RISK ASSESSMENT FOR INSTALLATION OF

CABLE TRAY AND TRUCKING


Facility No.: Location: Report No.:
____________________________________________________________________________________
Project Name: __________________________________________ Date:
____________________________________________________________________________________

SEVERITY: 1 – Slightly Harmful, 2 – Harmful, 3 – Extremely Harmful; LIKELIHOOD: 1 – Unlikely, 2 – Likely, 3 – Very Likely; RISK LEVEL: 1 – Trivial, 2 – Low, 2 to 4 – Medium, 4 to
6 – High, Above 6 – Extremely High.

Risk Evaluation Residual Risk

Sr.

Likelihood

Likelihood
Risk Level

Risk Level
Activity Hazard Effect / Harm Control Measures Monitoring Mechanism

Severity

Severity
No.

1. Installation of cable tray Handling of materials, Lost of assets, personnel 3 3 9 Work at Height Permit 1 3 L Safety personnel
and cable trucking Use of tools & tackles injury, fatality, death, shall be provided before surveillance, giving
for installation, Accident, work commencement. first aid, & proper
Working at height. Appropriate PPE should toolbox talk.
be provided. Induction training.
Induction training and
Tool Box Talk should be
carried out regularly
before commencement on
work.
Direct supervision of the
supervisor.
Safety Warning signs
shall be in place.
Provision of safe access.
Protection of material
from falling.

Prepared by: Name: Reviewed by: Name:


HSE Signature & Date: Signature & Date:

Doc. No.: Rev. No.: 00 Date: Page 1 of 1