Section: Engineering 2, TSD

Count Description of Activity


1 Replacement of 50kva s/n#:1708E0672 brand: Wagner
2 Replacement of Recloser Control of Taft Main Recloser
3 Download Recloser Data
4 Download Recloser Data
5 Install Power Supply of Nato Substation's 3 Reclosers
6 IR test of DS and Bypass Switch @ Nato Substation
7 Conductoring @ Songco
8 IR Testing of Existing Transformer after Fire
9 Construction of AVR Platform (New Location)
Installation of Lightning Arrester & Bracket, Replacement of Cut-
10 out for existing transformer
11 Clearing of vegetation of Secondary line
12 Transformer Testing of Engr. Galacan's DT
13 Change Meter of Lorenzo Dulfo @ Baybay5 (EDMI to I-210)
14 Inspection of DT Protections (Fuselinks in particular)
Final Touching at New Nato Substation (Installation of Static Wires
15 to Stub Pole)
16 Cleaning of Equipments of Nato Substation

17 Installation of new Bus bar for the Double incomer line (69kV side)
18 Re-Tapping of 69kV metering to the newly installed bus bar
Measure conductors to be fabricated as grounding protection of
19 69kV equipments
20 Install ground wires of PT (69kV)
21 Assist Asiaphil
22 Cover up the Cable Trench
23 Assist Asiaphil
24 Help fix DS Control for 69kV Incomer
25 Energization of New Nato Substation (No Load)
26 Testing of 3 Reclosers

27 Installation of Cut-out Bracket & CT, PT Bracket for LGU Lawaan


28 Tapping of Load for Feeder 32
29 Change Tapping pole of Lateral going to Binaloan
30 Installation of ground rod @ Petron Nato

31 Replacement of Recloser control at nato Substation (F31 to F32)


32 Installation of new Lightning Arrester (69kV side)
33 Installation of Private DT, CT, PT, Ground Rod & kWh Meter

34 Change meter (Smart Lalawigan & Globe San Francisco Sulat)


Proper Fusing inspection and Voltage Monitoring, Thermal
35 Scanning at Nato Substation of Hotspots
36 Reading of Big Loads
37 Change Tap Power Transformer of Polangi Substation
38 Voltage Check at Nato Substation outlets
39 Seminar of Metering and Calibration of kWh Meters
40 Thermal Scanning

41 IR and TTR Test of CT, PT and DT for Dolores Ice Plant and Metering
42 Metering at Dolores Ice Plant

Prepared by:

RUSSEL BOY PALCE


ENG'G 2
Time
Location Date Remarks
From To
Brgy. Alang-alang, Borongan 2-Jan-18 8:00AM 5:00PM Completed
Brgy. Polangi, Taft 3-Jan-18 8:00AM 5:00PM Completed
North Area Coverage 3-Jan-18 8:00AM 5:00PM Completed
Central & South Area Coverage 4-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 5-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 5-Jan-18 8:00AM 5:00PM Completed
Brgy. Songco, Borongan 8-Jan-18 8:00AM 5:00PM Completed
Brgy. Songco, Borongan 8-Jan-18 8:00AM 5:00PM Completed
Guiuan, Eastern Samar 9-Jan-18 8:00AM 5:00PM Partial
10-Jan-18 8:00AM 5:00PM Completed
Brgy. Lalawigan, Borongan
Brgy. Lalawigan, Borongan 10-Jan-18 8:00AM 5:00PM Completed
Balud1, Borongan 10-Jan-18 8:00AM 5:00PM Completed
Baybay5, Borongan 10-Jan-18 5:00PM 8:00PM Completed
Borongan Area 11-Jan-18 8:00AM 5:00PM Completed
12-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft
Brgy. Nato, Taft 12-Jan-18 8:00AM 5:00PM Completed

13-Jan-18 8:00AM 5:00PM Completed


Brgy. Nato, Taft
Brgy. Nato, Taft 13-Jan-18 8:00AM 5:00PM Completed

15-Jan-18 8:00AM 5:00PM Completed


Brgy. Nato, Taft
Brgy. Nato, Taft 16-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 16-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 17-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 17-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 17-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 18-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 18-Jan-18 8:00AM 5:00PM Completed
19-Jan-18 8:00AM 5:00PM Completed
Lawaan
Brgy. Nato, Taft 20-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 20-Jan-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 20-Jan-18 8:00AM 5:00PM Completed

20-Jan-18 8:00AM 5:00PM Completed


Brgy. Nato, Taft
Brgy. Nato, Taft 21-Jan-18 1:00PM 4:00PM Completed
LGU Lawaan 22-Jan-18 8:00AM 7:00PM Completed

23-Jan-18 8:00AM 5:00PM Completed


Borongan and Sulat
23-Jan-18 8:00AM 5:00PM Completed
Taft, Can-Avid and Dolores
North Area Coverage 24-Jan-18 8:00AM 5:00PM Completed
Brgy. Polangi, Taft 25-Jan-18 12:00PM 1:00PM Completed
Nato Substation 25-Jan-18 8:00AM 5:00PM Completed
ESAMELCO Cabong 1/26-27/2018 8:00AM 5:00PM Completed
29-Jan-18 8:00AM 5:00PM Completed
30-Jan-18 8:00AM 5:00PM Partial
ESAMELCO Cabong
Dolores 31-Jan-18 8:00AM 5:00PM Completed
Section: Engineering 2, TSD
Count Description of Activity
1 Central Area Maintenance (served 1 S.R.O)
2 Changed Meter (2 Consumers)
3 Inspection of Private DT
4 Downloaded Recloser Data
5 Installation of 10kVA Private DT (Virgilio Asadon)
6 Downloaded Recloser Data
7 Inspection of Recloser connectivity to Computer
8 Tap Change Communal DT outside Nato Substation
9 Load Balancing @ Feeder 32
10 Retrieval of 2-10kVA Private DT @ DYVW Borongan (Howard,
961121-424 / White Westing House, 80A393645)
11
Transfer of kWhr Mtr of Seminario from building to DU Pole.
12 Installation of MTS for Esamelco Power Supply
13 Connectivity Check of Nato Reclosers to Computer
14 Changed min. Trip & GND Trip of Feeder 2 (from 30-40Amps)
15 Central Area Maintenance (served 4 S.R.O)
16 Installation of 10kVA DT for Dolores Recloser (JFI, 16016018)
17
Installation of 10kVA DT for Maydolong Recloser (JFI, 1606036)
18
Installation of 10kVA DT for Llorente Recloser (Dong-A, 12-10139)
19 Installation of 10kVA DT for Sulangan Recloser
20 Assist Construction team for 3phase line construction for LGU San
Julian
21 Transfer of 25kVA Private DT of San Julian Health Center to nearby
Pole
22 Installation of CT, PT Bracket for San Julian LGU

23 Replacement of 25kVA Private DT (Wagner, 1507C1036) to 50kVA


(Allis Chalmers, 961019-337) @ Maydolong Water System
24 Installation of 3-75kVA Private DT, 3 CT & 3 PT
25 Transfer of Sulangan Recloser to Brgy. Tagpuro, Guiuan
26 Installation of 2 Ground Rod
27 Installation of Cut-out ahead Brgy. Barbo for Sectionalizing
Purposes
28 Download Feeder Meter Data (FC, FD, FE)
29 Reading of Big Loads
30 Download Recloser Data
31 Finish Installation of CT & PT for Feeder Metering of Polangi
Substation
32
Installation of Service Wire for Private Consumer (Atilano, Pormida)
33 Energization of 50kVA Private DT (Atilano Pormida)
34 Installation of Service Drop Wire for Buildings of Eastern Samar
National Comprehensive High School
35 Replacement of Damaged Dolores Recloser
36 Random inspection for DT Proper Fusing

Prepared by:

RUSSEL BOY PALCE


ENG'G 2
Time
Location Date Remarks
From To
Brgy. Lalawigan, Borongan 1-Feb-18 4:00PM 12:00MN Completed
Divinubo Island 2-Feb-18 8:00AM 5:00PM Completed
Brgy. Maypangdan, Borongan 5-Feb-18 8:00AM 5:00PM Completed
North Area 5-Feb-18 8:00AM 5:00PM Completed
Brgy. Taboc, Llorente 6-Feb-18 8:00AM 5:00PM Completed
Central Area & South Area 6-Feb-18 8:00AM 5:00PM Completed
Brgy. Nato, Taft 7-Feb-18 8:00AM 5:00PM no changes
Brgy. Nato, Taft 7-Feb-18 8:00AM 5:00PM Completed
North Area 8-Feb-18 8:00AM 5:00PM Partial
9-Feb-18 8:00AM 5:00PM Completed
Boulevard, Borongan
9-Feb-18 8:00AM 5:00PM Completed
Boulevard, Borongan
Brgy. Cabong, Borongan 10-Feb-18 8:00AM 5:00PM Completed
Nato Substation 12-Feb-18 8:00AM 5:00PM no changes
Polangi substation 13-Feb-18 8:00AM 5:00PM Completed
Central Area 14-Feb-18 8:00AM 5:00PM Completed
Brgy. Lunang Dolores 15-Feb-18 8:00AM 5:00PM Completed
17-Feb-18 8:00AM 5:00PM Completed
Maydolong
17-Feb-18 8:00AM 5:00PM Completed
Llorente
Brgy. Tagpuro, Guiuan 19-Feb-18 8:00AM 5:00PM Completed

20-Feb-18 8:00AM 5:00PM Completed


San Julian
20-Feb-18 8:00AM 5:00PM Completed
San Julian
San Julian 20-Feb-18 8:00AM 5:00PM Completed

21-Feb-18 8:00AM 5:00PM Completed


Maydolong
LGU San Julian 21-Feb-18 8:00AM 5:00PM Completed
Brgy. Tagpuro, Guiuan 22-Feb-18 8:00AM 5:00PM Completed
Brgy. Tagpuro, Guiuan 22-Feb-18 8:00AM 5:00PM Completed

22-Feb-18 8:00AM 5:00PM Completed


Brgy. Barbo
Buenavista Substation 22-Feb-18 6:05PM 6:30PM Completed
North Area 23-Feb-18 8:00AM 5:00PM Completed
Oras & Dolores 23-Feb-18 8:00AM 8:00AM Completed
24-Feb-18 8:00AM 3:00PM Completed
Brgy. Polangi, Taft
26-Feb-18 8:00AM 5:00PM Completed
Brgy. Burak, Oras
Brgy. Burak, Oras 26-Feb-18 8:00AM 5:00PM Completed

27-Feb-18 8:00AM 5:00PM Completed


Brgy. AlangAlang, Borongan
Brgy. Lunang, Dolores 28-Feb-18 8:00AM 5:00PM Completed
North Area 28-Feb-18 8:00AM 5:00PM Completed
Section: Engineering 2, TSD
Count Description of Activity
1 Banking of 3-75kVA Private DT, CT & PT
2 Installation of BNEW 50 kVA Private DT
3 Retrieval of old 50kVA private DT
4 Demo for the new Phantom Load
5 Transfer of 3-AVR for its new location
6 Installation of Service Drop Wires
7 Download Recloser Data
8 Installation of Recloser Control
9 Installation of 10kVA DT for Sta. Fe Recloser
10 installation of Ground Rod for 10kVA DT supply of Recloser
11 Energization of Sta. Fe Recloser (Min. Trip=80, TCC= 114)
12 Accuracy test of ESSU Can-Avid Meter
13 Inspection of CT & PT of ESSU Can-Avid
14 Download Feeder Meter Data
15 Fault indicator Training
16 Installation of 15kVA Private DT @ Cirilo Nicart
17 Installation of 15kVA ADB DT @ Lalawigan National HS
18 Fault indicator Strategic Planning
19 Driving Lesson
20 Load Transfer of FA-1 to F1
21 Energization of Dolores Ice Plant ( 3-75kVA)
22 Inspection of CT & PT of ESSU Can-Avid
23 Inspection of SNPOSA 37.5kVA ADB DT
24 Installation of Fault Indicator
25 Download Recloser Data
26 Installation of Battery for Reclosers
27 Installation of Battery for Reclosers
28 Installation of Battery for Reclosers
29 Inspection of Smart Alang-Alang
30 Load & Voltage Study of PNB Borongan
31 Driving Lesson
32 Installation of Fault Indicator
33 DT Protection inspection
34 Recollection Day
35 DT Protection inspection & Voltage Monitoring
36 Termination of LGU San Julian Meter
37 Load Study & Thermal Scanning
38 Installation of Lightning Arrester for Feeder 2 Recloser of Polangi
Substation
39 Load Transfer of FA-1 to F1
40 Reading of Big Loads
41 Replacement of 22kV Single Phase Line to Submarine Cable
42 Transfer of kV2c Meter of Cirilo Nicart from Alang-alang to their
Transformer Pole
43 Energization of Cirilo Nicart's Private DT 15kVA
44 Continue Installation of Submarine Cable
45 Continue Installation of Submarine Cable

Prepared by:

RUSSEL BOY PALCE


ENG'G 2
Time
Location Date Remarks
From To
LGU San Julian 1-Mar-18 8:00AM 5:00PM Completed
maydolong Water System 2-Mar-18 8:00AM 5:00PM Completed
maydolong Water System 2-Mar-18 8:00AM 5:00PM Completed
HESA, Esamelco Main 2-Mar-18 8:00AM 5:00PM Completed
Guiuan 3-Mar-18 8:00AM 5:00PM Completed
Comprehensive Borongan 5-Mar-18 8:00AM 5:00PM Completed
North Area 6-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Can-Avid 7-Mar-18 8:00AM 5:00PM Completed
Can-Avid 7-Mar-18 8:00AM 5:00PM Completed
Nato Substation 7-Mar-18 8:00AM 5:00PM Completed
Esamelco Main 8-Mar-18 8:00AM 5:00PM Completed
Brgy. Alang-Alang, Borongan 8-Mar-18 8:00AM 5:00PM Completed
Brgy. Lalawigan, Borongan 8-Mar-18 8:00AM 5:00PM Completed
Esamelco Main 9-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 10-Mar-18 8:00AM 5:00PM Completed
Central & North Area 11-Mar-18 5:00PM 8:00PM Completed
Brgy. 2, Dolores 12-Mar-18 8:00AM 5:00PM Completed
Can-Avid 12-Mar-18 8:00AM 5:00PM Completed
San Poli High School 13-Mar-18 8:00AM 5:00PM Completed
North Area 13-Mar-18 8:00AM 5:00PM Completed
Central & South Area 14-Mar-18 8:00AM 5:00PM Completed
Buenavista Substaion 15-Mar-18 8:00AM 5:00PM Completed
Polangi Substation 16-Mar-18 8:00AM 5:00PM Completed
Polangi Substation 16-Mar-18 8:00AM 5:00PM Completed
Brgy. Alang-Alang, Borongan 16-Mar-18 8:00AM 5:00PM Completed
Borongan 16-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 17-Mar-18 8:00AM 5:00PM Completed
Feeder B 19-Mar-18 8:00AM 5:00PM Completed
San Julian Coverage to Brgy. Tamoso 20-Mar-18 8:00AM 5:00PM Completed
Brgy. Camada, Maydolong 21-Mar-18 8:00AM 5:00PM Completed
Sulat to San Poli 22-Mar-18 8:00AM 5:00PM Completed
San Julian 23-Mar-18 8:00AM 5:00AM Completed
San Poli Poblacion 23-Mar-18 5:00PM 7:00PM Completed
24-Mar-18 6:00AM 7:00AM Completed
Polangi Substation
Central & North Area 24-Mar-18 8:00AM 5:00PM Completed
North Area 26-Mar-18 8:00AM 5:00PM Completed
Brgy. Point Mary, Borongan 24-Mar-18 8:00AM 5:00PM Completed

27-Mar-18 8:00AM 5:00PM Completed


Brgy. Alang-Alang, Borongan
Brgy. Alang-Alang, Borongan 27-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 27-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 28-Mar-18 8:00AM 5:00PM Completed
Section: Engineering 1, TSD
Count Description of Activity
1 Clearing @ Brgy. Taboc, hitting the secondary line
2 Load study
3 Installation of BNEW 50 kVA Private DT
4 Retrieval of old 50kVA private DT
5 Transfer of 3-AVR for its new location
6 Energization of 10kVA Private DT (Virgilio Asadon)
7 Transformer load management
8 PNB Testing
9 Installation of Recloser Control
10 Installation of 10kVA DT for Sta. Fe Recloser
11 installation of Ground Rod for 10kVA DT supply of Recloser
12 Fault Indicator Training
13 Installation of 15kVA Private DT @ Cirilo Nicart
14 Installation of 15kVA ADB DT @ Lalawigan National HS
15 Inspection of CT & PT of ESSU Can-Avid
16 Energization of Dolores Ice Plant ( 3-75kVA)
17 Installation of Fault Indicator
18 DT, CT & Meter Testing & Load Study @ PNB
19 Transfer of Meter of Marie Rivier Spirituality Center
20 Installation of Battery for Reclosers
21 changed Meter of Boco
22 Installation of Battery for Reclosers
23 Inspection of Smart Alang-Alang
24 Load & Voltage Study of PNB Borongan
25 Installation of Fault Indicator
26 Recollection Day
27 Installation of Battery for Sta. Fe Recloser
28 Random Inspection of Proper Fusing
29 Termination of Battery supply for Sta. Fe Recloser
30 Random Inspection of Proper Fusing
31 Installation of 2 Battery Set for Salcedo Recloser
32 retrieval of 2 Battery sets
33 Installation of 2 Battery Set for Giporlos Recloser from retrieved
battery of Buenavista Substation
34 Installation of 69kV Lightning Arrester @ Nato Substation
35 Retrieval of Lightning Arrester borrowed from NGCP 69kv
36 Tap Change of Nato Power Transformer from Tap5 to Tap4
37 Load Balancing @ Feeder B
38 Load Balancing @ FA-1
39 Load Balancing @ FA
40
Replacement of 22kV Single Phase Line to Submarine Cable
41 Cable Pulling & Termination (340mtrs)
42 Energization of Point Mary
43 Construction & Installation of 35ft Pole
44 Continue Installation of Submarine Cable
45 Continue Installation of Submarine Cable

Prepared by:

Jimmy Valeriano Uy
ENG'G 1
Time
Location Date Remarks
From To
Borongan 1-Mar-18 8:00AM 5:00PM Completed
Borongan Area 1-Mar-18 5:00PM 8:00PM Completed
maydolong Water System 2-Mar-18 8:00AM 5:00PM Completed
maydolong Water System 2-Mar-18 8:00AM 5:00PM Completed
Guiuan 3-Mar-18 8:00AM 5:00PM Completed
Llorente 5-Mar-18 8:00AM 5:00PM Completed
Brgy. Taboc, Borongan 6-Mar-18 8:00AM 5:00PM Completed
Songco, Borongan 6-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Sta. Fe, Borongan 7-Mar-18 8:00AM 5:00PM Completed
Esamelco Main 8-Mar-18 8:00AM 5:00PM Completed
Brgy. Alang-Alang, Borongan 8-Mar-18 8:00AM 5:00PM Completed
Brgy. Lalawigan, Borongan 8-Mar-18 8:00AM 5:00PM Completed
Can-Avid 12-Mar-18 8:00AM 5:00PM Completed
Brgy. 2, Dolores 12-Mar-18 8:00AM 5:00PM Completed
North Area 13-Mar-18 8:00AM 5:00PM Completed
Borongan 14-Mar-18 8:00AM 5:00PM Completed
Brgy. Camada, Maydolong 14-Mar-18 8:00AM 5:00PM Completed
Buenavista Substaion 15-Mar-18 8:00AM 5:00PM Completed
Brgy. San Miguel, Llorente 15-Mar-18 8:00AM 5:00PM Completed
Polangi Substation 16-Mar-18 8:00AM 5:00PM Completed
Brgy. Alang-Alang, Borongan 16-Mar-18 8:00AM 5:00PM Completed
Borongan 16-Mar-18 8:00AM 5:00PM Completed
Feeder B 19-Mar-18 8:00AM 5:00PM Completed
Brgy. Camada, Maydolong 20-Mar-18 8:00AM 5:00PM Completed
Brgy. Sta. Fe, Borongan 21-Mar-18 8:00AM 5:00PM Completed
Borongan 21-Mar-18 8:00AM 5:00PM Completed
Brgy. Sta. Fe, Borongan 22-Mar-18 8:00AM 5:00PM Completed
Borongan 22-Mar-18 8:00AM 5:00AM Completed
Salcedo 23-Mar-18 8:00AM 5:00AM Completed
Buenavista Substation 23-Mar-18 8:00AM 5:00AM Completed
23-Mar-18 8:00AM 5:00PM Completed
Giporlos
Nato Substation 24-Mar-18 8:00AM 5:00PM Completed
Nato Substation 24-Mar-18 8:00AM 5:00PM Completed
Nato Substation 24-Mar-18 8:00AM 5:00PM Completed
Feeder B 24-Mar-18 8:00AM 5:00PM Completed
Feeder A-1 24-Mar-18 8:00AM 5:00PM Completed
Feeder A 24-Mar-18 8:00AM 5:00PM Completed

26-Mar-18 8:00AM 5:00PM Completed


Brgy. Point Mary, Borongan
Brgy. Point Mary, Borongan 26-Mar-18 8:00AM 5:00PM Completed
Brgy. Point Mary, Borongan 26-Mar-18 8:00AM 5:00PM Completed
Brgy. Point Mary, Borongan 27-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 27-Mar-18 8:00AM 5:00PM Completed
Point Mary, Borongan 28-Mar-18 8:00AM 5:00PM Completed
Section: Engineering 1, TSD
Count Description of Activity
1 install fault indecator feeder D
2 J & F mall transformer was in open delta bank
3 relocation of SDW
4 replacement of 333 J & F transformer
5 retintioning feeder A&A-1(takeoff)
6 Hauling wood pole 40'
7 pole eriction 40'
8 line clearing of coconut tree
9 line clearing of coconut tree
10 CT&PT TTR Testing
11 Load Monitoring @ PNB
12 ADB Transformer Installation of KVA DT's
13 CT Testing @PNB
14 Installation of 37.5 KVA DT's @ Rural Bank
15 Replacement of DT's All Star,37.5kva s/n:6-01846-2-20
16 install Dt's 37.5kva Dong-A sn:09-3040
17 Install AR switch 3Ø NHA Nagaja
18 Install AR switch 3Ø NHA balangkayan s/n:1310206
Brand:chance
19
Install AR switch 3Ø NHA Guiuan s/n:1610211 Brand:chance
20
Install AR switch 3Ø NHA Guiuan s/n:1610203 Brand:chance
21 Install AR switch 3Ø NHA Buenavista s/n:161202
Brand:chance
22 DT's replacement Wagner 50kva s/n:0606E0806
23 Installation of 37.5kva DT's @ CAAP Airport
24 Installation of AR switch 3Ø NHA Balangiga s/n:1610210
brand:chance
Installation of AR switch 3Ø NHA Mac Arthur s/n:1610204
25 brand:chance

26 Installation of 25kva DT's private @Des Marketing,Guiuan


s/n:1801C0099 brand:wagner
27 Additional DT's s/n:10030-62 brand:shanghai
28 Install Grownding & Tapping of primary line
29 Split loading of 37.5kva & additional 15kva Dt's
30 Install Transformer bracket,cut out bracket & lightning
arester
31 Install AVR to recloser control,Buenavista substation
32 Install wire of recloser control
33 Install of 1Ø line & nuetral line LGU Borongan for crises
center building
34 Inspetion Borongan public market

Prepared by:

Jimmy Valeriano B. Uy
ENG'G 1
Time
Location Date Remarks
From To
Guiuan E. Samar 3-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 4-Apr-18 5:00PM 8:00PM Completed
Borongan E. Samar 5-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 6-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 7-Apr-18 8:00AM 5:00PM Completed
Tabunan Borongan 7-Apr-18 8:00AM 5:00PM Completed
Tabunan Borongan 7-Apr-18 8:00AM 5:00PM Completed
San Saturnino Borongan 7-Apr-18 8:00AM 5:00PM Completed
Can -Abong Borongan 7-Apr-18 8:00AM 5:00PM Completed
Buenavista Substation 7-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 10-Apr-18 8:00AM 5:00PM Completed
Nena San Julian 10-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 11-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 11-Apr-18 8:00AM 5:00PM Completed
San Miguel,Llorente 12-Apr-18 8:00AM 5:00PM Completed
San Miguel,Llorente 12-Apr-18 8:00AM 5:00PM Completed
Hernani Eastern Samar 16-Apr-18 8:00AM 5:00PM Completed
Cabay,Balangkayan 17-Apr-18 8:00AM 5:00PM Completed

Tagporo,Guiuan E.samar 18-Apr-18 8:00AM 5:00PM Completed

Sapao,Guiuan E.Samar 19-Apr-18 8:00AM 5:00PM Completed

Buenavista,Quinapondan 20-Apr-18 8:00AM 5:00PM Completed


Lalawiga,Borongan E.Samar 22-Apr-18 8:00AM 5:00PM Completed
Point Mary,Borongan 23-Apr-18 8:00AM 5:00PM Completed
Kansumangkay,Balangiga 24-Apr-18 8:00AM 5:00PM Completed

Vigan,Mac Arthur 25-Apr-18 8:00AM 5:00PM Completed

Lugay st. Guiuan E.Samar 25-Apr-18 8:00AM 5:00PM Completed


Tabunan Borongan 26-Apr-18 8:00AM 5:00PM Completed
Tabunan Borongan 26-Apr-18 8:00AM 5:00PM Completed
Tabunan Borongan 26-Apr-18 8:00AM 5:00PM Completed
Tabunan Borongan 26-Apr-18 8:00AM 5:00AM Completed
Buenavista Substation 27-Apr-18 8:00AM 5:00AM Completed
Buenavista Substation 27-Apr-18 8:00AM 5:00AM Completed
Borongan E. Samar 30-Apr-18 8:00AM 5:00PM Completed
Borongan E. Samar 8:00AM 5:00PM Completed
Section: Engineering 1, TSD
Count Description of Activity
Installation of DT 10kva private s/n:81A276740
1 brand:westing house private; MS.MARILOU CALZITA
2 SRO private no light PORMIDA SAMUEL
3 Pick up 50pcs pin type insulator SAMELCO ll
4 Droped 30pcs pin type insulator Polangi Taf. Sub.
5 30pcs insulator pin type to central area office
6 Load balancing 1-25kva from tapC to B single phase
7 Load balancing 1-37.5kva from tapC to B single phase
8 retrieval of un used DT 1-37.5kva
9 retrieval of un used DT 1-25kva
10 retrieval of un used DT 1-25kva s/n:70TR884019 brand:macgran
edison
11 retrieval of un used DT 1-25kva s/n:8307-0152A218
brand:pheltic
12 replacement of pin insulator C2 structure
13 retieghtening of the sec.terminal of 37.5kva DT's
14 transformer erection near ESADEF
15 hot spot correction of the source & load side terminal of 1Ø line
front of Aqua 2000 water station
16 changed of setting of F1 main recloser Polangi Sub.
17 Install KWhr meter s/n:17616103 GE KV2c
18 Install NFL transformer s/n;151224 25kva
19 load study;NATO 25kva,volts:240V,A:69.6/28.8,time:6:30 front
of ELEM.SCHOOL
20
load study;NATO 10kva,volts:238V,A:24.2,time:6:35 near Petron
21 load study;SAN ISIDRO 25kva,volts;230V,A;42.3,time;6:46 near
church
22 load study;SAN ISIDRO 15kva,volts;231V,A;30.8Øß,time;7:00
front Elem.School
load study;SAN ISIDRO 15kva,volts;231vVA;30.8Øß,time;7:00
23 front Elem.School
24 load study;SAN ISIDRO 15kva,volts;233V,A;29.7,time;7:02
25 load study;SAN ISIDRO 25kva,volts;224V,A;84,time;7:31 San
Isidro chapel
26
load study;SAN ISIDRO 10kva,volts;229V,A;32.6,time;7:37 Sulod
27 load study;SAN ISIDRO 15kva,volts;227.9V,A;37.3,time;7:43
front Elem. School
28
load study BRGY.CANLARAY 25kva,volts;231V,A;41,time;8:02
29 IR testing 10kva,s/n:932838 brand:shen chang private; Obaldo
Alberto retrieval kwh meter:14612924
30 ttr testing 10kva s/n:932838 brand: shen chang
31 IR testing serial:0707E0817 brand: wagner
32 installation of overloaded DT 50kva,s/n;0707Eo817
brand;wagner Maytigbao

33 retrieval of overloaded DT 25kva,s/n;196208307,brand;central


moloney inc.Maytigbao
34 retrieval of 15kva DT s/n;130981,brand;NFL
35 Installation of 25kva DT s/n;196208307,brand:central coloney
inc.
36 Additional DT's 15kva,s/n;0509B1105 brand;wagner
37 additional DT's 25kva,s/n;1803C0278,brand;wagner Hillside
Drive New
38 Old DT 15kva s/n;130970,brand;NFC Hill Side
39 additional DT's 25kva Sn:1805C0497 Brand:wagner

40 Installation of 10kva,s/n:932838 brand:shen chang private;


Obaldo Alberto retrieval kwh meter:14612924 @GMA road
41 Deliver of 2 sets battery 200M @Nato Substation
42 download @ Guiuan
43
Installation of 2 sets of battery & installation of pipes /lay-out
44 cable/wiring @Cabong Substation
45 energized of 3 phase line dolores
46 inspection Aman Juray Hydro plant
47 intall DT's
48 install lightning Arrester for 69kv
49 retrieval of lightning Arrester Borrowed from NGCP 69kv
50 load balanciing feeder A
51 load balanciing feeder A-1
52 load balanciing feeder B
53 tap change from tap5 to tap 4
54 load balancing feeder 32
55 install 3phase cut out llorente
56 rehab & retreived rotten wood pole 40"
57 install cut out
58 load study poblacion llorente
59 replacement of overloaded DT's 25kva to 37.5 kva
60 replacement of overloaded DT's 15kva sn:414864
brabd:shinyoung to 25 kva sn:1803C0269 brand:wagner
61 replacement of overloaded Dt's 10kva sn: 15kva sn:414864
brand:shinyoung
62 install & load centering25kva sn:1803C0270 brand:wagner
63 low voltage correction,tap change

prepared By:

JIMMY B. UY
ENG'G 1
Time
Location Date Remarks
From To
Antipolo,Llorente 2-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 3-May-18 5:00PM 8:00PM Completed
Paranas W.Samar 4-May-18 8:00AM 5:00PM Completed
Polangi,Taft 4-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 5-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 5-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 5-May-18 8:00AM 5:00PM Completed
Lalawigan,Borongan 5-May-18 8:00AM 5:00PM Completed
Umawas,Maydolong 5-May-18 8:00AM 5:00PM Completed
Songco, Borongan 5-May-18 8:00AM 5:00PM Completed

Loom bridge,Borongan 5-May-18 8:00AM 5:00PM Completed


Camada,Maydolong 5-May-18 8:00AM 5:00PM Completed
Baybay,Borongan 5-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 5-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 5-May-18 8:00AM 5:00PM Completed
Polangi,Taft 7-May-18 8:00AM 5:00PM Completed
Oras,E.Samar 7-May-18 8:00AM 5:00PM Completed
Oras,E.Samar 7-May-18 8:00AM 5:00PM Completed
Taft.E.Samar 7-May-18 8:00AM 5:00PM Completed

Taft.E.Samar 7-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed


Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed
Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 7-May-18 8:00AM 5:00PM Completed


Borongan E.Samar 7-May-18 8:00AM 5:00AM Completed

san saturnino, Borongan 8-May-18 8:00AM 5:00AM Completed


san saturnino, Borongan 8-May-18 8:00AM 5:00AM Completed
San Isidro,Sulat 9-May-18 8:00AM 5:00PM Completed
Sulat.E.Samar 9-May-18 8:00AM 5:00PM Completed

Sulat.E.Samar 9-May-18 8:00AM 5:00PM Completed

Binaloan,Taft E.Samar 10-May-18 8:00AM 5:00PM Completed


Binaloan,Taft E.Samar 10-May-18 8:00AM 5:00PM Completed
Camada,Maydolong 13-May-18 8:00AM 5:00PM Completed
Brgy.7,Maydolong 13-May-18 8:00AM 5:00PM Completed
Brgy.7,Maydolong 13-May-18 8:00AM 5:00PM Completed
brgy. Tabok,Borongan 16-May-18 8:00AM 5:00PM Completed

Borongan E.Samar 17-May-18 8:00AM 5:00PM Completed

Taft.E.Samar 17-May-18 8:00AM 5:00PM Completed


Guiuan E.Samar 18-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 21-May-18 8:00AM 5:00PM Completed
Borongan E.Samar 21-May-18 8:00AM 5:00PM Completed
Dolores E. samar 22-May-18 8:00AM 5:00PM Completed
Lawaan-Samar 23-May-18 8:00AM 5:00PM Completed
Llorente E. Samar 23-May-18 8:00AM 5:00PM Completed
Nato substation 24-May-18 8:00AM 5:00PM Completed
Nato substation 24-May-18 8:00AM 5:00PM Completed
central coverage area 24-May-18 8:00AM 5:00PM Completed
central coverage area 24-May-18 8:00AM 5:00PM Completed
central coverage area 24-May-18 8:00AM 5:00PM Completed
Nato substation 24-May-18 8:00AM 5:00PM Completed
north coverage area 25-May-18 8:00AM 5:00PM Completed
poblacion llorente 26-May-18 8:00AM 5:00PM Completed
poblacion llorente 26-May-18 8:00AM 5:00PM Completed
brgy. Bayubay borongan 28-May-18 8:00AM 5:00PM Completed
poblacion llorente 28-May-18 8:00AM 5:00PM Completed
san miguel,llorente 29-May-18 8:00AM 5:00PM Completed
brgy. Cagbonga,borongan 30-May-18 8:00AM 5:00PM Completed
brgy. Canliwag,llorente 30-May-18 8:00AM 5:00PM Completed
brgy. Bacayawan,llorente 30-May-18 8:00AM 5:00PM Completed
poblacion llorente 31-May-18 8:00AM 5:00PM Completed
Section: Engineering 1, TSD
Count Description of Activity Location

1 install metering PT s/n:C2H10513 ratio:70:1 Dongwoo poblacion,salcedo


2 install metering CT s/n:C2H10497 ratio:20/5A Dongwoo poblacion,salcedo
3 install DT:00070P s/n:T70416 brand:CIC poblacion,salcedo
4 install 2pcs. Grounding rod poblacion,salcedo
5 install guy wire lapgap,maydolong
6 install 25kva grounding rod poblacion,maydolong
7 pole digging greenland songco,borongan
8 hauling of pole greenland songco,borongan
9 pole erriction greenland songco,borongan
10 pole erriction greenland songco,borongan

11 hauling of pole from san miguel llorente to greenland 2pcs.25' greenland songco,borongan
1pc. 35'
12 install DT:00010P s/n:1806C0631 brand:wagner GLOBE tungkip,llorente
13 retrieval DT s/n: kva:25 damage tungkip,llorente
14 replacement of meter box GLOBE tungkip,llorente
15 inspection ADB sulat national high school poblacion sulat
16 inspection of mang inasal poblacion borongan
17 inspection plat form borongan doctors songco,borongan
18 preparation of DT Giporlos water system cabong,borongan
19 motorcade APEC central area coverage
20 motorcade APEC south area coverage

21 install metering s/n:17616236 LGU giporlos water system brgy. 7,giporlos

22 install DT:00071P s/n:97020P brand:sanjiang brgy. 7,giporlos


22 additional pole 30' of low clearance secondary line balogo,maydolong
22 pole digging balogo,maydolong
23 pole erriction balogo,maydolong
24 install of grounding 3 pcs. greenland songco,borongan
25 install of guy wire 2 pcs. greenland songco,borongan
26 install secondary 92 meters greenland songco,borongan
27 install neutral 92 meters greenland songco,borongan
28 install of suspension sulat national high school ADB poblacion,sulat
29 clearing sulat national high school ADB poblacion,sulat
30 tapping of jumper secondary & neutral,primary poblacion,sulat
install DT s/n :1801J0098 dt:00072P s/n:1801J0096 dt:00073P
31 s/n:1801J0097 dt:00074P brand:wagner songco,borongan

32 attend seminar cabong main office


33 install metering salcedo doctors s/n:16657564 poblacion,salcedo
34 install pt:C2810513 dongwoo 70:1 poblacion,salcedo
35 install ct:C1810497 ratio:20:5 poblacion,salcedo
36 fabrecation pt ct bracket borongan doctors songco,borongan
37 hauling of PT & CT bracket songco,borongan
install bracket songco,borongan
38 install ct: 18-00791,18-00453,18-00792 ESIT songco,borongan
39 install ct: 18/08332,18/08325,18/08331 ESIT songco,borongan
40 install EMT pipe & meter box borongan doctors songco,borongan
41 tapping of pt to ct H1 jumper songco,borongan
42 hole digging @ BUGAS bugas,borongan
43 install side guy bugas,borongan
44 install side guy bugas,borongan

45 replacement of dilapidated pole from C2 structure to 2 C-7 bugas,borongan


structure
46 line clearing bugas,borongan

47 sitio minaili,san mateo,borongan


additional secondary line 4- span 340 meters 2/0 insulated awg

prepared By:

JIMMY B. UY
ENG'G 1
Time
Date Remarks
From To
4-Feb-19 8:00AM 5:00PM Completed
4-Feb-19 5:00PM 8:00PM Completed
4-Feb-19 8:00AM 5:00PM Completed
4-Feb-19 8:00AM 5:00PM ADB used
6-Feb-19 8:00AM 5:00PM Completed
6-Feb-19 8:00AM 5:00PM secondary bushing oil
leaking
7-Feb-19 8:00AM 5:00PM Completed
7-Feb-19 8:00AM 5:00PM Completed
7-Feb-19 8:00AM 5:00PM Completed
8-Feb-19 8:00AM 5:00PM Completed

8-Feb-19 8:00AM 5:00PM Completed

8-Feb-19 8:00AM 5:00PM Completed


8-Feb-19 8:00AM 5:00PM Completed
8-Feb-19 8:00AM 5:00PM Completed
11-Feb-19 8:00AM 5:00PM Completed
11-Feb-19 8:00AM 5:00PM Completed
11-Feb-19 8:00AM 5:00PM Completed
12-Feb-19 8:00AM 5:00PM Completed
12-Feb-19 8:00AM 5:00PM Completed
damage secondary
13-Feb-19 8:00AM 5:00PM bushing 2-DT's
open cut out tapping
13-Feb-19 8:00AM 5:00PM point
13-Feb-19 8:00AM 5:00PM Completed
14-Feb-19 8:00AM 5:00PM Completed
14-Feb-19 8:00AM 5:00PM Completed
14-Feb-19 8:00AM 5:00PM Completed
15-Feb-19 8:00AM 5:00PM Completed
15-Feb-19 8:00AM 5:00PM Completed
15-Feb-19 8:00AM 5:00PM Completed
15-Feb-19 8:00AM 5:00PM Completed
18-Mar-19 8:00AM 5:00AM Completed
18-Mar-19 8:00AM 5:00AM Completed
18-Mar-19 8:00AM 5:00AM Completed

19-Mar-19 8:00AM 5:00PM Completed

19-Mar-19 8:00AM 5:00PM Completed


20-Feb-19 8:00AM 5:00PM Completed
20-Feb-19 8:00AM 5:00PM Completed
20-Feb-19 8:00AM 5:00PM Completed
21-Feb-19 8:00AM 5:00PM Completed
21-Feb-19 8:00AM 5:00PM Completed
21-Feb-19
21-Feb-19 8:00AM 5:00PM Completed
21-Feb-19 8:00AM 5:00PM Completed
22-Feb-19 8:00AM 5:00PM Completed
22-Feb-19 8:00AM 5:00PM Completed
26-Feb-19 8:00AM 5:00PM Completed
26-Feb-19 8:00AM 5:00PM Completed
27-Feb-19 8:00AM 5:00PM Completed

27-Feb-19 8:00AM 5:00PM Completed

27-Feb-19 8:00AM 5:00PM Completed

28-Feb-19 8:00AM 5:00PM Completed