Daily Report - Mine Operation For The Month of June - 2021
Daily Report - Mine Operation For The Month of June - 2021
Date 01.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes
(PF)
Mines Blasting Status :
- -
Only Low-grade limestone is handled and crushed for Civil department usage.
0:15 Hopper empty
(Hopper empty hours included in the Crusher Run hours)
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
49 9.0
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
Pile full on
12.25 31.05.2021
MINES 2
n hours)
Cumulative
Boom Height
SiO₂
12.25 90%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
297978.00
0.00
0.00
297978.00
Da
Date 02.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 5911.00 6:20:00 933.81 0.00
Note: Limestone handled from stockyard to crusher with minimum (3 tippers) due to local issue
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
Mines Blasting Status :
34 8.08
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Misc., 3
Mechanical., 1
11.74 5%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
303889.00
0.00
2110.00
305999.00
Da
Date 03.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 22083.00 19:00:00 1162.26 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 2
Misc., 1
Misc., 1
Misc., 1
Mechanical., 1
Misc., 1
Misc., 1
Misc., 1
MINES 5
n hours)
bridge
MINES 3
n hours)
Cumulative
Boom Height
SiO₂
12.32 82%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
325972.00
0.00
2110.00
328082.00
Da
Date 04.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 9438.00 9:05:00 1039.43 0.00
As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 1039.43.
Hopper empty due to shortage of tippers(Tyre punctures)
0:35
(Hopper empty hours included in the Crusher Run hours)
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1039.43.
unctures) Misc., 4
n hours)
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
335410.00
0.00
2110.00
337520.00
Da
Date 05.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 3417.00 2:55:00 1170.21 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Cumulative
Boom Height
SiO₂
12.06 1%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
338827.00
0.00
2123.00
340950.00
Da
Date 06.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 11762.00 10:40:00 1102.34 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
50 8.0
Hopper empty
0:15 (Hopper empty hours included in the Crusher Run hours)
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
y Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 2
Misc., 1
Misc., 1
Misc., 1
Misc. 1
n hours)
Misc., 3
Cumulative
Boom Height
SiO₂
11.95 43%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
350589.00
0.00
2123.00
352712.00
Da
Date 07.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 11931.00 10:50:00 1101.66 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Mechanical 1
Misc., 1
Process 1
Quality 1
Mechanical 1
Misc., 1
n hours)
Misc., 6
Cumulative
Boom Height
SiO₂
12.44 73%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
362520.00
0.00
2123.00
364643.00
Da
Date 08.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 6083.00 5:45:00 1057.91 0.00
As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 1057.91
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
s Mines 1
Misc., 1
Misc., 1
Process 1
Misc., 1
Misc., 1
en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1057.91
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
368603.00
0.00
2123.00
370726.00
Da
Date 09.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 12960.00 10:45:00 1205.58 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
42 8.4
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
s Mines 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
g Mechanical 2
Misc., 1
Misc., 1
n hours)
Cumulative
Boom Height
SiO₂
11.41 32%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
381563.00
0.00
2123.00
383686.00
Da
Date 10.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 13813.00 11:50:00 1167.62 0.00
Hopper empty
0:45
(Hopper empty hours included in the Crusher Run hours)
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
47 8.38
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Process 1
Mines 1
Misc., 7
n hours)
Cumulative
Boom Height
SiO₂
12.02 67%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
395376.00
0.00
2123.00
397499.00
Da
Date 11.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 8804.00 8:20:00 1056.90 0.00
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Mechanical 1
Misc., 1
Misc., 1
Mechanical 1
Misc., 1
en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1056.90
Misc., 3
n hours)
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
404180.00
0.00
2123.00
406303.00
Da
Date 12.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 3634.00 3:00:00 1211.33 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
side Misc., 1
Misc., 1
Cumulative
Boom Height
SiO₂
10.86 1%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
407814.00
0.00
2123.00
409937.00
Da
Date 13.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 15682.00 13:10:00 1190.74 0.00
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
Misc., 1
n hours)
Misc., 1
Cumulative
Boom Height
SiO₂
12.35 54%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
423496.00
0.00
2123.00
425619.00
Da
Date 14.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 12556.00 11:20:00 1108.21 0.00
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
Mines 1
Mines 1
Misc., 1
39
Mechanical 1
Misc., 1
Cumulative
Boom Height
SiO₂
12.41 85%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
436052.00
0.00
2123.00
438175.00
Da
Date 15.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 2879.00 3:25:00 841.81 0.00
As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 841.81
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
62 8.50
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
djustment Mechanical 1
Mines 1
Misc., 1
39
Misc., 1
en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
841.81
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
2123.00
441054.00
Da
Date 16.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 17.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 18.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 19.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 20.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 21.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 22.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 23.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 24.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 25.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 26.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
58 8.35
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 27.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00
Powder factor
Blasted Holes
(PF)
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Cumulative
Boom Height
SiO₂
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
438931.00
0.00
0.00
438931.00
Da
Date 28.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 3645.00 3:00:00 1215.00 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
ute Mechanical 1
Misc., 1
Electrical 1
Misc., 1
Cumulative
Boom Height
SiO₂
11.03
11.03 5%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
442576.00
0.00
1128.02
443704.02
Da
Date 29.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH
Limestone Production
1
From Mines 13277.00 11:15:00 1180.18 0.00
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
Mines Blasting Status :
- -
To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump
Frequency of
Department
stoppage
Misc., 1
Misc., 1
05 Misc., 1
Misc., 1
Misc., 1
Misc., 1
Cumulative
Boom Height
SiO₂
12.42 38%
FY 2021 - 2022
to date Year to date
To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard
455853.00
0.00
1128.02
456981.02