HIRA No: SBD-418-HSE-HIRA-008 REV:01

Operation/Task: Adverse Weather Condition


Method Statement Title: All Areas
Location/Area: RCS Package 5 Method Statement No:

SBD HSEMS Revision: 01


HSEMSP06/F02 Date Issued: Oct 2020
Page No: Page 1 of 5
HIRA No: SBD-418-HSE-HIRA-008 REV:01
Operation/Task: Adverse Weather Condition
Method Statement Title: All Areas
Location/Area: RCS Package 5 Method Statement No:

Item Activity Hazards Identified Risk Rating Control Measures Residual Risk Responsibility Monitoring
S L RR S L RR Responsibility
01 All Dust 3 4 12  Safety shoes, reflective vest, gloves and safety glass 3 1 3 Supervisor/ Construction
Sand storm shall be worn at all times as a minimum requirement. Engineer Manager
Inhalation of Exhaust  Dust mask shall be provided for operators /workers.
fumes, dust, etc.  Stops the activity during heavy sand storm period as
instructed by Project Manager.

SBD HSEMS Revision: 01


HSEMSP06/F02 Date Issued: Oct 2020
Page No: Page 2 of 5
HIRA No: SBD-418-HSE-HIRA-008 REV:01
Operation/Task: Adverse Weather Condition
Method Statement Title: All Areas
Location/Area: RCS Package 5 Method Statement No:
Risk Rating Residual Risk

Item Activity Hazards Identified S L RR Control Measures S L RR Responsibility Monitoring


Responsibility
02 Working in Heat Heat stress when working 4 3 12  Comply with legal working hours during summer. 4 1 4 All CM/ Engineers
in hot weather causing Schedule the heavy work for cold part of the day if
Heat Stroke, nausea, possible
vomiting.  Close supervision all times
 Monitor the wet bulb and dry bulb temperatures (TWL)
and communication to construction team for possible
immediate actions as recommended as per the Thermal
Work Limit Zones and Interventions for Management of
Work
 Make short shifts (sufficient break for work groups)
 Heat stress awareness for all operatives through training,
campaigns, etc.
 Provide Re-hydration drinks & cold water, wet and
appropriate weather clothing must be worn.
 Provide adequate shaded areas, rest area & cold room
for the work group
 Workers are not allowed to work alone.
 Displays of different posters illustrating monitoring of
hydration status
 Pre-screening will be provided to employees working in
high temperature like asphalt works.
 Proper emergency arrangements should be in place and
procedure will be communicated to all workforce
 Implementation of Safety in Heat Plan

SBD HSEMS Revision: 01


HSEMSP06/F02 Date Issued: Oct 2020
Page No: Page 3 of 5
HIRA No: SBD-418-HSE-HIRA-008 REV:01
Operation/Task: Adverse Weather Condition
Method Statement Title: All Areas
Location/Area: RCS Package 5 Method Statement No:

Item Activity Hazards Identified Risk Rating Control Measures Residual Risk Monitoring
S L RR S L RR
Responsibility
Responsibility
03 All Adverse weather 3 4 12  Monitor weather condition prior to the start of activity. 3 1 3 Supervisor/ Construction
condition. Sand storm,  Wind conditions will be monitored and work stopped if Engineer Manager
fog, high wind, high and the stability of the load is affected. Operator
low temperature and rain  Lifting operations shall be ceased when the recorded
fall wind speed reaches or gusts in excess of 38KM/HR
(20.5knots)
 Stop all equipment and plant activities if the visibility is
not clear, pending on the clear visibility before
commencement of activities.
 Check PPE (goggle, cover all, high visibility reflective
jacket, dust mask, safety shoes, hand gloves ear plug) if
it appropriate for the prevailing condition before rippled
 Possible curtail of all activity if appropriate.
 Stop all activity during heavy rain fall.

KEY:

RR = Risk Rating
S = L = Likelihood of Occurrence
Severit
y
Rating

1. Negligible 1. Improbable 5 5 10 15 20 25 R (15-25) Unacceptable risk, plan out or add further controls
2. Minor Injury / Minor Spill / Leak 2. Remote 1 – 10% (8-12) Acceptable if no other method viable & high level controls in
ityverSe

4 4 8 12 16 20 O
place
3. Major Injury / Major Spill / Contamination 3. Possible 11 – 49% 3 3 6 9 12 15 Y (4-6) Acceptable with suitable controls
4. Fatality / Serious Hazardous Release 4. Probable 50 – 89% 2 2 4 6 8 10 G (1-3) Acceptable, no further action required
5. Multiple Fatality / Multiple Catastrophe 5. Almost certain 90%+ 1 1 2 3 4 5
1 2 3 4 5
Likelihood

HIRA Prepared by (Name): Karthikeyan Signature: Date: 14 Oct, 2020

SBD HSEMS Revision: 01


HSEMSP06/F02 Date Issued: Oct 2020
Page No: Page 4 of 5
HIRA No: SBD-418-HSE-HIRA-008 REV:01
Operation/Task: Adverse Weather Condition
Method Statement Title: All Areas
Location/Area: RCS Package 5 Method Statement No:

HIRA Reviewed by (Name): Venkadesh Signature: Date: 14 Oct, 2020

HIRA Approved by (Name): Vimal Kumar Signature: Date: 14 Oct, 2020

SBD HSEMS Revision: 01


HSEMSP06/F02 Date Issued: Oct 2020
Page No: Page 5 of 5