Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KERB MARKING

KERB AT HIGH EMBANKMENT

SECTION AA

PLAN

BOUNDRY STONE
Note:

KERB

LEGEND ABBREVIATIONS
PLAN

MISCELLANEOUS DRAWINGS

KERB STONE & BOUNDARY STONE


THE EXECUTIVE ENGINEER, SOIL INVESTIGATION DIVISION, RANCHI DESIGN & CONSULTANCY SERVICES PVT LTD.
ADVANCE PLANNING,ROAD CONSTRUCTION DEPARTMENT, SOUTH OFFICE PARA, NEAR ST. XAVIERS’S SCHOOL,
PROFILE RANCHI. DORANDA RANCHI– 834002
001 1/2 0
4.0%

MEDIAN M-20

2.5%

BC
DBM
2.5%

CONCRETE M20

LINED U-DRAIN
COVERED DRAIN IN
DETAIL OF KERB M-15 URBAN AREAS
(APPLICABLE FOR SERVICE ROAD AFTER SERVICE ROAD
KERB AT FOOT PATH) EXISTING CARRIAGEWAY
(SCALE 1:10)

DETAIL OF KERB WITH CHANNEL


KERB
(SCALE 1:10)
(SCALE 1:10)

SECTIONAL ELEVATION
REINFORCEMENT DETAIL OF
COVERED DRAIN
TURFING

2.5% 2
1
IL OF DRAIN
GSB
3%
SSG

1
2

UNLINED DRAIN
(SCALE 1:50)

GRADE M-40
90-100mm THICK

CEMENT CONCRETE BLOCK


Notes:

LEGEND ABBREVIATIONS
PLAN

MISCELLANEOUS DRAWINGS
KERB, KERB CHANNEL,
THE EXECUTIVE ENGINEER, SOIL INVESTIGATION DIVISION, RANCHI DESIGN & CONSULTANCY SERVICES PVT LTD.
RAILING DETAILS
ADVANCE PLANNING,ROAD CONSTRUCTION DEPARTMENT, SOUTH OFFICE PARA, NEAR ST. XAVIERS’S SCHOOL,
PROFILE RANCHI. DORANDA RANCHI– 834002
001 2/2 0

You might also like