Download as pdf or txt
Download as pdf or txt
You are on page 1of 100

AN ASSESSMENT OF ENVIRONMENTAL IMPACTS OF QUARRYING ACTIVITIES IN

NDARUGO AREA, KIAMBU COUNTY

By

SAMUEL NJOROGE MWANGI

N36/2184/2010

RESEARCH PROJECT SUBMITTED IN PARTIAL FULFILLMENT OF THE

REQUIREMENT FOR THE AWARD OF THE DEGREE IN BACHELOR’S OF

ENVIRONMENTAL PLANNING AND MANAGEMENT AT KENYATTA UNIVERSITY

May, 2014

i
DECLARATION

This research project report is an original work and has never been submitted in this way or any

other to any university for examination or award.

Samuel Njoroge Mwangi …………… ………………

(N36/2184/2010) SIGNATURE DATE

This report has been submitted with my approval as university supervisor

…………………. ………………

Mr. Wilson Nyaoro SIGNATURE DATE

ii
DEDICATION

This work is dedicated to Kenyatta University; Department of Environmental Planning and

Management and the people of Ndarugu area and the County Government of Kiambu.

iii
ACKNOWLEDGEMENT

First and foremost, I would like to express my deepest appreciation to God for giving me

the opportunity to carry out the research project. I also wish to thank my family; dad, mum and

my sisters for their encouragement and support, the Department of Environmental Planning and

Management for their support throughout this studio. Their support has been invaluable to the

completion of the field work and this report.

My gratitude goes to the residents of Ndarugu area, Juja constituency for giving me an

opportunity to administer questionnaires in their homes and undertake focus interviews in their

households. I also thank the quarry owners and workers for allowing me to have access to the

quarries.

Finally, my sincere thanks go to my University Project Supervisor; Mr. W. Nyaoro for

his availability for consultation during the entire period. My classmates cannot go unmentioned

for their encouragement and continued assistance during this whole period of research.

iv
TABLE OF CONTENTS
DECLARATION .................................................................................................................................... ii
DEDICATION ....................................................................................................................................... iii
ACKNOWLEDGEMENT ...................................................................................................................... iv
TABLE OF FIGURES.......................................................................................................................... viii
ABSTRACT........................................................................................................................................... ix
ABBREVIATIONS ................................................................................................................................. x
CHAPTER ONE ..................................................................................................................................... 1
1.0 INTRODUCTION ............................................................................................................................. 1
1.1 Background to the problem ................................................................................................................ 1
1.2 Research questions ............................................................................................................................ 3
1.3 Objectives ......................................................................................................................................... 4
1.4 Research premises ............................................................................................................................. 4
1.5 Justification of the study .................................................................................................................... 4
1.6 Significance of the study .................................................................................................................... 5
1.7 Scope of the study ............................................................................................................................. 6
CHAPTER TWO .................................................................................................................................... 7
2.0 LITERATURE REVIEW .................................................................................................................. 7
2.1 Mining and quarrying ........................................................................................................................ 7
2.2 The bio-physical and socio-economic effects of quarrying activities................................................... 9
2.2.2 The socio-economic effects ........................................................................................................... 12
2.3 Mitigation measures for the management and control of quarrying activities .................................... 13
2.4 Policy and legal frameworks governing mining in Kenya ................................................................. 18
2.4.1 National Environment Policy, 2012: Revised Draft 5 of July 2012 ................................................ 18
2.4.2 The National Minerals and Mining Policy: Revised Final Draft 2010 ............................................ 18
2.4.3 Draft National Education for Sustainable Development Policy, 2011............................................. 18
2.4.4 Mineral Development Policy......................................................................................................... 18
2.4.5 Policies on Legislation Governing Mining Activities..................................................................... 19
2.4.6 Environmental Management and Co-ordination Act no. 8 of 1999................................................. 19
2.4.7 National Land Policy Of 2007 ....................................................................................................... 19
2.4.8 The Kenya National Environment Action Plan (NEAP) report of June, 1994 ................................. 20
2.4.9 Trade Policies ............................................................................................................................... 20

v
2.4.10 Resettlement/Land Acquisition Policy Framework of the Government of Kenya ......................... 20
2.4.11 Land Reclamation Policy ............................................................................................................ 20
2.4.12 National Occupational Safety and Health Policy (June 2010) ...................................................... 21
2.5 Gaps from the existing literature ...................................................................................................... 21
2.6 Theoretical and Conceptual Framework ........................................................................................... 21
2.6.1 Theoretical framework .................................................................................................................. 21
2.6.2 Conceptual framework .................................................................................................................. 23
CHAPTER THREE ............................................................................................................................... 26
3.0 AREA OF STUDY .......................................................................................................................... 26
3.1 Location and extent ......................................................................................................................... 26
3.2 Topography ..................................................................................................................................... 28
3.3 Climate ............................................................................................................................................ 29
3.4 Land use .......................................................................................................................................... 30
3.5 Geology........................................................................................................................................... 30
CHAPTER FOUR ................................................................................................................................. 32
4.0 RESEARCH DESIGN AND METHODOLOGY ............................................................................. 32
4.1 Sampling frame and design .............................................................................................................. 32
4.2 Nature and sources of data ............................................................................................................... 33
4.2.1 Nature of data ............................................................................................................................... 33
4.2.2 Sources of data ............................................................................................................................. 34
4.2.2.1 Primary and secondary sources of data ....................................................................................... 34
4.3 Data processing and analysis............................................................................................................ 36
CHAPTER FIVE ................................................................................................................................... 37
5.0 DATA ANALYSIS AND DISCUSSION ......................................................................................... 37
5.1 Policy and legal framework governing quarrying activities in Kenya ................................................ 37
5.2 The bio-physical and socio-economic effects of quarrying activities................................................. 42
5.2.1 Bio physical effects....................................................................................................................... 42
5.2.1.1 Pit flooding ................................................................................................................................ 42
5.2.1.2 Property damage (Effects of dust, noise and vibration) ............................................................... 43
5.2.1.3 Air pollution (dust) .................................................................................................................... 45
5.2.1.4 Noise pollution .......................................................................................................................... 47
5.2.2 The socio-economic effects ........................................................................................................... 48

vi
5.2.2.1 Sex ............................................................................................................................................ 49
5.2.2.2 Pit flooding versus drowning incidents ....................................................................................... 50
5.2.2.3 Marital status versus income sufficiency .................................................................................... 50
5.2.2.4 Income sufficiency based on the number of dependants .............................................................. 51
5.2.2.5 Education level .......................................................................................................................... 52
5.2.2.5 Education level versus the type of job employed to do................................................................ 54
5.2.2.6 Health related issues .................................................................................................................. 56
5.2.2.6.1 Coughs and colds .................................................................................................................... 57
5.2.2.6.2 Chest aches ............................................................................................................................. 58
5.2.2.6.3 Throat infections ..................................................................................................................... 59
5.2.2.6.4 Stress ...................................................................................................................................... 60
5.3 The state of abandoned quarries and their use................................................................................... 61
5.4 Mitigation measures for the management and control of quarrying activities .................................... 64
CHAPTER SIX ..................................................................................................................................... 67
6.0 SUMMARY OF THE FINDINGS, CONCLUSION AND RECOMMENDATIONS........................ 67
6.1 Summary of the findings .................................................................................................................. 67
6.2 Conclusion ...................................................................................................................................... 68
6.3 Recommendations ........................................................................................................................... 69
6.3.1 Short term recommendations......................................................................................................... 69
6.3.2 Long term recommendations ......................................................................................................... 69
6.4 Areas for further studies................................................................................................................... 70
REFERENCES...................................................................................................................................... 71
Appendix I: People living in quarry environs questionnaire ................................................................... 75
Appendix II: Quarry workers questionnaire ........................................................................................... 78
Appendix III: Quarry owners questionnaire ........................................................................................... 81
Appendix IV: List of tables for data analysis and discussion .................................................................. 84

vii
LIST OF FIGURES
Figure 1-2: Conceptual model ...................................................................................................... 25
Figure 2-3: Juja constituency wards in context from Kiambu County ......................................... 27
Figure 3-3: Quarry sites along Ndarugo River ............................................................................. 28
Figure 4-3: Climatic data for Juja area ......................................................................................... 29
Figure 5-5: Percentage response on pit flooding .......................................................................... 43
Figure 6-5: Percentage response on property damage .................................................................. 44
Figure 7-5: Seriousness of dust as a cause of pollution ................................................................ 46
Figure 8-5: Seriousness of noise as a cause of pollution .............................................................. 48
Figure 9-5: Percentage male and female respondents................................................................... 49
Figure 10-5: Total percentage of respondents' level of education ................................................ 53
Figure 11-5: Percentage on job learning ....................................................................................... 54
Figure 12-5: Percentage response on other sources of income ..................................................... 56
Figure 13-5: Seriousness of coughs and colds .............................................................................. 58
Figure 14-5: Seriousness of chest aches ....................................................................................... 59
Figure 15-5: Seriousness of throat infections ............................................................................... 60
Figure 16-5: Seriousness of stress related problems ..................................................................... 61
Figure 17-5: State of abandoned quarries ..................................................................................... 64

Plate 1-5: Flooded quarry pits ....................................................................................................... 42


Plate 2-5: Developing cracks on the floor of a newly built house ................................................ 45
Plate 3-5: Dust lifted into air......................................................................................................... 47
Plate 4-5: Abandoned quarry pit with small layer of stone rubble ............................................... 62

viii
ABSTRACT

Artisanal mining has been for many years disregarded, where large scale mining that
involves large scale extraction of minerals such us valuable metals, oil and gas has been
documented and given much concentration. Small scale mining however has had a significant
role to play in the developing countries, where it takes opportunity of the abundant available
labor while only requiring limited amounts of less than abundant capital. Nevertheless, this
sector of the economy surrounded by much enthusiasm has a lot of problems, which has plagued
it; poor health and safety, wasted mineral resources, and environmental degradation (Noronha,
1998). This sector is not affected by other pollutant problems like those experienced by the
mining industry involved in metals and minerals, because the process of extraction is merely
physical, and more recently involves the use of some machinery to ease the process. However,
this does not mean that stone quarrying does not have its fair share of numerous environmental
effects, which are actually serious.

Ndarugu is among the areas in the country where such quarries exist, and they pose a
blatant disregard for the environment. The research project aims at looking at these
environmental effects, coming up with mitigation measures and recommendations to tackle these
issues. The major effects were examined first by looking at relevant literature, and finally
collecting data on the ground and providing a comprehensive analysis. Data was analyzed and
represented statistically through use of graphs and photographs collected in the field. The
findings show that the quarrying activities are a great source of negative environment impacts.
The issue is greatly accelerated by the fact that the quarries are abandoned after use and no
elaborate rehabilitation plan is available, and furthermore the sector is highly unregulated with
no proper legislations and policies.

ix
ABBREVIATIONS

B.C.E - before Christ Era

CSI - Cement Sustainability Initiative

GDP - Gross Domestic Product

IEHM - Integrated Environment and Health Monitoring

ILO - International Labor Organization

IUCN - International Union for Conservation of Nature and Natural Resources

KNBS - Kenya National Bureau of Statistics

NGO - Non-Governmental Organization

WBCSD - World Business Council for Sustainable Development

WHO - World Health Organization

x
CHAPTER ONE

1.0 INTRODUCTION

1.1 Background to the problem

Mining can be described as the extraction of valuable minerals as well as the removal of

other of geological materials from the earth. Mining is an activity that has been carried out since

the prehistoric times, where stone and other metals were extracted from the earth. The process of

mining has to prove profitable to the miner seeking to gain from the extract, and involves

prospecting for the extracts, analyzing the profitability of the mine, the process of extraction and

finally but not in all cases the reclamation of the land. For many years, these mining processes

have led to adverse negative environmental effects either during the mining process or long after

the mines have been closed. Stone as one of the valuable mineral extract has always been used

since the beginning of civilization to make early tools and weapons (Hartmann and Howard L,

1992)

Mining techniques are divided into two excavation types, which include surface mining

and subsurface mining. In the current times, surface mining is more common. In relation to

extraction of rocks, surface mining is employed, and a technique known as open pit mining is

used. Surface mining began in the mid sixteen centuries, and has been continually employed

throughout the world; although it is majorly employed in the North American continent, where

today, surface mining is much more common, and produces, for example, 85% of minerals

(excluding petroleum and natural gas) in the United States, including 98% of metallic ores

(Hartmann, 2002). This technique is used when the deposits of the useful rock are found near the

surface. The open pits that produce building materials and dimension stones are commonly

referred to as quarries. Extraction of materials using this method involves the use of heavy

1
equipment that moves the earth and other huge machines that extract the final product, which in

itself results to negative effects to the surrounding environment through noise, dust, and

vibrations that are as a result of the activity, where also in some cases additional logging of

forests is done in the vicinities of the mines to create room for the storage of debris and soil

excavated.

Stone has always been used for building and decorations because of its resistance to

weather and for its aesthetic appeal. For example, India’s use of stone for construction purposes

can be traced back to 3200 B.C. The country’s many innumerable temples and ancient palaces

have been carved out of locally available stone. One of the most famous buildings, the TajMahal

at Agra, portrays a long age tradition of stone architecture in the country (UNESCO World

Heritage Centre, n.d.).

Stone being an important component in the construction of homes is often demanded in

large quantities, especially in our country Kenya. The demand for quarried aggregates is

enormous (George M. Ndegwa, Oguta B, Calvince O, 2003). Developmental activities in Kenya

that involves the construction of homes, factories and schools among other developments

underpin the necessity of quarrying as an activity in the country. The quarrying and aggregate

production industry is therefore a major player in the important role of steering the nation’s

economy through the provision of essential building materials and providing employment

opportunities. Housing demand in Kenya supports the fact that there is an enormous reliance on

stone aggregates, and bearing in mind that the population growth is placed at 4.2% per annum,

which accelerates urban migration gives a projection of an annual increase of housing units,

which currently stands at 206,000 units annually (CAHF, 2012).

2
Areas like Ngong and Mwiki supply Nairobi’s area with building stone and are home to

artisanal stone quarrying, however Juja Township is also another location in Kenya that is home

to the industry, and has seen exponential growth in the recent years, since the quarries in the area

became active in the 1940’s and late 1950’s. During those early times, there were seven stone

quarries that were in operation, however, the number has increased to the present 207 quarries.

The quarries are distributed along the Ndarugo river, with the largest quarry covering 20 ha of

land and the smallest 0.01 ha (George et al., 2003). The quarries relatively vary in depth ranging

from 2- 50 m deep.

The quarries are undeniably of economic significance; however they are also a source of

environmental problems throughout their whole phase of operation. Both active and abandoned

quarries are a threat to the surrounding environment, and more significantly result to the

degradation of land, drainage problems and visual intrusion because many are not rehabilitated

after use.

1.2 Research questions

1. What are the environmental issues associated with quarrying activities?

2. What happens to the quarry sites after they have been fully utilized?

3. What rehabilitation measures have been undertaken in the past or in the present for the

quarries?

4. What steps are being taken or have been taken in the past to prevent negative

environmental effects?

5. What are the socio-economic issues that arise as a result of quarrying in the area?

3
1.3 Objectives

1. To evaluate the legal frameworks and policies governing quarrying activities

2. To assess the bio-physical and socio-economic effects of quarrying activities in the area

3. To examine the state of the abandoned quarries and what use they are put to

4. To identify and explain mitigation measures that should be adopted to manage and

control the negative environmental impacts of quarrying activities

1.4 Research premises

The premises for the study were as follows;

1. The existing policies and legal frameworks governing the quarrying activities are

characterized by weaknesses and gaps and are therefore not effective.

2. Abandoned quarry sites in Ndarugu area are not put to any use and there is a reluctance to

restore or rehabilitate them.

3. There are numerous negative bio-physical and socio-economic effects of quarrying in the

area.

4. There are no proper mitigation measures and sound action plans to curb both negative

environmental effects and rehabilitate abandoned quarries.

1.5 Justification of the study

Quarrying is an important part of economic development as it serves as the backbone of

an exponentially growing industry in the housing sector. The study focuses on quarries dealing

with artisanal stone mining; in an era where stone is the most common type of building material.

However quarrying has come with a lot of negative effects where, there is a lot of open-pit, and

derelict land that has been left open in the areas where it is being practiced. Ndarugu is one such

4
area, where this practice has raised a lot of issues both in the environment and to the society

around the area. This is an opportunity to exploit especially now that people are looking for

serene environments and the fact that ecologically sound environs are diminishing by day; where

the land is free from pollution, and a new ecosystem can be created altogether. Furthermore, it

being an unexploited opportunity to rehabilitate these lands, new ecosystems that will create

diverse flora and fauna like a case example of Bamburi’s Haller Park, which will go a long way

in boosting the economy of Kiambu County, through establishment of nature trails and

agricultural based projects considering Ndarugu’s location, which will in turn, create value for

land around the area.

1.6 Significance of the study

Quarrying has had an impact both economically and socially, where it contributes to the

economy as an industry, and has created many job opportunities for many people. However

many people have had to suffer due to the negative effects, especially those people that live

around the quarry sites. They are faced with these negative impacts on a daily basis. Juja

Township being a home to many people stands to benefit from mitigating these impacts such as

arising pollution which causes a lot of problems such as health issues. Further the society that

lives around the area will get value for their land, and safety of their houses thus enjoying a

serene and conducive environment. The county government is also going to benefit from this

study because the study deals with how to manage derelict lands by rehabilitating them. There is

a lot of opportunity to be exploited by the county government as there is a lot of land that can be

utilized once these lands have been rehabilitated, and also will serve as an opportunity to control

pollution in that part of the county. Finally the industry movers of the sector can also refer to the

study on how to mitigate the forthcoming negative impacts as they continue their quarrying

5
activities, and can also learn of the benefits accruing from rehabilitating quarry sites, as is learnt

with the positive outcomes of Bamburi success story.

1.7 Scope of the study

The study is going to be carried out in the study area, which is the Ndarugo area in Juja

location which covers an area of about 4,000 km2, and its effects toward the people of Juja

Township where the quarries are located. Since the quarries are located along Ndarugu River, it

shall also be included in the study, but the negative effects do not solely revolve around the river

system. The study is going to focus on the issues related with negative environmental impacts

based on bio-physical effects and socio-economic effects of quarrying, mitigation measures

employed to mitigate the adverse effects and finally the policies and legislations governing the

quarrying sector. Finally, the necessary recommendations are going to be provided.

6
CHAPTER TWO

2.0 LITERATURE REVIEW

2.1 Mining and quarrying

Mining just like agriculture is one development feat by the human race, which marked

the start of early civilization. It is one of the basic industries that fueled civilization, and as a fact

being second from agriculture as the agrarian revolution commenced in 1500 B.C and it in the

1700 B.C has continually supplied all the basic resources that are in use by modern civilization

(Hartmann and Howard L, 1992). According to Madigan, mining has played a chief role in the

existence of the human race (Madigan, 1981), whereby the term mining is in its broadest terms to

mean the extraction of any naturally occurring minerals, be they in gas, liquid or solid state.

Many important cultural eras are earmarked by the development of mining, and the

derivatives of the activities associated with the industry. The eras can be outlined as; Stone Age

(prior to 4000 B.C.E), the Bronze Age (4000 to 5000 B.C.E), the Iron Age (1500 B.C.E. to 1780

B.C.E), the Steel Age (1780 to 1945), and the Nuclear Age (1945 to the present). There are many

uses of minerals, for different purposes and occurring in different ages by the human race.

Active and abandoned mines and quarries have been a source of negative environmental

effects which have led to erosion, formation of sinkholes, and contamination of soil,

groundwater, and surface water, and also the loss of biodiversity. All these problems arise from

contamination of the chemicals used in mining and the neglect of environmental awareness while

operating the mines and quarries. Increasingly, there are abandoned quarries and mines

throughout the world because of low running reserves and this leaves so many open pits after the

extraction process is finished, where many of the mining companies are reluctant to properly

rehabilitate a site after they have exploited it fully. In the United States alone, there are more

7
than 560,000 abandoned mines on publicly and privately owned land (Kertes, 1996). These open

mines are a danger to those that may want to explore them, especially to those people that do not

have the proper knowledge and skills on how to approach them safely, and this forms a majority

of the population (DOI, 2007).

Minerals have also been a great source of wealth that has enabled many countries with

the rich abundance of the natural resources accumulate wealth and form great economies. Those

countries that do have them obtain valuable currencies from the countries that do not have. It has

also been estimated that only a fraction of 1% of the earth’s surface is underlain with mineral

deposits that can be exploited for monetary value (National Mining Association, 1998).

In the modern times, the consumption of minerals has been on the rise, as the society is

drastically changing because people are relying now more on airplanes, trains and vehicles for

transportation; mobile phones, computers and radios for communications; heavy machinery and

fertilizers for agricultural output; industrial minerals for home building; and nuclear plants, and

coal for electric power. This kind of use for industrial services has led to the over exploitation of

minerals.

However, this kind of use has spurred a lot of public reaction, where people have become

more aware of the need to conserve energy, minerals and the environment. Countries like the

United States have compelled their mining industry to endorse a policy that favors the extraction

of minerals in a more sustainable manner (National Mining Association, 1998).

Mining in Kenya is however not that large, and it is dominated by exploitation of non-

metallic minerals such as soda ash, diatomite, gypsum, limestone, fluorite, constructional stone

8
and sand harvesting. The large percentage of mining in the country is done by the artisanal

miners, which accounts to about 70-80% (Osumo, 2001).

Majorly the type of activity under quarrying in Kenya is the extraction of stone. This

activity is a very significant activity in the country under the informal sector or popularly known

as the Jua Kali sector. It involves a number of stakeholders that include land owners, quarry

owners, concession holders (who lease land and extract stone for sale) and quarry workers who

constitute both the skilled and unskilled. The sector is believed to employ over 40,000 workers

nationally, where in Nairobi alone it employs 10,000 people (Asher shadmon, Sam, 1999).

The country has a very great demand for stone because of the ever growing construction

industry, and stone from mechanized quarries is in high demand. Many of these quarries are

found in Juja, but recently those that that serve Nairobi (the Ngong division of Kajiado district,

approximately 13 kilometers southwest of Nairobi) have been surveyed, and according to Asher

Shadmon (1999) the results have revealed that the local stone reserves can sufficiently supply

stone for the next 50 years.

2.2 The bio-physical and socio-economic effects of quarrying activities

The process of quarrying is greatly related to the negative environmental effects of the

activity. There are several processes that are involved in quarrying and they include; clearing of

overburden of soil, drilling, blasting, splitting and dressing of stone. The process uses various

tools for extraction which are categorized into two, namely, hand tools and machine tools. The

hand tools include; jacks, levers, hammers, and chisels for extraction; and hammers, chisels

(including pneumatic), drills, saws, grinding stones and polishing powder for stone-working

(Shadmon 1989). On the other hand, machine tools include: jack-saws, saws, wire-saws, and

9
chainsaws, mechanical chisels for extraction; and guillotines, saws, planers or fraisers, grinders

and polishers for manufacturing (Shadmon 1989). Every stage in the operation of a mine ahs its

negative consequences, which are:

Clearance of the overburden leads to the destruction of vegetation, destruction of fauna

habitats, loss of scenery, enhancement of soil erosion; Drilling leads to the generation of dust,

and generation of noise; Blasting causes ground vibrations, fly rock generation of dust,

generation of noise, surface land disruption, and explosive fumes (gases); Splitting causes flying

stones pieces, while Stone dressing causes the generation of dust (Mines and Geology).

The bio-physical effects are associated with the environmental impacts because the fact

that many of the quarry sites are uncontrolled and that insufficient techniques of mining are used,

it produces a degradation of both land and stone reserves. In many cases there is lack of resource

allocation planning in quarry land, a situation that results to quarry sites being located

haphazardly without any proper development and guidance. In the end there is a myriad of

mineral surface workings that show a lack of resource and environmental management (Savery,

1997).

Artisanal stone quarries are also known for the high waste to recovery ratio, which is

influenced by among other factors, the natural formation of the rocks and the method used to

extract the stones. The situation is such that the estimated amount of stone wasted in the country

ranges from 50 – 90%. The situation is influenced by use of manual mining techniques, although

blasting is also used in areas where the rock is much harder before the stone is split and sized.

These wasteful methods of both quarrying and processing of the stones aggravate the situation

(Agevi and Ogero, 1990).

10
There is also aesthetic pollution, which happens if there is no screening of current

operations and proper restoration of abandoned mines. Visual aftermath of quarrying is equal to

the poor utilization of resources in small-scale artisanal quarrying (Savery, 1997). Introduction of

potentially discordant features into the landscape also result to visual intrusion and affect the

landscape character e.g. quarry face, plant, lighting and quarry face.

Another effect is that quarries can contribute to air pollution in a number of ways that

include; ammonium nitrates form the fuel mix used in blasting and from engines, dust from the

quarry or the roads that lead to the quarry site, as well as the dust and fumes from the lorry traffic

and dust from the blasting process may cause discharge of pollutants to the atmosphere. Dust is

one of the most visible, invasive and potentially irritating impact associated with quarrying. Dust

concentrations, potential impacts and deposition rates tend to decrease rapidly away from the

source (Howard and Cameron, 1998). However, its visibility tends to raise concerns that are not

usually directly proportional to its impacts on human health and the environment (Howard and

Cameron, 1998).

Noise is another of the effects which is as a result of the use of explosives, processing

equipment and earth moving equipment and the situation is worsened with quarries being at

close proximities to each other. The impact of noise on the sound receiver is often from the

source which is characterized by the rhythm, pitch of noise, beat and distance (Langer, 2001).

The use of explosives may also trigger ground vibration which is also a cause of disturbance.

In cases where rivers are located near river or other drainage systems, they lead to water

pollution which is also another effect and can be attributed to the amount of lead in oil,

petroleum spills and waste metals on soil without treatment, in the quarry mining and

11
transportation machinery. Quarries can also be a cause for water table alterations, where the

quarries go deep enough to affect ground water aquifers. Formation of dams at quarry sites is

also a common feature in abandoned quarry sites (Agevi and Ogero, 1990)

2.2.2 The socio-economic effects

Quarrying is undeniably a valuable source of building materials worldwide, but it raises

problems in land use by the communities that are found around areas where such activities take

place. A study conducted in the Niagra escarpment on quarrying, revealed that there is a struggle

between the industry, the quarry operators who are in charge of producing the construction

materials and the local communities that have new uses and value for the same land (Sandra and

Andes, 2005).

In Kenya, studies on the socio-economic effects of artisanal quarrying have been

conducted. The studies have focused on resource utilization, restoration and respiratory dusts

created by lorry traffic, and are aimed at improving productivity and environmental sensitivity of

artisanal quarrying (Savery, 1997; Agevi and Agero, 1990; Mjaria, 1997; Ng’ang’a, 1997;

Ng’ang’a and Agevi, 1990; Wells, 1996).

In a report tabled by Ng’ang’a (1997) after a workshop of artisanal quarrying

stakeholders, quarrying was presented as being a significant economic activity in the

construction sector, as well as providing a livelihood for land owners, quarry owners, concession

holders, quarry workers, and people in the transport industry. Another report by Kenya Quarry

and Mine Workers Union (1996), it indicated that the sector was providing a livelihood for about

200,000 people in the country.

12
Constraints facing the expansion of the industry, in meeting both the existing and

potential demand for dimension stone, have been captured in a report titled socio-economic and

institutional survey of stone quarrying in Kenya by Agevi and Agero (1990).

There are potential risks associated with quarrying that cannot be ignored, but have been

underplayed in many of the reports, and include health risks. Quarries located near residential

areas have been connected to posing health issues especially because of the clouds of dust

produced. A certain report in Palestine indicated that the locals living near quarries were

suffering from increased levels of asthma and acute bronchial infections (Foundation of Middle

East Peace, 1998)

2.3 Mitigation measures for the management and control of quarrying activities

The extraction of materials from the earth’s crust inevitably impacts on the surrounding

natural and social environment. Particularly, the removal of soil and changes in topography of

the area are likely to affect local ecosystems and watersheds. However, throughout the years

these impacts have been successfully addressed and mitigated through the development and

implementation of effective quarry rehabilitation plans. In many of the cases, effective

implementation of a well-designed rehabilitation plan has resulted in significant environmental

and social benefits, an example in our country being Bamburi Cement Mines in the coast (CSI,

2011).

The CSI through its published work by the WBCSD indicates that quarrying activity

carries with it the obligation to rehabilitate both the site and, wherever necessary, the

surrounding area while operating and upon completion of operations. The success of

rehabilitation also carries commercial benefits for the operating companies. The license to

13
operate for both the industry as a whole and for individual companies is dependent on ensuring

that land used for quarrying purposes is rehabilitated in an effective and responsible manner,

taking into account the needs and expectations of stakeholders, and the influence of regional and

local planning requirements. Those that adopt the best practices in this regard have a greater

expectation in realization of the significant benefits, which includes long-term sustainability of

their operations and competitive advantage, which far outweigh the short-term financial costs

that are a result of undertaking a rehabilitation program (CSI, 2011).

CSI ESIA guidelines also points out principles that guide an effective rehabilitation plan are as

follows:

• The post-closure land use needs to be clearly assessed when initiating a quarry

rehabilitation plan, even if this can evolve over the lifetime of the quarry. A quarry

rehabilitation plan needs to be based on a clear set of objectives reflecting the legislative

requirements (as the highest priority), and encompassing the local social, economic and

environmental (including biodiversity) considerations for the future use of the site. The

objectives will be technically and financially sustainable.

• Legal compliance must be the minimum requirement when establishing each quarry

rehabilitation plan. The rehabilitation guidelines should never be in conflict with, but

should always complement and go beyond legal compliance.

• The rehabilitation plan will ensure the site is left in a safe and stable condition. The safety

of the rehabilitated quarry includes the stability of slopes, roads and raw materials piles.

Safety should always be considered as paramount for the rehabilitation plan.

14
• Stakeholders should be listened to, and relevant stakeholders need to be involved at all

stages. The quarry rehabilitation plan must address stakeholder expectations, and be

aligned with, or leverage from, the stakeholder view, experience, culture and customs.

• An assessment of the baseline conditions enables identification of the impacts and

measurement of the changes that may arise as a result of quarrying activity. The

assessment of baseline conditions includes air and water, flora and fauna, site safety,

landscape integration, human activities and cultural heritage.

• The rehabilitation plan shall be developed prior to the commencement of mining for new

sites, but should also be developed for operating quarries, where such a plan does not

already exist. It should be aligned with the mining plan. Depending on the objectives and

priorities set, the development and monitoring of management plans for biodiversity

should, at a minimum, be considered as a supplement to the quarry rehabilitation plan,

and in other cases, as core parts of the plan.

• A monitoring plan and appropriate corrective measures (if necessary) should be included

in the rehabilitation plan, thereby ensuring the documentation and measurement of

performance against the objectives.

Other mitigation measures have been explored by many scholars and organizations and are as

outlined below:

Classification of protected areas is an effective mitigation measure and if there is a need

to designate such areas, then the classification of the protected areas by the International Union

for Conservation of Nature and Natural Resources (IUCN) is one of the prominent systems that

exist for such purpose. There was a resolution that was passed on October 2000 by the world

15
congress in Amman, Jordan, that recommended the member states to prohibit by law, all

explorations and extraction of mineral resources in protected areas that corresponded to the

IUCN protected area management categories.

EIA’s and ESIA’s are another mitigation measure where there are internationally

accepted tools that have enabled mining companies to adequately factor in environmental and

social considerations in investment decisions. For many of the companies internationally they

have become an integral part of investment assessment methodologies that had previously been

focused largely on financial criteria. There has been a re-emphasis on the use of impact

assessment instruments that came as recommendations of the UN conference on Environment

and development in 1992, which as a result reinforced the aspirations of the Berlin guidelines of

1991 on environmental stewardship. The impacts of assessments cover the effects on flora and

fauna and on human health, as well as broad socio-economic impacts of mining both directly and

indirectly.

Public participation is another very important part of regulating the environmental and

social impacts of mining activities and an effective mitigation measure, which ensures

sustainability by ensuring overall management of exploiting mineral resources, is held to

accountability. There are key benefits that do arise from public participation, where the decision

on whether a project has a significant impact on the environment as well as social effects and

should be allowed to proceed is based on the local knowledge that is often valuable information

often missed by the experts and it also legitimizes the project that would otherwise prove to be a

problem because of social tensions when the project is externally imposed.

16
It is also now law that whenever anyone is carrying out an environmental and social

impact assessment, that they include a public participation component. This is supported by the

fact that many of the African countries provide for the right to a clean environment in their

constitutions. This kind of provisions can actually found claims of a right of a member of the

public to be heard before any decisions are made on projects that could have significant adverse

effects on them.

Last but not least is access to information as outlined in Principle 10 of the Rio

declaration that states that “each individual shall have the appropriate access to information

concerning the environment that is held by public authorities, including information on

hazardous material and activities in their communities and the opportunity to participate in

decision making processes. States shall facilitate and encourage public awareness and

participation by making information widely available”, expresses the relationship between access

to information and participation in decision making. This is also further expressed in the UN

Economic Commission for Europe “convention on access to information, public participation in

decision making and access to justice in environmental matters (the Aarhus Convention), which

is widely regarded as a model of public participation regime (UNECE, 1998).

In South Africa, their promotion of access to information act (2000) and its regulations

establish a scheme to facilitate access to information held by public and public institutions. To

monitor and enhance the implantation of the act, the South African human rights commission is

assigned that responsibility.

17
2.4 Policy and legal framework governing mining in Kenya

2.4.1 National Environment Policy, 2012: Revised Draft 5 of July 2012

The policy aims to provide a holistic framework to guide the management of the

environment and natural resources in Kenya. Its core goal is to advance better quality of life for

present and future generations through sustainable management of the environment and natural

resources.

2.4.2 The National Minerals and Mining Policy: Revised Final Draft 2010

The objectives of this draft policy that is awaiting parliament’s enactment covers several

facets of mining in Kenya such as the regulatory framework, stimulation of investment in the

mining sector in Kenya, ensure harnessing of minerals contributes optimally to vision 2030 and

national development. Additionally, the policy also recognizes the need to bring into the

mainstream the small scale artisanal mining sector.

2.4.3 Draft National Education for Sustainable Development Policy, 2011

This is a policy document prepared by the ministry of environment and mineral resources

on November 2011 (Ministry of Environment and Mineral Resources, 2011, p. 14). Education of

the general public around the mineral rich areas is critical for them to understand the benefits,

opportunities and effects of the mining activities. This policy is crucial in preparing the people

for a resettlement exercise and in order to receive less resistance.

2.4.4 Mineral Development Policy

This policy covers the National Development Plan of 1994-1996, titled Resource

Mobilization for Sustainable Development. The National Environment Action Plan Committee

(NEAP) is established under Section 37 of EMCA. This cross-sectoral committee is responsible

18
inter alia, for the development of a five year national environment action plan. The national

environment action plan shall contain among other aspects analysis of the natural resources of

Kenya and their distribution, quantity and various uses. It shall also recommend legal and fiscal

incentives for business that incorporate environmental requirements into their planning and

operational processes as well set out

2.4.5 Legal framework Governing Mining Activities

The Mining Act Cap 306 of 1940 is outdated and does not apply to standard mining

regulation procedures. The industry wants to see a new law that aims to remedy the problems by

stating the timeframes and procedures to be followed when access to land is unreasonably

denied. The current Mining Act, which dates back to the 1940s, has been termed as a major

block in the development of the mining industry.

2.4.6 Environmental Management and Co-ordination Act no. 8 of 1999

The policy process culminated into the Draft Sessional Paper No. 6 of 1999 entitled

“Environment and Development.” The legislative process gave forth the Environment

Management and Coordination Act (EMCA) (Act No. 8 of 1999) as Kenya’s first framework

environmental law. Both the Draft Policy and Act added to a large number of existing sectoral

laws and policies dealing with various facets of the environment, such as water, forests, minerals

and many others (Government of Kenya, 2012, p. 7).

2.4.7 National Land Policy Of 2007

To address this problem, the Government has come up with a National Land Policy 2007

whose vision is to guide the country towards efficient, sustainable and equitable use of land for

prosperity and posterity. This policy will ensure that all land is put into sustainable and

19
productive use. The policy has so far received Cabinet’s approval and is currently waiting for

enactment by the legislature.

2.4.8 The Kenya National Environment Action Plan (NEAP) report of June, 1994

This policy is covered in the Draft Sessional Paper on Environment and Development of

1996, Sessional Paper No.1 of 1994 on Recovery and Sustainable Development to the Year

2010, and the Report of the East African Cooperation Meeting of National Environment

Institutions of November, 1997. This policy was updated in 2009 by the National Environment

Management Authority (NEMA) in a document titled the “The National Environment Action

Plan Framework 2009 to 2013.

2.4.9 Trade Policies

Although most of the minerals are exported in their raw form, the government policy is to

encourage value addition within the country for higher returns, support of industrialization and

employment creation.

2.4.10 Resettlement/Land Acquisition Policy Framework of the Government of Kenya

The objective of the policy is to outline the manner in which the people in areas where

minerals have been found to be relocated to other areas.

2.4.11 Land Reclamation Policy

This policy was not drafted by the ministry concerned with mining and minerals in Kenya

rather it is a product of the Ministry of Water and Irrigation. Nevertheless, it has been included

here since it affects the mining sector especially on the aftermath of mining activities and not on

the onset of mining. For instance, in mining fro limestone and even sand, huge holes are left

behind that become hazardous to the environment.

20
2.4.12 National Occupational Safety and Health Policy (June 2010)

This policy aims at promoting safe and healthy environment in places of work especially

mining sector which not only uses dangerous chemicals in extraction of minerals but also

exposes the workers to health hazards like dust.

2.5 Gaps from the existing literature

Health and safety issues in and around the quarry sites have not been explored as well as

there are no proper policies and legislative frameworks to govern the sector in the country.

2.6 Theoretical and Conceptual Framework

2.6.1 Theoretical framework

The theory guiding this study is the systems theory. This section reviews the theory with

a view to bringing out the salient attributes that would enable this study to fit in. Similarly, the

concept of land degradation is also incorporated to further buttress the effect of mining within

the system. The general systems theory developed by Bertalanfy (1951), argue that the natural

geology consist of mutually related subsystems and the destruction of one of the subsystem lead

to the modification of the entire system. The environment is the sum total of all the external

factors that influences the life of an organism, here the physical environment which comprise the

land is considered. Consequently in the strive for economic growth, the physical and social

environments are subjected to pressure that affect the entire system. He emphasized that real

systems are open to, and interact with, their environments, and that they can acquire qualitatively

new properties through emergence resulting in continual evolution. Thus rather than reducing an

entity e.g. (environment) to the properties of its parts or element e.g. (land, social and economic

setup), system theory focuses on the arrangement of and relations between the parts which

connect them into a whole.

21
The systems theory conceptualizes land degradation and negative social and economic

effects as the response of the mining to the demand of the environment. The theory sees land

degradation as well as negative social and economic effects as an output of the mining. Land

degradation such as loss in vegetation cover, changes on the landscape and negative social

effects such as health related issues is seen as the reaction of the mining to environmental

demands and pressures. The theory shows that the relationships that unite the part to form a

whole have a lot of influence on the behavior of the whole.

Man affects his environment as he responds to the changing condition set by the

environment and the environment responds to human manipulation, thereby creating a state of

dynamic equilibrium that continues to adjust and readjust in space with time (Olofin, 1989). The

systems theory was chosen against other theories because, the world is made up of components

and the components are interrelated. Nothing is independent on its own. A change in one will

have repercussions on the other parts. With respect to this study therefore, because man depend

on the mining and the mining is being done on the land, the environment is in turn affected by

such activity and land degradation sets in. The relationship between the two is that the mining as

an input was converted into land degradation as the output in this case. The three interrelated

components resulted into land degradation. Land is one of the major resources in both developed

and developing countries, and forms the basis of economic sustenance. Degradation is therefore

the diminution of the biological productivity expected of a given tract of land (Ayuba, 2005).

Land degradation which includes degradation of vegetation and soil has been identified as a

major problem in Africa (FAO, 1980). From the foregoing therefore, the systems theory sees

land degradation as the output of the mining.

22
2.6.2 Conceptual framework

Human beings are part of the biosphere or its ecological component and play a central

role in modifying and interfering with the physical environment through their activities. Human

systems tend to influence these activities, whereby socio-economic aspects that include

demography, knowledge, economic development and lifestyle among others, directly or

indirectly influence what we do. These in turn lead to the development of man-made systems that

are strongly influenced by human beings, and includes the development of physical structures,

public infrastructure, parks, man-made lakes, mines and rock quarries, so as to satisfy the needs

and wants in society. Quarrying as one of the developments interacts with the aspects of the

physical environment or otherwise the natural systems that includes physical phenomena that do

not originate from human activities; including water, air and climate. The ecosystem as part of

the natural system is also affected. Human beings as the sole generator of these effects are also

affected, where the effects on the physical environment can also impact on the socio-economic

aspects of quarrying, including loss of lives, poor health and diseases, accidents, reduction of

land for other land uses, and destruction of built structures.

Quarrying as an activity that involves the extraction of earth materials for economic

value, takes place within the physical environment and therefore has impacts both on the

physical and socio-economic environment, however there are also positive aspects of mining

which determine whether quarrying will continue.

The conceptual framework is a synthesis of components from a developed conceptual

framework for integrated monitoring, namely Integrated Environment and Health Monitoring

(IEHM) framework developed by WHO (world health organization), 2010 with that of a

theoretical framework by Law and Smith on the principal components of the environment. The

23
synthesis has modifications in line with the researcher’s conceptualization of quarrying as an

activity that has both socio-economic and environmental impacts (see figure 1-2).

24
Figure 1-2:Conceptual
Figure 1-2: Conceptualmodel
model

Man-made system

Building and construction Human systems


industry

Quarrying

Effect on natural Socio-economic


system environment

Physical environment Negative impacts Positive impacts


impact
• Loss of lives • Income
• Creation of new • Poor health/ generation
landscape diseases • Raising living
• Siltation of rivers • Reduces land standards
• Derelict for further • Employment
landscapes/loss of land uses provision
aesthetics • Destruction of • Development of
• Soil erosion built structure housing

REHABILITATION PLAN

Source: Adapted and modified from WHO Integrated Health and Monitoring Framework (2010)

25
CHAPTER THREE

3.0 AREA OF STUDY

3.1 Location and extent

Ndarugo area is found in Kalimoni sub-location, Juja location of Thika district, Kiambu

County, in central Kenya and is located at about 30 km north of Nairobi city. Juja location is

divided into three sub-locations namely Kiaora, Kalimoni and Komo. The location covers an

area of about 4,000 km2 and is home to a population of about 200,000 people (KNBS, 2009). It

lies within 1 11’ 0’’ South, 37 7’ 0’’ East, and is placed at an altitude of 1560 m above sea level

(see figure 2-3). Kalimoni is home to most of the hand operated quarries, while most of the

machine operated quarries are found along Ndarugo River (figure 3-3).

26
Figure 2-3:
3: Juja constituency wards in context from Kiambu County

Source: KNBS, 2009

27
Figure 3-3: Quarry sites along Ndarugo River

Source: George, Oguta and Calvince, 2007.

3.2 Topography

The slope of the area is oriented to the northeast- southwest direction and its

physiographic consists of scarps that are formed by the extensive quarry activities going on in

the area. The underlying bedrock in Ndarugo area is formed of granite, which is suitable for

building stones.

28
There are two small rivers that can be located in the area, and they join the Nairobi River

at the lower boundary of the wider Juja. The quarry sites are located along river Ndarugo, which

is recognized for its diverse flora and fauna, and also offers a mild climate and natural beauty to

the area. It is a freshwater river that is both ecologically and economically beneficial to the

residents of the area. The river is provides water for both domestic and agricultural use.

3.3 Climate

The area receives an annual rainfall of 856 mm and experiences two rainy seasons; that is

the long-rains that occur between March and May, while short-rains occur between October and

December. The mean annual temperature of the area is 19.60c, with the hottest month which is

March with 21.30c, and the coldest month which is July with 18.40 c (see figure 4-3).

Figure 4-3: Climatic data for Juja area

Source: World weather, 2013

29
3.4Land use

The quarries are placed under a lease tenure system, where the developers lease the land

from the owners at an agreed fee until the quarry work is finished.

The main land uses in the area can be categorized into two; that is quarrying and

agriculture. As mentioned earlier, the granite deposit that underlies the area are suitable for

building stone exploration, therefore suitable for commercial quarrying of stone as well as quarry

dust. Apart from the quarries there are also agricultural activities around the area, with mostly

subsistence and cash crop farming. The cash crops planted in the area are coffee and horticultural

flowers and products. Penta flower is the major flower grower and has a farm by the name

Ndarugu farm, whereas horticultural products are grown by one farm known as Benvar Limited,

which also owns several quarry sites.

3.5Geology

The Proterozoic Mozambique Belt that is most extensive in Kenya Central, North to

South in which metamorphic minerals such as Kyarite, Corundum, Graphite, Wollastonite,

Marble, kaolin and a variety of gemstones are found together with minerals associated with basic

and granitic rocks, such as mica and iron ore. The general rock formation in Juja is tertiary basic

igneous rock that consists of olivine basalts, phenelites, granite and other older basic turf. The

presence of such rock formation provides an abundance of suitable stone that can be used as

building material. The igneous rocks are used in the production of coarse aggregates, which are

used in making of concrete. As for other rocks that are relatively soft compared to the igneous

rocks, they are used as building stones sourced from the quarries, and are exploited either

through hand or machine methods. The soils in the area are moderately well drained, shallow,

and friable, as dictated by the presence of gravely clay or petrophithenite with pockets of

30
murramwith lithesol. There are also pockets of poor drained deep to very deep petrophithite,

vestrols, undifferentiated and verticgleyosols. This type of geological formation provides a rich

background of building materials in the area.

31
CHAPTER FOUR

4.0 RESEARCH DESIGN AND METHODOLOGY

This chapter concerns itself with the methodology used in this study. The information

includes the sampling frame and design, and then covers data collection, processing and analysis.

The instruments of data collection are also outlined as well as the limitation of the study.

4.1 Sampling frame and design

The respondents for this study were drawn from quarries in Ndarugo and its environs.

The sampling frame is inclusive of all quarries in Ndarugo area. Since most of the quarries are

closely located to each other, the systematic random sampling was employed. Most of the

quarries assume similar characteristics and the same quality of stones are mined. According to

the mines and geology department of Kenya, the quarries in the area can be termed as large scale

quarries, based on the kind of technology and scale of operation. The stones are extracted

through machines such as crushers, bulldozers and run in a 24 hour cycle, thus assuming the term

large scale quarries. The socio economic considerations for all the quarries are assumed to be

similar.

The socio economic data was collected from quarry workers, quarry owners and those

people living within the quarries. The choice of the number of respondents was through simple

random sampling, and a total of 30 Workers from the quarry sites were interviewed. The

availability and willingness to respond was determined by who the respondents were. The work

done in the quarries is tedious and it demands a lot of commitment to the extent that by the end

of the day most of the workers are too tired to respond to an interview or even fill in a

questionnaire. The researcher had to take advantage of the short sessions of rest during the day

collect data.

32
Another sample of 5 respondents was taken from the quarry owners. This is because most

of the owners of the quarries have their offices outside the area of study, which presented

difficulty in accessing them as their locations are not well defined. This reduced the number of

the intended respondents from 10 to 5. Lack of cooperation also posed a great challenge, just as

in the case of the quarry workers. Most were very negative and suspicious of the researcher.

There have been a lot of complaints in the recent past about the problems caused by quarrying

activities, and these complaints are a threat to the activity. The researcher was viewed as a spy

with a motive of getting information from the public so as to take it to the government. Many of

the respondents had to be convinced so as to cooperate.

Another 30 respondents were interviewed for people living within 3 kilometers of the

quarry sites. The quarries are located on individuals’ land which is leased. Purposive random

sampling was used in selecting these respondents as the data was to be used to determine the

effects of quarrying on people living within quarry environs. The presence of respondents, which

was determined by availability of settlement structures close to the quarries, was significant.

Most of the people were living in their own plots of land, which were found just adjacent to the

quarry sites.

4.2 Nature and sources of data

4.2.1 Nature of data

The data collected for the study is qualitative data because it is descriptive in nature,

where the data collected was focused on individual people rather than the use of numbers and

figures to answer the study research questions. The study aims to evaluate the descriptions and

responses given by the respondents and this place the respondents’ responses as paramount in the

research approach.

33
4.2.2 Sources of data

The data collected in the study was based on both primary and secondary data. The

primary data collected was gathered from the use of instruments such as; questionnaires,

interview schedule, photography, and direct observation. The secondary sources of information

used were books, peer reviewed journals and the internet.

4.2.2.1 Primary and secondary sources of data

The primary sources of data included;

• Questionnaire

Three questionnaire schedules appendices I, II, and III were administered to various

respondents. Questionnaire A was administered to quarry workers, B to the quarry owners, and C

to people living within 3 km of the quarry sites. 30 questionnaires were administered to quarry

workers, 5 to quarry owners, and 30 to people living within 3 km of the quarry sites. The

questionnaires were used to elicit primary data on both socio economic aspects such as sex, age,

level of education, direct employment generation, income and wealth generation, welfare of

those involved, welfare of those living nearby, support of quarrying to other social aspects and

conditions of work. It also provided information on extent of quarry rehabilitation.

The respondents were randomly selected depending on their availability and willingness

to respond. The researcher conducted the research wholly on his own.

• Interview schedule

The interview schedule was used alongside the questionnaires. It was used on all

respondents whenever the researcher felt it was necessary in the process of filling the

34
questionnaires. It proved to be a vital tool in eliciting information that could not be obtained

through the use of questionnaires. Moreover the level of education of most of the respondents

commanded the use of this tool. Most of the respondents could not afford time to fill the

questionnaires by themselves as payment of their work is pegged on the amount of work done.

• Photography

This method of data collection was an effective tool and was used to capture some of the

information relevant to the study such as dust in the quarry sites, the abandoned quarries, as well

as the pit floods.

• Direct observation

This was also employed and as one of the most important tool, it was aided by the use of an

observation record sheet, where information seen was recorded.

Secondary sources of data included;

Secondary data was used to cover the dimensions of the study was also used. This

included data from academic journals, NGO reports, government policy documents, the

meteorological department of Kenya, newspaper reports and the internet. The data used was that

obtained from studies on socio-economic aspects of quarrying, policy documents, and quarry

rehabilitation practices in general from any part of the world, and one case study in Kenya which

was mentioned.

35
4.3 Data processing and analysis

Data from the various sources was edited and then coded for analysis using the SPSS

analysis tool. This was done in order to find answers to the research questions and then draw the

conclusions from the objectives of the study. Data collected using questionnaires was first used

in computation of statistics as frequencies, totals, percentages, tabulations and cross tabulations.

Secondary sources and observation provided data on bio-physical characteristics of the site as

well as the quarrying process.

36
CHAPTER FIVE

5.0 DATA ANALYSIS AND DISCUSSION

5.1 Policy and legal framework governing quarrying activities in Kenya

The respondents both the quarry owners and people living within the quarry environs

were asked whether they knew of any policies or legislations that govern the quarrying sector in

the country during the interviews, the quarry owners said that they had the knowledge of some

laws that state the fact that the quarries have to be reclaimed after use. They also pointed out that

laws governing quarrying are not properly developed and that the national environmental

management authority (NEMA) usually makes random visits to the sites to ensure that they are

not doing any harm to the environment. The owners also pointed out to the fact that it is a

recommendation that they develop an EIA and clearly set out mitigation measures.

Many of the people living within the quarry environs said that they had not heard of any

laws or policies that govern quarrying. They said that the quarry owners did not regard any

environmental regulations as they blatantly disregard the safety of the surrounding environment

as there are no authorities that control them other than the fact that the local county council

collects levies from the quarries.

Those that work in the quarries are not safeguarded in any case of accidents occurring in

the quarries as the quarry owners ignore the fact that health and safety laws exist, whereby the

workers operate in the quarries without any protective gear, and as a result of this they are

exposed to potential health and risk hazards.

Mining activities in the country have not been well coordinated as there are many

artisanal mining groups that do not adhere to environmental policies and guidelines. There has

37
been a major setback in the policy implementation, which is caused by having fragmented

stakeholders and oversight authorities. Many of these policies have been faced with the challenge

of lack of adequate up to date regulations addressing the bright of key stakeholders such as

communities in rich mineral areas, and in addition the present laws are outdates and full of

loopholes that have provided lee ways for fragmented mining activities that are hazardous

especially to the inexperienced miners. Some of the key policies that could be directly linked

with quarrying activities are as outlined below, and the gaps in the policies discussed.

National land policy of 2007

The law is supposed to ensure that land is put into sustainable and productive use, but it is

inconsistent with mining and minerals bill of 2009 that states “a mineral right shall not be

granted under this Act on, under or over private land without the consent of the owner.” Whereas

the land policy states that all private land harboring mineral resources shall be repossessed by

Government upon offering sufficient compensation to land owners. In addition, the

commissioner of department of mines and geology grants both exploration and mining licenses

to companies and individuals who want to explore minerals in Kenya in areas that are

agricultural lands, gazette forests, urban areas, areas set aside for commercial activities, ranches,

private lands, trust lands and so on. The laws are in contradiction, and the policy does not

provide for a clear framework where all stakeholders are supposed to communicate and execute

the processes smoothly.

Resettlement/land acquisition policy framework of the government of Kenya, 2007

The policy outlines resettlement measures undertaken in areas where minerals have been

found, and though this is the case, there has not been a clear way forward for resettling people

38
found in such areas. The problem is aggravated by the lack of adequate awareness by the people

though it is the responsibility of the government in conjunction with the ministry of lands. Many

of the people found living in the quarry environs are surrounded by quarries in very close

distances, a situation which puts the people in huge risks. Because the land owners have

operating licenses, they disregard the people living near the quarries, where they explore for

stones near residential areas and many of the people that are found too close are forced to move

without any compensation.

Land reclamation policy, 2005

The policy is not drafted by the ministry concerned with mining and minerals in Kenya

but rather the former ministry of water and irrigation. Therefore, there is a very big issue as it

does provide a conceptual framework on how the ministry concerned with minerals and mines

can be involved. The lack of this networking framework means that the policy is only as good as

it is on paper. The quarry owners do not reclaim the quarried land at all, and because this issue is

disregarded by the concerned ministry, the owners do not bare any responsibility for their

actions.

National occupational safety and health policy, 2010

The policy aims at promoting a safe and healthy environment in the places of work. In

relation to quarrying, it would ensure that workers are not exposed to health hazards such as dust,

but due to the lack of a clear framework governing mining in Kenya, there lies a gap in the

implementation strategy of the policy as it is conclusive and concrete. Many accidents do occur

in the mining sector and especially in the quarrying sector as the owners disregard the provision

of safety equipment and gear for their workers. When the quarry workers were asked through the

39
questionnaires what they would like to be improved in the quarries, 98% of the workers stated

that they wanted the owners to provide them with safety gear and equipment to prevent them

from the hazards in the place of work.

Quarrying legislations

Though no specific mention or reference to quarrying has been made in any mining

legislations, some laws however point indirectly to some legislations that ensure proper

governance of quarries and efficient extraction of stone and rock. Some of these laws are as

follows;

Environmental Management and Co-ordination Act, no. 8 of 1999

The policy process culminated into the Draft Sessional Paper No. 6 of 1999 entitled

“Environment and Development.” The legislative process gave forth the Environment

Management and Coordination Act (EMCA) (Act No. 8 of 1999) as Kenya’s first framework

environmental law.Its most important contribution to the governance of environmental

regulations is the creation of the National Environmental Management Authority (NEMA)

(EMCA, 1999 part II & 7). NEMA is charged with enforcing EMCA’s provisions as well as the

subsidiary legislation that has been passed over the last decade. The subsidiary legislation

includes water quality, waste management, controlled substances, biodiversity, wetland, river

and seashore, and environmental impact assessment (EIA) regulations. Most of the provisions

contained in EMCA, as well as the subsidiary legislation, are intended to provide regulations for

the usage and type of allowable activity in the different ecosystems and habitats of Kenya. Thus,

NEMA’s main task is to review and grant licenses to proponents that plan to change land-use.

40
Under EMCA, 1999 and the subsidiary 2003 regulations, NEMA is required to review

the EIA report and solicit comments from the relevant lead agencies and the public. Nonetheless,

NEMA’s review process faces many challenges that could allow proponents of ill-prepared

reports to get EIA licenses. Some of the quarry owners do have these licenses and they do not

have proper reports, while some do not even have these reports.

Mining Act, 1940

The Mining Act 1940 (chapter 306 of the Laws of Kenya) (the “Mining Act”) regulates

all mining activities in Kenya. The Commissioner of Mines and Geology (the “Commissioner”),

heads the Department of Mines and Geology and is responsible for overseeing mining research

and policy as well as implementing the Mining Act.

The law does not include stone and rock. Consequently, artisanal stone quarrying has

operated outside this legislation with no governing body, no overall framework governing land

use planning, and no environmental control. The absolute bereft of quarrying control is

illustrated by the fact that stone quarrying can commence on private land without reference to

any authority. Such operations are unrecorded, unregulated and have no environmental

obligations. It should be noted however that quarries operating on government of Kenya forestry

land do require a license and are required to restore the land at closure.

41
5.2 The bio-physical and socio-economic effects of quarrying activities

5.2.1 Bio physical effects

5.2.1.1 Pit flooding

The analysis was based on the responses of those people that lived within the quarry sites

as they were deemed to understand the surrounded environment better, therefore all the

responses are based on appendix 1. There was evidence of flooded pits near the quarry sites that

are found just opposite the Thika super highway, where water had filled the abandoned quarries

after the companies exploiting the stone resources had vacated as shown in plate 1-5.

Plate 1-5: Flooded quarry pits

Source: Field survey, 2014

People living around the quarry environment were asked whether the abandoned quarries

experienced pit flooding. 90% of the respondents said that the abandoned pits experienced

flooding after rains, and since the floor of the quarry is covered by stone, the water takes time

before it percolates, and that it takes a long time for the water to subside especially for the

42
abandoned quarries, and as a result pits flooded with water are seen even through the dry period.

10% of the respondents said that they had not seen the pits flooding because they had moved

recently in the vicinity and had not explored the area (figure 5-5).

Figure 5-5: Percentage response on pit flooding

Source: Field data, 2014

5.2.1.2 Property damage (Effects of dust, noise and vibration)

The respondents living in the quarry environs were asked whether there was any property

that had been affected either by noise, dust or vibration and that had caused damage, and 86.7%

of the respondents reported that indeed some of their properties had been damaged, majorly by

the appearance of cracks on their houses as well as accumulation of dust inside their houses. The

respondents who responded in this manner had been living in the area for a significant number of

years, and were living in close proximity to the quarry sites, with those living within a 500m to

43
1km radius being the most affected. 10% of those questioned said that they had not seen any

damages on their property because they were not in close proximity to the quarries and most had

moved into the area less than a year ago. 3.33% of the respondents did not give any answer as

shown in figure 6-5.

Figure 6-5: Percentage response on property damage

Source: Field data, 2014

Many of the houses in the area had to be closed, that is the doors and windows, for the

better part of the day because dust was an issue as the roads are not made of tarmac and when

trucks ferrying the stones pass on these roads they leave huge clouds of dust and as the winds

blow they carry the dust in the houses, especially for those that are found in close proximity to

the road. Houses that had been in the area for a long time were being affected by the fact that

new quarries that were being developed near the residential, were producing a lot of vibrations

and cracks had started to develop on both the floors and walls of the houses (plate 2-5). Noise

44
from the heavy machinery was also a big nuisance for the residents living around the quarry

sites, especially those that were found in close proximity of within 500m to the quarries.

Plate 2-5: Developing cracks on the floor of a newly built house

Source: Field survey, 2014

5.2.1.3 Air pollution (dust)

The respondents, that is people living around the quarry environs were asked about the

seriousness of dust as a cause of pollution around the environs as a result of the quarrying

activities and 63.33% of the respondents stated that the issue of dust was very serious, and was a

great source of air pollution in the area while 33.33% stated that it was a serious issue and 3.33%

gave no answer. The level of seriousness decreased based on the distance of the residents home

from the quarries, where those that were within a radius of 500m said the issue was very serious,

and those that were within a radius of 1km and 3km said that it was a serious issue (figure 7-5).

45
Figure 7-5: Seriousness of dust as a cause of pollution

Source: Field data, 2014

The issues was aggravated because of the fact that the roads in the area were plain earth

and are very dusty and because of the constant passage of the heavy trucks, the earth becomes

loose and dust particles are always seen suspended in the air especially when there is a lot of

wind blowing. Quarry dust produced after cutting stones was also another serious cause of air

pollution in the area as a lot of dust is produced in the quarry process, and it is not moved where

it is just scattered on the quarry floors. When strong winds blow over the quarry sites, a lot of

dust is lifted in the air and it causes a lot of nuisance around the area (plate 3-5).

46
Plate 3-5: Dust lifted into air

Source: Field survey, 2014

5.2.1.4 Noise pollution

Respondents who were the people living around the quarry environs were asked on the

seriousness of noise in their environment, and 23.33% stated that the issue of noise pollution was

very serious, while 50% of the respondents said that the issue was serious, whereas 23.33% said

it was slightly serious, and 3.33% said that it was not serious, as shown in figure 8-5. Those that

attested to the issue being very serious were those that were close to the quarry sites within a

radius of 500m, and as the distance increased the issue decreased in seriousness with those

residents living within a 1km radius not being subjected to much noise, which is a result of the

working of some heavy machinery and blasting of stone, with the later occurring rarely.

47
Figure 8-5: Seriousness of noise as a cause of pollution

Source: Field data, 2014

5.2.2 The socio-economic effects

These are the effects that are related to the functional society and their livelihoods, and

the information gathered was derived from the quarry workers, and therefore the responses are

based on both appendix I and II.

48
5.2.2.1 Sex

Overall, 86.67% of the respondents were male, while 13.33% were female. Much of the

work in the quarry is physical, where digging of soil, loading of stones and blasting of rocks, are

the day to day activities, activities which are more preferable to men than women (figure 9-5).

Figure 9-5: Percentage male and female respondents

Source: Field data, 2014

49
5.2.2.2 Pit flooding versus drowning incidents

In order to understand the occurrence of drowning incidents based on the fact that there

was pit flooding that occurred in the quarry pits, a cross tabulation was derived indicating the

relationship between pit flooding and drowning incidents. From the tabulation, 83.3% of those

respondents that had agreed to pits flooding stated that that indeed there were drowning incidents

in the flooded pits, whereas 6.7% of the respondents said that they had not heard of any

drowning incidents. This was because some of the respondents had just moved into the area.

10% of the respondents said that they had not seen any flooded pits and thus had not heard of

any drowning incidents. This was majorly because those respondents had just moved into the

area and had not had a chance to explore their environs. Many of the respondents also revealed

that children were more prone to drowning because they are found playing near these abandoned

quarries, and the situation is aggravated further by the fact that most of these abandoned quarries

are not fenced and if they are it is done poorly, and as a result increases the risk not only for the

children but also the rest of the population especially at night when the ability to see clearly is

low.

5.2.2.3 Marital status versus income sufficiency

In order to better understand whether the income earned by respondents, that is those who

were working in the quarries, was sufficient to support their livelihoods based on their marital

status, a cross tabulation between these variables was derived. The results showed that, 60% of

those workers that were single and earning an income between ksh.10,001 – ksh.20,000 said that

they had a sufficient income, while 40% in the same income range and assuming the same

marital status said that the income was not sufficient to cater for their needs. 60% of the

respondents was majorly comprised of those respondents that were below 25 years as they did

50
not have that much responsibility, while 40% were those respondents were those aged above 25

years as they had an increased pressure of being more responsible towards different areas of their

life such as owning some property and wanting to settle down into marriage life.

Results on workers that were married and were earning an income of between ksh.10,001

– ksh.20,000 indicated that 50% of the respondents said that they did not have sufficient income,

which was because of the increased responsibilities that they had as they were supporting their

families, where most of them were the sole bread winners. 14.3% of those workers that were

married and earning an income of more than ksh.20,000 stated that the income was sufficient,

whereas 28.6% of the same category of respondents stated that the income was insufficient,

whereas 7.1% gave no answer. This shows that many of the respondents do not have a sufficient

income to take care of their needs and the work they do is tedious and demands a lot from them.

One of the respondents was a widower and stated that the income earned was insufficient.

5.2.2.4 Income sufficiency based on the number of dependants

Information on whether the income earned was sufficient enough to support those

respondents that had dependants was sought, and the results indicated that out of those

respondents that said that the income earned was sufficient 30% had no dependants at all, while

3.3% had one dependant and the other 3.3% had three dependants. Of the respondents that said

that the income earned was not sufficient, 10% had no dependants, 16.7% had one dependant,

13.3% had two dependants, 20% had three dependants, and 3.3% had four dependants. This

shows that the more the number of dependants that the workers have, the more they feel that the

income they earn is not sufficient, which is because of the burden they have to bear in taking o

their dependants.

51
5.2.2.5 Education level

To understand the education level of those workers in the quarries, respondents were

asked what is the highest education level that they attained and 10% said they had reached

primary school level, 70% had completed secondary school, 16.67% had got to college or

university level, and 3.33% gave no answer to the question asked (figure 10-5). When asked why

most of them had only had a primary education and secondary education as the highest level of

education, they said that they did not have funds or their families could not facilitate a further

education for them, and as a result thy decided to go work at the quarries. This is because most to

the work that they were employed to do was informal and did not require specialized skills.

52
Figure 10-5: Total percentage of respondents' level of education

Source: Field data, 2014

In order to understand the level of skills required to do the different kind of works in the

quarries because many of the workers had pointed out the fact that they had only attained a

secondary education and some of them a primary education as the highest level of education, the

respondents were asked how they learned of their job and the results showed that 76.67% of the

respondents, that is the quarry workers, had learned to do their job by watching others, or what is

known as apprenticeship or Jua Kali which is the informal sector, where it included stone

blasters, soil diggers, and stone cutters. 23.33% of the respondents went to school to learn

53
whatever they were doing and it included those in the administration of the quarries, machine

operators and quarry supervisors. Much of the work that is done in the quarries is largely

informal, and skilled labor is only required when operating the heavy machinery and general

administration of the quarries (figure 11-5).

Figure 11-5: Percentage on job learning

Source: Field data, 2014

5.2.2.5 Education level versus the type of job employed to do

According to the survey results, a comparison on the type of job the workers were

employed to do based on their level of education, revealed that 10% of the workers were

employed to carry out soil digging in the quarries, and they had only attained a primary school

education. Those that had attained a secondary school education were employed to do various

54
works such as blasting, stonecutting, soil digging and small administrative duties, and they

comprised of 70% of the respondents. Respondents who had attained a college/university

education were employed to do administrative jobs and office accounting, and they comprised of

16.7% of the respondents. 3.3% of the respondents gave no answer. Much of the work in the

quarries requires hard labor, and for the greater part it is unskilled labor which only requires

physical strength to carry out the jobs that mainly involve digging soil, loading trucks with stone,

and blasting the hard rock, and is a choice of many dropouts and those who do not have access to

further education after they are through with high school.

In order to further understand whether the respondents had any other source of income to

support them, because of the fact that much of the work is on casual and informal basis and is

mostly unpredictable especially for those that are unskilled, it was important to gather the

information and the results showed that, 63.33% said no, while 36.67% said yes. Many of the

people working in the quarries are not married and do not have many dependents, as they are

people who have left school at primary level and secondary school level and are relatively young

(figure 12-5).

55
Figure 12-5: Percentage response on other sources of income

Source: Field data, 2014

5.2.2.6 Health related issues

Respondents in the study were asked about health related issues and the major health

issues were coughs and colds, chest aches, throat infections, and stress. Each of the mentioned

problems was analyzed, and the results were as follows:

56
5.2.2.6.1 Coughs and colds

According to the results, the highest percentage of the respondents declared the health

issue to be very serious and serious, which translated to 36.67% for the former and a similar

36.67% for the later (figure 13-5). The quarry is filled with dust which is left behind during the

quarrying process, and there is a lot of dust in the air within those quarries, which accelerates the

issue. The workers in the quarries are prone to inhaling the dust throughout the day as they work

because they do not have any protective equipment like dust masks to cover themselves as they

work. Those loading the stones to the Lorries are most affected as they have to follow the stone

cutter machine as it cuts the stones, and blows a lot of dust as it moves on the rails.

57
Figure 13-5: Seriousness of coughs and colds

Source: Field data, 2014

5.2.2.6.2 Chest aches

Majority of the respondents having been asked on the issue concerning chest aches, the

highest percentage replied that the issue was serious, which was at 53.33% (figure 14-5). The

issue is accelerated with the presence of dust and the fact that most of the workers do tedious

work without any protection gear.

58
Figure 14-5: Seriousness of chest aches

Source: Field data, 2014

5.2.2.6.3 Throat infections

The highest percentage of the respondents that replied on the issue of throat infection

indicated that the issue was serious, which was at 46.67% (figure 15-5). Just like the other cases,

dust is the major cause of the problem, where during the whole process of quarrying a lot of dust

is produced and the workers breathe in a lot of dust.

59
Figure 15-5: Seriousness of throat infections

Source: Field data, 2014

5.2.2.6.4 Stress

The respondents having been asked on the issue of stress, the highest majority said that

the issue was serious, which translated to 40% of the total respondents (figure 16-5). Stress

related issues occurred due to the kind of tedious work that the workers are subjected to because

the amount they earn is dependent on the amount of work done. The levels of noise, vibrations,

and dust also contribute highly to the issue of stress.

60
Figure 16-5: Seriousness of stress related problems

Source: Field data, 2014

5.3 The state of abandoned quarries and their use

According to the survey results, all the respondents asked about the issue of the state of

quarries after their lifecycle, said that the owners left them as open pits which translated to 100%

of all the respondents, as shown in figure 17-5. The owners leave the quarry pits open and most

of the abandoned ones have been filled with a very small layer of stone rubble and dust where no

further rehabilitation takes place, as shown in plate 4-5. The quarry owners said that filling up of

the quarries after use is an expensive exercise which would not translate to good profits, as the

61
depth of the quarries is large, where some quarries are more than 50m in depth and 100m wide.

Also the fact that the land is majorly leased to the quarry owners, and the lessors are after

gaining financially from the lease, they do not provide that the land be rehabilitated once the

lease period expires.

Plate 4-5: Abandoned quarry pit with small layer of stone rubble

Source: Field survey, 2014


The whole quarrying process is expensive as explained by the owners and causes a lot of

pollution, and it involves land preparation where the land is leveled using bulldozers, shovels and

tippers. After this is done, the stone cutting machine is guided through rails where actual stone

cutting starts. Noise and vibrations are produced throughout the process and the major product is

quarry dust, which is often left behind. This whole process is filled with a lot of negative

implications to the environment, as the land that is being turned into a quarry site does not blend

in with the rest of the environment because of the huge rubbles and quarry dust that is left

62
behind, often creating aesthetic intrusion around the areas where they exist. The noise, dust and

vibrations that are produced during the process, leave behind a huge trail of both environmental

pollution and socio effects in terms of diseases; such as air pollution caused by the heavy

presence of dust for the former and coughs and chest aches for the later. After the exploitation is

complete, the quarries are left open because as explained by one of the quarry owners, the filling

up of the pit is more expensive than the actual exploitation because there would be need of a lot

of metric tons of soil and gravel to fill it up. Because this does not make economic sense to the

owners, which if they did actually fill the pits up would mean more expenses that income, they

result to leaving them in that state.

63
Figure 17-5: State of abandoned quarries

Source: Field data, 2014

5.4 Mitigation measures for the management and control of quarrying activities

All of the quarry owners attested to having elaborate rehabilitation plans after they are

done exploiting the quarries, where they said that the quarries are to be filled with loam soils for

the purposes of farming but no quarry has done this. The quarries are partially filled with the

quarry dust and stone debris left behind after the quarrying process. The major hindrance to this

is the fact that the policies and legislations governing the sector have so many loop holes as

64
discussed and a large part of mitigation measures for the management and control of quarrying

activities lies with the proper formulation of these policies.

This means that there is need for harmonization of sectoral policy instruments with

EMCA and the Constitution: There are several sectoral policies and laws relating to the

environment which are not harmonized with both the EMCA and the Constitution. These include

policies concerning agriculture, water, forests, trade and industry, which have significant

implications for the environment. It is imperative that policy instrument in these sectors are

harmonized with the EMCA and the Constitution and requirements made that they be subjected

to strategic environmental assessment in order to promote sustainable development.

Implementation of Land Policy: Striking the right balance between land tenure and

environmental imperatives is critical for sustainable development. The National Land Policy and

the Constitution provide a critical basis for addressing the long-standing tensions around land

tenure and use in Kenya. However, they need effective legislation to ensure implementation.

Valuation of environmental and natural resources: The value of environmental resources is

hardly reflected in pricing of marketed goods and services. Environmental and natural resources

are largely considered as public goods. This is symptomatic of market failure. Integrating

environmental considerations into the behavior of enterprises and consumers would reflect a

change in consumption and production patterns. Prioritization of environment and natural

resources remains low among policy makers partly due to inadequate appreciation of the total

economic value of the sector. Thus there is less public investment in the sector. Rehabilitation

and restoration of environmentally degraded areas: There are several degraded areas in Kenya

which require rehabilitation and restoration. These include wetlands, riverbanks, deforested

65
areas, eroded shoreline, hilltops, and disused quarries and mines. An example is a case scenario

in Ndarugo area where there are many abandoned quarries.

Loss of biodiversity: Biodiversity plays a fundamental role in underpinning ecosystems

and the services they provide. The most important causes of loss of biodiversity include habitat

destruction, overgrazing, deforestation, pollution, unsustainable harvesting of natural resources,

bio-piracy and introduction of invasive and alien species. Public participation, environmental

education and awareness: Broad public participation in decision making processes is one of the

fundamental preconditions for sustainable development. This presupposes access to timely and

accurate information on the environment. Sound environmental management has to be based on

openness and participation at all levels.

66
CHAPTER SIX

6.0 SUMMARY OF THE FINDINGS, CONCLUSION AND RECOMMENDATIONS

6.1 Summary of the findings

From the information collected and analyzed, it is evident that the quarrying process in

the area causes both negative environmental and socio-economic effects, as a result of the

quarrying process which uses some heavy machinery and leaves behind a lot of debris and

quarry dust which an environmental nuisance. Issues to with open pit flooding, property damage,

air pollution and noise pollution are some of the bio-physical effects that are evident, and have

been a nuisance to the surrounding community. Socio-economic effects on issues to with the

quarry workers as discussed reveal that the workers are highly affected by the presence of dust as

many of them complain about various infections such as coughs and chest aches. Casual workers

in this sector are also not well compensated and many of them have only attained a secondary

school level education and learn the work through apprenticeship, showing that the sector is

highly informal, and a situation that makes it prone to exploitation by those controlling the

sector. Those that leave around the quarry are also directly affected by the negative effects

arising from quarrying, as they suffer directly the consequences of pollution and property

damage, because of the fact that the quarries are in close proximity with the residential areas,

where there is a huge concentration of residential within a 3km radius.

The results from the discussions also show that the quarry owners are in total disregard of

the environment evidenced by the fact that the quarries are left as open pits without being

rehabilitated. The quarries are also in close proximity to the area residential areas and safety

issues are ignored by the owners, creating a huge risk to the community residents.

67
It is also evident that the quarrying sector is highly unregulated, where the county

council only collects levies from the trucks leaving the sites as they transport materials, and there

is also a lack of policies and legislations to govern the activity, as only mining regulations for

other minerals exist. Because of this, the quarry owners ignore the responsibility of

rehabilitating quarries after their use as well as disregard of safety measures and regulations for

the workers, and lack of the general respect of the environment as well the surrounding

community.

6.2 Conclusion

In assessing the environmental impacts of quarrying activities in reference to Ndarugu

area, Kiambu county, it can be deduced that; in an effort by quarry owners who seek to exploit

minerals through quarrying activities, for the highly demanded stone commodity, there are

numerous abandoned quarries that have been put to no use. This is because there is a general

reluctance by the owners to restore or to rehabilitate the abandoned quarries. For the active

quarry sites, there are numerous negative environmental impacts both bio-physical and socio-

economic which affect both the people living in close proximity to the mining sites and the

workers who work in the sites. This has led to the development of many risks both health wise

and exposure to risky sites that leaves the community highly affected. However this is not only

limited to active sites but also abandoned quarries have hugely contributed to the degradation of

the environment as well as posing numerous risks associated with open pits.

Several mitigation measures have been laid out to mitigate mining activities at worldwide

level and also locally in the country with Agenda 21, The National Environmental Action Plan,

National Environmental Policy and also rehabilitation plans that have been successful, but the

issues to do with artisanal or small scale quarrying have not been properly addressed and the

68
policies and legislative frameworks go silent when it comes to issues of concern to quarrying.

This has resulted to a blatant disregard of the environment in a highly unregulated industry,

where those that assume the role of controlling the sector, who being the local authority have no

capacity in terms of skills and manpower to affect control in the sector.

6.3 Recommendations

6.3.1 Short term recommendations

• The quarry owners should adopt methods that are less wasteful

• There should be use of technologies that are user and environmental friendly

• Rehabilitation of quarries should be emphasized after use

• Adoption and emphasis of use of safety equipment to reduce accidents and health risks

around the worksites

• Community members, landowners and concession holders be involved in finding viable

solutions to the problems posed by quarrying

• Promotion of environmental awareness campaigns and technical training programs to add

value to how the locals respond to the quarrying process and negative environmental

impacts

6.3.2 Long term recommendations

• Quarrying activities should be under one government department under the newly

established Ministry of Environment, Water and Natural resources. The quarrying

activities in the country are currently licensed by the local authority that do not have the

capacity to do so. They operate from revenue collection and land allocation only without

any regard of the actual activities carried out. They are unable to assess the quantity and

69
production capacity and hence duration of quarrying to go hand in hand with

development plans. They are unable to assess the environmental degradation and

rehabilitation program thereof required after the quarrying.

• The government should re-establish mining cooperative societies for the small scale and

artisanal mining. This is because individuals may not be able to handle the environmental

issues and the mines rehabilitation.

6.4 Areas for further studies

• Safety and health regulations in the quarrying sector

• Policy and legislative framework gaps in the governing of quarrying in the country

• Rehabilitation process for quarries in the country

• Planning regulations and zoning of lands with quarrying potential

• Quarrying contribution to the country’s GDP

70
REFERENCES

Agevi and Ogero B.B. (1990).Stone quarrying in Kenya: a socio-economic and institutional

survey. Nairobi, Kenya: Intermediate Technology and Development Group Mining

Program.

Asher Shadmon, Sam G. (1999). Training and policy guidelines for artisanl quarrying.ITDG.

Ashurst, J. and Dimes, G. (1977).Stone in building: its use and potential today. London: The

Architectural Press.

Ayuba, H.K. (2005).Environmental science.An introductory text.Apani publisher.

Bertalanfy, L. (1951). An outline of general systems theory. British Journal of Philosophy of

Science theory, 1: 143.

CAHF. (2012). Housing Finance in Africa - a review of some of African’s housing finance

markets. Finmark Trust.

CSI. (2011).Guidelines on quarrying rehabilitation: biodiversity and land stewardship.

Switzerland: RotoPresse SA.

FAO.(1980). Natural resources and the human environment for food and agriculture.

Environment Paper No. I. Rome. File:///A:\Population and Land degradation

(Text).htm.

George M. Ndegwa, Oguta B, Calvince O. (2003).Impacts of quarrying on water quality

alongNdarugu river of Thika District. Kenya: JKUAT.

71
Government of Kenya.(2012).ACT NO. 8 of 1999 - Environmental Management and

Coordination Act. Nairobi: Government Printers.

Government of Kenya.(2010).The National Minerals and Mines Policy.Nairobi: Government

Printers.

Hartmann Hl. (2002).Introductory to Mining Engineering.

Hartmann, Howard L. (1992).SME Egineering Handbook, Society for Mining, Metallurgy, and

Exploration Inc.

Hornbostel C. (1991).Construction Materials: Types, Uses and Applications (Second Edition.).

New York: John Wiley and Sons Inc.

Howard Bob and Cameron Ian.(n.d.). Dust Control: Best Practice Environmental Mnagement

in Mining.

ILO.(1999).Social and labour issues in small-scale mines. Report for discussion at the Tripartite

Meeting on Social and Labour Issues in Small-scale Mines Geneva. International Labour

Office.

Kertes N. (2007).U.S abandoned mine count still a mystery-General Accounting Office Report.

American Metal Market.

Logging of forests and debris dumping.(n.d.). Retrieved from Ngm.nationalgeographic.com

Ministry of Environment and Mineral Resources.(2010).draft national education for

sustainable development policy.nairobi: ministry of environment and mineral resources.

72
Ministry of Environment and Mineral Resources.(2012).National environment policy, 2012.

Nairobi: ministry of environment and mineral resources.

Mjaria J. (1997).The artisanal stone quarry workers in Nairobi region: Baseline survey report.

Nairobi, Kenya: Intermediate Technology and Development Group.

National EnviromnentMagamenet Authority (2009).NATIONAL ENVIRONMENT ACTION

PLAN FRAMEWORK 2009-2013.airobi: National Environment Management Authority.

Noranha I. (1998).The smallscale Indian laterite stone quarry and working sector: A case study

of Goa. New Delhi: Tata Energy Research Institute.

Olofin, E.A.(1989).Human response to the natural environment in the kano region. Kano and

Some of Her Neighbours.ABU Press.

Saevery S.P.A. (1997).Training and policy guidelines for artisanal quarrying: Report on field

study research in the Nairobi region of Kenya (Working paper). ITDG/University of

Bath/ODA.

Savery S. (1997).Report on field research in the Nairobi region of Kenya (Unpublished

report).ITDG/University of Bath/ODA.

Shadmon A. (1989).Stone: An Introduction. New York: The Bootstrap Press.

Shadmon A. (1993). Dimension Stone-its impacts on environment and constructional

applications-the role of engineering geology.

UNECE. (1998). Convention On Access To Information, Public Participation In Decision

Making and Access to Justice in Environmental Matters. Aarhus.

73
UNESCO World Heritage Centre.(n.d.). Taj-Mahal - UNESCO World Heritage Centre.

Retrieved from Whc.unesco.org

Wells J. (1996).Artisanal stone quarrying in Kenya: a market study.

74
APPENDICES

Appendix I: People living in quarry environs questionnaire

The aim of the questionnaire is to collect data on socio-economic and environmental


aspects of quarrying in Ndarugo area and its environs. The data collected is solely for academic
purpose with an aim of linking it to policy making and rehabilitation plans. Information provided
will be treated as confidential and will be used for academic purpose. Tick or fill in spaces
provided.

The questionnaire is to be administered in English or Kiswahili.

Answer in the spaces provided and tick the appropriate boxes

Name of location _____________________________________________________________

The questionnaire will be administered to people living within 3km diameter of the
sampled quarries

Respondent Name_______________________________________________________________

1. Age
2. Sex

1. Male 2.Female

3. Distance from the quarry


1 0 – 500m 2 501m – 1km 3 1km – 2km 4 3km>
4. How long have lived in this particular locality?
1 0 – 5 years 2 6 – 10 years 3 11-20 years 4 20years>
5. Did you find quarrying going on?
1 Yes 2 No
6. If ‘No’ when did quarrying start in this locality?
________________________________________________________________________
7. To what degrees do the following problems associated with quarrying affects you?

75
PROBLEM SEVERITY

1 Very serious 2 Serious 3 Slightly serious 4 Not serious

coughs and colds

chest ache

backache

throat infections

breathing
problems

Stress

Malaria

Cholera

dysentery

Typhoid

Noise

dust

accidents

vibrations

other problems

76
8. Is there any property that is affected by noise or dust or vibration?
1 Yes 2 No
9. Do quarry pits in this location become flooded during the rains?
1 Yes 2 No
10. Any incidences of drowning in flooded quarry pits in this locality?
1 Yes 2 No
11. What benefits do you enjoy as a result of this activity in this area?
________________________________________________________________________
________________________________________________________________________
12. What uses are abandoned quarries put to?
1 Derelict 2 rehabilitated
13. Are you aware of any policies or legal frameworks governing quarrying activities?
1 Yes 2 No
If yes, which ones ………………………………………………………………….

77
Appendix II: Quarry workers questionnaire

The aim of the questionnaire is to collect data on socio-economic and environmental


aspects of quarrying in Ndarugo area and its environs. The data collected is solely for academic
purpose with an aim of

2 Female

1. Residence
2. Marital status

1 Single 2 Married 3 Widow/er 4 Divorced 5 Separated

3. How many dependants do you have? ______________________________


4. Highest education level
1 Primary
2 Secondary
3 College/university
4 None
5. What type of job are you employed to do?

1 Blaster

2 Stonecutter

3 Soil digger

4 Assistant

5 Other (specify)

6. How did you learn this job? 1 School 2 Apprenticeship


7. How are you paid?

1 Daily 2 weekly 3 monthly 4 other

78
8. How much are you paid?
1 0 – 2000 2 2001 – 5000 3 5001 – 10000 4 10001 – 20000 5 20001 >
9. Is the amount of money you are paid sufficient to cater for your needs?
1Yes 2 No
10. Any other source of income for the family?
1 Yes 2 No
11. Is there any other job you would choose instead of quarrying?
1 Yes 2 No
12. To what degree do the following problems related to quarrying affect you

PROBLEM SEVERITY

Very serious Serious Slightly serious Not serious

Coughs and
colds

Chest ache

Backache

Throat infections

Breathing
problems

Stress

Malaria

Cholera

Dysentery

Typhoid

79
Noise

Dust

Accidents

Vibrations

Other problems

13. When you get an accident or fall sick, what happens?


1 I get myself treated
2 My workmates help me get treated
3 The quarry owner arranges for me to get treated
14. What do you do in the event of an accident before one gets to hospital?
1 Nothing 2 First aid
15. How do you spend your evening after you leave the quarry?
________________________________________________________________________
16. In your opinion what should be done to improve quarrying?
________________________________________________________________________
17. Are you aware of any policies or legal frameworks governing quarrying activities?
1 Yes 2 No
If yes, which ones ………………………………………………………………….

80
Appendix III: Quarry owners questionnaire

The aim of the questionnaire is to collect data on socio-economic and environmental


aspects of quarrying in Ndarugo area and its environs. The data collected is solely for academic
purpose with an aim of linking it to policy making and rehabilitation plans. Information provided
will be treated as confidential and will be used for academic purpose. Tick or fill in spaces
provided.

Name of quarry____________________________________________

The questionnaire is to be administered in English or Kiswahili.

Answer in the spaces provided and tick the appropriate boxes

Respondent Name___________________________________________________________

1. Age
2. Sex

1 Male 2 Female

3. Residence
4. Marital status

1 Single 2 Married 3 Widow/er 4 Divorced 5 Separated

5. How many dependants do you have? ____________________________________


6. Highest education level
1 Primary
2 Secondary
3 College/university
4 None
7. How do you own this quarry? (Type of ownership)

1 It is part of my land

81
2 I have rented it form a private landowner

3 I have hired it from the government

4 Other (specify)

8. If rented/hired, how much does this cost? __________________________


9. For how long have you rented/hired?
1 0 – 10 years 2 11 – 20 years 3 21 – 30 years 4 30years>
10. Have you had other quarries besides this one in the past? 1 Yes 2 No
If yes, how many _____________________________________________
11. What was the type of ownership?
1 It was part of my land
2 I had rented it form a private landowner
3 I had hired it from the government
4 Other (specify)

12. How many people do you employ? _______________________________


13. Explain how the rock is broken in the quarrying process:

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

14. What quarry materials do you produce?


________________________________________________________________________
15. How many Lorries of quarried materials do you produce per day?
________________________________________________________________________
16. How many Lorries do you sell per day?
________________________________________________________________________
17. What is the price of the material per lorry?
________________________________________________________________________

82
18. Where do the buyers come from?
________________________________________________________________________
19. How do you attract buyers to your quarry since there are many quarries?
________________________________________________________________________
________________________________________________________________________
20. Where do you operate from?
________________________________________________________________________
21. Does the noise and dust disturb you? 1 Yes 2 No
22. Do you experience any health problems which you think are connected to quarrying?
1 Yes 2 No

If yes which problems?

________________________________________________________________________

23. Do accidents occur in quarries? 1 Yes 2 No


24. If yes what is done to get the quarry workers treated?
1 I get myself treated
2 My workmates help me get treated
3 The quarry owner arranges for me to get treated

25. Are there any rehabilitation plans put in place once the quarry productive life is over?
1 Yes 2 No
If yes, which are they?
________________________________________________________________________
______________________________________________________________________
26. Are you aware of any policies or legal frameworks governing quarrying activities?
1 Yes 2 No
If yes, which ones ………………………………………………………………….

83
Appendix IV: List of tables for data analysis and discussion

Table 1-4: Pit Flooding

Valid Cumulative
Frequency Percent Percent Percent

Valid Yes 27 90.0 90.0 90.0

No 3 10.0 10.0 100.0

Total 30 100.0 100.0

Table 2-5: Property Damage

Frequency Percent Valid Percent Cumulative Percent

Valid Yes 26 86.7 86.7 86.7

No 3 10.0 10.0 96.7

No answer 1 3.3 3.3 100.0

Total 30 100.0 100.0

84
Table 3-5: Noise

Frequency Percent Valid Percent Cumulative Percent

Valid Very Serious 7 23.3 23.3 23.3

Serious 15 50.0 50.0 73.3

Slightly Serious 7 23.3 23.3 96.7

Not Serious 1 3.3 3.3 100.0

Total 30 100.0 100.0

Table 4-5: Pit Flooding versus Drowning Incidents Cross tabulation

Drowning Incidents

Yes No Total

Pit Flooding Yes Count 25 2 27

% of Total 83.3% 6.7% 90.0%

85
No Count 0 3 3

% of Total .0% 10.0% 10.0%

Total Count 25 5 30

% of Total 83.3% 16.7% 100.0%

Table 5-5: Income * Sufficiency Of Income * Marital Status Cross tabulation

Sufficiency Of
Income

Marital Status Yes No Total

Single Income 10001 - 20000 Count 9 6 15

% of Total 60.0% 40.0% 100.0%

Total Count 9 6 15

% of Total 60.0% 40.0% 100.0%

Married Income 10001 - 20000 Count 0 7 7

86
% of Total .0% 50.0% 50.0%

20001 > Count 2 4 6

% of Total 14.3% 28.6% 42.9%

No answer Count 0 1 1

% of Total .0% 7.1% 7.1%

Total Count 2 12 14

% of Total 14.3% 85.7% 100.0%

Widow/er Income 20001 > Count 1 1

% of Total 100.0% 100.0%

Total Count 1 1

% of Total 100.0% 100.0%

Table 6-5: Sufficiency Of Income versus Number Of Dependants Cross tabulation

87
Number Of Dependants

0 1 2 3 4 Total

Sufficiency Of Yes Count 9 1 0 1 0 11


Income

% of Total 30.0% 3.3% .0% 3.3% .0% 36.7%

No Count 3 5 4 6 1 19

% of Total 10.0% 16.7% 13.3% 20.0% 3.3% 63.3%

Total Count 12 6 4 7 1 30

% of Total 40.0% 20.0% 13.3% 23.3% 3.3% 100.0%

Table 7-5: Education Level

Valid Cumulative
Frequency Percent Percent Percent

Valid Primary 3 10.0 10.0 10.0

Secondary 21 70.0 70.0 80.0

88
College/Universit
5 16.7 16.7 96.7
y

No answer 1 3.3 3.3 100.0

Total 30 100.0 100.0

Table 8-5: Education Level versus Job Type Cross tabulation

Job Type

Blaster Stonecutter Soil Digger Assistant Other Total

Count 0 0 3 0 0 3

Primary
% of
.0% .0% 10.0% .0% .0% 10.0%
Total

Educatio
Count 5 7 7 0 2 21
n Level
Secondary
% of
16.7% 23.3% 23.3% .0% 6.7% 70.0%
Total

College/ Count 0 0 0 1 4 5

89
University
% of
.0% .0% .0% 3.3% 13.3% 16.7%
Total

Count 0 0 1 0 0 1

No
answer

% of
.0% .0% 3.3% .0% .0% 3.3%
Total

Count 5 7 11 1 6 30

Total
% of
16.7% 23.3% 36.7% 3.3% 20.0% 100.0%