Boq Gisu Ok
Boq Gisu Ok
Total 24 Weeks
No. Activity Percentage
Price 2 4 6 8 10 12 14 16 18 20 22 24
A PREPARASAUN
1 MOBILIZASAUN DE MOBILIZASAUN $ 4,488.88 2.34% 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
2 KUADRO NARAN PROJECTO $ 112.20 0.06% 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3 ARMAJEN IHA PROJECTO NO IHA SEGURANCA $ 420.75 0.22% 0.22
4 RELATORIO PROGRESU PROJECTO & RELATORIO FINAL $ 336.60 0.18% 0.04 0.04 0.04 0.04
5 TRANSPORTE DILI - LIQUISA - GISU $ 11,823.36 6.16% 1.54 1.54 1.54 1.54
B KONSTRUSAUN 0.00 0.00 0.00 0.00 0.00 0.00
1 PARTE 1: INTAKE $ 34,690.65 18.09% 4.52 4.52 4.52 4.52
2 PART -2 : KANU TRANSMISAUN $ 18,753.93 9.78% 4.89 4.89
3 PART -3 : BPT 6M3 $ 5,414.53 2.82% 1.41 1.41
4 PART -4 : CONCRETE TANK 30M3 $ 14,873.96 7.75% 3.88 3.88
5 PART -5 : CONCRETE TANK 30M3 II $ 13,814.92 7.20%
6 PART -6 : LUTU RESERVATORIO, 9 X 9 $ 4,133.26 2.15% 0.54 0.54 0.54 0.54
7 PART -7 : PONTI KANU 40' $ 4,955.41 2.58% 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32
8 PART -8 : KANU DISTRIBUISAUN $ 74,034.29 38.60% 6.43 6.43 6.43 6.43 6.43 6.43
9 PART -9 : TORNEIRA PUBLIKA $ 1,043.44 0.54% 0.27 0.27
10 PARTE-10 : SASAN SERVISU $ 2,906.82 1.52% 0.25 0.25 0.25 0.25 0.25 0.25
0.00 0.00 0.00
0.00 0.00
Signed
Name
In the capacity of
Duly authorized to sign the Bid for and on behalf of Hedge Construction Unipessoal, Lda
PROJECTO "REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO"
24 Weeks
No. Activity Percentage
2 4 6 8 10 12 14 16 18 20 22 24
A PREPARASAUN
1 MOBILIZASAUN DE MOBILIZASAUN 2.34% 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
2 KUADRO NARAN PROJECTO 0.06% 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3 ARMAJEN IHA PROJECTO NO IHA SEGURANCA 0.22% 0.22
4 RELATORIO PROGRESU PROJECTO & RELATORIO FINAL 0.18% 0.04 0.04 0.04 0.04
5 TRANSPORTE DILI - LIQUISA - GISU 6.16% 1.54 1.54 1.54 1.54
B KONSTRUSAUN 0.00 0.00 0.00 0.00 0.00 0.00
1 PARTE 1: INTAKE 18.09% 4.52 4.52 4.52 4.52
2 PART -2 : KANU TRANSMISAUN 9.78% 4.89 4.89
3 PART -3 : BPT 6M3 2.82% 1.41 1.41
4 PART -4 : CONCRETE TANK 30M3 7.75% 3.88 3.88
5 PART -5 : CONCRETE TANK 30M3 II 7.20%
6 PART -6 : LUTU RESERVATORIO, 9 X 9 2.15% 0.54 0.54 0.54 0.54
7 PART -7 : PONTI KANU 40' 2.58% 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32
8 PART -8 : KANU DISTRIBUISAUN 38.60% 6.43 6.43 6.43 6.43 6.43 6.43
9 PART -9 : TORNEIRA PUBLIKA 0.54% 0.27 0.27
10 PARTE-10 : SASAN SERVISU 1.52% 0.25 0.25 0.25 0.25 0.25 0.25
0.00 0.00 0.00
0.00 0.00
PRESU MATERIAL
B Material kanu
GS DN 150mm Med.A M $ 30.00
GS DN 100mm Med.A M $ 20.00
GS DN 80mm Med.A M $ 17.00
GS DN 50mm Med.A M $ 14.00
GS DN 15mm Med.A M $ 2.50
Shocket GS DN100 Unit $ 12.75
Shocket GS DN80 Unit $ 10.00
Shocket GS DN50 Unit $ 9.00
Union GS DN 80 mm Unit $ 10.00
Union GS DN 50 mm Unit $ 9.00
Socket reducer GS DN 80 mm Unit $ 12.00
Gate valve DN 80 mm Unit $ 195.00
Niple DN 80 mm Unit $ 10.00
Tee GS DN 80 x 80 mm Unit $ 8.50
Gilboult joint DN 80 mm Unit $ 20.00
Elbow degree 90 GS 80 mm Unit $ 10.00
Flange DN 80 mm Unit $ 15.00
Gasket DN 80 mm Unit $ 4.50
Baut 3" Unit $ 0.75
Gate valve DN 100 mm Unit $ 300.00
Niple DN 100 mm Unit $ 12.50
Tee GS DN 100 x 100 mm Unit $ 16.75
Gilboult joint DN 100 mm Unit $ 85.00
Elbow degree 90 GS 100 mm Unit $ 22.50
Flange DN 100 mm Unit $ 25.00
Gasket DN 100 mm Unit $ 6.00
Gate valve DN 50 mm Unit $ 225.00
Tee GS DN 80 x 50 mm Unit $ 7.50
Gilboult joint DN 50 mm Unit $ 20.00
Elbow degree 90 GS 50 mm Unit $ 9.00
Flange DN 50 mm Unit $ 10.00
Gasket DN 50 mm Unit $ 2.50
Baut 2" Unit $ 0.50
Elbow degree 90 GS DN 50 mm Unit $ 4.50
Niple GS DN 50 mm Unit $ 9.00
Tapping sadles / clamp sadles 3x1/2" Unit $ 10.00
Tapping sadles / clamp sadles 2x1/2" Unit $ 7.00
Meter air / kontador be'e Unit $ 25.00
Socket GS DN 15 mm Unit $ 1.00
Union GS DN 15 mm Unit $ 3.50
Elbow degree 90 GS DN 15 mm Unit $ 1.25
Niple GS DN 15 mm Unit $ 1.00
Stop kran 1/2" Unit $ 10.00
Kran air / torneira 1/2" Unit $ 12.00
Box valve Unit $ 25.00
Union GS DN 100 mm Unit $ 40.00
Float valve 1/2" Unit $ 25.00
Puddle Flange DN80 Unit $ 50.00
Puddle Flange DN100 Unit $ 60.00
Gal Mal 90˚ Elbow DN65 Unit $ 9.00
Gal Mal Hex Nipple DN65 Unit $ 8.00
Gal Mal Union DN65 Unit $ 17.00
Gal Mal Socket DN65 Unit $ 5.50
Gal Mal Hex Nipple DN 100MM Unit $ 12.00
Gal Mal Socket DN 100MM Unit $ 15.00
PE 100 PN12.5 Unit $ 8.00
GAL PIPE DN50 X 3.6 MM X 6M , BSP
Unit $ 14.00
ENDS+SOCKET
GAL MAL UNION DN50 Unit $ 12.00
GAL MAL 45˚ ELBOW LONG RADIUS
Unit $ 5.00
DN50
Monta kanu PE G1 too G7 M $ 2.00
Kabel tara kanu Diameter Ø10MM M $ 5.00
Wire rope grip & Turn buckle Fatin $ 4.00
Besi beton Ø16MM M $ 3.00
Arame 10mmø x 150mm x150mm (wiremesh,
M2 $ 20.00
ulir)
Puddle Flange DN50 Unit $ 40.00
Puddle Flange DN25 Unit $ 30.00
Gal Mal 90˚ Elbow DN50 Unit $ 4.50
Gal Mal 90˚ Elbow DN25 Unit $ 2.00
Gal Mal Double Nipple DN50 Unit $ 4.50
Gal Mal Double Nipple DN25 Unit $ 1.75
Gal Mal Union DN50 Unit $ 10.00
Brass/metal Ball Valve DN 50, PN16 Unit $ 100.00
Gal Mal Tee DN50 Unit $ 5.00
Gal Mal Tee DN25 Unit $ 2.00
Gal Mal Tee Reducer DN50xDN25xDN50 Unit $ 12.50
Gal Mal Pipe DN25 x 6m Unit $ 30.00
Gal Mal Pipe DN50 x 6m Unit $ 10.50
Gal Mal Pipe Socket DN50 Unit $ 4.00
BRASS FLOAT VALVE DN50,
AUSTRALIAN STANDARD, PN 12, Unit $ 450.00
+BALL, BSP
Gal Mal Union DN80 $ 27.00
Brass/metal Ball Valve DN 50, PN16 $ 65.00
Galvanized tension wire 3.15mm (AS)
M $ 1.00
750M Roll
1.57mm diameter Galvanized Tie Wire
Roll $ 30.00
280m roll (4.6kg)
MASPROCLIP 500PACK Pack $ 25.00
Fixed Corner - Galvanized Butt40 - thru40 Nos $ 35.00
Fixed Cross - Galvanized Butt40 - thru40 Nos $ 25.00
Fixed Tees - Galvanized Butt80 - thru40 Nos $ 18.00
Gate hinges DN80 x DN40 Nos $ 25.00
Standard gate GS DN40, 1,5m wide (per-
pieces $ 195.00
piece)
Cross bar of gal, Uza Pipe DN40 x 3.2mm
Lolon $ 40.00
x 6m BSP at both end
FENCE BARB WIRE, 3 layer M $ 2.00
Kadiado & long Galva chain (50cm) Unit $ 15.00
Kanu Gal DN 80 x 6m naruk unit $ 100.00
GAL PIPE DN25 x 3.2MM x 6M unit $ 25.00
Katrol Galvanizadu unit $ 15.00
Round Strand Pipe Support 12mmø unit $ 6.00
Round Strand Pipe Support 8mmø unit $ 3.50
GAL PIPE DN50 X 3.6 MM X 6M , BSP
M' $ 13.00
ENDS+SOCKET
GAL PIPE DN40 X 3.2 MM X 6M , BSP
M' $ 12.50
ENDS+SOCKET
GAL PIPE DN32 X 3.2 MM X 6M , BSP
LOLON $ 32.50
ENDS+SOCKET
GAL PIPE DN25 X 3.2 MM X 6M , BSP
M' $ 27.50
ENDS+SOCKET
GAL PIPE DN20 X 2.6 MM X 6M , BSP
M' $ 18.00
ENDS+SOCKET
GAL MAL UNION DN40 ( 1 ½" ) UNIT $ 8.50
GAL MAL UNION DN25 (1") UNIT $ 5.50
GAL MAL UNION DN20 (¾") UNIT $ 4.00
GAL MAL ELBOW LONG RADIUS 45,
UNIT $ 10.00
DN50
GAL MAL TEE DN50 X 20 UNIT $ 15.00
GAL MAL TEE DN40 X 20 UNIT $ 10.00
GAL MAL TEE DN25 X 20 UNIT $ 6.00
Tee DN 32 X DN 20 UNIT $ 8.50
GAL MAL ELBOW LONG RADIUS 90˚
UNIT $ 5.50
DN40
GAL MAL ELBOW LONG RADIUS 45˚
UNIT $ 7.50
DN40
GAL MAL REDUCER DN50 X 40 UNIT $ 2.50
GAL MAL REDUCER DN40 X 25 UNIT $ 2.00
GAL MAL REDUCER DN25 X 15 UNIT $ 2.00
Gal Mal 90˚ Elbow DN20 UNIT $ 1.50
Reducer DN32 X DN20 UNIT $ 2.50
Gal Pipe DN20 x2.6mmx 6m length ea $ 20.00
Brass Ball Valve DN20 (PN16) ea $ 14.00
Gal Mal Hexa Nipple DN20 ea $ 1.50
Gal Mal FF Union DN20 ea $ 1.50
Brass Hose Cock DN20, PN16 ea $ 13.50
Gal Mal FF Elbow 90° DN20 ea $ 1.50
PTFE Tape 12mm, 10M Roll $ 1.00
GAL MAL SOCKET DN 50 Nos $ 4.00
GAL MAL SOCKET DN 20 Nos $ 1.50
GAL MAL HEX NIPPLE DN65 Nos $ 9.00
GAL MAL HEX NIPPLE DN50 Nos $ 4.50
GAL MAL HEX NIPPLE DN20 Nos $ 1.25
C Material local
1 Pasir M³ $ 10.00
Pasir pasang / beton M³ $ 25.00
Batu belah M³ $ 20.00
Batupecah 5/7 M³ $ 20.00
Batupecah 1/2 M³ $ 55.00
3 Kayu 4/6 M³ $ 200.00
4 Kayu 5/7 M³ $ 200.00
5 Kayu 5/10 M³ $ 200.00
6 Kayu papan 2/30 M³ $ 200.00
7 Britas 2/3 M3 $ 40.00
8
FATIN : GISU
SUMARIO
POSTO : MAUBARA
MUNI : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY
UNIDADE
TOTAL
A PREPARASAUN
B KONSTRUSAUN
Signed :
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY UNIDADE
TOTAL
SERVISU FONDASI
1 Hamoos no prepara fatin m2 420.0 $ 1.10 $ 462.00
2 Sukat & Bowplank m' 76.0 $ 3.85 $ 292.92
3 Kee rai ba fondasi hada fatuk m3 36.5 $ 3.73 $ 136.22
4 Pondasi hada fatuk uza concrete 1:3 m3 64.3 $ 77.25 $ 4,968.89
5 Besi Beton Ø13mm Ulir Kg 2698 $ 2.00 $ 5,396.96
Hatetuk ho britas 2/3 (mahar 200mm) iha intake laran
6 m3 7.6 $ 35.33 $ 268.48
atu bele evita tahu.
SERVISU CONCRETE
1 Kee rai ba Tanke Colector nomos Slap Pipe Screen fatin. m3 47.03 $ 1.10 $ 51.73
2 Concrete K-225 (kahor 1:2:3) ba tanke Colector m3 24.28 $ 161.97 $ 3,932.74
Concrete K-225 (kahor 1:2:3) ba Intake, Slap ho nia
3 m3 6.40 $ 161.97 $ 1,036.64
mahar 200mm
4 Besi Beton Ø13mm Ulir Kg 2866 $ 2.00 $ 5,732.68
5 Arame kesi beton Kg 57 $ 1.00 $ 57.33
6 Formwork (bekisting) m2 80.4 $ 40.00 $ 3,216.00
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY UNIDADE
TOTAL
RUSTY SPOTS must be treated with cold
galvanised paint (hasae feruzen, pinta ho tinta
FENCE
galvanis POST OF GAL
kualidade forte) PIPE DN40 x 3.2MM X
1 Nos 9 $ 40.00 $ 360.0
3M, BSP
GATE AT 1OF
POST ENDGAL PIPE DN80 x 4.0 MM X
2 Nos 1 $ 65.00 $ 65.0
3M, BSP AT 1GATE,
STANDARD END 1.5M WIDE , DN40x
3 Nos 1 $ 200.00 $ 200.0
3.2MM (Diamond
CROSS BAR OF GALchainPIPE
wire)DN40 x 3.2MM X
4 Lolon 5.5 $ 40.00 $ 220.0
6M, BSPPLASTIC
SHADE AT BOTHNET,ENDS 80% sunlight
5 m2 32 $ 8.00 $ 256.0
protection
6 Gal Mal Hex Nipple DN 100MM unit 1.0 $ 12.00 $ 12.00
7 Gal Mal Socket DN 100MM unit 1.0 $ 15.00 $ 15.00
TOTAL $ 30,918.59
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-2: KANU TRANSMISAUN
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 SERVISO PREPARATORIO
2 SOSA KANU GS
Sosa kanu, fittings inklui socket BSP no water mur ida kada monta kanu lolon
3 NOTES
sanulu, lori ba fatin servicu
Gal Pipe shall comply with AS1074 or BS1740, 6m long, BSP threaded ends
(Kanu galvanis tenki kumpri standar Australia No. AS1074 ou standard Inglatera
4 NOTES
NO. BS1740, ujung pipa iha roska kumpri standard BSP). Note: hare didiak
kualidade ho mahar kanu nee
6 PE 100 PN12.5 NOD 63 HUSI INTAKE (G0 > to'o >G7) M' 257 $ 8.00 $ 2,056.0
9 GAL MAL 45˚ ELBOW LONG RADIUS DN50 UNIT 4.0 $ 5.00 $ 20.0
10 MONTA KANU
Kee rai ba kanu nia dalan ho medida (0.4 x 0.6 x 359M'), kada metru =
11 M3 305 $ 3.73 $ 1,138.0
0.24M3
13 Bedding material, uza rai finu, 175mm mahar G1 too G7 M3 19 $ 13.66 $ 258.1
Monta kanu inklui socket BSP no water mur (UNION) ida monta kada kanu
14 M' 359 $ 2.50 $ 897.9
lolon sanulu. Dia DN50
Kompaksi (Pemadatan) rai galian (Per 20 Cm), labele hatama dala ida, maibe
16 M3 255 $ 3.00 $ 766.2
phasu por phasu ho mahar 20cm, uza plate compactor
Monta kanu GS nee inklui PTFE tape, sasan servico [working tools], tesi
17 kanu, halo roska foun, solda kanu tuir necesidade. Inklui mos elbow, tee nebe NOTES
sei precisa maibe seidauk identifika
Kontrator tenki profa instalasaun nee halo ho diak no cuidado; kontrator tenki
19 NOTES
halo pipe testing
Wainhira seccao kanu hotu, tenki test. Taka kanu nia rohan labele liu 300
20 metru kada seccao. Hare labele iha kanu kuak. DTO SAS tenki declara katak NOTES
testing nee hetan resultado diak. Contrator hadia kanu nebe sei kuak
Tuir realidade, SAS sei hatudo fatin nebe precisa fui betaun atu proteje kanu.
22 NOTES
Concrete nee tenki 1:2:3 [usa britas 10/20mm].
518466999.xlsx 28 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-2: KANU TRANSMISAUN
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
26 PIPE HANGER
Tuir realidade, Tecnico SAS sei hatudo fatin nebe precisa fui betaun hodi tara
27 kanu transmisaun tuir foho lolon. Concrete nee tenki 1:2:3 [usa britas NOTES
10/20mm].
29 Ke'e rai ba beton Pipe Hunger nian hodi tara kanu M³ 5.6 $ 3.73 $ 20.7
Thrust Block Beton K225, dimensi 400mm x 400mm x 600mm hodi tara kanu
30 Fatin 37.0 $ 25.00 $ 925.0
(Pipe Hanger), tuir dezenho
32 Wire rope grip & Turn buckle Fatin 37.0 $ 4.00 $ 148.0
Besi beton Ø16MM, tesi no monta tuir dezenho. (Coordena ho DTO SAS),
33 M' 30.0 $ 3.00 $ 90.0
800 MM kada fatin, hatama iha beton hanger nia laran antes fui betaun
34 TOTAL $ 16,714.7
518466999.xlsx 29 of 61
PROJETO :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -3 : BPT 6M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT KUANTIDADE TOTAL
UNIDADE
1 SERVISU FONDASI
6 Hatetuk ho britas (mahar 150mm) no kompresaun ba tanki concrete m3 0.6 $ 35.33 $ 21.20
7 Nahe Plastik inklui fakar fatuk 5/7 iha area tanki wainhira tanki remata. m2 19.0 $ 6.00 $ 114.00
8 SERVISU CONCRETE
518466999.xlsx 30 of 61
PROJETO :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -3 : BPT 6M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT KUANTIDADE TOTAL
UNIDADE
29 TOTAL $ 4,825.78
518466999.xlsx 31 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -4 : CONCRETE TANK 30M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 SERVISU FONDASI
Kee rai lolon to'o nivelado ho rai tetuk hodi halo fondasi ba tanke
4 m3 160.00 $ 3.73 $ 597.44
reservatorio 30M3 nomos lutu haleu tanke
Nahe Plastik inklui fakar fatuk 5/7 iha area tanki wainhira tanki
9 m2 37.00 $ 6.00 $ 222.00
remata.
10 SERVISU CONCRETE
16 GAL PIPE DN50 X 3.6MM X 6M , BSP ENDS+SOCKET M' 12.00 $ 14.00 $ 168.00
518466999.xlsx 32 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -4 : CONCRETE TANK 30M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
24 TOTAL $ 13,256.65
518466999.xlsx 33 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -4 : CONCRETE TANK 30M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 SERVISU FONDASI
Kee rai lolon to'o nivelado ho rai tetuk hodi halo fondasi ba tanke
4 m3 45.00 4.31 $ 194.13
reservatorio 30M3 nomos lutu haleu tanke
Nahe Plastik inklui fakar fatuk 5/7 iha area tanki wainhira tanki
8 m2 37.00 6.00 $ 222.00
remata.
9 SERVISU CONCRETE
15 GAL PIPE DN50 X 3.6MM X 6M , BSP ENDS+SOCKET M' 12.00 14.00 $ 168.00
518466999.xlsx 34 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PART -4 : CONCRETE TANK 30M3
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
23 TOTAL $ 12,312.76
518466999.xlsx 35 of 61
PROJETO :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU
PARTE-5: LUTU RESERVATORIO, 9 X 9
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT KUANTIDADE TOTAL
UNIDADE
1 SERVISO PREPARATORIO
2 Dimension 9M x 9M
Each post must have 1 BSP CAP attached and butt welded to secure the
5 NOTES
CAP, add price of BSP CAPs on to the posts' unit price
7 Galvanized tension wire 3.15mm (AS) 750M Roll m 80.00 1.00 $ 80.0
8 1.57mm diameter Galvanized Tie Wire 280m roll (4.6kg) Roll 2.00 30.00 $ 60.0
Fence Post of Gal Pipe DN40 x 3.2mm x 2.8m BSP top end, inklui ida
14 Nos 10.00 30.00 $ 300.0
GS CAP DN40 (F) BSP Inklui tesi, halo kuak, roska ho solda CAP
Gate post of Gal Pipe DN80 x 4.2mm x 2.8m BSP CAP at 1 End, inklui
15 No 2.00 50.00 $ 100.0
ida GS CAP DN80 (F) BSP; Inklui tesi, halo kuak, roska ho solda CAP
16 Standard gate GS DN40, 1,5m wide (per- piece) pieces 2.00 195.00 $ 390.0
17 Cross bar of gal, Uza Pipe DN40 x 3.2mm x 6m BSP at both end Lolon 5.50 40.00 $ 220.0
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT KUANTIDADE TOTAL
UNIDADE
19 Kadiado & long Galva chain (50cm) Unit 1.00 15.00 $ 15.0
20 INSTALASAUN
21 Kee kuak ba footings too nivel desenho ho hamos rai restu LS 0.54 25.00 $ 13.5
22 Cor beton footing: Concreeting 12 posts, 1:2:3 mix m3 0.65 161.97 $ 105.0
Pinta parte nebe iha feruzen, usa cold galvanizing paint kualidade
24 LS 1.00 50.00 $ 50.0
hanesan ba bee tasi [marina]
Fatuk Britas DIA 5/7 CM, fakar 100MM mahar iha lutu nia laran
27 m3 9.72 35.33 $ 343.38
(plastik nia leten)
28 TOTAL $ 3,683.84
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU
PART 6: PONTI KANU 40M'
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 SERVISU FONDASI
7 Renta Scafolding, metru 2, hodi monta kanu sets-loron 32.00 3.00 $ 96.00
8 SERVISU CONCRETE
518466999.xlsx 38 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU
PART 6: PONTI KANU 40M'
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
24 TOTAL $ 4,416.58
518466999.xlsx 39 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU
PARTE-7: KANU DISTRIBUISAUN
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 SERVISO PREPARATORIO
2 SOSA KANU GS
Sosa kanu, fittings inklui socket BSP no water mur ida kada monta kanu
3 NOTES
lolon sanulu, lori ba fatin servicu
Gal Pipe shall comply with AS1074 or BS1740, 6m long, BSP threaded
ends (Kanu galvanis tenki kumpri standar Australia No. AS1074 ou
4 NOTES
standard Inglatera NO. BS1740, ujung pipa iha roska kumpri standard
BSP). Note: hare didiak kualidade ho mahar kanu nee
6 GAL PIPE DN50 X 3.6 MM X 6M , BSP ENDS+SOCKET M' 800.00 13.00 $ 10,400.0
7 GAL PIPE DN40 X 3.2 MM X 6M , BSP ENDS+SOCKET M' 956.00 12.50 $ 11,950.0
8 GAL PIPE DN32 X 3.2 MM X 6M , BSP ENDS+SOCKET LOLON 29.67 32.50 $ 964.2
9 GAL PIPE DN25 X 3.2 MM X 6M , BSP ENDS+SOCKET M' 700.00 27.50 $ 19,250.0
10 GAL PIPE DN20 X 2.6 MM X 6M , BSP ENDS+SOCKET M' 352.00 18.00 $ 6,336.0
11 ACCESSORIES
16 GAL MAL ELBOW LONG RADIUS 45, DN50 UNIT 4.00 10.00 $ 40.0
21 GAL MAL ELBOW LONG RADIUS 90˚ DN40 UNIT 2.00 5.50 $ 11.0
22 GAL MAL ELBOW LONG RADIUS 45˚ DN40 UNIT 4.00 7.50 $ 30.0
518466999.xlsx 40 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU
PARTE-7: KANU DISTRIBUISAUN
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
SOBU KANU
28 MONTA KANU
Kee rai, luang 400mm x naruk 600mm husi tanke too distribuisaun. Kada
29 M3 673.92 3.73 $ 2,516.4
metru precisa kee 0.24m3 (ba kanu distribusi tomak)
Monta kanu inklui socket BSP no water mur ida kada monta kanu lolon
30 M' 800.00 2.50 $ 2,000.0
sanulu. DN50
Monta kanu inklui socket BSP no water mur ida kada monta kanu lolon
31 LOLON 29.67 14.50 $ 430.2
sanulu. Dia DN32
Monta kanu inklui socket BSP no water mur ida kada monta kanu lolon
32 M' 956.00 2.50 $ 2,390.0
sanulu. DN40
Monta kanu inklui socket BSP no water mur ida kada monta kanu lolon
33 M' 700.00 1.25 $ 875.0
sanulu. DN25
Monta kanu inklui socket BSP no water mur ida kada monta kanu lolon
34 M' 352.00 1.25 $ 440.0
sanulu. DN20
Monta kanu GS nee inklui PTFE tape, sasan servico [working tools], tesi
35 kanu, halo roska foun, solda kanu tuir necesidade. Inklui mos elbow, tee NOTES
nebe identifika ona.
Kompaksi (Pemadatan) rai galian (Per 20 Cm), labele hatama dala ida,
37 M3 673.92 3.10 $ 2,089.2
maibe phasu por phasu ho mahar 20cm, uza plate compactor
Wainhira seccao kanu hotu, tenki test. Taka kanu nia rohan labele liu 300
metru kada seccao. Hare labele iha kanu kuak. Tecnico Officer, Planing
40 NOTES
and Development (P&D) SAS tenki declara katak testing nee hetan
resultado diak. Contrator tenki hadia wainhira kanu sei kuak
Tuir realidade, SAS sei hatudo fatin nebe precisa fui betaun atu proteje
42 NOTES
kanu. Concrete nee tenki 1:2:3 [usa britas 10/20mm].
45 TOTAL $ 65,984.2
518466999.xlsx 41 of 61
PROJETU
:REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-8: TORNEIRA PUBLIKA
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 PREPARASAUN
5 SERVISU CONCRETE
Concrete K225 (9.4 sak sementu @40kg, 0.82m3 split 1/2 + 0.5m3 rai-henek
6 m3 1.62 161.97 $ 262.58
beton)
Gal Pipe tenki AS1074 or BS1740, 6m long, BSP threaded ends (Kanu
galvanis tenki kumpri standar Australia No. AS1074 ou standard Inglatera
11
NO. BS1740, ujung pipa iha roska kumpri standard BSP). Note: hare didiak
kualidade ho mahar kanu nee.
Gate valves, Ball Valve no torneira tenki cumpri Australian Standard,
12
konsulta ho SMASA antes sosa. PN16
20 Pinta torneira Uja tinta NIPON PAIN Koor Biru Laut NOS 1.00 10.00 $ 10.00
21 FINISHING
Sosa no fakar Fatuk 50/70 atu evita ambiente nebe ladiak, hanesan tahu,
22 m3 4.16 35.00 $ 145.71
dodok. Wainhira remata, britas nia mahar 100mm
22 TOTAL $ 929.98
518466999.xlsx 42 of 61
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-10 : SASAN SERVISU
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
1 TOOL BOXES
4 WORKING TOOLS
11 Save halo roska (drat) diametru DN50-DN65 Sets 1.00 97.00 $ 97.00
12 Save halo roska (drat) diametru DN15-DN32 Set 2.00 55.00 $ 110.00
14 Wheel Pipe cutter ba kanu dia DN80 Set 2.00 80.00 $ 160.00
15 Wheel Pipe cutter ba kanu dia DN50 Set 2.00 42.50 $ 85.00
518466999.xlsx 43 of
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-10 : SASAN SERVISU
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
16 Wheel Pipe cutter ba kanu dia DN25 Set 2.00 26.00 $ 52.00
518466999.xlsx 44 of
PROJETU :REHABILITASAUN SISTEMA BEMOS IHA ALDEIA PANDEIVOU, MAUNO
FATIN : GISU PARTE-10 : SASAN SERVISU
POSTO : MAUBARA
MUNI. : LIQUISA
PRESU
ITEM DESKRISAUN UNIT QTY TOTAL
UNIDADE
35 SEL-SELUK
37 TOTAL $ 2,590.75
518466999.xlsx 45 of
MATERIAL KONSTRUSAUN
HARGA
Deskrisaun UNIT KOEFISIEN STN2011-2016
1 1 M' Pagar Sementara dari seng gelombang, tinggi 2m
MATERIAL
1 Semen Porland Kg 1 0.25
2 Britas (batu kerikil beton 10/20) M³ 1 57.00
3 Pasir beton M³ 1 35.00
4 Pasir Urug M³ 1 15.00
5 Pasir Pasang M³ 1 35.00
6 Batu belah 15/20 M³ 1 20.00
7 Batu pecah 5/7 M³ 1 20.00
BESI BETON
1 Besi Betaun 12mmø x 12m kg 1 1.80
2 Besi Betaun 10mmø x 12m kg 1 1.80
3 Besi Betaun 8 mmø x 12m kg 1 1.80
4 Besi Betaun 6 mmø x 12m kg 1 1.80
5 Arame 8mmø x 150mm x150mm (wiremesh) m2 1 15.00
6 Arame 12mmø x 150mm x150mm (wiremesh) m2 1 20.00
7 Kawat beton kg 1 2.50
KAYU
1 Kayu kelas iii M³ 1 350.00
2 Kayu usuk 5/7 M³ 1 320.00
3 Kayu papan 3/20 M³ 1 320.00
4 Dolken kayu ø 8-10/4m Btg. 1 2.00
5 Kayu balok terentang M³ 1 200.00
6 Kayu balok kelas ii M³ 1 360.00
7 Paku biasa 2¨5¨ Kg. 1 2.50
8 Minyak Bekisting liter 1 1.50
PLYWOOD (TRIPLEKS)
1 Plywood 12mm Lbr 1 16.00
2 Plywood 9 mm Lbr 1 12.00
3 Plywood 6 mm Lbr 1 10.00
4 Plywood 4 mm Lbr 1 6.00
5 Plywood 3 mm Lbr 1 5.00
6 Seng gelombang BJLS 28 Lbr 1 6.00
TENAGA KERJA
1 Pekerja Oh 1 5.00
2 Tukang Oh 1 8.00
3 Kepala tukang Oh 1 10.00
4 Mandor Oh 1 12.00
MATERIAL SEL_SELUK
1 Ijuk M³ 1 50.00
2 Sirtu Oh 1 12.00
3 PolyEthylene Sheets Oh 1 10.00
WIRE FENCE MATERIALS
1 Standard Galvanised Diamond Chainwire 50mmx 2.5mm, 1800mm, AUSTRALI M' 1 11.50
2 GALVANISED TENSION WIRE 3.15MM (AUSTRALIAN STANDARD) M' 1 0.93
3 1.57mm diameter Galvanised Tie Wire 280m roll (4.6kg) (AUSTRALIAN STANDAROLL 1 31.00
4 MASPROCLIP 500PACK PACK 1 25.00
5 Fixed Corners - Galvanised Butt40-Thru40 Nos 1 33.00
6 Fixed Cross - Galvanised Butt40-Thru40 Nos 1 25.00
7 Fixed Tees - Galvanised Butt80-Thru40 Nos 1 19.00
8 Gate hinges DN80xDN40 Nos 1 25.00
WATER QUALITY TESTING (Complete set)
1 1 Sample test (fisik, kimia & bakteorologi), Transport & handling LS 1 261.00
PREFABRICATED LINER TANK
Standard Prefabricated Water Tank, for Potable water Line; Roofsheet; Locable
Access Hatch; Whirley Bird Ventilator; Internal/External Ladder, 1xDN50 BSP
1 Inlet& Float Valve; 3xDN50 Outlets+3xDN25 Vent Pipes; 3xDN50 BV PN21 SPEC
2 100M3 Tank Unit 1
2 80M3 Tank Unit 1
3 60M3 Tank Unit 1
4 40M3 Tank Unit 1 16,000.00
5 Installation + 10yrs Warranty Unit 1 1,500.00
Water Quality Sampling, handling, transportation & Testing (fisis, kimia &
bakteorologi by DNSA Laboratorium). Foti sample husi torneira publika.
1 NOTES
2 NON-LOCAL TRANSPORT Rit 1 200.00
2 NON-LOCAL TRUCK Rit 1 300.00
1 Tool Boxes, made in ET roofing, 750 x 350 x 350 Aas, flat sheet galv, 0.6mm, inklUnit 1 150.00
2 Save kanu DN80 Set 1 40.25
3 Save kanu (Pipe wrench) 24" Set 1 25.00
4 Save kanu (Pipe wrench) 18" Set 1 18.00
5 Save kanu (Pipe wrench) 14" Set 1 12.00
6 Kunci rantai ba kanu DN80 Set 1 60.00
7 Kunci rantai ba kanu DN50 Set 1 40.00
8 Sabe halo roska (drat) diametru DN50-DN100 Set 1 145.00
9 Sabe halo roska (drat) diametru DN50-DN65 Set 1 90.00
10 Sabe halo roska (drat) diametru DN15-DN32 Set 1 50.00
11 Meja catok inklui catok (ref. desenho), 4" capacity Set 1 275.00
12 Wheel Pipe cutter ba kanu dia DN80 Set 1 80.00
13 Wheel Pipe cutter ba kanu dia DN50 Set 1 40.00
14 Wheel Pipe cutter ba kanu dia DN25 Set 1 25.00
15 Kunci strap (hametin kanu PE), too DN50 Set 1 20.00
16 Kunci strap (hametin kanu PE), too DN110 Set 1 30.00
17 Kado besi (hacksaw frame) Set 1 10.00
18 Matan kado besi (Bi-metal safety blade 12" (300mm) Set 1 2.50
19 Aluminium Waterpass (aluminium level), 18" Set 1 8.00
20 Measuring tape 5m Set 1 8.00
21 PILOX Spray Paint, 300ml lata Lata 1 5.00
22 Tinner "A"(1 litro per lata) Lata 1 7.00
23 Pinsel (kuas) 2 inci Unit 1 2.00
FITTINGS
C.2 GAL MAL SOCKET/COUPLING 1
1 GAL MAL SOCKET DN 15 (½") (F) unit 1 0.95
2 GAL MAL SOCKET DN 20 (¾") (F) unit 1 1.35
3 GAL MAL SOCKET DN 25 (1") (F) unit 1 1.75
0.25
57.00
35.00
15.00
35.00
20.00
20.00
1.80
1.80
1.80
1.80
15.00
20.00
2.50
350.00
320.00
320.00
2.00
200.00
360.00
2.50
1.50
16.00
12.00
10.00
6.00
5.00
6.00
5.00
8.00
10.00
12.00
50.00
12.00
10.00
11.50
0.93
31.00
25.00
33.00
25.00
19.00
25.00
261.00
17,600.00
1,500.00
575.00
840.00
1,010.00
1,175.00
1,502.00
1,640.00
2,202.00
64
50
37
261.00
220.00
330.00
12.65
44.00
71.50
1.03
34.10
27.50
38.50
27.50
38.50
38.50
27.50
27.50
2.15
50.00
PRESU
UNIDADE
165.00
44.28
27.50
19.80
13.20
66.00
44.00
159.50
99.00
55.00
302.50
88.00
44.00
27.50
22.00
33.00
11.00
2.75
8.80
8.80
5.50
7.70
2.20
PRESU
UNIDADE
1.6
1.9
2.3
3.3
4.0
6.3
7.2
11.8
16.6
316.3
3.3
4.1
5.6
17.5
26.1
50.4
67.9
117.2
165.7
3.1
4.0
4.2
16.8
16.9
17.4
24.8
25.6
79.8
79.8
79.8
71.2
100.7
93.5
126.5
3.9
5.6
6.9
9.2
18.9
36.7
93.5
86.2
226.1
0.0
0.0
10.0
11.6
16.9
27.1
14.8
22.4
24.5
17.5
31.9
32.9
26.0
31.9
37.7
37.7
39.5
0.0
0.0
6.4
6.7
12.5
19.3
22.7
28.0
87.6
104.1
139.8
0.0
0.0
7.9
10.8
24.2
37.6
47.5
52.4
57.3
115.5
192.5
0.0
0.0
0.0
4.2
4.6
6.6
12.9
15.6
19.8
85.3
0.0
0.0
0.0
3.6
4.0
6.4
10.7
13.3
19.8
82.8
0.0
0.0
0.0
3.9
5.5
7.1
10.1
16.4
19.4
29.8
59.7
90.1
214.0
0.0
0.0
3.9
5.0
6.1
19.3
25.9
41.3
82.5
93.5
99.0
137.5
0.0
0.0
3.3
5.0
6.6
11.5
15.1
18.8
51.2
80.4
126.0
0.0
0.0
5.0
6.0
7.8
17.9
22.3
60.6
95.1
149.1
0.0
0.0
3.2
3.8
5.1
9.2
10.8
11.4
17.1
19.0
42.6
57.9
104.3
0.0
0.0
2.9
3.7
4.8
8.4
8.7
9.4
10.1
10.3
14.0
14.3
44.9
45.3
56.1
93.1
0.0
0.0
3.4
3.5
3.5
4.6
7.0
10.5
14.0
41.4
55.8
95.7
0.0
0.0
2.5
3.0
3.7
5.8
7.9
9.4
0.0
0.0
0.0
#VALUE!
0.0
16.6
20.6
31.7
41.3
47.7
66.8
88.8
113.0
168.4
334.5
0.0
0.0
0.0
1.0
1.5
1.9
0.0
2.8
3.4
4.3
6.3
11.0
15.7
104.3
0.0
0.0
1.7
2.2
1.1
1.7
1.9
1.9
1.9
2.1
2.2
2.2
2.5
2.5
2.5
2.5
2.8
2.8
3.9
3.9
8.3
8.3
8.3
8.3
44.3
43.7
0.0
0.0
0.0
3.6
4.3
5.5
6.5
9.1
12.4
19.5
27.5
31.1
0.0
0.0
1.1
1.3
1.9
3.0
3.4
4.8
9.4
12.9
13.8
123.1
0.0
0.0
0.0
0.8
1.9
1.9
2.8
2.8
2.8
3.3
3.3
3.3
4.4
4.4
4.4
4.4
8.3
8.3
8.3
0.0
0.0
0.0
1.7
3.0
3.4
6.5
7.8
11.5
23.4
40.7
62.1
0.0
0.0
0.0
1.4
1.7
2.2
2.8
3.3
5.0
10.2
13.8
24.8
0.0
0.0
0.0
1.7
2.2
3.3
5.5
5.5
6.6
9.9
0.0
0.0
0.0
0.0
1.2
1.6
2.3
3.4
4.3
5.8
9.4
18.4
0.0
0.0
0.0
4.3
6.0
6.2
9.7
9.7
10.7
10.7
10.7
17.1
17.1
18.0
23.1
27.5
41.1
0.0
0.0
0.0
1.6
2.2
3.0
7.0
8.9
12.7
24.8
28.7
0.0
0.0
0.0
9.9
14.3
17.6
34.1
48.4
73.7
161.7
236.5
331.1
0.0
0.0
0.0
10.0
14.9
20.9
36.3
51.7
70.4
134.2
211.2
306.9
0.0
0.0
16.7
22.2
0.0
0.0
14.0
14.9
0.0
0.0
1.1
1.7
0.0
0.0
56.1
115.5
137.2
249.9
359.9
468.1
0.0
0.0
0.0
44.0
66.0
1.0