oct-14
( Area: A, Unit:F4)

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-019 1705-01 ( Area: A, 27-Oct-14
Unit:F3)

1702-02: CER Stm


Turbine Surface
SMIC-I-6013 S 1702-02-HT-008 1702-02 Condansate (Area: A , 27-Oct-14
Unit:V1)

1503-01: F-1130
SMIC-I-6012 S 1503-01-HT-034 1503-01 BFW,Stm Drums & SVH 27-Oct-14
Side ( Furnace )

1602-01: F-1120 Fuel &


SMIC-I-6012 S 1602-01-HT-001 1602-01 Burner System 27-Oct-14
(Furnace)

1702-02: CER Stm


Turbine Surface
SMIC-I-6013 S 1702-02-HT-020 1702-02 27-Oct-14
Condansate (Area: A ,
Unit:V1)
1672-02: DEPROP O/H
Turbine Surface
SMIC-I-6013 S 1672-02-HT-013 1672-02 27-Oct-14
Condansate (Area: A ,
Unit:V1)
1712-02: C3R Stm
turbine Surface
SMIC-I-6013 S 1712-02-HT-016 1712-02 Condensate ( Area A. 27-Oct-14
Unit V2S)

1514-01: F-1240
SMIC-I-6013 S 1514-01-HT-008 1514-01 BFW,Steam Drums & 28-Oct-14
SVH Side (FURNACE)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-019 1705-01 ( Area: A, 28-Oct-14
Unit:F3)

1512-01: F-1220
SMIC-I-6013 S 1512-01-HT-008 1512-01 BFW,Steam Drums & 28-Oct-14
SVH Side (FURNACE)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-019 1705-01 ( Area: A, 28-Oct-14
Unit:F3)
1511-01: F-1210
SMIC-I-6013 S 1511-01-HT-008 1511-01 BFW,Steam Drums & 28-Oct-14
SVH Side (FURNACE)

1603-01: F-1130 (FUEL


SMIC-I-6013 S 1603-01-HT-001 1603-01 28-Oct-14
AND BURNER SYSTEM)

1603-01: F-1130 (FUEL


SMIC-I-6013 S 1603-01-HT-004 1603-01 AND BURNER SYSTEM) 28-Oct-14

1507-01: F-1170 BFW, 28-Oct-14 ~


SMIC-I-6012 S 1507-01-HT-001 1507-01
Stm Drum & SVH Side 30-Oct-14

1513-02: F-1230
SMIC-I-6014 W 1513-02-HT-001 1513-02 28-Oct-14
Process ( Furnace )

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-019 1705-01 ( Area: A, 28-Oct-14
Unit:F3)

1712-01: C3R Stm


Turbine
SMIC-I-6012 S 1712-01-HT-005 1712-01 28-Oct-14
( Area: A,Unit: V2)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-021 1683-02 Methanizers 28-Oct-14
( Area: A, Unit:F3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-019 1683-02 Methanizers 28-Oct-14
( Area: A, Unit:F3)

1683-03 : Methane
wash and Cold box
SMIC-I-6015 S 1683-03-HT-007 1683-03 28-Oct-14
( Area: A,
Unit:F3)
1683-03 : Methane
wash and Cold box
SMIC-I-6015 S 1691-01-HT-025 1691-01 ( Area: A, 28-Oct-14
Unit:F3)
1712-01: C3R Stm
Turbine Surface
SMIC-I-6012 S 1712-02-HT-014 1712-02 Condensate 28-Oct-14

( Area: A,Unit: V2)


1712-01: C3R Stm
Turbine
SMIC-I-6012 S 1712-01-HT-012 1712-01 28-Oct-14
( Area:
A,Unit: V2)

1621-01: Oil quench


SMIC-I-6013 S 1621-01-HT-003 1621-01 29-Oct-14
Tower & QO System

1704-02 : C2R
SMIC-I-6016 S 1704-02-HT-032 1704-02 Refrigeration ( Area: A, 29-Oct-14
Unit: F1)

1705-01: C2 Splitter
SMIC-I-6017 S 1714-00-HT-004 1714-00 29-Oct-14
( Area: A, Unit: V2)

1651-00: Dryers ( Area:


SMIC-I-6016 S 1651-00-HT-005 1651-00 29-Oct-14
A, Unit:F1)

1683-03: Methane
SMIC-I-6016 S 1683-03-HT-023 1683-03 wash and Cold box 29-Oct-14
( Area: A, Unit:F4)

1623-01: Water
SMIC-I-6013 S 1623-01-HT-023 1623-01 Quench System ( Area: 29-Oct-14
B2,Unit: H2)

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-009 1681-00 System ( Area: A, 29-Oct-14
Unit:F3)

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-008 1681-00 System ( Area: A, 29-Oct-14
Unit:F3)

1672-01: Deprop O/H


SMIC-I-6012 S 1672-01-HT-017 1672-01 Turbine ( Area: A,Unit: 29-Oct-14
V1)

1701-01: C2R
SMIC-I-6017 S 1701-01-HT-011 1701-01 Compressor ( Area: A, 29-Oct-14
Unit:F2 )

1683-02: Secondary
SMIC-I-6017 S 1603-02-HT-024 1603-02 Methanizer ( Area: A, 29-Oct-14
Unit:F4)
1651-00: Dryers ( Area:
SMIC-I-6017 S 1651-00-HT-005 1651-00 29-Oct-14
A, Unit:F1)

1691-01: Deethanizer (
SMIC-I-6017 S 1691-01-HT-001 1691-01 29-Oct-14
Area: A, Unit:F2)

1704-02 : C2R
SMIC-I-6017 S 1704-02-HT-032 1704-02 Refrigeration ( Area: A, 29-Oct-14
Unit: F1)

1683-03: Methane
SMIC-I-6017 S 1683-03-HT-023 1683-03 wash and Cold box 29-Oct-14
( Area: A, Unit:F4)

1503-01: F-1130
SMIC-I-6013 S 1504-01-HT-034 1504-01 BFW,Stm Drums & SVH 29-Oct-14
Side ( Furnace )

1602-01: F-1120 Fuel &


SMIC-I-6012 S 1602-01-HT-001 1602-01 Burner System 29-Oct-14
(Furnace)

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-019 1614-02 29-Oct-14
Process ( Furnace )

1603-01: F-1130 (FUEL


SMIC-I-6014 W 1603-02-HT-004 1603-02 AND BURNER SYSTEM) 29-Oct-14

1603-01: F-1130 (FUEL


SMIC-I-6014 W 1603-01-HT-001 1603-01 29-Oct-14
AND BURNER SYSTEM)

1514-02: F-1240
SMIC-I-6014 W 1514-02-HT-001 1514-02 29-Oct-14
Process ( Furnace )

1671-02: Deprop O/H


SMIC-I-6014 W 1671-02-HT-006 1671-02 Compressor ( Area A, 29-Oct-14
Unit V1 )

1683-03: Methane
SMIC-I-6018 W 1683-03-HT-023 1683-03 wash and Cold box 29-Oct-14
( Area: A, Unit:F4)
1683-02 : Secondary
Methanizers
SMIC-I-6015 S 1683-02-HT-014 1683-02 30-Oct-14
( Area:
A, Unit:F4)
1683-02 : Secondary
Methanizers
SMIC-I-6015 S 1683-02-HT-018 1683-02 30-Oct-14
( Area:
A, Unit:F3)
1683-03 : Methane
wash and Cold box
SMIC-I-6015 S 1683-03-HT-017 1683-03 30-Oct-14
( Area: A,
Unit:F3,F4,L4)
1503-01: F-1130
SMIC-I-6012 S 1503-01-HT-034 1503-01 BFW,Stm Drums & SVH 30-Oct-14
Side ( Furnace )

1501-01: F-1110
SMIC-I-6012 S 1501-01-HT-034 1501-01 BFW,Stm Drums & SVH 30-Oct-14
Side ( Furnace )

1602-01: F-1120 (FUEL


SMIC-I-6012 S 1602-01-HT-004 1602-01 30-Oct-14
AND BURNER SYSTEM)

1702-01: C2R Stm


SMIC-I-6014 W 1702-01-HT-011 1702-01 turbine ( Area A. Unit 30-Oct-14
V1)

1671-02: Deprop O/H


SMIC-I-6014 W 1671-02-HT-011 1671-02 Compressor ( Area: A, 30-Oct-14
Unit:V1)

1672-01: Deprop O/H


SMIC-I-6014 W 1672-01-HT-001 1672-01 30-Oct-14
turbine

1672-03: Deprop O/H


Turbine Vaccum
SMIC-I-6014 W 1672-03-HT-001 1672-03 30-Oct-14
System ( Area: A,
Unit:V1)
1623-01: Water
Quench System (Area:
SMIC-I-6013 S 1623-01-HT-008 1623-01 A, Unit : 30-Oct-14
K1,K2,L1,L2,L3,W3)

1621-01 : Oil Quench


SMIC-I-6014 W 1621-01-HT-010 1621-01 Tower & QO System 31-Oct-14
(aREA: B2, Unit: H1)
1621-01: Oil quench
SMIC-I-6014 S 1621-01-HT-003 1621-01 31-Oct-14
Tower & QO System

1621-01: Oil Quench


SMIC-I-6013 S 1621-01-HT-027 1621-01 Tower & QO System 31-Oct-14
( Area B2, Unit H1 )

1604-01: F-1140 Fuel &


SMIC-I-6012 S 1604-01-HT-001 1604-01 Burner System 31-Oct-14
(Furnace)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-019 1683-03 Wash and Cold Box 31-Oct-14
( Area: A, Unit: F3, L4 )
1423-00: Cooling
Water Chem Additive
SMIC-I-6013 S 1423-00-HT-037 1423-00 31-Oct-14
( Area: A,
Unit:V6)

PIR (COLD) MFC SITE BESIDE


SMIC-I-6011 W 31-Oct-14
INSULATION MATERIAL FLARE AREA

1714-00: C3R
Refigerationr
SMIC-I-6017 S 1714-00-HT-038 1714-00 1-Nov-14
( Area:
A, Unit: V2)
1714-00: C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-016 1714-00 ( Area: A, Unit: 1-Nov-14
F2,F3,V2 )
1681-00 : Deprop O/H
System
SMIC-I-6016 S 1681-00-HT-009 1681-00 1-Nov-14
( Area: A,
Unit:F3)
1681-00 : Deprop O/H
System
SMIC-I-6016 S 1681-00-HT-008 1681-00 1-Nov-14
( Area: A,
Unit:F3)
1683-02 : Secondary
Methanizers
SMIC-I-6016 S 1682-02-HT-014 1682-02 ( Area: 1-Nov-14
A, Unit:F4)
1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-018 1683-02 Methanizers 1-Nov-14
( Area:
A, Unit:F3)
1683-03 : Methane
wash and Cold box
1-Nov-14 ~
SMIC-I-6016 S 1683-03-HT-017 1683-03
4-Nov-14
( Area: A,
Unit:F3,F4,L4)
1714-00: C3R
Refrigeration
SMIC-I-6018 S 1714-00-HT-016 1714-00 1-Nov-14
( Area: A, Unit:
F2,F3,V2 )
1714-00: C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-016 1714-00 ( Area: A, Unit: 22-Oct-14
F2,F3,V2 )
1623-01: Water
Quench System ( Area:
SMIC-I-6014 S 1623-01-HT-008 1623-01 30 OCT.,'14
A, Unit :
K1,K2,L1,L2,L3,W3 )
1714-00: C3R
Refigerationr
SMIC-I-6018 S 1714-00-HT-038 1714-00 1-Nov-14
( Area:
A, Unit: V2)
1423-00: Cooling
Water Chem Additive
SMIC-I-6014 W 1423-00-HT-037 1423-00 1-Nov-14
( Area: A,
Unit:V6)
1503-01: F-1130
SMIC-I-6014 W 1503-01-HT-028 1503-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1503-01: F-1130
SMIC-I-6014 W 1503-01-HT-027 1503-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6014 W 1504-01-HT-028 1504-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6014 W 1504-01-HT-027 1504-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6014 W 1502-01-HT-028 1502-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1502-01: F-1120
SMIC-I-6014 W 1502-01-HT-027 1502-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)
1501-01: F-1110
SMIC-I-6014 W 1501-01-HT-028 1501-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1501-01: F-1110
SMIC-I-6014 W 1501-01-HT-027 1501-01 BFW,Steam Drums & 1-Nov-14
SVH Side (FURNACE)

1681-00 : Deprop O/H


System
SMIC-I-6017 S 1681-00-HT-009 1681-00 ( Area: A, 2-Nov-14
Unit:F3)
1681-00 : Deprop O/H
System
SMIC-I-6017 S 1681-00-HT-008 1681-00 2-Nov-14
( Area: A,
Unit:F3)
1683-02 : Secondary
Methanizers
SMIC-I-6016 S 1683-02-HT-014 1683-02 2-Nov-14
( Area:
A, Unit:F4)
1683-02 : Secondary
Methanizers
SMIC-I-6016 S 1683-02-HT-018 1683-02 2-Nov-14
( Area:
A, Unit:F3)

1604-01: F-1140 (FUEL


SMIC-I-6012 S 1604-01-HT-004 1604-01 2-Nov-14
AND BURNER SYSTEM)

1511-01: F-1210 BFW,


SMIC-I-6012 S 1511-01-HT-038 1511-01 Stm Drums & SVH Side 2-Nov-14

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-015 1621-01 Tower & QO System 2-Nov-14
( Area: B, Unit: H1,L1)

1712-01: C3R Stm


SMIC-I-6012 S 1712-01-HT-009 1712-01 Turbine ( Area: A, Unit: 2-Nov-14
V2)

1683-02: Secondary
Methanizers
SMIC-I-6018 S 1683-02-HT-016 1683-02 ( Area: A, Unit: 2-Nov-14
F3,F4,L4 )
1683-03: Methane
SMIC-I-6018 S 1683-03-HT-015 1683-03 Wash and Cold Box 2-Nov-14
( Area: A,
Unit: F3,L4,F4)
1714-00: C3R
Refigerationr
SMIC-I-6018 W 2-Nov-14
( Area:
A, Unit: V2)
1702-01: C2R Stm
Turbine
SMIC-I-6014 W 2-Nov-14
( Area:A,
Unit:V1)

1712-01: C3R Stm


SMIC-I-6014 W 1712-01-HT-004 1712-01 Turbine 2-Nov-14

1672-03: Deprop O/H


turbine Vacuum
SMIC-I-6014 W 2-Nov-14
System ( Area: A,Unit:
V1 )
1683-02 : Secondary
Methanizers
SMIC-I-6017 S 1683-02-HT-014 1683-02 3-Nov-14
( Area:
A, Unit:F4)
1683-02 : Secondary
Methanizers
SMIC-I-6017 S 1683-02-HT-018 1683-02 3-Nov-14
( Area:
A, Unit:F3)

1731-01 :
SMIC-I-6016 S 1731-01-HT-007 1731-01 Debuthanizers 3-Nov-14
( Area: A, Unit:V4)

1662-01 : LP
Depropanizer
SMIC-I-6015 S 1662-01-HT-005 1662-01 ( Area: 3-Nov-14
A, Unit:F1)
1662-01 : LP
Depropanizer
SMIC-I-6015 S 1662-01-HT-030 1662-01 3-Nov-14
( Area:
A, Unit:F1)
1662-01 : LP
Depropanizer
SMIC-I-6012 S 1662-01-HT-009 1662-01 3-Nov-14
( Area:
A, Unit:F1)
1701-01 : C2R
Compressor
SMIC-I-6015 S 1701-01-HT-002 1701-01 ( Area: A, 3-Nov-14
Unit:V1)
1683-03 : Metane
SMIC-I-6015 S 1683-03-HT-027 1683-03 wash and Cold box 3-Nov-14
( Area: A, Unit:F4)
1704-021 : C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-004 1704-02 3-Nov-14
( Area:
A, Unit:F3)
1704-02 : C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-009 1704-02 3-Nov-14
( Area:
A, Unit:F3)
1704-02 : C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-014 1704-02 ( Area: 3-Nov-14
A, Unit:F3)

1712-01: C3R Stm


SMIC-I-6013 S 1712-01-HT-009 1712-01 Turbine ( Area: A, Unit: 3-Nov-14
V2)

1731-01 :
SMIC-I-6017 S 1731-01-HT-007 1731-01 Debuthanizers 3-Nov-14
( Area: A, Unit:V4)

1701-01 : C2
Compressor
SMIC-I-6015 S 1701-01-HT-003 1701-01 3-Nov-14
( Area: A,
Unit:V1)

1515-01: F-1250 BFW,


SMIC-I-6012 S 1515-01-HT-038 1515-01 3-Nov-14
Stm Drums & SVH Side

1702-01: C2R Stm


Turbine
SMIC-I-6014 W 1702-01-HT-004 1702-01 ( Area:A, 3-Nov-14
Unit:V1)

1731-01 :
SMIC-I-6018 W 1731-01-HT-007 1731-01 Debuthanizers 3-Nov-14
( Area: A, Unit:V4)

1621-01: Oil quench


SMIC-I-6013 S 1621-01-HT-015 1621-01 Tower & QO System 3-Nov-14
( Area: B, Unit: H1,L1)

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-019 1683-03 Wash and Cold Box 4-Nov-14
( Area: A, Unit: F3, L4 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-040 1714-00 Refrigeration 4-Nov-14
( Area:
A, Unit:V2)
1731-01 :
Debutanizers
SMIC-I-6012 S 1731-01-HT-021 1731-01 4-Nov-14
( Area:
A, Unit:V4)

1744-01 : Dry Flare


SMIC-I-6012 S 1744-01-HT-014 1744-01 4-Nov-14
( Area: A, Unit:V2)

1683-03: Metane wash


and Cold box
SMIC-I-6016 S 1683-03-HT-002 1683-03 4-Nov-14
( Area: A, Unit:F3,L4)

1621-01: Oil quench


SMIC-I-6014 S 1621-01-HT-015 1621-01 Tower & QO System 4-Nov-14
( Area: B, Unit: H1,L1)

1712-01: C3R Stm


SMIC-I-6014 S 1712-01-HT-009 1712-01 Turbine ( Area: A, Unit: 4-Nov-14
V2)

1662-01 : LP
Depropanizer
SMIC-I-6016 S 1662-01-HT-005 1662-01 4-Nov-14
( Area:
A, Unit:F1)
1662-01 : LP
Depropanizer
SMIC-I-6016 S 1662-01-HT-030 1662-01 4-Nov-14
( Area:
A, Unit:F1)
1662-01 : LP
Depropanizer
SMIC-I-6013 S 1662-01-HT-009 1662-01 ( Area: 4-Nov-14
A, Unit:F1)
1683-03 : Metane
wash and Cold box
SMIC-I-6013 S 1683-03-HT-027 1683-03 4-Nov-14
( Area: A, Unit:F4)
1701-01 : C2R
Compressor
SMIC-I-6016 S 1701-01-HT-002 1701-01 4-6 NOV.,'14
( Area: A,
Unit:V1)
1704-021 : C2
Refrigeration
SMIC-I-6016 S 1704-02-HT-004 1704-02 ( Area: 4-6 NOV.,'14
A, Unit:F3)
1704-02 : C2
SMIC-I-6016 S 1704-02-HT-009 1704-02 Refrigeration 4-6 NOV.,'14
( Area:
A, Unit:F3)
1704-02 : C2
Refrigeration
SMIC-I-6016 S 1704-02-HT-014 1704-02 4-6 NOV.,'14
( Area:
A, Unit:F3)
1701-01 : C2
Compressor
SMIC-I-6016 S 1701-01-HT-003 1701-01 4-6 NOV.,'14
( Area: A,
Unit:V1)

1602-01: F-1120 Fuel &


SMIC-I-6013 S 1602-01-HT-001 1602-01 Burner System 4-Nov-14
(Furnace)

1602-01: F-1120 (FUEL


SMIC-I-6013 S 1602-01-HT-004 1602-01 4-Nov-14
AND BURNER SYSTEM)

1604-01: F-1140 Fuel &


SMIC-I-6013 S 1604-01-HT-001 1604-01 Burner System 4-Nov-14
(Furnace)

1604-01: F-1140 (FUEL


SMIC-I-6013 S 1604-01-HT-004 1604-01 4-Nov-14
AND BURNER SYSTEM)

1506-01 : F-1160
SMIC-I-6012 S 1506-01-HT-001 1506-01 BFW, Steam Drum & 5-Nov-14
SVH Side

1711-01 : C3R
SMIC-I-6012 S 1711-01-HT-001 1711-01 Compressor ( Area: A, 5-Nov-14
Unit:V2)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-042 1714-00 Refrigeration ( Area: A, 5-Nov-14
Unit:V2)

1683-03: Methane
SMIC-I-6017 S 1683-03-HT-002 1683-03 wash and Cold box 5-Nov-14
( Area: A, Unit:F3,L4)

1744-01: Dry Flare


SMIC-I-6013 S 1744-01-HT-014 1744-01 ( Area: A, Unit: V2) 5-Nov-14

SMIC-I-6013 S 1731-01-HT-021 1731-01 1731-01: Debutanizers 5-Nov-14


( Area: A, Unit: V4)
1704-02: C2
SMIC-I-6018 S 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 5-Nov-14
Unit: F1,F3,L3,L4,V1)

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-010 1705-01 5-Nov-14
( Area: A, Unit:F3,L4)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-040 1714-00 Refrigeration ( Area: A, 5-Nov-14
Unit:V2)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-019 1704-02 Refrigeration ( Area: A, 5-Nov-14
Unit:F2)

1712-01 : C3R Stm


SMIC-I-6012 S 1712-01-HT-006 1712-01 Turbine ( Area: A, 5-Nov-14
Unit:V2)

1601-02 :F-1110
SMIC-I-6012 S 1601-02-HT-001 1601-02 5-Nov-14
Process Furnace

1605-02 :F-1150
SMIC-I-6012 S 1605-02-HT-020 1605-02 5-Nov-14
Process Furnace

1507-01 : F-1170 BFW,


SMIC-I-6012 S 1507-01-HT-007 1507-01 Steam Drum & SVH 5-Nov-14
Side

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-011 1704-02 Refrigeration ( Area: A, 5-Nov-14
Unit:V1)

1671-02 : Deprop O/H


SMIC-I-6012 S 1671-02-HT-001 1671-02 6-Nov-14
Compressor

1662-01 : LP
SMIC-I-6012 S 1662-01-HT-014 1662-01 Depropanizer ( Area: A, 6-Nov-14
Unit: F1)

1672-03 : Deprop O/H


SMIC-I-6012 S 1672-03-HT-002 1672-03 Turbine Vacuum 6-Nov-14
System ( Area: A,
Unit:V1)
1515-01: F-1250 BFW
Steam Drum & SVH
SMIC-I-6014 S 1515-01-HT-038 1515-01 6-Nov-14
Side

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-020 1612-02 Process ( Furnace 6-Nov-14
Area)

1683-03: Methane
SMIC-I-6018 S 1683-03-HT-002 1683-03 wash and Cold Box 6-Nov-14
( Area: A, Unit: F3,L4)

1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-041 1683-02 Methanizers ( Area: A, 6-Nov-14
Unit: F3)

1704-02: C2
SMIC-I-6017 S 1704-02-HT-011 1704-02 Refrigeration ( Area: A, 6-Nov-14
Unit: F1,F3,L3,L4,V1)

1672-03 : Deprop O/H


Turbine Vacuum
SMIC-I-6013 S 1672-03-HT-002 1672-03 6-Nov-14
System ( Area: A,
Unit:V1)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-003 1683-03 wash and Cold box 6-Nov-14
( Area: A, Unit:F3)

1662-02 : LP
SMIC-I-6015 S 1662-01-HT-005 1662-01 Depropanizer 7-Nov-14

1621-01 : Oil Quench


SMIC-I-6013 S 1621-01-HT-017 1621-01 Tower and OQ System 7-Nov-14
( Area: B2, Unit: H1)

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-017 1672-01 Turbine ( Area: A, 7-Nov-14
Unit:V1)

1712-01: C2R Stm


SMIC-I-6013 S 1712-01-HT-005 1712-01 Turbine 7-Nov-14

1712-01: C2R Stm


SMIC-I-6014 W 1712-02-HT-001 1712-02 Turbine Surface 7-Nov-14
Condensate
1455-00: SL Steam
SMIC-I-6012 S 1455-00-HT-001 1455-00 8-Nov-14
( Area: A, Unit:
L1,T1,T2,T3)
1662-01: LP
Depropanizer
SMIC-I-6012 S 1662-01-HT-012 1662-01 8-Nov-14
( Area: A,
Unit: F1)

1704-02: C2
SMIC-I-6015 S 1704-02-HT-030 1704-02 Refrigeration 8-Nov-14
( Area: A, Unit: F2)

1712-01: C2R Stm


SMIC-I-6013 S 1712-01-HT-005 1712-01 Turbine ( Area: A, Unit: 8-Nov-14
V2)

1511-01: F-1110 BFW


SMIC-I-6013 S 1511-01-HT-038 1511-01 Steam Drum & SVH 8-Nov-14
Side

1672-03 : Deprop O/H


SMIC-I-6014 W 1672-01-HT-010 1672-01 Turbine ( Area: A, 8-Nov-14
Unit:V1)
1672-03 : Deprop O/H
Turbine Vacuum
SMIC-I-6014 W 1672-03-HT-002 1672-03 System 8-Nov-14
( Area: A,
Unit:V1)
1712-02: C2R Stm
Turbine Surface
SMIC-I-6014 W 1712-02-HT-002 1712-02 Condensate ( Area: A, 8-Nov-14
Unit: V2)

1616-00: Furnace Gas


SMIC-I-6012 S 1616-00-HT-011 1616-00 9-Nov-14
Feed Prep

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-020 1603-02 9-Nov-14
Process ( Furnace )

1602-01: F-1120 Fuel &


SMIC-I-6014 W 1602-01-HT-001 1602-01 Burner System 9-Nov-14
(Furnace)

SMIC-I-6014 W 1602-01-HT-004 1602-01 1602-01: F-1120 (FUEL 9-Nov-14


AND BURNER SYSTEM)
1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-020 1612-02 Process ( Furnace 9-Nov-14
Area)

1713-00: C3R
SMIC-I-6014 W Compressor Lube Oil 9-Nov-14
( Area: A,Unit: V2 )

1506-01 : F-1160
SMIC-I-6013 S 1506-01-HT-001 1506-01 BFW, Steam Drum & 9-Nov-14
SVH Side

1507-01 : F-1170 BFW,


SMIC-I-6013 S 1507-01-HT-007 1507-01 Steam Drum & SVH 9-Nov-14
Side

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-019 1683-03 Wash and Cold Box 10-Nov-14
( Area: A, Unit: F3, L4 )

1681-00: Deprop O/H


System
SMIC-I-6017 S 1683-02-HT-029 1683-02 10-Nov-14
( Area:
A, Unit:L4,L3,F3,F1)
1683-03 : Methane
wash and Cold box
SMIC-I-6017 S 1683-03-HT-017 1683-03 10-Nov-14
( Area: A,
Unit:F3,F4,L4)
1604-01: F-1140 Fuel &
SMIC-I-6014 W 1604-01-HT-001 1604-01 Burner System 10-Nov-14
(Furnace)

1604-01: F-1140 (FUEL


SMIC-I-6014 W 1604-01-HT-004 1604-01 10-Nov-14
AND BURNER SYSTEM)

1621-01 : Oil Quench


Tower and OQ System
SMIC-I-6014 S 1621-01-HT-017 1621-01 10-Nov-14
( Area: B2,
Unit: H1)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-056 1683-02 Methanizers 10-Nov-14
( Area: A, Unit: F3)

SMIC-I-6013 S 1616-00-HT-011 1616-00 1616-00: Furnace Gas 10-Nov-14


Feed Prep
1661-01 : HP
SMIC-I-6015 S 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 10-Nov-14
Unit: F1,F3,L3,L4,V1 )

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-001 1705-01 ( Area: A, Unit:F2,F4, 10-Nov-14
L3, L4)

1661-01 : HP
SMIC-I-6015 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 10-Nov-14
Unit: F1,F3,L3 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-031 1683-02 Methanizers ( Area: A, 10-Nov-14
Unit: F1,F3,L3 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-047 1714-00 Refrigeration ( Area:A, 10-Nov-14
Unit: F2, F3,L3,L4 )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-056 1683-02 Methanizers 11-Nov-14
( Area: A, Unit: F3)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-002 1705-01 ( Area: A, Unit:F2,F4, 11-Nov-14
L3, L4)

1661-01 : HP
SMIC-I-6016 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 11-Nov-14
Unit: F1,F3,L3 )

1661-01 : HP
SMIC-I-6015 S 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 11-Nov-14
Unit: F1,F3,L3,L4,V1 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 11-Nov-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-031 1683-02 Methanizers ( Area: A, 11-Nov-14
Unit: F1,F3,L3 )

SMIC-I-6012 S 1607-02-HT-001 1607-02 1607-02: F-1170 11-Nov-14


Process ( Furnace )
1683-03 : Methane
wash and Cold box
SMIC-I-6016 S 1683-03-HT-030 1683-03 11-Nov-14
( Area: A,
Unit:F3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-021 1683-02 Methanizers 11-Nov-14
( Area: A, Unit:F3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-021 1683-02 Methanizers 11-Nov-14
( Area: A, Unit:F3)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-020 1683-03 wash and Cold box 11-Nov-14
( Area: A, Unit: F4)

1683-03 : Methane
wash and Cold box
SMIC-I-6015 S 1683-03-HT-009 1683-03 11-Nov-14
( Area: A, Unit:
F3,F4,L4)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-003 1683-02 Methanizers ( Area: A, 11-Nov-14
Unit: F3,L4)

1491-00: Portable
SMIC-I-6012 S 1491-00-HT-002 1491-00 Water ( Area: A, 12-Nov-14
Unit:K1,K2,T1,V1,V5)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-002 1705-01 ( Area: A, Unit:F2,F4, 12-Nov-14
L3, L4)

1661-01 : HP
SMIC-I-6017 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 12-Nov-14
Unit: F1,F3,L3 )

1661-01 : HP
SMIC-I-6016 S 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 12-Nov-14
Unit: F1,F3,L3,L4,V1 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 12-Nov-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-031 1683-02 Methanizers ( Area: A, 12-Nov-14
Unit: F1,F3,L3 )
1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-030 1683-03 wash and Cold box 12-Nov-14
( Area: A, Unit:F3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-019 1683-02 Methanizers ( Area: A, 12-Nov-14
Unit:F3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-021 1683-02 Methanizers ( Area: A, 12-Nov-14
Unit:F3)

1731-01: Debutanizer (
SMIC-I-6013 S 1731-01-HT-022 1731-01 12-Nov-14
Area: A, Unit: V4 )

17014-02 : C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-017 1704-02 13-Nov-14
( Area:
A, Unit:F2)
1704-02 : C2
Refrigeration
SMIC-I-6016 S 1704-02-HT-019 1704-02 13-Nov-14
( Area: A,
Unit:F2)

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-030 1625-00 Steam Generation 13-Nov-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-031 1625-00 Steam Generation 13-Nov-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-032 1625-00 Steam Generation 13-Nov-14
( Area: B2, Unit: H3 )

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-020 1683-03 wash and Cold box 13-Nov-14
( Area: A, Unit: F4)

1683-03 : Methane
wash and Cold box
SMIC-I-6016 S 1683-03-HT-009 1683-03 ( Area: A, Unit: 13-Nov-14
F3,F4,L4)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-003 1683-02 Methanizers ( Area: A, 13-Nov-14
Unit: F3,L4)
1661-01 : HP
SMIC-I-6017 S 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 13-Nov-14
Unit: F1,F3,L3,L4,V1 )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-028 1683-02 Methanizers ( Area: A, 13-Nov-14
Unit: F3,L4,V3)

1606-02 :F-1160
SMIC-I-6012 S 1606-02-HT-020 1606-02 Process 14-Nov-14
Furnace
1541-00 : Eye Bath
bath & Safety Showers
SMIC-I-6015 S 1541-00-HT-001 1541-00 14-Nov-14
( Area: A,
Unit:F1,F3,L3,L4,V1,V2,
1541-00 : Eye Bath
V3,V4)
bath & Safety Showers
SMIC-I-6015 S 1541-00-HT-002 1541-00 14-Nov-14
( Area: A,
Unit:F1,F3,L3,L4,V1,V2,
V3,V4)
1683-02: Secondary
Methanizer
SMIC-I-6018 W 1683-02-HT-010 1683-02 14-Nov-14
( Area: A, Unit:F3)

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-019 1683-03 Wash and Cold Box 14-Nov-14
( Area: A, Unit: F3, L4 )
1683-03 : Methane
wash and Cold box
SMIC-I-6018 S 1683-03-HT-017 1683-03 14-Nov-14
( Area: A,
Unit:F3,F4,L4)
1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-008 1683-02 Methanizers ( Area: A, 14-Nov-14
Unit: F3, L4 )

1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-009 1683-02 Methanizers ( Area: A, 14-Nov-14
Unit: F3,L4,V3)

1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-001 1683-02 Methanizers 14-Nov-14
( Area: A, Unit: F3)

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-056 1683-02 Methanizers 14-Nov-14
( Area: A, Unit: F3)
1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-002 1683-02 Methanizers 14-Nov-14
( Area: A, Unit: F3)

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-014 1705-01 ( Area: A, Unit: F2,F3, 14-Nov-14
L3,L4 )

PIR (COLD) DAELIM/ TCC


SMIC-I-6011 W INSULATION MATERIAL LAYDOWWN YARD 14-Nov-14

1615-02: F-1250
SMIC-I-6013 S 1615-02-HT-019 1615-02 15-Nov-14
Process ( Furnace )

1491-00: Portable
SMIC-I-6013 S 1491-00-HT-002 1491-00 Water ( Area: A, 15-Nov-14
Unit:K1,K2,T1,V1,V5)

1731-01: Debutanizers
SMIC-I-6014 W 1731-01-HT-021 1731-01 15-Nov-14
( Area: A, Unit: V4)

1683-03 : Methane
wash and Cold box
SMIC-I-6016 S 1691-01-HT-025 1691-01 15-Nov-14
( Area: A,
Unit:F3)
1683-03 : Methane
wash and Cold box
SMIC-I-6016 S 1683-03-HT-007 1683-03 ( Area: A, 15-Nov-14
Unit:F3)

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-030 1625-00 Steam Generation 15-Nov-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-031 1625-00 Steam Generation 15-Nov-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-032 1625-00 Steam Generation 15-Nov-14
( Area: B2, Unit: H3 )

SMIC-I-6013 S 1606-02-HT-020 1606-02 1606-02 :F-1160 16-Nov-14


Process Furnace
1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-019-RT1 1611-02 16-Nov-14
Process ( Furnace )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-040 1704-02 Refrigeration ( Area: A, 16-Nov-14
Unit:F2)

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-020 1681-00 System ( Area: A, 16-Nov-14
Unit:F3)

1614-02:F-1240
SMIC-I-6012 S 1614-02-HT-021 1614-02 17-Nov-14
Process ( Furnace )

1614-02:F-1240
SMIC-I-6012 S 1614-02-HT-001 1614-02 17-Nov-14
Process ( Furnace )

1615-02:F-1250
SMIC-I-6012 S 1615-02-HT-001 1615-02 17-Nov-14
Process ( Furnace )

1632-02: CGC Stm


Turbine Surface
SMIC-I-6012 S 1632-02-HT-003 1632-02 17-Nov-14
Condensate ( Area: A,
Unit: W5)

1506-01: F-1160
SMIC-I-6014 W 1506-01-HT-028 1506-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1506-01: F-1160
SMIC-I-6014 W 1506-01-HT-027 1506-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6014 W 1507-01-HT-028 1507-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1507-01: F-1170
SMIC-I-6014 W 1507-01-HT-027 1507-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1504-01: F-1140
SMIC-I-6014 W 1505-01-HT-027 1505-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)
1505-01: F-1150
SMIC-I-6014 W 1505-01-HT-028 1505-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6014 W 1512-01-HT-031 1512-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1512-01: F-1220
SMIC-I-6014 W 1512-01-HT-030 1512-01 BFW,Steam Drums & 17-Nov-14
SVH Side (FURNACE)

1702-00: C2R Stm


SMIC-I-6014 W 1702-01-HT-020 1702-01 Turbine ( Area: A, 17-Nov-14
Unit:V1)

1731-01: Debutanizer (
SMIC-I-6014 W 1731-01-HT-022 1731-01 17-Nov-14
Area: A, Unit: V4 )

1662-01 : LP
SMIC-I-6013 S 1662-01-HT-014 1662-01 Depropanizer ( Area: A, 18-Nov-14
Unit: F1)

1711-01 : C3R
SMIC-I-6013 S 1711-01-HT-001 1711-01 Compressor ( Area: A, 18-Nov-14
Unit:V2)

1712-01: C3R Stm


Turbine Surface
SMIC-I-6013 S 1712-02-HT-014 1712-02 Condensate ( Area: 18-Nov-14
A,Unit: V2)

1712-01: C3R Stm


SMIC-I-6013 S 1712-02-HT-012 1712-02 Turbine ( Area: A,Unit: 18-Nov-14
V2)

1662-01: LP
SMIC-I-6013 S 1662-01-HT-012 1662-01 Depropanizer ( Area: A, 18-Nov-14
Unit: F1)

1671-02 : Deprop O/H


SMIC-I-6013 S 1671-02-HT-001 1671-02 Compressor 18-Nov-14

1712-01 : C3R Stm


SMIC-I-6013 S 1712-01-HT-006 1712-01 Turbine ( Area: A, 18-Nov-14
Unit:V2)
1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-030 1625-00 Steam Generation 18-Nov-14
( Area: B2, Unit: H3 )

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-031 1625-00 Steam Generation 18-Nov-14
( Area: B2, Unit: H3 )

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-014 1705-01 ( Area: A, Unit: F2,F3, 18-Nov-14
L3,L4 )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-003 1714-00 Refrigeration ( Area: A, 18-Nov-14
Unit: L3)
1541-00 : Eye Bath
bath & Safety Showers
SMIC-I-6016 S 1541-00-HT-001 1541-00 19-Nov-14
( Area: A,
Unit:F1,F3,L3,L4,V1,V2,
1541-00 : Eye Bath
V3,V4)
bath & Safety Showers
SMIC-I-6016 S 1541-00-HT-002 1541-00 19-Nov-14
( Area: A,
Unit:F1,F3,L3,L4,V1,V2,
V3,V4)
1681-00: Deprop O/H
System
SMIC-I-6016 S 1681-00-HT-017 1681-00 19-Nov-14
( Area:
A, Unit:F3)

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-001 1705-01 ( Area: A, 19-Nov-14
Unit:F2)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 19-Nov-14
Unit:F1,F3, L3, L4,V1 )
1541-00 : Eye Bath
bath & Safety Showers
SMIC-I-6017 S 1541-00-HT-001 1541-00 19-Nov-14
( Area: A,
Unit:F1,F3,L3,L4,V1,V2,
1541-00 : Eye Bath
V3,V4)
bath & Safety Showers
SMIC-I-6017 S 1541-00-HT-002 1541-00 ( Area: A, 19-Nov-14
Unit:F1,F3,L3,L4,V1,V2,
V3,V4)

SMIC-I-6013 S 1614-02-HT-021 1614-02 1614-02:F-1240 19-Nov-14


Process ( Furnace )
1455-00: SL Steam
SMIC-I-6013 S 1455-00-HT-001 1455-00 19-Nov-14
( Area: A, Unit:
L1,T1,T2,T3)

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-015 1621-01 Tower & QO System 20-Nov-14
( Area: B, Unit: H1,L1)

1612-02:F-1220
SMIC-I-6012 S 1612-02-HT-021 1612-02 Process ( Furnace ) 20-Nov-14

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-073 1714-00 Refrigeration ( Area: A, 20-Nov-14
Unit:F3 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-027 1683-02 Methanizers ( Area: A, 20-Nov-14
Unit:F2,F3,L3,L4 )

1731-01: Debutanizer
SMIC-I-6012 S 1731-01-HT-010 1731-01 20-Nov-14
( Area: A,: Unit:V4 )

1702-01: Stm Turbine


SMIC-I-6012 S 1702-01-HT-019 1702-01 20-Nov-14
( Area: A,: Unit:V1 )

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-010 1681-00 System ( Area: A, 20-Nov-14
Unit:F3 )

1705-01 : C2 Splitter
SMIC-I-6015 S 1705-01-HT-011 1705-01 20-Nov-14
( Area: A, Unit:F2 )

1747-04: Unit 104


SMIC-I-6012 S 1747-04-HT-001 1747-04 Utilities: MP Stm 20-Nov-14
( Area: A: Unit: R1)

1463-00: CM
SMIC-I-6012 S 1463-00-HT-009 1463-00 Condensate ( Area: A, 20-Nov-14
Unit: R1)

1746-00: Unit 104


SMIC-I-6012 S 1746-00-HT-001 1746-00 MPGF ( Area: A,: 20-Nov-14
Unit:R1 )
1605-01: F-1150 Fuel &
SMIC-I-6012 S 1605-01-HT-001 1605-01 Burner System 21-Nov-14
(Furnace)

1691-01: Deethanizer (
SMIC-I-6018 W 1691-01-HT-001 1691-01 21-Nov-14
Area: A, Unit:F2)

PIR (COLD) DAELIM/ TCC


SMIC-I-6011 W INSULATION MATERIAL LAYDOWWN YARD 21-Nov-14

1632-02 : CGC Stm


Turbine Surface
SMIC-I-6012 S 1632-02-HT-005 1632-02 22-Nov-14
Condensate ( Area: A,
Unit:W5 )

1705-01: C2 Splitter
SMIC-I-6018 W 1705-01-HT-007 1705-01 22-Nov-14
( Area: A, Unit:F2)

1612-02:F-1220
SMIC-I-6012 S 1612-02-HT-001 1612-02 22-Nov-14
Process ( Furnace )

1611-02:F-1210
SMIC-I-6012 S 1611-02-HT-001 1611-02 22-Nov-14
Process ( Furnace )

1731-01 : Debutanizer
SMIC-I-6015 S 1731-01-HT-005 1731-01 ( Area: A, Unit:V4 ) 22-Nov-14

1605-01: F-1150 (FUEL


SMIC-I-6012 S 1605-01-HT-004 1605-01 23-Nov-14
AND BURNER SYSTEM)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-021 1704-02 Refrigeration ( Area: A, 23-Nov-14
Unit:F2 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-023 1704-02 Refrigeration ( Area: A, 23-Nov-14
Unit:F2 )

SMIC-I-6012 S 1611-02-HT-021 1611-02 1611-02:F-1210 23-Nov-14


Process ( Furnace )
1604-02: F-1140
SMIC-I-6013 S 1604-02-HT-001 1604-02 24-Nov-14
Process ( Furnace )

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-001 1606-02 24-Nov-14
Process ( Furnace )

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-001 1605-02 Process ( Furnace ) 24-Nov-14

1607-02: F-1170
SMIC-I-6013 S 1607-02-HT-001 1607-02 24-Nov-14
Process ( Furnace )

1681-00 : Deprop O/H


System
SMIC-I-6015 S 1681-00-HT-023 1681-00 24-Nov-14
( Area: A,
Unit:F3)

1604-02: F-1140
SMIC-I-6012 S 1604-02-HT-022 1604-02 26-Nov-14
Process ( Furnace )

1491-00: PORTABLE
SMIC-I-6018 S 1491-00-HT-002 1491-00 26-Nov-14
WATER ( Area: K2A, )

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-026 1613-02 Process ( Furnace ) 26-Nov-14

1701-03 : Ethylene
SMIC-I-6015 S 1701-03-HT-009 1701-03 Product ( Area: A, 26-Nov-14
Unit:F2A/L3A)

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-027 1613-02 26-Nov-14
Process ( Furnace )

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-073 1714-00 Refrigeration 26-Nov-14
( Area: A, Unit:F3A)

1714-00 : C3R
SMIC-I-6015 S 1704-02-HT-019 1704-02 Refrigeration 26-Nov-14
( Area: A, Unit:F3A)
1681-00 : Deprop O/H
SMIC-I-6015 S 1681-00-HT-023 1681-00 26-Nov-14
System ( Area: F3A )

1615-02 :F-1250
SMIC-I-6013 S 1615-02-HT-001 1615-02 27-Nov-14
Process Furnace

1662-01 : LP
SMIC-I-6015 S 1662-01-HT-031 1662-01 Depropanizer ( Area: A, 27-Nov-14
Unit:F1A)

1661-01 : HP
SMIC-I-6018 S 1661-01-HT-003 1661-01 Depropanizer ( Area: A, 27-Nov-14
Unit: F3,L3)

1605-01: F-1150 Fuel &


SMIC-I-6012 S 1605-01-HT-001 1605-01 Burner System 27-Nov-14
(Furnace)

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-001 1603-02 27-Nov-14
Process ( Furnace )

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-014 1683-03 WASH AND Cold box 27-Nov-14
( Area: A, Unit:F3,F4)

1662-01 : LP
SMIC-I-6015 S 1662-01-HT-004 1662-01 Depropanizer ( Area: A, 27-Nov-14
Unit:F1 )

1661-01 : LP
SMIC-I-6012 S 1661-01-HT-004 1661-01 Depropanizer ( Area: A, 27-Nov-14
Unit:F1 )

1661-01 : LP
SMIC-I-6012 S 1661-01-HT-021 1661-01 Depropanizer ( Area: A, 27-Nov-14
Unit:F1 )

1601-01: F-1210 Fuel &


SMIC-I-6012 S 1601-01-HT-004 1601-01 Burner System 28-Nov-14
( Furnace )

1604-02 :F-1140
SMIC-I-6013 S 1604-02-HT-020 1604-02 Process 28-Nov-14
Furnace
1601-01: F-1210 Fuel &
SMIC-I-6012 S 1601-01-HT-001 1601-01 Burner System 28-Nov-14
( Furnace )

1704-02: C2
SMIC-I-6015 S 1704-02-HT-044 1704-02 Refrigeration ( Area: A, 28-Nov-14
Unit: F3)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-013 1714-00 Refrigeration ( Area: A, 29-Nov-14
Unit:F3A)

1613-02 : F-1230
SMIC-I-6012 S 1613-02-HT-001 1613-02 Process ( Area: A, 29-Nov-14
Unit:Furnace )

1714-00 : C3R
SMIC-I-6015 S 1691-01-HT-006 1691-01 Refrigeration ( Area: A, 29-Nov-14
Unit:F3A)

1704-02 : C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-033 1704-02 30-Nov-14
( Area: A,
Unit:F1A)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-001 1705-01 ( Area: A, 30-Nov-14
Unit:F2)

1704-02 : C2
Refrigeration 30-Nov-14 ~
SMIC-I-6016 S 1704-02-HT-040 1704-02 ( Area: 01-Dec-14
A, Unit:F2)

1701-03 : Ethylene
SMIC-I-6017 S 1701-03-HT-006 1701-03 Product ( Area: A, Unit: 30-Nov-14
F2)

1683-03 : Methane
WASH AND Cold box 30-Nov-14 ~
SMIC-I-6016 S 1683-03-HT-014 1683-03
01-Dec-14
( Area: A, Unit:F3,F4)

1621-01: Oil quench


SMIC-I-6014 W Tower & QO System 30-Nov-14

1621-01: Oil Quench


SMIC-I-6014 W Tower & QO System 30-Nov-14
(Area B2, Unit H2 )
1714-00: C23
SMIC-I-6018 W Refrigeration 30-Nov-14
( Area: A, Unit: V2)

1623-01: Water
SMIC-I-6014 W Quench System ( Area: 30-Nov-14
B2,Unit: H2)

1683-02: C2R
SMIC-I-6018 W Compressor ( Area: A, 30-Nov-14
Unit:F3 )

1701-01: C2R
SMIC-I-6018 W Compressor ( Area: A, 30-Nov-14
Unit:F2 )

1712-02: C3R Stm


turbine Surface
SMIC-I-6014 W 30-Nov-14
Condensate ( Area A.
Unit V2S)

1704-02 : C2R
SMIC-I-6018 W Refrigeration ( Area: A, 30-Nov-14
Unit: F1)

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-024 1603-02 30-Nov-14
PROCESS (FURNACE)

1651-00: Dryers
SMIC-I-6018 W ( Area: 30-Nov-14
A, Unit:F1)

1662-01 : LP
Depropanizer
SMIC-I-6014 W 30-Nov-14
( Area:
A, Unit:F1)

1605-02 :F-1150
SMIC-I-6013 S 1605-02-HT-020 1605-02 Process 30-Nov-14
Furnace

1605-01: F-1150 (FUEL


SMIC-I-6013 S 1605-01-HT-004 1605-01 AND BURNER SYSTEM) 30-Nov-14

SMIC-I-6014 W 1506-02: F-1160 DS, 30-Nov-14


S10 & Decoking Air
1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-001 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3)

1683-02 : Secondary
SMIC-I-6018 W . 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3)

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-008 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3, L4 )

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-009 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3,L4,V3)

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-016 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3,F4,L4 )

1683-02: C2R
SMIC-I-6018 W 1683-02-HT-022 1683-02 Compressor ( Area: A, 1-Dec-14
Unit:F3 )

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-026 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3,L4)

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-028 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F3,L4,V3)

1681-00: Deprop O/H


SMIC-I-6018 W 1683-02-HT-029 1683-02 System ( Area: A, 1-Dec-14
Unit:L4,L3,F3,F1)

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-030 1683-02 Methanizer ( Area: A, 1-Dec-14
Unit:F3)

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-031 1683-02 Methanizers ( Area: A, 1-Dec-14
Unit: F1,F3,L3 )

1683-03: Methane
SMIC-I-6018 W 1683-03-HT-015 1683-03 Wash and Cold Box 1-Dec-14
( Area: A, Unit:
F3,L4,F4)
1683-03 : Methane
wash and Cold box
SMIC-I-6018 W 1683-03-HT-017 1683-03 1-Dec-14
( Area: A,
Unit:F3,F4,L4)

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-019 1683-03 Wash and Cold Box 1-Dec-14
( Area: A, Unit: F3, L4 )

1704-02: C2
SMIC-I-6018 W 1704-02-HT-005 1704-02 Refrigeration ( Area: A, 1-Dec-14
Unit: F1,F3,L3,L4,V1)

1661-01 : HP
SMIC-I-6018 W 1704-02-HT-035 1704-02 Depropanizer ( Area: A, 1-Dec-14
Unit: F1,F3,L3,L4,V1 )

1611-01 : F-1210 Fuel


SMIC-I-6012 S 1611-01-HT-001 1611-01 & Burner System 1-Dec-14

1611-01 : F-1210 Fuel


SMIC-I-6012 S 1611-01-HT-004 1611-01 & Burner System 1-Dec-14

1704-02: C2
SMIC-I-6016 S 1704-02-HT-044 1704-02 Refrigeration ( Area: A, 2-Dec-14
Unit: F3)

1683-03 : Methane
wash and Cold box
SMIC-I-6017 S 1683-03-HT-009 1683-03 ( Area: A, Unit: 2-Dec-14
F3,F4,L4)

1613-02 : F-1230
SMIC-I-6013 S 1613-02-HT-001 1613-02 Process ( Area: A, 2-Dec-14
Unit:Furnace )

1611-02:F-1210
SMIC-I-6013 S 1611-02-HT-001 1611-02 2-Dec-14
Process ( Furnace )

1612-02:F-1220
SMIC-I-6013 S 1612-02-HT-001 1612-02 Process ( Furnace ) 2-Dec-14

SMIC-I-6013 S 1612-02-HT-021 1612-02 1612-02:F-1220 2-Dec-14


Process ( Furnace )
1614-02:F-1240 Fuel &
SMIC-I-6013 S 1614-02-HT-001 1614-02 Burner System 2-Dec-14
( Furnace )

1614-02:F-1240 Fuel &


SMIC-I-6012 S 1614-01-HT-001 1614-01 Burner System 2-Dec-14
( Furnace )

1614-02:F-1240 Fuel &


SMIC-I-6012 S 1614-01-HT-004 1614-01 Burner System 2-Dec-14
( Furnace )

1613-02:F-1230 Fuel &


SMIC-I-6012 S 1613-01-HT-001 1613-01 Burner System 2-Dec-14
( Furnace )

1613-02:F-1230 Fuel &


SMIC-I-6012 S 1613-01-HT-004 1613-01 Burner System 2-Dec-14
( Furnace )

1404-00: Decoke Air


SMIC-I-6012 S 1404-00-HT-001 1404-00 2-Dec-14
( Furnace )

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-020 1603-02 2-Dec-14
Process ( Furnace )

1605-02 :F-1150
SMIC-I-6014 W 1605-02-HT-020 1605-02 Process Furnace 2-Dec-14

1614-02: F-1240 Fuel &


SMIC-I-6013 S 1614-02-HT-019 1614-02 Burner System 2-Dec-14
( Furnace )

1615-02: F-1250 Fuel &


SMIC-I-6014 S 1615-02-HT-019 1615-02 Burner System 2-Dec-14
( Furnace )

1606-02 :F-1160
SMIC-I-6014 S 1606-02-HT-020 1606-02 Process Furnace 2-Dec-14

1614-02 :F-1240
SMIC-I-6013 S 1614-01-HT-001 1614-01 Process 4-Dec-14
Burner System
Furnace
1614-02 :F-1240
Process
SMIC-I-6013 S 1614-01-HT-004 1614-01 4-Dec-14
Burner System
Furnace
1613-02 :F-1230
Process
SMIC-I-6013 S 1613-01-HT-001 1613-01 4-Dec-14
Burner System
Furnace
1613-02 :F-1230
Process
SMIC-I-6013 S 1613-01-HT-004 1613-01 Burner System 4-Dec-14
Furnace

1404-00 :Decoke Air


SMIC-I-6013 S 1404-00-HT-001 1404-00 4-Dec-14
( Furnace )

1506-01: F-1160
SMIC-I-6014 W 1506-01-HT-001 1506-01 (BFW,Steam Drum & 4-Dec-14
SVH Side)

1506-01: F-1160
SMIC-I-6012 S 1506-01-HT-007 1506-01 (BFW,Steam Drum & 4-Dec-14
SVH Side)

1606-02 : F-1160
SMIC-I-6012 S 1606-02-HT-022 1606-02 5-Dec-14
Process

1601-02 : F-1110
SMIC-I-6012 S 1601-02-HT-022 1601-02 Process 5-Dec-14

1601-01: F-1210 Fuel &


SMIC-I-6013 S 1601-01-HT-001 1601-01 Burner System 5-Dec-14
( Furnace )

1601-01: F-1210 Fuel &


SMIC-I-6013 S 1601-01-HT-004 1601-01 Burner System 5-Dec-14
( Furnace )

1604-02 :F-1140
SMIC-I-6013 S 1604-02-HT-020 1604-02 Process 5-Dec-14
Furnace

1704-02: C2
SMIC-I-6017 S 1704-02-HT-044 1704-02 Refrigeration 5-Dec-14
( Area: A, Unit: F3)
1704-02 : C2
Refrigeration 6-Dec-14 ~
SMIC-I-6016 S 1704-02-HT-033 1704-02
( Area: A, 7-Dec-14
Unit:F1A)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-013 1714-00 Refrigeration 6-Dec-14
( Area: A, Unit:F3A)

1714-00 : C3R
6-Dec-14 ~
SMIC-I-6016 S 1691-01-HT-006 1691-01 Refrigeration 7-Dec-14
( Area: A, Unit:F3A)

1671-02- :Deprop O/H


SMIC-I-6015 S 1671-02-HT-002 1671-02 6-Dec-14
Compressor

1662-01 : LP
SMIC-I-6015 S 1662-01-HT-008 1662-01 6-Dec-14
Depropanizer

1602-02 : F-1120
SMIC-I-6012 S 1602-02-HT-022 1602-02 7-Dec-14
Process

1603-02 : F-1130
SMIC-I-6012 S 1603-02-HT-022 1603-02 7-Dec-14
Process

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-022 1605-02 Process 7-Dec-14

1512-01 : F-1220 BFW,


SMIC-I-6012 S 1512-01-HT-038 1512-01 Steam drum & SVH 7-Dec-14
Side

1501-01 : F-1110 BFW,


SMIC-I-6012 S 1501-01-HT-034 1501-01 Steam drum & SVH 7-Dec-14
Side

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-004 1704-02 Refrigeration ; (Area: 7-Dec-14
A ; Unit: F3 )

SMIC-I-6015 S 1731-01-HT-015 1731-01 1731-01 : Debutanizer; 7-Dec-14


(Area: A ; Unit: V4 )
1731-01 : Debutanizer;
SMIC-I-6015 S 1731-01-HT-016 1731-01 7-Dec-14
(Area: A ; Unit: V4 )

C3R Refrigeration;
SMIC-I-6015 S 1714-00-HT-043 1714-00 7-Dec-14
(Area: A ; Unit: V2 )

C3R Refrigeration;
SMIC-I-6015 S 1714-00-HT-045 1714-00 (Area: A ; Unit: V2 ) 7-Dec-14

1501-01 : F-1110 BFW,


SMIC-I-6013 S 1501-01-HT-034 1501-01 Steam drum & SVH 8-Dec-14
Side

1704-02: C2
Refrigeration
SMIC-I-6015 S 1704-02-HT-010 1704-02 8-Dec-14
( Area: A, Unit:
V1 )

1615-02 : F-1250 :Fuel


SMIC-I-6012 S 1615-02-HT-022 1615-02 & Burner System (GAS 8-Dec-14
FURNACE)

1611-01 : F-1210 Fuel


SMIC-I-6013 S 1601-01-HT-001 1601-01 & Burner System 8-Dec-14

1611-01 : F-1210 Fuel


SMIC-I-6013 S 1611-01-HT-004 1611-01 & Burner System 8-Dec-14

1613-02:F-1230
SMIC-I-6012 S 1613-02-HT-021 1613-02 8-Dec-14
Process ( Furnace )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-021 1704-02 Refrigeration ( Area: A, 9-Dec-14
Unit:F2 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-023 1704-02 Refrigeration ( Area: A, 9-Dec-14
Unit:F2 )

1704-02: C2
SMIC-I-6016 S 1704-02-HT-030 1704-02 Refrigeration 9-Dec-14
( Area: A, Unit: F2)
1681-00 : Deprop O/H
SMIC-I-6016 S System ( Area: A, 9-Dec-14
Unit:F3 )

1714-00 : C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-013 1714-00 9-Dec-14
( Area: A, Unit: F1,
F2, F3, L3, L4, V2)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-006 1691-01 ( Area: A, 9-Dec-14
Unit:F3A)

1704-02 : C2
Refrigeration
SMIC-I-6017 S 1704-02-HT-033 1704-02 9-Dec-14
( Area: A,
Unit:F1A)
1704-02 : C2
Refrigeration
SMIC-I-6017 S 1704-02-HT-040 1704-02 9-Dec-14
( Area:
A, Unit:F2)
1683-03 : Methane
WASH AND Cold box
SMIC-I-6017 S 1683-03-HT-014 1683-03 9-Dec-14
( Area: A, Unit:F3,F4)

1512-01 : F-1220 BFW,


SMIC-I-6013 S 1512-01-HT-038 1512-01 Steam drum & SVH 9-Dec-14
Side

1662-01 : LP
SMIC-I-6016 S 1662-01-HT-008 1662-01 Depropanizer 9-Dec-14

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-021 1704-02 Refrigeration ( Area: A, 9-Dec-14
Unit:F2 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-023 1704-02 Refrigeration ( Area: A, 9-Dec-14
Unit:F2 )

1704-02: C2
SMIC-I-6017 S 1704-02-HT-030 1704-02 Refrigeration 9-Dec-14
( Area: A, Unit: F2)

SMIC-I-6016 S 1714-00-HT-043 1714-00 C3R Refrigeration: 9-Dec-14


(Area: A ; Unit: V2)
C3R Refrigeration:
SMIC-I-6016 S 1714-00-HT-045 1714-00 9-Dec-14
(Area: A ; Unit: V2)

1601-02 : F-1110
SMIC-I-6013 S 1601-02-HT-022 1601-02 10-Dec-14
Process ( Furnace )

1604-02: F-1140
SMIC-I-6013 S 1604-02-HT-022 1604-02 Process ( Furnace ) 10-Dec-14

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-022 1605-02 10-Dec-14
Process ( Furnace )

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-022 1606-02 10-Dec-14
Process ( Furnace )

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-027 1613-02 10-Dec-14
Process ( Furnace )

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-026 1613-02 10-Dec-14
Process ( Furnace )

1506-01: F-1160
SMIC-I-6013 S 1506-01-HT-007 1506-01 (BFW,Steam Drum & 10-Dec-14
SVH Side)

1607-02: F-1170
SMIC-I-6012 S 1607-02-HT-022 1607-02 10-Dec-14
Process ( Furnace )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-047 1714-00 Refrigeration ( Area: 10-Dec-14
A ; Unit: F2, F3, L3, L4 )

1601-01: F-1210 Fuel &


SMIC-I-6014 W 1601-01-HT-001 1601-01 Burner System 10-Dec-14
( Furnace )

1601-01: F-1110 Fuel &


SMIC-I-6014 W 1601-01-HT-004 Burner System 10-Dec-14
( Furnace )
1604-02 :F-1140
SMIC-I-6014 W 1604-02-HT-020 1604-02 Process 10-Dec-14
Furnace

1615-02 :F-1250
SMIC-I-6014 W 1615-02-HT-001 1615-02 Process 10-Dec-14
Furnace

1604-02 :F-1140
SMIC-I-6014 W Process 10-Dec-14
Furnace

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-020 1603-02 10-Dec-14
Process ( Furnace )

1704-02 : C2R
SMIC-I-6018 W 1704-02-HT-032 1704-02 Refrigeration ( Area: A, 10-Dec-14
Unit: F1)

1612-01: F-1220 Fuel &


SMIC-I-6012 S 10-Dec-14
Burner System

1612-01: F-1220 Fuel &


SMIC-I-6012 S 10-Dec-14
Burner System

1623-02: F-PYGAS
SMIC-I-6012 S 1623-02-HT-002 1623-02 IMPORT ( AREA: 4 ; 11-Dec-14
UNIT: BRA )

1612-01: F-1220 Fuel &


SMIC-I-6012 S 1612-01-HT-001 1612-01 11-Dec-14
Burner System

1612-01: F-1220 Fuel &


SMIC-I-6012 S 1612-01-HT-004 1612-01 11-Dec-14
Burner System

C3R Refrigeration:
SMIC-I-6017 S 1714-00-HT-043 1714-00 (Area: A ; Unit: V2) 11-Dec-14

SMIC-I-6017 S 1714-00-HT-045 1714-00 C3R Refrigeration: 11-Dec-14


(Area: A ; Unit: V2)
1671-02- :Deprop O/H
SMIC-I-6013 S 1671-02-HT-002 1671-02 11-Dec-14
Compressor

1683-03 : Methane
wash and Cold box
SMIC-I-6017 S 1683-03-HT-007 1683-03 11-Dec-14
( Area: A,
Unit:F3)
1701-03 : Ethylene
Product
SMIC-I-6016 S 1701-03-HT-009 1701-03 ( Area: A, Unit:F2, 11-Dec-14
L3, V2)

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-016 1731-01 11-Dec-14
(Area: A ; Unit: V4 )

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-015 1731-01 11-Dec-14
(Area: A ; Unit: V4 )

IWR 701 AP Primary


Vapor Barrier & KIC STORAGE AREA
SMIC-I-6011 W Aluminum 3003 Stucco (BESIDE KIC MAIN 11-Dec-14
Embosed with polysurlyn OFFICE, JUBAIL)
MB MATERIAL

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-019 1613-02 12-Dec-14
Process ( Furnace )

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-019 1612-02 Process ( Furnace ) 12-Dec-14

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-026 1614-02 12-Dec-14
Process ( Furnace )

1614-02: F-1240
SMIC-I-6012 S 1614-02-HT-027 1614-02 12-Dec-14
Process ( Furnace )

1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-002 1691-01 r ( Area: A ; Unit: F2 ) 12-Dec-14

1701-01 : C2R
SMIC-I-6015 S 1701-01-HT-007 1701-01 Compressor ( Area: A ; 12-Dec-14
Unit: F2 )
1704-02 : C2
SMIC-I-6016 S 1704-02-HT-019 1704-02 Refrigeration 12-Dec-14
( Area: A, Unit:F2 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-018 1704-02 Refrigeration 12-Dec-14
( Area: A, Unit:F2 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-027 1704-02 Refrigeration 12-Dec-14
( Area: A, Unit:F2)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-017 1704-02 Refrigeration 12-Dec-14
( Area: A, Unit:F2 )

1662-01 : LP
Depropanizer
SMIC-I-6016 S 1662-01-HT-004 1662-01 12-Dec-14
( Area:
A, Unit:F1 )
1701-03 : Ethylene
Product
SMIC-I-6017 S 1701-03-HT-009 1701-03 12-Dec-14
( Area: A, Unit:F2,
L3, V2)

1704-02*: C2
SMIC-I-6016 S 1704-02-HT-010 1704-02 refrigeration (Area: A, 12-Dec-14
Unit: V1)

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-019 RT1 1611-02 Process ( Furnace ) 12-Dec-14

1614-02: F-1240 Fuel &


SMIC-I-6014 W 1614-02-HT-019 1614-02 Burner System 13-Dec-14
( Furnace )

1614-02:F-1240 Fuel &


SMIC-I-6014 W 1614-02-HT-001 1614-02 Burner System 13-Dec-14
( Furnace )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-019 1704-02 Refrigeration 13-Dec-14
( Area: A, Unit:F2 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-018 1704-02 Refrigeration 13-Dec-14
( Area: A, Unit:F2 )
1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-003 1691-01 13-Dec-14
( Area: A, Unit: F2 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-027 1704-02 Refrigeration 13-Dec-14
( Area: A, Unit:F2)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-017 1704-02 Refrigeration 13-Dec-14
( Area: A, Unit:F2 )

1662-01 : LP
Depropanizer
SMIC-I-6017 S 1662-01-HT-004 1662-01 13-Dec-14
( Area:
A, Unit:F1 )

1704-02: C2
SMIC-I-6018 S 1704-02-HT-011 1704-02 Refrigeration ( Area: A, 13-Dec-14
Unit: F1,F3,L3,L4,V1)

1611-02: F-1210
SMIC-I-6014 S 1611-02-HT-019 RT1 1611-02 13-Dec-14
Process ( Furnace )

1672-02: Deprop O/H


turbine Surface
SMIC-I-6012 S 1672-01-HT-010 1672-01 14-Dec-14
Condensate ( AREA:
A ; UNIT: V1 )

1672-01: Deprop O/H


SMIC-I-6012 S 1672-01-HT-015 1672-01 turbine ( AREA: A ; 14-Dec-14
UNIT: V1 )

1712-01 : C3R STM


SMIC-I-6012 S 1712-01-HT-012 1712-01 Turbine ( AREA: A ; 14-Dec-14
UNIT: V1 )

1404-00 : Decoke Air


SMIC-I-6012 S 1404-00-HT-001 1404-00 14-Dec-14
( Furnace)

1731-01: Debitanizer
SMIC-I-6015 S 1731-01-HT-038 1731-01 ( AREA: A ; UNIT: V4 ) 14-Dec-14

1704-02*: C2
SMIC-I-6017 S 1704-02-HT-010 1704-02 refrigeration (Area: A, 14-Dec-14
Unit: V1)
1704-02 : C2
SMIC-I-6018 W 1704-02-HT-019 1704-02 Refrigeration 14-Dec-14
( Area: A, Unit:F2 )

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-018 1704-02 Refrigeration 14-Dec-14
( Area: A, Unit:F2 )

1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-003 1691-01 ( Area: A, Unit: F2 ) 14-Dec-14

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-027 1704-02 Refrigeration 14-Dec-14
( Area: A, Unit:F2)

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-017 1704-02 Refrigeration 14-Dec-14
( Area: A, Unit:F2 )

1662-01 : LP
Depropanizer
SMIC-I-6018 W 1662-01-HT-004 1662-01 14-Dec-14
( Area:
A, Unit:F1 )

1701-03 : Ethylene
SMIC-I-6018 W 1701-03-HT-006 1701-03 Product ( Area: A, Unit: 14-Dec-14
F2)

1612-02 : F-1220 :
SMIC-I-6012 S 1612-02-HT-022 1612-02 Process 15-Dec-14

1614-02 : F-1240 :
SMIC-I-6012 S 1614-02-HT-022 1614-02 15-Dec-14
Process

1614-02 : F-1240 :
SMIC-I-6012 S 1614-02-HT-030 1614-02 15-Dec-14
Process

1662-01: LP
SMIC-I-6012 S 1662-01-HT-017 1662-01 Depropanizer (Area: A ; 15-Dec-14
Unit: F1 )

1662-01: LP
SMIC-I-6012 S 1662-01-HT-018 1662-01 Depropanizer (Area: A ; 15-Dec-14
Unit: F1 )
1681-00 : Deprop O/H
SMIC-I-6016 S 1681-00-HT-010 1681-00 System ( Area: A, 15-Dec-14
Unit:F3 )

1615-01: F-1250 Fuel &


SMIC-I-6013 S 1615-02-HT-022 1615-02 Burner System ( Gas 15-Dec-14
Furnace )

1602-02 : F-1120
SMIC-I-6013 S 1602-02-HT-022 1602-02 Process ( Furnace ) 15-Dec-14

1603-02 : F-1130
SMIC-I-6013 S 1603-02-HT-022 1603-02 15-Dec-14
Process ( Furnace )

1611-02:F-1210
SMIC-I-6013 S 1611-02-HT-021 1611-02 15-Dec-14
Process ( Furnace )

1612-01: F-1220 Fuel &


SMIC-I-6013 S 1612-01-HT-001 1612-01 15-Dec-14
Burner System

1612-01: F-1220 Fuel &


SMIC-I-6013 S 1612-01-HT-004 1612-01 15-Dec-14
Burner System

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-019 1613-02 Process ( Furnace ) 15-Dec-14

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-019 1612-02 15-Dec-14
Process ( Furnace )

1601-02 :F-1110
SMIC-I-6013 S 1601-02-HT-001 1601-02 Process 15-Dec-14
Furnace

1602-02: F-1120
SMIC-I-6013 S 1602-02-HT-001 1602-02 Process ( Furnace ) 15-Dec-14

SMIC-I-6018 W 1705-01-HT-012 1705-01 1705-01 : C2 Splitter 15-Dec-14


( Area: A, Unit: F2)
1701-03 : Ethylene
Product
SMIC-I-6018 W 1701-03-HT-009 1701-03 15-Dec-14
( Area: A, Unit:F2,
L3, V2)

1701-01 : C2R
SMIC-I-6018 W 1701-01-HT-009 1701-01 Compressor ( Area: A, 15-Dec-14
Unit: F2)
1683-01: Primary
Demethanizers
SMIC-I-6015 S 1683-01-HT-001 1683-01 16-Dec-14
( Area: A,
Unit:L4,L3,F3,F1)
1661-01 : HP
SMIC-I-6012 S 1661-01-HT-006 1661-01 Depropanizer (Area: A , 16-Dec-14
Unit: F1 )

1681-01: Deprop O/H


System
SMIC-I-6015 S 1681-00-HT-016 1681-00 16-Dec-14
( Area:
A, Unit:L4,L3,F3,F1)

1506-01 : F-1160
SMIC-I-6012 S 1506-01-HT-009 1506-01 BFW, Steam Drum & 16-Dec-14
SVH Side

1507-01 : F-1170
SMIC-I-6012 S 1507-01-HT-009 1507-01 BFW, Steam Drum & 16-Dec-14
SVH Side

1603 -02 : F-1130


SMIC-I-6012 S 1603-02-HT-027 1603-02 Process 16-Dec-14

1603 -02 : F-1130


SMIC-I-6012 S 1603-02-HT-023 1603-02 16-Dec-14
Process

1505-01 : F-1150
SMIC-I-6012 S 1505-01-HT-009 1505-01 BFW, Steam Drum & 16-Dec-14
SVH Side

1503-01 : F-1130
SMIC-I-6012 S 1503-01-HT-009 1503-01 BFW, Steam Drum & 16-Dec-14
SVH Side

1504-01 : F-1140
SMIC-I-6012 S 1504-01-HT-009 1504-01 BFW, Steam Drum & 16-Dec-14
SVH Side
1611-02 : F-1210 :
SMIC-I-6012 S 1611-02-HT-022 1611-02 16-Dec-14
Process

1613-02 : F-1230 :
SMIC-I-6012 S 1613-02-HT-022 1613-02 16-Dec-14
Process

1404-00 : Decoke Air


SMIC-I-6013 S 1404-00-HT-001 1404-00 ( Furnace) 16-Dec-14

1701-01 : C2R
SMIC-I-6015 S Compressor ( Area: A ; 16-Dec-14
Unit: F1, F2, L3, V1 )

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-027 1714-00 Refrigeration ( Area: A, 16-Dec-14
Unit: V2)

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-016 1731-01 16-Dec-14
(Area: A ; Unit: V4 )

1662-01: LP
SMIC-I-6013 S 1662-01-HT-018 1662-01 Depropanizer (Area: A ; 16-Dec-14
Unit: F1 )

1662-01: LP
SMIC-I-6013 S 1662-01-HT-017 1662-01 Depropanizer (Area: A ; 16-Dec-14
Unit: F1 )

1681-00 : Deprop O/H


SMIC-I-6017 S 1681-00-HT-010 1681-00 System ( Area: A, 16-Dec-14
Unit:F3 )

1614-02 : F-1240 :
SMIC-I-6013 S 1614-02-HT-022 1614-02 16-Dec-14
Process

1612-02 : F-1220 :
SMIC-I-6013 S 1612-02-HT-022 1612-02 Process 16-Dec-14

1702-02: CER Stm


SMIC-I-6013 S 1702-02-HT-008 1702-02 Turbine Surface 17-Dec-14
Condansate (Area: A ,
Unit:V1)
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-047 1714-00 Refrigeration ( Area: 17-Dec-14
A ; Unit: F2, F3, L3, L4 )

1731-01 :
SMIC-I-6012 S 1731-01-HT-010 1731-01 Debutanizer ( Area: A, 17-Dec-14
Unit: V4)

1712-01: C3R Stm


SMIC-I-6014 W 1712-01-HT-009 1712-01 Turbine ( Area: A, Unit: 17-Dec-14
V2)

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-016 1731-01 17-Dec-14
(Area: A ; Unit: V4 )

1681-00 : Deprop O/H


SMIC-I-6018 S 1681-00-HT-010 1681-00 System ( Area: A, 17-Dec-14
Unit:F3 )

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-014 1683-03 WASH AND Cold box 17-Dec-14
( Area: A, Unit:F3,F4)

1701-01 : C2R
SMIC-I-6015 S 1701-01-HT-005 1701-01 Compressor ( Area: A ; 17-Dec-14
Unit: F1, F2, L3, V1 )

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-044 1714-00 Refrigeration ( Area: A, 17-Dec-14
Unit: V2)

1506-01 : F-1160
SMIC-I-6013 S 1506-01-HT-009 1506-01 BFW, Steam Drum & 17-Dec-14
SVH Side

1507-01 : F-1170
SMIC-I-6013 S 1507-01-HT-009 1507-01 BFW, Steam Drum & 17-Dec-14
SVH Side

1617-00 : Furnace
SMIC-I-6012 S 1617-00-HT-001 1617-00 Liquid Feed Prep 18-Dec-14

1683-01: Primary
Demethanizers
SMIC-I-6016 S 1683-01-HT-001 1683-01 18-Dec-14
( Area: A,
Unit:L4,L3,F3,F1)
1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-003 1683-02 Methanizers ( Area: A, 18-Dec-14
Unit: F3,L4)

1623-02: F-PYGAS
SMIC-I-6013 S 1623-02-HT-002 1623-02 IMPORT ( AREA: 4 ; 18-Dec-14
UNIT: BRA )

1614-01: F-1240 Fuel &


SMIC-I-6014 W 1614-01-HT-003 1614-01 Burner System (GAS 18-Dec-14
FURNACE)

1507-01 : F-1170
SMIC-I-6014 W 1507-01-HT-009 1507-01 BFW, Steam Drum & 18-Dec-14
SVH Side

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-001 1625-00 18-Dec-14
Steam Generation

1712-00: C3R Stm


SMIC-I-6014 W 1712-01-HT-007 1712-01 Turbine ( Area: A, 18-Dec-14
Unit:V2)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-047 1714-00 Refrigeration ( Area: 18-Dec-14
A ; Unit: F2, F3, L3, L4 )

PIR (COLD) TCC Laydown


SMIC-I-6011 W INSULATION MATERIAL ( KIC Storage) 18-Dec-14

KIC MATERIAL
HOT INSULATION STORAGE AREA
SMIC-I-6011 W 18-Dec-14
MATERIAL JUWAYMA
WAREHOUSE
1632-03 : CGC Stm
Turbine Vacuum
SMIC-I-6012 S 1632-03-HT-001 1632-03 19-Dec-14
System (Area: A ; Unit:
W5 )

1631-04 : CGC Stm


SMIC-I-6012 S 1631-04-HT-050 1631-04 Sealing Steam System 19-Dec-14
(Area: A ; Unit: W5 )

1631-04 : CGC Stm


SMIC-I-6012 S 1631-04-HT-049 1631-04 Sealing Steam System 19-Dec-14
(Area: A ; Unit: W5 )
1681-00 : Deprop O/H
SMIC-I-6015 S 1681-00-HT-007 1681-00 System (Area: A ; Unit: 19-Dec-14
W5 )

1681-01: Deprop O/H


System
SMIC-I-6016 S 1681-00-HT-016 1681-00 19-Dec-14
( Area:
A, Unit:L4,L3,F3,F1)

1613-02 : F-1230 :
SMIC-I-6013 S 1613-02-HT-022 1613-02 Process 19-Dec-14

1611-02 : F-1210 :
SMIC-I-6013 S 1611-02-HT-022 1611-02 19-Dec-14
Process

1614-02 : F-1240 :
SMIC-I-6013 S 1614-02-HT-030 1614-02 20-Dec-14
Process

1661-01 : HP
SMIC-I-6013 S 1661-01-HT-006 1661-01 Depropanizer (Area: A , 20-Dec-14
Unit: F1 )

1701-01 : C2R
SMIC-I-6016 S 1701-01-HT-005 1701-01 Compressor ( Area: A ; 20-Dec-14
Unit: F1, F2, L3, V1 )

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-044 1714-00 Refrigeration ( Area: A, 20-Dec-14
Unit: V2)

1731-01 :
SMIC-I-6013 S 1731-01-HT-010 1731-01 Debutanizer ( Area: A, 20-Dec-14
Unit: V4)

1661-01 : HP
SMIC-I-6013 S Depropanizer (Area: A , 20-Dec-14
Unit: F1 )
1683-01: Primary
Demethanizers
SMIC-I-6017 S 1683-01-HT-001 1683-01 20-Dec-14
( Area: A,
Unit:L4,L3,F3,F1)
1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-013 1714-00 Refrigeration 20-Dec-14
( Area: A, Unit: F1,
F2, F3, L3, L4, V2)
1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-026 1714-00 Refrigeration (Area: A, 21-Dec-14
Unit: F2, F3, L3, V2 )

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-018 1681-00 System (Area: A ; Unit: 21-Dec-14
F1, F3, L3 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-023 1683-02 Methanizers (Area: A ; 21-Dec-14
Unit: F4 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-024 1683-02 Methanizers (Area: A ; 21-Dec-14
Unit: F4 )

1684-01 : Turbo
SMIC-I-6015 S 1684-01-HT-001 1684-01 Expanders (Area: A ; 21-Dec-14
Unit: F4)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-073 1714-00 Refrigeration ( Area: A, 21-Dec-14
Unit:F3A)

1681-00 : Deprop O/H


SMIC-I-6017 S 1681-00-HT-023 1681-00 21-Dec-14
System ( Area: F3A )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-027 1683-02 Methanizers ( Area: A, 21-Dec-14
Unit:F2,F3,L3,L4 )

1731-01 : Debutanizer
SMIC-I-6016 S 1731-01-HT-005 1731-01 21-Dec-14
( Area: A, Unit:V4 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-001 1625-00 21-22-Dec-14
Steam Generation

1617-00 : Furnace
SMIC-I-6013 S 1617-00-HT-001 1617-00 Liquid Feed Prep 21-Dec-14

SMIC-I-6013 S 1614-02-HT-027 1614-02 1614-02: F-1240 21-Dec-14


Process ( Furnace )
1614-02: F-1240
SMIC-I-6013 S 1614-02-HT-026 1614-02 21-Dec-14
Process ( Furnace )

1632-02 : CGC Stm


Turbine Surface
SMIC-I-6013 S 1632-02-HT-005 1632-02 21-Dec-14
Condensate ( Area: A,
Unit:W5 )
1632-02: CGC Stm
Turbine Surface
SMIC-I-6013 S 1632-02-HT-003 1632-02 Condensate ( Area: A, 21-Dec-14
Unit: W5)

C3R Refrigeration:
SMIC-I-6018 S 1714-00-HT-045 1714-00 21-Dec-14
(Area: A ; Unit: V2)

C3R Refrigeration:
SMIC-I-6018 S 1714-00-HT-043 1714-00 21-Dec-14
(Area: A ; Unit: V2)

1605-01: F-1150 Fuel &


SMIC-I-6014 W 1605-01-HT-001 1605-01 Burner System 21-Dec-14
(Furnace)

1605-01: F-1150 (FUEL


SMIC-I-6014 W 1605-01-HT-004 1605-01 21-Dec-14
AND BURNER SYSTEM)

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-023 1704-02 Refrigeration ( Area: A, 21-Dec-14
Unit:F2 )

1713-00: C3R
SMIC-I-6014 W 1713-00-HT-003 1713-00 Compressor Lube Oil 21-Dec-14
( Area: A,Unit: V2 )

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-015 1731-01 21-Dec-14
(Area: A ; Unit: V4 )

1404-00 : Decoke Air (


SMIC-I-6014 W 1404-00-HT-001 1404-00 Furnace) 21-Dec-14

1613-02 : F-1230
SMIC-I-6014 W 1613-02-HT-001 1613-02 Process ( Area: A, 21-Dec-14
Unit:Furnace )
1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-006 1691-01 21-Dec-14
( Area: A, Unit:F3A)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-047 1714-00 Refrigeration ( Area: A , 22-Dec-14
Unit: F3 )

1616 : Furnace Gas


SMIC-I-6012 S 1616-00-HT-002 1616-00 Prep 22-Dec-14

1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-026 1611-02 22-Dec-14
Process

1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-027 1611-02 22-Dec-14
Process

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-026 1612-02 22-Dec-14
Process

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-027 1612-02 22-Dec-14
Process

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-073 1714-00 Refrigeration 22-Dec-14
( Area: A, Unit:F3A)

1681-00 : Deprop O/H


SMIC-I-6018 W 22-Dec-14
System ( Area: F3A )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-027 1683-02 Methanizers ( Area: A, 22-Dec-14
Unit:F2,F3,L3,L4 )

1731-01 : Debutanizer
SMIC-I-6017 S 1731-01-HT-005 1731-01 ( Area: A, Unit:V4 ) 22-Dec-14

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-004 1683-03 Wash and Cold Box 22-Dec-14
(Area: A ; Unit: F3 )
1681-00: Deprop O/H
SMIC-I-6017 S 1681-00-HT-017 1681-00 System ( Area: A, 23-Nov-14
Unit:F3)

1681-00 : Deprop O/H


SMIC-I-6016 S 1681-00-HT-020 1681-00 System ( Area: A, 23-Nov-14
Unit:F3)

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-044 1714-00 Refrigeration ( Area: A, 23-Nov-14
Unit: V2)

1616-00 : Furnace
SMIC-I-6013 S 1616-00-HT-002 1616-00 23-Nov-14
Gas Prep

1704-02*: C2
SMIC-I-6018 W 1704-02-HT-010 1704-02 refrigeration (Area: A, 23-Nov-14
Unit: V1)

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-027 1683-02 Methanizers ( Area: A, 23-Nov-14
Unit:F2,F3,L3,L4 )

1704-02: C2
SMIC-I-6018 W 1704-02-HT-030 1704-02 Refrigeration ( Area: A, 23-Nov-14
Unit: F2)

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-021 1704-02 Refrigeration ( Area: A, 23-Nov-14
Unit:F2 )

1681-00 : Deprop O/H


System
SMIC-I-6017 S 1681-00-HT-020 1681-00 24-Nov-14
( Area: A,
Unit:F3)
1683-03 : Methane
wash and Cold box
SMIC-I-6017 S 1683-03-HT-003 1683-03 24-Nov-14
( Area: A, Unit:F3)

1501-01: F-1110
SMIC-I-6013 S 1501-01-HT-009 1501-01 BFW,Steam Drums & 24-Nov-14
SVH Side (FURNACE)

1503-01 : F-1130
SMIC-I-6013 S 1503-01-HT-009 1503-01 BFW, Steam Drum & 24-Nov-14
SVH Side
1504-01 : F-1140
SMIC-I-6013 S 1504-01-HT-009 1504-01 BFW, Steam Drum & 24-Nov-14
SVH Side

1505-01 : F-1150
SMIC-I-6013 S 1505-01-HT-009 1505-01 BFW, Steam Drum & 24-Nov-14
SVH Side

1612-02: F-1220
SMIC-I-6014 W Process ( Furnace ) 24-Nov-14

1613-02: F-1230
SMIC-I-6014 W 24-Nov-14
Process ( Furnace )

1681-00: Deprop O/H


System
SMIC-I-6018 W 1681-00-HT-017 1681-00 24-Nov-14
( Area:
A, Unit:F3)

1466-00 : CH
SMIC-I-6012 S 1466-00-HT-016 1466-00 Condensate (3.5 bar) 24-Nov-14
( Area: A ; Unit: G3 )

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-027 1631-04 Steam System ( Area: A 24-Nov-14
; Unit: W5 )

1744-01 : Dry Flare


SMIC-I-6012 S 1744-01-HT-010 1744-01 ( Area: A ; Unit: G3 ) 24-Nov-14

1683-03 : Methane
Wash and Cold Box
SMIC-I-6015 S 1683-03-HT-013 1683-03 25-Dec-14
( Area: A, Unit: F3, F4,
L4)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-021 1683-03 Wash and Cold Box 25-Dec-14
( Area: A, Unit: F4)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 25-Dec-14
Unit: F1, F2, F3, V2, L3)

1661-00 : HP-
SMIC-I-6015 S 1661-01-HT-007 1661-01 Depropanizer ( Area: A, 25-Dec-14
Unit: F1, L3)
1714-00: C3R
SMIC-I-6018 S 1714-00-HT-044 1714-00 Refrigeration ( Area: A, 25-Dec-14
Unit: V2)

1506-01: F-1160
SMIC-I-6014 W 1506-01-HT-007 1506-01 (BFW,Steam Drum & 25-Dec-14
SVH Side)

1681-00 : Deprop O/H


SMIC-I-6018 W 1681-00-HT-023 1681-00 System ( Area: F3A ) 25-Dec-14

1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-019 1612-02 25-Dec-14
Process ( Furnace )

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-019 1613-02 25-Dec-14
Process ( Furnace )

1601-01: F-1110 Fuel &


SMIC-I-6014 W 1601-01-HT-001 1601-01 Burner System 25-Dec-14
( Furnace )

1601-01: F-1110 Fuel &


SMIC-I-6014 W 1601-01-HT-004 1601-01 Burner System 25-Dec-14
( Furnace )

1506-01 : F-1160
SMIC-I-6014 W 1506-01-HT-009 1506-01 BFW, Steam Drum & 25-Dec-14
SVH Side

1506-01: F-1160
SMIC-I-6014 W (BFW,Steam Drum & 25-Dec-14
SVH Side)

1661-01 : LP
Depropanizer
SMIC-I-6013 S 1661-01-HT-021 1661-01 25-Dec-14
( Area:
A, Unit:F1 )

1672-01: Deprop O/H


SMIC-I-6013 S 1672-01-HT-015 1672-01 turbine ( AREA: A ; 25-Dec-14
UNIT: V1 )

1463-00: CM
SMIC-I-6013 S 1463-00-HT-009 1463-00 Condensate ( Area: A, 25-Dec-14
Unit: R1)
1747-04: Unit 104
SMIC-I-6013 S 1747-04-HT-001 1747-04 Utilities: MP Stm 25-Dec-14
( Area: A: Unit: R1)

1746-00: Unit 104


SMIC-I-6013 S 1746-00-HT-001 1746-00 MPGF ( Area: A,: 25-Dec-14
Unit:R1 )

1712-01 : C3R STM


SMIC-I-6013 S 1712-01-HT-012 1712-01 Turbine ( AREA: A ; 25-Dec-14
UNIT: V1 )

1746-00: Unit 104


SMIC-I-6013 S MPGF ( Area: A,: 25-Dec-14
Unit:R1 )

1712-01 : C3R STM


SMIC-I-6013 S Turbine ( AREA: A ; 25-Dec-14
UNIT: V2 )

1702-01: Stm Turbine


SMIC-I-6013 S 1702-01-HT-019 1702-01 25-Dec-14
( Area: A,: Unit:V1 )

1601-02 : F-1120
SMIC-I-6013 S 1601-02-HT-027 1601-02 Process (Gas Furnace 25-Dec-14
Area)

1602-02 : F-1120
SMIC-I-6013 S 1602-02-HT-023 1602-02 Process (Gas Furnace 25-Dec-14
Area)

1466-00: CH
SMIC-I-6013 S 1466-00-HT-015 1466-00 Condensate ( Area: A , 25-Dec-14
Unit: T1)

HOT INSULATION TCC Laydown


SMIC-I-6011 W 25-Dec-14
MATERIAL ( KIC Storage)

(HOT & COLD) KIC CAMP


SMIC-I-6011 W INSULATION MATERIAL WAREHOUSE, Jubail 25-Dec-14

1661-00 : HP-
SMIC-I-6015 S 1661-01-HT-025 1661-01 Depropanizer ( Area: A, 26-Dec-14
Unit: F1)
1691-01 : Deethanizer
SMIC-I-6015 S 1691-01-HT-024 1691-01 26-Dec-14
(Area: A, Unit: L3)

1601-02 : F-1110
SMIC-I-6012 S 1601-02-HT-023 1601-02 Process (Gas Furnace 26-Dec-14
Area)

1601-02: F-1110
SMIC-I-6012 S 1601-02-HT-024 1601-02 PROCESS (FURNACE) 26-Dec-14

1602-02: F-1120
SMIC-I-6012 S 1602-02-HT-024 1602-02 26-Dec-14
PROCESS (FURNACE)

1604-02: F-1140
SMIC-I-6012 S 1604-02-HT-024 1604-02 26-Dec-14
PROCESS (FURNACE)

1605-02: F-1150
SMIC-I-6012 S 1605-02-HT-024 1605-02 26-Dec-14
PROCESS (FURNACE)

1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-024 1606-02 26-Dec-14
PROCESS (FURNACE)

1683-03 : Methane
Wash and Cold Box
SMIC-I-6016 S 1683-03-HT-013 1683-03 ( Area: A, Unit: F3, F4, 26-Dec-14
L4)

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-021 1683-03 Wash and Cold Box 26-Dec-14
( Area: A, Unit: F4)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 26-Dec-14
Unit: F1, F2, F3, V2, L3)

1661-00 : HP-
SMIC-I-6013 S 1661-01-HT-007 1661-01 Depropanizer ( Area: A, 26-Dec-14
Unit: F1, L3)

SMIC-I-6011 W HOT INSULATION TCC Laydown 26-Dec-14


MATERIAL ( KIC Storage)
1612-01: F-1220 Fuel &
SMIC-I-6014 W 1612-01-HT-001 1612-01 27-Dec-14
Burner System

1612-01: F-1220 Fuel &


SMIC-I-6014 W 1612-01-HT-004 1612-01 27-Dec-14
Burner System

1611-01: F-1210 Fuel &


SMIC-I-6014 W 1611-01-HT-001 1611-01 Burner System 27-Dec-14

1611-01: F-1210 Fuel &


SMIC-I-6014 W 1611-01-HT-004 1611-01 27-Dec-14
Burner System

1614-02 :F-1240
SMIC-I-6014 W 1614-01-HT-001 1614-01 Process Burner System 27-Dec-14
Furnace

1614-02 :F-1240
SMIC-I-6014 W 1614-01-HT-004 1614-01 Process Burner System 27-Dec-14
Furnace

1731-01 :
SMIC-I-6014 S 1731-01-HT-010 1731-01 Debutanizer ( Area: A, 27-Dec-14
Unit: V4)

1701-01 : C2R
SMIC-I-6015 S 1701-01-HT-010 1701-01 Compressor ( Area: A, 28-Dec-14
Unit: L3, V1)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-080 1714-00 Refrigeration ( Area: A, 28-Dec-14
Unit: F2 )

1714-07 : Unit 104


SMIC-I-6012 S 1747-07-HT-001 1747-07 Utilities : LP ( Area: B3, 28-Dec-14
Unit: R1)

1714-01 : Unit 104


SMIC-I-6012 S 1747-01-HT-001 1747-01 Utilities : Ethane Back - 28-Dec-14
up ( Area: B3, Unit: R1)

SMIC-I-6012 S 1635-00-HT-001 1635-00 1635-00 : WASH OIL 28-Dec-14


( Area: A, Unit: V3)
1601-02: F-1110
SMIC-I-6013 S 1601-01-HT-024 1601-02 28-Dec-14
PROCESS (FURNACE)

1613-02 :F-1230 FUEL


&
SMIC-I-6014 W 1613-01-HT-001 1613-01 28-Dec-14
Burner System
Furnace
1613-02 :F-1230 FUEL
&
SMIC-I-6014 W 1613-01-HT-004 1613-01 Burner System 28-Dec-14
Furnace

1612-02:F-1220
SMIC-I-6014 W 1612-02-HT-001 1612-02 28-Dec-14
Process ( Furnace )

1602-02: F-1120
SMIC-I-6013 S 1602-02-HT-024 1602-02 28-Dec-14
PROCESS (FURNACE)

1604-02: F-1140
SMIC-I-6013 S 1604-02-HT-024 1604-02 28-Dec-14
PROCESS (FURNACE)

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-024 1605-02 28-Dec-14
PROCESS (FURNACE)

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-024 1606-02 PROCESS (FURNACE) 28-Dec-14

1683-03 : Methane
Wash and Cold Box
SMIC-I-6017 S 1683-03-HT-013 1683-03 28-Dec-14
( Area: A, Unit: F3, F4,
L4)

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-021 1683-03 Wash and Cold Box 28-Dec-14
( Area: A, Unit: F4)

1661-01 : HP-
SMIC-I-6016 S 1661-01-HT-025 1661-01 Depropanizer ( Area: A, 28-Dec-14
Unit: F1)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 28-Dec-14
Unit: F1, F2, F3, V2, L3)
1701-01 : C2R
SMIC-I-6016 S 1701-01-HT-010 1701-01 Compressor ( Area: A, 29-Dec-14
Unit: L3, V1)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-080 1714-00 Refrigeration ( Area: A, 29-Dec-14
Unit: F2 )

1747-07 : Unit 104


SMIC-I-6013 S 1747-07-HT-001 1747-07 Utilities : LP ( Area: B3, 29-Dec-14
Unit: R1)

1747-01 : Unit 104


SMIC-I-6013 S 1747-01-HT-001 1747-01 Utilities : Ethane Back - 29-Dec-14
up ( Area: B3, Unit: R1)

1635-00 : WASH OIL


SMIC-I-6013 S 1635-00-HT-001 1635-00 29-Dec-14
( Area: A, Unit: V3)

1661-01 : HP-
SMIC-I-6017 S 1661-01-HT-025 1661-01 Depropanizer ( Area: A, 29-Dec-14
Unit: F1)

1616-00 : Furnace Gas


SMIC-I-6012 S 1616-00-HT-002 1616-00 29-Dec-14
Prep

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 29-Dec-14
Unit:F1,F3, L3, L4,V1 )

1701-01 : C2R
SMIC-I-6017 S 1701-01-HT-005 1701-01 Compressor ( Area: A ; 29-Dec-14
Unit: F1, F2, L3, V1 )

1616-00 : Furnace
SMIC-I-6014 W 1616-00-HT-002 1616-00 29-Dec-14
Gas Prep

1617-00 : Furnace
SMIC-I-6014 W 1617-00-HT-001 1617-00 Liquid Feed Prep 29-Dec-14

SMIC-I-6011 W HOT INSULATION TCC Laydown 29-Dec-14


MATERIAL ( KIC Storage)
1611-02 : F-1210
SMIC-I-6012 S 1611-02-HT-027 1611-02 30-Dec-14
Process

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-002 1714-00 Refrigeration (Area: A, 30-Dec-14
Unit: V4)

1731-01 : Debutanizer
SMIC-I-6015 S 1731-01-HT-002 1731-01 (Area: A, Unit: V4) 30-Dec-14

1701-01 : C2R
SMIC-I-6017 S Compressor ( Area: A, 30-Dec-14
Unit: L3, V1)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-080 1714-00 Refrigeration ( Area: A, 30-Dec-14
Unit: F2 )

1616-00 : Furnace Gas


SMIC-I-6013 S 1616-00-HT-002 1616-00 30-Dec-14
Prep

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 30-Dec-14
Unit:F1,F3, L3, L4,V1 )

1701-01 : C2R
SMIC-I-6018 S 1701-01-HT-005 1701-01 Compressor ( Area: A ; 30-Dec-14
Unit: F1, F2, L3, V1 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-027 1714-00 Refrigeration ( Area: A, 30-Dec-14
Unit: V2)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-024 1691-01 (Area: A, Unit: F2, F3, 30-Dec-14
L3, L4, )

1601-02 : F-1110
SMIC-I-6013 S 1601-02-HT-023 1601-02 Process (Gas Furnace 30-Dec-14
Area)

SMIC-I-6013 S 1605-02-HT-024 1605-02 1605-02: F-1150 30-Dec-14


PROCESS (FURNACE)
1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-025 1683-03 Wash & Cold Box 31-Dec-14
(Area: A , Unit: F4 )

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-022 1681-00 31-Dec-14
(Area: A , Unit: F1 )

1681-00 : Deprop O/H


SMIC-I-6015 S 1661-01-HT-010 1661-01 (Area: A , Unit: F1 ) 31-Dec-14

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 31-Dec-14
Unit:F1,F3, L3, L4,V1 )

1681-00 : Deprop O/H


SMIC-I-6015 S 1661-01-HT-009 1661-01 31-Dec-14
(Area: A , Unit: F1 )

1615-02 : F-1250
SMIC-I-6012 S 1615-02-HT-023 1615-02 31-Dec-14
Process

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-002 1625-00 31-Dec-14
Steam Generation

1614-02:F-1240
SMIC-I-6014 W 1614-02-HT-021 1614-02 Process ( Furnace ) 31-Dec-14

1731-01 : Debutanizer
SMIC-I-6018 W 1731-01-HT-005 1731-01 31-Dec-14
( Area: A, Unit:V4 )

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-003 1683-03 wash and Cold box 31-Dec-14
( Area: A, Unit:F3)

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-001 1625-00 Steam Generation 31-Dec-14

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-004 1683-03 Wash and Cold Box 31-Dec-14
(Area: A ; Unit: F3 )
1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-020 1683-03 wash and Cold box 31-Dec-14
( Area: A, Unit: F4)

1681-00 : Deprop O/H


SMIC-I-6016 S 1681-00-HT-018 1681-00 System (Area: A ; Unit: 31-Dec-14
F1, F3, L3 )

1681-01: Deprop O/H


SMIC-I-6017 S 1681-01-HT-016 1681-01 System ( Area: A, 31-Dec-14
Unit:L4,L3,F3,F1)

1681-00 : Deprop O/H


SMIC-I-6016 S 1681-00-HT-007 1681-00 System (Area: A ; Unit: 31-Dec-14
W5 )

1731-01: Debitanizer
SMIC-I-6016 S 1731-01-HT-038 1731-01 31-Dec-14
( AREA: A ; UNIT: V4 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-003 1704-02 Refrigeration (Area: A , 1-Jan-15
Unit: F2, F3, F4, L3, L4 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-025 1714-00 Refrigeration (Area: A , 1-Jan-15
Unit: F2, F4, L3, L4 )

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-006 1704-02 Refrigeration (Area: A , 1-Jan-15
Unit: F2, L3, V1 )

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-006 1682-01 Reactors (Area: A , 1-Jan-15
Unit: M1 )

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-003 1682-01 Reactors (Area: A , 1-Jan-15
Unit: M1 )

1661-00 : HP
SMIC-I-6016 S 1661-01-HT-010 1661-01 Depropanizer (Area: A , 1-Jan-15
Unit: F1 )

1681-00 : Deprop O/H


SMIC-I-6017 S 1681-00-HT-018 1681-00 System (Area: A ; Unit: 1-Jan-15
F1, F3, L3 )
1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-020 1683-03 wash and Cold box 1-Jan-15
( Area: A, Unit: F4)

1681-00 : Deprop O/H


SMIC-I-6018 S 1681-00-HT-020 1681-00 System (Area: A ; Unit: 1-Jan-15
F3)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-027 1714-00 Refrigeration ( Area: A, 1-Jan-15
Unit: V2)

1681-01: Deprop O/H


System
SMIC-I-6018 S 1681-00-HT-016 1681-00 1-Jan-15
( Area:
A, Unit:L4,L3,F3,F1)

1683-01 : Primary
SMIC-I-6018 S 1683-01-HT-001 1683-01 Demethanizers ( Area: 1-Jan-15
A, Unit: L4.L3, F3, F1 )

1681-00 : Deprop O/H


SMIC-I-6017 S 1681-00-HT-007 1681-00 System (Area: A ; Unit: 1-Jan-15
W5 )

1731-01: Debitanizer
SMIC-I-6017 S 1731-01-HT-038 1731-01 1-Jan-15
( AREA: A ; UNIT: V4 )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-024 1691-01 (Area: A, Unit: F2, F3, 1-Jan-15
L3, L4, )

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6012 S 1631-01-HT-001 1631-01 2-Jan-15
(Area: A , Unit: F1, L2,
L3, W5 )

1661-01 : HP (Area: A ,
SMIC-I-6012 S 1661-01-HT-022 1661-01 2-Jan-15
Unit: F1)

1662-01 : LP
SMIC-I-6012 S 1662-01-HT-019 1662-01 Depropanizer (Area: 2-Jan-15
A , Unit: F1 )

1662-01 : LP
SMIC-I-6012 S 1662-01-HT-020 1662-01 Depropanizer (Area: 2-Jan-15
A , Unit: F1 )
1704-02 : C2
SMIC-I-6015 S 1704-02-HT-041 1704-02 Refrigeration (Area: A , 2-Jan-15
Unit: F2 )

1661-00 : HP
SMIC-I-6017 S 1661-01-HT-010 1661-01 Depropanizer (Area: A , 2-Jan-15
Unit: F1 )

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-024 1691-01 (Area: A, Unit: F2, F3, 2-Jan-15
L3, L4, )

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-026 1714-00 Refrigeration (Area: A, 2-Jan-15
Unit: F2, F3, L3, V2 )

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-004 1683-03 Wash and Cold Box 2-Jan-15
(Area: A ; Unit: F3 )

1614-02: F-1240
SMIC-I-6018 W 1614-02-HT-026 1614-02 3-Jan-15
Process ( Furnace )

1614-02: F-1240
SMIC-I-6018 W 1614-02-HT-027 1614-02 3-Jan-15
Process ( Furnace )

1683-01 : Primary
SMIC-I-6015 S 1683-01-HT-004 1683-01 Demethanizers (Area: 4-Jan-15
A , Unit: F3 )

1683-01 : Primary
SMIC-I-6015 S 1683-01-HT-005 1683-01 Demethanizers (Area: 4-Jan-15
A , Unit: F3 )

1661-01 : HP
SMIC-I-6015 S 1661-01-HT-009 1661-01 Depropanizer (Area: 4-Jan-15
A , Unit: F1 )

1701-01 : C2R
SMIC-I-6017 S 1701-01-HT-010 1701-01 Compressor ( Area: A, 4-Jan-15
Unit: L3, V1)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-026 1714-00 Refrigeration (Area: A, 4-Jan-15
Unit: F2, F3, L3, V2 )
1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-023 1683-02 Methanizers (Area: A ; 4-Jan-15
Unit: F4 )

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-024 1683-02 Methanizers (Area: A ; 4-Jan-15
Unit: F4 )

1731-01: Debitanizer
SMIC-I-6018 W 1731-01-HT-038 1731-01 ( AREA: A ; UNIT: V4 ) 4-Jan-15

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-004 1683-03 Wash and Cold Box 4-Jan-15
(Area: A ; Unit: F3 )

1455-00: SL Steam
SMIC-I-6014 S 1455-00-HT-001 1455-00 4-Jan-15
( Area: A, Unit:
L1,T1,T2,T3)

1681-00 : Deprop O/H


SMIC-I-6018 S 1681-00-HT-007 1681-00 System (Area: A ; Unit: 4-Jan-15
F3 )

1681-00 : Deprop O/H


SMIC-I-6018 S 1681-00-HT-018 1681-00 System (Area: A ; Unit: 4-Jan-15
F3 )

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-006 1683-03 Wash & Cold Box 4-Jan-15
(Area: A , Unit: F3, F4 )

1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-002 1625-00 4-Jan-15
Steam Generation

1615-02 : F-1250
SMIC-I-6012 S 1615-02-HT-025 1615-02 Process (Furnace 5-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6012 S 1615-02-HT-026 1615-02 Process (Furnace 5-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6012 S 1615-02-HT-027 1615-02 Process (Furnace 5-Jan-15
Area )
1615-02 : F-1250
SMIC-I-6012 S 1615-02-HT-028 1615-02 Process (Furnace 5-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6013 S 1615-02-HT-023 1615-02 5-Jan-15
Process

1613-02 :F-1230
SMIC-I-6013 S 1613-02-HT-021 1613-02 Process 5-Jan-15
( Furnace )

1661-01 : HP
SMIC-I-6016 S 1661-01-HT-009 1661-01 Depropanizer (Area: 5-Jan-15
A , Unit: F1 )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-023 1683-02 Methanizers (Area: A ; 5-Jan-15
Unit: F4 )

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-024 1683-02 Methanizers (Area: A; 5-Jan-15
Unit: F4 )

1614-02 : F-1240 :
SMIC-I-6014 W 1614-02-HT-022 1614-02 5-Jan-15
Process

1611-02:F-1210
SMIC-I-6014 W 1611-02-HT-001 1611-02 Process ( Furnace ) 5-Jan-15

1615-01: F-1250 Fuel &


SMIC-I-6014 W 1615-02-HT-022 1615-02 Burner System ( Gas 5-Jan-15
Furnace )

1611-02:F-1210
SMIC-I-6014 W 1611-02-HT-021 1611-02 5-Jan-15
Process ( Furnace )

1681-00 : Deprop O/H


SMIC-I-6015 S 1681-00-HT-025 1681-00 Sysytem 5-Jan-15

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-006 1683-03 Wash & Cold Box 5-Jan-15
(Area: A , Unit: F3, F4 )
1662-01 : LP
SMIC-I-6012 S 1662-01-HT-015 1662-01 Depropanizer (Area: A, 6-Jan-15
Unit: F1 )

1632-02 : CGC Stm


SMIC-I-6012 S 1632-02-HT-002 1632-02 Turbine (Area: A, Unit: 6-Jan-15
W5 )

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-028 1631-04 Steam System (Area: A, 6-Jan-15
Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-040 1631-04 Steam System (Area: A, 6-Jan-15
Unit: W5 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-040 1683-02 Methanizers (Area: A, 6-Jan-15
Unit: F3 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-024 1714-00 refrigeration (Area: A, 6-Jan-15
Unit: F2 )

1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-006 1682-01 Reactors (Area: A , 6-Jan-15
Unit: M1 )

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-023 1683-02 Methanizers (Area: A ; 6-Jan-15
Unit: F4 )

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-024 1683-02 Methanizers (Area: A ; 6-Jan-15
Unit: F4 )

1615-02 : F-1250
SMIC-I-6014 W 1615-02-HT-023 1615-02 6-Jan-15
Process

1683-03 : Methane
WASH AND Cold box
SMIC-I-6018 W 1683-03-HT-014 1683-03 6-Jan-15
( Area: A, Unit:F3,F4)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-026 1714-00 Refrigeration (Area: A, 6-Jan-15
Unit: F2, F3, L3, V2 )
1614-02: F-1240
SMIC-I-6013 S 1614-02-HT-023 1614-02 6-Jan-15
PROCESS (FURNACE)

1614-02: F-1240
SMIC-I-6013 S 1614-02-H-T025 1614-02 6-Jan-15
PROCESS (FURNACE)

1614-02: F-1240
SMIC-I-6013 S 1614--02-HT-028 1614-02 PROCESS (FURNACE) 6-Jan-15

1615-02 : F-1250
SMIC-I-6013 S 1615-02-HT-025 1615-02 Process (Furnace 6-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6013 S 1615-02-HT-026 1615-02 Process (Furnace 6-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6013 S 1615-02-HT-027 1615-02 Process (Furnace 6-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6013 S 1615-02-HT-028 1615-02 Process (Furnace 6-Jan-15
Area )

1683-01 : Primary
SMIC-I-6016 S 1683-01-HT-005 1683-01 Demethanizers (Area: 6-Jan-15
A , Unit: F3 )

1701-01 : C2R
Compressor
SMIC-I-6017 S 1701-01-HT-002 1701-01 6-Jan-15
( Area: A,
Unit:V1)

1661-01 : HP
SMIC-I-6017 S 1661-01-HT-009 1661-01 Depropanizer (Area: 6-Jan-15
A , Unit: F1 )

1681-00 : Deprop O/H


SMIC-I-6016 S 1681-00-HT-025 1681-00 Sysytem 6-Jan-15

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-006 1683-03 Wash & Cold Box 6-Jan-15
(Area: A , Unit: F3, F4 )
1704-02 : C2
SMIC-I-6015 S 1704-02-HT-028 1704-02 Refrigeration ( Area: A, 7-Jan-15
Unit: F2, L3 )

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-042 RT1 1631-04 Steam System ( Area: 7-Jan-15
A, Unit: W5 )

1603 -02 : F-1130


SMIC-I-6013 S 1603-02-HT-023 1603-02 Process 7-Jan-15

1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-023 1604-02 Process (Gas Furnace 7-Jan-15
Area)

1605-02 : F-1150
SMIC-I-6013 S 1605-02-HT-023 1605-02 Process (Gas Furnace 7-Jan-15
Area)

1606-02 : F-1160
SMIC-I-6013 S 1606-02-HT-023 1606-02 Process (Gas Furnace 7-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6012 S 1607-02-HT-023 1607-02 Process (Gas Furnace 7-Jan-15
Area)

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-006 1683-03 Wash & Cold Box 7-Jan-15
(Area: A , Unit: F3, F4 )

1615-02 : F-1250
SMIC-I-6014 W 1615-02-HT-025 1615-02 Process (Furnace 7-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6014 W 1615-02-HT-026 1615-02 Process (Furnace 7-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6014 W 1615-02-HT-027 1615-02 Process (Furnace 7-Jan-15
Area )

1615-02 : F-1250
SMIC-I-6014 W 1615-02-HT-028 1615-02 Process (Furnace 7-Jan-15
Area )
1607-02: F-1170
SMIC-I-6013 S 1607-02-HT-022 1607-02 7-Jan-15
Process ( Furnace )

1603 -02 : F-1130


SMIC-I-6013 S 1603-02-HT-027 1603-02 7-Jan-15
Process

1683-01 : Primary
SMIC-I-6016 S 1683-01-HT-004 1683-01 Demethanizers (Area: 7-Jan-15
A , Unit: F3 )

1683-01 : Primary
SMIC-I-6017 S 1683-01-HT-005 1683-01 Demethanizers (Area: 7-Jan-15
A , Unit: F3 )

1681-00 : Deprop O/H


SMIC-I-6016 S 1681-00-HT-022 1681-00 7-Jan-15
(Area: A , Unit: F1 )

1632-03 : CGC Stm


Turbine Vacuum
SMIC-I-6013 S 1632-03-HT-001 1632-03 7-Jan-15
System (Area: A ; Unit:
W5 )

1771-00 : Methanol
SMIC-I-6012 S 1771-00-HT-018 1771-00 8-Jan-15
( Area: A, Unit : G3 )

1634-00 : LP Drips
SMIC-I-6012 S 1634-00-HT-025 1634-00 Stripper (Area: A, Unit: 8-Jan-15
W5 )

1634-00 : LP Drips
SMIC-I-6012 S 1634-00-HT-024 1634-00 Stripper (Area: A, Unit: 8-Jan-15
W5 )

1631-01 : CGC 1st


SMIC-I-6012 S 1631-01-HT-003 1631-01 Suc/dis & 2nd Suc 8-Jan-15
(Area: A, Unit: W5 )

1452-00 : SH Steam
SMIC-I-6012 S 1452-00-HT-018 1452-00 (Area: A, Unit: L2) 8-Jan-15

1612-02 : F-1220
SMIC-I-6014 W 1612-02-HT-021 1612-02 Process (Furnace 8-Jan-15
Area )
1613-02 : F-1230 :
SMIC-I-6014 W 1613-02-HT-022 1613-02 8-Jan-15
Process

1613 -02 : F-1230


SMIC-I-6014 W 1613-02-HT-028 1613-02 8-Jan-15
Process

1613 -02 : F-1230


SMIC-I-6014 W 1613-02-HT-027 1613-02 Process 8-Jan-15

1614 -02 : F-1240


SMIC-I-6014 W 1614-02-HT-023 1614-02 8-Jan-15
Process

1614 -02 : F-1240


SMIC-I-6014 W 1614-02-HT-025 1614-02 8-Jan-15
Process

1614 -02 : F-1240


SMIC-I-6014 W 1614-02-HT-028 1614-02 8-Jan-15
Process

1614 -02 : F-1240


SMIC-I-6014 W 1614-02-HT-030 1614-02 8-Jan-15
Process

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-002 1714-00 Refrigeration (Area: A, 8-Jan-15
Unit: V4)

1641-00 : Caustic
SMIC-I-6015 S 1641-00-HT-023 1641-00 9-Jan-15
( Area: A, Unit: G1 )

1683-01 : Primary
SMIC-I-6017 S 1683-01-HT-004 1683-01 Demethanizers (Area: 9-Jan-15
A , Unit: F3 )

1661-01 : HP
SMIC-I-6018 S 1661-01-HT-009 1661-01 Depropanizer (Area: 9-Jan-15
A , Unit: F1 )

1661-00 : HP
SMIC-I-6018 S 1661-01-HT-010 1661-01 Depropanizer (Area: A , 9-Jan-15
Unit: F1 )
1661-01 : HP-
SMIC-I-6018 S 1661-01-HT-025 1661-01 Depropanizer ( Area: A, 9-Jan-15
Unit: F1)

1661-01 : HP-
SMIC-I-6018 W 1661-01-HT-026 1661-01 Depropanizer (Area: A , 9-Jan-15
Unit: F1 )

1683-01 : Primary
SMIC-I-6018 S 1683-01-HT-005 1683-01 Demethanizers (Area: 9-Jan-15
A , Unit: F3 )

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-002 1682-01 Reactors (Area:A, Unit: 9-Jan-15
M1 )

1632-01 : CGC (Area:A,


SMIC-I-6012 S 1632-01-HT-003 1632-01 9-Jan-15
Unit: W5)

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-030 1631-04 Steam System(Area:A, 9-Jan-15
Unit: W5)

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-024 1607-02 Process (Gas Furnace 10-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-025 1607-02 Process (Gas Furnace 10-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-026 1607-02 Process (Gas Furnace 10-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-027 1607-02 Process (Gas Furnace 10-Jan-15
Area)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-003 1704-02 Refrigeration (Area: A , 10-Jan-15
Unit: F2, F3, F4, L3, L4 )

1683-01 : Primary
SMIC-I-6018 S 1683-01-HT-004 1683-01 Demethanizers (Area: 10-Jan-15
A , Unit: F3 )
1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-002 1714-00 Refrigeration (Area: A, 10-Jan-15
Unit: V4)

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-027 1611-02 11-Jan-15
Process

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-026 1611-02 Process 11-Jan-15

1611-02 : F-1210
SMIC-I-6012 S 1611-02-HT-023 1611-02 11-Jan-15
Process

1611-02 : F-1210
SMIC-I-6013 S 1611-02-HT-028 1611-02 11-Jan-15
Process

1611-02 : F-1210
SMIC-I-6012 S 1611-02-HT-025 1611-02 11-Jan-15
Process

1612-02 : F-1220
SMIC-I-6012 S 1612-02-HT-023 1612-02 11-Jan-15
Process

1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-002 1625-00 Steam Generation 11-Jan-15

1611-02 : F-1210 :
SMIC-I-6014 W 1611-02-HT-022 1611-02 11-Jan-15
Process

1612-02 : F-1220 :
SMIC-I-6014 W 1612-02-HT-022 1612-02 11-Jan-15
Process

1512-01 : F-1220 BFW,


SMIC-I-6014 W 1512-01-HT-038 1512-01 Steam drum & SVH 11-Jan-15
Side

SMIC-I-6013 S 1612-02-HT-026 1612-02 1612-02: F-1220 11-Jan-15


Process
1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-027 1612-02 11-Jan-15
Process

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-028 1612-02 11-Jan-15
Process

1454-00 : S10 Steam


SMIC-I-6012 S 1454-00-HT-001 1454-00 (S10 Steam ) 11-Jan-15

SMIC-I-6015 S 1631-02-HT-004 1631-02 1631-02 : CGC 2nd dis 11-Jan-15

1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-003 1682-01 Reactors (Area: A , 11-Jan-15
Unit: M1 )

1471-00 : (Furnace
SMIC-I-6012 S 1471-00-HT-003 1471-00 11-Jan-15
Blowdown )

1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-002 1682-01 Reactors (Area:A, Unit: 11-Jan-15
M1 )

1471-00 : F-1110
SMIC-I-6012 S 1471-00-HT-006 1471-00 (Furnace Blowdown) 11-Jan-15

1471-00 : F-1120
SMIC-I-6012 S 1471-00-HT-007 1471-00 11-Jan-15
(Furnace Blowdown)

1471-00 : F-1130
SMIC-I-6012 S 1471-00-HT-008 1471-00 11-Jan-15
(Furnace Blowdown)

1471-00 : F-1160
SMIC-I-6012 S 1471-00-HT-011 1471-00 (Furnace Blowdown) 11-Jan-15

SMIC-I-6012 S 1471-00-HT-012 1471-00 1471-00 : F-1210 11-Jan-15


(Furnace Blowdown)
1471-00 : F-1220
SMIC-I-6012 S 1471-00-HT-013 1471-00 11-Jan-15
(Furnace Blowdown)

1471-00 : F-1230
SMIC-I-6012 S 1471-00-HT-014 1471-00 11-Jan-15
(Furnace Blowdown)

1471-00 : F-1240
SMIC-I-6012 S 1471-00-HT-015 1471-00 (Furnace Blowdown) 11-Jan-15

1714-00: C3R
Refrigeration
SMIC-I-6016 S 1714-00-HT-077 1714-00 12-Jan-15
( Area: A, Unit:V2)

1611-02 : F-1210
SMIC-I-6013 S 1611-02-HT-023 1611-02 12-Jan-15
Process

1611-02 : F-1210
SMIC-I-6013 S 1611-02-HT-025 1611-02 12-Jan-15
Process

1612-02 : F-1220
SMIC-I-6013 S 1612-02-HT-023 1612-02 12-Jan-15
Process

1611-02 : F-1210
SMIC-I-6014 W 1611-02-HT-028 1611-02 Process 12-Jan-15

1611-02: F-1210
SMIC-I-6014 W 1611-02-HT-026 1611-02 12-Jan-15
Process

1611-02: F-1210
SMIC-I-6014 W 1611-02-HT-027 1611-02 12-Jan-15
Process

1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-026 1612-02 Process 12-Jan-15

SMIC-I-6014 W 1612-02-HT-027 1612-02 1612-02: F-1220 12-Jan-15


Process
1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-028 1612-02 12-Jan-15
Process

1682-01 : Acetylene
SMIC-I-6014 S 1682-01-HT-003 1682-01 Reactors (Area: A , 12-Jan-15
Unit: M1 )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 12-Jan-15
Unit: F1, F2, F3, V2, L3)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-015 1704-02 Refrigeration (Area; A : 12-Jan-15
Unit: F2, L3, V1

1632 -03 : CGC Stm


SMIC-I-6012 S 1632-03-HT-002 1632-03 Turbine Vcuum System 12-Jan-15
(Area:A , Unit:W5)

1454-00 : S10 Steam


SMIC-I-6012 S 1454-00-HT-001 1454-00 12-Jan-15
Area:A,

1731-01 : Debutanizer
SMIC-I-6012 S 1731-01-HT-020 1731-01 (Area:A , Unit: F1, K1, 12-Jan-15
K2, L2, L3, V4)

1471-00 : F-1250
SMIC-I-6012 S 1471-00-HT-005 1471-00 (Furnace Blowdown) 12-Jan-15

1471-00 : F-1150
SMIC-I-6012 S 1471-00-HT-010 1471-00 12-Jan-15
(Furnace Blowdown)

1714-00: C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-077 1714-00 13-Jan-15
( Area: A, Unit:V2)

1681-00 : Deprop O/H


SMIC-I-6017 S 1681-00-HT-022 1681-00 (Area: A , Unit: F1 ) 13-Jan-15

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-006 1704-02 Refrigeration (Area: A , 13-Jan-15
Unit: F2, L3, V1 )
1671-01 : Deprop O/H
SMIC-I-6015 S 1671-01-HT-001 1671-01 Compressor Suction 13-Jan-15
(Area; A : Unit: V1 )

1662-01 LP
SMIC-I-6015 S 1662-01-HT-003 1662-01 Depropanizer (Area:A, 13-Jan-15
Unit: F1,L3)

1691-01 : Deethanizers
SMIC-I-6015 S 1691-01-HT-008 1691-01 ( Area:A, Unit: F2, L3) 13-Jan-15

1661-01 HP
SMIC-I-6015 S 1661-01-HT-011 1661-01 Depropanizer (Area:A, 13-Jan-15
Unit: F1,L2)

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-013 1704-02 Refrigeratio (Area: A, 13-Jan-15
Unit: L3, V1 )

1611-02 : F-1210
SMIC-I-6014 W 1611-02-HT-023 1611-02 13-Jan-15
Process

1611-02 : F-1210
SMIC-I-6014 W 1611-02-HT-025 1611-02 13-Jan-15
Process

1612-02 : F-1220
SMIC-I-6014 W 1612-02-HT-023 1612-02 Process 13-Jan-15

1625-00 : Dilution
SMIC-I-6014 S 1625-00-HT-002 1625-00 13-Jan-15
Steam Generation

1631-04 : CGC Sealing


SMIC-I-6013 S 1631-04-HT-027 1631-04 Steam System ( Area: A 14-Jan-15
; Unit: W5 )

1631-04 : CGC Stm


SMIC-I-6013 S 1631-04-HT-049 1631-04 Sealing Steam System 14-Jan-15
(Area: A ; Unit: W5 )

1631-04 : CGC Stm


SMIC-I-6013 S 1631-04-HT-050 1631-04 Sealing Steam System 14-Jan-15
(Area: A ; Unit: W5 )
1744-01 : Dry Flare
SMIC-I-6013 S 1744-01-HT-010 1744-01 14-Jan-15
( Area: A ; Unit: G3 )

1684-01 : Turbo
SMIC-I-6016 S 1684-01-HT-001 1684-01 Expanders (Area: A ; 14-Jan-15
Unit: F4)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-024 1714-00 refrigeration (Area: A, 14-Jan-15
Unit: F2 )

1661-01 HP
SMIC-I-6016 S 1661-01-HT-011 1661-01 Depropanizer (Area:A, 14-Jan-15
Unit: F1,L2)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-013 1704-02 Refrigeratio (Area: A, 14-Jan-15
Unit: L3, V1 )

1601-02, F-1110
SMIC-I-6012 S 1601-02-HT-025 1601-02 14-Jan-15
Process Furnace

1601-02, F-1110
SMIC-I-6012 S 1601-02-HT-026 1601-02 14-Jan-15
Process Furnace

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-025 1613-02 PROCESS (FURNACE) 14-Jan-15

1601-02 : F-1110
SMIC-I-6014 W 1601-02-HT-022 1601-02 14-Jan-15
Process ( Furnace )

1601-02 :F-1110
SMIC-I-6014 W 1601-02-HT-001 1601-02 Process 14-Jan-15
Furnace

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-028 1613-02 PROCESS (FURNACE) 14-Jan-15

SMIC-I-6013 S 1613-02-HT-023 1613-02 1613-02: F-1230 14-Jan-15


PROCESS (FURNACE)
1605-02: F-1110
SMIC-I-6013 S 1601-02-HT-028 1601-02 14-Jan-15
Process

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-007 1456-00 15-Jan-15
( Area: A, Unit: G3, N3 )

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-002 1731-01 (Area: A, Unit: V4) 15-Jan-15

1712-02: C3R Stm


turbine Surface
SMIC-I-6013 S 1712-02-HT-004 1712-02 15-Jan-15
Condensate ( Area A.
Unit V2)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-006 1704-02 Refrigeration (Area: A , 15-Jan-15
Unit: F2, L3, V1 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-024 1714-00 refrigeration (Area: A, 15-Jan-15
Unit: F2 )

1661-01 HP
SMIC-I-6017 S 1661-01-HT-011 1661-01 Depropanizer (Area:A, 15-Jan-15
Unit: F1,L2)

1601-02: F-1110
SMIC-I-6014 W 1601-02-HT-023 1601-02 Process 15-Jan-15

1601-02: F-1110
SMIC-I-6014 W 1601-02-HT-024 1601-02 15-Jan-15
Process

1601-02: F-1110
SMIC-I-6014 W 1601-02-HT-027 1601-02 15-Jan-15
Process

1601-02: F-1110
SMIC-I-6014 W 1601-02-HT-028 1601-02 Process 15-Jan-15

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-013 1704-02 Refrigeratio (Area: A, 15-Jan-15
Unit: L3, V1 )
1681-00 : Deprop O/H
SMIC-I-6017 S 1681-00-HT-025 1681-00 15-Jan-15
Sysytem

1691-01 : Deethanizers
SMIC-I-6015 S 1691-01-HT-008 1691-01 15-Jan-15
( Area:A, Unit: F2, L3)

1601-02, F-1110
SMIC-I-6013 S 1601-02-HT-025 1601-02 Process Furnace 15-Jan-15

1601-02, F-1110
SMIC-I-6013 S 1601-02-HT-026 1601-02 15-Jan-15
Process Furnace

1681-00: Deprop O/H


System (Area: A,
SMIC-I-6012 S 1681-00-HT-001 1681-00 15-Jan-15
Unit:L2, L3, M1, N1,
V1)

1704-02, C2
SMIC-I-6015 S 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 15-Jan-15
F3, L3, L4, V1)

1701-02, C2R
SMIC-I-6015 S 1701-01-HT-004 1701-01 Compressor (F2, L3, 15-Jan-15
V1)

1471-00, F-1140,
SMIC-I-6012 S 1471-00-HT-009 1471-00 Furnace Blowdown 15-Jan-15

1471-00, Furnace
SMIC-I-6012 S 1471-00-HT-001 1471-00 15-Jan-15
Blowdown

1456-00 : SLL Steam


SMIC-I-6013 S 1456-00-HT-007 1456-00 16-Jan-15
( Area: A, Unit: G3, N3 )

1454-00 : S10 Steam


SMIC-I-6013 S 1454-01-HT-001 1454-01 Line (Area: B4, Unit: 16-Jan-15
AF, AR,BF,BR)

1454-00 : S10 Steam


SMIC-I-6013 S 1454-01-HT-001 1454-01 Line ( Area A. Unit L3, 16-Jan-15
V1, V2, W5)
1631-04 : CGC Sealing
SMIC-I-6013 S 1631-04-HT-030 1631-04 Steam System(Area:A, 16-Jan-15
Unit: W5)

1466-00 : CH
SMIC-I-6013 S 1466-00-HT-016 1466-00 Condensate (3.5 bar) 16-Jan-15
( Area: A ; Unit: G3 )

1634-00 : LP Drips
SMIC-I-6013 S 1634-00-HT-024 1634-00 Stripper (Area: A, Unit: 16-Jan-15
W5 )

1634-00 : LP Drips
SMIC-I-6013 S 1634-00-HT-025 1634-00 Stripper (Area: A, Unit: 16-Jan-15
W5 )

1514-01 : F-1240 BFW,


SMIC-I-6014 W 1514-01-HT-030 1514-01 Steam Drums & SVH 16-Jan-15
Side

1514-01 : F-1240 BFW,


SMIC-I-6014 W 1514-01-HT-031 1514-01 Steam Drums & SVH 16-Jan-15
Side

1514-01 : F-1250 BFW,


SMIC-I-6014 W 1515-01-HT-030 1515-01 Steam Drums & SVH 16-Jan-15
Side

1514-01 : F-1250 BFW,


SMIC-I-6014 W 1515-01-HT-031 1515-01 Steam Drums & SVH 16-Jan-15
Side

1714-00: C3R
SMIC-I-6018 W 1714-00-HT-002 1714-00 Refrigeration (Area:A, 16-Jan-15
Unit V4 )

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-013 1704-02 Refrigeratio (Area: A, 16-Jan-15
Unit: L3, V1 )

1704-02 : C2
SMIC-I-6016 S 1701-01-HT-007 1701-01 Refrigeratio (Area: A, 16-Jan-15
Unit: F2, L3 )

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-028 1704-02 Refrigeratio (Area: A, 16-Jan-15
Unit: F2, L3 )
1704-02 : C2
SMIC-I-6016 S 1704-02-HT-015 1704-02 Refrigeration (Area; A : 16-Jan-15
Unit: F2, L3, V1

1602-02, F-1120
SMIC-I-6012 S 1602-02-HT-025 1602-02 16-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6012 S 1602-02-HT-026 1602-02 Process Furnace 16-Jan-15

1602-02, F-1120
SMIC-I-6013 S 1602-02-HT-027 1602-02 16-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6013 S 1602-02-HT-028 1602-02 16-Jan-15
Process Furnace

SMIC-I-6011 W TCC LAYDOWN YARD 17-Jan-15

1602-02, F-1120
SMIC-I-6013 S 1602-02-HT-025 1602-02 17-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6013 S 1602-02-HT-026 1602-02 Process Furnace 17-Jan-15

1601-02, F-1110
SMIC-I-6014 W 1601-02-HT-025 1601-02 17-Jan-15
Process Furnace

1601-02, F-1110
SMIC-I-6014 W 1601-02-HT-026 1601-02 17-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-027 1602-02 Process Furnace 17-Jan-15

SMIC-I-6014 W 1602-02-HT-028 1602-02 1602-02, F-1120 17-Jan-15


Process Furnace
1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-022 1602-02 17-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-023 1602-02 17-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-024 1602-02 Process Furnace 17-Jan-15

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-023 1613-02 17-Jan-15
PROCESS (FURNACE)

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-025 1613-02 17-Jan-15
PROCESS (FURNACE)

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-028 1613-02 17-Jan-15
PROCESS (FURNACE)

1662-01 : LP
SMIC-I-6013 S 1662-01-HT-019( 1662-01 Depropanizer (Area: A, 17-Jan-15
Unit: F1)

1662-01 : LP
SMIC-I-6013 S 1662-01-HT-020 1662-01 Depropanizer (Area: A, 17-Jan-15
Unit: F1)

1661-01 : LP
SMIC-I-6013 S 1661-01-HT-022 1661-01 Depropanizer (Area: A, 17-Jan-15
Unit: F1)

1471-00 : F-1210
SMIC-I-6013 S 1471-00-HT-012 1471-00 18-Jan-15
(Furnace Blowdown)

1471-00 : F-1220
SMIC-I-6013 S 1471-00-HT-013 1471-00 (Furnace Blowdown) 18-Jan-15

SMIC-I-6013 S 1471-00-HT-014 1471-00 1471-00 : F-1230 18-Jan-15


(Furnace Blowdown)
1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-025 1602-02 18-Jan-15
Process Furnace

1602-02, F-1120
SMIC-I-6014 W 1602-02-HT-026 1602-02 18-Jan-15
Process Furnace

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-001 1606-02 Process ( Furnace ) 18-Jan-15

1661-01 HP
SMIC-I-6018 W 1661-01-HT-011 1661-01 Depropanizer (Area:A, 18-Jan-15
Unit: F1,L2)

1613-02 :F-1230
SMIC-I-6014 W 1613-02-HT-021 1613-02 Process 18-Jan-15
( Furnace )

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-023 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-024 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-025 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-026 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1607-02 : F-1170
SMIC-I-6014 W 1607-02-HT-027 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-022 1607-02 Process ( Furnace ) 18-Jan-15

SMIC-I-6013 S 1471-00-HT-015 1471-00 1471-00 : F-1240 18-Jan-15


(Furnace Blowdown)
1471-00 : F-1250
SMIC-I-6013 S 1471-00-HT-005 1471-00 18-Jan-15
(Furnace Blowdown)

1704-02 : C2
SMIC-I-6017 S 1701-01-HT-007 1701-01 Refrigeratio (Area: A, 18-Jan-15
Unit: F2, L3 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-028 1704-02 Refrigeratio (Area: A, 18-Jan-15
Unit: F2, L3 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-015 1704-02 Refrigeration (Area; A : 18-Jan-15
Unit: F2, L3, V1

1625-00, Dilution
SMIC-I-6012 S 1625-00-HT-005 1625-00 Steam Generation 18-Jan-15
(Area: B2, Area: H3 )

1453-00, SM STEAM
SMIC-I-6012 S 1453-00-HT-001 1453-00 (Area: A, Unit: L1, L2, 18-Jan-15
L3,V1, V2, W5)

1625-00 : DILUTION
SMIC-I-6012 S 1625-00-HT-002 1625-00 STEAM GENERATION ( 18-Jan-15
E/W PIPE RACK)

1712-01 : C3R
SMIC-I-6012 S 1712-01-HT-017 1712-01 ( Area: A, Unit: V2) 18-Jan-15

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-007 1682-01 Reactors ( Area: A, 18-Jan-15
Unit: M1)

1682-01 : Acetylene
SMIC-I-6012 S 1682-01-HT-008 1682-01 Reactors ( Area: A, 18-Jan-15
Unit: M1)

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-030 1714-00 Refrigeration ( Area: A, 18-Jan-15
Unit: V2, V3)

1701-01 : C2R
SMIC-I-6015 S 1701-01-HT-006 1701-01 Compressor ( Area: A, 18-Jan-15
Unit: F2)
1607-02 : F-1170
SMIC-I-6013 S 1607-02-HT-028 1607-02 Process (Gas Furnace 18-Jan-15
Area)

1606-02: F-1160
SMIC-I-6013 W 1606-02-HT-026 1606-02 19-Jan-15
Process ( Furnace )

1606-02: F-1160
SMIC-I-6013 W 1607-02-HT-026 1607-02 Process ( Furnace ) 19-Jan-15

1641-00 : Caustic
SMIC-I-6015 S 1641-00-HT-024 1641-00 Wash ( Area: A, Unit: 19-Jan-15
G1)

1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-025 1606-02 19-Jan-15
Process ( Furnace )

1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-028 1606-02 19-Jan-15
Process ( Furnace )

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-028 1704-02 Refrigeratio (Area: A, 19-Jan-15
Unit: F2, L3 )

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-023 1606-02 Process ( Furnace ) 19-Jan-15

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-024 1606-02 19-Jan-15
Process ( Furnace )

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-022 1606-02 19-Jan-15
Process ( Furnace )

1454-00 : S10 Steam


SMIC-I-6014 W 1454-00-HT-001 1454-00 Line (Area: B4, Unit: 19-Jan-15
AF, AR,BF,BR)

SMIC-I-6014 W 1602-02-HT-001 1602-02 1602-02: F-1120 19-Jan-15


Process ( Furnace )
1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-001 1607-02 19-Jan-15
Process ( Furnace )

1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-028 1607-02 19-Jan-15
Process ( Furnace )

1624-02 : Process
Condensate Holding
SMIC-I-6012 S 1624-02-HT-001 1624-02 Tank (Area:A, Unit: G3, 19-Jan-15
L1)

1453-00, SM STEAM
SMIC-I-6012 S 1453-00-HT-011 1453-00 19-Jan-15
(Area: A, Unit: L2)

1744-02 : WET FLARE


SMIC-I-6012 S 1744-02-HT-008 1744-02 19-Jan-15
(Area: A, Unit: G3)

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-037 1631-04 Steam System (Area: A, 19-Jan-15
Unit: W5)

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-034 1631-04 Steam System (Area:A, 19-Jan-15
Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6012 S 1631-04-HT-035 1631-04 Steam System (Area:A, 19-Jan-15
Unit: W5 )

1625-00, Dilution
SMIC-I-6013 S 1625-00-HT-005 1625-00 Steam Generation 20-Jan-15
(Area: A, Unit: H3)

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-025 1606-02 20-Jan-15
Process (Furnace)

1606-02: F-1160
SMIC-I-6013 S 1606-02-HT-028 1606-02 Process (Furnace) 20-Jan-15

SMIC-I-6014 W 1606-02-HT-026 1606-02 1606-02: F-1160 20-Jan-15


Process (Furnace)
1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-026 1607-02 20-Jan-15
Process (Furnace)

1454-00 : S10 Steam


SMIC-I-6014 S 1454-00-HT-001 1454-00 Line (Area: B4, Unit: 20-Jan-15
AF, AR,BF,BR)

TP: 1531-01-HT-001
SMIC-I-6012 S 1531-01-HT-001 1531-01 1531-01 : BFV (Area A, 20-Jan-15
Unit T1,T2,T3)

1662-01, LP
SMIC-I-6015 S 1662-01-HT-002 1662-01 Depropanizer (Area: A, 20-Jan-15
Unit: F1, )

1662-01, LP
SMIC-I-6012 S 1662-01-HT-001 1662-01 Depropanizer (Area: A, 20-Jan-15
Unit: F1, L3, )

1511-01 : F-1210 BFW,


SMIC-I-6014 W 1511-01-HT-009 1511-01 Steam Drum & SVH 21-Jan-15
Side (Furnace Area)

1512-01 : F-1220 BFW,


SMIC-I-6014 W 1512-01-HT-009 1512-01 Steam Drum & SVH 21-Jan-15
Side (Furnace Area)

1512-01 : F-1230 BFW,


SMIC-I-6014 W 1513-01-HT-009 1513-01 Steam Drum & SVH 21-Jan-15
Side (Furnace Area)

1512-01 : F-1240 BFW,


SMIC-I-6014 W 1514-01-HT-009 1514-01 Steam Drum & SVH 21-Jan-15
Side (Furnace Area)

1512-01 : F-1250 BFW,


SMIC-I-6014 W 1515-01-HT-009 1515-01 Steam Drum & SVH 21-Jan-15
Side (Furnace Area)

1471-00 : F-1210
SMIC-I-6014 W 1471-00-HT-012 1471-00 (Furnace Blowdown) 21-Jan-15

SMIC-I-6014 W 1471-00-HT-013 1471-00 1471-00 : F-1220 21-Jan-15


(Furnace Blowdown)
1471-00 : F-1230
SMIC-I-6014 W 1471-00-HT-014 1471-00 21-Jan-15
(Furnace Blowdown)

1471-00 : F-1240
SMIC-I-6014 W 1471-00-HT-015 1471-00 21-Jan-15
(Furnace Blowdown)

1471-00 : F-1250
SMIC-I-6014 W 1471-00-HT-005 1471-00 (Furnace Blowdown) 21-Jan-15

1714-00: C23
SMIC-I-6018 W 1714-00-HT-004 1714-00 Refrigeration 21-Jan-15
( Area: A, Unit: V2)

1701-03: N2
SMIC-I-6015 S 1701-03-HT-010 1701-03 Refrigeration 21-Jan-15
( Area: A, Unit: N2)

1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-025 1604-02 Process (Gas Furnace 21-Jan-15
Area)

1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-028 1604-02 Process (Gas Furnace 21-Jan-15
Area)

1605-02: F-1150
SMIC-I-6014 W 1605-02-HT-022 1605-02 Process ( Furnace ) 22-Jan-15

1605-02: F-1150
SMIC-I-6014 W 1605-02-HT-024 1605-02 22-Jan-15
PROCESS (FURNACE)

1605-02 : F-1150
SMIC-I-6014 W 1605-02-HT-023 1605-02 Process (Gas Furnace 22-Jan-15
Area)

1605-02: F-1150
SMIC-I-6014 W 1605-02-HT-001 1605-02 Process ( Furnace ) 22-Jan-15

SMIC-I-6014 W 1604-02-HT-001 1604-02 1604-02: F-1140 22-Jan-15


Process ( Furnace )
1604-02: F-1140
SMIC-I-6014 W 1604-02-HT-022 1604-02 22-Jan-15
Process ( Furnace )

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-023 1604-02 Process (Gas Furnace 22-Jan-15
Area)

1604-02: F-1140
SMIC-I-6014 W 1604-02-HT-024 1604-02 PROCESS (FURNACE) 22-Jan-15

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-025 1604-02 Process (Gas Furnace 22-Jan-15
Area)

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-006 1704-02 Refrigeration (Area: A , 22-Jan-15
Unit: F2, L3, V1 )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-024 1714-00 refrigeration (Area: A, 22-Jan-15
Unit: F2 )

1671-02- :Deprop O/H


SMIC-I-6018 S 1671-02-HT-002 1671-02 22-Jan-15
Compressor

1606-02 : F-1160
SMIC-I-6014 W 1606-02-HT-027 1606-02 Process (Gas Furnace 22-Jan-15
Area)

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-020 1731-01 (Area:A , Unit: F1, K1, 22-Jan-15
K2, L2, L3, V4)

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-028 1605-02 22-Jan-15
PROCESS (FURNACE)

1605-02: F-1150
SMIC-I-6013 S 1605-02-HT-027 1605-02 Process 22-Jan-15

1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-026 1604-02 Process (Gas Furnace 22-Jan-15
Area)
1604-02 : F-1140
SMIC-I-6013 S 1604-02-HT-027 1604-02 Process (Gas Furnace 22-Jan-15
Area)

1671-01 : Deprop O/H


SMIC-I-6016 S 1671-01-HT-001 1671-01 Compressor Suction 22-Jan-15
(Area; A : Unit: V1 )

1681-00 : Deprop O/H


SMIC-I-6018 S 1681-00-HT-025 1681-00 Sysytem 23-Jan-15

1625-00, Dilution
SMIC-I-6014 W 1625-00-HT-005 1625-00 Steam Generation 23-Jan-15
(Area: A, Unit: H3 )

SMIC-I-6012 S 1453-00-HT-001 1453-00 1453-00: SM STEAM 23-Jan-15

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-076 1714-00 REFRIGERATION @ V2 23-Jan-15
AREA

1711-01: C3R
SMIC-I-6012 S 1711-01-HT-014 1711-01 COMPRESSOR @ V2 23-Jan-15
AREA

1681-00: Deprop O/H


SMIC-I-6012 S 1681-00-HT-001 1681-00 System (Area: A, 23-Jan-15
Unit:L2, N1)

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-025 1605-02 Process (Gas Furnace 23-Jan-15
Area)

1605-02 : F-1150
SMIC-I-6012 S 1605-02-HT-026 1605-02 Process (Gas Furnace 23-Jan-15
Area)

1681-00: Deprop O/H


System (Area: A,
SMIC-I-6013 S 1681-00-HT-001 1681-00 Unit:L2, L3, M1, N1, 23-Jan-15
V1)
1681-00: Deprop O/H
SMIC-I-6014 S 1681-00-HT-001 1681-00 System (Area: A, 24-Jan-15
Unit:L2, L3, M1, N1,
V1)
1605-02: F-1150
SMIC-I-6014 W 1605-02-HT-028 1605-02 24-Jan-15
PROCESS (FURNACE)

1605-02: F-1150
SMIC-I-6014 W 1605-02-HT-027 1605-02 24-Jan-15
Process

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-026 1604-02 Process (Gas Furnace 24-Jan-15
Area)

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-027 1604-02 Process (Gas Furnace 24-Jan-15
Area)

1671-02 : DEPROP O/H


SMIC-I-6014 S 1671-02-HT-002 1671-02 24-Jan-15
COMPRESSOR

1671-01 : Deprop O/H


SMIC-I-6017 S 1671-01-HT-001 1671-01 Compressor Suction 24-Jan-15
(Area; A : Unit: V1 )

1631-04 : CGC Sealing


SMIC-I-6013 S 1631-04-HT-028 1631-04 Steam System (Area: A, 24-Jan-15
Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6013 S 1631-04-HT-040 1631-04 Steam System (Area: A, 24-Jan-15
Unit: W5 )

1632-01 : CGC (Area:A,


SMIC-I-6013 S 1632-01-HT-003 1632-01 24-Jan-15
Unit: W5)

1701-01 : C2
Compressor
SMIC-I-6017 S 1701-01-HT-003 1701-01 24-Jan-15
( Area: A,
Unit:V1)

1701-02, C2R
SMIC-I-6016 S 1701-01-HT-004 1701-01 Compressor (F2, L3, 24-Jan-15
V1)

SMIC-I-6014 W 1603-02-HT-022 1603-02 1603-02 : F-1130 25-Jan-15


Process ( Furnace )
1603 -02 : F-1130
SMIC-I-6014 W 1603-02-HT-023 1603-02 25-Jan-15
Process

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-024 1603-02 25-Jan-15
PROCESS (FURNACE)

1603 -02 : F-1130


SMIC-I-6014 W 1603-02-HT-027 1603-02 Process 25-Jan-15

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-001 1603-02 25-Jan-15
Process ( Furnace )

1671-01 : Deprop O/H


SMIC-I-6018 W 1671-01-HT-001 1671-01 Compressor Suction 25-Jan-15
(Area; A : Unit: V1 )

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-025 1603-02 25-Jan-15
Process ( Furnace )

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-028 1603-02 25-Jan-15
Process ( Furnace )

1683-03: Methane
wash and cold box
SMIC-I-6015 S 1683-03-HT-028 1683-03 Process ( Area: A Unit: 25-Jan-15
F4&L4)

1603-02 : F-1130
SMIC-I-6013 S 1603-02-HT-026 1603-02 Process (Gas Furnace 25-Jan-15
Area)
TP: 1531-01-HT-001

SMIC-I-6013 S 1531-01-HT-001 1531-01 25-Jan-15


1531-01 : BFV (Area
A, Unit T1,T2,T3)
KIC MATERIAL
INSULATION ACCESSORY
SMIC-I-6011 W & JACKETING MATERIAL STORAGE AREA IN 25-Jan-15
JUBAIL

KIC MATERIAL
SMIC-I-6011 W COLD PIR INSULATION STORAGE AREA @ TCC 25-Jan-15
MATERIAL
LAYDOWN
1704-02 : C2
SMIC-I-6018 S 1704-02-HT-015 1704-02 Refrigeration (Area; A : 26-Jan-15
Unit: F2, L3, V1

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-001 1705-01 ( Area: A, 26-Jan-15
Unit:F2)

1681-00: Deprop O/H


SMIC-I-6018 W 1681-00-HT-011 1681-00 System ( Area: A, Unit: 26-Jan-15
F3)

1701-01: C2R
SMIC-I-6018 W 1701-01-HT-011 1701-01 Compressor ( Area: A, 26-Jan-15
Unit:F2 )

1691-01 : Deethanizer
SMIC-I-6018 S 1691-01-HT-024 1691-01 (Area: A, Unit: F2, F3, 26-Jan-15
L3, L4, )

1681-00 : Deprop O/H


SMIC-I-6012 S 1681-00-HT-002 1681-00 System (Area: A, Unit: 26-Jan-15
M1)

1452-00 : SH Steam
SMIC-I-6012 S 1452-00-HT-016 1452-00 26-Jan-15
(Area: A, Unit: L2 )

1731-01 : Debutanizer
SMIC-I-6012 S 1731-01-HT-001 1731-01 (Area: A, Unit: 26-Jan-15
K1,K2,L1,L2,T3,V4

1731-01 : Debutanizer
SMIC-I-6012 S 1731-01-HT-003 1731-01 (Area: A, Unit: 26-Jan-15
K1,K2,L1,L2,T3,V4

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-025 1714-00 Refrigeration (Area: A , 26-Jan-15
Unit: F2, F4, L3, L4 )

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-025 1683-03 Wash & Cold Box 26-Jan-15
(Area: A , Unit: F4 )

1704-02, C2
SMIC-I-6016 S 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 26-Jan-15
F3, L3, L4, V1)
1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-008 1682-01 Reactors ( Area: A, 26-Jan-15
Unit: M1)

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-003 1704-02 Refrigeration (Area: A , 26-Jan-15
Unit: F2, F3, F4, L3, L4 )

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6013 S 1631-01-HT-001 1631-01 (Area: A , Unit: F1, L2, 26-Jan-15
L3, W5 )

1662-01, LP
SMIC-I-6013 S 1662-01-HT-001 1662-01 Depropanizer (Area: A, 26-Jan-15
Unit: F1, L3, )

1662-01 : LP
SMIC-I-6013 S 1662-01-HT-015 1662-01 Depropanizer (Area: A, 26-Jan-15
Unit: F1 )

1711-01: C3R
SMIC-I-6013 S 1711-01-HT-014 1711-01 COMPRESSOR @ V2 26-Jan-15
AREA

1683-01 : Primary
SMIC-I-6018 W 1683-01-HT-004 1683-01 Demethanizers (Area: 27-Jan-15
A , Unit: F3)

1683-01 : Primary
SMIC-I-6018 W 1683-01-HT-005 1683-01 Demethanizers (Area: 27-Jan-15
A , Unit: F3)

1661-01 : HP
SMIC-I-6018 W 1661-01-HT-009 1661-01 Depropanizer (Area: 27-Jan-15
A , Unit: F1)

1632-03 : CGC Stm


Turbine Vacuum
SMIC-I-6014 W 1632-03-HT-001 1632-03 27-Jan-15
System (Area: A ; Unit:
W5)

1731-01 : Debutanizer
SMIC-I-6014 S 1731-01-HT-020 1731-01 (Area:A , Unit: F1, K1, 27-Jan-15
K2, L2, L3, V4)

1681-00 : Deprop O/H


SMIC-I-6013 S 1681-00-HT-002 1681-00 System (Area: A, Unit: 27-Jan-15
M1)
1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-016 1452-00 27-Jan-15
(Area: A, Unit: L2 )

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-001 1731-01 (Area: A, Unit: 27-Jan-15
K1,K2,L1,L2,T3,V4

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-003 1731-01 (Area: A, Unit: 27-Jan-15
K1,K2,L1,L2,T3,V4

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-025 1714-00 Refrigeration (Area: A , 27-Jan-15
Unit: F2, F4, L3, L4 )

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-025 1683-03 Wash & Cold Box 27-Jan-15
(Area: A , Unit: F4 )

1704-02, C2
SMIC-I-6017 S 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 27-Jan-15
F3, L3, L4, V1)

1701-02, C2R
SMIC-I-6017 S 1701-01-HT-004 1701-01 Compressor (F2, L3, 27-Jan-15
V1)

1662-01, LP
SMIC-I-6016 S 1662-01-HT-002 1662-01 Depropanizer (Area: A, 27-Jan-15
Unit: F1, )

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-025 1603-02 27-Jan-15
Process ( Furnace )

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-028 1603-02 27-Jan-15
Process ( Furnace )

1662-01: LP
SMIC-I-6012 S 1662-01-HT-016 1662-01 Depropanizer Area: A 27-Jan-15
@ Unit: F1, L3

1704-02, C2
SMIC-I-6018 S 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 28-Jan-15
F3, L3, L4, V1)
1704-02 : C2
SMIC-I-6018 S 1701-01-HT-007 1701-01 Refrigeratio (Area: A, 28-Jan-15
Unit: F2, L3 )

1681-00 : Deprop O/H


SMIC-I-6018 W 1681-00-HT-007 1681-00 System (Area: A ; Unit: 28-Jan-15
F3 )

1681-01: Deprop O/H


System
SMIC-I-6018 W 1681-00-HT-016 1681-00 ( Area: 28-Jan-15
A, Unit:L4,L3,F3,F1)

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-025 1603-02 28-Jan-15
Process ( Furnace )

1603-02 : F-1130
SMIC-I-6014 W 1603-02-HT-026 1603-02 Process (Gas Furnace 28-Jan-15
Area)

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-028 1603-02 28-Jan-15
Process ( Furnace )

1604-02 : F-1140
SMIC-I-6014 W 1604-02-HT-028 1604-02 Process (Gas Furnace 28-Jan-15
Area)

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-025 1606-02 Process ( Furnace ) 28-Jan-15

SMIC-I-6012 S 1531-01-HT-001 1531-01 28-Jan-15


1531-01 : BFV
(FURNACE PIPERACK)

1683-02 :
SMIC-I-6015 S 1683-02-HT-012 1683-02 28-Jan-15
Secondary
Methanizers @
Area:F3
1683-02 :
SMIC-I-6015 S 1683-02-HT-017 1683-02 Secondary 28-Jan-15
Methanizers @
Area:F3

SMIC-I-6012 S 1453-00-HT-008 1453-00 28-Jan-15


1453-00 : AM
Steam @ Area: L1 & L2
1701-01 : C2R
SMIC-I-6016 S 1701-01-HT-006 1701-01 Compressor ( Area: A, 28-Jan-15
Unit: F2)

1662-01, LP
SMIC-I-6016 S 1662-01-HT-001 1662-01 Depropanizer (Area: A, 28-Jan-15
Unit: F1, L3, )

1662-01, LP
SMIC-I-6017 S 1662-01-HT-002 1662-01 Depropanizer (Area: A, 28-Jan-15
Unit: F1, )

1662-01: LP
SMIC-I-6013 S 1662-01-HT-016 1662-01 Depropanizer Area: A 28-Jan-15
@ Unit: F1, L3
TP: 1531-01-HT-001

SMIC-I-6013 S 1531-01-HT-001 1531-01 28-Jan-15


1531-01 : BFV (Area
A, Unit T1,T2,T3)
1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-030 1714-00 Refrigeration ( Area: A, 29-Jan-15
Unit: V2, V3)

1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-018 1452-00 29-Jan-15
(Area: A, Unit: L2)

1452-00 : SH Steam
SMIC-I-6013 S 1452-00-HT-018 1452-00 (Area: A, Unit: L2) 29-Jan-15

1631-01 : CGC 1st


SMIC-I-6013 S 1631-01-HT-003 1631-01 Suc/dis & 2nd Suc 29-Jan-15
(Area: A, Unit: W5 )

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-028 1704-02 Refrigeratio (Area: A, 29-Jan-15
Unit: F2, L3 )

1682-01 : Acetylene
SMIC-I-6014 W 1682-01-HT-002 1682-01 Reactors (Area:A, Unit: 29-Jan-15
M1 )

1701-01 : C2R
SMIC-I-6017 S 1701-01-HT-006 1701-01 Compressor ( Area: A, 29-Jan-15
Unit: F2)
1471-00 : F-1160
SMIC-I-6013 S 1471-00-HT-011 1471-00 29-Jan-15
(Furnace Blowdown)

1712-01 : C3R
SMIC-I-6013 S 1712-01-HT-017 1712-01 29-Jan-15
( Area: A, Unit: V2)

1471-00 : F-1150
SMIC-I-6013 S 1471-00-HT-010 1471-00 (Furnace Blowdown) 29-Jan-15

1471-00 : (Furnace
SMIC-I-6013 S 1471-00-HT-003 1471-00 29-Jan-15
Blowdown )

1453-00, SM STEAM
SMIC-I-6013 S 1453-00-HT-011 1453-00 29-Jan-15
(Area: A, Unit: L2)

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-007 1456-00 29-Jan-15
( Area: A, Unit: G3, N3 )

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-001 1456-00 ( Area: A, Unit: L3, 29-Jan-15
L4,M1,V1 )

1662-01, LP
SMIC-I-6017 S 1662-01-HT-001 1662-01 Depropanizer (Area: A, 30-Jan-15
Unit: F1, L3, )

1531-01 : BFV
SMIC-I-6013 S 1531-01-HT-001 1531-01 30-Jan-15
(FURNACE PIPERACK)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-012 1683-02 Methanizers @ 30-Jan-15
Area:F3

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-017 1683-02 Methanizers @ 30-Jan-15
Area:F3

SMIC-I-6013 S 1453-00-HT-008 1453-00 1453-00 : AM Steam 30-Jan-15


@ Area: L1 & L2
KIC MATERIAL
INSULATION ACCESSORY
SMIC-I-6011 W STORAGE AREA IN 30-Jan-15
& JACKETING MATERIAL
JUBAIL

1701-01 : C2R
SMIC-I-6018 S 1701-01-HT-006 1701-01 Compressor ( Area: A, 31-Jan-15
Unit: F2)

1662-01, LP
SMIC-I-6018 S 1662-01-HT-001 1662-01 Depropanizer (Area: A, 31-Jan-15
Unit: F1, L3, )

1662-01, LP
SMIC-I-6018 S 1662-01-HT-002 1662-01 Depropanizer (Area: A, 31-Jan-15
Unit: F1, )

1462-00 : C42
Condensate @ unit:
SMIC-I-6012 S 1462-00-HT-001 1462-00 31-Jan-15
L1,L2,T1,T2,T3,V1,V2,
W2,W5

1682-01 : ACETYLENE
SMIC-I-6012 S 1682-01-HT-010 1682-01 31-Jan-15
REACTOR @ unit: M1

1631-02 : CGC 2nd dis /


SMIC-I-6012 S 1631-02-HT-003 1631-02 31-Jan-15
3rd Sue @ unit: W5

1651-00: DRYERS,
SMIC-I-6015 S 1651-00-HT-001 1651-00 UNIT: F1 31-Jan-15

1454-00: S10 STEAM


SMIC-I-6012 S 1454-00-HT-001 1454-00 31-Jan-15
UNIT: L1,L2,W5

1705-01: C2 Splitter
SMIC-I-6018 W 1705-01-HT-005 1705-01 1-Feb-15
( Area: A, Unit: F2 )

1661-01 : HP-
SMIC-I-6018 W 1661-01-HT-025 1661-01 Depropanizer ( Area: A, 1-Feb-15
Unit: F1)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-003 Refrigeration ( Area: A, 1-Feb-15
Unit: L3)
1455 : SL STEAM @
SMIC-I-6012 S 1455-00-HT-002 1455-00 1-Feb-15
unit: L1

1453-00 : SM STEAM
SMIC-I-6012 S 1453-00-HT-009 1453-00 1-Feb-15
@ Unit: L1

1463-00 : CM
SMIC-I-6012 S 1463-00-HT-001 1463-00 Condensate @ unit: 1-Feb-15
L3,V1,V2

1662-01: LP
SMIC-I-6014 S 1662-01-HT-016 1662-01 Depropanizer Area: A 1-Feb-15
@ Unit: F1, L3

KIC MATERIAL
HOT INSULATION STORAGE AREA WEST
SMIC-I-6011 W 1-Feb-15
MATERIAL SIDE OF DAELIM
OFFICE

1641-00 : Caustic
SMIC-I-6016 S 1641-00-HT-023 1641-00 1-Feb-15
(Area: A, Unit: G1)

1691-01 : Deethanizers
SMIC-I-6016 S 1691-01-HT-008 1691-01 1-Feb-15
(Area:A, Unit: F2, L3)

1641-00 : Caustic
SMIC-I-6016 S 1641-00-HT-023 1641-00 (Area: A, Unit: G1) 1-Feb-15

1661-00 : HP
SMIC-I-6018 W 1661-01-HT-010 1661-01 Depropanizer (Area: A , 2-Feb-15
Unit: F1)

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-033 1704-02 Refrigeration (Area: A, 2-Feb-15
Unit:F1A)

1641-00 : Caustic
SMIC-I-6018 W 1641-00-HT-023 1641-00 (Area: A, Unit: G1) 2-Feb-15

1683-02: Secondary
SMIC-I-6015 S 1683-02-HT-034 1683-02 Methanizers @ unit: 2-Feb-15
F3,F4,V3
1705-01: C2 Splitter @
SMIC-I-6015 S 1705-01-HT-003 1705-01 2-Feb-15
unit: F2,F3,L3

1682-01 : Acetylene
SMIC-I-6013 S 1682-01-HT-007 1682-01 Reactors ( Area: A, 2-Feb-15
Unit: M1)

1744-02 : WET FLARE


SMIC-I-6013 S 1744-02-HT-008 1744-02 (Area: A, Unit: G3) 2-Feb-15

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-004 1704-02 2-Feb-15
Refrigeration

1621-01: Oil Quench


SMIC-I-6012 S 1621-01-HT-001 1621-01 Tower & QO System @ 2-Feb-15
unit: Furnace Area

1631-02 : CGC 2nd dis /


SMIC-I-6013 S 1631-02-HT-003 1631-02 3-Feb-15
3rd Sue @ unit: W5

1651-00: DRYERS,
SMIC-I-6016 S 1651-00-HT-001 1651-00 3-Feb-15
UNIT: F1

1454-00: S10 STEAM


SMIC-I-6013 S 1454-00-HT-001 1454-00 UNIT: L1,L2,W5 3-Feb-15

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-004 1704-02 3-Feb-15
Refrigeration

1682-01 : ACETYLENE
SMIC-I-6013 S 1682-01-HT-010 1682-01 3-Feb-15
REACTOR @ unit: M1

1462-00 : C42
Condensate @ unit:
SMIC-I-6013 S 1462-00-HT-001 1462-00 L1,L2,T1,T2,T3,V1,V2, 3-Feb-15
W2,W5

1463-00 : CM
SMIC-I-6013 S 1463-00-HT-001 1463-00 Condensate @ unit: 3-Feb-15
L3,V1,V2
1682-01 : Acetylene
SMIC-I-6014 W 1682-01-HT-008 1682-01 Reactors ( Area: A, 3-Feb-15
Unit: M1)

1682-01 : Acetylene
SMIC-I-6014 W 1682-01-HT-007 1682-01 Reactors ( Area: A, 3-Feb-15
Unit: M1)

1691-01 : Deethanizers
SMIC-I-6018 S 1691-01-HT-008 1691-01 ( Area:A, Unit: F2, L3) 3-Feb-15

1662-01 : LP
Depropanizer
SMIC-I-6014 S 1662-01-HT-009 1662-01 3-Feb-15
( Area:
A, Unit:F1)

1453-00 : SM STEAM
SMIC-I-6013 S 1453-00-HT-009 1453-00 3-Feb-15
@ Unit: L1

1455 : SL STEAM @
SMIC-I-6013 S 1455-00-HT-002 1455-00 3-Feb-15
unit: L1

1471-00 : F-1130
SMIC-I-6013 S 1471-00-HT-008 1471-00 3-Feb-15
(Furnace Blowdown)

1471-00, F-1140,
SMIC-I-6013 S 1471-00-HT-009 1471-00 Furnace Blowdown 3-Feb-15

1471-00, Furnace
SMIC-I-6013 S 1471-00-HT-001 1471-00 3-Feb-15
Blowdown

1471-00 : F-1110
SMIC-I-6013 S 1471-00-HT-006 1471-00 3-Feb-15
(Furnace Blowdown)

1631-04 : CGC
SMIC-I-6013 S 1631-04-HT-034 1631-04 Sealing Steam System 3-Feb-15
(Area:A, Unit: W5 )

1641-00 : Caustic
SMIC-I-6016 S 1641-00-HT-024 1641-00 Wash ( Area: A, Unit: 3-Feb-15
G1)
1662-01: LP
SMIC-I-6014 W 1662-01-HT-017 1662-01 Depropanizer (Area: A ; 4-Feb-15
Unit: F1 )

1681-00 : Deprop O/H


SMIC-I-6014 S 1681-00-HT-002 1681-00 System (Area: A, Unit: 4-Feb-15
M1)

1681-00 : Deprop O/H


SMIC-I-6018 W 1681-00-HT-010 1681-00 System ( Area: A, 4-Feb-15
Unit:F3 )

1531-01 : BFV
SMIC-I-6014 S 1531-01-HT-001 1531-01 4-Feb-15
(FURNACE PIPERACK)

1731-01 : Debutanizer
SMIC-I-6012 S 1731-01-HT-020 1731-01 4-Feb-15
(Area:A , Unit: K1,K2,L2

1731-01 : HFO
SMIC-I-6012 S 1621-02-HT-001 1621-02 Separatoer (Area:A , 4-Feb-15
Unit: Furnace Area

1631-04 : CGC
SMIC-I-6013 S 1631-04-HT-035 1631-04 Sealing Steam System 4-Feb-15
(Area:A, Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6013 S 1631-04-HT-037 1631-04 Steam System ( Area: 4-Feb-15
A, Unit: W5)

1771-00 : Methanol
SMIC-I-6013 S 1771-00-HT-018 1771-00 4-Feb-15
( Area: A, Unit: G3 )

1662-01 : LP
SMIC-I-6016 S 1662-01-HT-031 1662-01 Depropanizer ( Area: 4-Feb-15
A, Unit:F1A)

SMIC-I-6013 S 1453-00-HT-001 1453-00 1453-00: SM STEAM 4-Feb-15

SMIC-I-6014 W 1744-02-HT-008 1744-02 1744-02 : WET FLARE 5-Feb-15


(Area: A, Unit: G3)
1632-01 : CGC (Area:A,
SMIC-I-6014 W 1632-01-HT-003 1632-01 5-Feb-15
Unit: W5)

1662-01: LP
SMIC-I-6014 W 1662-01-HT-018 1662-01 Depropanizer (Area: A ; 5-Feb-15
Unit: F1 )

1631-04 : CGC Sealing


SMIC-I-6014 S 1631-04-HT-028 1631-04 Steam System (Area: A, 5-Feb-15
Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6014 S 1631-04-HT-030 1631-04 Steam System(Area:A, 5-Feb-15
Unit: W5)

SMIC-I-6014 S 1453-00-HT-001 1631-04 1453-00: SM STEAM 5-Feb-15

1631-04 : CGC Sealing


SMIC-I-6013 S 1631-04-HT-042 RT1 1631-04 Steam System ( Area: 5-Feb-15
A, Unit: W5 )

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-058 1683-02 Methanizers ( Area: A, 5-Feb-15
Unit: F3)

1683-02 : Secondary
SMIC-I-6015 S 1683-02-HT-057 1683-02 Methanizers ( Area: A, 5-Feb-15
Unit: F3)

1683-03 : Methane
SMIC-I-6015 S 1683-03-HT-018 1683-03 wash and Cold box 5-Feb-15
( Area: A, Unit: F4)

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-001 1456-00 ( Area: A, Unit: 5-Feb-15
FURNACE AREA)

1632 -03 : CGC Stm


SMIC-I-6013 S 1632-03-HT-002 1632-03 Turbine Vcuum System 5-Feb-15
(Area:A , Unit:W5)

1661-01 : LP
SMIC-I-6013 S 1661-01-HT-004 1661-01 Depropanizer (Area: A, 5-Feb-15
Unit:F1)
1625-00 : DILUTION
SMIC-I-6013 S 1625-00-HT-002 1625-00 STEAM GENERATION ( 5-Feb-15
E/W PIPE RACK)

1683-02: Secondary
SMIC-I-6016 S 1683-02-HT-020 1683-02 Methanizres ( Area: 6-Feb-15
A,Unit: F3)

1691-01 : Deethanizer
SMIC-I-6016 S 1691-01-HT-002 1691-01 r ( Area: A ; Unit: F2 ) 6-Feb-15

1453-00, SM STEAM
SMIC-I-6013 S 1453-00-HT-001 1453-00 (Area: A, Unit: L1, L2, 6-Feb-15
L3,V1, V2, W5)

1456-00 : SLL Steam


SMIC-I-6013 S 1456-00-HT-001 1456-00 ( Area: A, Unit: 7-Feb-15
FURNACE AREA)

1631-04 : CGC Sealing


SMIC-I-6014 W 1631-04-HT-042 RT1 1631-04 Steam System ( Area: 7-Feb-15
A, Unit: W5 )

1623-02: F-PYGAS
SMIC-I-6014 W 1623-02-HT-002 1623-02 IMPORT ( AREA: 4 ; 7-Feb-15
UNIT: BRA )

1682-01 : Acetylene
SMIC-I-6014 S 1682-01-HT-006 Reactors (Area: A , 7-Feb-15
Unit: M1 )

1662-01 : LP
SMIC-I-6017 S 1662-01-HT-031 1662-01 Depropanizer (Area: A, 8-Feb-15
Unit:F1A)

1471-00 : F-1120
SMIC-I-6013 S 1471-00-HT-007 1471-00 8-Feb-15
(Furnace Blowdown)

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-030 1714-00 Refrigeration ( Area: A, 8-Feb-15
Unit: V2, V3,L4)

1662-01 LP
SMIC-I-6016 S 1662-01-HT-003 1662-01 Depropanizer (Area:A, 8-Feb-15
Unit: F1,L3)
1456-00 : SLL Steam
SMIC-I-6013 S 1456-00-HT-001 1456-00 ( Area: A, Unit: L3, 8-Feb-15
L4,M1,V1 )

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-025 1714-00 Refrigeration (Area: A , 8-Feb-15
Unit: F2, F4, L3, L4 )

1453-00, SM STEAM
SMIC-I-6013 S 1453-00-HT-001 1453-00 (Area: A, Unit: L1, L2, 8-Feb-15
L3,V1, V2, W5)

1531-01 : BFV
SMIC-I-6014 s 1531-01-HT-001 1531-01 8-Feb-15
(FURNACE PIPERACK)

1731-01 : Debutanizer
SMIC-I-6013 S 1731-01-HT-020 1731-01 8-Feb-15
(Area:A , Unit: K1,K2,L2

1731-01 : HFO
SMIC-I-6013 S 1621-02-HT-001 1621-02 Separatoer (Area:A , 8-Feb-15
Unit: Furnace Area

1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-020 1683-02 Methanizres ( Area: 8-Feb-15
A,Unit: F3)

1691-01 : Deethanizer
SMIC-I-6017 S 1691-01-HT-002 1691-01 r ( Area: A ; Unit: F2 ) 8-Feb-15

1621-01: Oil Quench


SMIC-I-6013 S 1621-01-HT-001 1621-01 Tower & QO System @ 8-Feb-15
unit: Furnace Area

1683-02: Secondary
SMIC-I-6016 S 1683-02-HT-034 1683-02 Methanizers @ unit: 8-Feb-15
F3,F4,V3

1705-01: C2 Splitter @
SMIC-I-6016 S 1705-01-HT-003 1705-01 unit: F2,F3,L3 8-Feb-15

SMIC-I-6012 S 1744-01-HT-006 1744-01 1744-01: Dry Flare: @ 8-Feb-15


unit: G3
1683-02: Secondary
SMIC-I-6017 S 1683-02-HT-034 1683-02 Methanizers @ unit: 9-Feb-15
F3,F4,V3

1651-00: DRYERS,
SMIC-I-6017 S 1651-00-HT-001 1651-00 9-Feb-15
UNIT: F1

1456-00 : SLL Steam


SMIC-I-6014 S 1456-00-HT-001 1456-00 ( Area: A, Unit: L3, 9-Feb-15
L4,M1,V1 )

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 9-Feb-15
F2, F3

1605-02 : F-1150
SMIC-I-6013 S 1605-02-HT-025 1605-02 Process (Gas Furnace 10-Feb-15
Area)

1605-02 : F-1150
SMIC-I-6013 S 1605-02-HT-026 1605-02 Process (Gas Furnace 10-Feb-15
Area)

1662-01 : LP
Depropanizer
SMIC-I-6017 S 1662-01-HT-030 1662-01 10-Feb-15
( Area:
A, Unit:F1)

1712-01: C3R Stm


SMIC-I-6012 S 1712-01-HT-019 1712-01 Turbine @ Unit: V2 10-Feb-15

1712-02: C3R Stm


Turbine Surface
SMIC-I-6012 S 1712-02-HT-010 1712-02 10-Feb-15
Condenssate @ Unit:
V2

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-025 1612-02 10-Feb-15
PROCESS (FURNACE)

1654-00: Fuel Gas


Furnace Dryout @
SMIC-I-6012 S 1654-00-HT-001 1654-00 Unit: 10-Feb-15
G1,L1,L2,T1,T2&T3

1662-01, LP
SMIC-I-6018 W 1662-01-HT-002 1662-01 Depropanizer (Area: A, 10-Feb-15
Unit: F1, )
1683-02: Secondary
SMIC-I-6018 S 1683-02-HT-034 1683-02 Methanizers @ unit: 10-Feb-15
F3,F4,V3

1705-01 : C2 Splitter
SMIC-I-6016 S 1705-01-HT-011 1705-01 10-Feb-15
( Area: A, Unit:F2 )

1683-03: Methane
wash and cold box
SMIC-I-6016 S 1683-03-HT-028 1683-03 Process ( Area: A Unit: 10-Feb-15
F4&L4)

1662-01 LP
SMIC-I-6017 S 1662-01-HT-003 1662-01 Depropanizer (Area:A, 10-Feb-15
Unit: F1,L3)

1705-01: C2 Splitter @
SMIC-I-6017 S 1705-01-HT-003 1705-01 10-Feb-15
unit: F2,F3,L3

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6015 S 1631-01-HT-001 1631-01 10-Feb-15
(Area: A , Unit: F1, L2,
L3, W5 )

1662-01 : LP
SMIC-I-6017 S 1662-01-HT-008 1662-01 11-Feb-15
Depropanizer

SMIC-I-6016 S 1631-02-HT-004 1631-02 1631-02 : CGC 2nd dis 11-Feb-15

1641-00 : Caustic
SMIC-I-6017 S 1641-00-HT-024 1641-00 Wash ( Area: A, Unit: 11-Feb-15
G1)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-012 1683-02 Methanizers @ 11-Feb-15
Area:F3

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-017 1683-02 Methanizers @ 11-Feb-15
Area:F3

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-040 1683-02 Methanizers (Area: A, 11-Feb-15
Unit: F3 )
1683-03 : Methane
wash and Cold box
SMIC-I-6017 S 1691-01-HT-025 1691-01 11-Feb-15
( Area: A,
Unit:F3)

1605-02 : F-1150
SMIC-I-6014 W 1605-02-HT-025 1605-02 Process (Gas Furnace 11-Feb-15
Area)

1605-02 : F-1150
SMIC-I-6014 W 1605-02-HT-026 1605-02 Process (Gas Furnace 11-Feb-15
Area)

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-028 1606-02 11-Feb-15
Process ( Furnace )

1462-00 : C42
Condensate @ unit:
SMIC-I-6014 S 1462-00-HT-001 1462-00 11-Feb-15
L1,L2,T1,T2,T3,V1,V2,
W2,W5
1454-00 : S10 Steam
@ Unit:
SMIC-I-6012 S 1454-00-HT-001 1454-00 11-Feb-15
L1,L2,H3,T2,T3,T4,V1,V
2
1624-02 : Process
Condensate Holding
SMIC-I-6013 S 1624-02-HT-001 1624-02 11-Feb-15
Tank (Area:A, Unit: G3,
L1)

1461-00: CVH
SMIC-I-6012 S Condensate @ Unit : 11-Feb-15
Furnace Area

1531-01: BFV @ Unit :


SMIC-I-6012 S 1531-01-HT-001 1531-01 11-Feb-15
L1

1466-00: CH
SMIC-I-6012 S 1466-00-HT-003 1466-00 Condensate @ Unit: 11-Feb-15
F1, L3, M1, W5

1652-00 : Dryer
SMIC-I-6012 S 1652-00-HT-012 1652-00 Regeneration @ Unit: 12-Feb-15
G2

SMIC-I-6012 S 1531-02-HT-001 1531-02 1531-02 : BFH @ Unit: 12-Feb-15


L1,L2
1761-00 : Pad Water
SMIC-I-6012 S 1761-00-HT-006 1761-00 Treatment @ Unit : 12-Feb-15
G3,L1,L2,N1,N2

1463-00 : CM
SMIC-I-6012 S 1463-00-HT-001 1463-00 Condensate @ Unit : 12-Feb-15
L1,L2, W5

1661-01 : HP
SMIC-I-6012 S 1661-01-HT-005 1661-01 Depropanizer @ Unit: 12-Feb-15
F1,L3

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-025 1612-02 12-Feb-15
PROCESS (FURNACE)

1683-02 : Secondary
Methanizers
SMIC-I-6018 W 1683-02-HT-018 1683-02 12-Feb-15
( Area:
A, Unit:F3)

1701-03: N2
SMIC-I-6016 S 1701-03-HT-010 1701-03 Refrigeration 12-Feb-15
( Area: A, Unit: N2)

1704-02 : C2
Refrigeration
SMIC-I-6017 S 1704-02-HT-009 1704-02 12-Feb-15
( Area:
A, Unit:F3)

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-041 1704-02 Refrigeration (Area: A , 12-Feb-15
Unit: F2 )

1714-00 : C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-040 1714-00 12-Feb-15
( Area:
A, Unit:V2)
1714-00 : C3R
Refrigeration
SMIC-I-6016 S 1714-00-HT-042 1714-00 12-Feb-15
( Area: A,
Unit:V2)

1456-00 : SLL Steam @


SMIC-I-6012 S 1456-00-HT-001 145-00 Unit : T1, T2, T3, T4 13-Feb-15

1652-00 : Dryer
SMIC-I-6012 S 1652-00-HT-002 1652-00 Refeneration @ Unit : 13-Feb-15
G2
1531-03 : BFM @ Unit :
SMIC-I-6012 S 1531-03-HT-002 1531-03 13-Feb-15
L1,L2,W5

1461-00: CVH
SMIC-I-6012 S 1461-00-HT-001 1461-00 Condensate @ Unit : 13-Feb-15
L3,L2

1451-00: SVH Steam @


SMIC-I-6012 S 1451-00-HT-001 1451-00 Unit: L3 13-Feb-15

1705-01 : C2 Splitter
SMIC-I-6018 S 1705-01-HT-002 1705-01 ( Area: A, Unit:F2,F4, 13-Feb-15
L3, L4)

1463-00 : CM
SMIC-I-6014 S 1463-00-HT-001 1463-00 Condensate @ unit: 13-Feb-15
L3,V1,V2

1515-01: F-1250 BFW


Steam Drum & SVH
SMIC-I-6014 S 1515-01-HT-038 1515-01 13-Feb-15
Side

1502-01: F-1120 BFW,


SMIC-I-6014 S 1513-01-HT-038 1513-01 Steam Drums & SVH 13-Feb-15
Side

1502-01: F-1120 BFW,


SMIC-I-6014 S 1514-01-HT-038 1514-01 Steam Drums & SVH 13-Feb-15
Side

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-057 1683-02 Methanizers ( Area: A, 13-Feb-15
Unit: F3)

1683-02 : Secondary
SMIC-I-6016 S 1683-02-HT-058 1683-02 Methanizers ( Area: A, 13-Feb-15
Unit: F3)

1683-03 : Methane
SMIC-I-6016 S 1683-03-HT-018 1683-03 wash and Cold box 13-Feb-15
( Area: A, Unit: F4)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 13-Feb-15
F2, F3,V2
1704-02 : C2
SMIC-I-6017 S 1704-02-HT-041 1704-01 Refrigeration (Area: A , 13-Feb-15
Unit: F2 )

1684-01 : Turbo
SMIC-I-6017 S 1684-01-HT-001 1684-01 Expanders (Area: A ; 14-Feb-15
Unit: F4)

1701-03: N2
SMIC-I-6017 S 1701-03-HT-010 1701-03 Refrigeration 14-Feb-15
( Area: A, Unit: N2)

1705-01 : C2 Splitter
SMIC-I-6017 S 1705-01-HT-011 1705-01 14-Feb-15
( Area: A, Unit:F2 )

1652-00 : Dryer
SMIC-I-6012 S 1652-00-HT-012 1652-00 Regeneration @ Unit: 14-Feb-15
G2

1531-02 : BFH @ Unit:


SMIC-I-6013 S 1531-02-HT-001 1531-02 14-Feb-15
L1,L2

1761-00 : Pad Water


SMIC-I-6013 S 1761-00-HT-006 1761-00 Treatment @ Unit : 14-Feb-15
G3,L1,L2,N1,N2

1463-00 : CM
SMIC-I-6013 S 1463-00-HT-001 1463-00 Condensate @ Unit : 14-Feb-15
L1,L2, W5

1661-01 : HP
SMIC-I-6013 S 1661-01-HT-005 1661-01 Depropanizer @ Unit: 14-Feb-15
F1,L3

1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-025 1612-02 14-Feb-15
PROCESS (FURNACE)

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-020 1683-02 Methanizres ( Area: 14-Feb-15
A,Unit: F3)

KIC MATERIAL
SMIC-I-6011 W INSULATION ACCESSORY STORAGE AREA IN 14-Feb-15
& JACKETING MATERIAL
JUBAIL
KIC STORAGE AREA
HOT INSULATION
SMIC-I-6011 W WESTSIDE OF DAELIM 14-Feb-15
MATERIAL
SITE OFFICE

1541-00 : Eye Bath &


SMIC-I-6015 S 1541-00-HT-001 1541-00 Safty Shower @ Unit: 15-Feb-15
Furnace Area

1541-00 : Eye Bath &


SMIC-I-6015 S 1541-00-HT-002 1541-00 Safty Shower @ Unit: 15-Feb-15
Furnace Area

1661-01: HP
SMIC-I-6015 S 1661-01-HT-012 1661-01 Depropanizer @ Unit: 15-Feb-15
F1

1691-01: Deethanizer
SMIC-I-6015 S 1691-01-HT-014 1691-01 15-Feb-15
@ Unit: F1

1454-00 : S10 Steam @


SMIC-I-6012 S 1454-00-HT-001 1454-00 15-Feb-15
Unit: H3,T2,T3,T4

1531-01 : BFV @ Unit:


SMIC-I-6012 S 1531-01-HT-005 1531-01 15-Feb-15
T2

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-080 1714-00 Refrigeration ( Area: A, 15-Feb-15
Unit: F2 )

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-024 1714-00 refrigeration (Area: A, 15-Feb-15
Unit: F2 )

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6016 S 1631-01-HT-001 1631-01 15-Feb-15
(Area: A , Unit: F1, L2,
L3, W5 )

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 15-Feb-15
F2, F3,V2

1631-01 : CGC 1st


SMIC-I-6017 S 1631-01-HT-001 1631-01 Suc/dis & 2nd Suc 16-Feb-15
(Area: A , Unit: F1, L2,
L3, W5 )
1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-057 1683-02 Methanizers ( Area: A, 16-Feb-15
Unit: F3)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-058 1683-02 Methanizers ( Area: A, 16-Feb-15
Unit: F3)

1651-00: DRYERS,
SMIC-I-6018 W 1651-00-HT-001 1651-00 UNIT: F1 16-Feb-15

1705-01: C2 Splitter @
SMIC-I-6018 S 1705-01-HT-003 1705-01 16-Feb-15
unit: F2,F3,L3

1454-00 : S10 Steam @


SMIC-I-6013 S 1454-00-HT-001 1454-00 16-Feb-15
Unit: H3,T2,T3,T4

1531-01 : BFV @ Unit:


SMIC-I-6013 S 1531-01-HT-005 1531-01 16-Feb-15
T2

1466-00: CH
Condensate @ Unit:
SMIC-I-6012 S 1466-00-HT-003 1466-00 16-Feb-15
F1,K1,K2,L1,L2,M1,N1,
V4

1453-00: SM Steam @
SMIC-I-6012 S 1453-00-HT-010 1453-00 Unit: L1 16-Feb-15

1456-00 : SLL Steam


SMIC-I-6013 S 1456-00-HT-007 1456-00 16-Feb-15
( Area: A, Unit: G3, N3 )

1654-00: Fuel Gas


SMIC-I-6012 S 1654-00-HT-001 1654-00 Furnace Dryout @ 16-Feb-15
Unit: G1,L1,L2

1714-00 : C3R
Refrigeration
SMIC-I-6017 S 1714-00-HT-042 1714-00 ( Area: A, 17-Feb-15
Unit:V2)

1683-02 : Secondary
SMIC-I-6018 W Methanizers 17-Feb-15
( Area: A, Unit:F3)
1683-02 : Secondary
SMIC-I-6018 W Methanizers 17-Feb-15
( Area: A, Unit:F3)

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6018 S 1631-01-HT-001 1631-01 17-Feb-15
(Area: A , Unit: F1, L2,
L3, W5 )

1456-00 : SLL Steam


SMIC-I-6018 S 1456-00-HT-007 1456-00 ( Area: A, Unit: G3, N3 ) 17-Feb-15

1461-00: CVH
SMIC-I-6012 S 1461-00-HT-001 1461-00 Condensate @ Unit : 17-Feb-15
Furnace Area

1683-03 : Methane
SMIC-I-6017 S 1683-03-HT-018 1683-03 wash and Cold box 18-Feb-15
( Area: A, Unit: F4)

1683-02 : Secondary
SMIC-I-6017 S 1683-02-HT-040 1683-02 Methanizers (Area: A, 18-Feb-15
Unit: F3 )

1661-01: HP
SMIC-I-6016 S 1661-01-HT-012 1661-01 Depropanizer @ Unit: 18-Feb-15
F1

1541-00 : Eye Bath &


SMIC-I-6016 S 1541-00-HT-001 1541-00 Safty Shower @ Unit: 18-Feb-15
Furnace Area

1541-00 : Eye Bath &


SMIC-I-6016 S 1541-00-HT-002 1541-00 Safty Shower @ Unit: 18-Feb-15
Furnace Area

SMIC-I-6017 S 1631-02-HT-004 1631-02 1631-02 : CGC 2nd dis 18-Feb-15

1681-00 : Deprop O/H


SMIC-I-6018 W 1681-00-HT-018 1681-00 System (Area: A ; Unit: 18-Feb-15
F3 )

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-003 1704-02 Refrigeration (Area: A , 18-Feb-15
Unit: F2, F3, F4, L3, L4 )
1453-00 : AM Steam
SMIC-I-6018 S 1453-00-HT-008 1453-00 18-Feb-15
@ Area: L1 & L2

1531-03 : BFM @ Unit :


SMIC-I-6013 S 1531-03-HT-002 1531-03 18-Feb-15
L1,L2,W5

1461-00: CVH
SMIC-I-6013 S 1461-00-HT-001 1461-00 Condensate @ Unit : 18-Feb-15
L3,L2

1461-00: CVH
SMIC-I-6013 S 1461-00-HT-001 1461-00 Condensate @ Unit : 18-Feb-15
Furnace Area

1744-01: Dry Flare: @


SMIC-I-6013 S 1744-01-HT-006 1744-01 18-Feb-15
unit: G3

1462-00 : C42
Condensate @ Unit:
SMIC-I-6012 S 1462-00-HT-001 1462-00 18-Feb-15
G2,L1,L2,N1,V1,W5,K2,
V2,

1623:-01 : Water
SMIC-I-6012 S 1623-01-HT-002 1623-01 18-Feb-15
Quench System

1654-00: Fuel Gas


Furnace Dryout @
SMIC-I-6013 S 1654-00-HT-001 1654-00 Unit: 19-Feb-15
G1,L1,L2,T1,T2&T3

1654-00: Fuel Gas


SMIC-I-6013 S 1654-00-HT-001 1654-00 Furnace Dryout @ 19-Feb-15
Unit: G1,L1,L2

1712-02: C3R Stm


Turbine Surface
SMIC-I-6013 S 1712-02-HT-010 1712-02 19-Feb-15
Condenssate @ Unit:
V2

1712-01: C3R Stm


SMIC-I-6013 S 1712-01-HT-019 1712-01 Turbine @ Unit: V2 19-Feb-15

SMIC-I-6014 W 1744-01-HT-006 1744-01 1744-01: Dry Flare: @ 19-Feb-15


unit: G3
1744-01 : Dry Flare
SMIC-I-6014 W 1744-01-HT-010 1744-01 19-Feb-15
( Area: A ; Unit: G3 )

1452-00 : SH Steam
SMIC-I-6014 S 1452-00-HT-016 19-Feb-15
(Area: A, Unit: L2 )

1455 : SL STEAM @
SMIC-I-6014 S 1455-00-HT-002 1455-00 unit: L1 19-Feb-15

1453-00 : SM STEAM
SMIC-I-6014 S 1453-00-HT-009 1453-00 19-Feb-15
@ Unit: L1

1704-02, C2
SMIC-I-6018 S 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 19-Feb-15
F3, L3, L4, V1)

1714-00: C3R
SMIC-I-6012 S 1714-00-HT-011 1714-00 Refrigeration @ Unit: 19-Feb-15
F1,V3

1541-00 : Eye Bath &


SMIC-I-6017 S 1541-00-HT-001 1541-00 Safty Shower @ Unit: 19-Feb-15
Furnace Area

1541-00 : Eye Bath &


SMIC-I-6017 S 1541-00-HT-002 1541-00 Safty Shower @ Unit: 19-Feb-15
Furnace Area

1661-01: HP
SMIC-I-6017 S 1661-01-HT-012 1661-01 Depropanizer @ Unit: 19-Feb-15
F1

1454-00 : S10 Steam


@ Unit:
SMIC-I-6013 S 1454-00-HT-001 1454-00 19-Feb-15
L1,L2,H3,T2,T3,T4,V1,V
2
1462-00 : C42
Condensate @ Unit:
SMIC-I-6013 S 1462-00-HT-001 1462-00 G2,L1,L2,N1,V1,W5,K2, 19-Feb-15
V2,

1466-00: CH
SMIC-I-6013 S 1466-00-HT-003 1466-00 Condensate @ Unit: 19-Feb-15
F1, L3, M1, W5
1466-00: CH
Condensate @ Unit:
SMIC-I-6013 S 1466-00-HT-003 1466-00 19-Feb-15
F1,K1,K2,L1,L2,M1,N1,
V4

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-014 1691-01 20-Feb-15
@ Unit: F1

1683-03: Methane
wash and cold box
SMIC-I-6017 S 1683-03-HT-028 1683-03 Process ( Area: A Unit: 20-Feb-15
F4&L4)

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-014 1691-01 20-Feb-15
@ Unit: F1

1704-02 : C2
Refrigeration
SMIC-I-6017 S 1704-02-HT-014 1704-02 20-Feb-15
( Area:
A, Unit:F3)

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-076 1714-00 REFRIGERATION @ V2 20-Feb-15
AREA

1623:-01 : Water
SMIC-I-6013 S 1623-01-HT-002 1623-01 20-Feb-15
Quench System

1632-02 : CGC Stm


SMIC-I-6013 S 1632-02-HT-002 1632-02 Turbine (Area: A, Unit: 20-Feb-15
W5 )

1681-00: Deprop O/H


SMIC-I-6013 S 1681-00-HT-001 1681-00 System (Area: A, 20-Feb-15
Unit:L2, N1)

1714-00: C3R
SMIC-I-6013 S 1714-00-HT-011 1714-00 Refrigeration @ Unit: 20-Feb-15
F1,V3

1682-01 : ACETYLENE
SMIC-I-6014 S 1682-01-HT-010 1682-01 REACTOR @ unit: M1 21-Feb-15

1652-00: Dryer
SMIC-I-6012 S 1652-00-HT-003 1652-00 Regeneration : Unit: 21-Feb-15
G2,N1
1631-02: CGC 2nd
SMIC-I-6012 S 1631-02-HT-001 1631-02 dis/3rd Sue @ Unit: 22-Feb-15
W5

1631-01: CGC 1st


SMIC-I-6012 S 1631-02-HT-004 1631-02 Sue/dis & 2nd Sue @ 22-Feb-15
Unit: W5

1714-00: C3R
SMIC-I-6012 S 1714-00-HT-014 1714-00 Refrigeration @ Unit: 22-Feb-15
L3,V2,V3,

1704-02 : C2
SMIC-I-6015 S 1704-02-HT-007 1704-02 Refrigeration @ Unit: 22-Feb-15
F2,L3

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-063 1714-00 Refrigeration @ Unit: 22-Feb-15
F3

1661-01: HP
SMIC-I-6015 S 1661-01-HT-008 1661-01 22-Feb-15
Depropanizer

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-030 1714-00 Refrigeration ( Area: A, 22-Feb-15
Unit: V2, V3,L4)

1701-01 : C2R
SMIC-I-6018 S 1701-01-HT-010 1701-01 Compressor ( Area: A, 22-Feb-15
Unit: L3, V1)

1462-00 : C42
Condensate @ Unit:
SMIC-I-6014 S 1462-00-HT-001 1462-00 22-Feb-15
G2,L1,L2,N1,V1,W5,K2,
V2,
1654-00: Fuel Gas
Furnace Dryout @
SMIC-I-6014 S 1654-00-HT-001 1654-00 22-Feb-15
Unit:
G1,L1,L2,T1,T2&T3

1632-01: CGC Stm


SMIC-I-6012 S 1632-01-HT-002 1632-01 Turbine @ Unit: W5 22-Feb-15

1652-00 : Dryer
SMIC-I-6013 S 1652-00-HT-006 1652-00 Refeneration @ Unit : 22-Feb-15
G2
1451-00: SVH Steam @
SMIC-I-6013 S 1451-00-HT-001 1451-00 22-Feb-15
Unit: L3

1453-00: SM Steam @
SMIC-I-6013 S 1453-00-HT-010 1453-00 22-Feb-15
Unit: L1

1531-01: BFV @ Unit :


SMIC-I-6013 S 1531-01-HT-001 1531-01 L1 22-Feb-15

1456-00 : SLL Steam


SMIC-I-6012 S 1456-00-HT-001 1456-00 22-Feb-15
( Area: A, Unit: C1,C3)

1652-00: Dryer
SMIC-I-6013 S 1652-00-HT-003 1652-00 Regeneration : Unit: 22-Feb-15
G2,N1

1456-00 : SLL Steam @


SMIC-I-6013 S 1456-00-HT-001 1456-00 22-Feb-15
Unit : T1, T2, T3, T4

1714-00 : C3R
SMIC-I-6015 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 23-Feb-15
F2, F3,V2

1721-03: Propylene
SMIC-I-6015 S 1721-03-HT-002 1721-03 Production @ Unit: 23-Feb-15
F3,L2,L3,N1,N2

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-076 1714-00 REFRIGERATION @ V2 23-Feb-15
AREA

1691-01: Deethanizer
SMIC-I-6017 S 1691-01-HT-014 1691-01 23-Feb-15
@ Unit: F1

1454-00 : S10 Steam


@ Unit:
SMIC-I-6014 S 1454-00-HT-001 1454-00 L1,L2,H3,T2,T3,T4,V1,V 23-Feb-15
2

SMIC-I-6014 S 1531-02-HT-001 1531-02 1531-02 : BFH @ Unit: 23-Feb-15


L1,L2
1461-00: CVH
SMIC-I-6014 S 1461-00-HT-001 1461-00 Condensate @ Unit : 23-Feb-15
L3,L2

1462-00 : C42
Condensate @ Unit:
SMIC-I-6014 S 1466-00-HT-003 1466-00 23-Feb-15
F1,K1,K2,L1,L2,L3,M1,N
1,V4

1531-03 : BFM @ Unit :


SMIC-I-6014 S 1531-03-HT-002 1531-03 L1,L2,W5 23-Feb-15

1631-02: CGC 2nd


SMIC-I-6013 S 1631-02-HT-001 1631-02 dis/3rd Sue @ Unit: 23-Feb-15
W5

1631-01: CGC 1st


SMIC-I-6013 S 1631-01-HT-004 1631-01 Sue/dis & 2nd Sue @ 23-Feb-15
Unit: W5

1714-00: C3R
SMIC-I-6013 S 1714-00-HT-014 1714-00 Refrigeration @ Unit: 23-Feb-15
L3,V2,V3,

1632-01: CGC Stm


SMIC-I-6013 S 1632-01-HT-002 1632-01 23-Feb-15
Turbine @ Unit: W5

1456-00 : SLL Steam


SMIC-I-6013 S 1456-00-HT-001 1456-00 ( Area: A, Unit: C1,C3) 23-Feb-15

1652-00 : Dryer
SMIC-I-6014 S 1652-00-HT-006 1652-00 Refeneration @ Unit : 23-Feb-15
G2

1704-02 : C2
SMIC-I-6016 S 1704-02-HT-007 1704-02 Refrigeration @ Unit: 24-Feb-15
F2,L3

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-063 1714-00 Refrigeration @ Unit: 24-Feb-15
F3

SMIC-I-6016 S 1661-01-HT-008 1661-01 1661-01: HP 24-Feb-15


Depropanizer
1651-00: Dryers @
SMIC-I-6015 S 1691-01-HT-014 1691-01 24-Feb-15
Unit: F1

1466-00: CH
SMIC-I-6015 S 1466-00-HT-001 1466-00 Condensate @ Unit: 24-Feb-15
F1,L3,L4,M1,V3,V4

1466-00 : CH
SMIC-I-6014 W 1466-00-HT-016 1466-00 Condensate (3.5 bar) 24-Feb-15
( Area: A ; Unit: G3 )

1704-02 : C2
SMIC-I-6017 S 1704-02-HT-007 1704-02 Refrigeration @ Unit: 25-Feb-15
F2,L3

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-063 1714-00 Refrigeration @ Unit: 25-Feb-15
F3

1661-01: HP
SMIC-I-6017 S 1661-01-HT-008 1661-01 25-Feb-15
Depropanizer

1624-02 : Process
Condensate Holding
SMIC-I-6014 S 1624-02-HT-001 1624-02 25-Feb-15
Tank (Area:A, Unit: G3,
L1)

1456-00 : SLL Steam @


SMIC-I-6014 S 1456-00-HT-001 1456-00 Unit : T1, T2, T3, T4 25-Feb-15

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-002 1731-01 25-Feb-15
(Area: A, Unit: V4)

1662-01, LP
SMIC-I-6018 W 1662-01-HT-001 1662-01 Depropanizer (Area: A, 25-Feb-15
Unit: F1, L3, )

1662-01 : LP
SMIC-I-6017 S 1662-01-HT-005 1662-01 Depropanizer ( Area: 25-Feb-15
A, Unit:F1)

1714-00 : C3R
SMIC-I-6016 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 25-Feb-15
F2, F3,V2
1466-00: CH
SMIC-I-6013 S 1466-00-HT-001 1466-00 Condensate @ Unit: 25-Feb-15
F1,L3,L4,M1,V3,V4

1651-00: Dryers @
SMIC-I-6015 S 1651-00-HT-002 1651-00 25-Feb-15
Unit : F1

1623-01: Water
SMIC-I-6015 S 1623-01-HT-010 1623-01 Quench System 25-Feb-15

1661-01: HP
SMIC-I-6015 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 25-Feb-15
K1,K2,L2,W4

1651-00: Dryers @
SMIC-I-6016 S 1651-00-HT-002 1651-00 26-Feb-15
Unit : F1

1623-01: Water
SMIC-I-6016 S 1623-01-HT-010 1623-01 26-Feb-15
Quench System

1661-01: HP
SMIC-I-6016 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 26-Feb-15
K1,K2,L2,W4

1771-00: Methanol @
SMIC-I-6015 S 1771-00-HT-002 1771-00 Unit: F3 26-Feb-15

1714-00 : C3R
SMIC-I-6017 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 26-Feb-15
F2, F3,V2

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-020 1731-01 (Area:A , Unit: F1, K1, 26-Feb-15
K2, L2, L3, V4)

1631-04 : CGC Sealing


SMIC-I-6014 W 1631-04-HT-040 1631-04 Steam System (Area: A, 26-Feb-15
Unit: W5 )

SMIC-I-6012 S 1507-01-HT-001 RT1 1507-01 1507-01: F-1170 BFW, 27-Feb-15


Stm Drum & SVH Side
1531-01: BFV @ Unit :
SMIC-I-6014 S 1531-01-HT-001 1531-01 27-Feb-15
L1

TP: 1531-01-HT-001
SMIC-I-6014 S 1531-01-HT-001 1531-01 1531-01 : BFV (Area A, 27-Feb-15
Unit T1,T2,T3)

1651-00: Dryers @
SMIC-I-6017 S 1651-00-HT-002 1651-00 Unit : F1 27-Feb-15

1623-01: Water
SMIC-I-6017 S 1623-01-HT-010 1623-01 27-Feb-15
Quench System

1661-01: HP
SMIC-I-6017 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 27-Feb-15
K1,K2,L2,W4

1771-00: Methanol @
SMIC-I-6016 S 1771-00-HT-002 1771-00 27-Feb-15
Unit: F3

1456-00: SLL STEAM @


SMIC-I-6012 S 1456-00-HT-001 1456-00 27-Feb-15
Unit: K1,K2,L1,L2

1683-01 : Primary
SMIC-I-6018 W 1683-01-HT-001 1683-01 Demethanizers ( Area: 28-Feb-15
A, Unit: L4.L3, F3, F1 )

1714-00: C3R
SMIC-I-6018 W 1714-00-HT-063 1714-00 Refrigeration @ Unit: 28-Feb-15
F3

1683-03: Methane
SMIC-I-6018 W 1683-03-HT-002 1683-03 wash and Cold Box 28-Feb-15
( Area: A, Unit: F3,L4)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-026 1714-00 Refrigeration (Area: A, 28-Feb-15
Unit: F2, F3, L3, V2 )

SMIC-I-6013 S 1507-01-HT-001 RT1 1507-01 1507-01: F-1170 BFW, 28-Feb-15


Stm Drum & SVH Side
1456-00: SLL STEAM @
SMIC-I-6013 S 1456-00-HT-001 1456-00 28-Feb-15
Unit: K1,K2,L1,L2

1744-01: Dry Flare @


SMIC-I-6012 S 1744-01-HT-007 1744-01 1-Mar-15
Unit: G3

1744-02: Wet Flare @


SMIC-I-6012 S 1744-02-HT-004 1744-02 Unit: G3 1-Mar-15

1721-02: Upper C3
SMIC-I-6015 S 1721-02-HT-044 1721-02 1-Mar-15
Splitter @ Unit: V2

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-023 1714-00 Refrigeration ( Area: A, 1-Mar-15
Unit: F1, F2, F3, V2, L3)

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-007 1683-03 wash and Cold box 1-Mar-15
( Area: A, Unit:F3)

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-001 1731-01 (Area: A, Unit: 1-Mar-15
K1,K2,L1,L2,T3,V4

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-042 1714-00 Refrigeration 1-Mar-15
( Area: A, Unit:V2)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-040 1714-00 Refrigeration ( Area: A, 1-Mar-15
Unit:V2)

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 1-Mar-15
F2, F3,V2

1466-00: CH
SMIC-I-6012 S 1466-00-HT-001 1466-00 Condensate @ Unit: 2-Mar-15
K1,K2,L1,L2,N1,N2

SMIC-I-6012 S 1651-00-HT-009 1651-00 1651-00: Dryers @ 2-Mar-15


Unit: G2
1651-00: Dryers @
SMIC-I-6012 S 1651-00-HT-008 1651-00 2-Mar-15
Unit: G2

1771-00: Methanol @
SMIC-I-6017 S 1771-00-HT-002 1771-00 2-Mar-15
Unit: F3

1721-03: Propylene
SMIC-I-6016 S 1721-03-HT-002 1721-03 Production @ Unit: 2-Mar-15
F3,L2,L3,N1,N2

1712-02: C3R Stm


turbine Surface
SMIC-I-6014 W 1712-02-HT-016 1712-02 2-Mar-15
Condensate ( Area A.
Unit V2S)

1456-00: SLL STEAM @


SMIC-I-6013 S 1744-01-HT-007 1744-01 3-Mar-15
Unit: K1,K2,L1,L2

1744-01: Dry Flare @


SMIC-I-6013 S 1744-02-HT-004 1744-02 3-Mar-15
Unit: G3

1744-02: Wet Flare @


SMIC-I-6016 S 1721-02-HT-044 1721-02 3-Mar-15
Unit: G3

1651-00: Dryers @
SMIC-I-6015 S 1651-00-HT-002 1651-00 Unit : F1,G2,N1 3-Mar-15

1621-01: Oil quench


SMIC-I-6012 S 1621-01-HT-002 1621-01 Tower & QO System @ 3-Mar-15
Unit: Furnce Area

1456-00 : SLL Steam


SMIC-I-6014 S 1456-00-HT-001 1456-00 3-Mar-15
( Area: A, Unit: C1,C3)

1714-00: C3R
S 1714-00-HT-014 1714-00 Refrigeration @ Unit: 3-Mar-15
L3,V2,V3,

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-002 1705-01 ( Area: A, Unit:F2,F4, 3-Mar-15
L3, L4)
1744-01: Dry Flare @
SMIC-I-6012 S 1744-01-HT-008 1744-01 4-Mar-15
Unit: G3

1744-01: Dry Flare @


SMIC-I-6012 S 1744-01-HT-002 1744-01 4-Mar-15
Unit: G3

1506-01 : F-1160
SMIC-I-6012 S 1506-01-HT-001 RT1 1506-01 BFW, Steam Drum & 4-Mar-15
SVH Side

1661-01: HP
SMIC-I-6015 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 4-Mar-15
F1,F2,L3,L4,V3

1652-00 : Dryer
SMIC-I-6014 W 1652-00-HT-012 1652-00 Regeneration @ Unit: 4-Mar-15
G2

1461-00: CVH
SMIC-I-6014 W Condensate @ Unit : 4-Mar-15
Furnace Area

1456-00 : SLL Steam


SMIC-I-6014 S 1456-00-HT-001 1456-00 ( Area: A, Unit: 4-Mar-15
FURNACE AREA)

1721-03: Propylene
SMIC-I-6018 S Production @ Unit: 4-Mar-15
F3,L2,L3,N1,N2

1721-03: Propylene
SMIC-I-6017 S 1721-03-HT-002 1721-03 Production @ Unit: 5-Mar-15
F3,L2,L3,N1,N2

1461-00: CVH
SMIC-I-6014 S 1461-00-HT-001 1461-00 Condensate @ Unit : 5-Mar-15
Furnace Area
1541-00 : Eye Bath
bath & Safety Showers
SMIC-I-6018 S 1541-00-HT-001 1541-00 ( Area: A, 5-Mar-15
Unit:F1,F3,L3,L4,V1,V2,
V3,V4)
1541-00 : Eye Bath
bath & Safety Showers
SMIC-I-6018 S 1541-00-HT-002 1541-00 ( Area: A, 5-Mar-15
Unit:F1,F3,L3,L4,V1,V2,
V3,V4)
1744-01: Dry Flare @
SMIC-I-6013 S 1744-01-HT-008 1744-01 5-Mar-15
Unit: G3

1744-01: Dry Flare @


SMIC-I-6013 S 1744-01-HT-002 1744-01 5-Mar-15
Unit: G3

1506-01 : F-1160
SMIC-I-6013 S 1506-01-HT-001 RT1 1506-01 BFW, Steam Drum & 5-Mar-15
SVH Side

1661-01: HP
SMIC-I-6016 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 5-Mar-15
F1,F2,L3,L4,V3

KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W 5-Mar-15
SIDE OF DAELIM
OFFICE
KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W 5-Mar-15
SIDE OF DAELIM
OFFICE

1661-01: HP
SMIC-I-6017 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 6-Mar-15
F1,F2,L3,L4,V3

1651-00: Dryers @
SMIC-I-6016 S 1651-00-HT-002 1651-00 Unit : F1,G2,N1 6-Mar-15

1714-00 : C3R
SMIC-I-6018 S 1714-00-HT-016 1714-00 Refrigeration @ Unit: 6-Mar-15
F2, F3,V2

1651-00: Dryers @
SMIC-I-6015 S 1651-00-HT-009 1651-00 6-Mar-15
Unit: G2

1651-00: Dryers @
SMIC-I-6015 S 1651-00-HT-008 1651-00 Unit: G2 6-Mar-15

1466-00: CH
SMIC-I-6013 S 1466-00-HT-001 1466-00 Condensate @ Unit: 6-Mar-15
K1,K2,L1,L2,N1,N2
1721-03: Propylene
SMIC-I-6018 S 1721-03-HT-002 1721-03 Production @ Unit: 7-Mar-15
F3,L2,L3,N1,N2

1683-03 : Metane
wash and Cold box
SMIC-I-6014 W 1683-03-HT-027 1683-03 7-Mar-15
( Area: A, Unit:F4)

1622-00: Flux Oil @


SMIC-I-6012 S 1622-00-HT-002 1622-00 Unit: L1 8-Mar-15

1652-00: Dryer
SMIC-I-6012 S 1652-00-HT-002 1652-00 Regeneration @ Unit: 8-Mar-15
G2

1616-00: Furnace Gas


SMIC-I-6012 S 1616-00-HT-001 1616-00 Feed Prep @ Unit: 8-Mar-15
Furnace P/R

1623-01: Water
SMIC-I-6015 S 1623-01-HT-020 1623-01 Quench System @ 8-Mar-15
Unit: G2

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-003 1683-03 wash and Cold box 8-Mar-15
( Area: A, Unit:F3)

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-007 1704-02 Refrigeration @ Unit: 8-Mar-15
F2,L3

1661-01 : LP
SMIC-I-6014 S 1661-01-HT-004 1661-01 Depropanizer (Area: A, 8-Mar-15
Unit:F1)

1662-01 : LP
SMIC-I-6013 S 1662-01-HT-015 1662-01 Depropanizer (Area: A, 8-Mar-15
Unit: F1 )

1541-00 : Eye Bath &


SMIC-I-6018 S 1541-00-HT-001 1541-00 Safty Shower @ Unit: 8-Mar-15
Furnace Area

1541-00 : Eye Bath &


SMIC-I-6018 S 1541-00-HT-002 1541-00 Safty Shower @ Unit: 8-Mar-15
Furnace Area
KIC SITE TOOL ROOM
SMIC-I-6011 W MATERIAL STORAGE 8-Mar-15
AREA

KIC SITE TOOL ROOM


SMIC-I-6011 W MATERIAL STORAGE 8-Mar-15
AREA

1606-02: F-1160
SMIC-I-6012 S 1606-02-HT-006 1606-02 Process @ Furnce Area 9-Mar-15

1606-02: F-1170
SMIC-I-6012 S 1607-02-HT-006 RT1 1607-02 9-Mar-15
Process @ Furnce Area

1466-00: CH
Condensate @ Unit:
SMIC-I-6012 S 1466-00-HT-002 1466-00 9-Mar-15
F1,F2,F3,F4,L3,L4,M1,V
1,V2,V3,V4

1744-01: Dry Flare @


SMIC-I-6014 S 1744-01-HT-002 1744-01 9-Mar-15
Unit: G3

1652-00: Dryer
SMIC-I-6014 S 1652-00-HT-003 1652-00 Regeneration : Unit: 9-Mar-15
G2,N1

1466-00: CH
SMIC-I-6014 S 1466-00-HT-001 1466-00 Condensate @ Unit: 9-Mar-15
F1,L3,L4,M1,V3,V4

1507-01: F-1170 BFW,


SMIC-I-6014 S 1507-01-HT-001 RT1 1507-01 9-Mar-15
Stm Drum & SVH Side

1651-00: Dryers @
SMIC-I-6016 S 1651-00-HT-009 1651-00 9-Mar-15
Unit: G2

1651-00: Dryers @
SMIC-I-6016 S 1651-00-HT-008 1651-00 Unit: G2 9-Mar-15

SMIC-I-6017 S 1651-00-HT-002 1651-00 1651-00: Dryers @ 9-Mar-15


Unit : F1,G2,N1
1622-00: Flux Oil @
SMIC-I-6013 S 10-Mar-15
Unit: L1

1652-00: Dryer
SMIC-I-6013 S Regeneration @ Unit: 10-Mar-15
G2

1616-00: Furnace Gas


SMIC-I-6013 S Feed Prep @ Unit: 10-Mar-15
Furnace P/R

1623-01: Water
SMIC-I-6013 S Quench System @ 10-Mar-15
Unit: G2

1744-02: Wet Flare @


SMIC-I-6017 S 10-Mar-15
Unit: G3

1621-01: Oil quench


SMIC-I-6013 S Tower & QO System @ 10-Mar-15
Unit: Furnce Area

1744-01: Dry Flare @


SMIC-I-6014 W 10-Mar-15
Unit: G3

1661-01 : LP
SMIC-I-6014 W Depropanizer (Area: A, 10-Mar-15
Unit: F1)

1661-00 : HP-
SMIC-I-6014 W Depropanizer ( Area: A, 10-Mar-15
Unit: F1, L3)

1661-01 : HP
SMIC-I-6014 S Depropanizer (Area: A , 10-Mar-15
Unit: F1 )

1661-01 : LP
Depropanizer
SMIC-I-6014 S ( Area: 10-Mar-15
A, Unit:F1 )

1661-01 : HP
SMIC-I-6014 S Depropanizer @ Unit: 10-Mar-15
F1,L3
1451-00: SVH Steam @
SMIC-I-6012 S 10-Mar-15
unit: L1,L2,L3,V2,W5,

1622-00: Flux Oil @


SMIC-I-6013 S 1622-00-HT-002 1622-00 11-Mar-15
Unit: L1

1652-00: Dryer
SMIC-I-6013 S 1652-00-HT-002 1652-00 Regeneration @ Unit: 11-Mar-15
G2

1616-00: Furnace Gas


SMIC-I-6013 S 1616-00-HT-001 1616-00 Feed Prep @ Unit: 11-Mar-15
Furnace P/R

1623-01: Water
SMIC-I-6013 S 1623-01-HT-020 1623-01 Quench System @ 11-Mar-15
Unit: G2

1744-02: Wet Flare @


SMIC-I-6017 S 1721-02-HT-044 1721-02 11-Mar-15
Unit: G3

1621-01: Oil quench


SMIC-I-6013 S 1621-01-HT-002 1621-01 Tower & QO System @ 11-Mar-15
Unit: Furnce Area

1744-01: Dry Flare @


SMIC-I-6014 W 1744-01-HT-008 1744-01 Unit: G3 11-Mar-15

1661-01 : LP
SMIC-I-6014 W 1661-01-HT-022 1661-01 Depropanizer (Area: A, 11-Mar-15
Unit: F1)

1661-00 : HP-
SMIC-I-6014 W 1661-01-HT-007 1661-01 Depropanizer ( Area: A, 11-Mar-15
Unit: F1, L3)

1661-01 : HP
SMIC-I-6014 W 1661-01-HT-006 1661-01 Depropanizer (Area: A , 11-Mar-15
Unit: F1 )

1661-01 : LP
SMIC-I-6014 S 1661-01-HT-021 1661-01 Depropanizer 11-Mar-15
( Area:
A, Unit:F1 )
1661-01 : HP
SMIC-I-6014 S 1661-01-HT-005 1661-01 Depropanizer @ Unit: 11-Mar-15
F1,L3

1451-00: SVH Steam @


SMIC-I-6012 S 1451-00-HT-001 1451-00 11-Mar-15
unit: L1,L2,L3,V2,W5,

1541-00: Eye Bath &


Safety Showers @
SMIC-I-6015 S 1541-00-HT-001 1541-00 Unit: 11-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6015 S 1541-00-HT-002 1541-00 Unit: 11-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1662-01 : LP
Depropanizer
SMIC-I-6014 W 1662-01-HT-014 1662-01 12-Mar-15
( Area: A,
Unit: F1)

1505-01 : F-1150
SMIC-I-6014 W 1505-01-HT-009 1505-01 BFW, Steam Drum & 12-Mar-15
SVH Side

1632-03 : CGC Stm


Turbine Vacuum
SMIC-I-6014 W 1632-03-HT-001 1632-03 12-Mar-15
System (Area: A ; Unit:
W5 )

1661-01: HP
SMIC-I-6018 S 1661-01-HT-012 1661-01 Depropanizer @ Unit: 12-Mar-15
F1

1466-00: CH
SMIC-I-6014 S 1466-00-HT-001 1466-00 Condensate @ Unit: 12-Mar-15
K1,K2,L1,L2,N1,N2

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 12-Mar-15
F1,F3,L3,V2

1651-00: Dryers @
SMIC-I-6017 S 1651-00-HT-008 1651-00 Unit: G2 12-Mar-15

SMIC-I-6013 S 1606-02-HT-006 1606-02 1606-02: F-1160 12-Mar-15


Process @ Furnce Area
1606-02: F-1170
SMIC-I-6013 S 1607-02-HT-006 RT1 1607-02 12-Mar-15
Process @ Furnce Area

SMIC-I-6018 S 1631-02-HT-004 1631-02 1631-02 : CGC 2nd dis 12-Mar-15

1507-01 : F-1170 BFW,


SMIC-I-6014 S 1507-01-HT-007 1507-01 Steam Drum & SVH 13-Mar-15
Side

1632-01: CGC Stm


SMIC-I-6014 S 1632-01-HT-002 1623-01 13-Mar-15
Turbine @ Unit: W5

1456-00: SLL STEAM @


SMIC-I-6014 S 1456-00-HT-001 1456-00 13-Mar-15
Unit: K1,K2,L1,L2

1704-02 : C2
SMIC-I-6018 S 1704-02-HT-041 1704-02 Refrigeration (Area: A , 13-Mar-15
Unit: F2 )

1661-01: HP
SMIC-I-6018 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 13-Mar-15
F1,F2,L3,L4,V3

1661-01: HP
SMIC-I-6018 S 1661-01-HT-001 1661-01 Depropanizer @ Unit: 13-Mar-15
K1,K2,L2,W4

1683-03 : Methane
SMIC-I-6018 S 1683-03-HT-021 1683-03 Wash and Cold Box 13-Mar-15
( Area: A, Unit: F4)

1691-01: Deethanizer
SMIC-I-6012 S 1691-01-HT-031 1691-01 13-Mar-15
@ Unit:F2

KIC MATERIAL
STORAGE AREA WEST
SMIC-I-6011 W SIDE OF DAELIM 13-Mar-15
OFFICE

SMIC-I-6013 S 1451-00-HT-001 1451-00 1451-00: SVH Steam @ 14-Mar-15


unit: L1,L2,L3,V2,W5,
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6016 S 1541-00-HT-001 1541-00 Unit: 14-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6016 S 1541-00-HT-002 1541-00 Unit: 14-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1761-00 : Pad Water
SMIC-I-6014 W 1761-00-HT-006 1761-00 Treatment @ Unit : 14-Mar-15
G3,L1,L2,N1,N2

1624-02 : Process
Condensate Holding
SMIC-I-6014 W 1624-02-HT-001 1624-02 14-Mar-15
Tank (Area:A, Unit: G3,
L1)

1506-01 : F-1160
SMIC-I-6014 S 1506-01-HT-001 RT1 1506-01 BFW, Steam Drum & 14-Mar-15
SVH Side

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 14-Mar-15
F1,F3,L3,V2

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-031 1691-01 15-Mar-15
@ Unit:F2

1631-01: CGC 1st Sue/


SMIC-I-6012 S 1631-01-HT-002 1631-01 dis & 2nd Sue @ Unit: 15-Mar-15
L2,W5,

1682-01: Acetylene
SMIC-I-6012 S 1682-01-HT-004 1682-01 Reactors @ Unit: 15-Mar-15
M1,N1,N2

1623-01: Water
SMIC-I-6012 S 1623-01-HT-015 1623-01 Quench System @ 15-Mar-15
Unit: L1,L2,W5

1627-00: Steam out


QCD @ Unit:
SMIC-I-6012 S 1627-00-HT-002 1627-00 F1,G1,K1,K2,L1,L2,L3,L 15-Mar-15
4,N1,V3,V4,W5

SMIC-I-6012 S 1631-02-HT-002 1631-02 1631-02: CGC 2nd dis / 15-Mar-15


3rd Sue @ Unit: W5
1623-01: Water
SMIC-I-6012 S 1623-01-HT-019 1623-01 Quench System @ 15-Mar-15
Unit: L1

1623-01: Water
SMIC-I-6015 S 1623-01-HT-019 1623-01 Quench System @ 15-Mar-15
Unit: G2,L1,L2,N1

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-004 1704-02 Refrigeration 15-Mar-15

1466-00: CH
SMIC-I-6014 S 1466-00-HT-003 1466-00 Condensate @ Unit: 15-Mar-15
V4, M1,L3,F1

1704-02: C2
SMIC-I-6015 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 15-Mar-15
L2,N1,N2
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6017 S 1541-00-HT-001 1541-00 Unit: 16-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6017 S 1541-00-HT-002 1541-00 Unit: 16-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1714-00: C3R
SMIC-I-6017 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 16-Mar-15
F1,F3,L3,V2

1683-03 : Methane
SMIC-I-6018 W wash and Cold box 16-Mar-15
( Area: A, Unit: F4)

1606-02: F-1170
SMIC-I-6014 W 1607-02-HT-006 RT1 1607-02 16-Mar-15
Process @ Furnce Area

1661-01 : HP
SMIC-I-6014 W 1661-01-HT-005 1661-01 Depropanizer @ Unit: 16-Mar-15
F1,L3

1661-01 : LP
SMIC-I-6014 W 1661-01-HT-021 1661-01 Depropanizer ( Area: A, 16-Mar-15
Unit:F1 )
1651-00: Dryers @
SMIC-I-6018 S 1651-00-HT-002 1651-00 16-Mar-15
Unit : F1,G2,N1

1651-00: Dryers @
SMIC-I-6018 S 1651-00-HT-002 1651-00 16-Mar-15
Unit : F1

1453-00: SM Steam @
SMIC-I-6012 S 1453-00-HT-001 B 1453-00 Unit: L2 17-Mar-15

1605-02" F-1150
SMIC-I-6012 S 1605-02-HT-006 1605-02 Process @ Unit: 17-Mar-15
Furnace Area

1691-01: Deethanizer
SMIC-I-6015 S 1691-01-HT-011 1691-01 17-Mar-15
@ Unit: F2

1651-00: Dryers @
SMIC-I-6015 S 1651-00-HT-003 1651-00 17-Mar-15
Unit: G2

1651-00: Dryers @
SMIC-I-6012 S 1651-00-HT-003 1651-00 17-Mar-15
Unit: G2

1704-02: C2
SMIC-I-6015 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 17-Mar-15
F1,L3,

1613-02: F-1230
SMIC-I-6012 S 1613-02-HT-006 1613-02 Process @ Unit: 17-Mar-15
Furnace

1701-03: Ethylene
SMIC-I-6012 S 1701-03-HT-001 1701-03 17-Mar-15
Product @ Unit: L4

1691-01 : Deethanizer
SMIC-I-6018 W 1691-01-HT-002 1691-01 r ( Area: A ; Unit: F2 ) 17-Mar-15

1621-01: Oil quench


SMIC-I-6014 S 1621-01-HT-002 1621-01 Tower & QO System @ 17-Mar-15
Unit: Furnce Area
1691-01: Deethanizer
SMIC-I-6017 S 1691-01-HT-031 1691-01 17-Mar-15
@ Unit:F2

1631-01: CGC 1st Sue/


SMIC-I-6013 S 1631-01-HT-002 1631-01 dis & 2nd Sue @ Unit: 17-Mar-15
L2,W5,

1682-01: Acetylene
SMIC-I-6013 S 1682-01-HT-004 1682-01 Reactors @ Unit: 17-Mar-15
M1,N1,N2

1623-01: Water
SMIC-I-6013 S 1623-01-HT-015 1623-01 Quench System @ 17-Mar-15
Unit: L1,L2,W5

1627-00: Steam out


QCD @ Unit:
SMIC-I-6013 S 1627-00-HT-002 1627-00 17-Mar-15
F1,G1,K1,K2,L1,L2,L3,L
4,N1,V3,V4,W5

1631-02: CGC 2nd dis /


SMIC-I-6013 S 1631-02-HT-002 1631-02 17-Mar-15
3rd Sue @ Unit: W5

1623-01: Water
SMIC-I-6013 S 1623-01-HT-019 1623-01 Quench System @ 17-Mar-15
Unit: L1

1623-01: Water
SMIC-I-6016 S 1623-01-HT-019 1623-01 Quench System @ 17-Mar-15
Unit: G2,L1,L2,N1

1704-02: C2
SMIC-I-6016 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 17-Mar-15
L2,N1,N2

1781-00: Slop Oil @


SMIC-I-6012 S 1781-00-HT-001 1781-00 18-Mar-15
Unit: G3

1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6015 S 1605-02-HT-006 1605-02 F1,F3,G1,L2,L3,L4,N1,V 18-Mar-15
2

SMIC-I-6018 W 1662-01-HT-008 1662-01 1662-01 : LP 18-Mar-15


Depropanizer
1662-01 : LP
SMIC-I-6014 W 1662-01-HT-015 1662-01 Depropanizer (Area: A, 18-Mar-15
Unit: F1 )

1623-01: Water
SMIC-I-6018 S 1623-01-HT-010 1623-01 18-Mar-15
Quench System

1451-00: SVH Steam @


SMIC-I-6014 S 1451-00-HT-001 1451-00 Unit: L3 18-Mar-15

1451-00: SVH Steam @


SMIC-I-6014 S 1451-00-HT-001 1451-00 18-Mar-15
unit: L1,L2,L3,V2,W5,

1651-00: Dryers @
SMIC-I-6013 S 1651-00-HT-003 1651-00 18-Mar-15
Unit: G2

1613-02: F-1230
SMIC-I-6013 S 1613-02-HT-006 1613-02 Process @ Unit: 18-Mar-15
Furnace

1701-03: Ethylene
SMIC-I-6013 S 1701-03-HT-001 1701-03 18-Mar-15
Product @ Unit: L4

1453-00: SM Steam @
SMIC-I-6013 S 1453-00-HT-001 B 1453-00 Unit: L2 18-Mar-15

1605-02" F-1150
SMIC-I-6013 S 1605-02-HT-006 1605-02 Process @ Unit: 18-Mar-15
Furnace Area

1691-01: Deethanizer
SMIC-I-6016 S 1691-01-HT-011 1691-01 19-Mar-15
@ Unit: F2

1651-00: Dryers @
SMIC-I-6016 S 1651-00-HT-003 1651-00 Unit: G2 19-Mar-15

1704-02: C2
SMIC-I-6016 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 19-Mar-15
F1,L3,
1781-00: Slop Oil @
SMIC-I-6013 S 1781-00-HT-001 1781-00 19-Mar-15
Unit: G3

TP: 1531-01-HT-001
SMIC-I-6014 W 1531-01-HT-001 1531-01 1531-01 : BFV (Area A, 19-Mar-15
Unit T1,T2,T3)

1606-02: F-1160
SMIC-I-6014 W 1606-02-HT-006 1606-02 Process @ Furnce Area 19-Mar-15

1541-00: Eye Bath &


Safety Showers @
SMIC-I-6018 S 1541-00-HT-001 1541-00 Unit: 19-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6018 S 1541-00-HT-002 1541-00 Unit: 19-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6015 S 1714-00-HT-012 1714-00 21-Mar-15
F1,F3,G1,L2,L3,L4,N1,V
2

1623-01: Water
SMIC-I-6017 S 1623-01-HT-019 1623-01 Quench System @ 21-Mar-15
Unit: G2,L1,L2,N1

1651-00: Dryers @
SMIC-I-6017 S 1651-00-HT-003 1651-00 Unit: G2 21-Mar-15

1681-00: Deprop O/H


SMIC-I-6016 S 1681-00-HT-013 1681-00 System (Area: A, 21-Mar-15
Unit:L4,L3,F3,F1)

1651-00: Dryers @
SMIC-I-6017 S 1651-00-HT-009 1651-00 21-Mar-15
Unit: G2

1691-01: Deethanizer
SMIC-I-6017 S 1691-01-HT-011 1691-01 @ Unit: F2 21-Mar-15

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-018 1683-03 wash and Cold box 21-Mar-15
( Area: A, Unit: F4)
1744-01: Dry Flare @
SMIC-I-6014 W 1744-01-HT-002 1744-01 21-Mar-15
Unit: G3

1531-02 : BFH @ Unit:


SMIC-I-6014 W 1531-02-HT-001 1531-02 21-Mar-15
L1,L2

1704-02: C2
SMIC-I-6017 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 21-Mar-15
L2,N1,N2

1704-02: C2
SMIC-I-6017 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 21-Mar-15
F1,L3,

1452-00: SH Steam @
SMIC-I-6012 S 1452-00-HT-020 1452-00 22-Mar-15
Unit: L2

1681-00: Deprop O/H


SMIC-I-6017 S 1681-00-HT-013 1681-00 System (Area: A, 22-Mar-15
Unit:L4,L3,F3,F1)

1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6016 S 1714-00-HT-012 1714-00 22-Mar-15
F1,F3,G1,L2,L3,L4,N1,V
2

1452-00 : SH Steam
SMIC-I-6014 W 1452-00-HT-018 1452-00 (Area: A, Unit: L2) 22-Mar-15

1744-01: Dry Flare @


SMIC-I-6014 W 1744-02-HT-004 1744-02 22-Mar-15
Unit: G3

1453-00 : SM STEAM
SMIC-I-6014 W 1453-00-HT-009 1453-00 22-Mar-15
@ Unit: L1

1682-01: Acetylene
SMIC-I-6014 S 1682-01-HT-004 1682-01 Reactors @ Unit: 22-Mar-15
M1,N1,N2

SMIC-I-6012 S 1621-03-HT-002 1621-03 1621-03: LFO Stripper 23-Mar-15


@ Unit: L1
1714-00: C3R
SMIC-I-6015 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 23-Mar-15
F3,L3

1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6017 S 1714-00-HT-012 1714-00 23-Mar-15
F1,F3,G1,L2,L3,L4,N1,V
2

1452-00: SH Steam @
SMIC-I-6013 S 1452-00-HT-020 1452-00 Unit: L2 23-Mar-15

1531-03 : BFM @ Unit :


SMIC-I-6014 W 1531-03-HT-002 1531-03 23-Mar-15
L1,L2,W5

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-040 1683-02 Methanizers (Area: A, 23-Mar-15
Unit: F3 )

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-041 1683-02 Methanizers ( Area: A, 23-Mar-15
Unit: F3)

1621-03: LFO Stripper


SMIC-I-6012 S 1623-01-HT-006 1623-01 24-Mar-15
@ Unit: L1

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-012 1683-02 Methanizers @ 24-Mar-15
Area:F3

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-017 1683-02 Methanizers @ 24-Mar-15
Area:F3

1616-00: Furnace Gas


SMIC-I-6018 W 1616-00-HT-001 1616-00 Feed Prep @ Unit: 24-Mar-15
Furnace P/R

1607-01: Fuel &


SMIC-I-6012 S 1607-01 1607-01 BURNER SYSTEM @ F- 24-Mar-15
1170

1606-01: Fuel &


SMIC-I-6012 S 1606-01 1606-01 BURNER SYSTEM @ F- 24-Mar-15
1160
1466-00: CH
Condensate @ Unit:
SMIC-I-6012 S 1466-00-HT-002 1466-00 24-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2

1682-01: Acetylene
SMIC-I-6012 S 1682-01-HT-011 1682-01 24-Mar-15
Reactor @ Unit: M1

1744-01: Dry Flare @


SMIC-I-6012 S 1744-01-HT-003 1744-01 Unit: G3,N2 24-Mar-15

1627-00: Steam out


QCD @ Unit:
SMIC-I-6014 W 1627-00-HT-002 1627-00 25-Mar-15
F1,G1,K1,K2,L1,L2,L3,L
4,N1,V3,V4,W5

1634-00 : LP Drips
SMIC-I-6014 W 1634-00-HT-025 1634-00 Stripper (Area: A, Unit: 25-Mar-15
W5 )

1634-00 : LP Drips
SMIC-I-6014 W 1634-00-HT-024 1634-00 Stripper (Area: A, Unit: 25-Mar-15
W5 )

1631-04 : CGC Sealing


SMIC-I-6014 W 1631-04-HT-027 1631-04 Steam System ( Area: A 25-Mar-15
; Unit: W5 )

1651-00: Dryers
SMIC-I-6018 S 1651-00-HT-005 1651-00 ( Area: 25-Mar-15
A, Unit:F1)

1662-01 LP
SMIC-I-6018 S 1662-01-HT-003 1662-01 Depropanizer (Area:A, 25-Mar-15
Unit: F1,L3)
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6018 S 1541-00-HT-001 1541-00 Unit: 25-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1541-00: Eye Bath &
Safety Showers @
SMIC-I-6018 S 1541-00-HT-002 1541-00 Unit: 25-Mar-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1605-02" F-1150
SMIC-I-6014 W 1605-02-HT-006 1605-02 Process @ Unit: 25-Mar-15
Furnace Area
1683-02: Secondary
SMIC-I-6015 S 1683-02-HT-032 1683-02 25-Mar-15
Methanizers

1604-02: F-1140
SMIC-I-6012 S 1604-02-HT-006 1604-02 25-Mar-15
Process @ Furnce Area

1621-03: LFO Stripper


SMIC-I-6013 S 1621-03-HT-002 1621-03 @ Unit: L1 26-Mar-15

1682-01: Acetylene
SMIC-I-6013 S 1682-01-HT-011 1682-01 26-Mar-15
Reactor @ Unit: M1

1744-01: Dry Flare @


SMIC-I-6013 S 1744-01-HT-003 1744-01 26-Mar-15
Unit: G3,N2

1621-03: LFO Stripper


SMIC-I-6013 S 1623-01-HT-006 1623-01 26-Mar-15
@ Unit: L1

1631-04 : CGC Sealing


SMIC-I-6014 W 1631-04-HT-030 1631-04 Steam System(Area:A, 26-Mar-15
Unit: W5)

1681-00 : Deprop O/H


SMIC-I-6014 W 1681-00-HT-002 1681-00 System (Area: A, Unit: 26-Mar-15
M1)

1621-01: Oil quench


SMIC-I-6014 W 1621-01-HT-002 1621-01 Tower & QO System @ 26-Mar-15
Unit: Furnce Area

1652-00: Dryer
SMIC-I-6014 W 1652-00-HT-002 1652-00 Regeneration @ Unit: 26-Mar-15
G2

1682-01:
SMIC-I-6012 S 1682-01-HT-001 1682-01 AcetyleneReactor @ 26-Mar-15
Unit: M1

SMIC-I-6016 S 1683-02-HT-032 1683-02 1683-02: Secondary 27-Mar-15


Methanizers
1604-02: F-1140
SMIC-I-6013 S 1604-02-HT-006 1604-02 27-Mar-15
Process @ Furnce Area

1721-02: Upper C3
SMIC-I-6012 S 1721-02-HT-017 1721-02 27-Mar-15
Splitter @ Unit: K1

1682-02: Secondary CG
SMIC-I-6015 S 1682-02-HT-001 1682-02 Dryers @ Unit: G2 27-Mar-15

1641-00: Caustic Wash


SMIC-I-6015 S 1641-00-HT-026 1641-00 27-Mar-15
Tower @ Unit: G1,N1

1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6018 S 1714-00-HT-012 1714-00 27-Mar-15
F1,F3,G1,L2,L3,L4,N1,V
2

1681-00: Deprop O/H


SMIC-I-6018 S 1681-00-HT-013 1681-00 System (Area: A, 27-Mar-15
Unit:L4,L3,F3,F1)

1714-00: C3R
SMIC-I-6018 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 27-Mar-15
F1,F3,L3,V2

1681-00 : Deprop O/H


SMIC-I-6018 W 1681-00-HT-022 1681-00 (Area: A , Unit: F1 ) 28-Mar-15

1632-02 : CGC Stm


Turbine Surface
SMIC-I-6014 W 1632-02-HT-005 1632-02 28-Mar-15
Condensate ( Area: A,
Unit:W5 )

1682-01:
SMIC-I-6013 S 1682-01-HT-001 1682-01 AcetyleneReactor @ 28-Mar-15
Unit: M1

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 29-Mar-15
F3,L3

SMIC-I-6016 S 1682-02-HT-001 1682-02 1682-02: Secondary CG 29-Mar-15


Dryers @ Unit: G2
1641-00: Caustic Wash
SMIC-I-6016 S 1641-00-HT-026 1641-00 29-Mar-15
Tower @ Unit: G1,N1

1721-02: Upper C3
SMIC-I-6013 S 1721-02-HT-017 1721-02 29-Mar-15
Splitter @ Unit: K1

1662-01 : LP
SMIC-I-6018 S 1662-01-HT-005 1662-01 Depropanizer ( Area: 29-Mar-15
A, Unit:F1)

1683-02 : Secondary
SMIC-I-6018 S 1683-02-HT-003 1683-02 Methanizers ( Area: A, 29-Mar-15
Unit: F3,L4)

1672-02: Deprop O/H


turbine Surface
SMIC-I-6014 W 1672-02-HT-010 1672-02 29-Mar-15
Condensate ( Area: A,
Unit:V1)

1651-00: Dryers @
SMIC-I-6018 W 29-Mar-15
Unit: G2

1623-01: Water
Quench System @
SMIC-I-6012 S 1623-01-HT-008 1623-01 Unit: 30-Mar-15
F1,F2,G1,H2,H4,K1,K2,L
1,L2,L3,T3,T4,W3

1731-01: Debutanizer
SMIC-I-6012 S 1731-01-HT-042 1731-01 @ Unit: V4 30-Mar-15

1704-02: C2
SMIC-I-6015 S 1704-02-HT-029 1704-02 Refrigeration @ Unit: 30-Mar-15
F2

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 30-Mar-15
F3,L3

1682-02: Secondary CG
SMIC-I-6017 S 1682-02-HT-001 1682-02 Dryers @ Unit: G2 30-Mar-15

SMIC-I-6017 S 1641-00-HT-026 1641-00 1641-00: Caustic Wash 30-Mar-15


Tower @ Unit: G1,N1
1683-03 : Methane
SMIC-I-6018 W 1691-01-HT-025 1691-01 wash and Cold box 30-Mar-15
( Area: A, Unit:F3)

1714-00 : C3R
SMIC-I-6018 W 1714-00-HT-027 1714-00 Refrigeration ( Area: A, 30-Mar-15
Unit: V2)

1456-00 : SLL Steam


SMIC-I-6018 W 1456-00-HT-007 1456-00 ( Area: A, Unit: G3, N3 ) 30-Mar-15

1613-02: F-1230
SMIC-I-6014 S 1613-02-HT-006 1613-02 Process @ Unit: 30-Mar-15
Furnace

1743-00: LBD Header


SMIC-I-6015 S 1743-00-HT-001 1743-00 30-Mar-15
@ Unit: F2,F3,V1

1744-01: Dry Flare @


SMIC-I-6014 S 1744-01-HT-003 1744-01 31-Mar-15
Unit: G3,N2

1701-01 : C2R
SMIC-I-6018 W 1701-01-HT-006 1701-01 Compressor ( Area: A, 31-Mar-15
Unit: F2)

1691-01: Deethanizer
SMIC-I-6018 W 1691-01-HT-011 1691-01 @ Unit: F2 31-Mar-15

1683-02: Secondary
SMIC-I-6016 S 1683-02-HT-032 1683-02 2-Apr-15
Methanizers

1623-01: Water
Quench System @
SMIC-I-6013 S 1623-01-HT-008 1623-01 Unit: 2-Apr-15
F1,F2,G1,H2,H4,K1,K2,L
1,L2,L3,T3,T4,W3

1731-01: Debutanizer
SMIC-I-6013 S 1731-01-HT-042 1731-01 @ Unit: V4 2-Apr-15

1704-02: C2
SMIC-I-6016 S 1704-02-HT-029 1704-02 Refrigeration @ Unit: 2-Apr-15
F2
1704-02 : C2
SMIC-I-6018 W 1704-02-HT-040 1704-02 Refrigeration ( Area: A, 2-Apr-15
Unit:F2)

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-006 1613-02 Process @ Unit: 2-Apr-15
Furnace

1662-01 : LP
SMIC-I-6018 W 1662-01-HT-031 1662-01 Depropanizer (Area: A, 2-Apr-15
Unit:F1A)

1507-01 : F-1170 BFW,


SMIC-I-6014 W Steam Drum & SVH 2-Apr-15
Side

1507-01: F-1170 BFW,


SMIC-I-6014 W 1507-01-HT-001 RT1 1507-01 2-Apr-15
Stm Drum & SVH Side

1682-02: Secondary CG
SMIC-I-6012 S 1682-02-HT-004 1682-02 2-Apr-15
Dryer @ Unit: G2

1682-02: Secondary CG
SMIC-I-6015 S 1682-02-HT-004 1682-02 2-Apr-15
Dryer @ Unit: G2

1714-00: C3R
SMIC-I-6015 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 2-Apr-15
G1,K1,K2

1613-02: F-1240
SMIC-I-6012 S 1614-02-HT-006 1614-02 Process @ Unit: 2-Apr-15
Furnace

1623-01: Water
SMIC-I-6012 S 1623-01-HT-008 1623-01 Quench System @ 2-Apr-15
Unit: F1,F2,W4

1704-02: C2
SMIC-I-6017 S 1704-02-HT-029 1704-02 Refrigeration @ Unit: 3-Apr-15
F2

1623-01: Water
SMIC-I-6012 S 1623-01-HT-007 1623-01 Quench System @ 3-Apr-15
Unit: F1,F2
1625-00, Dilution
SMIC-I-6014 S 1625-00-HT-005 1625-00 Steam Generation 3-Apr-15
(Area: A, Unit: H3 )

1641-00: Caustic Wash


SMIC-I-6018 S 1641-00-HT-026 1641-00 3-Apr-15
Tower @ Unit: G1,N1

1463-00 : CM
SMIC-I-6014 S 1463-00-HT-001 1463-00 Condensate @ Unit : 3-Apr-15
L1,L2, W5

1704-02: C2
SMIC-I-6018 S 1704-02-HT-036 1704-02 Refrigeration @ Unit: 3-Apr-15
F1,L2,L3,N1,N2

1615-02: F-1250
SMIC-I-6012 S 1615-02-HT-006 RT1 1615-02 Process @ Unit: 3-Apr-15
Furnace

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-032 1683-02 4-Apr-15
Methanizers

1456-00: SLL STEAM @


SMIC-I-6014 W 1744-01-HT-007 1744-01 4-Apr-15
Unit: K1,K2,L1,L2

1731-01 : Debutanizer
SMIC-I-6014 W 1731-01-HT-003 1731-01 (Area: A, Unit: V4 4-Apr-15

1453-00, SM STEAM
SMIC-I-6014 W 1453-00-HT-011 1453-00 4-Apr-15
(Area: A, Unit: L2)

1623:-01 : Water
SMIC-I-6014 W 1623-01-HT-002 1623-01 4-Apr-15
Quench System

1781-00: Slop Oil @


SMIC-I-6014 W 1781-00-HT-001 1781-00 Unit: G3 4-Apr-15

1641-00 : Caustic
SMIC-I-6018 W 1641-00-HT-024 1641-00 Wash ( Area: A, Unit: 4-Apr-15
G1)
1682-02: Secondary CG
SMIC-I-6013 S 1682-02-HT-004 1682-02 4-Apr-15
Dryer @ Unit: G2

1682-02: Secondary CG
SMIC-I-6016 S 1682-02-HT-004 1682-02 4-Apr-15
Dryer @ Unit: G2

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 4-Apr-15
G1,K1,K2

1613-02: F-1240
SMIC-I-6013 S 1614-02-HT-006 RT1 1614-02 Process @ Unit: 4-Apr-15
Furnace

1623-01: Water
SMIC-I-6013 S 1623-01-HT-008 1623-01 Quench System @ 4-Apr-15
Unit: F1,F2,W4

1625-00 : Dilution
SMIC-I-6012 S 1625-00-HT-002 1625-00 Steam Generation @ 5-Apr-15
Unit: L1

1682-02: Secondary CG
SMIC-I-6017 S 1682-02-HT6-004 1682-02 5-Apr-15
Dryer @ Unit: G2

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 5-Apr-15
G1,K1,K2

1744-01: Dry Flare @


SMIC-I-6014 W 1744-01-HT-003 1744-01 5-Apr-15
Unit: G3,N2

1661-01: HP
SMIC-I-6018 W 1661-01-HT-012 1661-01 Depropanizer @ Unit: 5-Apr-15
F1

1621-03: LFO Stripper


SMIC-I-6014 W 1621-03-HT-002 1621-03 @ Unit: L1 5-Apr-15

1623-01: Water
SMIC-I-6013 S 1623-01-HT-007 1623-01 Quench System @ 5-Apr-15
Unit: F1,F2
1625-00 : Dilution
SMIC-I-6013 S 1625-00-HT-002 1625-00 Steam Generation @ 6-Apr-15
Unit: L1

1466-00: CH
Condensate @ Unit:
SMIC-I-6013 S 1466-00-HT-002 1466-00 6-Apr-15
F1,F2,F3,F4,L3,L4,M1,V
1,V2,V3,V4
1466-00: CH
Condensate @ Unit:
SMIC-I-6013 S 1466-00-HT-002 1466-00 G1,G2,G3,K1,K2,L1,L2, 6-Apr-15
N1,N2

1743-00: LBD Header


SMIC-I-6016 S 1743-00-HT-001 1743-00 6-Apr-15
@ Unit: F2,F3,V1

1654-00: Fuel Gas


Furnace Dryout @
SMIC-I-6014 W 1654-00-HT-001 1654-00 6-Apr-15
Unit:
G1,L1,L2,T1,T2&T3

1743-00: LBD Header


SMIC-I-6018 W 1743-00-HT-002 1743-00 ( Area: A, Unit: F4 6-Apr-15
)

1604-02: F-1140
SMIC-I-6014 W 1604-02-HT-006 1604-02 6-Apr-15
Process @ Furnce Area

1743-00: LBD Header


SMIC-I-6017 S 1743-00-HT-001 1743-00 @ Unit: F2,F3,V1 7-Apr-15

1651-00: Dryers @
SMIC-I-6018 W 1651-00-HT-003 1651-00 7-Apr-15
Unit: G2

1651-00: Dryers @
SMIC-I-6014 W 1651-00-HT-003 1651-00 7-Apr-15
Unit: G2

1623-01: Water
Quench System @
SMIC-I-6014 S 1623-01-HT-008 1623-01 Unit: 7-Apr-15
F1,F2,G1,G1,K1,L1,L2,L
3,W4
1714-00: C3R
SMIC-I-6018 S 1714-00-HT-007 1714-00 Refrigeration @ Unit: 7-Apr-15
F3,G1,K1,K2,L2,L3,V2,V
4
1602-02: F-1120
SMIC-I-6012 S 1602-02-HT-006 1602-02 7-Apr-15
Process @ Furnce Area

1603-02: F-1130
SMIC-I-6012 S 1603-02-HT-006 1603-02 7-Apr-15
Process @ Furnce Area

1466-00: CH
Condensate @ Unit:
SMIC-I-6012 S 1466-00-HT-002 1466-00 F1,F2,F3,F4,L3,L4,M1,V 7-Apr-15
1,V2,V3,V4,T1,T2,T3,T4

1623-01: Water
SMIC-I-6014 W 1623-01-HT-015 1623-01 Quench System @ 8-Apr-15
Unit: L1,L2,W5

1651-00: Dryers @
SMIC-I-6018 W 1651-00-HT-008 1651-00 8-Apr-15
Unit: G2

1613-02: F-1240
SMIC-I-6014 S 1614-02-HT-006 1614-02 Process @ Unit: 8-Apr-15
Furnace

1602-02: F-1120
SMIC-I-6013 S 1602-02-HT-006 1602-02 9-Apr-15
Process @ Furnce Area

1603-02: F-1130
SMIC-I-6013 S 1603-02-HT-006 1603-02 Process @ Furnce Area 9-Apr-15

1466-00: CH
Condensate @ Unit:
SMIC-I-6013 S 1466-00-HT-002 1466-00 F1,F2,F3,F4,L3,L4,M1,V 9-Apr-15
1,V2,V3,V4 & Furnace
Area

1601-02: F-1110
SMIC-I-6012 S 1601-02-H-T006 1601-02 9-Apr-15
Process @ Furnce Area

1682-01:
SMIC-I-6014 S 1682-01-HT-001 1682-01 AcetyleneReactor @ 9-Apr-15
Unit: M1

1625-00 : DILUTION
SMIC-I-6014 S 1625-00-HT-002 1625-00 STEAM GENERATION 10-Apr-15
@ L1 & E/W PIPE
RACK)
1623-01: Water
SMIC-I-6014 S 1623-01-HT-007 1623-01 Quench System @ 10-Apr-15
Unit: F1,F2

1623-01: Water
SMIC-I-6014 S 1623-01-HT-019 1623-01 Quench System @ 10-Apr-15
Unit: L1

1632-02: CGC Stm


Turbine Surface
SMIC-I-6014 S 1632-02-HT-003 1632-02 Condensate ( Area: A, 10-Apr-15
Unit: W5)

1621-03: LFO Stripper


SMIC-I-6014 S 1623-01-HT-006 1623-01 10-Apr-15
@ Unit: L1

1623-01: Water
SMIC-I-6012 S 1623-01-HT-008 1623-01 Quench System @ 10-Apr-15
Unit: L1

1506-01 : F-1160
SMIC-I-6014 W 1506-01-HT-001 RT1 1506-01 BFW, Steam Drum & 11-Apr-15
SVH Side

1622-00: Flux Oil @


SMIC-I-6014 W 1622-00-HT-002 1622-00 11-Apr-15
Unit: L1

1601-02: F-1110
SMIC-I-6013 S 1601-02-HT-006 1601-02 Process @ Furnce Area 11-Apr-15

1611-02: F-1210
SMIC-I-6012 S 1611-02-HT-006 1611-02 12-Apr-15
Process @ Furnce Area

1612-02: F-1220
SMIC-I-6012 S 1612-02-HT-006 1612-02 12-Apr-15
Process @ Furnce Area

1631-03: CGC 3rd Dis


SMIC-I-6012 S 1631-03-HT-010 1631-03 @ Unit: W5 12-Apr-15

SMIC-I-6014 W 1506-02-HT-001 1506-02 1506-02: F-1160 DS, 12-Apr-15


S10 & Decoking Air
1606-02 : F-1160
SMIC-I-6014 W 1606-02-HT-027 1606-02 Process (Gas Furnace 12-Apr-15
Area)

1451-00: SVH Steam


SMIC-I-6014 S 1451-00-HT-004 1451-00 12-Apr-15
Area A L2 )

1451-00: SVH Steam


SMIC-I-6014 S 1451-00-HT-003 1451-00 ( Area A 12-Apr-15
L2 )

1623-01: Water
SMIC-I-6013 S 1623-01-HT-008 1623-01 Quench System @ 13-Apr-15
Unit: L1

1607-02: F-1170
SMIC-I-6014 W 1607-02-HT-026 1607-02 13-Apr-15
Process ( Furnace )

1502-02: F-1120 DS,


SMIC-I-6014 W 13-Apr-15
S10 & Decoking Air

1625-00, Dilution
SMIC-I-6014 W 1625-00-HT-005 1625-00 Steam Generation 13-Apr-15
(Area: A, Unit: H3 )

1615-02: F-1250
SMIC-I-6013 S 1615-02-HT-006 RT1 1615-02 Process @ Unit: 14-Apr-15
Furnace

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-028 1705-01 14-Apr-15
( Area: A, Unit: F2)

1613-02: F-1240
SMIC-I-6014 W 1614-02-HT-006 RT1 1614-02 Process @ Unit: 14-Apr-15
Furnace

1683-03 : Methane
wash and Cold box
SMIC-I-6018 W 1683-03-HT-030 1683-03 ( Area: A, 14-Apr-15
Unit:F3)

SMIC-I-6018 W 1743-00-HT-001 1743-00 1743-00: LBD Header 14-Apr-15


@ Unit: F2,F3,V1
1681-00 : Deprop O/H
SMIC-I-6018 W 1681-00-HT-009 1681-00 System ( Area: A, 14-Apr-15
Unit:F3)

1771-00: Methanol @
SMIC-I-6018 W 1771-00-HT-002 1771-00 14-Apr-15
Unit: F3

1611-02: F-1210
SMIC-I-6013 S 1611-02-HT-006 1611-02 Process @ Furnce Area 15-Apr-15

1612-02: F-1220
SMIC-I-6013 S 1612-02-HT-006 1612-02 15-Apr-15
Process @ Furnce Area

1631-03: CGC 3rd Dis


SMIC-I-6013 S 1631-03-HT-010 1631-03 15-Apr-15
@ Unit: W5

1683-03: Methane
SMIC-I-6018 W 1683-03-HT-011 1683-03 Wash and Cold Box 15-Apr-15
(Area: A, Unit: F3)

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-010 1705-01 15-Apr-15
( Area: A, Unit:F3,L4)

1613-02: F-1230
SMIC-I-6014 W 1613-02-HT-020 1623-02 Process ( Furnace ) 15-Apr-15

1662-01: LP
SMIC-I-6014 W 1662-01-HT-012 1662-01 Depropanizer 15-Apr-15
( Area: A, Unit: F1)

1501-02: F-1120 DS,


SMIC-I-6014 S 1502-02-HT-001 1502-02 15-Apr-15
S10 & Decoking Air

1451-00: SVH Steam @


SMIC-I-6012 S 1451-00-HT-007 1451-00 Unit: L2 15-Apr-15

1623-01: Water
SMIC-I-6012 S 1623-01-HT-007 1623-01 Quench System @ 15-Apr-15
Unit: G1,L1,W4
1714-00: C3R
SMIC-I-6015 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 15-Apr-15
G1,L2,N1

1466-00: CH
Condensate @ Unit:
SMIC-I-6012 S 1466-00-HT-002 1466-00 16-Apr-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2
1466-00: CH
Condensate @ Unit:
SMIC-I-6014 S 1466-00-HT-002 1466-00 F1,F2,F3,F4,L3,L4,M1,V 16-Apr-15
1,V2,V3,V4 & Furnace
Area

1602-02: F-1120
SMIC-I-6014 S 1602-02-HT-006 1602-02 16-Apr-15
Process @ Furnce Area

1651-00: Dryers @
SMIC-I-6018 S 1651-00-HT-009 1651-00 16-Apr-15
Unit: G2

1682-02: Secondary CG
SMIC-I-6018 S 1682-02-HT-001 1682-02 16-Apr-15
Dryers @ Unit: G2

1682-02: Secondary CG
SMIC-I-6014 , SMIC-I-6018S 1682-02-H-T004 1682-02 16-Apr-15
Dryer @ Unit: G2

1451-00: SVH Steam @


SMIC-I-6012 S 1451-00-HT-007 1451-00 Unit: L2 16-Apr-15

1623-01: Water
SMIC-I-6012 S 1623-01-HT-007 1623-01 Quench System @ 16-Apr-15
Unit: G1,L1,W4

1714-00: C3R
SMIC-I-6016 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 16-Apr-15
G1,L2,N1

1511-02: DS, S10 &


SMIC-I-6012 S 1511-02-HT-002 1511-02 Decoking Air @ F-1210 20-Apr-15

SMIC-I-6012 S 1512-02-H-T002 1512-02 1512-02: DS, S10 & 20-Apr-15


Decoking Air @ F-1220
1513-02: DS, S10 &
SMIC-I-6012 S 1513-02-HT-002 1513-02 20-Apr-15
Decoking Air @ F-1230

1514-02: DS, S10 &


SMIC-I-6012 S 1514-02-HT-002 1514-02 20-Apr-15
Decoking Air @ F-1240

1515-02: DS, S10 &


SMIC-I-6012 S 1515-02-HT-002 1515-02 Decoking Air @ F-1250 20-Apr-15

1501-02: DS, S10 &


SMIC-I-6012 S 1501-02-HT-002 1501-02 20-Apr-15
Decoking Air @ F-1110

1502-02: DS, S10 &


SMIC-I-6012 S 1502-02-HT-002 1502-02 20-Apr-15
Decoking Air @ F-1120

1503-02: DS, S10 &


SMIC-I-6012 S 1503-02-HT-002 1503-02 20-Apr-15
Decoking Air @ F-1130

1504-02: DS, S10 &


SMIC-I-6012 S 1504-02-HT-002 1504-02 20-Apr-15
Decoking Air @ F-1140

1505-02: DS, S10 &


SMIC-I-6012 S 1505-02-HT-002 1505-02 Decoking Air @ F-1150 20-Apr-15

1506-02: DS, S10 &


SMIC-I-6012 S 1506-02-HT-002 1506-02 20-Apr-15
Decoking Air @ F-1160

1507-02: DS, S10 &


SMIC-I-6012 S 1507-02-HT-002 1507-02 20-Apr-15
Decoking Air @ F-1170

1651-00: Dryers @
SMIC-I-6018 W 1651-00-HT-002 1651-00 Unit : F1,G2,N1 20-Apr-15

SMIC-I-6018 W 1641-00-HT-026 1641-00 1641-00: Caustic Wash 20-Apr-15


Tower @ Unit: G1,N1
1623-01: Water
Quench System @
SMIC-I-6014 W 1623-01-HT-007 1623-01 20-Apr-15
Unit:
F1,F2,T3,T4,G1,L1,W4

1714-00: C3R
SMIC-I-6017 S 1714-00-HT-010 1714-00 Refrigeration @ Unit: 20-Apr-15
G1,L2,N1

1466-00: CH
Condensate @ Unit:
SMIC-I-6013 S 1466-00-HT-002 1466-00 G1,G2,G3,K1,K2,L1,L2, 20-Apr-15
N1,N2

1511-02: DS, S10 &


SMIC-I-6013 S 1511-02-HT-002 1511-02 21-Apr-15
Decoking Air @ F-1210

1512-02: DS, S10 &


SMIC-I-6013 S 1512-02-HT-002 1512-02 21-Apr-15
Decoking Air @ F-1220

1513-02: DS, S10 &


SMIC-I-6013 S 1513-02-HT-002 1513-02 21-Apr-15
Decoking Air @ F-1230

1514-02: DS, S10 &


SMIC-I-6013 S 1514-02-HT-002 1514-02 21-Apr-15
Decoking Air @ F-1240

1515-02: DS, S10 &


SMIC-I-6013 S 1515-02-HT-002 1515-02 Decoking Air @ F-1250 21-Apr-15

1683-03 : Methane
wash and Cold box
SMIC-I-6018 S 1683-03-HT-009 1683-03 21-Apr-15
( Area: A, Unit:
F3,F4,L4)

1623-01: Water
SMIC-I-6014 S 1623-01-HT-008 1623-01 Quench System @ 21-Apr-15
Unit: T3,T4

1501-02: DS, S10 &


SMIC-I-6013 S 1501-02-HT-002 1501-02 Decoking Air @ F-1110 22-Apr-15

SMIC-I-6013 S 1502-02-HT-002 1502-02 1502-02: DS, S10 & 22-Apr-15


Decoking Air @ F-1120
1503-02: DS, S10 &
SMIC-I-6013 S 1503-02-HT-002 1503-02 22-Apr-15
Decoking Air @ F-1130

1504-02: DS, S10 &


SMIC-I-6013 S 1504-02-HT-002 1504-02 22-Apr-15
Decoking Air @ F-1140

1505-02: DS, S10 &


SMIC-I-6013 S 1505-02-HT-002 1505-02 Decoking Air @ F-1150 22-Apr-15

1506-02: DS, S10 &


SMIC-I-6013 S 1506-02-HT-002 1506-02 22-Apr-15
Decoking Air @ F-1160

1507-02: DS, S10 &


SMIC-I-6013 S 1507-02-HT-002 1507-02 22-Apr-15
Decoking Air @ F-1170

1701-03: N2
SMIC-I-6018 W 1701-03-HT-010 1701-03 Refrigeration 22-Apr-15
( Area: A, Unit: N2)

1704-02: C2
SMIC-I-6018 W Refrigeration @ Unit: 22-Apr-15
F1,L2,L3,N1,N2

1721-03: Propylene
SMIC-I-6018 W 1721-03-HT-002 1721-03 Production @ Unit: 22-Apr-15
F3,L2,L3,N1,N2

1683-03 : Methane
Wash and Cold Box
SMIC-I-6018 W 22-Apr-15
( Area: A, Unit: F3, F4,
L4)

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-011 1705-01 22-Apr-15
( Area: A, Unit:F2 )

1615-02: F-1250
SMIC-I-6014 W Process @ Unit: 23-Apr-15
Furnace

1714-00: C3R
SMIC-I-6018 W Refrigeration @ Unit: 23-Apr-15
F1,F3,G1,L2,L3,L4,N1,V
2
1681-00: Deprop O/H
SMIC-I-6018 W 1681-00-HT-013 1681-00 System (Area: A, 23-Apr-15
Unit:L4,L3,F3,F1)

1615-02: F-1250
SMIC-I-6014 S 1615-02-HT-006 RT1 1615-02 Process @ Unit: 24-Apr-15
Furnace

1466-00: CH
Condensate @ Unit:
SMIC-I-6014 S 1466-00-HT-002 1466-00 G1,G2,G3,K1,K2,L1,L2, 24-Apr-15
N1,N2

1603-02: F-1130
SMIC-I-6014 S 1603-02-HT-006 1603-02 24-Apr-15
Process @ Furnce Area

1711-01: C3R
SMIC-I-6012 S 1711-01-HT-004 1711-01 24-Apr-15
Compressor @ Unit: V2

KIC LAYDOWN AREA


SMIC-I-6011 W (WEST SIDE OF DAELIM 24-Apr-15
OFFICE)

1652-00 : Dryer
SMIC-I-6014 W 1652-00-HT-006 1652-00 Refeneration @ Unit : 25-Apr-15
G2

1662-01: LP
SMIC-I-6014 W 1662-01-HT-016 1662-01 Depropanizer Area: A 25-Apr-15
@ Unit: F1, L3

1705-01: C2 Splitter
SMIC-I-6018 W 1681-00-HT-006 1681-00 25-Apr-15
(Area: A, Unit:F2)

1705-01 : C2 Splitter
SMIC-I-6018 W 1705-01-HT-001 1705-01 25-Apr-15
(Area: A, Unit:F2)

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-003 1704-02 Refrigeration (Area: A , 25-Apr-15
Unit: F2, F3, F4, L3, L4 )

1631-01: CGC 1st


SMIC-I-6019 W Sue/dis & 2nd Sue @ 26-Apr-15
Unit: W5
1631-02: CGC 2nd
SMIC-I-6019 W dis/3rd Sue @ Unit: 26-Apr-15
W5

1631-03: CGC 3rd Dis


SMIC-I-6019 W 26-Apr-15
@ Unit: W5

1623-01: Water
SMIC-I-6013 W Quench System @ 26-Apr-15
Unit: W4

1631-03: CGC 3rd Dis


SMIC-I-6012 W 26-Apr-15
@ Unit: W5

1631-01: CGC 1st


SMIC-I-6019 W 1631-01-HT-004 1631-01 Sue/dis & 2nd Sue @ 27-Apr-15
Unit: W5

1631-02: CGC 2nd


SMIC-I-6019 W 1631-02-HT-001 1631-02 dis/3rd Sue @ Unit: 27-Apr-15
W5

1631-03: CGC 3rd Dis


SMIC-I-6019 W 1631-03-HT-010 1631-03 27-Apr-15
@ Unit: W5

1623-01: Water
SMIC-I-6019 W 1623-01-HT-008 1623-01 Quench System @ 27-Apr-15
Unit: W4

1631-03: CGC 3rd Dis


SMIC-I-6012 S 27-Apr-15
@ Unit: W5

1631-01: CGC 1st Sue/


SMIC-I-6019 W 1631-01-HT-002 1631-01 dis & 2nd Sue @ Unit: 27-Apr-15
L2,W5,

1451-00: SVH Steam @


SMIC-I-6019 W 1451-00-HT-001 1451-00 unit: L1,L2,L3,V2,W5, 27-Apr-15

SMIC-I-6018 W 1651-00-HT-005 1651-00 1651-00: Dryers 28-Apr-15


( Area: A, Unit:F1)
1625-00 : Dilution
SMIC-I-6014 W 1625-00-HT-032 1625-00 Steam Generation 28-Apr-15
( Area: B2, Unit: H3 )

1491-00: PORTABLE
SMIC-I-6014 W 1491-00-HT-002 1491-00 28-Apr-15
WATER ( Area: K2A, )

1615-02: F-1250
SMIC-I-6014 W 1615-02-HT-006 RT1 1605-02 Process @ Unit: 28-Apr-15
Furnace

1602-02: F-1120
SMIC-I-6014 W 1602-02-HT-006 1602-02 28-Apr-15
Process @ Furnce Area

1631-01 : CGC 1st


Suc/dis & 2nd Suc
SMIC-I-6019 W 1631-01-HT-001 1631-01 28-Apr-15
(Area: A , Unit: F1, L2,
L3, W5 )

1711-01: C3R
SMIC-I-6013 S 1711-01-HT-004 1711-01 30-Apr-15
Compressor @ Unit: V2

1631-03: CGC 3rd Dis


SMIC-I-6019 W 1631-03-HT-001 1631-03 30-Apr-15
@ Unit: W5

1714-00: C3R
SMIC-I-6018 W 1714-00-HT-038 1714-00 Refigerationr 30-Apr-15
( Area: A, Unit: V2)

1603-02: F-1130
SMIC-I-6014 W 1603-02-HT-006 1603-02 30-Apr-15
Process @ Furnce Area

1631-01: CGC 1st


SMIC-I-6022 W 1631-01-HT-004 1631-01 Sue/dis & 2nd Sue @ 1-May-15
Unit: W5

1631-02: CGC 2nd


SMIC-I-6022 W 1631-02-HT-001 1631-02 dis/3rd Sue @ Unit: 1-May-15
W5

SMIC-I-6022 W 1631-03-HT-010 1631-03 1631-03: CGC 3rd Dis 1-May-15


@ Unit: W5
1612-02: F-1220
SMIC-I-6014 S 1612-02-HT-006 1612-02 1-May-15
Process @ Furnce Area

1704-02: C2
SMIC-I-6018 W Refrigeration 2-May-15
( Area: A, Unit: F3)

1601-02: F-1110
SMIC-I-6014 W 1601-02-HT-006 1601-02 Process @ Furnce Area 2-May-15

1611-02: F-1210
SMIC-I-6014 S 1611-02-HT-006 1611-02 4-May-15
Process @ Furnce Area

1541-00: Eye Bath &


Safety Showers @
SMIC-I-6018 W Unit: 4-May-15
G1,G2,G3,K1,K2,L1,L2,
N1,N2,W5
1623-01: Water
SMIC-I-6022 W Quench System @ 4-May-15
Unit: W4
1623-01: Water
Quench System @
SMIC-I-6014 W 1623-01-HT-008 1623-01 Unit: 4-May-15
F1,F2,G1,G1,K1,L1,L2,L
3,W4
1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6018 W 1714-00-HT-007 1714-00 F3,G1,K1,K2,L2,L3,V2,V 5-May-15
4

1714-00: C3R
SMIC-I-6018 W 1714-00-HT-010 1714-00 Refrigeration @ Unit: 5-May-15
F1,F3,L3,V2,G1,N1,L2

1714-00: C3R
SMIC-I-6020 W 1714-00-HT-014 1714-00 Refrigeration @ Unit: 5-May-15
L3,V2,V3,

1451-00: SVH Steam @


SMIC-I-6012 S 1451-00-HT-023 1451-00 Unit: L2 5-May-15

SMIC-I-6012 S 1631-03-HT-001 1631-03 1631-03: CGC 3rd Dis 5-May-15


@ Unit: W5,L2,K2
1714-00: C3R
Refrigeration @ Unit:
SMIC-I-6018 W 1714-00-HT-012 1714-00 6-May-15
F1,F3,G1,L2,L3,L4,N1,V
2

1704-02 : C2
SMIC-I-6018 W 1704-02-HT-002 1704-02 Refrigeration ( Area: A, 9-May-15
Unit:F1,F3, L3, L4,V1 )

1683-03 : Methane
Wash and Cold Box
SMIC-I-6018 W 1683-03-HT-013 1683-03 ( Area: A, Unit: F3, F4, 9-May-15
L4)

1612-02: F-1220
SMIC-I-6014 W 1612-02-HT-006 1612-02 9-May-15
Process @ Furnce Area

1683-02 : Secondary
SMIC-I-6018 W 1683-02-HT-003 1683-02 Methanizers ( Area: A, 10-May-15
Unit: F3,L4)

1683-02: Secondary
SMIC-I-6018 W Methanizers @ unit: 10-May-15
F3,F4,V3

1623-01: Water
SMIC-I-6022 W Quench System @ 10-May-15
Unit: W4

1683-02: Secondary
SMIC-I-6018 W 1683-02-HT-034 1683-02 Methanizers @ unit: 11-May-15
F3,F4,V3

1691-01: Deethanizer
SMIC-I-6018 W 1691-01-HT-031 1691-01 11-May-15
@ Unit:F2

1631-02: CGC 2nd dis /


SMIC-I-6020 W 1631-02-HT-002 1631-02 11-May-15
3rd Sue @ Unit: W5

1451-00: SVH Steam @


SMIC-I-6019 W Unit: L2 11-May-15

SMIC-I-6019 W 1631-03-HT-001 1631-03 1631-03: CGC 3rd Dis 11-May-15


@ Unit: W5,L2,K2
1714-07 : Unit 104
SMIC-I-6014 W 1747-07-HT-001 1747-07 Utilities : LP ( Area: B3, 12-May-15
Unit: R1)

1714-01 : Unit 104


SMIC-I-6014 W 1747-01-HT-001 1747-01 Utilities : Ethane Back - 12-May-15
up ( Area: B3, Unit: R1)

1747-04: Unit 104


SMIC-I-6014 W 1747-04-HT-001 1747-04 Utilities: MP Stm 12-May-15
( Area: A: Unit: R1)

1463-00: CM
SMIC-I-6014 W 1463-00-HT-009 1463-00 Condensate ( Area: A, 12-May-15
Unit: R1)

1746-00: Unit 104


SMIC-I-6014 W 1746-00-HT-001 1746-00 MPGF ( Area: A,: 12-May-15
Unit:R1 )

1631-02: CGC 2nd dis /


SMIC-I-6022 W 1631-02-HT-002 1631-02 12-May-15
3rd Sue @ Unit: W5

1672-02: Deprop O/H


Turbine Surface
SMIC-I-6014 W 1672-02-HT-005 1672-02 13-May-15
Condensate( Area:A,
Unit:V1)
1712-02: C3R Stm
Turbine Surface
SMIC-I-6014 W 1712-02-HT-010 1712-02 Condenssate @ Unit: 13-May-15
V2

1662-01 : LP
SMIC-I-6014 W 1662-01-HT-019 1662-01 Depropanizer (Area: A, 13-May-15
Unit: F1)

1662-01 : LP
SMIC-I-6014 W 1662-01-HT-020 1662-01 Depropanizer (Area: A, 13-May-15
Unit: F1)

1611-02: F-1210
SMIC-I-6014 W 1611-02-HT-006 1611-02 Process @ Furnce Area 14-May-15

SMIC-I-6022 W 1451-00: SVH Steam @ 14-May-15


unit: L1,L2,L3,V2,W5,
1714-00: C3R
SMIC-I-6022 W 1714-00-HT-014 1714-00 Refrigeration @ Unit: 14-May-15
L3,V2,V3,

1451-00: SVH Steam @


SMIC-I-6020 W 17-May-15
Unit: L2

1631-03: CGC 3rd Dis


SMIC-I-6020 W 1631-03-HT-001 1631-03 @ Unit: W5,L2,K2 17-May-15

1681-00 : Deprop O/H


System
SMIC-I-6018 W 1681-00-HT-008 1681-00 17-May-15
( Area: A,
Unit:F3)
1632-02: CGC Stm
Turbine Surface
SMIC-I-6014 W 1632-02-HT-003 1632-02 18-May-15
Condensate ( Area: A,
Unit: W5)

1771-00 : Methanol
SMIC-I-6014 W 1771-00-HT-018 1771-00 18-May-15
( Area: A, Unit: G3 )

1662-01 : LP
Depropanizer
SMIC-I-6018 W 1662-01-HT-030 1662-01 18-May-15
( Area:
A, Unit:F1)

1662-01 : LP
SMIC-I-6018 W 1662-01-HT-005 1662-01 Depropanizer ( Area: 18-May-15
A, Unit:F1)

1631-03: CGC 3rd Dis


SMIC-I-6022 W 1631-03-HT-001 1631-03 18-May-15
@ Unit: W5,L2,K2

1631-01 : CGC 1st


SMIC-I-6020 W 1631-01-HT-003 1631-01 Suc/dis & 2nd Suc 18-May-15
(Area: A, Unit: W5 )

1631-02 : CGC 2nd dis /


SMIC-I-6020 W 1631-02-HT-003 1631-02 3rd Sue @ unit: W5 18-May-15

1466-00: CH
SMIC-I-6012 S 1466-00-HT-001 RT1 1466-00 Condensate @ Unit 18-May-15
Area: H1,K2,L1,W3,W5
1631-04 : CGC
SMIC-I-6014 W 1631-04-HT-035 1631-04 Sealing Steam System 19-May-15
(Area:A, Unit: W5 )

1631-04 : CGC Sealing


SMIC-I-6014 W 1631-04-HT-037 1631-04 Steam System 19-May-15
( Area: A, Unit: W5)

1631-01 : CGC 1st


SMIC-I-6022 W 1631-01-HT-003 1631-01 Suc/dis & 2nd Suc 19-May-15
(Area: A, Unit: W5 )

1631-02 : CGC 2nd dis /


SMIC-I-6022 W 1631-02-HT-003 1631-02 19-May-15
3rd Sue @ unit: W5

1631-04 : CGC
SMIC-I-6014 W 1631-04-HT-034 1631-04 Sealing Steam System 19-May-15
(Area:A, Unit: W5 )

1471-00 : F-1150
SMIC-I-6014 W 1471-00-HT-010 1471-00 20-May-15
(Furnace Blowdown)

1471-00, F-1140,
SMIC-I-6014 W 1471-00-HT-009 1471-00 20-May-15
Furnace Blowdown

1471-00 : F-1130
SMIC-I-6014 W 1471-00-HT-008 1471-00 (Furnace Blowdown) 20-May-15

1506-02: DS, S10 &


SMIC-I-6014 W 1506-02-HT-002 1506-02 20-May-15
Decoking Air @ F-1160

1507-02: DS, S10 &


SMIC-I-6014 W 1507-02-HT-002 1507-02 20-May-15
Decoking Air @ F-1170

1504-02: DS, S10 &


SMIC-I-6014 W 1504-02-HT-002 1504-02 Decoking Air @ F-1140 21-May-15

SMIC-I-6014 W 1503-02-HT-002 1503-02 1503-02: DS, S10 & 21-May-15


Decoking Air @ F-1130
1631-01 : CGC 1st
Suc/dis & 2nd Suc
SMIC-I-6022 W 1631-01-HT-001 1631-01 21-May-15
(Area: A , Unit: F1, L2,
L3, W5 )

1611-02 : F-1210
SMIC-I-6014 W 1611-02-HT-023 1611-02 22-May-15
Process

1611-02 : F-1210
SMIC-I-6014 W 1611-02-HT-025 1611-02 Process 22-May-15

1506-01: F-1160 BFW,


SMIC-I-6014 W 1506-01-HT-034 1506-01 Steam Drums & SVH 22-May-15
Side

1507-01: F-1170 BFW,


SMIC-I-6014 W 1507-01-HT-034 1507-01 Steam Drums & SVH 22-May-15
Side

1712-01 : C3R Stm


Turbine
SMIC-I-6014 W 1712-01-HT-006 1712-01 22-May-15
( Area: A,
Unit:V2)

1514-02: DS, S10 &


SMIC-I-6014 W 1514-02-HT-002 1514-02
Decoking Air @ F-1240

1515-02: DS, S10 &


SMIC-I-6014 W 1515-02-HT-002 1515-02 Decoking Air @ F-1250 23-May-15

1501-02: DS, S10 &


SMIC-I-6014 W 1501-02-HT-002 1501-02 23-May-15
Decoking Air @ F-1110

1502-02: DS, S10 &


SMIC-I-6014 W 1502-02-HT-002 1502-02 23-May-15
Decoking Air @ F-1120

1503-02: DS, S10 &


SMIC-I-6014 W Decoking Air @ F-1130 23-May-15

1704-02, C2
SMIC-I-6018 W 1704-02-HT-001 1704-02 Refrigeration (F1, F2, 24-May-15
F3, L3, L4, V1)
1662-01 : LP
SMIC-I-6018 W 1662-01-HT-008 1662-01 24-May-15
Depropanizer

1704-02: C2
SMIC-I-6018 W 1704-02-HT-036 1704-02 Refrigeration @ Unit: 24-May-15
F1,L2,L3,N1,N2

1504-01: F-1140 BFW,


SMIC-I-6014 W 1504-01-HT-034 1504-01 Steam Drums & SVH 24-May-15
Side

1505-01: F-1150 BFW,


SMIC-I-6014 W 1505-01-HT-034 1505-01 Steam Drums & SVH 24-May-15
Side

1503-01: F-1130
SMIC-I-6014 W 1503-01-HT-034 1503-01 BFW,Stm Drums & SVH 24-May-15
Side ( Furnace )

KIC LAYDOWN AREA


ACOUSTIC INSULATION
SMIC-I-6011 W (WEST SIDE OF DAELIM 24-May-15
MATERIAL OFFICE)

1505-02: DS, S10 &


SMIC-I-6014 W 1505-02 25-May-15
Decoking Air @ F-1150

1511-02: DS, S10 &


SMIC-I-6014 W 1511-02-HT-002 1511-02 Decoking Air @ F-1210 25-May-15

1512-02: DS, S10 &


SMIC-I-6014 W 1512-02-HT-002 1512-02 25-May-15
Decoking Air @ F-1220

1513-02: DS, S10 &


SMIC-I-6014 W 1513-02-HT-002 1513-02 25-May-15
Decoking Air @ F-1230

1471-00 : F-1110
SMIC-I-6014 W 1471-00-HT-006 1471-00 (Furnace Blowdown) 25-May-15

SMIC-I-6014 W 1471-00-HT-007 1471-00 1471-00 : F-1120 25-May-15


(Furnace Blowdown)
1631-01: CGC 1st Sue/
SMIC-I-6022 W 1631-01-HT-002 1631-01 dis & 2nd Sue @ Unit: 25-May-15
L2,W5,

1681-00: Deprop O/H


System (Area: A,
SMIC-I-6020 W 1681-00-HT-001 1681-00 25-May-15
Unit:L2, L3, M1, N1,
V1)

1451-00: SVH Steam @


SMIC-I-6022 W 1451-00-HT-023 1451-00 Unit: L2 26-May-15

1452-00: SH STEAM
SMIC-I-6014 W 1452-00-HT-001 1452-00 26-May-15
( Area: A,Unit: V1)

1452-00: SH STEAM
SMIC-I-6014 W 26-May-15
( Area: A,Unit: V1)

KIC LAYDOWN AREA


SMIC-I-6011 W (WEST SIDE OF DAELIM 26-May-15
OFFICE)

1747-03: MP Steam @
SMIC-I-6012 S 1747-04-HT-001 RT1 1747-04 27-May-15
Unit: R1

1702-01: Stm Turbine


SMIC-I-6014 W 1702-01-HT-019 1702-01 ( Area: A,: Unit:V1 ) 27-May-15

1721-02: Upper C3
SMIC-I-6018 W 1721-02-HT-017 1721-02 27-May-15
Splitter @ Unit: K1

1683-03 : Methane
SMIC-I-6018 W 1683-03-HT-021 1683-03 Wash and Cold Box 27-May-15
( Area: A, Unit: F4)

1704-02 : C2
Refrigeration
SMIC-I-6018 W 1704-02-HT-009 1704-02 ( Area: 27-May-15
A, Unit:F3)

SMIC-I-6014 W 1453-00-HT-010 1453-00 1453-00: SM Steam @ 27-May-15


Unit: L1
1747-03: MP Steam @
SMIC-I-6013 S 1747-04-HT-001 RT1 1747-04 27-May-15
Unit: R1

1747-03: MP Steam @
SMIC-I-6014 W 1747-04-HT-001 RT1 1747-04 29-May-15
Unit: R1

1631-03: CGC 3rd Dis


SMIC-I-6022 W 1631-03-HT-001 1631-03 @ Unit: W5,L2,K2 29-May-15

1451-00: SVH Steam @


SMIC-I-6022 W 1451-00-HT-001 1451-00 29-May-15
unit: L1,L2,L3,V2,W5,

1681-00: Deprop O/H


System (Area: A,
SMIC-I-6022 W 1681-00-HT-001 1681-00 29-May-15
Unit:L2, L3, M1, N1,
V1)

1511-01: F-1110 BFW


SMIC-I-6014 W Steam Drum & SVH 30-May-15
Side

1502-01: F-1230 BFW,


SMIC-I-6014 W Steam Drums & SVH 30-May-15
Side

1502-01: F-1140 BFW,


SMIC-I-6014 W Steam Drums & SVH 30-May-15
Side

1515-01: F-1250 BFW


Steam Drum & SVH
SMIC-I-6014 W 30-May-15
Side

1501-0 : F-1110 BFW,


SMIC-I-6014 W Steam Drum & SVH 30-May-15
Side

1502-01: F-1120 BFW,


SMIC-I-6014 W Steam Drums & SVH 30-May-15
Side
TIME DAELIM
STATUS

8.00AM ACCEPTED

8.00AM ACCEPTED

11.00AM ACCEPTED

10.00AM ACCEPTED

10:00 AM ACCEPTED

10:00 AM ACCEPTED

10:00 AM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED
2:00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED

2:00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED

2:00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED

1.00 PM ACCEPTED
1.00 PM ACCEPTED

2:00 PM ACCEPTED

1.00 PM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED

2:00 PM ACCEPTED

2:00PM ACCEPTED

2:00PM ACCEPTED

2:00PM ACCEPTED

2:00PM ACCEPTED
1.00 PM ACCEPTED

2:00PM ACCEPTED

1:00PM ACCEPTED

2:00PM ACCEPTED

1:00PM ACCEPTED

3:00PM ACCEPTED

1:00PM ACCEPTED

2:00PM ACCEPTED

1:00PM ACCEPTED

13:00:00 PM ACCEPTED

10:30 AM ACCEPTED

1:00PM ACCEPTED
1:00PM ACCEPTED

2:00PM ACCEPTED

1:00 PM ACCEPTED

3:00 PM ACCEPTED

1:00 PM ACCEPTED

2:00PM ACCEPTED

1:00 PM ACCEPTED

2:30 PM ACCEPTED

1:00PM ACCEPTED

1:00PM ACCEPTED

1:00PM ACCEPTED

9:30 AM cancel
8:00 AM ACCEPTED

1:30 AM ACCEPTED

8:00AM ACCEPTED

1:00 PM ACCEPTED

2:30 PM ACCEPTED

8:00 AM ACCEPTED

9:30 PM ACCEPTED

1:30 PM ACCEPTED

7:30 AM ACCEPTED

10:00 AM ACCEPTED

8:00 AM ACCEPTED

9:30 PM ACCEPTED
8:00 AM ACCEPTED

8:00 AM ACCEPTED

9:30 PM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

8:00 AM ACCEPTED

3:30 PM ACCEPTED

8:00 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

2:00 PM ACCEPTED

2:15 PM ACCEPTED

2:30 PM ACCEPTED

2:45 PM ACCEPTED

3:00 PM ACCEPTED

3:00 PM ACCEPTED

4:00 PM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

9:30 AM ACCEPTED

1:00 PM ACCEPTED

8:00 AM ACCEPTED WEEKLY

2:00 PM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

2:00 PM ACCEPTED

8:00AM ACCEPTED

1:00 PM ACCEPTED
8:00 AM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

10:45 AM ACCEPTED

11:00 AM ACCEPTED
8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8.AM ACCEPTED

2. PM ACCEPTED

9.30 AM ACCEPTED

2. PM ACCEPTED

3. PM ACCEPTED

8.AM ACCEPTED

8:30 AM ACCEPTED

8.AM ACCEPTED
1:30 PM ACCEPTED

3:30 PM ACCEPTED

3: PM ACCEPTED

8. AM ACCEPTED

2. PM ACCEPTED

3. PM ACCEPTED

9.30 AM ACCEPTED

2. PM ACCEPTED

3. PM ACCEPTED

8. AM ACCEPTED

8.30 AM ACCEPTED

8.45 AM ACCEPTED
9.00 AM ACCEPTED

10.30 AM ACCEPTED

3. PM cancel

8.15 AM ACCEPTED

8.45 AM ACCEPTED

9.30 AM ACCEPTED

10.00 AM ACCEPTED

8:00 AM ACCEPTED

1:00 PM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

2:00 PM ACCEPTED

3:00 PM ACCEPTED

9:00 A.M. ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

2:30 PM ACCEPTED

3:00 PM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

3:00 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED
9:30 AM ACCEPTED

9:45 AM ACCEPTED

7:30 AM ACCEPTED

2:00 PM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

2:00 PM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

10:00 AM ACCEPTED

9:00 AM ACCEPTED

2:00 PM ACCEPTED
2:20 PM ACCEPTED

2:40 PM ACCEPTED

9:00 AM ACCEPTED

9::30 AM ACCEPTED

2:00 PM ACCEPTED

2:30 PM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

2:00 PM ACCEPTED

2:15 PM ACCEPTED

2:30 PM ACCEPTED

8:30 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

1:30 PM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED
8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

2::00 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:15 AM ACCEPTED

2:00 PM ACCEPTED
2:20 AM ACCEPTED

2:30 AM ACCEPTED

8:00 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED
8:40 AM ACCEPTED

8:50 AM ACCEPTED

2:00 PM ACCEPTED

2:10 PM ACCEPTED

2:20 PM ACCEPTED

2:30 PM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

8:00 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8::45 AM ACCEPTED

3:00 PM ACCEPTED

3:05 PM ACCEPTED

3:10 PM ACCEPTED

3:15 PM ACCEPTED

3:20 PM ACCEPTED

3:25 PM ACCEPTED

3:30 PM ACCEPTED
8:00 AM ACCEPTED

7:00 AM ACCEPTED

8:00 AM ACCEPTED

9:00 AM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:45 AM ACCEPTED

2:20 PM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

9:15 AM ACCEPTED
9:20 AM ACCEPTED

9:25 AM ACCEPTED

9:30 AM ACCEPTED

9:35 AM ACCEPTED

9:40 AM ACCEPTED

13:00 PM ACCEPTED

13:15PM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:00 AM ACCEPTED

2:00 PM ACCEPTED
8:15 AM ACCEPTED

8:20 AM ACCEPTED

8:25 AM ACCEPTED

8:30 AM ACCEPTED

8:35 AM ACCEPTED

8:40 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

10:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

10:00 AM ACCEPTED
10:15 AM ACCEPTED

10:30 AM ACCEPTED

8:30 AM ACCEPTED

2:00 PM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

10:00 AM ACCEPTED
8:30 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:45 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8::00 AM ACCEPTED

8:15 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

7:00 AM ACCEPTED
7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

1:30 PM ACCEPTED

2:00 PM ACCEPTED

7:30 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

7:45 AM ACCEPTED
8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM cancel

9:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 A.M. ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:50 A.M. ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED
7:30 AM ACCEPTED

8:30 AM cancel

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

2:00 PM ACCEPTED
7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

1:30 PM ACCEPTED

2:00 PM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED
9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

1:30 PM ACCEPTED

2:00 P.M. ACCEPTED


7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:30 AM ACCEPTED

1:30 PM ACCEPTED

2:00 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:30 AM ACCEPTED

2:00 PM ACCEPTED

7:30 AM ACCEPTED
7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:20 AM ACCEPTED

8:40 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

7:30 AM RE-SCHEDULE
8:00 AM RE-SCHEDULE

8:30 AM RE-SCHEDULE

9:00 AM RE-SCHEDULE

9:30 AM RE-SCHEDULE

10:00 AM RE-SCHEDULE

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED
7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED
2:00 PM ACCEPTED

2:10 PM ACCEPTED

2:20 PM ACCEPTED

2:30 PM ACCEPTED

2:40 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED
8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:00 AM ACCEPTED

8:20 AM ACCEPTED

8:40 AM ACCEPTED

9:00 AM ACCEPTED

9:20 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

1:30 PM ACCEPTED
1:45 PM ACCEPTED

2:30 PM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

1:30 PM ACCEPTED

1:45 PM ACCEPTED

2:00 PM ACCEPTED

2:30 PM ACCEPTED

7:00 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM cancel

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:15 AM ACCEPTED
9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:15 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:20 AM ACCEPTED

8:40 AM ACCEPTED

2:00 PM ACCEPTED

9:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED
8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED
9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

8:00 AM ACCEPTED

1:30 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED
1:30 PM ACCEPTED

2:00 PM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED
10:00 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

9:30 AM ACCEPTED

Open ACCEPTED

8:30 AM ACCEPTED

1:30 PM ACCEPTED

2:00 PM ACCEPTED

7:00 AM ACCEPTED

8:00 AM ACCEPTED
10:30 AM ACCEPTED

10:45 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED
7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

2:15 PM ACCEPTED

2:30 PM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED
7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

10:00 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED
7:45 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:00 AM ACCEPTED

8:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

9:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

1:30 PM ACCEPTED
1:45 PM ACCEPTED

7:15 AM ACCEPTED

1:30 PM ACCEPTED

1:30 PM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:45 AM ACCEPTED

OPEN ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

7:15 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED
7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

1:00 PM ACCEPTED

7:00 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:50 AM ACCEPTED
1:30 PM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM RE-SCHEDULE

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

10:45 AM ACCEPTED

10:30 AM ACCEPTED

7:00 AM ACCEPTED
7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

7:50 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED
9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:40 AM ACCEPTED

10:50 AM ACCEPTED

11:00 AM ACCEPTED

11:10 AM ACCEPTED
11:20 AM ACCEPTED

11:30 AM ACCEPTED

11:40 AM ACCEPTED

8:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

9:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED
8:30 AM RE-SCHEDULE

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

1:30 PM ACCEPTED
2:00 PM ACCEPTED

9:30 AM ACCEPTED

9:20 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED
8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
1:30 PM ACCEPTED

7:30 AM ACCEPTED

7:45 AM cancel

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED
8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

1:00 PM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM cancel

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED
10:10 AM ACCEPTED

10:20 AM ACCEPTED

7:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

1:45 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

9:00 AM ACCEPTED
7:00 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED
8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED
8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED
10:00 AM ACCEPTED

10:10 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

10:20 AM ACCEPTED

1:30 PM ACCEPTED

1:45 PM ACCEPTED

7:00 AM cancel

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

10:45 AM ACCEPTED

7:00 AM ACCEPTED
7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM cancel

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED
9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

8:20 AM ACCEPTED

9:30 AM ACCEPTED

1:30 PM ACCEPTED
7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED
9:10 AM ACCEPTED

9:20 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM cancel

8:30 AM ACCEPTED
8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

9:40 AM ACCEPTED

OPEN ACCEPTED
10:10 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED
8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

8:59 AM ACCEPTED

9:09 AM ACCEPTED

9:19 AM ACCEPTED

9:29 AM ACCEPTED

9:39 AM ACCEPTED

9:49 AM ACCEPTED

9:59 AM ACCEPTED

1:15 PM ACCEPTED

1:30 PM ACCEPTED
1:45 PM ACCEPTED

2:00 PM ACCEPTED

2:15 PM ACCEPTED

2:30 PM ACCEPTED

2:45 PM ACCEPTED

3:00 PM ACCEPTED

3:15 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

OPEN ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

OPEN ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

OPEN ACCEPTED

9:10 AM ACCEPTED

OPEN ACCEPTED
1:00 PM ACCEPTED

1:15 PM ACCEPTED

1:30 PM ACCEPTED

1:45 PM ACCEPTED

2:00 PM ACCEPTED

2:15 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED
OPEN ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM cancel

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:45 AM ACCEPTED

10:15 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

9:00 AM ACCEPTED

1:30 PM ACCEPTED

1:45 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:19 AM ACCEPTED

9:29 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED
7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED
8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

OPEN ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED
10:45 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED
8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

10:40 AM ACCEPTED
7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:15 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

1:30 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED
OPEN ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
9:50 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED
9:30 AM cancel

9:45 AM rejected by sadara

10:00 AM ACCEPTED

10:15 AM cancel

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

10:45 AM ACCEPTED

11:00 AM ACCEPTED

11:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED

OPEN ACCEPTED
OPEN ACCEPTED

OPEN ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

10:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:15 AM ACCEPTED

10:45 AM ACCEPTED

11:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:45 AM ACCEPTED

10:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

1:30 PM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM rejected by sadara

8:45 AM ACCEPTED

9:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
9:15 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED
9:30 AM ACCEPTED

9:45 AM ACCEPTED

1:30 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

7:00 AM ACCEPTED
7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED
9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:30 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED
7:00 AM ACCEPTED

7:45 AM ACCEPTED

1:30 PM ACCEPTED

7:00 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED
8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED
9:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

8:10 AM ACCEPTED

8:30AM ACCEPTED
8:00 AM ACCEPTED

8:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

7:00 A.M ACCEPTED

7:10 A.M ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM cancel

8:00 AM cancel
8:10 AM cancel

8:20 AM cancel

8:30 AM cancel

8:40 AM cancel

8:50 AM cancel

9:00 AM cancel

9:10 AM ACCEPTED

9:20 AM cancel

9:30 AM cancel

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM cancel
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

10:00 AM ACCEPTED

10:30 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

8:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:00 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED
8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM cancel

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

11:30 AM ACCEPTED

11:40 AM ACCEPTED

11:50 AM ACCEPTED

1:00 PM ACCEPTED
1:30 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED
8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM cancel

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM cancel

9:50 AM cancel

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED
8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

1:00 PM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

10:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED
8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

10:15 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED
8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
9:50 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED
8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM cancel

9:20 AM ACCEPTED

9:30 AM cancel

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

7:30 AM ACCEPTED
7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

9:15 AM ACCEPTED

9:30 AM ACCEPTED

9:45 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED
7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM ACCEPTED

8:30 AM ACCEPTED

8:45 AM ACCEPTED

9:00 AM ACCEPTED

1:00 PM ACCEPTED

2:00 PM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:15 AM ACCEPTED

7:30 AM ACCEPTED

7:45 AM ACCEPTED

8:00 AM ACCEPTED

8:15 AM cancel

8:30 AM ACCEPTED

8:45 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

10:40 AM ACCEPTED

10:50 AM ACCEPTED
11:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM cancel

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED
7:00 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:10 AM cancel

8:20 AM cancel

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM cancel

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED
9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM cancel

10:20 AM cancel

10:30 AM ACCEPTED

10:40 AM ACCEPTED

10:50 AM ACCEPTED

11:00 AM ACCEPTED

1:00 PM ACCEPTED

2:00 PM ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED
8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM cancel

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM cancel

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

10:40 AM ACCEPTED

10:50 AM ACCEPTED
7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED
9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED
8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED
7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED
8:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM cancel

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED
8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

10:40 AM ACCEPTED
10:50 AM ACCEPTED

11:00 AM ACCEPTED

11:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED
8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM cancel

8:30 AM cancel

8:40 AM ACCEPTED

8:50 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED
9:30 AM ACCEPTED

7:00 AM cancel

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED
8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

7:00 AM cancel

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED
9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED
7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED
9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

10:10 AM ACCEPTED

10:20 AM ACCEPTED

10:30 AM ACCEPTED

10:40 AM ACCEPTED

10:50 AM ACCEPTED

11:00 AM ACCEPTED

11:10 AM ACCEPTED

11:20 AM ACCEPTED
11:30 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM cancel

8:40 AM ACCEPTED
8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED

9:50 AM ACCEPTED

10:00 AM ACCEPTED

7:30 AM ACCEPTED

7:50 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED
8:30 AM cancel

8:40 AM ACCEPTED

9:30 AM ACCEPTED

9:50 AM ACCEPTED

10:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED
7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM cancel

9:00 AM cancel

9:10 AM ACCEPTED

9:20 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
9:50 AM ACCEPTED

10:00 AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

7:00 AM ACCEPTED
7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

7:00 AM cancel
7:10 AM ACCEPTED

7:20 AM ACCEPTED

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AMREJECTED BY SADARA

8:00 AM ACCEPTED

8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

9:30 AM ACCEPTED

9:40 AM ACCEPTED
8:30 A.M ACCEPTED

8:40 A.M ACCEPTED

8:50 A.M ACCEPTED

9:00AM ACCEPTED

9:10AM ACCEPTED

9:20AM ACCEPTED

9:30AM ACCEPTED

9:40AM ACCEPTED

9:50AM ACCEPTED

10:00AM ACCEPTED

10:10AM ACCEPTED

10:20AM ACCEPTED
10:30AM ACCEPTED

10:40AM ACCEPTED

10:50AM ACCEPTED

11:00AM cancel

11:10AM ACCEPTED

11:20AM ACCEPTED

7:00: AM ACCEPTED

7:10: AM ACCEPTED

7:20: AM ACCEPTED

7:30: AM cancel

7:40: AM ACCEPTED

7:50: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

7:30 AM ACCEPTED
7:40AM ACCEPTED

7:50AMREJECTED BY SADARA

8:00AM ACCEPTED

8:10AM ACCEPTED

8:20AM ACCEPTED

8:30: AM ACCEPTED

8:40AM ACCEPTED

8:50AM ACCEPTED

9:00AM ACCEPTED

9:10AM ACCEPTED

9:20AM ACCEPTED

9:30AM ACCEPTED
9:40AM ACCEPTED

9:50AM ACCEPTED

10:00AM ACCEPTED

10:10AM ACCEPTED

10:20AM ACCEPTED

7:00 AM ACCEPTED

7:10 AM ACCEPTED

7:20 AM cancel

7:30 AM ACCEPTED

7:40 AM ACCEPTED

7:50 AM ACCEPTED

8:00 AM ACCEPTED
8:10 AM ACCEPTED

8:20 AM ACCEPTED

8:30 AM ACCEPTED

8:40 AM ACCEPTED

8:50 AM ACCEPTED

9:00 AM ACCEPTED

9:10 AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED
9:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM
REJECTED BY SADARA
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:50: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

7:30 A.M ACCEPTED

7:40 A.M ACCEPTED

7:50 A.M ACCEPTED

8:00 A.M ACCEPTED


9:00 A.M ACCEPTED

8:10 A.M ACCEPTED

8:20 A.M ACCEPTED

8:30 A.M ACCEPTED

9:10 A.M ACCEPTED

7:00: AM ACCEPTED

7:10: AM ACCEPTED

7:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

10:00: AM ACCEPTED
7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED
9:40: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

9:30: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

10:00: AM ACCEPTED
7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED
8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

7:00: AM ACCEPTED

7:10: AM ACCEPTED

7:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM cancel

9:20: AM ACCEPTED

9:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED
9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

10:00: AM ACCEPTED

10:10: AM ACCEPTED

10:20: AM cancel

10:30: AM cancel

10:40: AM ACCEPTED

10:50: AM ACCEPTED

11:00: AM ACCEPTED

11:10: AM ACCEPTED
11:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:15: AM ACCEPTED
10:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM
REJECTED BY SADARA

8:40: AM
REJECTED BY SADARA

8:50: AM ACCEPTED

9:00: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM REJECTED BY
SADARA
REJECTED BY
7:50: AM
SADARA

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED
8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

10:00: AM ACCEPTED

10:10: AM ACCEPTED
10:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM cancel

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM cancel

8:40: AM ACCEPTED

8:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED
9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

8:30AM ACCEPTED

10:10: AM ACCEPTED

10:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED
8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED
8:00: AM cancel

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED
9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:00: AM cancel

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED
8:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

9:00: AM ACCEPTED
7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM cancel

8:30: AM ACCEPTED

8:40: AM cancel

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

9:00: AM ACCEPTED

9:15: AM cancel

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED
8:30: AM ACCEPTED

8:40: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED
9:30: AM ACCEPTED

9:45: AM
REJECTED BY SADARA

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED
7:30: AM
REJECTED BY SADARA

7:40: AM
REJECTED BY SADARA

7:50: AM
REJECTED BY SADARA

8:00: AM
REJECTED BY SADARA

8:10: AM
REJECTED BY SADARA

8:20: AM
REJECTED BY SADARA

REJECTED BY
8:30: AM
SADARA

REJECTED BY
8:40: AM SADARA

REJECTED BY
8:50: AM
SADARA

REJECTED BY
9:00: AM
SADARA

REJECTED BY
9:10: AM SADARA

9:20: AM REJECTED BY
SADARA
REJECTED BY
9:30: AM
SADARA

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED
9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED
8:50: AM ACCEPTED

9:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

10:30: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED
8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM cancel

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED
8:40: AM ACCEPTED

8:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED
9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

9:50: AM ACCEPTED

10:00: AM ACCEPTED

10:10: AM ACCEPTED

10:20: AM ACCEPTED

10:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM cancel

7:50: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED
8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED
8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED
9:10: AM ACCEPTED

9:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM cancel

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED
8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM cancel

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED
8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED
7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM cancel

8:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED
9:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED

9:20: AM ACCEPTED

9:30: AM ACCEPTED

9:40: AM ACCEPTED
9:50: AM ACCEPTED

10:00: AM ACCEPTED

10:10: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED
7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM cancel

9:00: AM ACCEPTED

9:10: AM cancel

9:20: AM ACCEPTED

7:30: AM cancel

7:40: AM cancel
7:50: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

REJECTED BY
8:20: AM
SADARA

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

7:30: AM RE-
SCHEDULE
RE-
7:40: AM
SCHEDULE

RE-
7:50: AM
SCHEDULE

RE-
8:00: AM SCHEDULE

RE-
8:10: AM
SCHEDULE

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM cancel

8:20: AM ACCEPTED

8:30: AM ACCEPTED

7:30: AM ACCEPTED
7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM cancel

8:20: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM cancel

7:50: AM cancel

8:00: AM ACCEPTED

7:30: AM ACCEPTED

7:40: AM ACCEPTED

7:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
7:30: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM cancel

8:20: AM cancel

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM

8:40: AM ACCEPTED
8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM
8:20: AM ACCEPTED

8:00: AM

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

9:10: AM ACCEPTED
8:00: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

8:00: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED
8:20: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM cancel

8:00: AM ACCEPTED
8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED

9:00: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED
9:00: AM ACCEPTED

9:10: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM cancel

8:30: AM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:40: AM ACCEPTED

8:50: AM ACCEPTED
2:00: PM ACCEPTED

8:00: AM ACCEPTED

8:10: AM ACCEPTED

8:20: AM ACCEPTED

8:30: AM ACCEPTED

8:00: AM

8:10: AM

8:20: AM

8:30: AM

8:40: AM

8:50: AM
INSULATION RFI C
INSPECTION/
SL NO RFI NO TEST ITEM
INSPECTION TEST / ACTIVITY

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1 MFC-DLM-RBH-I-0001 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 029 (PIPE SIZES: 18,12,8,4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


2 MFC-DLM-RBH-I-0002 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 007 (PIPE SIZES: 4,3,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


3 MFC-DLM-RBH-I-0003 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 022 (PIPE SIZES: 6,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


4 MFC-DLM-RBH-I-0004 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-HT-
inspection 006 (PIPE SIZES: 14,12,3,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


5 MFC-DLM-RBH-I-0005 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 023 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


6 MFC-DLM-RBH-I-0006 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 021 (PIPE SIZES: 10,2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


7 MFC-DLM-RBH-I-0007 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 021 (PIPE SIZES: 2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


8 MFC-DLM-RBH-I-0008 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-HT-
inspection 018 (PIPE SIZES: 2)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
9 MFC-DLM-RBH-I-0009 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 016 (PIPE SIZES: 6,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


10 MFC-DLM-RBH-I-0010 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 012 (PIPE SIZES: 8,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


11 MFC-DLM-RBH-I-0011 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 029 (PIPE SIZES: 18,12,8,4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


12 MFC-DLM-RBH-I-0012 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 007 (PIPE SIZES: 4,3,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


13 MFC-DLM-RBH-I-0013 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 022 (PIPE SIZES: 6,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


14 MFC-DLM-RBH-I-0014 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 023 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


15 MFC-DLM-RBH-I-0015 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 021 (PIPE SIZES: 10,2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


16 MFC-DLM-RBH-I-0016 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 021 (PIPE SIZES: 2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


17 MFC-DLM-RBH-I-0017 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-HT-
inspection 018 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


18 MFC-DLM-RBH-I-0018 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 016 (PIPE SIZES: 6,1,3/4)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
19 MFC-DLM-RBH-I-0019 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-HT-
inspection 012 (PIPE SIZES: 8,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


20 MFC-DLM-RBH-I-0020 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-02-HT-
inspection 002 (PIPE SIZES: 4,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


21 MFC-DLM-RBH-I-0021 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-HT-
inspection 002 (PIPE SIZES: 6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


22 MFC-DLM-RBH-I-0022 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-02-HT-
inspection 002 (PIPE SIZES: 4,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


23 MFC-DLM-RBH-I-0023 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-HT-
inspection 004 (PIPE SIZES: 14,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


24 MFC-DLM-RBH-I-0024 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-HT-
inspection 024 (PIPE SIZES: 14,8,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


25 MFC-DLM-RBH-I-0025 Preparation INSULATION ON HYDROTESTED LINES TP: 1541-00-HT-
inspection 002 (PIPE SIZES: 3,2,1.1/2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


26 MFC-DLM-RBH-I-0026 Preparation INSULATION ON HYDROTESTED LINES TP: 1541-00-HT-
inspection 001 (PIPE SIZES: 3,2,1.1/2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


27 MFC-DLM-RBH-I-0027 Preparation INSULATION ON HYDROTESTED LINES TP: 1423-00-HT-
inspection 011 (PIPE SIZES: 2,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


28 MFC-DLM-RBH-I-0028 Preparation INSULATION ON HYDROTESTED LINES TP: 1423-00-HT-
inspection 008 (PIPE SIZES: 1/2,3/4)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
29 MFC-DLM-RBH-I-0029 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-HT-
inspection 019 (PIPE SIZES: 36,8,6,4,2,1)

Insulation Inpection of Insulation Prior to Cladding/Weather


30 MFC-DLM-RBH-I-0030 Inspection Protection TP: 1621-01-HT-029 (PIPE SIZES: 18,12,8,4)

Insulation Inpection of Insulation Prior to Cladding/Weather


31 MFC-DLM-RBH-I-0031 Inspection Protection TP: 1621-01-HT-022 (PIPE SIZES: 6,2,1)

Insulation Inpection of Insulation Prior to Cladding/Weather


32 MFC-DLM-RBH-I-0032 Inspection Protection TP: 1621-01-HT-021 (PIPE SIZES: 10,2,3/4)

Inspection in process application of Insulation Prior to


Insulation
33 MFC-DLM-RBH-I-0033 Inspection
Vapor Barrier TP: 1541-00-HT-002 (PIPE SIZES:
3,2,1.1/2,3/4)

Inspection in process application of Insulation Prior to


Insulation
34 MFC-DLM-RBH-I-0034 Inspection
Vapor Barrier TP: 1541-00-HT-001 (PIPE SIZES:
3,2,1.1/2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


35 MFC-DLM-RBH-I-0035 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-HT-
inspection 003 (PIPE SIZES: 12,10,3,2,1)

Insulation Inpection of Insulation Prior to Cladding/Weather


36 MFC-DLM-RBH-I-0036 Inspection Protection TP: 1623-02-HT-002 (PIPE SIZES: 4,1,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


37 MFC-DLM-RBH-I-0037 Preparation INSULATION ON HYDROTESTED LINES TP: 1515-01-HT-
inspection 001

Inpection of Insulation Prior to Cladding/Weather


Insulation
38 MFC-DLM-RBH-I-0038 Inspection
Protection On HYDROTESTED LINES TP: 1626-00-HT-
019 (PIPE SIZES: 36)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
39 MFC-DLM-RBH-I-0039 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-HT-
inspection 021 (PIPE SIZES: 42,4,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


40 MFC-DLM-RBH-I-0040 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-HT-
inspection 022 (PIPE SIZES: 42,4,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


41 MFC-DLM-RBH-I-0041 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-HT-
inspection 023(PIPE SIZES: 42,4,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


42 MFC-DLM-RBH-I-0042 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-HT-
inspection 024(PIPE SIZES: 42,4,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


43 MFC-DLM-RBH-I-0043 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 062(PIPE SIZES: 3,2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


44 MFC-DLM-RBH-I-0044 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 022(PIPE SIZES: 6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


45 MFC-DLM-RBH-I-0045 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 023 (PIPE SIZES: 6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


46 MFC-DLM-RBH-I-0046 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 024 (PIPE SIZES: 6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


47 MFC-DLM-RBH-I-0047 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-HT-
inspection 012 (PIPE SIZES: 20)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


48 MFC-DLM-RBH-I-0048 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 022 (PIPE SIZES: 6)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
49 MFC-DLM-RBH-I-0049 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 023 (PIPE SIZES: 6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


50 MFC-DLM-RBH-I-0050 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 011 (PIPE SIZES: 20)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


51 MFC-DLM-RBH-I-0051 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 014 (PIPE SIZES: 2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


52 MFC-DLM-RBH-I-0052 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 064 (PIPE SIZES: 3,2,3/4)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


53 MFC-DLM-RBH-I-0053 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-HT-
inspection 007 (PIPE SIZES: 14,10,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


54 MFC-DLM-RBH-I-0054 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-HT-
inspection 007 (PIPE SIZES: 12,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


55 MFC-DLM-RBH-I-0055 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-HT-
inspection 014 (PIPE SIZES: 20,12)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


56 MFC-DLM-RBH-I-0056 Preparation INSULATION ON HYDROTESTED LINES TP: 1471-00-HT-
inspection 004 (PIPE SIZES: 6,3,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


57 MFC-DLM-RBH-I-0057 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 023 (PIPE SIZES: 6,2,1)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


58 MFC-DLM-RBH-I-0058 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-HT-
inspection 009 (PIPE SIZES: 2,1)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
59 MFC-DLM-RBH-I-0059 Preparation INSULATION ON HYDROTESTED LINES TP: 1761-00-HT-
inspection 010 (PIPE SIZES: 4,2,1)

Insulation Inpection of Insulation Prior to Cladding/Weather


60 MFC-DLM-RBH-I-0060 Inspection Protection TP: 1626-00-HT-004 (PIPE SIZES: 14,2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


61 MFC-DLM-RBH-I-0061 Preparation INSULATION ON HYDROTESTED LINES TP: 1514-01-HT-
inspection 001 (PIPE SIZES: 12,10,8,6,3,2,1)

Insulation Inpection of Insulation Prior to Cladding/Weather


62 MFC-DLM-RBH-I-0062 Inspection Protection TP: 1626-00-HT-019 (PIPE SIZES: 8)

Insulation Inpection of Insulation Prior to Cladding/Weather


63 MFC-DLM-RBH-I-0063 Inspection Protection TP: 1634-00-HT-003 (PIPE SIZES: 12)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


64 MFC-DLM-RBH-I-0064 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-HT-
inspection 015 (PIPE SIZES: 16,6)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


65 MFC-DLM-RBH-I-0065 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-HT-
inspection 025 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


66 MFC-DLM-RBH-I-0066 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-HT-
inspection 006 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


67 MFC-DLM-RBH-I-0067 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-03-HT-
inspection 007 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


68 MFC-DLM-RBH-I-0068 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 027 (PIPE SIZES: 4,2)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
69 MFC-DLM-RBH-I-0069 Preparation INSULATION ON HYDROTESTED LINES TP: 1505-01-HT-
inspection 001 (PIPE SIZES: 10,8,6,3,2,1.5,1)

Inpection of Insulation Prior to


Insulation
70 MFC-DLM-RBH-I-0070 Inspection Cladding/Weather Protection TP: 1625-00-HT-
023 (PIPE SIZES: 42,4,2)

Inpection of Insulation Prior to


Insulation
71 MFC-DLM-RBH-I-0071 Inspection Cladding/Weather Protection TP: 1625-00-HT-
022 (PIPE SIZES: 42,4,2)

Inpection of Insulation Prior to


Insulation
72 MFC-DLM-RBH-I-0072 Inspection Cladding/Weather Protection TP: 1625-00-HT-
021 (PIPE SIZES: 42,4,2)

Inpection of Insulation Prior to


Insulation
73 MFC-DLM-RBH-I-0073 Inspection Cladding/Weather Protection TP: 1625-00-HT-
024 (PIPE SIZES: 42,4,2)

Inpection of Insulation (Partial) Prior to


Insulation
74 MFC-DLM-RBH-I-0074 Inspection Cladding/Weather Protection TP: 1515-01-HT-
001 (PIPE SIZES: 2,3)

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
75 MFC-DLM-RBH-I-0075 Inspection INSPECTION PRIOR TO METAL CLADDING ON
@ TP-1515-01-HT-001 (PIPE SIZES: 10,3,2)

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
76 MFC-DLM-RBH-I-0076 Inspection INSPECTION PRIOR TO METAL CLADDING ON
@ TP-1626-00-HT-009

Inpection of Insulation Prior to


Insulation
77 MFC-DLM-RBH-I-0077 Inspection Cladding/Weather Protection @ TP-1515-01-
HT-001

PARTIAL FINAL FINAL PARTIAL INSPECTION OF CLADDING/WEATHER


78 MFC-DLM-RBH-I-0078 INSPECTION. PROTECTION @ TP- 1626-00-HT-019
IN-PROCES INSULATION 1st, 2nd LAYER
79 MFC-DLM-RBH-I-0079 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1515-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
80 MFC-DLM-RBH-I-0080 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
81 MFC-DLM-RBH-I-0081 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
82 MFC-DLM-RBH-I-0082 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1505-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

Inspection of Insulation Prior to Metal


Insulation
83 MFC-DLM-RBH-I-0083 Inspection Cladding/ Weather Protecion (Hot PP )@ TP:
1621-03-HT-007 (PIPE SIZES: 2)

Inspection of Insulation Prior to Metal


Insulation
84 MFC-DLM-RBH-I-0084 Inspection Cladding/ Weather Protecion (Hot PP )@ TP:
1621-01-HT-023 (PIPE SIZES: 6'',2'')

Inspection of Insulation Prior to Metal


Insulation
85 MFC-DLM-RBH-I-0085 Inspection Cladding/ Weather Protecion (Hot PP )@ TP:
1621-01-HT-027 (PIPE SIZES: 2)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


86 MFC-DLM-RBH-I-0086 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1404-00-HT-001 (PIPE SIZES: 16'',10'',8'',6'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


87 MFC-DLM-RBH-I-0087 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1515-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


88 MFC-DLM-RBH-I-0088 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1514-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR
89 MFC-DLM-RBH-I-0089 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1513-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


90 MFC-DLM-RBH-I-0090 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1511-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')

IN-PROCES INSULATION 1st, 2nd LAYER


91 MFC-DLM-RBH-I-0091 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1515-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
92 MFC-DLM-RBH-I-0092 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
93 MFC-DLM-RBH-I-0093 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection @ TP-1505-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

Inspection of Insulation Prior to Metal


Insulation
94 MFC-DLM-RBH-I-0094 Inspection Cladding/ Weather Protecion (Hot PP )@ TP:
1623-01-HT-023 (PIPE SIZES: 6'',2'')

PARTIAL FINAL INSPECTION OF METAL


Cladding
95 MFC-DLM-RBH-I-0095 Inspection CLADDING/WEATHER PROTECTION @ TP-
1626-00-HT-019

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


96 MFC-DLM-RBH-I-0096 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1644-00-HT-006 (PIPE SIZES: 3'',2'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


97 MFC-DLM-RBH-I-0097 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1645-00-HT-005 (PIPE SIZES: 10'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


98 MFC-DLM-RBH-I-0098 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1645-00-HT-006 (PIPE SIZES: 10'',)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR
99 MFC-DLM-RBH-I-0099 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1645-00-HT-073 (PIPE SIZES: 3'',1'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


100 MFC-DLM-RBH-I-0100 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1646-00-HT-030 (PIPE SIZES: 2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


101 MFC-DLM-RBH-I-0101 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1646-00-HT-035 (PIPE SIZES: 44'',3'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


102 MFC-DLM-RBH-I-0102 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1647-00-HT-025 (PIPE SIZES: 3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


103 MFC-DLM-RBH-I-0103 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1505-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')

PARTIAL FINAL INSPECTION OF METAL


Cladding
104 MFC-DLM-RBH-I-0104 Inspection CLADDING TP: 1623-02-HT-002 (PIPE SIZES:
4'',1'',3/4'')

PARTIAL FINAL INSPECTION OF METAL


Cladding
105 MFC-DLM-RBH-I-0105 Inspection CLADDING. TP: 1626-00-HT-009 (PIPE SIZES:
2'')

106 MFC-DLM-RBH-I-0106 Cladding FINAL INSPECTION OF METAL CLADDING. TP:


Inspection 1626-00-HT-009 (PIPE SIZES: 14'',2'')

107 MFC-DLM-RBH-I-0107 Cladding FINAL INSPECTION OF METAL CLADDING. TP:


Inspection 1625-01-HT-022 (PIPE SIZES: 6'',2'')

PATIAL FINAL INSPECTION OF METAL


Cladding
108 MFC-DLM-RBH-I-0108 Inspection CLADDING. TP: 1515-01-HT-001 (PIPE SIZES:
2'')
Inspection of Insulation Prior to Metal
Insulation
109 MFC-DLM-RBH-I-0109 Inspection Cladding/ Weather Protecion @ TP: 1624-01-
HT-002 (PIPE SIZES: 6''')

Inspection of Insulation Prior to Metal


Insulation
110 MFC-DLM-RBH-I-0110 Inspection Cladding/ Weather Protecion @ TP: 1471-00-
HT-004 (PIPE SIZES: 6'')

Inspection of Insulation Prior to Metal


Insulation
111 MFC-DLM-RBH-I-0111 Inspection Cladding/ Weather Protecion @ TP: 1466-00-
HT-007 (PIPE SIZES: 12'')

In process Inspection of Insulation Prior to


112 MFC-DLM-RBH-I-0112 Insulation Second layer Metal Cladding/ Weather
Inspection Protecion @ TP: 1404-00-HT-001 (PIPE SIZES:
16'',10'',8'',6'',1'')

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


113 MFC-DLM-RBH-I-0113 INSPECTION OF
METAL CLADDING 1626-00-HT-004 (PIPE SIZES: 14'',2'')

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


114 MFC-DLM-RBH-I-0114 INSPECTION OF
METAL CLADDING 1621-01-HT-022 (PIPE SIZES: 6'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


115 MFC-DLM-RBH-I-0115 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1466-00-HT-008 (PIPE SIZES: 6'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


116 MFC-DLM-RBH-I-0116 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1627-00-HT-004 (PIPE SIZES: 4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


117 MFC-DLM-RBH-I-0117 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1463-00-HT-006 (PIPE SIZES: 4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


118 MFC-DLM-RBH-I-0118 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1512-01-HT-007 (PIPE SIZES: 8'',4'',2'',1'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR
119 MFC-DLM-RBH-I-0119 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1647-00-HT-058 (PIPE SIZES: 2'')

Inprocess Inspection of Insulation Prior to 2nd


120 MFC-DLM-RBH-I-0120 Insulation layer Metal Cladding/ Weather Protecion @
Inspection TP: 1404-00-HT-001 (PIPE SIZES:
16'',10'',8'',6'',1'')

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


121 MFC-DLM-RBH-I-0121 INSPECTION OF 1625-00-HT-021 (PIPE SIZES: 42'',4'',2'')
METAL CLADDING

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


122 MFC-DLM-RBH-I-0122 INSPECTION OF 1625-00-HT-022 (PIPE SIZES: 42'',4'',2'')
METAL CLADDING

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


123 MFC-DLM-RBH-I-0123 INSPECTION OF
METAL CLADDING 1625-00-HT-023 (PIPE SIZES: 42'',4'',2'')

FINAL
124 MFC-DLM-RBH-I-0124 INSPECTION OF FINAL INSPECTION OF METAL CLADDING. TP:
METAL CLADDING 1625-00-HT-024 (PIPE SIZES: 42'',4'',2'')

Inspection of Insulation Prior to Metal


Insulation
125 MFC-DLM-RBH-I-0125 Inspection Cladding/ Weather Protecion @ TP: 1627-00-
HT-004 (PIPE SIZES: 4'')

Inspection of Insulation Prior to Metal


Insulation
126 MFC-DLM-RBH-I-0126 Inspection Cladding/ Weather Protecion @ TP: 1463-00-
HT-007 (PIPE SIZES:14'',10'')

Inspection of Insulation Prior to Metal


Insulation
127 MFC-DLM-RBH-I-0127 Inspection Cladding/ Weather Protecion @ TP: 1634-00-
HT-003 (PIPE SIZES:3'',2'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
128 MFC-DLM-RBH-I-0128
Inspection INSPECTION PRIOR TO METAL CLADDING ON @
TP-1515-01-HT-007 (PIPE SIZES:,8'',2''1'')
Inspection of Insulation Prior to Metal
Insulation
129 MFC-DLM-RBH-I-0129 Inspection Cladding/ Weather Protecion @ TP: 1466-00-
HT-008 (PIPE SIZES: 6'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON
130 MFC-DLM-RBH-I-0130 Inspection @ TP-1515-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
Insulation INSPECTION PRIOR TO METAL CLADDING ON
131 MFC-DLM-RBH-I-0131 Inspection @ TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
Insulation INSPECTION PRIOR TO METAL CLADDING ON
132 MFC-DLM-RBH-I-0132 Inspection @ TP-1505-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


133 MFC-DLM-RBH-I-0133 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1501-01-HT-007 (PIPE SIZES: 8'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


134 MFC-DLM-RBH-I-0134 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1502-01-HT-007 (PIPE SIZES: 8'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


135 MFC-DLM-RBH-I-0135 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1503-01-HT-007 (PIPE SIZES: 8'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


136 MFC-DLM-RBH-I-0136 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1623-01-HT-038(PIPE SIZES:18'',3'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


137 MFC-DLM-RBH-I-0137 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1634-00-HT-012(PIPE SIZES: 3'',1 1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


138 MFC-DLM-RBH-I-0138 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1644-00-HT-003(PIPE SIZES: 3'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR
139 MFC-DLM-RBH-I-0139 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1645-00-HT-008(PIPE SIZES: 8'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


140 MFC-DLM-RBH-I-0140 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1463-00-HT-005(PIPE SIZES: 20'',16'')

Insulation Inpection of 1 layer Insulation Prior to Start


141 MFC-DLM-RBH-I-0141 Inspection 2nd layer @ TP-1761-00-HT-010 (Pipe size 4'')

Insulation Inpection of Insulation Prior to Start Metal


142 MFC-DLM-RBH-I-0142 Inspection Cladding @ TP-1463-00-HT-006 (Pipe size 4'')

Insulation Inpection of Insulation Prior to Start Metal


143 MFC-DLM-RBH-I-0143 Inspection Cladding @ TP-1621-01-HT-007 (Pipe size 3'')

Inpection of Insulation Prior to Start Metal


Insulation
144 MFC-DLM-RBH-I-0144 Inspection Cladding @ TP-1455-00-HT-001 (Pipe size-1
1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


145 MFC-DLM-RBH-I-0145 Preparation TO INSULATION ON HYDROTESTED LINES TP:
inspection 1645-00-HT-131 (PIPE SIZES: 4'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR


Surface TO INSULATION ON HYDROTESTED LINES TP :
146 MFC-DLM-RBH-I-0146 Preparation
1504-01-HT-001 (PIPE SIZES:
inspection
10'',8'',6'',3'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


147 MFC-DLM-RBH-I-0147 Preparation TO INSULATION ON HYDROTESTED LINES TP :
inspection 1455-00-HT-001 (PIPE SIZES: 1 1/2'')

Inprocess Inspection of Insulation 1st& 2nd


Insulation layer Prior to Metal Cladding/ Weather
148 MFC-DLM-RBH-I-0148 Inspection Protecion @ TP: 1404-00-HT-001 (PIPE SIZES:
16'',10'',8'',6'',1'')
Partial FINAL INSPECTION OF METAL
149 MFC-DLM-RBH-I-0149 Cladding CLADDING. TP: 1404-00-HT-001 (PIPE SIZES:
Inspection
10'',6'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR


Surface
TO INSULATION ON HYDROTESTED LINES
150 MFC-DLM-RBH-I-0150 Preparation TP: 1504-01-HT-007 (PIPE SIZES:
inspection (8'',2'',1'')
PRE- INSULATION INSPECTION OF (HOT) PRIOR
Surface TO INSULATION ON HYDROTESTED LINES
151 MFC-DLM-RBH-I-0151 Preparation TP:1623-03-HT-006 (PIPE
inspection
SIZES:2'')
PRE- INSULATION INSPECTION OF (HOT) PRIOR
Surface TO INSULATION ON HYDROTESTED LINES TP:
152 MFC-DLM-RBH-I-0152 Preparation 1647-00-HT-061 (PIPE
inspection
SIZES:6''3'')
PRE- INSULATION INSPECTION OF (HOT) PRIOR
Surface
TO INSULATION ON HYDROTESTED LINES
153 MFC-DLM-RBH-I-0153 Preparation
inspection TP:1647-00-HT-006 (PIPE
SIZES:8'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR


154 MFC-DLM-RBH-I-0154 Preparation TO INSULATION ON HYDROTESTED LINES
inspection TP:1617-00-HT-001 (PIPE
SIZES:10'',4'',2'')

IN-PROCES INSULATION 1st, 2nd LAYER


155 MFC-DLM-RBH-I-0155 Insulation INSPECTION PRIOR TO METAL CLADDING ON
Inspection TP-1511-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
156 MFC-DLM-RBH-I-0156 Inspection INSPECTION PRIOR TO METAL CLADDING ON
TP-1512-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


157 MFC-DLM-RBH-I-0157 Inspection INSPECTION PRIOR TO METAL CLADDING ON
TP-1513-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


158 MFC-DLM-RBH-I-0158 Inspection INSPECTION PRIOR TO METAL CLADDING ON
@ TP-1515-01-HT-007 (PIPE SIZES:,8'',2''1'')
159 MFC-DLM-RBH-I-0159 Insulation Insulation Inspection Prior to Start Metal Cladding
Inspection TP-1761-00-HT-010 (Pipe size 4'')

Insulation Partial Inspection of Insulation Prior to Start Metal


160 MFC-DLM-RBH-I-0160 Cladding TP-1455-00-HT-001 (Pipe
Inspection size 1 1/2'''')

Inspection of Insulation Prior to Metal Cladding/


Insulation
161 MFC-DLM-RBH-I-0161 Inspection Weather Protecion (Hot PP )@ TP: 1621-01-HT-
023 (PIPE SIZES: 6'',2'')

Insulation Insulation Inspection Prior to Start Metal Cladding


162 MFC-DLM-RBH-I-0162
Inspection TP-1761-00-HT-010 (Pipe size 4'')

Insulation Partial Inspection of Insulation Prior to Start Metal


163 MFC-DLM-RBH-I-0163 Inspection Cladding TP-1455-00-HT-001 (Pipe size 1 1/2'''')

Inspection of Insulation Prior to Metal Cladding/


164 MFC-DLM-RBH-I-0164 Insulation Weather Protecion (Hot PP )@ TP: 1621-01-HT-
Inspection
023 (PIPE SIZES: 6'',2'')

IN-PROCES INSULATION 1st, 2nd LAYER


165 MFC-DLM-RBH-I-0165 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1515-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
166 MFC-DLM-RBH-I-0166
Inspection TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
167 MFC-DLM-RBH-I-0167 Inspection TP-1505-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


168 MFC-DLM-RBH-I-0168 Preparation INSULATION ON HYDROTESTED LINES TP: 1616-00-
inspection HT-015 (PIPE SIZES:3'',2'',1'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
169 MFC-DLM-RBH-I-0169 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-001 (PIPE SIZES:24'',12'',10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


170 MFC-DLM-RBH-I-0170 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-021 (PIPE SIZES:14'',10'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


171 MFC-DLM-RBH-I-0171 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-
inspection HT-023 (PIPE SIZES:14'',8'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


172 MFC-DLM-RBH-I-0172 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-020 (PIPE SIZES:14'',10'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


173 MFC-DLM-RBH-I-0173 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-03-
inspection HT-003 (PIPE SIZES:12'',8'',6'',3'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


174 MFC-DLM-RBH-I-0174 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-033 (PIPE SIZES:10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


175 MFC-DLM-RBH-I-0175 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-030 (PIPE SIZES:10'')

Surface Pre Insulation Inspection of (Hot) Prior to


176 MFC-DLM-RBH-I-0176 Preparation Inasulation on Hydrotested Lines TP-1513-01-HT-
inspection 001 (PIPE SIZES: 12'',10'',8'',6'',3'',2''1'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


177 MFC-DLM-RBH-I-0177 Inspection ON TP-1515-01-HT-001 (PIPE SIZES: 10'')

FINAL FINAL INSPECTION OF CLADDING/WEATHER


178 MFC-DLM-RBH-I-0178 INSPECTION OF
METAL CLADDING PROTECTION @ TP- 1626-00-HT-019
FINAL FINAL INSPECTION OF CLADDING/WEATHER
179 MFC-DLM-RBH-I-0179 INSPECTION OF
METAL CLADDING PROTECTION @ TP- 1626-00-HT-009

FINAL FINAL INSPECTION OF CLADING/WEATHER


180 MFC-DLM-RBH-I-0180 INSPECTION OF PROTECTION @ TP: 1627-00-HT-004 (PIPE SIZES:
METAL CLADDING 4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


181 MFC-DLM-RBH-I-0181 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-042 (PIPE SIZES:30'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


182 MFC-DLM-RBH-I-0182 Preparation INSULATION ON HYDROTESTED LINES TP: 1627-00-
inspection HT-005 (PIPE SIZES:2'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
183 MFC-DLM-RBH-I-0183 Inspection INSPECTION PRIOR TO METAL CLADDING ON @
TP-1501-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


184 MFC-DLM-RBH-I-0184 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection
TP-1502-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


185 MFC-DLM-RBH-I-0185 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1503-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
186 MFC-DLM-RBH-I-0186
Inspection TP-1504-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

INSULATION INSPECTION (HOT) PRIOR TO START


Insulation
187 MFC-DLM-RBH-I-0187 Inspection CLADDING TP: 1466-00-HT-015 (PIPE
SIZES:16'',6'')

Insulation INSULATION INSPECTION (HOT) PRIOR TO START


188 MFC-DLM-RBH-I-0188
Inspection CLADDING TP: 1463-00-HT-005 (PIPE SIZES:3'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
189 MFC-DLM-RBH-I-0189 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-004 (PIPE SIZES:3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


190 MFC-DLM-RBH-I-0190 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-002 (PIPE SIZES:3'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


191 MFC-DLM-RBH-I-0191 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-011 (PIPE SIZES:12'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


192 MFC-DLM-RBH-I-0192 Preparation INSULATION ON HYDROTESTED LINES TP: 1645-00-
inspection HT-057 (PIPE SIZES:10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


193 MFC-DLM-RBH-I-0193 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-041 (PIPE SIZES:44'',3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


194 MFC-DLM-RBH-I-0194 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-019 (PIPE SIZES:3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


195 MFC-DLM-RBH-I-0195 Preparation INSULATION ON HYDROTESTED LINES TP: 1465-00-
inspection HT-002 (PIPE SIZES:8'',3'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


196 MFC-DLM-RBH-I-0196
Inspection ON TP-1515-01-HT-001 (PIPE SIZES: 6'')

Insulation Insulation Inspection Prior to Start Metal Cladding


197 MFC-DLM-RBH-I-0197 Inspection TP-1623-03-HT-006 (Pipe size 2'')

Insulation Insulation Inspection Prior to Start Metal Cladding


198 MFC-DLM-RBH-I-0198
Inspection TP-1623-01-HT-038 (Pipe size 18'')
IN-PROCES INSULATION 1st, 2nd LAYER
199 MFC-DLM-RBH-I-0199 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1455-010HT-001 (PIPE SIZES: 1 .1/2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


200 MFC-DLM-RBH-I-0200
Inspection ON TP-1514-01-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


201 MFC-DLM-RBH-I-0201 Preparation INSULATION ON HYDROTESTED LINES TP: 1471-00-
inspection HT-002 (PIPE SIZES:12'',8'',4'',3'',3/4'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
202 MFC-DLM-RBH-I-0202
Inspection TP-1513-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
203 MFC-DLM-RBH-I-0203 Inspection INSPECTION PRIOR TO METAL CLADDING ON @
TP-1455-00HT-001 (PIPE SIZES: 1 .1/2'')

204 MFC-DLM-RBH-I-0204 Cladding FINAL INSPECTION OF METAL CLADDING. TP:


Inspection 1634-00-HT-03 (PIPE SIZES: 12'',10'',3'',2'',)

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


205 MFC-DLM-RBH-I-0205 INSPECTION OF
METAL CLADDING 1623-03-HT-006 (PIPE SIZES:2'')

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


206 MFC-DLM-RBH-I-0206 INSPECTION OF
METAL CLADDING 1624-01-HT-002 (PIPE SIZES:6'')

FINAL FINAL INSPECTION OF METAL CLADDING. TP:


207 MFC-DLM-RBH-I-0207 INSPECTION OF
1463-00-HT-007 (PIPE SIZES1:6'',10'')
METAL CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


208 MFC-DLM-RBH-I-0208 ON TP-1404-00-HT-001 (PIPE SIZES:
Inspection ( 16'')
IN-PROCES INSULATION 1st, 2nd LAYER
209 MFC-DLM-RBH-I-0209 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1515-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
210 MFC-DLM-RBH-I-0210
Inspection TP-1514-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
211 MFC-DLM-RBH-I-0211 Inspection TP-1505-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
212 MFC-DLM-RBH-I-0212
Inspection TP-1504-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
213 MFC-DLM-RBH-I-0213 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1511-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


214 MFC-DLM-RBH-I-0214 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection
TP-1501-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


215 MFC-DLM-RBH-I-0215 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1502-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


216 MFC-DLM-RBH-I-0216 INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1503-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
217 MFC-DLM-RBH-I-0217 Inspection INSPECTION PRIOR TO METAL CLADDING ON @
TP-1515-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


218 MFC-DLM-RBH-I-0218 INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection 1513-01-HT-007 (PIPE SIZES:,8'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
219 MFC-DLM-RBH-I-0219 Insulation INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection 1512-01-HT-007 (PIPE SIZES:,8'',2''1'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
220 MFC-DLM-RBH-I-0220
METAL 1515-01-HT-007
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


221 MFC-DLM-RBH-I-0221 Inspection ON TP-1515-01-HT-001 (PIPE SIZES:10'',3'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


222 MFC-DLM-RBH-I-0222 START CLADDING TP: 1616-00-HT-015 (PIPE
Inspection SIZES:3'',2'',1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
223 MFC-DLM-RBH-I-0223 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1504-01-HT-007 (PIPE SIZES:,8'',2''1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


224 MFC-DLM-RBH-I-0224 Insulation START CLADDING TP: 1623-03-HT-003 (PIPE
Inspection
SIZES:12'',8'',6'',3'',2'',1'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


225 MFC-DLM-RBH-I-0225 Insulation PRIOR TO START CLADDING
Inspection TP:1617-00-HT-001 (PIPE SIZES:10'',4'',2'')

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


226 MFC-DLM-RBH-I-0226 PRIOR TO START CLADDING TP: 1471-00-HT-002
Inspection (PIPE SIZES:12'',8'',4'',3'',3/4'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
227 MFC-DLM-RBH-I-0227 Inspection PRIOR TO START CLADDING TP: 1626-00-HT-001
(PIPE SIZES:24'',12'',10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


228 MFC-DLM-RBH-I-0228 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-
inspection HT-010 (PIPE SIZES:6'',4'',3'',1'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
229 MFC-DLM-RBH-I-0229 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-005 (PIPE SIZES:8'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


230 MFC-DLM-RBH-I-0230 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-02-
inspection HT-004 (PIPE SIZES:2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


231 MFC-DLM-RBH-I-0231 Preparation INSULATION ON HYDROTESTED LINES TP: 1616-00-
inspection HT-002 (PIPE SIZES:16'',14'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


232 MFC-DLM-RBH-I-0232 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-011 (PIPE SIZES:2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


233 MFC-DLM-RBH-I-0233 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-
inspection HT-004 (PIPE SIZES:14'',2'',1 1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


234 MFC-DLM-RBH-I-0234 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-002 (PIPE SIZES:8'',6'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


235 MFC-DLM-RBH-I-0235 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-028 (PIPE SIZES:4'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


236 MFC-DLM-RBH-I-0236 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-009 (PIPE SIZES:60'',42'',1 -1/2 '')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


237 MFC-DLM-RBH-I-0237 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-002 (PIPE SIZES:8'',6'',4'',3 '',2''),

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


238 MFC-DLM-RBH-I-0238 Preparation INSULATION ON HYDROTESTED LINES TP: 1626-00-
inspection HT-007 (PIPE SIZES:3 '',2''),
FINAL
239 MFC-DLM-RBH-I-0239 INSPECTION OF FINAL INSPECTION OF METAL CLADDING. TP:
METAL 1623-01-HT-023 (PIPE SIZES:2'')
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING. TP:
240 MFC-DLM-RBH-I-0240
METAL 1621-03-HT-007 (PIPE SIZES:2'')
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING. TP:
241 MFC-DLM-RBH-I-0241 METAL 1466-00-HT-015 (PIPE SIZES:2'')
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING.


242 MFC-DLM-RBH-I-0242
Inspection TP: 1471-00-HT-004 (PIPE SIZES:6'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING.


243 MFC-DLM-RBH-I-0243 Inspection TP: 1626-00-HT-001 (PIPE SIZES:24'')

Inspection in process application of Insulation and


244 MFC-DLM-RBH-I-0244 Insulation Vapor Barrier Prior to Start Cladding TP: 1541-00-
Inspection
HT-002 (PIPE SIZES: 3,2,1.1/2,3/4)

Inspection in process application of Insulation and


245 MFC-DLM-RBH-I-0245 Insulation Vapor Barrier Prior to Start Cladding TP: 1541-00-
Inspection HT-001 (PIPE SIZES: 3,2,1.1/2,3/4)

Insulation IN-PROCES INSULATION INSPECTION PRIOR TO


246 MFC-DLM-RBH-I-0246 METAL CLADDING ON TP-1423-00-HT-008 (PIPE
Inspection SIZES:,36'',8'',6'',4'',2''1'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


247 MFC-DLM-RBH-I-0247 Inspection ON TP-1515-01-HT-001 (PIPE SIZES:12'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


248 MFC-DLM-RBH-I-0248
Inspection ON TP-1514-01-HT-001 (PIPE SIZES:12'')
249 MFC-DLM-RBH-I-0249 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP-1634-00-HT-003 (PIPE SIZES:3'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


250 MFC-DLM-RBH-I-0250
Inspection ON TP-1617-00-HT-001 (PIPE SIZES:10'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


251 MFC-DLM-RBH-I-0251 Inspection ON TP-1616-00-HT-015 (PIPE SIZES:3'',1'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


252 MFC-DLM-RBH-I-0252
Inspection CLADDING ON TP-1634-00-HT-004 (PIPE SIZES:3'')

INSULATION INSPECTION PRIOR TO START METAL


Insulation
253 MFC-DLM-RBH-I-0253 Inspection CLADDING ON TP-1616-00-HT-002 (PIPE
SIZES:16''14'',1'')

254 MFC-DLM-RBH-I-0254 Insulation INSULATION INSPECTION PRIOR TO START METAL


Inspection CLADDING ON TP-1647-00-HT-022 (PIPE SIZES:6'')

255 MFC-DLM-RBH-I-0255 Insulation INSULATION INSPECTION PRIOR TO START METAL


Inspection CLADDING ON TP-1647-00-HT-024 (PIPE SIZES:6'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


256 MFC-DLM-RBH-I-0256
Inspection CLADDING ON TP-1646-00-HT-022 (PIPE SIZES:6'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


257 MFC-DLM-RBH-I-0257 Inspection CLADDING ON TP-1646-00-HT-014 (PIPE SIZES:2'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


258 MFC-DLM-RBH-I-0258
Inspection CLADDING ON TP-1646-00-HT-023 (PIPE SIZES:6'')
259 MFC-DLM-RBH-I-0259 Insulation INSULATION INSPECTION PRIOR TO START METAL
Inspection CLADDING ON TP-1647-00-HT-023 (PIPE SIZES:6'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


260 MFC-DLM-RBH-I-0260 CLADDING ON TP-1646-00-HT-025 (PIPE
Inspection SIZES:2'',3/4'')

INSULATION INSPECTION PRIOR TO START METAL


Insulation
261 MFC-DLM-RBH-I-0261 Inspection CLADDING ON TP-1647-00-HT-030 (PIPE
SIZES:10'')

Insulation INSULATION INSPECTION PRIOR TO START METAL


262 MFC-DLM-RBH-I-0262 CLADDING ON TP-1646-00-HT-033 (PIPE
Inspection SIZES:10'')

Cladding FINAL INSPECTION OF METAL CLADDING ON TP-


263 MFC-DLM-RBH-I-0263 Inspection 1514-01-HT-007

IN-PROCES INSULATION 1st, 2nd LAYER


264 MFC-DLM-RBH-I-0264 Insulation INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection
1514-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION INSPECTION PRIOR TO


265 MFC-DLM-RBH-I-0265 Insulation METAL CLADDING ON @ TP-1455-00-HT-001
Inspection (PIPE SIZES: 1 .1/2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


266 MFC-DLM-RBH-I-0266
Inspection ON TP-1514-01-HT-001 (PIPE SIZES:10'',3'',2'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
267 MFC-DLM-RBH-I-0267 Inspection ON TP-1541-00-HT-002 (PIPE SIZES:3'',2'',1
1/2'',3/4'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


268 MFC-DLM-RBH-I-0268 ON TP-1541-00-HT-001 (PIPE SIZES:3'',2'',1
Inspection 1/2'',3/4'')
269 MFC-DLM-RBH-I-0269 Cladding FINAL INSPECTION OF METAL CLADDING. TP:
Inspection 1634-00-HT-0103 (PIPE SIZES:12'',10'',3'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


270 MFC-DLM-RBH-I-0270
Inspection ON TP-1423-00-HT-008 (PIPE SIZES:1'',3/4'',1/2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


271 MFC-DLM-RBH-I-0271 Inspection ON TP-1514-01-HT-007 (PIPE SIZES :8'',2'',1'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING. TP:
272 MFC-DLM-RBH-I-0272
METAL 1634-00-HT-003 (PIPE SIZES:12'',10'',3'',2'')
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
273 MFC-DLM-RBH-I-0273 Inspection ON TP-1541-00-HT-002 (PIPE SIZES:3'',2'',1
1/2'',3/4'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


274 MFC-DLM-RBH-I-0274 Cladding ON TP-1541-00-HT-001 (PIPE SIZES:3'',2'',1
Inspection
1/2'',3/4'')

FINAL
275 MFC-DLM-RBH-I-0275 INSPECTION OF FINAL INSPECTIONOF METAL CLADDING ON TP-
METAL 1616-00-HT-002 (PIPE SIZES:16''14'',1'')
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
276 MFC-DLM-RBH-I-0276
METAL 1514-01-HT-007
CLADDING

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
277 MFC-DLM-RBH-I-0277 Inspection START METAL CLADDING ONTP: 1645-00-HT-073
(PIPE SIZES: 3'',1'',3/4'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


278 MFC-DLM-RBH-I-0278 START METAL CLADDING ON TP: 1646-00-HT-035
Inspection (PIPE SIZES: 44'',3'',2'')
INSULATION INSPECTION OF (HOT) PRIOR TO
279 MFC-DLM-RBH-I-0279 Insulation START METAL CLADDING ON HYDROTESTED LINES
Inspection TP: 1646-00-HT-011 (PIPE SIZES: 20)

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


280 MFC-DLM-RBH-I-0280 START METAL CLADDING ON TP: 1647-00-HT-012
Inspection (PIPE SIZES: 20)

PRE- INSULATION INSPECTION OF (HOT) PRIOR


Insulation
281 MFC-DLM-RBH-I-0281 Inspection TOSTART METAL CLADDING ON TP: 1634-00-HT-
011 (PIPE SIZES:2'',1'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


282 MFC-DLM-RBH-I-0282 START METRAL CLADDING ON TP: 1623-02-HT-004
Inspection (PIPE SIZES:2'',1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
283 MFC-DLM-RBH-I-0283 Inspection START METAL CLADDING TP: 1621-01-HT-028
(PIPE SIZES:4'',2'')

IN-PROCESS INSULATION INSPECTION PRIOR TO


284 MFC-DLM-RBH-I-0284 Insulation METAL CLADDING ON TP: 1623-01-HT-009 (PIPE
Inspection
SIZES:60'',42'',1 -1/2 '')

IN-PROCESS INSULATION INSPECTION OF (HOT)


285 MFC-DLM-RBH-I-0285 Insulation PRIOR TO START METAL CLADDING ON TP: 1463-
Inspection 00-HT-010 (PIPE SIZES:6'',4'',3'',1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
286 MFC-DLM-RBH-I-0286
Inspection TP-1504-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
287 MFC-DLM-RBH-I-0287 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1511-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


288 MFC-DLM-RBH-I-0288 INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1501-01-HT-007 (PIPE SIZES:,8'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
289 MFC-DLM-RBH-I-0289 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1502-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


290 MFC-DLM-RBH-I-0290 INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1503-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
291 MFC-DLM-RBH-I-0291 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1513-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


292 MFC-DLM-RBH-I-0292 INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection 1512-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
293 MFC-DLM-RBH-I-0293 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1504-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


294 MFC-DLM-RBH-I-0294 Insulation PRIOR TO START METAL CLADDING TP: 1626-00-
Inspection
HT-002 (PIPE SIZES:8'',6'',4'',3 '',2''),

IN-PROCESS INSULATION INSPECTION OF (HOT)


295 MFC-DLM-RBH-I-0295 Insulation PRIOR TO START METAL CLADDING TP: 1626-00-
Inspection HT-007 (PIPE SIZES:3 '',2''),

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


296 MFC-DLM-RBH-I-0296 START METAL CLADDING ONTP: 1645-00-HT-073
Inspection (PIPE SIZES: 3'',1'',3/4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
297 MFC-DLM-RBH-I-0297 Inspection START METAL CLADDING ON TP: 1634-00-HT-011
(PIPE SIZES:2'',1'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


298 MFC-DLM-RBH-I-0298
Inspection (HOT) TP: 1471-00-HT-002 (PIPE SIZES:8'')
FINAL
299 MFC-DLM-RBH-I-0299 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
METAL 1646-00-HT-022
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
300 MFC-DLM-RBH-I-0300
METAL 1647-00-HT-022
CLADDING

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
301 MFC-DLM-RBH-I-0301 Inspection METAL CLADDING ON TP: 1634-00-HT-012 (PIPE
SIZES: 3'',1 1/2'')

FINAL
INSPECTION OF FINAL INISPECTION OF METAL CLADDING ON TP:
302 MFC-DLM-RBH-I-0302
METAL 1645-00-HT-073
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP :
303 MFC-DLM-RBH-I-0303 METAL 1646-00-HT-011
CLADDING

FINAL
304 MFC-DLM-RBH-I-0304 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
METAL 1647-00-HT-012
CLADDING

FINAL
305 MFC-DLM-RBH-I-0305 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
METAL 1634-00-HT-004
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


306 MFC-DLM-RBH-I-0306
Inspection ON TP-1515-01-HT-001 (PIPE SIZES:10'',2'',3'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
307 MFC-DLM-RBH-I-0307 Inspection START METAL CLADDING ON TP: 1646-00-HT-019
(PIPE SIZES:3'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


308 MFC-DLM-RBH-I-0308 START METAL CLADDING ON TP: 1645-00-HT-008
Inspection (PIPE SIZES: 8'')
INSULATION INSPECTION OF (HOT) PRIOR TO
309 MFC-DLM-RBH-I-0309 Insulation START METAL CLADDING ON TP: 1647-00-HT-058
Inspection (PIPE SIZES: 2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


310 MFC-DLM-RBH-I-0310 START METAL CLADDINGTP: 1646-00-HT-005 (PIPE
Inspection SIZES:8'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
311 MFC-DLM-RBH-I-0311 Inspection START METAL CLADDING ON TP: 1646-00-HT-030
(PIPE SIZES: 2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


312 MFC-DLM-RBH-I-0312 START METAL CLADDING ON TP:1647-00-HT-006
Inspection (PIPE SIZES:8'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
313 MFC-DLM-RBH-I-0313 Inspection START METAL CLADDING ON TP: 1645-00-HT-005
(PIPE SIZES: 10'',)

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


314 MFC-DLM-RBH-I-0314 Insulation START METAL CLADDING ON TP: 1645-00-HT-057
Inspection
(PIPE SIZES:10'')

INSULATION INSPECTION OF (HOT) PRIOR TO


315 MFC-DLM-RBH-I-0315 Insulation START METAL CLADDING ON TP: 1645-00-HT-006
Inspection (PIPE SIZES: 10'',)

FINAL
INSPECTION OF FINAL INISPECTION OF METAL CLADDING ON TP:
316 MFC-DLM-RBH-I-0316
METAL 1646-00-HT-014
CLADDING

FINAL
INSPECTION OF FINAL INISPECTION OF METAL CLADDING ON TP:
317 MFC-DLM-RBH-I-0317 METAL 1646-00-HT-035
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


318 MFC-DLM-RBH-I-0318 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-007 (PIPE SIZES:24'',3'',2'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
319 MFC-DLM-RBH-I-0319 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-005 (PIPE SIZES:24'',3'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


320 MFC-DLM-RBH-I-0320 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-03-
inspection HT-009 (PIPE SIZES:18'',12'',2'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


321 MFC-DLM-RBH-I-0321 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-03-
inspection HT-002 (PIPE SIZES:18'',12'',2'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


322 MFC-DLM-RBH-I-0322 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-010 (PIPE SIZES:10'',8'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


323 MFC-DLM-RBH-I-0323 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-006 (PIPE SIZES:10'',4'',8'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


324 MFC-DLM-RBH-I-0324 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-009 (PIPE SIZES : 8'',6'',2'',3/4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


325 MFC-DLM-RBH-I-0325 Insulation START 2nd LAYER ON TP: 1644-00-HT-006 (PIPE
Inspection SIZES: 3'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


326 MFC-DLM-RBH-I-0326 START 2nd LAYER ON TP: 1644-00-HT-003 (PIPE
Inspection SIZES: 3'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
327 MFC-DLM-RBH-I-0327 Inspection INSULATION ON HYDROTESTED LINES TP: 1645-00-
HT-006 (PIPE SIZES:4'')

Insulation PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


328 MFC-DLM-RBH-I-0328 INSULATION ON HYDROTESTED LINES TP: 1647-00-
Inspection HT-041 (PIPE SIZES:44'')
PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
329 MFC-DLM-RBH-I-0329 Insulation INSULATION ON HYDROTESTED LINES TP: 1465-00-
Inspection HT-002 (PIPE SIZES:8'',3'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


330 MFC-DLM-RBH-I-0330 Preparation INSULATION ON HYDROTESTED LINES TP: 1423-00-
inspection HT-010 (PIPE SIZES:2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


331 MFC-DLM-RBH-I-0331 Preparation INSULATION ON HYDROTESTED LINES TP: 1423-00-
inspection HT-012 (PIPE SIZES:2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


332 MFC-DLM-RBH-I-0332 START METAL CLADDING ON TP: 1645-00-HT-006
Inspection (PIPE SIZES:4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
333 MFC-DLM-RBH-I-0333 Inspection START METAL CLADDING ON TP: 1647-00-HT-041
(PIPE SIZES:44'')

INSULATION INSPECTION OF (HOT) PRIOR TO


334 MFC-DLM-RBH-I-0334 Insulation START METAL CLADDING ON TP: 1465-00-HT-002
Inspection
(PIPE SIZES:8'',3'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


335 MFC-DLM-RBH-I-0335 Insulation START METAL CLADDING TP: 1645-00-HT-131
Inspection (PIPE SIZES: 4'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


336 MFC-DLM-RBH-I-0336 START METAL CLADDING ON TP: 1645-00-HT-057
Inspection (PIPE SIZES:10'')

INSULATION INSPECTION OF (HOT) 2nd LAYER


Insulation
337 MFC-DLM-RBH-I-0337 Inspection PRIOR TO START METAL CLADDING ON TP: 1644-
00-HT-006 (PIPE SIZES: 3'')

Insulation INSULATION INSPECTION OF (HOT) 2nd LAYER


338 MFC-DLM-RBH-I-0338 PRIOR TO START METAL CLADDING ON TP: 1644-
Inspection 00-HT-003 (PIPE SIZES: 3'')
339 MFC-DLM-RBH-I-0339 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP: 1623-01-HT-009 (PIPE SIZES:60'',42'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


340 MFC-DLM-RBH-I-0340 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-041 (PIPE SIZES:66'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


341 MFC-DLM-RBH-I-0341 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-042 (PIPE SIZES:66'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


342 MFC-DLM-RBH-I-0342 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-008 (PIPE SIZES:12'',2'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


343 MFC-DLM-RBH-I-0343 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-
inspection HT-005 (PIPE SIZES:12'',10'',4'',2'',3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


344 MFC-DLM-RBH-I-0344 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-
inspection HT-005 (PIPE SIZES:12'',10'',4'',2'',3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


345 MFC-DLM-RBH-I-0345 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-001 (PIPE SIZES:6'',3'',2'',1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation INSPECTION PRIOR TO METAL CLADDING ON @
346 MFC-DLM-RBH-I-0346
Inspection TP-1504-01-HT-001 (PIPE SIZES:
12'',10'',8'',6'',3'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
347 MFC-DLM-RBH-I-0347 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1511-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


348 MFC-DLM-RBH-I-0348 INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1501-01-HT-007 (PIPE SIZES:,8'',2''1'')
IN-PROCES INSULATION 1st, 2nd LAYER
349 MFC-DLM-RBH-I-0349 Insulation INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1502-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


350 MFC-DLM-RBH-I-0350 INSPECTION PRIOR TO METAL CLADDING ON @
Inspection TP-1503-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
351 MFC-DLM-RBH-I-0351 Inspection INSPECTION PRIOR TO METAL CLADDING ON @
TP-1505-01-HT-007 (PIPE SIZES:,8'',2''1'')

Insulation IN-PROCES INSULATION 1st, 2nd LAYER


352 MFC-DLM-RBH-I-0352 INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection 1512-01-HT-007 (PIPE SIZES:,8'',2''1'')

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
353 MFC-DLM-RBH-I-0353 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1504-01-HT-007 (PIPE SIZES:,8'',2''1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


354 MFC-DLM-RBH-I-0354 Insulation MEYAL CLADDING ON TP: 1623-03-HT-009 (PIPE
Inspection
SIZES:18'',12'',2'',3/4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


355 MFC-DLM-RBH-I-0355 Insulation METAL CLADDING ON TP: 1623-03-HT-002 (PIPE
Inspection SIZES:18'',12'',2'',3/4'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


356 MFC-DLM-RBH-I-0356 METAL CLADDING ON TP: 1634-00-HT-002 (PIPE
Inspection SIZES:8'',6'',2'',1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
357 MFC-DLM-RBH-I-0357 Inspection METAL CLADDING ON TP: 1634-00-HT-007 (PIPE
SIZES:24'',3'',2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


358 MFC-DLM-RBH-I-0358 METAL CLADDING ON TP :1624-01-HT-024 (PIPE
Inspection SIZES: 14,8,2,1)
INSULATION INSPECTION OF (HOT) PRIOR TO
359 MFC-DLM-RBH-I-0359 Insulation METAL CLADDING ON TP: 1624-01-HT-023 (PIPE
Inspection SIZES:14'',8'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


360 MFC-DLM-RBH-I-0360
Inspection ON TP-1513-01-HT-007

FINAL
INSPECTION OF FINAL INSPECTION OF METRAL CLADDING ON TP:
361 MFC-DLM-RBH-I-0361 METAL 1623-02-HT-004
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


362 MFC-DLM-RBH-I-0362 Preparation INSULATION ON HYDROTESTED LINES TP: 1531-03-
inspection HT-002 (PIPE SIZES:4'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


363 MFC-DLM-RBH-I-0363 Preparation INSULATION ON HYDROTESTED LINES TP: 1634-00-
inspection HT-023 (PIPE SIZES:8'',6'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


364 MFC-DLM-RBH-I-0364 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-005 (PIPE SIZES:6'',4'',3'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


365 MFC-DLM-RBH-I-0365 Insulation INSULATION ON HYDROTESTED LINES TP: 1423-00-
Inspection HT-010 (PIPE SIZES:2'')

Insulation PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


366 MFC-DLM-RBH-I-0366 INSULATION ON HYDROTESTED LINES TP: 1423-00-
Inspection HT-011 (PIPE SIZES:2'',1'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
367 MFC-DLM-RBH-I-0367 Inspection INSULATION ON HYDROTESTED LINES TP: 1423-00-
HT-012 (PIPE SIZES:2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


368 MFC-DLM-RBH-I-0368 Preparation INSULATION ON HYDROTESTED LINES TP: 1625-00-
inspection HT-002 (PIPE SIZES:42'',36'',10'',12'',4'',3'',2'',)
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
369 MFC-DLM-RBH-I-0369 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-
inspection HT-007 (PIPE SIZES:10'',6'',4'',2'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


370 MFC-DLM-RBH-I-0370 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-01-
inspection HT-001 (PIPE SIZES:12''10'',8'',2'',1 1/2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
371 MFC-DLM-RBH-I-0371 Inspection METAL CLADDING ON TP: 1625-00-HT-005 (PIPE
SIZES:12'',10'',4'',2'',3'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


372 MFC-DLM-RBH-I-0372 METAL CLADDING ON TP: 1531-03-HT-002 (PIPE
Inspection SIZES:4'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
373 MFC-DLM-RBH-I-0373 Inspection METAL CLADDING ON TP: 1624-01-HT-004 (PIPE
SIZES:14'',2'',1 1/2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


374 MFC-DLM-RBH-I-0374 Insulation METAL CLADDING ON TP: 1634-00-HT-005 (PIPE
Inspection
SIZES:24'',3'',2'')

375 MFC-DLM-RBH-I-0375 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TP-1505-01-HT-001 (PIPE SIZES:6''3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


376 MFC-DLM-RBH-I-0376
Inspection ON TP-1504-01-HT-001 (PIPE SIZES:3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


377 MFC-DLM-RBH-I-0377 Inspection ON TP-1515-01-HT-001 (PIPE SIZES:10'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
378 MFC-DLM-RBH-I-0378
METAL TP: 1626-00-HT-002
CLADDING
INSULATION INSPECTION OF (HOT) PRIOR TO
379 MFC-DLM-RBH-I-0379 Insulation METAL CLADDING TP: 1423-00-HT-010 (PIPE
Inspection SIZES:2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


380 MFC-DLM-RBH-I-0380 METAL CLADDING ON TP: 1423-00-HT-011 (PIPE
Inspection SIZES:2'',1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
381 MFC-DLM-RBH-I-0381 Inspection METAL CLADDING ON TP: 1423-00-HT-012 (PIPE
SIZES:2'')

Insulation IN -PROCESS INSULATION INSPECTION OF (HOT)


382 MFC-DLM-RBH-I-0382 PRIOR TO METAL CLADDING TP: 1625-00-HT-002
Inspection (PIPE SIZES:42'',36'',10'',12'',4'',3'',2'',)

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


383 MFC-DLM-RBH-I-0383 Inspection ON TP-1515-01-HT-001 (PIPE SIZES:12'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


384 MFC-DLM-RBH-I-0384 Insulation PRIOR TO METAL CLADDING ON TP: 1624-01-HT-
Inspection
001 (PIPE SIZES:12''10'',8'',2'',1 1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


385 MFC-DLM-RBH-I-0385 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-04-
inspection HT-001 (PIPE SIZES:20'',12'',10'',3'',2'',3/4'',1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


386 MFC-DLM-RBH-I-0386 Preparation INSULATION ON HYDROTESTED LINES TP: 1465-00-
inspection HT-003 (PIPE SIZES:8'',3'',3'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


387 MFC-DLM-RBH-I-0387 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-013 (PIPE SIZES:8'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


388 MFC-DLM-RBH-I-0388 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-012 (PIPE SIZES:8'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
389 MFC-DLM-RBH-I-0389 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-012 (PIPE SIZES:10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


390 MFC-DLM-RBH-I-0390 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-009 (PIPE SIZES:3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


391 MFC-DLM-RBH-I-0391 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-
inspection HT-008 (PIPE SIZES:14'',10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


392 MFC-DLM-RBH-I-0392 Preparation INSULATION ON HYDROTESTED LINES TP: 1645-00-
inspection HT-007 (PIPE SIZES:10'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
393 MFC-DLM-RBH-I-0393 METAL 1645-00-HT-008
CLADDING

FINAL
394 MFC-DLM-RBH-I-0394 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
METAL 1647-00-HT-030
CLADDING

FINAL
395 MFC-DLM-RBH-I-0395 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
METAL 1646-00-HT-033
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON TP-


396 MFC-DLM-RBH-I-0396
Inspection 1511-01-HT-007

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


397 MFC-DLM-RBH-I-0397 Inspection ON TP: 1623-01-HT-009 (PIPE SIZES:60'',42'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


398 MFC-DLM-RBH-I-0398
Inspection ON TP: 1624-01-HT-001 (PIPE SIZES:10'')
PARTIAL FINAL INSPECTION OF METAL CLADDING
399 MFC-DLM-RBH-I-0399 Cladding ON TP-1504-01-HT-001 (PIPE SIZES:
Inspection 6'',8'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


400 MFC-DLM-RBH-I-0400 METAL CLADDING ON TP: 1626-00-HT-002 (PIPE
Inspection SIZES:8'',6'',4'',3 '',2''),

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
401 MFC-DLM-RBH-I-0401 Inspection PRIOR TO METAL CLADDING ON TP: 1624-01-HT-
001 (PIPE SIZES:12''10'',8'',2'',1 1/2'')

Insulation IN -PROCESS INSULATION INSPECTION OF (HOT)


402 MFC-DLM-RBH-I-0402 PRIOR TO METAL CLADDING TP: 1625-00-HT-002
Inspection (PIPE SIZES:42'',36'',10'',12'',4'',3'',2'',)

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
403 MFC-DLM-RBH-I-0403 Inspection PRIOR TO METAL CLADDING TP: 1621-04-HT-001
(PIPE SIZES:20'',12'',10'',3'',2'',3/4'',1'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


404 MFC-DLM-RBH-I-0404 Insulation PRIOR TO METAL CLADDING ON TP: 1634-00-HT-
Inspection
001 (PIPE SIZES:6'',3'',2'',1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


405 MFC-DLM-RBH-I-0405 Insulation METAL CLADDING ON TP: 1634-00-HT-008 (PIPE
Inspection SIZES:12'',2'',1'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


406 MFC-DLM-RBH-I-0406 METAL CLADDING ON TP: 1634-00-HT-023 (PIPE
Inspection SIZES:8'',6'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
407 MFC-DLM-RBH-I-0407 Inspection METAL CLADDING ON TP: 1626-00-HT-021 (PIPE
SIZES:14'',10'',2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


408 MFC-DLM-RBH-I-0408 METAL CLADDING ON TP: 1624-01-HT-007 (PIPE
Inspection SIZES:10'',6'',4'',2'',)
INSULATION INSPECTION OF (HOT) PRIOR TO
409 MFC-DLM-RBH-I-0409 Insulation METAL CLADDING ON TP: 1466-00-HT-005 (PIPE
Inspection SIZES:6'',4'',3'')

Cladding FINAL INSPECTION OF METAL CLADDING ON


410 MFC-DLM-RBH-I-0410
Inspection TP: 1423-00-HT-010

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
411 MFC-DLM-RBH-I-0411 METAL TP: 1423-00-HT-011
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
412 MFC-DLM-RBH-I-0412
METAL TP: 1423-00-HT-012
CLADDING

PARTIAL FINAL
INSPECTION OF PARTIAL FINAL INSPECTION OF METAL CLADDING
413 MFC-DLM-RBH-I-0413 METAL ON TP-1515-01-HT-001 (PIPE SIZES:12'')
CLADDING

INSULATION INSPECTION OF (HOT) PRIOR TO


414 MFC-DLM-RBH-I-0414 Insulation START METAL CLADDING ON TP: 1623-01-HT-016
Inspection
(PIPE SIZES: 6,1,3/4)

415 MFC-DLM-RBH-I-0415 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TP-1515-01-HT-001 (PIPE SIZES:6'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


416 MFC-DLM-RBH-I-0416
Inspection ON TP-1505-01-HT-001 (PIPE SIZES:8'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


417 MFC-DLM-RBH-I-0417 Inspection ON TP-1514-01-HT-001 (PIPE SIZES: 12'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


418 MFC-DLM-RBH-I-0418
Inspection ON TP-1512-01-HT-007 (PIPE SIZES:8'',2'',1'')
PARTIAL FINAL INSPECTION OF METAL CLADDING
419 MFC-DLM-RBH-I-0419 Cladding TP: 1623-03-HT-003 (PIPE
Inspection SIZES:12'',8'',6'',3'',2'',1'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


420 MFC-DLM-RBH-I-0420
Inspection ON TP: 1625-00-HT-002 (PIPE SIZES:36'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
421 MFC-DLM-RBH-I-0421 METAL 1623-03-HT-009
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON TP:


422 MFC-DLM-RBH-I-0422
Inspection 1624-01-HT-004

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
423 MFC-DLM-RBH-I-0423 METAL 1645-00-HT-005
CLADDING

FINAL
424 MFC-DLM-RBH-I-0424 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
METAL 1645-00-HT-057
CLADDING

FINAL
425 MFC-DLM-RBH-I-0425 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
METAL 1647-00-HT-041
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
426 MFC-DLM-RBH-I-0426
METAL 1465-00-HT-002
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
427 MFC-DLM-RBH-I-0427 METAL 1646-00-HT-023
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON TP:


428 MFC-DLM-RBH-I-0428
Inspection 1644-00-HT-006
429 MFC-DLM-RBH-I-0429 Cladding FINAL INSPECTION OF METAL CLADDING ON TP:
Inspection 1644-00-HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


430 MFC-DLM-RBH-I-0430 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-
inspection HT-004 (PIPE SIZES:14'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


431 MFC-DLM-RBH-I-0431 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-013 (PIPE SIZES:10'',8'',6'',4'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


432 MFC-DLM-RBH-I-0432 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-014 (PIPE SIZES:12'',8'',3'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


433 MFC-DLM-RBH-I-0433 Inspection ON TP: 1624-01-HT-001 (PIPE SIZES:10'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


434 MFC-DLM-RBH-I-0434 Cladding ON TP: 1621-04-HT-001 (PIPE
Inspection
SIZES:20'',12'',10'',3'',2'',3/4'',1'')

FINAL
435 MFC-DLM-RBH-I-0435 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
METAL 1501-01-HT-007
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


436 MFC-DLM-RBH-I-0436
Inspection ON TP: 1634-00-HT-012 (PIPE SIZES: 3'',1 1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


437 MFC-DLM-RBH-I-0437 Preparation INSULATION ON HYDROTESTED LINES TP: 1624-02-
inspection HT-003 (PIPE SIZES:4'',1'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


438 MFC-DLM-RBH-I-0438 START METAL CLADDING ON TP: 1463-00-HT-004
Inspection (PIPE SIZES:14'')
439 MFC-DLM-RBH-I-0439 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP: 1624-01-HT-004

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


440 MFC-DLM-RBH-I-0440
Inspection ON TP-1505-01-HT-007 (PIPE SIZES:,8'',2''1'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
441 MFC-DLM-RBH-I-0441 METAL 1623-01-HT-016
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


442 MFC-DLM-RBH-I-0442 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1621-04-HT-001 (PIPE SIZES:20'')

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


443 MFC-DLM-RBH-I-0443 Preparation INSULATION ON HYDROTESTED LINES
inspection TP: 1625-00-HT-002 (PIPE SIZES:10'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


444 MFC-DLM-RBH-I-0444 Preparation INSULATION ON HYDROTESTED LINES
inspection TP: 1621-01-HT-040 (PIPE SIZES:48'',2'')

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


445 MFC-DLM-RBH-I-0445 Preparation INSULATION ON HYDROTESTED LINES TP:1623-03-
inspection HT-005 (PIPE SIZES:12'',6'',4''3'',2'')

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


446 MFC-DLM-RBH-I-0446 Preparation INSULATION ON HYDROTESTED LINES TP:1624-02-
inspection HT-001 (PIPE SIZES:10'',8'',6'')

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


447 MFC-DLM-RBH-I-0447 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-023 (PIPE SIZES:20'',12)

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


448 MFC-DLM-RBH-I-0448 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-023 (PIPE SIZES:10'',4'')
Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO
449 MFC-DLM-RBH-I-0449 Preparation INSULATION ON HYDROTESTED LINES TP:1463-00-
inspection HT-002 (PIPE SIZES:18'',6'')

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


450 MFC-DLM-RBH-I-0450 Preparation INSULATION ON HYDROTESTED LINES TP:1463-00-
inspection HT-002 (PIPE SIZES:6''4'',3'',)

Surface PRE-INSULATION INSPECTION OF (HOT) PRIOR TO


451 MFC-DLM-RBH-I-0451 Preparation INSULATION ON HYDROTESTED LINES TP:1453-00-
inspection HT-001 (PIPE SIZES:2'')

Insulation IN PROCESS INSULATION INSPECTION OF (HOT) 1


452 MFC-DLM-RBH-I-0452 & 2 LAYER PRIOR TO METAL CLADDING ON TP:
Inspection 1624-02-HT-003 (PIPE SIZES:4'',1'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
453 MFC-DLM-RBH-I-0453 Inspection START METAL CLADDING ON TP: 1466-00-HT-014
(PIPE SIZES: 20,12)

INSULATION INSPECTION OF (HOT) PRIOR TO


454 MFC-DLM-RBH-I-0454 Insulation START METAL CLADDING ON TP: 1466-00-HT-018
Inspection
(PIPE SIZES: 2)

INSULATION INSPECTION OF (HOT) PRIOR TO


455 MFC-DLM-RBH-I-0455 Insulation START METAL CLADDING ON
Inspection TP: 1466-00-HT-006 (PIPE SIZES:10'',4'',8'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


456 MFC-DLM-RBH-I-0456 START METAL CLADDING ON
Inspection TP: 1621-01-HT-041 (PIPE SIZES:66'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
457 MFC-DLM-RBH-I-0457 Inspection START METAL CLADDING ON
TP: 1621-01-HT-042 (PIPE SIZES:66'',2'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding ON
458 MFC-DLM-RBH-I-0458
Inspection TP: 1626-00-HT-007 (PIPE SIZES:3
'',2''),
PARTIAL FINAL INSPECTION OF METAL CLADDING
459 MFC-DLM-RBH-I-0459 Cladding ON
Inspection TP-1514-01-HT-001 (PIPE
SIZES:10'',3'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
460 MFC-DLM-RBH-I-0460
METAL TP: 1466-00-HT-008
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
461 MFC-DLM-RBH-I-0461 METAL TP: 1466-00-HT-007
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


462 MFC-DLM-RBH-I-0462 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-
inspection HT-003 (PIPE SIZES:4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


463 MFC-DLM-RBH-I-0463 Preparation INSULATION ON HYDROTESTED LINES TP: 1463-00-
inspection HT-003 (PIPE SIZES:8'',6'',4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


464 MFC-DLM-RBH-I-0464 Insulation START METAL CLADDING ON TP:1463-00-HT-002
Inspection
(PIPE SIZES:18'',6'')

INSULATION INSPECTION OF (HOT) PRIOR TO


465 MFC-DLM-RBH-I-0465 Insulation START METAL CLADDING ON TP:1463-00-HT-002
Inspection (PIPE SIZES:6''4'',3'',)

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


466 MFC-DLM-RBH-I-0466 START METAL CLADDING ON TP: 1621-04-HT-001
Inspection (PIPE SIZES:20'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
467 MFC-DLM-RBH-I-0467 Inspection START METAL CLADDING ON TP: 1625-00-HT-002
(PIPE SIZES:10'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


468 MFC-DLM-RBH-I-0468
Inspection ON TP: 1624-01-HT-001 (PIPE SIZES:10'',2'')
469 MFC-DLM-RBH-I-0469 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP-1515-01-HT-001 (PIPE SIZES:3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


470 MFC-DLM-RBH-I-0470 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1454-00-HT-001 (PIPE SIZES:2'',1 1/2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


471 MFC-DLM-RBH-I-0471 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1624-01-HT-005 (PIPE SIZES:20'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


472 MFC-DLM-RBH-I-0472 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1625-00-HT-001 (PIPE SIZES:3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


473 MFC-DLM-RBH-I-0473 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1741-00-HT-001 (PIPE SIZES:1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


474 MFC-DLM-RBH-I-0474 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1741-00-HT-002 (PIPE SIZES:1'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


475 MFC-DLM-RBH-I-0475 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-013 (PIPE SIZES:10'',4'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


476 MFC-DLM-RBH-I-0476
Inspection ON TP: 1625-00-HT-002 (PIPE SIZES:36'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


477 MFC-DLM-RBH-I-0477 Inspection ON TP: 1621-04-HT-001 (PIPE SIZES:20'',12)

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
478 MFC-DLM-RBH-I-0478
METAL TP: 1623-01-HT-038
CLADDING
479 MFC-DLM-RBH-I-0479 Cladding FINAL INSPECTION OF METAL CLADDING ON
Inspection TP: 1623-01-HT-038

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
480 MFC-DLM-RBH-I-0480
METAL TP: 1466-00-HT-006
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
481 MFC-DLM-RBH-I-0481 METAL TP: 1466-00-HT-018
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON


482 MFC-DLM-RBH-I-0482
Inspection TP: 1647-01-HT-024

Cladding FINAL INSPECTION OF METAL CLADDING ON


483 MFC-DLM-RBH-I-0483 Inspection TP: 1647-01-HT-024

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


484 MFC-DLM-RBH-I-0484 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-04-
inspection HT-002 (PIPE SIZES:30'',20'',18'',2'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


485 MFC-DLM-RBH-I-0485 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-04-
inspection HT-003 (PIPE SIZES:30'',20'',18'',2'',3/4'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


486 MFC-DLM-RBH-I-0486 METAL CLADDING ON TP: 1647-00-HT-025 (PIPE
Inspection SIZES: 3/4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
487 MFC-DLM-RBH-I-0487 Inspection METAL CLADDING ON TP:1466-00-HT-023 (PIPE
SIZES:20'',12)

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


488 MFC-DLM-RBH-I-0488 PRIOR TO METAL CLADDING ON TP: 1623-01-HT-
Inspection 013 (PIPE SIZES:10'',8'',6'',4'',2'')
489 MFC-DLM-RBH-I-0489 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP: 1463-00-HT-004 (PIPE SIZES:14'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


490 MFC-DLM-RBH-I-0490
Inspection ON TP-1514-01-HT-001 (PIPE SIZES:10'')

Insulation FINAL INSPECTION OF METAL CLADDING ON TP:


491 MFC-DLM-RBH-I-0491 Inspection 1647-01-HT-024

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
492 MFC-DLM-RBH-I-0492
METAL 1623-01-HT-009
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
493 MFC-DLM-RBH-I-0493 METAL 1634-00-HT-008
CLADDING

NSULATION INSPECTION OF (HOT) PRIOR TO


494 MFC-DLM-RBH-I-0494 Insulation METAL CLADING ON TP:1623-03-HT-005
Inspection
(PIPE SIZES:12'',6'',4''3'',2'')

INSULATION INSPECTION OF (HOT) PRIOR TO


495 MFC-DLM-RBH-I-0495 Insulation METAL CLADDING ON TP: 1466-00-HT-010
Inspection (PIPE SIZES:10'',8'',2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


496 MFC-DLM-RBH-I-0496 METAL CLADDING ON TP:1624-02-HT-001
Inspection (PIPE SIZES:10'',8'',6'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
497 MFC-DLM-RBH-I-0497 Inspection METAL CLADDING ON TP: 1466-00-HT-009
(PIPE SIZES:3'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


498 MFC-DLM-RBH-I-0498 METAL CLADDING ON TP: 1466-00-HT-012
Inspection (PIPE SIZES:10'')
INSULATION INSPECTION OF (HOT) PRIOR TO
499 MFC-DLM-RBH-I-0499 Insulation METAL CLADDING ON TP: 1623-01-HT-014
Inspection (PIPE SIZES:12'',8'',3'',2'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


500 MFC-DLM-RBH-I-0500 METAL CLADDING ON TP: 1647-00-HT-013
Inspection (PIPE SIZES:8'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
501 MFC-DLM-RBH-I-0501 Inspection METAL CLADDING ON TP: 1465-00-HT-003
(PIPE SIZES:8'',3'',3'',)

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


502 MFC-DLM-RBH-I-0502 METAL CLADDING ONTP: 1646-00-HT-012
Inspection (PIPE SIZES:8'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
503 MFC-DLM-RBH-I-0503 Inspection METRAL CLADDING ON TP: 1646-00-HT-009 (PIPE
SIZES : 8'',6'',2'',3/4'')

PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


504 MFC-DLM-RBH-I-0504 Insulation METAL CLADDING ON TP:1647-00-HT-061 (PIPE
Inspection
SIZES:6''3'')

FINAL
505 MFC-DLM-RBH-I-0505 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
METAL TP: 1466-00-HT-014
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


506 MFC-DLM-RBH-I-0506 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1462-00-HT-001 (PIPE SIZES:6'',3'',4'',2'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


507 MFC-DLM-RBH-I-0507 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1761-00-HT-008 (PIPE SIZES:6'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


508 MFC-DLM-RBH-I-0508 Preparation INSULATION ON HYDROTESTED LINES TP:
inspection 1781-00-HT-001 (PIPE SIZES:4'',3'')
PARTIAL FINAL INSPECTION OF METAL CLADDING
509 MFC-DLM-RBH-I-0509 Cladding ON
Inspection TP-1514-01-HT-001 (PIPE SIZES:
2'')

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


510 MFC-DLM-RBH-I-0510 PRIOR TO METAL CLADDNG ON TP: 1454-00-HT-
Inspection 001 (PIPE SIZES:2'',1 1/2'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
511 MFC-DLM-RBH-I-0511 Inspection PRIOR TO METAL CLADDNG ON TP: 1453-00-HT-
001 (PIPE SIZES:2'',1 1/2'')

Insulation IN -PROCESS INSULATION INSPECTION OF (HOT)


512 MFC-DLM-RBH-I-0512 PRIOR TO METAL CLADDING ON TP: 1621-04-HT-
Inspection 002 (PIPE SIZES:30'',20'',18'',2'',3/4'')

IN -PROCESS INSULATION INSPECTION OF (HOT)


Insulation
513 MFC-DLM-RBH-I-0513 Inspection PRIOR TO METAL CLADDING ON TP: 1621-04-HT-
003 (PIPE SIZES:30'',20'',18'',2'',3/4'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


514 MFC-DLM-RBH-I-0514 Insulation PRIOR TO METAL CLADDING ON TP: 1462-00-HT-
Inspection
001 (PIPE SIZES:6'',3'',4'',2'',)

IN-PROCESS INSULATION INSPECTION OF (HOT)


515 MFC-DLM-RBH-I-0515 Insulation PRIOR TO METAL CLADDING ON TP: 1463-00-HT-
Inspection 003 (PIPE SIZES:4'')

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


516 MFC-DLM-RBH-I-0516 PRIOR TO METAL CLADDING ON TP: 1463-00-HT-
Inspection 003 (PIPE SIZES:8'',6'',4'')

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
517 MFC-DLM-RBH-I-0517 Inspection METAL CLADDING ON TP: 1463-00-HT-008 (PIPE
SIZES:14'',10'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


518 MFC-DLM-RBH-I-0518
Inspection ON TP: 1463-00-HT-004 (PIPE SIZES:14'')
519 MFC-DLM-RBH-I-0519 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection ON TP: 1624-01-HT-007 (PIPE SIZES:10'',6'',4'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


520 MFC-DLM-RBH-I-0520
Inspection ON TP: 1466-00-HT-005 (PIPE SIZES:6'',4'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


521 MFC-DLM-RBH-I-0521 Inspection ON TP:1624-02-HT-001 (PIPE SIZES:10'',8'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


522 MFC-DLM-RBH-I-0522 Preparation INSULATION ON HYDROTESTED LINES TP: 1654-
inspection 00-HT-001 (PIPE SIZES:6",0.75'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
523 MFC-DLM-RBH-I-0523 Inspection PRIOR TO METAL CLADDNG ON
TP: 1654-00-HT-001 (PIPE SIZES:6",0.75'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


524 MFC-DLM-RBH-I-0524 Preparation INSULATION ON HYDROTESTED LINES
inspection TP: 1623-03-HT-001 (PIPE SIZES:3",2'',)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


525 MFC-DLM-RBH-I-0525 Preparation INSULATION ON HYDROTESTED LINES
inspection TP: 1621-01-HT-020 (PIPE SIZES:20",12'',10",6")

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


526 MFC-DLM-RBH-I-0526 ON TP: 1463-00-HT-003
Inspection (PIPE SIZES:8'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
527 MFC-DLM-RBH-I-0527 Inspection PRIOR TO METAL CLADDNG ON TP: 1654-00-HT-
001 (PIPE SIZES:6",0.75'')

Insulation IN PROCESS INSULATION INSPECTION OF (HOT)


528 MFC-DLM-RBH-I-0528 PRIOR TO METAL CLADDING ON TP: 1623-03-HT-
Inspection 001 (PIPE SIZES:3",2'',)
IN-PROCESS INSULATION INSPECTION OF (HOT)
529 MFC-DLM-RBH-I-0529 Insulation PRIOR TO METAL CLADDNG ON TP: 1454-00-HT-
Inspection 001 (PIPE SIZES:2'',1 1/2'')

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


530 MFC-DLM-RBH-I-0530 PRIOR TO METAL CLADDNG ON TP: 1453-00-HT-
Inspection 001 (PIPE SIZES:2'',1 1/2'')

IN -PROCESS INSULATION INSPECTION OF (HOT)


Insulation
531 MFC-DLM-RBH-I-0531 Inspection PRIOR TO METAL CLADDING ON TP: 1621-04-HT-
002 (PIPE SIZES:30'',20'',18'',2'',3/4'')

Insulation IN -PROCESS INSULATION INSPECTION OF (HOT)


532 MFC-DLM-RBH-I-0532 PRIOR TO METAL CLADDING ON TP: 1621-04-HT-
Inspection 003 (PIPE SIZES:30'',20'',18'',2'',3/4'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
533 MFC-DLM-RBH-I-0533 Inspection PRIOR TO METAL CLADDING ON TP: 1462-00-HT-
001 (PIPE SIZES:6'',3'',4'',2'',)

IN-PROCESS INSULATION INSPECTION OF (HOT)


534 MFC-DLM-RBH-I-0534 Insulation PRIOR TO METAL CLADDING ON
Inspection
TP: 1463-00-HT-003 (PIPE SIZES:4'')

IN-PROCESS INSULATION INSPECTION OF (HOT)


535 MFC-DLM-RBH-I-0535 Insulation PRIOR TO METAL CLADDING ON TP: 1463-00-HT-
Inspection 003 (PIPE SIZES:8'',6'',4'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


536 MFC-DLM-RBH-I-0536
Inspection ON TP-1514-01-HT-001 (PIPE SIZES: 3'')

Cladding PARTIAL FINAL INSPECTION OFMETAL CLADDING


537 MFC-DLM-RBH-I-0537 Inspection TP: 1471-00-HT-002 (PIPE SIZES:3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


538 MFC-DLM-RBH-I-0538
Inspection ON TP: 1634-00-HT-001 (PIPE SIZES:6'',3'')
PARTIAL FINAL INSPECTION OF METRAL CLADDING
539 MFC-DLM-RBH-I-0539 Cladding ON TP: 1646-00-HT-009 (PIPE SIZES :
Inspection 8'',6'',2'',3/4'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
540 MFC-DLM-RBH-I-0540
METAL 1624-01-HT-004
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
541 MFC-DLM-RBH-I-0541 METAL TP:1466-00-HT-023
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP-
542 MFC-DLM-RBH-I-0542
METAL 1646-00-HT-025
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
543 MFC-DLM-RBH-I-0543 METAL 1647-00-HT-025
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


544 MFC-DLM-RBH-I-0544 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-
inspection 02-HT-001 (PIPE SIZES:2',3",')

545 MFC-DLM-RBH-I-0545 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TP:1463-00-HT-002 (PIPE SIZES:6''4'',3'',)

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


546 MFC-DLM-RBH-I-0546
Inspection ON TP: 1625-00-HT-005 (PIPE SIZES:10''')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


547 MFC-DLM-RBH-I-0547 Preparation INSULATION ON HYDROTESTED LINES TP: 1731-
inspection 01-HT-001 (PIPE SIZES:6")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


548 MFC-DLM-RBH-I-0548 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-
inspection 01-HT-001 (PIPE SIZES:78",1",)
INSULATION INSPECTION OF (HOT) PRIOR TO
549 MFC-DLM-RBH-I-0549 Insulation METAL CLADDING ON TP: 1645-00-HT-007 (A)
Inspection (PIPE SIZES:10'')

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


550 MFC-DLM-RBH-I-0550 METAL CLADDING ON TP: 1761-00-HT-008
Inspection (PIPE SIZES:6'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
551 MFC-DLM-RBH-I-0551 Inspection ON TP: 1623-01-HT-013 (PIPE
SIZES:10'',8'',6'',4'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


552 MFC-DLM-RBH-I-0552
Inspection ON TP: 1623-01-HT-014 (PIPE SIZES:12'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
553 MFC-DLM-RBH-I-0553 METAL TP:1647-00-HT-006 (PIPE SIZES:8'')
CLADDING

INSULATION INSPECTION OF (HOT) PRIOR TO


554 MFC-DLM-RBH-I-0554 Insulation METAL CLADDING TP:1647-00-HT-061
Inspection
(PIPE SIZES:6''3'')

FINAL
555 MFC-DLM-RBH-I-0555 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
METAL TP: 1646-00-HT-012 (PIPE SIZES:8'')
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
556 MFC-DLM-RBH-I-0556
METAL TP: 1621-01-HT-041 (PIPE SIZES:66'',2'')
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON


557 MFC-DLM-RBH-I-0557 Inspection TP: 1621-01-HT-042 (PIPE SIZES:66'',2'')

Cladding FINAL INSPECTION OF METAL CLADDING. ON


558 MFC-DLM-RBH-I-0558
Inspection TP: 1626-00-HT-001 (PIPE SIZES:24",12",10'')
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
559 MFC-DLM-RBH-I-0559 Preparation INSULATION ON HYDROTESTED LINES TP:1645-00-
inspection HT-003 (PIPE SIZES:6'',4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


560 MFC-DLM-RBH-I-0560 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-010 (PIPE SIZES:8'',6'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


561 MFC-DLM-RBH-I-0561 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-031 (PIPE SIZES:3'',3/4'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


562 MFC-DLM-RBH-I-0562 Preparation INSULATION ON HYDROTESTED LINES TP: 1627-00-
inspection HT-003 (PIPE SIZES:6'',3'',2'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


563 MFC-DLM-RBH-I-0563 Inspection ON TP: 1654-00-HT-006 (PIPE SIZES:6'')

564 MFC-DLM-RBH-I-0564 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TP: 1625-00-HT-002 (PIPE SIZES:10'')

565 MFC-DLM-RBH-I-0565 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TP: 1625-00-HT-002 (PIPE SIZES:10'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


566 MFC-DLM-RBH-I-0566
Inspection ON TP: 1454-00-HT-001 (PIPE SIZES:2'',1 1/2'''')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


567 MFC-DLM-RBH-I-0567 Inspection ON TP: 1453-00-HT-001 (PIPE SIZES:2'',1 1/2'''')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


568 MFC-DLM-RBH-I-0568
Inspection ON TP: 1462-00-HT-001 (PIPE SIZES:3'',4'',2'',)
FINAL
569 MFC-DLM-RBH-I-0569 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON TP:
METAL 1647-00-HT-061
CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING ON TP:


570 MFC-DLM-RBH-I-0570
Inspection 1647-00-HT-013

INSULATION INSPECTION OF (HOT) PRIOR TO


Insulation
571 MFC-DLM-RBH-I-0571 Inspection METAL CLADDING ON TP: 1624-01-HT-005
(PIPE SIZES:20'',2'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


572 MFC-DLM-RBH-I-0572 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1617-00-HT-003 (PIPE SIZES:10",2",12",2")

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
573 MFC-DLM-RBH-I-0573 Inspection PRIOR TO METAL CLADDING ON
TP: 1623-02-HT-001 (PIPE SIZES:2',3",')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


574 MFC-DLM-RBH-I-0574 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1621-04-HT-001 RT1 (PIPE SIZES:12")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


575 MFC-DLM-RBH-I-0575 Preparation INSULATION ON HYDROTESTED LINES TP:1623-01-
inspection HT-044 (PIPE SIZES:60",42")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


576 MFC-DLM-RBH-I-0576 Preparation INSULATION ON HYDROTESTED LINES TP:1654-00-
inspection HT-001 (P) (PIPE SIZES:6",1",3/4",8",)

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
577 MFC-DLM-RBH-I-0577 Inspection ON TP: 1654-00-HT-001
(PIPE SIZES:6",0.75'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


578 MFC-DLM-RBH-I-0578 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1621-03-HT-008 (PIPE SIZES:2",10")
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
579 MFC-DLM-RBH-I-0579 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1624-01-HT-003 (PIPE SIZES:10",2",8",1")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


580 MFC-DLM-RBH-I-0580 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1624-01-HT-003 (PIPE SIZES:10",4")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


581 MFC-DLM-RBH-I-0581 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1624-01-HT-023 RT1 (PIPE SIZES:14",1")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


582 MFC-DLM-RBH-I-0582 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1624-01-HT-024 RT2 (PIPE SIZES:2")

IN-PROCESS INSULATION INSPECTION OF (HOT)


INSULATION
583 MFC-DLM-RBH-I-0583 INSPECTION PRIOR TO METAL CLADDING TP: 1621-01-HT-001
ON (PIPE SIZES:78",1",)

IN-PROCESS INSULATION INSPECTION OF (HOT)


584 MFC-DLM-RBH-I-0584 INSULATION PRIOR TO METAL CLADDING TP: 1621-01-HT-020
INSPECTION
ON (PIPE SIZES:20",12'',10",6")

IN-PROCESS INSULATION INSPECTION OF (HOT)


585 MFC-DLM-RBH-I-0585 INSULATION PRIOR TO METAL CLADDING TP: 1625-00-HT-001
INSPECTION ON (PIPE SIZES:3'')

INSULATION IN-PROCESS INSULATION INSPECTION OF (HOT)


586 MFC-DLM-RBH-I-0586 PRIOR TO METAL CLADDING TP:1781-00-HT-001
INSPECTION (PIPE SIZES:4'',3'')

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


587 MFC-DLM-RBH-I-0587 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1463-00-HT-001 (PIPE SIZES:18",12")

INSULATION INSULATION INSPECTION OF (HOT) PRIOR TO


588 MFC-DLM-RBH-I-0588 METAL CLADDING TP:1623-01-HT-044 ON
INSPECTION (PIPE SIZES:60",42")
FINAL
589 MFC-DLM-RBH-I-0589 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TP: 1624-01-HT-005 ON (PIPE SIZES:20'',2'')
CLADDING

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


590 MFC-DLM-RBH-I-0590 PRIOR TO METAL CLADDING TP:1654-00-HT-001
Inspection ON (PIPE SIZES:6",1",8")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


591 MFC-DLM-RBH-I-0591 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1462-00-HT-001 (PIPE SIZES:6",2",1",4")

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


592 MFC-DLM-RBH-I-0592 METAL CLADDING TP: 1647-00-HT-010 ON
Inspection (PIPE SIZES:8'',6'',3/4'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
593 MFC-DLM-RBH-I-0593 METAL TP:1623-01-HT-044 ON (PIPE SIZES:60")
CLADDING

594 MFC-DLM-RBH-I-0594 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection (HOT) ON TP:1781-00-HT-001 (PIPE SIZES:-3'')

595 MFC-DLM-RBH-I-0595 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection (HOT) ON TP-1514-01-HT-001 (PIPE SIZES:-3''')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


596 MFC-DLM-RBH-I-0596
Inspection ON TP-1504-01-HT-001 (PIPE SIZES:3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


597 MFC-DLM-RBH-I-0597 Inspection ON TP-1505-01-HT-001 (PIPE SIZES:-6",3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


598 MFC-DLM-RBH-I-0598
Inspection ON TP-1515-01-HT-001 (PIPE SIZES:3",6'')
INSULATION INSPECTION OF (HOT) PRIOR TO
599 MFC-DLM-RBH-I-0599 Insulation METAL CLADDING TP:1731-01-HT-001 ON (PIPE
Inspection SIZES:6")

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


600 MFC-DLM-RBH-I-0600 METAL CLADDING TP:1463-00-HT-001 (PIPE
Inspection SIZES:18",12")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


601 MFC-DLM-RBH-I-0601 Preparation INSULATION ON HYDROTESTED LINES TP :1623-
inspection 03-HT-001 (PIPE SIZES:2'',3")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


602 MFC-DLM-RBH-I-0602 Preparation INSULATION ON HYDROTESTED LINES TP:1456-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


603 MFC-DLM-RBH-I-0603 Preparation INSULATION ON HYDROTESTED LINES TP:1463-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


604 MFC-DLM-RBH-I-0604 Preparation INSULATION ON HYDROTESTED LINES TP:1625-00-
inspection HT-008

PARTIAL FINAL INSPECTION OF (HOT) METAL


605 MFC-DLM-RBH-I-0605 Cladding CLADDING ON TP: 1625-00-HT-005 (PIPE
Inspection SIZES:4'',2')

FINAL
INSPECTION OF FINAL INSPECTION OF (HOT) METAL CLADDING
606 MFC-DLM-RBH-I-0606
METAL ON TP:1781-00-HT-001 (PIPE SIZES:4'',3'')
CLADDING

PARTIAL FINAL INSPECTION OF (HOT) METAL


Cladding
607 MFC-DLM-RBH-I-0607 Inspection CLADDING ON TP: 1463-00-HT-010 (PIPE
SIZES:6'',4'',3'',1'')

Cladding PARTIAL FINAL INSPECTION OF (HOT) METAL


608 MFC-DLM-RBH-I-0608 CLADDING ON TP:1463-00-HT-002 (PIPE
Inspection SIZES:6''4'',3'',)
PARTIAL FINAL INSPECTION OF (HOT) METAL
609 MFC-DLM-RBH-I-0609 Cladding CLADDING ON TP-1514-01-HT-001 (PIPE SIZES:
Inspection 12'',10'',8'',6'',3'',2''1'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


610 MFC-DLM-RBH-I-0610
Inspection (HOT) TESTPACK NO. TP: 1621-04-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


611 MFC-DLM-RBH-I-0611 Inspection (HOT) TESTPACK NO. TP: 1621-04-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


612 MFC-DLM-RBH-I-0612
Inspection (HOT) TESTPACK NO. TP: 1621-04-HT-001

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
613 MFC-DLM-RBH-I-0613 Inspection (HOT) TESTPACK NO. TP:1623-03-HT-005

614 MFC-DLM-RBH-I-0614 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection (HOT) TESTPACK NO TP: 1466-00-HT-005 )

INSULATION INSPECTION OF (HOT) PRIOR TO


615 MFC-DLM-RBH-I-0615 Insulation METAL CLADDING ON HYDROTESTED LINES TP:
Inspection 1466-00-HT-013

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


616 MFC-DLM-RBH-I-0616 (HOT) TESTPACK NO. TP: 1466-00-HT-010
Inspection

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
617 MFC-DLM-RBH-I-0617 Inspection (HOT) TESTPACK NO. TP: 1466-00-HT-012

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


618 MFC-DLM-RBH-I-0618
Inspection (HOT) TESTPACK NO.TP: 1463-00-HT-003
619 MFC-DLM-RBH-I-0619 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection (HOT) TESTPACK NO.TP: 1654-00-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
620 MFC-DLM-RBH-I-0620 TESTPACK NO.
METAL TP: 1646-00-HT-019
CLADDING

FINAL FINAL INSPECTION OF METAL CLADDING (HOT)


INSPECTION OF
621 MFC-DLM-RBH-I-0621 METAL TESTPACK NO.
TP: 1646-00-HT-005
CLADDING

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


622 MFC-DLM-RBH-I-0622
Inspection METAL CLADDING ON TP: 1621-01-HT-040

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


623 MFC-DLM-RBH-I-0623 Inspection PRIOR TO METAL CLADDING TP:1463-00-HT-001

624 MFC-DLM-RBH-I-0624 Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


Inspection METAL CLADDING TP:1623-03-HT-001

PARTIAL FINAL INSPECTION OF METAL CLADDING


625 MFC-DLM-RBH-I-0625 Cladding (HOT) TESTPACK NO.TP:1654-00-HT-001
Inspection (PIPE SIZES:6",0.75'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


626 MFC-DLM-RBH-I-0626 (HOT) TESTPACK NO.TP: 1462-00-HT-001
Inspection (PIPE SIZES:6'',3'',4'',2'',)

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
627 MFC-DLM-RBH-I-0627 Inspection (HOT) TESTPACK NO. TP: 1466-00-HT-013
(PIPE SIZES: 10'',)

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding (HOT) TESTPACK NO. TP:1623-03-HT-005
628 MFC-DLM-RBH-I-0628
Inspection
(PIPE SIZES:12'',8")
PARTIAL FINAL INSPECTION OF METAL CLADDING
629 MFC-DLM-RBH-I-0629 Cladding (HOT) TESTPACK NO. TP: 1466-00-HT-005 (PIPE
Inspection SIZES:6'',4'',3'')

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


630 MFC-DLM-RBH-I-0630 (HOT) TESTPACK NO.TP: 1463-00-HT-003 (PIPE
Inspection SIZES:8'',6'',4'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
631 MFC-DLM-RBH-I-0631 Inspection (HOT) TESTPACK NO. TP: 1626-00-HT-001 (PIPE
SIZES:24'',10'')

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
632 MFC-DLM-RBH-I-0632
METAL TESTPACK NO. TP:1654-00-HT-001 (PIPE SIZES:8")
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
633 MFC-DLM-RBH-I-0633 METAL TESTPACK NO. TP:1623-03-HT-003 (PIPE SIZES:12'')
CLADDING

FINAL FINAL INSPECTION OF METAL CLADDING (HOT)


634 MFC-DLM-RBH-I-0634 INSPECTION OF TESTPACK NO. TP: 1623-03-HT-002 (PIPE
METAL
CLADDING SIZES:12'')

PARTIAL FINAL INSPECTION OF METAL CLADDING


635 MFC-DLM-RBH-I-0635 Cladding (HOT) TESTPACK NO TP: 1625-00-HT-002
Inspection (PIPE SIZES:10")

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


636 MFC-DLM-RBH-I-0636 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1626-00-HT-018

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


637 MFC-DLM-RBH-I-0637 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1626-00-HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


638 MFC-DLM-RBH-I-0638 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1461-00-HT-001
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
639 MFC-DLM-RBH-I-0639 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1451-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


640 MFC-DLM-RBH-I-0640 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1616-00-HT-015 RT1

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


641 MFC-DLM-RBH-I-0641 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1627-00-HT-007

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


642 MFC-DLM-RBH-I-0642 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1761-00-HT-006

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
643 MFC-DLM-RBH-I-0643 Inspection PRIOR TO METAL CLADDING ON TP:1456-00-HT-
001

644 MFC-DLM-RBH-I-0644 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection (HOT) TESTPACK NO. TP: 1621-01-HT-020

INSULATION INSPECTION OF (HOT) PRIOR TO


645 MFC-DLM-RBH-I-0645 Insulation METAL CLADDING TESTPACK NO. TP: 1623-01-HT-
Inspection 012

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


646 MFC-DLM-RBH-I-0646 (HOT)
Inspection TESTPACK NO. TP: 1621-01-HT-021

Cladding Inpection of Insulation Prior to Metal Cladding


647 MFC-DLM-RBH-I-0647 Inspection Testpack No. TP: 1621-01-HT-021

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
648 MFC-DLM-RBH-I-0648
METAL TESTPACK NO. TP: 1625-00-HT-001
CLADDING
649 MFC-DLM-RBH-I-0649 Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1625-00-HT-008

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


650 MFC-DLM-RBH-I-0650
Inspection PRIOR TO METAL CLADDING TP:1624-01-HT-003

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


651 MFC-DLM-RBH-I-0651 Inspection METAL CLADDING TP:1621-04-HT-001 RT1

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


652 MFC-DLM-RBH-I-0652
Inspection PRIOR TO METAL CLADDING TP:1626-00-HT-018

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


653 MFC-DLM-RBH-I-0653 Inspection PRIOR TO METAL CLADDING TP:1626-00-HT-003

654 MFC-DLM-RBH-I-0654 Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1461-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


655 MFC-DLM-RBH-I-0655 Preparation INSULATION ON HYDROTESTED LINES TP:1461-00-
inspection HT-001

Cladding FINAL INSPECTION OF METAL CLADDING (HOT)


656 MFC-DLM-RBH-I-0656
Inspection TESTPACK NO. TP: 1623-01-HT-012

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


657 MFC-DLM-RBH-I-0657 Inspection (HOT) TESTPACK NO. TP:1624-01-HT-003

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


658 MFC-DLM-RBH-I-0658
Inspection METAL CLADDING TP:1624-01-HT-024 RT2
659 MFC-DLM-RBH-I-0659 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1617-00-HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


660 MFC-DLM-RBH-I-0660 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


661 MFC-DLM-RBH-I-0661 Preparation INSULATION ON HYDROTESTED LINES TP:1541-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


662 MFC-DLM-RBH-I-0662 Preparation INSULATION ON HYDROTESTED LINES TP:1541-00-
inspection HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


663 MFC-DLM-RBH-I-0663 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1625-00-HT-043

664 MFC-DLM-RBH-I-0664 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TEST PACK NO. TP: 1621-01-HT-001

FINAL
665 MFC-DLM-RBH-I-0665 INSPECTION OF FINAL INSPECTION OF METAL CLADDING TEST
METAL PACK NO. TP: 1621-01-HT-021
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


666 MFC-DLM-RBH-I-0666
Inspection TEST PACK NO. TP-1513-01-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


667 MFC-DLM-RBH-I-0667 Inspection TEST PACK NO. TP: 1621-01-HT-040

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


668 MFC-DLM-RBH-I-0668
Inspection TEST PACK NO. TP:1624-01-HT-003
669 MFC-DLM-RBH-I-0669 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TEST PACK NO. TP:1617-00-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


670 MFC-DLM-RBH-I-0670
Inspection TEST PACK NO. TP:1625-00-HT-008

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


671 MFC-DLM-RBH-I-0671 Inspection METAL CLADDING TP:1627-00-HT-003

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


672 MFC-DLM-RBH-I-0672
Inspection PRIOR TO METAL CLADDING TP:1645-00-HT-003

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
673 MFC-DLM-RBH-I-0673 Inspection PRIOR TO METAL CLADDING ON TP:1456-00-HT-
001

674 MFC-DLM-RBH-I-0674 Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1626-00-HT-018

675 MFC-DLM-RBH-I-0675 Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1625-00-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


676 MFC-DLM-RBH-I-0676
Inspection PRIOR TO METAL CLADDING TP:1463-00-HT-001

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


677 MFC-DLM-RBH-I-0677 Inspection PRIOR TO METAL CLADDING TP:1626-00-HT-003

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


678 MFC-DLM-RBH-I-0678
Inspection PRIOR TO METAL CLADDING TP:1625-00-HT-043
IN- PROCESS INSULATION INSPECTION OF (HOT)
679 MFC-DLM-RBH-I-0679 Insulation PRIOR TO METAL CLADDING TP:1616-00-HT-015
Inspection RT1

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


680 MFC-DLM-RBH-I-0680 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1541-00-HT-001

IN-PROCES INSULATION 1st, 2nd LAYER


Insulation
681 MFC-DLM-RBH-I-0681 Inspection INSPECTION PRIOR TO METAL CLADDING ON
TP:1451-00-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT )
682 MFC-DLM-RBH-I-0682
METAL TP: 1463-00-HT-005
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


683 MFC-DLM-RBH-I-0683 Inspection (HOT) TP:1625-00-HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


684 MFC-DLM-RBH-I-0684 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-003 (P)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


685 MFC-DLM-RBH-I-0685 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


686 MFC-DLM-RBH-I-0686 Preparation INSULATION ON HYDROTESTED LINES TP:1621-02-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


687 MFC-DLM-RBH-I-0687 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1623-01-HT-011

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


688 MFC-DLM-RBH-I-0688 Preparation INSULATION ON HYDROTESTED LINES TP:1456-00-
inspection HT-001
689 MFC-DLM-RBH-I-0689 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1626-00-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


690 MFC-DLM-RBH-I-0690
Inspection (HOT) TP:1625-00-HT-008

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
691 MFC-DLM-RBH-I-0691 Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-003
(P)

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


692 MFC-DLM-RBH-I-0692
Inspection PRIOR TO METAL CLADDING TP:1456-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


693 MFC-DLM-RBH-I-0693 Inspection TESTPACK NO. TP:1456-00-HT-001

694 MFC-DLM-RBH-I-0694 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1625-00-HT-008

695 MFC-DLM-RBH-I-0695 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1456-00-HT-001

Insulation INSULATION INSPECTION OF (HOT) PRIOR TO


696 MFC-DLM-RBH-I-0696
Inspection METAL CLADDING TP:1621-03-HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


697 MFC-DLM-RBH-I-0697 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


698 MFC-DLM-RBH-I-0698 Preparation INSULATION ON HYDROTESTED LINES TP:1627-00-
inspection HT-002
699 MFC-DLM-RBH-I-0699 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1463-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


700 MFC-DLM-RBH-I-0700
Inspection TESTPACK NO. TP:1466-00-HT-003 (P)

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


701 MFC-DLM-RBH-I-0701 Inspection TESTPACK NO. TP:1624-01-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


702 MFC-DLM-RBH-I-0702
Inspection TESTPACK NO. TP:1463-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


703 MFC-DLM-RBH-I-0703 Inspection TESTPACK NO. TP:1451-00-HT-001

704 MFC-DLM-RBH-I-0704 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1461-00-HT-001

705 MFC-DLM-RBH-I-0705 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1623-02-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


706 MFC-DLM-RBH-I-0706
Inspection TESTPACK NO. TP: 1623-03-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


707 MFC-DLM-RBH-I-0707 Inspection TESTPACK NO. TP:1625-00-HT-008

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
708 MFC-DLM-RBH-I-0708
METAL TESTPACK NO. TP:1621-03-HT-008
CLADDING
709 MFC-DLM-RBH-I-0709 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1463-00-HT-001

Insulation INSPECTION IN-PROCESS APPLICATION OF


710 MFC-DLM-RBH-I-0710 INSULATION AND VAPOR BARRIER PRIOR TO
Inspection START METAL CLADDING TP:1541-00-HT-001

INSPECTION IN-PROCESS APPLICATION OF


Insulation
711 MFC-DLM-RBH-I-0711 Inspection INSULATION AND VAPOR BARRIER PRIOR TO
START METAL CLADDING TP:1541-00-HT-001

Insulation INSPECTION IN-PROCESS APPLICATION OF


712 MFC-DLM-RBH-I-0712 INSULATION AND VAPOR BARRIER PRIOR TO
Inspection START METAL CLADDING TP:1541-00-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


713 MFC-DLM-RBH-I-0713 Inspection PRIOR TO METAL CLADDING TP:1621-02-HT-001

714 MFC-DLM-RBH-I-0714 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-001

IN-PROCESS INSULATION INSPECTION OF (HOT)


715 MFC-DLM-RBH-I-0715 Insulation PRIOR TO METAL CLADDING TP:1624-01-HT-023
Inspection RT1

Insulation IN- PROCESS INSULATION INSPECTION OF (HOT)


716 MFC-DLM-RBH-I-0716
Inspection PRIOR TO METAL CLADDING TP:1625-00-HT-043

IN-PROCESS INSULATION INSPECTION OF (HOT)


Insulation
717 MFC-DLM-RBH-I-0717 Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-003
(P)

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


718 MFC-DLM-RBH-I-0718
Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-003
719 MFC-DLM-RBH-I-0719 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1461-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


720 MFC-DLM-RBH-I-0720
Inspection PRIOR TO METAL CLADDING TP:1627-00-HT-007

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


721 MFC-DLM-RBH-I-0721 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


722 MFC-DLM-RBH-I-0722 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-047

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


723 MFC-DLM-RBH-I-0723 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-010

PARTIAL FINAL INSPECTION OF METAL CLADDING


724 MFC-DLM-RBH-I-0724 Cladding TP:1456-00-HT-001 (EXCLUDING SCAFFOLDING
Inspection
TOUCHING AREA)

725 MFC-DLM-RBH-I-0725 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TP:1625-00-HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


726 MFC-DLM-RBH-I-0726 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-008

Surface PRE- INSULATION INSPECTION OF (COLD) PRIOR


727 MFC-DLM-RBH-I-0727 Preparation TO INSULATION ON HYDROTESTED LINES
inspection TP: 1541-00-HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


728 MFC-DLM-RBH-I-0728 Preparation INSULATION ON HYDROTESTED LINES TP: 1622-00-
inspection HT-001
PARTIAL FINAL INSPECTION OF METAL CLADDING
729 MFC-DLM-RBH-I-0729 Cladding TESTPACK NO. TP: 1453-00-HT-001
Inspection

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


730 MFC-DLM-RBH-I-0730
Inspection TESTPACK NO. TP:1463-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


731 MFC-DLM-RBH-I-0731 Inspection TESTPACK NO. TP: 1462-00-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
732 MFC-DLM-RBH-I-0732
METAL TESTPACK NO. TP:1731-01-HT-001
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


733 MFC-DLM-RBH-I-0733 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-001

734 MFC-DLM-RBH-I-0734 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-031

735 MFC-DLM-RBH-I-0735 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1466-00-HT-004

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


736 MFC-DLM-RBH-I-0736
Inspection PRIOR TO METAL CLADDING TP:1623-01-HT-011

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


737 MFC-DLM-RBH-I-0737 Inspection (HOT) TP:1625-00-HT-008

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
738 MFC-DLM-RBH-I-0738
METAL TP:1616-00-HT-015 RT1
CLADDING
739 MFC-DLM-RBH-I-0739 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection (HOT) TP:1625-00-HT-043

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


740 MFC-DLM-RBH-I-0740 (HOT)
Inspection TP:1451-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


741 MFC-DLM-RBH-I-0741 Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-047

Insulation in process insulation inspection and application


742 MFC-DLM-RBH-I-0742 of vapor barrier Prior to metal cladding TP: 1623-
Inspection 01-HT-010

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


743 MFC-DLM-RBH-I-0743 Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-008

in process insulation inspection and application


744 MFC-DLM-RBH-I-0744 Insulation of vapor barrier Prior to metal cladding TP: 1541-
Inspection
00-HT-002

745 MFC-DLM-RBH-I-0745 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1622-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


746 MFC-DLM-RBH-I-0746
Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


747 MFC-DLM-RBH-I-0747 Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


748 MFC-DLM-RBH-I-0748 (HOT)
Inspection TP:1466-00-HT-003 (P)
FINAL
749 MFC-DLM-RBH-I-0749 INSPECTION OF FINAL INSPECTION OF METAL CLADDING (HOT)
METAL TP: 1626-00-HT-007
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


750 MFC-DLM-RBH-I-0750 (COLD)
Inspection TP:1541-00-HT-001

FINAL FINAL INSPECTION OF METAL CLADDING (HOT)


INSPECTION OF
751 MFC-DLM-RBH-I-0751 METAL TP: 1761-00-HT-008
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


752 MFC-DLM-RBH-I-0752
Inspection TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


753 MFC-DLM-RBH-I-0753 Inspection (COLD) TP: 1541-00-HT-002

754 MFC-DLM-RBH-I-0754 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1627-00-HT-002

FINAL
755 MFC-DLM-RBH-I-0755 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1624-02-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
756 MFC-DLM-RBH-I-0756
METAL TESTPACK NO. TP-1463-00-HT-006
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


757 MFC-DLM-RBH-I-0757 Inspection TESTPACK NO. TP:1625-00-HT-043

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


758 MFC-DLM-RBH-I-0758
Inspection TESTPACK NO.TP:1541-00-HT-001
759 MFC-DLM-RBH-I-0759 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP: 1541-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


760 MFC-DLM-RBH-I-0760
Inspection TESTPACK NO. TP:1626-00-HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


761 MFC-DLM-RBH-I-0761 Preparation INSULATION ON HYDROTESTED LINES TP:1627-00-
inspection HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


762 MFC-DLM-RBH-I-0762 Preparation INSULATION ON HYDROTESTED LINES TP:1622-00-
inspection HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


763 MFC-DLM-RBH-I-0763 Preparation INSULATION ON HYDROTESTED LINES TP:1623-01-
inspection HT-015

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


764 MFC-DLM-RBH-I-0764 Preparation INSULATION ON HYDROTESTED LINES TP:1623-01-
inspection HT-019

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


765 MFC-DLM-RBH-I-0765 Preparation INSULATION ON HYDROTESTED LINES TP:1647-00-
inspection HT-005

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


766 MFC-DLM-RBH-I-0766 Preparation INSULATION ON HYDROTESTED LINES TP:1465-00-
inspection HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


767 MFC-DLM-RBH-I-0767 Inspection TP: 1531-03-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


768 MFC-DLM-RBH-I-0768
Inspection TP: 1621-01-HT-020
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
769 MFC-DLM-RBH-I-0769 Preparation INSULATION ON HYDROTESTED LINES TP:1625-00-
inspection HT-005

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


770 MFC-DLM-RBH-I-0770
Inspection TESTPACK NO. TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


771 MFC-DLM-RBH-I-0771 Inspection TESTPACK NO. TP: 1541-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


772 MFC-DLM-RBH-I-0772
Inspection TESTPACK NO. TP:1541-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


773 MFC-DLM-RBH-I-0773 Inspection TESTPACK NO. TP:1466-00-HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


774 MFC-DLM-RBH-I-0774 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-014

775 MFC-DLM-RBH-I-0775 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1627-00-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


776 MFC-DLM-RBH-I-0776
Inspection PRIOR TO METAL CLADDING TP:1622-00-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


777 MFC-DLM-RBH-I-0777 Inspection PRIOR TO METAL CLADDING TP:1623-01-HT-015

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


778 MFC-DLM-RBH-I-0778
Inspection PRIOR TO METAL CLADDING TP:1623-01-HT-019
779 MFC-DLM-RBH-I-0779 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1647-00-HT-005

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


780 MFC-DLM-RBH-I-0780
Inspection PRIOR TO METAL CLADDING TP:1465-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


781 MFC-DLM-RBH-I-0781 Inspection PRIOR TO METAL CLADDING TP:1625-00-HT-005

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


782 MFC-DLM-RBH-I-0782
Inspection PRIOR TO METAL CLADDING TP:1621-01-HT-014

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


783 MFC-DLM-RBH-I-0783 Inspection PRIOR TO METAL CLADDING TP: 1466-00-HT-011

784 MFC-DLM-RBH-I-0784 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-029

785 MFC-DLM-RBH-I-0785 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1626-00-HT-020

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


786 MFC-DLM-RBH-I-0786
Inspection PRIOR TO METAL CLADDING TP: 1634-00-HT-006

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


787 MFC-DLM-RBH-I-0787 Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-064

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


788 MFC-DLM-RBH-I-0788
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-021
789 MFC-DLM-RBH-I-0789 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-042

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


790 MFC-DLM-RBH-I-0790
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-062

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


791 MFC-DLM-RBH-I-0791 Inspection PRIOR TO METAL CLADDING TP: 1741-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


792 MFC-DLM-RBH-I-0792
Inspection PRIOR TO METAL CLADDING TP: 1741-00-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


793 MFC-DLM-RBH-I-0793 Inspection PRIOR TO METAL CLADDING TP:1761-00-HT-006

794 MFC-DLM-RBH-I-0794 Insulation PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1466-00-HT-001

795 MFC-DLM-RBH-I-0795 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


796 MFC-DLM-RBH-I-0796
Inspection PRIOR TO METAL CLADDING TP: 1622-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


797 MFC-DLM-RBH-I-0797 Inspection PRIOR TO METAL CLADDING TP: 1623-01-HT-010

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


798 MFC-DLM-RBH-I-0798
Inspection TESTPACK NO. TP:1623-01-HT-011
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
799 MFC-DLM-RBH-I-0799 Preparation INSULATION ON HYDROTESTED LINES TP: 1627-00-
inspection HT-005

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


800 MFC-DLM-RBH-I-0800 Preparation INSULATION ON HYDROTESTED LINES TP:1466-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


801 MFC-DLM-RBH-I-0801 Preparation INSULATION ON HYDROTESTED LINES TP:1627-00-
inspection HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


802 MFC-DLM-RBH-I-0802 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-044

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


803 MFC-DLM-RBH-I-0803 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-060

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


804 MFC-DLM-RBH-I-0804 Preparation INSULATION ON HYDROTESTED LINES TP:1647-00-
inspection HT-031

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


805 MFC-DLM-RBH-I-0805 Preparation INSULATION ON HYDROTESTED LINES TP:1647-00-
inspection HT-059

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


806 MFC-DLM-RBH-I-0806
Inspection TESTPACK NO. TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


807 MFC-DLM-RBH-I-0807 Inspection TESTPACK NO. TP: 1471-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


808 MFC-DLM-RBH-I-0808
Inspection TESTPACK NO. TP:1625-00-HT-005
809 MFC-DLM-RBH-I-0809 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP: 1622-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


810 MFC-DLM-RBH-I-0810 Preparation INSULATION ON HYDROTESTED LINES
inspection TP:1621-01-HT-002

IN - PROCESS INSPECTION OF (HOT ACOUSTIC ) 1


Insulation & 2 LAYER INSULATION AND INSTALLATION OF
811 MFC-DLM-RBH-I-0811 Inspection VINYLE SHEET PRIOR TO METAL CLADDING ON TP:
1624-02-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


812 MFC-DLM-RBH-I-0812
Inspection TESTPACK NO. TP: 1621-01-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


813 MFC-DLM-RBH-I-0813 Inspection TESTPACK NO. TP: 1623-01-HT-010

814 MFC-DLM-RBH-I-0814 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1451-00-HT-001

815 MFC-DLM-RBH-I-0815 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1627-00-HT-005

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


816 MFC-DLM-RBH-I-0816
Inspection PRIOR TO METAL CLADDING TP:1466-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


817 MFC-DLM-RBH-I-0817 Inspection PRIOR TO METAL CLADDING TP:1627-00-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


818 MFC-DLM-RBH-I-0818
Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-044
819 MFC-DLM-RBH-I-0819 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-060

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


820 MFC-DLM-RBH-I-0820
Inspection PRIOR TO METAL CLADDING TP:1647-00-HT-031

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


821 MFC-DLM-RBH-I-0821 Inspection PRIOR TO METAL CLADDING TP:1647-00-HT-059

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


822 MFC-DLM-RBH-I-0822
Inspection PRIOR TO METAL CLADDING TP:1621-01-HT-002

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
823 MFC-DLM-RBH-I-0823 Inspection TESTPACK NO.
TP: 1622-00-HT-001

824 MFC-DLM-RBH-I-0824 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1456-00-HT-001

825 MFC-DLM-RBH-I-0825 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1461-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


826 MFC-DLM-RBH-I-0826
Inspection TESTPACK NO. TP-1455-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


827 MFC-DLM-RBH-I-0827 Inspection TESTPACK NO. TP: 1466-00-HT-004

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


828 MFC-DLM-RBH-I-0828
Inspection TESTPACK NO.TP:1621-02-HT-001
FINAL
829 MFC-DLM-RBH-I-0829 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO.TP: 1645-00-HT-007 (A)
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
830 MFC-DLM-RBH-I-0830
METAL TESTPACK NO.TP: 1645-00-HT-006
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
831 MFC-DLM-RBH-I-0831 METAL TESTPACK NO. TP-1647-00-HT-023
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
832 MFC-DLM-RBH-I-0832
METAL TESTPACK NO.TP-1647-00-HT-024
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
833 MFC-DLM-RBH-I-0833 METAL TESTPACK NO.TP: 1466-00-HT-010
CLADDING

834 MFC-DLM-RBH-I-0834 Cladding FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP-1423-00-HT-008

835 MFC-DLM-RBH-I-0835 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1626-00-HT-018

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


836 MFC-DLM-RBH-I-0836
Inspection TESTPACK NO.TP:1622-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


837 MFC-DLM-RBH-I-0837 Inspection TESTPACK NO. TP:1626-00-HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


838 MFC-DLM-RBH-I-0838
Inspection TESTPACK NO.TP: 1621-01-HT-008
839 MFC-DLM-RBH-I-0839 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO.TP: 1453-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


840 MFC-DLM-RBH-I-0840 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-020

Cladding FINAL INSPECTION OF METAL CLADDING


841 MFC-DLM-RBH-I-0841 Inspection TESTPACK NO.TP: 1404-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


842 MFC-DLM-RBH-I-0842
Inspection TESTPACK NO. TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


843 MFC-DLM-RBH-I-0843 Inspection TESTPACK NO. TP:1627-00-HT-007

844 MFC-DLM-RBH-I-0844 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1623-01-HT-013

845 MFC-DLM-RBH-I-0845 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-020

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


846 MFC-DLM-RBH-I-0846 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


847 MFC-DLM-RBH-I-0847 Preparation INSULATION ON HYDROTESTED LINES TP: 1654-00-
inspection HT-005

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


848 MFC-DLM-RBH-I-0848 Preparation INSULATION ON HYDROTESTED LINES TP: 1616-00-
inspection HT-008
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
849 MFC-DLM-RBH-I-0849 Preparation INSULATION ON HYDROTESTED LINES TP: 1616-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


850 MFC-DLM-RBH-I-0850 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-006

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
851 MFC-DLM-RBH-I-0851 METAL TESTPACK NO. TP:1646-00-HT-060
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
852 MFC-DLM-RBH-I-0852
METAL TESTPACK NO. TP:1646-00-HT-044
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
853 MFC-DLM-RBH-I-0853 METAL TESTPACK NO. TP: 1621-01-HT-023
CLADDING

FINAL
854 MFC-DLM-RBH-I-0854 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP-1621-01-HT-007
CLADDING

855 MFC-DLM-RBH-I-0855 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO.TP:1541-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


856 MFC-DLM-RBH-I-0856
Inspection TESTPACK NO. TP: 1541-00-HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


857 MFC-DLM-RBH-I-0857 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-008

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
858 MFC-DLM-RBH-I-0858
METAL TESTPACK NO. TP:1647-00-HT-059
CLADDING
FINAL
859 MFC-DLM-RBH-I-0859 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1647-00-HT-031
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


860 MFC-DLM-RBH-I-0860
Inspection TESTPACK NO. TP:1466-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


861 MFC-DLM-RBH-I-0861 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-024

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


862 MFC-DLM-RBH-I-0862 Preparation INSULATION ON HYDROTESTED LINES TP:1621-03-
inspection HT-011

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


863 MFC-DLM-RBH-I-0863 Preparation INSULATION ON HYDROTESTED LINES TP:1621-03-
inspection HT-003

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


864 MFC-DLM-RBH-I-0864 Preparation INSULATION ON HYDROTESTED LINES TP:1621-03-
inspection HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


865 MFC-DLM-RBH-I-0865 Preparation INSULATION ON HYDROTESTED LINES TP:1621-03-
inspection HT-012

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


866 MFC-DLM-RBH-I-0866 Preparation INSULATION ON HYDROTESTED LINES TP:1645-00-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


867 MFC-DLM-RBH-I-0867 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-024

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


868 MFC-DLM-RBH-I-0868
Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-004
869 MFC-DLM-RBH-I-0869 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP: 1654-00-HT-005

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


870 MFC-DLM-RBH-I-0870
Inspection PRIOR TO METAL CLADDING TP: 1616-00-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


871 MFC-DLM-RBH-I-0871 Inspection PRIOR TO METAL CLADDING TP: 1616-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


872 MFC-DLM-RBH-I-0872
Inspection PRIOR TO METAL CLADDING TP: 1623-01-HT-006

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


873 MFC-DLM-RBH-I-0873 Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


874 MFC-DLM-RBH-I-0874 Preparation INSULATION ON HYDROTESTED LINES TP: 1627-00-
inspection HT-005

Surface Pre Insulation Inspection of (Hot) Prior to


875 MFC-DLM-RBH-I-0875 Preparation Inasulation on Hydrotested Lines TP-1513-01-HT-
inspection 001-RT1

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


876 MFC-DLM-RBH-I-0876 Preparation INSULATION ON HYDROTESTED LINES TP: 1505-01-
inspection HT-001-RT1

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


877 MFC-DLM-RBH-I-0877 Preparation INSULATION ON HYDROTESTED LINES TP : 1504-
inspection 01-HT-001-RT1

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
878 MFC-DLM-RBH-I-0878
METAL TESTPACK NO. TP: 1623-02-HT-002
CLADDING
879 MFC-DLM-RBH-I-0879 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP: 1622-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


880 MFC-DLM-RBH-I-0880
Inspection TESTPACK NO. TP: 1623-01-HT-006

Cladding FINAL INSPECTION OF METAL CLADDING


881 MFC-DLM-RBH-I-0881 Inspection TESTPACK NO. TP-1761-00-HT-010

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


882 MFC-DLM-RBH-I-0882
Inspection TESTPACK NO. TP:1456-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


883 MFC-DLM-RBH-I-0883 Inspection TESTPACK NO.TP:1463-00-HT-001

FINAL
884 MFC-DLM-RBH-I-0884 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO.TP: 1463-00-HT-010
CLADDING

885 MFC-DLM-RBH-I-0885 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO TP: 1621-04-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


886 MFC-DLM-RBH-I-0886
Inspection PRIOR TO METAL CLADDING TP: 1627-00-HT-005

IN-PROCESS INSULATION 1st,AND 2nd LAYER


Insulation
887 MFC-DLM-RBH-I-0887 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP-
1513-01-HT-001-RT1

Insulation IN-PROCESS INSULATION 1st,AND 2nd LAYER


888 MFC-DLM-RBH-I-0888 INSPECTION PRIOR TO METAL CLADDING ON TP:
Inspection 1505-01-HT-001-RT1
IN-PROCESS INSULATION 1st,AND 2nd LAYER
889 MFC-DLM-RBH-I-0889 Insulation INSPECTION PRIOR TO METAL CLADDING ON TP :
Inspection 1504-01-HT-001-RT1

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


890 MFC-DLM-RBH-I-0890
Inspection TESTPACK NO. TP:1621-01-HT-002

Cladding FINAL INSPECTION OF METAL CLADDING


891 MFC-DLM-RBH-I-0891 Inspection TESTPACK NO. TP: 1621-01-HT-028

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


892 MFC-DLM-RBH-I-0892
Inspection PRIOR TO METAL CLADDING TP:1621-01-HT-024

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


893 MFC-DLM-RBH-I-0893 Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-002

894 MFC-DLM-RBH-I-0894 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-003

895 MFC-DLM-RBH-I-0895 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-011

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


896 MFC-DLM-RBH-I-0896
Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-012

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


897 MFC-DLM-RBH-I-0897 Inspection PRIOR TO METAL CLADDING TP:1645-00-HT-004

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


898 MFC-DLM-RBH-I-0898
Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-024
899 MFC-DLM-RBH-I-0890A Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1621-01-HT-002

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
900 MFC-DLM-RBH-I-0891A
METAL TESTPACK NO. TP: 1621-01-HT-028
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


901 MFC-DLM-RBH-I-0899 Inspection TESTPACK NO.TP-1513-01-HT-001-RT1

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


902 MFC-DLM-RBH-I-0900
Inspection TESTPACK NO. TP-1455-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


903 MFC-DLM-RBH-I-0901 Inspection TESTPACK NO. TP: 1462-00-HT-001

904 MFC-DLM-RBH-I-0902 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1621-01-HT-008

905 MFC-DLM-RBH-I-0903 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1466-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


906 MFC-DLM-RBH-I-0904
Inspection TESTPACK NO.TP:1541-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


907 MFC-DLM-RBH-I-0905 Inspection TESTPACK NO. TP:1541-00-HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


908 MFC-DLM-RBH-I-0906 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-010
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
909 MFC-DLM-RBH-I-0907 Preparation INSULATION ON HYDROTESTED LINES TP: 1645-00-
inspection HT-108

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


910 MFC-DLM-RBH-I-0908 Preparation INSULATION ON HYDROTESTED LINES TP: 1503-01-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


911 MFC-DLM-RBH-I-0909 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-009

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


912 MFC-DLM-RBH-I-0910 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-0011

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


913 MFC-DLM-RBH-I-0911 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-040

914 MFC-DLM-RBH-I-0912 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-010

915 MFC-DLM-RBH-I-0913 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1645-00-HT-108

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


916 MFC-DLM-RBH-I-0914
Inspection PRIOR TO METAL CLADDING TP: 1503-01-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


917 MFC-DLM-RBH-I-0915 Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-009

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


918 MFC-DLM-RBH-I-0916
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-011
919 MFC-DLM-RBH-I-0917 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-040

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


920 MFC-DLM-RBH-I-0918
Inspection TESTPACK NO.TP: 1621-04-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
921 MFC-DLM-RBH-I-0919 METAL TESTPACK NO. TP:1621-04-HT-001 RT1
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
922 MFC-DLM-RBH-I-0920
METAL TESTPACK NO. TP:1621-04-HT-002
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
923 MFC-DLM-RBH-I-0921 METAL TESTPACK NO. TP: 1621-04-HT-003
CLADDING

924 MFC-DLM-RBH-I-0922 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1466-00-HT-004

925 MFC-DLM-RBH-I-0923 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP:1456-00-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


926 MFC-DLM-RBH-I-0924
Inspection TESTPACK NO. TP:1621-02-HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


927 MFC-DLM-RBH-I-0925 Inspection TESTPACK NO. TP:1623-01-HT-019

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


928 MFC-DLM-RBH-I-0926
Inspection TESTPACK NO. TP:1541-00-HT-001
929 MFC-DLM-RBH-I-0927 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO.TP:1541-00-HT-002

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
930 MFC-DLM-RBH-I-0928
METAL TESTPACK NO. TP:1621-01-HT-002
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


931 MFC-DLM-RBH-I-0929 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-003

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
932 MFC-DLM-RBH-I-0930
METAL TESTPACK NO.TP-1616-00-HT-015
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


933 MFC-DLM-RBH-I-0931 Inspection ON TESTPACK NO. TP:1625-00-HT-043

934 MFC-DLM-RBH-I-0932 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TESTPACK NO. TP: 1621-01-HT-008

935 MFC-DLM-RBH-I-0933 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TESTPACK NO. TP:1627-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


936 MFC-DLM-RBH-I-0934
Inspection ON TESTPACK NO. TP: 1623-01-HT-010

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


937 MFC-DLM-RBH-I-0935 Inspection ON TESTPACK NO. TP-1513-01-HT-001-RT1

Cladding PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


938 MFC-DLM-RBH-I-0936 INSULATION ON HYDROTESTED LINES TP: 1514-01-
Inspection HT-001-RT1
939 MFC-DLM-RBH-I-0937 Insulation IN-PROCESS INSULATION INSPECTION OF HOT
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-003

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


940 MFC-DLM-RBH-I-0938 PRIOR TO METAL CLADDING TP: 1514-01-HT-001-
Inspection RT1

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


941 MFC-DLM-RBH-I-0939 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-059

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


942 MFC-DLM-RBH-I-0940 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-045

Cladding FINAL INSPECTION OF METAL CLADDING


943 MFC-DLM-RBH-I-0941 Inspection TESTPACK NO.TP: 1466-00-HT-009

FINAL
944 MFC-DLM-RBH-I-0942 INSPECTION OF FINAL INSPECTION OF METAL CLADDING ON
METAL TESTPACK NO.TP:1463-00-HT-002
CLADDING

945 MFC-DLM-RBH-I-0943 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection ON TESTPACK NO. TP: 1616-00-HT-008

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


946 MFC-DLM-RBH-I-0944
Inspection ON TESTPACK NO. TP:1623-01-HT-019

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


947 MFC-DLM-RBH-I-0945 Inspection ON TESTPACK NO. TP: 1505-01-HT-001-RT1

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


948 MFC-DLM-RBH-I-0946
Inspection ON TESTPACK NO. TP:1456-00-HT-001
949 MFC-DLM-RBH-I-0947 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-010

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


950 MFC-DLM-RBH-I-0948
Inspection PRIOR TO METAL CLADDING TP: 1645-00-HT-108

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


951 MFC-DLM-RBH-I-0949 Inspection PRIOR TO METAL CLADDING TP: 1503-01-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


952 MFC-DLM-RBH-I-0950
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-009

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


953 MFC-DLM-RBH-I-0951 Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-011

954 MFC-DLM-RBH-I-0952 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-040

955 MFC-DLM-RBH-I-0953 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-004

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


956 MFC-DLM-RBH-I-0954
Inspection PRIOR TO METAL CLADDING TP: 1654-00-HT-005

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


957 MFC-DLM-RBH-I-0955 Inspection PRIOR TO METAL CLADDING TP: 1616-00-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


958 MFC-DLM-RBH-I-0956
Inspection PRIOR TO METAL CLADDING TP: 1616-00-HT-001
959 MFC-DLM-RBH-I-0957 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP: 1623-01-HT-006

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


960 MFC-DLM-RBH-I-0958
Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


961 MFC-DLM-RBH-I-0959 Inspection PRIOR TO METAL CLADDING TP: 1627-00-HT-005

Insulation IN-PROCESS INSULATION 1st,AND 2nd LAYER


962 MFC-DLM-RBH-I-0960 INSPECTION PRIOR TO METAL CLADDING ON TP-
Inspection 1513-01-HT-001-RT1

IN-PROCESS INSULATION 1st,AND 2nd LAYER


Insulation
963 MFC-DLM-RBH-I-0961 Inspection INSPECTION PRIOR TO METAL CLADDING ON TP:
1505-01-HT-001-RT1

IN-PROCESS INSULATION 1st,AND 2nd LAYER


964 MFC-DLM-RBH-I-0962 Insulation INSPECTION PRIOR TO METAL CLADDING ON TP :
Inspection
1504-01-HT-001-RT1

965 MFC-DLM-RBH-I-0963 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1621-01-HT-024

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


966 MFC-DLM-RBH-I-0964
Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


967 MFC-DLM-RBH-I-0965 Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-003

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


968 MFC-DLM-RBH-I-0966
Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-011
969 MFC-DLM-RBH-I-0967 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)
Inspection PRIOR TO METAL CLADDING TP:1621-03-HT-012

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


970 MFC-DLM-RBH-I-0968
Inspection PRIOR TO METAL CLADDING TP:1645-00-HT-004

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


971 MFC-DLM-RBH-I-0969 Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-024

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


972 MFC-DLM-RBH-I-0970 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-02-
inspection HT-004 (PARTIAL TESTPACK ONLY)

Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


973 MFC-DLM-RBH-I-0971 Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-059

974 MFC-DLM-RBH-I-0972 Insulation IN-PROCESS INSULATION INSPECTION OF (HOT)


Inspection PRIOR TO METAL CLADDING TP:1646-00-HT-045

IN-PROCESS INSULATION INSPECTION OF (HOT)


975 MFC-DLM-RBH-I-0973 Insulation PRIOR TO METAL CLADDING TP: 1621-02-HT-004
Inspection (PARTIAL TESTPACK ONLY)

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


976 MFC-DLM-RBH-I-0974 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-039

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


977 MFC-DLM-RBH-I-0975 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-007

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
978 MFC-DLM-RBH-I-0976
METAL TESTPACK NO.TP: 1624-01-HT-007
CLADDING
FINAL
979 MFC-DLM-RBH-I-0977 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1466-00-HT-011
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
980 MFC-DLM-RBH-I-0978
METAL TESTPACK NO. TP:1623-01-HT-015
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
981 MFC-DLM-RBH-I-0979 METAL TESTPACK NO. TP: 1623-01-HT-013
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


982 MFC-DLM-RBH-I-0980
Inspection TESTPACK NO.TP:1541-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


983 MFC-DLM-RBH-I-0981 Inspection TESTPACK NO. TP:1541-00-HT-001

984 MFC-DLM-RBH-I-0982 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1531-03-HT-002

FINAL
985 MFC-DLM-RBH-I-0983 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1634-00-HT-006
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
986 MFC-DLM-RBH-I-0984
METAL TESTPACK NO. TP: 1621-04-HT-001
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


987 MFC-DLM-RBH-I-0985 Inspection TESTPACK NO. TP: 1616-00-HT-008

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
988 MFC-DLM-RBH-I-0986
METAL TESTPACK NO. TP: 1616-00-HT-001
CLADDING
989 MFC-DLM-RBH-I-0987 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1621-01-HT-024

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


990 MFC-DLM-RBH-I-0988
Inspection TESTPACK NO. TP:1621-01-HT-014

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


991 MFC-DLM-RBH-I-0989 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-043

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


992 MFC-DLM-RBH-I-0990 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-03-
inspection HT-005

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


993 MFC-DLM-RBH-I-0991 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-03-
inspection HT-006

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


994 MFC-DLM-RBH-I-0992 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-025

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


995 MFC-DLM-RBH-I-0993 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-026

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
996 MFC-DLM-RBH-I-0994
METAL TESTPACK NO. TP: 1626-00-HT-020
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
997 MFC-DLM-RBH-I-0995 METAL TESTPACK NO. TP: 1626-00-HT-021
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
998 MFC-DLM-RBH-I-0996
METAL TESTPACK NO. TP: 1626-00-HT-002
CLADDING
999 MFC-DLM-RBH-I-0997 Cladding FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1505-01-HT-001-RT1

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1000 MFC-DLM-RBH-I-0998
Inspection PRIOR TO METAL CLADDING TP: 1647-00-HT-039

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1001 MFC-DLM-RBH-I-0999 Inspection PRIOR TO METAL CLADDING TP: 1623-01-HT-007

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1002 MFC-DLM-RBH-I-1000 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1003 MFC-DLM-RBH-I-1001 Inspection PRIOR TO METAL CLADDING TP: 1646-00-HT-043

1004 MFC-DLM-RBH-I-1002 Insulation IN-PROCESS INSULATION INSPECTION OF HOT


Inspection PRIOR TO METAL CLADDING TP: 1621-03-HT-005

1005 MFC-DLM-RBH-I-1003 Insulation IN-PROCESS INSULATION INSPECTION OF HOT


Inspection PRIOR TO METAL CLADDING TP: 1621-03-HT-006

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1006 MFC-DLM-RBH-I-1004
Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-025

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1007 MFC-DLM-RBH-I-1005 Inspection PRIOR TO METAL CLADDING TP: 1621-01-HT-026

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1008 MFC-DLM-RBH-I-1006
Inspection PRIOR TO METAL CLADDING TP: 1466-00-HT-002
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
1009 MFC-DLM-RBH-I-1007 Preparation INSULATION ON HYDROTESTED LINES TP: 1647-00-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1010 MFC-DLM-RBH-I-1008 Preparation INSULATION ON HYDROTESTED LINES TP: 1646-00-
inspection HT-003

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1011 MFC-DLM-RBH-I-1009 Inspection TESTPACK NO. TP:1456-00-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1012 MFC-DLM-RBH-I-1010
METAL TESTPACK NO. TP: 1623-01-HT-010
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1013 MFC-DLM-RBH-I-1011 Preparation INSULATION ON HYDROTESTED LINES TP: 1623-01-
inspection HT-008

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1014 MFC-DLM-RBH-I-1012 Preparation INSULATION ON HYDROTESTED LINES TP: 1644-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1015 MFC-DLM-RBH-I-1013 Preparation INSULATION ON HYDROTESTED LINES TP: 1515-01-
inspection HT-001-RT1

PARTIAL FINAL INSPECTION OF METAL CLADDING


FINAL
INSPECTION OF TESTPACK NO. TP:1505-01-HT-001-RT1 (EXCLUDE
1016 MFC-DLM-RBH-I-1014 2" BD LINE AS PER ATTACHED LINE LIST AND
METAL HIGHLIGHTED ON ISO
CLADDING
(PARTIAL TESTPACK ONLY)
FINAL INSPECTION OF METAL CLADDING
FINAL TESTPACK NO. TP : 1504-01-HT-001-RT1 (EXCLUDE
INSPECTION OF
1017 MFC-DLM-RBH-I-1015 METAL 2" BD LINE AS PER ATTACHED LINE LIST AND
HIGHLIGHTED ON ISO
CLADDING
(PARTIAL TESTPACK ONLY)

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1018 MFC-DLM-RBH-I-1016 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1647-00-HT-004
IN-PROCESS INSULATION INSPECTION OF HOT
1019 MFC-DLM-RBH-I-1017 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1646-00-HT-003

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1020 MFC-DLM-RBH-I-1018 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1623-01-HT-008

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1021 MFC-DLM-RBH-I-1019 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1644-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1022 MFC-DLM-RBH-I-1020 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1515-01-HT-001-RT1

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1023 MFC-DLM-RBH-I-1021 METAL TESTPACK NO.TP: 1654-00-HT-005
CLADDING

FINAL
1024 MFC-DLM-RBH-I-1022 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1623-01-HT-014
CLADDING

1025 MFC-DLM-RBH-I-1023 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO.TP: 1621-02-HT-004

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1026 MFC-DLM-RBH-I-1024
METAL TESTPACK NO. TP: 1645-00-HT-108
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1027 MFC-DLM-RBH-I-1025 METAL TESTPACK NO. TP: 1466-00-HT-004
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1028 MFC-DLM-RBH-I-1026
METAL TESTPACK NO. TP:1621-02-HT-001
CLADDING
FINAL
1029 MFC-DLM-RBH-I-1027 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1466-00-HT-005
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1030 MFC-DLM-RBH-I-1028
METAL TESTPACK NO. TP:1645-00-HT-004
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1031 MFC-DLM-RBH-I-1029 Inspection TESTPACK NO. TP:1623-01-HT-019 (HOT/COLD)

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1032 MFC-DLM-RBH-I-1030
Inspection TESTPACK NO. TP: 1621-02-HT-004

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
1033 MFC-DLM-RBH-I-1031 Inspection TESTPACK NO. TP-1513-01-HT-001-RT1
(EXCLUDING 2" BD LINE )

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1034 MFC-DLM-RBH-I-1032 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-004

FINAL
1035 MFC-DLM-RBH-I-1033 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1617-00-HT-003
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1036 MFC-DLM-RBH-I-1034
METAL TESTPACK NO. TP:1627-00-HT-007
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1037 MFC-DLM-RBH-I-1035 METAL TESTPACK NO.TP:1465-00-HT-003
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1038 MFC-DLM-RBH-I-1036
Inspection TESTPACK NO. TP: 1466-00-HT-002
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
1039 MFC-DLM-RBH-I-1037 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-02-
inspection HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1040 MFC-DLM-RBH-I-1038 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1647-00-HT-004

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1041 MFC-DLM-RBH-I-1039 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1646-00-HT-003

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1042 MFC-DLM-RBH-I-1040 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1623-01-HT-008

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1043 MFC-DLM-RBH-I-1041 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1644-00-HT-001

IN-PROCESS INSULATION INSPECTION OF HOT


1044 MFC-DLM-RBH-I-1042 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection
1515-01-HT-001-RT1

IN-PROCESS INSULATION INSPECTION OF HOT


1045 MFC-DLM-RBH-I-1043 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-01-HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1046 MFC-DLM-RBH-I-1044 Preparation INSULATION ON HYDROTESTED LINES TP:1512-01-
inspection HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1047 MFC-DLM-RBH-I-1045 METAL TESTPACK NO. TP:1617-00-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1048 MFC-DLM-RBH-I-1046
METAL TESTPACK NO. TP: 1634-00-HT-012
CLADDING
FINAL
1049 MFC-DLM-RBH-I-1047 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1634-00-HT-011
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1050 MFC-DLM-RBH-I-1048
METAL TESTPACK NO. TP:1621-01-HT-014
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1051 MFC-DLM-RBH-I-1049 METAL TESTPACK NO. TP: 1634-00-HT-005
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1052 MFC-DLM-RBH-I-1050
METAL TESTPACK NO. TP: 1634-00-HT-007
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1053 MFC-DLM-RBH-I-1051 Inspection TESTPACK NO.TP:1456-00-HT-001

PARTIAL FINAL INSPECTION OF METAL CLADDING


1054 MFC-DLM-RBH-I-1052 Cladding TESTPACK NO. TP: 1514-01-HT-001-RT1
Inspection
(EXCLUDING 2" BD HEADER LINE )

1055 MFC-DLM-RBH-I-1053 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO.TP: 1623-01-HT-007

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1056 MFC-DLM-RBH-I-1054
Inspection TESTPACK NO.TP: 1623-01-HT-008

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1057 MFC-DLM-RBH-I-1055 Inspection TESTPACK NO. TP: 1616-00-HT-008

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1058 MFC-DLM-RBH-I-1056
Inspection TESTPACK NO.TP:1541-00-HT-001
1059 MFC-DLM-RBH-I-1057 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO. TP:1541-00-HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1060 MFC-DLM-RBH-I-1058 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-018 (P)

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1061 MFC-DLM-RBH-I-1059 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1621-02-HT-008

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1062 MFC-DLM-RBH-I-1060 PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1512-01-HT-001

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1063 MFC-DLM-RBH-I-1061 Inspection PRIOR TO METAL CLADDING TESTPACK NO.
TP:1621-01-HT-018 (P)

PARTIAL FINAL INSPECTION OF METAL CLADDING


1064 MFC-DLM-RBH-I-1062 Cladding TESTPACK NO. TP: 1503-01-HT-001 (EXCLUDE 2"
Inspection BD LINE AS PER ATTACHED LINE LIST AND
HIGHLIGHTED ON ISO (PARTIAL TESTPACK ONLY)

1065 MFC-DLM-RBH-I-1063 Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


Inspection TESTPACK NO. TP: 1623-01-HT-008

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1066 MFC-DLM-RBH-I-1064
Inspection TESTPACK NO. TP: 1466-00-HT-002

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1067 MFC-DLM-RBH-I-1065 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-026

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1068 MFC-DLM-RBH-I-1066 Preparation INSULATION ON HYDROTESTED LINES TP:1646-00-
inspection HT-063
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
1069 MFC-DLM-RBH-I-1067 Preparation INSULATION ON HYDROTESTED LINES TP:1647-00-
inspection HT-014

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1070 MFC-DLM-RBH-I-1068
METAL TESTPACK NO. TP: 1647-00-HT-010
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1071 MFC-DLM-RBH-I-1069 METAL TESTPACK NO. TP: 1647-00-HT-040
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1072 MFC-DLM-RBH-I-1070
METAL TESTPACK NO. TP: 1647-00-HT-011
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1073 MFC-DLM-RBH-I-1071 METAL TESTPACK NO. TP: 1463-00-HT-004
CLADDING

FINAL
1074 MFC-DLM-RBH-I-1072 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1463-00-HT-008
CLADDING

FINAL
1075 MFC-DLM-RBH-I-1073 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1471-00-HT-004
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1076 MFC-DLM-RBH-I-1074
METAL TESTPACK NO. TP:1623-03-HT-005
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1077 MFC-DLM-RBH-I-1075 METAL TESTPACK NO. TP: 1621-01-HT-026
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1078 MFC-DLM-RBH-I-1076
METAL TESTPACK NO. TP: 1621-01-HT-025
CLADDING
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
1079 MFC-DLM-RBH-I-1077 Preparation INSULATION ON HYDROTESTED LINES TP:1511-01-
inspection HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1080 MFC-DLM-RBH-I-1078 PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1646-00-HT-026

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1081 MFC-DLM-RBH-I-1079 Inspection PRIOR TO METAL CLADDING TESTPACK NO.
TP:1646-00-HT-063

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1082 MFC-DLM-RBH-I-1080 PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1647-00-HT-014

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1083 MFC-DLM-RBH-I-1081 Preparation INSULATION ON HYDROTESTED LINES TP: 1466-00-
inspection HT-002

PARTIAL FINAL INSPECTION OF METAL CLADDING


1084 MFC-DLM-RBH-I-1082 Cladding TESTPACK NO. TP: 1515-01-HT-001-RT1
Inspection
(EXCLUDING 2" BD HEADER LINE )

IN-PROCESS INSULATION INSPECTION OF HOT


1085 MFC-DLM-RBH-I-1083 Insulation PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1511-01-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1086 MFC-DLM-RBH-I-1084 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1466-00-HT-002

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1087 MFC-DLM-RBH-I-1085 METAL TESTPACK NO. TP: 1623-01-HT-012
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1088 MFC-DLM-RBH-I-1086
METAL TESTPACK NO. TP: 1627-00-HT-005
CLADDING
FINAL
1089 MFC-DLM-RBH-I-1087 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1627-00-HT-003
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1090 MFC-DLM-RBH-I-1088
METAL TESTPACK NO. TP:1465-00-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1091 MFC-DLM-RBH-I-1089 METAL TESTPACK NO. TP: 1645-00-HT-131
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1092 MFC-DLM-RBH-I-1090
Inspection TESTPACK NO. TP: 1466-00-HT-002

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1093 MFC-DLM-RBH-I-1091 METAL TESTPACK NO. TP: 1647-00-HT-058
CLADDING

FINAL
1094 MFC-DLM-RBH-I-1092 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1623-01-HT-019
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1095 MFC-DLM-RBH-I-1093 Preparation INSULATION ON HYDROTESTED LINES TP: 1471-00-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1096 MFC-DLM-RBH-I-1094 Preparation INSULATION ON HYDROTESTED LINES TP: 1501-01-
inspection HT-001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1097 MFC-DLM-RBH-I-1095 Preparation INSULATION ON HYDROTESTED LINES TP: 1502-01-
inspection HT-001

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1098 MFC-DLM-RBH-I-1096 TESTPACK NO. TP:1512-01-HT-001(EXCLUDING 2"
Inspection BD LINE )
FINAL
1099 MFC-DLM-RBH-I-1097 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1466-00-HT-012
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1100 MFC-DLM-RBH-I-1098 TESTPACK NO. TP: 1466-00-HT-013
METAL
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1101 MFC-DLM-RBH-I-1099 Inspection TESTPACK NO. TP: 1466-00-HT-002

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1102 MFC-DLM-RBH-I-1100 PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1646-00-HT-026

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1103 MFC-DLM-RBH-I-1101 Inspection PRIOR TO METAL CLADDING TESTPACK NO.
TP:1646-00-HT-063

IN-PROCESS INSULATION INSPECTION OF HOT


1104 MFC-DLM-RBH-I-1102 Insulation PRIOR TO METAL CLADDING TESTPACK NO.
Inspection
TP:1647-00-HT-014

IN-PROCESS INSULATION INSPECTION OF HOT


1105 MFC-DLM-RBH-I-1103 Insulation PRIOR TO METAL CLADDING TESTPACK NO.
Inspection TP:1511-01-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1106 MFC-DLM-RBH-I-1104 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1466-00-HT-002

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1107 MFC-DLM-RBH-I-1105 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1471-00-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1108 MFC-DLM-RBH-I-1106 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1501-01-HT-001
IN-PROCESS INSULATION INSPECTION OF HOT
1109 MFC-DLM-RBH-I-1107 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1502-01-HT-001

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1110 MFC-DLM-RBH-I-1108
METAL TESTPACK NO. TP:1645-00-HT-003
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1111 MFC-DLM-RBH-I-1109 METAL TESTPACK NO. TP: 1644-00-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1112 MFC-DLM-RBH-I-1110
METAL TESTPACK NO. TP: 1646-00-HT-010
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1113 MFC-DLM-RBH-I-1111 METAL TESTPACK NO. TP: 1646-00-HT-031
CLADDING

FINAL
1114 MFC-DLM-RBH-I-1112 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1646-00-HT-004
CLADDING

FINAL
1115 MFC-DLM-RBH-I-1113 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1647-00-HT-005
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1116 MFC-DLM-RBH-I-1114
METAL TESTPACK NO. TP: 1741-00-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1117 MFC-DLM-RBH-I-1115 METAL TESTPACK NO. TP: 1741-00-HT-002
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1118 MFC-DLM-RBH-I-1116
METAL TESTPACK NO. TP:1646-00-HT-026
CLADDING
FINAL FINAL INSPECTION OF METAL CLADDING TESTPACK
1119 MFC-DLM-RBH-I-1117 INSPECTION OF
NO. TP: 1471-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1120 MFC-DLM-RBH-I-1118 INSPECTION OF NO. TP: 1621-01-HT-029
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1121 MFC-DLM-RBH-I-1119 INSPECTION OF
NO. TP: 1621-01-HT-020
METAL CLADDING

Cladding FINAL INSPECTION OF METAL CLADDING TESTPACK


1122 MFC-DLM-RBH-I-1120 Inspection NO. TP: 1471-00-HT-002

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1123 MFC-DLM-RBH-I-1121 Inspection TESTPACK NO.TP:1456-00-HT-001

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1124 MFC-DLM-RBH-I-1122 INSPECTION OF
NO.TP: 1634-00-HT-002
METAL CLADDING

FINAL FINAL INSPECTION OF METAL CLADDING TESTPACK


1125 MFC-DLM-RBH-I-1123 INSPECTION OF NO. TP: 1634-00-HT-023
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1126 MFC-DLM-RBH-I-1124 INSPECTION OF
NO. TP: 1634-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1127 MFC-DLM-RBH-I-1125 INSPECTION OF
NO. TP :1624-01-HT-024
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1128 MFC-DLM-RBH-I-1126 INSPECTION OF
NO.TP:1624-01-HT-024 RT2
METAL CLADDING
FINAL FINAL INSPECTION OF METAL CLADDING TESTPACK
1129 MFC-DLM-RBH-I-1127 INSPECTION OF
NO.TP:1624-01-HT-023 RT1
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1130 MFC-DLM-RBH-I-1128 INSPECTION OF NO.TP: 1624-01-HT-023
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1131 MFC-DLM-RBH-I-1129 INSPECTION OF
NO.TP:1466-00-HT-003 -P
METAL CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1132 MFC-DLM-RBH-I-1130 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1133 MFC-DLM-RBH-I-1131 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-018

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1134 MFC-DLM-RBH-I-1132 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-027

FINAL
1135 MFC-DLM-RBH-I-1133 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO.TP: 1646-00-HT-030
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1136 MFC-DLM-RBH-I-1134
METAL TESTPACK NO. TP: 1647-00-HT-020
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1137 MFC-DLM-RBH-I-1135 METAL TESTPACK NO. TP:1647-00-HT-014
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1138 MFC-DLM-RBH-I-1136
METAL TESTPACK NO. TP: 1647-00-HT-021
CLADDING
FINAL
1139 MFC-DLM-RBH-I-1137 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO.TP: 1647-00-HT-009
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1140 MFC-DLM-RBH-I-1138
METAL TESTPACK NO. TP:1627-00-HT-008
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1141 MFC-DLM-RBH-I-1139 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-02-
inspection HT-004

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1142 MFC-DLM-RBH-I-1140
METAL TESTPACK NO.TP: 1616-00-HT-008
CLADDING

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1143 MFC-DLM-RBH-I-1141 Inspection PRIOR TO METAL CLADDING TESTPACK NO.TP:
1621-01-HT-018

IN-PROCESS INSULATION INSPECTION OF HOT


1144 MFC-DLM-RBH-I-1142 Insulation PRIOR TO METAL CLADDING TESTPACK NO.TP:
Inspection
1621-01-HT-004

PARTIAL FINAL INSPECTION OF METAL CLADDING


1145 MFC-DLM-RBH-I-1143 Cladding TESTPACK NO. TP:1511-01-HT-001 (EXCLUDING 2"
Inspection HEADER BD LINE )

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1146 MFC-DLM-RBH-I-1144
Inspection TESTPACK NO.TP: 1623-01-HT-008

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1147 MFC-DLM-RBH-I-1145 Inspection PRIOR TO METAL CLADDING TESTPACK NO.TP:
1621-01-HT-027

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1148 MFC-DLM-RBH-I-1146 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-02-HT-004
Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO
1149 MFC-DLM-RBH-I-1147 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-
inspection HT-013

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1150 MFC-DLM-RBH-I-1148
METAL TESTPACK NO. TP:1623-01-HT-011
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1151 MFC-DLM-RBH-I-1149 METAL TESTPACK NO.TP:1646-00-HT-024
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1152 MFC-DLM-RBH-I-1150
METAL TESTPACK NO. TP:1646-00-HT-059
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1153 MFC-DLM-RBH-I-1151 METAL TESTPACK NO. TP: 1621-01-HT-008
CLADDING

FINAL
1154 MFC-DLM-RBH-I-1152 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO.TP: 1646-00-HT-009
CLADDING

IN-PROCESS INSULATION INSPECTION OF HOT


1155 MFC-DLM-RBH-I-1153 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-01-HT-013

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1156 MFC-DLM-RBH-I-1154
METAL TESTPACK NO.TP: 1621-01-HT-027
CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING
1157 MFC-DLM-RBH-I-1155 INSPECTION OF
TESTPACK NO.TP:1627-00-HT-002
METAL CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING


Cladding
1158 MFC-DLM-RBH-I-1156 Inspection
TESTPACK NO. TP: 1502-01-HT-001 (EXCLUDING 2" BD
BRANCH LINE)
FINAL
1159 MFC-DLM-RBH-I-1157 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1624-01-HT-003
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1160 MFC-DLM-RBH-I-1158
METAL TESTPACK NO.TP:1761-00-HT-006
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1161 MFC-DLM-RBH-I-1159 METAL TESTPACK NO. TP: 1623-01-HT-007
CLADDING

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1162 MFC-DLM-RBH-I-1160
Inspection TESTPACK NO. TP: 1621-01-HT-004

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1163 MFC-DLM-RBH-I-1161 METAL TESTPACK NO.TP: 1646-00-HT-008
CLADDING

FINAL
1164 MFC-DLM-RBH-I-1162 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1466-00-HT-003
CLADDING

FINAL
1165 MFC-DLM-RBH-I-1163 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1463-00-HT-003
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1166 MFC-DLM-RBH-I-1164
METAL TESTPACK NO.TP:1623-03-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1167 MFC-DLM-RBH-I-1165 METAL TESTPACK NO.TP: 1623-02-HT-001
CLADDING

FINAL
INSPECTION OF FINAL INSPECTION OF METAL CLADDING
1168 MFC-DLM-RBH-I-1166
METAL TESTPACK NO. TP: 1621-03-HT-006
CLADDING
FINAL
1169 MFC-DLM-RBH-I-1167 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1623-01-HT-008
CLADDING

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1170 MFC-DLM-RBH-I-1168 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 016

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1171 MFC-DLM-RBH-I-1169 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-03-HT-
inspection 001

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1172 MFC-DLM-RBH-I-1170 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-03-HT-
inspection 005

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1173 MFC-DLM-RBH-I-1171 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-02-HT-
inspection 004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1174 MFC-DLM-RBH-I-1172 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 004

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1175 MFC-DLM-RBH-I-1173 Preparation INSULATION ON HYDROTESTED LINES TP: 1621-01-HT-
inspection 018

Cladding PARTIAL FINAL INSPECTION OF METAL CLADDING


1176 MFC-DLM-RBH-I-1174 Inspection TESTPACK NO.TP: 1466-00-HT-002

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1177 MFC-DLM-RBH-I-1175 INSPECTION OF
NO. TP-1423-00-HT-008
METAL CLADDING

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1178 MFC-DLM-RBH-I-1176 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-01-HT-016
IN-PROCESS INSULATION INSPECTION OF HOT
1179 MFC-DLM-RBH-I-1177 Insulation PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-03-HT-001

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1180 MFC-DLM-RBH-I-1178 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-03-HT-005

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1181 MFC-DLM-RBH-I-1179 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1621-02-HT-004

Insulation IN-PROCESS INSULATION INSPECTION OF HOT


1182 MFC-DLM-RBH-I-1180 PRIOR TO METAL CLADDING TESTPACK NO. TP:
Inspection 1621-01-HT-004

IN-PROCESS INSULATION INSPECTION OF HOT


Insulation
1183 MFC-DLM-RBH-I-1181 Inspection PRIOR TO METAL CLADDING TESTPACK NO. TP:
1621-01-HT-018

FINAL
1184 MFC-DLM-RBH-I-1182 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP: 1622-00-HT-001
CLADDING

PARTIAL FINAL INSPECTION OF METAL CLADDING


1185 MFC-DLM-RBH-I-1183 Cladding TESTPACK NO. TP: 1501-01-HT-001 (EXCLUDING 2"
Inspection BD LINE)

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1186 MFC-DLM-RBH-I-1184 INSPECTION OF
NO. TP:1463-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1187 MFC-DLM-RBH-I-1185 INSPECTION OF
NO.TP:1451-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1188 MFC-DLM-RBH-I-1186 INSPECTION OF
NO. TP: 1621-01-HT-001
METAL CLADDING
FINAL FINAL INSPECTION OF METAL CLADDING TESTPACK
1189 MFC-DLM-RBH-I-1187 INSPECTION OF
NO. TP-1455-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1190 MFC-DLM-RBH-I-1188 INSPECTION OF NO. TP:1461-00-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1191 MFC-DLM-RBH-I-1189 INSPECTION OF
NO. TP: 1502-01-HT-001
METAL CLADDING

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1192 MFC-DLM-RBH-I-1190 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1761-00-HT-010

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1193 MFC-DLM-RBH-I-1191 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1624-02-HT-003

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1194 MFC-DLM-RBH-I-1192 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1404-00-HT-001

Surface PRE- INSULATION INSPECTION OF(Hot Acoustic)


1195 MFC-DLM-RBH-I-1193 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1502-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1196 MFC-DLM-RBH-I-1194 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1503-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1197 MFC-DLM-RBH-I-1195 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1505-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1198 MFC-DLM-RBH-I-1196 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1512-01-HT-007
Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)
1199 MFC-DLM-RBH-I-1197 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1513-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1200 MFC-DLM-RBH-I-1198 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1504-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1201 MFC-DLM-RBH-I-1199 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1501-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1202 MFC-DLM-RBH-I-1200 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1511-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1203 MFC-DLM-RBH-I-1201 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1514-01-HT-007

Surface PRE- INSULATION INSPECTION OF (Hot Acoustic)


1204 MFC-DLM-RBH-I-1202 Preparation PRIOR TO INSULATION ON HYDROTESTED LINES
inspection TP: 1515-01-HT-007

FINAL
1205 MFC-DLM-RBH-I-1203 INSPECTION OF FINAL INSPECTION OF METAL CLADDING
METAL TESTPACK NO. TP:1625-00-HT-008
CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1206 MFC-DLM-RBH-I-1204 INSPECTION OF
NO. TP: 1503-01-HT-001
METAL CLADDING

FINAL
FINAL INSPECTION OF METAL CLADDING TESTPACK
1207 MFC-DLM-RBH-I-1205 INSPECTION OF
NO. TP : 1504-01-HT-001-RT1
METAL CLADDING

IN-PROCESS INSULATION INSPECTION OF HOT


insulation ACOUSTIC AND INSPECTION OF DAMPING LAYER
1208 MFC-DLM-RBH-I-1206 inspection PRIOR TO METAL CLADDING TESTPACK NO.TP: 1624-
02-HT-003
FINAL FINAL INSPECTION OF METAL CLADDING TESTPACK
1209 MFC-DLM-RBH-I-1207 INSPECTION OF
NO.TP: 1626-00-HT-001
METAL CLADDING

Surface PRE- INSULATION INSPECTION OF (Hot) PRIOR TO


1210 MFC-DLM-RBH-I-1208 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-009

Surface PRE- INSULATION INSPECTION OF (Hot) PRIOR TO


1211 MFC-DLM-RBH-I-1209 Preparation INSULATION ON HYDROTESTED LINES TP:1621-02-
inspection HT-007

Surface PRE- INSULATION INSPECTION OF (Hot) PRIOR TO


1212 MFC-DLM-RBH-I-1210 Preparation INSULATION ON HYDROTESTED LINES TP:1621-02-
inspection HT-004

Surface PRE- INSULATION INSPECTION OF (Hot) PRIOR TO


1213 MFC-DLM-RBH-I-1211 Preparation INSULATION &DAMPING LAYER ON HYDROTESTED
inspection LINES TP:1621-01-HT-004

Surface PRE- INSULATION INSPECTION OF (Hot) PRIOR TO


1214 MFC-DLM-RBH-I-1212 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-038

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1215 MFC-DLM-RBH-I-1213 Preparation INSULATION ON HYDROTESTED LINES TP:1621-01-
inspection HT-018

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1216 MFC-DLM-RBH-I-1214 Preparation INSULATION ON HYDROTESTED LINES TP:1471-00-
inspection HT-022

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1217 MFC-DLM-RBH-I-1215 Preparation INSULATION ON HYDROTESTED LINES TP:1471-00-
inspection HT-021

Surface PRE- INSULATION INSPECTION OF (HOT) PRIOR TO


1218 MFC-DLM-RBH-I-1216 Preparation INSULATION ON HYDROTESTED LINES TP:1623-01-
inspection HT-002
1219 MFC-DLM-RBH-I-1217 Cladding FINAL INSPECTION OF METAL CLADDING
Inspection TESTPACK NO.TP: 1624-02-HT-003
RFI Control Record (RBH)
INSP. SUB SUB SYSTEM/ LOCATION /
CHECKLIST NO. GRADE PACKAGE
(H/W/S) SYSTEM AREA

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S
& QO SYSTEM (Area : H1)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S
& QO SYSTEM (Area : H1)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S
& QO SYSTEM (Area : H2)

1634-00 : LP DRIPS STIRPPER


SMIC - I 6012 S
(Area : H2)

1623-01 : WATER QUENCH


SMIC - I 6012 S SYSTEM (Area : H2)

SMIC - I 6012 S 1621-01: OIL QUENCH TOWER


& QO SYSTEM (Area : H4)

1647-00 : SPENT CAUSTIC


SMIC - I 6012 S
INCINERATOR 540 (Area : C1)

1466 - 00 : CH CONDENSATE
SMIC - I 6012 S
(3.5 BAR) (Area : W2)
1623-01 : WATER QUENCH
SMIC - I 6012 S
SYSTEM (Area : W3)

1623-01 : WATER QUENCH


SMIC - I 6012 S SYSTEM (Area : W3)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S 1621-01-HT-029 1621-01 & QO SYSTEM (Area : H1)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S 1621-01-HT-007 1621-01 & QO SYSTEM (Area : H1)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S 1621-01-HT-022 1621-01 & QO SYSTEM (Area : H2)

1623-01 : WATER QUENCH


SMIC - I 6012 S 1623-01-HT-023 1623-01 SYSTEM (Area : H2)

1621-01: OIL QUENCH TOWER


SMIC - I 6012 S 1621-01-HT-021 1621-01 & QO SYSTEM (Area : H4)

1647-00 : SPENT CAUSTIC


SMIC - I 6012 S 1647-00-HT-021 1647-00 INCINERATOR 540 (Area : C1)

1466 - 00 : CH CONDENSATE
SMIC - I 6012 S 1466-00-HT-018 1466-00 (3.5 BAR) (Area : W2)

1623-01 : WATER QUENCH


SMIC - I 6012 S 1623-01-HT-016 1623-01 SYSTEM (Area : W3)
1623-01 : WATER QUENCH
SMIC - I 6012 S 1623-01-HT-012 1623-01 SYSTEM (Area : W3)

1623-02 : PYGAS Import (Area :


SMIC - I 6012 S H1, T3, T4)

1624-01 : Process Condensate


SMIC - I 6012 S 1624-01-HT-002 1624-01 System (Area : H2)

SMIC - I 6012 S 1623-02-HT-002 1623-02 1623-02 : PYGAS Import (Area :


H1, T3, T4)

1626-00 : Diute Stream


SMIC - I 6012 S 1626-00-HT-004 1626-00 Concentrator (Area : H2)

1624-01 : Process Condensate


SMIC - I 6012 S 1624-01-HT-024 1624-01 System (Area : H2)

1541-00 : Eye Bath & Safety


SMIC - I 6012 S 1541-00-HT-002 1541-00 Showers (Area : V5, V6)

1541-00 : Eyewash and Safety


SMIC - I 6012 S 1541-00-HT-001 1541-00 Showers Distribution (Area :
V5/V6)

1423-00 : Cooling Water Chem


SMIC - I 6012 S 1423-00-HT-011 1423-00 Additives (Area : V6)

1624-01 : Cooling Chem


SMIC - I 6012 S 1423-00-HT-008 1423-00 Additives (Area : V6)
1626-00 : Dilution Stea
SMIC - I 6012 S 1626-00-HT-019 1626-00 Concentrator (Area : H2)

1621-01: OIL QUENCH TOWER


SMIC - I 6013 S 1621-01-HT-029 1621-01 & QO SYSTEM (Area : H1)

1621-01: OIL QUENCH TOWER


SMIC - I 6013 S 1621-01-HT-022 1621-01 & QO SYSTEM (Area : H2)

1621-01: OIL QUENCH TOWER


SMIC - I 6013 S 1621-01-HT-021 1621-01 & QO SYSTEM (Area : H4)

1541-00 : Eye Bath & Safety


SMIC - I 6016 S 1541-00-HT-002 1541-00 Showers (Area : V5, V6)

1541-00 : Eyewash and Safety


SMIC - I 6016 S 1541-00-HT-001 1541-00 Showers Distribution (Area :
V5/V6)

1634-00: LP DRIPS STIPPER


SMIC - I 6012 S 1634-00-HT-003 1634-00 (Area : H2,T3)

SMIC - I 6013 S 1623-02-HT-002 1623-02 1623-02 : PYGAS Import (Area :


H1, T3, T4)

SMIC - I 6012 S 1515-01-HT-001 1515-01 Furnace-1250

1626-00 : Dilution Stea


SMIC - I 6013 S 1626-00-HT-019 1626-00 Concentrator (Area : H2)
1625-00 : Dilution Steam
SMIC - I 6012 S 1625-00-HT-021 1625-00 Generation (Area : H3)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-022 1625-00 Generation (Area : H3)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-023 1625-00 Generation (Area : H3)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-024 1625-00 Generation (Area : H3)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-062 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-022 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-023 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-024 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-012 1647-00 Incinerator 540 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-022 1646-00 Incinerator 510 (Area : C1)
1646-00 : Spent Caustic
SMIC - I 6012 S 1646-00-HT-023 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-011 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-014 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-064 1646-00 Incinerator 510 (Area : C1)

1463-00 : CM Condensate (17


SMIC - I 6012 S 1463-00-HT-007 1463-00 bar) (Area : W2)

1466-00 : CM Condensate (3.5


SMIC - I 6012 S 1466-00-HT-007 1466-00 bar) (Area : W2)

1466-00 : CM Condensate (3.5


SMIC - I 6012 S 1466-00-HT-014 1466-00 bar) (Area : W2)

1471-00 : Furnace Blowdown


SMIC - I 6012 S 1471-00-HT-004 1471-00 (Area : W3)

1621-01 : Oil Quench Tower &


SMIC - I 6012 S 1621-01-HT-023 1621-01 QO system (Area : H2)

1626-00 : Dilution Steam


SMIC - I 6012 S 1626-00-H-009 1626-00 Concentrator (Area : H2)
SMIC - I 6012 S 1761-00-HT-010 1761-00 1761-00 : Pad Water Treatment
(Area : W2)

1626-00: Dilution Steam


SMIC - I 6013 S 1626-00-HT-004 1626-00 Concentrator (Area : H2)

1514-01: F-1240 BFW, Steam


SMIC - I 6012 S 1514-01-HT-001 1514-01 Drum & SVH Side (Area : F-
1240)

1626-00: Dilution Steam


SMIC - I 6013 S 1626-00-HT-019 1626-00 Concentrator (Area : H2)

SMIC - I 6013 S 1634-00-HT-003 1634-00 1634-00: LP :Drips Stripper (Area


H2, T3)

1466-00: CH Condensate (3.5


SMIC - I 6012 S 1466-00-HT-015 1466-00 bar)(Area : T1)

1646-00: Spent Caustic


SMIC - I 6012 S 1646-00-HT-025 1646-00 Incinerator 510 (Area : C1)

SMIC - I 6012 S 1634-00-HT-006 1634-00 1634-00: LP Drips


: H2)
Stripper (Area

1621-03: LP0 Stripper (Area :


SMIC - I 6012 S 1621-03-HT-007 1621-03 H2)

1621-01: Oil quench tower &


SMIC - I 6012 S 1621-01-HT-027 1621-01 QO System (Area : H1)
1505-01: F-1150 BFW, Steam
SMIC - I 6012 S 1505-01-HT-001 1505-01 drum &SVH Side (Area : F-1150)

1625-00: Dilution Steam


SMIC - I 6013 S 1625-00-HT-023 1625-00 Generation (Area : H3)

1625-00: Dilution Steam


SMIC - I 6013 S 1625-00-HT-022 1625-00 Generation (Area : H3)

1625-00: Dilution Steam


SMIC - I 6013 S 1625-00-HT-021 1625-00 Generation (Area : H3)

1625-00: Dilution Steam


SMIC - I 6013 S 1625-00-HT-024 1625-00
Generation (Area : H3)

1625-00: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)

1625-00: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)

1626-00 : Dilution Steam


SMIC - I 6016 S 1626-00-HT-009 1626-00 Concentrator (Area : H2)

1515-01 : F-1250 BFW,Steam


SMIC - I 6016 S 1515-01-HT-001 1515-01 Drum SVH Side

1626-00 : Dilution Steam


SMIC - I 6014 S 1626-00-HT-019 1626-00 Concerntrator (Area : H2)
1515-01: F-1250 BFW,
SMIC - I 6013 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)

1514-01: F-1240 BFW,


SMIC - I 6013 S 1514-01-HT-001 1514-01 Steam Dru SVH Side (Area :
F-1250)

1514-01: F-1240 BFW,


SMIC - I 6013 S Steam Dru SVH Side (Area :
F-1250)

1505-01: F-1150 BFW,


SMIC - I 6013 S 1505-01-HT-001 1505-01 Steam Dru SVH Side (Area :
F-1250)

1621-03: LP0 Stripper


SMIC - I 6013 S 1621-03-HT-007 1621-03
(Area : H2)

1621-01 : Oil Quench


SMIC - I 6013 S Tower & QO system (Area :
H2)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-027 1621-01 TOWER & QO SYSTEM
(Area : H1)

1404-00 :Decoke Air


SMIC - I 6012 S 1404-00-HT-001 1404-00 (Area : H4)

1515-01: F-1250 BFW,


SMIC - I 6012 S 1515-01-HT-007 1515-01 Steam Dru SVH Side (Area :
F-1250)

1514-01: F-1240 BFW,


SMIC - I 6012 S 1514-01-HT-007 1514-01 Steam Dru SVH Side (Area :
F-1240)
1513-01: F-1230 BFW,
SMIC - I 6012 S 1513-01-HT-007 1513-01 Steam Dru SVH Side (Area :
F-1230)

1511-01: F-1210 BFW,


SMIC - I 6012 S 1511-01-HT-007 1511-00 Steam Dru SVH Side (Area :
F-1210)

1515-01: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)

1514-01: F-1240 BFW,


SMIC - I 6013 S 1514-01-HT-001 1514-01 Steam Dru SVH Side (Area :
F-1250)

1505-01: F-1150 BFW,


SMIC - I 6013 S 1505-01-HT-001 1505-01 Steam Dru SVH Side (Area :
F-1250)

SMIC - I 6013 S 1623-01-HT-023 1623-01 1631-01 : Water Quench


system (Area : H2)

SMIC - I 6014 S 1623-02 : PYGAS Import


(Area : T4)

1644-00:Spent Caustic
SMIC - I 6012 S 1644-00-HT-006 1644-00 Treating Stg (Area : C4)

1645-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-005 1645-00 Treatment Common
(Area : C2)

1645-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-066 1645-00 Treatment Common
(Area : C2)
1645-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-073 1645-00 Treatment Common
(Area : C2)

1645-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-030 1646-00 Incinerator 510 (Area : C1)

1645-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-035 1646-00 Incinerator 510 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-025 1647-00 Incinerator 540 (Area : C1)

1505-01: F-1150 BFW,


SMIC - I 6012 S 1505-01-HT-007 1505-01 Steam Dru SVH Side (Area :
F-1210)

SMIC - I 6014 S 1623-02-HT-002 1623-02 1623-02 : PYGAS Import


(Area : H1, T3, T4)

SMIC - I 6014 S 1626-00-HT-009 1626-00 1626-00 : Dilution Steam


Concentrator (Area : H2)

1626-00 : Diute Stream


SMIC - I 6014 S Concentrator (Area : H2)

1621-01: OIL QUENCH


SMIC - I 6014 w TOWER & QO SYSTEM
(Area : H1)

1515-01: F-1250 BFW,


SMIC - I 6014 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)
1624-01 : Process
SMIC - I 6013 S 1624-01-HT-002 1624-01 Condensate System (Area :
H2)

1471-00 :Furnace
SMIC - I 6013 S 1471-00-HT-004 1471-00 blowdown (Area :W3)

1466-00 : CH Condensate
SMIC - I 6013 S 1466-00-HT-007 1466-00 (Area :W2)

1404-00 :Decoke Air


SMIC - I 6013 S 1404-00-HT-001 1404-00 (Area : H4)

1626-00 : Diute Stream


SMIC - I 6014 w 1626-00-HT-004 1626-00
Concentrator (Area : H2)

1621-01 : Oil quench


SMIC - I 6014 w 1621-01-HT-022 1621-01 tower& QO system (Area :
H2)

SMIC - I 6012 S 1466-00-HT-008 1466-00 1466-00:CH Condensate


(Area : W2)

1627-00:Steam out QCD


SMIC - I 6012 S 1627-00-HT-004 1627-00 (Area : W2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-006 1463-00 (Area : W2)

151-01: F-1220 BFW,


SMIC - I 6012 S 1512-01-HT-007 1512-01 Steam Drum & SVH Side
(Area : F-1220)
SMIC - I 6012 S 1647-00-HT-058 1647-00: Spent Caustic
1647-00 Incinerator 540 (Area : C1)

1404-00 :Decoke Air


SMIC - I 6013 S 1404-00-HT-001 1404-00 (Area : H4)

1625-00 : Dilution Stream


SMIC - I 6014 w 1625-00-HT-021 1625-00 Generation (Area : H3)

1625-00 : Dilution Stream


SMIC - I 6014 w 1625-00-HT-022 1625-00 Generation (Area : H3)

1625-00 : Dilution Stream


SMIC - I 6014 w 1625-00-HT-023 1625-00
Generation (Area : H3)

SMIC - I 6014 w 1625-00-HT-024 1625-00 1625-00 : Dilution Stream


Generation (Area : H3)

SMIC - I 6013 S 1627-00-HT-004 1627-00 1627-00:Steam out QCD


(Area : W2)

1463-00 : CM Condensate
SMIC - I 6013 S 1463-00-HT-007 1463-00 (17 bar) (Area : W2)

1634-00: LP DRIPS STIPPER


SMIC - I 6013 S 1634-00-HT-003 1634-00 (Area : H2,T3)

1515-01: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-007 1515-01 Steam Dru SVH Side (Area :
F-1250)
SMIC - I 6013 S 1466-00-HT-008 1466-00 1466-00:CH Condensate
(Area : W2)

1515-01: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-001 1515-01 Steam Dru SVH Side (Area :
F-1250)

1514-01: F-1240 BFW,


SMIC - I 6013 S 1514-01-HT-001 1514-01 Steam Dru SVH Side (Area :
F-1250)

1505-01: F-1150 BFW,


SMIC - I 6013 S 1505-01-HT-001 1505-01 Steam Dru SVH Side (Area :
F-1250)

1501-01: F-1110 BFW,


SMIC - I 6012 S 1501-01-HT-007 1501-01 Steam Drum & SVH Side
(Area : F-1110)

1502-01: F-1120 BFW,


SMIC - I 6012 S 1502-01-HT-007 1502-01 Steam Drum & SVH Side
(Area : F-1120)

1503-01: F-1130 BFW,


SMIC - I 6012 S 1503-01-HT-007 1503-01 Steam Drum & SVH Side
(Area : F-1130)

1623-01:Water Quench
SMIC - I 6012 S 1623-01-HT-038 1623-01 System (Area : W3)

1634-00:L P Drips
SMIC - I 6012 S 1634-00-HT-012 1634-00 stripper(Area : H2)

1644-00:Spent Caustic
SMIC - I 6012 S 1644-00-HT-003 1644-00 Treating Stg (Area :C4)
1645-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-008 1645-00 Treatment Common
(Area :C2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-005 1463-00 (Area :W2)

1463-00: Pad water


SMIC - I 6013 S 1761-00-HT-010 1761-00 treatment (Area : W2)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-006 1463-00 (Area :W2)

1621-01 : Oil quench


SMIC - I 6013 S 1621-01-HT-007 1621-01 tower& QO system (Area :
H1)

SMIC - I 6013 S 1455-00 : SL Stae m


(Area : T2)

1645-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-131 1645-00 Treatment Common
(Area :C2)

1504-01: F-1140 BFW,


SMIC - I 6012 S 1504-01-HT-001 1504-01 Steam Dru SVH Side

1455-00 : SL Stae m
SMIC - I 6012 S 1455-00-HT-001 1455-00 (Area : T2)

1404-00 :Decoke Air


SMIC - I 6013 S 1404-00-HT-001 1404-00 (Area : H4)
SMIC - I 6014 S 1404-00-HT-001 1404-00 1404-00 :Decoke Air
(Area : H4)

1504-01: F-1140 BFW,


SMIC - I 6012 S 1504-01-HT-007 1504-01 Steam Drum & SVH Side
(Area : F-1140)

1623-03:Pygas Pump
SMIC - I 6012 S 1623-03-HT-006 1623-03 System (Area :H3)

1647-00:Spemt Caustic
SMIC - I 6012 S 1647-00-HT-061 1647-00 Incinerator 540 (Area :C1)

1647-00:Spemt Caustic
SMIC - I 6012 S 1647-00-HT-006 1647-00
Incinerator 540 (Area :C1)

SMIC - I 6012 S 1617-00-HT-001 1617-00 1647-00:Furnace Liquid


Feed Prep :(Area T4, H4)

SMIC - I 6013 S 1511-01-HT-007 1511-01 1511-01: F-1210 BFW,


Steam Dru SVH Side

1512-01: F-1220 BFW,


SMIC - I 6013 S 1512-01-HT-007 1512-01 Steam Dru SVH Side

1513-01: F-1230 BFW,


SMIC - I 6013 S 1513-01-HT-007 1513-01 Steam Dru SVH Side

1515-01: F-1250 BFW,


SMIC - I 6013 S 1515-01-HT-007 1515-01 Steam Dru SVH Side (Area :
F-1250)
1463-00: Pad water
SMIC - I 6013 S 1761-00-HT-010 1761-00 treatment (Area : W2)

SMIC - I 6013 S 1455-00-HT-001 1455-00 1455-00 : SL T2)Stae m (Area :

1621-01 : Oil Quench Tower


SMIC - I 6013 S 1621-01-HT-023 1621-01 & QO system (Area : H2)

1463-00: Pad water


SMIC - I 6013 S 1761-00-HT-010 1761-00 treatment (Area : W2)

SMIC - I 6013 S 1455-00-HT-001 1455-00 1455-00 : SL T2)Stae m (Area :

1621-01 : Oil Quench Tower


SMIC - I 6013 S 1621-01-HT-023 1621-01 & QO system (Area : H2)

SMIC - I 6013 S 1515-01-HT-001 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

SMIC - I 6013 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam


Dru SVH Side (Area : F-1250)

SMIC - I 6013 S 1505-01-HT-001 1505-01 1505-01: F-1150 BFW, Steam


Dru SVH Side (Area : F-1250)

1616-00:Furnace Gas Feed


SMIC - I 6012 S 1616-00-HT-015 1616-00 Prep (Area : H4)
1626-00 : Dilution Stream
SMIC - I 6012 S 1626-00-HT-001 1626-00 Concentrator (Area : T3,H2)

1626-00 : Dilution Stream


SMIC - I 6012 S 1626-00-HT-021 1626-00 Concentrator (Area : H2)

1624-01 : Process
SMIC - I 6012 S 1624-01-HT-023 1624-01 Condensate System (Area :
H2)

1626-00 : Dilution Stream


SMIC - I 6012 S 1626-00-HT-020 1626-00 Concentrator (Area : H2)

1623-03 : PYGAS Pump


SMIC - I 6012 S 1623-03-HT-003 1623-03 System (Area : W3)

1646-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-033 1646-00 Incinerator 510 (Area : C1)

1646-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-030 1647-00 Incinerator 540 (Area : C1)

SMIC - I 6012 S 1513-01-HT-001 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1250)

SMIC - I 6014 S 1515-01-HT-001 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1626-00 : Dilution Steam


SMIC - I 6014 W 1626-00-HT-019 1626-00 Concerntrator (Area : H2)
1626-00 : Dilution Steam
SMIC - I 6014 W 1626-00-HT-009 1626-00 Concerntrator (Area : H2)

1627-00:Steam out QCD


SMIC - I 6014 W 1627-00-HT-004 1627-00 (Area : W2)

1647-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-042 1647-00 Incinerator 540 (Area : C1)

1627-00:Steam out QCD


SMIC - I 6012 S 1627-00-HT-005 1627-00 (Area : W2)

SMIC - I 6013 S 1501-01-HT-007 1501-01 1501-01: F-1110 BFW, Steam


Dru SVH Side (Area : F-1110)

1502-01: F-1120BFW, Steam


SMIC - I 6013 S 1502-01-HT-007 1502-01 Dru SVH Side (Area : F-1120)

SMIC - I 6013 S 1503-01-HT-007 1503-01 1503-01: F-1130 BFW, Steam


Dru SVH Side (Area : F-1130)

SMIC - I 6013 S 1504-01-HT-001 1504-01 1503-01: F-1140 BFW, Steam


Dru SVH Side (Area : F-1140)

SMIC - I 6013 S 1466-00-HT-015 1466-00 1466-00: CH Condensate (3.5


bar)(Area : T1)

1644-00:Spent Caustic
SMIC - I 6013 S 1463-00-HT-005 1463-00 Treating Stg (Area :C4)
1634-00:L P Drip Stripper
SMIC - I 6012 S 1634-00-HT-004 1634-00 (Area : H 2)

1626-00 : Dilution Steam


SMIC - I 6012 S 1626-00-HT-002 1626-00 Concerntrator (Area :W2)

1626-00 :CH
SMIC - I 6012 S 1466-00-HT-011 1466-00 Condensate(Area :W2)

1646-00:Spent Caustic
SMIC - I 6012 S 1645-00-HT-057 1645-00 Treatment Common (Area :
C2)

1647-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-041 1647-00 Incinerator 540 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-019 1646-00 Incinerator 510 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6012 S 1465-00-HT-002 1465-00 Incinerator 510 (Area : C1)

SMIC - I 6014 S 1515-01-HT-001 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1623-03 : PYGAS Pump


SMIC - I 6013 S 1623-03-HT-006 1623-03 System (Area : H3)

1623-01 :Water Quench


SMIC - I 6013 S 1623-01-HT-038 1623-01 System (Area : W3)
1455-00 :SL STEAM(Area :
SMIC - I 6013 S 1455-01-HT-001 1455-01 T1,T2)

SMIC - I 6014 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam


Dru SVH Side (Area : F-1240)

1471-00:Furnace Blowdown
SMIC - I 6012 S 1471-00-HT-002 1471-00 (Area : W3,T3,T2)

SMIC - I 6013 S 1513-01-HT-001 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1455-00 :SL STEAM(Area :


SMIC - I 6013 S 1455-00-HT-001 1455-00 T1,T2)

1634-00: LP DRIPS STIPPER


SMIC - I 6014 w 1634-00-HT-03 1634-00 (Area : H2,T3)

1623-03 : PYGAS Pump


SMIC - I 6014 w 1623-03-HT-006 1623-03 System (Area : H3)

1624-01 : Process
SMIC - I 6014 w 1624-01-HT-002 1624-01 Condensate System (Area :
H2)

1463-00 : CM Condensate
SMIC - I 6014 w 1463-00-HT-0007 1463-00 (17 bar) (Area : W2)

1404-00 :Decoke Air (Area


SMIC - I 6014 w 1404-00-HT-001 1404-00 :T1, H4)
SMIC - I 6013 S 1515-01-HT-001 1515-01 1515-01: F-1250 BFW, Steam
Drum SVH Side(Area:F1250)

1514-01: F-1240 BFW, Steam


SMIC - I 6013 S 1514-01-HT-001 1514-01 Drum SVH Side (Area : F-
1240)

1505-01: F-1150 BFW, Steam


SMIC - I 6013 S 1505-01-HT-001 1505-01 Drum SVH Side (Area : F-
1150)

1503-01: F-1140 BFW, Steam


SMIC - I 6013 S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)

SMIC - I 6013 S 1511-01-HT-007 1511-01 1511-01: F-1210 BFW, Steam


Drum SVH Side(Area-F-1210)

1501-01: F-1110 BFW, Steam


SMIC - I 6013 S 1501-01-HT-007 1501-01 Drum SVH Side (Area : F-
1110)

1502-01: F-1120BFW, Steam


SMIC - I 6013 S 1502-01-HT-007 1502-01 Drum SVH Side (Area : F-
1120)

1503-01: F-1130 BFW, Steam


SMIC - I 6013 S 1503-01-HT-007 1503-01 Drum SVH Side (Area : F-
1130)

1515-01: F-1250 BFW, Steam


SMIC - I 6013 S 1515-01-HT-007 1515-01 Drum SVH Side (Area : F-
1250)

SMIC - I 6013 S 1513-01-HT-007 1513-01 1513-01: F-1230 BFW, Steam


Drum SVH Side(Area-F-1230)
SMIC - I 6013 S 1512-01-HT-007 1512-01 1512-01: F-1220 BFW, Steam
Drum SVH Side(Area-F-1220)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 w 1515-01-HT-007 1515-01 Drum SVH Side (Area : F-
1250)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

1616-00:Furnace Gas Feed


SMIC - I 6013 S 1616-00-HT-015 1616-00 Prep (Area : H4)

SMIC - I 6013 S 1504-01-HT-007 1504-01 1503-01: F-1140 BFW, Steam


Dru SVH Side (Area : F-1140)

1623-03 : PYGAS Pump


SMIC - I 6013 S 1623-03-HT-003 1623-03 System (Area : W3)

SMIC - I 6013 S 1617-00-HT-001 1617-00 1647-00:Furnace Liquid Feed


Prep :(Area T4, H4)

1471-00:Furnace Blowdown
SMIC - I 6013 S 1514-01-HT-001 1514-01 (Area : W3,T3,T2)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-001 1626-00 Concentrator (Area : T3,H2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-010 1463-00 (Area :H2)
1647-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-005 1646-00 Incinerator 510 (Area : C1)

1623-02 : PYGAS Import


SMIC - I 6012 S 1623-02-HT-004 1623-02 (Area : H3)

1616-00:Furnace Gas Feed


SMIC - I 6012 S 1616-00-HT-002 1616-00 Prep (Area : H4,T4)

1634-00:L P Drips Stripper


SMIC - I 6012 S 1634-00-HT-011 1634-00 (Area : H 2)

1624-01 : Process
SMIC - I 6012 S 1624-01-HT-004 1624-01 Condensate System (Area :
H2)

1634-00:L P Drips Stripper


SMIC - I 6012 S 1634-00-HT-002 1634-00 (Area : H 2)

1621-01 : Oil Quench Tower


SMIC - I 6012 S 1621-01-HT-028 1621-01 & QO system (Area :H1, H2)

1623-01 : Water Quench


SMIC - I 6012 S 1623-01-HT-009 1623-01 system (Area : W3)

1626-00 : Dilution Stream


SMIC - I 6012 S 1626-00-HT-002 1626-00 Concentrator (Area :H2)

1626-00 : Dilution Stream


SMIC - I 6012 S 1626-00-HT-007 1626-00 Concentrator (Area :H2,H3)
1623-01 : Water Quench
SMIC - I 6014 w 1623-01-HT-023 1623-01 system (Area : H2)

SMIC - I 6014 w 1621-03-HT-007 1621-03 1621-03: LF0H2)


Stripper (Area :

SMIC - I 6014 w 1466-00-HT-015 1466-00 1466-00: CH Condensate (3.5


bar)(Area : T1)

SMIC - I 6014 s 1471-00-HT-004 1471-00 1471-00 :Furnace blowdown


(Area :W3)

1626-00 : Dilution Stream


SMIC - I 6014 s 1626-00-HT-001 1626-00 Concentrator (Area :H2)

1541-00 : Eye Bath & Safety


SMIC - I 6016 S 1541-00-HT-002 1541-00 Showers (Area : V5, V6)

1541-00 : Eyewash and


SMIC - I 6016 S 1541-00-HT-001 1541-00 Safety Showers Distribution
(Area : V5/V6)

1423-00 : Cooling Chem


SMIC - I 6013 S 1423-00-HT-008 1423-00 Additives (Area : V6)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-001 1514-01 Drum SVH Side (Area : F-
1240)
1634-00: LP DRIPS STIPPER
SMIC - I 6014 S 1634-00-HT-003 1634-00 (Area : H2,T3)

SMIC - I 6014 S 1617-00-HT-001 1617-00 1647-00:Furnace Liquid Feed


Prep :(Area H4)

1616-00:Furnace Gas Feed


SMIC - I 6014 S 1616-00-HT-015 1616-00 Prep (Area : H4)

1634-00:L P Drip Stripper


SMIC - I 6012 S 1634-00-HT-004 1634-00 (Area : H 2)

1616-00:Furnace Gas Feed


SMIC - I 6012 S 1616-00-HT-002 1616-00 Prep (Area : H4,T4)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-022 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-024 1647-00 Incinerator 540 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-022 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-014 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-023 1646-00 Incinerator 510 (Area : C1)
1647-00 : Spent Caustic
SMIC - I 6012 S 1647-00-HT-023 1647-00 Incinerator 540 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-025 1646-00 Incinerator 510 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6012 S 1647-00-HT-030 1647-00 Incinerator 540 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6012 S 1646-00-HT-033 1646-00 Incinerator 510 (Area : C1)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 W 1514-01-HT-007 1514-01 Drum SVH Side (Area : F-
1240)

1514-01: F-1240 BFW, Steam


SMIC - I 6013 S 1514-01-HT-007 1514-01 Drum SVH Side (Area : F-
1240)

1455-00 :SL STEAM(Area :


SMIC - I 6013 S 1455-00-HT-001 1455-00 T1,T2)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-001 1514-01 Drum SVH Side (Area : F-
1240)

SMIC - I 6017 1541-00 : Eye Bath & Safety


&SMIC-I6018 S 1541-00-HT-002 1541-00 Showers (Area : V5, V6)

SMIC - I 6017 1541-00 : Eyewash and


&SMIC-I6018
S 1541-00-HT-001 1541-00 Safety Showers Distribution
(Area : V5/V6)
1634-00: LP DRIPS STIPPER
SMIC - I 6014 w 1634-00-HT-0103 1634-00 (Area : H2,T3)

1423-00 : CoolingWater
SMIC - I 6014 S 1423-00-HT-008 1423-00 Chem Additives (Area : V6)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-007 1514-01 Drum SVH Side (Area : F-
1240)

1634-00: LP DRIPS STIPPER


SMIC - I 6014 w 1634-00-HT-003 1634-00 (Area : H2,T3)

SMIC - I 6017 1541-00 : Eye Bath & Safety


&SMIC-I6018 S 1541-00-HT-002 1541-00 Showers (Area : V5, V6)

1541-00 : Eyewash and


SMIC - I 6017
&SMIC-I6018
S 1541-00-HT-001 1541-00 Safety Showers Distribution
(Area : V5/V6)

1616-00:Furnace Gas Feed


SMIC - I 6014 W 1616-00-HT-002 1616-00 Prep (Area : H4,T4)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 W 1514-01-HT-007 1514-01 Drum SVH Side (Area : F-
1240)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-073 1645-00 Treatment Common (Area :
C2)

1645-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-035 1646-00 Incinerator 510 (Area : C1)
1646-00 : Spent Caustic
SMIC - I 6013 S 1646-00-HT-011 1646-00 Incinerator 510 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6013 S 1647-00-HT-012 1647-00 Incinerator 540 (Area : C1)

1634-00:L P Drips Stripper


SMIC - I 6013 S 1634-00-HT-011 1634-00 (Area : H 2)

1623-02 : PYGAS Import


SMIC - I 6013 S 1623-02-HT-004 1623-02 (Area : H3)

SMIC - I 6013 S 1621-01-HT-028 1621-01 1621-01 : Oil Quench Tower


& QO system (Area :H1, H2)

1623-01 : Water Quench


SMIC - I 6013 S 1623-01-HT-009 1623-01 system (Area : W3)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-010 1463-00 (Area :H2)

1503-01: F-1140 BFW, Steam


SMIC - I 6013 S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)

SMIC - I 6013 S 1511-01-HT-007 1511-01 1511-01: F-1210 BFW, Steam


Drum SVH Side(Area-F-1210)

1501-01: F-1110 BFW, Steam


SMIC - I 6013 S 1501-01-HT-007 1501-01 Drum SVH Side (Area : F-
1110)
1502-01: F-1120BFW, Steam
SMIC - I 6013 S 1502-01-HT-007 1502-01 Drum SVH Side (Area : F-
1120)

1503-01: F-1130 BFW, Steam


SMIC - I 6013 S 1503-01-HT-007 1503-01 Drum SVH Side (Area : F-
1130)

SMIC - I 6013 S 1513-01-HT-007 1513-01 1513-01: F-1230 BFW, Steam


Drum SVH Side(Area-F-1230)

SMIC - I 6013 S 1512-01-HT-007 1512-01 1512-01: F-1220 BFW, Steam


Drum SVH Side(Area-F-1220)

SMIC - I 6013 S 1504-01-HT-007 1504-01 1503-01: F-1140 BFW, Steam


Dru SVH Side (Area : F-1140)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-002 1626-00 Concentrator (Area :H2)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-007 1626-00 Concentrator (Area :H2,H3)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-073 1645-00 Treatment Common (Area :
C2)

1634-00:L P Drips Stripper


SMIC - I 6013 S 1634-00-HT-011 1634-00 (Area : H 2)

1471-00:Furnace Blowdown
SMIC - I 6014 S 1471-00-HT-002 1471-00 (Area : W3,T3,T2)
1646-00 : Spent Caustic
SMIC - I 6014 S 1646-00-HT-022 1646-00 Incinerator 510 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6014 S 1647-00-HT-022 1647-00 Incinerator 540 (Area : C1)

1634-00:L P Drips
SMIC - I 6013 S 1634-00-HT-012 1634-00 stripper(Area : H2)

1645-00:Spent Caustic
SMIC - I 6014 W 1645-00-HT-073 1645-00 Treatment Common (Area :
C2)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-011 1646-00 Incinerator 510 (Area : C1)

SMIC - I 6014 W 1647-00-HT-012 1647-00 1647-00 : Spent Caustic


Incinerator 540 (Area : C1)

SMIC - I 6014 W 1634-00-HT-004 1634-00 1634-00:L P Drip Stripper


(Area : H 2)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

1647-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-019 1646-00 Incinerator 510 (Area : C1)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-008 1645-00 Treatment Common (Area
:C2)
SMIC - I 6013 S 1647-00-HT-058 1647-00 1647-00: Spent Caustic
Incinerator 540 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-005 1646-00
Incinerator 510 (Area : C1)

1645-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-030 1646-00 Incinerator 510 (Area : C1)

1647-00:Spemt Caustic
SMIC - I 6013 S 1647-00-HT-006 1647-00
Incinerator 540 (Area :C1)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-005 1645-00 Treatment Common (Area :
C2)

1646-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-057 1645-00 Treatment Common (Area :
C2)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-006 1645-00 Treatment Common (Area :
C2)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-014 1646-00
Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-035 1646-00 Incinerator 510 (Area : C1)

1634-00:L P Drips
SMIC - I 6012 S 1634-00-HT-007 1634-00
stripper(Area : H2)
SMIC - I 6012 S 1634-00-HT-005 1634-00 1634-00:L P Drips
stripper(Area : H2)

1623-03:PYGAS Pump System


SMIC - I 6012 S 1623-03-HT-009 1623-03
(Area :W3 )

1623-03:PYGAS Pump System


SMIC - I 6012 S 1623-03-HT-002 1623-03 (Area :W3 )

1466-00:CH Condensate
SMIC - I 6012 S 1466-00-HT-010 1466-00
(Area :W2 )

1466-00:CH Condensate
SMIC - I 6012 S 1466-00-HT-006 1466-00 (Area :W2 )

SMIC - I 6012 S 1646-00-HT-009 1646-00 1646-00 : Spent Caustic


Incinerator 510 (Area : C1)

SMIC - I 6013 S 1644-00-HT-006 1644-00 1644-00:Spent Caustic


Treating Stg (Area : C4)

1644-00:Spent Caustic
SMIC - I 6013 S 1644-00-HT-003 1644-00
Treating Stg (Area :C4)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-006 1645-00 Treatment Common (Area
:C2)

1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-041 1647-00
Incinerator 540 (Area : C1)
SMIC - I 6013 S 1465-00-HT-002 1465-00 1647-00:Spent Caustic
Incinerator 510 (Area : C1)

1423-00 : CoolingWater
SMIC - I 6012 S 1423-00-HT-010 1423-00
Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6012 S 1423-00-HT-012 1423-00 Chem Additives (Area : V6)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-006 1645-00 Treatment Common (Area
:C2)

1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-041 1647-00 Incinerator 540 (Area : C1)

SMIC - I 6013 S 1465-00-HT-002 1465-00 1647-00:Spent Caustic


Incinerator 510 (Area : C1)

1645-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-131 1645-00 Treatment Common (Area
:C2)

1646-00:Spent Caustic
SMIC - I 6013 S 1645-00-HT-057 1645-00 Treatment Common (Area :
C2)

1644-00:Spent Caustic
SMIC - I 6013 S 1644-00-HT-006 1644-00 Treating Stg (Area : C4)

1644-00:Spent Caustic
SMIC - I 6013 S 1644-00-HT-003 1644-00
Treating Stg (Area :C4)
SMIC - I 6014 S 1623-01-HT-009 1623-01 1623-01 : Water Quench
system (Area : W3)

1621-01 : Oil Quench Tower


SMIC - I 6012 S 1621-01-HT-041 1621-01
& QO System (Area : H1)

1621-01 : Oil Quench Tower


SMIC - I 6012 S 1621-01-HT-042 1621-01 & QO System (Area : H1)

1634-01 : LP Drips Stripper


SMIC - I 6012 S 1634-00-HT-008 1634-00
(Area : H2)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-005 1625-00 Generation (Area : H3,T3,T4)

SMIC - I 6012 S 1625-00-HT-005 1625-00 1634-01 : LP Drips Stripper


(Area : H2)

SMIC - I 6012 S 1634-00-HT-001 1634-00 1634-01 : LP Drips Stripper


(Area : H2,T3)

1503-01: F-1140 BFW, Steam


SMIC - I 6013 S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)

1511-01: F-1210 BFW, Steam


SMIC - I 6013 S 1511-01-HT-007 1511-01 Drum SVH Side(Area-F-1210)

1501-01: F-1110 BFW, Steam


SMIC - I 6013 S 1501-01-HT-007 1501-01 Drum SVH Side (Area : F-
1110)
1502-01: F-1120BFW, Steam
SMIC - I 6013 S 1502-01-HT-007 1502-01 Drum SVH Side (Area : F-
1120)

1503-01: F-1130 BFW, Steam


SMIC - I 6013 S 1503-01-HT-007 1503-01 Drum SVH Side (Area : F-
1130)

1505-01: F-1150 BFW, Steam


SMIC - I 6013 S 1505-01-HT-007 1505-01 Drum SVH Side (Area : F-
1150)

1512-01: F-1220 BFW, Steam


SMIC - I 6013 S 1512-01-HT-007 1512-01
Drum SVH Side(Area-F-1220)

1503-01: F-1140 BFW, Steam


SMIC - I 6013 S 1504-01-HT-007 1504-01 Dru SVH Side (Area : F-1140)

SMIC - I 6013 S 1623-03-HT-009 1623-03 1623-03:PYGAS Pump System


(Area :W3 )

SMIC - I 6013 S 1623-03-HT-002 1623-03 1623-03:PYGAS Pump System


(Area :W3 )

1634-00:L P Drips Stripper


SMIC - I 6013 S 1634-00-HT-002 1634-00
(Area : H 2)

1634-00:L P Drips
SMIC - I 6013 S 1634-00-HT-007 1634-00 stripper(Area : H2)

1624-01 : Process
SMIC - I 6013 S 1624-01-HT-024 1624-01 Condensate System (Area :
H2)
1624-01 : Process
SMIC - I 6013 S 1624-01-HT-023 1624-01 Condensate System (Area :
H2)

1514-01: F-1230 BFW, Steam


SMIC - I 6014 S 1513-01-HT-007 1513-01 Drum SVH Side (Area : F-
1230)

1623-02 : PYGAS Import


SMIC - I 6014 W 1623-02-HT-004 1623-02 (Area : H3)

1531-03 : BFM (Area :


SMIC - I 6012 S 1531-03-HT-002 1531-03
H3,T3,T4)

1634-00 : LP Drips Stripper


SMIC - I 6012 S 1634-00-HT-023 1634-00 (Area : H2)

SMIC - I 6012 S 1466-00-HT-005 1466-00 1466-00:CH Condensate


(Area :W2 )

SMIC - I 6013 S 1423-00-HT-010 1423-00 1423-00 : CoolingWater


Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6013 S 1423-00-HT-011 1423-00
Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6013 S 1423-00-HT-012 1423-00 Chem Additives (Area : V6)

1625-00 : Dilution Steam


S 1625-00-HT-002 1625-00 Generation (Area :H2,
H3,T2,T3,T4,W3)
SMIC - I 6012
1624-01 : Process
S 1624-01-HT-007 1624-01 Condensate System (Area
:W2)
SMIC - I 6012

1625-00 :Process Condensate


S 1624-01-HT-001 1624-01
System (Area :T2,T3,H2)
SMIC - I 6012

1625-00 : Dilution Steam


S 1625-00-HT-005 1625-00 Generation (Area : H3,T3,T4)
SMIC - I 6013

1531-03 : BFM (Area :


S 1531-03-HT-002 1531-03
H3,T3,T4)
SMIC - I 6013

1624-01 : Process
S 1624-01-HT-004 1624-01 Condensate System (Area :
H2)
SMIC - I 6013

S 1634-00-HT-005 1634-00 1634-00:L P Drips


stripper(Area : H2)
SMIC - I 6013

1505-01: F-1150 BFW, Steam


S 1505-01-HT-001 1505-01 Drum SVH Side (Area : F-
1150)
SMIC - I 6014

1504-01: F-1140 BFW, Steam


S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)
SMIC - I 6014

1515-01: F-1250 BFW, Steam


S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)
SMIC - I 6014

1626-00 : Dilution Stream


SMIC - I 6014 W 1626-00-HT-002 1626-00
Concentrator (Area :H2)
SMIC - I 6013 S 1423-00-HT-010 1423-00 1423-00 : CoolingWater
Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6013 S 1423-00-HT-011 1423-00
Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6013 S 1423-00-HT-012 1423-00 Chem Additives (Area : V6)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-002 1625-00 Generation (Area :H2,
H3,T2,T3,T4,W3)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

SMIC - I 6013 S 1624-01-HT-001 1624-01 1625-00 :Process Condensate


System (Area :T2,T3,H2)

SMIC - I 6012 S 1621-04-HT-001 1621-04 1621-04 :LQO Cyclone


(Area :T3,H1)

1465-00 :CVA Condensate


SMIC - I 6012 S 1465-00-HT-003 1465-00
(Area :C1)

1647-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-013 1647-00 Incinerator 540 (Area : C1)

1646-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-012 1646-00
Incinerator 510 (Area : C1)
SMIC - I 6012 S 1466-00-HT-012 1466-00 1466-00:CH Condensate
(Area:W2)

1466-00:CH Condensate
SMIC - I 6012 S 1466-00-HT-009 1466-00
(Area:W2)

1466-00:CMCondensate
SMIC - I 6012 S 1463-00-HT-008 1463-00 (Area:W2)

1645-00 : Dilution Steam


SMIC - I 6012 S 1645-00-HT-007 1645-00 Treatment Common (Area
:C2)

1645-00:Spent Caustic
SMIC - I 6014 W 1645-00-HT-008 1645-00 Treatment Common (Area
:C2)

SMIC - I 6014 W 1647-00-HT-030 1647-00 1647-00 : Spent Caustic


Incinerator 540 (Area : C1)

SMIC - I 6014 W 1646-00-HT-033 1646-00 1646-00 : Spent Caustic


Incinerator 510 (Area : C1)

1511-01: F-1210 BFW, Steam


SMIC - I 6014 W 1511-01-HT-007 1511-01
Drum SVH Side(Area-F-1210)

1623-01 : Water Quench


SMIC - I 6014 S 1623-01-HT-009 1623-01 system (Area : W3)

1625-00 :Process Condensate


SMIC - I 6014 S 1624-01-HT-001 1624-01
System (Area :T2,T3,H2)
1504-01: F-1140 BFW, Steam
SMIC - I 6014 S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-002 1626-00
Concerntrator (Area :H2,W2)

1625-00 :Process Condensate


SMIC - I 6013 S 1624-01-HT-001 1624-01 System (Area :T2,T3,H2)

1625-00 : Dilution Steam


SMIC - I 6013 S 1625-00-HT-002 1625-00 Generation (Area :H2,
H3,T2,T3,T4,W3)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-001 1621-04 (Area :T3,H1)

SMIC - I 6013 S 1634-00-HT-001 1634-00 1634-01 : LP Drips Stripper


(Area : H2,T3)

SMIC - I 6013 S 1634-00-HT-008 1634-00 1634-01 : LP Drips Stripper


(Area : H2)

1634-00 : LP Drips Stripper


SMIC - I 6013 S 1634-00-HT-023 1634-00
(Area : H2)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-021 1626-00 Concentrator (Area : H2)

1624-01 : Process
SMIC - I 6013 S 1624-01-HT-007 1624-01 Condensate System (Area
:W2)
SMIC - I 6013 S 1466-00-HT-005 1466-00 1466-00:CH Condensate
(Area :W2 )

1423-00 : CoolingWater
SMIC - I 6014 W 1423-00-HT-010 1423-00
Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6014 W 1423-00-HT-011 1423-00 Chem Additives (Area : V6)

1423-00 : CoolingWater
SMIC - I 6014 W 1423-00-HT-012 1423-00
Chem Additives (Area : V6)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

SMIC - I 6013 S 1623-01-HT-016 1623-01 1623-01 : WATER QUENCH


SYSTEM (Area : W3)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)

1505-01: F-1150 BFW, Steam


SMIC - I 6014 S 1505-01-HT-001 1505-01
Drum SVH Side

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-001 1514-01 Dru SVH Side (Area : F-1240)

1512-01: F-1220 BFW, Steam


SMIC - I 6014 S 1512-01-HT-007 1512-01
Drum SVH Side
SMIC - I 6014 S 1623-03-HT-003 1623-03 1623-03 : PYGAS Pump
System (Area : W3)

1625-00 : Dilution Steam


SMIC - I 6014 S 1625-00-HT-002 1625-00
Generation (Area : H3,)

1623-03:PYGAS Pump System


SMIC - I 6014 W 1623-03-HT-009 1623-03 (Area :W3 )

1624-01 : Process
SMIC - I 6014 W 1624-01-HT-004 1624-01 Condensate System (Area :
H2)

1645-00:Spent Caustic
SMIC - I 6014 W 1645-00-HT-005 1645-00 Treatment Common (Area :
C2)

1646-00:Spent Caustic
SMIC - I 6014 W 1645-00-HT-057 1645-00 Treatment Common (Area :
C2)

SMIC - I 6014 W 1647-00-HT-041 1647-00 1647-00:Spent Caustic


Incinerator 540 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6014 W 1465-00-HT-002 1465-00
Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-023 1646-00 Incinerator 510 (Area : C1)

1644-00:Spent Caustic
SMIC - I 6014 W 1644-00-HT-006 1644-00
Treating Stg (Area : C4)
SMIC - I 6014 W 1644-00-HT-003 1644-00 1644-00:Spent Caustic
Treating Stg (Area :C4)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-004 1463-00
(Area :W2)

1623-00:Water Quench
SMIC - I 6012 S 1623-01-HT-013 1623-01 System (Area :W3)

1623-00:Water Quench
SMIC - I 6012 S 1623-01-HT-014 1623-01
System (Area :W3)

1625-00 :Process Condensate


SMIC - I 6014 S 1624-01-HT-001 1624-01 System (Area :T2,T3)

SMIC - I 6014 S 1621-04-HT-001 1621-04 1621-04 :LQO Cyclone


(Area :T3,H1)

SMIC - I 6014 W 1501-01-HT-007 1501-01 1501-01: F-1110 BFW, Steam


Drum SVH Side

1634-00:L P Drips
SMIC - I 6014 S 1634-00-HT-012 1634-00
stripper(Area : H2)

SMIC - I 6012 S 1624-02-HT-003 1624-02 1624-02: (Area :W3)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-004 1463-00
(Area :W2)
1624-01 : Process
SMIC - I 6014 S 1624-01-HT-004 1624-01 Condensate System (Area :
H2)

1505-01: F-1150 BFW, Steam


SMIC - I 6014 S 1505-01-HT-007 1505-01 Drum SVH Side (Area : F-
1150)

1623-01 : WATER QUENCH


SMIC - I 6014 W 1623-01-HT-016 1623-01 SYSTEM (Area : W3)

1621-04 :LQO Cyclone


SMIC - I 6012 S 1621-04-HT-001 1621-04
(Area :L1)

1625-00 : Dilution Steam


SMIC - I 6012 S 1625-00-HT-002 1625-00 Generation (Area :L1)

SMIC - I 6012 S 1621-01-HT-040 1621-01 1621-01 : Oil Quench Tower


& QO system (Area :H1)

SMIC - I 6012 S 1623-03-HT-005 1623-03 1623-03:PYGAS Pump System


(Area :H1,H2,T3,W3)

1624-02:Process Condensate
SMIC - I 6012 S 1624-02-HT-001 1624-02
Holding Tank (Area :T2,W3)

1463-00:CH Condensate
SMIC - I 6012 S 1466-00-HT-023 1466-00 (Area :W2)

1463-00:CH Condensate
SMIC - I 6012 S
(Area :W2)
SMIC - I 6012 S 1463-00-HT-002 1463-00 1463-00:CM Condensate
(Area :W2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-002 1463-00
(Area :H2,T1,T2,T3)

1453-00:SM Steam
SMIC - I 6012 S 1453-00-HT-001 1453-00 (Area :T1,T2,T3,T4)

SMIC - I 6013 S 1624-02-HT-003 1624-02 1624-02: (Area :W3)

1466-00 : CM Condensate
SMIC - I 6013 S 1466-00-HT-014 1466-00 (3.5 bar) (Area : W2)

SMIC - I 6013 S 1466-00-HT-018 1466-00 1466 - 00 : CH CONDENSATE


(3.5 BAR) (Area : W2)

SMIC - I 6013 S 1466-00-HT-006 1466-00 1466-00:CH Condensate


(Area :W2 )

1621-01 : Oil Quench Tower


SMIC - I 6013 S 1621-01-HT-041 1621-01
& QO System (Area : H1)

1621-01 : Oil Quench Tower


SMIC - I 6012 S 1621-01-HT-042 1621-01 & QO System (Area : H1)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-007 1626-00
Concentrator (Area :H2,H3)
SMIC - I 6014 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam
Drum SVH Side

1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-008 1466-00
(Area : W2)

1466-00 : CH Condensate
SMIC - I 6014 W 1466-00-HT-007 1466-00 (Area :W2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-003 1463-00
(Area :H2)

1463-00:CM Condensate
SMIC - I 6012 S 1463-00-HT-003 1463-00 (Area :W2)

SMIC - I 6013 S 1463-00-HT-002 1463-00 1463-00:CM Condensate


(Area :W2)

SMIC - I 6013 S 1463-00-HT-002 1463-00 1463-00:CM Condensate


(Area :H2,T1,T2,T3)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-001 1621-04
(Area :L1)

1625-00 : Dilution Steam


SMIC - I 6013 S 1625-00-HT-002 1625-00 Generation (Area :L1)

1625-00 :Process Condensate


SMIC - I 6014 S 1624-01-HT-001 1624-01
System (Area :H2)
SMIC - I 6014 S 1515-01-HT-001 1515-01 1515-01: F-1250 BFW, Steam
Drum SVH Side

1454-00: S10 Steam (Area


SMIC - I 6012 S 1454-00-HT-001 1454-00
:T2,T3,T4)

1624-01: Process
SMIC - I 6012 S 1624-01-HT-005 1624-01 Condensate System (Area
:H2)

1625-00: Dilution Steam


SMIC - I 6012 S 1625-00-HT-001 1625-00
Generation (Area :H2)

1463-00:LP Vent ISBL Flare


SMIC - I 6012 S 1741-00-HT-001 1741-00 (Area :C4)

SMIC - I 6012 S 1741-00-HT-002 1741-00 1463-00:LP Vent ISBL Flare


(Area :C4)

SMIC - I 6012 S 1466-00-HT-013 1466-00 1466-00:CH Condensate


(Area:W2)

1625-00 : Dilution Steam


SMIC - I 6014 S 1625-00-HT-002 1625-00
Generation (Area : H3,)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-001 1621-04 (Area :H1)

1623-01 : Water Quench


SMIC - I 6014 W 1623-01-HT-038 1623-01
system (Area : W3)
SMIC - I 6014 W 1623-01-HT-038 1623-01 1623-01 :Water Quench
System (Area : W3)

1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-006 1466-00
(Area :W2 )

1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-018 1466-00 (Area :W2 )

1647-00 : Spent Caustic


SMIC - I 6014 W
Incinerator 540 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6014 W Incinerator 510 (Area : C1)

1621-04 :LQO Cyclone


SMIC - I 6012 S 1621-04-HT-002 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6012 S 1621-04-HT-003 1621-04 (Area :H1)

1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-025 1647-00 Incinerator 540 (Area : C1)

1463-00:CH Condensate
SMIC - I 6013 S 1466-00-HT-023 1466-00 (Area :W2)

1623-00:Water Quench
SMIC - I 6013 S 1623-01-HT-013 1623-01 System (Area :W3)
1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-004 1463-00 (Area :W2)

SMIC - I 6014 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam


Drum SVH Side

1646-00 : Spent Caustic


SMIC - I 6014 W Incinerator 510 (Area : C1)

1623-01 : Water Quench


SMIC - I 6014 W 1623-01-HT-009 1623-01 system (Area : W3)

1634-01 : LP Drips Stripper


SMIC - I 6014 W 1634-00-HT-008 1634-00 (Area : H2)

SMIC - I 6013 S 1623-03-HT-005 1623-03 1623-03:PYGAS Pump System


(Area :H1,H2,T3,W3)

1466-00:CH Condensate
SMIC - I 6013 S 1466-00-HT-010 1466-00 (Area :W2 )

SMIC - I 6013 S 1624-02-HT-001 1624-02 1624-02:Process Condensate


Holding Tank (Area :T2,W3)

1466-00:CH Condensate
SMIC - I 6013 S 1466-00-HT-009 1466-00 (Area:W2)

1466-00:CH Condensate
SMIC - I 6013 S 1466-00-HT-012 1466-00 (Area:W2)
1623-00:Water Quench
SMIC - I 6013 S 1623-01-HT-014 1623-01 System (Area :W3)

1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-013 1647-00 Incinerator 540 (Area : C1)

1465-00 :CVA Condensate


SMIC - I 6013 S 1465-00-HT-003 1465-00 (Area :C1)

1646-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-012 1646-00 Incinerator 510 (Area : C1)

1646-00 : Spent Caustic


SMIC - I 6013 S 1646-00-HT-009 1646-00 Incinerator 510 (Area : C1)

SMIC - I 6013 S 1647-00:Spemt Caustic


Incinerator 540 (Area :C1)

1466-00 : CM Condensate
SMIC - I 6014 W 1466-00-HT-014 1466-00 (3.5 bar) (Area : W2)

1462-C42 Condensate
SMIC - I 6012 S 1462-00-HT-001 1462-00 (Area:T1,T3)

1761-Pad Water Treatment


SMIC - I 6012 S 1761-00-HT-008 1761-00 (Area:W2)

SMIC - I 6012 S 1781-00-HT-001 1781-00 1781 - Slop Oil (Area:W2)


SMIC - I 6014 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam
Drum SVH Side

1454-00: S10 Steam (Area


SMIC - I 6013 S 1454-00-HT-001 1454-00 :T2,T3,T4)

1453-00:SM Steam (Area


SMIC - I 6013 S 1453-00-HT-001 1453-00 :T1,T2,T3,T4)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-002 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-003 1621-04 (Area :H1)

1462-C42 Condensate
SMIC - I 6013 S 1462-00-HT-001 1462-00 (Area:T1,T3)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-003 1463-00 (Area :H2)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-003 1463-00 (Area :W2)

1466-00:CMCondensate
SMIC - I 6013 S 1463-00-HT-008 1463-00 (Area:W2)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-004 1463-00 (Area :W2)
1624-01 : Process
SMIC - I 6014 S 1624-01-HT-007 1624-01 Condensate System (Area
:W2)

1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-005 1466-00 (Area :W2 )

SMIC - I 6014 S 1624-02-HT-001 1624-02 1624-02:Process Condensate


Holding Tank (Area :T2,W3)

SMIC - I 6012 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1,C3

SMIC - I 6013 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1,C3

1623-03:PYGAS PUMP
SMIC - I 6012 S 1623-03-HT-001 1623-03 SYSTEM (AREA:H1,T4

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-020 1621-01 TOWER &QO SYSTEM
(AREA:H1,H2,T3)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-003 1463-00 (Area :W2)

SMIC - I 6013 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1,C3

1623-03:PYGAS PUMP
SMIC - I 6013 S 1623-03-HT-001 1623-03 SYSTEM (AREA:H1,T4
1454-00: S10 Steam (Area
SMIC - I 6013 S 1454-00-HT-001 1454-00 :T2,T3,T4)

1453-00:SM Steam
SMIC - I 6013 S 1453-00-HT-001 1453-00 (Area :T1,T2,T3,T4)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-002 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6013 S 1621-04-HT-003 1621-04 (Area :H1)

1462-C42 Condensate
SMIC - I 6013 S 1462-00-HT-001 1462-00 (Area:T1,T3)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-003 1463-00 (Area :H2)

1463-00:CM Condensate
SMIC - I 6013 S 1463-00-HT-003 1463-00 (Area :W2)

SMIC - I 6014 S 1514-01-HT-001 1514-01 1514-01: F-1240 BFW, Steam


Drum SVH Side

1471-00:Furnace Blowdown
SMIC - I 6014 S 1471-00-HT-002 1471-00 (Area : T3,T2)

1634-01 : LP Drips Stripper


SMIC - I 6014 S 1634-00-HT-001 1634-00 (Area : T3)
1646-00 : Spent Caustic
SMIC - I 6014 S 1646-00-HT-009 1646-00 Incinerator 510 (Area : C1)

1624-01 : Process
SMIC - I 6014 W 1624-01-HT-004 1624-01 Condensate System (Area :
H2)

1463-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-023 1466-00 (Area :W2)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-025 1646-00 Incinerator 510 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6014 W 1647-00-HT-025 1647-00 Incinerator 540 (Area : C1)

1623-02
SMIC - I 6012 S 1623-02-HT-001 1623-02 PYGAS IMPORT (AREA:H1,H2
&T3)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-002 1463-00 (Area :H2,T1,T2,T3)

1625-00 : Dilution Steam


SMIC - I 6014 S Generation (Area : T3,T4
&H2)

SMIC - I 6012 S 1731-01-HT-001 1731-01 1731 DEBUTANIZER

1621-01 : OIL QUENCH


SMIC - I 6012 S 1621-01-HT-001 1621-01 TOWER & QO SYSTEM
( AREA:H1,)
1645-00 : Dilution Steam
SMIC - I 6013 S 1645-00-HT-007 1645-00 Treatment Common (Area
:C2)

1761-Pad Water Treatment


SMIC - I 6013 S 1761-00-HT-008 1761-00 (Area:W2)

1623-00:Water Quench
SMIC - I 6014 S 1623-01-HT-013 1623-01 System (Area :W3)

1623-01:Water Quench
SMIC - I 6014 S 1623-01-HT-014 1623-01 System (Area :W3)

1647-00:Spemt Caustic
SMIC - I 6014 S 1647-00-HT-006 1647-00 Incinerator 540 (Area :C1)

1647-00:Spemt Caustic
SMIC - I 6013 S 1647-00-HT-061 1647-00 Incinerator 540 (Area :C1)

1646-00:Spent Caustic
SMIC - I 6014 S 1646-00-HT-012 1646-00 Incinerator 510 (Area : C1)

SMIC - I 6014 S 1621-01-HT-041 1621-01 1621-01 : Oil Quench Tower


& QO System (Area : H1)

SMIC - I 6014 S 1621-01-HT-042 1621-01 1621-01 : Oil Quench Tower


& QO System (Area : H1)

1626-00 : Dilution Stream


SMIC - I 6014 s
Concentrator (Area :H2,T3)
1645-00: Spent Caustic
SMIC - I 6012 S 1645-00-HT-003 1645-00 Treatment Common (Area
:C2,C2,C3,)

1647-00:Spent Caustic
SMIC - I 6012 S 1647-00-HT-010 1647-00 Incinerator 540 (Area : C1)

1647-00:Spent Caustic
SMIC - I 6012 S 1646-00-HT-031 1646-00 Incinerator 510 (Area : C1)

1627-00:Steam Out
SMIC - I 6012 S 1627-00-HT-003 1627-00 QCD(Area W2)

SMIC - I 6014 S 1654-00-HT-006 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1,C3

1625-00 : Dilution Steam


SMIC - I 6014 S 1625-00-HT-002 1625-00 Generation (Area :L1)

SMIC - I 6014 S 1625-00 : Dilution Steam


Generation (Area :W3)

1454-00: S10 Steam (Area


SMIC - I 6014 S 1454-00-HT-001 1454-00 :T2,T3,T4)

1453-00:SM Steam (Area


SMIC - I 6014 S 1453-00-HT-001 1453-00 :T1,T2,T3,T4)

1462-C42 Condensate
SMIC - I 6014 S 1462-00-HT-001 1462-00 (Area:T1,T3)
1647-00:Spemt Caustic
SMIC - I 6014 W 1647-00-HT-061 1647-00 Incinerator 540 (Area :C1)

1647-00:Spent Caustic
SMIC - I 6014 W 1647-00-HT-013 1647-00 Incinerator 540 (Area : C1)

1624-01: Process
SMIC - I 6013 S 1624-01-HT-005 1624-01 Condensate System (Area
:H2)

1617-00:Furnace Liquid Feed


SMIC - I 6012 S 1617-00-HT-003 1617-00 Prep
(Area:H4,)

1623-02
SMIC - I 6013 S 1623-02-HT-001 1623-02 PYGAS IMPORT (AREA:H1,H2
&T3)

SMIC - I 6012 S 1621-04-HT-001 RT1 1621-01 1621-04 LQO CYCLONE

1623-01 WATER QUENCH


SMIC - I 6012 S 1623-01-HT-044 1623-01 SYSTEM

1654-00 Fuel Gas Furnace


SMIC - I 6012 S 1654-00-HT-001 1654-00 Dryout

SMIC - I 6014 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1,C3

1621-03 LFO STRIPPER


SMIC - I 6012 S 1621-03-HT-008 1621-03 (AREA:H2)
1624-01-PROCESS
SMIC - I 6012 S 1624-01-HT-003 1624-01 CONDENSATE SYSTEM
(AREA:H2,T3)

1624-01-PROCESS
SMIC - I 6012 S 1624-01-HT-003 1624-01 CONDENSATE SYSTEM
(AREA:W2)

1624-01-PROCESS
SMIC - I 6012 S 1624-01-HT-023 RT1 1624-01 CONDENSATE SYSTEM
(AREA:H2)

1624-01-PROCESS
SMIC - I 6012 S 1624-01-HT-024 1624-01 CONDENSATE SYSTEM
(AREA:H2)

1621-01 : OIL QUENCH


SMIC - I 6013 S 1621-01-HT-001 1621-01 TOWER & QO SYSTEM
( AREA:H1,)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-020 1621-01 TOWER &QO SYSTEM
(AREA:H1,H2,T3)

1625-00: Dilution Steam


SMIC - I 6013 S 1625-00-HT-001 1625-00 Generation (Area :H2)

SMIC - I 6013 S 1781-00-HT-001 1781-00 1781 - Slop Oil (Area:W2)

1463-00:CM CONDENSATE
SMIC - I 6012 S 1463-00-HT-001 1463-00 (AREA:W2)

1623-01 WATER QUENCH


SMIC - I 6013 S 1623-01-HT-044 1623-01 SYSTEM
1624-01: Process
SMIC - I 6014 S 1624-01-HT-0005 1624-01 Condensate System (Area
:H2)

1654-00 Fuel Gas Furnace


SMIC - I 6013 S 1654-00-HT-001 1654-00 Dryout (T1,T2,T3

1462-C42-CONDENSATE
SMIC - I 6012 S 1462-00-HT-001 1462-00 (AREA:W2)

1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-010 1647-00 Incinerator 540 (Area : C1)

1623-01 WATER QUENCH


SMIC - I 6014 S 1623-01-HT-044 1623-01 SYSTEM

SMIC - I 6014 S 1781-00-HT-001 1781-00 1781 - Slop Oil (Area:W2)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-001 1514-01 Drum SVH Side (Area : F-
1240)

1504-01: F-1140 BFW, Steam


SMIC - I 6014 S 1504-01-HT-001 1504-01 Drum SVH Side (Area : F-
1140)

1505-01: F-1150 BFW, Steam


SMIC - I 6014 S 1505-01-HT-001 1505-01 Drum SVH Side (Area : F-
1150)

1515-01: F-1250 BFW, Steam


SMIC - I 6014 S 1515-01-HT-001 1515-01 Drum SVH Side (Area : F-
1250)
SMIC - I 6013 S 1731-01-HT-001 1731-01 1731 DEBUTANIZER

1463-00:CM CONDENSATE
SMIC - I 6013 S 1463-00-HT-001 1463-00 (AREA:W2)

1623-03:PYGAS PUMP
SMIC - I 6012 S 1623-03-HT-001 1623-03 SYSTEM (AREA:H2,T3,,H3,H4)

1456-00-SLL STEAM
SMIC - I 6012 S 1456-00-HT-001 1456-00 (T1,T2,T3,T4,W3
,H1,H2,H3,H4

1463-00 :CM CONDENSATE


SMIC - I 6012 S 1463-00-HT-001 1463-00 (H2,H3,T1,T2,T3,T4)

1625-00 :DILITION STEAM


SMIC - I 6012 S 1625-00-HT-008 1625-00 GENERATION (AREA:H2,H3

1625-00 : Dilution Steam


SMIC - I 6014 S 1625-00-HT-005 1625-00 Generation
(Area : H3,)

SMIC - I 6014 W 1781-00-HT-001 1781-00 1781 - Slop Oil (Area:W2)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-010 1463-00 (Area :H2)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-002 1463-00 (Area :H2)
1514-01: F-1240 BFW, Steam
SMIC - I 6014 S 1514-01-HT-001 1514-01 Drum SVH Side (Area : F-
1240)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-003 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-002 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-001 1621-04 (Area :T3,H1,L1)

SMIC - I 6014 S 1623-03-HT-005 1623-03 1623-03:PYGAS Pump System


(Area :T3,W3)

1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-005 1466-00 (Area :W2 )

1466-00:CH Condensate
SMIC - I 6013 S 1466-00-HT-013 1466-00 (Area:W2)

1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-010 1466-00 (Area :W2 )

1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-012 1466-00 (Area:W2)

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-003 1463-00 (Area :W2)
SMIC - I 6014 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE
DRYOUT (AREA:C1,C3)

1646-00:Spent Caustic
SMIC - I 6014 W 1646-00-HT-019 1646-00 Incinerator 510 (Area : C1)

1646-00:Spent Caustic
SMIC - I 6014 W 1646-00-HT-005 1646-00 Incinerator 510 (Area : C1)

1621-01 : Oil Quench Tower


SMIC - I 6013 S 1621-01-HT-040 1621-01 & QO system (Area :H1)

1463-00 :CM CONDENSATE


SMIC - I 6013 S 1463-00-HT-001 1463-00 (H2,H3,T1,T2,T3,T4)

1623-03:PYGAS PUMP
SMIC - I 6013 S 1623-03-HT-001 1623-03 SYSTEM (AREA:H2,T3,,H3,H4)

SMIC - I 6014 S 1654-00-HT-001 1654-00 1654-00:FUEL GAS FURNACE


DRYOUT (AREA:C1)

1462-C42 Condensate
SMIC - I 6014 S 1462-00-HT-001 1462-00 (Area:T2,T3)

1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-013 1466-00 (Area:W2)

SMIC - I 6014 S 1623-03-HT-005 1623-03 1623-03:PYGAS Pump System


(Area :H1)
1466-00:CH Condensate
SMIC - I 6014 S 1466-00-HT-005 1466-00 (Area :W2 )

1463-00:CM Condensate
SMIC - I 6014 S 1463-00-HT-003 1463-00 (Area :W2)

1626-00 : Dilution Stream


SMIC - I 6014 S 1626-00-HT-001 1626-00 Concentrator (Area : T3,H2)

1654-00 Fuel Gas Furnace


SMIC - I 6014 W 1654-00-HT-001 1654-00 Dryout
(Area :T2,T3)

1623-03 : PYGAS Pump


SMIC - I 6014 W 1623-03-HT-003 1623-03 System (Area : W3)

SMIC - I 6014 W 1623-03-HT-002 1623-03 1623-03:PYGAS Pump System


(Area :W3 )

1625-00 : Dilution Steam


SMIC - I 6014 S 1625-00-HT-002 1625-00 Generation
(Area :H2,)

1626-00 : DILUTION STEAM


SMIC - I 6012 S 1626-00-HT-018 1626-00 CONCERNTRATOR (AREA:H2)

1626-00 : DILUTION STEAM


SMIC - I 6012 S 1626-00-HT-003 1626-00 CONCERNTRATOR
(AREA:H2,H3,T3,T4)

SMIC - I 6012 S 1461-00-HT-001 1461-00 1461-00 : CVH CONDENSATE


(AREA:T1,T2,T3)
1451-00 : SVH STEAM
SMIC - I 6012 S 1451-00-HT-001 1451-00 (AREA:T2,T3)

1616-00 : FURNACE GAS


SMIC - I 6012 S 1616-00-HT-015 1616-00 FEED PREP (AREA:H4)

1627-00 :STEAM OUT QCD


SMIC - I 6012 S 1627-00-HT-007 1627-00 (AREA: W2)

1761-00 : PAD WATER


SMIC - I 6012 S 1761-00-HT-006 1761-00 TREATMENT (Area : W2)

1456-00-SLL STEAM
SMIC - I 6013 S 1456-00-HT-001 1456-00 (T1,T2,T3,T4,W3,H1,H2,H3,H
4

1621-01:OIL QUENCH
SMIC - I 6014 S 1621-01-HT-020 1621-01 TOWER &QO SYSTEM
(AREA:H1,H2)

1623-01 : WATER QUENCH


SMIC - I 6013 S 1623-01-HT-012 1623-01 SYSTEM (Area : W3)

1621-01: OIL QUENCH


SMIC - I 6014 S 1621-01-HT-021 1621-01 TOWER & QO SYSTEM (Area :
H4)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-021 1621-01 TOWER & QO SYSTEM (Area :
H4)

SMIC - I 6014 W 1625-00-HT-001 1625-00 1625-00: Dilution Steam


Generation (Area :T3)
1625-00 :DILITION STEAM
SMIC - I 6013 S 1625-00-HT-008 1625-00 GENERATION (AREA:H2,H3

1624-01-PROCESS
SMIC - I 6013 S 1624-01-HT-003 1624-01 CONDENSATE SYSTEM
(AREA:H2,T3,W2)

SMIC - I 6013 S 1621-04-HT-001 RT1 1621-04 1621-04 LQO CYCLONE

1626-00 : DILUTION STEAM


SMIC - I 6013 S 1626-00-HT-018 1626-00 CONCERNTRATOR (AREA:H2)

1626-00 : DILUTION STEAM


SMIC - I 6013 S 1626-00-HT-003 1626-00 CONCERNTRATOR
(AREA:H2,H3,T3,T4)

SMIC - I 6013 S 1461-00-HT-001 1461-00 1461-00 : CVH CONDENSATE


(AREA:T1,T2,T3)

SMIC - I 6012 S 1461-00-HT-001 1461-00 1461-00 :(AREA:W2)


CVH CONDENSATE

1623-01 : WATER QUENCH


SMIC - I 6014 W
SYSTEM (Area : W3)

1624-01-PROCESS
SMIC - I 6014 S 1624-01-HT-003 1624-01 CONDENSATE SYSTEM
(AREA:H2)

1624-01-PROCESS
CONDENSATE SYSTEM
SMIC - I 6013 S 1624-01-HT-024 RT2 1624-01 (AREA:H2)
1617-00:Furnace Liquid Feed
Prep
SMIC - I 6013 S 1617-00-HT-003 1617-00 (Area:H4,)

1466-00- CH CONDENSATE
(AREA:H2,H4,T2,T3,T4
SMIC - I 6012 S 1466-00-HT-003 1466-00

1541-00: EYE BATH &SAFETY


SHOWERS
SMIC - I 6012 S 1541-00-HT-001 1541-00 (AREA:D1,H1,H2,H3,H4,T1,T2
,T3,T4,W3)

1541-00: EYE BATH &SAFETY


SHOWERS
SMIC - I 6012 S 1541-00-HT-002 1541-00 (AREA:D1,H1,H2,H3,H4,T1,T2
,T3,T4,W3)

1625-00:DILUTION STEAM
GENERATION (AREA:H3,)
SMIC - I 6012 S 1625-00-HT-043 1625-00

1624-01-PROCESS
CONDENSATE SYSTEM
SMIC - I 6014 S 1621-01-HT-001 1621-01 (AREA:H1,)

1621-01: OIL QUENCH


TOWER & QO SYSTEM (Area :
SMIC - I 6014 W 1621-01-HT-021 1621-01 H4)

1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)
SMIC - I 6014 S 1513-01-HT-001 1513-01

1621-01 : Oil Quench Tower


& QO system (Area :H1)
SMIC - I 6014 S 1621-01-HT-040 1621-01

1624-01-PROCESS
CONDENSATE SYSTEM
SMIC - I 6014 S 1624-01-HT-003 1624-01 (AREA:W2)
1617-00:Furnace Liquid Feed
SMIC - I 6014 S 1617-00-HT-003 1617-00 Prep
(Area:H4,)

1625-00 :DILITION STEAM


SMIC - I 6014 S 1625-00-HT-008 1625-00 GENERATION (AREA:H2)

1627-00:Steam Out
QCD(Area W2)
SMIC - I 6013 S 1627-00-HT-003 1627-00

1645-00: Spent Caustic


Treatment Common
SMIC - I 6013 S 1645-00-HT-003 1645-00 (Area :C1,C2,C3,)

1456-00-SLL STEAM
(T1,T2,T3,T4,W3,H1,H2,H3,H
SMIC - I 6013 S 1456-00-HT-001 1456-00 4

1626-00 : DILUTION STEAM


CONCERNTRATOR (AREA:H2)
SMIC - I 6013 S 1626-00-HT-018 1626-00

1625-00 :DILITION STEAM


GENERATION (AREA:H2,H3
SMIC - I 6013 S 1625-00-HT-008 1625-00

1463-00 :CM CONDENSATE


(H2,H3,T1,T2,T3,T4)
SMIC - I 6013 S 1463-00-HT-001 1463-00

1626-00 : DILUTION STEAM


CONCERNTRATOR
SMIC - I 6013 S 1626-00-HT-003 1626-00 (AREA:H2,H3,T3,T4)

1625-00:DILUTION STEAM
GENERATION (AREA:H3,)
SMIC - I 6013 S 1625-00-HT-043 1625-00
1616-00 : FURNACE GAS
FEED PREP (AREA:H4)
SMIC - I 6013 S 1616-00-HT-015 RT1 1616-00

1541-00- EYE BATH &SAFETY


SHOWERS(AREA:C1,C2,C3,C4
SMIC - I 6012 S 1541-00-HT-001 1541-00 W1,W2,)

1451-00 : SVH STEAM


(AREA:T2,T3)
SMIC - I 6013 S 1451-00-HT-001 1451-00

1463-00:CM Condensate
(Area :W2)
SMIC - I 6014 W 1463-00-HT-005 1463-00

1625-00 :DILITION STEAM


GENERATION (AREA:H3 )
SMIC - I 6014 S 1625-00-HT-08 1625-00

1466-00- CH CONDENSATE
(AREA:H2,H4,T2,T3,T4)
SMIC - I 6012 S 1466-00-HT-003 1466-00

1466-00- CH CONDENSATE
(AREA:W2)
SMIC - I 6012 S 1466-00-HT-003 1466-00

1621-02:HFO SEPARATOR
(AREA:H1,T3,)
SMIC - I 6012 S 1621-02-HT-001 1621-02

1623-01 : WATER QUENCH


SYSTEM (AREA:T3,W3)
SMIC - I 6012 S 1623-01-HT-011 1623-01

1456-00:SLL STEAM
(AREA:W2,C1,C2,C3,C4
SMIC - I 6012 S 1456-00-HT-001 1456-00
1626-00 : DILUTION STEAM
CONCERNTRATOR (AREA:H3)
SMIC - I 6014 S 1626-00-HT-003 1626-00

1625-00 :DILITION STEAM


GENERATION (AREA:H2,H3 )
SMIC - I 6014 S 1625-00-HT-008 1625-00

1466-00- CH CONDENSATE
(AREA:H2,H4,T2,T3,T4)
SMIC - I 6013 S 1466-00-HT-003 1466-00

1456-00:SLL STEAM
(AREA:W2,C1,C2,C3,C4
SMIC - I 6013 S 1456-00-HT-001 1456-00

1456-00-SLL STEAM
(AREA:H3)
SMIC - I 6014 S 1456-00-HT-001 1456-00

1625-00 :DILITION STEAM


GENERATION (AREA:H3)
SMIC - I 6014 S 1625-00-HT-008 1625-00

1456-00-SLL STEAM
(AREA:H3)
SMIC - I 6014 S 1456-00-HT-001 1456-00

1621-03 LFO STRIPPER


(AREA:H2)
SMIC - I 6013 S 1621-03-HT-008 1621-03

1466-00:CH CONDENSATE
(AREA:H1,H2,W3,)
SMIC - I 6012 S 1466-00-HT-001 1466-00

1627-00:STEAM OUT
(AREA:H1,H2,H3,H4,W3
SMIC - I 6012 S 1627-00-HT-002 1627-00
1463-00:CM Condensate
(Area :W2)
SMIC - I 6014 S 1463-00-HT-002 1463-00

1466-00- CH CONDENSATE
(AREA:T4)
SMIC - I 6014 S 1466-00-HT-003 1466-00

1624-01-PROCESS
CONDENSATE SYSTEM
SMIC - I 6014 S 1624-01-HT-003 1624-01 (AREA:H2)

1463-00 :CM CONDENSATE


(T1,T2,T3,T4,H2)
SMIC - I 6014 S 1463-00-HT-001 1463-00

1451-00 : SVH STEAM


SMIC - I 6014 S 1451-00-HT-001 1451-00 (AREA:T2)

1461-00 : CVH CONDENSATE


(AREA:T1,T3)
SMIC - I 6014 S 1461-00-HT-001 1461-00

1623-02
PYGAS IMPORT (AREA:H1)
SMIC - I 6014 S 1623-02-HT-001 1623-02

1623-03:PYGAS PUMP
SYSTEM (AREA:H1)
SMIC - I 6014 S 1623-03-HT-001 1623-03

1625-00 :DILITION STEAM


GENERATION (AREA:H2,H3)
SMIC - I 6014 S 1625-00-HT-008 1625-00

1621-03 LFO STRIPPER


SMIC - I 6014 w 1621-03-HT-008 1621-03 (AREA:H2)
1463-00:CM CONDENSATE
SMIC - I 6014 S 1463-00-HT-001 1463-00 (AREA:W2)

1541-00: EYE BATH &SAFETY


SHOWERS
SMIC - I 6016 S 1541-00-HT-001 1541-00 (AREA:D1,H1,H2,H3,H4,T1,T2
,T3,T4,W3)

1541-00- EYE BATH &SAFETY


SMIC - I 6016 S 1541-00-HT-001 1541-00 SHOWERS(AREA:C1,C2,C3,C4
W1,W2,)

1541-00: EYE BATH &SAFETY


SHOWERS
SMIC - I 6016 S 1541-00-HT-002 1541-00 (AREA:D1,H1,H2,H3,H4,T1,T2
,T3,T4,W3)

1621-02:HFO SEPARATOR
SMIC - I 6013 S 1621-02-HT-001 1621-02 (AREA:H1,T3,)

1624-01-PROCESS
SMIC - I 6013 S 1621-01-HT-001 1621-01 CONDENSATE SYSTEM
(AREA:H1,T2)

1624-01-PROCESS
SMIC - I 6013 S 1624-01-HT-023 RT1 1624-01 CONDENSATE SYSTEM
(AREA:H2)

1625-00:DILUTION STEAM
SMIC - I 6013 S 1625-00-HT-043 1625-00 GENERATION (AREA:H3,)

1466-00- CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-003 1466-00 (AREA:H2,H4,T2,T3,T4)

1466-00- CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-003 1466-00 (AREA:W2)
SMIC - I 6013 S 1461-00-HT-001 1461-00 1461-00 :(AREA:W2)
CVH CONDENSATE

1627-00 :STEAM OUT QCD


SMIC - I 6013 S 1627-00-HT-007 1627-00 (AREA: W2)

1466-00: CH CONDENSATE
SMIC - I 6012 S 1466-00-HT-004 1466-00 (AREA:T1,W2,)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-047 1646-00 INCINERATOR 510 (AREA:C1,)

1623-01:WATER QUENCH
SMIC - I 6015 S 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (T1,T2,T3,T4,W3,H1,H2,H3,H
4,W2,C1,C2,C3,C4

1625-00 :DILITION STEAM


SMIC - I 6014 S 1625-00-HT-008 1625-00 GENERATION (AREA:H2,)

1621-01 : OIL QUENCH


SMIC - I 6012 s 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H1,H2,H4,T3,T4)

1541-00:EYE BATH &SAFETY


SMIC - I 6015 s 1541-00-HT-002 1541-00 SHOWERS
(AREA:C1,C2,C3,C4,W1,W2,

1622-00:FLUX OIL
SMIC - I 6012 s 1622-00-HT-001 1622-00 (AREA:H1,T3,T4)
SMIC - I 6014 S 1453-00-HT-001 1453-00 1453-00:SM Steam (Area :T1)

1463-00 :CM CONDENSATE


SMIC - I 6014 S 1463-00-HT-001 1463-00 (AREA : T1,T2)

1462-C42 Condensate
SMIC - I 6014 S 1462-00-HT-001 1462-00 (Area:T1)

1731 DEBUTANIZER
SMIC - I 6014 W 1731-01-HT-001 1731-01 (AREA:T3)

1466-00: CH CONDENSATE
SMIC - I 6012 S 1466-00-HT-001 1466-00 (AREA:C1,C2,C3,W2,)

1647-00:Spent Caustic
SMIC - I 6013 S 1646-00-HT-031 1646-00 Incinerator 510 (Area : C1)

1466-00: CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-004 1466-00 (AREA:T1,W2,)

1623-01 : WATER QUENCH


SMIC - I 6013 S 1623-01-HT-011 1623-01 SYSTEM (AREA:T3,W3)

1625-00 :DILITION STEAM


SMIC - I 6014 S 1625-00-HT-008 1625-00 GENERATION (AREA:H3)

1616-00 : FURNACE GAS


SMIC - I 6014 W 1616-00-HT-015 RT1 1616-00 FEED PREP (AREA:H4)
1625-00:DILUTION STEAM
SMIC - I 6014 S 1625-00-HT-043 1625-00 GENERATION (AREA:H3,)

1451-00 : SVH STEAM


SMIC - I 6014 S 1451-00-HT-001 1451-00 (AREA:T3)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-047 1646-00 INCINERATOR 510 (AREA:C1,)

1623-01:WATER QUENCH
SMIC - I 6016 S 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

1621-01 : OIL QUENCH


SMIC - I 6013 s 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H1,H2,H4,T3,T4)

1541-00:EYE BATH &SAFETY


SMIC - I 6016 s 1541-00-HT-002 1541-00 SHOWERS
(AREA:C1,C2,C3,C4,W1,W2,

1622-00:FLUX OIL
SMIC - I 6013 s 1622-00-HT-001 1622-00 (AREA:H1,T3,T4)

1466-00:CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-001 1466-00 (AREA:H1,H2,W3,H3,H4,T1,T
2,T3,T4)

1466-00: CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-001 1466-00 (AREA:C1,C2,C3,W2)

1466-00- CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-003 1466-00 (AREA:T2)
1626-00 : Dilution Stream
SMIC - I 6014 W 1626-00-HT-007 1626-00 Concentrator (Area :H2,H3)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00- EYE BATH &SAFETY


SHOWERS(AREA: C3)

1761-Pad Water Treatment


SMIC - I 6014 W 1761-00-HT-008 1761-00 (Area:W2)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:T1)

1541-00:EYE BATH &SAFETY


SMIC - I 6018 S 1541-00-HT-002 1541-00 SHOWERS (AREA:C1,C3)

1627-00:STEAM OUT
SMIC - I 6013 S 1627-00-HT-002 1627-00 (AREA:H1,H2,H3,H4,W3

SMIC - I 6014 W 1624-02-HT-001 1624-02 1624-02:Process Condensate


Holding Tank (Area :T2,W3)

1463-00:CM Condensate
SMIC - I 6014 W 1463-00-HT-006 1463-00 (Area :W2)

1625-00:DILUTION STEAM
SMIC - I 6014 S 1625-00-HT-043 1625-00 GENERATION (AREA:H3,)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00- EYE BATH &SAFETY


SHOWERS(AREA:C2,W1,)
SMIC - I 6018 S 1541-00-HT-002 1541-00 1541-00- EYE BATH &SAFETY
SHOWERS(AREA:C2)

1626-00 : DILUTION STEAM


SMIC - I 6014 S 1626-00-HT-003 1626-00 CONCERNTRATOR (AREA:H2)

1627-00: STEAM OUT QCD


SMIC - I 6012 S 1627-00-HT-002 1627-00 (AREA:W2,)

1622-00:FLUX OIL
SMIC - I 6012 S 1622-00-HT-002 1622-00 (AREA:H1,L1,T3,T4,)

1623-01:WATER QUENCH
SMIC - I 6012 S 1623-01-HT-015 1623-01 SYSTEM (W3,W5)

1623-01:WATER QUENCH
SMIC - I 6012 S 1623-01-HT-019 1623-01 SYSTEM (H2,W3)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-005 1647-00 INCINERATOR 540 (Area :C1,)

1465-00:CVA CONDENSATE
SMIC - I 6012 S 1465-00-HT-001 1465-00 (AREA:C1,)

SMIC - I 6014 S 1531-03-HT-002 1531-03 1531-03 : BFM :(Area : H3,)

1621-01:OIL QUENCH
SMIC - I 6014 S 1621-01-HT-020 1621-01 TOWER &QO SYSTEM
(AREA:H4)
1625-00:DILUTION STEAM
SMIC - I 6012 S 1625-00-HT-005 1625-00 GENERATION
(AREAT3,T4,H2,:H3,)

1466-00: CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:C1,C2,C3,)

1541-00:EYE BATH &SAFETY


SMIC - I 6018 S 1541-00-HT-002 1541-00 SHOWERS (AREA:C1,C2,)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00- EYE BATH &SAFETY


SHOWERS(AREA:C2)

1466-00- CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-003 1466-00 (AREA:T3)

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-014 1621-01 TOWER &QO SYSTEM
(AREA:H1,

1627-00: STEAM OUT QCD


SMIC - I 6013 S 1627-00-HT-002 1627-00 (AREA:W2,)

1622-00:FLUX OIL
SMIC - I 6013 S 1622-00-HT-002 1622-00 (AREA:H1,L1,T3,T4,)

1623-01:WATER QUENCH
SMIC - I 6013 S 1623-01-HT-015 1623-01 SYSTEM (W3,W5)

1623-01:WATER QUENCH
SMIC - I 6013 S 1623-01-HT-019 1623-01 SYSTEM (H2,W3)
1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-005 1647-00 INCINERATOR 540 (Area :C1,)

1465-00:CVA CONDENSATE
SMIC - I 6013 S 1465-00-HT-001 1465-00 (AREA:C1,)

1625-00:DILUTION STEAM
SMIC - I 6013 S 1625-00-HT-005 1625-00 GENERATION
(AREAT3,T4,H2,:H3,)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-014 1621-01 TOWER &QO SYSTEM
(AREA:H1,

1626-00 :CH
SMIC - I 6013 S 1466-00-HT-011 1466-00 Condensate(Area :W2)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-029 1621-01 TOWER & QO SYSTEM (Area :
H1)

1626-00 : Dilution Stream


SMIC - I 6013 S 1626-00-HT-020 1626-00 Concentrator (Area : H2)

1634-00: LP Drips Stripper


SMIC - I 6013 S 1634-00-HT-006 1634-00 (Area : H2)

1646-00 : Spent Caustic


SMIC - I 6013 S 1646-00-HT-064 1646-00 Incinerator 510 (Area : C1)

1647-00 : SPENT CAUSTIC


SMIC - I 6013 S 1647-00-HT-021 1647-00 INCINERATOR 540 (Area : C1)
1647-00:Spent Caustic
SMIC - I 6013 S 1647-00-HT-042 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6013 S 1647-00-HT-062 1647-00 Incinerator 540 (Area : C1)

1463-00:LP Vent ISBL Flare


SMIC - I 6013 S 1741-00-HT-001 1741-00 (Area :C4)

1463-00:LP Vent ISBL Flare


SMIC - I 6013 S 1741-00-HT-002 1741-00 (Area :C4)

1761-00 : PAD WATER


SMIC - I 6013 S 1761-00-HT-006 1761-00 TREATMENT (Area : W2)

SMIC - I 6014 S 1466-00: CH CONDENSATE


(AREA:C1,C2,C3,W2,)

1621-01 : OIL QUENCH


SMIC - I 6013 S 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H1,H2,H4,T3,T4)

1622-00:FLUX OIL
SMIC - I 6013 S 1622-00-HT-001 1622-00 (AREA:H1,T3,T4)

1623-01:WATER QUENCH
SMIC - I 6016 S 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

1623-01 : WATER QUENCH


SMIC - I 6014 S 1623-01-HT-011 1623-01 SYSTEM (AREA:W3)
1627-00:Steam out QCD
SMIC - I 6012 S 1627-00-HT-005 1627-00 (Area : W2)

1466-00:CH CONDENSATE
SMIC - I 6012 S 1466-00-HT-001 1466-00 (AREA:W2)

SMIC - I 6012 S 1627-00-HT-008 1627-00 1627-00:STEAM OUT QCD

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-044 1646-00 INCINERATOR 510 (AREA:C1,)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-060 1646-00 INCINERATOR 510 (AREA:C1,)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-031 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-059 1647-00 INCINERATOR 540 (AREA:C1)

1466-00: CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:C1,C2,C3,W2,)

1471-00:Furnace Blowdown
SMIC - I 6014 S 1471-00-HT-002 1471-00 (Area : W3)

1625-00:DILUTION STEAM
SMIC - I 6014 S 1625-00-HT-005 1625-00 GENERATION (AREAT3,T4,H2)
1622-00:FLUX OIL
SMIC - I 6014 S 1622-00-HT-001 1622-00 (AREA:T3,T4)

1621-01: OIL QUENCH


SMIC - I 6012 S 1621-01-HT-002 1621-01 TOWER &QO SYSTEM
(AREA:H1)

SMIC - I 6013 S 1624-02-HT-003 1624-02 1624-02: (Area :W3)

1624-01-PROCESS
SMIC - I 6014 S 1621-01-HT-001 1621-01 CONDENSATE SYSTEM
(AREA:H1,T2)

1623-01:WATER QUENCH
SMIC - I 6018 S 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

1451-00 : SVH STEAM


SMIC - I 6014 S 1451-00-HT-001 1451-00 (AREA:T2)

1627-00:Steam out QCD


SMIC - I 6013 S 1627-00-HT-005 1627-00 (Area : W2)

1466-00:CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-001 1466-00 (AREA:W2,V5)

SMIC - I 6013 S 1627-00-HT-008 1627-00 1627-00:STEAM OUT QCD

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-044 1646-00 INCINERATOR 510 (AREA:C1,)
1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-060 1646-00 INCINERATOR 510 (AREA:C1,)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-031 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-059 1647-00 INCINERATOR 540 (AREA:C1)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-002 1621-01 TOWER &QO SYSTEM
(AREA:H1)

SMIC - I 6014 S 1622-00-HT-001 1622-00 1622-00:FLUX OIL (AREA:T4)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (AREA:C2,W2,T2,H2,H3,T4)

SMIC - I 6014 S 1461-00-HT-001 1461-00 1461-00 : (AREA:T2)


CVH CONDENSATE

1455-00 :SL STEAM


SMIC - I 6014 S 1455-00-HT-001 1455-00 (Area : T2)

1466-00: CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-004 1466-00 (AREA:W2)

1621-02:HFO SEPARATOR
SMIC - I 6014 S 1621-02-HT-001 1621-02 (AREA:H1)
1645-00 : Dilution Steam
SMIC - I 6014 W 1645-00-HT-007 1645-00 Treatment Common (Area
:C2)

1645-00:Spent Caustic
SMIC - I 6014 W 1645-0-HT-006 1645-00 Treatment Common (Area
:C2)

1647-00 : Spent Caustic


SMIC - I 6014 W 1647-00-HT-023 1647-00 Incinerator 540 (Area : C1)

1647-00 : Spent Caustic


SMIC - I 6014 W 1647-00-HT-024 1647-00 Incinerator 540 (Area : C1)

1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-010 1466-00 (Area :W2 )

SMIC - I 6014 W 1423-00 : CoolingWater


Chem Additives (Area :V6)

1626-00 : DILUTION STEAM


SMIC - I 6014 S 1626-00-HT-018 1626-00 CONCERNTRATOR (AREA:H2)

1622-00:FLUX OIL
SMIC - I 6014 S 1622-00-HT-002 1622-00 (AREA:T3,T4,)

1626-00 : DILUTION STEAM


SMIC - I 6014 S 1626-00-HT-003 1626-00 CONCERNTRATOR
(AREA:H2,T3,T4)

1621-01 : OIL QUENCH


SMIC - I 6014 S 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H4,T4)
1453-00:SM Steam
SMIC - I 6014 S 1453-00-HT-001 1453-00 (Area :T2)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-020 1647-00 INCINERATOR 540 (AREA:C1)

1404-00 :Decoke Air (Area :


SMIC - I 6014 W 1404-00-HT-001 1404-00 H4)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:H3,H4)

1627-00 :STEAM OUT QCD


SMIC - I 6014 S 1627-00-HT-007 1627-00 (AREA: W2)

1623-00:Water Quench
SMIC - I 6014 S 1623-01-HT-013 1623-01 System (Area :W3)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-020 1647-00 INCINERATOR 540 (AREA:C1)

1646-00: SPENT CAUSTIC


SMIC - I 6012 S 1646-00-HT-004 1646-00 INCINERATOR 510 (AREA:C1)

SMIC - I 6012 S 1654-00-HT-005 1654-00 1654-00:FUEL GAS FURNACE


DRYPUT (AREA:C1)

SMIC - I 6012 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)
SMIC - I 6012 S 1616-00-HT-001 1616-00 1616-00:FURNACE GAS FEED
PREP (AREA:H4,W3)

1623-01: WATER QUENCH


SMIC - I 6012 S 1623-01-HT-006 1623-01 SYSTEM(AREA:H2,T3,

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-060 1646-00 INCINERATOR 510 (AREA:C1,)

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-044 1646-00 INCINERATOR 510 (AREA:C1,)

1621-01 : Oil Quench Tower


SMIC - I 6014 S 1621-01-HT-023 1621-01 & QO system (Area : H2)

SMIC - I 6014 S 1621-01-HT-007 1621-01 1621-01 : Oil quench tower&


QO system (Area : H1)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00- EYE BATH &SAFETY


SHOWERS(AREA:C1,C2,W2)

1541-00:EYE BATH &SAFETY


SMIC - I 6018 S 1541-00-HT-002 1541-00 SHOWERS
(AREA:C1,C2,W1,W2)

1646-00-SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-008 1646-00 INCINERATOR 510 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-059 1647-00 INCINERATOR 540 (AREA:C1)
1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-031 1647-00 INCINERATOR 540 (AREA:C1)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:H3)

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-024 1621-01 TOWER &QO SYSTEM (H1)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-011 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-003 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-002 1621-03 (AREA:H1,H2,T3,)

1621-03-:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-012 1621-03 (AREA:H2)

1645-00:SPENT CAUSTIC
SMIC - I 6012 S 1645-00-HT-004 1645-00 TREATMENT COMMON
(AREA:C2,)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-024 1646-00 INCINERATOR 510(AREA:C1)

1646-00: SPENT CAUSTIC


SMIC - I 6013 S 1646-00-HT-004 1646-00 INCINERATOR 510 (AREA:C1)
SMIC - I 6013 S 1654-00-HT-005 1654-00 1654-00:FUEL GAS FURNACE
DRYPUT (AREA:C1)

SMIC - I 6013 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

SMIC - I 6013 S 1616-00-HT-001 1616-00 1616-00:FURNACE GAS FEED


PREP (AREA:H4,W3)

1623-01: WATER QUENCH


SMIC - I 6013 S 1623-01-HT-006 1623-01 SYSTEM (AREA:H2,T3,

1646-00-SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-008 1646-00 INCINERATOR 510 (AREA:C1)

1627-00:Steam out QCD


SMIC - I 6012 S 1627-00-HT-005 1627-00 (Area : W2)

SMIC - I 6012 S 1513-01-HT-001 RT1 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1505-01: F-1150 BFW, Steam


SMIC - I 6012 S 1505-01-HT-001 RT1 1505-01 drum &SVH Side
(Area : F-1150)

SMIC - I 6012 S 1504-01-HT-001 RT1 1504-01 1504-01: F-1140 BFW, Steam


Dru SVH Side (AREA:1140)

1623-02 : PYGAS Import


SMIC - I 6014 W 1623-02-HT-002 1623-02 (Area : H1, T3, T4)
SMIC - I 6014 S 1622-00-HT-001 1622-00 1622-00:FLUX OIL (AREA:T4)

1623-01: WATER QUENCH


SMIC - I 6014 S 1623-01-HT-006 1623-01 SYSTEM(AREA:T3)

1463-00: Pad water


SMIC - I 6014 W treatment (Area : W2)

1456-00:SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (AREA:C3,C4,H3)

1463-00 :CM CONDENSATE


SMIC - I 6014 S 1463-00-HT-001 1463-00 (AREA:T2,T3)

1463-00:CM Condensate
SMIC - I 6014 W 1463-00-HT-010 1463-00 (Area :H2)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-001 1621-04 (Area :T3,H1)

1627-00:Steam out QCD


SMIC - I 6013 S 1627-00-HT-005 1627-00 (Area : W2)

SMIC - I 6013 S 1513-01-HT-001 RT1 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1505-01: F-1150 BFW, Steam


SMIC - I 6013 S 1505-01-HT-001 RT1 1505-01 drum &SVH Side (Area : F-
1150)
SMIC - I 6013 S 1504-01-HT-001 RT1 1504-01 1504-01: F-1140 BFW, Steam
Dru SVH Side (AREA:1140)

1621-01: OIL QUENCH


SMIC - I 6014 S TOWER &QO SYSTEM
(AREA:H1)

1621-01 : Oil Quench Tower


SMIC - I 6014 W 1621-01-HT-028 & QO system (Area :H1, H2)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-024 1621-01 TOWER &QO SYSTEM (H1)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-002 1621-03 (AREA:H1,H2,T3,)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-003 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-011 1621-03 (AREA:H2)

1621-03-:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-012 1621-03 (AREA:H2)

1645-00:SPENT CAUSTIC
SMIC - I 6013 S 1645-00-HT-004 1645-00 TREATMENT COMMON
(AREA:C2,)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-024 1646-00 INCINERATOR 510(AREA:C1)
1621-01: OIL QUENCH
SMIC - I 6014 S 1621-01-HT-002 1621-01 TOWER &QO SYSTEM
(AREA:H1)

1621-01 : Oil Quench Tower


SMIC - I 6014 W 1621-01-HT-028 1621-01 & QO system (Area :H1, H2)

SMIC - I 6014 S 1513-01-HT-001 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1455-00 :SL STEAM


SMIC - I 6014 S 1455-00-HT-001 1455-00 (Area : T1,)

1462-C42 Condensate
SMIC - I 6014 S 1462-00-HT-001 1462-00 (Area:W2)

1621-01 : OIL QUENCH


SMIC - I 6014 S 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H2,T3,)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-001 1466-00 (AREA:W2,H3,T2,T3,T4)

1541-00: EYE BATH &SAFETY


SMIC - I 6018 S 1541-00-HT-002 1541-00 SHOWERS
(AREA:T1,T2,T3,T4,C1,W3)

1541-00: EYE BATH &SAFETY


SMIC - I 6018 S 1541-00-HT-001 1541-00 SHOWERS
(AREA:C1,T1,T2,T3,T4,W3)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-010 1646-00 INCINERATOR 510 (AREA:C1,)
1645-00: Spent Caustic
SMIC - I 6012 S 1645-00-HT-108 1645-00 Treatment Common
(Area :C2,)

1503-01:F-1130 BFW STEAM


SMIC - I 6012 S 1503-01-HT-001 1503-01 DRUM &SVH SIDE
(AREA:1130)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-009 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-011 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-040 1647-00 INCINERATOR 540 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-010 1646-00 INCINERATOR 510 (AREA:C1,)

1645-00: Spent Caustic


SMIC - I 6013 S 1645-00-HT-108 1645-00 Treatment Common (Area
:C2,)

1503-01:F-1130 BFW STEAM


SMIC - I 6013 S 1503-01-HT-001 1503-01 DRUM &SVH SIDE
(AREA:1130)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-009 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-011 1647-00 INCINERATOR 540 (AREA:C1)
1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-040 1647-00 INCINERATOR 540 (AREA:C1)

1621-04 :LQO Cyclone


SMIC - I 6014 S 1621-04-HT-001 1621-04 (Area :H1)

1621-04 LQO CYCLONE


SMIC - I 6014 W 1621-04-HT-001 RT1 1621-04 (AREA:H1)

1621-04 :LQO Cyclone


SMIC - I 6014 W 1621-04-HT-002 1621-04 (Area :H1)

1621-04 :LQO Cyclone


SMIC - I 6014 W 1621-04-HT-003 1621-04 (Area :H1)

1466-00: CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-004 1466-00 (AREA:T1,W2,)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (AREA:C3,H3)

1621-02:HFO SEPARATOR
SMIC - I 6014 S 1621-02-HT-001 1621-02 (AREA:T3,)

1623-01:WATER QUENCH
SMIC - I 6014 S 1623-01-HT-019 1623-01 SYSTEM (H2,W3)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00: EYE BATH &SAFETY


SHOWERS (AREA:C4)
SMIC - I 6018 S 1541-00-HT-002 1541-00 1541-00: EYE BATH &SAFETY
SHOWERS (AREA:C4)

1621-01: OIL QUENCH


SMIC - I 6014 W 1621-01-HT-002 1621-01 TOWER &QO SYSTEM
(AREA:H1)

1647-00: Spent Caustic


SMIC - I 6012 S 1647-00-HT-003 1647-00 Incinerator 540 (Area : C1)

1616-00:Furnace Gas Feed


SMIC - I 6014 W 1616-00-HT-015 1616-00 Prep (Area : H4)

1625-00:DILUTION STEAM
SMIC - I 6014 S 1625-00-HT-043 1625-00 GENERATION (AREA:H3,)

1621-01 : OIL QUENCH


SMIC - I 6014 S 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H1,H2)

1627-00:STEAM OUT
SMIC - I 6014 S 1627-00-HT-002 1627-00 (AREA:H1,H2,)

1623-01:WATER QUENCH
SMIC - I 6018 S 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

SMIC - I 6014 S 1513-01-HT-001 RT1 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1514-01: F-1240 BFW, Steam


SMIC - I 6012 S 1514-01-HT-001 RT1 1514-01 Drum & SVH Side (Area : F-
1240)
1647-00: Spent Caustic
SMIC - I 6013 S 1647-00-HT-003 1647-00 Incinerator 540 (Area : C1)

1514-01: F-1240 BFW, Steam


SMIC - I 6013 S 1514-01-HT-001 RT1 1514-01 Drum & SVH Side (Area : F-
1240)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-059 1646-00 INCINERATOR 510 (AREA:C1,)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-045 1646-00 INCINERATOR 510 (AREA:C1,)

1466-00:CH Condensate
SMIC - I 6014 W (Area:W2)

1463-00:CM Condensate
SMIC - I 6014 W 1463-00-HT-002 1463-00 (Area :H2,T1,T2,T3,W2)

SMIC - I 6014 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

1623-01:WATER QUENCH
SMIC - I 6014 S 1623-01-HT-019 1623-01 SYSTEM (W3)

1505-01: F-1150 BFW, Steam


SMIC - I 6014 S 1505-01-HT-001 RT1 1505-01 drum &SVH Side (Area : F-
1150)

1456-00:SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (AREA:T3,H1,W3)
1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-010 1646-00 INCINERATOR 510 (AREA:C1,)

1645-00: Spent Caustic


SMIC - I 6013 S 1645-00-HT-108 1645-00 Treatment Common (Area
:C2,)

1503-01:F-1130 BFW STEAM


SMIC - I 6013 S 1503-01-HT-001 1503-01 DRUM &SVH SIDE
(AREA:1130)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-009 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-011 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-040 1647-00 INCINERATOR 540 (AREA:C1)

1646-00: SPENT CAUSTIC


SMIC - I 6013 S 1646-00-HT-004 1646-00 INCINERATOR 510 (AREA:C1)

SMIC - I 6013 S 1654-00-HT-005 1654-00 1654-00:FUEL GAS FURNACE


DRYPUT (AREA:C1)

SMIC - I 6013 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

SMIC - I 6013 S 1616-00-HT-001 1616-00 1616-00:FURNACE GAS FEED


PREP (AREA:H4,W3)
1623-01: WATER QUENCH
SMIC - I 6013 S 1623-01-HT-006 1623-01 SYSTEM(AREA:H2,T3,

1646-00-SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-008 1646-00 INCINERATOR 510 (AREA:C1)

1627-00:Steam out QCD


SMIC - I 6013 S 1627-00-HT-005 1627-00 (Area : W2)

SMIC - I 6013 S 1513-01-HT-001 RT1 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1505-01: F-1150 BFW, Steam


SMIC - I 6013 S 1505-01-HT-001 RT1 1505-01 drum &SVH Side (Area : F-
1150)

SMIC - I 6013 S 1504-01-HT-001 RT1 1504-01 1504-01: F-1140 BFW, Steam


Dru SVH Side (AREA:1140)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-024 1621-01 TOWER &QO SYSTEM (H1)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-002 1621-03 (AREA:H1,H2,T3,)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-003 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-011 1621-03 (AREA:H2)
1621-03-:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-012 1621-03 (AREA:H2)

1645-00:SPENT CAUSTIC
SMIC - I 6013 S 1645-00-HT-004 1645-00 TREATMENT COMMON
(AREA:C2,)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-024 1646-00 INCINERATOR 510(AREA:C1)

1621-02:HFO SEPARATOR
SMIC - I 6012 S 1621-02-HT-004 1621-02 (AREA:H2,T3,T4,)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-059 1646-00 INCINERATOR 510 (AREA:C1,)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-045 1646-00 INCINERATOR 510 (AREA:C1,)

1621-02:HFO SEPARATOR
SMIC - I 6013 S 1621-02-HT-004 1621-02 (AREA:H2,T3,T4,)

1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-039 1647-00 INCINERATOR 540 (C1)

1623-01:WATER QUENCH
SMIC - I 6012 S 1623-01-HT-007 1623-01 SYSTEM (AREA :H2,H4,W3)

1624-01 : Process
SMIC - I 6014 W 1624-01-HT-007 1624-01 Condensate System (Area
:W2)
1626-00 :CH
SMIC - I 6014 W 1466-00-HT-011 1466-00 Condensate(Area :W2)

1623-01:WATER QUENCH
SMIC - I 6014 W 1623-01-HT-015 1623-01 SYSTEM (W3,W5)

1623-00:Water Quench
SMIC - I 6014 W 1623-01-HT-013 1623-01 System (Area :W3)

SMIC - I 6018 S 1541-00-HT-002 1541-00 1541-00: EYE BATH &SAFETY


SHOWERS (AREA:D1,H3)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00: EYE BATH &SAFETY


SHOWERS (AREA:D1)

1531-03 : BFM (Area :


SMIC - I 6014 S 1531-03-HT-002 1531-03 H3,T3,T4)

1634-00: LP Drips Stripper


SMIC - I 6014 W 1634-00-HT-006 1634-00 (Area : H2)

1621-04 :LQO Cyclone


SMIC - I 6014 W 1621-04-HT-001 1621-04 (Area :T3,H1,L1)

SMIC - I 6014 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

SMIC - I 6014 W 1616-00-HT-001 1616-00 1616-00:FURNACE GAS FEED


PREP (AREA:H4,W3)
1621-01:OIL QUENCH
SMIC - I 6014 S 1621-01-HT-024 1621-01 TOWER &QO SYSTEM (H1)

1621-01:OIL QUENCH
SMIC - I 6014 S 1621-01-HT-014 1621-01 TOWER &QO SYSTEM
(AREA:H1,

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-043 1646-00 INCINERATOR 510 (AREA:C1,)

1621-03-:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-005 1621-03 (AREA:H2,T3,T4,)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-006 1621-03 (AREA:H2)

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-025 1621-01 TOWER & QO SYSTEM
(AREA:H2)

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-026 1621-01 TOWER & QO SYSTEM
(AREA:H2)

1626-00 : Dilution Stream


SMIC - I 6014 W 1626-00-HT-020 1626-00 Concentrator (Area : H2)

1626-00 : Dilution Stream


SMIC - I 6014 W 1626-00-HT-021 1626-00 Concentrator (Area : H2)

1626-00 : Dilution Stream


SMIC - I 6014 W 1626-00-HT-002 1626-00 Concerntrator (Area :H2,W2)
1505-01: F-1150 BFW, Steam
SMIC - I 6014 W drum &SVH Side (Area : F-
1150)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-039 1647-00 INCINERATOR 540 (C1)

1623-01:WATER QUENCH
SMIC - I 6013 S 1623-01-HT-007 1623-01 SYSTEM (AREA :H2,H4,W3)

SMIC - I 6012 S 1466-00-HT-002 1466-00 1466-00:CH CONDENSATE

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-043 1646-00 INCINERATOR 510 (AREA:C1,)

1621-03-:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-005 1621-03 (AREA:H2,T3,T4,)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-006 1621-03 (AREA:H2)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-025 1621-01 TOWER & QO SYSTEM
(AREA:H2)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-026 1621-01 TOWER & QO SYSTEM
(AREA:H2)

1466-00:CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-002 1466-00 (AREA:H1,H2,H3,H4,T2,T1,T3,
T4,W3,
1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-004 1647-00 INCINERATOR 540 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-003 1646-00 INCINERATOR 510 (AREA:C1,)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (H1,W3,H4,H2,H3)

1623-01:WATER QUENCH
SMIC - I 6018 W 1623-01-HT-010 1623-01 SYSTEM (AREA:W3,)

1623-01:WATER QUENCH
SMIC - I 6012 S 1623-01-HT-008 1623-01 SYSTEM
(AREA:H2,H4,T3,T4,W3)

1644-00:SPENT CAUSTIC
SMIC - I 6012 S 1644-00-HT-001 1644-00 TREATING STG (AREA:C1)

SMIC - I 6012 S 1515-01-HT-001 RT1 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1505-01: F-1150 BFW, Steam


SMIC - I 6014 S 1505-01-HT-001 RT1 1505-01 drum &SVH Side (Area : F-
1150)

SMIC - I 6014 S 1504-01-HT-001 RT1 1504-01 1504-01: F-1140 BFW, Steam


Dru SVH Side (AREA:1140)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-004 1647-00 INCINERATOR 540 (AREA:C1)
1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-003 1646-00 INCINERATOR 510 (AREA:C1,)

1623-01:WATER QUENCH
SMIC - I 6013 S 1623-01-HT-008 1623-01 SYSTEM
(AREA:H2,H4,T3,T4,W3)

1644-00:SPENT CAUSTIC
SMIC - I 6013 S 1644-00-HT-001 1644-00 TREATING STG (AREA:C1)

SMIC - I 6013 S 1515-01-HT-001 RT1 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

SMIC - I 6014 W 1654-00-HT-005 1654-00 1654-00:FUEL GAS FURNACE


DRYPUT (AREA:C1)

1623-00:Water Quench
SMIC - I 6014 W 1623-01-HT-014 1623-01 System (Area :W3)

SMIC - I 6014 S 1621-02:HFO SEPARATOR


(AREA:T3,T4,)

1645-00: Spent Caustic


SMIC - I 6014 W 1645-00-HT-108 1645-00 Treatment Common (Area
:C2,)

1466-00: CH CONDENSATE
SMIC - I 6014 W 1466-00-HT-004 1466-00 (AREA:T1,W2,)

1621-02:HFO SEPARATOR
SMIC - I 6014 W 1621-02-HT-001 1621-02 (AREA:H1,T3,)
1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-005 1466-00 (Area :W2 )

1645-00:SPENT CAUSTIC
SMIC - I 6014 W 1645-00-HT-004 1645-00 TREATMENT COMMON
(AREA:C2,)

SMIC - I 6014 1623-01:WATER QUENCH


SMIC - I 6018 S 1623-01-HT-019 1623-01 SYSTEM (W3)

1621-02:HFO SEPARATOR
SMIC - I 6014 S 1621-02-HT-004 1621-02 (AREA:T3,T4,)

SMIC - I 6014 S 1513-01-HT-001 RT1 1513-01 1513-01: F-1230 BFW, Steam


Dru SVH Side (Area : F-1230)

1621-01: OIL QUENCH


SMIC - I 6012 S 1621-01-HT-004 1621-01 TOWER & QO SYSTEM (Area :
T3)

1617-00:Furnace Liquid Feed


SMIC - I 6014 w 1617-00-HT-003 1617-00 Prep
(Area:H4,)

1627-00 :STEAM OUT QCD


SMIC - I 6014 w 1627-00-HT-007 1627-00 (AREA: W2)

1465-00 :CVA Condensate


SMIC - I 6014 w 1465-00-HT-003 1465-00 (Area :C1)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-002 1466-00 (AREA:T2,T1,T3,T4,)
SMIC - I 6012 S 1621-02-HT-008 1621-02 1621-02:HFO SEPARATOR

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-004 1647-00 INCINERATOR 540 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-003 1646-00 INCINERATOR 510 (AREA:C1,)

1623-01:WATER QUENCH
SMIC - I 6013 S 1623-01-HT-008 1623-01 SYSTEM
(AREA:H2,H4,T3,T4,W3)

1644-00:SPENT CAUSTIC
SMIC - I 6013 S 1644-00-HT-001 1644-00 TREATING STG (AREA:C1)

SMIC - I 6013 S 1515-01-HT-001 RT1 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-004 1621-01 TOWER & QO SYSTEM (Area :
T3)

SMIC - I 6012 S 1512-01-HT-001 1512-01 1512-01:F-1220 BFW STEAM


DRUM SVH SIDE

SMIC - I 6014 W 1617-00-HT-001 1617-00 1617-00:Furnace Liquid Feed


Prep :(Area T4, H4)

1634-00:L P Drips
SMIC - I 6014 W 1634-00-HT-012 1634-00 stripper(Area : H2)
1634-00:L P Drips Stripper
SMIC - I 6014 W 1634-00-HT-011 1634-00 (Area : H 2)

1621-01:OIL QUENCH
SMIC - I 6014 W 1621-01-HT-014 1621-01 TOWER &QO SYSTEM
(AREA:H1,

1634-00:L P Drips
SMIC - I 6014 W 1634-00-HT-005 1634-00 stripper(Area : H2)

1634-00:L P Drips
SMIC - I 6014 W 1634-00-HT-007 1634-00 stripper(Area : H2)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (H1,H2,H4,T2,T3,T4,W3,)

1514-01: F-1240 BFW, Steam


SMIC - I 6014 S 1514-01-HT-001 1514-01 Drum & SVH Side (Area : F-
1240)

1623-01:WATER QUENCH
SMIC - I 6014 S 1623-01-HT-007 1623-01 SYSTEM (AREA :H4)

1623-01:WATER QUENCH
SMIC - I 6014 S 1623-01-HT-008 1623-01 SYSTEM (AREA:H4)

SMIC - I 6014 S 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

SMIC - I 6018 S 1541-00-HT-001 1541-00 1541-00- EYE BATH &SAFETY


SHOWERS(AREA:D1,C1,T3)
1541-00: EYE BATH &SAFETY
SMIC - I 6018 S 1541-00-HT-002 1541-00 SHOWERS
(AREA:D1,C1,C2,T3))

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-018 1621-01 TOWER &QO SYSTEM
(AREA:H1,H3,T3,T4)

1621-02:HFO SEPARATOR-
SMIC - I 6013 S 1621-02-HT-008 1621-02 (AREA:H2,T3,T4)

SMIC - I 6013 S 1512-01-HT-001 1512-01 1512-01:F-1220 BFW STEAM


DRUM SVH SIDE

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-018 1621-01 TOWER &QO SYSTEM
(AREA:H1,H3,T3,T4)

1503-01:F-1130 BFW STEAM


SMIC - I 6014 S 1503-01-HT-001 1503-01 DRUM &SVH SIDE
(AREA:1130)

1623-01:WATER QUENCH
SMIC - I 6014 S 1623-01-HT-008 1623-01 SYSTEM (AREA:W3)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-002 1466-00 (AREA:T1,H2)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-026 1646-00 INCINERATOR 510 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6012 S 1646-00-HT-063 1646-00 INCINERATOR 510 (AREA:C1)
1647-00:SPENT CAUSTIC
SMIC - I 6012 S 1647-00-HT-014 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:Spent Caustic
SMIC - I 6014 w 1647-00-HT-010 1647-00 Incinerator 540 (Area : C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 w 1647-00-HT-040 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 w 1647-00-HT-011 1647-00 INCINERATOR 540 (AREA:C1)

1463-00:CM Condensate
SMIC - I 6014 w 1463-00-HT-004 1463-00 (Area :W2)

1466-00:CMCondensate
SMIC - I 6014 w 1463-00-HT-008 1463-00 (Area:W2)

SMIC - I 6014 w 1471-00-HT-004 1471-00 1471-00 :Furnace blowdown


(Area :W3)

SMIC - I 6014 w 1623-03-HT-005 1623-03 1623-03:PYGAS Pump System


(Area :H1,H2,T3,W3)

1621-01:OIL QUENCH
SMIC - I 6014 w 1621-01-HT-026 1621-01 TOWER & QO SYSTEM
(AREA:H1)

1621-01:OIL QUENCH
SMIC - I 6014 w 1621-01-HT-025 1621-01 TOWER & QO SYSTEM
(AREA:H2)
1511-01:F1210 BFW,STEAM
SMIC - I 6012 S 1511-01-HT-001 1511-01 DRUM & SVH SIDE
(AREA:1210)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-026 1646-00 INCINERATOR 510 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S INCINERATOR 510 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-014 1647-00 INCINERATOR 540 (AREA:C1)

1466-00:CH CONDENSATE
SMIC - I 6012 S 1466-00-HT-002 1466-00 (AREA:C1,C2,C3,C4 &W2),

SMIC - I 6014 S 1515-01-HT-001 RT1 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1511-01:F1210 BFW,STEAM
SMIC - I 6013 S 1511-01-HT-001 1511-01 DRUM & SVH SIDE
(AREA:1210)

1466-00:CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-002 1466-00 (AREA:C1,C2,C3,C4 &W2,V5),

1623-01 : WATER QUENCH


SMIC - I 6014 W 1623-01-HT-012 1623-01 SYSTEM (Area : W3)

1627-00:Steam out QCD


SMIC - I 6014 W 1627-00-HT-005 1627-00 (Area : W2)
1627-00:Steam Out
SMIC - I 6014 W 1627-00-HT-003 1627-00 QCD(Area W2)

1465-00:CVA CONDENSATE
SMIC - I 6014 W 1465-00-HT-001 1465-00 (AREA:C1,)

1645-00:Spent Caustic
SMIC - I 6014 W 1645-00-HT-131 1645-00 Treatment Common (Area
:C2)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-002 1466-00 (AREA:

1647-00: Spent Caustic


SMIC - I 6014 W 1647-00-HT-058 1647-00 Incinerator 540 (Area : C1)

1623-01:WATER QUENCH
SMIC - I 6014 W 1623-01-HT-019 1623-01 SYSTEM (H2,W3)

1471-00:FURNACE
SMIC - I 6012 S 1471-00-HT-001 1471-00 BLOWDOWN (AREA:D1A)

SMIC - I 6012 S 1501-01-HT-001 1501-01 1501-01:F-1110 BFW,STEAM


DRUM & SVH SIDE (F-1110)

1502-01:F-1120 BFW STEAM


SMIC - I 6012 S 1502-01-HT-001 1502-01 DRUM & SVH SIDE

1512-01:F-1220 BFW STEAM


SMIC - I 6014 S
DRUM SVH SIDE
1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-012 1466-00 (Area:W2)

1466-00:CH Condensate
SMIC - I 6014 W 1466-00-HT-013 1466-00 (Area:W2)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-002 1466-00 (AREA:H3,H4,W2,C2)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-026 1646-00 INCINERATOR 510 (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6013 S 1646-00-HT-063 1646-00 INCINERATOR 510 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6013 S 1647-00-HT-014 1647-00 INCINERATOR 540 (AREA:C1)

1511-01:F1210 BFW,STEAM
SMIC - I 6013 S 1511-01-HT-001 1511-01 DRUM & SVH SIDE
(AREA:1210)

1466-00:CH CONDENSATE
SMIC - I 6013 S 1466-00-HT-002 1466-00 (AREA:C1,C2,C3,C4 &W2,V5),

1471-00:FURNACE
SMIC - I 6013 S 1471-00-HT-001 1471-00 BLOWDOWN (AREA:D1A)

SMIC - I 6013 S 1501-01-HT-001 1501-01 1501-01:F-1110 BFW,STEAM


DRUM & SVH SIDE (F-1110)
1502-01:F1120 BFW,STEAM
SMIC - I 6013 S 1502-01-HT-001 1502-01 DRUM &SVH SIDE

1645-00: Spent Caustic


SMIC - I 6014 W 1645-00-HT-003 1645-00 Treatment Common (Area
:C1,C2,C3,)

1644-00:SPENT CAUSTIC
SMIC - I 6014 W 1644-00-HT-001 1644-00 TREATING STG (AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-010 1646-00 INCINERATOR 510 (AREA:C1,)

1647-00:Spent Caustic
SMIC - I 6014 W 1646-00-HT-031 1646-00 Incinerator 510 (Area : C1)

1646-00: SPENT CAUSTIC


SMIC - I 6014 W 1646-00-HT-004 1646-00 INCINERATOR 510 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-005 1647-00 INCINERATOR 540 (Area :C1,)

1463-00:LP Vent ISBL Flare


SMIC - I 6014 W 1741-00-HT-001 1741-00 (Area :C4)

1463-00:LP Vent ISBL Flare


SMIC - I 6014 W 1741-00-HT-002 1741-00 (Area :C4)

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-026 1646-00 INCINERATOR 510 (AREA:C1)
SMIC - I 6014 W 1471-00-HT-001 1471-00 1471-00:FURNACE BLOWDOWN
(AREA:D1A)

1621-01: OIL QUENCH TOWER


SMIC - I 6014 W 1621-01-HT-029 1621-01 & QO SYSTEM (Area : H1)

1621-01:OIL QUENCH TOWER


SMIC - I 6014 W 1621-01-HT-020 1621-01 &QO SYSTEM
(AREA:H1,H2,H4,T3)

1471-00:Furnace Blowdown
SMIC - I 6014 W 1471-00-HT-002 1471-00 (Area : W3,T3,T2)

1456-00-SLL STEAM
SMIC - I 6014 S 1456-00-HT-001 1456-00 (H1,H2,H3,H4,C1,C2)

SMIC - I 6014 w 1634-00-HT-002 1634-00 1634-00:L P Drips Stripper (Area


: H 2)

1634-00 : LP Drips Stripper


SMIC - I 6014 w 1634-00-HT-023 1634-00 (Area : H2)

1634-01 : LP Drips Stripper


SMIC - I 6014 w 1634-00-HT-001 1634-00 (Area : H2,T3)

1624-01 : Process Condensate


SMIC - I 6014 w 1624-01-HT-024 1624-01 System (Area : H2)

1624-01-PROCESS
SMIC - I 6014 w 1624-01-HT-024 RT2 1624-01 CONDENSATE SYSTEM
(AREA:H2)
1624-01-PROCESS
SMIC - I 6014 w 1624-01-HT-023 RT1 1624-01 CONDENSATE SYSTEM
(AREA:H2)

1624-01 : Process Condensate


SMIC - I 6014 w 1624-01-HT-023 1624-01 System (Area : H2)

1466-00- CH CONDENSATE
SMIC - I 6014 w 1466-00-HT-003 1466-00 (AREA:H2,H4,T2,T3,T4)

1621-01: OIL QUENCH


SMIC - I 6012 S 1621-01-HT-004 1621-01 TOWER & QO SYSTEM
(Area :H3,)

1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-018 1621-01 TOWER &QO SYSTEM
(AREA:H3,)

SMIC - I 6012 S 1621-01-HT-027 1621-01 1621-01: Oil quench tower &


QO System (Area : H1)

1645-00:Spent Caustic
SMIC - I 6014 W 1646-00-HT-030 1646-00 Incinerator 510 (Area : C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-020 1647-00 INCINERATOR 540 (AREA:C1)

1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-014 1647-00 INCINERATOR 540 (AREA:C1)

1647-00 : SPENT CAUSTIC


SMIC - I 6014 W 1647-00-HT-021 1647-00 INCINERATOR 540 (Area : C1)
1647-00:SPENT CAUSTIC
SMIC - I 6014 W 1647-00-HT-009 1647-00 INCINERATOR 540 (AREA:C1)

1627-00:STEAM OUT QCD


SMIC - I 6014 W 1627-00-HT-008 1627-00 (AREA:W2)

1627-00:STEAM OUT QCD


SMIC - I 6012 S 1621-02-HT-004 1621-02 (AREA:T3,H1)

SMIC - I 6014 W 1616-00-HT-008 1616-00 1616-00: FURNACE GAS FEED


PREP (AREA:H4)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-018 1621-01 TOWER &QO SYSTEM
(AREA:H3,)

1621-01: OIL QUENCH


SMIC - I 6013 S 1621-01-HT-004 1621-01 TOWER & QO SYSTEM
(Area :H3,)

1511-01:F1210 BFW,STEAM
SMIC - I 6014 S 1511-01-HT-001 1511-01 DRUM & SVH SIDE
(AREA:1210)

1623-01:WATER QUENCH
SMIC - I 6014 S
SYSTEM (AREA:W3)

SMIC - I 6013 S 1621-01-HT-027 1621-01 1621-01: Oil quench tower &


QO System (Area : H1)

1627-00:STEAM OUT QCD


SMIC - I 6013 S 1621-02-HT-004 1621-02 (AREA:T3,H1)
1621-01:OIL QUENCH
SMIC - I 6012 S 1621-01-HT-013 1621-01 TOWER AND QO SYSTEM
(AREA:H1,L1)

1623-01 : WATER QUENCH


SMIC - I 6014 W 1623-01-HT-011 1623-01 SYSTEM (AREA:T3,W3)

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-024 1646-00 INCINERATOR 510(AREA:C1)

1646-00:SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-059 1646-00 INCINERATOR 510 (AREA:C1,)

1621-01 : OIL QUENCH


SMIC - I 6014 W 1621-01-HT-008 1621-01 TOWER AND QO SYSTEM
(AREA:H1,H2,H4,T3,T4)

1646-00 : Spent Caustic


SMIC - I 6014 W 1646-00-HT-009 1646-00 Incinerator 510 (Area : C1)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-013 1621-01 TOWER AND QO SYSTEM
(AREA:H1,L1)

SMIC - I 6014 W 1621-01-HT-027 1621-01 1621-01: Oil quench tower &


QO System (Area : H1)

1627-00:STEAM OUT
SMIC - I 6014 W 1627-00-HT-002 1627-00 (AREA:H1,H2,H3,H4,W3,W2)

1502-01:F1120 BFW,STEAM
SMIC - I 6014 S 1502-01-HT-001 1502-01 DRUM &SVH SIDE
1624-01-PROCESS
SMIC - I 6014 W 1624-01-HT-003 1624-01 CONDENSATE SYSTEM
(AREA:H2,T3,W2)

1761-00 : PAD WATER


SMIC - I 6014 W 1761-00-HT-006 1761-00 TREATMENT (Area : W2)

1623-01:WATER QUENCH
SMIC - I 6014 W 1623-01-HT-007 1623-01 SYSTEM (AREA :H2,H4,W3)

1621-01: OIL QUENCH


SMIC - I 6014 S 1621-01-HT-004 1621-01 TOWER & QO SYSTEM
(Area :H3,)

1646-00-SPENT CAUSTIC
SMIC - I 6014 W 1646-00-HT-008 1646-00 INCINERATOR 510 (AREA:C1)

1466-00- CH CONDENSATE
SMIC - I 6014 W 1466-00-HT-003 1466-00 (AREA:W2)

1463-00:CM Condensate
SMIC - I 6014 W 1463-00-HT-003 1463-00 (Area :H2,W2)

1623-03:PYGAS PUMP SYSTEM


SMIC - I 6014 W 1623-03-HT-001 1623-03 (AREA:H1,H2,H3,T3,T4)

1623-02
SMIC - I 6014 W 1623-02-HT-001 1623-02 PYGAS IMPORT
(AREA:H1,H2,H3,H4 &T3)

1621-03:LFO STRIPPER
SMIC - I 6014 W 1621-03-HT-006 1621-03 (AREA:H2)
1623-01:WATER QUENCH
SMIC - I 6014 W 1623-01-HT-008 1623-01 SYSTEM
(AREA:H2,H4,T3,T4,W3)

1621-01:OIL QUENCH TOWER


SMIC - I 6012 S 1621-01-HT-016 1621-01 &QO SYSTEM (AREA:H1,H2,T3)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-001 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6012 S 1621-03-HT-005 1621-03 (AREA:H2,T3)

1621-02:HFO SEPARATOR
SMIC - I 6012 S 1621-02-HT-004 1621-02 (AREA:H2)

SMIC - I 6012 S 1621-01-HT-004 1621-01 1621-01 OIL QUENCH TOWER &


QO SYSTEM (AREA:H3)

SMIC - I 6012 S 1621-01-HT-018 1621-01 1621-01 OIL QUENCH TOWER &


QO SYSTEM (AREA:H3)

1466-00:CH CONDENSATE
SMIC - I 6014 S 1466-00-HT-002 1466-00 (AREA:C1,C3,C2,T1,T2,W3,T3,T4
,H1,H2,H3,&W2)

1423-00 : CoolingWater Chem


SMIC - I 6014 W 1423-00-HT-008 1423-00 Additives (Area :V6)

1621-01:OIL QUENCH
SMIC - I 6013 S 1621-01-HT-016 1621-01 TOWER &QO SYSTEM
(AREA:H1,H2,T3)
1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-001 1621-03 (AREA:H2)

1621-03:LFO STRIPPER
SMIC - I 6013 S 1621-03-HT-005 1621-03 (AREA:H2,T3)

1621-02:HFO SEPARATOR
SMIC - I 6013 S 1621-02-HT-004 1621-02 (AREA:H2)

SMIC - I 6013 S 1621-01-HT-004 1621-01 1621-01 OIL QUENCH TOWER


& QO SYSTEM (AREA:H3)

1621-01 OIL QUENCH TOWER


SMIC - I 6013 S & QO SYSTEM (AREA:H3)

1622-00:FLUX OIL
SMIC - I 6014 W 1622-00-HT-001 1622-00 (AREA:H1,T3,T4)

SMIC - I 6014 S 1501-01-HT-001 1501-01 1501-01:F-1110 BFW,STEAM


DRUM & SVH SIDE (F-1110)

1463-00 :CM CONDENSATE


SMIC - I 6014 W 1463-00-HT-001 1463-00 (W2,H2,H3,T1,T2,T3,T4)

1451-00 : SVH STEAM


SMIC - I 6014 W 1451-00-HT-001 1451-00 (AREA:T2,T3)

1624-01-PROCESS
SMIC - I 6014 W 1621-01-HT-001 1621-01 CONDENSATE SYSTEM
(AREA:H1,T2)
1455-00 :SL STEAM(Area :
SMIC - I 6014 W 1455-00-HT-001 1455-00 T1,T2)

1461-00 : CVH CONDENSATE


SMIC - I 6014 W 1461-00-HT-001 1461-00 (AREA:T1,T2,T3,W2)

1502-01:F1120 BFW,STEAM
SMIC - I 6014 W 1502-01-HT-001 1502-01 DRUM &SVH SIDE

1761-00 : Pad Water


SMIC-I-6019 S 1761-00-HT-010 1761-00 Treatment (Area : W2)

SMIC-I-6019 S 1624-02-HT-003 1624-02 1624-02: (Area :W3)

1404-00 :Decoke Air (Area :


SMIC-I-6019 S 1404-00-HT-001 1404-00 H4)

1502-01: F-1120 BFW, Steam


SMIC-I-6019 S 1502-01-HT-007 1502-01 Drum & SVH Side (Area : F-
1120)

1503-01: F-1130 BFW, Steam


SMIC-I-6019 S 1503-01-HT-007 1503-01 Drum & SVH Side (Area : F-
1130)

SMIC-I-6019 S 1505-01-HT-007 1505-01 1505-01: F-1150 BFW, Steam


Dru SVH Side (Area : F-1210)

151-01: F-1220 BFW, Steam


SMIC-I-6019 S 1512-01-HT-007 1512-01 Drum & SVH Side (Area : F-
1220)
SMIC-I-6019 S 1513-01-HT-007 1513-01 1513-01: F-1230 BFW, Steam
Dru SVH Side (Area : F-1230)

1504-01: F-1140 BFW, Steam


SMIC-I-6019 S 1504-01-HT-007 1504-01 Drum & SVH Side (Area : F-
1140)

1501-01: F-1110 BFW, Steam


SMIC-I-6019 S 1501-01-HT-007 1501-01 Drum & SVH Side (Area : F-
1110)

SMIC-I-6019 S 1511-01-HT-007 1511-01 1511-01: F-1210 BFW, Steam


Dru SVH Side (Area : F-1210)

SMIC-I-6019 S 1514-01-HT-007 1514-01 1514-01: F-1240 BFW, Steam


Dru SVH Side (Area : F-1240)

SMIC-I-6019 S 1515-01-HT-007 1515-01 1515-01: F-1250 BFW, Steam


Dru SVH Side (Area : F-1250)

1625-00 :DILITION STEAM


SMIC - I 6014 W 1625-00-HT-008 1625-00 GENERATION (AREA:H2,H3

1503-01:F-1130 BFW STEAM


SMIC - I 6014 W 1503-01-HT-001 1503-01 DRUM &SVH SIDE (AREA:1130)

1504-01: F-1140 BFW, Steam


SMIC - I 6014 W 1504-01-HT-001 RT1 1504-01 Dru SVH Side (AREA:1140)

1624-02: Process Condensate


SMIC-I-6020 W 1624-02-HT-003 1624-02 Holding Tank (Area :W3)
1626-00 : Dilution Stream
SMIC - I 6014 W 1626-00-HT-001 1626-00 Concentrator (Area : T3,H2)

1621-01:Oil Quench
SMIC - I 6012 S
Tower&Qo System (area:H1)

1621-02:HFO Separator
SMIC - I 6012 S (Area:H1)

1621-02:HFO Separator
SMIC - I 6012 S
(Area:H1)

1621-01:OIL QUENCH
SMIC - I
6012/6019 S TOWER &QO SYSTEM
(AREA:H1,H3,T3,T4)

SMIC - I 6012 S 1621-01:Oil Quench Tower


&Qo Syetem (Area:H1)

1621-01:Oil Quench Tower


SMIC - I 6012 S &Qo Syetem
(AREA:H1,H3,T3,T4)

1471-00:Furnace Blowdown
SMIC - I 6012 S
(Area:W3)

1471-00:Furnace Blowdown
SMIC - I 6012 S (Area:W3)

1623-01:Water Quench
SMIC - I 6012 S
System(H2,W3)
1624-02: Process
SMIC-I-6022 W Condensate Holding Tank
(Area :W3)
BH)
DATE OF SADARA
TIME DAELIM STATUS
INSPECTION STATUS

REJECTED BY
17-Nov-14 7:00 AM
SADARA

REJECTED BY
17-Nov-14 7:15 AM
SADARA

REJECTED BY
17-Nov-14 7:30 AM
SADARA

REJECTED BY
17-Nov-14 7:45 AM
SADARA

REJECTED BY
17-Nov-14 8:00 AM SADARA

17-Nov-14 8:10 AM REJECTED BY


SADARA

REJECTED BY
17-Nov-14 8:20 AM
SADARA

REJECTED BY
17-Nov-14 8:30 AM
SADARA
REJECTED BY
17-Nov-14 8:40 AM
SADARA

REJECTED BY
17-Nov-14 9:00 AM SADARA

18-Nov-14 8:00 AM ACCEPTED

18-Nov-14 8:15 AM ACCEPTED

18-Nov-14 8:30 AM ACCEPTED

18-Nov-14 9:00 AM ACCEPTED

18-Nov-14 9:10 AM ACCEPTED

18-Nov-14 9:20 AM ACCEPTED

18-Nov-14 9:30 AM ACCEPTED

18-Nov-14 9:40 AM ACCEPTED


18-Nov-14 10:00 AM ACCEPTED

20-Nov-14 8:00 AM CANCEL

20-Nov-14 8:30 AM ACCEPTED

22-Nov-14 8:00 AM ACCEPTED

22-Nov-14 8:15 AM ACCEPTED

22-Nov-14 8:15 AM ACCEPTED

23-Nov-14 8:00 AM ACCEPTED

23-Nov-14 8:15 AM ACCEPTED

23-Nov-14 8:30 AM ACCEPTED

23-Nov-14 8:45 AM ACCEPTED


25-Nov-14 8:00 AM ACCEPTED

26-Nov-14 8:00 AM ACCEPTED

26-Nov-14 8:15 AM ACCEPTED

26-Nov-14 8:30 AM ACCEPTED

26-Nov-14 8:45 AM ACCEPTED

26-Nov-14 9:00 AM ACCEPTED

26-Nov-14 9:15 AM ACCEPTED

27-Nov-14 8:00 AM ACCEPTED

29-Nov-14 8:00 AM ACCEPTED

30-Nov-14 8:00 AM ACCEPTED


1-Dec-14 8:00 AM ACCEPTED

1-Dec-14 8:10 AM ACCEPTED

1-Dec-14 8:20 AM ACCEPTED

1-Dec-14 8:30 AM ACCEPTED

1-Dec-14 8:40 AM ACCEPTED

1-Dec-14 8:50 AM ACCEPTED

1-Dec-14 9:00 AM ACCEPTED

1-Dec-14 9:10 AM ACCEPTED

1-Dec-14 9:20 AM ACCEPTED

1-Dec-14 9:30 AM ACCEPTED


1-Dec-14 9:40 AM ACCEPTED

1-Dec-14 9:50 AM ACCEPTED

1-Dec-14 10:00 AM ACCEPTED

1-Dec-14 10:10 AM ACCEPTED

2-Dec-14 8:00 AM ACCEPTED

2-Dec-14 8:10 AM ACCEPTED

2-Dec-14 8:20 AM ACCEPTED

2-Dec-14 8:30 AM ACCEPTED

2-Dec-14 8:40 AM ACCEPTED

2-Dec-14 8:50 AM ACCEPTED


2-Dec-14 9:00 AM ACCEPTED

2-Dec-14 9:10 AM ACCEPTED

3-Dec-14 8:00 AM ACCEPTED

4-Dec-14 8:00 AM ACCEPTED

4-Dec-14 8:10 AM ACCEPTED

4-Dec-14 8:20 AM ACCEPTED

4-Dec-14 8:30 AM ACCEPTED

4-Dec-14 8:40 AM ACCEPTED

4-Dec-14 8:50 AM ACCEPTED

4-Dec-14 9:00 AM ACCEPTED


4-Dec-14 9:10 AM ACCEPTED

7-Dec-14 8:00 AM ACCEPTED

7-Dec-14 8:10 AM ACCEPTED

7-Dec-14 8:20 AM ACCEPTED

7-Dec-14 8:30 AM ACCEPTED

7-Dec-14 8:40 AM ACCEPTED

7-Dec-14 8:50 AM ACCEPTED

9-Dec-14 8:00 AM ACCEPTED

9-Dec-14 8:15 AM ACCEPTED

9-Dec-14 8:30 AM ACCEPTED


11-Dec-14 8:00 AM ACCEPTED

11-Dec-14 8:15 AM ACCEPTED

11-Dec-14 8:30 AM CANCEL

11-Dec-14 8:45 AM ACCEPTED

11-Dec-14 9:00 AM ACCEPTED

11-Dec-14 9:15 AM CANCEL

11-Dec-14 9:30 AM ACCEPTED

11-Dec-14 9:45 AM ACCEPTED

11-Dec-14 10:00 AM ACCEPTED

11-Dec-14 10:15 AM ACCEPTED


11-Dec-14 10:30 AM ACCEPTED

11-Dec-14 10:45 AM ACCEPTED

13-Dec-14 ~
18-Dec-14 8:00 AM ACCEPTED

13-Dec-14 ~
18-Dec-14 8:15 AM ACCEPTED

13-Dec-14 ~
8:30 AM ACCEPTED
18-Dec-14

13-Dec-14 8:45 AM ACCEPTED

13-Dec-14 9:00 AM CANCEL

13-Dec-14 9:15 AM ACCEPTED

13-Dec-14 9:30 AM ACCEPTED

13-Dec-14 9:45 AM ACCEPTED


13-Dec-14 10:00 AM ACCEPTED

13-Dec-14 10:15 AM ACCEPTED

13-Dec-14 10:30 AM ACCEPTED

13-Dec-14 10:45 AM ACCEPTED

14-Dec-14 8:00 AM ACCEPTED

14-Dec-14 8:15 AM ACCEPTED

14-Dec-14 8:30 AM ACCEPTED

14-Dec-14 8:45 AM CANCEL

15-Dec-14 8:00AM CANCEL

15-Dec-14 8:15AM ACCEPTED


15-Dec-14 8:30AM ACCEPTED

15-Dec-14 8:45AM ACCEPTED

15-Dec-14 9:00AM ACCEPTED

15-Dec-14 9:15AM ACCEPTED

16-Dec-14 8:00 AM ACCEPTED

16-Dec-14 8:15 AM ACCEPTED

16-Dec-14 8:30 AM ACCEPTED

16-Dec-14 8:45 AM ACCEPTED

16-Dec-14 9:00 AM ACCEPTED

16-Dec-14 9:15 AM ACCEPTED


16-Dec-14 9:30 AM ACCEPTED

16-Dec-14 ~
22-Dec-14 9:45 AM ACCEPTED

17-Dec-14 8:00 AM ACCEPTED

17-Dec-14 8:15 AM ACCEPTED

17-Dec-14 8:30 AM ACCEPTED

17-Dec-14 8:45 AM ACCEPTED

17-Dec-14 9:00 AM ACCEPTED

17-Dec-14 9:15 AM ACCEPTED

17-Dec-14 9:30 AM ACCEPTED

18-Dec-14 ~
24-Dec-14 13:30 PM
ACCEPTED
18-Dec-14 13:45 PM ACCEPTED

20-Dec-14 ~
25-Dec-14 8:00 AM ACCEPTED

20-Dec-14 ~
25-Dec-14 8:15 AM ACCEPTED

20-Dec-14 ~
25-Dec-14 8:30 AM ACCEPTED

20-Dec-14 8:45 AM ACCEPTED

20-Dec-14 9:00 AM ACCEPTED

20-Dec-14 9:15 AM ACCEPTED

20-Dec-14 9:30 AM ACCEPTED

20-Dec-14 9:45 AM ACCEPTED

20-Dec-14 10:00 AM ACCEPTED


20-Dec-14 10:15 AM ACCEPTED

20-Dec-14 10:30 AM ACCEPTED

21-Dec-14 8:00 AM ACCEPTED

21-Dec-14 8:15 AM ACCEPTED

21-Dec-14 8:30 AM ACCEPTED

21-Dec-14 8:45 AM CANCEL

21-Dec-14 9:00 AM ACCEPTED

21-Dec-14 9:15 AM ACCEPTED

22-Dec-14 8:00 AM ACCEPTED

22-Dec-14 ~
27-Dec-14 8:15 AM ACCEPTED
23-Dec-14 7:00 AM ACCEPTED

24-Dec-14 8:00 AM ACCEPTED

24-Dec-14 8:15 AM ACCEPTED

24-Dec-14 8:30 AM ACCEPTED

24-Dec-14 8:45 AM ACCEPTED

24-Dec-14 9:00 AM ACCEPTED

24-Dec-14 ~ 9:15 AM ACCEPTED


29-Dec-14

24-Dec-14 ~
29-Dec-14 9:30 AM ACCEPTED

24-Dec-14 ~
29-Dec-14 9:45 AM ACCEPTED

25-Dec-14 ~
29-Dec-14 8:00 AM ACCEPTED
28-Dec-14 8:00 AM CANCEL

28-Dec-14 8:15 AM CANCEL

28-Dec-14 8:30 AM CANCEL

28-Dec-14 8:00 AM ACCEPTED

28-Dec-14 8:15 AM ACCEPTED

28-Dec-14 8:30 AM ACCEPTED

27-Dec-14 ~ 9:00 AM ACCEPTED


01-Jan-15

27-Dec-14 ~
9:15 AM ACCEPTED
01-Jan-15

27-Dec-14 ~
01-Jan-15 9:30 AM ACCEPTED

28-Dec-14 945:00 AM ACCEPTED


28-Dec-14 10:00 AM ACCEPTED

28-Dec-14 10:15 AM ACCEPTED

28-Dec-14 10:30 AM ACCEPTED

28-Dec-14 10:45 AM ACCEPTED

28-Dec-14 11:00 AM ACCEPTED

28-Dec-14 11:15 AM ACCEPTED

28-Dec-14 11:30 AM ACCEPTED

28-Dec-14 13:30 PM ACCEPTED

28-Dec-14 13:45 PM ACCEPTED

28-Dec-14 14:00 PM ACCEPTED


28-Dec-14 14:15 PM ACCEPTED

28-Dec-14 14:30 PM ACCEPTED

29-Dec-14 8:00 AM ACCEPTED

29-Dec-14 8:15 AM CANCEL

29-Dec-14 ~
01-Jan-15 8:30 AM ACCEPTED

29-Dec-14 ~ 8:45 AM ACCEPTED


01-Jan-15

29-Dec-14 ~ 9:00 AM ACCEPTED


01-Jan-15

29-Dec-14 ~
9:15 AM ACCEPTED
01-Jan-16

29-Dec-14 9:30 AM ACCEPTED

29-Dec-14 9:45 AM ACCEPTED


29-Dec-14 10:00 AM ACCEPTED

30-Dec-14 8:00 AM ACCEPTED

30-Dec-14 8:15 AM ACCEPTED

30-Dec-14 8:30 AM ACCEPTED

30-Dec-14 8:45 AM ACCEPTED

30-Dec-14 9:00 AM ACCEPTED

30-Dec-14 9:15 AM ACCEPTED

30-Dec-14 9:30 AM ACCEPTED

30-Dec-14 9:45 AM ACCEPTED

30-Dec-14 10:00 AM ACCEPTED


30-Dec-14 10:15 AM ACCEPTED

30-Dec-14 1:45 PM ACCEPTED

31-Dec-14 7:00 AM ACCEPTED

31-Dec-14 ~
7:15 AM ACCEPTED
05-Jan-15

01/01/2015
to 08::00 AM ACCEPTED
06/01/2015

1-Jan-15 13:30:PM CANCEL

1-Jan-15 13:45:PM ACCEPTED

1-Jan-15 14:00:PM ACCEPTED

1-Jan-15 14:15:PM ACCEPTED

1-Jan-15 14:30:PM ACCEPTED


03/01/2015
to 8:00 AM ACCEPTED
08/01/2015

03/01/2015
to 8:15 AM ACCEPTED
08/01/2015

03/01/2015
to 8:30 AM ACCEPTED
08/01/2015

03/01/2015
to 8:45 AM ACCEPTED
08/01/2015

03/01/2015
to 9:15 AM ACCEPTED
08/01/2015

03/01/2015
to 9:30 AM ACCEPTED
08/01/2015

03/01/2015
to 9:45 AM ACCEPTED
08/01/2015

03/01/2015
to 10:00 AM ACCEPTED
08/01/2015

03/01/2015
to 10:15 AM ACCEPTED
08/01/2015

03/01/2015
to 10:30 AM ACCEPTED
08/01/2015
03/01/2015
to 10:45 AM ACCEPTED
08/01/2015

4-Jan-14 8:00 AM ACCEPTED

4-Jan-14 8:30 AM ACCEPTED

4-Jan-14 8:45 AM ACCEPTED

04/01/2015
to 9:00:AM ACCEPTED
08/01/2015

4-Jan-14 9:15:AM ACCEPTED

04/01/2015
to 9:30:AM ACCEPTED
08/01/2015

04/01/2015
to 9:45:AM ACCEPTED
08/01/2015

04/01/2015
to 10:00 AM ACCEPTED
08/01/2015

4-Jan-14 10:15 AM ACCEPTED


4-Jan-14 10:30 AM ACCEPTED

4-Jan-14 10:45 AM ACCEPTED

4-Jan-14 11:00 AM ACCEPTED

4-Jan-14 13:30: PM ACCEPTED

4-Jan-14 13:45: PM ACCEPTED

4-Jan-14 14:00: PM ACCEPTED

5-Jan-15 8:00 AM ACCEPTED

5-Jan-15 8:15 AM ACCEPTED

5-Jan-15 8:30 AM ACCEPTED

5-Jan-15 8:45 AM ACCEPTED


5-Jan-15 13:30:PM ACCEPTED

5-Jan-15 13:45:PM ACCEPTED

5-Jan-15 14:00:PM ACCEPTED

5-Jan-15 14:15:PM ACCEPTED

5-Jan-15 14:30:PM ACCEPTED

05/01/2015 ~ 9:00 AM ACCEPTED


08/01/2015

05/01/2015 ~ 9:15 AM ACCEPTED


08/01/2015

05/01/2015 ~
9:30 AM ACCEPTED
08/01/2015

6-Jan-14 8:00 AM ACCEPTED

6-Jan-14 8:15 AM ACCEPTED


6-Jan-14 8:30 AM ACCEPTED

6-Jan-14 8:45 AM ACCEPTED

6-Jan-14 9:00 AM ACCEPTED

6-Jan-14 9:15 AM ACCEPTED

6-Jan-14 9:30 AM ACCEPTED

6-Jan-14 9:45 AM ACCEPTED

6-Jan-14 10:00 AM ACCEPTED

6-Jan-14 10:15 AM ACCEPTED

6-Jan-14 10:30 AM ACCEPTED

6-Jan-14 11:00 AM ACCEPTED


6-Jan-14 11:15 AM ACCEPTED

6-Jan-14 11:30 AM ACCEPTED

6-Jan-14 13:00: PM ACCEPTED

6-Jan-14 13:15: PM ACCEPTED

6-Jan-14 14:30: PM CANCEL

07/01/2014
to 8:00 AM ACCEPTED
08/01/2015

07/01/2014
to 8:15 AM ACCEPTED
08/01/2015

7-Jan-14 8:30 AM ACCEPTED

7-Jan-14 13:30 PM ACCEPTED

7-Jan-14 14:00 PM ACCEPTED


7-Jan-14 14:30 PM CANCEL

7-Jan-14 2:45 PM ACCEPTED

8-Jan-14 13:30 PM ACCEPTED

8-Jan-14 14:00 PM ACCEPTED

10-Jan-14 7:00 AM ACCEPTED

10-Jan-14 7:10 AM ACCEPTED

10-Jan-14 7:20 AM ACCEPTED

10-Jan-14 7:30 AM ACCEPTED

10-Jan-14 7:40 AM CANCEL

10-Jan-14 7:50 AM ACCEPTED


10-Jan-14 8:00 AM ACCEPTED

10-Jan-14 8:10 AM ACCEPTED

10-Jan-14 8:20 AM CANCEL

10-Jan-14 8:30 AM ACCEPTED

10-Jan-14 8:40 AM ACCEPTED

10/01/2015
to 8:50 AM ACCEPTED
15/01/2015

10/01/2015
to 9:00 AM ACCEPTED
15/01/2015

10/01/2015
to 9:10 AM ACCEPTED
15/01/2015

10/01/2015
to 9:20 AM ACCEPTED
15/01/2015

10/01/2015
to 9:30 AM ACCEPTED
15/01/2015
10/01/2015
to 9:40 AM ACCEPTED
15/01/2015

10/01/2015
to 9:50 AM ACCEPTED
15/01/2015

10/01/2015
to 10:00 AM ACCEPTED
15/01/2015

10/01/2015
to 10:10 AM ACCEPTED
15/01/2015

10/01/2015
to 10:20:AM ACCEPTED
15/01/2015

11-Jan-15 8:30 AM ACCEPTED

11-Jan-15 8:45 AM ACCEPTED

11-Jan-15 9:00 AM ACCEPTED

11-Jan-15 9:15 AM ACCEPTED

11-Jan-15 13:30:PM ACCEPTED


11-Jan-15 13:45:PM ACCEPTED

11-Jan-15 14:00:PM ACCEPTED

12-Jan-15 8:00 AM ACCEPTED

12-Jan-15 13:30: PM ACCEPTED

12-Jan-15 13:45: PM ACCEPTED

12-Jan-15 14:00: PM ACCEPTED

12-Jan-15 14:15: PM ACCEPTED

12-Jan-15 14:30:PM ACCEPTED

13-Jan-15 8:00 AM ACCEPTED

13-Jan-15 8:15 AM ACCEPTED


13-Jan-15 8:30 AM ACCEPTED

13-Jan-15 8:45 AM ACCEPTED

13-Jan-15 9:00 AM ACCEPTED

13-Jan-15 9:15 AM ACCEPTED

13-Jan-15 9:30 AM ACCEPTED

13-Jan-15 9:45 AM CANCEL

13-Jan-15 10:00 AM ACCEPTED

13-Jan-15 13:30: PM ACCEPTED

13-Jan-15 13:45: PM ACCEPTED

14-Jan-15 8:00 AM ACCEPTED


14-Jan-15 8:15 AM ACCEPTED

14-Jan-15 8:30 AM ACCEPTED

14-Jan-15 8:45 AM ACCEPTED

14-Jan-15 9:00 AM ACCEPTED

14-Jan-15 9:15 AM ACCEPTED

14-Jan-15 9:30 AM ACCEPTED

14-Jan-15 9:45 AM ACCEPTED

14-Jan-15 10:00 AM ACCEPTED

14-Jan-15 13:30: PM CANCEL

14-Jan-15 13:45: PM CANCEL


14-Jan-15 14:00: PM CANCEL

15-Jan-15 8:00 AM ACCEPTED

15-Jan-15 8:15 AM ACCEPTED

15-Jan-15 8:30 AM ACCEPTED

15-Jan-15 8:45 AM ACCEPTED

15-Jan-15 9:00 AM ACCEPTED

15-Jan-15 9:15 AM ACCEPTED

15-Jan-15 9:30 AM ACCEPTED

15-Jan-15 9:45:AM ACCEPTED

15-Jan-15 10:00:AM ACCEPTED


15-Jan-15 13:30:PM ACCEPTED

17-Jan-14 8:00 AM ACCEPTED

17-Jan-14 8:10 AM ACCEPTED

17-Jan-14 8:20 AM ACCEPTED

17-Jan-14 8:30 AM ACCEPTED

17-Jan-14 8:40 AM CANCEL

17-Jan-14 8:50 AM ACCEPTED

17/01/2015
to 9:00 AM ACCEPTED
22/01/2015

17/01/2015
to 9:10 AM ACCEPTED
22/01/2015

17/01/2015
to 9:20 AM ACCEPTED
22/01/2015
17/01/2015
to 9:30 AM ACCEPTED
22/01/2015

17/01/2015
to 9:40 AM ACCEPTED
22/01/2015

17/01/2015
to 9:50 AM ACCEPTED
22/01/2015

17/01/2015
to 10:00:AM ACCEPTED
22/01/2015

17/01/2015
to 10:10:AM ACCEPTED
22/01/2015

17-Jan-14 13:30:PM ACCEPTED

17-Jan-14 13:40:PM ACCEPTED

17-Jan-14 13:50:PM ACCEPTED

17-Jan-14 14:10:PM ACCEPTED

17-Jan-14 14:20:PM ACCEPTED


17-Jan-14 14:30:PM ACCEPTED

17-Jan-14 14:40:PM ACCEPTED

17-Jan-14 15:00:PM ACCEPTED

18-Jan-14 8:00 AM ACCEPTED

18-Jan-14 8:15 AM ACCEPTED

18-Jan-14 8:30 AM ACCEPTED

18-Jan-14 8:45 AM CANCEL

18-Jan-14 9:00 AM CANCEL

18-Jan-14 9:15 AM CANCEL

19-Jan-14 8:00 AM ACCEPTED


19-Jan-14 8:15 AM ACCEPTED

19-Jan-14 8:30 AM ACCEPTED

19-Jan-14 8:45 AM ACCEPTED

19-Jan-14 9:00 AM ACCEPTED

19-Jan-14 9:15 AM ACCEPTED

19-Jan-14 9:30 AM ACCEPTED

19-Jan-14 1:30 PM ACCEPTED

19-Jan-14 1:45 PM ACCEPTED

19-Jan-14 2:00 PM CANCEL

19-Jan-14 2:15 PM ACCEPTED


20-Jan-14 8:00 AM ACCEPTED

20-Jan-14 8:15 AM ACCEPTED

20-Jan-14 8:30 AM ACCEPTED

20/01/2015
to 8:45 AM ACCEPTED THREE
22/01/2015 DAYS

20-Jan-14 13:30 PM ACCEPTED

21/01/2015
to 8:00 AM ACCEPTED TWO
22/01/2015 DAYS

21-Jan-15 8:15 AM ACCEPTED

21-Jan-15 8:30 AM ACCEPTED

21-Jan-15 8:45 AM ACCEPTED

21-Jan-15 9:00 AM ACCEPTED


22/01/2015 8:00 AM ACCEPTED

22/01/2015 8:15 AM ACCEPTED

22/01/2015 8:30 AM ACCEPTED

22/01/2015 8:45 AM ACCEPTED

22/01/2015 13:30 PM ACCEPTED

22/01/2015 13:40 PM ACCEPTED

22/01/2015 13:50 PM ACCEPTED

REJECTED BY
22/01/2015 14:00 PM
SADARA

22/01/2015 14:10 PM ACCEPTED

22/01/2015 14:20 PM ACCEPTED


22/01/2015 14:30 PM ACCEPTED

22/01/2015 14:40 PM ACCEPTED

24/01/2015
to 8:00 AM ACCEPTED
29/01/2015

24/01/2015
to 8:15 AM ACCEPTED
29/01/2015

24/01/2015
to 8:30 AM ACCEPTED
29/01/2015

24/01/2015
to 8:40 AM ACCEPTED
29/01/2015

24-Jan-15 8:50 AM ACCEPTED

24-Jan-15 9:00 AM ACCEPTED

24-Jan-15 9:10 AM ACCEPTED

24-Jan-15 9:20 AM ACCEPTED


24-Jan-15 9:30 AM ACCEPTED

24-Jan-15 13:30 PM ACCEPTED

24-Jan-15 13:40 PM ACCEPTED

24-Jan-15 13:50 PM ACCEPTED

24-Jan-15 14:00 PM ACCEPTED

25-Jan-15 8:00 AM ACCEPTED

25-Jan-15 8:10 AM ACCEPTED

25-Jan-15 8:20 AM ACCEPTED

25-Jan-15 8:30 AM ACCEPTED

25-Jan-15 8:45 AM ACCEPTED


25-Jan-15 9:00 AM ACCEPTED

25-Jan-15 9:15 AM ACCEPTED

25-Jan-15 13:30:PM ACCEPTED

25-Jan-15 13:40:PM CANCEL

25-Jan-15 13:50:PM ACCEPTED

25-Jan-15 14:00:PM ACCEPTED

25-Jan-15 14:10:PM ACCEPTED

25-Jan-15 14:20:PM ACCEPTED

25-Jan-15 14:30:PM ACCEPTED

REJECTED BY
25-Jan-15 14:40:PM
SADARA
25-Jan-15 14:50:PM REJECTED BY
SADARA

26-Jan-15 8:00 AM ACCEPTED

26-Jan-15 8:10 AM ACCEPTED

26-Jan-15 8:20 AM ACCEPTED

26-Jan-15 13:30: PM ACCEPTED

26-Jan-15 13:45: PM ACCEPTED

26-Jan-15 14:00: PM ACCEPTED

26-Jan-15 14:15: PM ACCEPTED

27-Jan-15 8:00 AM ACCEPTED

27-Jan-15 8:15 AM ACCEPTED


27-Jan-15 13:30: PM ACCEPTED

27-Jan-15 13:45: PM ACCEPTED

27-Jan-15 14:00: PM ACCEPTED

28-Jan-15 8:00 AM ACCEPTED

28-Jan-15 8:10 AM ACCEPTED

28-Jan-15 8:20 AM ACCEPTED

28-Jan-15 8:30 AM ACCEPTED

28-Jan-15 8:40 AM ACCEPTED

28-Jan-15 8:50 AM ACCEPTED

28-Jan-15 9:00 AM CANCEL


28-Jan-15 9:10 AM ACCEPTED

28-Jan-15 9:20 AM ACCEPTED

28-Jan-15 9:30 AM ACCEPTED

28/01/2015
to 9:40 AM ACCEPTED
29/01/2015

28-Jan-15 9:50 AM ACCEPTED

28-Jan-15 10:00 AM ACCEPTED

28-Jan-15 10:10 AM ACCEPTED

28-Jan-15 10:20 AM ACCEPTED

28-Jan-15 10:30 AM ACCEPTED

28-Jan-15 13;30:PM ACCEPTED


28-Jan-15 13;45:PM ACCEPTED

28-Jan-15 14;00:PM ACCEPTED

28-Jan-15 14;15:PM ACCEPTED

29-Jan-15 8:00 AM ACCEPTED

29-Jan-15 8:15 AM ACCEPTED

29-Jan-15 8:30 AM ACCEPTED

29-Jan-15 8:45 AM ACCEPTED

29-Jan-15 9:00 AM ACCEPTED

29-Jan-15 9:15 AM ACCEPTED

29-Jan-15 13:30 PM ACCEPTED


29-Jan-15 13:45 PM ACCEPTED

31-Jan-15 8:00 AM ACCEPTED

31-Jan-15 8:10 AM ACCEPTED

31-Jan-15 8:40 AM ACCEPTED

31-Jan-15 8:50 AM ACCEPTED

31-Jan-15 9:00 AM ACCEPTED

31-Jan-15 9:10 AM ACCEPTED

31-Jan-15 9:20 AM ACCEPTED

31-Jan-15 9:30 AM ACCEPTED

31-Jan-15 13:30 PM ACCEPTED


31-Jan-15 13:45 PM CANCEL

31-Jan-15 14:00 PM ACCEPTED

31-Jan-15 14:15 PM ACCEPTED

31-Jan-15 14:30 PM CANCEL

31-Jan-15 14:45 PM CANCEL

1-Feb-15 8:00 AM ACCEPTED

1-Feb-15 8:10 AM ACCEPTED

1-Feb-15 8:40 AM ACCEPTED

1-Feb-15 8:50 AM ACCEPTED

01/02/2015
to 9:00 AM ACCEPTED
05/02/2015
1-Feb-15 9:15 AM ACCEPTED

1-Feb-15 9:30 AM ACCEPTED

1-Feb-15 13:30 PM CANCEL

1-Feb-15 13:45 PM ACCEPTED

1-Feb-15 14:00 PM ACCEPTED

2-Feb-15 8:00 AM ACCEPTED

2-Feb-15 8:10 AM ACCEPTED

2-Feb-15 8:40 AM ACCEPTED

2-Feb-15 8:50 AM ACCEPTED

2-Feb-15 9:00 AM ACCEPTED


2-Feb-15 9:10 AM ACCEPTED

2-Feb-15 9:20 AM ACCEPTED

2-Feb-15 9:30 AM ACCEPTED

2-Feb-15 9:40 AM ACCEPTED

2-Feb-15 9:50 AM ACCEPTED

2-Feb-15 10:00 AM CANCEL

2-Feb-15 13:30 PM ACCEPTED

2-Feb-15 13:45 PM ACCEPTED

3-Feb-15 8:00 AM ACCEPTED

3-Feb-15 8:10 AM ACCEPTED


3-Feb-15 13:30 PM ACCEPTED

4/2/2015 TO
8:00 AM ACCEPTED
5/2/2015

4/2/2015 TO
5/2/2015 8:10 AM ACCEPTED

4/2/2015 TO
8:20 AM ACCEPTED
5/2/2015

4/2/2015 TO
5/2/2015 8:30 AM ACCEPTED

4/2/2015 TO 8:30 AM ACCEPTED


5/2/2015

4/2/2015 TO 8:40 AM ACCEPTED


5/2/2015

4/2/2015 TO
8:50 AM ACCEPTED
5/2/2015

4-Feb-15 9:00 AM ACCEPTED

4-Feb-15 13:30 PM ACCEPTED


4-Feb-15 13:45 PM ACCEPTED

4-Feb-15 14:00 PM ACCEPTED

4-Feb-15 14:15 PM ACCEPTED

5-Feb-15 8:00 AM ACCEPTED

5-Feb-15 1:30 PM ACCEPTED

5-Feb-15 8:20 AM ACCEPTED

5-Feb-15 8:30 AM ACCEPTED

5-Feb-15 2:00 PM ACCEPTED

7/2/2015 to
12/02/2015 8:00 AM ACCEPTED

7/2/2015 to
8:10 AM ACCEPTED
12/02/2015
7/2/2015 to 8:20 AM ACCEPTED
12/02/2015

7/2/2015 to
8:30 AM ACCEPTED
12/02/2015

7/2/2015 to
12/02/2015 8:40 AM ACCEPTED

7/2/2015 to
8:50 AM ACCEPTED
12/02/2015

7/2/2015 to
12/02/2015 9:00 AM ACCEPTED

7/2/2015 to 9:10 AM ACCEPTED


12/02/2015

7/2/2015 to 9:20 AM ACCEPTED


12/02/2015

7-Feb-15 13:30 PM ACCEPTED

7-Feb-15 13:45 PM ACCEPTED

7-Feb-15 14:00 PM ACCEPTED


7-Feb-15 14:30 PM ACCEPTED

7-Feb-15 14:45 PM ACCEPTED

7-Feb-15 15:00 PM ACCEPTED

7-Feb-15 15:15PM ACCEPTED

7-Feb-15 15:30 PM ACCEPTED

8-Feb-15 8:00 AM ACCEPTED

8-Feb-15 1:30 PM ACCEPTED

8-Feb-15 1:40 PM CANCEL

8-Feb-15 8:05 AM ACCEPTED

8-Feb-15 8:10 AM ACCEPTED


8-Feb-15 8:15 AM ACCEPTED

8-Feb-15 8:20 AM ACCEPTED

8-Feb-15 1:50 PM ACCEPTED

8-Feb-15 2:00 PM ACCEPTED

8-Feb-15 2:10 PM ACCEPTED

8-Feb-15 8:25 AM ACCEPTED

8-Feb-15 2:20 PM ACCEPTED

8-Feb-15 2:30 PM ACCEPTED

8-Feb-15 2:40 PM ACCEPTED

8-Feb-15 2:50 PM CANCEL


9-Feb-15 8:00 AM ACCEPTED

9-Feb-15 8:10 AM ACCEPTED

9-Feb-15 8:20 AM ACCEPTED

9-Feb-15 8:30 AM ACCEPTED

9-Feb-15 13:30 PM CANCEL

9-Feb-15 13:45 PM ACCEPTED

9-Feb-15 14:00 PM CANCEL

9-Feb-15 14:15 PM ACCEPTED

9-Feb-15 14:30 PM ACCEPTED

9-Feb-15 14:45 PM ACCEPTED


9-Feb-15 15:00 PM ACCEPTED

9-Feb-15 15:15 PM ACCEPTED

10-Feb-15 8:00 AM ACCEPTED

10-Feb-15 8:10 AM ACCEPTED

10-Feb-15 8:20 AM ACCEPTED

10-Feb-15 8:30 AM ACCEPTED

10-Feb-15 8:40 AM ACCEPTED

10-Feb-15 8:50 AM ACCEPTED

10-Feb-15 1:30 PM ACCEPTED

11-Feb-15 8:00 AM ACCEPTED


11-Feb-15 8:10 AM ACCEPTED

11-Feb-15 8:20 AM ACCEPTED

11-Feb-15 8:30 AM ACCEPTED

11-Feb-15 8:40 AM ACCEPTED

11/2/2015 to
12/02/2015 8:50 AM ACCEPTED

11/2/2015 to 9:00 AM ACCEPTED


12/02/2015

11/2/2015 to 9:10 AM ACCEPTED


12/02/2015

11/2/2015 to
9:20 AM ACCEPTED
12/02/2015

11-Feb-15 9:30 AM ACCEPTED

11-Feb-15 9:40 AM ACCEPTED


11-Feb-15 10:00 AM ACCEPTED

11~12-Feb-
1:30 PM ACCEPTED
2015

11-Feb-15 1:40 PM ACCEPTED

12-Feb-15 8:00 AM ACCEPTED

12-Feb-15 8:10 AM ACCEPTED

12-Feb-15 1:30 PM ACCEPTED

12-Feb-15 1:40 PM ACCEPTED

12-Feb-15 1:50 PM ACCEPTED

12-Feb-15 2:00 PM ACCEPTED

12-Feb-15 2:10 PM ACCEPTED


14-Feb-15 8:00 AM ACCEPTED

14-Feb-15 8:10 AM ACCEPTED

14-Feb-15 8:20 AM ACCEPTED

14-Feb-15 8:30 AM ACCEPTED

14-Feb-15 8:40 AM ACCEPTED

14-Feb-15 8:50 AM ACCEPTED

14-Feb-15 1:30 PM ACCEPTED

14-Feb-15 1:40 PM ACCEPTED

14-Feb-15 1:50 PM ACCEPTED

14-Feb-15 2:00 PM ACCEPTED


14-Feb-15 2:10 PM ACCEPTED

15-Feb-15 8:00 AM ACCEPTED

15-Feb-15 8:10 AM ACCEPTED

15-Feb-15 8:20 AM ACCEPTED

15-Feb-15 8:30 AM ACCEPTED

15-Feb-15 8:40 AM ACCEPTED

15-Feb-15 8:50 AM ACCEPTED

15-Feb-15 9:00 AM ACCEPTED

15-Feb-15 9:10 AM ACCEPTED

15-Feb-15 9:20 AM ACCEPTED


15-Feb-15 9:30 AM ACCEPTED

15-Feb-15 9:40 AM ACCEPTED

15-Feb-15 9:50 AM ACCEPTED

15-Feb-15 10:00 AM ACCEPTED

15-19 Feb- 15 10:10 AM ACCEPTED

15-Feb-15 10:20 AM ACCEPTED

16-Feb-15 1:30 PM ACCEPTED

16-Feb-15 1:40 PM ACCEPTED

16-Feb-15 1:50 PM ACCEPTED

16-Feb-15 2:00 PM ACCEPTED


16-Feb-15 2:10 PM ACCEPTED

16-Feb-15 2:20 PM ACCEPTED

16-Feb-15 2:30 PM ACCEPTED

16-Feb-15 2:40 PM ACCEPTED

16-Feb-15 2:50 PM ACCEPTED

16-Feb-15 3:00 PM ACCEPTED

16-Feb-15 3:10 PM ACCEPTED

17-Feb-15 8:00 AM ACCEPTED

17-Feb-15 8:10 AM ACCEPTED

17-Feb-15 8:20 AM ACCEPTED


17-Feb-15 8:30 AM ACCEPTED

17-Feb-15 8:40 AM ACCEPTED

17-Feb-15 8:50 AM ACCEPTED

17-Feb-15 9:00 AM ACCEPTED

17-Feb-15 9:10 AM ACCEPTED

17-Feb-15 1:30 AM ACCEPTED

17-Feb-15 1:40 PM ACCEPTED

17-Feb-15 1:50 PM ACCEPTED

17-Feb-15 2:00 PM ACCEPTED

17-Feb-15 2:10 PM ACCEPTED


18/02/2015 8:00 AM ACCEPTED
19/02/2015

18/02/2015
8:10 AM ACCEPTED
19/02/2015

18-Feb-15 8:20 AM ACCEPTED

18/02/2015
8:30 AM ACCEPTED
19/02/2015

18/02/2015
19/02/2015 8:40 AM ACCEPTED

18/02/2015 8:50 AM ACCEPTED


19/02/2015

18-Feb-15 9:00 AM ACCEPTED

18-Feb-15 1:30 PM CANCEL

18-Feb-15 1:40 PM ACCEPTED

19-Feb-15 8:00 AM ACCEPTED


19-Feb-15 8:10 AM ACCEPTED

19-Feb-15 8:20 AM CANCEL

19-Feb-15 8:30 AM ACCEPTED

19-Feb-15 8:40 AM ACCEPTED

19-Feb-15 8:50 AM ACCEPTED

19-Feb-15 1:30 PM ACCEPTED

19-Feb-15 1:40 PM ACCEPTED

19-Feb-15 1:50 PM ACCEPTED

19-Feb-15 2:00 PM ACCEPTED

19-Feb-15 2:10 PM ACCEPTED


21-Feb-15 8:00 AM ACCEPTED

21-Feb-15 8:10 AM ACCEPTED

22-Feb-15 8:00 AM ACCEPTED

22/02/15~
8:10 AM ACCEPTED
26/02/15

22/02/15~
26/02/15 8:20 AM ACCEPTED

22/02/15~ 8:30 AM ACCEPTED


26/02/15

22/02/15~ 8:40 AM ACCEPTED


26/02/15

22/02/15~
8:50 AM ACCEPTED
26/02/15

22/02/15~
26/02/15 9:00 AM ACCEPTED

22/02/15~
9:10 AM ACCEPTED
26/02/15
22/02/15~ 9:20 AM ACCEPTED
26/02/15

22-Feb-15 9:30 AM ACCEPTED

22/02/15~
26/02/15 9:40 AM ACCEPTED

22-Feb-15 1:30 PM ACCEPTED

22-Feb-15 2:00 PM ACCEPTED

23-Feb-15 8:00 AM ACCEPTED

23-Feb-15 8:10 AM ACCEPTED

23-Feb-15 8:20 AM ACCEPTED

23-Feb-15 8:30 AM ACCEPTED

23-Feb-15 8:40 AM ACCEPTED


23-Feb-15 1:30 PM ACCEPTED

23-Feb-15 2:00 PM ACCEPTED

24/02/15~
26/02/15 8:00 AM ACCEPTED

24/02/15~
8:10 AM ACCEPTED
26/02/15

24-Feb-15 1:30 PM ACCEPTED

25-Feb-15 1:30 PM ACCEPTED

25-Feb-15 1:40 PM ACCEPTED

26-Feb-15 8:00 AM ACCEPTED

26-Feb-15 8:10 AM ACCEPTED

26-Feb-15 8:20 AM ACCEPTED


26-Feb-15 1:30 PM ACCEPTED

26-Feb-15 1:40 PM ACCEPTED

26-Feb-15 1:50 PM ACCEPTED

26-Feb-15 2:00 PM ACCEPTED

26-Feb-15 2:10 PM ACCEPTED

26-Feb-15 2:20 PM ACCEPTED

26-Feb-15 2:30 PM ACCEPTED

26-Feb-15 2:40 PM ACCEPTED

26-Feb-15 2:50 PM ACCEPTED

28-Feb-15 1:30 PM ACCEPTED


28-Feb-15 1:40 PM ACCEPTED

28/02/2015
1:50 PM ACCEPTED
05/03/2015

28/02/2015
05/03/2015 2:00 PM ACCEPTED

28/02/2015
2:10 PM ACCEPTED
05/03/2015

01/03/2015
05/03/2015 8:00 AM ACCEPTED

01/03/2015 8:10 AM ACCEPTED


05/03/2015

01/03/2015 8:20 AM ACCEPTED


05/03/2015

01/03/2015
8:30 AM ACCEPTED
05/03/2015

01/03/2015
05/03/2015 8:40 AM ACCEPTED

01/03/2015
8:50 AM ACCEPTED
05/03/2015
01/03/2015 9:00 AM ACCEPTED
05/03/2015

01/03/2015
9:10 AM ACCEPTED
05/03/2015

1-Mar-15 9:20 AM ACCEPTED

1-Mar-15 9:30 AM ACCEPTED

1-Mar-15 9:40 AM ACCEPTED

1-Mar-15 2:00 PM ACCEPTED

1-Mar-15 2:10 PM ACCEPTED

2-Mar-15 8:00 AM ACCEPTED

2-Mar-15 8:10 AM ACCEPTED

2-Mar-15 8:20 AM ACCEPTED


2-Mar-15 1:30 PM ACCEPTED

2-Mar-15 1:40 PM ACCEPTED

2-Mar-15 1:50 PM ACCEPTED

2-Mar-15 2:00 PM ACCEPTED

3-Mar-15 8:00 AM ACCEPTED

03/03/2015 8:10 AM ACCEPTED


05/03/2015

03/03/2015 8:20 AM ACCEPTED


05/03/2015

03/03/2015
8:30 AM ACCEPTED
05/03/2015

3-Mar-15 1:30 PM ACCEPTED

3-Mar-15 1:40 PM ACCEPTED


3-Mar-15 1:50 PM ACCEPTED

3-Mar-15 2:00 PM ACCEPTED

04/03/2015
05/03/2015 8:00 AM ACCEPTED

04/03/2015
8:10 AM ACCEPTED
05/03/2015

04/03/2015
05/03/2015 8:20 AM ACCEPTED

04/03/2015 8:30 AM ACCEPTED


05/03/2015

04/03/2015 8:40 AM ACCEPTED


05/03/2015

04/03/2015
8:50 AM ACCEPTED
05/03/2015

04/03/2015
05/03/2015 9:00 AM ACCEPTED

4-Mar-15 1:30 PM ACCEPTED


4-Mar-15 1:40 PM ACCEPTED

4-Mar-15 1:50 PM ACCEPTED

4-Mar-15 2:00 PM ACCEPTED

5-Mar-15 1:30 PM ACCEPTED

5-Mar-15 1:40 PM ACCEPTED

07/03/2015 8:00 AM ACCEPTED


12/03/2015

7-Mar-15 1:30 PM ACCEPTED

7-Mar-15 1:40 PM ACCEPTED

7-Mar-15 1:50 PM ACCEPTED

7-Mar-15 2:00 PM ACCEPTED


7-Mar-15 2:10 PM ACCEPTED

7-Mar-15 2:20 PM ACCEPTED

8-Mar-15 8:00 AM ACCEPTED

8-Mar-15 8:10 AM ACCEPTED

8-Mar-15 8:20 AM ACCEPTED

8-Mar-15 8:30 AM ACCEPTED

8-Mar-15 8:40 AM ACCEPTED

8-Mar-15 8:50 AM ACCEPTED

8-Mar-15 1:30 PM ACCEPTED

8-Mar-15 1:40 PM ACCEPTED


9-Mar-15 8:00 AM ACCEPTED

9-Mar-15 1:30 PM ACCEPTED

9-Mar-15 1:40 PM ACCEPTED

9-Mar-15 1:50 PM ACCEPTED

9-Mar-15 2:00 PM ACCEPTED

9-Mar-15 2:10 PM ACCEPTED

10/03/2015 8:00 AM ACCEPTED


12/03/2015

10/03/2015
8:10 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 8:20 AM ACCEPTED

10/03/2015
8:30 AM ACCEPTED
12/03/2015
10/03/2015 8:40 AM ACCEPTED
12/03/2015

10/03/2015
8:50 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 9:00 AM ACCEPTED

10/03/2015
9:10 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 9:20 AM ACCEPTED

10/03/2015 9:30 AM ACCEPTED


12/03/2015

10/03/2015 9:40 AM ACCEPTED


12/03/2015

10/03/2015
9:50 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 10:00 AM ACCEPTED

10/03/2015
10:10 AM ACCEPTED
12/03/2015
10/03/2015 10:20 AM ACCEPTED
12/03/2015

10/03/2015
10:30 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 10:40 AM ACCEPTED

10/03/2015
10:50 AM ACCEPTED
12/03/2015

10/03/2015
12/03/2015 11:00 AM ACCEPTED

10-Mar-15 1:30 PM CANCEL

11/03/2015 8:00 AM ACCEPTED


12/03/2015

11/03/2015
8:10 AM ACCEPTED
12/03/2015

11/03/2015
12/03/2015 8:20 AM ACCEPTED

11-Mar-15 1:30 PM ACCEPTED


12-Mar-15 8:00 AM CANCEL

12-Mar-15 8:10 AM ACCEPTED

12-Mar-15 8:20 AM ACCEPTED

12-Mar-15 8:30 AM ACCEPTED

12-Mar-15 8:40 AM ACCEPTED

12-Mar-15 8:50 AM ACCEPTED

12-Mar-15 9:00 AM ACCEPTED

12-Mar-15 1:30 PM ACCEPTED

12-Mar-15 1:40 PM ACCEPTED

12-Mar-15 1:50 PM ACCEPTED


11/03/2015 2:00 PM ACCEPTED
12/03/2015

14-Mar-15 8:00 AM ACCEPTED

14/03/2015
19/03/2015 8:10 AM CANCEL

14-Mar-15 1:30 PM ACCEPTED

14-Mar-15 1:40 PM ACCEPTED

14-Mar-15 1:50 PM ACCEPTED

16/03/2015 8:00 AM ACCEPTED


19/03/2015

16/03/2015
8:10 AM ACCEPTED
19/03/2015

16/03/2015
19/03/2015 8:20 AM ACCEPTED

16/03/2015
8:30 AM ACCEPTED
19/03/2015
16/03/2015 8:40 AM ACCEPTED
19/03/2015

16/03/2015
8:50 AM ACCEPTED
19/03/2015

16/03/2015
19/03/2015 9:00 AM ACCEPTED

16/03/2015
9:10 AM ACCEPTED
19/03/2015

16-Mar-15 1:30 PM ACCEPTED

16-Mar-15 1:40 PM ACCEPTED

16-Mar-15 1:50 PM ACCEPTED

16-Mar-15 2:00 PM ACCEPTED

16-Mar-15 2:10 PM ACCEPTED

17-Mar-15 8:00 AM ACCEPTED


18-Mar-15 1:30 PM ACCEPTED

18-Mar-15 1:40 PM ACCEPTED

18-Mar-15 1:50 PM ACCEPTED

18-Mar-15 2:00 PM ACCEPTED

18-Mar-15 2:10 PM ACCEPTED

18-Mar-15 2:20 PM CANCEL


WORK NOT
COMPLETED

18-Mar-15 2:30 PM ACCEPTED

18-Mar-15 2:40 PM ACCEPTED

18-Mar-15 2:50 PM ACCEPTED

18-Mar-15 3:00 PM ACCEPTED


18-Mar-15 3:10 PM ACCEPTED

18-Mar-15 3:20 PM ACCEPTED

REJECTED BY
19-Mar-15 1:30 PM SADARA

19-Mar-15 1:40 PM ACCEPTED

19-Mar-15 1:50 PM ACCEPTED

19-Mar-15 2:00 PM ACCEPTED

21/03/2015 8:00 AM ACCEPTED


26/03/2015

21-Mar-15 8:10 AM ACCEPTED

21-Mar-15 8:20 AM ACCEPTED

21-Mar-15 8:30 AM ACCEPTED


21-Mar-15 8:40 AM ACCEPTED

21-Mar-15 8:50 AM ACCEPTED

21-Mar-15 1:30 PM ACCEPTED

21-Mar-15 1:40 PM ACCEPTED

21-Mar-15 1:50 PM ACCEPTED

21-Mar-15 2:00 PM ACCEPTED

21-Mar-15 2:10 PM ACCEPTED

21-Mar-15 2:20 PM ACCEPTED

22-Mar-15 8:00 AM ACCEPTED

22-Mar-15 1:30 PM ACCEPTED


22-Mar-15 1:40 PM ACCEPTED

22-Mar-15 1:50 PM ACCEPTED

23-Mar-15 8:00 AM ACCEPTED

23-Mar-15 8:10 AM ACCEPTED

23-Mar-15 8:20 AM ACCEPTED

23-Mar-15 8:30 AM ACCEPTED

23-Mar-15 8:40 AM ACCEPTED

23-Mar-15 8:50 AM ACCEPTED

23-Mar-15 9:00 AM ACCEPTED

23/03/2015
9:10 AM ACCEPTED
26/03/2015
23/03/2015 9:20 AM ACCEPTED
26/03/2015

23/03/2015
9:30 AM ACCEPTED
26/03/2015

23/03/2015
26/03/2015 9:40 AM ACCEPTED

23/03/2015
9:50 AM ACCEPTED
26/03/2015

23/03/2015
26/03/2015 10:00 AM ACCEPTED

25-Mar-15 8:00 AM ACCEPTED

25-Mar-15 8:10 AM ACCEPTED

25-Mar-15 8:20 AM ACCEPTED

25-Mar-15 8:30 AM ACCEPTED

25-Mar-15 1:30 PM ACCEPTED


25-Mar-15 1:40 PM ACCEPTED

25-Mar-15 1:50 PM ACCEPTED

25-Mar-15 2:00 PM CANCEL

25-Mar-15 2:10 PM ACCEPTED

25-Mar-15 2:20 PM ACCEPTED

25-Mar-15 2:30 PM ACCEPTED

25-Mar-15 2:40 PM ACCEPTED

26/03/2015
8:00 AM ACCEPTED
02/04/2015

26/03/2015
02/04/2015 8:10 AM ACCEPTED

26/03/2015
8:20 AM ACCEPTED
02/04/2015
26/03/2015 8:30 AM ACCEPTED
02/04/2015

26-Mar-15 1:30 PM RE-SCHEDULE

26-Mar-15 1:40 PM RE-SCHEDULE

26/03/2015
1:50 PM ACCEPTED
02/04/2015

26/03/2015
02/04/2015 2:00 PM ACCEPTED

26/03/2015 2:10 PM ACCEPTED


02/04/2015

26/03/2015 2:20 PM ACCEPTED


02/04/2015

26/03/2015
2:30 PM ACCEPTED
02/04/2015

26/03/2015
02/04/2015 2:40 PM ACCEPTED

26/03/2015
2:50 PM ACCEPTED
02/04/2015
28-Mar-15 1:30 PM ACCEPTED

28-Mar-15 1:40 PM ACCEPTED

29-Mar-15 1:30 PM ACCEPTED

29-Mar-15 1:40 PM ACCEPTED

29-Mar-15 1:50 PM ACCEPTED

29-Mar-15 2:00 PM ACCEPTED

29-Mar-15 2:10 PM ACCEPTED

29-Mar-15 2:20 PM ACCEPTED

29-Mar-15 2:30 AM ACCEPTED

29-Mar-15 2:40 PM ACCEPTED


29-Mar-15 2:50 PM ACCEPTED

29-Mar-15 3:00 PM ACCEPTED

29-Mar-15 3:10 PM ACCEPTED

29-Mar-15 3:20 PM ACCEPTED

29-Mar-15 3:30 PM ACCEPTED

31/03/2015 8:00 AM ACCEPTED


02/04/2015

31/03/2015 8:10 AM ACCEPTED


02/04/2015

31/03/2015
8:20 AM ACCEPTED
02/04/2015

31/03/2015
02/04/2015 8:30 AM ACCEPTED

31/03/2015
8:40 AM ACCEPTED
02/04/2015
31/03/2015 8:50 AM ACCEPTED
02/04/2015

31-Mar-15 1:30 PM ACCEPTED

31-Mar-15 1:40 PM ACCEPTED

31-Mar-15 1:50 PM ACCEPTED

31-Mar-15 2:00 PM ACCEPTED

31-Mar-15 2:10 PM ACCEPTED

31-Mar-15 2:20 PM ACCEPTED

31-Mar-15 2:30 PM ACCEPTED

31-Mar-15 2:40 PM ACCEPTED

31-Mar-15 2:50 PM ACCEPTED


31-Mar-15 3:00 PM ACCEPTED

31-Mar-15 3:10 PM ACCEPTED

1-Apr-15 8:00 AM ACCEPTED

1-Apr-15 1:30 PM ACCEPTED

1-Apr-15 1:40 PM ACCEPTED

1-Apr-15 1:50 PM ACCEPTED

1-Apr-15 2:00 PM ACCEPTED

1-Apr-15 2:10 PM ACCEPTED

1-Apr-15 2:20 PM ACCEPTED

1-Apr-15 2:30 PM ACCEPTED


02/04/2015 8:00 AM ACCEPTED
09/04/2015

02/04/2015
8:10 AM ACCEPTED
09/04/2015

2-Apr-15 8:20 AM ACCEPTED

2-Apr-15 8:30 AM ACCEPTED

2-Apr-15 1:30 PM CANCEL

2-Apr-15 1:40 PM ACCEPTED

2-Apr-15 1:50 PM ACCEPTED

2-Apr-15 2:00 PM ACCEPTED

2-Apr-15 2:10 PM ACCEPTED

2-Apr-15 2:20 PM ACCEPTED


04/04/2015 8:00 AM ACCEPTED
09/04/2015

04/04/2015
8:10 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 8:20 AM ACCEPTED

04/04/2015
8:30 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 8:40 AM ACCEPTED

04/04/2015 8:50 AM ACCEPTED


09/04/2015

04/04/2015 9:00 AM ACCEPTED


09/04/2015

04/04/2015
9:10 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 9:20 AM ACCEPTED

04/04/2015
9:30 AM ACCEPTED
09/04/2015
04/04/2015 9:40 AM ACCEPTED
09/04/2015

04/04/2015
9:50 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 10:00 AM ACCEPTED

04/04/2015
10:10 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 10:20 AM ACCEPTED

04/04/2015 10:30 AM ACCEPTED


09/04/2015

04/04/2015 10:40 AM ACCEPTED


09/04/2015

04/04/2015
10:50 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 11:00 AM ACCEPTED

04/04/2015
11:10 AM ACCEPTED
09/04/2015
04/04/2015 11:20 AM ACCEPTED
09/04/2015

04/04/2015
11:30 AM ACCEPTED
09/04/2015

04/04/2015
09/04/2015 11:40 AM ACCEPTED

4-Apr-15 11:50 AM ACCEPTED

05/04/2015
09/04/2015 8:00 AM ACCEPTED

05/04/2015 8:10 AM ACCEPTED


09/04/2015

05/04/2015 8:20 AM ACCEPTED


09/04/2015

6-Apr-15 8:00 AM ACCEPTED

6-Apr-15 8:10 AM ACCEPTED

6-Apr-15 1:30 PM ACCEPTED


6-Apr-15 1:40 PM ACCEPTED

6-Apr-15 1:50 PM ACCEPTED

6-Apr-15 2:00 PM ACCEPTED

6-Apr-15 2:30 PM ACCEPTED

6-Apr-15 2:40 PM ACCEPTED

6-Apr-15 2:50 PM ACCEPTED

7-Apr-15 1:30 PM ACCEPTED

7-Apr-15 1:40 PM ACCEPTED

7-Apr-15 1:50 PM ACCEPTED

7-Apr-15 2:00 PM ACCEPTED


7-Apr-15 2:10 PM ACCEPTED

7-Apr-15 2:20 PM ACCEPTED

8-Apr-15 8:00 AM ACCEPTED

8-Apr-15 8:10 AM ACCEPTED

8-Apr-15 8:20 AM ACCEPTED

8-Apr-15 8:30 AM ACCEPTED

8-Apr-15 8:40 AM ACCEPTED

8-Apr-15 1:30 PM ACCEPTED

8-Apr-15 1:40 PM ACCEPTED

8-Apr-15 1:50 PM ACCEPTED


8-Apr-15 2:00 PM CANCEL

08 TO 09-
2:10 PM ACCEPTED
APR-2015

08 TO 09-
APR-2015 2:20 PM ACCEPTED

8-Apr-15 9:00 AM ACCEPTED

09/04/2015
16/04/2015 8:00 AM ACCEPTED

09/04/2015 8:10 AM ACCEPTED


16/04/2015

09/04/2015 8:20 AM ACCEPTED


16/04/2015

09/04/2015
8:30 AM ACCEPTED
16/04/2015

09/04/2015
16/04/2015 8:40 AM ACCEPTED

09/04/2015
8:50 AM ACCEPTED
16/04/2015
9-Apr-15 9:00 AM ACCEPTED

9-Apr-15 9:10 AM ACCEPTED

9-Apr-15 1:30 PM ACCEPTED

10-Apr-15 8:00 AM ACCEPTED

11-Apr-15 8:00 AM ACCEPTED

11-Apr-15 8:10 AM ACCEPTED

11-Apr-15 8:20 AM ACCEPTED

11-Apr-15 1:30 PM ACCEPTED

11-Apr-15 1:40 PM ACCEPTED

12/04/2015
8:00 AM ACCEPTED
16/04/2015
12/04/2015 8:10 AM ACCEPTED
16/04/2015

12/04/2015
8:20 AM ACCEPTED
16/04/2015

12/04/2015
16/04/2015 8:30 AM ACCEPTED

12/04/2015
8:40 AM ACCEPTED
16/04/2015

12-Apr-15 1:30 PM ACCEPTED

12-Apr-15 1:40 PM ACCEPTED

12-Apr-15 1:50 PM CANCEL

13-Apr-15 1:30 PM ACCEPTED

13-Apr-15 1:40 PM ACCEPTED

14-Apr-15 1:30 PM ACCEPTED


14-Apr-15 1:40 PM ACCEPTED

14-Apr-15 1:50 PM ACCEPTED

14-Apr-15 2:00 PM ACCEPTED

14-Apr-15 2:10 PM ACCEPTED

14-Apr-15 2:20 PM ACCEPTED

15-Apr-15 8:00 AM ACCEPTED

15-Apr-15 1:30 PM ACCEPTED

15-Apr-15 1:40 PM ACCEPTED

15-Apr-15 1:50 PM ACCEPTED

15-Apr-15 2:00 PM ACCEPTED


18-Apr-15 8:00 AM ACCEPTED

18/04/2015
8:10 AM ACCEPTED
23/04/2015

18/04/2015
23/04/2015 8:20 AM ACCEPTED

18/04/2015
8:30 AM ACCEPTED
23/04/2015

18/04/2015
23/04/2015 8:40 AM ACCEPTED

18/04/2015 8:50 AM ACCEPTED


23/04/2015

18/04/2015 9:00 AM ACCEPTED


23/04/2015

18-Apr-15 9:10 AM ACCEPTED

18-Apr-15 1:30 PM ACCEPTED

18-Apr-15 1:40 PM ACCEPTED


18-Apr-15 1:50 PM ACCEPTED

18-Apr-15 2:00 PM ACCEPTED

18-Apr-15 2:10 PM ACCEPTED

18-Apr-15 2:20 PM ACCEPTED

18-Apr-15 2:30 PM ACCEPTED

18-Apr-15 2:40 PM ACCEPTED

18-Apr-15 2:50 PM ACCEPTED

18-Apr-15 3:00 PM ACCEPTED

18-Apr-15 3:10 PM ACCEPTED

18-Apr-15 3:20 PM ACCEPTED


18-Apr-15 3:30 PM ACCEPTED

19-Apr-15 8:00 AM ACCEPTED

21/04/2015
23/04/2015 8:00 AM ACCEPTED

21/04/2015
8:10 AM ACCEPTED
23/04/2015

21/04/2015
23/04/2015 8:20 AM ACCEPTED

21-Apr-15 1:30 PM ACCEPTED

21-Apr-15 1:40 PM ACCEPTED

21-Apr-15 1:50 PM ACCEPTED

23-Apr-15 8:00 AM ACCEPTED

23-Apr-15 8:10 AM ACCEPTED


23-Apr-15 8:20 AM ACCEPTED

23-Apr-15 1:30 PM ACCEPTED

23-Apr-15 1:40 PM ACCEPTED

23-Apr-15 1:50 PM ACCEPTED

23-Apr-15 2:00 PM ACCEPTED

23-Apr-15 2:10 PM ACCEPTED

23-Apr-15 2:20 PM ACCEPTED

23-Apr-15 2:30 PM ACCEPTED

23-Apr-15 2:40 PM ACCEPTED

23-Apr-15 2:50 PM ACCEPTED


26-Apr-15 8:00 AM ACCEPTED

26/04/2015 -
8:10 AM ACCEPTED
30/04/2015

26/04/2015 -
30/04/2015 8:20 AM ACCEPTED

26/04/2015 -
8:30 AM ACCEPTED
30/04/2015

26-Apr-15 8:40 AM ACCEPTED

26-Apr-15 1:30 PM ACCEPTED

27/04/2015 - 8:00 AM ACCEPTED


30/04/2015

27/04/2015 -
8:10 AM ACCEPTED
30/04/2015

27-Apr-15 1:30 PM ACCEPTED

27-Apr-15 1:40 PM ACCEPTED


27-Apr-15 1:50 PM ACCEPTED

27-Apr-15 2:00 PM ACCEPTED

27-Apr-15 2:10 PM ACCEPTED

27-Apr-15 2:20 PM ACCEPTED

27-Apr-15 2:30 PM ACCEPTED

27-Apr-15 2:40 PM ACCEPTED

28-Apr-15 8:00 AM ACCEPTED

28-Apr-15 8:10 AM ACCEPTED

30-Apr-15 8:00 AM ACCEPTED

30-Apr-15 1:30 PM ACCEPTED


30-Apr-15 1:40 PM ACCEPTED

30-Apr-15 1:50 PM ACCEPTED

30-Apr-15 2:00 PM ACCEPTED

02/05/2015
8:00 AM ACCEPTED
07/05/2015

02/05/2015
07/05/2015 8:10 AM ACCEPTED

02/05/2015 8:20 AM ACCEPTED


07/05/2015

02/05/2015 8:30 AM ACCEPTED


07/05/2015

02/05/2015
8:40 AM ACCEPTED
07/05/2015

02/05/2015
07/05/2015 8:50 AM ACCEPTED

02/05/2015
9:00 AM ACCEPTED
07/05/2015
02/05/2015 9:10 AM ACCEPTED
07/05/2015

3-May-15 1:30 PM ACCEPTED

3-May-15 1:40 PM ACCEPTED

3-May-15 1:50 PM ACCEPTED

3-May-15 2:00 PM ACCEPTED

3-May-15 2:10 PM ACCEPTED

3-May-15 2:20 PM ACCEPTED

3-May-15 2:40 PM ACCEPTED

3-May-15 2:50 PM ACCEPTED

3-May-15 3:00 PM ACCEPTED


4-May-15 8:00 AM ACCEPTED

4-May-15 8:10 AM ACCEPTED

4-May-15 8:20 AM ACCEPTED

4-May-15 8:30 AM ACCEPTED

4-May-15 8:40 AM ACCEPTED

6-May-15 8:00 AM ACCEPTED

6-May-15 8:10 AM ACCEPTED

6-May-15 8:20 AM ACCEPTED

6-May-15 8:30 AM ACCEPTED

6-May-15 8:40 AM ACCEPTED


6-May-15 8:50 AM ACCEPTED

6-May-15 9:00 AM ACCEPTED

6-May-15 9:10 AM ACCEPTED

10-May-15 8:00 AM ACCEPTED

10-May-15 8:10 AM ACCEPTED

10-May-15 8:20 AM ACCEPTED

10-May-15 8:30 AM ACCEPTED

10-May-15 8:40 AM ACCEPTED

10-May-15 8:50 AM ACCEPTED

10-May-15 9:00 AM ACCEPTED


10-May-15 9:10 AM ACCEPTED

10-May-15 9:20 AM ACCEPTED

12-May-15 8:00 AM ACCEPTED

12-May-15 8:10 AM ACCEPTED

12-May-15 8:20 AM ACCEPTED

12-May-15 8:30 AM ACCEPTED

12-May-15 8:40 AM ACCEPTED

12-May-15 8:50 AM CANCEL

14-May-15 8:00 AM ACCEPTED

14-May-15 8:10 AM ACCEPTED


14-May-15 8:20 AM ACCEPTED

14-May-15 8:30 AM ACCEPTED

14-May-15 8:40 AM ACCEPTED

14-May-15 8:50 AM ACCEPTED

16-May-15 8:00 AM ACCEPTED

16-May-15 8:10 AM ACCEPTED

17-May-15 8:00 AM ACCEPTED

17-May-15 8:10 AM ACCEPTED

18-May-15 1:30 PM ACCEPTED

18-May-15 1:40 PM ACCEPTED


19-May-15 8:00 AM ACCEPTED

19-May-15 8:10 AM ACCEPTED

19-May-15 8:20 AM ACCEPTED

19-May-15 8:30 AM ACCEPTED

20-May-15 8:00 AM ACCEPTED

20-May-15 8:10 AM ACCEPTED

20-May-15 8:20 AM ACCEPTED

20-May-15 8:30 AM ACCEPTED

20-May-15 8:40 AM ACCEPTED

20-May-15 8:50 AM ACCEPTED


20-May-15 9:00 AM ACCEPTED

21-May-15 8:00 AM ACCEPTED

21-May-15 8:10 AM ACCEPTED

21-May-15 8:20 AM ACCEPTED

21-May-15 8:30 AM ACCEPTED

21-May-15 8:40 AM ACCEPTED

21-May-15 8:50 AM ACCEPTED

21-May-15 9:00 AM ACCEPTED

21-May-15 9:10 AM ACCEPTED

23-May-15 8:00 AM ACCEPTED


23-May-15 8:10 AM ACCEPTED

23-May-15 8:20 AM ACCEPTED

23-May-15 8:30 AM ACCEPTED

23-May-15 8:40 AM ACCEPTED

23-May-15 8:50 AM

23-May-15 9:00 AM ACCEPTED

23-May-15 10:00 AM ACCEPTED

25-May-15 8:00 AM ACCEPTED

25-May-15 8:10 AM ACCEPTED

25-May-15 8:20 AM ACCEPTED


25-May-15 8:30 AM ACCEPTED

25-May-15 8:40 AM ACCEPTED

25-May-15 8:50 AM ACCEPTED

26-May-15 8:00 AM ACCEPTED

26-May-15 8:10 AM ACCEPTED

26-May-15 8:20 AM ACCEPTED

26-May-15 8:30 AM ACCEPTED

26-May-15 8:40 AM ACCEPTED

26-May-15 8:50 AM ACCEPTED

26-May-15 9:00 AM ACCEPTED


26-May-15 9:10 AM ACCEPTED

26-May-15 9:20 AM ACCEPTED

26-May-15 9:30 AM ACCEPTED

26-May-15 9:40 AM ACCEPTED

26-May-15 9:50 AM ACCEPTED

26-May-15 10:00 AM ACCEPTED

26-May-15 10:10 AM ACCEPTED

8:00 AM ACCEPTED

27-May-15 8:10 AM ACCEPTED

27-May-15 8:20 AM ACCEPTED


27-May-15 8:30 AM ACCEPTED

30-May-15 8:00 AM

30-May-15 8:10 AM

30-May-15 8:20 AM

30-May-15 8:30 AM

30-May-15 8:40 AM

30-May-15 8:50 AM

30-May-15 9:00 AM

30-May-15 9:10 AM

30-May-15 9:20 AM
30-May-15 9:30 AM
INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSP.
SLNO RFI NUMBER DISCIPLINE INSPECTION/ TEST INSPECTION/TEST ACTIVITY CHECKLIST NO. GRADE SUB- LOCATION / AREA DATE OF
TIME Daelim status
ITEM SYSTEM INSP.
(H/W/R)

ROCK WOOL,PIR,FOSTER-95-50,60-90,MASTER
1 MFC-DLM-GS-1-001 INSULATIONMATERIAL INSPECTION FAB,S.S WIRE,VENTURE CLAD-1577 SMIC-1-4011 W GSC FARMLAND AREA 20-Jun-13 8:00:00 AM CANCELLED

2 MFC-DLM-GS-1-002 INSULATION
INSPECTION OF CLADDING ALUMINIUM CORRUGATED SHEET SMIC-1-4011 W GSC GARNET AREA 20-Jun-13 9:00:00 AM ACCEPTED

3 MFC-DLM-GS-1-003 INSULATION EQUIPMENT ROLL MACHINE,GREW MACHINE NIL W GSC GARNET AREA 20-Jun-13 9.30 AM ACCEPTED
INSPECTION

4 MFC-DLM-GS-1-004 INSULATION MATERIAL INSPECTION OF HOT&COLD MATERIAL STORAGE SMIC-1-4011 W GSC GARNET AREA 25-Jun-13 9.AM CANCELLED
INSPECTION

5 MFC-DLM-GS-1-005 INSULATION MATERIAL INSPECTION OF HOT&COLD MATERIAL STORAGE SMIC-1-4011 W GSC GARNET AREA 25-Jun-13 8.30 AM CANCELLED
INSPECTION

6 MFC-DLM-G-1-006 INSULATION
INSULATION HOT&COLD INSULATION MATERIAL SMIC-1-4011 W GARNET/FARMLAND 30-Jun-13 10.00 am CANCELLED
MATERIAL

7 MFC-DLM-GS-1-007 INSULATION CLADDING INSPECTION OF CLADDING MATERIAL SMIC-1-4011 W GARNET AREA 30-Jun-13 10.30 AM CANCELLED
MATERIAL

8 MFC-DLM-GS-1-008 INSULATION CLADDING INSPECTION OF CLADDING MATERIAL SMIC-1-4011 W GARNET AREA 30-Jun-13 11:00 AM ACCEPTED
MATERIAL

EQUIPMENT
9 MFC-DLM-GS-1-009 INSULATION INSPECTION-T PRE INSULATION INSPECTION SMIC-1-4012 W 1731-01 T-1910 27-Jun-13 3.30 PM ACCEPTED
-1910

EQUIPMENT INSULATION INSPECTION PRIOR TO CLADDING


10 MFC-DLM-GS-1-010 INSULATION INSPECTION- SMIC-1-4013 W 1731-01 T-1910 28-O6-13 11.30 AM CANCELLED
T1910 (PARTIAL)

MFC-DLM-GS-1-011 INSULATION
11 T-1910 INSPECTION OF INSULATION PROR TO CLADDING SMIC-1-4013 W 1731-01 MFC SITE 7-Jul-13 10;AM ACCEPTED
A

INSULATION INSPECTION OF HOT&COLD MATERIAL STORAGE GSC GARNET/FARM


12 MFC-DLM-GS-1-012 INSULATION MATERIAL foster 95-44&ppg SMIC-1-4011 W LAND AREA
2-Jul-13 9; AM CANCELLED

CLADDING INSPECTION OF CLADDING MATERIAL &STORAGE


13 MFC-DLM-GS-1-013 INSULATION
MATERIAL ALUMINIUM PLAIN SHEET 0.08mm SMIC-1-4011 W GSC GARNET AREA 2-Jul-13 9:AM ACCEPTED

INSULATION RECIVING Inspection of cold Insulation Material


14 MFC-DLM-GS-1-014 INSULATION MATERIAL And Storage SMIC-1-4011 W GSC FARM LAND AREA 4-Jul-13 3: PM CANCELLED

INSULATION RECIVING Inspection of cold &HOT Insulation


15 MFC-DLM-GS-1-015 INSULATION MATERIAL Material And Storage SMIC-1-4011 W GSC FARM LAND AREA 4-Jul-13 3:30 PM CANCELLED

16 MFC-DLM-GS-1-016 INSULATION INSULATION FOSTER-95-50/FOSTER-60-90(MASTIC) SMIC-1-4011 W GSC FARM LAND AREA 11-Jul-13 3.00:PM CANCELLED
MATERIAL

17 MFC-DLM-GS-1-17 INSULATION
INSULATION FOSTER-95-44 (SILICONE) SMIC-1-4011 W GSC FARM LAND AREA 11-Jul-13 3.30:PM ACCEPTED
MATERIAL

T-
18
MFC-DLM-GS-1- FINAL 1910(DEBUTANA FINAL INSPECTION OF CLADDING OF EQUIPMENT SMIC-1-4014 W 1731-01
SADARA MFC SITE 15-Jul-13 9:AM ACCEPTED
18A(RE SECHDULE) INSPECTION
ZER) EXCLUDING3 SADDLE SUPPORT&BOTTOM DOME AREA-1

19 MFC-DLM-GS-I-019 INSULATION Insulation Receiving Inspection of Hot and Cold Insulation SMIC-I-4011 W GSC Farmland Area 18-Jul-13 10:00:AM ACCEPTED
Material Material and Storage (Foster 95-50)

20 MFC-DLM-GS-I-020 INSULATION Insulation Receiving Inspection of Cold Insulation Material SMIC-I-4011 W GSC Farmland Area 18-Jul-13 10:15:AM ACCEPTED
Material and Storage (Foster 60-90)

21 MFC-DLM-GS-I-021 INSULATION Insulation Receiving Inspection of Hot and Cold Insulation SMIC-I-4011 W GSC Garnet Area 18-Jul-13 11:00:AM ACCEPTED
Material Material and Storage (PPG TEXO HTM MAT)

22 MFC-DLM-GS-I-022 INSULATION T-1330 Pre Insulation Inspection SMIC-I-4012 W 1621-03 MFC Site 23-Jul-13 2:00:PM ACCEPTED

23 MFC-DLM-GS-I-023 INSULATION T-1330 Insulation Inspection Prior to Cladding SMIC-I-4013 W 1621-03 MFC Site 25-Jul-13 8:00:AM ACCEPTED

Insulation Final Inspection (Cladding) Excludding


24 MFC-DLM-GS-I-024 INSULATION T-1330 SMIC-I-4014 W 1621-03 MFC Site 27-Jul-13 3:00:PM RESCHEDULE
Bottom Dome

MFC-DLM-GS-I- FINAL
25
024( A) INSPECTION T-1330 FINAL INSPECTION OF CLADDING SMIC-I-4014 W 1621-03 MFC Site 28-Jul-13 8: AM ACCEPTED

26 MFC-DLM-GS-I-025 INSULATION T-1510 Pre Insulation Inspection SMIC-I-4012 W 1624-01 MFC Site 31-Jul-13 8: AM ACCEPTED

Partial Insulation Inspection prior to cladding


27 MFC-DLM-GS-I-026 INSULATION T-1510 upto second Stiffner Ring as per the highlighted SMIC-I-4013 W 1624-01 MFC Site 2-Aug-13 10:00:AM ACCEPTED
drawing (Excluding One Saddle Support)

2nd partial Inspection of Hot Insulation


28 MFC-DLM-GS-I-027 INSULATION T-1510 installation prior to Cladding as er highlighted SMIC-I-4011 W 1624-01 Sadara MFC Site 4-Aug-13 8:00:AM ACCEPTED
drawing (Excluding One Saddle Support)

29 MFC-DLM-GS-I-028 INSULATION Insulation Inspection of cold insulation material SMIC-I-4013 W GSC Farmland Area 4-Aug-13 9:30:AM RESCHEDULE
Material acceceries(filament tape)

30
MFC-DLM-GS-I- INSULATION
Insulation Inspection of cold insulation material SMIC-I-4013 W GSC Farmland Area 5-Aug-13 9:30:AM ACCEPTED
028A Material acceceries(filament tape)

31 MFC-DLM-GS-I-029 INSULATION T-1820 Pre Insulation Inspection SMIC-I-4012 W 1662-01 Sadara MFC Site (T- 8-Aug-13 7:30:AM ACCEPTED
1820)

32
FINAL
MFC-DLM-GS-I-030 INSPECTION Eq no-T-1510 Final inspection for cladding (Excludding 2saddle SMIC-I-4014 W 1624-01 Flare Area (T-1510) 10-Aug-13 11:00:AM ACCEPTED
support& Bottom dome)

33 MFC-DLM-GS-I-031 insulation Eq no-T-1820 Insulation inspection prior to cladding for eq no SMIC-I-4013 W 1662-01 Flare Area 11-Aug-13 07:00:AM ACCEPTED
-T1820 (hot insulation area only)

34 MFC-DLM-GS-I-032 insulation Eq no-T-1820 Cold insulation inspection prior to vapor barrier SMIC-I-5016 W 1662-01 Flare Area 15-Aug-13 08:00:AM ACCEPTED
eq no -T1820 (As per high lighted drawing area )

MFC-DLM-GS-I-033 vapor barrier inspection prior to cladding eq no


35 insulation Eq no-T-1820 SMIC-I-5017 W 1662-01 Flare Area 15-Aug-13 04:00:PM RESCHEDULE
A -T1820 (As per high lighted drawing area )

vapor barrier inspection prior to cladding eq no


36 MFC-DLM-GS-I-033 insulation Eq no-T-1820 SMIC-I-5017 W 1662-01 Flare Area 16-Aug-13 9:AM ACCEPTED
-T1820 (As per high lighted drawing area )

37 MFC-DLM-GS-I-034 insulation FOSTER 81-33 inspection of cold insulation material and storage SMIC-I-4011 W Farm land area 16-Aug-13 08:00AM ACCEPTED

Aero Flex(rubber inspection of cold insulation material and storage


38 MFC-DLM-GS-I-035 insulation
form) (Back up layer) SMIC-I-4011 W Flare area 18-Aug-13 08:00:AM ACCEPTED

MFC-DLM-GS-I-036 insulation Butyl Rubber inspection of cold insulation material and storage SMIC-I-4011 W Flare area 18-Aug-13 08:15:AM ACCEPTED

Cold Insulation inspection prior to vapor barrier


39 MFC-DLM-GS-I-037 insulation T-1820 for eq no T-1820 SMIC-I-5016 W 1662-01 flair area 19-Aug-13 09:00:AM ACCEPTED

40 MFC-DLM-GS-I-038 insulation T-2127 Pre insulation inspection for eq noT-2127 SMIC-I-5015 W 1683-03 flair area 19-Aug-13 10:30:AM ACCEPTED

MFC-DLM-GS-I-039 insulation
Foster-90-66 Inspection of cold insulation material and storage SMIC-I-4011 W Farm land area 19-Aug-13 08.15AM ACCEPTED
A&B

Vapor barrier inspection prior to cladding for eq


43 MFC-DLM-GS-I-040 insulation T-1820 no T-1820 SMIC-I-5017 W 1662-01 flair area 20-Aug-13 11:30:AM ACCEPTED

44 MFC-DLM-GS-I-041 Mechanical Minaral wool Inspection for hot insulation material and storage SMIC-I-4011 W Farm land Area 23-Aug-13 10:00:AM ACCEPTED
70MM Thick

Final inspection cladding for eqno-T-


45 MFC-DLM-GS-I-042 FINAL
T-1820 1820(excluding Three saddle Saport &and SMIC-I- W 1662-01 Flair Area 24-Aug-13 03:30:PM
WORK NOT
INSPECTION 5018/4014 COMPLETED
Bottom Dome)

Final inspection cladding for eqno-T-


46
MFC-DLM-GS-I-042 FINAL
T-1820 1820(excluding Three saddle Saport &and SMIC-I- W 1662-01 Flair Area 24-Aug-13 10.am
WORK NOT
A INSPECTION 5018/4014 COMPLETED
Bottom Dome)

Final Inspection Cladding for Equipment No. T-


47
FINAL
MFC-DLM-GS-I-043 INSPECTION T-1820 1820 (excluding three saddle support & and SMIC-I- W 1662-01
Flare Area (Sadara MFC 26-Aug-13 9:00AM ACCEPTED
(Bottom Dome) 5018/4014 Site)

48 MFC-DLM-GS-I-044 Insulation T-2110 Pre Insulation Inspection of Equipment No T-2110 SMIC-I-4012 W 1683-01 Sadara MFC Site 27-Aug-13 4:00PM RESCHEDULE

MFC-DLM-GS-I- Insulation
49 Insulation Pre Insulation Inspection of Equipment No T-2110 SMIC-I-5015 W Sadara MFC Site 27-Aug-13 10:00AM ACCEPTED
044( A) Material

50 MFC-DLM-GS-I -045 INSULATION FOSTER 95-44 Inspection of cold & hot material and storage SMIC-I-4011 w Farm land area 2-Sep-13 9.30 AM ACCEPTED

Partial Insulation Inspection prior to Second


51 MFC-DLM-GS-I -046 INSULATION T-2110 Layer insulation for the High lighted Area of SMIC-I-5016 W 1683-01 Sadara MFC Site 2-Sep-13 10:AM ACCEPTED
equipment no:T-2110

52 MFC-DLM-GS-I-047 insulation R-2030 Pre insulation inspection for EQ-noR-2030 SMIC-I-4012 W 1682-01 Dryer pipe rack area 4-Sep-13 10:00AM ACCEPTED

MFC-DLM-GS-I-048
53
A insulation R-2035 Pre insulation inspection for EQ-noR-2035 SMIC-I-4012 W 1682-01 Dryer pipe rack area 4-Sep-13 10:30AM ACCEPTED

Partial 2 Insulation inspection prior to scond layer


54 MFC-DLM-GS-I-049 Insulation T-2110 insulaton for Eq no T-2110 As per highlighted SMIC-I-5016 W 1683-01 Sadara MFC Site 7-Sep-13 10:00AM ACCEPTED
area (excluding one saddle support & dome)
Partial 4 Second Layer Insulation Inspection prior
to Vapor barrier for Equipment No T-2110 as per
55 MFC-DLM-GS-I-050 insulation T-2110 highlighted drawing area (excluding one saddle SMIC-I-5016 W 1683-01 T-2110 8-Sep-13 8:00:AM CANCELLED
support and Bottom Dome)

Pre Insulation Inspection for Equipment No. D-


56 MFC-DLM-GS-I-051 insulation D-1917 1917 SMIC-I-4012 W 1731-01 D-1917 8-Sep-13 8:30:AM ACCEPTED

57 MFC-DLM-GS-I-52 insulation R-2035 Pre Insulation Inspection Prior to Cladding of SMIC -I -4013 W 1682-01 Dryer pipe rack area 9-Sep-13 11:AM CANCELLED
eq:R-2035 (Excluding bottom dome)

58 MFC-DLM-GS-I-053 insulation R-2035 insulation inspection prior to cladding for EQ- SMIC-I-4013 W 1682-01 Dryer pipe rack area (R- 11-Sep-13 REJECTED
08:30AM BY SADARA WORK NOT COMPLETED
noR-2035(Excluding bottom dome) 2035)

Partial- 4 Second layer Insulation inspection


59 MFC-DLM-GS-I-054 insulation T-2110 prior to vapor barrier for EQ no-T2110(Excluding SMIC-I-5016 W 1683-01 Sadara MFC Site 11-Sep-13 3:30PM ACCEPTED
one saddele support&Bottom dome)

60 MFC-DLM-GS-I-055 Insulation BUTYL RUBBER Inspection of cold insulation material and storage SMIC-I-4011 W Cold area 13-Sep-13 08:30AM ACCEPTED
(BUTYL RUBBER 10 ROLL)

Dryer pipe rack area (R-


61 MFC-DLM-GS-I-056 Insulation T-2025 Pre insulation inspection for eq no-R2025 SMIC-I-4012 W 1682-01 13-Sep-13 09:00AM ACCEPTED
2025)

Partial 5- vapor barrier inspection prior to


62 MFC-DLM-GS-I-057 Insulation T-2110 cladding up to first stiffner ring (excluding one SMIC-I-5017 W 1683-01 Cold area 15-Sep-13 08:00AM ACCEPTED
saddle support and bottom dome)

Partial 6-second layer insulation inspection prior


63 MFC-DLM-GS-I-058 Insulation T-2110 to vapor barrier for eq-noT-2110 (Excluding one SMIC-I-5016 W 1683-01 Cold area 15-Sep-13 03:00PM ACCEPTED
saddle support &head dome)

HOT INSULATION INSPECTION PRIOR TO DRYER PIPE RACK


64 MFC-DLM-GS-I-059 INSULATION R-2030 CLADDING FOR EQ-NO-R2030 SMIC-I-4013 W 1682-01
AREA(R-2030) 16-Sep-13 08:00:AM ACCEPTED

COLD INSULATION INSPECTION PRIOR TO


65 MFC-DLM-GS-I-060 INSULATION T-2110 SECOND LAYER FOR EQ-NO-T2110(ONLY HEAD SMIC-I-5016 W 1683-01 COLD AREA(T-2110) 16-Sep-13 04:00:PM CANCELLED
DOME AREA)

HOT IUNSULATION INSPECTION PRIOR TO


66 MFC-DLM-GS-I-061 INSULATION R-2025 CLADDING FOR EQ-NO-R2025 SMIC-I-4013 W 1682-01 DRYER PIPE RACK 17-Sep-13 9:00 AM CANCELLED

VAPOR BARRIER INSPECTION PRIOR TO


CLADDING FOR EQ-NO-T2110 (EXCLUDING ONE MFC SADARA SITE (T-
67 MFC-DLM-GS-I-062 INSULATION T-2110 SADDLE SUPPORT ANDD HEAD DOME) SMIC-H-4017 W 1683-01
2110)
17-Sep-13 3:00 PM RE SCHEDULE
HIGHLIGHTED DRAWING AREA
7th PARTIAL VAPOR BARRIER INSPECTION PRIOR
MFC-DLM-GS-I-062 TO CLADDING FOR EQ-NO-T2110 (EXCLUDING MFC SADARA SITE (T-
68
A
INSULATION T-2110 ONE SADDLE SUPPORT ANDD HEAD DOME) SMIC-H-4017 W 1683-01
2110)
18-Sep-13 9:00 AM ACCEPTED
HIGHLIGHTED DRAWING AREA

HOT INSULATION INSPECTION PRIOR TO DRYER PIPE RACK


69 MFC-DLM-GS-I-063 INSULATION R-2025 CLADDING FOR EQ-NO-R2025 SMIC-I-4013 W 1682-01
AREA(R-2025)
19-Sep-13 08:00:AM CANCELLED

70 MFC-DLM-GS-I-064 INSULATION D-1917 HOT INSULATION INSPECTION PRIOR TO SMIC-I-4013 W 1731-01 SPLITTER PIPE RACK 19-Sep-13 09:00:AM CANCELLED
CLADDING FOR EQ-NO-D-1917 AREA(D-1917)

INSULATION INSPECTION PRIOR TO VAPOR


71 MFC-DLM-GS-I-065 INSULATION T-2110 BARRIER FOR EQ NO-T2110 ( ONLY 22 SRINGLER SMIC-I-5016 W 1683-01 SADARA MFC SITE(T-2110) 19-Sep-13 10:00:AM CANCELLED
SUPPORT)

VAPOR BARRIER INSPECTION PRIOR TO


72 MFC-DLM-GS-I-066 INSULATION T-2110 CLADDING FOR EQ NO-T2110 ( ONLY 22 SMIC-I-5017 W 1683-01 SADARA MFC SITE(T-2110) 19-Sep-13 03:00:AM CANCELLED
SRINGLER SUPPORT)

INSULATION INSPECTION PRIOR TO VAPOR


73 MFC-DLM-GS-I-067 INSULATION T-2110 BARRIER FOR EQ NO-T2110 ( ONLY 22 SRINGLER SMIC-I-5016 W 1683-01
SADARA MFC SITE (T- 20-Sep-13 7:00:AM ACCEPTED
SUPPORT) 2110)

VAPOR BARRIER INSPECTION PRIOR TO SADARA MFC SITE (T-


74 MFC-DLM-GS-I-068 INSULATION T-2110 CLADDING FOR EQ. NO-T2110 ( ONLY 22 SMIC-I-5017 W 1683-01 20-Sep-13 10:00:AM ACCEPTED
SRINGLER SUPPORT) 2110)

75 MFC-DLM-GS-I-069 INSULATION E-2026 Pre Insulation Inspection for Equipment - E-2026 SMIC-I-4012 W 1682-01 SADARA MFC SITE 20-Sep-13 9:00:AM ACCEPTED

HOT INSULATION INSPECTION PRIOR TO DRYER PIPE RACK


76 MFC-DLM-GS-I-070 INSULATION R-2025 SMIC-I-4013 W 1682-01 21-Sep-13 08:00:AM ACCEPTED
CLADDING FOR EQ-NO-R2025 AREA(R-2025)

HOT INSULATION INSPECTION PRIOR TO SPLITTER PIPE RACK REJECTED


77 MFC-DLM-GS-I-071 INSULATION D-1917 CLADDING FOR EQ-NO-D-1917 SMIC-I-4013 W 1731-01
AREA(D-1917) 21-Sep-13 08:30:AM WORK NOT
COMPLETED

8th PARTIAL- FIRST LAYER COLD INSULATION


SADARA MFC SITE(T-
78 MFC-DLM-GS-I-072 INSULATION T-2110 INSPECTION PRIOR TO SECOND LAYER FOR EQ- SMIC-I-5016 W 1683-01
2110) 21-Sep-13 09:00:AM ACCEPTED
NO-T2110 (ONLY HEAD DOME)

REJECTED
79 MFC-DLM-GS-I-073 INSULATION X-2010 PRE INSULATION INSPECTION FOR EQ-NO-X-2010 SMIC-I-4012 W 1681-00 DRYER PIPE RACK 21-Sep-13 09:30:AM WORK NOT
(MERCURY REMOVAL BED) AREA(X-2010) COMPLETED

DRYER PIPE RACK


80 MFC-DLM-GS-I-074 INSULATION X-2010 PRE INSULATION INSPECTION FOR EQ-NO-X-2010 SMIC-I-4012 W 1681-00
AREA(X-2010)
22-Sep-13 08:00:AM ACCEPTED

Page 1336 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
HOT INSULATION INSPECTION PRIOR TO SPLITTER PIPE RACK
81 MFC-DLM-GS-I-075 INSULATION D-1917 CLADDING FOR EQ-NO-D-1917 SMIC-I-4013 W 1731-01
AREA(D-1917) 23-Sep-13 08:00:AM ACCEPTED

9th PARTIAL 2nd LAYER INSULATION INSPECTION


82 MFC-DLM-GS-I-076 INSULATION T-2110 PRIOR TO VAPOR BARRIER FOR EQ -NO T-2110 SMIC-I-5016 W 1683-01 MFC SADARA SITE 23-Sep-13 08:30:AM ACCEPTED
(ONLY HEAD DOME)

83 MFC-DLM-GS-I-077 INSULATION T-2110 Vapor Barrier inspector Prior to Cladding for SMIC-I-5017 W 1683-01 SADARA MFC SITE 23-Sep-13 11:30AM ACCEPTED
Equipment No.T-2110(ONLY HEAD DOME AREA)

FINAL
FINAL INSPECTION FOR CLADDING INSTALATION
84 MFC-DLM-GS-I-078 INSPECTION T-2110 FOR EQ -NO T-2110(EXCLUDING TWO SADDLE SMIC-I-5018 W 1683-01 SADARA MFC SITE 26-Sep-13 04:00PM ACCEPTED
SUPPORT BOTTOM DOME AND ONE BEND)

insulation inspection prior to cladding for EQ- Dryer pipe rack area (R-
85 MFC-DLM-GS-I-79 insulation R-2035 noR-2035(Excluding bottom dome) SMIC-I-4013 W 1682-01
2035)
11-Sep-13 08:30AM ACCEPTED

PRE INSULATION INSPECTION FOR EQ-NO E-


86 MFC-DLM-GS-I-080 insulation Eq no-E-1534A 1534A SMIC-I-4012 W 1626-00 EW PIPE PACK AREA 27-Sep-13 08:00:AM ACCEPTED

PRE INSULATION INSPECTION FOR EQ-NO E-


87 MFC-DLM-GS-I-081 insulation Eq no-E-1534B 1534B SMIC-I-4012 W 1626-00 EW PIPE PACK AREA 27-Sep-13 08:30:AM ACCEPTED

88 MFC-DLM-GS-I-082 insulation Eq no-E-1537 PRE INSULATION INSPECTION FOR EQ-NO E-1537 SMIC-I-4012 W 1624-01 EW PIPE PACK AREA 27-Sep-13 09:00:AM ACCEPTED

89 MFC-DLM-GS-I-083 insulation Eq no-D-1718 PRE INSULATION INSPECTION FOR EQ-NO E-1718 SMIC-I-5015 W 1641-00 DRYER PIPE PACK AREA 27-Sep-13 09:30:AM ACCEPTED

90 MFC-DLM-GS-I-084 INSULATION E-1534A INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-4013 W 1626-00 FURNACE AREA 29-SEPT-13 07:30:AM ACCEPTED
FOR EQ-NO-E-1534A(EXCLUDING TWO FLANGES)

91 MFC-DLM-GS-I-085 INSULATION E-1534B INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-4013 W 1626-00 FURNACE AREA 29-SEPT-13 08:00:AM ACCEPTED
FOR EQ-NO-E-1534B(EXCLUDING TWO FLANGES)

MFC-DLM-GS-I-086 INSULATION E-1537 INSULATION INSPECTION PRIOR TO CLADDING


FOR EQ-NO-E-1537(EXCLUDING TWO FLANGES) SMIC-I-4013 W 1624-01 FURNACE AREA ACCEPTED
92 29-SEPT-13 08:15:AM

93 MFC-DLM-GS-I-087 INSULATION D-1827 PRE INSULATION INSPECTION FOR EQ-NO-D-1827 SMIC-I-4012 W 1662-01 SADARA MFC SITE 29-SEPT-13 08:30:AM ACCEPTED

FINAL INSPECTION FOR CLADDING INSTALATION


94
FINAL
MFC-DLM-GS-I-088 INSPECTION E-1534A INSPECTION FOR EQ-NO-E-1534A(EXCLUDING SMIC-I-4014 W 1626-00 FURNACE AREA 30-Sep-13 11:00:AM ACCEPTED
TWO FLANGES)

FINAL INSPECTION FOR CLADDING INSTALATION


FINAL
95 MFC-DLM-GS-I-089 INSPECTION E-1534B INSPECTION FOR EQ-NO-E-1534B(EXCLUDING SMIC-I-4014 W 1626-00 FURNACE AREA 30-Sep-13 11:15:AM ACCEPTED
TWO FLANGES)

FINAL
FINAL INSPECTION FOR CLADDING INSTALATION
96 MFC-DLM-GS-I-090 INSPECTION E-1537 INSPECTION FOR EQ-NO-E-1537(EXCLUDING SMIC-I-4014 W 1624-01 FURNACE AREA 30-Sep-13 11:30:AM ACCEPTED
TWO FLANGES)

INSULATION INSPECTION PRIOR TO CLADDING


97 MFC-DLM-GS-I-091 INSULATION X-2010 SMIC-I-4013 W 1681-00 DRYER PIPE RACK AREA 30-Sep-13 08:30AM CANCELLED
FOR EQ-NO-X-2110

Page 1337 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSULATION INSPECTION PRIOR TO CLADDING
98 MFC-DLM-GS-I-092 INSULATION E-2026 FOR EQ-NO-E-2026 SMIC-I-4013 W 1682-01 DRYER PIPE RACK AREA 30-Sep-13 08:00AM CANCELLED

INSULATION INSPECTION PRIOR TO CLADDING


99 MFC-DLM-GS-I-093 INSULATION X-2010 FOR EQ-NO-X-2010 SMIC-I-4013 W 1681-00 DRYER PIPE RACK AREA OCT. 1, 2013 08:30AM ACCEPTED

100 MFC-DLM-GS-I-094 INSULATION E-2026 INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-4013 W 1682-01 DRYER PIPE RACK AREA OCT. 1, 2013 07:30AM ACCEPTED
FOR EQ-NO-E-2026(EXCLUDING ONE FLANGE)

MFC-DLM-GS-I-95 T-1910 (DE INSULATION INSPECTION PRIOR TO CLADDING


101 INSULATION SMIC-I-4013 W 1731-01 RE SCHEDULE OCT. 10, 2013 8 ;00 AM CANCELLED
A BUTANAZER) FOR 3 SADDLE SUPPORTS OF EQ: T1910
12-Oct-13
MFC-DLM-GS-I-96 FINAL T-1910 (DE FINAL CLADDING INSPECTION OF 3 SADDLE
102
A INSPECTION BUTANAZER) SUPPORTS FOR EQ:T-1910 SMIC-1-4014 W 1731-01 RE SCHEDULE OCT. 10, 2013 10 ;00AM CANCELLED
12-Oct-13
T-1510
MFC-DLM-GS-I-97 (PROCESS INSULATION INSPECTION PRIOR TO CLADDING
103
A
INSULATION
CONDENSATE FOR 2 SADDLE SUPPORTS OF EQ: T1510 SMIC-I-4013 W 1624-01 RE SCHEDULE OCT. 10, 2013 11 ;00 AM CANCELLED
STRIPPER) 12-Oct-13
T-1510
MFC-DLM-GS-I-98 FINAL (PROCESS FINAL CLADDING INSPECTION OF 3 SADDLE
104
A INSPECTION CONDENSATE SUPPORTS FOR EQ:T-1510 SMIC-I-4014 W 1624-01 RE SCHEDULE OCT. 10, 2013 1:00 PM CANCELLED
STRIPPER) 12-Oct-13
MFC-DLM-GS-I-99 T-1820 (LP INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-
105
A
INSULATION
DEPROPANIZER) FOR 3 SADDLE SUPPORTS OF EQ: T1820 4013/5016 W 1662-01 RE SCHEDULE OCT. 10, 2013 1:30 PM CANCELLED
12-Oct-13

106
MFC-DLM-GS-I-100 FINAL T-1820 (LP FINAL CLADDING INSPECTION OF 3 SADDLE SMIC-I- W 1662-01 RE SCHEDULE OCT. 10, 2013 3:30 PM CANCELLED
A INSPECTION DEPROPANIZER) SUPPORTS FOR EQ:T-1820 4014/5016
12-Oct-13
D-1827( LP
DEPROPANIZER
107 MFC-DLM-GS-I-101 INSULATION REBOILER INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-4013 W 1662-01
NEAR N.S PIPE RACK OCT. 10, 2013 7:30AM ACCEPTED
CONDENSATE FOR EQ:D-1827 AREA
DRUM
D-1917
108 MFC-DLM-GS-I-102 FINAL (DEBUTANAZER FINAL INSPECTION OF CLADDING FOR EQ:D-1917 SMIC-1-4014 W 1731-01
SPLITTER PIPE RACK OCT. 10, 2013 8.15 AM ACCEPTED
INSPECTION CONDENSATE AREA
DRUM)
E-2026
109 MFC-DLM-GS-I-103 FINAL (ACETYLENE FINAL INSPECTION OF CLADDING FOR EQ:E-2026 SMIC-1-4014 W 1682-01 DRYER PIPE RACK AREA OCT. 10, 2013 8.30 AM ACCEPTED
INSPECTION
INTERCOOLER)

110 MFC-DLM-GS-I-104 INSULATION R-2025 FINAL INSPECTION OF CLADDING FOR EQ:R-2025 SMIC-1-4014 W 1682-01 DRYER PIPE RACK AREA OCT. 10, 2013 9.00 AM ACCEPTED

111 MFC-DLM-GS-I-105 FINAL R-2030 FINAL INSPECTION OF CLADDING FOR EQ:R-2030 SMIC-1-4014 W 1682-01 DRYER PIPE RACK AREA OCT. 10, 2013 9.30 AM ACCEPTED
INSPECTION

FINAL
112 MFC-DLM-GS-I-106 INSPECTION R-2035 FINAL INSPECTION OF CLADDING FOR EQ:R-2035 SMIC-1-4014 W 1682-01 DRYER PIPE RACK AREA OCT. 10, 2013 10.30 AM ACCEPTED

SURFACE PREPARATION OF INSULATION


113 MFC-DLM-GS-I-107 INSULATION D-0140 SMIC-1-4012 W 1471-00 FURNACE AREA 11-Oct-13 8:00AM ACCEPTED
INSTALATION OF EQ:140 (FURNACE BD DRUM)

SURFACE PREPARATION OF INSULATION


114 MFC-DLM-GS-I-108 INSULATION E-2032 INSTALATION OF EQ:E-2032(ACETYLENE SMIC-1-4012 W 1682-01 DRYER PIPE RACK AREA 11-Oct-13 8:15AM ACCEPTED
HYDROGENATION INTERCOOLER #1

SURFACE PREPARATION OF INSULATION


115 MFC-DLM-GS-I-109 INSULATION E-2037 INSTALATION OF EQ:E-2037(ACETYLENE SMIC-1-4012 W 1682-01 DRYER PIPE RACK AREA 11-Oct-13 9.00AM ACCEPTED
HYDROGENATION REACTOR EFFLUENT COOLER)

SURFACE PREPARATION PRIOR TO INSULATION


MFC SADARA SITE (near
116 MFC-DLM-GS-I-110 INSULATION E-2050 INSTALATION OF EQUIPMENT E-2050 (HP SMIC-1-4012 W 1681-00
N S PIPE RACK AREA)
12-Oct-13 9.AM ACCEPTED
DEPROPANIZER REFLUX CHILLER #1

SURFACE PREPARATION PRIOR TO INSULATION


117 MFC-DLM-GS-I-111 INSULATION E-2051 INSTALATION OF EQUIPMENT E-2051 (HP SMIC-I-4012 W 1681-00 MFC SADARA SITE (near 12-Oct-13 9.15 AM ACCEPTED
N S PIPE RACK AREA)
DEPROPANIZER REFLUX CHILLER #2

FINAL FINAL INSPECTION OF CLADDING FOR EQ: X-2010


118 MFC-DLM-GS-I-112 INSPECTION X-2010 (MERCURY REMOVAL BED) SMIC-1-4014 W 1681-00 DRYER PIPE RACK AREA 13-Oct-13 9.30 AM ACCEPTED

119 MFC-DLM-GS-I-113 INSULATION D-0140 Insulation instalation inspection prior to Cladding SMIC-I-4013 W 1471-00 FURNACE AREA 15-Oct-13 8:00:AM ACCEPTED
of EQ: D -0140(FURNACE BD DRUM)

Insulation instalation inspection prior to Cladding


120 MFC-DLM-GS-I-114 INSULATION E-2032 of EQ: E-2032(ACETYELENE HYDROGENATION SMIC-1-4013 W 1682-01 DRYER PIPE RACK AREA 15-Oct-13 8:15AM ACCEPTED
COOLER# 1

Insulation instalation inspection prior to Cladding


121 MFC-DLM-GS-I-115 INSULATION E-2037 of EQ: E-2037(ACETYELENE HYDROGENATION SMIC-I-4013 W 1682-01 DRYER PIPE RACK AREA 15-Oct-13 8:30 AM ACCEPTED
EFFLUENT COOLER)

MFC-DLM-GS-I- D-1718 Insulation inspection prior to VAPOUR BARRIER SMIC-I-5016 W DRYER PIPE RACK AREA
116( A )RESCHDULE INSULATION 1641-00 ACCEPTED
122 16-Oct-13 9:30 AM
FOR EQ;D-1718 (DRYER FEED K.O DRUM)

FINAL INSPECTION OF CLADDING FOR EQ: D-1827 NEAR N.S. PIPE RACK
123 MFC-DLM-GS-I-117 FINAL D -1827 (LP DEPROPANIZERREBOILERCONDENSATE SMIC-I-4014 W 1662-01 16-Oct-13 10. AM ACCEPTED
INSPECTION AREA
DRUM)

MATERIAL RECIVING INSPECTION OF COLD


124 MFC-DLM-GS-I-118 INSULATION FOSTER-60 -90 INSULATION MATERIAL (foster -60-90) SMIC-I-4011 W FARM LAND AREA 19-Oct-13 9. 30AM ACCEPTED

VAPOUR BARIER INSPECTION PRIOR TO


125 MFC-DLM-GS-I-119 INSULATION D-1718 SMIC-1-5017 W 1641-00 DRYER PIPE RACK AREA 20-10-13 10.AM ACCEPTED
CLADDING FOR EQ: D-1718

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-


126 MFC-DLM-GS-I-120 INSPECTION D-0140 SMIC-I-4014 W 1471-00 FURNACE AREA 21-Oct-13 10:00AM ACCEPTED
0140(FURNACE BD DRUM)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


127 MFC-DLM-GS-I-121 INSPECTION E-2032 SMIC-I-4014 W 1682-01 DRYER PIPE RACK AREA 21-Oct-13 10.30 AM ACCEPTED
2032(ACETYELENE INTER COOLER#2)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


128 MFC-DLM-GS-I-122 INSPECTION E-2037 2037(ACETYELENE REACTOR EFFLUENT COOLER) SMIC-I-4014 W 1682-01 DRYER PIPE RACK AREA 21-Oct-13 10.45 AM ACCEPTED

RECIVING OF COLD INSULATION MATERIAL


129 MFC-DLM-GS-I-123 INSULATION FOSTER -95-50 FOSTER -95-50 SMIC-I-4011 W GSC FARM LAND AREA 22-Oct-13 10.AM ACCEPTED

SURFACE PREPARATION PRIOR TO INSULATION


130 MFC-DLM-GS-I-124 INSULATION E -0303 FOR EQ- 0303(DRY FLARE METHANOL SMIC-I -4012 W 1744-01 DRYER PIPE RACK AREA 23-10-2013 8.30 AM ACCEPTED
VAPORIZER)

SURFACE PREPARATION PRIOR TO INSULATION


131 MFC-DLM-GS-I-125 INSULATION E -1726 FOR EQ- E-1726(REGENARATION GAS COOLER) SMIC-I -4012 W 1652-00 DRYER PIPE RACK AREA 23-10-2013 8.00AM ACCEPTED

INSULATION INSPECTION PRIOR TO VAPOUR


132 MFC-DLM-GS-I-126 INSULATION D -1718 BARRIER FOR EQ:-D1718(DRYER FEED KO SMIC-I -5016 W 1641-00 DRYER PIPE RACK AREA 23-10-2013 9.30 AM ACCEPTED
DRUM)14 SUPPORTS ONLY

VAPOUR BARRIER INSPECTION PRIOR TO


133 MFC-DLM-GS-I-127 INSULATION D -1718 CLADDING FOR EQ:-D1718(DRYER FEED KO SMIC-I -5017 W 1641-00 DRYER PIPE RACK AREA 23-10-2013 11. AM ACCEPTED
DRUM)14 SUPPORTS ONLY

134 MFC-DLM-GS-I-128 INSULATION E -1726 INSULATION INSPECTION PRIOR TO CLADDING SMIC-I -4013 W 1652-00 DRYER PIPE RACK AREA 24-10-2013 8.30 AM ACCEPTED
FOR EQ- E-1726 (REGENARATION GAS COOLER)

INSULATION INSPECTION PRIOR TO VAPOR


135 MFC-DLM-GS-I-129 INSULATION E -2051 BARRIER FOR EQ- E-2051 (HP DEPROPANIZER SMIC-I -5016 W 1681-00 DRYER PIPE RACK AREA 26-Oct-13 10.30 AM ACCEPTED
REFLUX CHILLER #2)

FINAL FINAL INSPECTION OF CLADDING FOR EQ- E-


136 MFC-DLM-GS-I-130 INSPECTION E -1726 1726 (REGENERATION GAS COOLER) SMIC-I -4014 W 1652-00 DRYER PIPE RACK AREA 28-Oct-13 8:00 AM ACCEPTED

137 MFC-DLM-GS-I-131 FINAL


D-1718 FINAL INSPECTION OF CLADDING FOR EQ- D- SMIC-I -5018 W 1641-00 DRYER PIPE RACK AREA 29-Oct-13 9.30 AM ACCEPTED
INSPECTION 1718 (DRYER FEED KO DRUM)

VAPOUR BARRIER INSPECTION PRIOR TO


138 MFC-DLM-GS-I-132 INSULATION E -2051 CLADDING FOR EQ:E-2051(HP DEPROPANIZER SMIC-I -5017 W 1681-00 NEAR N.S. PIPE RACK 29-Oct-13 10.30 AM ACCEPTED
REFLUX CHILLER#2)

INSULATION INSPECTION PRIOR TO VAPOUR


139 MFC-DLM-GS-I-133 INSULATION E -2050 BARRIER FOR EQ:E-2050(HP SMIC-I -5016 W 1681-00 NEAR N.S. PIPE RACK 31-10-2013 8.AM ACCEPTED
DEPROPANIZERREFLUX CHILLER#1)

INSULATION INSPECTION PRIOR TO CLADDING


140 MFC-DLM-GS-I-134 INSULATION E -0303 FOR EQ:E-0303(DRY FLARE METHANOL SMIC-I -4013 W 1744-01 DRYER PIPE RACK AREA 4-Nov-13 8.AM ACCEPTED
VAPOURIZER)

VAPOUR BARRIER INSPECTION PRIOR TO


141 MFC-DLM-GS-I-135 INSULATION E -2050 CLADDING FOR EQ:E-2050(HP SMIC-I -5017 W 1681-00 NEAR N.S. PIPE RACK 4-Nov-13 9.30 AM ACCEPTED
DEPROPANIZERREFLUX CHILLER#1)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-2051


142 MFC-DLM-GS-I-136 INSPECTION E -2051 (HP DEPROPANIZERREFLUX CHILLER#2) SMIC-I -5018 W 1681-00 NEAR N.S. PIPE RACK 4-Nov-13 3. PM RE SCHEDULE

MFC-DLM-GS-I-136 FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-2051


143
A INSPECTION
E -2051 (HP DEPROPANIZER REFLUX CHILLER #2) SMIC-I -5018 W 1681-00 NEAR N.S. PIPE RACK 5-Nov-13 9.30 AM ACCEPTED

SURFACE PREPARATION PRIOR TO INSULATION SPLITTER PIPE RACK


144 MFC-DLM-GS-I-137 INSULATION D -1914 FOR EQ:D-1914(DE BUTANIZER REFLUX DRUM) SMIC-I-4012 W 1731-01
AREA 7-Nov-13 11:00 AM ACCEPTED

2 ROLL PLAIN
145 MFC-DLM-GS-I-138 INSULATION ALUMINIUM Material Receiving & Inspection of cladding SMIC-I -4011 W GSC Garnet Area 8-Nov-13 9.30 AM ACCEPTED
SHEET(0.8mm) material aluminium sheet(08mm)

146 MFC-DLM-GS-I-139 INSULATION Foster 95-44 Inspection of cold&hot material( Foster -95-44 SMIC-I -4011 w GSC Garnet Area 8-Nov-13 9.30 AM ACCEPTED
sealent)

147 MFC-DLM-GS-I-140 INSULATION


BOSS Material Receiving & Inspection of Hot Insulation SMIC-I -4011 W GSC site Store 10-Nov-13 9.30 AM ACCEPTED
-322(silicone) material silicone Boss -322(100 pc)

148 MFC-DLM-GS-I-141 INSULATION MW-40mm Material Receiving & Inspection of Hot Insulation SMIC-I -4011 W GSC FARM LAND 13-Nov-13 9.30 AM ACCEPTED
material MinralWool-40 mm

149 MFC-DLM-GS-I-142 INSULATION MW-70mm Material Receiving & Inspection of Hot Insulation SMIC-I -4011 W GSC FARM LAND 13-Nov-13 9.45 AM ACCEPTED
material MinralWool-70 mm

150 MFC-DLM-GS-I-143 INSULATION E-1913 Surface Prepration Inspection Prior to Insulation SMIC-I -5015 W 1731-01 C-3 Pipe Rack Area 15-Nov-13 9.00 AM ACCEPTED
Installation for Eq: E-1913

Material Receiving & Inspection of Cold


151 MFC-DLM-GS-I-144 INSULATION STRAT-A-FAB SMIC-I -4011 W GSC FARMLAND 15-Nov-13 9.30 AM ACCEPTED
Insulation material STRAT-A-FAB

Material Receiving & Inspection of Cold


152 MFC-DLM-GS-I-145 INSULATION PC-88 SMIC-I -4011 W GSC FARMLAND 15-Nov-13 9.45 AM ACCEPTED
Insulation material PC-88

Material Receiving & Inspection of Hot Insulation


153 MFC-DLM-GS-I-146 INSULATION HYDROCAL B11 SMIC-I -4011 W GSC FARMLAND 15-Nov-13 10:00 AM ACCEPTED
material Hydrocoal B11

Inspection of Insulation Installation Prior to SPILITER PIPE RACK


154 MFC-DLM-GS-I-147 INSULATION D-1914 Vapor Barier for Eq: D-1914 (Debutanizer Reflux SMIC-I -5016 W 1731-01
AREA
17-Nov-13 9.30 AM ACCEPTED
Drum)

INSPECTION OF INSULATION INSTALLATION SPLITTER PIPE RACK


155 MFC-DLM-GS-I-148 INSULATION E-1913 PRIOR TO VAPOR BARRIER FOR EQ: E-1913 SMIC-I -5016 W 1731-01
AREA 19-Nov-13 8:00 AM RE SCHEDULE Due to rain

156 MFC-DLM-GS-I-149 FINAL E-2050 FINAL INSPECTION OF CLADDING FOR EQ: E-2050 SMIC-I -5018 W 1681-00 COLD PIPE RACK AREA 19-Nov-13 8:30 AM RE SCHEDULE Due to rain
INSPECTION

FINAL
157 MFC-DLM-GS-I-150 INSPECTION
E-0303 FINAL INSPECTION OF CLADDING FOR EQ: E-0303 SMIC-I -4014 W 1744-01 DRYER PIPE RACK AREA 19-Nov-13 9:30 AM RE SCHEDULE Due to rain

158 MFC-DLM-GS-I-151 INSULATION T-1810 Surface Preparation prior to Insulation for SMIC-I -4012 W 1661-01
NEAR DRYER PIPE RACK 19-Nov-13 10:30AM RE SCHEDULE Due to rain
Equipment T-1810(HP DEPROPANIZER) AREA(DRESS UP)

159
MFC-DLM-GS-I-148 INSULATION E-1913 INSPECTION OF INSULATION INSTALLATION SMIC-I -5016 W 1731-01
SPLITTER PIPE RACK 20-Nov-13 8:00 AM
CANCELLED
A PRIOR TO VAPOR BARRIER FOR EQ: E-1913 AREA FOR RAIN

160
MFC-DLM-GS-I-149 FINAL E-2050 FINAL INSPECTION OF CLADDING FOR EQ: E-2050 SMIC-I -5018 W 1681-00 COLD PIPE RACK AREA 20-Nov-13 8:30 AM
CANCELLED
A INSPECTION FOR RAIN

161
MFC-DLM-GS-I-150 FINAL
E-0303 FINAL INSPECTION OF CLADDING FOR EQ: E-0303 SMIC-I -4014 W 1744-01 DRYER PIPE RACK AREA 20-Nov-13 9:30 AM
CANCELLED
A INSPECTION FOR RAIN

162 MFC-DLM-GS-I-151 INSULATION T-1810 Surface Preparation prior to Insulation for SMIC-I -4012 W 1661-01 NEAR DRYER PIPE RACK 20-Nov-13 10:30AM
CANCELLED
A Equipment T-1810(HP DEPROPANIZER) AREA(DRESS UP) FOR RAIN

163 MFC-DLM-GS-I-152 INSULATION E-1913 INSPECTION OF INSULATION INSTALLATION SMIC-I -5016 W 1731-01 SPLITTER PIPE RACK 21-Nov-13 9:00 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-1913 AREA

SURFACE PREPARATION PRIOR TO INSULATION NEAR DRYER PIPE RACK


164 MFC-DLM-GS-I-153 INSULATION T -1810 SMIC-I -4012 W 1661-01 22-Nov-13 9.30 AM ACCEPTED
INSTALATION FOR EQ: T -1810 AREA(dress up)

FINAL
165 MFC-DLM-GS-I-154 INSPECTION E-2050 FINAL INSPECTION OF CLADDING FOR EQ: E-2050 SMIC-I -5018 W 1681-00 COLD PIPE RACK AREA 22-Nov-13 8:15 AM ACCEPTED

FINAL
166 MFC-DLM-GS-I-155 INSPECTION E-0303 FINAL INSPECTION OF CLADDING FOR EQ: E-0303 SMIC-I -4014 W 1744-01 DRYER PIPE RACK AREA 22-Nov-13 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR THE EAST WAST


167 MFC-DLM-GS-I-156 INSULATION D-0601 INSULATION INSTALLATION FOR EQ: D-0601 SMIC-I -4012 W 1627-00
PIPE RACK AREA 22-Nov-13 9:45 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO SPLITTER PIPE RACK


168 MFC-DLM-GS-I-157 INSULATION D-1914 CLADDING FOR EQ: D-1914 SMIC-I -5017 W 1731-01
AREA 23-Nov-13 8:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO SPLITTER PIPE RACK


169 MFC-DLM-GS-I-158 INSULATION E-1913 CLADDING FOR EQ: E-1913 SMIC-I -5017 W 1731-01
AREA 23-Nov-13 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO


NEAR THE EAST WAST
170 MFC-DLM-GS-I-159 INSULATION T-1410 INSULATION INSTALLATION FOR EQ: T-1410 SMIC-I-4012 W 1623-01
PIPE RACK AREA 23-Nov-13 11:00 AM ACCEPTED
(PARTIAL UP TO 3 STIFFNER RING AREA)

171
MFC-DLM-GS-I- INSULATION
ROCKWOOL INSPECTION & RECEIVING MATERIAL ROCKWOOL SMIC-I -4011 W GSC GARNET YARD 26-Nov-13 9.30 AM CANCELLED
160-A(reschedule) 40mm 40mm (300 ROLL'S)

172 MFC-DLM-GS-I-161 INSULATION D-0120 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-4012 W 1463-00
EAST WAST PIPE RACK 26-Nov-13 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-0120 AREA

INSPECTION OF COLD INSULATION NEAR DRYER PIPE RACK


173 MFC-DLM-GS-I-162 INSULATION T-1810 INSTALLATION 1st LAYER PRIOR TO 2nd LAYER SMIC-I -5016 W 1661-01 26-Nov-13 10:30 AM ACCEPTED
AREA
FOR EQ: T-1810 (EXCLUDING REDUCER & HEAD)

174
MFC-DLM-GS-I-163 INSULATION D-0120 Insulation Inspection Prior to Cladding SMIC-I -4013 W 1463-00
EAST WAST PIPE RACK 28-Nov-13 3:00PM ACCEPTED
A RESCHEDULE AREA

175 MFC-DLM-GS-I-164 INSULATION D-0601 Insulation Inspection Prior to Cladding SMIC-I -4013 W 1627-00
EAST WAST PIPE RACK 27-Nov-13 3:30PM ACCEPTED
AREA

176 MFC-DLM-GS-I-165 INSULATION


Material Material Receiving Inspection (50mm Mineral SMIC-I -4011 W FLARE AREA 27-Nov-13 8:30 AM ACCEPTED
Receiving Wool)

INSPECTION OF COLD INSULATION


INSTALLATION 1st LAYER OF HEAD PRIOR TO 2nd NEAR DRYER PIPE RACK
180 MFC-DLM-GS-I-166 INSULATION T-1810 SMIC-I -5016 W 1661-01 29-Nov-13 8.30 AM ACCEPTED
LAYER INSULATION INSTALLATION FOR EQ: T- AREA
1810
INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR THE EAST WAST
181 MFC-DLM-GS-I-167 INSULATION T-1410 INSULATION INSTALLATION FOR EQ: T-1410 SMIC-I-4012 W 1623-01 29-Nov-13 9. AM ACCEPTED
(FROM 3 STIFFNER RING TO HEAD) PIPE RACK AREA

Page 1338 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPRATION PRIOR TO EAST WAST PIPE RACK
182 MFC-DLM-GS-I-168 INSULATION D-0125 INSULATION INSTALLATION FOR EQ: D-0125 SMIC-I-4012 W 1466-00
AREA 29-Nov-13 9:30 AM ACCEPTED

MATERIAL RECIVING & INSPECTION OF HOT


183 MFC-DLM-GS-I-169 INSULATION ROCK WOOL INSULATION MATERIAL 50 mm 32pcs SMIC-I-4011 W FLARE AREA 1-Dec-13 8.00AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR OF DRYER PIPE


184 MFC-DLM-GS-I-170 INSULATION T-1810 INSULATION INSTALLATION FOR EQ: T-1810 SMIC-I-4012 W 1661-01 2-Dec-13 8:00 AM ACCEPTED
RACK AREA
(ONLY HOT AREA)

INSPECTION OF INSULATION INSTALLATION OF NEAR OF DRYER PIPE


185 MFC-DLM-GS-I-171 INSULATION T-1810 2nd LAYER PRRIOR TO 3rd LAYER FOR EQ: T- SMIC-I-5016 W 1661-01 2-Dec-13 8:30 AM ACCEPTED
1810(EXCLUDING HEAD, REDUCER & SUPPORTS) RACK AREA

FINAL SPLITTER PIPE RACK


186 MFC-DLM-GS-I-172 INSPECTION D-1914 FINAL INSPECTION OF CLADDING FOR EQ: D-1914 SMIC-I-4014 W 1731-01
AREA
2-Dec-13 9:30 AM ACCEPTED

FINAL SPLITTER PIPE RACK


187 MFC-DLM-GS-I-173 INSPECTION E-1913 FINAL INSPECTION OF CLADDING FOR EQ: E-1913 SMIC-I-4014 W 1731-01
AREA
2-Dec-13 9:45 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO


188 MFC-DLM-GS-I-174 INSULATION E-1507 INSULATION INSTALLATION FOR EQ: E-1507 SMIC-I-4012 W 1624-01 FURNCE AREA 2-Dec-13 10:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ:D-


189 MFC-DLM-GS-I-175 INSPECTION D-0601 0601(SOH KO DRUM) SMIC-I-4014 W 1627-00 NEAR EW PIPE RACK 3-Dec-13 8.AM ACCEPTED

190 MFC-DLM-GS-I-176 INSULATION E-1724 SURFACE PREPARATION PRIOR TO INSULATION SMIC-I-5015 W 1652-00 NEAR DRYER PIPE RACK 3-Dec-13 9.30 AM ACCEPTED
FOR EQ:E-1724(REGENARATION GAS HEATER) AREA

191 MFC-DLM-GS-I-177 INSULATION E-1514 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-4012 W 1625-00 FARNCE AREA 4-Dec-13 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1514

192 MFC-DLM-GS-I-178 INSULATION


Minera Wool- RECEIVING AND INSPECTION OF HOT MATERIAL SMIC-I-4011 W GSC GARNET YARD 4-Dec-13 1:30 PM ACCEPTED
40mm SAUDIA ROCKWOOL 40mm

193 MFC-DLM-GS-I-179 FINAL D-0120 FINAL INSPECTION OF CLADDING FOR EQ: D-0120 SMIC-I-4014 W 1463-00 NEAR EW PIPE RACK 4-Dec-13 4:00 PM CANCELLED
INSPECTION

MFC-DLM-GS-I- FINAL
194
179-A INSPECTION D-0120 FINAL INSPECTION OF CLADDING FOR EQ: D-0120 SMIC-I-4014 W 1463-00 NEAR EW PIPE RACK 5-Dec-13 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION FOR


195 MFC-DLM-GS-I-180 INSULATION E-1507 EQ: E-1507 (EXCLUDING FLANGE) SMIC-I-4013 W 1624-01 FARNCE AREA 5-Dec-13 8:00 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO


196 MFC-DLM-GS-I-181 INSULATION E-1810-A INSULATION INSTALLATION FOR EQ: E-1810-A SMIC-I-4012 W 1661-01 COLD PIPE RACK AREA 5-Dec-13 9:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION FOR NEAR DRYER PIPE RACK


197 MFC-DLM-GS-I-182 INSULATION T-1810 SMIC-I-4013 W 1661-01 5-Dec-13 10:00 AM ACCEPTED
EQ: T-1810 (HOT AREA) AREA

INSPECTION OF INSULATION INSTALLATION NEAR E/W PIPE RACK


198 MFC-DLM-GS-I-183 INSULATION T-1410 PRIOR TO CLADDING FOR EQ: T-1410 (UP TO 3 SMIC-I-4013 W 1623-01 6-Dec-13 8:00 AM ACCEPTED
STIFFNER RING) AREA

INSPECTION OF INSULATION INSTALLATION 3rd NEAR DRYER PIPE RACK


199 MFC-DLM-GS-I-184 INSULATION T-1810 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-1810 SMIC-I-5016 W 1661-01
AREA
6-Dec-13 8:30 AM ACCEPTED
(EXCLUDING HEAD, REDUCER & SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


NEAR DRYER PIPE RACK
200 MFC-DLM-GS-I-185 INSULATION T-1810 LAYER PRIOR TO 2nd LAYER OF REDUCER (EQ: T- SMIC-I-5016 W 1661-01
AREA
8-Dec-13 10:00 AM ACCEPTED
1810, COLD AREA)

INSPECTION OF VAPOR BARRIER PRIOR TO


NEAR DRYER PIPE RACK
201 MFC-DLM-GS-I-186 INSULATION T-1810 CLADDING FOR EQ; T-1810 (ONLY COLD AREA SMIC-I-5017 W 1661-01
AREA
9-Dec-13 10:00 AM ACCEPTED
BODY)

INSPECTION OF INSULATION INSTALLATION


202 MFC-DLM-GS-I-187 INSULATION E-1810-A PRIOR TO CLADDING FOR EQ: E-1810A SMIC-I-4013 W 1661-01 COLD PIPE RACK AREA 10-Dec-13 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION OF


203 MFC-DLM-GS-I-188 INSULATION T-1810 REDUCER 2nd LAYER PRIOR TO 3rd LAYER FOR SMIC-I-5016 W 1661-01
NEAR DRYER PIPE RACK 10-Dec-13 9:30 AM ACCEPTED
EQ: T-1810 AREA

204 MFC-DLM-GS-I-189 INSULATION E-1810-B INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-4012 W 1661-01 COLD PIPE RACK AREA 10-Dec-13 10:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1810B

205 MFC-DLM-GS-I-190 FINAL E-1507 FINAL INSPECTION OF CLADDING FOR EQ: E-1507 SMIC-I-4014 W 1624-01 FARNCE AREA 11-Dec-13 10:00 AM ACCEPTED
INSPECTION (EXCLUDDING FLANGE & 6 SUPPORTS)

206 MFC-DLM-GS-I-191 INSULATION E-1810-B INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1661-01 COLD PIPE RACK AREA 13-Dec-13 8:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1810B

INSPECTION OF INSULATION INSTALLATION NEAR EAST WAST PIPE


207 MFC-DLM-GS-I-192 INSULATION T-1410 PRIOR TO CLADDING FOR EQ: T-1410 (FROM 3 SMIC-I-4013 W 1623-01
RACK AREA 13-Dec-13 8:30 AM ACCEPTED
STIFFNER RING TO 4 STIFFNER RING)

INSPECTION OF INSULATION INSTALLATION 3rd NEAR DRYER PIPE RACK


208 MFC-DLM-GS-I-193 INSULATION T-1810 LAYER OF REDUCER PRIOR TO VAPOR BARRIER SMIC-I-5016 W 1661-01
AREA 13-Dec-13 9:30 AM ACCEPTED
FOR EQ: T-1810

INSPECTION OF INSULATION INSTALLATION 1st


209 MFC-DLM-GS-I-194 INSULATION E-1724 LAYER PRIOR TO 2nd LAYER FOR EQ: E-1724 SMIC-I-4013 W 1652-00 DRYER PIPE RACK AREA 15-Dec-13 9:30 AM ACCEPTED
(MW-50, SF-40)

INSPECTION OF INSULATION INSTALLATION 2nd NEAR DRYER PIPE RACK


210 MFC-DLM-GS-I-195 INSULATION T-1810 LAYER PRIOR TO 3rd LAYER OF HEAD, FOR EQ: T- SMIC-I-5016 W 1661-01 17-Dec-13 6:30 AM ACCEPTED
1810 AREA

INSPECTION OF VAPOR BARRIER PRIOR TO NEAR DRYER PIPE RACK


211 MFC-DLM-GS-I-196 INSULATION T-1810 SMIC-I-5017 W 1661-01 17-Dec-13 7:30 AM ACCEPTED
CLADDING OF REDUCER, FOR EQ: T-1810 AREA

INSPECTION OF INSULATION INSTALLATION 2nd


212 MFC-DLM-GS-I-197 INSULATION E-1724 LAYER PRIOR TO CLADDING FOR EQ: E-1724 SMIC-I-4013 W 1652-00 DRYER PIPE RACK AREA 17-Dec-13 2:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd


NEAR DRYER PIPE RACK
213 MFC-DLM-GS-I-198 INSULATION T-1810 LAYER PRIOR TO VAPOR BARRIER OF HEAD FOR SMIC-I-5017 W 1661-01
AREA
18-Dec-13 8:00 AM ACCEPTED
EQ: T-1810

INSPECTION OF COLD INSULATION MATERIAL GSC LAYDOWN AREA AT


214 MFC-DLM-GS-I-199 INSULATION CELLULAR GLASS CELLULAR GLASS SMIC-I-4011 W MFC SITE
18-Dec-13 2:00 PM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


215 MFC-DLM-GS-I-200 INSPECTION E-1810-A 1810-A SMIC-I-4014 W 1661-01 COLD PIPE RACK AREA 19-Dec-13 10:00 AM ACCEPTED

216 MFC-DLM-GS-I-201 INSULATION T-1410 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1623-01


NEAR EAST WAST PIPE 20-Dec-13 10:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ; T-1410 RACK AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


217 MFC-DLM-GS-I-202 INSULATION T-1810 CLADDING OF HEAD FOR EQ: T-1810 (COLD SMIC-I-5017 W 1661-01
NEAR DRYER PIPE RACK 20-Dec-13 1:00 PM ACCEPTED
AREA) AREA

218 MFC-DLM-GS-I-203 INSULATION D-2505 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1714-00
NEAR NS PIPE RACK 21-Dec-13 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2505 AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO


219 MFC-DLM-GS-I-204 INSULATION E-1606 INSULATION INSTALLATION FOR EQ: E-1606 SMIC-I-4012 W 1631-03
NEAR C3 SPLITTER PIPE 21-Dec-13 8:30 AM ACCEPTED
RACK AREA
(ONLY REDUCER SIDE)

INSPECTION OF COLD INSULATION MATERIAL GSC LAYDOWN AREA AT


220 MFC-DLM-GS-I-205 INSULATION CELLULAR GLASS CELLULAR GLASS SMIC-I-4011 W MFC SITE 23-Dec-13 2:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


221 MFC-DLM-GS-I-206 INSULATION E-1606 PRIOR TO CLADDING FOR EQ: E-1606 (ONLY SMIC-I-4013 W 1631-03 NEAR C3 SPLITTER PIPE 23-Dec-13 2:30 PM ACCEPTED
REDUCER SIDE) RACK AREA

INSPECTION OF INSULATION INSTALLATION OF NEAR EAST WAST PIPE


222 MFC-DLM-GS-I-207 INSULATION T-1410 SMIC-I-4013 W 1623-01 23-Dec-13 3:00 PM ACCEPTED
HEAD PRIOR TO CLADDING FOR EQ: T-1410 RACK AREA

FINAL
FINAL INSPECTION OF CLADDING FOR EQ: T-1810 NEAR DRYER PIPE RACK
223 MFC-DLM-GS-I-208 INSPECTION T-1810 (COLD AREA) (EXCLUDDING 2 SADDLE SUPPORTS, SMIC-I-5018 W 1661-01 25-Dec-13 9:30 AM ACCEPTED
2 ORIANTION MARKING AND 2 LIFTING LUG) AREA

FINAL INSPECTION OF CLADDING FOR EQ: T-1810


FINAL (HOT AREA) (EXCLUDDING 2 SADDLE SUPPORT NEAR DRYER PIPE RACK
224 MFC-DLM-GS-I-209 INSPECTION T-1810 SMIC-I-4014 W 1661-01 25-Dec-13 9:40 AM ACCEPTED
AND, 2 ORIANTION MARKING AND BOTTOM AREA
DOOM)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- NEAR COLD PIPE RACK
225 MFC-DLM-GS-I-210 INSPECTION E-1810-B 1810-B SMIC-I-4014 W 1661-01
AREA
25-Dec-13 10:00 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR COLD PIPE RACK


226 MFC-DLM-GS-I-211 INSULATION E-2302 INSULATION INSTALLATION FOR EQ: E-2302 SMIC-I-5015 W 1704-02
AREA
25-Dec-13 10:15 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR COLD PIPE RACK


227 MFC-DLM-GS-I-212 INSULATION E-2303 INSULATION INSTALLATION FOR EQ: E-2303 SMIC-I-5015 W 1705-01
AREA 26-Dec-13 8:00 AM ACCEPTED

INPSECTION OF SURFACE PREPRATION PRIOR TO


NEAR C3 SPLITTER PIPE
228 MFC-DLM-GS-I-213 INSULATION E-1606 INSULATION INSTALLATION FOR EQ: E-1606 SMIC-I-4012 W 1631-03
RACK AREA 27-Dec-13 11:00 AM ACCEPTED
(ONLY HEAD SIDE)

229 MFC-DLM-GS-I-214 FINAL E-1724 FINAL INSPECTION OF CLADDING FOR EQ: E1724 SMIC-I-4014 W 1652-00 DRYER PIPE RACK AREA 27-Dec-13 1:00PM ACCEPTED
INSPECTION

MATERIAL RECIVING & INSPECTION OF HOT


230 MFC-DLM-GS-I-215 INSULATION ROCK WOOL INSULATION MATERIAL MINRAL WOOL SMIC-I-4011 W FLARE AREA 29-Dec-13 2:00 PM ACCEPTED
50mm(135 Pc)

231 MFC-DLM-GS-I-216 INSULATION E-1910-A INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-4012 W 1731-01
C3 SPLITTER PIPE RACK 30-Dec-13 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E1910-A AREA

232 MFC-DLM-GS-I-217 INSULATION E-1910-B INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-4012 W 1731-01
C3 SPLITTER PIPE RACK 30-Dec-13 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E1910-B AREA

233 MFC-DLM-GS-I-218 INSULATION D-2506 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1714-00 NEAR N/S PIPE RACK 30-Dec-13 9:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2506 AREA

INSPECTION OF INSULATION INSTALLATION


234 MFC-DLM-GS-I-219 INSULATION E-1606 PRIOR TO CLADDING FOR EQ: E-1606 (ONLY SMIC-I-4013 W 1631-03 NEAR C3 SPLITTER PIPE 30-Dec-13 10:00 AM ACCEPTED
HEAD SIDE) RACK AREA

INSPECTION OF SURFACE PREPARATION PRIOR


235 MFC-DLM-GS-I-220 INSULATION E-1003 SMIC-I-4012 W 1616-00 NEAR FURNACE AREA 2-Jan-14 8. AM ACCEPTED
TO INSULATION INSTALATION FOR EQ: E-1003

INSPECTION OF SURFACE PREPARATION PRIOR NEAR N.S PIPE RACK


236 MFC-DLM-GS-I-221 INSULATION E-0235 SMIC-I-4012 W 1531-03 2-Jan-14 8.30 AM ACCEPTED
TO INSULATION INSTALATION FOR: E-O235 AREA

INSPECTION OF INSULATION INSTALLATION


237 MFC-DLM-GS-I-222 INSULATION E-2302 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 2-Jan-14 10. AM ACCEPTED
PRIOR TO VAPOUR BARRIER FOR EQ: E-2302

INSPECTION OF INSULATION INSTALLATION C3 SPLITTER PIPE RACK


238 MFC-DLM-GS-I-223 INSULATION E-1910-A PRIOR TO CLADDING FOR EQ: E-1910-A SMIC-I-4013 W 1731-01
AREA
3-Jan-14 10:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION C3 SPLITTER PIPE RACK


239 MFC-DLM-GS-I-224 INSULATION E-1910-B PRIOR TO CLADDING FOR EQ: E-1910-B SMIC-I-4013 W 1731-01
AREA 3-Jan-14 11:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st NEAR NS PIPE RACK


240 MFC-DLM-GS-I-225 INSULATION D-2505 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2505 SMIC-I-5016 W 1714-00
AREA 3-Jan-14 1:00 PM ACCEPTED

MATERIAL RECIVING AND INSPECTION OF COLD GSC LAYDOWN AT MFC


241 MFC-DLM-GS-I-226 INSULATION CELLULAR GLASS INSULATION MATERIALS SMIC-I-4011 W SITE 5-Jan-14 8:00AM ACCEPTED

242 MFC-DLM-GS-I-227 INSULATION D-1824 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1662-01 COLD PIPE RACK AREA 8-Jan-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-1824

243 MFC-DLM-GS-I-228 INSULATION E-1823 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1662-01 COLD PIPE RACK AREA 8-Jan-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ:E-1823

244 MFC-DLM-GS-I-229 INSULATION E-1003 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1616-00 NEAR FARNCE AREA 8-Jan-14 10:00 AM ACCEPTED
PRIOR TO CLADDING FOR E-1003

245 MFC-DLM-GS-I-230 INSULATION E-0235 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1531-03 NEAR NS PIPE RACK 8-Jan-14 10:30 AM ACCEPTED
PRIOR TO CLADDING FOR E-0235 AREA

246 MFC-DLM-GS-I-231 INSULATION E-2303 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1705-01 NEAR COLD PIPE RACK 9-Jan-14 8:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2303 AREA

247 MFC-DLM-GS-I-232 FINAL


T-1410 FINAL INSPECTION OF CLADDING FOR EQ: T-1410 SMIC-I-4014 W 1623-01 NEAR THE EAST WAST 10-Jan-14 2:00 PM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME) PIPE RACK AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR NS PIPE RACK


248 MFC-DLM-GS-I-233 INSULATION E-2115 SMIC-I-5015 W 1683-03 13-Jan-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ:E-2115 AREA

FINAL NEAR NS PIPE RACK


249 MFC-DLM-GS-I-234 INSPECTION E-0235 FINAL INSPECTION OF CLADDING FOR EQ: E-0235 SMIC-I-4014 1531-03 13-Jan-14 10:30 AM ACCEPTED
AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


250 MFC-DLM-GS-I-235 INSULATION E-2302 SMIC-I-5017 W 1704-02 COLD PIPE RACK AREA 14-Jan-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2302

251 MFC-DLM-GS-I-236 FINAL E-1003 FINAL INSPECTION OF CLADDING FOR EQ: E-1003 SMIC-I-4014 W 1616-00 NEAR FARNCE AREA 14-Jan-14 8:30 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 2nd


252 MFC-DLM-GS-I-237 INSULATION E-2303 LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2303 SMIC-I-5016 W 1705-01 COLD PIPE RACK AREA 14-Jan-14 3:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION NEAR NS PIPE RACK


253 MFC-DLM-GS-I-238 INSULATION D-2506 PRIOR TO VAPOR BARRIER FOR EQ: D-2506 SMIC-I-5016 W 1714-00
AREA 14-Jan-14 4:00 PM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- C3 SPLITTER PIPE RACK


254 MFC-DLM-GS-I-239 INSPECTION
E-1910-A 1910-A SMIC-I-4014 W 1731-01
AREA 15-Jan-14 10:00 AM ACCEPTED

255 MFC-DLM-GS-I-240 FINAL


E-1910-B FINAL INSPECTION OF CLADDING FOR EQ: E- SMIC-I-4014 W 1731-01
C3 SPLITTER PIPE RACK 15-Jan-14 10:30 AM ACCEPTED
INSPECTION 1910-B AREA

256 MFC-DLM-GS-I-241 FINAL


E-1606 FINAL INSPECTION OF CLADDING FOR EQ: E-1606 SMIC-I-4014 W 1631-03
NEAR C3 SPLITTER PIPE 16-Jan-14 9:00 AM ACCEPTED
INSPECTION RACK AREA

257 MFC-DLM-GS-I-242 INSULATION D-1824 INSULATION INSPECTION PRIOR TO VAPOR SMIC-I-5016 W 1662-01 11:00 AM NEAR COLD PIPE
12:00 AM ACCEPTED
BARRIER FOR EQ: D-1824 RACK AREA

258 MFC-DLM-GS-I-243 INSULATION E-1913 INSULATION INSPECTION PRIOR TO VAPOR SMIC-I-5016 W 1731-01 2:00 PM NEAR COLD PIPE
12:00 AM ACCEPTED
BARRIER FOR EQ: E-1823 RACK AREA

259 MFC-DLM-GS-I-244 INSULATION W-2040 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1682-02 DRYER PIPE RACK AREA 18-Jan-14 8:00 AM
CANCELLED
INSULATION INSTALLATION FOR EQ: W-2040 FOR RAIN

260 MFC-DLM-GS-I-245 INSULATION D-2506 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1714-00
NEAR NS PIPE RACK 18-Jan-14 8:15 AM
CANCELLED
CLADDING FOR EQ: D-2506 AREA FOR RAIN

INSPECTION OF INSULATION INSSTALLATION 1st CANCELLED


261 MFC-DLM-GS-I-246 INSULATION E-2115 SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 18-Jan-14 10:00 AM
FOR RAIN
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2115

INSPECTION OF SURFACE PREPRATION PRIOR TO CANCELLED


262 MFC-DLM-GS-I-247 INSULATION D-2055 SMIC-I-5015 W 1681-00 COLD PIPE RACK AREA 18-Jan-14 10:30 AM
FOR RAIN
INSULATION INSTALLATION FOR EQ: D-2055

Page 1339 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPRATION PRIOR TO
263 MFC-DLM-GS-I-248 INSULATION W-2040 INSULATION INSTALLATION FOR EQ: W-2040 SMIC-I-5015 W 1682-02 DRYER PIPE RACK AREA 20-Jan-14 7:'00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO NEAR NS PIPE RACK


264 MFC-DLM-GS-I-249 INSULATION D-2506 CLADDING FOR EQ: D-2506 SMIC-I-5017 W 1714-00
AREA 20-Jan-14 7:15 AM ACCEPTED

265 MFC-DLM-GS-I-250 INSULATION E-2115 INSPECTION OF INSULATION INSSTALLATION 1st SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 20-Jan-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2115

INSPECTION OF SURFACE PREPRATION PRIOR TO


266 MFC-DLM-GS-I-251 INSULATION D-2055 SMIC-I-5015 W 1681-00 COLD PIPE RACK AREA 20-Jan-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2055

INSPECTION OF VAPOR BARRIER PRIOR TO


267 MFC-DLM-GS-I-252 INSULATION E-2302 CLADDING FOR EQ: E-2302 SMIC-I-5017 W 1704-02 COLD PIPE RACK AREA 20-Jan-14 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO


268 MFC-DLM-GS-I-253 INSULATION D-2124 INSULATION INSTALLATION FOR EQ: D-2124 SMIC-I-5015 W 1683-02 COLD PIPE RACK AREA 21-Jan-14 8:30AM ACCEPTED
(Part of T-2120)

INSPECTION OF INSULATION INSTALLATION 1st


269 MFC-DLM-GS-I-254 INSULATION D-2124 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2124 SMIC-I-5016 W 1683-02 COLD PIPE RACK AREA 22-Jan-14 2:00 PM ACCEPTED
(HEAD ONLY)

INSPECTION OF VAPOR BARRIER PRIOR TO


270 MFC-DLM-GS-I-255 INSULATION D-1824 CLADDING FOR EQ: D-1824 SMIC-I-5017 W 1662-01 COLD PIPE RACK AREA 22-Jan-14 3:00 PM ACCEPTED

271 MFC-DLM-GS-I-256 INSULATION E-1823 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1662-01 COLD PIPE RACK AREA 22-Jan-14 3:30 PM ACCEPTED
CLADDING FOR EQ: E-1823

INSPECTION OF INSULATION INSTALLATION 2nd


272 MFC-DLM-GS-I-257 INSULATION E-2115 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2124 SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 23-Jan-14 10:00 AM ACCEPTED
(HEAD ONLY)

273 MFC-DLM-GS-I-258 INSULATION D-2124 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1683-02 COLD PIPE RACK AREA 23-Jan-14 10:30 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: E-2115

INSPECTION OF INSULATION INSTALLATION 1st


274 MFC-DLM-GS-I-259 INSULATION W-2040 LAYER PRIOR TO 2nd LAYER FOR EQ: W-2040 SMIC-I-5016 W 1682-02 DRYER PIPE RACK AREA 24-Jan-14 8:00 AM ACCEPTED
(ONLY BODY)

INSPECTION OF INSULATION INSTALLATION 3rd


275 MFC-DLM-GS-I-260 INSULATION D-2124 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2124 SMIC-I-5016 W 1683-02 COLD PIPE RACK AREA 24-Jan-14 8:10 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


276 MFC-DLM-GS-I-261 INSULATION D-2055 PRIOR TO VAPOR BARRIER FOR EQ: D-2055 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 24-Jan-14 11:00 AM ACCEPTED
(BODY ONLY)

FINAL
277 MFC-DLM-GS-I-262 INSPECTION E-2302 FINAL INSPECTION OF CLADDING FOR EQ: E-2302 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 24-Jan-14 2:00 PM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


278 MFC-DLM-GS-I-263 INSULATION D-2124 SMIC-I-5018 W 1683-02 COLD PIPE RACK AREA 24-Jan-14 2:30 PM ACCEPTED
CLADDING FOR EQ: D-2124 (ONLY NOZZLE)

FINAL
279 MFC-DLM-GS-I-264 INSPECTION E-2303 FINAL INSPECTION OF CLADDING FOR EQ: E-2303 SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 26-Jan-14 2:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION NEAR N.S PIPE RACK


280 MFC-DLM-GS-I-265 INSULATION D-2055 PRIOR TO VAPOR BARRIER FOR EQ: D-2055 SMIC-I-5016 W 1681-00
AREA
26-Jan-14 3:00 PM ACCEPTED
(HEAD ONLY)

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR COLD PIPE RACK


281 MFC-DLM-GS-I-266 INSULATION E-1820-A INSULATIION INSTALLATION FOR EQ: E-1820-A SMIC-I-4012 W 1662-01
AREA
27-Jan-14 9::00 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR COLD PIPE RACK


282 MFC-DLM-GS-I-267 INSULATION E-1820-B INSULATIION INSTALLATION FOR EQ: E-1820-B SMIC-I-4012 W 1662-01
AREA
27-Jan-14 9:15 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


283 MFC-DLM-GS-I-268 INSULATION W-2040 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1682-02 DRYER PIPE RACK AREA 27-Jan-14 2:30 PM ACCEPTED
2040 (ONLY BODY)

284 MFC-DLM-GS-I-269 INSULATION D-2055 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 27-Jan-14 3:00 PM ACCEPTED
CLADDING FOR EQ: D-2055

INSPECTION OF INSULATION INSTALLATION 3rd SMIC-I-5016 CANCELLED


285 MFC-DLM-GS-I-270 INSULATION E-2115 W 1683-03 COLD PIPE RACK AREA 28-Jan-14 9. AM FOR MASTIC IS
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2115 NOT DRY

1st PARTIAL INSPECTION OF VAPOR BARRIER


286 MFC-DLM-GS-I-271 INSULATION W-2040 PRIOR TO CLADDING FOR EQ: W-2040 (UP TO 1st SMIC-I-5017 W 1682-02 DRYER PIPE RACK AREA 29-Jan-14 4.30 PM ACCEPTED
STIFFNER RING)

MFC-DLM-GS-I-272 E-2115 INSPECTION OF INSULATION INSTALLATION 3rd


INSULATION
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2115 SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA ACCEPTED
287 30-Jan-14 8:00 AM

INSPECTION OF INSULATION INSTALLATION


288 MFC-DLM-GS-I-273 INSULATION E-1820-A PRIOR TO CLADDING FOR EQ: E-1820-A SMIC-I-4013 W 1662-01 COLD PIPE RACK AREA 30-Jan-14 8:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


289 MFC-DLM-GS-I-274 INSULATION E-1820-B PRIOR TO CLADDING FOR EQ: E-1820-B SMIC-I-4013 W 1662-01 COLD PIPE RACK AREA 30-Jan-14 8:40 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR THE EAST WEST


290 MFC-DLM-GS-I-275 INSULATION E-1521-A/B SMIC-I-4012 W 1625-00 30-Jan-14 9:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1521-A/B PIPE RACK AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR THE NORTH


291 MFC-DLM-GS-I-276 INSULATION E-2430 SMIC-I-5015 W 1721-03 30-Jan-14 9:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-2430 SOUTH PIPE RACK AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


292 MFC-DLM-GS-I-277 INSULATION W-2040 CLADDING FOR EQ: W-2040 (FROM 1st STIFFNER SMIC-I-5017 W 1682-02 DRYER PIPE RACK AREA 30-Jan-14 4:00 PM ACCEPTED
RING TO UP to HEAD)

INSPECTION OF SURFACE PREPRATION PRIOR TO


293 MFC-DLM-GS-I-278 INSULATION D-1530 INSULATION INSTALLATION FOR EQ: D-1530 SMIC-I-4012 W 1626-00 NEAR THE FARNCE AREA 31-Jan-14 8. AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR NS PIPE RACK


294 MFC-DLM-GS-I-279 INSULATION D-2230 INSULATION INSTALLATION FOR EQ: D-2230 SMIC-I-5015 W 1701-01
AREA
31-Jan-14 8.30 AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO NEAR NS PIPE RACK


295 MFC-DLM-GS-I-280 INSULATION E-2110 INSULATION INSTALLATION FOR EQ: E-2110 SMIC-I-5015 W 1701-01
AREA
31-Jan-14 9. AM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO


296 MFC-DLM-GS-I-281 INSULATION E-1521-C/D INSULATION INSTALLATION FOR EQ: E-1521-C/D SMIC-I-4012 W 1625-00 NEAR FARNCE AREA 31-Jan-14 9.30 AM ACCEPTED

297 MFC-DLM-GS-I-282 INSULATION E-1514 INSULATION INSPECTION PRIOR TO CLADDING SMIC-I-4013 W 1625-00 NEAR FARNCE AREA 31-Jan-14 10.30 AM ACCEPTED
FOR EQ: E-1514

298 MFC-DLM-GS-I-283 INSULATION E-2115 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1683-03 COLD PIPE RACK AREA 31-Jan-14 11.30 AM ACCEPTED
CLADDING FOR EQ: E-2115

INSPECTION OF INSULATION INSTALLATION 1st


299 MFC-DLM-GS-I-284 INSULATION W-2040 LAYER PRIOR TO 2nd LAYER FOR EQ: W-2040 SMIC-I-5016 W 1682-02 DRYER PIPE RACK AREA 31-Jan-14 12.30 AM ACCEPTED
(ONLY HEAD )

300 MFC-DLM-GS-I-285 FINAL D-2506 FINAL INSPECTION OF CLADDING FOR EQ: D-2506 SMIC-I-5018 W 1714-00
NEAR NS PIPE RACK 31-Jan-14 2. PM ACCEPTED
INSPECTION AREA

INSPECTION OF INSULATION INSTALLATION NEAR FURNACE PIPE


301 MFC-DLM-GS-I-286 INSULATION E-1521 A/B PRIOR TO CLADDING FOR EQ:E-1521 ALB SMIC-I-4013 W 1625-00
RACK AREA 2-Feb-14 8.30 AM ACCEPTED

302 MFC-DLM-GS-I-287 FINAL


E-1823 FINAL INSPECTION OF CLADDING FOR EQ:E-1823 SMIC-I-5018 1662-01 NEAR NS PIPE RACK 2-Feb-14 4. PM ACCEPTED
INSPECTION AREA

FINAL NEAR NS PIPE RACK


303 MFC-DLM-GS-I-288 INSPECTION D-1824 FINAL INSPECTION OF CLADDING FOR EQ:D-1824 SMIC-I-5018 1662-01 2-Feb-14 4.30 PM ACCEPTED
AREA

INSPECTION OF INSULATION INSTALLATION


304 MFC-DLM-GS-I-289 INSULATION E-1521-C/D SMIC-I-4013 W 1625-00 NEAR FARNCE AREA 3-Feb-14 8:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1521-C/D

MATERIAL INSPECTION OF HOT & COLD MATERIAL GSC LAYDOWN AREA AT


305 MFC-DLM-GS-I-290 INSULATION SMIC-I-4011 W 3-Feb-14 8:30 AM ACCEPTED
RECEIVING CELLULAR GLASS MFC SITE

INSPECTION OF INSULATION INSTALLATION 2nd


306 MFC-DLM-GS-I-291 INSULATION W-2040 LAYER OF HEAD PRIOR VAPOR BARRIER FOR EQ: SMIC-I-5016 W 1682-02 DRYER PIPE RACK AREA 3-Feb-14 11:00 AM RESCHEDULE
W-2040

INSPECTION OF INSULATION INSTALLATION 2nd


MFC-DLM-GS-I-
307
291-A
INSULATION W-2040 LAYER OF HEAD PRIOR VAPOR BARRIER FOR EQ: SMIC-I-5016 W 1682-02 DRYER PIPE RACK AREA 4-Feb-14 10:00 AM ACCEPTED
W-2040

INSPECTION OF INSULATION INSTALLATION NEAR E/W PIPE RACK


308 MFC-DLM-GS-I-292 INSULATION D-0125 PRIOR TO CLADDING FOR EQ:D-0125 SMIC-I-4013 W 1466-00
AREA 3-Feb-14 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st NEAR COLD PIPE RACK


309 MFC-DLM-GS-I-293 INSULATION D-2230 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2230 SMIC-I-5016 W 1701-01
AREA 4-Feb-14 9:30 AM ACCEPTED

310 MFC-DLM-GS-I-294 FINAL E-1514 FINAL INSPECTION OF CLADDING FOR EQ: E-1514 SMIC-I-4014 W 1625-00 NEAR FARNCE AREA 4-Feb-14 4:00 PM ACCEPTED
INSPECTION

311 MFC-DLM-GS-I-295 INSULATION D-1530 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1626-00 NEAR FARNCE AREA 6-Feb-14 8:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: D-1530

312 MFC-DLM-GS-I-296 FINAL D-2055 FINAL INSPECTION OF CLADDING FOR EQ: D-2055 SMIC-I-5018 W 1681-00
NEAR COLD PIPE RACK 6-Feb-14 10:30 AM ACCEPTED
INSPECTION AREA

313 MFC-DLM-GS-I-297 INSULATION E-2430 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1721-03
NEAR COLD PIPE RACK 6-Feb-14 11:00 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2430 AREA

314 MFC-DLM-GS-I-298 INSULATION D-2230 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1701-01 NEAR COLD PIPE RACK 6-Feb-14 4:00 PM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2230 AREA

315 MFC-DLM-GS-I-299 INSULATION MATERIAL REC. & INSP. OF HOT & COLD MATERIAL BOSS SMIC-I-4011 W GSC STORE AT MFC SITE 6-Feb-14 4:10 PM ACCEPTED
322 100% RTV SILICONE

INSPECTION OF HOT & COLD MATERIAL


316 MFC-DLM-GS-I-300 INSULATION MATERIAL SMIC-I-4011 W GSC STORE AT MFC SITE 7-Feb-14 9:00 AM ACCEPTED
CELLULAR GLASS

FINAL NEAR COLD PIPE RACK


317 MFC-DLM-GS-I-301 INSPECTION E-2115 FINAL INSPECTION OF CLADDING FOR EQ: E-2115 SMIC-I-5018 W 1683-03 7-Feb-14 1:00 PM ACCEPTED
AREA

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- NEAR COLD PIPE RACK
318 MFC-DLM-GS-I-302 INSPECTION E-1820-A SMIC-I-4014 W 1662-01 7-Feb-14 1:30 PM ACCEPTED
1820-A AREA

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- NEAR COLD PIPE RACK
319 MFC-DLM-GS-I-303 INSPECTION E-1820-B 1820-B SMIC-I-4014 W 1662-01
AREA
7-Feb-14 2:00 PM ACCEPTED

SURFACE PREPARATION INSPECTION OF EQ:D- NEAR COLD PIPE RACK


320 MFC-DLM-GS-I-304 INSULATION D-2309 2309 SMIC-I-5015 W 1704-02
AREA 8-Feb-14 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-1521 NEAR FURNACE PIPE
321 MFC-DLM-GS-I-305 INSPECTION
E-1521 A/B/C/D A/B/C/D SMIC-I-4014 W 1625-00
RACK 8-Feb-14 3:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION NEAR COLD PIPE RACK


322 MFC-DLM-GS-I-306 INSULATION E-2110 PRIOR TO VAPOR BARRIER FOR EQ: E-2110 SMIC-I-5016 W 1701-01
AREA 10-Feb-14 7:30 AM ACCEPTED

323 MFC-DLM-GS-I-307 INSULATION D-2109 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1681-00
NEAR COLD PIPE RACK 10-Feb-14 7:45 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2109 AREA

324 MFC-DLM-GS-I-308 INSULATION E-2430 INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 W 1721-03


NEAR COLD PIPE RACK 10-Feb-14 8:00 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-2430 AREA

325 MFC-DLM-GS-I-309 INSULATION D-2230 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1701-01
NEAR COLD PIPE RACK 10-Feb-14 8:30 AM ACCEPTED
CLADDING FOR EQ: D-2230 AREA

326 MFC-DLM-GS-I-310 FINAL


D-0125 FINAL INSPECTION OF CLADDING FOR EQ: D-0125 SMIC-I-4014 W 1466-00 NEAR E/W PIPE RACK 10-Feb-14 2:00 PM ACCEPTED
INSPECTION AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


327 MFC-DLM-GS-I-311 INSULATION W-2040 CLADDING FOR EQ: W-2040 (EXCLUDD 2 PLACE SMIC-I-5017 W 1682-02 DRYER PIPE RACK AREA 11-Feb-14 8:00 AM ACCEPTED
OF BEAM TOUCHING POINT)

328 MFC-DLM-GS-I-312 INSULATION E-2110 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1701-01 NEAR COLD PIPE RACK 11-Feb-14 2:00 PM ACCEPTED
CLADDING FOR EQ: E-2110 AREA

SURFACE PREPARATION INSPECTION OF EQ:D-


329 MFC-DLM-GS-I-313 INSULATION D-2107 SMIC-I-5015 W 1681-00 COLD PIPE RACK AREA 11-Feb-14 9:00AM ACCEPTED
2107

MATERIAL INSPECTION OF COLD MATERIAL BUTYLE RUBBER


330 MFC-DLM-GS-I-314 INSULATION SMIC-I-4011 W GSC STORE AT MFC SITE 12.Feb-14 8:00 AM ACCEPTED
RECEIVING (Q'ty 100 Pcs.)

INSPECTION OF SURFACE PREPRATION PRIOR TO C3 SPLITTER PIPE RACK


331 MFC-DLM-GS-I-315 INSULATION E-1604 SMIC-I-4012 W 1631-02 12.Feb-14 10:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1604 AREA

INSPECTION OF INSULATION INSTALLATION 2nd NEAR NS PIPE RACK


332 MFC-DLM-GS-I-316 INSULATION D-2505 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2505 SMIC-I-5016 W 1714-00
AREA 12.Feb-14 10:10 AM ACCEPTED
(ONLY BODY SIDE)

INSPECTION OF VAPOR BARRIER PRIOR TO


333 MFC-DLM-GS-I-317 INSULATION E-2430 CLADDING FOR EQ: E-2430 SMIC-I-5017 W 1721-03 COLD PIPE RACK AREA 12.Feb-14 3:00 PM ACCEPTED

INSPECTION OF SURFACE PREPRATION PRIOR TO C3 SPLITTER PIPE RACK


334 MFC-DLM-GS-I-318 INSULATION E-1602 INSULATION INSTALLATION FOR EQ: E-1602 SMIC-I-4012 W 1631-01
AREA 14-Feb-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


NEAR NS PIPE RACK
335 MFC-DLM-GS-I-319 INSULATION D-2505 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2505 SMIC-I-5016 W 1714-00
AREA 14-Feb-14 12:30 PM ACCEPTED
(ONLY HEAD SIDE)

336 MFC-DLM-GS-I-320 INSULATION D-2309 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 14-Feb-14 1:30 PM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-2309

FINAL
337 MFC-DLM-GS-I-321 INSPECTION D-1530 FINAL INSPECTION OF CLADDING FOR EQ: D-1530 SMIC-I-4014 W 1626-00 NEAR FARNCE AREA 14-Feb-14 2:00 PM ACCEPTED

338 MFC-DLM-GS-I-322 INSULATION E-1604 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1631-02


C3 SPLITTER PIPE RACK 15-Feb-14 9:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1604 AREA

339 MFC-DLM-GS-I-323 INSULATION E-1602 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1631-01


C3 SPLITTER PIPE RACK 15-Feb-14 9:45 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1602 AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO


340 MFC-DLM-GS-I-324 INSULATION E-1413-A/B/C/D INSULATION INSTALLATION FOR EQ: E-1413- SMIC-I-4012 W 1623-01
NEAR NS PIPE RACK 15-Feb-14 10:00 AM ACCEPTED
AREA
A/B/C/D

341 MFC-DLM-GS-I-325 INSULATION D-2109 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 16-Feb-14 3:00 PM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-2109

INSPECTION OF INSULATION INSTALLATION NEAR NS PIPE RACK


342 MFC-DLM-GS-I-326 INSULATION E-1413-A/B/C/D SMIC-I-4013 W 1623-01 16-Feb-14 3:30 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1413-A/B/C/D AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO CORNNOR OF DRYER &


343 MFC-DLM-GS-I-327 INSULATION FL-1723 SMIC-I-5015 W 1651-00 17-Feb-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: FL-1723 NS PIPE RACK AREA

Page 1340 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF INSULATION INSTALLATION 2nd
344 MFC-DLM-GS-I-328 INSULATION D-2309 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2309 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 17-Feb-14 10:30 AM ACCEPTED
(ONLY BODY SIDE)

FINAL C3 SPLITTER PIPE RACK


345 MFC-DLM-GS-I-329 INSPECTION E-1604 FINAL INSPECTION OF CLADDING FOR EQ: E-1604 SMIC-I-4014 W 1631-02
AREA 19-Feb-14 8:00 AM ACCEPTED

FINAL INSPECTION OF CLADDING FOR EQ: W-


FINAL
346 MFC-DLM-GS-I-330 INSPECTION
W-2040 2040 (EXCLUDDING 6 CROSSING POINT OF BEAM SMIC-I-5018 W 1682-02 DRYER PIPE RACK AREA 19-Feb-14 8:30 AM ACCEPTED
ON HEAD, BOTTOM DOME & 1 NOZZLE)

FINAL C3 SPLITTER PIPE RACK


347 MFC-DLM-GS-I-331 INSPECTION E-1602 FINAL INSPECTION OF CLADDING FOR EQ: E-1602 SMIC-I-4014 W 1631-01 19-Feb-14 11:30 AM ACCEPTED
AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


348 MFC-DLM-GS-I-332 INSULATION D-2309 CLADDING FOR EQ: D-2309 (ONLY BODY SIDE) SMIC-I-5017 W 1704-02 COLD PIPE RACK AREA 19-Feb-14 3:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


349 MFC-DLM-GS-I-333 INSULATION D-2309 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2309 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 20-Feb-14 8:00 AM ACCEPTED
(BOTH SIDE OF HEAD)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- NEAR NS PIPE RACK


350 MFC-DLM-GS-I-334 INSPECTION E-1413-A/B/C/D 1413-A/B/C/D (ONLY ONE SIDE TUBE) SMIC-I-4014 W 1623-01
AREA
20-Feb-14 8:10 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


NEAR NS PIPE RACK
351 MFC-DLM-GS-I-335 INSULATION D-2506 PRIOR TO VAPOR BARRIER FOR EQ: D-2506 (ONLY SMIC-I-5016 W 1714-00
AREA
20-Feb-14 9:00 AM ACCEPTED
13 SUPPORTS)

352 MFC-DLM-GS-I-336 INSULATION E-1803 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1661-01 COLD PIPE RACK AREA 21-Feb-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1803

353 MFC-DLM-GS-I-337 INSULATION D-2309 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1704-02 COLD PIPE RACK AREA 21-Feb-14 10:30 AM ACCEPTED
CLADDING FOR EQ: D-2309 (BOTH SIDE OF HEAD)

354 MFC-DLM-GS-I-338 INSULATION D-2109 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 21-Feb-14 12:30 PM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2109

MFC-DLM-GS-I-339 D-2506 VAPOR BARRIER INSPECTION PRIOR TO NEAR NS PIPE RACK


INSULATION
CLADDING FOR EQ: D-2506 (ONLY 13 SUPPORTS) SMIC-I-5017 W 1714-00 ACCEPTED
355 21-Feb-14 1:00 PM
AREA

INSPECTION OF INSULATION INSTALLATION 3rd NEAR NS PIPE RACK


356 MFC-DLM-GS-I-340 INSULATION D-2505 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2505 SMIC-I-5016 W 1714-00
AREA 21-Feb-14 1:30 PM ACCEPTED
(ONLY BODY)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2506 NEAR NS PIPE RACK
357 MFC-DLM-GS-I-341 INSPECTION D-2506 (ONLY 13 SUPPORTS) SMIC-I-5018 W 1714-00
AREA 23-Feb-14 8:00 AM ACCEPTED

FINAL
358 MFC-DLM-GS-I-342 INSPECTION E-2430 FINAL INSPECTION OF CLADDING FOR EQ: E-2430 SMIC-I-5018 W 1721-03 COLD PIPE RACK AREA 23-Feb-14 10:30 AM ACCEPTED

FINAL
359 MFC-DLM-GS-I-343 INSPECTION E-2110 FINAL INSPECTION OF CLADDING FOR EQ: E-2110 SMIC-I-5018 W 1701-01 COLD PIPE RACK AREA 23-Feb-14 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd NEAR NS PIPE RACK


360 MFC-DLM-GS-I-344 INSULATION D-2505 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2505 SMIC-I-5016 W 1714-00 24-Feb-14 7:30 AM ACCEPTED
(ONLY HEAD) AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


361 MFC-DLM-GS-I-345 INSULATION D-2109 CLADDING FOR EQ: D-2109 (ONLY BODY SIDE) SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 24-Feb-14 8:00 AM ACCEPTED

FINAL
362 MFC-DLM-GS-I-346 INSPECTION D-2230 FINAL INSPECTION OF CLADDING FOR EQ: D-2230 SMIC-I-5018 W 1701-01 COLD PIPE RACK AREA 24-Feb-14 10:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO NEAR NS PIPE RACK


363 MFC-DLM-GS-I-347 INSULATION D-2505 CLADDING FOR EQ: D-2505 (ONLY BODY SIDE) SMIC-I-5017 W 1714-00
AREA
25-Feb-14 8:00 AM ACCEPTED

RESCHEDULE for
MFC-DLM-GS-I-348 INSPECTION OF VAPOR BARRIER PRIOR TO
364
A
INSULATION D-2109 CLADDING FOR EQ: D-2109 (ONLY HEAD SIDE) SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 25-Feb-14 8:30 AM 26-2-
2014(accepted)

365 MFC-DLM-GS-I-349 INSULATION D-2507 INSPECTION OF SURFACE PREPRATION PRIOR TO SMIC-I-5015 W 1714-00
NEAR NS PIPE RACK 25-Feb-14 10:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2507 AREA

366 MFC-DLM-GS-I-350 INSULATION D-2107 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 25-Feb-14 11:00 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-2107

367 MFC-DLM-GS-I-351 INSULATION E-1803 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1661-01 COLD PIPE RACK AREA 26-Feb-14 8:30AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-1803

368 MFC-DLM-GS-I-352 INSULATION FL-1723 INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 W 1651-00 COLD PIPE RACK AREA 26-Feb-14 8:00 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: FL-1723

INSPECTION OF SURFACE PREPARATION PRIOR


369 MFC-DLM-GS-I-353 INSULATION GLOBAL TO INSULATION INSTALLATION FOR EQ: E-1805 SMIC-I-5015 W 1661-01 COLD PIPE RACK AREA 27-Feb-14 9:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO NEAR NS PIPE RACK


370 MFC-DLM-GS-I-354 INSULATION GLOBAL CLADDING FOR EQ: D-2505 (ONLY HEAD SIDE) SMIC-I-5017 W 1714-00
AREA 27-Feb-14 9:30 AM ACCEPTED

FINAL
371 MFC-DLM-GS-I-355 INSPECTION GLOBAL FINAL INSPECTION OF CLADDING FOR EQ: D-2309 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 27-Feb-14 5:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


372 MFC-DLM-GS-I-356 INSULATION E-1803 SMIC-I-5015 W 1661-01 COLD PIPE RACK AREA 28-Feb-14 10:30 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-1803

INSPECTION OF VAPOR BARRIER PRIOR TO


373 MFC-DLM-GS-I-357 INSULATION FL-1723 SMIC-I-5017 W 1651-00 COLD PIPE RACK AREA 28-Feb-14 11:00 AM ACCEPTED
CLADDING FOR EQ: FL-1723

INSULATION INSPECTION & REC. OF HOT & COLD MATERIAL


374 MFC-DLM-GS-I-358 INSULATION
MATERIAL RAMCOAT 1200 SMIC-I-4011 W GSC GARNET YARD 28-Feb-14 1:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


375 MFC-DLM-GS-I-359 INSULATION D-2107 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2107 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 1-Mar-14 8:00 AM ACCEPTED
(ONLY BODY)

FINAL NEAR NS PIPE RACK


376 MFC-DLM-GS-I-360 INSPECTION D-2505 FINAL INSPECTION OF CLADDING FOR EQ: D-2505 SMIC-I-5018 W 1714-00
AREA
1-Mar-14 4:00 PM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR NEAR COLD PIPE RACK


377 MFC-DLM-GS-I-361 INSULATION E-2330 TO INSULATION INSTALLATION FOR EQ: E-2330 SMIC-I-5015 W 1704-02
AREA 3-Mar-14 8:30 AM ACCEPTED

378 MFC-DLM-GS-I-362 INSULATION E-2106 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-5015 W 1681-00
NEAR COLD PIPE RACK 3-Mar-14 8:45 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2106 AREA

INSPECTION OF INSULATION INSTALLATION 2nd


379 MFC-DLM-GS-I-363 INSULATION D-2107 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2107 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 3-Mar-14 9:00 AM ACCEPTED
(ONLY HEAD)

380 MFC-DLM-GS-I-364 INSULATION E-1803 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1661-01 COLD PIPE RACK AREA 4-Mar-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-1803

INSPECTION OF INSULATION INSTALLATION


381 MFC-DLM-GS-I-365 INSULATION D-2507 PRIOR TO VAPOR BARRIER FOR EQ: D-2507 SMIC-I-5016 W 1714-00
NEAR NS PIPE RACK 4-Mar-14 8:30 AM ACCEPTED
AREA
(FROM BOTTOM TO 1st STIFNER RING)

INSPECTION OF SURFACE PREPARATION PRIOR


382 MFC-DLM-GS-I-366 INSULATION W-1721 TO INSULATION INSTALLATION FOR EQ: W-1721 SMIC-I-5015 W 1651-00 DRYER PIPE RACK AREA 4-Mar-14 1:00 PM ACCEPTED

383 MFC-DLM-GS-I-367 FINAL


FL-1723 FINAL INSPECTION OF CLADDING FOR EQ: FL- SMIC-I-5018 W 1651-00 NEAR DRYER PIPE RACK 5-Mar-14 9:30 AM ACCEPTED
INSPECTION 1723 AREA

MFC-DLM-GS-I-368 FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2109


384 INSPECTION D-2109 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 5-Mar-14 10:00 AM ACCEPTED
A (EXCLUDDING BOTTOM DOME AND SUPPORTS)

INSPECTION OF SURFACE PREPARATION PRIOR


385 MFC-DLM-GS-I-369 INSULATION E-2108 SMIC-I-5015 W 1681-00 COLD PIPE RACK AREA 5-Mar-14 11:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2108

INSPECTION OF SURFACE PREPARATION PRIOR


386 MFC-DLM-GS-I-370 INSULATION E-2053 SMIC-I-5015 W 1681-00 COLD PIPE RACK AREA 5-Mar-14 11:30 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2053

INSPECTION OF INSULATION INSTALLATION NEAR NS PIPE RACK


387 MFC-DLM-GS-I-371 INSULATION D-2507 PRIOR TO VAPOR BARRIER FOR EQ: D-2507 SMIC-I-5016 W 1714-00
AREA
6-Mar-14 7:30 AM ACCEPTED
(FROM 1st STIFNER RING TO HEAD)

INSPECTION OF VAPOR BARRIER PRIOR TO


388 MFC-DLM-GS-I-372 INSULATION D-2107 CLADDING FOR EQ: D-2107 SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 6-Mar-14 8:00 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


389 MFC-DLM-GS-I-373 INSULATION D-2214 TO INSULATION INSTALLATION FOR EQ: D-2214 SMIC-I-5015 W 1691-01 COLD PIPE RACK AREA 6-Mar-14 9:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


390 MFC-DLM-GS-I-374 INSULATION W-1721 LAYER PRIOR TO 2nd LAYER FOR EQ: W-1721 SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 7-Mar-14 8:00 AM ACCEPTED
(ONLY BODY)

VAPOR BARRIER INSPECTION PRIOR TO


391 MFC-DLM-GS-I-375 INSULATION D-2507 CLADDING FOR EQ: D-2507 (FROM BOTTOM TO SMIC-I-5017 W 1714-00
NEAR NS PIPE RACK 7-Mar-14 9:30 AM ACCEPTED
1st STIFNER RING) AREA

392
MFC-DLM-GS-I-376 FINAL E-1803 FINAL INSPECTION OF CLADDING FOR EQ: E-1803 SMIC-I-5018 W 1661-01 COLD PIPE RACK AREA 8-Mar-14 5.00 PM ACCEPTED
A INSPECTION

INSPECTION OF SURFACE PREPARATION PRIOR


393 MFC-DLM-GS-I-377 INSULATION E-1413-A/B/C/D TO INSULATION INSTALLATION FOR EQ: E-1413- SMIC-I-4012 W 1623-01
NEAR NS PIPE RACK 8-Mar-14 7:30 AM ACCEPTED
A/B/C/D (AS PER THE HIGH LIGHTED DRAWING) AREA

MFC-DLM-GS-I-378 E-2420-A INSPECTION OF SURFACE PREPARATION PRIOR NEAR C3 SPLITTER PIPE


INSULATION
TO INSULATION INSTALLATION FOR EQ: E-2420-A SMIC-I-4012 W 1721-01 CANCELLED
394 8-Mar-14 8:00 AM
RACK AREA

395 MFC-DLM-GS-I-379 INSULATION E-2106 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 8-Mar-14 8:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2106

396 MFC-DLM-GS-I-380 INSULATION E-1805 INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 W 1661-01 COLD PIPE RACK AREA 8-Mar-14 2:30 PM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-1805

INSPECTION OF SURFACE PREPARATION PRIOR NEAR C3 SPLITTER PIPE


397 MFC-DLM-GS-I-381 INSULATION E-2420-B SMIC-I-4012 W 1721-01 9-Mar-14 8:00 AM ACCEPTED
TO INSULATION INSTALLTION FOR EQ: E-2420-B RACK AREA

INSPECTION OF INSULATION INSTALLATION 1st


398 MFC-DLM-GS-I-382 INSULATION E-2330 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 9-Mar-14 11:30 AM CANCELLED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2330

INSPECTION OF INSULATION INSTALLATION NEAR NS PIPE RACK


399 MFC-DLM-GS-I-383 INSULATION E-1413-A/B/C/D PRIOR TO CLADDING FOR EQ: E-1413-A/B/C/D SMIC-I-4013 W 1623-01 9-Mar-14 5:00 PM ACCEPTED
(WEST SIDE DOME ONLY) AREA

INSPECTION OF INSULATION INSTALLATION 2nd


400 MFC-DLM-GS-I-384 INSULATION W-1721 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 10-Mar-14 8:00 AM ACCEPTED
1721 (UP TO 1st CONSTRUCTION RING)

INSPECTION OF INSULATION INSTALLATION NEAR C3 SPLITTER PIPE


401 MFC-DLM-GS-I-385 INSULATION E-2420-B PRIOR TO CLADDIING FOR EQ: E-2420-B SMIC-I-4013 W 1721-01
RACK AREA 10-Mar-14 8:30 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


NEAR NS PIPE RACK
402 MFC-DLM-GS-I-386 INSULATION D-2507 CLADDING FOR EQ: D-2507 (FROM 1st STIFFNER SMIC-I-5017 W 1714-00
AREA 10-Mar-14 2:00 PM ACCEPTED
RING TO UPTO HEAD)

INSPECTION OF INSULATION INSTALLATION 1st


403 MFC-DLM-GS-I-387 INSULATION E-2330 LAYER PRIOR TO 2nd LAYER FOR EQ: E-2330 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 11-Mar-14 7:30 AM ACCEPTED

404 MFC-DLM-GS-I-388 INSULATION E-1717 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-5015 W 1714-00 DRYER PIPE RACK AREA 11-Mar-14 8:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-1717

405 MFC-DLM-GS-I-389 INSULATION E-2106 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 11-Mar-14 10:00 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2106

INSPECTION OF INSULATION INSTALLATION 2nd


406 MFC-DLM-GS-I-390 INSULATION W-1721 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 12-Mar-14 8:30 AM ACCEPTED
1721 (FROM 1st CONTRACTION RING TO UPTO
2st CONTRACTION RING)

407 MFC-DLM-GS-I-391 INSULATION E-1805 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1661-01 COLD PIPE RACK AREA 12-Mar-14 5:00 PM ACCEPTED
CLADDING FOR EQ: E-1805

408 MFC-DLM-GS-I-392 FINAL


D-2107 FINAL INSPECTION OF CLADDING FOR EQ: D-2107 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 13-Mar-14 10:00 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME & SUPPORTS)

409 MFC-DLM-GS-I-393 INSULATION E-2330 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 14-Mar-14 8:00 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: E-2330

INSPECTION OF VAPOR BARRIER PRIOR TO


410 MFC-DLM-GS-I-394 INSULATION E-2106 SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 14-Mar-14 10:30 AM ACCEPTED
CLADDING FOR EQ: E-2106

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


411 MFC-DLM-GS-I-395 INSPECTION E-1413-A/B/C/D SMIC-I-5018 W 1623-01 COLD PIPE RACK AREA 14-Mar-14 1:30 PM ACCEPTED
1413-A/B/C/D (WEST SIDE TUBE ONLY)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E- NEAR C3 SPLITTER PIPE


412 MFC-DLM-GS-I-396 INSPECTION E-2420-B SMIC-I-4014 W 1721-01 15-Mar-14 8:00 AM ACCEPTED
2420-B (NORTH SIDE TUBE ONLY) RACK AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


413 MFC-DLM-GS-I-397 INSULATION W-1721 CLADDING FOR EQ: W-1721 (FROM 1st SMIC-I-5017 W 1651-00 DRYER PIPE RACK AREA 15-Mar-14 2:00 PM ACCEPTED
CONSTRUCTION RING TO UPTO HEAD)

INSPECTION OF INSULATION INSTALLATION 3rd


414 MFC-DLM-GS-I-398 INSULATION E-2330 LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2330 SMIC-I-5016 W 1704-02 COLD PIPE RACK AREA 15-Mar-14 5:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


415 MFC-DLM-GS-I-399 INSULATION D-2214 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2214 SMIC-I-5016 W 1691-01 COLD PIPE RACK AREA 17-Mar-14 11:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


416 MFC-DLM-GS-I-400 INSULATION E-1717 PRIOR TO VAPOR BARRIER FOR EQ: E-1717 SMIC-I-5016 W 1714-00 DRYER PIPE RACK AREA 17-Mar-14 5:00 PM ACCEPTED

417 MFC-DLM-GS-I-401 INSULATION E-2330 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1704-02 COLD PIPE RACK AREA 18-Mar-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2330

418 MFC-DLM-GS-I-402 FINAL


D-2507 FINAL INSPECTION OF CLADDING FOR EQ: D-2507 SMIC-I-5018 W 1714-00
NEAR NS PIPE RACK 18-Mar-14 5:00 PM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME & SUPPORTS) AREA

INSPECTION OF INSULATION INSTALLATION


419 MFC-DLM-GS-I-403 INSULATION D-2107 PRIOR TO VAPOR BARRIER FOR EQ: D-2107 (ONLY SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 19-Mar-14 7:30 AM ACCEPTED
19 SUPPORTS)

INSPECTION OF INSULATION INSTALLATION


420 MFC-DLM-GS-I-404 INSULATION D-2109 PRIOR TO VAPOR BARRIER FOR EQ: D-2109 (ONLY SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 19-Mar-14 8:00 AM ACCEPTED
21 SUPPORTS)

INSPECTION OF VAPOR BARRIER PRIOR TO


421 MFC-DLM-GS-I-405 INSULATION D-2107 CLADDING FOR EQ: D-2107 (ONLY 19 SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 19-Mar-14 2:00 PM ACCEPTED
SUPPPORTS)

INSPECTION OF VAPOR BARRIER PRIOR TO


422 MFC-DLM-GS-I-406 INSULATION D-2109 CLADDING FOR EQ: D-2109 (ONLY 21 SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 19-Mar-14 2:30 PM ACCEPTED
SUPPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


423 MFC-DLM-GS-I-407 INSULATION E-2108 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 20-Mar-14 8:00 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2108

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-1805


424 MFC-DLM-GS-I-408 INSPECTION E-1805 SMIC-I-5018 W 1661-01 COLD PIPE RACK AREA 20-Mar-14 8:30 AM ACCEPTED
(EXCLUDDING SUPPORTS)

Page 1341 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPARATION PRIOR
425 MFC-DLM-GS-I-409 INSULATION W-1720 TO INSULATION INSTALLATION FOR EQ: W-1720 SMIC-I-5015 W 1651-00 DRYER PIPE RACK AREA 20-Mar-14 9:30 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


426 MFC-DLM-GS-I-410 INSULATION CY-1301 TO INSULATION INSTALLATION FOR EQ: CY-1301 SMIC-I-4012 W 1621-02 NEAR FARNCE AREA 20-Mar-14 10:00 AM ACCEPTED
(FROM SKIRT TO TOP HEAD)

INSPECTION OF INSULATION INSTALLATION 2nd


427 MFC-DLM-GS-I-411 INSULATION D-2214 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2214 SMIC-I-5016 W 1691-01 COLD PIPE RACK AREA 20-Mar-14 3:30 PM ACCEPTED
(ONLY BODY)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2107


428 MFC-DLM-GS-I-412 INSPECTION D-2107 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 20-Mar-14 4:00 PM ACCEPTED
(ONLY 19 SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


429 MFC-DLM-GS-I-413 INSULATION W-1721 LAYER PRIOR TO 2nd LAYER FOR EQ: W-1721 SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 21-Mar-14 7:30 AM ACCEPTED
(ONLY HEAD SIDE)

INSPECTION OF VAPOR BARRIER PRIOR TO


430 MFC-DLM-GS-I-414 INSULATION E-1717 CLADDING FOR EQ: E-1717 SMIC-I-5017 W 1714-00 DRYER PIPE RACK AREA 21-Mar-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


431 MFC-DLM-GS-I-415 INSULATION D-2055 PRIOR TO VAPOR BARRIER FOR EQ: D-2055 (ONLY SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 21-Mar-14 8:30 AM ACCEPTED
SUPPORTS)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2109


432 MFC-DLM-GS-I-416 INSPECTION D-2109 (ONLY 21 SUPPORTS) SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 21-Mar-14 9:30 AM ACCEPTED

433 MFC-DLM-GS-I-417 FINAL


E-2106 FINAL INSPECTION OF CLADDING FOR EQ: E-2106 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 21-Mar-14 12:30 PM ACCEPTED
INSPECTION (EXCLUDDING SUPPORTS)

434 MFC-DLM-GS-I-418 INSULATION D-2055 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 21-Mar-14 1:00 PM ACCEPTED
CLADDING FOR EQ: D-2055 (ONLY SUPPORTS)

435 MFC-DLM-GS-I-419 INSULATION


MATERIAL REC. & INSP. OF COLD MATERIAL FOSTER -60-90 SMIC-I-4011 W GSC FARMLAND 21-Mar-14 1:45 PM ACCEPTED
RECEIVING (Q'ty 280 PCS)

INSPECTION OF INSULATION INSTALLATION 2nd


436 MFC-DLM-GS-I-420 INSULATION D-2214 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2214 SMIC-I-5016 W 1691-01 COLD PIPE RACK AREA 23-Mar-14 8:00 AM ACCEPTED
(BOTH SIDE OF HEAD)

INSPECTION OF SURFACE PREPARATION PRIOR


437 MFC-DLM-GS-I-421 INSULATION D-1170 TO INSULATION INSTALLATION FOR EQ: D-1170 SMIC-I-4012 W 1507-01 ABOVE THE FURNACE 23-Mar-14 8:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION CANCELLED-


438 MFC-DLM-GS-I-422 INSULATION CY-1301 PRIOR TO CLADDING FOR EQ: CY-1301 (UPPER SMIC-I-4013 W 1621-02 NEAR FARNCE AREA 23-Mar-14 10:00 AM NOT PROPER
SIDE) SCAFFOLDING

INSPECTION OF SURFACE PREPARATION PRIOR


439 MFC-DLM-GS-I-423 INSULATION E-1530-A/B TO INSULATION INSTALLATION FOR EQ: E-1530- SMIC-I-4012 W 1626-00 NEAR FARNCE AREA 23-Mar-14 2:30 PM ACCEPTED
A/B

INSPECTION OF SURFACE PREPARATION PRIOR


440 MFC-DLM-GS-I-424 INSULATION D-1160 SMIC-I-4012 W 1506-01 ABOVE THE FURNACE 23-Mar-14 3:00 PM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: D-1160

INSPECTION OF INSULATION INSTALLATION


441 MFC-DLM-GS-I-425 INSULATION CY-1301 PRIOR TO CLADDING FOR EQ: CY-1301 (UPPER SMIC-I-4013 W 1621-02 NEAR FARNCE AREA 25-Mar-14 7:30 AM ACCEPTED
SIDE)

INSPECTION OF INSULATION INSTALLATION 2nd


442 MFC-DLM-GS-I-426 INSULATION W-1721 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 25-Mar-14 8:00 AM ACCEPTED
1721 (ONLY HEAD)

INSPECTION OF INSULATION INSTALLATION 2nd


443 MFC-DLM-GS-I-427 INSULATION E-2108 LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2108 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 25-Mar-14 8:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2055


444 MFC-DLM-GS-I-428 INSPECTION D-2055 (ONLY 21 SUPPORTS) SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 25-Mar-14 9:30 AM ACCEPTED

REJECTED BY
INSPECTION OF VAPOR BARRIER PRIOR TO
445 MFC-DLM-GS-I-429 INSULATION D-2214 CLADDING FOR EQ: D-2214 (ONLY BODY) SMIC-I-5017 W 1691-01 COLD PIPE RACK AREA 25-Mar-14 10:00 AM SADARA(subcon
qc not avilable)

446 MFC-DLM-GS-I-430 FINAL E-2330 FINAL INSPECTION OF CLADDING FOR EQ: E-2330 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 25-Mar-14 4:00 PM ACCEPTED
INSPECTION (EXCLUDDING 4 SUPPORTS)

447 MFC-DLM-GS-I-431 FINAL E-1823 FINAL INSPECTION OF EXCLUDDING PLACE SMIC-I-5018 W 1662-01 COLD PIPE RACK AREA 25-Mar-14 4:30 PM ACCEPTED
INSPECTION (SCAFFOLDING TOUCH AREA) FOR EQ: E-1823

INSPECTION OF VAPOR BARRIER PRIOR TO


448 MFC-DLM-GS-I-432 INSULATION D-2214 CLADDING FOR EQ: D-2214 (ONLY BOTH SIDE OF SMIC-I-5017 W 1691-01 COLD PIPE RACK AREA 26-Mar-14 7:30 AM ACCEPTED
HEAD)

INSPECTION OF INSULATION INSTALLATION 1st


449 MFC-DLM-GS-I-433 INSULATION W-1720 LAYER PRIOR TO 2nd LAYER FOR EQ: W-1720 SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 27-Mar-14 10:00 AM ACCEPTED
(ONLY BODY)

INSPECTION OF VAPOR BARRIER PRIOR TO


450 MFC-DLM-GS-I-434 INSULATION W-1721 CLADDING FOR EQ: W-1721 (ONLY HEAD) SMIC-I-5017 W 1651-00 DRYER PIPE RACK AREA 27-Mar-14 5:00 PM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


451 MFC-DLM-GS-I-435 INSULATION D-2214 CLADDING FOR EQ: D-2214 (ONLY BODY) SMIC-I-5017 W 1691-01 COLD PIPE RACK AREA 28-Mar-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


452 MFC-DLM-GS-I-436 INSULATION E-2053 SMIC-I-5016 W 1681-00 COLD PIPE RACK AREA 28-Mar-14 9:30 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-2053

INSPECTION OF INSULATION INSTALLATION


453 MFC-DLM-GS-I-437 INSULATION E-1530-A/B SMIC-I-4013 W 1626-00 NEAR FARNCE AREA 28-Mar-14 11:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ;E-1530-A/B

INSPECTION OF VAPOR BARRIER PRIOR TO


454 MFC-DLM-GS-I-438 INSULATION E-2108 SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 28-Mar-14 1:30 PM ACCEPTED
CLADDING FOR EQ: E-2108

INSPECTION OF INSULATION INSTALLATION 1st


455 MFC-DLM-GS-I-439 INSULATION D-1170 LAYER PRIOR TO 2nd LAYER FOR EQ: D-1170 SMIC-I-4013 W 1507-01 ON SIDE OF FURNACE 30-Mar-14 3:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


456 MFC-DLM-GS-I-440 INSULATION W-1720 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 30-Mar-14 4:00 PM ACCEPTED
1720 (ONLY BODY)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: CY-


457 MFC-DLM-GS-I-441 INSPECTION CY-1301 1301 (UPPER SIDE) SMIC-I-4014 W 1621-02 NEAR FARNCE AREA 30-Mar-14 4:30 PM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR NEAR NS PIPE RACK


458 MFC-DLM-GS-I-442 INSULATION D-2508 TO INSULATION INSTALLATION FOR EQ: D-2508 SMIC-I-5015 W 1714-00
AREA 31-Mar-14 10:00 AM RESCHEDULE

459 MFC-DLM-GS-I-443 INSULATION D-1160 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 W 1506-01 HARI ON SIDE OF
12:00 AM 4:00 PM
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1160 FURNACE

460 MFC-DLM-GS-I-443 INSULATION D-1160 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 W 1506-01 ON SIDE OF FURNACE 31-Mar-14 4:00 PM RESCHEDULE
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1160

461
MFC-DLM-GS-I- INSULATION D-2508 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-5015 W 1714-00
NEAR NS PIPE RACK 1-Apr-14 10:00 AM ACCEPTED
442-A TO INSULATION INSTALLATION FOR EQ: D-2508 AREA

462
MFC-DLM-GS-I- INSULATION D-1160 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 W 1506-01 ON SIDE OF FURNACE 1-Apr-14 4:00 PM ACCEPTED
443-A LAYER PRIOR TO 2nd LAYER FOR EQ: D-1160

INSPECTION OF SURFACE PREPARATION PRIOR


463 MFC-DLM-GS-I-444 INSULATION E-2118 TO INSULATION INSTALLATION FOR EQ: E-2118 SMIC-I-5015 W 1683-03 COLD PIPE RACK AREA 2-Apr-14 7:30 AM ACCEPTED

464 MFC-DLM-GS-I-445 INSULATION E-2053 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1681-00 COLD PIPE RACK AREA 2-Apr-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2053

INSPECTION OF INSULATION INSTALLATION 2nd


465 MFC-DLM-GS-I-446 INSULATION D-1170 SMIC-I-4013 W 1507-01 ON SIDE OF FURNACE 2-Apr-14 4:00 PM ACCEPTED
LAYER PRIOR TO CLADDING FOR EQ: D-1170

INSPECTION OF INSULATION INSTALLATION 1st


466 MFC-DLM-GS-I-447 INSULATION E-2118 SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 3-Apr-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2118

INSPECTION OF SURFACE PREPARATION PRIOR NEAR FURNACE PIPE


467 MFC-DLM-GS-I-448 INSULATION E-1525-A/C/D TO INSULATION INSTALLATION FOR EQ: E-1525- SMIC-I-4012 W 1625-00 3-Apr-14 8:00 AM ACCEPTED
A-C-D RACK AREA

INSPECTION OF SURFACE PREPARATION PRIOR NEAR FURNACE PIPE


468 MFC-DLM-GS-I-449 INSULATION E-1525-B TO INSULATION INSTALLATION FOR EQ: E-1525-B SMIC-I-4012 W 1625-00
RACK AREA
4-Apr-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


469 MFC-DLM-GS-I-450 INSULATION D-1160 LAYER PRIOR TO CLADDING FOR EQ: D-1160 SMIC-I-4013 W 1506-01 ON SIDE OF FURNACE 4-Apr-14 10:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


470 MFC-DLM-GS-I-451 INSULATION W-1720(80mm) CLADDING FOR EQ: W-1720 (ONLY BODY) SMIC-I-5017 W 1651-00 DRYER PIPE RACK AREA 4-Apr-14 11:30 AM ACCEPTED

MATERIAL INSPECTION OF COLD MATERIAL FOSTER 95-50


471 MFC-DLM-GS-I-452 INSULATION
RECEIVING (100 PAIL'S) SMIC-I-4011 W GSC STORE AT MFC SITE 4-Apr-14 12:00 PM ACCEPTED

472 MFC-DLM-GS-I-453 INSULATION


MATERIAL INSPECTION OF HOT MATERIAL SILICON BOSS SMIC-I-4011 W GSC GARNET YARD 4-Apr-14 1:00 PM ACCEPTED
RECEIVING RTV-322

473 MFC-DLM-GS-I-454 INSULATION


MATERIAL INSPECTION OF VAPOR BARRIER (COLD) SMIC-I-4011 W GSC FARMLAND 4-Apr-14 2:00 PM ACCEPTED
RECEIVING MATERIAL INSU-W-RAPID VM

474 MFC-DLM-GS-I-455 INSULATION E-2118(200mm) INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 6-Apr-14 10:30 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: E-2118

INSPECTION OF INSULATION INSTALLATION 1st


475 MFC-DLM-GS-I-456 INSULATION W-1720 LAYER PRIOR TO 2nd LAYER FOR EQ: W-1720 SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 7-Apr-14 8:00 AM ACCEPTED
(ONLY HEAD)

476 MFC-DLM-GS-I-457 FINAL


E-2330 FINAL INSPECTION OF CLADDING FOR EQ: E-2330 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 7-Apr-14 8:30 AM ACCEPTED
INSPECTION (EXCLUDDING 4 SUPPORTS)

INSPECTION OF SURFACE PREPARATION PRIOR


477 MFC-DLM-GS-I-458 INSULATION E-2322-A/B TO INSULATION INSTALLATION FOR EQ: E-2322- SMIC-I-5015 W 1701-03 COLD PIPE RACK AREA 7-Apr-14 9:00 AM ACCEPTED
A/B

INSPECTION OF INSULATION INSTALLATION


478 MFC-DLM-GS-I-459 INSULATION E-1525-A/B SMIC-I-4013 W 1625-00 NEAR FURNACE AREA 7-Apr-14 4:00 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1525-A/B

INSPECTION OF SURFACE PREPARATION PRIOR


479 MFC-DLM-GS-I-460 INSULATION D-1520 SMIC-I-4012 W 1625-00 NEAR FURNACE AREA 9-Apr-14 7:30 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: D-1520

INSPECTION OF INSULATION INSTALLATION


480 MFC-DLM-GS-I-461 INSULATION E-1525-C/D SMIC-I-4013 W 1625-00 NEAR FURNACE AREA 9-Apr-14 4:00 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-1525-C/D

INSPECTION OF SURFACE PREPARATION PRIOR


481 MFC-DLM-GS-I-462 INSULATION E-2219 TO INSULATION INSTALLATION FOR EQ: E-2219 SMIC-I-5015 W 1705-01 COLD PIPE RACK AREA 11-Apr-14 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


482 MFC-DLM-GS-I-463 INSULATION E-2222 TO INSULATION INSTALLATION FOR EQ: E-2222 SMIC-I-5015 W 1705-01 COLD PIPE RACK AREA 11-Apr-14 9:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd


483 MFC-DLM-GS-I-464 INSULATION E-2118 LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2118 SMIC-I-5016 W 1683-03 COLD PIPE RACK AREA 11-Apr-14 10:00 AM ACCEPTED

FINAL
484 MFC-DLM-GS-I-465 INSPECTION
E-1717 FINAL INSPECTION OF CLADDING FOR EQ: E-1717 SMIC-I-5018 W 1714-00 DRYER PIPE RACK AREA 11-Apr-14 11:00 AM ACCEPTED

485 MFC-DLM-GS-I-466 FINAL E-1530-A/B FINAL INSPECTION OF CLADDING FOR EQ: E- SMIC-I-4014 W 1626-00 NEAR FURNACE AREA 11-Apr-14 12:30 PM ACCEPTED
INSPECTION 1530-A/B

486 MFC-DLM-GS-I-467 INSULATION D-2508 INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 W 1714-00


NEAR NS PIPE RACK 12-Apr-14 8:30 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: D-2508 AREA

487 MFC-DLM-GS-I-468 INSULATION E-2322-A INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 W 1701-03 COLD PIPE RACK AREA 13-Apr-14 4:00 PM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-2322-A

488 MFC-DLM-GS-I-469 INSULATION D-1520 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 W 1625-00 NEAR FURNACE AREA 14-Apr-14 3:30 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: D-1520

489 MFC-DLM-GS-I-470 FINAL


D-1170 FINAL INSPECTION OF CLADDING FOR EQ: D- SMIC-I-4014 W 1507-01 ON SIDE OF FURNACE 15-Apr-14 10:00 AM ACCEPTED
INSPECTION 1170(steam drum)

490 MFC-DLM-GS-I-471 INSULATION D-2508 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 W 1714-00 NEAR NS PIPE RACK 15-Apr-14 3:00 PM ACCEPTED
CLADDING FOR EQ: D-2508 AREA

INSPECTION OF VAPOR BARRIER PRIOR TO


491 MFC-DLM-GS-I-472 INSULATION E-2322-A SMIC-I-5017 W 1701-03 COLD PIPE RACK AREA 15-Apr-14 4:00 PM ACCEPTED
CLADDING FOR EQ: E-2322-A

INSPECTION OF INSULATION INSTALLATION 2nd


492 MFC-DLM-GS-I-473 INSULATION W-1720 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 W 1651-00 DRYER PIPE RACK AREA 17-Apr-14 7.30 AM ACCEPTED
1720 (ONLY HEAD)

INSPECTION OF INSULATION INSTALLATION 1nd


493 MFC-DLM-GS-I-474 INSULATION E-2219 SMIC-I-5016 W 1705-01 COLD PIPE RACK AREA 17-Apr-14 8:00 AM ACCEPTED
LAYER PRIOR TO 2rd LAYER FOR EQ: E-2219

INSPECTION OF SURFACE PREPARATION PRIOR


494 MFC-DLM-GS-I-475 INSULATION D-1140 TO INSULATION INSTALLATION FOR EQ: D-1140 SMIC-I-4012 W 1504-01 ON SIDE OF FURNACE 17-Apr-14 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


495 MFC-DLM-GS-I-476 INSULATION D-1150 TO INSULATION INSTALLATION FOR EQ: D-1150 SMIC-I-4012 W 1505-01 ON SIDE OF FURNACE 17-Apr-14 8:45 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


496 MFC-DLM-GS-I-477 INSULATION D-2304 TO INSULATION INSTALLATION FOR EQ: D-2304 SMIC-I-5015 W 1714-00 COLD PIPE RACK AREA 17-Apr-14 9:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-


497 MFC-DLM-GS-I-478 INSPECTION
D-1160 1160(steam drum) SMIC-I-4014 W 1506-01 ON SIDE OF FURNACE 17-Apr-14 10:00 AM ACCEPTED

498 MFC-DLM-GS-I-479 FINAL


D-2214 FIANL INSPECTION OF CLADDING FOR EQ: D-2214 SMIC-I-5018 W 1691-01 COLD PIPE RACK AREA 18-Apr-14 8:00 AM ACCEPTED
INSPECTION (EXCLUDDING 10 SUPPORTS)

499 MFC-DLM-GS-I-480 INSULATION E-2021 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1682-01
NEAR DRYER PIPE RACK 18-Apr-14 9:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2021 AREA

500 MFC-DLM-GS-I-481 INSULATION E-2027 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1682-01
NEAR DRYER PIPE RACK 18-Apr-14 9:30 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2027 AREA

501 MFC-DLM-GS-I-482 INSULATION E-2322-B INSPECTION OF INSULATION INSTALLATION SMIC-I-5016 S 1701-03 COLD PIPE RACK AREA 18-Apr-14 11:30 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: E-2322-B

502 MFC-DLM-GS-I-483 INSULATION


MATERIAL INSPECTION OF CLADDING MATERIAL RIVETS SMIC-I-4011 W GSC STORE AT MFC SITE 18-Apr-14 1:00 PM ACCEPTED
RECEIVING (SIZE 4X10mm)

503 MFC-DLM-GS-I-484 INSULATION


MATERIAL INSPECTION OF COLD INSULATION MATERIAL PIR SMIC-I-4011 W GSC FARMLAND 18-Apr-14 1:30 AM ACCEPTED
RECEIVING

INSPECTION OF VAPOR BARRIER PRIOR TO


504 MFC-DLM-GS-I-485 INSULATION E-2118 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 19-Apr-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2118

INSPECTION OF INSULATION INSTALLATION 2nd


505 MFC-DLM-GS-I-486 INSULATION E-2219 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 19-Apr-14 10:00 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: E-2219

Page 1342 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF INSULATION INSTALLATION
506 MFC-DLM-GS-I-487 INSULATION D-1150 PRIOR CLADDING FOR EQ: D-1150 SMIC-I-4013 S 1505-01 ON SIDE OF FURNACE 20-Apr-14 9:30 AM ACCEPTED

FINAL INSPECTION OF CLADDING FOR EQ: W-


FINAL
507 MFC-DLM-GS-I-488 INSPECTION W-1721 1721(EXCLUDDING BOTTOM DOME & 2 SMIC-I-5018 W 1651-00 DRYER PIPE RACK AREA 20-Apr-14 11:00 AM ACCEPTED
CROSSING POINT ON HEAD)

508 MFC-DLM-GS-I-489 INSULATION D-1120 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1502-01 ON SIDE OF FURNACE 21-Apr-14 8:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: D-1120

INSPECTION OF INSULATION INSTALLATION 1st


509 MFC-DLM-GS-I-490 INSULATION D-1140 SMIC-I-4013 S 1504-01 ON SIDE OF FURNACE 21-Apr-14 8:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1140

INSPECTION OF VAPOR BARRIER PRIOR TO


510 MFC-DLM-GS-I-491 INSULATION W-1720 CLADDING FOR EQ: W-1720 (ONLY HEAD) SMIC-I-5017 S 1651-00 DRYER PIPE RACK AREA 21-Apr-14 9:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


511 MFC-DLM-GS-I-492 INSPECTION E-1525-A/B/C/D 1525-A/B/C/D SMIC-I-4014 W 1625-00 NEAR FURNACE AREA 21-Apr-14 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


512 MFC-DLM-GS-I-493 INSULATION D-1150 LAYER PRIOR TO CLADDING FOR EQ: D-1150 SMIC-I-4013 S 1505-01 ON SIDE OF FURNACE 22-Apr-14 9:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


513 MFC-DLM-GS-I-494 INSULATION D-1140 LAYER PRIOR TO CLADDING FOR EQ: D-1140 SMIC-I-4013 S 1504-01 ON SIDE OF FURNACE 22-Apr-14 10:00 AM ACCEPTED

514 MFC-DLM-GS-I-495 INSULATION E-2021 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1682-01 NEAR DRYER PIPE RACK 22-Apr-14 3:00 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-2021 AREA

515 MFC-DLM-GS-I-496 INSULATION E-2027 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1682-01


NEAR DRYER PIPE RACK 22-Apr-14 3:30 PM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-2027 AREA

516 MFC-DLM-GS-I-497 INSULATION E-2219 INSPECTION OF INSULAITON INSTALLATION 3rd SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 24-Apr-14 8:00 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2219

517 MFC-DLM-GS-I-498 INSULATION T-1620 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1634-00 NEAR FURNACE AREA 25-Apr-14 8:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: T-1620

INSPECTION OF SURFACE PREPARATION PRIOR


518 MFC-DLM-GS-I-499 INSULATION D-1210 TO INSULATION INSTALLATION FOR EQ: D-1210 SMIC-I-4012 S 1511-01 ON SIDE OF FURNACE 25-Apr-14 9:00 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR


519 MFC-DLM-GS-I-500 INSULATION D-1250 TO INSULATION INSTALLATION FOR EQ: D-1250 SMIC-I-4012 S 1515-01 ON SIDE OF FURNACE 25-Apr-14 10:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


520 MFC-DLM-GS-I-501 INSULATION D-1120 LAYER PRIOR TO 2nd LAYER FOR EQ: D-1120 SMIC-I-4013 S 1502-01 ON SIDE OF FURNACE 25-Apr-14 11:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER FOR EQ: E-2322- NEAR COLD PIPE RACK
521 MFC-DLM-GS-I-502 INSULATION E-2322-B SMIC-I-5017 S 1701-03 25-Apr-14 12:00 PM ACCEPTED
B AREA

FINAL
522 MFC-DLM-GS-I-503 INSPECTION D-1520 FINAL INSPECTION OF CLADDING FOR EQ: D-1520 SMIC-I-4014 W 1625-00 NEAR FURNACE AREA 25-Apr-14 1:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


523 MFC-DLM-GS-I-504 INSULATION D-1120 LAYER PRIOR TO CLADDING FOR EQ: D-1120 SMIC-I-4013 S 1502-01 ON SIDE OF FURNACE 26-Apr-14 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


NEAR COLD PIPE RACK
524 MFC-DLM-GS-I-505 INSULATION D-2304 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2304 SMIC-I-5016 S 1714-00
AREA
27-Apr-14 9:00 AM ACCEPTED
(ONLY BODY)

INSPECTION OF VAPOR BARRIER PRIOR TO


525 MFC-DLM-GS-I-506 INSULATION E-2219 CLADDING FOR EQ: E-2219 SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 28-Apr-14 8:00 AM ACCEPTED

FINAL E-2118(JOB NOT


526 MFC-DLM-GS-I-507 INSPECTION READY) FINAL INSPECTION OF CLADDING FOR EQ: E-2118 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 28-Apr-14 8:30 AM CANCELLED

527 MFC-DLM-GS-I-508 INSULATION T-1620 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1634-00 NEAR FURNACE AREA 28-Apr-14 9:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: T-1620

528 MFC-DLM-GS-I-509 INSULATION


MATERIAL INSPECTION OF COLD MATERIAL FOSTER 95-50 SMIC-I-4011 W GSC FARMLAND 28-Apr-14 3:00 PM ACCEPTED
RECEIVING (1000 PAIL'S)

529 MFC-DLM-GS-I-510 INSULATION


MATERIAL INSPECTION OF HOT&COLD MATERIAL FOSTER SMIC-I-4011 W GSC FARMLAND 28-Apr-14 3:15 PM ACCEPTED
RECEIVING 95-44 (1000 PAIL'S)

530 MFC-DLM-GS-I-511 INSULATION D-1210 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1511-01 ON SIDE OF FURNACE 28-Apr-14 4:00 PM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1210

INSPECTION OF INSULATION INSTALLATION 1st


531 MFC-DLM-GS-I-512 INSULATION D-1250 LAYER PRIOR TO 2nd LAYER FOR EQ: D-1250 SMIC-I-4013 S 1515-01 ON SIDE OF FURNACE 30-Apr-14 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2508 NEAR NS PIPE RACK
532 MFC-DLM-GS-I-513 INSPECTION
D-2508 (EXCLUDDING BOTTOM DOME) SMIC-I-5018 W 1714-00
AREA 30-Apr-14 9:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


533 MFC-DLM-GS-I-514 INSULATION D-2304 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2304 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 30-Apr-14 10:00 AM ACCEPTED
(ONLY BODY)

FINAL
FINAL INSPECTION OF CLADDING FOR EQ: W-
534 MFC-DLM-GS-I-515 INSPECTION W-1720 1720 (EXCLUDDING BOTTOM DOME & 2 SMIC-I-5018 W 1651-00 DRYER PIPE RACK AREA 30-Apr-14 3:00 PM ACCEPTED
CROSSING POINT ON HEAD)

INSPECTION OF SURFACE PREPARATION PRIOR


535 MFC-DLM-GS-I-516 INSULATION D-1627 SMIC-I-4012 S 1634-00 NEAR FURNACE AREA 1-May-14 8:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: D-1627

INSPECTION OF INSULATION INSTALLATION 2nd


536 MFC-DLM-GS-I-517 INSULATION D-1210 LAYER PRIOR TO CLADDING FOR EQ: D-1210 SMIC-I-4013 S 1511-01 ON SIDE OF FURNACE 1-May-14 8:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION


537 MFC-DLM-GS-I-518 INSULATION E-2106 PRIOR TO VAPOR BARRIER FOR EQ: E-2106 (ONLY SMIC-I-5016 S 1681-00 ON SIDE OF FURNACE 2-May-14 8:00 AM ACCEPTED
EXCLUDDED SUPPORTS)

INSPECTION OF SURFACE PREPARATION PRIOR


538 MFC-DLM-GS-I-519 INSULATION E-2331 TO INSULATION INSTALLATION FOR EQ: D-2331 SMIC-I-5015 S 1704-02 COLD PIPE RACK AREA 2-May-14 8:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


539 MFC-DLM-GS-I-520 INSULATION D-1250 LAYER PRIOR TO CLADDING FOR EQ: D-1250 SMIC-I-4013 S 1515-01 ON SIDE OF FURNACE 2-May-14 9:30 AM ACCEPTED

540 MFC-DLM-GS-I-521 FINAL D-1150 FINAL INSPECTION OF CLADDING FOR EQ: D- SMIC-I-4014 W 1505-01 ON SIDE OF FURNACE 2-May-14 10:00 AM ACCEPTED
INSPECTION 1150(steam drum)

INSPECTION OF VAPOR BARRIER PRIOR TO


541 MFC-DLM-GS-I-522 INSULATION E-2106 CLADDING FOR EQ: E-2106 (ONLY EXCLDDED SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 2-May-14 11:00 AM ACCEPTED
SUPPORTS)

542 MFC-DLM-GS-I-523 INSULATION


MATERIAL INSPECTION OF HOT INSULATION MATERIAL SMIC-I-4011 W GSC FARMLAND 2-May-14 1:00 PM ACCEPTED
RECEIVING ROCKWOOL PIPE SECTION (SIZE- 5",6",8")

INSPECTION OF HOT INSULATION MATERIAL


543 MFC-DLM-GS-I-524 INSULATION
MATERIAL FIBREFRAX BLANKETS(CERAMIC WOOL), (Thik.- SMIC-I-4011 W GSC FARMLAND 2-May-14 1:30 PM ACCEPTED
RECEIVING
25,40,38 mm)

INSPECTION OF INSULATION INSTALLATION


544 MFC-DLM-GS-I-525 INSULATION D-1627 PRIOR TO CLADDING FOR EQ: D-1627 SMIC-I-4013 S 1634-00 NEAR FURNACE AREA 4-May-14 8:00 AM ACCEPTED

FINAL
545 MFC-DLM-GS-I-526 INSPECTION T-1620 FINAL INSPECTION OF CLADDING FOR EQ: T-1620 SMIC-I-4014 W 1634-00 NEAR FURNACE AREA 4-May-14 10:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-


546 MFC-DLM-GS-I-527 INSPECTION D-1140 SMIC-I-4014 W 1504-01 ON SIDE OF FURNACE 4-May-14 4:30 PM ACCEPTED
1140(steam drum)

FINAL
INSPECTION OF SURFACE PREPARATION PRIOR
547 MFC-DLM-GS-I-528 INSPECTION T-2220 TO INSULATION INSTALLATION FOR EQ: T-2220 SMIC-I-5015 S 1705-01 COLD PIPE RACK AREA 5-May-14 8:00 AM ACCEPTED
(PARTIAL)

INSPECTION OF INSULATION INSTALLATION 1st


548 MFC-DLM-GS-I-529 INSULATION D-2304 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2304 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 5-May-14 8:30 AM ACCEPTED
(BOTH SIDE OF HEAD)

INSPECTION OF INSULATION INSTALLATION 1st


549 MFC-DLM-GS-I-530 INSULATION E-2222 LAYER PRIOR TO 2nd LAYER FOR EQ: E-2222 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 5-May-14 3:00 PM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-2106


550 MFC-DLM-GS-I-531 INSPECTION E-2106 (ONLY 12 SUPPORTS) SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 5-May-14 3:30 PM ACCEPTED

551 MFC-DLM-GS-I-532 FINAL E-2108 FINAL INSPECTION OF CLADDING FOR EQ: E-2108 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 5-May-14 3:45 PM ACCEPTED
INSPECTION

FINAL
552 MFC-DLM-GS-I-533 INSPECTION
E-2053 FINAL INSPECTION OF CLADDING FOR EQ: E-2053 SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 5-May-14 4:00 PM ACCEPTED

553 MFC-DLM-GS-I-534 FINAL E-2021 FINAL INSPECTION OF CLADDING FOR EQ: E-2021 SMIC-I-4014 W 1682-01
NEAR DRYER PIPE RACK 5-May-14 4:15 PM RESCHEDULE
INSPECTION AREA

554 MFC-DLM-GS-I-535 FINAL E-2027 FINAL INSPECTION OF CLADDING FOR EQ: E-2027 SMIC-I-4014 W 1682-01
NEAR DRYER PIPE RACK 5-May-14 4:30 PM RESCHEDULE
INSPECTION AREA

555
MFC-DLM-GS-I- FINAL E-2021 FINAL INSPECTION OF CLADDING FOR EQ: E-2021 SMIC-I-4014 W 1682-01
NEAR DRYER PIPE RACK 6-May-14 4:15 PM CANCELLED JOB NOT READY
534-A INSPECTION AREA

556
MFC-DLM-GS-I- FINAL E-2027 FINAL INSPECTION OF CLADDING FOR EQ: E-2027 SMIC-I-4014 W 1682-01
NEAR DRYER PIPE RACK 6-May-14 4:30 PM CANCELLED JOB NOT READY
535-A INSPECTION AREA

INSPECTION OF SURFACE PREPARATION PRIOR


557 MFC-DLM-GS-I-536 INSULATION E-1171 A-H(TLE TO INSULATION INSTALLATION FOR EQ: E- 1171 SMIC-I-4012 S 1607-02 GAS CRACKING 6-May-14 8:00 AM ACCEPTED
GAS FURNACE) FURNACE
A-H

558 MFC-DLM-GS-I-537 INSULATION D-2304 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 6-May-14 10:00 AM ACCEPTED
CLADDING FOR EQ: D-2304 (ONLY BODY)

FINAL
559 MFC-DLM-GS-I-538 INSPECTION
D-1120 FINAL INSPECTION OF CLADDING FOR EQ: D-1120 SMIC-I-4014 W 1502-01 ON SIDE OF FURNACE 7-May-14 4:00 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


560 MFC-DLM-GS-I-539 INSULATION D-2304 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2304 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 8-May-14 10:00 AM ACCEPTED
(ONLY BOTH SIDE OF HEAD)

561 MFC-DLM-GS-I-540 FINAL D-1627 FINAL INSPECTION OF CLADDING FOR EQ: D-1627 SMIC-I-4014 W 1634-00 NEAR FURNACE AREA 8-May-14 4:00 PM ACCEPTED
INSPECTION

562 MFC-DLM-GS-I-541 INSULATION D-1130 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1503-01 ON SIDE OF FURNACE 9-May-14 8:30 AM ACCEPTED
INSULATION INSTALLAITON FOR EQ: D-1130

563 MFC-DLM-GS-I-542 FINAL E-2118 FINAL INSPECTION OF CLADDING FOR EQ: E-2118 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 9-May-14 10:00 AM ACCEPTED
INSPECTION

FINAL NEAR DRYER PIPE RACK


564 MFC-DLM-GS-I-543 INSPECTION
E-2021 FINAL INSPECTION OF CLADDING FOR EQ: E-2021 SMIC-I-4014 W 1682-01
AREA 9-May-14 12:00 PM ACCEPTED

FINAL NEAR DRYER PIPE RACK


565 MFC-DLM-GS-I-544 INSPECTION
E-2027 FINAL INSPECTION OF CLADDING FOR EQ: E-2027 SMIC-I-4014 W 1682-01 9-May-14 1:00 PM ACCEPTED
AREA

INSPECTION OF INSULATION INSTALLATION 2nd


566 MFC-DLM-GS-I-545 INSULATION E-2222 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 9-May-14 1:30 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2222

INSPECTION OF VAPOR BARRIER INSPECTION PROIR


567 MFC-DLM-GS-I-546 INSULATION D-2304 TO CLADDING FOR EQ: D-2304 (ONLY BOTH SIDE OF SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 11-May-14 8:00 AM ACCEPTED
HEAD)

INSPECTION OF INSULATION INSTALLATION 1st


568 MFC-DLM-GS-I-547 INSULATION E-1171 A-H LAYER PRIOR TO 2nd LAYER FOR TLE SMIC-I-4013 S 1607-02 GAS CRACKING FURNACE 11-May-14 2:00 PM ACCEPTED
EQ.&PIPE'S(PARTIAL)

INSPECTION OF INSULATION INSTALLATION 1st


569 MFC-DLM-GS-I-548 INSULATION T-2220 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 11-May-14 4:00 PM ACCEPTED
(PARTIAL)

570 MFC-DLM-GS-I-549 INSULATION E-2222 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 12-May-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2222

571 MFC-DLM-GS-I-550 INSULATION D-1130 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1503-01 ON SIDE OF FURNACE 12-May-14 2:00 PM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1130

FINAL
572 MFC-DLM-GS-I-551 INSPECTION D-1210 FINAL INSPECTION OF CLADDING FOR EQ: D-1210 SMIC-I-4014 W 1511-01 ON SIDE OF FURNACE 13-May-14 8:00 AM ACCEPTED

573 MFC-DLM-GS-I-552 INSULATION E-2331 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 13-May-14 8:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-2331

574 MFC-DLM-GS-I-553 INSULATION D-1230 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1513-01 ON SIDE OF FURNACE 14-May-14 8:00 AM ACCEPTED
INSULATION INSSTALLATION FOR EQ: D-1230

INSPECTION OF SURFACE PREPARATION PRIOR TO


575 MFC-DLM-GS-I-554 INSULATION E-1161-A-H INSULATION INSSTALLATION FOR EQ: E-1161-A-H SMIC-I-4012 S 1606-02 GAS CRACKING FURNACE 14-May-14 9:30 AM ACCEPTED

576 MFC-DLM-GS-I-555 FINAL D-1250 FINAL INSPECTION OF CLADDING FOR EQ: D-1250 SMIC-I-4014 W 1515-01 ON SIDE OF FURNACE 14-May-14 4:00 PM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 2nd


577 MFC-DLM-GS-I-556 INSULATION E-2331 SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 16-May-14 7:30 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: E-2331

INSPECTION OF INSULATION INSTALLATION 2nd


578 MFC-DLM-GS-I-557 INSULATION T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 16-May-14 8:00 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220

INSPECTION OF INSULATION INSTALLATION 2nd


579 MFC-DLM-GS-I-558 INSULATION E-1171 A-H LAYER PRIOR TO CLADDING FOR EQ: E-1171-A-H SMIC-I-4013 S 1607-02 GAS CRACKING FURNACE 16-May-14 8:30 AM ACCEPTED
(PARTIAL)

580 MFC-DLM-GS-I-559 INSULATION D-1130 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-4013 S 1503-01 ON SIDE OF FURNACE 16-May-14 10:00 AM ACCEPTED
LAYER PRIOR TO CLADDING FOR EQ: D-1130

FINAL
581 MFC-DLM-GS-I-560 INSPECTION E-2219 FINAL INSPECTION OF CLADDING FOR EQ: E-2219 SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 16-May-14 11:00 AM ACCEPTED

INSPECTION OF CLADDING MATERIAL (EXPANSION


582 MFC-DLM-GS-I-561 INSULATION
MATERIAL SPRING 3/4" BAND, RIVETS 4x10mm, SCREW SMIC-I-4011 W GSC GARNET YARD 16-May-14 12:30 PM ACCEPTED
RECEIVING 4.2x13mm, WING SEALS 13x.8mm)

583 MFC-DLM-GS-I-562 INSULATION


MATERIAL INSPECTION OF CLADDING MATERIAL SS COIL (SIZE . SMIC-I-4011 W GSC GARNET YARD 16-May-14 1:00 PM ACCEPTED
RECEIVING 8mmX1000mmXCOIL)

584 MFC-DLM-GS-I-563 INSULATION D-2308 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1704-02 NEAR NS PIPE RACK AREA 17-May-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2308

585 MFC-DLM-GS-I-564 INSULATION E-2331 INSPECTION OF INSULATION INSTALLATION 3rd SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 17-May-14 9:30 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: E-2331

INSPECTION OF INSULATION INSTALLATION 1st


586 MFC-DLM-GS-I-565 INSULATION D-2304 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2304 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 18-May-14 8:00 AM ACCEPTED
(EXCHANGER AREA)

Page 1343 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF INSULATION INSTALLATION 1st
587 MFC-DLM-GS-I-566 INSULATION D-1230 SMIC-I-4013 S 1513-01 ON SIDE OF FURNACE 18-May-14 9:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1230

INSPECTION OF INSULATION INSTALLATION 3rd


588 MFC-DLM-GS-I-567 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 18-May-14 2:00 PM ACCEPTED
(UPTO 3rd STIFFNER RING)

589 MFC-DLM-GS-I-568 FINAL


E-2322-A/B FINAL INSPECTION OF CLADDING FOR EQ: E-2322- SMIC-I-5018 W 1701-03 COLD PIPE RACK AREA 18-May-14 3:00 PM CANCELLED
INSPECTION A/B

FINAL
590 MFC-DLM-GS-I-569 INSPECTION E-2222 FINAL INSPECTION OF CLADDING FOR EQ: E-2222 SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 18-May-14 3:30 PM CANCELLED

591 MFC-DLM-GS-I-570 INSULATION D-1240 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1514-01 ON SIDE OF FURNACE 19-May-14 7:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-1240

592 MFC-DLM-GS-I-571 INSULATION E-2331 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1704-02 COLD PIPE RACK AREA 19-May-14 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2331

INSPECTION OF INSULATION INSTALLATION 2nd


593 MFC-DLM-GS-I-572 INSULATION D-2304 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2304 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 19-May-14 8:30 AM ACCEPTED
(EXCHANGER AREA)

594 MFC-DLM-GS-I-573 INSULATION TLE-1161-A-H INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1606-02 GAS CRACKING FURNACE 19-May-14 8:45 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-1161-A-H

595 MFC-DLM-GS-I-574 INSULATION D-2307 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1704-02 NEAR NS PIPE RACK AREA 19-May-14 9:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2307

INSPECTION OF INSULATION INSTALLATION 2nd


596 MFC-DLM-GS-I-575 INSULATION D-1230 LAYER PRIOR TO CLADDING FOR EQ: D-1230 SMIC-I-4013 S 1513-01 ON SIDE OF FURNACE 19-May-14 3:30 PM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


597 MFC-DLM-GS-I-576 INSULATION D-2304 CLADDING FOR EQ: D-2304 (EXCHANGER AREA SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 19-May-14 4:00 PM ACCEPTED
ONLY)

INSPECTION OF VAPOR BARRIER PRIOR TO


598 MFC-DLM-GS-I-577 INSULATION T-2220 CLADDING FOR EQ: T-2220 (PARTIAL, UPTO 3rd SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 20-May-14 10:00 AM ACCEPTED
STIFFNER RING)

INSPECTION OF INSULATION INSTALLATION 1st


599 MFC-DLM-GS-I-578 INSULATION D-2308 SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 20-May-14 10:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-2308

600 MFC-DLM-GS-I-579 FINAL D-1130 FINAL INSPECTION OF CLADDING FOR EQ: D-1130 SMIC-I-4014 W 1503-01 ON SIDE OF FURNACE 20-May-14 4:30 PM ACCEPTED
INSPECTION

601 MFC-DLM-GS-I-580 INSULATION D-1240 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1514-01 ON SIDE OF FURNACE 21-May-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1240

602 MFC-DLM-GS-I-581 INSULATION E-1151-A-H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1605-02 GAS CRACKING FURNACE 21-May-14 8:30 AM ACCEPTED
INSULATION INSSTALLATION FOR EQ: E-1151-A-H

603 MFC-DLM-GS-I-582 INSULATION D-2307 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 22-May-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-2307

INSPECTION OF INSULATION INSTALLATION 2nd


604 MFC-DLM-GS-I-583 INSULATION D-2308 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2308 (ONLY SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 22-May-14 7:45 AM ACCEPTED
BODY)

605 MFC-DLM-GS-I-584 INSULATION D-1220 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1512-01 ON SIDE OF FURNACE 22-May-14 8:00 AM ACCEPTED
INSULATION INSSTALLATION FOR EQ: D-1220

606 MFC-DLM-GS-I-585 FINAL E-2331 FINAL INSPECTION OF CLADDING FOR EQ: E-2331 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 23-May-14 8:30 AM ACCEPTED
INSPECTION

607 MFC-DLM-GS-I-586 FINAL D-2304 FINAL INSPECTION OF CLADDING FOR EQ: D-2304 SMIC-I-5018 W 1714-00 COLD PIPE RACK AREA 23-May-14 9:30 AM ACCEPTED
INSPECTION

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-2322-


608 MFC-DLM-GS-I-587 E-2322-A/B A/B SMIC-I-5018 W 1701-03 COLD PIPE RACK AREA 23-May-14 11:00 AM ACCEPTED
INSPECTION excludding 2
supports

INSPECTION OF INSULATION INSTALLATION 2nd


609 MFC-DLM-GS-I-588 INSULATION D-1240 LAYER PRIOR TO CLADDING FOR EQ: D-1240 SMIC-I-4013 S 1514-01 ON SIDE OF FURNACE 23-May-14 12:30 PM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR TO


610 MFC-DLM-GS-I-589 INSULATION T-1310 INSULATION INSTALLATION FOR EQ: T-1310 (UPTO SMIC-I-4012 S NEAR NS PIPE RACK AREA 24-May-14 8:00 AM ACCEPTED
3rd STIFFNER RING)

611 MFC-DLM-GS-I-590 FINAL D-1230 FINAL INSPECTION OF CLADDING FOR EQ: D-1230 SMIC-I-4014 W 1513-01 ON SIDE OF FURNACE 25-May-14 3:30 PM ACCEPTED
INSPECTION

612 MFC-DLM-GS-I-591 INSULATION D-2307 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 25-May-14 4:00 PM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: D-2307

INSPECTION OF INSULATION INSTALLATION 3rd


613 MFC-DLM-GS-I-592 INSULATION D-2308 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2308 SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 25-May-14 4:30 PM ACCEPTED
(ONLY BODY)

614 MFC-DLM-GS-I-593 INSULATION E-1161-A-H INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-4013 S 1606-02 GAS CRACKING FURNACE 26-May-14 4:00 PM ACCEPTED
LAYER PRIOR TO CLADDING FOR EQ: E-1161-A-H

615 MFC-DLM-GS-I-594 INSULATION E-1151-A-H INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 26-May-14 4:30 PM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: E-1151-A-H

616 MFC-DLM-GS-I-595 INSULATION D-1220 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1512-01 ON SIDE OF FURNACE 27-May-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1220

INSPECTION OF INSULATION INSTALLATION 2nd


617 MFC-DLM-GS-I-596 INSULATION D-2308 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2308 (ONLY SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 27-May-14 3:30 PM ACCEPTED
HEAD)

618 MFC-DLM-GS-I-597 INSULATION D-2308 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1704-02 NEAR NS PIPE RACK AREA 28-May-14 4:00 PM ACCEPTED
CLADDING FOR EQ: D-2308 (ONLY BODY)

619 MFC-DLM-GS-I-598 INSULATION D-1220 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-4013 S 1512-01 ON SIDE OF FURNACE 29-May-14 7:30 AM ACCEPTED
LAYER PRIOR TO CLADDING FOR EQ: D-1220

INSPECTION OF SURFACE PREPARATION PRIOR TO


620 MFC-DLM-GS-I-599 INSULATION TLE-1141-A-H INSULATION INSTALLATION FOR EQ: E-1141-A/H SMIC-I-4012 S 1604-02 GAS CRACKING FURNACE 30-May-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd


621 MFC-DLM-GS-I-600 INSULATION D-2308 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2308 SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 30-May-14 9:30 AM ACCEPTED
(ONLY HEAD)

622 MFC-DLM-GS-I-601 FINAL D-1240 FINAL INSPECTION OF CLADDING FOR EQ: D-1240 SMIC-I-4014 W 1514-01 ON SIDE OF FURNACE 30-May-14 10:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 3rd


623 MFC-DLM-GS-I-602 INSULATION D-2307 SMIC-I-5016 S 1704-02 NEAR NS PIPE RACK AREA 30-May-14 11:30 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2307

624 MFC-DLM-GS-I-603 INSULATION T-2210 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1683-01 COLD PIPE RACK AREA 2-Jun-14 9:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: T-2210

625 MFC-DLM-GS-I-604 INSULATION D-2308 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1704-02 NEAR NS PIPE RACK AREA 4-Jun-14 7:30 AM ACCEPTED
CLADDING FOR EQ: D-2308 (ONLY HEAD)

626 MFC-DLM-GS-I-605 INSULATION D-2307 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1704-02 NEAR NS PIPE RACK AREA 4-Jun-14 8:00 AM ACCEPTED
CLADDING FOR EQ: D-2307

627 MFC-DLM-GS-I-606 INSULATION TLE-1131-A-H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4013 S 1603-02 ON SIDE OF FURNACE 4-Jun-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1131-A/H

628 MFC-DLM-GS-I-607 INSULATION TLE-1151-A-H INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 6-Jun-14 8:00 AM ACCEPTED
LAYER PRIOR TO CLADDING FOR TLE-1151-A-H

629 MFC-DLM-GS-I-608 INSULATION TLE-1141-A-H INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1604-02 GAS CRACKING FURNACE 6-Jun-14 9:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR TLE-1141-A-H

630 MFC-DLM-GS-I-609 FINAL D-1220 FINAL INSPECTION OF CLADDING FOR EQ: D-1220 SMIC-I-4014 W 1512-01 ON SIDE OF FURNACE 6-Jun-14 11:00 AM ACCEPTED
INSPECTION

631 MFC-DLM-GS-I-610 MATERIAL MATERIAL INSPECTION OF HOT INSULATION MATERIAL SMIC-I-4011 W GSC GARNET YARD 6-Jun-14 1:00 PM ACCEPTED
RECEIVING RECEIVING ROCKWOOL 90mm

MATERIAL MATERIAL INSPECTION OF CLADDING MATERIAL SS COIL (Thik .


632 MFC-DLM-GS-I-611 RECEIVING RECEIVING 8mmX1000mmXCOIL) SMIC-I-4011 W GSC GARNET YARD 6-Jun-14 1:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


633 MFC-DLM-GS-I-612 INSULATION TLE-1131-A-H LAYER PRIOR TO 2nd LAYER FOR TLE-1131-A-H (ONLY SMIC-I-4013 S 1603-02 GAS CRACKING FURNACE 8-Jun-14 7:30 AM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR


634 MFC-DLM-GS-I-613 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (UPTO 3rd STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 8-Jun-14 7:45 AM ACCEPTED
RING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


635 MFC-DLM-GS-I-614 PREPARATION D-1110 SMIC-I-4012 S 1501-01 ON SIDE OF FURNACE 8-Jun-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-1110

INSPECTION OF INSULATION INSTALLATION PRIOR


636 MFC-DLM-GS-I-615 VAPOR BARRIER
INSPECTION
T-2210 TO VAPOR BARRIER FOR EQ: T-2210 (ONLY HIGH SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 8-Jun-14 8:15 AM ACCEPTED
LIGHTED AREA IN DRAWING)

637 MFC-DLM-GS-I-616 INSULATION D-1110 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-4013 S 1501-01 ON SIDE OF FURNACE 10-Jun-14 7:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: D-1110

INSPECTION OF INSULATION INSTALLATION 1st


638 MFC-DLM-GS-I-617 INSULATION T-2210 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2210 (ONLY SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 10-Jun-14 8:00 AM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)

639 MFC-DLM-GS-I-618 FINAL TLE-1171-A/H FINAL INSPECTION OF CLADDING FOR TLE - 1171- SMIC-I-4014 W 1607-02 GAS CRACKING FURNACE 11-Jun-14 8:30 AM ACCEPTED
INSPECTION A/H

INSPECTION OF VAPOR BARRIER PRIOR TO


640 MFC-DLM-GS-I-619 VAPOR BARRIER
INSPECTION
T-2210 CLADDING FOR EQ: T-2210 (UPTO 70mm Thikn ; AS SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 12-Jun-14 8:00 AM ACCEPTED
PER HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


641 MFC-DLM-GS-I-620 INSULATION T-2210 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2210 (ONLY SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 12-Jun-14 8:15 AM ACCEPTED
HEAD)

642 SURFACE
MFC-DLM-GS-I-621 PREPARATION TLE-1121-A/H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1602-02 GAS CRACKING FURNACE 12-Jun-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: TLE-1121-A/H

643
SURFACE
MFC-DLM-GS-I-622 PREPARATION E-1172 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1607-02 GAS CRACKING FURNACE 13-Jun-14 9:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1172

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


644 MFC-DLM-GS-I-623 PREPARATION E-1173 INSULATION INSTALLATION FOR EQ: E-1173 SMIC-I-4012 S 1607-02 GAS CRACKING FURNACE 13-Jun-14 9:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


645 MFC-DLM-GS-I-624 INSULATION D-1110 LAYER PRIOR TO CLADDING FOR EQ: D-1110 SMIC-I-4013 S 1501-01 ON SIDE OF FURNACE 15-Jun-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR


646 MFC-DLM-GS-I-625 INSULATION TLE-1131-A-H SMIC-I-4013 S 1603-02 GAS CRACKING FURNACE 15-Jun-14 8:00 AM ACCEPTED
TO CLADDING FOR TLE-1131-A-H

INSPECTION OF INSULATION INSTALLATION 2nd


647 MFC-DLM-GS-I-626 INSULATION T-2210 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2210 SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 15-Jun-14 8:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

648 MFC-DLM-GS-I-627 FINAL D-2308 FINAL INSPECTION OF CLADDING FOR EQ: D-2308 SMIC-I-5018 W 1704-02 NEAR NS PIPE RACK AREA 16-Jun-14 8:00 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

649
SURFACE
MFC-DLM-GS-I-628 PREPARATION TLE-1111-A-H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1601-02 GAS CRACKING FURNACE 17-Jun-14 7:30 AM ACCEPTED
INSULATION INSTALLATION FOR TLE-1111-A/H

650
SURFACE
MFC-DLM-GS-I-629 PREPARATION E-1162/E-1163 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1606-02 GAS CRACKING FURNACE 17-Jun-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ:-E-1162/E-1163

INSPECTION OF INSULATION INSTALLATION 1st


651 MFC-DLM-GS-I-630 INSULATION TLE-1121-A-H LAYER PRIOR TO 2nd LAYER FOR TLE-1121-A/H SMIC-I-4013 S 1602-02 GAS CRACKING FURNACE 17-Jun-14 8:30 AM ACCEPTED
(ONLY HIGH LIGHTED AREA IN DRAWING )

INSPECTION OF INSULATION INSTALLATION 2nd


652 MFC-DLM-GS-I-631 INSULATION T-2210 LAYER PRIOR TO VAPOR BARIER FOR EQ: T-2210 SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 17-Jun-14 9:30 AM ACCEPTED
(ONLY HEAD)

INSPECTION OF VAPOR BARRIER PRIOR TO


653 MFC-DLM-GS-I-632 VAPOR BARRIER
INSPECTION T-2210 CLADDING FOR EQ: T-2210 (UPTO HEAD ; AS PER SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 18-Jun-14 2:00 PM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)

654
SURFACE
MFC-DLM-GS-I-633 PREPARATION D-2119 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1683-03 COLD PIPE RACK AREA 18-Jun-14 3:30 PM ACCEPTED
INSULATION INSTALLATION FOR EQ:- D-2119

655
SURFACE
MFC-DLM-GS-I-634 PREPARATION D-2152 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1683-03 COLD PIPE RACK AREA 18-Jun-14 4:00 PM ACCEPTED
INSULATION INSTALLATION FOR EQ:- D-2152

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR GAS FURNACE
656 MFC-DLM-GS-I-635 PREPARATION F-1170 JUMP & CROSS OVER FIELD JOINT (10" , 8" and 6" SMIC-I-4012 S 1607-02 GAS CRACKING FURNACE 20-Jun-14 7:30 AM ACCEPTED
Pipes)
INSPECTION OF SURFACE PREPARATION PRIOR TO
657 SURFACE
MFC-DLM-GS-I-636 PREPARATION E-1152/E-1153 INSULATION INSTALLATION FOR EQ: E-1152 & E- SMIC-I-4012 S 1605-02 GAS CRACKING FURNACE 20-Jun-14 8:00 AM ACCEPTED
1153

INSPECTION OF INSULATION INSTALLATION PRIOR


658 MFC-DLM-GS-I-637 INSULATION E-1172/E-1173 SMIC-I-4013 S 1607-02 GAS CRACKING FURNACE 20-Jun-14 8:30 AM ACCEPTED
TO CLADDING FOR EQ: E-1172 & E-1173

INSPECTION OF INSULATION INSTALLATION PRIOR


659 MFC-DLM-GS-I-638 INSULATION E-1162/E-1163 SMIC-I-4013 S 1606-02 GAS CRACKING FURNACE 20-Jun-14 9:00 AM ACCEPTED
TO CLADDING FOR EQ: E-1162 & E-1163

INSPECTION OF INSULATION INSTALLATION 1st


660 MFC-DLM-GS-I-639 INSULATION TLE-1111-A-H LAYER PRIOR TO 2nd LAYER FOR TLE-1111-A/H (AS SMIC-I-4013 S 1601-02 GAS CRACKING FURNACE 20-Jun-14 10:30 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF VAPOR BARRIER PRIOR TO


661 MFC-DLM-GS-I-640 VAPOR BARRIER
INSPECTION T-2210 CLADDING FOR EQ: T-2210 (ONLY HEAD ; AS PER SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 20-Jun-14 2:30 PM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)

FINAL
662 MFC-DLM-GS-I-641 INSPECTION D-2307 FINAL INSPECTION OF CLADDING FOR EQ: D-2307 SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 21-Jun-14 8:00 AM ACCEPTED

FINAL
663 MFC-DLM-GS-I-642 INSPECTION TLE-1161-A-H FINAL INSPECTION OF CLADDING FOR TLE-1161-A/H SMIC-I-4014 W 1606-02 GAS CRACKING FURNACE 21-Jun-14 8:30 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
664 MFC-DLM-GS-I-643 PREPARATION F-1160 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1606-02 GAS CRACKING FURNACE 22-Jun-14 7:30 AM ACCEPTED
(6" , 8" , & 10")

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
665 MFC-DLM-GS-I-644 PREPARATION E-1142/E-1143 INSULATION INSTALLATION FOR EQ: E-1142 & E- SMIC-I-4012 S 1604-02 GAS CRACKING FURNACE 22-Jun-14 8:00 AM ACCEPTED
1143

INSPECTION OF INSULATION INSTALLATION 1st


666 MFC-DLM-GS-I-645 INSULATION F-1170 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1607-02 GAS CRACKING FURNACE 22-Jun-14 9:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


667 MFC-DLM-GS-I-646 INSULATION D-2119 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2119 (AS PER SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 22-Jun-14 10:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING)

Page 1344 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE
668 MFC-DLM-GS-I-647 PREPARATION E-1132/E-1133 INSULATION INSTALLATION FOR EQ: E-1132 & E- SMIC-I-4012 S 1603-02 GAS CRACKING FURNACE 23-Jun-14 7:30 AM ACCEPTED
1133

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
669 MFC-DLM-GS-I-648 PREPARATION E-1122/E-1123 INSULATION INSTALLATION FOR EQ: E-1122 & E- SMIC-I-4012 S 1602-02 GAS CRACKING FURNACE 23-Jun-14 8:00 AM ACCEPTED
1123

INSPECTION OF INSULATION INSTALLATION 1st


670 MFC-DLM-GS-I-649 INSULATION D-2152 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2152 (ONLY SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 23-Jun-14 9:00 AM ACCEPTED
BODY)

FINAL
671 MFC-DLM-GS-I-650 INSPECTION D-1110 FINAL INSPECTION OF CLADDING FOR D-1110 SMIC-I-4014 W 1501-01 GAS CRACKING FURNACE 23-Jun-14 9:30 AM ACCEPTED

672 MFC-DLM-GS-I-651 INSULATION E-1152/E-1153 INSPECTION OF INSULATION INSTALLAION PRIOR TO SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 23-Jun-14 10:00 AM ACCEPTED
CLADDING FOR EQ: E-1152 & E-1153

673 MFC-DLM-GS-I-652 INSULATION D-2119 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 24-Jun-14 11:00 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: D-2119

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
MFC-DLM-GS-I-653 PREPARATION E-1112/E-1113 SMIC-I-4012 S 1603-02 GAS CRACKING FURNACE ACCEPTED
674 INSULATION INSTALLATION FOR EQ: E-1112 & E- 25-Jun-14 7:30 AM
1113

675 MFC-DLM-GS-I-654 INSULATION E-1142/E-1143 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1604-02 GAS CRACKING FURNACE 25-Jun-14 8:00 AM ACCEPTED
TO CLADDING FOR EQ: E-1142/E-1143

INSPECTION OF INSULATION INSTALLATION 1st


676 MFC-DLM-GS-I-655 INSULATION D-2152 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2152 (ONLY SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 25-Jun-14 8:30 AM ACCEPTED
HEAD)

INSPECTION OF INSULATION INSTALLATION PRIOR


677 MFC-DLM-GS-I-656 INSULATION E-1132/E-1133 TO CLADDING FOR EQ: E-1132/E-1133 SMIC-I-4013 S 1603-02 GAS CRACKING FURNACE 26-Jun-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


678 MFC-DLM-GS-I-657 INSULATION TLE-1121-A/H LAYER PRIOR TO CLADDING FOR EQ: E-1121-A/H SMIC-I-4013 S 1602-02 GAS CRACKING FURNACE 26-Jun-14 8:00 AM ACCEPTED

679 MFC-DLM-GS-I-658 FINAL TLE-1151-A/H FINAL INSPECTION OF CLADDING FOR TLE-1151-A/H SMIC-I-4014 W 1605-02 GAS CRACKING FURNACE 26-Jun-14 8:30 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION PRIOR


680 MFC-DLM-GS-I-659 INSULATION E-1122/E-1123 SMIC-I-4013 S 1602-02 GAS CRACKING FURNACE 27-Jun-14 9:00 AM ACCEPTED
TO CLADDING FOR EQ: E-1122/E-1123

681 MFC-DLM-GS-I-660 INSULATION D-2152 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 30-Jun-14 7:00 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2152

682 MFC-DLM-GS-I-661 INSULATION D-2119 INSPECTION OF INSULATION INSTALLATION 3rd SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 30-Jun-14 7:30 AM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2119

683 SURFACE
MFC-DLM-GS-I-662 PREPARATION TLE-1251-A/H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1615-02 LIQUID FURNACE AREA 30-Jun-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR TLE-1251-A/H

684 MFC-DLM-GS-I-663 INSULATION E-1112/E-1113 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1603-02 GAS CRACKING FURNACE 30-Jun-14 8:30 AM ACCEPTED
TO CLADDING FOR EQ: E-1112/E-1113

INSPECTION OF SURFACE PREPARATION PRIOR TO


685 SURFACE
MFC-DLM-GS-I-664 PREPARATION E-1252 INSULATION INSTALLATION FOR SECONDARY SMIC-I-4012 S 1615-02 LIQUID FURNACE AREA 1-Jul-14 7:00 AM ACCEPTED
EXCHANGER-1252

INSPECTION OF INSULATION INSTALLAION PRIOR TO


686 MFC-DLM-GS-I-665 INSULATION E-1111-A/H CLADDING FOR TLE- 1111-A/H (AS PER THE HIGH SMIC-I-4013 S 1601-02 GAS CRACKING FURNACE 1-Jul-14 7:30 AM ACCEPTED
LIGHTED AREA IN DRAWING)
INSPECTION OF INSULATION INSTALLATION PRIOR
687 MFC-DLM-GS-I-666 INSULATION E-1803 & E-1805 TO VAPOR BARRIER FOR EQ: E-1803/1805(ONLY SMIC-I-5016 S 1661-01 COLD PIPE RACK AREA 1-Jul-14 8:00 AM ACCEPTED
SUPPORTS, 12 SUPPORT IN E-1803 & 30 SUPPORT IN
E-1805)

688 MFC-DLM-GS-I-667 FINAL


INSPECTION E-1172 & E-1173 FINAL INSPECTION OF CLADDING FOR SECONDARY & SMIC-I-4014 W 1607-02 GAS CRACKING FURNACE 1-Jul-14 8:30 AM ACCEPTED
TRETARY EXCHANGER E-1172 & E-1173

INSPECTION OF VAPOR BARRIER PRIOR TO


689 MFC-DLM-GS-I-668 VAPOR BARRIER E-1803 & E-1805 CLADDING FOR EQ: E-1803/1805(ONLY SUPPORTS,
INSPECTION
SMIC-I-5016 S 1661-01 COLD PIPE RACK AREA 1-Jul-14 2:00 PM ACCEPTED
12 SUPPORT IN E-1803 & 30 SUPPORT IN E-1805)

INSPECTION OF INSULATION INSTALLATION 1st


690 MFC-DLM-GS-I-669 INSULATION F-1160 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1606-02 GAS CRACKING FURNACE 2-Jul-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF VAPOR BARRIER PRIOR TO


691 MFC-DLM-GS-I-670 VAPOR BARRIER
INSPECTION
D-2152 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 2-Jul-14 7:30 AM ACCEPTED
CLADDING FOR EQ: D-2152

INSPECTION OF VAPOR BARRIER PRIOR TO


692 MFC-DLM-GS-I-671 VAPOR BARRIER
INSPECTION
D-2119 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 2-Jul-14 7:45 AM ACCEPTED
CLADDING FOR EQ: D-2119

INSPECTION OF SURFACE PREPARATION PRIOR TO


693 SURFACE
MFC-DLM-GS-I-672 PREPARATION E-1242 INSULATION INSTALLATION FOR SECONDARY SMIC-I-4012 S 1614-02 LIQUID FURNACE AREA 2-Jul-14 8:00 AM ACCEPTED
EXCHANGER-1242

INSPECTION OF SURFACE PREPARATION PRIOR TO


694
SURFACE
MFC-DLM-GS-I-673 PREPARATION E-1232 INSULATION INSTALLATION FOR SECONDARY SMIC-I-4012 S 1613-02 LIQUID FURNACE AREA 2-Jul-14 8:15 AM ACCEPTED
EXCHANGER-1232

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
695 MFC-DLM-GS-I-674 PREPARATION F-1150 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1605-02 GAS CRACKING FURNACE 3-Jul-14 7:00 AM ACCEPTED
(6" , 8" , & 10")

696 MFC-DLM-GS-I-675 FINAL E-1162/E-1163 FINAL INSPECTION OF CLADDING FOR SECONDRY & SMIC-I-4014 W 1606-02 GAS CRACKING FURNACE 3-Jul-14 8:00 AM ACCEPTED
INSPECTION TRETARY EXCHANGER E-1162 & E-1163

697 MFC-DLM-GS-I-676 FINAL E-1152/E-1153 FINAL INSPECTION OF CLADDING FOR SECONDRY & SMIC-I-4014 W 1605-02 GAS CRACKING FURNACE 3-Jul-14 8:30 AM ACCEPTED
INSPECTION TRETARY EXCHANGER E-1152 & E-1153

698 MFC-DLM-GS-I-677 FINAL TLE-1141-A-H FINAL INSPECTION OF CLADDING FOR TLE-1141-A/H SMIC-I-4014 W 1604-02 GAS CRACKING FURNACE 3-Jul-14 9:30 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 1st


699 MFC-DLM-GS-I-678 INSULATION TLE-1251-A/H LAYER PRIOR TO 2nd LAYER FOR TLE-1251-A-H (AS SMIC-I-4013 S 1615-02 LIQUID FURNACE AREA 4-Jul-14 7:30 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

700 MFC-DLM-GS-I-679 INSULATION E-1252 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1615-02 LIQUID FURNACE AREA 6-Jul-14 7:30 AM ACCEPTED
TO CLADDING FOR SECONDARY TLE-1252

INSPECTION OF INSULATION INSTALLATION 1st


701 MFC-DLM-GS-I-680 INSULATION F-1150 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 7-Jul-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


702 MFC-DLM-GS-I-680 A F-1150 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 8-Jul-14 7:00 AM cancel
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


703 MFC-DLM-GS-I-681 PREPARATION E-1222 SMIC-I-4012 S 1612-02 LIQUID FURNACE AREA 8-Jul-14 7.30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1222

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


704 MFC-DLM-GS-I-682 PREPARATION E-1212 SMIC-I-4012 S 1611-02 LIQUID FURNACE AREA 8-Jul-14 7:40 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1212

INSPECTION OF SURFACE PREPARATION PRIOR TO


705 SURFACE
MFC-DLM-GS-I-683 PREPARATION F-1140 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1604-02 GAS CRACKING FURNACE 9-Jul-14 7:30 AM ACCEPTED
(6" , 8" , & 10")

INSPECTION OF SURFACE PREPARATION PRIOR TO


706
SURFACE
MFC-DLM-GS-I-684 PREPARATION T-2220 INSULATION INSTALLATION FOR EQ: T-2220 (FROM SMIC-I-5015 S 1705-01 COLD PIPE RACK AREA 9-Jul-14 8:30 AM ACCEPTED
REDUCER TO UPTO HEAD)

707 MFC-DLM-GS-I-685 FINAL E-1142/E-1143 FINAL INSPECTION OF CLADDING FOR EQ: E-1142 & SMIC-I-4014 W 1604-02 GAS CRACKING FURNACE 9-Jul-14 9:30 AM ACCEPTED
INSPECTION 1143

708 MFC-DLM-GS-I-686 FINAL


E-1132/E-1133 FINAL INSPECTION OF CLADDING FOR EQ: E-1132 & SMIC-I-4014 W 1603-02 GAS CRACKING FURNACE 9-Jul-14 10:00 AM ACCEPTED
INSPECTION 1133

709 MFC-DLM-GS-I-687 INSULATION E-1242 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1614-02 LIQUID FURNACE AREA 10-Jul-14 7:00 AM ACCEPTED
TO CLADDING FOR SECONDARY EXCHANGER-1242

710 MFC-DLM-GS-I-688 INSULATION E-1232 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 10-Jul-14 7:30 AM ACCEPTED
TO CLADDING FOR SECONDARY EXCHANGER-1232

INSPECTION OF INSULATION INSTALLATION 1st


711 MFC-DLM-GS-I-689 INSULATION F-1150 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 10-Jul-14 8:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

712 MFC-DLM-GS-I-690 FINAL TLE-1131-A-H FINAL INSPECTION OF CLADDING FOR TLE - 1131- SMIC-I-4014 W 1603-02 GAS CRACKING FURNACE 10-Jul-14 9:30 AM ACCEPTED
INSPECTION A/H

INSPECTION OF INSULATION INSTALLATION 2nd


713 MFC-DLM-GS-I-691 INSULATION F-1170 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPE SMIC-I-4013 S 1607-02 GAS CRACKING FURNACE 11-Jul-14 7:00 AM ACCEPTED
(ONLY 10" LINE)

INSPECTION OF INSULATION INSTALLATION 2nd


714 MFC-DLM-GS-I-692 INSULATION F-1160 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPE SMIC-I-4013 S 1606-02 GAS CRACKING FURNACE 11-Jul-14 7:15 AM ACCEPTED
(ONLY 10" LINE)

INSPECTION OF SURFACE PREPARATION PRIOR TO


715 SURFACE
MFC-DLM-GS-I-693 PREPARATION F-1130 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1603-02 GAS CRACKING FURNACE 11-Jul-14 7:30 AM ACCEPTED
(6" , 8" , & 10")

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


716 MFC-DLM-GS-I-694 PREPARATION TLE-1211-A-H SMIC-I-4012 S 1611-02 LIQUID FURNACE AREA 11-Jul-14 9:30 AM ACCEPTED
INSULATION INSTALLATION FOR LIQUID AREA TLE

717 MFC-DLM-GS-I-695 INSULATION TLE-1251-A/H INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1615-02 LIQUID FURNACE AREA 11-Jul-14 10:30 AM ACCEPTED
TO CLADDING FOR TLE-1251-A/H

718 MFC-DLM-GS-I-696 FINAL


INSPECTION
E-1122/E-1123 FINAL INSPECTION OF CLADDING FOR SECONDARY & SMIC-I-4014 W 1602-02 GAS CRACKING FURNACE 12-Jul-14 8:00 AM ACCEPTED
TERTIARY EXCHANGER E-1122 & E-1123

719 MFC-DLM-GS-I-697 FINAL


INSPECTION
E-1112/E-1113 FINAL INSPECTION OF CLADDING FOR SECONDARY & SMIC-I-4014 W 1603-02 GAS CRACKING FURNACE 12-Jul-14 8:30 AM ACCEPTED
TERTIARY EXCHANGER E-1112 & E-1113

720 MFC-DLM-GS-I-698 FINAL TLE-1121-A-H FINAL INSPECTION OF TLE -1121-A-H (AS PER THE SMIC-I-4014 W 1602-02 GAS CRACKING FURNACE 12-Jul-14 9:30 AM ACCEPTED
INSPECTION HIGHLIGHTED AREA IN DRAWING)

721 MFC-DLM-GS-I-699 INSULATION E-1222 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 12-Jul-14 2:30 PM ACCEPTED
TO CLADDING FOR SECONDARY TLE-1222

722 MFC-DLM-GS-I-700 INSULATION E-1212 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1611-02 LIQUID FURNACE AREA 12-Jul-14 3:00 PM ACCEPTED
TO CLADDING FOR SECONDARY TLE-1212

INSPECTION OF INSULATION INSTALLATION 1st


723 MFC-DLM-GS-I-701 INSULATION T-2220 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2220 (FROM SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 13-Jul-14 7:00 AM ACCEPTED
3rd STIFFNER RING TO UPTO REDUCER)

724 MFC-DLM-GS-I-702 FINAL E-1252 FINAL INSPECTION OF CLADDING FOR EQ: E-1252 SMIC-I-4014 W 1615-02 LIQUID FURNACE AREA 13-Jul-14 8:00 AM ACCEPTED
INSPECTION

FINAL INSPECTION OF CLADDING FOR EQ: E-1803 &


725 MFC-DLM-GS-I-703 FINAL E-1803 & E-1805 E-1805 (ONLY SUPPORTS, 12 SUPPORT IN E-1803 & SMIC-I-5018 W 1661-01 COLD PIPE RACK AREA 13-Jul-14 8:15 AM ACCEPTED
INSPECTION
30 SUPPORT IN E-1805)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


726 MFC-DLM-GS-I-704 PREPARATION TLE-1241-A/H INSULATION INSTALLTION FOR TLE-1241-A to H SMIC-I-4012 S 1614-02 LIQUID FURNACE AREA 13-Jul-14 8:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-2210


727 MFC-DLM-GS-I-705 INSPECTION
T-2210 SMIC-I-5018 W 1683-01 COLD PIPE RACK AREA 13-Jul-14 3:00 PM ACCEPTED
(EXCLUDDING BOTTOM DOME & 6 SUPPORTS)

728 MFC-DLM-GS-I-706 FINAL E-1242 FINAL INSPECTION OF CLADDING FOR EQ: E-1242 SMIC-I-4014 W 1614-02 LIQUID FURNACE AREA 15-Jul-14 8:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 2nd


729 MFC-DLM-GS-I-707 INSULATION T-2220 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220 (FROM SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 15-Jul-14 9:30 AM ACCEPTED
3rd STIFFNER RING TO UPTO REDUCER)

INSPECTION OF INSULATION INSTALLTION 2nd


730 MFC-DLM-GS-I-708 INSULATION F-1150 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPE SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 16-Jul-14 7:00 AM ACCEPTED
LINE (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


731 MFC-DLM-GS-I-709 INSULATION F-1140 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1604-02 GAS CRACKING FURNACE 16-Jul-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


732
SURFACE
MFC-DLM-GS-I-710 PREPARATION F-1120 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1602-02 GAS CRACKING FURNACE 16-Jul-14 8:00 AM ACCEPTED
(6" , 8" , & 10")
PARTIAL, FINAL INSPECTION OF CLADDING FOR
733 MFC-DLM-GS-I-711 FINAL F-1170 CROSS OVER PIPING (EXCLUDDING WELD JOINT & SMIC-I-4014 W 1607-02 GAS CRACKING FURNACE 17-Jul-14 8:00 AM ACCEPTED
INSPECTION SUPPORT, AS PER THE HIGH LIGHTED AREA IN
DRAWING
PARTIAL, FINAL INSPECTION OF CLADDING FOR
734 MFC-DLM-GS-I-712 FINAL
F-1160 CROSS OVER PIPING (EXCLUDDING WELD JOINT & SMIC-I-4014 W 1606-02 GAS CRACKING FURNACE 17-Jul-14 8:30 AM ACCEPTED
INSPECTION SUPPORT, AS PER THE HIGH LIGHTED AREA IN
DRAWING

735 MFC-DLM-GS-I-713 FINAL


E-1232 FINAL INSPECTION OF CLADDING FOR SECONDARY SMIC-I-4014 W 1613-02 LIQUID FURNACE AREA 17-Jul-14 9:30 AM ACCEPTED
INSPECTION EXCHANGER-1232

INSPECTION OF INSULATION INSTALLTION 1st LAYER


736 MFC-DLM-GS-I-714 INSULATION TLE-1241-A/H PRIOR TO 2nd LAYER FOR TLE-1241-A/H (AS PER THE SMIC-I-4013 S 1614-02 LIQUID FURNACE AREA 18-Jul-14 7:00 AM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)

MATERIAL MATERIAL INSPECTION OF HOT INSULATION MATERIAL


737 MFC-DLM-GS-I-715 RECEIVING RECEIVING ROCKWOOL BLANKET (40mm, 50mm,70mm, 80mm) SMIC-I-4011 W GSC FARMLAND 18-Jul-14 10:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd


738 MFC-DLM-GS-I-716 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 19-Jul-14 10:00 AM ACCEPTED
(FROM 3rd STIFFNER RING TO UPTO REDUCER)

W-1720/1 & W- FINAL INSPECTION OF EXCLUDDING PLACE ON


739 MFC-DLM-GS-I-717 FINAL DOME (BEAM CROSSING AREA) OF EQ: W-1720, W- SMIC-I-5018 W 1651-00 DRYER PIPE RACK AREA 19-Jul-14 10:30 AM ACCEPTED
INSPECTION 2040 1682-02
1721 & W-2040

FINAL FINAL INSPECTION OF CLADDING FOR SECONDARY


740 MFC-DLM-GS-I-718 INSPECTION
E-1242 SMIC-I-4014 W 1614-02 LIQUID FURNACE AREA 19-Jul-14 2:00 PM ACCEPTED
EXCHANGER-1222

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
741 MFC-DLM-GS-I-719 PREPARATION T-2120 INSULATION INSTALLATION FOR EQ: T-2120 (UPTO SMIC-I-5015 S 1683-02 COLD PIPE RACK AREA 20-Jul-14 8:00 AM ACCEPTED
3rd STIFFNER RING)

742
SURFACE
MFC-DLM-GS-I-720 PREPARATION TLE-1231-A-H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4011 S 1613-02 LIQUID FURNACE AREA 20-Jul-14 9:00 AM ACCEPTED
INSULATION INSTALLATION FOR TLE-1231-A-H

743 MFC-DLM-GS-I-721 FINAL


E-1212 FINAL INSPECTION OF CLADDING FOR SECONDARY SMIC-I-4014 W 1611-02 LIQUID FURNACE AREA 20-Jul-14 10:00 AM ACCEPTED
INSPECTION EXCHANGER-1212

744
SURFACE
MFC-DLM-GS-I-722 PREPARATION TLE-1221-A-H INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4011 S 1612-02 LIQUID FURNACE AREA 22-Jul-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR TLE-1221-A-H

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
745 MFC-DLM-GS-I-723 PREPARATION B-1115 -to- 1175 INSULATION INSTALLATION FOR ID FAN B-1115 TO SMIC-I-4011 S 1601-02 GAS CRACKING FURNACE 22-Jul-14 8:30 AM ACCEPTED
1175

746 MFC-DLM-GS-I-724 INSULATION TLE-1241-A-H INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1614-02 LIQUID FURNACE AREA 22-Jul-14 10:00 AM ACCEPTED
TO CLADDING FOR TLE-1241-A-to-H

747 MFC-DLM-GS-I-725 FINAL


E-1111-A/H FINAL INSPECTION OF CLADDING FOR TLE E-1111-A- SMIC-I-4014 W 1601-02 GAS CRACKING FURNACE 23-Jul-14 2:00 PM ACCEPTED
INSPECTION H

PARTIAL, INSPECTION OF INSULATION INSTALLATION


748 MFC-DLM-GS-I-726 INSULATION T-2220 1st LAYER PRIOR TO 2nd LAYER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 24-Jul-14 7:00 AM ACCEPTED
(FROM REDUCER TO UPTO 6 STIFFNER RING, AS PER
THE HIGH LIGHTED AREA IN DRAWING)

Page 1345 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
PARTIAL, FINAL INSPECTION OF CLADDING FOR
FINAL
749 MFC-DLM-GS-I-727 INSPECTION F-1150 CROSS OVER PIPE 10" LINE (AS PER THE HIGH SMIC-I-4014 W 1605-02 GAS CRACKING FURNACE 24-Jul-14 8:00 AM ACCEPTED
LIGHTED AREA IN DRAWING)

INSPECTION OF VAPOR BARRIER PRIOR TO


750 MFC-DLM-GS-I-728 VAPOR BARRIER
INSPECTION T-2220 CLADDING FOR EQ: T-2220 (PARTIAL, FROM 3rd SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 25-Jul-14 8:00 AM ACCEPTED
STIFFNER RING TO UPTO REDUCER)

INSPECTION OF INSULATION INSTALLATION 1st


751 MFC-DLM-GS-I-729 INSULATION TLE-1211-A-H LAYER PRIRO TO 2nd LAYER FOR TLE-1211-A-H (AS SMIC-I-4013 S 1611-02 LIQUID FURNACE AREA 26-Jul-14 7:00 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
752 MFC-DLM-GS-I-730 PREPARATION T-1310 INSULATION INSTALLATON FOR EQ: T-1310 (FROM SMIC-I-4012 S 1501-01 NEAR NS PIPE RACK AREA 30-Jul-14 8:00 AM ACCEPTED
3rd STIFFNER RING TO UPTO HEAD)

INSPECTION OF INSULATION INSTALLATION 2nd


753 MFC-DLM-GS-I-731 INSULATION T-2220 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220 (FROM SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 30-Jul-14 9:00 AM ACCEPTED
REDUCER TO UPTO 4th STIFFNER RING)

754 MFC-DLM-GS-I-732 INSULATION TLE-1211-A-H INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1611-02 LIQUID FURNACE AREA 1-Aug-14 8:00 AM ACCEPTED
TO CLADDING FOR TLE-1211-A-H

755 MFC-DLM-GS-I-733 INSULATION B-1165 & B-1175 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1606-02
1607-02 GAS CRACKING FURNACE 1-Aug-14 8:30 AM ACCEPTED
TO CLADDING FOR ID FAN B-1165&1175

INSPECTION OF INSULATION INSTALLATION PRIOR


756 MFC-DLM-GS-I-734 VAPOR BARRIER
INSPECTION T-2210 TO VAPOR BARRIER FOR EQ: T-2210 (ONLY 6 SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 1-Aug-14 9:00 AM ACCEPTED
SUPPORTS)

757 MFC-DLM-GS-I-735 VAPOR BARRIER T-2210 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 1-Aug-14 1:00 PM ACCEPTED
INSPECTION CLADDING FOR EQ: T-2210 (ONLY 6 SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


758 MFC-DLM-GS-I-736 INSULATION T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (UPTO SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 5-Aug-14 7:00 AM ACCEPTED
1st STIFFNER RING)

B-1155,1145 & INSPECTION OF INSULATION INSTALLATION PRIOR


759 MFC-DLM-GS-I-737 INSULATION 1135 TO CLADDING FOR ID FAN B-1155,1145 & 1135 SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 5-Aug-14 9:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR TLE-1251-A-


760 MFC-DLM-GS-I-738 INSPECTION TLE-1251-A/H SMIC-I-4014 W 1615-02 LIQUID FURNACE AREA 5-Aug-14 10:00 AM ACCEPTED
to-H (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 3rd


761 MFC-DLM-GS-I-739 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 5-Aug-14 2:00 PM ACCEPTED
(FROM REDUCER TO UPTO 5 STIFFNER RING)

INSPECTION OF INSULATION INSTALLATION PRIOR


762 MFC-DLM-GS-I-740 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (FROM 3rd STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 7-Aug-14 8:00 AM ACCEPTED
RING TO UPTO 4th STIFFNER RING)

INSPECTION OF INSULATION INSTALLATION 1st


763 MFC-DLM-GS-I-741 INSULATION TLE-1231-A-H LAYER PRIOR TO 2nd LAYER FOR TLE-1231-A-H (AS SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 8-Aug-14 8:00 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

764 MFC-DLM-GS-I-742 INSULATION B-1125 & B-1115 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1605-02 GAS CRACKING FURNACE 8-Aug-14 9:30 AM ACCEPTED
TO CLADDING FOR ID FAN B-1125 & B-1115

765 MFC-DLM-GS-I-743 FINAL D-2152 FINAL INSPECTION OF CLADDING FOR EQ: D-2152 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 9-Aug-14 3:00PM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME & SUPPORTS)

766 MFC-DLM-GS-I-744 FINAL D-2119 FINAL INSPECTION OF CLADDING FOR EQ: D-2119 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 9-Aug-14 3:30PM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

INSPECTION OF VAPOR BARRIER PRIOR TO


767 MFC-DLM-GS-I-745 VAPOR BARRIER
INSPECTION T-2220 CLADDING FOR EQ: T-2220 (FROM REDUCER TO SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 10-Aug-14 8:00 AM ACCEPTED
UPTO 3rd STIFFNER RING )

INSPECTION OF INSULATION INSTALLATION PRIOR


768 MFC-DLM-GS-I-746 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (FROM 4th STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 10-Aug-14 9:30 AM ACCEPTED
RING TO UPTO 5th STIFFNER RING)
1615-02
SURFACE
INSPECTION OF SURFACE PREPARATION PRIOR TO 1614-02
769 MFC-DLM-GS-I-747 PREPARATION B-1255-to-B-1215 INSULATION INSTALLATION FOR ID FAN B-1255-to-B- SMIC-I-4012 S 1613-02 LIQUID FURNACE AREA 11-Aug-14 7:00 AM ACCEPTED
1215 1612-02
1611-02

SURFACE B-1254, B-1244 & INSPECTION OF SURFACE PREPARATION PRIOR TO 1615-02


770 MFC-DLM-GS-I-748 PREPARATION B-1234 INSULATION INSTALLATION FOR FD FAN B-1254, B- SMIC-I-4012 S 1614-02 LIQUID FURNACE AREA 11-Aug-14 8:30 AM ACCEPTED
1244 & B-1234 1613-02

INSPECTION OF INSULATION INSTALLATION 1st


LAYER PRIOR TO 2nd LAYER FOR EQ: T-2220 (FROM
771 MFC-DLM-GS-I-749 INSULATION T-2220 10 STIFFNER RING TO UPTO FULL BODY, AS PER THE SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 11-Aug-14 11:00 AM ACCEPTED
HIGH LIGHTED AREA IN DRAWING)
INSPECTION OF INSULATION INSTALLATION PRIOR
772 MFC-DLM-GS-I-750 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (FROM 5th STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 13-Aug-14 7:30 AM ACCEPTED
RING TO 6th RING)

INSPECTION OF INSULATION INSTALLATION 1st


773 MFC-DLM-GS-I-751 INSULATION TLE-1221-A-H SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 13-Aug-14 8:00 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR TLE-1221-A-H

774 MFC-DLM-GS-I-752 INSULATION TLE-1231-A-H INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 13-Aug-14 8:30 AM ACCEPTED
TO CLADDING FOR TLE-1231-A-H

INSPECTION OF INSULATION INSTALLATION 1st


775 MFC-DLM-GS-I-753 INSULATION T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 14-Aug-14 7:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING )

INSPECTION OF VAPOR BARRIER PRIOR TO


776 MFC-DLM-GS-I-754 VAPOR BARRIER
INSPECTION
T-2220 CLADDING FOR EQ: T-2220 ( FROM STIFFNER RING 7 SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 14-Aug-14 7:30 AM ACCEPTED
TO 9)

777 SURFACE
MFC-DLM-GS-I-755 PREPARATION D-2022 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1682-01 WEST PIPE RACK AREA 14-Aug-14 10:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2022

INSPECTION OF INSULATION INSTALLATION 2nd


778 MFC-DLM-GS-I-756 INSULATION T-2120 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 15-Aug-14 8:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING )

779 MFC-DLM-GS-I-757 MATERIAL MATERIAL INSPECTION OF DOW CORING RTV SILICON 736 SMIC-I-4011 W GSC SITE STORE 15-Aug-14 8:30 AM ACCEPTED
RECEIVING RECEIVING (Q'ty-120 Pce.)

780 MFC-DLM-GS-I-758 MATERIAL MATERIAL INSPECTION OF COLD INSULATION MATERIAL PIR SMIC-I-4011 W GSC FARMLAND 15-Aug-14 9:30 AM ACCEPTED
RECEIVING RECEIVING

INSPECTION OF INSULATION INSTALLATION PRIOR


781 MFC-DLM-GS-I-759 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (FROM STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 17-Aug-14 7:00 AM ACCEPTED
RING 6th to 7th )
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR EQ: T-2120 (FROM
782 MFC-DLM-GS-I-760 PREPARATION T-2120 3rd STIFFNER RING TO UPTO REDUCER, AS PER THE SMIC-I-5015 S 1683-02 COLD PIPE RACK AREA 18-Aug-14 7:00 AM ACCEPTED
HIGH LIGHTED AREA IN DRAWING )
INSPECTION OF INSULATION INSTALLATION 1st
783 MFC-DLM-GS-I-761 INSULATION T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 18-Aug-14 8:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING )

INSPECTION OF INSULATION INSTALLATION 2nd


784 MFC-DLM-GS-I-762 INSULATION T-2220 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220 (AS PR SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 18-Aug-14 8:30 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR


785 MFC-DLM-GS-I-763 INSULATION T-1310 TO CLADDING FOR EQ: T-1310 (FROM STIFFNER SMIC-I-4013 S NEAR NS PIPE RACK AREA 19-Aug-14 7:30 AM ACCEPTED
RING 7th TO UPTO HEAD)

786 MFC-DLM-GS-I-764 FINAL TLE-1241-A-H FINAL INSPECTION OF CLADDING FOR TLE-1241-A- SMIC-I-4014 W 1614-02 LIQUID FURNACE AREA 19-Aug-14 8:30 AM ACCEPTED
INSPECTION to-H (AS PER THE HIGH LIGHTED AREA IN DRAWING)

787 MFC-DLM-GS-I-765 MATERIAL MATERIAL INSPECTION OF CLADDING MATERIAL GI SHEET SMIC-I-4011 W GSC GARNET YARD 19-Aug-14 9:30 AM ACCEPTED
RECEIVING RECEIVING

788 MFC-DLM-GS-I-766 MATERIAL MATERIAL INSPECTION OF CLADDING (HOT) MATERIAL BOSS SMIC-I-4011 W GSC GARNET YARD 19-Aug-14 10:00 AM ACCEPTED
RECEIVING RECEIVING 322 RTV

INSPECTION OF INSULATION INSTALLATION 3nd


789 MFC-DLM-GS-I-767 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 21-Aug-14 7.30 AM ACCEPTED
(AS PR THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


790 MFC-DLM-GS-I-768 INSULATION T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 22-Aug-14 7:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING )

INSPECTION OF INSULATION INSTALLATION 2nd


791 MFC-DLM-GS-I-769 INSULATION T-2220 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220 (AS PR SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 22-Aug-14 7:30 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING)

792 MFC-DLM-GS-I-770 FINAL T-2210 FINAL INSPECTION OF CLADDING FOR EQ: T-2210 SMIC-I-5018 W 1683-01 COLD PIPE RACK AREA 22-Aug-14 9:30 AM ACCEPTED
INSPECTION (ONLY 6 SUPPORTS)

793 MFC-DLM-GS-I-771 INSULATION TLE-1221-A-H INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 22-Aug-14 10:30 AM ACCEPTED
TO CLADDING FOR TLE-1221-A-H

INSPECTION OF VAPOR BARRIER PRIOR TO


794 MFC-DLM-GS-I-772 VAPOR BARRIER
INSPECTION
T-2220 CLADDING FOR EQ: T-2220 (AS PER THE HIGH SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 24-Aug-14 7:30 AM ACCEPTED
LIGHTED AREA IN DRAWING )

INSPECTION OF INSULATION INSTALLATION 3rd


795 MFC-DLM-GS-I-773 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 24-Aug-14 10:00 AM ACCEPTED
(AS PR THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


796 MFC-DLM-GS-I-774 INSULATION T-2120 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 26-Aug-14 7:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING )

INSPECTION OF SURFACE PREPARATION PRIOR TO


797 SURFACE
MFC-DLM-GS-I-775 PREPARATION T-2120 INSULATION INSTALLATION FOR EQ: T-2120 (AS PER SMIC-I-5015 S 1683-02 COLD PIPE RACK AREA 26-Aug-14 8:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING)

798 MFC-DLM-GS-I-776 FINAL TLE-1211-A-H FINAL INSPECTION OF CLADDING FOR TLE-1211-A-H SMIC-I-4014 W 1611-02 LIQUID FURNACE AREA 26-Aug-14 8:30 AM ACCEPTED
INSPECTION (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION THIRD


799 MFC-DLM-GS-I-777 INSULATION T-2120 LAYER PRIOR TO VAPOR BARRIER FOR EQUIPMENT SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 27-Aug-14 8:00 AM ACCEPTED
T-2120 (AS PER THE HIGHLIGHTED AREA IN
DRAWING)
INSPECTION OF INSULATION INSTALLATION 1st
800 MFC-DLM-GS-I-778 INSULATION T-2220 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2220 (ONLY SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 28-Aug-14 8:30 AM ACCEPTED
HEAD)

INSPECTION OF VAPOR BARRIER PRIOR TO


801 MFC-DLM-GS-I-779 T-2220 CLADDING FOR EQ: T-2220 (AS PER THE HIGH SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 29-Aug-14 7:00 AM RS
LIGHTED AREA IN DRAWING )

INSPECTION OF INSULATION INSTALLATION 1st


802 MFC-DLM-GS-I-780 T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 29-Aug-14 8:00 AM RS
THE HIGH LIGHTED AREA IN DRAWING)

803 MFC-DLM-GS-I-781 D-2022 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1682-01 NEAR DRYER PIPE RACK 29-Aug-14 8:30 AM RS
TO CLADDING FOR EQ: D-2022 AREA
1615-02
INSPECTION OF INSULATION INSTALLATION PRIOR 1614-02
804 MFC-DLM-GS-I-782 B-1215-to-1255 SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 29-Aug-14 9:30 AM RS
TO CLADDING FOR ID FAN B-1215 to B-1255 1612-02
1611-02

B-1234,B1244, INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 1615-02


805 MFC-DLM-GS-I-783 S 1614-02 LIQUID FURNACE AREA 29-Aug-14 10:30 AM RS
B1254 TO CLADDING FOR FD FAN B-1234, B-1244 & B-1254 1613-02

MFC-DLM-GS-I-779- VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO


806
A INSPECTION
T-2220 CLADDING FOR EQ: T-2220 (AS PER THE HIGH SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 31-Aug-14 7:00 AM ACCEPTED
LIGHTED AREA IN DRAWING )

MFC-DLM-GS-I-780- INSPECTION OF INSULATION INSTALLATION 1st


807
A INSULATION T-2120 LAYER PRIOR TO 2nd LAYER FOR EQ: T-2120 (AS PER SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 31-Aug-14 8:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING)

MFC-DLM-GS-I-781- INSPECTION OF INSULATION INSTALLATION PRIOR NEAR DRYER PIPE RACK


808 INSULATION D-2022 SMIC-I-4013 S 1682-01 31-Aug-14 8:30 AM ACCEPTED
A TO CLADDING FOR EQ: D-2022 AREA
1615-02
MFC-DLM-GS-I-782- INSPECTION OF INSULATION INSTALLATION PRIOR 1614-02
809 INSULATION B-1215-to-1255 SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 31-Aug-14 9:30 AM ACCEPTED
A TO CLADDING FOR ID FAN B-1215 to B-1255 1612-02
1611-02

MFC-DLM-GS-I-783- B-1234,B1244, INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 1615-02


810 INSULATION S 1614-02 LIQUID FURNACE AREA 31-Aug-14 10:30 AM ACCEPTED
A B1254 TO CLADDING FOR FD FAN B-1234, B-1244 & B-1254 1613-02

INSPECTION OF IN PROCESS APPLICATION


811 MFC-DLM-GS-I-784 INSULATION T-2120 INSULATION INSTALLATION PRIOR TO VAPOR SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 31-Aug-14 11:00 AM ACCEPTED
BARRIER FOR EQ: T-2120 (E-2121 & D-2124)

INSPECTION OF INSULATION INSTALLATION 2nd


812 MFC-DLM-GS-I-785 INSULATION T-2220 LAYER PRIOR TO 3rd LAYER FOR EQ: T-2220 (ONLY SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 31-Aug-14 11:30 AM ACCEPTED
HEAD)

813 MFC-DLM-GS-I-786 MATERIAL MATERIAL RECEIVING & INSPECTION OF COLD SMIC-I-4011 W GSC FARMLAND 31-Aug-14 2:30 PM ACCEPTED
RECEIVING INSULATION MATERIAL PIR

INSPECTION OF INSULATION INSTALLATION 3rd


814 MFC-DLM-GS-I-787 INSULATION T-2220 LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2220 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 3-Sep-14 7:30 AM ACCEPTED
(ONLY HEAD)

INSPECTION OF VAPOR BARRIER PRIOR TO


815 MFC-DLM-GS-I-788 VAPOR BARRIER
INSPECTION T-2120 CLADDING FOR EQ: T-2120 (AS PER THE HIGH SMIC-I-5017 S 1683-02 COLD PIPE RACK AREA 3-Sep-14 9:30 AM ACCEPTED
LIGHTED AREA IN DRAWING)

816 MFC-DLM-GS-I-789 VAPOR BARRIER


T-2220 INSPECTION OF VAPOR BARRIER PRIOR TO SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 5-Sep-14 7:30 AM ACCEPTED
INSPECTION CLADDING FOR EQ: T-2220 (HEAD)

817 MFC-DLM-GS-I-790 FINAL


T-1310 FINAL INSPECTION OF CLADDING FOR EQ: T-1310 SMIC-I-4014 W NEAR NS PIPE RACK AREA 6-Sep-14 7:30 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

INSPECTION OF IN PROCESS APPLICATION


INSULATION INSTALLATION PRIOR TO VAPOR
818 MFC-DLM-GS-I-791 VAPOR BARRIER
INSPECTION T-2120 BARRIER FOR EQ: T-2120 (E-2121 & D-2124) SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 06-09-2014 ~
11-09-2014 WEEKLY ACCEPTED
(WEEKLY RFI)

B-1154,1164 & INSPECTION OF SURFACE PREPARATION PRIOR TO


819 SURFACE
MFC-DLM-GS-I-792 PREPARATION INSULATION INSTALLATION FOR FD FAN B-1154, B- SMIC-I-4012 S 1605/6/7-02 GAS FURNACE AREA 7-Sep-14 7:00 AM ACCEPTED
1174
1164 & B-1174

SK-0529 & SK INSPECTION OF SURFACE PREPARATION PRIOR TO


820 SURFACE
MFC-DLM-GS-I-793 PREPARATION INSULATION INSTALLATION FOR EQ: SK-0529 & SK- SMIC-I-4012 S 1646/47-00 SPENT CAUSTIC AREA 7-Sep-14 9:30 AM ACCEPTED
0599 0599

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-2220


821 MFC-DLM-GS-I-794 INSPECTION
T-2220 SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 10-Sep-14 2:00 PM ACCEPTED
(EXCLUDDING BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


821
SURFACE
MFC-DLM-GS-I-795 PREPARATION B-1144, B-1134 & INSULATION INSTALLATION FOR FD FAN B-1144, B- SMIC-I-4012 S 1604/3/2-02 GAS FURNACE AREA 12-Sep-14 8:00 AM ACCEPTED
B-1124 1134 & B-1124

INSPECTION OF VAPOR BARRIER PRIOR TO


822 MFC-DLM-GS-I-796 VAPOR BARRIER
INSPECTION T-2120 CLADDING FOR EQ: T-2120 (E-2121 & D-2124) (AS SMIC-I-5017 S 1683-02 COLD PIPE RACK AREA 12-Sep-14 11:30 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

823 MFC-DLM-GS-I-797 INSULATION


SK-0529 & SK INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1646-00 SPENT CAUSTIC AREA 13-Sep-14 8:00 AM ACCEPTED
0599 TO CLADDING FOR EQ: SK-0529 & SK-0559

824
SURFACE
MFC-DLM-GS-I-798 PREPARATION D-1420 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1623-01 NEAR NS PIPE RACK AREA 13-Sep-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-1420

825 MFC-DLM-GS-I-799 FINAL


TLE-1231-A-H FINAL INSPECTION OF CLADDING FOR TLE-1231-A-H SMIC-I-4014 W 1613-02 LIQUID FURNACE AREA 14-Sep-14 8:00 AM ACCEPTED
INSPECTION (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
826 MFC-DLM-GS-I-800 PREPARATION F-1170 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1501-01 GAS FURNACE AREA 17-Sep-14 7:00 AM ACCEPTED
(6" , 8" , & 10")

INSPECTION OF INSULATION INSTALLATION 1st


827 MFC-DLM-GS-I-801 INSULATION F-1130 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1603-02 GAS FURNACE AREA 17-Sep-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


828 MFC-DLM-GS-I-802 INSULATION F-1140 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPE SMIC-I-4013 S 1504-01 GAS FURNACE AREA 17-Sep-14 8:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

Page 1346 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE
829 MFC-DLM-GS-I-803 PREPARATION F-1250 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1515-01 LIQUID FURNACE AREA 17-Sep-14 8:30 AM ACCEPTED
(AS PER HIGH LIGHTED AREA IN DRAWING)

830 MFC-DLM-GS-I-804 FINAL


TLE-1221-A-H FINAL INSPECTION OF CLADDING FOR TLE -1221-A-H SMIC-I-4014 W 1612-02 LIQUID FURNACE AREA 17-Sep-14 8:45 AM ACCEPTED
INSPECTION (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


831 MFC-DLM-GS-I-805 INSULATION F-1120 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1502-01 GAS FURNACE AREA 19-Sep-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


832 MFC-DLM-GS-I-806 INSULATION F-1130 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPE SMIC-I-4013 S 1603-02 GAS FURNACE AREA 19-Sep-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

833 MFC-DLM-GS-I-807 INSULATION B-1134 TO B-1174 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1603-02 GAS FURNACE AREA 19-Sep-14 10:00 AM ACCEPTED
TO CLADDING FOR FD FAN B-1134 TO B-1174

834 MFC-DLM-GS-I-808 INSULATION T-2127 INSPECTION OF INSULATION INSTALLATION 1st SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 19-Sep-14 11:30 AM ACCEPTED
LAYER PRIOR TO 2nd LAYER FOR EQ: T-2127

INSPECTION OF SURFACE PREPARATION PRIOR TO


835
SURFACE
MFC-DLM-GS-I-809 PREPARATION B-1224 & B-1214 INSULATION INSTALLATION FOR FD FAN-B-1224 & B- SMIC-I-4012 S 1612-02 LIQUID FURNACE AREA 21-Sep-14 8:30 AM ACCEPTED
1214

836 MFC-DLM-GS-I-810 INSULATION T-2127 INSPECTION OF INSULATION INSTALLATION 2nd SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 22-Sep-14 7:30 AM ACCEPTED
LAYER PRIOR TO 3rd LAYER FOR EQ: T-2127

837
SURFACE
MFC-DLM-GS-I-811 PREPARATION B-1114 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1601-02 GAS FURNACE AREA 22-Sep-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR FD FAN-B-1114

INSPECTION OF INSULATION INSTALLATION 2nd


838 MFC-DLM-GS-I-812 INSULATION F-1120 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1502-01 GAS FURNACE AREA 22-Sep-14 8:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


839 MFC-DLM-GS-I-813 INSULATION F-1110 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1501-01 GAS FURNACE AREA 23-Sep-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


840
SURFACE
MFC-DLM-GS-I-814 PREPARATION F-1210 to F-1240 INSULATION INSTALLATION FOR CROSS OVER PIPING SMIC-I-4012 S 1511-01 LIQUID FURNACE AREA 23-Sep-14 7:30 AM ACCEPTED
(AS PER HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


841 MFC-DLM-GS-I-815 INSULATION F-1250 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1515-01 LIQUID FURNACE AREA 23-Sep-14 8:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st


842 MFC-DLM-GS-I-816 INSULATION F-1240 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1514-01 LIQUID FURNACE AREA 25-Sep-14 7 .00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


843 MFC-DLM-GS-I-817 INSULATION F-1110 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1501-01 GAS FURNACE AREA 26-Sep-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


844
SURFACE
MFC-DLM-GS-I-818 PREPARATION W-1720 & W- INSULATION INSTALLATION FOR EQ: W-1720 & W- SMIC-I-5015 S 1682-02 DRYER PIPE RACK AREA 26-Sep-14 9:30 AM ACCEPTED
2040 2040 (ONLY BOTTOM DOME)
INSPECTION OF SURFACE PREPARATION PRIOR TO
845
SURFACE
MFC-DLM-GS-I-819 PREPARATION D-2307, D-2308 & INSULATION INSTALLATION FOR EQ: D-2307, D-2308 SMIC-I-5015 S 1704-02 COLD PIPE RACK AREA 26-Sep-14 11:30 AM ACCEPTED
T-1810 & T-1810 (ONLY BOTTOM DOME & SADDLE
SUPPORTS)

846 MFC-DLM-GS-I-820 INSULATION T-2127 INSPECTION OF INSULATION INSTALLATION 3rd SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 26-Sep-14 1:30 PM ACCEPTED
LAYER PRIOR TO VAPOR BARRIER FOR EQ: T-2127

847 MFC-DLM-GS-I-821 FINAL T-2120 FINAL INSPECTION OF CLADDING FOR EQ: T-2120 SMIC-I-5018 W 1683-02 COLD PIPE RACK AREA 29-Sep-14 8:00 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 1st


848 MFC-DLM-GS-I-822 INSULATION F-1230 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1513-01 LIQUID FURNACE AREA 1-Oct-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


849 MFC-DLM-GS-I-823 INSULATION F-1250 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1515-01 LIQUID FURNACE AREA 1-Oct-14 7:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


850 MFC-DLM-GS-I-824 PREPARATION E-1528 INSULATION INSTALLATION FOR EQ: E-1528 SMIC-I-4012 S 1625-00 E/W PIPE RACK AREA 1-Oct-14 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR FD FAN B-


851 MFC-DLM-GS-I-825 INSPECTION
B-1254 1254 (EXCEPT MANHOLE) SMIC-I-4014 W 1615-02 LIQUID FURNACE AREA 1-Oct-14 8:15 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


852 MFC-DLM-GS-I-826 VAPOR BARRIER
INSPECTION
T-2127 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 1-Oct-14 10:30 AM ACCEPTED
CLADDING FOR EQ: T-2127

FINAL FINAL INSPECTION OF CLADDING FOR FD FAN B-


853 MFC-DLM-GS-I-827 INSPECTION
B-1244 SMIC-I-4014 W 1614-02 LIQUID FURNACE AREA 2-Oct-14 8:00 AM ACCEPTED
1244 (EXCEPT MANHOLE)

INSPECTION OF SURFACE PREPARATION PRIOR TO


854
SURFACE
MFC-DLM-GS-I-828 PREPARATION T-1910 INSULATION INSTALLAION FOR EQ: T-1910 (ONLY SMIC-I-4012 S 1731-01 NEAR C3 SPLITTER PIPE 3-Oct-14 8:00 AM ACCEPTED
FOR 3 SADDLE SUPPORTS & BOTTOM DOME) RACK AREA

855 MFC-DLM-GS-I-829 FINAL D-2022 FINAL INSPECTION OF CLADDING FOR EQ: D-2022 SMIC-I-4014 W 1682-01 DRYER PIPE RACK AREA 3-Oct-14 10:30 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR


856 MFC-DLM-GS-I-830 INSULATION T-1910 TO CLADDING FOR EQ : T-1910 (ONLY FOR 3 SADDLE SMIC-I-4013 S 1731-01
NEAR C3 SPLITTER PIPE 3-Oct-14 12:30 PM ACCEPTED
SUPPORTS) RACK AREA

INSPECTION OF INSULATION INSTALLATION 1st


857 MFC-DLM-GS-I-831 INSULATION F-1220 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1512-01 LIQUID FURNACE AREA 7-Oct-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd


858 MFC-DLM-GS-I-832 INSULATION F-1240 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1514-01 LIQUID FURNACE AREA 7-Oct-14 7:15 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

859 MFC-DLM-GS-I-833 INSULATION B-1214 & B-1224 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1611-02 LIQUID FURNACE AREA 7-Oct-14 7:30 AM ACCEPTED
TO CLADDING FOR LIQUID FD FAN B-1214 & B-1224

860 MFC-DLM-GS-I-834 INSULATION B-1114 & B-1124 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1601-02 GAS FURNACE AREA 7-Oct-14 7:45 AM ACCEPTED
TO CLADDING FOR GAS FD FAN B-1114 & B-1124

861 MFC-DLM-GS-I-835 INSULATION E-1528 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1625-00 NEAR E/W PIPE RACK 7-Oct-14 8:00 AM ACCEPTED
TO CLADDING FOR EQ: E-1528 AREA

INSPECTION OF INSULATION INSTALLATION PRIOR


862 MFC-DLM-GS-I-836 INSULATION T-1810 TO VAPOR BARRIER FOR EQ: T-1810 (ONLY FOR 4 SMIC-I-5016 S 1661-01 COLD PIPE RACK AREA 7-Oct-14 8:15 AM ACCEPTED
SADDLE SUPPORTS)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-1910 C3 SPLITTER PIPE RACK
863 MFC-DLM-GS-I-837 INSPECTION
T-1910 ( ONLY FOR 3 SADDLE SUPPORTS) SMIC-I-4014 W 1731-01
AREA 7-Oct-14 8:30 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


864 MFC-DLM-GS-I-838 VAPOR BARRIER
INSPECTION T-1810 CLADDING FOR EQ: T-1810 (ONLY FOR 4 SADDLE SMIC-I-5017 S 1661-01 COLD PIPE RACK AREA 7-Oct-14 2:00 PM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


865 MFC-DLM-GS-I-839 INSULATION F-1210 LAYER PRIOR TO 2nd LAYER FOR CROSS OVER PIPING SMIC-I-4013 S 1511-01 LIQUID FURNACE AREA 8-Oct-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

866 MFC-DLM-GS-I-840 FINAL SK-0529 & SK FINAL INSPECTION OF CLADDING FOR EQ: SK-0529 & SMIC-I-4014 W 1646-00 SPENT CAUSTIC AREA 8-Oct-14 8:00 AM ACCEPTED
INSPECTION 0559 SK-0559 1647-00

INSPECTION OF SURFACE PREPRATION PRIOR TO


867 MFC-DLM-GS-I-841
SURFACE PREPARATION T-1510 INSULATION INSTALLATION FOR EQ: T-1510 (ONLY SMIC-I-4012 S 1624-01 NEAR E/W PIPE RACK 10-Oct-14 7:00 AM ACCEPTED
FOR 2 SADDLE SUPPORTS) AREA

INSPECTION OF SURFACE PREPRATION PRIOR TO


868 SURFACE PREPARATIONR-2025,2030 &
MFC-DLM-GS-I-842 INSULATION INSTALLATION FOR EQ: R- SMIC-I-4012 S 1682-02 DRYER PIPE RACK AREA 10-Oct-14 8:00 AM ACCEPTED
2035 2025/2030/2035 (ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPRATION PRIOR TO


869 MFC-DLM-GS-I-843
SURFACE PREPARATION X-2010 INSULATION INSTALLATION FOR EQ: X-2010 (ONLY SMIC-I-4012 S 1681-00 DRYER PIPE RACK AREA 10-Oct-14 9:00 AM ACCEPTED
FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd


870 MFC-DLM-GS-I-844 INSULATION F-1230 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1513-01 LIQUID FURNACE AREA 10-Oct-14 11:30 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR


MFC-DLM-GS-I-845 T-1510 NEAR E/W PIPE RACK
871 INSULATION TO CLADDING FOR EQ: T-1510 (ONLY FOR 2 SADDLE SMIC-I-4013 S 1624-01
AREA
10-Oct-14 12:30 PM ACCEPTED
SUPPORTS)

872 MFC-DLM-GS-I-846 FINAL T-1510 FINAL INSPECTION OF CLADDING FOR EQ: T-1510 SMIC-I-4014 W 1624-01 NEAR E/W PIPE RACK 11-Oct-14 8:00 AM ACCEPTED
INSPECTION (ONLY FOR 2 SADDLE SUPPORTS) AREA

PARTIAL FINAL INSPECTION OF CLADDING FOR


873 MFC-DLM-GS-I-847 PARTIAL FINAL
INSPECTION F-1250 CROSS OVER PIPE LINE (EXCLUDDING FIELD JOINT, SMIC-I-4014 S 1615-02 LIQUID FURNACE AREA 11-Oct-14 8:30 AM cancel
AS PER THE HIGH LIGHTED AREA IN DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR LIQUID FD


874 MFC-DLM-GS-I-848 INSPECTION
B-1224 FAN B-1224 SMIC-I-4014 W 1612-02 LIQUID FURNACE AREA 11-Oct-14 10:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


875 MFC-DLM-GS-I-849 INSULATION F-1220 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1512-01 LIQUID FURNACE AREA 12-Oct-14 7:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

PARTIAL INSPECTION OF CLADDING FOR CROSS


876 MFC-DLM-GS-I-850 FINAL F-1250 OVER PIPE LINE 10" (EXCLUDDING FIELD JOINT, AS SMIC-I-4014 S 1515-01 LIQUID FURNACE AREA 12-Oct-14 8:00 AM ACCEPTED
INSPECTION
PER THE HIGH LIGHTED AREA IN DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


877 MFC-DLM-GS-I-851 PREPARATION E-0305 SMIC-I-4012 S 1744-01 DRYER PIPE RACK AREA 12-Oct-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-0305

D-0512, D-0514, INSPECTION OF SURFACE PREPARATION PRIOR TO


878
SURFACE
MFC-DLM-GS-I-852 PREPARATION D-0525, D-0542, INSULATION INSTALLATION FOR EQ: D-0512, D-0514, SMIC-I-4012 S 1646-00 SPENT CAUSTIC AREA 14-Oct-14 8:00 AM ACCEPTED
1647-00
D-0544, D-0555 D-0525, D-0542, D-0544, D-0555

879 MFC-DLM-GS-I-853 FINAL B-1154 & B-1174 FINAL INSPECTION OF CLADDING FOR FD FAN B- SMIC-I-4014 W 1605-02 GAS FURNACE AREA 14-Oct-14 8:30 AM ACCEPTED
INSPECTION 1154 & B-1174 (EXCLUDDING MANHOLE) 1607-02

PARTIAL INSPECTION OF CLADDING FOR CROSS


880 MFC-DLM-GS-I-854 FINAL F-1240 OVER PIPE LINE 10" (EXCLUDDING FIELD JOINT, AS SMIC-I-4014 S 1514-01 LIQUID FURNACE AREA 16-Oct-14 7:30 AM ACCEPTED
INSPECTION
PER THE HIGH LIGHTED AREA IN DRAWING)

PARTIAL INSPECTION OF CLADDING FOR CROSS


881 MFC-DLM-GS-I-855 FINAL F-1230 OVER PIPE LINE 10" (EXCLUDDING FIELD JOINT, AS SMIC-I-4014 S 1513-01 LIQUID FURNACE AREA 16-Oct-14 8:30 AM ACCEPTED
INSPECTION
PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE 1646-00
882 MFC-DLM-GS-I-856 PREPARATION S-0515 & S-0545 INSULATION INSTALLATION FOR EQ: S-0515 & S- SMIC-I-4012 S 1647-00
SPENT CAUSTIC AREA 17-Oct-14 7:00 AM ACCEPTED
0545

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
MFC-DLM-GS-I-857 PREPARATION V-0517 & V-0547 SMIC-I-4012 S 1646-00 SPENT CAUSTIC AREA ACCEPTED
883 INSULATION INSTALLATION FOR EQ: V-0517 & V- 1647-00
17-Oct-14 8:00 AM
0547

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO 1646-00


884 MFC-DLM-GS-I-858 PREPARATION T-0523 & T-0553 INSULATION INSTALLATION FOR EQ: T-0523 & T- SMIC-I-4012 S 1647-00
SPENT CAUSTIC AREA 17-Oct-14 9:00 AM ACCEPTED
0553

885
SURFACE
MFC-DLM-GS-I-859 PREPARATION D-0950 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1423-00 NEAR COOLING TOWER 17-Oct-14 10:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-0950

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


886 MFC-DLM-GS-I-860 PREPARATION V-0955 INSULATION INSTALLATION FOR EQ: V-0955 SMIC-I-5015 S NEAR COOLING TOWER 17-Oct-14 11:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd


887 MFC-DLM-GS-I-861 INSULATION F-1210 LAYER PRIOR TO CLADDING FOR CROSS OVER PIPING SMIC-I-4013 S 1511-01 LIQUID FURNACE AREA 17-Oct-14 12:30 PM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

B-1134, B-1144, FINAL LINSPECTION OF CLADDING FOR GAS ID FAN


FINAL 1603-02
888 MFC-DLM-GS-I-862 INSPECTION
B-1154, B-1164 & B-1134, B-1144, B-1154, B-1164 & B-1174 (EXCEPT SMIC-I-4014 W 1607-02
GAS FURNACE AREA 18-Oct-14 8:00 AM ACCEPTED
B-1174 MANHOLE)

FINAL FINAL INSPECTION OF CLADDING FOR LIQUID FD


889 MFC-DLM-GS-I-863 INSPECTION
B-1234 SMIC-I-4014 W 1613-02 LIQUID FURNACE AREA 18-Oct-14 9:15 AM ACCEPTED
FAN B-1234

890 MFC-DLM-GS-I-864 FINAL B-1164 FINAL INSPECTION OF CLADDING FOR GAS FD FAN B- SMIC-I-4014 W 1603-02 GAS FURNACE AREA 18-Oct-14 8:30 AM ACCEPTED
INSPECTION 1164

891
SURFACE
MFC-DLM-GS-I-865 PREPARATION D-1011 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1616-00 E/W PIPE RACK AREA 19-Oct-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-1011

892 MFC-DLM-GS-I-866 INSULATION D-1011 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1616-00 E/W PIPE RACK AREA 22-Oct-14 7:00 AM ACCEPTED
TO CLADDING FOR EQ: D-1011

893 MFC-DLM-GS-I-867 INSULATION E-0305 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1744-01 DRYER PIPE RACK AREA 22-Oct-14 7:15 AM ACCEPTED
TO CLADDING FOR EQ: E-0305

894 MFC-DLM-GS-I-868 INSULATION V-0955 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-5016 S COOLING TOWER AREA 22-Oct-14 7:30 AM ACCEPTED
TO VAPOR BARRIER FOR EQ: V-0955

895 MFC-DLM-GS-I-869 FINAL


B-1214 FINAL INSPECTION OF CLADDING FOR LIQUID FD SMIC-I-4014 W 1611-02 LIQUID FURNACE AREA 22-Oct-14 8:00 AM ACCEPTED
INSPECTION FAN B-1214 (EXCEPT MANHOLE)

896 MFC-DLM-GS-I-870 FINAL


B-1144 FINAL INSPECTION OF CLADDING FOR GAS FD FAN B- SMIC-I-4014 W 1601-02 GAS FURNACE AREA 22-Oct-14 8:30 AM ACCEPTED
INSPECTION 1144 (EXCEPT MANHOLE)

FINAL PARTIAL INSPECTION OF CLADDING FOR CROSS 1511-02


897 MFC-DLM-GS-I-871 INSPECTION F-1110 & F1120 OVER PIPE LINE 10" (EXCLUDDING FIELD JOINT, AS SMIC-I-4014 S 1511-01 LIQUID FURNACE AREA 22-Oct-14 9:00 AM ACCEPTED
PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR NEAR S/W CORNER PIPE


898 MFC-DLM-GS-I-872 INSULATION D-1420 TO CLADDING FOR EQ: D-1420 SMIC-I-4013 S 1623-01 RACK AREA 24-Oct-14 8:00 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO


899 MFC-DLM-GS-I-873 VAPOR BARRIER
INSPECTION V-0955 CLADDING FOR EQ: V-0955 SMIC-I-5017 S COOLING TOWER AREA 26-Oct-14 7:30AM ACCEPTED

FINAL NEAR E/W PIPE RACK


900 MFC-DLM-GS-I-874 INSPECTION E-1528 FINAL INSPECTION OF CLADDING FOR EQ: E-1528 SMIC-I-4014 W 1625-00 26-Oct-14 8:00AM ACCEPTED
AREA

INSPECTION OF IN PROCESS APPLICATION


INSULATION INSTALLATION 1st, 2nd AND 3rd LAYER 27-Oct-14 ~
901 MFC-DLM-GS-I-875 INSULATION D-2307 SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 30-Oct-14 8.30 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: D-2307 (ONLY
FOR BOTTOM DOME) (WEEKLY RFI)
INSPECTION OF IN PROCESS APPLICATION
902 MFC-DLM-GS-I-876 INSULATION D-2308 INSULATION INSTALLATION 1st, 2nd AND 3rd LAYER SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 27-Oct-14 ~
8.30 AM ACCEPTED
PRIOR TO VAPOR BARRIER FOR EQ: D-2308 (ONLY 30-Oct-14
FOR BOTTOM DOME) (WEEKLY RFI)

FINAL
903 MFC-DLM-GS-I-877 INSPECTION E-0305 FINAL INSPECTION OF CLADDING FOR EQ: E-0305 SMIC-I-4014 W 1744-01 DRYER PIPE RACK AREA 30-Oct-14 8:00 AM ACCEPTED

FINAL
904 MFC-DLM-GS-I-878 INSPECTION V-0955 FINAL INSPECTION OF CLADDING FOR EQ: V-0955 SMIC-I-5018 W COOLING TOWER AREA 30-Oct-14 8:30 AM ACCEPTED

905 MFC-DLM-GS-I-879 FINAL


B-1134 FINAL INSPECTION OF CLADDING FOR GAS FD FAN B- SMIC-I-4014 W 1603-02 GAS FURNACE AREA 30-Oct-14 9:00 AM ACCEPTED
INSPECTION 1134 (EXCEPT MANHOLE)

906 MFC-DLM-GS-I-880 INSULATION D-0514/0544 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1646-00
SPENT CAUSTIC AREA 31-Oct-14 8:00 AM ACCEPTED
TO CLADDING FOR EQ:D-0514/0544 1647-00

907 MFC-DLM-GS-I-881 INSULATION D-0525/0555 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1646-00
SPENT CAUSTIC AREA 31-Oct-14 10:30 AM ACCEPTED
TO CLADDING FOR EQ:D-0525/0555 1647-00

908 MFC-DLM-GS-I-882 FINAL


D-0514/0544 FINAL INSPECTION OF CLADDING FOR EQ: D- SMIC-I-4014 W 1646-00
SPENT CAUSTIC AREA 5-Nov-14 7:30 AM ACCEPTED
INSPECTION 0514/0544 1647-00

909 MFC-DLM-GS-I-883 FINAL


D-0525/0555 FINAL INSPECTION OF CLADDING FOR EQ: D- SMIC-I-4014 W 1646-00
SPENT CAUSTIC AREA 5-Nov-14 8:00 AM ACCEPTED
INSPECTION 0525/0555 1646-00

Page 1347 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
FINAL
910 MFC-DLM-GS-I-884 INSPECTION D-1011 FINAL INSPECTION OF CLADDING FOR EQ: D-1011 SMIC-I-4014 W 1616-00 E/W PIPE RACK AREA 5-Nov-14 8:30 AM ACCEPTED

911 MFC-DLM-GS-I-885 FINAL


B-1124 FINAL INSPECTION OF CLADDING FOR FD FAN B- SMIC-I-4014 W 1602-02 GAS FURNACE AREA 5-Nov-14 9:00 AM ACCEPTED
INSPECTION 1124 (EXCEPT MANHOLE)

912 MFC-DLM-GS-I-886 INSULATION D-0950 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1423-00 COOLING TOWER AREA 7-Nov-14 7:00 AM ACCEPTED
TO CLADDING FOR EQ: D-0950

INSPECTION OF INSULATION INSTALLATION PRIOR


1704-02
913 MFC-DLM-GS-I-887 INSULATION D-2309 & D-2214 TO VAPOR BARRIER FOR EQ: D-2309 & D-2214 (ONLY SMIC-I-5016 S 1691-01 COLD PIPE RACK AREA 7-Nov-14 7:30 AM ACCEPTED
FOR SUPPORTS)

914
SURFACE
MFC-DLM-GS-I-888 PREPARATION E-1010 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1616-00
NEAR E/W PIPE RACK 7-Nov-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1010 AREA

915
SURFACE
MFC-DLM-GS-I-889 PREPARATION E-1620-A/B INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1634-00
NEAR E/W PIPE RACK 7-Nov-14 8:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1620-A/B AREA

916
SURFACE
MFC-DLM-GS-I-890 PREPARATION E-1340-A/B/C/D INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1621-02 NEAR E/W PIPE RACK 7-Nov-14 9:30 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-1340-A/B/C/D AREA

917
SURFACE
MFC-DLM-GS-I-891 PREPARATION D-2116 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-5015 S 1683-02 COLD PIPE RACK AREA 7-Nov-14 10:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: D-2116

INSPECTION OF VAPOR BARRIER PRIOR TO


918 MFC-DLM-GS-I-892 VAPOR BARRIER
INSPECTION D-2309 & D-2214 CLADDING FOR EQ: D-2309 & D-2214 (ONLY FOR SMIC-I-5017 S 1704-02
1691-01 COLD PIPE RACK AREA 7-Nov-14 11:30 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR 1646-00


919 MFC-DLM-GS-I-893 INSULATION S-0515 & S-0545 TO CLADDING FOR EQ: S-0515 & S-0545 SMIC-I-4013 S 1647-00 SPENT CAUSTIC AREA 9-Nov-14 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR 1646-00


920 MFC-DLM-GS-I-894 INSULATION V-0517 & V-0547 TO CLADDING FOR EQ: V-0517 & V-0547 SMIC-I-4013 S 1647-00 SPENT CAUSTIC AREA 9-Nov-14 7:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-1521


921 MFC-DLM-GS-I-895 INSPECTION E-1521-A/B/C/D SMIC-I-4014 W 1625-00 E/W PIPE RACK AREA 9-Nov-14 8:00 AM ACCEPTED
A/B/C/D (ONLY FOR 32 SUPPORTS)

FINAL FINAL INSPECTION OF CLADDING FOR FD FAN B-


922 MFC-DLM-GS-I-896 INSPECTION B-1114 SMIC-I-4014 W 1602-02 GAS FURNACE AREA 9-Nov-14 8:30 AM ACCEPTED
1114 (EXCEPT MANHOLE)

923 MFC-DLM-GS-I-897 FINAL


INSPECTION B-1115 & B-1125 FINAL INSPECTION OF CLADDING FOR ID FAN B-1115 SMIC-I-4014 W 1601-02
1602-02 GAS FURNACE AREA 9-Nov-14 9:00 AM ACCEPTED
& B-1125 (EXCEPT MANHOLE)

924 MFC-DLM-GS-I-898 FINAL


B-1225 FINAL INSPECTION OF CLADDING FOR ID FAN B-1225 SMIC-I-4014 W 1612-02 LIQUID FURNACE AREA 13-Nov-14 8:00 AM ACCEPTED
INSPECTION (EXCEPT MANHOLE)

925 MFC-DLM-GS-I-899 FINAL


INSPECTION
D-2309 & D-2214 FINAL INSPECTION OF CLADDING FOR EQ: D-2309 & SMIC-I-4014 W 1704-02
1691-01
COLD PIPE RACK AREA 13-Nov-14 8:30 AM ACCEPTED
D-2214 (ONLY FOR 10+10 SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 1st


926 MFC-DLM-GS-I-900 INSULATION D-2116 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2116 (ONLY SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 14-Nov-14 8:00 AM ACCEPTED
BODY)

927 MFC-DLM-GS-I-901 FINAL D-0950 FINAL INSPECTION OF CLADDING FOR EQ: D-0950 SMIC-I-5018 W COOLING TOWER AREA 17-Nov-14 9:00 AM
REJECTED BY
INSPECTION SADARA

928 MFC-DLM-GS-I-902 FINAL D-0950 FINAL INSPECTION OF CLADDING FOR EQ: D-0950 SMIC-I-4014 W COOLING TOWER AREA 18-Nov-14 8:00 AM ACCEPTED
INSPECTION

929 MFC-DLM-GS-I-903 FINAL D-2307 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D- SMIC-I-5017 S 1704-02 NEAR NS PIPE RACK AREA 18-Nov-14 8:30 AM ACCEPTED
INSPECTION 2307 (ONLY FOR BOTTOM DOME)

930 MFC-DLM-GS-I-904 FINAL D-2308 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D- SMIC-I-5017 S 1704-02 NEAR NS PIPE RACK AREA 18-Nov-14 9:00 AM ACCEPTED
INSPECTION 2308 (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 1st


931 MFC-DLM-GS-I-905 INSULATION D-2116 LAYER PRIOR TO 2nd LAYER FOR EQ: D-2116 (ONLY SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 21-Nov-14 7:30 AM ACCEPTED
FOR HEAD)

INSPECTION OF INSULATION INSTALLATION 2nd


932 MFC-DLM-GS-I-906 INSULATION D-2116 LAYER PRIOR TO 3rd LAYER FOR EQ: D-2116 SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 21-Nov-14 12:30 PM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR NEAR E/W PIPE RACK


933 MFC-DLM-GS-I-907 INSULATION E-1620-A/B SMIC-I-4013 S 1634-00 23-Nov-14 8:00 AM ACCEPTED
TO CLADDING FOR EQ" E-1620-A/B AREA

INSPECTION OF INSULATION INSTALLATION PRIOR 1646-00


934 MFC-DLM-GS-I-908 INSULATION T-0553 SMIC-I-4013 S 1647-00
SPENT CAUSTIC AREA 23-Nov-14 8:30 AM ACCEPTED
TO CLADDING FOR EQ: T-0553

INSPECTION OF SURFACE PREPARATION PRIOR TO


935
SURFACE
MFC-DLM-GS-I-909 PREPARATION VS-0522 & VS- INSULATION INSTALLATION FOR EQ: VS-0522 & VS- SMIC-I-4012 S SPENT CAUSTIC AREA 24-Nov-14 7:30 AM ACCEPTED
0552 0552

936 MFC-DLM-GS-I-910 INSULATION E-1010 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1616-00 NEAR E/W PIPE RACK 24-Nov-14 8:00 AM ACCEPTED
TO CLADDING FOR EQ" E-1010 AREA

937 MFC-DLM-GS-I-911 FINAL


T-2127 FINAL INSPECTION OF CLADDING FOR EQ: T-2127 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 24-Nov-14 8:30 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

938 MFC-DLM-GS-I-912 FINAL D-1420 FINAL INSPECTION OF CLADDING FOR EQ: D-1420 SMIC-I-4014 W 1623-01 NEAR E/W PIPE RACK 24-Nov-14 8:45 AM ACCEPTED
INSPECTION AREA

939 MFC-DLM-GS-I-913 INSULATION D-0512 & D-0542 INSPECTION OF INSULATION INSTALLATION PRIOR SMIC-I-4013 S 1646-00
1647-00
SPENT CAUSTIC AREA 26-Nov-14 7:30 AM ACCEPTED
TO CLADDING FOR EQ: D-0512 & D-0542

940
SURFACE
MFC-DLM-GS-I-914 PREPARATION E-2502-A INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1714-00 NEAR N.S PIPE RACK AREA 26-Nov-14 8:00 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-2502-A

941 MFC-DLM-GS-I-915 FINAL


INSPECTION
S-0515 & S-0545 FINAL INSPECTION OF CLADDING FOR EQ: S-0515 & SMIC-I-4014 W 1646-00
1647-00
SPENT CAUSTIC AREA 26-Nov-14 8:15 AM
REJECTED BY
SADARA
S-0545

942 MFC-DLM-GS-I-916 FINAL


INSPECTION
V-0517 & V-0547 FINAL INSPECTION OF CLADDING FOR EQ: V-0517 & SMIC-I-4014 W SPENT CAUSTIC AREA 26-Nov-14 8:30 AM
REJECTED BY
SADARA
V-0547

INSPECTION OF INSULATION INSTALLATION NEAR E/W PIPE RACK


943 MFC-DLM-GS-I-917 INSULATION E-1340-A/B/C/D PRIOR TO CLADDING FOR EQ: E-1340-A/B/C/D SMIC-I-4013 S 1621-02
AREA 27-Nov-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd


944 MFC-DLM-GS-I-918 INSULATION D-2116 LAYER PRIOR TO VAPOR BRRIER FOR EQ: D-2116 SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 27-Nov-14 8:00 AM ACCEPTED
(ONLY FOR BODY)

INSPECTION OF SURFACE PREPARATION PRIOR


945
SURFACE
MFC-DLM-GS-I-919 PREPARATION FL-1423-A/B TO INSULATION INSTALLATION FOR EQ: FL-1423- SMIC-I-4012 S 1623-03 E/W PIPE RACK AREA 29-Nov-14 7:30 AM ACCEPTED
A/B

946
SURFACE
MFC-DLM-GS-I-920 PREPARATION FL-0603 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1627-00 E/W PIPE RACK AREA 29-Nov-14 8:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: FL-0603

SURFACE
MFC-DLM-GS-I-921 PREPARATION E-2502-B INSPECTION OF SURFACE PREPARATION PRIOR NEAR N/S PIPE RACK
TO INSULATION INSTALLATION FOR EQ: E-2502-B SMIC-I-4012 S 1714-00 ACCEPTED
947 29-Nov-14 8:30 AM
AREA

1611-02
FINAL B-1215, B-1235, FINAL INSPECTION OF CLADDING FOR LIQUID ID 1613-02
948 MFC-DLM-GS-I-922 INSPECTION B-1245 & B-1255 FAN B-1215, B-1235, B-1245 & B-1255 (EXCEPT SMIC-I-4014 W 1614-02 LIQUID FURNACE AREA 29-Nov-14 9:00 AM ACCEPTED
MANHOLE) 1615-02

INSPECTION OF INSULATION INSTALLATION 3rd


949 MFC-DLM-GS-I-923 INSULATION D-2116 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2116 SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 30-Nov-14 8:00 AM ACCEPTED
(ONLY FOR HEAD)

INSPECTION OF INSULATION INSTALLATION 1646-00


950 MFC-DLM-GS-I-924 INSULATION T-0523 SMIC-I-4013 S 1647-00 SPENT CAUSTIC AREA 30-Nov-14 8:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: T-0523

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO


951 MFC-DLM-GS-I-925 INSPECTION D-2116 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 30-Nov-14 10:30 AM ACCEPTED
CLADDING FOR EQ: D-2116 (ONLY BODY)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: S-0515 1646-00


952 MFC-DLM-GS-I-926 INSPECTION S-0515 & S-0545 SMIC-I-4014 W 1647-00 SPENT CAUSTIC AREA 1-Dec-14 7:30 AM ACCEPTED
& S-0545

FINAL D-0512 & D- FINAL INSPECTION OF CLADDING FOR EQ: D-0512 1646-00
953 MFC-DLM-GS-I-927 INSPECTION 0542 & D-0542 SMIC-I-4014 W 1647-00 SPENT CAUSTIC AREA 1-Dec-14 7:45 AM ACCEPTED

FINAL
954 MFC-DLM-GS-I-928 INSPECTION T-0553 FINAL INSPECTION OF CLADDING FOR EQ: T-0553 SMIC-I-4014 W 1646-00 SPENT CAUSTIC AREA 1-Dec-14 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-


955 MFC-DLM-GS-I-929 INSPECTION
E-1620-A/B 1620-A/B SMIC-I-4014 W 1634-00 E/W PIPE RACK AREA 1-Dec-14 8:15 AM ACCEPTED

FINAL
956 MFC-DLM-GS-I-930 INSPECTION
E-1010 FINAL INSPECTION OF CLADDING FOR EQ: E-1010 SMIC-I-4014 W 1616-00 E/W PIPE RACK AREA 1-Dec-14 8:30 AM ACCEPTED

957 MFC-DLM-GS-I-931 INSULATION E-2502-A INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1714-00


NEAR N/S PIPE RACK 2-Dec-14 7:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: E-2502-A AREA

958
SURFACE
MFC-DLM-GS-I-932 PREPARATION E-2502-C INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1714-00
NEAR N/S PIPE RACK 3-Dec-14 7:00 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: E-2502-C AREA

959
SURFACE
MFC-DLM-GS-I-933 PREPARATION CY-1322 INSPECTION OF SURFACE PREPARATION PRIOR SMIC-I-4012 S 1621-04 E/W PIPE RACK AREA 3-Dec-14 7:15 AM ACCEPTED
TO INSULATION INSTALLATION FOR EQ: CY-1322

INSPECTION OF INSULATION INSTALLATION


960 MFC-DLM-GS-I-934 INSULATION F-1250 PRIOR TO CLADDING FOR LIQUID CROSS OVER SMIC-I-4013 S 1515-01 LIQUID FURNACE AREA 3-Dec-14 7:30 AM ACCEPTED
PIPING (AS PER THE HIGH LIGHTED AREA IN
DRAWING)

961 MFC-DLM-GS-I-935 INSULATION FL-0603 INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1627-00 E/W PIPE RACK AREA 3-Dec-14 7:45 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: FL-0603

962 MFC-DLM-GS-I-936 INSULATION FL-1423-A/B INSPECTION OF INSULATION INSTALLATION SMIC-I-4013 S 1623-03 E/W PIPE RACK AREA 3-Dec-14 8:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: FL-1423-A/B

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO


963 MFC-DLM-GS-I-937 INSPECTION D-2116 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 3-Dec-14 8:30 AM ACCEPTED
CLADDING FOR EQ: D-2116 (ONLY FOR HEAD)

964 MFC-DLM-GS-I-938 INSULATION E-2502-B INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1714-00 E/W PIPE RACK AREA 5-Dec-14 7:00 AM ACCEPTED
CLADDING FOR EQ: E-2502-B

965 MFC-DLM-GS-I-939 INSULATION VS-0522 & VS-0552 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S SPENT CAUSTIC AREA 5-Dec-14 7:30 AM ACCEPTED
CLADDING FOR EQ: VS-0522 & VS-0552

966 MFC-DLM-GS-I-940 INSULATION R-2025 & R-2030 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1682-02 DRYER PIPE RACK AREA 5-Dec-14 8:00 AM ACCEPTED
CLADDING FOR EQ: R-2025 & R-2030 (FOR BOTTOM DOME)

967 MFC-DLM-GS-I-941
FINAL T-0523
FINAL INSPECTION OF CLADDING OF CLADDING FOR EQ: T-
SMIC-I-4014 W 1646-00 SPENT CAUSTIC AREA 5-Dec-14 8:30 AM ACCEPTED
INSPECTION 0523

968 MFC-DLM-GS-I-942
SURFACE V-0561-A/B
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1645-00 SPENT CAUSTIC AREA 5-Dec-14 11:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: V-0561-A/B

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


969 MFC-DLM-GS-I-943 E-2502-D INSULATION INSTALLATION FOR EQ: E-2502-D SMIC-I-4012 S 1714-00 NEAR N/S PIPE RACK AREA 6-Dec-14 7:00 AM ACCEPTED
PREPARATION

INSPECTION OF INSULATION INSTALLATION PRIOR TO


970 MFC-DLM-GS-I-944 INSULATION E-2502-C CLADDING FOR EQ: E-2502-C SMIC-I-4013 S 1714-00 NEAR N/S PIPE RACK AREA 6-Dec-14 7:30 AM ACCEPTED

971 MFC-DLM-GS-I-945
FINAL E-1340-A/B/C/D FINAL INSPECTION OF CLADDING FOR EQ: E-1340-A/B/C/D SMIC-I-4014 W 1621-02 E/W PIPE RACK AREA 6-Dec-14 8:00 AM ACCEPTED
INSPECTION

972 MFC-DLM-GS-I-946
FINAL E-2502-A FINAL INSPECTION OF CLADDING FOR EQ: E-2502-A SMIC-I-4014 W 1714-00 NEAR N/S PIPE RACK AREA 6-Dec-14 8:30 AM ACCEPTED
INSPECTION

973 MFC-DLM-GS-I-947
SURFACE D-0750
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1541-00 C3 SPLITTER PIPE RACK AREA 8-Dec-14 7:00 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: D-0750

974 MFC-DLM-GS-I-948
SURFACE E-2502-E
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1714-00 NEAR N/S PIPE RACK AREA 8-Dec-14 7:15 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-2502-E

INSPECTION OF INSULATION INSTALLATION PRIOR TO


975 MFC-DLM-GS-I-949 INSULATION E-2502-D
CLADDING FOR EQ: E-2502-D
SMIC-I-4013 S 1714-00 NEAR N/S PIPE RACK AREA 8-Dec-14 7:30 AM ACCEPTED

FINAL
976 MFC-DLM-GS-I-950
INSPECTION E-2502-B FINAL INSPECTION OF CLADDING FOR EQ: E-2502-B SMIC-I-4014 W 1714-00 NEAR N/S PIPE RACK AREA 8-Dec-14 8:00 AM ACCEPTED

FINAL 1646-00
977 MFC-DLM-GS-I-951 V-0517 & V-0547 FINAL INSPECTION OF CLADDING FOR EQ: V-0517 & V-0547 SMIC-I-4014 W SPENT CAUSTIC AREA 8-Dec-14 8:15 AM ACCEPTED
INSPECTION 1647-00

978 MFC-DLM-GS-I-952 INSULATION F-1240 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1514-01 LIQUID FURNACE AREA 8-Dec-14 8:30 AM ACCEPTED
CLADDING FOR CROSS OVER PIPING

979 MFC-DLM-GS-I-953
SURFACE E-0127
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1466-00 E/W PIPE RACK AREA 8-Dec-14 10:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-0127

980 MFC-DLM-GS-I-954
SURFACE E-1305-ABCD
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1621-02 E/W PIPE RACK AREA 8-Dec-14 10:45 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-1305-A/B/C/D

INSPECTION OF SURFACE PREPARATION PRIOR TO


981 MFC-DLM-GS-I-955
SURFACE F-1110 INSULATION INSTALLATION FOR CROSS OVER PIPING (AS PER SMIC-I-4012 S 1501-01 GAS FURNACE AREA 9-Dec-14 7:30 AM ACCEPTED
PREPARATION HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE
982 MFC-DLM-GS-I-956 X-2010 INSULATION INSTALLATION FOR EQ: X-2010 (ONLY FOR SMIC-I-4012 S 1681-00 DRYER PIPE RACK AREA 9-Dec-14 8:00 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


983 MFC-DLM-GS-I-957 D-2022 INSULATION INSTALLATION FOR EQ: D-2022 (ONLY FOR SMIC-I-4012 S 1682-01 DRYER PIPE RACK AREA 10-Dec-14 7:00 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


984 MFC-DLM-GS-I-958
PREPARATION D-2508 INSULATION INSTALLATION FOR EQ: D-2508 (ONLY FOR SMIC-I-5015 S 1714-00 NEAR NS PIPE RACK AREA 10-Dec-14 7:15 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


985 MFC-DLM-GS-I-959 INSULATION E-2502-E CLADDING FOR EQ: E-2502-E SMIC-I-4013 S 1714-00 NEAR NS PIPE RACK AREA 10-Dec-14 7:30 AM ACCEPTED

FINAL
986 MFC-DLM-GS-I-960
INSPECTION E-2502-C FINAL INSPECTION OF CLADDING FOR EQ: E-2502-C SMIC-I-4014 W 1714-00 NEAR NS PIPE RACK AREA 10-Dec-14 7:45 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


987 MFC-DLM-GS-I-961 INSULATION E-0127
CLADDING FOR EQ: E-0127
SMIC-I-4013 S 1466-00 E/W PIPE RACK AREA 10-Dec-14 8:00 AM ACCEPTED

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


988 MFC-DLM-GS-I-962
PREPARATION D-2506 INSULATION INSTALLATION FOR EQ: D-2506 (ONLY FOR SMIC-I-5015 S 1714-00 NEAR NS PIPE RACK AREA 10-Dec-14 9:00 AM ACCEPTED
BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


989 MFC-DLM-GS-I-963
PREPARATION D-2507 INSULATION INSTALLATION FOR EQ: D-2507 (ONLY FOR SMIC-I-5015 S 1714-00 NEAR NS PIPE RACK AREA 10-Dec-14 9:30 AM ACCEPTED
BOTTOM DOME)

990 MFC-DLM-GS-I-964 INSULATION X-2010 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1681-00 DRYER PIPE RACK AREA 11-Dec-14 7:00 AM ACCEPTED
CLADDING FOR EQ: X-2010

Page 1348 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF INSULATION INSTALLATION PRIOR TO
991 MFC-DLM-GS-I-965 INSULATION R-2035 CLADDING FOR EQ: R-2035 SMIC-I-4013 S 1682-01 DRYER PIPE RACK AREA 11-Dec-14 7:15 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


992 MFC-DLM-GS-I-966 INSULATION D-0750 CLADDING FOR EQ: D-0750 SMIC-I-4013 S C3 SPLITTER PIPE RACK AREA 11-Dec-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION FOR CROSS


993 MFC-DLM-GS-I-967 INSULATION F-1170 OVER PIPING (AS PER THE HIGH LIGHTED AREA IN DRAWING) SMIC-I-4013 S 1507-01 GAS FURNACE AREA 11-Dec-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


994 MFC-DLM-GS-I-968 INSULATION V-0561-A/B CLADDING FOR EQ: V-0561-A/B SMIC-I-4013 S 1645-00 SPENT CAUSTIC AREA 13-Dec-14 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


995 MFC-DLM-GS-I-969 INSULATION E-1305-ABCD CLADDING FOR EQ: E-1305-A/B/C/D SMIC-I-4013 S 1621-02 E/W PIPE RACK AREA 13-Dec-14 7:15 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


996 MFC-DLM-GS-I-970 INSULATION CY-1322
CLADDING FOR EQ: CY-1322
SMIC-I-4013 S 1621-04 E/W PIPE RACK AREA 13-Dec-14 7:30 AM ACCEPTED

997 MFC-DLM-GS-I-971
SURFACE E-1335
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1621-03 E/W PIPE RACK AREA 13-Dec-14 7:45 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-1335

998 MFC-DLM-GS-I-972
FINAL D-2116 FINAL INSPECTION OF CLADDING FOR EQ: D-2116 SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 13-Dec-14 8:00 AM ACCEPTED
INSPECTION (EXCLUDDING BOTTOM DOME)

999 MFC-DLM-GS-I-973
FINAL E-2502-D FINAL INSPECTION OF CLADDING FOR EQ: E-2502-D SMIC-I-4014 W NEAR NS PIPE RACK AREA 13-Dec-14 8:30 AM ACCEPTED
INSPECTION

1000 MFC-DLM-GS-I-974
FINAL FL-0603 FINAL INSPECTION OF CLADDING FOR EQ: FL-0603 SMIC-I-4014 W 1627-00 E/W PIPE RACK AREA 13-Dec-14 8:45 AM ACCEPTED
INSPECTION

1001 MFC-DLM-GS-I-975
FINAL FL-1423-A/B FINAL INSPECTION OF CLADDING FOR EQ: FL-01423-A/B SMIC-I-4014 W 1623-03 E/W PIPE RACK AREA 13-Dec-14 9:00 AM ACCEPTED
INSPECTION

1002 MFC-DLM-GS-I-976
SURFACE D-2233
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-5015 S COLD PIPE RACK AREA 14-Dec-14 7:00 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: D-2233

INSPECTION OF SURFACE PREPARATION PRIOR TO


1003 MFC-DLM-GS-I-977
SURFACE T-1820 INSULATION INSTALLATION FOR EQ: T-1820 (ONLY FOR 3 SMIC-I-5015 S 1682-01 COLD PIPE RACK AREA 14-Dec-14 7:15 AM ACCEPTED
PREPARATION SADDLE SUPPORTS)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1004 MFC-DLM-GS-I-978
PREPARATION T-2110 INSULATION INSTALLATION FOR EQ: T-2110 (ONLY FOR 2 SMIC-I-5015 S 1683-01 COLD PIPE RACK AREA 14-Dec-14 7:30 AM ACCEPTED
SADDLE SUPPORTS)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1005 MFC-DLM-GS-I-979
PREPARATION D-2505 INSULATION INSTALLATION FOR EQ: T-2110 (ONLY FOR SMIC-I-5015 S 1714-00 NEAR NS PIPE RACK AREA 14-Dec-14 7:45 AM ACCEPTED
BOTTOM DOME)

1006 MFC-DLM-GS-I-980
SURFACE E-1025
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1617-00 E/W PIPE RACK AREA 14-Dec-14 8:00 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-1025

1007 MFC-DLM-GS-I-981
SURFACE E-1026
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1617-00 E/W PIPE RACK AREA 14-Dec-14 8:15 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-1026

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1008 MFC-DLM-GS-I-982
PREPARATION D-1627 INSULATION INSTALLATION FOR EQ: D-1627 (ONLY FOR SMIC-I-4012 S 1634-00 E/W PIPE RACK AREA 14-Dec-14 8:30 AM ACCEPTED
BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1009 MFC-DLM-GS-I-983
PREPARATION T-1620 INSULATION INSTALLATION FOR EQ: T-1620 (ONLY FOR SMIC-I-4012 S 1634-00 E/W PIPE RACK AREA 14-Dec-14 8:45 AM ACCEPTED
BOTTOM DOME)

1010 MFC-DLM-GS-I-984
FINAL E-2502-E FINAL INSPECTION OF CLADDING FOR EQ: E-2502-E SMIC-I-4014 W 1714-00 NEAR NS PIPE RACK AREA 14-Dec-14 9:00 AM ACCEPTED
INSPECTION

1011 MFC-DLM-GS-I-985 INSULATION E-1335 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1621-03 E/W PIPE RACK AREA 15-Dec-14 7:00 AM ACCEPTED
CLADDING FOR EQ: E-1335

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1012 MFC-DLM-GS-I-986 INSULATION D-2508 VAPOR BARRIER FOR EQ: D-2508 (ONLY FOR BOTTOM SMIC-I-5016 S 1714-00 NEAR NS PIPE RACK AREA 15-Dec-14 8:00 AM ACCEPTED
DOME)

1013 MFC-DLM-GS-I-987
FINAL E-0127 FINAL INSPECTION OF CLADDING FOR EQ: E-0127 SMIC-I-4014 W 1466-00 E/W PIPE RACK AREA 15-Dec-14 8:30 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIOR


1014 MFC-DLM-GS-I-988 INSULATION D-2233 TO 2nd LAYER FOR EQ: D-2233 SMIC-I-5016 S COLD PIPE RACK AREA 15-Dec-14 10:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1015 MFC-DLM-GS-I-989 INSULATION D-2022 CLADDING FOR EQ: D-2022 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S 1682-01 DRYER PIPE RACK AREA 16-Dec-14 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1016 MFC-DLM-GS-I-990 INSULATION E-1025 CLADDING FOR EQ: E-1025 SMIC-I-4013 S 1617-00 E/W PIPE RACK AREA 16-Dec-14 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1017 MFC-DLM-GS-I-991 INSULATION E-1026 CLADDING FOR EQ: E-1026 SMIC-I-4013 S 1617-00 E/W PIPE RACK AREA 16-Dec-14 8:30 AM ACCEPTED

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1018 MFC-DLM-GS-I-992 T-1330 INSULATION INSTALLATION FOR EQ: T-1330 (ONLY FOR SMIC-I-4012 S 1621-03 NEAR DRYER PIPE RACK AREA 16-Dec-14 9:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1019 MFC-DLM-GS-I-993 T-1510 INSULATION INSTALLATION FOR EQ: T-1510 (ONLY FOR SMIC-I-4012 S 1624-01 NEAR DRYER PIPE RACK AREA 16-Dec-14 10:00 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF INSULATION INSTALLATION PRIOR TO


1020 MFC-DLM-GS-I-994 D-2507 VAPOR BARRIER FOR EQ: D-2507 (ONLY FOR BOTTOM SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 17-Dec-14 8:30 AM ACCEPTED
PREPARATION DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1021 MFC-DLM-GS-I-995 T-1910 INSULATION INSTALLATION FOR EQ: T-1910 (ONLY FOR SMIC-I-4012 S 1731-01 C3 SPLITTER PIPE RACK AREA 18-Dec-14 7:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1022 MFC-DLM-GS-I-996 T-2210 INSULATION INSTALLATION FOR EQ: T-2210 (ONLY FOR SMIC-I-5015 S 1691-01 COLD PIPE RACK AREA 18-Dec-14 8:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1023 MFC-DLM-GS-I-997 T-2220 INSULATION INSTALLATION FOR EQ: T-2220 (ONLY FOR SMIC-I-5015 S 1705-01 COLD PIPE RACK AREA 18-Dec-14 10:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR EQ: D-0120 (ONLY FOR
1024 MFC-DLM-GS-I-998
PREPARATION D-0120 SMIC-I-4012 S 1463-00 E/W PIPE RACK AREA 21-Dec-14 7:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1025 MFC-DLM-GS-I-999
SURFACE D-0125 INSULATION INSTALLATION FOR EQ: D-0125 (ONLY FOR SMIC-I-4012 S 1466-00 E/W PIPE RACK AREA 21-Dec-14 7:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1026 MFC-DLM-GS-I-1000
SURFACE D-0601 INSULATION INSTALLATION FOR EQ: D-0601 (ONLY FOR SMIC-I-4012 S 1627-00 E/W PIPE RACK AREA 21-Dec-14 8:30 AM ACCEPTED
PREPARATION BOTTOM DOME)

INSPECTION OF INSULAITON INSTALLATION 2nd LAYER


1027 MFC-DLM-GS-I-1001 INSULATION D-2233 PRIOR TO VAPOR BARRIER FOR EQ: D-2233 SMIC-I-5016 S COLD PIPE RACK AREA 21-Dec-14 9:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1028 MFC-DLM-GS-I-1002 INSULATION T-1910 CLADDING FOR EQ: T-1910 (ONLY BOTTOM DOME) SMIC-I-4013 S 1731-01 C3 SPLITTER PIPE RACK AREA 21-Dec-14 9:30 AM ACCEPTED

MFC-DLM-GS-I-1003
FINAL FINAL INSPECTION OF CLADDING FOR CROSS OVER PIPE LINE
1029
INSPECTION F-1250 (AS PER THE HIGH LIGHTED AREA IN DRAWING) SMIC-I-4014 W 1515-01 FURNACE AREA 22-Dec-14 7:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR EQ: VS-0522 & VS-


1030 MFC-DLM-GS-I-1004
INSPECTION VS-0522 & VS-0552 0552 SMIC-I-4014 W SPENT CAUSTIC AREA 22-Dec-14 8:00 AM ACCEPTED

VAPOR BARRIER VAPOR BARRIER INSPECTION PRIOR TO CLADDING FOR EQ:


1031 MFC-DLM-GS-I-1005
INSPECTION D-2233 D-2233 SMIC-I-5017 S 1701-01 COLD PIPE RACK AREA 23-Dec-14 7:00 AM ACCEPTED

1032 MFC-DLM-GS-I-1006
VAPOR BARRIER D-2507
VAPOR BARRIER INSPECTION PRIOR TO CLADDING FOR EQ:
SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 23-Dec-14 7:30 AM ACCEPTED
INSPECTION D-2507 (ONLY FOR BOTTOM DOME)

1033 MFC-DLM-GS-I-1007
VAPOR BARRIER D-2508 VAPOR BARRIER INSPECTION PRIOR TO CLADDING FOR EQ: SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 23-Dec-14 8:00 AM ACCEPTED
INSPECTION D-2508 (ONLY FOR BOTTOM DOME)

1034 MFC-DLM-GS-I-1008
FINAL V-0561-A/B FINAL INSPECTION OF CLADDING FOR EQ: V-0561-A/B SMIC-I-4014 W SPENT CAUSTIC AREA 23-Dec-14 8:30 AM ACCEPTED
INSPECTION

1035 MFC-DLM-GS-I-1009
FINAL D-0750 FINAL INSPECTION OF CLADDING FOR EQ: D-0750 SMIC-I-4014 W 1451-00 C3 SPLITTER PIPE RACK AREA 23-Dec-14 9:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIRO


1036 MFC-DLM-GS-I-1010 INSULATION T-2220 TO 2nd LAYER FOR EQ: T-2220 (ONLY FOR BOTTOM DOME) SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 25-Dec-14 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIRO


1037 MFC-DLM-GS-I-1011 INSULATION F-1170 TO 2nd LAYER FOR TLE-1170-A-H (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1507-01 GAS FURNACE AREA 25-Dec-14 7:15 AM ACCEPTED
AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1038 MFC-DLM-GS-I-1012 INSULATION D-0120 CLADDING FOR EQ: D-0120 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S 1463-00 E/W PIPE RACK AREA 25-Dec-14 7:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1039 MFC-DLM-GS-I-1013 INSULATION D-0125 CLADDING FOR EQ: D-0125 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S 1466-00 E/W PIPE RACK AREA 25-Dec-14 7:45 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1040 MFC-DLM-GS-I-1014 INSULATION D-0601 CLADDING FOR EQ: D-0601 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S 1627-00 E/W PIPE RACK AREA 25-Dec-14 8:00 AM ACCEPTED

1041 MFC-DLM-GS-I-1015
FINAL F-1240
FINAL INSPECTION OF CLADDING FOR FOR CROSS OVER PIPE
SMIC-I-4014 W 1514-01 LIQUID FURNACE AREA 25-Dec-14 8:15 AM ACCEPTED
INSPECTION LINE (AS PER THE HIGH LIGHTED AREA IN DRAWING)

1042 MFC-DLM-GS-I-1016
FINAL F-1170 TO F-1140
FINAL INSPECTION OF CLADDING FOR FOR CROSS OVER PIPE
SMIC-I-4014 W
1507-01 GAS FURNACE AREA 25-Dec-14 8:30 AM ACCEPTED
INSPECTION LINE (AS PER THE HIGH LIGHTED AREA IN DRAWING) 1504-01

1043 MFC-DLM-GS-I-1017 SURFACE E-0301 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1714-01 DRYER PIPE RACK AREA 28-Dec-14 7:00 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-0301

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1044 MFC-DLM-GS-I-1018 INSULATION D-2505 PRIRO TO 2nd LAYER FOR EQ: D-2505 (ONLY FOR SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 28-Dec-14 7:15 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1045 MFC-DLM-GS-I-1019 INSULATION D-2506 VAPOR BARRIER FOR EQ: D-2506 (ONLY FOR BOTTOM SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 28-Dec-14 7:30 AM ACCEPTED
DOME & 1 SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1046 MFC-DLM-GS-I-1020 INSULATION D-2507 VAPOR BARRIER FOR EQ: D-2507 (ONLY FOR 9 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 28-Dec-14 7:45 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1047 MFC-DLM-GS-I-1021 INSULATION T-2220 PRIRO TO 3rd LAYER FOR EQ: T-2220 (ONLY FOR SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 28-Dec-14 8:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1048 MFC-DLM-GS-I-1022 INSULATION D-2152 VAPOR BARRIER FOR EQ: D-2152 (ONLY FOR 9 SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 28-Dec-14 8:15 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1049 MFC-DLM-GS-I-1023 INSULATION T-2110 VAPOR BARRIER FOR EQ: T-2110 (ONLY FOR 2 SADDLE SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 28-Dec-14 8:30 AM ACCEPTED
SUPPORT)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1050 MFC-DLM-GS-I-1024 INSULATION E-2219 VAPOR BARRIER FOR EQ: E-2219 (ONLY FOR 4 SUPPORTS SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 28-Dec-14 8:40 AM ACCEPTED
& 2 TOUCHING PLACE NEAR THE FLANG)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1051 MFC-DLM-GS-I-1025 INSULATION E-2222 VAPOR BARRIER FOR EQ: E-2222(ONLY FOR 4 SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 28-Dec-14 8:50 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1052 MFC-DLM-GS-I-1026 INSULATION D-2109 VAPOR BARRIER FOR EQ: D-2109 (ONLY FOR 1 SMIC-I-5016 S 1681-00 COLD PIPE RACK AREA 28-Dec-14 9:00 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1053 MFC-DLM-GS-I-1027 INSULATION D-2107 VAPOR BARRIER FOR EQ: D-2107 (ONLY FOR 2 SMIC-I-5016 S 1681-00 COLD PIPE RACK AREA 28-Dec-14 9:10 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1054 MFC-DLM-GS-I-1028 INSULATION E-2322-AB VAPOR BARRIER FOR EQ: E-2322-AB (ONLY FOR 2 SMIC-I-5016 S 1701-03 COLD PIPE RACK AREA 28-Dec-14 9:20 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO 1702-02


1055 MFC-DLM-GS-I-1029 INSULATION E-2302/E-2303 VAPOR BARRIER FOR EQ: E-2302& E-2303 (ONLY FOR SMIC-I-5016 S COLD PIPE RACK AREA 28-Dec-14 9:30 AM ACCEPTED
3+3 SUPPORTS) 1705-01

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1056 MFC-DLM-GS-I-1030 INSULATION E-2330 VAPOR BARRIER FOR EQ: E-2330 (ONLY FOR 4 SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 28-Dec-14 9:40 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1057 MFC-DLM-GS-I-1031 INSULATION E-2331 VAPOR BARRIER FOR EQ: E-2331 (ONLY FOR 4 SMIC-I-5016 S 1704-02 COLD PIPE RACK AREA 28-Dec-14 9:50 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1058 MFC-DLM-GS-I-1032 INSULATION T-1820 VAPOR BARRIER FOR EQ: T-1820 (ONLY FOR 3 SADDLE SMIC-I-5016 S 1662-01 COLD PIPE RACK AREA 28-Dec-14 10:00 AM ACCEPTED
SUPPORT)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1059 MFC-DLM-GS-I-1033 INSULATION E-1820 CLADDING FOR EQ: E-1820-AB (ONLY FOR 4 SUPPORTS) SMIC-I-4013 S 1662-01 COLD PIPE RACK AREA 28-Dec-14 10:10 AM ACCEPTED

1060 MFC-DLM-GS-I-1034 FINAL E-1305-ABCD FINAL INSPECTION OF CLADDING FOR EQ: E-1305-ABCD SMIC-I-4014 W 1621-02 NEAR E/W PIPE RACK AREA 28-Dec-14 10:20 AM ACCEPTED
INSPECTION (AS PER THE HIGH LIGHTED AREA IN DRAWING)

1061 MFC-DLM-GS-I-1035 FINAL E-1335 FINAL INSPECTION OF CLADDING FOR EQ: E-1335 (AS SMIC-I-4014 W 1621-03 NEAR E/W PIPE RACK AREA 28-Dec-14 10:30 AM ACCEPTED
INSPECTION PER THE HIGH LIGHTED AREA IN DRAWING)

1062 MFC-DLM-GS-I-1036 F-1230 FINAL INSPECTION OF CLADDING FOR CROSS OVER PIPE SMIC-I-4014 W LIQUID FURNACE AREA 28-Dec-14 11:00 AM cancel
LINE (AS PER THE HIGH LIGHTED AREA IN DRAWING)

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING


1063 MFC-DLM-GS-I-1037 D-2507 SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 29-Dec-14 7:00 AM ACCEPTED
INSPECTION FOR EQ: D-2507 (ONLY FOR 9 SUPPORTS)

MFC-DLM-GS-I-1038 VAPOR BARRIER


INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1064 D-2152 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 29-Dec-14 7:15 AM ACCEPTED
INSPECTION FOR EQ: D-2152 (ONLY FOR 9 SUPPORTS)

MFC-DLM-GS-I-1039 VAPOR
BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1065
INSPECTION T-2110 FOR EQ: T-2110 (ONLY FOR 2 SADDLE SUPPORTS) SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 29-Dec-14 7:30 AM ACCEPTED

INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING


MFC-DLM-GS-I-1040 VAPOR
BARRIER
1066
INSPECTION E-2219 FOR EQ: E-2219 (ONLY FOR 4 SUPPORTS & 2 TOUCHING SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 29-Dec-14 7:45 AM ACCEPTED
PLACE NEAR THE FLANG)

MFC-DLM-GS-I-1041 VAPOR
BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1067
INSPECTION E-2222 FOR EQ: E-2222(ONLY FOR 4 SUPPORTS) SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 29-Dec-14 8:00 AM ACCEPTED

MFC-DLM-GS-I-1042 VAPOR
BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1068
INSPECTION D-2109 FOR EQ: D-2109 (ONLY FOR 1 SUPPORTS) SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 29-Dec-14 8:15 AM ACCEPTED

MFC-DLM-GS-I-1043 VAPOR
BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1069
INSPECTION D-2107 FOR EQ: D-2107 (ONLY FOR 2 SUPPORTS) SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 29-Dec-14 8:30 AM ACCEPTED

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING


1070 MFC-DLM-GS-I-1044 INSPECTION E-2322-AB FOR EQ: E-2322-AB (ONLY FOR 2 SUPPORTS) SMIC-I-5017 S 1701-03 COLD PIPE RACK AREA 29-Dec-14 8:45 AM ACCEPTED

MFC-DLM-GS-I-1045 VAPOR BARRIER


INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING 1704-02
1071 E-2302/E-2303 SMIC-I-5017 S COLD PIPE RACK AREA 29-Dec-14 9:00 AM ACCEPTED
INSPECTION FOR EQ: E-2302& E-2303 (ONLY FOR 3+3 SUPPORTS) 1705-01

Page 1349 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1072 MFC-DLM-GS-I-1046 INSPECTION E-2330 FOR EQ: E-2330 (ONLY FOR 4 SUPPORTS) SMIC-I-5017 S 1704-02 COLD PIPE RACK AREA 29-Dec-14 9:15 AM ACCEPTED

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING


1073 MFC-DLM-GS-I-1047 INSPECTION E-2331 FOR EQ: E-2331 (ONLY FOR 4 SUPPORTS) SMIC-I-5017 S 1704-02 COLD PIPE RACK AREA 29-Dec-14 9:30 AM ACCEPTED

VAPOR BARRIER INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING


1074 MFC-DLM-GS-I-1048 T-1820 SMIC-I-5017 S 1662-01 COLD PIPE RACK AREA 29-Dec-14 9:45 AM ACCEPTED
INSPECTION FOR EQ: T-1820 (ONLY FOR 3 SADDLE SUPPORT)

VAPOR BARRIER INSPECTION OF INSULATION INSTALLATION PRIOR TO


1075 MFC-DLM-GS-I-1049 INSPECTION D-1827 CLADDING FOR EQ: D-1827 (ONLY FOR 14 SUPPORTS) SMIC-I-4013 S 1662-01 COLD PIPE RACK AREA 29-Dec-14 10:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1076 MFC-DLM-GS-I-1050 INSULATION E-0301-A/B CLADDING FOR EQ: E-0301-A/B SMIC-I-4013 S 1744-01 DRYER PIPE RACK AREA 30-Dec-14 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIOR


1077 MFC-DLM-GS-I-1051 INSULATION F-1150 TO 2nd LAYER FOR TLE-1150-A-H (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1505-01 GAS FURNACE AREA 30-Dec-14 7:30 AM ACCEPTED
AREA IN DRAWING)

1078 MFC-DLM-GS-I-1052
SURFACE E-2210
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1691-01 COLD PIPE RACK AREA 30-Dec-14 8:10 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-2210

1079 MFC-DLM-GS-I-1053
FINAL D-2507 FINAL INSPECTION OF CLADDING FOR EQ: D-2507 (ONLY FOR SMIC-I-5018 W 1714-00 COLD PIPE RACK AREA 30-Dec-14 8:20 AM ACCEPTED
INSPECTION 9 SUPPORTS)

1080 MFC-DLM-GS-I-1054
FINAL D-2152 FINAL INSPECTION OF CLADDING FOR EQ: D-2152 (ONLY SMIC-I-5018 W 1683-03 COLD PIPE RACK AREA 30-Dec-14 8:30 AM ACCEPTED
INSPECTION FOR 9 SUPPORTS)

1081 MFC-DLM-GS-I-1055
FINAL T-2110
FINAL INSPECTION OF CLADDING FOR EQ: T-2110 (ONLY FOR
SMIC-I-5018 W 1683-01 COLD PIPE RACK AREA 30-Dec-14 8:40 AM ACCEPTED
INSPECTION 2 SADDLE SUPPORTS)

1082 MFC-DLM-GS-I-1056
FINAL E-2219
FINAL INSPECTION OF CLADDING FOR EQ: E-2219 ( (ONLY
SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 30-Dec-14 8:50 AM ACCEPTED
INSPECTION FOR 4 SUPPORTS & 2 TOUCHING PLACE NEAR THE FLANG)

1083 MFC-DLM-GS-I-1057
FINAL E-2222
FINAL INSPECTION OF CLADDING FOR EQ: E-2222 (ONLY FOR
SMIC-I-5018 W 1705-01 COLD PIPE RACK AREA 30-Dec-14 9:00 AM ACCEPTED
INSPECTION 4 SUPPORTS)

1084 MFC-DLM-GS-I-1058
FINAL D-2107
FINAL INSPECTION OF CLADDING FOR EQ: D-2107 (ONLY
SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 30-Dec-14 9:10 AM ACCEPTED
INSPECTION FOR 2 SUPPORTS)

1085 MFC-DLM-GS-I-1059
FINAL D-2109
FINAL INSPECTION OF CLADDING FOR EQ: D-2109 (ONLY
SMIC-I-5018 W 1681-00 COLD PIPE RACK AREA 30-Dec-14 9:20 AM ACCEPTED
INSPECTION FOR 1 SUPPORTS)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-2322-A/B (ONLY


1086 MFC-DLM-GS-I-1060
INSPECTION E-2322-AB FOR 2 SUPPORTS) SMIC-I-5018 W 1701-03 COLD PIPE RACK AREA 30-Dec-14 9:30 AM ACCEPTED

1087 MFC-DLM-GS-I-1061
FINAL E-2302/E-2303
FINAL INSPECTION OF CLADDING FOR EQ: E-2302/ E-2303
SMIC-I-5018 W
1704-02 COLD PIPE RACK AREA 30-Dec-14 9:40 AM ACCEPTED
INSPECTION (ONLY FOR 3+3 SUPPORTS) 1705-01

1088 MFC-DLM-GS-I-1062
FINAL E-2330
FINAL INSPECTION OF CLADDING FOR EQ: E-2330 (ONLY FOR
SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 30-Dec-14 9:50 AM ACCEPTED
INSPECTION 4 SUPPORTS)

1089 MFC-DLM-GS-I-1063
FINAL E-2331
FINAL INSPECTION OF CLADDING FOR EQ: E-2331 (ONLY FOR
SMIC-I-5018 W 1704-02 COLD PIPE RACK AREA 30-Dec-14 10:00 AM ACCEPTED
INSPECTION 4 SUPPORTS)

1090 MFC-DLM-GS-I-1064
FINAL T-1820
FINAL INSPECTION OF CLADDING FOR EQ: T-1820 (ONLY FOR
SMIC-I-5018 W 1662-01 COLD PIPE RACK AREA 30-Dec-14 10:10 AM ACCEPTED
INSPECTION 3 SADDLE SUPPORTS)

1091 MFC-DLM-GS-I-1065
FINAL D-1827 FINAL INSPECTION OF CLADDING FOR EQ: D-1827 (ONLY FOR SMIC-I-4014 W 1662-01 COLD PIPE RACK AREA 30-Dec-14 10:20 AM ACCEPTED
INSPECTION 14 SUPPORTS)

1092 MFC-DLM-GS-I-1066
FINAL E-1820-AB FINAL INSPECTION OF CLADDING FOR EQ: E-1820-A/B (ONLY SMIC-I-4014 W 1662-01 COLD PIPE RACK AREA 30-Dec-14 10:30 AM ACCEPTED
INSPECTION FOR 4 SUPPORTS)

1093 MFC-DLM-GS-I-1067
FINAL E-1025
FINAL INSPECTION OF CLADDING FOR EQ: E-1025 (AS PER HIGH
SMIC-I-4014 W 1617-00 E/W PIPE RACK AREA 1-Jan-15 8:00 AM ACCEPTED
INSPECTION LIGHTED AREA IN DRAWING)

1094 MFC-DLM-GS-I-1068
FINAL E-1026
FINAL INSPECTION OF CLADDING FOR EQ: E-1026 (AS PER HIGH
SMIC-I-4014 W E/W PIPE RACK AREA 1-Jan-15 8:15 AM cancel
INSPECTION LIGHTED AREA IN DRAWING)

1095 MFC-DLM-GS-I-1069
FINAL T-1910
FINAL INSPECTION OF CLADDING FOR EQ: T-1910 ( FOR BOTTOM
SMIC-I-4014 W 1617-00 C3 SPLITTER PIPE RACK 1-Jan-15 8:30 AM cancel
INSPECTION DOME) AREA

1096 MFC-DLM-GS-I-1070
FINAL E-1026
FINAL INSPECTION OF CLADDING FOR EQ: E-1026 (AS PER HIGH
SMIC-I-4014 W 1617-00 E/W PIPE RACK AREA 1-Jan-15 8:15 AM ACCEPTED
INSPECTION LIGHTED AREA IN DRAWING)

1097 MFC-DLM-GS-I-1071
FINAL T-1910
FINAL INSPECTION OF CLADDING FOR EQ: T-1910 ( FOR BOTTOM
SMIC-I-4014 W 1731-01 C3 SPLITTER PIPE RACK 1-Jan-15 8:30 AM ACCEPTED
INSPECTION DOME) AREA

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1098 MFC-DLM-GS-I-1072 INSULATION F-1170 PRIOR TO CLADDING FOR TLE (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1507-01 GAS FURNACE AREA 4-Jan-15 7:00 AM ACCEPTED
AREA IN DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-0120 (ONLY FOR


1099 MFC-DLM-GS-I-1073 D-0120 BOTTOM DOME) SMIC-I-4014 W 1463-00 E/W PIPE RACK AREA 4-Jan-15 7:30 AM ACCEPTED
INSPECTION

1100 MFC-DLM-GS-I-1074
FINAL D-0125
FINAL INSPECTION OF CLADDING FOR EQ: D-0125 (ONLY FOR
SMIC-I-4014 W 1466-00 E/W PIPE RACK AREA 4-Jan-15 8:00 AM ACCEPTED
INSPECTION BOTTOM DOME)

1101 MFC-DLM-GS-I-1075
FINAL D-0601
FINAL INSPECTION OF CLADDING FOR EQ: D-0601 (ONLY FOR
SMIC-I-4014 W 1627-00 E/W PIPE RACK AREA 4-Jan-15 8:15 AM ACCEPTED
INSPECTION BOTTOM DOME)

1102 MFC-DLM-GS-I-1076
FINAL D-2233 FINAL INSPECTION OF CLADDING FOR EQ: D-2233 SMIC-I-5018 W 1701-01 COLD PIPE RACK AREA 4-Jan-15 8:30 AM cancel
INSPECTION

1103 MFC-DLM-GS-I-1077
FINAL E-0301-A/B FINAL INSPECTION OF CLADDING FOR EQ: E-0301-A/B SMIC-I-4014 W 1744-01 DRYER PIPE RACK AREA 4-Jan-15 9:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 3rd LAYER PRIOR


1104 MFC-DLM-GS-I-1078 INSULATION T-2220 TO VAPOR BARRIER FOR EQ: T-2220 (ONLY FOR BOTTOM SMIC-I-5016 S 1705-01 COLD PIPE RACK AREA 5-Jan-15 7:00 AM ACCEPTED
DOME)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


VAPOR BARRIER PRIOR TO VAPOR BARRIER FOR EQ: D-2505 (ONLY FOR
1105 MFC-DLM-GS-I-1079
INSPECTION D-2505 SMIC-I-5016 S 1714-00 COLD PIPE RACK AREA 5-Jan-15 7:30 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1106 MFC-DLM-GS-I-1080
VAPOR BARRIER T-1810 VAPOR BARRIER FOR EQ: T-1810 (ONLY FOR 4 SADDLE SMIC-I-5016 S 1661-01 COLD PIPE RACK AREA 5-Jan-15 8:00 AM ACCEPTED
INSPECTION SUPPORTS & 4 ORIANTION MARKING AND 2 LIFTING LOGE)

INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING FOR


1107 MFC-DLM-GS-I-1081
VAPOR BARRIER T-1810 EQ: T-1810 (ONLY FOR 4 SADDLE SUPPORTS & 4 ORIANTION SMIC-I-5017 S 1661-01 COLD PIPE RACK AREA 5-Jan-15 2:00 PM ACCEPTED
INSPECTION MARKING AND 2 LIFTING

1108 MFC-DLM-GS-I-1082
FINAL T-2220
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: T-2220
SMIC-I-5017 S 1705-01 COLD PIPE RACK AREA 6-Jan-15 7:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1109 MFC-DLM-GS-I-1083
FINAL D-2506
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2506
SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 6-Jan-15 7:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1110 MFC-DLM-GS-I-1084 INSULATION CY-1301 CLADDING FOR EQ: CY-1301 (LOWER SIDE) SMIC-I-5018 s 1621-02 NEAR E/W PIPE RACK AREA 6-Jan-15 8:00 AM ACCEPTED

1111 MFC-DLM-GS-I-1085
FINAL R-2025/2030/2035
FINAL INSPECTION OF CLADDING FOR EQ: R-2025/2030/2035
SMIC-I-4014 W 1682-01 DRYER PIPE RACK AREA 6-Jan-15 8:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-1810 (ONLY FOR


1112 MFC-DLM-GS-I-1086
INSPECTION T-1810 4 SADDLE SUPPORTS & 4 ORIANTION MARKING AND 2 SMIC-I-5018 W 1661-01 COLD PIPE RACK AREA 6-Jan-15 9:00 AM ACCEPTED
LIFTING LOGE)

1113 MFC-DLM-GS-I-1087
FINAL D-2233 FINAL INSPECTION OF CLADDING FOR EQ: D-2233 SMIC-I-5018 W COLD PIPE RACK AREA 6-Jan-15 9:30 AM ACCEPTED
INSPECTION

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1114 MFC-DLM-GS-I-1088
PREPARATION W-1721 INSULATION INSTALLATION FOR EQ: W-1721 (ONLY FOR SMIC-I-5015 S 1651-00 DRYER PIPE RACK AREA 7-Jan-15 7:00 AM ACCEPTED
BOTTOM DOME)

1115 MFC-DLM-GS-I-1089
SURFACE FL-1304-AB INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1621-02 E/W PIPE RACK AREA 7-Jan-15 7:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: FL-1304-AB

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO 1621-02


1116 MFC-DLM-GS-I-1090 OQR-1300, OQR- INSULATION INSTALLATION FOR EQ: OQR-1300, OQR-1309- SMIC-I-4012 S E/W PIPE RACK AREA 7-Jan-15 8:00 AM ACCEPTED
PREPARATION 1309-AB AB 1621-01

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1117 MFC-DLM-GS-I-1091 INSULATION F-1150 PRIOR TO CLADDING FOR TLE (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1505-01 GAS FURNACE AREA 7-Jan-15 8:30 AM ACCEPTED
AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION


1118 MFC-DLM-GS-I-1092 INSULATION T-2210 PRIOR TO VAPOR BARRIER FOR EQ: T-2210 (ONLY SMIC-I-5016 S COLD PIPE RACK AREA 8-Jan-15 7:00 AM ACCEPTED
FOR BOTTOM DOME)

1119 MFC-DLM-GS-I-1093
FINAL X-2010
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: X-2010
SMIC-I-5017 W COLD PIPE RACK AREA 8-Jan-15 7:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1120 MFC-DLM-GS-I-1094
FINAL D-2022
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2022
SMIC-I-5017 W COLD PIPE RACK AREA 8-Jan-15 8:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1121 MFC-DLM-GS-I-1095
FINAL D-2505
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2505
SMIC-I-5017 S 1714-00 COLD PIPE RACK AREA 9-Jan-15 7:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1122 MFC-DLM-GS-I-1096 T-1620 CLADDING FOR EQ: T-1620 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S NEAR E/W PIPE RACK AREA 9-Jan-15 8:00 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR TO


1123 MFC-DLM-GS-I-1097 E-0142 INSULATION INSTALLATION FOR EQ: E-0142 SMIC-I-4012 S E/W PIPE RACK AREA 10-Jan-15 9:00 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR TO


1124 MFC-DLM-GS-I-1098 E-1428 INSULATION INSTALLATION FOR EQ: E-1428 SMIC-I-4012 S N/S PIPE RACK AREA 10-Jan-15 9:30 AM ACCEPTED

FINAL
1125 MFC-DLM-GS-I-1099 CY-1322 FINAL INSPECTION OF CLADDING FOR EQ: CY-1322 SMIC-I-4014 W 1621-04 NEAR E/W PIPE RACK AREA 10-Jan-15 10:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION


1126 MFC-DLM-GS-I-1100 INSULATION D-2505 PRIOR TO VAPOR BARRIER FOR EQ: D-2505 (ONLY SMIC-I-5016 S N/S PIPE RACK AREA 12-Jan-15 7:00 AM ACCEPTED
FOR 34 SUPPORTS)

INSPECTION OF SURFACE PREPARATION PRIOR


1127 MFC-DLM-GS-I-1101 INSULATION D-2152 TO INSULATION INSTALLATIO FOR EQ: D-2152 SMIC-I-5015 S COLD PIPE RACK AREA 12-Jan-15 8:00 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR


1128 MFC-DLM-GS-I-1102 INSULATION D-2116 TO INSULATION INSTALLATIO FOR EQ: D-2116 SMIC-I-5015 S COLD PIPE RACK AREA 12-Jan-15 8:15 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR


1129 MFC-DLM-GS-I-1103 INSULATION D-2119 TO INSULATION INSTALLATIO FOR EQ: D-2119 SMIC-I-5015 S COLD PIPE RACK AREA 12-Jan-15 8:30 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR


1130 MFC-DLM-GS-I-1104 INSULATION T-2127 TO INSULATION INSTALLATIO FOR EQ: T-2127 SMIC-I-5015 S COLD PIPE RACK AREA 12-Jan-15 8:45 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF VAPOR BARRIER PRIOR TO


1131 MFC-DLM-GS-I-1105 INSULATION D-2506 CLADDING FOR EQ: D-2506 (ONLY FOR 1 SMIC-I-5017 S N/S PIPE RACK AREA 12-Jan-15 9:00 AM ACCEPTED
SUPPORT)

INSPECTION OF VAPOR BARRIER PRIOR TO


1132 MFC-DLM-GS-I-1106 INSULATION D-2505 CLADDING FOR EQ: D-2505 (ONLY FOR 34 SMIC-I-5017 S N/S PIPE RACK AREA 12-Jan-15 11:00 AM ACCEPTED
SUPPORTS)

INSPECTION OF INSULATION INSTALLATION


1133 MFC-DLM-GS-I-1107 INSULATION D-1627 PRIOR TO CLADDING FOR EQ: D-1627 (ONLY FOR SMIC-I-4013 S N/S PIPE RACK AREA 13-Jan-15 7:00 AM ACCEPTED
BOTTOM DOME)
INSPECTION OF INSULATION INSTALLATION
1134 MFC-DLM-GS-I-1108 INSULATION T-1330 PRIOR TO CLADDING FOR EQ: T-1330 (ONLY FOR SMIC-I-4013 S N/S PIPE RACK AREA 13-Jan-15 7:30 AM ACCEPTED
BOTTOM DOME)
INSPECTION OF INSULATION INSTALLATION
1135 MFC-DLM-GS-I-1109 INSULATION T-1510 PRIOR TO CLADDING FOR EQ: T-1510 (ONLY FOR SMIC-I-4013 S N/S PIPE RACK AREA 13-Jan-15 8:00 AM ACCEPTED
BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: CY-1301 (LOWER


1136 MFC-DLM-GS-I-1110
INSPECTION CY-1301 SIDE) SMIC-I-4014 W N/S PIPE RACK AREA 13-Jan-15 8:30 AM ACCEPTED

FINAL FINAL INSPECTION OF CLADDING FOR GAS ID FAN INCLUDE


1137 MFC-DLM-GS-I-1111
INSPECTION B-1115 to B-1175 MANHOLE SMIC-I-4014 W GAS FURNACE AREA 13-Jan-15 9:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 1st


1138 MFC-DLM-GS-I-1112 INSULATION W-1720 LAYER PRIRO TO 2nd LAYER FOR EQ: W-1720 SMIC-I-5016 S DRYER PIPE RACK AREA 14-Jan-15 7:00 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR


TO INSULATION INSTALLATION FOR EQ: E-1521-
1139 MFC-DLM-GS-I-1113 INSULATION E-1521-A/B/C/D SMIC-I-4012 S E/W PIPE RACK AREA 15-Jan-15 7:00 AM ACCEPTED
A/B/C/D (AS PER HIGH LIGHTED AREA IN
DRAWING)

INSPECTION OF INSULATION INSTALLATION


1140 MFC-DLM-GS-I-1114 INSULATION W-2040 PRIOR TO VAPOR BARRIER FOR EQ: W-2040 (ONLY SMIC-I-5016 S E/W PIPE RACK AREA 15-Jan-15 7:30 AM ACCEPTED
FOR BOTTOM DOME)

1141 MFC-DLM-GS-I-1115
FINAL D-1627
FINAL INSPECTION OF CLADDING FOR EQ: D-1627 (ONLY FOR
SMIC-I-4014 W E/W PIPE RACK AREA 15-Jan-15 8:00 AM ACCEPTED
INSPECTION BOTTOM DOME)

1142 MFC-DLM-GS-I-1116
FINAL T-1620
FINAL INSPECTION OF CLADDING FOR EQ: T-1620 (ONLY FOR
SMIC-I-4014 W E/W PIPE RACK AREA 15-Jan-15 8:30 AM ACCEPTED
INSPECTION BOTTOM DOME)

1143 MFC-DLM-GS-I-1117
FINAL T-1330
FINAL INSPECTION OF CLADDING FOR EQ: T-1330 (ONLY FOR
SMIC-I-4014 W E/W PIPE RACK AREA 15-Jan-15 9:00 AM ACCEPTED
INSPECTION BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-1510 (ONLY FOR


1144 MFC-DLM-GS-I-1118 T-1510 SMIC-I-4014 W 1624-01 E/W PIPE RACK AREA 15-Jan-15 9:30 AM ACCEPTED
INSPECTION BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR LIQUID ID FAN


1145 MFC-DLM-GS-I-1119 B-1215 to B-1255 SMIC-I-4014 W LIQUID FURNACE AREA 15-Jan-15 10:00 AM ACCEPTED
INSPECTION INCLUDE MANHOLE

INSPECTION OF INSULATION INSTALLATION


1146 MFC-DLM-GS-I-1120 INSULATION FL-1304-AB SMIC-I-4013 S E/W PIPE RACK AREA 16-Jan-15 7:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: FL-1304-A/B

INSPECTION OF INSULATION INSTALLATION


1147 MFC-DLM-GS-I-1121 INSULATION E-1521-A/B/C/D PRIOR TO CLADDING FOR EQ: E-1521-A/B/C/D (AS SMIC-I-4013 S E/W PIPE RACK AREA 16-Jan-15 8:00 AM ACCEPTED
PER HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF FIRST LAYER INSULATION


1148 MFC-DLM-GS-I-1122 INSULATION D-2152 INSTALLATION PRIOR TO SECOND LAYER FOR SMIC-I-4013 S N/S PIPE RACK AREA 17-Jan-15 7:30 AM ACCEPTED
EQ: D-2152(SKIRT INSERT AREA)

INSPECTION OF SURFACE PREPARATION PRIRO


C3 SPLITTER PIPE RACK
1149 MFC-DLM-GS-I-1123 INSULATION D-1917 TO INSULATION INSTALLATION FOR EQ: D-1917 SMIC-I-4012 S 18-Jan-15 7:00 AM ACCEPTED
AREA
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIRO


1150 MFC-DLM-GS-I-1124 INSULATION D-0140 TO INSULATION INSTALLATION FOR EQ: D-0140 SMIC-I-4012 S E/W PIPE RACK AREA 18-Jan-15 8:00 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIRO


1151 MFC-DLM-GS-I-1125 INSULATION FL-1316-A/B/C TO INSULATION INSTALLATION FOR EQ: FL-1316- SMIC-I-4012 S E/W PIPE RACK AREA 18-Jan-15 9:00 AM ACCEPTED
A/B/C

FINAL INSPECTION OF VAPOR BARRIER FOR EQ:


1152 MFC-DLM-GS-I-1126 INSULATION T-2210 SMIC-I-5017 S COLD PIPE RACK AREA 18-Jan-15 10:00 AM ACCEPTED
T-2210 (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd


1153 MFC-DLM-GS-I-1127 INSULATION W-1720 LAYER PRIOR TO VAPOR BARRIER FOR EQ: W- SMIC-I-5016 S DRYER PIPE RACK AREA 18-Jan-15 11:00 AM ACCEPTED
1720 (ONLY FOR BOTTOM DOME)
Page 1350 of 1353
INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF INSULATION INSTALLATION 2nd
1154 MFC-DLM-GS-I-1128 INSULATION D-2152 LAYER PRIOR TO VAPOR BARRIER FOR EQ: D-2152 SMIC-I-5016 S COLD PIPE RACK AREA 19-Jan-15 7:00 AM ACCEPTED
(ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION


1155 MFC-DLM-GS-I-1129 INSULATION OQR-1309-AB SMIC-I-4013 S E/W PIPE RACK AREA 19-Jan-15 8:00 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: OQR-1309-AB

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2505 (ONLY FOR


1156 MFC-DLM-GS-I-1130 D-2505 SMIC-I-5018 W COLD PIPE RACK AREA 19-Jan-15 8:30 AM ACCEPTED
INSPECTION 34 SUPPORTS)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: D-2506 (ONLY FOR


1157 MFC-DLM-GS-I-1131 D-2506 SMIC-I-5018 W COLD PIPE RACK AREA 19-Jan-15 9:00 AM ACCEPTED
INSPECTION 1 SUPPORT)

INSPECTIO OF SURFACE PREPARATION PRIOR TO


1158 MFC-DLM-GS-I-1132 INSULATION D-1827 INSULATION INSTALLATION FOR EQ: D-1827 (ONLY SMIC-I-4012 S COLD PIPE RACK AREA 20-Jan-15 7:00 AM ACCEPTED
FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION


C3 SPLITTER PIPE RACK
1159 MFC-DLM-GS-I-1133 INSULATION D-1917 PRIOR TO CLADDING FOR EQ: D-1917 (ONLY FOR SMIC-I-4013 S 20-Jan-15 7:30 AM ACCEPTED
AREA
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION


1160 MFC-DLM-GS-I-1134 INSULATION D-0140 PRIOR TO CLADDING FOR EQ: D-0140 (ONLY FOR SMIC-I-4013 S E/W PIPE RACK AREA 20-Jan-15 8:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION


1161 MFC-DLM-GS-I-1135 INSULATION OQR-1300 SMIC-I-4013 S EW PIPE PACK AREA 20-Jan-15 8:30 AM ACCEPTED
PRIOR TO CLADDING FOR EQ: OQR-1300

INSPECTIO OF SURFACE PREPARATION PRIOR TO


1162 MFC-DLM-GS-I-1136 INSULATION D-1718 INSULATION INSTALLATION FOR EQ: D-1718 (ONLY SMIC-I-5015 S DRYER PIPE RACK AREA 20-Jan-15 9:10 AM ACCEPTED
FOR BOTTOM DOME)

FINAL
1163 MFC-DLM-GS-I-1137
INSPECTION FL-1304-AB FINAL INSPECTION OF CLADDING FOR EQ; FL-1304-A/B SMIC-I-4014 W EW PIPE PACK AREA 20-Jan-15 9:30 AM ACCEPTED

1164 MFC-DLM-GS-I-1138
FINAL E-1521-ABCD
FINAL INSPECTION OF CLADDING FOR EQ: E-1521-A/B/C/D
SMIC-I-4014 W EW PIPE PACK AREA 20-Jan-15 10:00 AM ACCEPTED
INSPECTION (AS PER THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF IN PROCESS INSULATION INSTALLATION 1st,


1165 MFC-DLM-GS-I-1139 INSULATION T-2127 2nd and 3rd LAYER FOR EQ: T-2127 (ONLY FOR BOTTOM SMIC-I-5016 S COLD PIPE RACK AREA 22-Jan-15 7:00 AM ACCEPTED
DOME)

INSPECTIO OF SURFACE PREPARATION PRIOR TO


1166 MFC-DLM-GS-I-1140 INSULATION D-2055 INSULATION INSTALLATION FOR EQ: D-2055 (ONLY FOR SMIC-I-5015 S COLD PIPE RACK AREA 22-Jan-15 8:00 AM ACCEPTED
BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR LIQUID FD FAN B-


1167 MFC-DLM-GS-I-1141
INSPECTION B-1214 to B-1254 1214 to B-1254 (NCLUDDING MANHOLE) SMIC-I-4014 W LIQUID FURNACE AREA 22-Jan-15 8:30 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1168 MFC-DLM-GS-I-1142 INSULATION E-1335 CLADDING FOR EQ: E-1335 (AS PER THE HIGH LIGHTED AREA SMIC-I-4013 S EW PIPE PACK AREA 22-Jan-15 8:45 AM ACCEPTED
IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1169 MFC-DLM-GS-I-1143 INSULATION E-1305-ABCD CLADDING FOR EQ: E-1305-A/B/C/D (AS PER THE HIGH SMIC-I-4013 S EW PIPE PACK AREA 22-Jan-15 9:00 AM ACCEPTED
LIGHTED AREA IN DRAWING)

1170 MFC-DLM-GS-I-1144 INSULATION E-1428 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S NEAR NS PIPE RACK AREA 24-Jan-15 7:00 AM ACCEPTED
CLADDING FOR EQ: E-1428

1171 MFC-DLM-GS-I-1145 INSULATION E-0142 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S EW PIPE PACK AREA 24-Jan-15 7:30 AM ACCEPTED
CLADDING FOR EQ: E-0142

INSPECTIO OF SURFACE PREPARATION PRIOR TO


1172 MFC-DLM-GS-I-1146 INSULATION D-2109 INSULATION INSTALLATION FOR EQ: D-2109 (ONLY FOR SMIC-I-5015 S COLD PIPE RACK AREA 24-Jan-15 8:00 AM ACCEPTED
BOTTOM DOME)

1173 MFC-DLM-GS-I-1147
FINAL E-1428 FINAL INSPECTION OF CLADDING FOR EQ: E-1428 SMIC-I-4014 W NEAR NS PIPE RACK AREA 24-Jan-15 9:30 AM ACCEPTED
INSPECTION

1174 MFC-DLM-GS-I-1148
FINAL E-0142 FINAL INSPECTION OF CLADDING FOR EQ: E-0142 SMIC-I-4014 W EW PIPE PACK AREA 24-Jan-15 10:00 AM ACCEPTED
INSPECTION

1175 MFC-DLM-GS-I-1149
FINAL D-0140
FINAL INSPECTION OF CLADDING FOR EQ: D-0140 (ONLY FOR
SMIC-I-4014 W EW PIPE PACK AREA 24-Jan-15 10:15 AM ACCEPTED
INSPECTION BOTTOM DOME)

1176 MFC-DLM-GS-I-1150
FINAL D-1917
FINAL INSPECTION OF CLADDING FOR EQ: D-1917 (ONLY FOR
SMIC-I-4014 W C3 SPLITTER PIPE RACK AREA 24-Jan-15 10:30 AM ACCEPTED
INSPECTION BOTTOM DOME)

1177 MFC-DLM-GS-I-1151
FINAL W-2040
FINAL INSPECTION OF VAPOR BARRIER FOR EQ: W-2040
SMIC-I-5017 S DRYER PIPE RACK AREA 24-Jan-15 10:45 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1178 MFC-DLM-GS-I-1152
FINAL B-1114 to B-1174
FINAL INSPECTION OF CLADDING FOR GAS FD FAN B-1114 to
SMIC-I-4014 W GAS FURNACE AREA 24-Jan-15 11:00 AM ACCEPTED
INSPECTION B-1174 (INCLUDDING MANHOLE)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1179 MFC-DLM-GS-I-1153 INSULATION FL-1316-A/B/C CLADDING FOR EQ: FL-1316-A/B/C SMIC-I-4013 S EW PIPE PACK AREA 25-Jan-15 7:00 AM ACCEPTED

INSPECTION OF SURFACE PREPARATION PRIOR TO


1180 MFC-DLM-GS-I-1154 INSULATION T-1310 INSULATION INSTALLATION FOR EQ: T-1310 (ONLY FOR SMIC-I-4012 S EW PIPE PACK AREA 25-Jan-15 7:15 AM ACCEPTED
BOTTOM DOME)

1181 MFC-DLM-GS-I-1155 INSULATION W-1721 INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIOR SMIC-I-5016 S DRYER PIPE RACK AREA 25-Jan-15 7:30 AM ACCEPTED
TO 2nd LAYER FOR EQ: W-1721 (ONLY FOR BOTTOM DOME)

1182 MFC-DLM-GS-I-1156
FINAL D-2152 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2152 SMIC-I-5017 S COLD PIPE RACK AREA 25-Jan-15 7:45 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: OQR-1309-AB


1183 MFC-DLM-GS-I-1157
INSPECTION OQR-1309-AB
(EXCLUDDING 12" PIPE LINE)
SMIC-I-4014 W EW PIPE PACK AREA 25-Jan-15 8:00 AM ACCEPTED

1184 MFC-DLM-GS-I-1158
FINAL OQR-1300
FINAL INSPECTION OF CLADDING FOR EQ: OQR-1300
SMIC-I-4014 W EW PIPE PACK AREA 25-Jan-15 8:15 AM ACCEPTED
INSPECTION (EXCLUDDING 6" PIPE LINE)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-1305-ABCD (AS


1185 MFC-DLM-GS-I-1159
INSPECTION E-1305-ABCD PER THE HIGH LIGHTED AREA IN DRAWING) SMIC-I-4014 W EW PIPE PACK AREA 25-Jan-15 8:30 AM ACCEPTED

1186 MFC-DLM-GS-I-1160
FINAL E-1335
FINAL INSPECTION OF CLADDING FOR EQ: E-1335 (AS PER
SMIC-I-4014 W EW PIPE PACK AREA 25-Jan-15 8:45 AM ACCEPTED
INSPECTION THE HIGH LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1187 MFC-DLM-GS-I-1161 INSULATION D-1827 CLADDING FOR EQ: D-1827 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S COLD PIPE RACK AREA 25-Jan-15 9:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1188 MFC-DLM-GS-I-1162 INSULATION T-1820 CLADDING FOR EQ: T-1820 (ONLY FOR BOTTOM DOME) SMIC-I-4013 S COLD PIPE RACK AREA 25-Jan-15 9:15 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1189 MFC-DLM-GS-I-1163 INSULATION D-1718 VAPOR BARRIER FOR EQ: D-1718 (ONLY FOR BOTTOM SMIC-I-5016 S DRYER PIPE RACK AREA 26-Jan-15 7:00 AM ACCEPTED
DOME)

INSPECTION OF INSULATION INSTALLATION 1st LAYER PRIOR


1190 MFC-DLM-GS-I-1164 INSULATION D-2116 TO 2nd LAYER FOR EQ: D-2116 (ONLY FOR BOTTOM DOME) SMIC-I-5016 S COLD PIPE RACK AREA 26-Jan-15 7:30 AM ACCEPTED

1191 MFC-DLM-GS-I-1165
FINAL T-1820
FINAL INSPECTION OF CLADDING FOR EQ: T-1820 (ONLY FOR
SMIC-I-4014 W COLD PIPE RACK AREA 26-Jan-15 8:00 AM ACCEPTED
INSPECTION BOTTOM DOME)

1192 MFC-DLM-GS-I-1166
FINAL D-1827
FINAL INSPECTION OF CLADDING FOR EQ: D-1827 (ONLY FOR
SMIC-I-4014 W COLD PIPE RACK AREA 26-Jan-15 8:30 AM ACCEPTED
INSPECTION BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1192 MFC-DLM-GS-I-1167 INSULATION E-2420-B INSULATION INSTALLATION FOR EQ: E-2420-B (AS PER SMIC-I-4012 S 1721-02 C3 SPLITTER PIPE RACK 27-Jan-15 7:00 AM ACCEPTED
THE HIGH LIGHTED AREA IN DRAWING) AREA

1192 MFC-DLM-GS-I-1168 INSULATION E-2420-A INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1721-02 C3 SPLITTER PIPE RACK 27-Jan-15 7:30 AM ACCEPTED
CLADDING FOR EQ: E-2420-A AREA

1192 MFC-DLM-GS-I-1169 INSULATION E-2410-A/B INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1721-01 C3 SPLITTER PIPE RACK 27-Jan-15 8:15 AM ACCEPTED
INSULATION INSTALLATION FOR EQ: E-2410-A/B AREA

INSPECTION OF INSULATION INSTALLATION PRIOR TO C3 SPLITTER PIPE RACK


1192 MFC-DLM-GS-I-1170 INSULATION E-2420-B CLADDING FOR EQ: E-2420-B (AS PER THE HIGH SMIC-I-4013 S 1721-02 27-Jan-15 8:30 AM ACCEPTED
LIGHTED AREA IN DRAWING) AREA

1192 MFC-DLM-GS-I-1171 INSULATION E-2410-A/B INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1721-01 C3 SPLITTER PIPE RACK 28-Jan-15 7:30 AM ACCEPTED
CLADDING FOR EQ: E-2410-A/B AREA

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1192 MFC-DLM-GS-I-1172 INSULATION D-2116 PRIOR TO 3rd LAYER FOR EQ: D-2116 (ONLY FOR SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 28-Jan-15 8:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1193 MFC-DLM-GS-I-1173 INSULATION W-1721 PRIOR TO VAPOR BARRIER FOR EQ: W-1721 (ONLY FOR SMIC-I-5016 S 1651-00 DRYER PIPE RACK AREA 29-Jan-15 7:00 AM ACCEPTED
BOTTOM DOME)

1194 MFC-DLM-GS-I-1174 FINAL W-1720 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: W-1720 SMIC-I-5017 S 1651-00 DRYER PIPE RACK AREA 29-Jan-15 7:30 AM cancel
INSPECTION (ONLY FOR BOTTOM DOME)

1195 MFC-DLM-GS-I-1175 FINAL FL-1316-A/B/C FINAL INSPECTION OF CLADDING FOR EQ: FL-1316-A/B/C SMIC-I-4014 W EW PIPE PACK AREA 29-Jan-15 8:00 AM ACCEPTED
INSPECTION

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1196 MFC-DLM-GS-I-1176 PREPARATION D-2107 INSULATION INSTALLATION FOR EQ: D-2107 (ONLY FOR SMIC-I-5015 S 1681-00 COLD PIPE RACK AREA 29-Jan-15 8:30 AM ACCEPTED
BOTTOM DOME)

1197 MFC-DLM-GS-I-1177 FINAL E-2420-A/B FINAL INSPECTION OF CLADDING FOR EQ: E-2420-A/B SMIC-I-4014 W 1721-01 C3 SPLITTER PIPE RACK 29-Jan-15 9:30 AM ACCEPTED
INSPECTION (AS PER HIGH LIGHTED AREA IN DRAWING) AREA

FINAL C3 SPLITTER PIPE RACK


1198 MFC-DLM-GS-I-1178 INSPECTION E-2410-A/B FINAL INSPECTION OF CLADDING FOR EQ: E-2410-A/B SMIC-I-4014 W 1721-02 AREA 29-Jan-15 10:00 AM ACCEPTED

FINAL FINAL INSPECTION OF VAPOR BARRIER FOR EQ: W-1721


1199 MFC-DLM-GS-I-1179 INSPECTION W-1721 (ONLY FOR BOTTOM DOME) SMIC-I-5017 S 1651-00 DRYER PIPE RACK AREA 30-Jan-15 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 3rd LAYER


1200 MFC-DLM-GS-I-1180 INSULATION D-2116 PRIOR TO VAPOR BARRIER FOR EQ: D-2116 (ONLY FOR SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 30-Jan-15 8:30 AM ACCEPTED
BOTTOM DOME)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1201 MFC-DLM-GS-I-1181 PREPARATION T-2110 INSULATION INSTALLATION FOR EQ: T-2110 (ONLY FOR SMIC-I-5015 S 1683-01 COLD PIPE RACK AREA 30-Jan-15 9:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1202 MFC-DLM-GS-I-1182 SURFACE T-2120 INSULATION INSTALLATION FOR EQ: T-2120 (ONLY FOR SMIC-I-5015 S 1683-02 COLD PIPE RACK AREA 30-Jan-15 9:30 AM ACCEPTED
PREPARATION
BOTTOM DOME)

1203 MFC-DLM-GS-I-1183 FINAL D-1718 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-1718 SMIC-I-5017 S 1641-00 DRYER PIPE RACK AREA 1-Feb-15 8:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1204 MFC-DLM-GS-I-1184 INSULATION D-2055 VAPOR BARRIER FOR EQ: D-2055 (ONLY FOR BOTTOM SMIC-I-5016 S 1681-01 COLD PIPE RACK AREA 1-Feb-15 8:30 AM ACCEPTED
DOME)

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1205 MFC-DLM-GS-I-1185 INSULATION D-2119 PRIOR TO 2nd LAYER FOR EQ: D-2119 (ONLY FOR SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 1-Feb-15 9:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1206 MFC-DLM-GS-I-1186 INSULATION F-1140 PRIOR TO 2nd LAYER FOR TLE (AS PER THE HIGH SMIC-I-4013 S 1504-01 GAS FURNACE AREA 2-Feb-15 7:30 AM ACCEPTED
LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1207 MFC-DLM-GS-I-1187 INSULATION F-1110 PRIOR TO 2nd LAYER FOR TLE (AS PER THE HIGH SMIC-I-4013 S 1501-01 GAS FURNACE AREA 3-Feb-15 7:00 AM ACCEPTED
LIGHTED AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1208 MFC-DLM-GS-I-1188 INSULATION D-2119 PRIOR TO 3rd LAYER FOR EQ: D-2119 (ONLY FOR SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 3-Feb-15 7:15 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1209 MFC-DLM-GS-I-1189 INSULATION T-1810 INSULATION INSTALLATION FOR EQ: T-1810 (ONLY FOR SMIC-I-4012 S 1661-01 COLD PIPE RACK AREA 3-Feb-15 7:30 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1210 MFC-DLM-GS-I-1190 SURFACE T-1410 INSULATION INSTALLATION FOR EQ: T-1410 (ONLY FOR SMIC-I-4012 S 1623-01 EW PIPE PACK AREA 3-Feb-15 7:45 AM ACCEPTED
PREPARATION BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1211 MFC-DLM-GS-I-1191 INSULATION D-2109 PRIOR TO 2nd LAYER FOR EQ: D-2109 (ONLY FOR SMIC-I-5016 S 1681-00 COLD PIPE RACK AREA 3-Feb-15 8:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1212 MFC-DLM-GS-I-1192 INSULATION X-2010 INSULATION INSTALLATION FOR EQ: X-2010 (ONLY FOR SMIC-I-4012 S 1681-00 DRYER PIPE RACK AREA 3-Feb-15 8:15 AM ACCEPTED
TOP SIDE NOZZLE)

1213 MFC-DLM-GS-I-1193 FINAL T-2127 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: T-2127 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 3-Feb-15 8:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1214 MFC-DLM-GS-I-1194 INSULATION X-2010 CLADDING FOR EQ: X-2010 (ONLY FOR TOP SIDE SMIC-I-4013 S 1681-00 DRYER PIPE RACK AREA 3-Feb-15 8:45 AM ACCEPTED
NOZZLE)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1215 MFC-DLM-GS-I-1195 INSULATION D-2109 PRIOR TO VAPOR BARRIER FOR EQ: D-2109 (ONLY FOR SMIC-I-5016 S COLD PIPE RACK AREA 4-Feb-15 7:30 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 3rd LAYER


1216 MFC-DLM-GS-I-1196 INSULATION D-2119 PRIOR TO VAPOR BARRIER FOR EQ: D-2119 (ONLY FOR SMIC-I-5016 S 1683-03 COLD PIPE RACK AREA 4-Feb-15 8:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1217 MFC-DLM-GS-I-1197 INSULATION F-1140 PRIOR TO CLADDING FOR TLE (AS PER THE HIGH SMIC-I-4013 S 1504-01 GAS FURNACE AREA 5-Feb-15 7:00 AM ACCEPTED
LIGHTED AREA IN DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: X-2010 (ONLY


1218 MFC-DLM-GS-I-1198 X-2010 SMIC-I-4014 W 1681-01 DRYER PIPE RACK AREA 5-Feb-15 7:30 AM ACCEPTED
INSPECTION FOR TOP SIDE NOZZLE)

1219 MFC-DLM-GS-I-1199 VAPOR BARRIER W-1720 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: W-1720 SMIC-I-5017 S 1651-00 DRYER PIPE RACK AREA 5-Feb-15 8:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1220 MFC-DLM-GS-I-1200 INSULATION T-1310 SMIC-I-4013 S EW PIPE PACK AREA 5-Feb-15 8:30 AM ACCEPTED
CLADDING FOR EQ: T-1310 (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1221 MFC-DLM-GS-I-1201 INSULATION D-2107 PRIOR TO 2nd LAYER FOR EQ: D-2107 (ONLY FOR SMIC-I-5016 S 1681-00 COLD PIPE RACK AREA 8-Feb-15 7:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF ON GOING APPLICATION INSULATION


1222 MFC-DLM-GS-I-1202 INSULATION T-2120 INSTALLATIONN 1st, 2nd & 3rd LAYER PRIOR TO VAPOR SMIC-I-5016 S 1683-02 COLD PIPE RACK AREA 8-Feb-15 7:30 AM ACCEPTED
BARRIER FOR EQ: T-2120 (ONLY FOR BOTTOM DOME)

1223 MFC-DLM-GS-I-1203 INSULATION T-1810 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1661-01 COLD PIPE RACK AREA 8-Feb-15 8:00 AM ACCEPTED
CLADDING FOR EQ: T-1810 (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1224 MFC-DLM-GS-I-1204 INSULATION D-2107 PRIOR TO VAPOR BARRIER FOR EQ: D-2107 (ONLY FOR SMIC-I-5016 S 1681-00 COLD PIPE RACK AREA 9-Feb-15 8:00 AM ACCEPTED
BOTTOM DOME)

1225 MFC-DLM-GS-I-1205 INSULATION T-1410 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S EW PIPE PACK AREA 10-Feb-15 7:30 AM ACCEPTED
CLADDING FOR EQ: T-1410 (ONLY FOR BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1226 MFC-DLM-GS-I-1206 INSULATION E-2210 SMIC-I-4013 S COLD PIPE RACK AREA 10-Feb-15 8:00 AM ACCEPTED
CLADDING FOR EQ: E-2210

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1227 MFC-DLM-GS-I-1207 INSULATION T-2110 PRIOR TO 2nd LAYER FOR EQ: T-2110 (ONLY FOR SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 12-Feb-15 7:00 AM ACCEPTED
BOTTOM DOME)

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1228 MFC-DLM-GS-I-1208 INSULATION T-2110 PRIOR TO VAPOR BARRIER FOR EQ: T-2110 (ONLY FOR SMIC-I-5016 S 1683-01 COLD PIPE RACK AREA 12-Feb-15 2:00 PM ACCEPTED
BOTTOM DOME)

Page 1351 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
INSPECTION OF SURFACE PREPARATION PRIOR TO
1229 MFC-DLM-GS-I-1209 INSULATION E-1418-A/B INSULATION INSTALLATION FOR EQ: E-1418-A/B SMIC-I-5015 S 1623-01 H2 AREA 13-Feb-15 7:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1230 MFC-DLM-GS-I-1210 INSULATION F-1110 CLADDING FOR TLE F-1110 (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1501-01 GAS FURNACE AREA 13-Feb-15 8:00 AM ACCEPTED
AREA IN DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: T-1810 (ONLY


1231 MFC-DLM-GS-I-1211 T-1810 SMIC-I-4014 W 1661-01 COLD PIPE RACK AREA 13-Feb-15 8:30 AM ACCEPTED
INSPECTION FOR BOTTOM DOME)

FINAL
1232 MFC-DLM-GS-I-1212 INSPECTION E-2210 FINAL INSPECTION OF CLADDING FOR EQ: E-2210 SMIC-I-4014 W 1691-01 COLD PIPE RACK AREA 14-Feb-15 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2107


1233 MFC-DLM-GS-I-1213 INSPECTION D-2107 (ONLY FOR BOTTOM DOME) SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 15-Feb-15 8:00 AM ACCEPTED

FINAL FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2109


1234 MFC-DLM-GS-I-1214 INSPECTION D-2109 (ONLY FOR BOTTOM DOME) SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 15-Feb-15 8:30 AM ACCEPTED

1235 MFC-DLM-GS-I-1215 FINAL T-1410 FINAL INSPECTION OF CLADDING FOR EQ: T-1410 (ONLY SMIC-I-4014 W 1623-01 EW PIPE PACK AREA 15-Feb-15 9:00 AM ACCEPTED
INSPECTION FOR BOTTOM DOME)

1236 MFC-DLM-GS-I-1216 FINAL D-2116 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2116 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 16-Feb-15 8:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1237 MFC-DLM-GS-I-1217 FINAL D-2119 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2119 SMIC-I-5017 S 1683-03 COLD PIPE RACK AREA 16-Feb-15 8:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1238 MFC-DLM-GS-I-1218 FINAL D-2055 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: D-2055 SMIC-I-5017 S 1681-00 COLD PIPE RACK AREA 18-Feb-15 8:00 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1239 MFC-DLM-GS-I-1219 FINAL T-2110 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: T-2110 SMIC-I-5017 S 1683-01 COLD PIPE RACK AREA 18-Feb-15 8:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1240 MFC-DLM-GS-I-1220 SURFACE W-1720/1 INSULATION INSTALLATION FOR EQ: W-1720 & W-1721 SMIC-I-5015 S 1651-00 DRYER PIPE RACK AREA 19-Feb-15 7:15 AM ACCEPTED
PREPARATION (ONLY FOR TOP SIDE NOZZLE)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1241 MFC-DLM-GS-I-1221 SURFACE W-2040 INSULATION INSTALLATION FOR EQ: W-2040 (ONLY FOR SMIC-I-5015 S 1682-02 DRYER PIPE RACK AREA 19-Feb-15 7:30 AM ACCEPTED
PREPARATION TOP SIDE NOZZLE)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1242 MFC-DLM-GS-I-1222 SURFACE S-0515 & S-0545 INSULATION INSTALLATION FOR EQ: S-0515 & S-0545 SMIC-I-4012 S 1646-00 SPENT CAUSTIC AREA 19-Feb-15 7:45 AM ACCEPTED
PREPARATION (AS PER THE HIGH LIGHTED AREA IN DRAWING) 1647-00

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE 1646-00
1243 MFC-DLM-GS-I-1223 PREPARATION V-0517 & V-0547 INSULATION INSTALLATION FOR EQ: V-0517 & V-0547 SMIC-I-4012 S 1647-00 SPENT CAUSTIC AREA 19-Feb-15 8:00 AM ACCEPTED
(AS PER THE HIGH LIGHTED AREA IN DRAWING)

1244 MFC-DLM-GS-I-1224 INSULATION E-1418-B INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-5016 S 1623-01 H2 AREA 19-Feb-15 8:15 AM ACCEPTED
VAPOR BARRIER FOR EQ: E-1418-B

INSPECTION OF INSULATION INSTALLATION 1st LAYER


1245 MFC-DLM-GS-I-1225 INSULATION W-1720/1 PRIRO TO 2nd LAYER FOR EQ: W-1720 & W-1721 (ONLY SMIC-I-5016 S 1651-00 DRYER PIPE RACK AREA 22-Feb-15 7:00 AM ACCEPTED
FOR TOP SIDE NOZZLE)

1246 MFC-DLM-GS-I-1226 FINAL T-2120 FINAL INSPECTION OF VAPOR BARRIER FOR EQ: T-2120 SMIC-I-5017 S 1683-02 COLD PIPE RACK AREA 22-Feb-15 7:30 AM ACCEPTED
INSPECTION (ONLY FOR BOTTOM DOME)

1247 MFC-DLM-GS-I-1227 VAPOR BARRIER


INSPECTION E-1418-B INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
FOR EQ: E-1418-B SMIC-I-5017 S 1623-01 H2 AREA 22-Feb-15 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION 2nd LAYER


1248 MFC-DLM-GS-I-1228 INSULATION W-1720/1 PRIRO TO VAPOR BARRIER FOR EQ: W-1720 & W-1721 SMIC-I-5016 S 1651-00 DRYER PIPE RACK AREA 22-Feb-15 2:00 PM ACCEPTED
(ONLY FOR TOP SIDE NOZZLE)

1249 MFC-DLM-GS-I-1229 INSULATION S-0515 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1646-00 SPENT CAUSTIC AREA 23-Feb-15 7:30 AM ACCEPTED
CLADDING FOR EQ: S-0515

DRYER PIPE RACK AREA


INSPECTION OF INSULATION INSTALLATION PRIOR TO
1250 MFC-DLM-GS-I-1230 INSULATION W-2040 VAPOR BARRIER FOR EQ: W-2040 (ONLY FOR TOP SIDE SMIC-I-5016 S 1682-02 26-Feb-15 7:00 AM ACCEPTED
NOZZLE)
DRYER PIPE RACK AREA
INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING
1251 MFC-DLM-GS-I-1231 VAPOR BARRIER W-1720/1 FOR EQ: W-1720 & W-1721 (ONLY FOR TOP SIDE SMIC-I-5017 S 1651-00 26-Feb-15 7:30 AM ACCEPTED
INSPECTION
NOZZLE)
DRYER PIPE RACK AREA
1252 MFC-DLM-GS-I-1232 VAPOR BARRIER W-2040 INSPECTION OF VAPOR BARRIER PRIOR TO CLADDING SMIC-I-5017 S 1682-02 26-Feb-15 8:00 AM ACCEPTED
INSPECTION FOR EQ: W-2040 (ONLY FOR TOP SIDE NOZZLE)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1253 MFC-DLM-GS-I-1233 INSULATION S-0545 CLADDING FOR EQ: S-0545 (AS PER THE HIGH LIGHTED SMIC-I-4013 S 1646-00 SPENT CAUSTIC AREA 26-Feb-15 8:30 AM ACCEPTED
AREA IN DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1254 MFC-DLM-GS-I-1234 INSULATION V-0517 & V-0547 CLADDING FOR EQ: V-0517 & V-0547 (AS PER THE HIGH SMIC-I-4013 S 1682-01 SPENT CAUSTIC AREA 26-Feb-15 9:00 AM ACCEPTED
LIGHTED AREA IN DRAWING)

1255 MFC-DLM-GS-I-1235 SURFACE EPS-0556 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1647-00 SPENT CAUSTIC AREA 26-Feb-15 9:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ; EPS-0556

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1256 MFC-DLM-GS-I-1236 INSULATION E-1418-A SMIC-I-5016 S 1623-01 H2 AREA 26-Feb-15 10:00 AM ACCEPTED
VAPOR BARRIER FOR EQ: E-1418-A

1257 MFC-DLM-GS-I-1237 FINAL W-2040 FINAL INSPECTION OF CLADDING FOR EQ: W-2040 SMIC-I-5018 W 1682-02 DRYER PIPE RACK AREA 1-Mar-15 7:00 AM ACCEPTED
INSPECTION (ONLY FOR TOP SIDE NOZZLE)

1258 MFC-DLM-GS-I-1238 FINAL W-1720/1 FINAL INSPECTION OF CLADDING FOR EQ: W-1720 & W- SMIC-I-5018 W 1651-00 DRYER PIPE RACK AREA 1-Mar-15 7:30 AM ACCEPTED
INSPECTION 1721(ONLY FOR TOP SIDE NOZZLE) 1682-02

1259 MFC-DLM-GS-I-1239 SURFACE E-0402 INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1654-00 G1 AREA 1-Mar-15 7:45 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: E-0402

1260 MFC-DLM-GS-I-1240 INSULATION E-0402 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1654-00 G1 AREA 3-Mar-15 8:30 AM ACCEPTED
CLADDING FOR EQ: E-0402

1261 MFC-DLM-GS-I-1241 VAPOR BARRIER E-1418-A INSPECTION OF VAPOUR BARRIER PRIOR TO CLADDING SMIC-I-5017 S 1623-01 G1 AREA 4-Mar-15 8:00 AM ACCEPTED
INSPECTION FOR EQ: E-1418-A

FINAL
1262 MFC-DLM-GS-I-1242
INSPECTION E-1418-B FINAL INSPECTION OF CLADDING FOR EQ: E-1418-B SMIC-I-5018 W 1623-01 G1 AREA 5-Mar-15 9:00 AM cancel
WORK NOT READY

1263 MFC-DLM-GS-I-1243
FINAL E-1418-B
FINAL INSPECTION OF CLADDING FOR EQ: E-1418-B ( As per
SMIC-I-5018 W 1623-01 G1 AREA 6-Mar-15 8:00 AM ACCEPTED
INSPECTION Highlighted Area in the Drawing)
A

1264 MFC-DLM-GS-I-1244
FINAL E-0402 FINAL INSPECTION OF CLADDING FOR EQ: E-0402 SMIC-I-4014 W 1654-00 G1 AREA 6-Mar-15 8:00 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1265 MFC-DLM-GS-I-1245 INSULATION T-1310 CLADDING FOR EQ: T-1310 (BOTTOM DOME,As per SMIC-I-4013 S EW PIPE PACK AREA 9-Mar-15 8:00 AM ACCEPTED
Highlighted in the Drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1266 MFC-DLM-GS-I-1246
PREPARATION T-1310 INSULATION INSTALLATION FOR EQ: T-1310 (SKIRT AREA, As SMIC-I-4012 S EW PIPE PACK AREA 9-Mar-15 8:15 AM ACCEPTED
per Highlighted in the Drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1267 MFC-DLM-GS-I-1247
SURFACE F-1160
INSULATION INSTALLATION FOR GAS FURNACE JUMP &
SMIC-I-4012 S GAS CRACKING FURNACE 9-Mar-15 8:30 AM ACCEPTED
PREPARATION CROSS OVER FIELD JOINT (AS PER HIGHLIGHTED IN THE
DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


MFC-DLM-GS-I-1248 INSULATION QQR-1309 A-B CLADDING FOR EQ: QQR-1309-A/B(12"PIPE LINE ONLY) SMIC-I-4013 S 1621-01 EW PIPE PACK AREA 9-Mar-15 8:00 AM ACCEPTED

FINAL
1268 MFC-DLM-GS-I-1251
INSPECTION E-1418 A FINAL INSPECTION OF CLADDING FOR EQ: E-1418 A SMIC-I-5018 W 1623-01 H2 AREA 11-Mar-15 8:00 AM ACCEPTED

INSPECTION OF INSULATION INSTALLATION OF 1ST


1269 MFC-DLM-GS-I-1252 INSULATION T-1310 LAYER PRIOR TO 2 ND LAYER FOR EQ: T-1310(SKIRT SMIC-I-4013 S EW PIPE PACK AREA 11-Mar-15 8:15 AM ACCEPTED
AREA, As per Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO 1ST


1270 MFC-DLM-GS-I-1253
SURFACE F-1170 LAYER INSULATION FOR GAS FURNACE CROSS OVER SMIC-I-4012 S GAS FURNACE AREA 11-Mar-15 8:30 AM ACCEPTED
PREPARATION PIPING - RADIANT COIL & INLET PIGTAIL (AS PER
HIGHLIGHTED IN THE DRAWING)
INSPECTION OF INSULATION INSTALLATION 1ST LAYER
1271 MFC-DLM-GS-I-1254 INSULATION F-1170 PRIOR TO 2ND LAYER FOR GAS FURNACE CROSS OVER SMIC-I-4013 S 1507-01 GAS FURNACE AREA 12-Mar-15 8:00 AM ACCEPTED
PIPING RADIANT COIL & INLET PIGTAIL(As per
Highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION 2ND LAYER


1272 MFC-DLM-GS-I-1255 INSULATION T-1310 PRIOR TO CLADDING FOR EQ: T-1310(SKIRT AREA, As SMIC-I-4013 S EW PIPE PACK AREA 12-Mar-15 3:00 PM ACCEPTED
per Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO 1ST LAYER


1273 MFC-DLM-GS-I-1256 SURFACE T-1310 INSULATION INSTALLATION FOR EQ: T-1310(OUTER SKIRT SMIC-I-4012 S EW PIPE PACK AREA 13-Mar-15 7:00 AM ACCEPTED
PREPARATION AREA, As per Highlighted in the drawing)

IN-PROCESS INSPECTION OF 1ST & 2ND LAYER INSULATION


1274 MFC-DLM-GS-I-1257 INSULATION T-1310 INSTALLATION PRIOR TO CLADDING FOR EQ: T-1310 (OUTER SMIC-I-4013 S EW PIPE PACK AREA 15-Mar-15 3:00 PM ACCEPTED
SKIRT AREA, As per Highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION OF 2ND LAYER


PRIOR TO CLADDING FOR GAS FURNACE CROSS OVER PIPING
1275 MFC-DLM-GS-I-1258 INSULATION F-1170 RADIANT COIL & INLET PIGTAIL FOR EQ: F-1170 (As per SMIC-I-4013 S 1507-01 GAS FURNACE AREA 15-Mar-15 3:00 PM ACCEPTED
Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1276 MFC-DLM-GS-I-1259 SURFACE T-1330 INSULATION INSTALLATION FOR EQ:T-1330(SKIRT INSIDE SMIC-I-4012 s 1621-03 E/W PIPE RACK AREA 15-Mar-15 3:00 PM ACCEPTED
PREPARATION BOLT WELDED AREA, As per Highlighed in the drawing)

INSPECTION OF INSULATION INSTALLATION OF 1ST LAYER


PRIOR TO 2ND LAYER FOR CROSS OVER PIPE LINES FOR EQ:
1277 MFC-DLM-GS-I-1260 INSULATION F-1230 F-1230(FIELD WELD JOINTS,As per Highlighted in the SMIC-I-4013 s 1613-02 LIQUID FURNACE AREA 16-Mar-15 8:00 AM ACCEPTED
drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO 1ST LAYER


1278 MFC-DLM-GS-I-1261 D-1627 INSULATION INSTALLATION FOR EQ: D-1627 (INNER SKIRT SMIC-I-4012 S 1634-00 NEAR FURNACE AREA 16-Mar-15 8:15 AM ACCEPTED
PREPARATION AREA, As per Highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1279 MFC-DLM-GS-I-1262 INSULATION F-1160 CLADDING FOR CROSS OVER PIPELINES FOR EQ: F-1160 SMIC-I-4013 S GAS FURNACE AREA 17-Mar-15 8:00 AM ACCEPTED
( 6",8" & 10" LINES , As per Highlighted in the Drawing)

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1280 MFC-DLM-GS-I-1263 INSULATION T-1330 1ST & 2ND LAYER FOR EQ: T-1330(SKIRT INSIDE BOLT SMIC-I-4013 S 1621-03 E/W PIPE RACK AREA 17-Mar-15 8:15 AM ACCEPTED
WELDED AREA,As per Highlighted in the Drawing)

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1281 MFC-DLM-GS-I-1264 INSULATION D-1627 1ST & 2ND LAYER FOR EQ: D-1627(SKIRT INSIDE BOLT SMIC-I-4013 S 1634-00 E/W PIPE RACK AREA 17-Mar-15 3:00 PM ACCEPTED
WELDED AREA,As per Highlighted in the Drawing)
A

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1282 MFC-DLM-GS-I-1265 F-1150 INSULATION INSTALLATION OF CROSS OVER PIPE LINES FOR SMIC-I-4012 S 1605-02 GAS FURNACE AREA 18-Mar-15 7:00 AM ACCEPTED
PREPARATION EQ: F-1150(As per Highlighted the Drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1283 MFC-DLM-GS-I-1266 F-1230 INSULATION INSTALLATION OF CROSS OVER PIPE LINES FOR SMIC-I-4012 S 1613-02 LIQUID FURNACE AREA 18-Mar-15 7:15 AM ACCEPTED
PREPARATION EQ: F-1230 (As per Highlighted the Drawing)

INSPECTION OF INSULATION INSTALLATION 2ND LAYER


1284 MFC-DLM-GS-I-1267 INSULATION F-1230 PRIOR TO CLADDING OF CROSS OVER PIPE LINES FOR EQ: F- SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 18-Mar-15 7:30 AM ACCEPTED
1230 (FILED WELD JOINT AREA,As per Highlighted the
Drawing)

1285 MFC-DLM-GS-I-1268
FINAL V-0517 & V-0547
FINAL INSPECTION OF CLADDING FOR EQ: V-0517 & V-0547
SMIC-I-4014 W
1646-00 SPENT CAUSTIC AREA 18-Mar-15 7:45 AM ACCEPTED
INSPECTION (As per Highlighted Area in the Drawing) 1647-00

INSPECTION OF INSULATION INSTALLATION 1ST LAYER PRIOR


TO 2ND LAYER OF CROSS OVER PIPE LINES ,TLE & RADIANT
1286 MFC-DLM-GS-I-1269 INSULATION F-1160 LINES FOR EQ: F-1160 (INCLUDING FIELD WELD JOINT AREA, SMIC-I-4013 S GAS FURNACE AREA 18-Mar-15 3:00 PM ACCEPTED
As per highlighted in the drawing)

FINAL FINAL INSPECTION OF CLADDING FOR EQ:T-1310(BOTTOM


1287 MFC-DLM-GS-I-1270 T-1310 DOME, As per Highlighted Area in the Drawing) SMIC-I-4013 W H2 AREA 18-Mar-15 3:15 PM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION 2ND LAYER


PRIOR TO CLADDING OF CROSS OVER PIPE LINES ,TLE &
1288 MFC-DLM-GS-I-1271 INSULATION F-1160 RADIANT LINES FOR EQ: F-1160 (INCLUDING FIELD WELD SMIC-I-4013 S GAS FURNACE AREA 21-Mar-15 7:00 AM ACCEPTED
JOINT AREA, As per highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1289 MFC-DLM-GS-I-1272 F-1230 CLADDING OF CROSS OVER PIPE LINES FOR EQ: F-1230 SMIC-I-4013 S LIQUID FURNACE AREA 21-Mar-15 3:00 PM cancel
(5",8"&10"LINES, As per highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION OF 1ST LAYER


PRIOR TO 2 ND LAYER OF CROSS OVER PIPELINES- TLE &
1290 MFC-DLM-GS-I-1273 INSULATION F-1150 RADIANT LINES FOR EQ: F-1150(FIELD WELD JOINT AREA,As SMIC-I-4013 S 1505-01 GAS FURNACE AREA 25-Mar-15 7:00 AM ACCEPTED
per Highlighted in the Drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST LAYER & 2ND LAYER PRIOR TO CLADDING FOR CROSS
1291 MFC-DLM-GS-I-1274 INSULATION F-1230 OVER PIPE LINES- TLE & RADIANT LINES FOR EQ:F-1230( As SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 25-Mar-15 7:15 AM ACCEPTED
per Highlighted in the Drawing)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1292 MFC-DLM-GS-I-1275 INSULATION F-1230 CLADDING FOR CROSS OVER PIPE LINES FOR EQ: F- SMIC-I-4013 S 1613-02 LIQUID FURNACE AREA 25-Mar-15 3:00 PM ACCEPTED
1230(4",5",6",8" & 10", As per Highlighted in the Drawing)

INSPECTION OF INSULATION INSTALLATION 2ND LAYER


PRIOR TO CLADDING OF CROSS OVER PIPE LINES ,TLE &
1293 MFC-DLM-GS-I-1276 INSULATION F-1150
RADIANT LINES FOR EQ: F-1150 (INCLUDING FIELD WELD
SMIC-I-4013 S 1505-01 GAS FURNACE AREA 26-Mar-15 7:00 AM ACCEPTED
JOINT AREA, As per highlighted in the drawing)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1294 MFC-DLM-GS-I-1277 INSULATION F-1150 CLADDING FOR CROSS OVER PIPE LINES FOR EQ: F-1150 SMIC-I-4013 S 1505-01 GAS FURNACE AREA 26-Mar-15 3:00 PM ACCEPTED
(6",8" & 10", As per Highlighted in the Drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1295 MFC-DLM-GS-I-1278 F-1140 INSULATION FOR GAS FURNACE CROSS OVER PIPING FOR SMIC-I-4012 S 1604-02 GAS FURNACE AREA 26-Mar-15 7:15 AM ACCEPTED
PREPARATION EQ:F-1140(6",8" & 10",As per Highlighted in the drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1296 MFC-DLM-GS-I-1279
PREPARATION F-1220 INSULATION FOR LIQUID FURNACE CROSS OVER PIPING FOR SMIC-I-4012 S 1612-02 LIQUID FURNACE AREA 26-Mar-15 7:30 AM ACCEPTED
EQ:F-1240(4",5",6" & 10",As per Highlighted in the drawing)

1297 MFC-DLM-GS-I-1280 FINAL F-1170


FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &
SMIC-I-4014 W 1607-02 GAS FURNACE AREA 29-Mar-15 3:00 PM ACCEPTED
INSPECTION CROSS OVER FIELD JOINT FOR FURNACE :F-1170

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1298 MFC-DLM-GS-I-1281 INSULATION F-1140 CLADDING FOR GAS FURNACE CROSS OVER PIPING FOR :F- SMIC-I-4013 S 1504-01 GAS FURNACE AREA 30-Mar-15 3:00 PM ACCEPTED
1140(6",8" & 10",As per Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO 1ST


SURFACE LAYER INSULATION INSTALLATION FOR GAS FURNACE CROSS
1299 MFC-DLM-GS-I-1282
PREPARATION F-1140 OVER PIPING TLE & RADIANT LINES FOR : F-1140 (INCLUDING SMIC-I-4012 S GAS FURNACE AREA 31-Mar-15 8:15 AM ACCEPTED
FIELD WELD JOINT AREA,As per Highlighted in the drawing)
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR LIQUID FURNACE JUMP &
1300 MFC-DLM-GS-I-1283 F-1240 CROSS OVER FIELD JOINTS FOR : F-1240 (INCLUDING FIELD SMIC-I-4012 S LIQUID FURNACE AREA 1-Apr-15 9:00 AM ACCEPTED
PREPARATION
WELD JOINT AREA,As per Highlighted in the drawing)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: OQR-1309-AB(12"


1301 MFC-DLM-GS-I-1284 OQR-1309-AB PIPE LINES ONLY) SMIC-I-4014 W 1621-01 EW PIPE PACK AREA 1-Apr-15 9:15 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1302 MFC-DLM-GS-I-1285 INSULATION OQR-1300 CLADDING FOR EQ: OQR-1300 ( 6" PIPE LINE ONLY, As Per SMIC-I-4013 S 1621-02 EW PIPE PACK AREA 3-Apr-15 7:00 AM ACCEPTED
Highlighted in the Drawing))
Q
INSPECTION OF INSULATION INSTALLATION PRIOR TO
CLADDING FOR LIQUID FURNACE CROSS OVER PIPING FOR
1303 MFC-DLM-GS-I-1286 INSULATION F-1220 EQ:F-1220(4",5",6" & 10",As per Highlighted in the drawing) SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 4-Apr-15 3:00 PM ACCEPTED
CS
IN-PROCESS INSPECTION OF INSULATION INSTALLATION 1ST
& 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE
1304 MFC-DLM-GS-I-1287 INSULATION F-1240 JUMP & CROSS OVER FIELD JOINT OF: F-1240(10", FIELD SMIC-I-4013 S 1614-02 LIQUID FURNACE AREA 6-Apr-15 8:00 AM ACCEPTED
WELD JOINT AREA,AS PER HIGHLIGHTED IN THE DRAWING )
IN-PROCESS INSPECTION OF INSULATION INSTALLATION 1ST
& 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE
1305 MFC-DLM-GS-I-1288 INSULATION F-1220
JUMP & CROSS OVER FIELD JOINT OF: F-1220(10", FIELD
SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 6-Apr-15 8:15 AM ACCEPTED
WELD JOINT AREA,AS PER HIGHLIGHTED IN THE DRAWING )
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR LIQUID FURNACE JUMP &
1306 MFC-DLM-GS-I-1289
PREPARATION F-1220
CROSS OVER FIELD JOINT OF : F-1220( 12" LINES, AS PER
SMIC-I-4012 S 1612-02 LIQUID FURNACE AREA 6-Apr-15 8:30 AM ACCEPTED
HIGHLIGHTED THE DRAWING) CS
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR GAS FURNACE JUMP &
1307 MFC-DLM-GS-I-1290
PREPARATION F-1130
CROSS OVER FIELD JOINT OF : F-1130(6",8" & 10" LINES, AS
SMIC-I-4012 S 1603-02 GAS FURNACE AREA 6-Apr-15 8:45 AM ACCEPTED
PER HIGHLIGHTED THE DRAWING) CS
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR GAS FURNACE CROSS OVER
1308 MFC-DLM-GS-I-1291 F-1130 SMIC-I-4012 S GAS FURNACE AREA 8-Apr-15 7:30 AM ACCEPTED
PREPARATION FIELD JOINT FOR : F-1130 ( FIELD WELD JOINT AREA,As per
Highlighted in the drawing)

Page 1352 of 1353


INSULATION RFI Control Record (GLOBAL SUHAIMY)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST & 2ND LAYER PRIOR TO CLADDING FOR GAS FURNACE
1309 MFC-DLM-GS-I-1292 INSULATION F-1140 JUMP & CROSS OVER FIELD JOINT FOR : F-1140 (TLE , SMIC-I-4013 S 1604-02 GAS FURNACE AREA 9-Apr-15 8:00 AM ACCEPTED
RADIANT LINES & FIELD WELD JOINT AREA,As per
Highlighted in the drawing)
INSPECTION OF SURFACE PREPARATION PRIOR TO
SURFACE INSULATION INSTALLATION FOR GAS FURNACE JUMP &
1310 MFC-DLM-GS-I-1293
PREPARATION F-1130 CROSS OVER FIELD JOINT FOR : F-1130(TLE & RADIANT SMIC-I-4012 S 1603-02 GAS FURNACE AREA 9-Apr-15 8:15 AM ACCEPTED
LINES,As per Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR LIQUID FURNACE JUMP &
1311 MFC-DLM-GS-I-1294 F-1240 CROSS OVER FIELD JOINT FOR : F-1240(TLE & RADIANT SMIC-I-4012 S 1614-02 LIQUID FURNACE AREA 9-Apr-15 8:30 AM ACCEPTED
PREPARATION
LINES,As per Highlighted in the drawing)
INSPECTION OF INSULATION INSTALLATION PRIOR TO
CLADDING FOR GAS FURNACE JUMP & CROSS OVER FIELD
1312 MFC-DLM-GS-I-1295 INSULATION F-1130 JOINT FOR : F-1130(6",8" & 10 " LINES,As per Highlighted in SMIC-I-4013 S 1603-02 GAS FURNACE AREA 10-Apr-15 8:00 AM ACCEPTED
the drawing)
INSPECTION OF INSULATION INSTALLATION PRIOR TO
CLADDING FOR LIQUID FURNACE JUMP & CROSS OVER FIELD
1313 MFC-DLM-GS-I-1296 INSULATION F-1220 JOINT FOR : F-1220(12" LINES,As per Highlighted in the SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 10-Apr-15 8:15 AM ACCEPTED
drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST & 2ND LAYER PRIOR TO CLADDING FOR GAS FURNACE
1314 MFC-DLM-GS-I-1297 INSULATION F-1130 JUMP & CROSS OVER FIELD JOINT FOR : F-1130 (TLE , SMIC-I-4013 S GAS FURNACE AREA 10-Apr-15 3::00 PM RE-SCH
RADIANT LINES & FIELD WELD JOINT AREA,As per
Highlighted in the drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST & 2ND LAYER PRIOR TO CLADDING FOR GAS FURNACE
1315 MFC-DLM-GS-I-1297A INSULATION F-1130 JUMP & CROSS OVER FIELD JOINT FOR : F-1130 (TLE , SMIC-I-4013 S 1603-02 GAS FURNACE AREA 11-Apr-15 7:00 AM ACCEPTED
RADIANT LINES & FIELD WELD JOINT AREA,As per
Highlighted in the drawing)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1316 MFC-DLM-GS-I-1298
PREPARATION E-1305-ABCD INSULATION INSTALLATION FOR EQ: E-1305-A/B/C/D( AS PER SMIC-I-4012 S 1621-02 EW PIPE PACK AREA 11-Apr-15 7:30 AM ACCEPTED
HIGHLIGHTED IN THE DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1317 MFC-DLM-GS-I-1299
SURFACE F-1120 INSULATION INSTALLATION FOR GAS FURNACE JUMP & SMIC-I-4012 S 1602-02 GAS FURNACE AREA 11-Apr-15 3:00 PM ACCEPTED
PREPARATION CROSS OVER PIPING FOR: F-1120 (6" , 8" , & 10", AS PER
HIGHLIGHTED IN THE DRAWING) CS

INSPECTION OF SURFACE PREPARATION PRIOR TO


1318 MFC-DLM-GS-I-1300
SURFACE E-1340-A/B/C/D INSULATION INSTALLATION FOR EQ: E-1340-A/B/C/D(AS PER SMIC-I-4012 S 1621-02 E/W PIPE RACK AREA E-
12-Apr-15 7:00 AM ACCEPTED
PREPARATION HIGHLIGHTED IN THE DRAWING) 1340A/B/C/D

INSPECTION OF SURFACE PREPARATION PRIOR TO


1319 MFC-DLM-GS-I-1301
SURFACE E-1335 INSULATION INSTALLATION FOR EQ: E-1335( AS PER SMIC-I-4012 S 1621-03 E/W PIPE RACK AREA E-1335 12-Apr-15 7:15 AM ACCEPTED
PREPARATION HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


CLADDING FOR EQ: E-1305-A/B/C/D(AS PER HIGHLIGHTED IN E/W PIPE RACK AREA E-
1320 MFC-DLM-GS-I-1302 INSULATION E-1305A/B/C/D SMIC-I-4013 S 1621-02 1305A/B/C/D 12-Apr-15 7:30 AM ACCEPTED
THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1321 MFC-DLM-GS-I-1303 INSULATION E-1340-A/B/C/D CLADDING FOR EQ: E-1340-A/B/C/D(AS PER HIGHLIGHTED SMIC-I-4013 S 1621-02 E/W PIPE RACK AREA 13-Apr-15 7:30 AM ACCEPTED
IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1322 MFC-DLM-GS-I-1304 INSULATION E-1335 CLADDING FOR EQ: E-1335( AS PER HIGHLIGHTED IN THE SMIC-I-4013 S 1621-03 E/W PIPE RACK AREA 13-Apr-15 7:45 AM ACCEPTED
DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR GAS FURNACE JUMP &
1323 MFC-DLM-GS-I-1305
PREPARATION F-1120 CROSS OVER FIELD JOINT FOR : F-1120(TLE , RADIANT LINES SMIC-I-4012 S 1602-02 GAS FURNACE AREA 13-Apr-15 8:00 AM ACCEPTED
& FIELD WELD JOINT AREA,As per Highlighted in the drawing)

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID
1324 MFC-DLM-GS-I-1306 INSULATION F-1250 FURNACE CROSS OVER FIELD JOINT OF F-1250( FIELD WELD SMIC-I-4013 S 1515-01 LIQUID FURNACE AREA 14-Apr-15 3:00 PM ACCEPTED
JOINT AREA,AS PER HIGHLIGHTED IN THE DRAWING)

1325 MFC-DLM-GS-I-1307
FINAL E-1340-A/B/C/D
FINAL INSPECTION OF CLADDING FOR EQ: E-1340-
SMIC-I-4014 W 1621-02 H2 AREA 14-Apr-15 3:15 PM ACCEPTED
INSPECTION A/B/C/D(AS PER HIGHLIGHTED IN THE DRAWING)

1326 MFC-DLM-GS-I-1308
FINAL E-1335
FINAL INSPECTION OF CLADDING FOR EQ: E-1335(AS PER
SMIC-I-4014 W 1621-03 H2 AREA 14-Apr-15 3:20 PM ACCEPTED
INSPECTION HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1327 MFC-DLM-GS-I-1309 INSULATION F-1120 CLADDING FOR GAS FURNACE CROSS OVER PIPING FOR :F- SMIC-I-4013 S GAS FURNACE AREA 15-Apr-15 3:00 PM ACCEPTED
1120(6",8" & 10",As per Highlighted in the drawing) CS

1328 MFC-DLM-GS-I-1310
FINAL E-1305-ABCD FINAL INSPECTION OF CLADDING FOR EQ: E-1305- SMIC-I-4014 W 1621-02 H2 AREA 15-Apr-15 3:15 PM ACCEPTED
INSPECTION A/B/C/D(AS PER HIGHLIGHTED IN THE DRAWING)

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1ST & 2ND LAYER PRIOR TO CLADDING FOR GAS FURNACE
1329 MFC-DLM-GS-I-1311 INSULATION F-1120
JUMP & CROSS OVER FIELD JOINT FOR : F-1120 (TLE &
SMIC-I-4013 S 1502-01 GAS FURNACE AREA F-1120 16-Apr-15 3:00 PM ACCEPTED
RADIANT LINES,As per Highlighted in the drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE LIQUID FURNACE AREA F-
1330 MFC-DLM-GS-I-1312 INSULATION F-1240 JUMP & CROSS OVER FIELD JOINT FOR : F-1240 (TLE SMIC-I-4013 S 1612-02 1240 16-Apr-15 3:15 PM ACCEPTED
LINES,As per Highlighted in the drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE LIQUID FURNACE AREA F-
1331 MFC-DLM-GS-I-1313 INSULATION F-1210 JUMP & CROSS OVER FIELD JOINT FOR : F-1210 (FIELD WELD SMIC-I-4013 S 1210 18-Apr-15 8:00 AM ACCEPTED
JOINT AREAS,As per Highlighted in the drawing)
INSPECTION OF SURFACE PREPARATION PRIOR TO
1332 MFC-DLM-GS-I-1314
SURFACE F-1110
INSULATION INSTALLATION FOR GAS FURNACE JUMP &
SMIC-I-4012 S 1501-01 GAS FURNACE AREA F-1110 18-Apr-15 8:15 AM ACCEPTED
PREPARATION CROSS OVER FIELD JOINT FOR F-1110(6", 8" & 10" LINES, AS
PER HIGHLIGHTED IN THE DRAWING)

1333 MFC-DLM-GS-I-1315
FINAL F-1160
FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &
SMIC-I-4014 W 1606-02 GAS FURNACE AREA F-1160 18-Apr-15 8:30 AM
REJECTED BY
INSPECTION CROSS OVER FIELD JOINT FOR FURNACE :F-1160 SADARA

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1334 MFC-DLM-GS-I-1316 E-1025 INSULATION INSTALLATION FOR E-1025 (AS PER SMIC-I-4012 S 1617-00 E-1025 /H2 AREA 20-Apr-15 9:30AM ACCEPTED
PREPARATION HIGHLIGHTED IN THE DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1335 MFC-DLM-GS-I-1317 E-1026 INSULATION INSTALLATION FOR E-1026 (AS PER SMIC-I-4012 S 1617-00 E-1026 /H2 AREA 20-Apr-15 9:45AM ACCEPTED
PREPARATION HIGHLIGHTED IN THE DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR GAS FURNACE JUMP &
1336 MFC-DLM-GS-I-1318 F-1110 CROSS OVER FIELD JOINT FOR : F-1110 (TLE & RADIANT SMIC-I-4012 S 1501-01 GAS FURNACE AREA 22-Apr-15 8:00 AM ACCEPTED
PREPARATION
LINES,As per Highlighted in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1337 MFC-DLM-GS-I-1319 E-1514 INSULATION INSTALLATION FOR E-1514 (As per Highlighted SMIC-I-4012 S H2 AREA 22-Apr-15 8:15 AM cancel
in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1338 MFC-DLM-GS-I-1320 E-1003 INSULATION INSTALLATION FOR E-1003 (As per Highlighted SMIC-I-4012 S H2 AREA 22-Apr-15 8:30 AM cancel
in the drawing)

INSPECTION OF SURFACE PREPARATION PRIOR TO


1339 MFC-DLM-GS-I-1321
SURFACE F-1250
INSULATION INSTALLATION FOR LIQUID FURNACE JUMP &
SMIC-I-4012 S 1515-01 LIQUID FURNACE AREA 23-Apr-15 7:30 AM ACCEPTED
PREPARATION CROSS OVER FIELD JOINT OF : F-1250(TLE & RADIANT LINES,
AS PER HIGHLIGHTED THE DRAWING) SS
INSPECTION OF SURFACE PREPARATION PRIOR TO
1340 MFC-DLM-GS-I-1322
SURFACE F-1210 INSULATION INSTALLATION FOR LIQUID FURNACE JUMP & SMIC-I-4012 S 1611-02 LIQUID FURNACE AREA 23-Apr-15 7:45 AM ACCEPTED
PREPARATION CROSS OVER FIELD JOINT OF : F-1210(4",5", 6" & 10" LINES,
AS PER HIGHLIGHTED THE DRAWING) CS

SURFACE INSPECTION OF SURFACE PREPRATION PRIOR TO


1341 MFC-DLM-GS-I-1323 E-1507 INSULATION INSTALLATION FOR EQ: E-1507 (AS PER SMIC-I-4012 S 1624-01 H2 AREA 23-Apr-15 8:00 AM ACCEPTED
PREPARATION HIGHLIGHTED IN THE DRAWING)

INSPECTION OF SURFACE PREPRATION PRIOR TO


SURFACE INSULATION INSTALLATION FOR EQ: E-1521 A/B/C/D (AS PER
1342 MFC-DLM-GS-I-1324
PREPARATION E-1521 A/B/C/D SMIC-I-4012 S 1625-00 H2 AREA 23-Apr-15 8:15 AM ACCEPTED
HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR


CLADDING FOR GAS FURNACE JUMP & CROSS OVER FIELD
1343 MFC-DLM-GS-I-1325 INSULATION F-1110 JOINT OF : F-1110 (6", 8" & 10" LINES, AS PER HIGHLIGHTED SMIC-I-4013 S GAS FURNACE AREA 23-Apr-15 8:30AM ACCEPTED
THE DRAWING) CS

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1344 MFC-DLM-GS-I-1326 INSULATION E-1025 CLADDING FOR EQ: E-1025( AS PER HIGHLIGHTED IN THE SMIC-I-4013 S 1617-00 H2 AREA 24-Apr-15 7:00 AM ACCEPTED
DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1345 MFC-DLM-GS-I-1327 INSULATION E-1026 CLADDING FOR EQ: E-1026( AS PER HIGHLIGHTED IN THE SMIC-I-4013 S 1617-00 H2 AREA 24-Apr-15 7:15 AM ACCEPTED
DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1346 MFC-DLM-GS-I-1328 INSULATION E-1521 A/B/C/D CLADDING FOR EQ: E-1521 A/B/C/D (AS PER HIGHLIGHTED SMIC-I-4013 S 1625-00 H2 AREA 24-Apr-15 7:30 AM ACCEPTED
IN THE DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1347 MFC-DLM-GS-I-1329
PREPARATION EPS-0526 INSULATION INSTALLATION FOR EQ; EPS-0526 (AS PER SMIC-I-4012 S 1646-00 SPENT CAUSTIC AREA 25-Apr-15 9:00 AM ACCEPTED
HIGHLIGHTED IN THE DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1348 MFC-DLM-GS-I-1330
INSPECTION F-1150 CROSS OVER FIELD JOINT FOR FURNACE :F-1150(6",8" & 10" SMIC-I-4014 W GAS FURNACE AREA 25-Apr-15 3:00 PM ACCEPTED
LINES , AS PER HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR


CLADDING FOR LIQUID FURNACE JUMP & CROSS OVER FIELD
1349 MFC-DLM-GS-I-1331 INSULATION F-1210 JOINT FOR FURNACE :F-1210(4",5" ,6" & 10" LINES , AS PER SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 26-Apr-15 8:00 AM ACCEPTED
HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1350 MFC-DLM-GS-I-1332 INSULATION E-1507 CLADDING FOR EQ: E-1507 (AS PER HIGHLIGHTED IN THE SMIC-I-4013 S 1624-01 H2 AREA 26-Apr-15 8:15 AM ACCEPTED
DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR INSULATION


1351 MFC-DLM-GS-I-1333
SURFACE F-1210 INSTALLATION FOR LIQUID FURNACE JUMP & CROSS OVER SMIC-I-4012 S 1611-02 LIQUID FURNACE AREA 27-Apr-15 8:00 AM ACCEPTED
PREPARATION FIELD JOINT FOR FURNACE :F-1210(TLE & RADIANT LINES , AS
PER HIGHLIGHTED IN THE DRAWING) A

1352 MFC-DLM-GS-I-1334
SURFACE CY-1314 A/B/C INSPECTION OF SURFACE PREPARATION PRIOR TO SMIC-I-4012 S 1621-01 E/W PIPE RACK AREA 27-Apr-15 8:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ: CY-1314 A/B/C

1353 MFC-DLM-GS-I-1335
FINAL E-1025 FINAL INSPECTION OF CLADDING FOR EQ: E-1025 (AS PER SMIC-I-4014 W 1617-00 E/W PIPE RACK AREA 29-Apr-15 8:00 AM ACCEPTED
INSPECTION HIGH LIGHTED AREA IN DRAWING)

1354 MFC-DLM-GS-I-1336
FINAL E-1026
FINAL INSPECTION OF CLADDING FOR EQ: E-1026 (AS PER
SMIC-I-4014 W 1617-00 E/W PIPE RACK AREA 29-Apr-15 8:15 AM ACCEPTED
INSPECTION HIGH LIGHTED AREA IN DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR EQ: E-1521-A/B/C/D


1355 MFC-DLM-GS-I-1337 E-1521-A/B/C/D (AS PER THE HIGH LIGHTED AREA IN DRAWING) SMIC-I-4014 W 1625-00 E/W PIPE RACK AREA 29-Apr-15 8:30 AM ACCEPTED
INSPECTION

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1356 MFC-DLM-GS-I-1338 INSULATION CY-1314 A/B/C CLADDING FOR EQ: CY-1314 A/B/C SMIC-I-4013 S 1621-01 E/W PIPE RACK AREA 29-Apr-15 9:30 AM ACCEPTED

1357 MFC-DLM-GS-I-1339
FINAL E-1507
FINAL INSPECTION OF CLADDING FOR EQ: E-1507 (AS PER
SMIC-I-4014 W 1624-01 H2 AREA 30-Apr-15 8:00 AM ACCEPTED
INSPECTION HIGHLIGHTED IN THE DRAWING)

INSPECTION OF SURFACE PREPARATION PRIOR INSULATION


1358 MFC-DLM-GS-I-1340
SURFACE F-1220
INSTALLATION FOR LIQUID FURNACE JUMP & CROSS OVER
SMIC-I-4012 S 1612-02 LIQUID FURNACE AREA 30-Apr-15 8:15 AM ACCEPTED
PREPARATION FIELD JOINT FOR FURNACE :F-1220(TLE & RADIANT LINES , AS
PER HIGHLIGHTED IN THE DRAWING)

1359 MFC-DLM-GS-I-1341
SURFACE EPS-0556
INSPECTION OF SURFACE PREPARATION PRIOR TO
SMIC-I-4012 S 1647-00 SPENT CAUSTIC AREA 30-Apr-15 8:30 AM ACCEPTED
PREPARATION INSULATION INSTALLATION FOR EQ; EPS-0556

1360 SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO


1744-02 ACCEPTED
MFC-DLM-GS-I-1342 E-0307 INSULATION INSTALLATION FOR EQ; E-0307 SMIC-I-4012 S G2 AREA 30-Apr-15 8:45 AM
PREPARATION

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1361 MFC-DLM-GS-I-1343 INSULATION E-0307 CLADDING FOR EQ; E-0307 SMIC-I-4013 S 1744-02 G2 AREA 1-May-15 7:30 AM ACCEPTED

FINAL
1362 MFC-DLM-GS-I-1344 E-0307 FINAL INSPECTION OF CLADDING FOR EQ: E-0307 SMIC-I-4014 W 1744-02 G2 AREA 1-May-15 8:45 AM ACCEPTED
INSPECTION

1363 MFC-DLM-GS-I-1345 MATERIAL INSPECTION OF CLADDING MATERIAL SS COIL (SIZE . SMIC-I-4011 W GSC GARNET YARD 2-May-15 9:30 AM ACCEPTED
RECEIVING 8mmX1000mmXCOIL)

1364 MFC-DLM-GS-I-1346
FINAL CY-1314 A/B/C FINAL INSPECTION OF CLADDING FOR EQ: CY-1314 A/B/C SMIC-I-4014 W 1621-01 E/W PIPE RACK AREA 7-May-15 8:30 AM ACCEPTED
INSPECTION

FINAL FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1365 MFC-DLM-GS-I-1347 F-1140 CROSS OVER FIELD JOINT FOR FURNACE :F-1140(6",8" & 10" SMIC-I-4014 W 1604-02 GAS FURNACE AREA 7-May-15 9:00 AM ACCEPTED
INSPECTION LINES , AS PER HIGHLIGHTED IN THE DRAWING)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1366 MFC-DLM-GS-I-1348 INSULATION OQR-1300 CLADDING FOR EQ: OQR-1300 ( 6" PIPE LINE ONLY, As Per SMIC-I-4013 S 1621-02 EW PIPE PACK AREA 8-May-15 8:00 AM ACCEPTED
Highlighted in the Drawing))

FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1367 MFC-DLM-GS-I-1349
FINAL F-1130 CROSS OVER FIELD JOINT FOR FURNACE :F-1130(6",8" & 10" SMIC-I-4014 W 1603-02 GAS FURNACE AREA 10-May-15 8:00 AM ACCEPTED
INSPECTION LINES , AS PER HIGHLIGHTED IN THE DRAWING)

SURFACE INSPECTION OF SURFACE PREPARATION PRIOR TO 1646-00


1368 MFC-DLM-GS-I-1350 B-0505 &B-0535 INSULATION INSTALLATION FOR EQ: B-0505 & B-0535 SMIC-I-4012 S SPENT CAUSTIC AREA 10-May-15 8:30 AM ACCEPTED
PREPARATION 1647-00

MATERIAL MATERIAL INSPECTION OF HOT INSULATION MATERIAL ROCKWOOL


1369 MFC-DLM-GS-I-1351 RECEIVING RECEIVING BLANKET (65 mm) SMIC-I-4011 W TCC LAYDOWN 11-May-15 8:30 AM ACCEPTED

IN-PROCESS INSPECTION OF INSULATION INSTALLATION 1ST


& 2ND LAYER PRIOR CLADDING OF GAS FURNCAE JUMP &
1370 MFC-DLM-GS-I-1352 INSULATION F-1110 CROSS OVER FIELD JOINT FOR : F-1110 (TLE & RADIANT SMIC-I-4013 S 1501-01 GAS FURNACE AREA 11-May-15 8:45 AM ACCEPTED
LINES, As per highlighted in the drawing)

FINAL FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1371 MFC-DLM-GS-I-1353 F-1120 CROSS OVER FIELD JOINT FOR FURNACE :F-1120(6",8" & 10" SMIC-I-4014 W 1602-02 GAS FURNACE AREA 12-May-15 8:30 AM ACCEPTED
INSPECTION LINES , AS PER HIGHLIGHTED IN THE DRAWING)

1372 MFC-DLM-GS-I-1354
FINAL OQR-1300
FINAL INSPECTION OF CLADDING FOR EQ: OQR-1300 ( 6"
SMIC-I-4014 W 1621-02 EW PIPE PACK AREA 14-May-15 8:30 AM ACCEPTED
INSPECTION PIPE LINES ONLY, AS PER HIGHLIGHTED IN THE DRAWING)

FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1373 MFC-DLM-GS-I-1355 F-1110 CROSS OVER FIELD JOINT FOR FURNACE :F-1110(6",8" & 10" SMIC-I-4014 W GAS FURNACE AREA 14-May-15 8:45 AM cancel
LINES , AS PER HIGHLIGHTED IN THE DRAWING)

FINAL FINAL INSPECTION OF CLADDING FOR GAS FURNACE JUMP &


1374 MFC-DLM-GS-I-1356
INSPECTION F-1110 CROSS OVER FIELD JOINT FOR FURNACE :F-1110(6",8" & 10" SMIC-I-4014 W 1601-02 GAS FURNACE AREA 16-May-15 8:30 AM ACCEPTED
LINES , AS PER HIGHLIGHTED IN THE DRAWING)

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1375 MFC-DLM-GS-I-1357 INSULATION F-1220 1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE SMIC-I-4013 S 1612-02 LIQUID FURNACE AREA 18-May-15 8:00 AM ACCEPTED
JUMP & CROSS OVER FIELD JOINT FOR : F-1220 (TLE &
RADIANT LINES,As per Highlighted in the drawing)
IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF
1376 MFC-DLM-GS-I-1358 INSULATION F-1210 1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE SMIC-I-4013 S 1611-02 LIQUID FURNACE AREA 19-May-15 8:30 AM ACCEPTED
JUMP & CROSS OVER FIELD JOINT FOR : F-1210 (TLE &
RADIANT LINES,As per Highlighted in the drawing)

1377 MFC-DLM-GS-I-1359 INSULATION EPS-0556 INSPECTION OF INSULATION INSTALLATION PRIOR TO SMIC-I-4013 S 1647-00 SPENT CAUSTIC AREA 21-May-15 8:00 AM ACCEPTED
CLADDING FOR EQ; EPS-0556(EXCLUDING MAN HOLE)

INSPECTION OF INSULATION INSTALLATION PRIOR TO


1378 MFC-DLM-GS-I-1360 INSULATION EPS-0526 CLADDING FOR EQ; EPS-0526(EXCLUDING MAN HOLE) SMIC-I-4013 S 1646-00 SPENT CAUSTIC AREA 23-May-15 8:00 AM ACCEPTED

IN-PROCESS INSPECTION OF INSULATION INSTALLATION OF


1ST & 2ND LAYER PRIOR TO CLADDING FOR LIQUID FURNACE
1379 MFC-DLM-GS-I-1361 INSULATION F-1250 JUMP & CROSS OVER FIELD JOINT FOR : F-1250 (TLE & SMIC-I-4013 S 1615-02 LIQUID FURNACE AREA 23-May-15 8:30 AM ACCEPTED
RADIANT LINES,As per Highlighted in the drawing)

1380 MFC-DLM-GS-I-1362
FINAL E-1418-B
FINAL INSPECTION OF CLADDING FOR EQ: E-1418-B ( Tube
SMIC-I-5018 W 1623-01 G1 AREA 27-May-15 8:30 AM ACCEPTED
INSPECTION side, As per Highlighted Area in the Drawing)

FINAL INSPECTION OF CLADDING FOR EQ: E-0303(12


1381 MFC-DLM-GS-I-1363 E-0303 SUPPORTS ONLY) SMIC-I-4014 W DRYER PIPE RACK AREA 29-May-15 8:30 AM