REQUEST FOR INSPECTION

ROYAL COMMISSION FOR JUBAIL AND YANBU


DIRECTORATE GENERAL FOR JUBAIL PROJECT
CONTRACT NO : 560 - C37
PROJECT NAME :
PROTECTION WORK FOR PIPE LINE STRUCTURES

CONTRACTOR : Rawabi Specialized Contracting Co.

ATTENTION TO : Eng'r. Dennis & Vincent


DATE OF INSPECTION : 31-Jan-21

PAY ITEM
RFI NO. TIME LOCATION HOLD POINT ITEM DESCRIPTION UNIT ESTIMATED QTY. REMARKS
NO.

RFI-287
Installation of new decorative Replace 5m Decorative
08.00AM Light Pole 3-01.07.1 Ea 65.00
light pole Light Pole with Single Arm

Installation of new decorative Replace 5m Decorative 7.00


3-01.07.2 Ea
light pole Light Pole with double Arm

Digitally signed by KARTHIK KUMAR

KARTHIK DN: C=SA, OU=RSCC, O=RAWABI


SPECI. CONT. CO., CN=KARTHIK
KUMAR,

KUMAR
[email protected]
Reason: I am the author of this

REQUESTED BY: KARTHIK KUMAR 28-Jan-21


document
Location: JUBAIL

QC MANAGER Signature
Date