PROPOSED CAFÉ BAI RENOVATION

BAI HOTEL
Cor. Ouano Ave., C.D. Seno Boulevard, Mandaue City, Cebu

J V O - CONSTRUCTION MANAGEMENT SERVICES


MONTHLY ACCOMPLISHMENT REPORT
JUNE 2021
(7TH MONTH OF RENOVATION)
Prepared by:

JANIERO D. BARIÑAN
Site Architect
Noted by:

JOY U. RENOMERON AR. JOENILLE V. OBIACORO


Construction Manager Principal
JVO-
PROPOSED CAFÉ BAI – 2ND FLOOR PLAN CONSTRUCTION MANAGEMENT
ENTIRE FLOOR AREA SERVICES
LEGEND:
ENTRANCE THRU HOTEL
MAIN LOBBY 4
ENTRANCE THRU SECOND FLOOR

TRAFFIC FLOW

CAFÉ BAI ENTIRE FLOOR AREA

1
4
3
3
1 2

2
4
ANNEX C 5
1.EXTENSION AREA FOR DINING
(CONVERTIBLE AS PRIVATE FUNCTION ANNEX A
ROOM) FOOD DISPLAY AREA & CENTER KITCHEN
2. WITH PRIVATE/ EXCLUSIVE ROOMS 1. WESTERN CUISINE
3. HAS ELEVATOR ACCESS ANNEX B 2. ASIAN CUISINE
4. TOILET 3. PASTRY AREA
5. FIRE EXIT ( BESIDE ELEVATOR) 1. EXTENSION AREA FOR DINING
4. BACK KITCHEN
5. ELEVATOR ACCESS / FIRE EXIT
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX A- Asian

 Stripping of a portion of counter ceiling for preparation of glass fram installation

JUNE 30, 2021

 Completed the installation of the Zocalo counter, glass partition rectification of ceiling
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX A- Asian

 Stripping of a portion of counter ceiling for preparation of glass fram installation

JUNE 30, 2021

 Completed the installation of the Zocalo counter, glass partition rectification of ceiling
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX A- Asian

 Grinding the ice well counter hole

JUNE 30, 2021

 Completed the installation of ice well base and final painting of the base
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX A- Asian

JUNE 30, 2021

 Completed the installation of the Zocalo counter, glass partition rectification of ceiling
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
ANNEX A- Asian

JUNE 01, 2021 JUNE 30, 2021

 Completed the installation of the Zocalo counter, glass partition and rectification of ceiling
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
ANNEX A- Asian

JUNE 01, 2021 JUNE 30, 2021

 Stripping of a portion of counter ceiling  Completed the installation of the Zocalo


for preparation of glass fram installation counter, glass partition and rectification
of ceiling
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION
JUNE 01, 2021

ANNEX B- ASIAN

JUNE 30, 2021

=> Completed installation of zocalo counter, lights, glass partition and ceiling rectification
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION

ANNEX A- ASIAN
JUNE 01, 2021 JUNE 30, 2021

 Stripping of a portion of counter ceiling  Completed the installation of the Zocalo


for preparation of glass fram installation counter and glass partition
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION
JUNE 01, 2021

ANNEX A- ASIAN

JUNE 30, 2021

 Completed the installation of the Zocalo counter and glass partition


PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX A- Asian

June 30, 2021

=> Completed the installation if floor tiles with Grout


PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH MONTH OF THE RENOVATION
JUNE 01, 2021
ANNEX B- Western

JUNE 30, 2021

=> Completed installation of zocalo counter, lights, glass partition and ceiling rectification
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION
JUNE 01, 2021

ANNEX B- Western

JUNE 30, 2021

=> Completed installation of zocalo counter, lights, glass partition and ceiling rectification
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION
JUNE 01, 2021

ANNEX B- Western

JUNE 30, 2021

=> Completed installation of zocalo counter, lights, glass partition and ceiling rectification
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION JUNE 01, 2021

ANNEX B- Western

JUNE 30, 2021

=> Completed installation of double swing door at the back of the kitchen
PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7th
MONTH OF THE RENOVATION June 01, 2021

ANNEX A- WESTERN

June 30, 2021

=> Completed installation of floor tiles at center kitchen area


PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION June 01 , 2021

ANNEX B
(ADDITIONAL WORK)

June 30 , 2021

=> Completed the tiling and grouting and on going cleaning


PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION June 01, 2021

ANNEX C
(ADDITIONAL WORK)

June 30, 2021

 Retouching and cleaning of the floor tiles


PROPOSED CAFÉ BAI RENOVATION LOCATION : BAI HOTEL- SECOND FLOOR JVO- CMS
MONTHLY REPORT 7TH
MONTH OF THE RENOVATION

June 8, 2021 June 30, 2021

ANNEX C
(ADDITIONAL WORK)

June 30, 2021

 Rectified ceiling structural framing for the installation of door architrave