Aeration Commisioning - STP
Aeration Commisioning - STP
Contents:
1. Start Up Process
3. Tertiary Process
1.0 START-UP PROCESS:
1. Check the Inlet parameters of the Inlet Sewage.
2. Check if there is sufficient sewage in the collection tank. If the Sewage is insufficient, STP can’t
work properly. Sewage should be minimum 30% of Plant capacity.
3. Before Starting the raw sewage transfer pump, open the Valve.
FIG: 1.3
Operation Sequence for Filteration System:
VALVE SEQUENCE OF
PSF/ACF FILTER
AIR
SR. SER SER BACKWAS BACKWAS BLOWE RINS AIR FEED BACKWAS TIME
CYCLE
NO. . . H I/L H O/L R I/L * E VEN PUMP H (Min)
I/L O/L O/L T PUMP
Service
1 Open - - - - - Open ON OFF 10 to 15
Air Vent
Rinse
2 Open - - - - Open - ON OFF 10 to 15
Cycle
3 Service Open Open - - - - - ON OFF 1200*
Backwa
4 sh With - - Open - - - Open OFF ON 2 to 5
air Vent
5 Backwas - - Open Open - - - OFF ON 5 to 15
h
Please note: The backwash should be done whenever the inlet and outlet pressure of the PFS or ACF is more
than 0.7 bar pressure irrespective of the service time. The backwash should be done till the differential
pressure reduces to regular pressure.