Buildings
Buildings
CEMENT MORTAR
7.37 192.36
7.37 172.36
12.95 431.84
12.95 411.84
12.95 951.84
12.95 1381.84
12.95 1026.84
8.61 3195.24
30000
1:5 1:6
201.978 201.978
1036.8 864
34 34
7 7
1279.578 1106.778
RATES OF SSR AS PER 2009-2010
Muncipal allowance (%) 20 LEAD & STACKING loading un-loading
Excavation of Foundations(% extra) 75 Sand 10 8.5
Turn Over Tax(%) 4.0 OTG & Aggregate 12.5 8.7
LABOUR Bricks 10 8.5
I Class Mason 224 steel 22.5 17.5
Brick Layer 224
Carpentar 224
II Class Mason 206
Brick Layer 206
Carpentar 206
Man Mazdoor 170
Woman Mazdoor 170
MATERIAL
OTG for RR Masonary 220 1 cum Blasting (cum) 70 1 cum
6mm HBG 650 1 cum Machine Crushing(%) 25
10 mm HBG 815 1 cum
20mm HBG 1170 1 cum Scaffolding-brck masry 40 1 cum
40mm HBG 740 1 cum
Gravel 65 1 cum
Sand for Mortar 120 1 cum Labour for Mixing CM 28 1 cum
sand for Filling 100 1 cum Mixing CM by Machine 45 1 cum
Cement 3600 1 MT
M.S. Rods(6mm) 31000 1 MT Earth Work Excavation 41 1 cum
M.S. Flats 34500 1 MT Sand filling charges 14 1 cum
M.S. Angles, Channels & Structural s 32000 1 MT Vibration 43 1 cum
HYSD Bars 30000 1 MT Machine Nixing 45 1 cum
Bricks ( 19 x9 x9) 3100 1000 no
Cuddapah slab (.457 x.457) black 1076 10 sqm binding wire 50 kg
659
BLD-CSTN
660
BLD-CSTN
661
BLD-CSTN
662
BLD-CSTN
663
BLD-CSTN
664
BLD-CSTN
A. MATERIALS:
20mm HBG graded metal cum 0.900
Sand cum 0.450
Cement Kgs 400.000
B. LABOUR:
1st Class Mason day 0.133
2nd Class Mason day 0.267
Mazdoor (Both Men and Women) day 3.600
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.000
Cost of Diesel for Miller Liters 0.133
Cost of Petrol for Vibrator Liters 0.667
Water (including for curing) kl 1.200
BASIC COST per 1 cum
B COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS
A. MATERIALS:
20mm HBG graded metal cum 0.900
Sand cum 0.450
Cement Kgs 400.000
B. LABOUR:
1st Class Mason day 0.167
2nd Class Mason day 0.167
Mazdoor (Both Men and Women) day 4.700
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.000
Water (including for curing) kl 1.200
BASIC COST per 1 cum
C RCC SLABS, BEAMS
A. MATERIALS:
20mm HBG graded metal cum 0.900
Sand cum 0.450
Cement Kgs 400.000
B. LABOUR:
1st Class Mason day 0.067
2nd Class Mason day 0.133
Mazdoor (Both Men and Women) day 2.500
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 0.267
Water (including for curing) kl 1.200
BASIC COST per 1 cum
665
BLD-CSTN
For Design mix concrete, allow Cement as follows (for Grade Kgs
estimate purpose only) :
M 20 350
M 25 380
M 30 400
M 35 420
M 40 430
666
BLD-CSTN
Unit : 1cum
A. MATERIALS:
Coarse aggregate 20mm graded cum 0.80
Fine aggregate (Sand) cum 0.40
Seigniorage charges for C.A cum 0.80
Seigniorage charges for F.A cum 0.40
Water (including for curing) kl 1.20
B. MACHINERY
Batching plant at 20 cum per hour hour 0.222
Transit mixer 4cum capacity for lead upto 1km hour 0.222
Concrete Pump day 0.222
C. LABOUR:
Mason 1st class day 0.056
Mason 2nd class day 0.056
Mazdoor (unskilled) day 0.917
Grand Total
Note : Wherever concrete is carried out using
batching plant, transit mixer, concrete pump, then
Admixtures @ 0.4% of weight of cement may be
added for achieving desired slump of concrete. If
concentrated Admixture is proposed, only 0.04% of
weight of Cement shall be used.
667
BLD-CSTN
Unit = 25 sqm
A. MATERIALS:
Cement kgs 320.00
Coarse aggregate 12mm cum 0.90
Fine aggregate (sand) cum 0.45
Seigniorage charges of coarse aggregate cum 0.90
Seigniorage charges of sand cum 0.45
Form work L.S.
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00
C. LABOUR:
Mason 1st class day 0.1
Mazdoor (unskilled) day 1.98
D. Grand Total for 25 sqm
Rate per Sqm = D/25
668
BLD-CSTN
Unit = 20 sqm
A. MATERIALS:
Cement kgs 320.00
Coarse aggregate 12mm cum 0.90
Fine aggregate (sand) cum 0.45
Seigniorage charges of coarse aggregate cum 0.90
Seigniorage charges of sand cum 0.45
Form work L.S.
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00
C. LABOUR:
Mason 1st class day 0.1
Mazdoor (unskilled) day 1.98
D. Grand Total for 20 sqm
Rate per Sqm = D/20
26 Supplying, fitting and placing HYSD bar
11.7 reinforcement in foundation complete as per
BLD-CSTN-2-18 drawings and technical specifications for Bars
below 36 mm dia including over laps and
wastage, where they are not welded
1000 Unit = t
&
1200
(a) Material
HYSD bars including 5 per cent for overlaps and t 1.05
wastage
Binding wire kg 6.00
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Blacksmith / Bar bender day 2.00
Mazdoor (Unskilled) day 6.40
Sundries on Material
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c)
Rate per t = a+b+c+d
A Supplying, fitting and placing HYSD bar
reinforcement in foundation complete including
wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done
compulsorily.
1000 Unit = t
&
1200
(a) Material
HYSD bars including 2.5 per cent for wastage t 1.025
Welding Electrodes @ 5 per joint (14 joints / ton) each 70.000
Welding Charges (Hire charges of Welding Machine) Hr 10.00
669
BLD-CSTN
1000 Unit = t
&
1200
(a) Material
TMT bars including 5 per cent for overlaps and t 1.05
wastage
Binding wire kg 6.00
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Blacksmith / Bar bender day 2.00
Mazdoor (Unskilled) day 6.40
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c)
Rate per t = a+b+c+d
A Supplying, fitting and placingTMT bar
reinforcement in foundation complete including
wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done
compulsorily.
Unit = t
(a) Material
TMT bars including 2.5 per cent for wastage t 1.025
Welding Electrodes @ 5 per joint (14 joints / ton) each 70.000
Welding Charges (Hire charges of Welding Machine) Hr 10.00
1000 Unit = t
&
1200
(a) Material
MS bars including 5 per cent for overlaps and t 1.05
wastage
Binding wire kg 6.00
(b) Labour for cutting, bending, shifting to site, tying
and placing in position
Blacksmith / Bar bender day 2.00
Mazdoor (Unskilled) day 6.40
670
BLD-CSTN
671
BLD-CSTN
672
BLD-CSTN
Mason 2 class
nd day 0.56
Mazdoor (unskilled) day 1.89
Grand Total
ii Brick Masonry in CM (1:4) with Modular Bricks
19 x 9 x 9 cms 2nd class
Unit = 1cum
A. MATERIALS:
Cement kg 75.60
Bricks modular size 19 x 9 x 9 cms 2nd class Nos 520.00
Fine aggregate (Sand) cum 0.21
Seigniorage charges for F.A cum 0.21
B. LABOUR:
Mason 1st class day 0.24
Mason 2 class
nd day 0.56
Mazdoor (unskilled) day 1.89
Grand Total
iii Brick Masonry in CM (1:5) with Modular Bricks
19 x 9 x 9 cms 2nd class
Unit = 1cum
A. MATERIALS:
Cement kg 60.48
Bricks modular size 19 x 9 x 9 cms 2nd class Nos 520.00
Fine aggregate (Sand) cum 0.21
Seigniorage charges for F.A cum 0.21
B. LABOUR:
Mason 1st class day 0.24
Mason 2 class
nd day 0.56
Mazdoor (unskilled) day 1.89
Grand Total
iv Brick Masonry in CM (1:8) with Modular Bricks
19 x 9 x 9 cms 2nd class
Unit = 1cum
A. MATERIALS:
Cement kg 37.80
Bricks modular size 19 x 9 x 9 cms 2nd class Nos 520.00
673
BLD-CSTN
unit:10sqm
A. MATERIALS:
Country bricks, second class traditional size nos 565.000
23x11x7cm
Cement kg. 106.000
Sand cum 0.220
Seigniorage charges for sand cum 0.220
B. LABOUR:
Mason 1st class day 0.600
Mason 2nd class day 0.600
Mazdoor (unskilled) day 2.750
Add water charges 1% 1.00%
Grand Total
32 Reinforced Brick Masonary walls of 11.5cm in CM(1:6)
using FlyAsh bricks having a crushing strength of not less
than 35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of the
main block work including cost and seignorage charges
and conveyance of all materials and water from approved
sources to work site and all operational, incidental, labour
BLD-CSTN-3-4 charges such as scaffolding mixing mortor constructing
masonary lift charges, curing etc. complete but excluding
the cost of steel and its fabrication charges for finished item
of work as per SS 509
Ground Floor :
A. MATERIALS:
II Class Bricks cum 512.000
C.M.(1:6) cum 0.200
B. LABOUR:
Mason 1st class day 0.600
Mason 2nd class day 0.600
Mazdoor (unskilled) day 2.750
Grand Total
33 Exposed brick masonry for super structure on
ground floor in cm (1:6) using wire cut bricks or
moulded bricks including making horizontal and
vertical grooves 10mm Wide 12mm deep, cost of
all materials, seigniorage charges, labour and all
BLD-CSTN-3-5 operations, mixing cement mortar, curing etc.,
complete for finished item of work, but
excluding conveyance charges of materials
unit:1cum
A. MATERIALS:
674
BLD-CSTN
675
BLD-CSTN
Unit = cum
a) Material
Brick 1st class Nos. 525.00
Cement mortar (1:4) cum 0.24
b) Labour
Mazdoor (Unskilled) day 1.88
Mason (1st Class) day 2.00
c) Add for centering and shuttering @ 110% of
(a+b)
Grand Total
Note : 1 ) In case cement mortar 1:3 is used, proportionate rate is to be adopted.
2) Quantity of bricks for arches will be about 10 per cent more than that for ordinary brickwork .
3) In case special arch bricks are used, the quantity of bricks per cum shall be taken as 580
Nos.
4) Rates for spandrel walls shall be taken same as for brickwork in substructure.
5) Rate for spandrel filling will depend on the filling material adopted
6) Compressive strength of individual Brick shall not be less than 70 kg / cm2
35 Honey Comb work with Bricks of traditional Size
and Plastered One Coat 10 mm. thick Cement
BLD-CSTN-3-7 Mortar 1:5 including White Washing 2 Coats
Unit = cum
a) Material
Brick 2nd class 23 x 11 x 7 Nos. 750.00
Cement mortar (1:5) cum 0.67
b) Labour
Mazdoor (Unskilled) day 6.60
Mason (1st Class) day 2.41
Mason (2nd Class) day 6.21
White Washing 2 Coats LS LS
Grand Total
36 Honey Comb work with Bricks of Modular Size
BLD-CSTN-3-8 and Plastered One Coat 10 mm. thick Cement
Mortar 1:5 including White Washing 2 Coats
Unit = cum
a) Material
Brick 2nd class 19 x 9 x 9 Nos. 790.00
Cement mortar (1:5) cum 0.67
b) Labour
Mazdoor (Unskilled) day 6.60
Mason (1st Class) day 2.41
Mason (2nd Class) day 6.21
White Washing 2 Coats LS LS
Grand Total
676
BLD-CSTN
677
BLD-CSTN
Unit = cum
A. Material
Stone for CR masonry 1st sort cum 0.94
Through and bond stone (7 Nos 0.24x0.24x0.39 = Nos. 0.16
0.16 cum)
Cement mortar (Rate as in item 11.5 II) cum 0.30
B. Labour
Mason (1st Class) day 3.00
Mazdoor (Unskilled) day 2.43
C. Add for centering and shuttering @ 100 % of
(a+b)
Grand Total
Note : 1) In case cement mortar 1:3 is used,
proportionate rate is to be adopted.
2) The addition for centering and sluttering at (c) above is for arch
above 6 m span. For lesser span length the addition shall be 80 per
cent for span above 4 m length and 50 per cent for spans less than 4
m.
678
BLD-CSTN
Unit = cum
I RCC grade M20 nominal mix
a) Material
Cement t 0.40
Coarse sand cum 0.45
20 mm aggregate cum 0.54
10 mm aggregate cum 0.36
b) Labour
Mason (1st Class) day 0.20
Mazdoor (Unskilled) day 2.15
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40
d) Add for cost of centering and shuttering @ 50 per
cent of (a+b) per sqm of surface of arch soffit
Grand Total
II RCC Grade M 25 (Design mix)
a) Material
Cement t 0.38
Coarse sand cum 0.45
20 mm aggregate cum 0.54
10 mm aggregate cum 0.36
b) Labour
Mason (1st Class) day 0.20
Mazdoor (Unskilled) day 2.15
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40
d) Add for cost of centering and shuttering @ 50 per
cent of (a+b) per sqm of surface of arch soffit
Grand Total
Note : The additional cost of centering and shuttering @ 50 per cent
of cost of material and labour shall hold good for arch spans of 6 m
and above. For lesser length of spans, the corresponding additional
cost can be taken as 40 per cent for spans above 4 m length and 30
per cent for spans less than 4 m.
679
BLD-CSTN
680
BLD-CSTN
681
BLD-CSTN
682
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement kg 43.00
Fine aggregate (Sand) cum 0.18
Top Coat in CM(1:4), 4 mm thick
Cement kg 14.50
Fine aggregate (Sand) cum 0.04
Seigniorage charges for F.A cum 0.22
B. LABOUR:
Mason 1st class day 0.63
Mason 2nd class day 1.47
Mazdoor (unskilled) day 3.90
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted
62 Plastering with CM 2 coats, 12 mm thick, base
BLD-CSTN-6-10 coat in CM (1:5), 8mm thick and top coat in CM
(1:3), 4mm thick with sponze finishing.
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:5), 8 mm thick
Cement kg 31.70
Fine aggregate (Sand) cum 0.11
Top Coat in CM(1:3), 4 mm thick
Cement kg 19.20
Fine aggregate (Sand) cum 0.04
683
BLD-CSTN
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) sqm 13.30
Cement Mortar 1:3 for 25 mm thick cum 0.25
Dry Cement for making Lumps kg 50.00
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides sqm 21.80
684
BLD-CSTN
685
BLD-CSTN
686
BLD-CSTN
687
BLD-CSTN
Ground Floor
Unit = 1 cum
A. MATERIALS:
No of blocks required for one cum of Masonry day 110.000
688
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Polished Shabad Stone (White) (0.457 x 0.457m) sqm 11.00
SSR item No. (36)
Cement for CM (1:8) proportion for base coat kg. 21.60
Cement for slurry kg. 33.00
Cement for jointing kg. 20.00
Sand for CM (1:8) proportion cum 0.12
Seigniorage charges of sand cum 0.12
B. LABOUR:
Mason 1st class day 3.10
Mason 2nd class day 1.10
Mazdoor (unskilled) day 0.86
Add water charges 1%
Grand Total
72 Flooring with 40 mm thick Rough
Cuddapah/Shabad stones, set over base coat of
cement mortar (1 : 8) 12 mm thick over CC bed
already laid or RCC roof slab, including pointing
with cement mortar 1:3 duly filling joints nearly,
including cost of all materials like flooring stone,
BLD-CSTN-7-2 cement, sand, and water etc., complete,
including seigniorage charges, labour charges
for dressing of flooring stones etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Rough Cuddapah/Shabad stones (40 mm thick) sqm 10.50
(0.457 x 0.457 m)
Cement for CM (1:8) proportion for base coat kg. 21.60
Cement for CM 1:3 proportion for pointing kg. 9.60
Sand for CM (1:8) proportion cum 0.12
Sand for CM (1:3) proportion cum 0.02
Seigniorage charges of sand cum 0.14
B. LABOUR:
Mason 1st class day 0.960
Mason 2nd class day 2.240
Mazdoor (unskilled) day 3.30
689
BLD-CSTN
690
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Marble slab of size 0.305 M x 0.305 M sqm 10.10
Cement for CM (1:6) proportion for base coat kg. 48.00
Cement for slurry for bedding kg. 33.00
White Cement for pointing kg. 5.00
Sand for CM (1:6) cum 0.20
Seigniorage charges of sand cum 0.20
B. Machinery
Machine for rubbing of floor day 1.00
C. LABOUR:
Mason 1st class day 2.10
Mason 2 class
nd day 3.00
Mazdoor (unskilled) day 5.00
Add water charges 1%
Grand Total
74 Flooring with chequrred terrazzo tiles of 22 mm thick
(medium shade) set over base coat of cement mortar
(1:6) 12 mm thick over CC bed already laid or RCC roof
slab, including near cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed with
neat cement to full depth mixed with pigment of
matching shade including cost of all materials like
BLD-CSTN-7-4 cement, sand water and tiles etc., complete, including
seigniorage charges, complete for finished item of
work, but excluding the cost of conveyance of all
materials.
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22 mm thick (medium sqm 10.05
shade)
Cement for CM (1:6) proportion for base coat kg. 28.80
Cement for slurry kg. 33.00
Cement for jointing & pointing kg. 6.00
Pigment kg.
Sand for CM (1:6) proportion cum 0.12
Seigniorage charges of sand cum 0.12
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class day 0.960
Man mazdoor day 2.240
Mazdoor (unskiled) day 3.30
Add water charges 1%
Grand Total
691
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size sqm 10.10
Cement for CM (1:8) for base coat kg. 21.60
Cement for slurry kg. 33.00
Cement for Pointing with CM (1:3) kg. 6.000
Sand for CM (1:8) cum 0.12
Sand for pointing cum 0.020
Seigniorage charges of sand cum 0.140
B. LABOUR
Mason 1st class day 0.96
Mason 2nd class day 2.24
Mazdoor (unskiled) day 3.30
Add water charges 1% 1.00%
Grand Total
76 Flooring with ceramic tiles, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat
cement slurry of honey like consistency spread
@ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of
matching shade, including cost of all materials
BLD-CSTN-7-6 like cement, sand water and tiles etc., complete,
including seigniorage charges, etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles sqm 10.10
Cement for CM (1:8) for base coat kg. 21.60
Cement for slurry kg. 33.00
White cement kg. 2.00
Sand for CM (1:8) cum 0.12
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason 1st class day 0.96
Mason 2nd class day 2.24
Mazdoor (unskiled) day 3.30
Add water charges 1% 1.00%
Grand Total
692
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
High polished granite 16 to 18 mm thick slab other sqm 10.10
than black
Cement for CM (1:8) for base coat kg. 36.00
Cement for slurry kg. 33.00
White cement for jointing & pointing kg. 6.00
Cement for jointing kg.
Sand for CM (1:8) cum 0.20
Seigniorage charges of sand cum 0.20
B. LABOUR
Mason 1st class day 3.00
Mason 2 class
nd day 1.00
Mazdoor (unskiled) day 8.00
Add water charges 1% 1.00%
Grand Total
78 Flooring with marble tiles polished 8 mm thick set over
base coat of cement mortar (1:8), 12 mm thick over CC
bed already laid or RCC roof slab, including neat
cement slurry of honey like consistency spread @
3.3.kgs per sqm & jointed neatly with white cement
paste mixed with pigment of matching shade to full
depth, including cost of all materials like cement, sand
BLD-CSTN-7-8 water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work, but
excluding the cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Marble tiles polished 8 mm thick sqm 10.10
Cement for CM (1:8) for base coat kg. 36.00
Cement for slurry kg. 33.00
White cement for jointing & pointing kg. 5.00
Sand for CM (1:8) cum 0.20
Seigniorage charges of sand cum 0.20
B. LABOUR (including for polishing & rubbing)
Mason 1st class day 4.00
693
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Granite stone tiles 8 mm thick (mirror polished of all sqm 10.10
shades)
Cement for CM (1:6) for base coat kg. 48.00
Sand for CM (1:6) cum 0.20
Seigniorage charges of sand cum 0.20
B. LABOUR
Mason 1st class day 4.00
Mazdoor (unskiled) day 8.00
Add water charges 1% 1.00%
Grand Total
80 Flooring with decorated white back ground
glazed tiles, set over base coat of cement mortar
(1:6), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste
mixed with pigment of matching shade to full
BLD-CSTN-7-10 depth, including cost of all materials like
cement, sand water and tiles etc., complete,
including seigniorage charges, etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Decorated white back ground glazed tiles sqm 10.10
Cement for CM (1:6) for base coat kg. 28.80
Cement for slurry kg. 33.00
White cement for jointing & pointing kg. 6.00
Sand for CM (1:6) cum 0.12
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason 1st class day 0.96
Mason 2nd class day 2.24
Mazdoor (unskiled) day 3.30
Add water charges 1% 1.00%
Grand Total
694
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
20 X 20 cm pressed clay flooring tiles 1000 0.255
Nos
Cement for CM (1:8) for base coat kg. 21.600
Cement for jointing & pointing kg. 6.000
Pointing with CM (1:3) 10sqm 1.000
Deduct CM (1:3) cum 0.040
Sand for CM (1:8) cum 0.120
Seigniorage charges of sand cum 0.120
B. LABOUR
Mason 1st class day 0.960
Mason 2nd class day 2.240
Mazdoor (unskiled) day 4.30
Add water charges 1% 1.00%
Grand Total
82 Flooring with Plain Cement tiles, set over base
coat of cement mortar (1:8) 12 mm thick over
CC bed already laid or RCC roof slab, including
neat cement slurry of honey like consistency
spread @ 3.3.kgs per sqm & jointed neatly with
cement paste mixed with pigment of matching
shade to full depth, including cost of all
BLD-CSTN-7-12 materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc.,
complete for finished item of work, but
excluding the cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Plain cement Tiles 20 x 20 cms 1000 0.255
Nos
Cement for CM (1:8) for base coat kg. 21.600
Cement for jointing & pointing kg. 6.000
Pointing with CM (1:3) 10sqm 1.000
Deduct CM (1:3) cum 0.040
Sand for CM (1:8) cum 0.120
Seigniorage charges of sand cum 0.120
B. LABOUR
Mason 1st class day 0.960
Mason 2nd class day 2.240
Mazdoor (unskiled) day 3.30
Add water charges 1% 1.00%
Grand Total
695
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed) cum 0.17
Cement kg 120.00
Sand cum 0.085
Seigniorage charges of sand cum 0.085
B. LABOUR
Mason 1st class day 1.25
Mason 2nd class day 0.06
Mazdoor (unskiled) day 3.00
Add water charges 1% 1.00%
Grand Total
84 Flooring with 100mm thick Cement Concrete 1:6:10,
using 40mm metal, 100mm thick and 20 mm Cement
BLD-CSTN-7-14 Concrete surface (Ellis Pattern, 1st Sort)
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer cum 1.000
Stone Chippings 3.34 mm - 10 mm cum 0.250
Cement kg 120.000
B. LABOUR
Mason 1st class day 0.150
Mason 2 class
nd day 0.350
Mazdoor (unskiled) day 5.40
Add water charges 1% 1.00%
Grand Total
85 Flooring with Cement Concrete 1:6:10, using
BLD-CSTN-7-15 40mm metal, 100mm thick and plastered over
with 12 mm thick in CM(1:3)
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer cum 1.00
Plastering with CM (1:3), 12 mm thick 10 sqm 1.00
Grand Total
86 Flooring with Cement Concrete 1:6:10, using
40mm metal, 100mm thick and plastered over
BLD-CSTN-7-16 with 12 mm thick in CM(1:3) using Red oxid, with
polished surface
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer cum 1.00
Plastering with CM (1:3), 12 mm thick 10 sqm 1.00
696
BLD-CSTN
697
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Marble Powder kg 17.000
Marble Chips cum 0.060
Cement for top layer kg. 50.000
Cement for base coat in CM (1:3) kg. 96.000
Sand for base coat cum 0.200
Seigniorage charges of sand cum 0.200
B. MACHINERY
Polishing Charges sqm 10.000
C. LABOUR
Mason 1st class day 0.960
Mason 2nd class day 2.240
Mazdoor (unskiled) day 3.30
Grand Total
88 Providing skirting to internal walls to 15 cm
height/risers of steps with ceramic tiles 7.30 mm
thick length equal to flooring stones, set over
base coat of CM (1:3) 12 mm thick with cement
slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointed with white
cement paste mixed with pigment of matching
BLD-CSTN-7-18 shade to full depth, including cost of all
materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc.,
complete for finished item of work, but
excluding the cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles 7.30 mm thick sqm 10.00
Sand for cm 1:3 base coat cum 0.12
Cement for cm 1:3 base coat kgs 57.60
Cement for slurry kgs 33.00
White cement for jointing & pointing kgs 6.00
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason 1st class day 0.77
Mazdoor (unskiled) day 0.80
Grand Total
698
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Marble slab………mm thickness sqm 10.10
Sand for base coat cum 0.12
Cement for base coat kg 57.60
Cement for slurry kg 33.00
White cement for jointing & pointing kg 5.00
Flate nosing charges RM 66.67
Machine cutting charges RM 67.67
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason Ist class day 2.10
Man mazdoor (Beldar) day 4.90
Man mazdoor (Beldar) for polishing & rubbing day 4.00
Woman mazdoor day 4.00
Grand Total
90 Providing skirting to internal walls to 15 cm
height/risers of steps with vitrified tiles length
equal to flooring stones, set over base coat of
CM (1:5) 12 mm thick with cement slurry of
honey like consistency spread at the rate of 3.30
kgs per sqm and jointed with white cement paste
mixed with pigment of matching shade to full
BLD-CSTN-7-20 depth, including cost of all materials like tiles,
cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished
item of work, but excluding the cost of
conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality sqm 10.10
Sand for cm 1:5 base coat cum 0.12
Cement for cm 1:5 base coat kgs 34.56
Cement for slurry kgs 33.00
White cement for jointing & pointing kgs 2.00
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason Ist class day 0.96
Mason 2nd class day 2.24
Mazdoor (unskilled) day 3.30
Add water charges 1% 1.00%
Grand Total
699
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
8 mm thick mirror polished granite tiles sqm 10.10
Sand for cm 1:3 base coat cum 0.12
Cement for cm 1:3 base coat kgs 57.60
Cement for slurry kgs 33.00
White cement for jointing & pointing kgs 5.00
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason Ist class day 2.10
Mazdoor (unskiled) day 0.80
Mason 2nd class 4.90
Add water charges 1% 1.00%
Grand Total
92 Providing skirting to internal walls to 15 cm
height/risers of steps with 25 mm thick polished
Cuddapah stone length equal to flooring stones,
set over base coat of CM (1:3) 12 mm thick with
cement slurry of honey like consistency spread
at the rate of 3.30 kgs per sqm and jointed with
white cement paste mixed with pigment of
BLD-CSTN-7-22 matching shade to full depth, including cost of
all materials like Cuddapah stone, cement, sand
and water etc., complete including seigniorage
charges, etc., complete for finished item of work,
but excluding the cost of conveyance of all
materials
Unit = 10 sqm
A. MATERIALS:
25 mm thick polished Cuddapah stone sqm 10.10
Sand for cm 1:3 base coat cum 0.12
Cement for cm 1:3 base coat kgs 57.60
Cement for slurry kgs 33.00
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason Ist class day 0.96
Mason 2nd class day 2.24
Mazdoor (unskiled) day 3.10
Add water charges 1% 1.00%
Grand Total
700
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
25 mm thick polished Shahabad stone (White) sqm 10.10
Sand for cm 1:3 base coat cum 0.12
Cement for cm 1:3 base coat kgs 57.60
Cement for slurry kgs 33.00
Seigniorage charges of sand cum 0.12
B. LABOUR
Mason Ist class day 0.96
Mason 2nd class 2.24
Mazdoor (unskiled) day 3.10
Add water charges 1% 1.00%
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted for all Skirting Items.
B. LABOUR
Carpenters 1st Class day 1.95
Carpenters 2nd Class day 4.55
Man mazdoor day 5.40
Note : Deduct 4.3 Nos Carpenters if plank rate is for tongued
and grooved ready planned.
Grand Total
701
BLD-CSTN
Grand Total
Rate per 10 sqm = Grand Total/10
702
BLD-CSTN
703
BLD-CSTN
Grand Total
Rate per 10 sqm = Grand Total/10
100 Best Tiled Roofing with Pan tiles over Flat Tiles
196 and Lime mortar Borders including Teak
BLD-CSTN-8-5
Reapers.
Unit = 10 sqm
A. MATERIALS:
Pan Tiles 230 x (140 + 130)/2, 12 mm thick 1000 No 1560
704
BLD-CSTN
Grand Total
705
BLD-CSTN
B. LABOUR
Bricklayers day 0.500
Woman mazdoor day 1.100
Grand Total
Common note Applicabable for Items 196 to
201 :-
1. The quantity proposed for Pan Tiles / Mangalore Tiles
includes allowance for cost of special tiles for ridges and
hips.
2. Reepers size is for rafter spacing 600 mm. including
allowance for eves and valleys.
3. Labour including fixing galvanized iron sheeting-cost of
sheeting to be paid separately.
Sub Analysis :
Lime Mortar (1: 1.5) :
Unit = 1 cum
Lime cum 0.670
Fine Sand cum 1.000
Grinding Mortar (Spl Grinding) cum 1.000
Sundries LS
Total
106 Plastering with Lime Mortar 3 Coats, 25 mm
BLD-CSTN-8-11 thick (Sebara Rendering)
Unit = 10 sqm
Lime Mortar (1:2) cum 0.180
Lime Mortar (1:1.5) cum 0.080
Lime cum 0.023
LABOUR
Bricklayers day 3.200
Mazdoor (unskilled) day 6.500
Sundries LS LS
Total
706
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Terracing Bricks 150 x 75 x 25mm 1000 No 2000
Unit = 10 sqm
A. MATERIALS:
Reinforced Concrete Roofing slab 125 mm thick (for rate - 10 sqm 10.000
vide relevant schedule item)
Flat Tiles 150 x 150 x 20 mm 100 No 900
Form Work
Total
109 Reinforced cement Concrete Roofing 140 mm
206 thick with CC (M 20) using 20 mm graded metal
BLD-CSTN-8-14 and 2 courses of Flat Tiles at Top including
Pointing with Cement Mortar (1:3)
Unit = 10 sqm
A. MATERIALS:
Rate of "Reinforced cement Concrete Roofing 125 mm 10 sqm 1.000
thick and 2 courses of Flat Tiles at Top including pointing
with Cement Mortar (1:3)"
Add :
For extra thickness of roofing slab cum 0.150
Grand Total
707
BLD-CSTN
Add :
For extra thickness of roofing slab cum 0.250
Grand Total
111 Reinforced cement Concrete Roofing 100 mm
207 thick with CC (M 20) using 20 mm graded metal
BLD-CSTN-8-16 and 2 courses of Flat Tiles at Top including
Pointing with Cement Mortar (1:3)
Rate of "Reinforced cement Concrete Roofing 125 10 sqm 1.000
mm thick and 2 courses of Flat Tiles at Top
including pointing with Cement Mortar (1:3)"
Deduct :
For Less thickness of roofing slab cum 0.250
Grand Total
112 Reinforced cement Concrete Roofing 100 mm
207 thick with CC (M 20) using 20 mm graded metal
with Imprevious Coat with 12 mm thick
BLD-CSTN-8-17 Plastering in CM (1:3) with 1 kg. of Impermo
Compound or ACCO Proof per Bag of Cement
and laid when slab is Green.
Unit = 10 sqm
Reinforced Concrete Roofing slab 100 mm thick (for 10 sqm 1.000
rate - vide relevant schedule item)
Centering Charges 10 sqm 1.000
708
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Flat Tiles 150 x 150 x 15 mm 1000 No 1350
709
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Pan Tiles 230 x (140 + 130)/2, 12 mm thick 1000 No 1560
Unit = 10 sqm
A. MATERIALS:
Teak Wood Planks 150 x 12 mm cum 0.132
Screws 40mm long 100 No 300
B. LABOUR
Carpenter day 6.500
Man Mazdoor day 5.400
Sundries LS
Grand Total
Note : Deduct 4.3 Nos Carpenters if plank rate is for
tongued and grooved ready planned.
119 12 mm. Teak Wood Plank Ceiling with 40 x 12
BLD-CSTN-8-24 223 mm Teak Wood Battens
Unit = 10 sqm
Rate for "12 mm. Teak Wood Plank Ceiling Tongued 10 sqm 10.000
and Grooved Planking"
Teak Wood Battens 40 x 12 mm 10 RM 66.000
Deduct :
Carpenter day 1.100
Sundries LS
Grand Total
710
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3 cum 0.210
Water proof compound kg 2.000
B. LABOUR
Mason 1st class day 0.660
Mason 2nd class day 1.540
Mazdoor (unskiled) day 3.70
Grand Total
121 Providing & fixing insulating board ceiling of
approved quality with nails etc., complete,
BLD-CSTN-8-26 excluding the cost of frame work for base and
cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
12 mm thick insulating board sqm 11.00
B. LABOUR
Carpenter Ist class day 2.50
Man mazdoor day 2.00
Grand Total
122 Providing & fixing hard board sheet ceiling of
approved quality with nails etc., complete,
BLD-CSTN-8-27 excluding the cost of frame work for base and
cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
3 mm thick standard quality of hard board sqm 11.00
B. LABOUR
Carpenter Ist class day 2.50
Man mazdoor day 2.00
Grand Total
123 Providing & fixing flat pressed 3 layer medium
density particle board sheet with necessary nails
BLD-CSTN-8-28 etc., complete, excluding the cost of frame work
for base and cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Standard quality of flat pressed 3 layer medium density sqm 11.00
board sheet 4.50 mm thick
B. LABOUR
Carpenter Ist class day 2.50
Man mazdoor day 2.00
Grand Total
711
BLD-CSTN
Unit = 10 sqm
A. MATERIALS:
Plain AC sheet for ceiling sqm 11.00
B. LABOUR
Carpenter Ist class day 2.50
Man mazdoor day 2.00
Grand Total
125 Providing 10 mm thick plaster of paris (Gypsum
anhydrous) ceiling upto a height of 5 m above
floor level over first class BT wood strips 25 x 6
mm with 10 mm gap in between and reinforced
BLD-CSTN-8-30 with rabbit wire mesh fixed to wooden frame
excluding cost of wooden frame for base & cost
of conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Wooden strips 1st class BT wood 25 x 6 mm size cum 0.05
Nails kg 0.75
Rabbit wire mesh sqm 10.20
Plaster of paris kg 219.76
B. LABOUR
for Jointing the wooden strips including fixing
the rabbit mesh
Carpenter Ist class day 2.60
Man mazdoor (beldar) day 1.60
For doing plaster of paris over wooden strips
Mason Ist class day 2.62
Mason IInd class day 1.62
Mazdoor (unskilled) day 377.00
Grand Total
Gypboard Suspended false ceiling
126 Supplying and fixing Gyp Board Suspended regular single
layer false ceiling (GS-MFSC-4.1 as per India Gypsum)
using 12.5 mm thick Gyp Board conforming to IS 2095 -
1982 fixing to Gyp steel GI perimeter channels of size 20
mm x 27 mm x 30 mm(web) of 0.55 mm thick along the
perimeter of ceiling screw fixed to brick work/ partition at
610 mm c/c and suspending the frame work using
Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm)
from soffit at 1220 mm c/c with ceiling angle (25 mm x 10
mm x 0.55 mm) fixed with GI Cleat and steel expansion
fasteners & connecting clip to the ceiling channels (with
knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm)
fixed in direction perpendicular to the intermediate channel
BLD-CSTN-8-31 at 457 mm c/c and fixing the 12.5 mm tapered edge
Gypboard with 25 mm drywall screws at 230 mm c/c &
jointing and finishing using joint compound and paper tape
to have a flush look including filling the tapered & square
edges with jointing compound, two coats of drywall topcoat
complete for finished item of work as per Idia Gypsum Ltd
specification.
UNIT -1 sqm
A) Material requirement as per India Gypsum
12.5 mm Gypboard
1219 mm x 1829 mm size Boards sqm 1.03
712
BLD-CSTN
Intermediate Channel
45 mmx 15 mm x 15 mm x 0.9 mm RM 0.84
Perimeter Channel
20 mm x 27 mm x 30 mm(web) of 0.55 mm thick RM 0.40
Rawl Plug Nos 0.64
Soffit Cleats Nos 0.64
Drywall Screws - 25 mm Nos 18.00
Jointing Compound Kgs 0.55
Jointing Paper Tape RM 1.46
Drywall Top Coat Lits 0.15
B) LABOUR CHARGES
1st Class Carpenter day 0.40
2nd Class Carpenter day 0.40
1st Class Painter day 0.08
2nd Class Painter day 0.08
Power Saw Cutter - Hand Operated - Operator day 0.04
Power Drill - Hand Operated - Operator day 0.08
Unskilled Mazdoor day 0.24
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 0.32
Power Drill - Hand Operated - Hire Charges Hrs 0.64
Scaffolding charges 1%
BASIC COST per 1 sqm
Gyp Board Fine Line Grid false ceiling
127 Supplying and fixing Gyp Board Fine Line Grid false ceiling
(GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600
mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet
tiles of size 595 mm x 595 mm or 595 mm x 1195 mm
conforming to IS 2095 - 1982 fixing to Gyp steel precoated
GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick
along the perimeter of ceiling screw fixed to brick work/
partition at 610 mm c/c and suspending the frame work
using precoated GI Tee section (24 mm x 38 mm x 0.7
mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat,
rawl plugs and steel expansion fasteners & connecting clip
BLD-CSTN-8-32 to the GI T section with 4 mm dia GI Rod with galvanised
spring steel level clip of PVC unversal holding clips system
at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard
Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195
mm and finishing two coats of drywall topcoat complete for
finished item of work as per Idia Gypsum Ltd specification.
UNIT -1 sqm
A) Material requirement as per India Gypsum
12.5 mm / 9.5 mm - Gypboard Tiles
Either - 595 mm x 595 mm - sqm 1.00
Or - 595 mm x 1195 mm -
GI Angle - Precoated
25 mm x 25 mm x 0.7 mm RM 0.40
GI - Precoated - T Section - 3600 mm long
24 mm x 38 mm x 0.7 mm thick RM 1.60
GI - Precoated - T Section - 600 mm long
24 mm x 38 mm x 0.7 mm thick RM 1.60
GI Rod - 4 mm Dia
Connecting Rod RM 1.28
Rawl Plug Nos 1.28
Soffit Cleats Nos 1.28
713
BLD-CSTN
714
BLD-CSTN
UNIT 1 sqm
A) Material requirement
15 mm - Armstrong Mineral Fiber sheet 600 x 600 sqm 1.00
715
BLD-CSTN
UNIT 1 sqm
A) Material requirement
15 mm/ 19 mm Thermocole sheet 600 x 600 sqm 1.00
Alumninium Angle
24 mm x 24 mm RM 0.40
Anodised Aluminium T Section
(1) 24 x 24.5 x 2.4 mm mm RM 3.20
GI Rod - prestraightened - 2.0 mm dia
Connecting Rod Nos 1.28
Rawl Plugs Nos 1.28
B) LABOUR CHARGES
1st Class Carpenter day 0.36
2nd Class Carpenter day 0.36
1st Class Painter day 0.00
2nd Class Painter day 0.00
Power Saw Cutter - Hand Operated - Operator day 0.02
Power Drill - Hand Operated - Operator day 0.04
Unskilled Mazdoor day 0.20
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 0.16
Power Drill - Hand Operated - Hire Charges Hrs 0.32
Scaffolding charges 1%
BASIC COST per 1 sqm
WHITE WASHING, COLOUR WASHING &
BLD-CSTN-9
DISTEMPERING
130 White washing one coat with lime of approved
quality to give an even shade after thoroughly
brushing the surface to remove all dirt and
remains of loose powdered materials including
BLD-CSTN-9-1 cost of all materials, labour charges and
incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but
excluding conveyance charges of materials
Unit: 10 sqm
A. MATERIALS :
Fine screened shell lime cum 0.005
Gum, conjee water, or prickly pear juice including L.S
necessary fire wood
B. LABOUR
Brick Layers day 0.11
Mazdoor (unskilled) day 0.22
Sundries including brushes etc., LS
Total cost for 10 sqm
716
BLD-CSTN
Unit: 10 sqm
A. MATERIALS :
Fine screened shell lime cum 0.007
Gum, conjee water, or prickly pear juice including L.S
necessary fire wood
B. LABOUR
Brick Layers day 0.160
Mazdoor (unskilled) day 0.32
Sundries including brushes etc., LS
Total cost for 10 sqm
132 White washing three coats with lime of approved
quality to give an even shade after thoroughly
brushing the surface to remove all dirt and
remains of loose powdered materials including
BLD-CSTN-9-3 cost of all materials, labour charges and
incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but
excluding conveyance charges of materials
Unit: 10 sqm
A. MATERIALS :
Fine screened shell lime cum 0.009
Gum, conjee water, or prickly pear juice including L.S
necessary fire wood
B. LABOUR
White washer day -
Brick Layers day 0.220
Man Mazdoor day -
Women mazdoor day -
Mazdoor (unskilled) day 0.43
Sundries including brushes, ladders etc., LS
Total cost for 10 sqm
133 White washing one coat with whiting of
approved quality to give an even shade after
thoroughly brushing the surface to remove all
dirt and remains of loose powdered materials
BLD-CSTN-9-4 including cost of all materials, labour charges with White Cement Grade II
and incidental such as scaffolding, lift charges
etc., complete for finished item of work, but
excluding conveyance charges of materials
Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement cum / kg 1.20
717
BLD-CSTN
Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement cum / kg 2.00
Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement cum / kg 2.800
718
BLD-CSTN
Unit: 10 sqm
A. MATERIALS :
Distemper kg 1.700
B. LABOUR
Painter day 1.200
Sundries including brushes, ladders, etc., 1.000%
Total cost for 10 sqm
BLD-CSTN-10 PAINTING & VARNISHING
140 Painting to new walls with 2 coats of ready mixed oil
bound wahsable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making 3 coats in all to give an
even shade after thourughly brushing the surface to
remove all dirt and remains of loose powdered
BLD-CSTN-10-1 materials, including cost and conveyance of all
materials to work site and all operational, incidental,
labour charges etc. complete for finished item of
work as per SS 911 for internal walls
PRIMARY COAT:
Cost of Primer Lts 0.50
Painter I st class Nos 0.08
Pianter Iind class Nos 0.19
Cost of washable Oil Bound Distemper Lts 1.70
1st class painter Nos 0.36
II class painter Nos 0.84
Total cost
141 Painting, Priming Coat on New Plastered Surface
BLD-CSTN-10-2 270
Unit: 10 sqm
A. MATERIALS :
Cement Primer kg 1.00
B. LABOUR
Painter day 0.700
Sundries including brushes, soaps, putty etc., 0.500%
Total cost for 10 sqm
142 Painting Walls with Snowcem or other equal and
BLD-CSTN-10-3 284 approved Water Proof Cement Paint over
Priming Coat, One Coat (All Colours)
Unit: 10 sqm
A. MATERIALS :
Cement Paint at 5 sqm., per kg kg 2.000
B. LABOUR
Painter day 0.300
Mazdoor (unskilled) day 1.500
Sundries including brushes, etc., 1.000%
Total cost for 10 sqm
143 Painting Walls with Snowcem or other equal and
BLD-CSTN-10-4 285 approved Water Proof Cement Paint over
Priming Coat, 2 Coats (All Colours)
Unit: 10 sqm
A. MATERIALS :
Cement Paint at 3 sqm., per kg kg 3.500
B. LABOUR
Painter day 0.500
Mazdoor (unskilled) day 1.500
Sundries including brushes, etc., 1.000%
Total cost for 10 sqm
719
BLD-CSTN
720
BLD-CSTN
721
BLD-CSTN
722
BLD-CSTN
723
BLD-CSTN
724
BLD-CSTN
725
BLD-CSTN
Unit = 1 cum
Materials :—
Teak wood large scantlings over 2 m and below 3 m cum 1.000
in length
Labour :—
Carpenter day 17.700
Man Mazdoor day 8.800
Sundries including nails, screws etc., LS
Cost per cum
158 Best Teak Wood wrought and put up for trusses
BLD-CSTN-11-4 including straps and all iron work (Schedule
Item No 289)
Unit = 1 cum
Materials :—
Teak wood large scantlings cum 1.000
Iron Work (average) kg 112.000
Labour :—
Carpenter day 26.500
Man Mazdoor day 8.800
Sundries including nails, screws etc., LS
Cost per cum
159 Fully Panelled doors - External or Internal -
BLD-CSTN-11-5 Moulded panels (Schedule Item No 290)
A Single Shutter
i 800 x 2000 mm
*Teak wood cum 0.083
Labour, wrought and putup in position frame & sqm 1.600
shutters
Sundries inclusive of holdfasts and all wind LS
appliances (Vide relevant standard specification)
726
BLD-CSTN
727
BLD-CSTN
728
BLD-CSTN
729
BLD-CSTN
730
BLD-CSTN
731
BLD-CSTN
732
BLD-CSTN
Single Shutter :
i 900 x 2000 mm
*Teak wood cum 0.035
Flush Shutter 35mm thick (Vide relevant standard sqm 1.530
specification)
Labour, wrought and putup in position frame & sqm 1.800
shutters
Sundries inclusive of hold fasts and all wind appliances
(Vide standard specification)
Total for each door
733
BLD-CSTN
734
BLD-CSTN
735
BLD-CSTN
736
BLD-CSTN
737
BLD-CSTN
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
B) LABOUR CHARGES
1st Class Carpenter day 0.947
2nd Class Carpenter day 1.158
Power Saw Cutter - Hand Operated - Operator day 0.105
Power Drill - Hand Operated - Operator day 0.211
Unskilled Mazdoor day 0.632
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 0.842
738
BLD-CSTN
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
PARTICLE BOARD - Prelaminated as per design
GLAZING with GLASS as per design
SILICON SEALANT as per design
RUBBER BEADING
B) LABOUR CHARGES
1st Class Carpenter day 1.042
2nd Class Carpenter day 1.042
Power Saw Cutter - Hand Operated - Operator day 0.104
Power Drill - Hand Operated - Operator day 0.139
Unskilled Mazdoor day 0.347
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 0.833
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION as per design
GLAZING with GLASS as per design
SILICON SEALANT as per design
RUBBER BEADING as per design
Alum.Anodised.PC Friction stay casement hinges as per design
Alum.Anodised.PC Handles as per design
B) LABOUR CHARGES
1st Class Carpenter day 0.360
2nd Class Carpenter day 1.081
739
BLD-CSTN
UNIT 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION as per design
GLAZING with GLASS as per design
SILICON SEALANT as per design
RUBBER BEADING as per design
Alum.Anodised.PC Handles as per design
B) LABOUR CHARGES
1st Class Carpenter day 0.347
2nd Class Carpenter day 1.042
Power Saw Cutter - Hand Operated - Operator day 0.347
Power Drill - Hand Operated - Operator day 0.347
Unskilled Mazdoor day 1.042
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 2.778
740
BLD-CSTN
UNIT 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION as per design
GLAZING with GLASS as per design
SILICON SEALANT as per design
RUBBER BEADING as per design
Alum.Anodised.PC Handles as per design
Hydraulic Floor Spring/ Door Closure as per design
B) LABOUR CHARGES
1st Class Carpenter day 0.417
2nd Class Carpenter day 0.833
Power Saw Cutter - Hand Operated - Operator day 0.417
Power Drill - Hand Operated - Operator day 0.417
Unskilled Mazdoor day 1.250
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges Hrs 3.333
741
BLD-CSTN
742
BLD-CSTN
743
BLD-CSTN
Labour :-
Carpenter II class day 0.090
Mason I class day 0.250
Mazdoor (male) day 0.250
Add for water charges @ 1 %
Cost for 3 m
Cost per m
744
BLD-CSTN
Labour :-
Carpenter II class day 0.090
Mason I class day 0.250
Mazdoor (male) day 0.250
Add for water charges @ 1 %
Cost for 3 m
Cost per m
201 Cutting RCC steps for fixing of aluminium step
BLD-CSTN-13-3 edging and make good to match the surroundings
Labour :-
For cutting and fixing in position
Assistant fitter day 0.100
Mason. day 0.400
Mazdoor (male). day 0.400
Sundries
Add for water charges @ 1 %
Cost for 1.25 m
Cost per m
203 Providing and fixing 1.80 metre long RCC fencing
posts with 6 mm bar nibs as per design in plate No.
BLD-CSTN-13-5 22/2/2. (earth work & concrete to be paid for
separately)
745
BLD-CSTN
Materials:—
Cement concrete 1:2:4 (1 cement : 2 coarse sand :4 cum 0.336
graded stone aggregate 12.5 mm nominal size)
746
BLD-CSTN
747
BLD-CSTN
Unit = 10 sqm
A) Chlorpyriphos/ Lindane emulsifiable concentrate of
20%
1 liter : 19 Parts water Therefore: 868.55 L /20 Lit 4.100
Add 12%wastage Liters 0.41
Total Quantity 4.51
B) Add Water Charges @ 1% 1%
C) Labour Charges
Man Mazdoor day 3.0
Sprayer day 0.22
D) Hire charges
Sprayer, drilling machine etc 10%
sundries & contingencies 3%
Water charges & electricity 1.50%
Add OH & CP
BASIC COST per 1 sqm
Note: CPWD - Rate Analysis per 9 Sqm
Vertical
Chloropyriphos Lit
Earthwork excavation cum
Beldar Nos
Horizontal
Chloropyriphos Lit
Vertical Nos
Beldar Nos
Hire charges
Sprayer, drilling machine etc
sundries & contingencies
Water charges & electricity
Add OH & CP
BLD-CSTN-15 CENTERING, FORM WORK etc.
208 Providing traditional centering, shuttering and
scaffolding using Cashewrina balli props and
bracings supporting wooden brackets, wooden wall
plates, wooden runners and steel plate form work as
per the approved plan and other accessories as per
BLD-CSTN-15-1 the standard trade practice including hire charges
for ballies, runners, wooden members and cost and
conveyance of all other consumable accessories,
taxes etc complete for finished item of work
UNIT 1 sqm
(I) Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
748
BLD-CSTN
749
BLD-CSTN
UNIT 1 sqm
(I) Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Jack Screw Adjsutable Props - 50 mm dia B Class
Pipes
750
BLD-CSTN
751
BLD-CSTN
A B C
A FOOTINGS 3.88 sqm per 1 cum
K WAFFLE - (GRID) SLABS (Rib Beams with Slabs) 3.85 sqm per 1 sqm
For calculating centering charges of RCC Structures, using either cashewrina balli scaffolding
or steel pipe scaffolding, the respective cost may be arrived by taking the above values.
Therefore, Centering charges for any structure:C= A x B
210 Providing STAGE SCAFFOLD with staging using
Cashewrina balli props and bracings supporting
wooden brackets, wooden stage scaffold boards
including hire charges for cashewrina ballies,
BLD-CSTN-15-3 wooden baords, scaffolds etc., and cost and
conveyance of all other consumable accessories,
taxes etc complete for finished item of work for
PLAN AREA
UNIT 1 sqm
(I) Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height Nos 2.40
752
BLD-CSTN
UNIT 1 sqm
(I) Up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height Nos 1.74
753
BLD-CSTN
UNIT 1 sqm
(I) Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Jack Screw Adjsutable Props - 50 mm dia B Class
Pipes
for vertical props placed @ 3'0" c/c in bothways
Lock Pins
LD Foot Plates
LD Couplers
Total Scaffolding Pipes - Appx - Kgs 39.26
B) LABOUR CHARGES
1st Class Carpenter day 0.04
2nd Class Carpenter day 0.34
Unskilled Mazdoor day 0.60
Supervision Charges day 0.04
Consumables like Rope, Nails, de-shuttering oil 1%
Tape, cover plates 1%
Tools like Hammers etc., 1%
BASIC COST per 1 sqm - PLAN AREA
(II) Unsupported Roof Height up to - 7.32 M (24'0")
A) MATERIAL REQUIREMENT
Heavy Frames - 50 mm dia B Class Pipes (HD
Towers)
Lock Pins
LD Foot Plates
LD Couplers
Total Scaffolding Pipes - Appx - Kgs 112.635
B) LABOUR CHARGES
1st Class Carpenter day 0.12
2nd Class Carpenter day 0.58
Unskilled Mazdoor day 1.20
Supervision Charges day 0.08
Consumables like Rope, Nails, de-shuttering oil 1%
Tape, cover plates 1%
Tools like Hammers etc., 1%
BASIC COST per 1 sqm - PLAN AREA
754
BLD-CSTN
UNIT 1 sqm
(I) Up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
MS Pipe Scaffold Frames - 1.20 x 1.50 M
Approximately 27.3 M Long x 3.66 M High
MS Pipe Bracing structure - 1.5 x 2.25 M
Scaffold Board
Lock Pins
LD Foot Plates
LD Couplers
Total Scaffolding Pipes - Appx - Kgs 19.7496
B) LABOUR CHARGES
1st Class Carpenter day 0.07
2nd Class Carpenter day 0.11
Unskilled Mazdoor day 0.24
Supervision Charges day 0.04
Consumables like Rope, Nails, de-shuttering oil 1%
Tape, cover plates 1%
Tools like Hammers etc., 1%
BASIC COST per 1 sqm - VERTICAL ELEVATION AREA
(II) Up to - 7.32 M (24'0")
A) MATERIAL REQUIREMENT
MS Pipe Scaffold Frames - 1.20 x 1.50 M
Approximately 27.3 M Long x 3.66 M High
MS Pipe Bracing structure - 1.5 x 2.25 M
Scaffold Board
Lock Pins
LD Foot Plates
LD Couplers
Total Scaffolding Pipes - Appx - Kgs 19.14
B) LABOUR CHARGES
1st Class Carpenter day 0.12
2nd Class Carpenter day 0.22
Unskilled Mazdoor day 0.44
Supervision Charges day 0.04
Consumables like Rope, Nails, de-shuttering oil 1%
Tape, cover plates 1%
Tools like Hammers etc., 1%
BASIC COST per 1 sqm - VERTICAL ELEVATION AREA
Note: HIRE & LIFT CHARGES - for all Scaffolding Materials
1. For Material Lift Charges & Labour rate for scaffolding above 7.32 M - increase @ 50% on labour
component for each upper floor on First Floor Rate (7.32 M)
2. For Hire Charges of scaffolding Materials following ratesmay be allowed:
Description of Structure
a Cashewrina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc.,
Let :
Cost of Scaffolding materials = Rs. A
Scrap value of Scaffolding materials = Rs. B
(Usually B = A * 10%)
Number of uses of Scaffolding materials = C
Therefore, Hire Charges of scaffolding Materials: (Rs. A - Rs. B)
C
b Steel scaffolding pipes, jack Props, wallers, Foot plates,
brackets, steel Centering Plates,etc.,
755
BLD-CSTN
756
BLD-CSTN
Remarks
7
757
BLD-CSTN
Remarks
7
758
BLD-CSTN
Remarks
7
759
BLD-CSTN
Remarks
7
760
BLD-CSTN
Remarks
7
761
BLD-CSTN
Remarks
7
762
BLD-CSTN
Remarks
7
763
BLD-CSTN
Remarks
7
764
BLD-CSTN
Remarks
7
765
BLD-CSTN
Remarks
7
766
BLD-CSTN
Remarks
7
767
BLD-CSTN
Remarks
7
768
BLD-CSTN
Remarks
7
769
BLD-CSTN
Remarks
7
770
BLD-CSTN
Remarks
7
771
BLD-CSTN
Remarks
7
772
BLD-CSTN
Remarks
7
773
BLD-CSTN
Remarks
7
774
BLD-CSTN
Remarks
7
775
BLD-CSTN
Remarks
7
776
BLD-CSTN
Remarks
7
777
BLD-CSTN
Remarks
7
778
BLD-CSTN
Remarks
7
779
BLD-CSTN
Remarks
7
780
BLD-CSTN
Remarks
7
781
BLD-CSTN
Remarks
7
782
BLD-CSTN
Remarks
7
783
BLD-CSTN
Remarks
7
784
BLD-CSTN
Remarks
7
785
BLD-CSTN
Remarks
7
786
BLD-CSTN
Remarks
7
787
BLD-CSTN
Remarks
7
788
BLD-CSTN
Remarks
7
789
BLD-CSTN
Remarks
7
790
BLD-CSTN
Remarks
7
791
BLD-CSTN
Remarks
7
792
BLD-CSTN
Remarks
7
793
BLD-CSTN
Remarks
7
794
BLD-CSTN
Remarks
7
795
BLD-CSTN
Remarks
7
796
BLD-CSTN
Remarks
7
797
BLD-CSTN
Remarks
7
798
BLD-CSTN
Remarks
7
799
BLD-CSTN
Remarks
7
800
BLD-CSTN
Remarks
7
801
BLD-CSTN
Remarks
7
802
BLD-CSTN
Remarks
7
803
BLD-CSTN
Remarks
7
804
BLD-CSTN
Remarks
7
805
BLD-CSTN
Remarks
7
806
BLD-CSTN
Remarks
7
807
BLD-CSTN
Remarks
7
808
BLD-CSTN
Remarks
7
809
BLD-CSTN
Remarks
7
810
BLD-CSTN
Remarks
7
811
BLD-CSTN
Remarks
7
812
BLD-CSTN
Remarks
7
813
BLD-CSTN
Remarks
7
814
BLD-CSTN
Remarks
7
815
BLD-CSTN
Remarks
7
816
BLD-CSTN
Remarks
7
817
BLD-CSTN
Remarks
7
818
BLD-CSTN
Remarks
7
819
BLD-CSTN
Remarks
7
820
BLD-CSTN
Remarks
7
821
BLD-CSTN
Remarks
7
822
BLD-CSTN
Remarks
7
823
BLD-CSTN
Remarks
7
824
BLD-CSTN
Remarks
7
825
BLD-CSTN
Remarks
7
826
BLD-CSTN
Remarks
7
827
BLD-CSTN
Remarks
7
828
BLD-CSTN
Remarks
7
829
BLD-CSTN
Remarks
7
830
BLD-CSTN
Remarks
7
831
BLD-CSTN
Remarks
7
832
BLD-CSTN
Remarks
7
833
BLD-CSTN
Remarks
7
834
BLD-CSTN
Remarks
7
835
BLD-CSTN
Remarks
7
836
BLD-CSTN
Remarks
7
837
BLD-CSTN
Remarks
7
838
BLD-CSTN
Remarks
7
839
BLD-CSTN
Remarks
7
840
BLD-CSTN
Remarks
7
841
BLD-CSTN
Remarks
7
842
BLD-CSTN
Remarks
7
843
BLD-CSTN
Remarks
7
844
BLD-CSTN
Remarks
7
845
BLD-CSTN
Remarks
7
846
BLD-CSTN
Remarks
7
847
BLD-CSTN
Remarks
7
848
BLD-CSTN
Remarks
7
849
BLD-CSTN
Remarks
7
850
BLD-CSTN
Remarks
7
851
BLD-CSTN
Remarks
7
852
BLD-CSTN
Remarks
7
853