60ac025038d3b8eda22a81c8 - 07 56 00.01 - Fluid-Applied Roofing (Asphalt)
60ac025038d3b8eda22a81c8 - 07 56 00.01 - Fluid-Applied Roofing (Asphalt)
These
notes are included as hidden text, and can be revealed or hidden by the following method in Microsoft Word:
Display the FILE tab on the ribbon, click OPTIONS, then DISPLAY. Select of deselect HIDDEN TEXT.
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes: Remedial roof coating system applied over existing [built-up bituminous] [[smooth]
[granulated] modified bitumen] roof systems.
1.2 SUBMITTALS
A. Action Submittals:
1. Product Data: Manufacturer’s current technical data sheet for proposed products.
2. Shop Drawings: Illustrate scope of work; include roofing details.
B. Informational Submittals:
1. Sample warranty.
A. Manufacturer Qualifications:
1. Minimum 25 years experience in manufacture of silicone roof coatings.
2. ISO 9001 certified.
B. Roof Coating:
1. UL Listed.
2. FM Class 1, 4470 approved.
3. NSF P151 Certified.
C. Applicator Qualifications:
1. Approved by roof coating manufacturer.
2. Eligible to offer manufacturer’s warranty.
A. Rooftop equipment and accessories in place prior to surface preparation and roof coating application.
C. Contact manufacturer for recommendations if applying coating to substrates over 120 degrees F (49
degrees C).
1.6 WARRANTIES
A. Provide roof coating manufacturer’s labor and material warranty for period of [10] [15] [20] years.
2.1 MANUFACTURERS
2.2 MATERIALS
2.3 ACCESSORIES
C. Walkway Coating: GE Enduris 3500 Protection silicone coating, [yellow,] [contrasting color,] with
granules installed in coating at minimum rate of 30 pounds per 100 square feet.
D. Cover Board: Greenboard, recycled and pressed material cover board by Kelly Green Products, or
plywood, non-treated, minimum 1/2 inch thick, or DensDeck sheathing, preprimed, [1/4] [1/2] inch
thick.
PART 3 EXECUTION
3.1 PREPARATION
A. Prior to beginning coating, conduct adhesion test in accordance with manufacturer’s adhesion testing
procedures; determine if primer or other surface preparation is required.
C. Review existing and imminent weather conditions including potential for extreme temperatures,
relative humidity, frost, dew, and precipitation; ensure that coating and accessory materials will have
sufficient curing time.
D. Core existing roofing at least once every 10,000 square feet. If moisture is detected a moisture survey
is required.
E. Surface Preparation:
F. Required Condition of Surfaces: Clean, sound, dry, and free of materials, laitance, membrane chalk,
and loose coatings that could inhibit proper adhesion of coatings or sealants.
3.2 APPLICATION
A. Apply roof coating in accordance with manufacturer’s instructions and approved Shop Drawings.
PART 4
A. Apply roof coating at rate of 1.5 gallons per 100 square feet to minimum 21 mils cured coating
thickness.
PART 7
PART 8 **** OR ****
PART 9
A. Apply roof coating at rate of 2.0 gallons per 100 square feet to minimum 28 mils cured coating
thickness.
**** OR ****
B. Apply roof coating at rate of 2.5 gallons per 100 square feet to minimum 36 mils cured coating
thickness.
E. Final Roof Coating: Monolithic and seamless, encapsulating entire roof surface.
11.2 CLEANING
A. Clean finished roof surface after completion; ensure that drainage components are not clogged.
11.3 PROTECTION
A. Roof coating is subject to pre-job, progress, and final inspections by coating manufacturer or its
designated third-party inspectors.
END OF SECTION