BCT643 CLO3 Online Slide Presentation 30% - (Format) Maintenance & Repair

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING

BACHELOR OF SCIENCE (HONS.) CONSTRUCTION TECHNOLOGY


(AP256)
Course(CODE): INDUSTRIALISED BUILDING MAINTENANCE (BCT643) (Teaching & Learning
Taxonomy Domain
MOHE/MQF LOD

Delivery Method

Specific Task Related To


Assessment
Activity)

MOHE/MQF LOD Attribute


N Course Learning
o Outcomes (CLOs)
Final
Ongoing Video
online
Online Slide Presen
online
Presentation examinat
test tation
ion
Demonstrate
teamwork skills in
delivering oral Students are required to produce an
assignment and a brief recorded
presentation on 1) Online video presentation to explain the
process of findings of assignment on process of
7 demonstratio maintenance and remedial works.
maintenance and A 1
3
remedial works in
/
7
n.
3 2) Video 30% 0
%
The assignment will be submitted in
softcopy form using online platform.
These specific tasks are related to
relation to IBS Simulation the accommodating lifelong learning
maintenance Presentation. skills in the construction industry to
emphasise the attribute of ‘lifelong
technology. learning’ in MQF7 LOD.
MQF5 LOD5 /
A3

PROJECT: Groupwork
Title: Justifying the techniques and process of maintenance and remedial
works for IBS building.
NO. NAME STUDENT ID
1
2
3
4

LECTURER : AP Ts. Sr. Dr. HAYROMAN BIN AHMAD


SUBMISSION DATE : WEEK 13th .

Title: Justifying the techniques and process of maintenance and remedial


works for IBS building.

1
How to measure the defects?
“…our department using the ‘blue print’ method by the lifetime of a building component to measure the performance of each
portfolio component of Building. ‘Blue print’ method of building component means maintenance is doing based on service
requirements in compliance with the conditions stipulated in the warranty certificate.” Maintenance is doing by feedback of 1.
Observation… 2. Condition survey technique (via building condition survey with special measurement instruments)… 3.
Complaint…

If the building parts categorized as damaged, decayed or malfunction, then it identified and verified as eligible to run
maintenance. Then there are three type of works needed, 1. Restoration work on mechanical and electrical equipment, 2. Repair and
replacement on building physical element for eg. Frame structures, building, façade, finishes, etc., 3. Upgrading of interior decorations
and services.

Activity .
Every groups are given a chance to select their case study. Every members in the group will discuss
and prepare a set of maintenance and remedial works processes. The students are encouraged
to make a further research by referring to the selected maintenance organisation (company or else
purposely as a mentor).

Date of briefing: week 10th of semester. Date of submission: week 13th of semester.

Format
All slide presentation should be in the format of MBOT Technology services as given.

Technology Fields Technology Profiles Expected Technology Competency

• Drawing & Survey.


• Feasibility.
Development • Analysis & Design.
• Estimating & Scheduling.
• Specifications & Contractual Documentation.

• Risk Identification & Safety.


• Project Management (Work Scheduling &
Manufacturing Reporting, Procurement & Coordination
Building & of Labour & Equipment).
• Inspection & Supervision.
Construction
Technology • Equipment Selection.
• Testing Planning & Management.
(BC)
Testing • Testing Equipment Operations.
• Standards & Specifications Compliance.
• Verifications.

• Management, Supervision & Inspection.


Commissioning
• Standards & Specifications Compliance.

• Defect Liability Period.


Maintenance • Maintenance Scheduling & Operations.
• Analysis & Improvement Planning.

Group members should analyse the video given. Certain additional information must be referred to the
group. Please do not cut and pasted directly. Students are encouraged to use your own sentences
correctly. Slide presentation must not more than 10 slides.

2
References (is a must)

1. Hamid, Mohamad Kamar, Alshawi (2011) “Industrialised Building System (IBS): Strategy,
People and Process”. Kuala Lumpur
2. Modern methods of construction (MMC). (2014). 1st ed. [ebook] Zurich. Available at:
http://insider.zurich.co.uk/wp-content/uploads/2014/03/Risk-Insight-Modern-Methods-of-
Construction.pdf [Accessed 8 May 2014]
3. The National Precast Concrete Association, (2006). THE LITTLE BOOK OF CONCRETE.
[online] Available at: http://precast.org/wp-content/uploads/docs
/100_Advantages_of_Precast_Concrete.pdf.
4. Manaf, N. (2014). Product Presentation I Duralite (M) Sdn. Bhd. [online] Duralitegreen.com.
Available at: http://www.duralitegreen.com/ppresentation.php [Accessed 1 Jul.2014].
5. ……………………………………………

APPENDIXES (is a must)

Containing any evidences (pictures or ‘teleconference picture link’) showing the social skill
and responsibility as a construction team in site management.