This logbook details the overnight shift activities at the Pakse Substation from 24:00-08:00 on January 1st, 2021. Key events include energizing two transmission lines connecting the substation to XPXN-PSE and one line connecting to PSE-UB3. Equipment checks were performed with no issues found. Voltage and frequency readings on the main buses were also recorded as within normal limits. The on-duty staff received and sent routine communications and performed switching to energize a transmission line during the shift without any faults, alarms or special incidents.
This logbook details the overnight shift activities at the Pakse Substation from 24:00-08:00 on January 1st, 2021. Key events include energizing two transmission lines connecting the substation to XPXN-PSE and one line connecting to PSE-UB3. Equipment checks were performed with no issues found. Voltage and frequency readings on the main buses were also recorded as within normal limits. The on-duty staff received and sent routine communications and performed switching to energize a transmission line during the shift without any faults, alarms or special incidents.
This logbook details the overnight shift activities at the Pakse Substation from 24:00-08:00 on January 1st, 2021. Key events include energizing two transmission lines connecting the substation to XPXN-PSE and one line connecting to PSE-UB3. Equipment checks were performed with no issues found. Voltage and frequency readings on the main buses were also recorded as within normal limits. The on-duty staff received and sent routine communications and performed switching to energize a transmission line during the shift without any faults, alarms or special incidents.
Date: 01-Jan-21 Record time 24:00-08:00 Shift: 3 Name: Mr vanxai SYLAPHET XPXN-PSE Status MW MVar XPXN-PSE Status MW MVar Line 1 Energize De-Energize -31.29 15.90 Line 2 Energize De-Energize -31.85 15.83
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 62.16 -72.81 Line 2 Energize De-Energize 0.00 0.00
SHUNT REACTOR 1 Energize De-Energize 50.6 A SHUNT REACTOR 2 Energize De-Energize 51.6 A
CB 80212A DS 80215A CB 80232A DS 80235A
Close Open Close Open Close Open Close Open
CB 80112 CB 80122 CB 80132 CB 80312
Close Open Close Open Close Open Close Open CB 80212 CB 80222 CB 80232 FUSE 603 Close Open Close Open Close Open Close Open
Service Voltage (kV) Current (A)
KW1A TR 21.65 0.8
Record Time Note
I. Transmission Line Status 24:00-08:00 Pakse Substation Energization Line1 XPXN-PSE 24:00-08:00 Pakse Substation Energization Line2 XPXN-PSE 24:00-08:00 Pakse Substation Energization Line 1 PSE-UB3 24:00-08:00 Pakse Substation Energization Line 2 PSE-UB3 II. Daily Activities 0:00 Receiving and Sending information to power house (call) 1:00 DCMS, Equipment Room Check (No problem) 5:30 DCMS, Equipment Room and Switch Yard Check (No problem) 7:45 230kV Main Bus 1 230kV Main Bus 2 𝑈𝑎𝑏 = 235.8 kV 𝑈𝑎𝑏 = 235.6 kV 𝑈𝑏𝑐 = 237.6 kV 𝑈𝑏𝑐 = 237.0 kV 𝑈𝑐𝑎 = 233.9 kV 𝑈𝑐𝑎 = 233.8 kV F = 50.00 Hz F = 50.00 Hz III. Switching Order Activities 0:17 On shun reactor 1 1:41-1:43 Pakse sub station Energize pakse- xpxn line 2 IV. Fault and Alarm Event Log No have V. Special Activities No have VI. Work Permit Activivties No have VII. Issue Trouble Memo No have VIII. Handover Activities Observe Transmission line No. 1&2 Observe tranmision line 2 Pakse-ubon3 for charge
Management Notification
Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….
Pakse Sub Operation Supervisor Signature: ………………………………