The document describes sewer line testing being conducted on July 21, 2021 at the Kidurong Industrial Area in Bintulu, Sarawak. It tests three separate sections of 9-inch VCP sewer pipe between manholes: 1) 137 feet between manholes 1 and 2, 2) 296 feet between manholes 2 and 3, 3) 12 feet between manhole 3 and an existing manhole. For each section it records the length, allowable water loss per half hour, and space to record the actual water loss and test result.
The document describes sewer line testing being conducted on July 21, 2021 at the Kidurong Industrial Area in Bintulu, Sarawak. It tests three separate sections of 9-inch VCP sewer pipe between manholes: 1) 137 feet between manholes 1 and 2, 2) 296 feet between manholes 2 and 3, 3) 12 feet between manhole 3 and an existing manhole. For each section it records the length, allowable water loss per half hour, and space to record the actual water loss and test result.
The document describes sewer line testing being conducted on July 21, 2021 at the Kidurong Industrial Area in Bintulu, Sarawak. It tests three separate sections of 9-inch VCP sewer pipe between manholes: 1) 137 feet between manholes 1 and 2, 2) 296 feet between manholes 2 and 3, 3) 12 feet between manhole 3 and an existing manhole. For each section it records the length, allowable water loss per half hour, and space to record the actual water loss and test result.