Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

5/12/2021 Pre-Quiz: Attempt review

 Chennasamudram Harsha .

 Dashboard / Software Engineering Concepts / Software Maintenance / Pre-Quiz

Started on Saturday, 8 May 2021, 10:58 PM


State Finished
Completed on Saturday, 8 May 2021, 10:59 PM
Time taken 1 min
Marks 5.67/6.00
Grade 94.44 out of 100.00
Feedback Congratulations!! You have passed by securing more than 80%

Question An SRS has the following requirement.The stock exchange shall show the stock report for the next 24 hours.What is the issue
1 with this requirement

Correct
Select one:
Mark 1.00 out of
1.00 a. Requirement is Correct

b. Ambiguous 

c. Inconsistent

d. In correct

Your answer is correct.


The correct answer is: Ambiguous

Question The standard document that describes all the requirements of the system is called as .............
2
Select one:
Correct
a. Test Case Document
Mark 1.00 out of
1.00
b. Contract Document

c. User Requirement Speci cation

d. Software Requirement Speci cation 

Your answer is correct.


The standard document that describes all the requirements of the system is called as Software Requirement Speci cation
The correct answer is: Software Requirement Speci cation

Question Client Comes to Allen Company for a Banking Solution. Who from the below options would be best suited to gather all the
3 requirements correctly from the client?

Correct
Select one:
Mark 1.00 out of
1.00 a. System analyst 

b. Analyzer

c. System Architect

d. Database Analyst

Your answer is correct.


A System Analyst understands the users requirements, and collects or gathers the required data 

The correct answer is: System analyst

https://accenturelearning.tekstac.com/2021/mod/quiz/review.php?attempt=637704&cmid=1115 1/2
5/12/2021 Pre-Quiz: Attempt review

 Chennasamudram Harsha .

Question A good SRS should be ______, ________ and _______.


4
Select one or more:
Partially correct
a. Traceable
Mark 0.67 out of
1.00
b. Periodical

c. Complete 

d. Consistent 

Your answer is partially correct.

You have correctly selected 2.


A good SRS should be complete, consistent and traceable

The correct answers are: Traceable, Consistent, Complete

Question In remote control Car application, in the step by step execution of the requirement described,  it is mentioned when the fuel
5 level goes below the minium level, the application should indicate the user in red color. In the output section of the same
process it is mentioned that the indicator will glow pink. What is the kind of requirement speci ed in SRS
Correct

Mark 1.00 out of


1.00
Select one:
a. Complete

b. Contradicting 

c. Consistent

d. Incomplete

Your answer is correct.

The correct answer is: Contradicting

Question Client Comes to Allen Company for a Banking Solution.Which phase of SDLC is best suited to gather what is expected from
6 client?

Correct
Select one:
Mark 1.00 out of
1.00 a. Requirement analysis 

b. Customer Analysis

c. System Analysis

d. Feasibility Analysis

Your answer is correct.

The correct answer is: Requirement analysis

https://accenturelearning.tekstac.com/2021/mod/quiz/review.php?attempt=637704&cmid=1115 2/2

You might also like