Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 69

1.

Which features can help to reduce deployment complexities of Private Cloud


Appliance solution? Mark for Review
(1) Points

(Choose all correct answers)

Allow external connectivity to existing network and storage resources

Single point of contact for support (*)

Ability to grow computing capacity on business demand

One hour from power-on to production (*)

Offers centralized, productivity tool for management and orchestration (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

2. Which scenario is best fit for Private Cloud Appliance solution?


Mark for Review
(1) Points

Consolidation of multiple mission critical applications that demand highest


reliability and extreme performance

Consolidation of ISV or home grown applications running on Linux and Windows


(*)

Consolidation of multiple applications deployed on Oracle WebLogic Server 12c

Consolidation of multiple Oracle Database instances

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

3. Which statements about the benefits of Oracle's Converged


Infrastructure are correct? Mark for Review
(1) Points

(Choose all correct answers)

Reduce deployment time and cost with integrated design (*)


Lower initial purchase cost of the system

Apply best practice at all levels (*)

Single-call support for the whole system (*)

Built-in system management & orchestration services (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

4. Which features of Private Cloud Appliance can help to reduce


overall cost for customers? Mark for Review
(1) Points

(Choose all correct answers)

Converged infrastructure to reduce cost in integration, management and


support (*)

Great IO Flexibility with built-in Oracle Virtual Networking solution

Can leverage existing external network and storage resources (*)

Allow to manage all software licenses by virtual cpus allocated to guest VMs

System can be upgraded with most recent firmware release (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

5. Which statements correctly describe that Private Cloud Appliance


is an integrated platform? Mark for Review
(1) Points

(Choose all correct answers)

Software components are implemented as the system firmware which drives


bootstrap and configuration of a PCA System. (*)

All system components must be pre-installed at factory and shipped to


customer's data center as a single system.

System firmware can be refreshed with a single package from Oracle Support
website. (*)

Hardware components including Rack, Server, Storage and Switch are selected
and configured carefully. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

6. Which statements correctly describe the fact of Private Cloud


Appliance? Mark for Review
(1) Points

(Choose all correct answers)

Fully virtualized system with built-in software defined networking (SDN) for
ultimate flexibility (*)

Out-of-box private cloud solution with easy Enterprise Manager Cloud Control
integration (*)

An Oracle Engineered System which implements optimized general-purpose Oracle


VM platform (*)

Enable Rapid Application Deployment (RAD) with pre-built templates (*)

Previously known as Virtual Compute Appliance which has been evolving for
generations (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Introduction module and try again

7. Which statements about PCA Dashboard UI are correct? Mark for Review
(1) Points

(Choose all correct answers)

Role-based delegated administration is NOT supported by PCA Dashboard UI. (*)

PCA Dashboard UI is a service only runs on current master Management Node.


(*)
PCA Dashboard UI is the centralized tool for managing and monitoring a single
Private Cloud Appliance deployment. (*)

Same management functions as PCA Admin CLIs have been implemented in PCA
Dashboard UI.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

8. Which credential is correct to login PCA Dashboard UI since


firmware release 2.1.1? Mark for Review
(1) Points

admin/Welcome1 (*)

ovcaadmin/Welcome1

ovcaadmin/welcome1

admin/welcome1

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

9. Which credentials can be managed through Dashboard UI? Mark


for Review
(1) Points

(Choose all correct answers)

Admin password of Dashboard UI (*)

MySQL DB password of Oracle VM Manager deployment (*)

ILOM root password of an individual Compute Node

root password of the Internal ZFS Storage Appliance (*)

Password to protect SSL keystore of Oracle VM Manager

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

10. Which URLs can be used to access PCA Dashboard UI during initial
configuration? Mark for Review
(1) Points

(Choose all correct answers)

http://192.168.4.216/dashboard

http://192.168.4.216/ (*)

https://192.168.4.4:7002/dashboard

https://192.168.4.216:7002/dashboard (*)

https://192.168.4.3:7002/dashboard (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

11. Which components will be started by First Management Node in


Private Cloud Appliance? Mark for Review
(1) Points

(Choose all correct answers)

Compute Nodes (*)

Internal Switches

Second Management Node (*)

Internal Storage

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

12. Which network settings MUST be assigned during initial


configuration? Mark for Review
(1) Points

(Choose all correct answers)


Hostname for management nodes

Shared external IP for management cluster (*)

External IPs for both management nodes (*)

External NTP Provider (*)

External DNS Servers

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

13. Which tab view in PCA Dashboard UI can be leveraged to monitor hardware
components in Private Cloud Appliance? Mark for Review
(1) Points

Health

Monitoring

Hardware View (*)

System View

Correct Corect!

14. Which statements about Resetting Password best practices for


Private Cloud Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

Should use different passwords for different security services. (*)

Resetting passwords must be the first task during initial configuration. (*)

Apply data center password policy to security services in Private Cloud


Appliance. (*)
Must use identical password for same type of security service. (*)

Dashboard UI is the only tool to reset passwords for security services in


Private Cloud Appliance.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

15. Which tasks are NOT expected to be performed during Private Cloud
Appliance initial configuration? Mark for Review
(1) Points

(Choose all correct answers)

Reset passwords for Dashboard UI in Private Cloud Appliance

Upload ISO images and Templates into Oracle VM solution (*)

Create additional physical LUNs in internal ZFS Storage Appliance (*)

Assign external IP addresses for Private Cloud Appliance

Configure NTP client for Management Nodes in Private Cloud Appliance

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

16. Which sequence is correct to be performed by Field Engineers to


power on a PCA System? Mark for Review
(1) Points

Rack PDUs, Fabric Interconnect, Internal Storage, First Management Node

Rack PDUs, Internal Storage, First Management Node (*)

Rack PDUs, Internal Storage, First Management Node, Second Management Node,
Compute Nodes

Rack PDUs, First Management Node, Internal Storage

Rack PDUs, Internal Storage, First Management Node, Second Management Node
Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

Connect external storage


(Answer all questions in this section)

17. To manage external storage devices from a PCA System, Admin


Servers need to be configured in the Oracle VM solution. Compute Nodes can be
picked from the following list:

Rack1_ServerPool : ovcacn07r1, ovcacn08r1, ovcacn09r1, ovcacn10r1, ovcacn11r1,


ovcacn12r1
Rack2_ServerPool : ovcacn07r2, ovcacn08r2, ovcacn09r2, ovcacn10r2, ovcacn11r2,
ovcacn12r2
Unassigned Servers : ovcacn13r1, ovcacn14r1, ovcacn26r1, ovcacn27r1, ovcacn28r1

Which servers can be used as Admin Servers for the PCA solution? Mark for Review
(1) Points

(Choose all correct answers)

All servers in Rack1_ServerPool

ovcacn08r1, ovcacn09r1

ovcacn07r1, ovcacn07r2 (*)

ovcacn12r2, ovcacn28r1 (*)

ovcacn07r1

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

18. To enable connectivity to Network Attached Storage (NAS) in data


center, a Network Cloud is created with ports (4:2, 5:2) in Ethernet Modules. Which
connections from the PCA System to external switches (Switch A, Switch B) can
ensure HA of the topology? Mark for Review
(1) Points

(Choose all correct answers)

(4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch B;
(4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch A (*)
(4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch B;
(4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch A

(4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch A;
(4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch B (*)

(4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch B;
(4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch B

(4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch A;
(4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch A

(4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch A;
(4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch B

Correct Corect!

19. Identify storage devices that can be used as external storage resources for a
Private Cloud Appliance deployment? Mark for Review
(1) Points

(Choose all correct answers)

Any storage array with 1GB Ethernet interfaces (*)

Any storage array with 10GB Ethernet interfaces (*)

Any storage array with QDR InfiniBand interfaces

Any storage array with SAS-3 interfaces

Any storage array with 16Gb Fibre Channel interfaces (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

20. FC Modules are just installed into an existing PCA System to


enable connectivity to external FC storage resources. Which CLIs need to be
executed to provision Virtual HBAs to a Compute Nodes ovcacn32r1? Mark for
Review
(1) Points

(Choose all correct answers)


# pca-admin configure vhbas ovcamn05r1 ovcamn06r1 (*)

# pca-admin configure vhbas ovcacn32r1 (*)

# pca-admin add network "Cloud_A" ovcacn32r1

# pca-admin create network "Cloud_A"

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

21. In a PCA deployment, a new Network Attached Storage (NAS) will be


used to expand storage capacity of the PCA System. Service endpoint of the NAS is
10.1.10.36/24. A Network Cloud is created as following for enabling network
connections.
# pca-admin create-network 'NAS_Network' host_network '10:1, 11:1' 10.1.100
255.255.255.0
However, some Compute Nodes in the PCA System can not discover storage resources in
the NAS. Identify possible causes of the issue. Mark for Review
(1) Points

(Choose all correct answers)

Forgot to add iSCSI initiators of those Compute Nodes into the LUN mask
configuration of the NAS (*)

Forgot to provision the Network Cloud to those Compute Nodes (*)

The uplink (10:1) on Fabric Interconnect A in the PCA System is broken

Forgot to mark Storage Role of the datalinks in those Compute Nodes

Mis-configuration of IP routing in those Compute Nodes (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

22. To manage an IB-based ZFS Storage Appliance from OVM Manager in a


PCA System, which interface can be selected as backend of the management data link
in the ZFS Storage? Mark for Review
(1) Points

NETMGMT
SERMGT

port0 in IB HCA

net0 (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

23. A new NAS storage is installed to provision resources for Guest


VMs in a Tenant Group (TG1) which currently contains two servers ovcacn05r2,
ovcacn06r2. Data Service Endpoint in the NAS storage is 10.1.10.12/24. IP addresses
for NAS clients in Guest VMs must be in subnet 10.1.100.0/24, and gateway is
10.1.100.254.

The ports (4:3) in IO Modules are selected as uplinks connecting the NAS storage.
Which CLIs must be executed to configure vNICs for servers in the Tenant Group?
Mark for Review
(1) Points

(Choose all correct answers)

# pca-admin create-network 'TG1_NAS_Network' external_network '4:3' (*)

# pca-admin create-network 'TG1_NAS_Network' host_network '4:3' 10.1.100


255.255.255.0 10.1.10.0/24 10.1.100.254

# pca-admin add network-to-tenant-group 'TG1_NAS_Network' 'TG1' (*)

# pca-admin add network 'TG1_NAS_Network' ovcacn05r2; pca-admin add network


'TG1_NAS_Network' ovcacn06r2

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

24. When planning storage for a PCA deployment, which resources can
be leveraged to store data for a production Oracle RAC solution in default Tenant
Group? Mark for Review
(1) Points

(Choose all correct answers)

External iSCSI LUNs which are provisioned to Management Nodes in the PCA
System
External iSCSI LUNs which are provisioned to Guest Domains that will host the
Oracle RAC solution (*)

An OVM Repository that is created from a NFS share which can be mounted on
all server nodes in the PCA System

External FC LUNs which are provisioned to Compute Nodes in default Tenant


Group (*)

OVM Repositories which are presented to the server pool by firmware

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.
25. Which configuration rules are correct for connecting ZFS Storage Appliances
with InfiniBand interfaces to a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

ZFS Storage must be configured with dual controllers, which have a dual-port
IB HCA on each controller. (*)

A Network Cloud must be created and provisioned to each Compute Node to


enable connectivity to the ZFS Storage.

IP settings for InfiniBand interfaces on ZFS Storage must be in a preserved


range defined by the PCA System. (*)

InfiniBand interfaces on storage controllers must connect to InfiniBand


Switches in Base Rack of the PCA System.

A PCA System can only connect to limited number of ZFS Storage Appliance with
InfiniBand interfaces. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

26. When connecting a PCA System to FC Switches (Switch 1, Switch 2)


in data center, uplinks in Cloud A are connecting to Switch 1, which connections
from other three Storage Clouds can ensure maximum reliability of the topology?
Mark for Review
(1) Points

(Choose all correct answers)


Cloud B -> Switch 2, Cloud C -> Switch 1, Cloud D -> Switch 2 (*)

Cloud B -> Switch 2, Cloud C -> Switch 2, Cloud D -> Switch 1 (*)

Cloud B -> Switch 1, Cloud C -> Switch 1, Cloud D -> Switch 2

Cloud B -> Switch 2, Cloud C -> Switch 1, Cloud D -> Switch 1

Cloud B -> Switch 1, Cloud C -> Switch 2, Cloud D -> Switch 2

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

27. Two Admin Servers have been configured in a PCA System.


Administrators can manage an external FC storage through OVM Manager. However one
Admin Server can not discover physical LUNs created in the FC storage. Which
statements can explain this phenomenon? Mark for Review
(1) Points

(Choose all correct answers)

vHBAs are not provisioned to the Admin Server. (*)

Management connection from the Admin Server to the FC storage is broken.

FC uplinks from the PCA System are disconnected from external FC switches.

Plugin component in the Admin Server is mis-configured.

LUN mask configuration in the FC storage prevent the server from accessing
those storage resources. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

28. A Network Cloud with ports (10:3, 11:3) is created dedicatedly to


enable external NAS connectivity. Two external Ethernet Switches (Switch A, Switch
B) are deployed to ensure redundancy. The port (10:3) in Fabric Connect A is
connected to Switch A, which additional connections are required to enable HA of
the topology? Mark for Review
(1) Points
(Choose all correct answers)

(11:3) in Fabric Connect A -> Switch A

(10:3) in Fabric Connect B -> Switch B (*)

(11:3) in Fabric Connect B -> Switch A (*)

(11:3) in Fabric Connect B -> Switch B

(11:3) in Fabric Connect A -> Switch B (*)

(10:3) in Fabric Connect B -> Switch A

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

29. To leverage FC-SAN storage in data center, which sets of


connections from a PCA System to external FC Switches (Switch 1, Switch 2) can
establish a HA topology? Mark for Review
(1) Points

(Choose all correct answers)

Cloud C -> Switch 1, Cloud D -> Switch 2 (*)

Cloud A -> Switch 1, Cloud B -> Switch 1

Cloud A -> Switch 1, Cloud B -> Switch 2 (*)

Cloud C -> Switch 2, Cloud D -> Switch 2

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

30. Which technologies can be leveraged to control resource access


from a PCA System to external FC Storage? Mark for Review
(1) Points

(Choose all correct answers)

WWN-based FC Zoning
User-based Access Control

LUN Mask (*)

Port-based FC Zoning (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Connect External Storage module and try again.

31. What is the primary goal of the Installation and


Configuration of Oracle Hardware and Software step in the EIS methodology? Mark
for Review
(1) Points

Hardware cabling , wiring and Power ON

Managing transition from Installation phase to Field Service issue recording

Troubleshooting software configuration issues

System acclimatization, installation, and basic configuration (*)

Incorrect Incorrect! Please review the course content and try again.

32. What are the two primary objectives for the Installation
Configuration Planning step of the EIS methodology? Mark for Review
(1) Points

(Choose all correct answers)

Oracle/Partner and Customer will determine and mutually agree upon the
hardware and software installation requirements which will be documented in the
Installation and Configuration Plan (*)

Customer provides walk-through of installation site

Oracle/Partner confirms power and cooling requirements for system


installation

Tests that will be performed during the Systems Testing will be defined. (*)
Incorrect Incorrect! Please review the course content and try again.

33. What should partners do before first using ESISdocV4? (Select


two) Mark for Review
(1) Points

(Choose all correct answers)

Review the “EISdoc V4 Getting Started Cookbook” and “Success with EISdoc V4
Cookbook” (*)

Review the Openoffice presentation on EISdoc V4 found on the EIS Planning &
Documentation web page

Review Oracle product overview documentation

Submit their EIS Test Procedure Plan outcomes

Incorrect Incorrect! Please review the course content and try again.

34. Which four objectives are primary goals for an EIS Site Audit?
Mark for Review
(1) Points

(Choose all correct answers)

Determine the availability of required electrical power to run and maintain


the System (*)

Determine how frequently system backups will be completed

Determine the environmental conditions at Customer's site including


temperature, humidity, cleanliness and such other assessments as are determined to
be necessary in Oracle's sole discretion (*)

Determine the floor weight load capacity at the location where the System
will be installed (*)

Determine how many logical domains need to be configured on the system

Determine installation needs for the System, including such assessments as:
the suitability of access routes to the installation location, such as doors,
elevators, floor strengths and ramps (*)
Incorrect Incorrect! Please review the course content and try again.

35. What is the main purpose of the EIS methodology? Mark for
Review
(1) Points

To use best practices, standards, methodologies and continuous process


improvement to ensure consistent, efficient, supportable and high quality product
installations globally (*)

To enable customers to install and service Oracle hardware and software.

To use best practices to support standard field delivery and break/fix


services by partners.

To provide a foundational methodology for front line support triage by Help


Desk providers.

Correct Correct!

36. What is found on the EIS-DVD? Select all the apply. Mark for
Review
(1) Points

(Choose all correct answers)

Scripts that assist during the installation (*)

Selected Oracle/Sun Software

A complete set all configuration files for every Oracle server, storage
system and Engineered system

Tools to help verify the quality of the installation (e.g. ORAS/CLI)

Sales and presales technical training on Oracle systems

Incorrect Incorrect! Please review the course content and try again.

37. What are three types of configuration information typically documented in an


Installation Configuration Plan? Mark for Review
(1) Points

(Choose all correct answers)

Power cord specifications

IO cards and controllers

General and Management Network Configuration

System documentation and guidelines

System host names (*)

Boot Disk Layout

Incorrect Incorrect! Please review the course content and try again.

38. Why it is important to do Installation planning, rather than just


asking the customer as you work through the installation process? (Select three)
Mark for Review
(1) Points

(Choose all correct answers)

Continuing interruptions can detract from the professionalism of your work,


and lead to customer dissatisfaction (*)

Customer technical contact may not be readily available (*)

Planning leads to more thoughtful consideration for a predictable outcome of


the installation process (*)

Pricing for Installation Services is less expensive if planning in not


included

Support Services will not engage on services requests if no installation


planning was done

Incorrect Incorrect! Please review the course content and try again.

39. Assuming a SPARC T5 Server installation on which you install


Solaris 11, what EIS documentation, at a minimum, is it recommended that you bring
to support you in the installation project? Mark for Review
(1) Points

(Choose all correct answers)

EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36

EIS Installation Checklist for SPARC T5 (*)

EIS Installation Checklist for Solaris 11 OS

EIS Installation Checklist for Common Array Manager

Incorrect Incorrect! Please review the course content and try again.

40. What is the primary purpose of the EIS-DVD? Mark for Review
(1) Points

The EIS-DVD is an annually released product which support all hardware


installations, and documents all bugs and issues that have been logged during the
prior year

The EIS-DVD is to help installers of Oracle/Sun products perform consistent


installations in an efficient manner. (*)

The EIS-DVD is a tool that is provided to installation partners as a give-


away to customers

The EIS-DVD is used for on-the-job tutorials on how to install Oracle servers
and storage

Incorrect Incorrect! Please review the course content and try again.

41. Name two functions for the EIS-DVD during the Installation and
Configuration of Oracle Hardware and Software step in the EIS methodology? Mark
for Review
(1) Points

(Choose all correct answers)

Used as a back-up for complete documentation sets that are on


http://docs.oracle.com
Provides an excellent tool as a leave behind utility for customers

Provides installation assessment and diagnostic tools (*)

Contains required patches and firmware for most installations

Incorrect Incorrect! Please review the course content and try again.

42. What is the purpose for the Operational Handover step in the EIS
Methodology? Mark for Review
(1) Points

Perform system testing and diagnostics

Documents how to use the EIS documentation and standards

Used to negate responsibility for any ongoing System issues

Documents the installation and configuration of Customer's system(s) (*)

Incorrect Incorrect! Please review the course content and try again.

43. What three documents are typically used as part of the EIS Planning and
Preparation stage in the installation process? Mark for Review
(1) Points

(Choose all correct answers)

Site Audit Report (*)

Installation and Configuration Plan

Acclimatization Report

Test Procedures Plan

Operational Hand-off Form

Project Schedule
Incorrect Incorrect! Please review the course content and try again.

44. What should you do if you believe you have found an error in an
EIS checklist? Mark for Review
(1) Points

Follow the feedback method on the last page of every checklist: email
[email protected] (*)

Email Larry Ellison and recommend changes

Assume that the EIS team is already aware and the next version of the
checklist will be updated

Submit your concerns to My Oracle Support

Correct Correct!

45. What should you do with the EIS checklist when an installation
project is complete? Mark for Review
(1) Points

Remove the EIS checklist and other confidential Oracle Intellectual Property
from the customer datacenter (*)

Post the EIS checklist and Test Procedures Plan to My Oracle Support under
your customer’s account

Crumple the checklist and throw it in the customer wastepaper bin

Leave the EIS checklist with the customer so that they can re-install when
they need to

Correct Correct!

46. What tasks occur during the operational handover phase of the EIS
methodology? Mark for Review
(1) Points

(Choose all correct answers)

Provide the customer the 20% installation service rebate that is required
after a successful installation

Document the serial number for the system(s) installed, as well as any
comments pertaining to the installation

Collate the EISdocV4 documents pertaining to this customer installation, and


product documentation for handover (*)

Obtain customer signatures to successful close project

Incorrect Incorrect! Please review the course content and try again.

47. What are the four key points covered in each test topic of the
Test Procedures Plan? Mark for Review
(1) Points

(Choose all correct answers)

Prerequisites

Outcome

Objective (*)

Conclusion

Test Result

Method

Incorrect Incorrect! Please review the course content and try again.

48. What two activities are accomplished during Installation Task


Planning step in the EIS Methodology? Mark for Review
(1) Points

(Choose all correct answers)

Review the timeframe options for delivery of the service

Networking and system component cabling


System unpacking and acclimatization

Communicate schedule for installation to the customer (*)

Organization of the team who will actively work the Installation (*)

Incorrect Incorrect! Please review the course content and try again.

49. Who is involved in the Project Initiation phase? Mark for Review
(1) Points

(Choose all correct answers)

3rd party Service Provider

Customer point of contact (*)

Oracle Financing contact

Partner point of contact (*)

Oracle Installation Coordinator or Project Manager (if applicable) (*)

Incorrect Incorrect! Please review the course content and try again.

50. Why are EIS deliverables relevant for Partner installations too?
Mark for Review
(1) Points

EIS deliverables provide flexibility when customers want to make ad-hoc


configuration changes

Advanced Customer Services mandates that Partners use the EIS methodology for
installations

When partners use the EIS deliverables and submit documentation to that
effect, their customer gets a 25% discount on support

EIS deliverables describe the amount of time, materials and deliverables are
in scope for a standard installation (*)
Incorrect Incorrect! Please review the course content and try again.

51. When should the Site-Audit be performed? Mark for Review


(1) Points

Prior to the completion of the sale, in order to ensure that the customer’s
location is viable

As soon as possible, and certainly prior to delivery of the system (*)

After the system has been acclimatized and is ready for unpacking at the
customer site

As soon as the product has been delivered to the customer

Incorrect Incorrect! Please review the course content and try again.

52. You are assigned to an installation project in France in February


to install 5 new SPARC T5 servers. The servers, in their original packaging, are
sitting in the customer’s loading dock with a temperature of 8 degrees C (46
degrees F). The customer’s data center is 20 degrees C (68 degrees F). What is the
recommended next step in acclimating these systems? Mark for Review
(1) Points

Move the systems (still packed) into the data center

Unpack the servers and store in the data center

Move the systems (still packed) into a room with a similar environment to the
data center (*)

Unpack the servers and store in the loading dock

Incorrect Incorrect! Please review the course content and try again.

53. What are two activities that take place during the System Test
step of the EIS methodology? Mark for Review
(1) Points

(Choose all correct answers)

Electrical grounding and environmental assessment


On Solaris-based systems, Oracle's Explorer Data Collector will be run and
the results evaluated with ORAS/CLI from the EIS-DVD (*)

Tests specified in the Test Procedures Plan Plan will be carried performed

Application installation, configuration, and testing

Incorrect Incorrect! Please review the course content and try again.

54. Which two EIS documents are most useful during the Installation
and Configuration of Oracle Hardware and Software step? Mark for Review
(1) Points

(Choose all correct answers)

EIS Checklist

Installation Configuration Plan (*)

Operational Handover Agreement

Site-Audit Report

DVD

Incorrect Incorrect! Please review the course content and try again.

55. What are two statements that are true about EIS checklists? Mark for Review
(1) Points

(Choose all correct answers)

Checklists are publicly available on oracle.com

EIS installation checklists are intended to guide the installer through the
installation in a logical and consistent manner (*)

Checklists are intended as guidelines for properly trained installers and are
NOT a substitute for appropriate product training.

Checklists are a valuable tool to share with customers so they know how to
install systems themselves

Incorrect Incorrect! Please review the course content and try again.

56. Which four documents are included as part of the Operational


Handover? Mark for Review
(1) Points

(Choose all correct answers)

MOS Internal Documentation

Installation and Configuration Plan

EIS Checklist for the System installed

Site Audit Report (*)

System Documentation

Test Procedures Plan

Incorrect Incorrect! Please review the course content and try again.

57. What are three items in the EIS Site-Audit Report are documented
for all Oracle hardware? Mark for Review
(1) Points

(Choose all correct answers)

Operating Environment and Cooling requirements

Facility Power requirements

Operating System requirements

IP Address requirements

Access Route requirements (*)


Incorrect Incorrect! Please review the course content and try again.

58. For safety awareness with respect to grounding, if a system has


been modified after the manufacturer's assembly process, what three recommendations
does the EIS Grounding Standard make? Mark for Review
(1) Points

(Choose all correct answers)

If modifications involved any power supplies, distribution units or wiring,


did qualified personnel verify that the modification was was correct and did they
test the system to ensure that it doesn't pose any safety hazard?

Check whether the modification involved any power supplies, distribution


units or wiring? (*)

If the temperature is below 60 degrees F., warm the room first before power
ON

If qualified personnel did not test the safety of the modified system then
proper testing should be requested before Oracle and/or partner personnel will work
on the equipment

Determine whether the local electrician can support the installation process

Incorrect Incorrect! Please review the course content and try again.

59. Which three responses are true regarding EISdoc v4? Mark for
Review
(1) Points

(Choose all correct answers)

Contains documents matched to the steps in the EIS Methodology

Is an OpenOffice-based set of documentation that includes planning for


installations of Oracle equipment and some software (*)

Is a free guide to configuring Oracle software

Is available on the partner Enterprise Installations Standards web page and


on the EIS-DVD

Is accessible to customers and end-users of Oracle hardware and software


Incorrect Incorrect! Please review the course content and try again.

60. Which three statements are true about EIS? Mark for Review
(1) Points

(Choose all correct answers)

EIS stands for “Enterprise information Standards”

EIS is a methodology designed to address issues before, during and after the
actual hands-on installation of Oracle systems (*)

EIS stands for “Enterprise Installation Standards” (*)

EIS is a quick and dirty process for expediting Oracle system installations

EIS evolved from the field, is sustained by those closely involved with the
field, and is intended to assist the field (*)

Incorrect Incorrect! Please review the course content and try again.

61. What if the customer has their own labeling methodology that differs from the
recommended one from EIS? Mark for Review
(1) Points

Submit a Service Request for Oracle approval on use of the customer labeling
and routing methods

Ignore the customer’s standard and use the EIS standard

Follow the customer's standard for cable labeling provided it meets with EIS
requirements for identification and port location. (*)

Redo cabling throughout the datacenter to meet the EIS standard

Incorrect Incorrect! Please review the course content and try again.

62. What is the primary purpose of the”Basic Solaris” standard? Mark


for Review
(1) Points

Defines a method for achieving a consistent installation for Oracle Servers


with Solaris OS (*)

Specifically describes how to install Solaris on non-SPARC hardware

Describes how to install legacy versions of Solaris on systems that need to


support backward compatible applications

Differentiates between Linux and Solaris installation processes on dual-boot


systems

Correct Correct!

63. Why do the EIS Standards recommend that external cables between
Oracle hardware, such as servers, storage devices, network devices and ports be
clearly labeled? Mark for Review
(1) Points

Labeling is not an EIS best practice

Service requests for field diagnostics will not be accepted unless cables are
labeled

For ease of maintenance it should be unambiguously clear from the label on


each cable, where the cable has to be attached (*)

Cable routing should be done with rubber bands for ease of reconfiguration

Incorrect Incorrect! Please review the course content and try again.

64. What four tasks are typically happening at the EIS Planning and
Preparation stage in the installation process? Mark for Review
(1) Points

(Choose all correct answers)

Compile EIS planning documents

Unpack and power ON systems


Notification of Customer Installation project (*)

Identify Installation team – Oracle Installation Coordinator, Project


Manager, Customer Point of Contact, others as needed

Cable and install systems into custom rack

Begin work on Project Schedule

Incorrect Incorrect! Please review the course content and try again.

65. What do EIS deliverables define? Mark for Review


(1) Points

EIS deliverables describe detailed process steps for each phase of the
installation service

EIS deliverables are the documents that are left behind with customers after
an installation service is performed

EIS deliverables give a high level description of the scope of the EIS
activities for each product or product family (*)

EIS deliverables are the Customer Support Identifiers that customers use for
field delivery service after an installation has completed

Incorrect Incorrect! Please review the course content and try again.

66. What three typical activities are done during the Project
Initiation phase of the EIS Methodology? Mark for Review
(1) Points

(Choose all correct answers)

Details about the customer are determined and documented (*)

System configuration details are documented.

Details about the project are identified and documented, for example, is this
a single system installation or a complex, multi-product installation (*)

The EIS Site-Audit is scheduled (*)


System delivery occurs, and the project commences

Incorrect Incorrect! Please review the course content and try again.

67. Why should you typically complete the Installation Configuration Plan and
create your Test Procedures Plan at the same time? Mark for Review
(1) Points

Test Procedures plan is a standard document used in all generic system


installations.

As you work through the system configuration process with your customer, you
should state how you will test key items in the system’s configuration for having
been successfully completed. (*)

You should create the Test Procedures Plan after you have completed the
system installation and configuration.

Correct Correct!

68. What are two cautions that should be acknowledged when


acclimatizing a system? Mark for Review
(1) Points

(Choose all correct answers)

Avoid unpacking items inside the computer centre (dust/dirt contaminating


filters etc.)

Once powered on the temperature is no longer an issue, as internal cooling


systems commence

Powering ON the system will speed the acclimatization process as the heat
from the system will accelerate its warming

The maximum positive or negative temperature gradient that is permitted for


multi-layer<br>boards is approximately 2° C (4° F) per hour. (*)

Incorrect Incorrect! Please review the course content and try again.

69. According to the EIS methodology, when issues are uncovered


during the Site-Audit, who should be notified? Mark for Review
(1) Points

(Choose all correct answers)

Customer point of contact (*)

Oracle Premier Support

Installation coordinator if applicable

Oracle sales management

Incorrect Incorrect! Please review the course content and try again.

70. Why should you use the EIS methodology to guide your installation
process? Mark for Review
(1) Points

Using the proven EIS methodology will provide step-by-step installation


guidelines, help guarantee a quality installation, make your life easier, and
ensure customer satisfaction (*)

The EIS methodology provides a 20% discount on Support Services if you


install your customers’ hardware or software using it

Installation processes are very lengthy, the EIS methodology is quick and
dirty

Larry Ellison has mandated using EIS

Correct Correct!

71. Why is the rate of temperature change when acclimatizing systems


such an important factor as described in the EIS methodology? Mark for Review
(1) Points

Systems should be warmed up and powered ON as quickly as possible to optimize


the installation project timeline

It is actually not relevant or important

Variations in temperature do not have as big an impact as do Service contract


considerations for how long an installation will take

Variations in temperature should not exceed the approved gradient of


approximately 2° C (4° F) per hour, because ignoring this may could lead to long-
term damage (hair-cracks) on the boards (*)

Incorrect Incorrect! Please review the course content and try again.

72. Name three of the problems that EIS was created to overcome?
Mark for Review
(1) Points

(Choose all correct answers)

Lack of formal agreement with customers as to outcome of an installation (*)

Inconsistent installations: Customers buying identical servers for two


locations were dismayed to find different patch levels, firmware versions etc. (*)

Oracle hardware shipping best practices for on-time delivery

Poor communication/use of Best Practices (*)

Standards for delivery of replacement parts for Oracle hardware

Incorrect Incorrect! Please review the course content and try again.

73. What are three factors that influence how long a


system (server, storage, engineered system) will require to be acclimatized after
delivery to a customer, before power can be applied without causing damage? Mark
for Review
(1) Points

(Choose all correct answers)

cleanliness

temperature (*)

humidity

timezone
data center space

Incorrect Incorrect! Please review the course content and try again.

74. What is the mission statement for use of the Enterprise


Installation Standards? Mark for Review
(1) Points

To manage communication and resolution of Services Requests in a timely and


customer-friendly manner

To drive the ongoing development and usage of Enterprise Installation


Standards (EIS), resulting in consistent, high quality, and cost effective
installations that speed time to deployment and provide the foundation for enhanced
stability and performance. (*)

To drive consistent best practices for Oracle Services field delivery

To use a methodology for support service that is from the field, created by
the field for the Field.

Correct Correct!

75. Which Oracle products are covered by EIS Checklists – select all
that apply. Mark for Review
(1) Points

(Choose all correct answers)

Engineered Systems

Servers (*)

ERP applications

OS and Cluster-related Software

Oracle Fusion Middleware

Storage
Switches

Incorrect Incorrect! Please review the course content and try again.

76. When should you review deliverables and why? Mark for Review
(1) Points

Ideally EIS deliverables would be reviewed at the very start of an


installation project, as they clearly define scope, roles and responsibilities, and
project deliverables (*)

EIS deliverables are an interim checklist to ensure that at the mid-way point
of an installation the project remains on track.

EIS deliverables are used as a last step in the installation process to


ensure the installer provided everything that is required

EIS deliverables are included in the Oracle system shipping and packaging
documents near the start of an installation

Correct Correct!

77. What are Oracle Standard System Installations (OSSI)? Mark for
Review
(1) Points

Installation Services sold by 3rd party service providers

Installation Services sold by Oracle Advanced Customer Support (*)

Advanced professional services offered by IBM Global Services

Field Delivery Support Services offered through certified partners

Correct Correct!

78. If the customer has asked for some customization of their


installation, how is testing for that accomplished? Choose all responses that
apply. Mark for Review
(1) Points

(Choose all correct answers)


Oracle is automatically responsible for any non-standard installation
procedure, regardless of whether they were agree to as part of the Installation and
Configuration Plan

Testing above and beyond the Covered System Tests are at the sole discretion
of Oracle and/or the Partner installer

Additional tests can be inserted into the Test Procedures plan (*)

Not all installation actions need testing

Incorrect Incorrect! Please review the course content and try again.

79. Which statements about installing ASR Manager software for Private Cloud
Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

ASR Manager software is a Java-based solution which requires at least Java


Runtime release 7. (*)

ASR Manager software package can be available from internal software


repository or download from oracle.com. (*)

ASR Manager software will be registered as a system service in Management


Node. (*)

ASR Manager software only needs to be installed on current master Management


Node.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

80. Which tasks are required after ASR Manager software is installed
on Management Nodes in Private Cloud Appliance? Mark for Review
(1) Points

(Choose all correct answers)

Register ASR Manager as a managed service in ovca service. (*)

Move configuration and log folder of ASR Manager service to a location in


internal ZFS Storage Appliance. (*)

Start ASR Manager service in both Management Nodes.

Stop and disable ASR Manager service in both Management Nodes. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

81. Which folder in ASR Manager 5.x deployment should be moved to the
shared internal storage? Mark for Review
(1) Points

/var/log/asrmanager

/var/opt/asrmanager (*)

/opt/asrmanager

/usr/lib/asrmanager

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

82. Which component in ASR Architecture will monitor hardware


component and generate Service Requests (SRs) when failure conditions are detected?
Mark for Review
(1) Points

ASR Assets

ASR Manager (*)

My Oracle Support

ASR Infrastructure

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.
83. Identify correct pre-requisites that enable sending Service
Requests (SRs) from embedded ASR Manager in internal ZFS Storage Appliance to
service team at Oracle. Mark for Review
(1) Points

(Choose all correct answers)

A light-weight HTTP proxy service (tinyproxy) in Management Nodes (*)

ASR Manager service in Management Nodes

A Direct Internet Connection from internal ZFS Storage Appliance

A SMTP daemon in data center is configured as relay for "phone-home" feature


in internal ZFS Storage Appliance

A valid System Support Contract and MOS Account for Private Cloud Appliance
(*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

84. Which statements about configuring ASR services for Private Cloud
Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

A direct Internet connection is the pre-requisite for configuring ASR


services for Private Cloud Appliance. (*)

Configuring ASR services for Private Cloud Appliance includes two steps which
are deploying stand-alone ASR Manager in the Management Cluster and activating ASR
Assets in PCA. (*)

Configuring ASR services is recommended to be done when Private Cloud


Appliance is first time installed for the customers. (*)

ASR services will be configured mostly by qualified field engineers from


Oracle and partners but sometimes even allow customers do the configuration
themselves.

Correct Corect!

85. Which system component inside Private Cloud Appliance has an embedded ASR
Manager inside? Mark for Review
(1) Points

PDUs in the Rack

InfiniBand Switches

Server Nodes

ZFS Storage Appliance (*)

Fabric Interconnect

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

86. To activate server nodes and switches nodes in Private Cloud


Appliance as ASR assets, which IP address should be used as destination of ASR
Manager service in the Management Nodes?
Mark for Review
(1) Points

192.168.4.4

External shared IP for the Management Cluster

192.168.4.3

192.168.4.216 (*)

Correct Corect!

87. Which statements about Automatic Service Request are correct?


Mark for Review
(1) Points

(Choose all correct answers)

The goal of ASR is to help to resolve hardware component failure in customers


data center faster. (*)

ASR is an integrated solution which includes hardware design, software


services and backend support infrastructure at Oracle. (*)

ASR was initially created by Sun for Sun Hardware. It has been extended to
support Oracle Engineered System. (*)

All hardware components in Private Cloud Appliance can be monitored with ASR
solution.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

88. Following is the snapshot of the configuration file of ovca


service before registering ASR Manager as a additional managed service.

[mgmt_init]
[...]
foundational_services: ovmm_mysql
ovmm
tinyproxy
xms
dhcpd
[...]

Which location in the "foundational_services" section is correct for the ASR


Manager service to be registered? Mark for Review
(1) Points

After all existing services

After tinyproxy service

Before tinyproxy service

Any location in the service list (*)

As the first service

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Configure ASR Service module and try again.

Private Cloud Appliance Management Tools


(Answer all questions in this section)

89. Which statements about System Diagnostic for Private Cloud


Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

Both stand-alone diagnostic tool and Health Check function in PCA Admin CLI
will generate report as files that can be sent to Oracle Support Engineers for
troubleshooting.

System Diagnostics for Private Cloud Appliance are used for troubleshooting
and support purposes. (*)

Both stand-alone Appliance Diagnostic tool and Health Check function in PCA
Admin CLI can be leveraged. (*)

Health Check function in PCA Admin CLI will run test against various aspects
in Private Cloud Appliance. (*)

Stand-alone Appliance Diagnostic tool will collect diagnostics data from


Private Cloud Appliance. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

90. When performing backup for Private Cloud Appliance, you can
leverage following CLIs:

1. # pca-admin list task


2. # pca-admin show task
3. # pca-admin list config-error
4. # pca-admin rerun config-task
5. # pca-admin delete config-error
6. # pca-admin backup

which CLI sequences will possibly lead to a confirmed successful backup? Mark
for Review
(1) Points

(Choose all correct answers)

6,1,6,2 (*)

6,2,3,5

6,1,3,4,5 (*)

6,2 (*)
6,2,3,4,1,5

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again

91. Which CLI can be used if you want to see detail information of the Compute
Node (ovcacn30r1) in Private Cloud Appliance? Mark for Review
(1) Points

# pca-admin list compute-node ovcacn30r1

# pca-admin show compute-node ovcacn30r1 (*)

# pca-admin show compute-node --filter-column "Compute_Node" --filter


"ovcacn30r1"

# pca-admin list compute-node --filter-column "Compute_Node" --filter


"ovcacn30r1"

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

92. Which URLs are valid management service endpoints of Oracle VM


Manager in a Private Cloud Appliance deployment which external IP for the
Management Cluster is 10.11.2.116? Mark for Review
(1) Points

(Choose all correct answers)

https://10.11.2.116:7002/core/ovm/soap (*)

https://10.11.2.116:7002/dashboard

ssh://10.11.2.116

https://192.168.4.216:7002/ovm/console (*)

Correct Corect!

93. In case you want to create a new VM network (myNetwork_s5p2) for


all configured Compute Nodes by leveraging unused port 2 on Ethernet Modules at
slot 5, which of the following CLIs combined can help you to implement the task?
Mark for Review
(1) Points

(Choose all correct answers)

# pca-admin add-network myNetwork_s5p2 external_network '5:2'

# pca-admin add-network myNetwork_s5p2 <node name> (*)

# pca-admin list compute-node (*)

# pca-admin create-network myNetwork_s5p2 <node name>

# pca-admin create-network myNetwork_s5p2 external_network '5:2' (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

94. Which statements about Managed Objects in Oracle VM Manager are


correct? Mark for Review
(1) Points

(Choose all correct answers)

All objects including metadata are stored centrally in Oracle VM Manager


Repository.

All management and monitoring functions in Oracle VM Manager are implemented


based on objects. (*)

Oracle VM Manager defines all manageable targets as objects. Different object


types have special attributes and operations. (*)

Each object is uniquely identified by an internal ID in Oracle VM Manager.


Also a human readable name can be assigned for each object. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

95. Which statements about object-based management and monitoring in


Oracle VM Manager are correct? Mark for Review
(1) Points
(Choose all correct answers)

An event can be recorded by Oracle VM Manager when state of an object is


changed. The severity will be used to mark the importance of the event. (*)

Objects in Oracle VM Manager can be monitored based on event or performance.


(*)

A job defines transaction boundary for all contained actions. The state of
job can indicate running or completion status of the job. (*)

Performance monitoring is only available for Oracle VM Server object. You can
define rules to determine health status for Oracle VM deployment.

All management tasks in Oracle VM Manager must be wrapped as jobs. A single


job can group multiple management actions. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

96. Which statements about PCA Management CLIs are correct? Mark
for Review
(1) Points

(Choose all correct answers)

PCA Admin CLI provides more comprehensive management functions than those
available in Dashboard UI. (*)

PCA Management CLIs are collection of scripts deployed on both Management


Nodes. Those scripts implement system management capabilities for Private Cloud
Appliance. (*)

PCA Admin CLI can run on both Management Nodes with identical functions.

PCA Management CLIs are firmware release dependent. Since firmware release
2.1.1, most previous single-function tools are consolidated into PCA Admin CLI
tool. (*)

Administrators can execute a single management command in Linux shell or


multiple management commands in an interactive session with PCA Admin CLI. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.
97. Which statements about OVM Manager CLI in Private Cloud Appliance are
correct? Mark for Review
(1) Points

(Choose all correct answers)

OVM Manager CLI implements a customized interactive shell and need to install
a special client on administrators' workstation.

OVM Manager CLI service can be customized to enable password and key based
authentication. (*)

OVM Manager CLI is a bundled management service in Oracle VM Manager so that


Oracle will provide official support. (*)

OVM Manager CLI can work seamlessly with OVM Manager UI because they both run
on same core services. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Management Tools module and try again.

98. You are installing Private Cloud Appliance for one of your
customers. During installation a Compute Node (ovcacn08r1) shown in the Dashboard
UI has never been successfully discovered by the OVM Manager. Choose the CLIs to
find possible reasons and to fix the issue in case of whole server need to be
replaced.

1. # pca-admin diag software


2. # pca-admin show compute-node ovcacn08r1
3. # pca-diag vmpinfo servers='ovcacn08r1'
4. # pca-node-db delete name=ovcacn08r1
5. # pca-admin reprovision compute-node ovcacn08r1" Mark for Review
(1) Points

1,2,4

2,3,4 (*)

2,3,5

1,2,3,4,5

Correct Corect!
Private Cloud Appliance Architecture
(Answer all questions in this section)

99. Which statements about Oracle VM Manager in Oracle VM solution


are correct? Mark for Review
(1) Points

(Choose all correct answers)

Management Server in Oracle VM Manager is deployed in an Oracle WebLogic


Server instance. (*)

Oracle VM Manager Repository in Oracle VM Manager stores metadata of objects


in Management Server. (*)

Oracle VM Manager is a JavaEE-based application solution that can be used to


manage one or more server pools. (*)

Management Server in Oracle VM Manager implements core management logic and


various management services. (*)

Oracle VM Manager Repository in Oracle VM Manager uses a MySQL DB instance


deployed either locally or remotely.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

100. Which statements about data fabric in a PCA System are correct?
Mark for Review
(1) Points

(Choose all correct answers)

Server and Storage nodes in each rack connect to InfiniBand Switches in same
rack. (*)

The fabric is configured with end-to-end fully-redundant topology. (*)

The fabric enables communications between Server and Storage nodes. (*)

InfiniBand Switches in each Expansion Rack need to connect with InfiniBand


Switches in Base Rack to extend the fabric.

Uplinks from InfiniBand Switches in each Expansion Rack are reserved to


maximize throughput. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

101. Which statements about Software-Defined Fabric feature in Oracle


Virtual Networking solution are correct? Mark for Review
(1) Points

(Choose all correct answers)

PVI implementation does not use any existing network protocol like VxLAN so
that can simplify network planning. (*)

A PVI creates a software domain which isolates network configuration and


switching. (*)

External switches in customers data center can help to route network traffic
across multiple PVIs.

Software-Defined Fabric, aka. Private Interconnect (PVI), is based on the


virtual IO device implementation that terminates in a Fabric Board. (*)

Software-Defined Fabric is ideal for cloud deployment with the isolation


nature. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

102. Which network interfaces in system components are used to enable


integrated management architecture of a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

ib0, ib1 in Compute Nodes (*)

SERIAL MGMT in Fabric Interconnect

NETMGT in Rack PDUs (*)

ib0, ib1 in Storage Controllers


net0 in Management Nodes (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

103. Which statements about switch node deployment in a PCA System are correct?
Mark for Review
(1) Points

(Choose all correct answers)

Switch Nodes are configured identically in all racks of a PCA System.

Network connections to components inside same rack are pre-cabled at factory.


(*)

All Switch Nodes are configured in pair to improve reliability. (*)

Three types of Switch Nodes, Ethernet, IB and Fabric Interconnect, are


configured in Private Cloud Appliance. (*)

All Switch Nodes are installed at the top of each rack for optimized cabling
and easy maintenance.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

104. Which components are building blocks of Oracle Fabric


Interconnect? Mark for Review
(1) Points

(Choose all correct answers)

IO Module (*)

Network Express Module

Mid-plane (*)

Management Module (*)

Fabric Board (*)


Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

105. Which statements about system racks in a PCA System are correct?
Mark for Review
(1) Points

(Choose all correct answers)

Base Rack is always required in a PCA system to deploy critical system


components. (*)

All system components are installed at fixed position, and unpopulated RUs
are installed with filler-panels. (*)

Expansion Racks are optional to add more computing and storage capacity to an
existing PCA system.

Power cords and network cables are pre-loaded for those populated nodes only.

All racks in a PCA System use uniform Sun Rack II 1242 cabinet. However
customers can choose among different PDU options for their needs. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

106. Which statements about management tools in PCA system firmware


are correct? Mark for Review
(1) Points

(Choose all correct answers)

Web-based and CLI-based tools are available, both provide identical


functions.

Management tools are deployed in both Management Nodes, however can only be
executed from current active Management Node.

Common libraries and configuration databases are implemented for management


tools. (*)

Management tools consume all management services on each system component via
the Ethernet-based internal management fabric.
Management tools are designed to manage Private Cloud Appliance as an
integrated platform. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

107. Which statements about internal storage in a PCA System are


correct? Mark for Review
(1) Points

(Choose all correct answers)

The storage inside Private Cloud Appliance is used as the "system" disk and
not recommended for storing guest VM's data. (*)

The storage inside Private Cloud Appliance can attach disk enclosures in
Expansion Racks to expand storage capacity.

The storage inside Private Cloud Appliance is fully-redundant for high


reliability. (*)

The storage inside Private Cloud Appliance is a customized ZFS Storage


Appliance for Oracle Engineered Systems. (*)

The storage inside Private Cloud Appliance can provide data services via both
10G Ethernet and QDR InfiniBand interfaces.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

108. Which statements about Oracle VM Server for x86 in a PCA System
are correct? Mark for Review
(1) Points

(Choose all correct answers)

Dom0 in Oracle VM Server for x86 is a special domain installed and launched
with the hypervisor. (*)

Oracle VM Server for x86 is rooted from open-source Xen community. (*)

Oracle VM Server for x86 is deployed in all server nodes in a PCA System.

Hypervisor in Oracle VM Server for x86 virtualizes critical resources


including CPU, Memory and IO for all domains.

DomUs in Oracle VM Server for x86 are domains running real workload for
customers. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

109. Which statements about dom0 in Oracle VM Server for x86 are correct? Mark
for Review
(1) Points

(Choose all correct answers)

Oracle VM Agent daemon running inside Dom0 enables centralized management


from Oracle VM Manager. (*)

Dom0 is a customized Oracle Linux instance. (*)

Dom0 has privileges to control all physical resources from bare-metal server.

Dom0 implements management services that control virtual resources and life-
cycle of all guest domains (domUs). (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

110. Which statements about System Bootstrap Service in Private Cloud


Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

System Bootstrap Service is installed and configured in both Management Nodes


at factory.

System Bootstrap Service is implemented as a system service in Management


Nodes. (*)

System Bootstrap Service will launch required system services at every power
on. (*)

System Bootstrap Service will setup Management Cluster with discovered system
resources at initial power on. (*)
System Bootstrap Service will start Management Nodes automatically.
Administrator has to power on Compute Nodes manually.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

111. Which statements about Node Automation Service in Private Cloud


Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

After a Compute Node is powered on, it can be discovered, provisioned and


configured automatically by Node Automation Service.

Node Automation Service is a group of customized system services that


interact with Compute Nodes to implement automation. (*)

A set of utilities in Management Nodes will be leveraged to configure Compute


Nodes. (*)

Node Manager is a component created to drive the automation process based on


defined State Machine for Compute Nodes. (*)

Node DB is a central repository to store state and other information of


discovered Compute Nodes. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

112. Which statements about Fabric Interconnect in Oracle Virtual


Networking Solution are correct? Mark for Review
(1) Points

(Choose all correct answers)

Fabric Board in Fabric Interconnect provides IB switching capability for


connected server nodes and configured IO Modules. (*)

Mid-plane connects all components in Fabric Interconnect together through


built-in connectors and grids. (*)

Fabric Interconnect is core of Oracle Virtual Networking solution. One or


more such devices form Oracle SDN Environment. (*)
Management Module enables external management from CLI or Fabric Manager. (*)

IO Modules have uplinks which can be used to enable external connectivity.


Customers can order any type of IO Module at any time.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

113. Which statements about server node deployment in a PCA System are
correct? Mark for Review
(1) Points

(Choose all correct answers)

Management Nodes are pre-installed at factory, however all Compute Nodes can
be installed at customer's site.

Customers can expand memory capacity of a Compute Node with Memory Upgrade
Kits. (*)

Dual Management Nodes are identically configured in Base Rack to deploy


management services in firmware. (*)

All Compute Nodes inside same rack must be configured with identical model.

Compute Nodes can be deployed in any rack to provide pooling virtual


resources for guest domains. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

114. Which statements about management & provisioning fabric in a PCA


System are correct? Mark for Review
(1) Points

(Choose all correct answers)

The fabric enables automatic discovery, provisioning and configuration for


Compute Nodes. (*)

The fabric allows to manage and monitor all system components from bare-
metal. (*)
Dual Ethernet Switches in each rack are interconnected to build a single
fully-redundant switch.

Forward and Reverse Supply Chain

Ethernet Switches in each Expansion Rack need to connect with Ethernet


Switches in Base Rack directly to extend the fabric. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

115. Which statements about Virtualization Runtime in a PCA System are correct?
Mark for Review
(1) Points

(Choose all correct answers)

Virtualization Runtime can be managed with PCA Admin CLI tool in firmware.
(*)

Virtualization Runtime contains Server Virtualization, Network Virtualization


and Storage Virtualization solutions.

Virtualization Runtime in Private Cloud Appliance will provision virtual


resources directly to Guest VMs.

All virtualization solutions are configured automatically by system firmware.


(*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

116. Which statements about Software-Defined IO Device feature in


Oracle Virtual Networking solution are correct? Mark for Review
(1) Points

(Choose all correct answers)

Software-Defined IO Device implementations in Oracle Virtual Networking use a


split-device model. (*)

Two backend implementations are supported in Fabric Interconnect. Both


implementations support vNIC and vHBA devices.
Backend of virtual IO device instances are implemented in Fabric
Interconnect. (*)

Frontend of virtual IO device instances are powered by a special kernel


driver in a supported OS. (*)

Communications between frontend and backend of a virtual IO device are


wrapped inside IB packets. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
: Architecture module and try again

Upgrade Private Cloud Appliance


(Answer all questions in this section)

117. Which CLIs can be leveraged to check current firmware release of


a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

# /usr/sbin/pca-admin show version (*)

# /usr/sbin/pca-admin diagnose software

# cat /etc/redhat-release

# /usr/sbin/pca-diag version (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

118. Which statements about upgrading a PCA System are correct? Mark
for Review
(1) Points

(Choose all correct answers)

It is recommended to upgrade a PCA System immediately after initial


configuration. (*)

There will be little impact to the running guests during the upgrade process.
(*)
Built-in tool enables upgrading all software components together in a single
step.

Upgrading a PCA System will refresh software components in firmware. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

119. A Compute Node in an Expansion Rack can not boot properly after
upgrade. An OS reprovisioning has to be done to restore the server. Which tasks
must be performed to put the server back to work? Mark for Review
(1) Points

(Choose all correct answers)

Execute the CLI: # pca-admin add server <node name> <tenant group name> (*)

Restore previous customization, including virtual IO devices and OS tuning,


for dom0 of the Compute Node (*)

Migrate some running guest VMs to the Compute Node

Present repositories previously assigned to the Compute Node (*)

Clear maintenance mode of the Compute Node

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

120. Which tasks must be performed before upgrading a Compute Node in


a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

Unpresent all repositories from the Compute Node

Execute the CLI: # pca-admin remove server <node name> <tenant group name>
from current master Management Node

Migrate all running guests to other Compute Nodes (*)


Configure a YUM repository by administrators

Backup OS configuration of dom0 in the Compute Node (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

121. Which statements about upgrading firmware for a PCA System are correct?
Mark for Review
(1) Points

(Choose all correct answers)

Firmware upgrade will refresh management services in the management cluster


and sometimes firmware of system components. (*)

Management activities will be prohibited when firmware upgrade task is


running. (*)

After firmware patch is uploaded into a Management Node, it is extracted into


software repository in the internal ZFS Storage. (*)

For the Management Cluster, current master node will be upgraded first then
current backup node.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

122. Which guidelines should be followed when performing Compute Nodes


upgrade for a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

Backup configuration and running Guest VMs on a Compute Node before upgrade

Upgrade only a single Compute Node in a server pool at any time (*)

Only upgrade Compute Nodes in a PCA System when firmware upgrade is done (*)

Put Compute Node back to work after it is successfully upgraded (*)

Upgrade a Compute Node immediately after it is added into a PCA System


Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

123. You are delivering PCA firmware upgrade services, the CLI # pca-
admin update appliance get_image is successfully launched. Which CLI should be
executed next? Mark for Review
(1) Points

(Choose all correct answers)

# pca-admin update compute-node

# pca-admin delete lock all_provisioning (*)

# pca-admin backup

# pca-admin show task (*)

# pca-admin update appliance install_image (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

124. Which tasks must be performed after a Compute Node in a PCA


System is upgraded? Mark for Review
(1) Points

(Choose all correct answers)

Perform health check of the Compute Node (*)

Present repositories previously assigned to the Compute Node

Clear maintenance mode of the Compute Node (*)

Execute the CLI: # pca-admin add server <node name> <tenant group name>

Migrate unassigned guest VMs to the Compute Node (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

125. When delivering PCA firmware upgrade services for a customer,


after executing the CLI # pca-admin update appliance install_image, you notice that
the current master Management Node is rebooted automatically. What can be implied
from this phenomenon? Mark for Review
(1) Points

(Choose all correct answers)

The current backup Management Node has been updated successfully. (*)

The current master Management Node will boot from network device net0. (*)

The current master Management Node will retake the master role after the
upgrade completes successfully.

The current backup Management Node is now the new master Management Node. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.

126. Which statements about firmware patches for Private Cloud


Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

Firmware patches must be uploaded into an external HTTP or FTP site that can
be accessed from Management Nodes directly.

Firmware patches will be released in a single ISO file. All new software
components for Private Cloud Appliance will be included.

Firmware patches need to be downloaded for a PCA System is firmware


dependent. (*)

Customers can download firmware patches from Oracle Support website after
signing the PCA System Support contract. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: Upgrade module and try again.
127. If you want to manage the Compute Node ovcacn28r1 in
a PCA System, which IP address can be used to access ILOM service of the Compute
Node? Mark for Review
(1) Points

192.168.4.28

192.168.40.28

192.168.4.128 (*)

192.168.140.28

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

128. Which network interface in storage controllers can be leveraged


to access ILOM service of the internal ZFS Storage? Mark for Review
(1) Points

net1

NETMGMT

net0 (*)

net2

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

129. Which file must be modified if a system service in Management


Nodes need to be registered as a managed service in the Bootstrap Service? Mark
for Review
(2) Points

/etc/pca.conf

/var/lib/pca/pca-system.conf

/var/lib/ovca/ovca-system.conf (*)
/etc/ovca.conf

Correct Correct!

130. Which statements about Oracle VM Server Pool Configuration in


Private Cloud Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

PCA System enforces that all Compute Nodes in a server pool must be with same
model.

A server pool is uniquely mapped to a Tenant Group in the PCA System. (*)

A default server pool is pre-configured in a PCA System. Administrators can


not delete or rename the default server pool. (*)

Every Compute Node will be added into a server pool when discovered by Node
Automation Service.

Server pools and server membership of any server pool can only be managed
with PCA Admin CLI tool. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

131. Which statements about Oracle VM Server Configuration in a PCA


System are correct? Mark for Review
(1) Points

(Choose all correct answers)

Oracle VM Server software is provisioned and configured automatically by


firmware. (*)

Two disk partitions are created on local hard drive. The smaller one is for
installing Oracle VM Server software, the larger one is for creating a local OVM
repository. (*)

Virtual CPU and virtual memory in dom0 are pre-configured depending on


hardware resources in the Compute Node. (*)
Customers can update Oracle VM Server software with latest Oracle VM Server
ISO image from Oracle Support website.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

132. Which statements about Management Cluster in Private Cloud


Appliance are correct? Mark for Review
(3) Points

(Choose all correct answers)

First Management Node will take over the master role when it rejoins the
cluster.

Two Management Nodes are configured with identical services. (*)

Management Cluster is setup by using OCFS2 DLM mechanism. (*)

Only a single Management Node is active and run management services and
cluster virtual IPs. (*)

All shared files are stored in an OCFS2 file system which is mounted onto
both Management Nodes.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

133. Which statements about Oracle VM Storage Resource Configuration in Private


Cloud Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

Internal ZFS Storage is registered as an iSCSI Storage. ZFS-specific plugin


is used to enable central management from OVM Manager.

An active-standby cluster is configured with dual controllers in the internal


ZFS Storage. (*)

An iSCSI LUN is provisioned automatically in the internal ZFS Storage when a


new Tenant Group is created. (*)

Resource provisioning of the internal ZFS Storage is differentiated by types


of server nodes. (*)
All Compute Nodes in a PCA System are automatically provisioned with two
repositories when discovered.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

134. Which statements about IO Clouds and PVI Clouds in Private Cloud
Appliance are correct? Mark for Review
(1) Points

(Choose all correct answers)

IO Clouds are created for defining virtual IO devices that can connect to
external fabrics. Uplinks from IO Modules must be selected in an IO Cloud
definition. (*)

IO Clouds and PVI Clouds are pre-configured in Private Cloud Appliance.


Customers are NOT allowed to make any manual modification.

PVI Clouds are created for defining virtual IO devices in a private fabric. A
PVI Cloud must be defined against an IB subnet in a SDN environment. (*)

Network Cloud and Storage Cloud are two supported IO Clouds which can be
differentiated by type of IO Modules in the definition. (*)

Both IO Clouds and PVI Clouds support vNIC and vHBA devices.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

135. Which IO Module Configuration in Fabric Interconnect are valid in


a PCA deployment? Mark for Review
(1) Points

(Choose all correct answers)

Upper F1-15 (2*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module), Lower F1-15
(2*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module)

Upper F1-15 (2*Quad 10G Ethernet Module), Lower F1-15 (2*Quad 10G Ethernet
Module)

Upper F1-15 (4*Quad 10G Ethernet Module), Lower F1-15 (4*Quad 10G Ethernet
Module, 2*Dual 8Gb FC Module)

Upper F1-15 (4*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module), Lower F1-15
(4*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module) (*)

Upper F1-15 (4*Quad 10G Ethernet Module), Lower F1-15 (4*Quad 10G Ethernet
Module) (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

136. Which network devices in a Management Node are provisioned from


Fabric Interconnect? Mark for Review
(1) Points

(Choose all correct answers)

ib0, ib1

eth4, eth4B (*)

eth0

eth5, eth5B (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Configuration module and try again.

137. Which bonding port in a Compute Node is NOT created over virtual
IO devices provisioned from Fabric Interconnect? Mark for Review
(1) Points

bond1 (*)

bond0

bond4

bond2

bond3
Correct Correct!

138. A guest VM need to communicate with services outside the PCA


System over a defined VLAN. Which network interface can be used as the backend for
the vNIC in the guest VM? Mark for Review
(1) Points

bond4 (*)

bond3

bond1

bond2

bond0

Correct Correct!

139. In a PCA deployment, both Ethernet and FC modules are


configured in the PCA System. Before installing the PCA System, which preparations
are mandatory to enable connectivity to data center fabrics? Mark for Review
(1) Points

(Choose all correct answers)

IP settings for dual Management Nodes and Management Cluster (*)

NTP Servers in data center (*)

Cables to FC Modules and Ethernet Modules (*)

DNS Servers in data center

Transceivers on FC Modules and Ethernet Modules

Correct Correct!

140. Which statements about stabilizing and grounding a PCA System are
correct? Mark for Review
(1) Points
(Choose all correct answers)

The PDUs in system racks can provide necessary grounding for the Private
Cloud Appliance through power cords. (*)

Stabilizing with Mounting Brackets can make system more stable but has more
restricted requirements to installation location. (*)

If customers want to move a PCA System to different locations, the PCA System
should be stabilized with Leveling Feet. (*)

Grounding cable from racks is optional to provide extra safety. (*)

For a fully loaded Private Cloud Appliance, only stabilizing with Mounting
Brackets is allowed.

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

141. Please select the correct sequence of actions to install a new


Compute Node into Private Cloud Appliance.

1. Remove front & rear rack doors


2. Remove filler panel of the RU to install the Compute Node
3. Install rack doors
4. Install the server on the rack
5. Install Cable Management Arm
6. Connect pre-configured power cords and network cables Mark for Review
(1) Points

2, 1, 4, 5, 3, 6

1, 2, 4, 5, 3, 6

1, 2, 4, 5, 6, 3 (*)

2, 1, 4, 5, 6, 3

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

142. Which statements about cabling a PCA System are correct? Mark
for Review
(1) Points

(Choose all correct answers)

Both 10Gb and GbE switches can be supported for Ethernet Connections.

Before connecting network cables to the PCA System, the brackets at back of
both Fabric Interconnect must be removed first. (*)

Power cords from PDUs are pre-loaded in the PCA System, however matched
receptacles must be prepared by customer's data center. (*)

Power cords can be routed from top or bottom of each rack to work with
different data center environment. (*)

Network cables from the PCA System should connect to network switches in data
center. (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

143. Which action are NOT correct when unpacking and moving a PCA
System to installation location? Mark for Review
(1) Points

Push from both sides of racks to move it to installation location

Move racks from shipping pallet carefully to avoid rocking or tilting

Unpack racks at a location where is flat and can support total weight of the
package

Throw away mounting brackets of racks because they are useless after
installation (*)

Recycle packaging of the PCA System properly to protect environment

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

144. Which components should be included inside the Server Upgrade


Kits for Private Cloud Appliance? Mark for Review
(1) Points
(Choose all correct answers)

Rack mounting kits (*)

Cable Management Arm (CMA)

Oracle x86 server (*)

Power cords and network cables

Installation manual and instructions (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

145. Which factors of a customer's data center need to be


checked before deploying a PCA System? Mark for Review
(1) Points

(Choose all correct answers)

Power and Cooling facility (*)

Installation Location (*)

Security Requirements, including identifications and entry permission

Environmental Conditions, including temperature, humidity and altitude (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

146. Which docs & tools need to be prepared before installing a PCA
System? Mark for Review
(1) Points

(Choose all correct answers)

Slide Rail Kits

Screwdrivers and wrenches (*)


Rack Installation Tools including Rack Door keys and side panel remove tool
(*)

EIS Install Checklist for Private Cloud Appliance (*)

Cage nuts and tools (*)

Incorrect Sorry, that's not correct. Please review the Oracle Private Cloud
Appliance: System Installation module and try again.

You might also like