PC Mauritania Time (Days)

Banda East-1 Well Mosaic 0


0.0 0

Rig m ove
+ Ancho ring
2 0.00 4 0.00

Jet 3 6" cond uctor


60.00 80.00

Recover BOP
+ De-an chorin g
+ Demo b rig
100.00

0
Banda East PP FG Estimate

26 Sept 2008 FINAL 5 00


Drill 17 -1/2 "
ho le 500

Drill 8-1 /2"


pilot hole

Ch‐1
1000 Banda 2 FIT Banda 1 LOT
10 00 Banda NW FIT

Rig Southern Cross Well Type Vertical Appraisal Surface Location Coordinates Run & cement 1 3-3/8 " csg + BOP

Copp‐1
Tiof‐1

Measured Depth (m-TVDDF)


Ch‐1
Contractor Atwood Field Banda X: 336,600.00 mE Long.: 16° 32' 29.009" W
1500

DFE 21.0 m Objectives: CN3 S35, CN3 S20 Y: 1,965,669.00 mN Lat.: 17° 46' 20.410" N 15 00

TVDSS (m)
Tiof‐6

Water Depth 210.0 m Target 1 CN3 S20 Coordinates Drill 1 2-1/4 " h ole
Copp‐1
Ch 4‐5

2000
TD hole 2,791 m MD Completion N/A X: 336,600.00 mE TVDss (m): 2459 20 00
Pore Pressure
2,791 mTVD AFE NO : Offset Wells: Y: 1,965,669.00 mN TVD RT (m): 2480
2500
Est. BHST/BHP 89°C / 4,045 psi 1A.W0.X08116552A1 Banda NW and Banda NW ST Total Depth Coordinates Coring (~2 cores)
Banda NW ST MDT
Frac Gradient
25 00 Banda NW MDT

AFE Total Days 97.5 days AFE COST (US$): Banda-2, Banda-1 X: 336,600.00 mE TVDss (m): 2770 Co nt. drill 12-1/4" hole

Aspect ratio N/A VS/TVD 80.5 mil MTO-3 Y: 1,965,669.00 mN TVD RT (m): 2791
3000
Run & ce ment 9-5/8" x 1 0-3/4" + We ll Testing + Completion
7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0

30 00 Pressure Gradient (ppg)

WELLHEAD EQUIPMENT:
PROGNOSIS
FORMATION DATA CASING LITHOLOGY WELL DESIGN POSSIBLE HAZARDS MUD SUMMARY BOTTOM HOLE ASSEMBLY BIT & HYDRAULICS FORMATION EVALUATION CASING / CEMENT / FIT

MD RT (m) Casing Casing 8-1/2" Pilot Hole( 208m - 1055m RT) Riserless
SB 229 m Seabed Conditions: No seabed MUD : *Cement P&A Plugs:
information available. Initial: 10-20m; Spud and drill pre-hydrated 8-1/2" Bit, 6-3/4" Stab, 6-3/4" Motor, 6-3/4" NM 8-1/2" MXL-1 LWD: GR-Resitivity-Directional
bentonite before switch over to seawater. Sub, 6-3/4" OnTrak MWD, MWD Stab, 6-3/4" Tricone mill tooth bit, IADC 117 Set P&A plugs from 1055m - 655m RT
Shallow Gas: Site survey specific to Thereafter: Drill with seawater and Hi-Vis BCPM, 6-3/4" NM Sub, 6-3/4" String Stab, 6-1/2" E-Log: None
Banda East not conductied. Offset sweeps (Approx 50-100bbls every 10m). NM DC, 4 x 6-1/2" DC, 6-1/2" Jar, 6-1/2" DC, 3 x TFA: 0.79, HSI: 2.95 *In case of well plugged & abandoned
36" Conductor shallow hazard studies indicate shallow TD; Clean hole with 200bbls Hi Vis Sweep 5" HWDP, 5" DP to surface
Hsg Jt 1.5" WT X52 SD2 gas not likely. Shallow gas not seen in (900-1000gpm). Diplace to 11.5ppg 8% KCl Hydraulics: 650 gpm, SPP: 2456 psi
XO Jt 1.5" WT X-52 SD-2 any offsets. mud. WOB: 5 - 15k
3 Jts 1" WT X52 SD2 RPM: 20 - 100
Shoe Jt 1" WT X52 SD2 Lost Circulation: Minor lost circulation Torque: 5k ft-lbs
in MTO-3 @ 444m & 931mss. Density: 8.66 ppg / 9.0 ppg BOP EQUIPMENT:
VIS: +/- 50, PV: < 15, YP: > 25 lb/100ft2 Intial parameters (10-15m BML); 50 RPM, 500
Shallow Water Flow: Shallow water FL : N/C gpm. Thereafter, 100-120 RPM. Ramp up
flow experienced in Banda-1 (Ch 4-3) Kill Mud : 500 bbls of 12.0 ppg kill mud pumps to +/- 700 gpm.
while jetting. Not seen on other Banda ready to go in reserve pit.
36" Conductor 301 m wells.
Vertical

Jet 36" Conductor (208m - 301m RT) Riserless


MUD : 36" Conductor:
Broaching: Broaching observed while Initial: First 10-20m jet with PHG mud to 17-1/2" Bit, 9-1/2" Motor, 9-1/2" String Stab, 9-1/2 17-1/2" MX-03 LWD: NA 6 joints conductor jetted in.
jetting on Banda-2. minimize washout effect. NM MWD Sub, 9-1/2" OnTrak MWD, MWD Stab, Tricone insert bit, IADC 437
9-1/2" BCPM, 9-1/2" NM MWD Sub, 9-1/2" X-O, E-Log: None Cement excess: NA
Thereafter: Pump 50-100 bbls of PHG 8" NM DC, 2 x 8" DC, D.A.T., 8-1/4" DC, 8" Jar, 2 TFA: 0.79
Shallow Water Flow : Shallow water sweeps every 10m. x 8-1/4" DC, 8" X-O, 3 x 5" HWDP, 5" DP to Centralizers: None
flow experienced in Banda-1 (Ch 4-3) Density: 8.66 ppg / 9.0 ppg surface Jetting procedures
while jetting. Not seen on other Banda VIS: +/- 50, PV: < 15, YP: > 25 lb/100ft2 Casing Press. Test: NA
wells. FL : N/C WOB: 10 - 20k
Kill Mud : 500 bbls of 12.0 ppg kill mud RPM: 70 - 180 Method/Bump pressure: NA
13-3/8" Casing Others: MTO-3 experienced some ready to go in reserve pit. Torque: 5k ft-lbs
FMC UWD-15 13-3/8" Hanger problems while running in casing @ Minimum FIT: NA
~826m 72# L80 Vam Top FE Top of Tail 905m TVDDF 444mss and 757mss due to obstruction. Intial parameters (10-15m BML); 50 RPM, 500
Float Joint gpm. Thereafter, 100-120 RPM. Ramp up
Intermediate Joint pumps to +/- 1000gpm.
Shoe Joint
*Shoe track Vam Top FE x BTC

WELL SUMMARY:
13-3/8" Shoe 1055m 17-1/2" HOLE x 13-3/8" Casing (301m - 1055m RT) Riserless The well is designed as vertical appraisal well. Drill 8-1/2" pilot hole from
MUD : Sea Water with Hi-Vis pre-hydrated 13 3/8" Surface Casing: 229m RT to 1055m RT. Jet 36" conductor with 6 joints to ~72m BML. Drill 17
PLM5 Lead cement: 12.5 ppg to seabed. 1/2" vertical hole riserless to 1055m RT. Run and cement 13-3/8" casing.
Stuck Pipe: Tight hole and stuck pipe bentonite sweeps at 9.0 ppg 17-1/2" Bit, 9-1/2" Motor, 9-1/2" String Stab, 9- 17-1/2" MX-03 LWD: GR-Resitivity-Directional
are significant risks for all Mau wells. ROV to assist with seeing cement returns. Run BOP stack/riser. Drill 12-1/4" vertical hole with SBM to 2377m RT.
1/2" NM MWD Sub, 9-1/2" OnTrak MWD, MWD Tricone insert bit, IADC 437
Density: 8.66 ppg / 9.0 ppg, VIS: +/- 50 E-Log: None Tail cement: 15.8 ppg for 150m above 13- Reservoir top expected at 2377m RT. Core with 8-1/2" assy (2 x 30m cores).
Stab, 9-1/2" BCPM, 9-1/2" NM MWD Sub, 9-1/2"
10-3/4" x 9-5/8" Casing Lost Circulation while Cementing: PV: < 15, YP: > 25 lb/100ft2 3/8" shoe. Continue to drill 12-1/4" vertical hole to well TD @ 2791m RT. Open hole
X-O, 8" NM DC, 2 x 8" DC, D.A.T., 8-1/4" DC, 8" TFA: 0.79, HSI: 3.28
FMC UWD-15 10-3/4" Hanger Seen on several wells in the area. FL : N/C Cement excess: 180% lead, 30% tail. logging. Run 10-3/4" x 9-5/8" casing and cement. Test, complete (GP) and
Jar, 2 x 8-1/4" DC, 8" X-O, 3 x 5" HWDP, 5" DP to
~300m 10-3/4" 55# L80 Vam Top Minor losses seen in the Banda wells. surface Hydraulics: 1050 gpm, SPP: 2819 Centralizers: 1 per joint on bottom 14 joints. suspend well. Recover BOP and prepare for rig move (demob).
XO 10-3/4" x 9-5/8" Kill Mud : 500 bbls of 12.0 ppg kill mud Casing Press Test: Nominally 2300 psi with
xxxm 9-5/8" 47# L80 Vam Top ready to go in reserve pit. WOB: 10 - 20k 10-20k WOB, 70/180 RPM, 10.2 ppg mud.
xxxm 9-5/8" 47# L80 13Cr VamTop RPM: 70 - 180 950 - 1050 gpm, 2800-3000 psi Method/Bump Pressure: BJ Sub Sea WELL OBJECTIVE:
9-5/8" 13Cr Float Joint Special Instructions: Torque: 5k ft-lbs Release sysetem with top and bottom plugs. Determine the hydrocarbon presence in the eastern part of Banda Field.
9-5/8" 13Cr Intermediate Joint 50-100 bbls sweeps pumped every 1/2 Bump with 500 psi over FCP. Evaluate Early to Mid Miocene (CN3 & CN2) sand top @ 2356+/- 50m tvdss.
9-5/8" 13Cr Shoe Joint stand. Intial parameters (10-15m BML); 50 RPM, 500
Spot 75 bbl Hi Vis around BHA before gpm. Thereafter, 100-120 RPM. Ramp up Minimum FIT: Limit to 11.2ppg
Notes: connections. pumps to +/- 1000gpm. OPERATION SEQUENCE:
TRSSV at ~100m BML At section TD, displace hole to 8% KCl /
Top of Lead 1900m TVDDF 1. Mobilize Atwood Southern Cross from Italy
Chrome 9-5/8" run to 50m MIS 11 bentonite mud at 11.7 ppg.
2. Run anchors and prepare to spud.
above main production packer.
3. Drill 846m of 8-1/2" pilot hole (229 - 1055 m RT)
4. Jet 6 joints 36" conductor to 72m BML (@ 301m RT).
12-1/4" Hole x 9-5/8" Casing (1055m - 2791m RT) 5. Drill 754m of 17-1/2" vertical hole to 1055m RT.
Swab kick: MTO-3 took a 40 bbl gain MUD : SBM 10-3/4" x 9-5/8" Intermediate Casing: 6. Run and cement 13-3/8” casing.
MIS 13 at 1630m RT. 12-1/4" Bit, 8-1/4" Stab, 9-1/2" Motor, 9-1/2" NM 12-1/4" HTC HCR-607Z LWD: GR-Resitivity-Directional Lead cement: ~327m Lead at 13.5 ppg. 7. Run BOPs and riser.
Density: 10.2 -10.5ppg, PV: 25-30, YP: > String Stab, 9-1/2" NM Sub, 9-1/2" OnTrak MWD, 7 blade, 19mm Zenith Cutters Leave 13-3/8" annulus uncemented to prevent 8. Drill out cement and shoe track. Conduct FIT (limit to 11.2ppg).
CN3-S35 Hard Drilling: Hard drilling/stringers 25 lb/100ft2, OWR: 75/25 - 80/20, ES: >400, 9-1/2" MWD Stab, 9-1/2" BCPM, 8-1/4" NM MWD E-Log (Open hole): annulur pressure build up. Cover all 9. Drill 12-1/4” vertical hole to top of CN3-S35 @ 2377 m RT.
were seen in all Banda wells in the lower LGS: <5%, HTHP FL: <4.0ml Sub, 8-1/4" String Stab, 8-1/4" Circulating Sub, 8- TFA: 1.48, HSI: 1.65 PEX, Single OBMI-DSI, MDT, MSCT, hydrocarbon zones. 10. Core with 8-1/2" assy (2 x 30m cores).
CN3-S30 section of the 12-1/4" hole. Banda NW reduce PV before running casing VSP, *SWC 11. Continue drill 12-1/4" hole to well TD @ 2791 m RT.
1/4" NM DC, 5 x 8" DC, 8" Jar, 2 x 8" DC, 8" X-O, Tail cement: ~564m with 15.8 ppg with
and NWST successfully countered this 3 x 5" HWDP, 5" DP to surface Hydraulics: 950 gpm, SPP: 3585 psi *On contingency depending on the **gasblock. Cover top of reservoir plus 100m. 12. Run wireline logs and evaluate reservoir.
MIS 23 Special Instructions:
Top of Tail 2227m TVDDF problem with quality PDC bits and made result of MSCT **TBA 13. Run and cement 10-3/4" x 9-5/8" casing.
it to TD in one run. Displace to SBM while drilling 13-3/8" shoe WOB: 10 - 20k 10-20k WOB, 100-140 RPM, Cement excess: 10% on caliper, 30% on 14. Perform well test and gravel pack well.
track. RPM: 100 - 140 900 - 950 gpm, 3000-3600psi open hole. 15. Recover BOP and risers.
High Solid Content: Plan for dilution to Torque: 10-15k ft-lbs Centralizers: 1 per joint from bottom to 100m 16. Pull anchors.
control LGS content. Spot ~75bbls new Avoid bridging agents/ LCM in mud system Consider liners, pop off settings and mud above top of reservoir. 17. Move off and release rig.
mud in 12-1/4" hole prior to logging. when the core assy is in hole to avoid core weight. Expect to use 6" liners. TBD by Casing Press Test: Nominally 4000 psi with
barrel plugged. DSV. 10.2 ppg mud. Contingency plan:
Method/Bump Pressure: BJ Sub Sea 1. In case of encountering shallow gas, pump kill mud and set cement
Avoid using XLink in the reservoir section to Release sysetem with top and bottom plugs. plug.
avoid damage to formation. Bump with 500 psi over FCP. 2. Abandon well and move rig 30-50m south (G&G to advise new loc).
3. Spud new well & jet 6 joints of 36" conductor.
Drill out shoe with 10.2 ppg MW. Minimum FIT: NA 4. Drill 26" hole and set 20" casing @ ~ 800m RT.
5. Drill 17-1/2" hole and set 13-3/8" casing @ ~ 1400m RT.
Due to LWD tool considerations, use no 6. Repeat Step 7 to 17 as per above "Operation Sequence".
more than 40 ppb for LCM pills. 7. Drill directionally to original target.
Vertical
9-5/8" Shoe 2791m

Drilling Engineer: Drilling Superintendent: Drilling Manager: