Ac7118 Rev G - 1 To Be Used On or After 5-Jan-2020
Ac7118 Rev G - 1 To Be Used On or After 5-Jan-2020
G
Issued 2004-05
161 Thorn Hill Road AUDIT CRITERIA
Warrendale, PA 15086-7527 Revised 22-Jul-2019
Nadcap
AUDIT CRITERIA FOR
COMPOSITES
SCOPE
This audit criteria is intended for use to survey a facility seeking Nadcap accreditation for the
fabrication of composites for aerospace or defense applications. This also includes bonded
structure such as metal bond parts, detail parts such as core details, and lower-tier details
such as material kits. The audit criteria for in-process and revalidation testing is addressed
in sections 10 and 24 of this checklist as well as in the Non Metallic Materials Testing
AC7122 documents. Composite Part Auditee’s Captive Laboratories can be audited to
AC7122 with a scope of - P, if chosen. If the Auditee is either previously certified to AC7122-
I, -P, or -R and the applicable slash sheets are selected or if they are choosing to be audited
to AC7122-P in conjunction with the AC7118 audit, thensections 10 and 24 of the AC7118
will be Not Applicable and the AC7122 documents will be used during the AC7118 audit
process.
NOTE: Composites accreditation may require supporting special processes that may include
Nadcap accreditation for Materials Testing, Chemical Processing and Nondestructive
Testing, as applicable.
GENERAL INSTRUCTIONS
In completing this assessment, auditors are instructed to respond with a “YES” or “NO” to
address compliance with each statement of requirement. For any negative responses, the
auditor must clearly indicate if the “NO” reflects noncompliance with respect to existence,
adequacy, and/or compliance. Existence relates to evidence of a documented procedure or
policy, adequacy relates to the completeness of the procedure or policy, and compliance
relates to evidence of effective implementation.
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under “Contact Us”.)
t-frm-15 08-Oct-2019
Nadcap AC7118 Revision G -2-
The audit results should not include any customer proprietary information, as it may be
viewed by any Nadcap subscriber. Throughout the checklist (most frequently in job audits)
specific questions may be marked with an (EC). If so, these are questions which have been
designated by the Task Group as those which cannot be answered in eAuditNet IF the part is
Export Controlled – License Required (EC-LR). If auditors have any questions about this,
they should contact the Staff Engineer for directions.
Questions that are highlighted in Grey are not required to be answered in Modified Scope
Audits. The Auditee is required to be compliant to these questions and the Auditor may
choose to answer these questions in a Modified Scope Audit. (Note that in the electronic
checklist in eAuditNet, the modified scope questions are identified by light italic text)
The auditor shall choose job audits in accordance with paragraph 2.2.2.1.
2.2.1.1 The Auditee, when possible, shall forward the following information, as directed by PRI, 30
days prior to the scheduled audit:
a) The completed Job Audit Form (available on eAuditNet, the staff engineer, or from
the auditor)
At least 50% of the product job/compliance audits being demonstrated for composites shall
be in-process utilizing actual production programs or demonstration parts during the on-site
audit, unless otherwise approved by the task group. It is acceptable to utilize historical data
to conduct paperwork audits for those jobs that are not in-process. In the event that
demonstration parts are used to meet this 50% minimum, Auditee merit may be impacted
(i.e. merit removed or merit not granted).
• In-process jobs for aviation, space and defense product from a Nadcap Composites
Task Group subscribing customer.
• Historical jobs from a Nadcap Composites Task Group subscribing customer for
product manufactured in the previous 12 months.
• In-process job for aviation, space and defense product from a non-subscribing
customer. This may be needed to meet the 50% in-process job audit requirement.
• Demonstration job of aviation, space and defense product. This may be needed to
meet the 50% in-process job audit requirement
• Historical jobs for product manufactured greater than 12 months prior to the audit
• Historical jobs from an aerospace customer that is not a subscribing member to the
Nadcap Composites Task Group.
• Any in-process or historical job audit for product that is not aviation, space or defense
related.
Nadcap accredits AC7118 to Aerospace fabricators working in the field of Composites and
Metal Bonding. The process of accreditation is through Nadcap auditing of the facility
seeking accreditation. All Auditees being audited to AC7118 must make auditors aware of all
subscribing Nadcap customer products fabricated at their site. The auditor shall choose the
products they wish to audit regardless of the customer. There may be extenuating
circumstances where a customer may request that a certain product not be audited. It is
incumbent on the Auditee to be able to demonstrate this formally to the auditor prior to the
audit, either by written document, customer PO or a contractual document.
The Auditee needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled –
License Required” (EC-LR) cannot be input into eAuditNet.
2.2.2.3
General
The Auditee shall provide for an in-briefing with the auditor. Key members of the applicant’s
staff should attend the in-briefing so the audit purpose, methods, and assessment processes
can be discussed.
Working space for the auditor with desks or tables, chairs, computer, web access, telephone,
etc. shall be made available. Clerical, typing and reproduction services are to be provided,
as required. This is not a full time assignment.
Nadcap AC7118 Revision G -4-
A final out-briefing shall be conducted at the completion of the audit. Each nonconformance
and observation will be reviewed and the Auditee will be given the opportunity to discuss
proposed corrective action or to provide any additional information.
NOTE: The Composites Task Group may, upon review, change the auditors’ determination
of a finding or observation. Auditees shall provide a written response to each
nonconformance identified by the auditor, Staff Engineer, or Task Group.
In accordance with Nadcap procedures, the Auditee has 21 calendar days from the close of
the audit to submit a corrective action plan and identify effectivity dates for each NCR. The
response must address the immediate action taken to resolve the discrepancy, the root
cause of the nonconformance from a systems management approach, and the actions taken
or to be taken to preclude reoccurrence. Acknowledgments to Observations are required.
When objective evidence is required, it shall be submitted within 21 calendar days from the
close of the audit.
PRI Staff or the Task Group may, after review of the audit report, require additional
information or may find cause to issue additional findings.
Non-conformances identified as part of the Nadcap audit with potential product impact may,
at the Composites Task Group’s discretion, require a follow-up audit at the Auditee’s
expense.
NOTE: Final authority over the audit report, acceptability of corrective actions, and
accreditation, recommendation rests with the Task Group.
Nadcap AC7118 Revision G -5-
Table of Contents
Job Audit Matrix .................................................................................................................................. 9
3. Auditee Information ........................................................................................................................ 12
3.1 General Information ............................................................................................... 12
3.2 Quality Management System Approvals ................................................................ 12
3.3 Verification of Corrective Actions ........................................................................... 13
3.4 Audit Content ......................................................................................................... 13
4. General Quality System Requirements ........................................................................................ 14
4.1 Process Approval .................................................................................................. 14
4.2 Internal Audits / Workstation Audits ....................................................................... 14
4.3 Software Quality Assurance................................................................................... 14
4.4 Spreadsheet .......................................................................................................... 15
4.5 Training ................................................................................................................. 15
4.6 Source Control Drawings ....................................................................................... 15
4.7 Operator Self-Verification………………………………………………………………. 15
5. Material Control ........................................................................................................................... 16
5.1 Shelf Life and Out-Time ......................................................................................... 16
5.2 Expendable ........................................................................................................... 17
6. Facilities and Equipment .............................................................................................................. 17
6.1 Cold Storage Units ................................................................................................ 17
6.2 Controlled Contamination Area (CCA) ................................................................... 17
6.3 Environmentally Monitored Area (EMA) ................................................................. 21
6.4 Temperature Uniformity Surveys ........................................................................... 21
6.5 Preventative Maintenance ..................................................................................... 21
6.6 Silicone Processing ............................................................................................... 21
7. Tooling......................................................................................................................................... 22
7.5 Mold Releases ....................................................................................................... 22
8. General Fabrication Procedures .................................................................................................. 22
8.1 General ................................................................................................................. 22
8.2 Lay-Up Composite Fabrication .............................................................................. 23
8.3 Bagging and Tooling Set-Up .................................................................................. 24
8.4 Resin Mixing (LRP Only) ....................................................................................... 24
8.5 Resin Infusion (LRP Only) ..................................................................................... 24
8.6 Adhesive Bonding, and Potting .............................................................................. 25
8.7 Cure, Consolidation, and Forming ......................................................................... 26
8.8 Core Processing/Machining (CP Only) .................................................................. 26
Nadcap AC7118 Revision G -6-
24c. Job Audit for Process Control Testing/Re-Validation – Thermal/Analytical Properties .............. 152
25. Job Audit for Calibration, Software Control, Validation, and Setup of Automated Tape Laying or
Automated Fiber Placement Machines ............................................................................................... 154
26. Job Audit for Laser Ply Projector Calibration, Software Control, Validation, and Setup ................. 157
27. Job Audit for NC Ply Cutter Calibration, Software Control, Validation, and Setup ......................... 159
28. Job Audit for Digital Product Definition (DPD) ............................................................................... 162
29. Job Audit for Operator Self Verification (OSV) .............................................................................. 163
30. Job Audit for Partial First Article Inspection (FAI) .......................................................................... 165
Nadcap AC7118 Revision G -9-
12b. Receiving Quality Control (1) (1) (1) (1) e.g. (1) (1)
FL3 – Adhesive stabilizing
Notes:
Anything in parenthesis ( ) performed at the Auditee requires a job audit but if more than one accreditation
scope is requested, the number of job audits would not sum together. For example, if an accreditation scope to
Prepreg (PAR) and Metal Bond (MB) is requested, per the Job Audit Matrix both scopes require a job audit but
only one job audit would be required.
Job audits for a satellite site shall be selected per the AC7118 Job Audit Matrix, independent of the main site.
Flag Notes:
FL 1 1 job audit minimum, 2 job audits if this is the only scope of accreditation requested
FL 2 Flag note 2 applies to scopes PAR, MB, and LRP
1 job audit minimum is required for each requested accreditation scope (PAR, MB, LRP).
Example: PAR + MB + LRP = 3 Job Audits (16a + 16b + 16c).
Nadcap AC7118 Revision G - 11 -
If only one (1) scope is requested, a minimum of two (2) job audits are required.
Example: PAR = 2 Job Audits (16a + 16d). Example: MB = 2 Job Audits (16b + 16D).
Example: LRP = 2 Job Audits (16c + 16d).
If only two (2) scopes are requested, a minimum of three (3) job audits are required. The third job audit
is chosen in the most prominent scope.
Example: PAR + MB = 3 Job Audits (16a + 16b + 16d).
Example PAR + LRP = 3 Job Audits (16a + 16c + 16d).
The auditor shall review the Auditee’s list of automated processes being presented for audit and
choose automated processes which have not been reviewed during previous Nadcap audits. The
auditor is responsible for reviewing the previous audits and verifying if there are any automated
processes which have not been audited. If all automated processes have been reviewed, then the
auditor shall choose automated processes which have been audited less frequently.
FL 3 Applies to modified scope audits. One job audit for each process. For example, a process such as
machining which has multiple job audits (22a & 22b) would only have one job audit for a modified scope audit
(e.g. 22b). The exception is a KSP accreditation requires two (2) job audits for the process of pattern cutting &
kitting.
FL 4 Compression molding job audits may involve the compression molding of bulk molding compound,
sheet molding compound or continuous fiber material (either thermoset or thermoplastic material) and are
covered in job audits 20a and 20b. Stamp forming is solely a thermoplastic process and is covered in job
audits 20c and 20d. If only compression molding is performed, job audits 20a and 20b are required, with one
job audit being a thermoplastic and one job audit being a thermoset part if the Auditee processes both
thermosets and thermoplastics. If the Auditee performs both compression molding and stamp forming, job
audits 20a and 20c would be performed.
AUDITEE INFORMATION
Verify that the Auditee has identified Subscriber Voting Member customers in
eAuditNet, or attach a list of Subscriber Voting Members represented at this
Auditee.
The Nadcap Composites Task Group recognizes PRI AC7004 and/or any
Nadcap approved quality management system certification/registration
programs. If the Auditee has been audited and approved by Nadcap or any
other Nadcap recognized agency for compliance with 9100 (9110), then no
further assessment for quality management systems will be required.
Although specific audit criteria for evaluation of the general quality
management system is not included within the text of this checklist, the
requirements of 9100 (9110) do form a part of the audit criteria used in the
Nadcap Composites Accreditation program.
3.2.1.1 Enter data below from actual certificate to identify the quality system
approvals:
Guidance: Review OP 1104 Audit Scheduling, as failure to provide a valid quality system
certificate may result in failure of the audit and/or suspension/withdrawal of accreditation.
3.2.1.6 The name and address of the facility matches that on the certificate? YES NO
(Information Only)
During the course of the audit, was compliance with the existing quality Yes No
management system demonstrated?
For re-accreditation audits, was corrective action from previous audits Yes No
implemented and sustained?
The audit to AC7118 will consist of two parts: procedural compliance audits
and job audits. Sections 4 through 11 comprise the requirements for the
procedural compliance audit. Procedures may or may not be documented.
When a question requires documentation, it will be stated as “documented
procedure,” “records,” set-up cards,” “work instructions,” or similar terminology.
Other questions verify a Auditee’s procedures indirectly, such as inspecting
gages for calibration (documented metrology procedures) or verifying
compliance to shop practices (informal training).
Sections 12 through 24 comprise the requirements for job audits. Job audits
verify the procedures from Section 4 through 11 are implemented on
production parts.
Other questions verify the capability of the Auditee’s quality system to flow
requirements from the customer. These questions typically state “per
customer requirements.” In this situation the AC7118 requirements are the
customer requirements. If the customer does not flow down a specific
requirement, the Auditee is considered compliant.
Does the Auditee have a current customer approval for the following
fabrication processes, as required:
Did the Auditee upload a copy of their completed self-audit to eAuditNet YES NO
at least 30 days prior to the audit- utilizing the version of the checklist(s)
applicable to this audit?
For each question in the checklist, has the Auditee identified where the YES NO
means of compliance or evidence* of compliance may be found? (*=
procedure, checklist, physical location of evidence, etc.)
Does the self-audit include job audits as required by the TG? YES NO
For programs controlling part characteristics are first article inspections YES NO
performed, including delta first article inspections?
Does the Auditee have a documented procedure to protect the software YES NO
from unauthorized changes?
4.4 Spreadsheets
4.5 Training
Is there objective evidence that personnel are trained to perform their YES NO
work in accordance with established requirements?
Does the Auditee have a documented procedure for Operator Self- YES NO
Verification which defines the identification of processes/operations
eligible for using Operator Self-Verification, training/competency of
Self-Verification operators and oversight of process and operator
performance?
MATERIAL CONTROL
Is there a documented procedure describing shelf life, out time and pot YES NO NA
life controls for all materials?
For perishable materials is out time and temperature controlled and YES NO NA
traceable from the purchased source?
Are there documented procedures to ensure materials are held and YES NO
segregated pending required tests/certification?
Is accumulated out time and pot life tracked by attached card or other YES NO NA
method to maintain specification limits?
Is the Auditee using and controlling the required expendable materials YES NO
as defined in the customer specification or internal requirements?
Is the cold storage unit equipped with at least a calibrated temperature YES NO
indicator with log or a calibrated temperature recorder?
Is there a record that monitors all the materials stored in the cold YES NO
storage unit(s) including their product designation and expiration date?
Does the cold storage unit maintain temperature within customer or YES NO
material storage requirements?
Filament Winding X X
Aerosol tackifying X X
(requires segregation)
Adhesive reticulation X X
Mixing of resin X X
(requires segregation)
Liquid resin infusion X X
(requires segregation)
Compression Molding (this includes cutting and kitting, lay-up X X
and forming)
Miscellaneous Bonding, such as potting inserts, abradable X X
application, etc. (requires segregation)
Storage of unprotected core details, surface treated metallic X Not allowed
details, pre-cured nonmetallic parts (unless a documented degreasing
procedure for subsequent
cleaning exists)
Structural Adhesive Bonding X Not Allowed
NOTE: ‘X’ signifies that the process is allowed in the indicated area.
Nadcap AC7118 Revision G - 19 -
Does the procedure define the required segregation for performing YES NO NA
EMA processes within the CCA?
For processing, the documented procedure shall be in compliance with
customer requirements or in the absence of customer requirements,
Table 2.
Segregation By Distance
• Process That Disperse Particulates – Examples include: Spraying Tackifier on tools or preforms
o 50 feet (15 meters) from prepreg or uncured adhesive that is not covered
• Processes That Disperse Fibers – Examples include: Minor Sanding, Cutting of dry fiber, Peel ply removal from
cured parts
• Processes That Utilize A-Staged (Uncured) Resin – Examples include: Cold bonding such as potting inserts and
potting core close-outs, Miscellaneous bonding with wet lay-up (Note: structural wet lay-up is not audited by
Nadcap, but requires segregation), Liquid resin infusion
o 10 feet (3 meters) from other processes (Note: These processes have a tendency to spill resin on the
workstation and therefore a separate workstation is required to prevent cross contamination.)
Segregation By Partition
o Segregation by: Room within CCA, Permanent wall or partition of adequate height to prevent contamination by
adjacent areas
Segregation By Time
o CCA processes shall not be in the area when EMA processes are introduced.
Worktables for EMA processes shall be cleaned before and after use.
Areas shall be inspected after completion of EMA processes and cleaned as required before CCA processes
are introduced.
Nadcap AC7118 Revision G - 20 -
If applicable, is the compressed air supply in the CCA filtered to remove YES NO NA
oil, water and particles and are the filters monitored for periodic
replacement?
Are signs posted outside the CCA for appropriate prohibition of eating, YES NO
smoking and drinking?
Note: The sign does not need to state “No Smoking” if the Auditee has
a documented procedure of “no smoking” within the facility.
Is the CCA enclosed (walls and ceiling), and are doors kept closed at YES NO
all times, except for entry and exit?
Is the CCA located in the factory such that it is separated from the trim YES NO
routing/stripping/sanding area to avoid contamination of the CCA?
Nadcap AC7118 Revision G - 21 -
Are all personnel and visitors in the CCA wearing appropriate personal YES NO
protective equipment (PPE) in accordance with the Auditee and
customer requirements?
Are the instruments used to monitor the area, such as temperature and YES NO
humidity calibrated per customer or internal requirements?
Are process operations separated from operations that create airborne YES NO
contaminants (such as trim, routing, stripping and sanding areas)?
Do System Accuracy Test (SAT) and Thermal Uniformity Survey (TUS) YES NO
comply with customer requirements, or, if no customer requirement
exists, does the instrumentation system accuracy meet the customer’s
processing requirements?
YES NO
Is the area where uncured silicones are processed designated within
the facility?
Is there a documented procedure specifying preventive measures for
YES NO
silicone cross contamination, which includes but is not limited to the
following:
a. Material handling, e.g. receiving and disposal
b. Use of Personnel Protective Attire, such as gloves and
booties, to prevent the spread of silicone contaminants
to adjacent areas.
c. Color coding or a similar method to identify silicone
exposed tooling, tooling aids, trays, hand tools, carts etc.
d. Controlled method for the transportation of uncured or
free silicones that prevents cross contamination (e.g.
marked closed containers, disposable non-permeable
envelope bags, defined transportation route)
Is there evidence of compliance to procedures preventing silicone cross
YES NO
contamination?
When airborne uncured silicone is present in a CCA, is the CCA
YES NO
operated with a lower pressure than area(s) outside of the entrance(s)?
YES NO NA
If a dedicated CCA is used to process uncured silicone, is it operated
with an HVAC system separated from areas with other bonding
processes?
TOOLING SECTION NA
7.1 Is tooling identified and referenced in the work instructions for YES NO
traceability?
7.2 Are tools inspected to a documented procedure which meets customer YES NO
requirements?
7.3 Are tools, including substructures, stored and maintained in accordance YES NO
with customer or Auditee requirements?
7.4 Is the tooling and ancillary equipment free from damage, deterioration, YES NO
debris, or contamination that could affect the part?
Is mold release fully cured prior to lay-up, adhesive bonding, infusion YES NO NA
and/or compression mold processing?
8.1 General
Nadcap AC7118 Revision G - 23 -
Is the equipment used for the verification of product and process YES NO
acceptance, calibrated?
If material is trimmed in place with a cutting tool, are measures taken YES NO NA
(e.g. shims) to protect other plies and/or tools from being cut?
Are hand sweeps and shop aids made from material that would not YES NO NA
contaminate the part?
Are kits prepared in CCA (EMA for dry fibers, fabric, braids, preforms YES NO
and prepreg/adhesive when protected by double sided carrier or
materials used for compression molding) and stored to protect from
contaminants and damage?
Nadcap AC7118 Revision G - 24 -
Do documented procedures exist for tooling set-up (i.e. mold closing, o- YES NO NA
rings, seals, sprue installation)? (LRP only)
Prior to bagging, are tool fittings and orifices checked for cleanliness YES NO
and obstructions?
Do documented procedures exist to check the tools/bags for leaks prior YES NO NA
to cure? (PAR, MB, LRP)
Are the core and laminates dried prior to bonding per customer YES NO NA
requirements? (PAR and CP only)
After parts have been cleaned, dried and primed, are stored parts being YES NO
wrapped in clean neutral non-sulfur containing protective paper or
plastic free from wax or silicone per customer or internal requirements?
Are process control panels or tag end specimens processed and cured YES NO NA
concurrently with the part they represent?
Are mix ratios validated (e.g. lap shears, shore-D hardness, recording YES NO NA
of weights, witnessing by quality assurance, operator self-verification
program, etc.)?
NOTE: This does not apply to automatic dispensers or pre-mix kits.
Is there evidence that pot life is monitored and controlled per customer YES NO
or internal requirements?
Are there documented procedures or work instructions for the drying of YES NO NA
core material per customer requirements?
9.2 Where drilling is performed are breakouts controlled within specification YES NO
tolerances?
9.3 Is deburring of the holes and/or edges of the composite detail YES NO
accomplished using an approved method?
9.4 Does the Auditee use customer approved coolants in accordance with YES NO NA
customer requirements?
9.5 If the part is cleaned during the manufacturing process are approved YES NO NA
methods and materials utilized?
9.6 Is the cutting tool used as specified by the customer or internal YES NO
documented procedure?
9.7 Is the sanding media grit and type as specified by the customer or YES NO
internal documented procedure?
Nadcap AC7118 Revision G - 27 -
10.1 General
Are all specimens tested by the laboratory recorded (such as tested YES NO
completion/failure, replaced, re-tests)?
Are extensometers calibrated per ASTM E83 class B2, ISO 9513 Class YES NO
0.5, or equivalent?
Are calibration records maintained for all thermal and analytical YES NO
equipment?
Is there objective evidence that personnel are trained to perform their YES NO
work in accordance with established requirements?
Are untrained personnel working under the supervision of someone that YES NO NA
is trained?
11.2 Materials
Has age/temperature sensitive material been marked and logged and is YES NO
it within shelf life and out time limits?
Are all material containers labeled and stored to prevent contamination YES NO
and improper use?
Does the manufacturing and/or inspection record have sufficient detail YES NO
to produce the part?
Is the manufacturing and/or inspection record complete for all work YES NO
performed?
Does the material traceability information from the raw material supplier YES NO
match the material acceptance documentation, and is it within shelf life
and out time as applicable?
Are material batches, roll numbers, lot numbers, and other traceable YES NO NA
information recorded on the traveler or work instruction, per customer
requirements?
Is all Material Review Board (MRB) activity documented and executed YES NO NA
in the work instructions/traveler?
Are the parts manufactured to the correct specification and drawing YES NO
revisions?
Does the work instruction identify each ply with its material, orientation YES NO NA
and location per design requirements?
Nadcap AC7118 Revision G - 30 -
Have personnel working in the area been trained to the applicable FOD YES NO
procedure(s) and are they familiar with its requirements?
Customer Requirements
12a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12a.1.1.1 Customer(s):
12a.1.1.2 Subscriber/Prime
Contractor(s):
12a.1.1.6 Operator:
General
12a.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12a.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12a.2.5 Are materials adequately protected from damage and contamination, YES NO
and when required, UV exposure? (e.g., bags are not torn; seals are
not damaged, etc.)
12a.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material Auditee match the material acceptance documentation?
12a.2.7 Has the material been released in accordance with customer or internal YES NO
quality requirements?
12a.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
Nadcap AC7118 Revision G - 32 -
12a.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
12a.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
12a.2.11 Is temperature sensitive material shipped and verified for temperature? YES NO
12a.2.12 When material is returned to the cold storage facility, is the proper YES NO
bagging material used and is it sealed?
12a.2.13 Are materials stored and handled in such a manner to prevent damage YES NO
to the material?
Nadcap AC7118 Revision G - 33 -
12b.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12b.1.1.1 Customer(s):
12b.1.1.2 Subscriber/Prime
Contractor(s):
12b.1.1.6 Operator:
General
12b.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12b.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12b.2.5 Are materials adequately protected from damage and contamination? YES NO
(e.g., bags are not torn; seals are not damaged, etc.)
12b.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material supplier match the material acceptance documentation?
12b.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
12b.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
12b.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
Nadcap AC7118 Revision G - 34 -
12b.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
12b.2.11 Is temperature sensitive material shipped and verified for temperature? YES NO
12b.2.12 When material is returned to the cold storage facility, is the proper YES NO
bagging material used and is it sealed?
12b.2.13 Are materials stored and handled in such a manner to prevent damage YES NO
to the material and cold flow of resin?
Nadcap AC7118 Revision G - 35 -
12.c.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12c.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12c.1.1.4 Customer(s):
12c.1.1.5 Subscriber/Prime
Contractor(s):
12c.1.1.8 Operator:
General
12c.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12c.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12c.2.5 Are materials adequately protected from damage and contamination? YES NO
(e.g., bags are not torn; seals are not damaged, etc.)
12c.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material supplier match the material acceptance documentation?
12c.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
Nadcap AC7118 Revision G - 36 -
12c.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
12c.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
12c.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
Nadcap AC7118 Revision G - 37 -
In-Process Historical
12d.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12d.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12d.1.1.4 Customer(s):
12d.1.1.5 Subscriber/Prime
Contractor(s):
12d.1.1.8 Operator:
General
12d.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12d.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12d.2.5 Does the Auditee verify that the detail part was adequately protected YES NO
during shipment to the Auditee?
12d.2.6 Does the part serial number match the acceptance documentation? YES NO
12d.2.7 Has the part been released in accordance with customer quality YES NO
requirements?
Nadcap AC7118 Revision G - 38 -
12d.2.8 Does the Auditee periodically perform assessments of the sub-tiers YES NO
manufacturing processes?
Nadcap AC7118 Revision G - 39 -
In-Process Historical
12e.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12e.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12e.1.1.1 Customer(s):
12e.1.1.2 Subscriber/Prime
Contractor(s):
12e.1.1.6 Operator:
General
12e.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12e.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12e.2.5 Are materials adequately protected from damage and contamination? YES NO
(e.g., bags are not torn; seals are not damaged, etc.)
12e.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material supplier match the material acceptance documentation?
12e.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
12e.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
Nadcap AC7118 Revision G - 40 -
12e.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
12e.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
Nadcap AC7118 Revision G - 41 -
In-Process Historical
12f.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12f.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12f.1.1.4 Customer(s):
12f.1.1.5 Subscriber/Prime
Contractor(s):
12f.1.1.8 Operator:
General
12f.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12f.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12f.2.5 Are materials adequately protected from damage and contamination? YES NO
(e.g., bags are not torn; seals are not damaged, etc.)
12f.2.6 Does the part serial number match the acceptance documentation? YES NO
12f.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
12f.2.8 Does the Auditee periodically perform verification assessments of the YES NO
sub-tiers manufacturing processes?
Nadcap AC7118 Revision G - 42 -
12f.2.9 Is temperature sensitive material shipped and verified for temperature? YES NO
Nadcap AC7118 Revision G - 43 -
In-Process Historical
(1-part, 2-part, bulk resins)
12g.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
1. Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12g.1.1.1 Customer(s):
12g.1.1.2 Subscriber/Prime
Contractor(s):
12g.1.1.6 Operator
General
12g.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12g.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12g.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material supplier match the material acceptance documentation?
12g.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
12g.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
Nadcap AC7118 Revision G - 44 -
12g.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
12g.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
12g.2.11 Is temperature sensitive material shipped and verified for temperature? YES NO NA
12g.2.13 Are materials stored and handled in such a manner to prevent YES NO
contamination to the material?
Nadcap AC7118 Revision G - 45 -
In-Process Historical
12h.0 Is the material controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
12h.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12h.1.1.1 Customer(s):
12h.1.1.2 Subscriber/Prime
Contractor(s):
12h.1.1.6 Operator:
General
12h.2.2 Are the receiving inspection records complete for tests/work YES NO
performed?
12h.2.3 Have receiving inspection tests been performed per the customer or YES NO NA
internal requirements?
12h.2.5 Are materials adequately protected from damage and contamination, YES NO
and when required, UV exposure? (e.g., bags are not torn; seals are
not damaged, etc.)
12h.2.6 Does the material traceability information from the sub-tier and/or raw YES NO
material supplier match the material acceptance documentation?
12h.2.7 Has the material been released in accordance with customer quality YES NO
requirements?
12h.2.8 Is a customer approved supplier used for the material received as per YES NO
contract or P.O. requirements? (raw material manufacturer, suppliers,
etc.)
Nadcap AC7118 Revision G - 46 -
12h.2.9 Have required acceptance tests by the material supplier been YES NO
performed?
12h.2.10 Is material identified for recall if it is issued prior to full acceptance in YES NO NA
the event of acceptance test failure?
12h.2.11 Is temperature sensitive material shipped and verified for temperature? YES NO NA
12h.2.12 When material is returned to the cold storage facility, is the proper YES NO NA
bagging material used and is it sealed?
12h.2.13 Are materials stored and handled in such a manner to prevent damage YES NO
to the material?
Nadcap AC7118 Revision G - 47 -
In-Process Historical
YES NO
12i.0 Is the material controlled under U.S. Export Control Regulations?
Information only.
Customer Requirements
12i.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
12i.1.1.1 Customer(s):
12i.1.1.2 Subscriber/Prime
Contractor(s):
12i.1.1.6 Operator:
12i.2 General
12i.2.2 Are the receiving inspection records complete for tests/work YES NO NA
performed?
12i.2.3 Are the plies and kitted material identified per customer requirements? YES NO
12i.2.4 Is temperature sensitive material shipped and verified for temperature? YES NO
12i.2.5 For temperature sensitive materials, are all material shelf life or freezer YES NO
logs updated to reflect out time?
12i.2.6 Has the kit been released in accordance with customer quality YES NO
requirements?
12i.2.7 Does the Auditee periodically perform assessments of the Kitting YES NO
Service Provider?
12i.2.8 Is the Kitting Services Provider listed on the customer’s list of approved YES NO NA
sources (engineering and/or quality)?
Nadcap AC7118 Revision G - 48 -
13.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
13.1.1.4 Customer(s):
13.1.1.5 Subscriber/Prime
Contractor(s):
13.1.1.7 Operator
13.2 General
Are tools identified, stored, and handled per procedure and, where YES NO
required, per customer or internal requirements?
Is the tooling used free from damage, deterioration, or debris that could YES NO
affect the part?
Nadcap AC7118 Revision G - 50 -
14a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
14a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
14a.1.1.4 Customer(s):
14a.1.1.5 Subscriber/Prime
Contractor(s):
14a.1.1.7 Operator:
General
14a.2.1 Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO NA
the documented procedure?
14a.2.2 Is cutting of dry materials (fiber / fabric / braid / preform) segregated YES NO NA
from other types of processes to prevent cross contamination and
compliant to documented procedure?
14a.2.3 Are kits made from a single supplier’s material or as required by YES NO
customer?
14a.2.4 Are defects marked by the material manufacturer removed during the YES NO NA
kit cutting process?
14a.2.6 If kits are removed from the CCA/EMA, are kits bagged and sealed to YES NO NA
prevent damage or contamination?
14a.2.7 For temperature sensitive materials, are all material shelf life/freezer YES NO
logs updated to reflect out time? (This applies both to the parent
material and the kits)
Nadcap AC7118 Revision G - 51 -
14a.2.8 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
14a.2.10 Is the orientation and detail shape/dimension consistent with customer YES NO
requirements?
14a.2.11 Are materials stored and handled in such a manner to prevent YES NO
damage?
14a.2.12 When material is returned to the cold storage facility, is it stored and YES NO NA
handled in such a manner to prevent damage?
14a.2.13 Are the tables for cutting adhesives for metal bond segregated from YES NO NA
other types of processing?
14a.3.1 Are the kitted materials and test specimens stored and shipped per YES NO
Auditee procedures and customer requirements?
14a.3.2 Are the kitted materials supported or rolls suspended within the YES NO
shipping container?
14a.3.3 Are box handling and storage instructions in accordance with YES NO
contractual requirements?
14a.3.4 Does the packaging (bagging) material meet customer requirements? YES NO
14a.3.5 Are temperature recorders and/or dry ice placed in the box in YES NO NA
accordance with contractual requirements?
14a.3.6 If required, is the amount of desiccant in each bag prior to sealing in YES NO NA
accordance with customer requirements?
14a.3.7 Does the certification include the information specified by the contract? YES NO
14a.3.8 Have all storage and out time records been accepted by QA and YES NO
included with the shipment?
Nadcap AC7118 Revision G - 52 -
14b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
14b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
14b.1.1.4 Customer(s):
14b.1.1.5 Subscriber/Prime
Contractor(s):
14b.1.1.7 Operator:
General
14b.2.1 Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO NA
the documented procedure?
14b.2.2 Is cutting of dry materials (fiber / fabric / braid / preform) segregated YES NO NA
from other types of processes to prevent cross contamination and
compliant to documented procedure?
14b.2.3 Are kits made from a single supplier’s material or as required by YES NO
customer?
14b.2.4 Are defects marked by the material manufacturer removed during the YES NO NA
kit cutting process?
14b.2.6 If kits are removed from the CCA, are kits bagged and sealed to YES NO NA
prevent damage or contamination?
Nadcap AC7118 Revision G - 53 -
14b.2.7 For temperature sensitive materials, are all material shelf life/freezer YES NO
logs updated to reflect out time? (This applies both to the parent
material and the kits)
14b.2.8 For temperature sensitive materials, is the material allowed to thaw YES NO NA
prior to removing from its protective covering?
14b.2.10 Is the orientation and detail shape/dimension consistent with customer YES NO
requirements?
14b.2.11 Are materials stored and handled in such a manner as to prevent YES NO
damage?
14b.2.12 When material is returned to the cold storage facility, is it stored and YES NO NA
handled in such a manner to prevent damage?
14b.2.13 Are the tables for cutting adhesives for metal bond segregated from YES NO NA
other types of processing?
14b.2.14 Is the part specific program traceable and under configuration control? YES NO
14b.3.1 Are the kitted materials and test specimens stored and shipped per YES NO
Auditee procedures and customer requirements?
14b.3.2 Are the kitted materials supported or rolls suspended within the YES NO
shipping container?
14b.3.3 Are box handling and storage instructions in accordance with YES NO
contractual requirements?
14b.3.4 Does the packaging (bagging) material meet customer requirements? YES NO
14b.3.5 Are temperature recorders and/or dry ice placed in the box in YES NO NA
accordance with contractual requirements?
14b.3.6 If required, is the amount of desiccant in each bag prior to sealing in YES NO NA
accordance with customer requirements?
14b.3.7 Does the certification include the information specified by the contract? YES NO
14b.3.8 Have all storage and out time records been accepted by QA and YES NO
included with the shipment?
Nadcap AC7118 Revision G - 54 -
14c.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
14c.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
14c.1.1.2 Part
Description:
14c.1.1.4 Customer(s):
14c.1.1.5 Subscriber/Prime
Contractor(s):
14c.1.1.7 Operator:
General
14c.2.1 Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO NA
the documented procedure?
14c.2.2 Is cutting of dry materials (fiber / fabric / braid / preform) segregated YES NO NA
from other types of processes to prevent cross contamination and
compliant to documented procedure?
14c.2.3 Are kits made from a single supplier’s material or as required by YES NO
customer?
14c.2.4 Are defects marked by the material manufacturer removed during the YES NO NA
kit cutting process?
14c.2.6 If kits are removed from the CCA/EMA, are kits bagged and sealed to YES NO NA
prevent damage or contamination?
Nadcap AC7118 Revision G - 55 -
14c.2.7 For temperature sensitive materials, are all material shelf life/freezer YES NO
logs updated to reflect out time? (This applies both to the parent
material and the kits)
14c.2.8 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
14c.2.10 Is the orientation and detail shape/dimension consistent with customer YES NO
requirements?
14c.2.11 Are materials stored and handled in such a manner to prevent YES NO
damage?
14c.2.12 When material is returned to the cold storage facility, is it stored and YES NO NA
handled in such a manner to prevent damage?
14c.2.13 Are the tables for cutting adhesives for metal bond segregated from YES NO NA
other types of processing?
Packaging/Storage/Certification
Are the kitted materials and test specimens stored and shipped per YES NO
14c.3.1
Auditee procedures and customer requirements?
Are the kitted materials supported or rolls suspended within the YES NO
14c.3.2
shipping container?
14c.3.4 Does the packaging (bagging) material meet customer requirements? YES NO
Are temperature recorders and/or dry ice placed in the box in YES NO NA
14c.3.5
accordance with contractual requirements?
14c.3.7 Does the certification include the information specified by the contract? YES NO
Have all storage and out time records been accepted by QA and YES NO
14c.3.8
included with the shipment?
Nadcap AC7118 Revision G - 56 -
14d.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
Complete the following and then check the Auditee’s information (i.e., technique sheets,
14d.1.1
travelers) against the purchasing requirements.
14d.1.1.4 Customer(s):
14d.1.1.7 Operator:
General
Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO NA
14d.2.1
the documented procedure?
Are defects marked by the material manufacturer removed during the YES NO NA
14d.2.4
kit cutting process?
If kits are removed from the CCA, are kits bagged and sealed to YES NO NA
14d.2.6
prevent damage or contamination?
Nadcap AC7118 Revision G - 57 -
For temperature sensitive materials, are all material shelf life/freezer YES NO
14d.2.7 logs updated to reflect out time? (This applies both to the parent
material and the kits)
When material is returned to the cold storage facility, is it stored and YES NO NA
14d.2.12
handled in such a manner to prevent damage?
Are the tables for cutting adhesives for metal bond segregated from YES NO NA
14d.2.13
other types of processing?
14d.2.14 Is the part specific program traceable and under configuration control? YES NO
Packaging/Storage/Certification
Are the kitted materials and test specimens stored and shipped per YES NO
14d.3.1
Auditee procedures and customer requirements?
Are the kitted materials supported or rolls suspended within the YES NO
14d.3.2
shipping container?
14d.3.4 Does the packaging (bagging) material meet customer requirements? YES NO
Are temperature recorders and/or dry ice placed in the box in YES NO NA
14d.3.5
accordance with contractual requirements?
14d.3.7 Does the certification include the information specified by the contract? YES NO
Have all storage and out time records been accepted by QA and YES NO
14d.3.8
included with the shipment?
Nadcap AC7118 Revision G - 58 -
General
15a.1.1 Does the area where core processing is performed meet requirements YES NO
in the CCA/EMA procedure for cleanliness, temperature, and humidity?
15a.1.2 Are core kits and detail parts labeled for traceability, per customer or YES NO
internal requirements?
15a.1.3 Is the core material (e.g. specification number) and core ribbon YES NO NA
direction verified prior to processing?
Note: NA is for the cases of foam or wood core
15a.1.4 Is the wood grain direction, density, and moisture content verified YES NO NA
before further processing? (wood core only)
15a.1.5 Is the foam core density verified before further processing? (crushed YES NO NA
foam core only)
15a.1.6 Is out-time of “time and temperature sensitive” core (such as heat YES NO NA
treated foam core) monitored and recorded?
15a.1.7 If core inventory (blocks or sheets) is moved to the core EMA area for YES NO NA
storage, is the core protected from contamination and damage (similar
to storage at Receiving)?
15a.1.8 If core details are stored outside of a CCA, are they protected from YES NO NA
contaminants (such as placed in plastic bags, wrapped in paper,
contained in a box), unless subsequent degrease cleaning is required
to be performed?
15a.1.9 Is the core detail inspected after processing to customer requirements YES NO
(such as buckle lines, node bond separations, blisters)?
SECTION NA
Machining/Trimming
15a.2.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15a.2.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15a.2.1.4 Customer(s):
Nadcap AC7118 Revision G - 59 -
15a.2.1.5 Subscriber/Prime
Contractor(s):
15a.2.1.7 Operator:
15a.2.3 If non-fly away materials are attached to the core to assist in machining YES NO NA
(such as peel ply, double backed pressure sensitive tape), is the
material approved by the customer?
15a.2.6 Are the equipment parameters (for example: feeds, speeds, abrasive YES NO NA
paper, drill/router bits) in compliance per customer requirements?
15a.2.7 Is the part specific program traceable and under configuration control? YES NO NA
15a.2.8 Is the core dimensionally stabilized prior to machining (such as drying) YES NO NA
per customer requirements?
15a.2.9 Is the machined core cleaned to remove contaminants (dust, metallic YES NO
shavings)?
15a.3.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15a.3.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15a.3.1.4 Customer(s):
15a.3.1.5 Subscriber/Prime
Contractor(s):
15a.3.1.7 Operator:
15a.3.2 Is potting of core performed in an EMA or CCA in accordance with the YES NO
documented procedure?
15a.3.10 Is the mix ratio used validated (e.g. lap shears, shore-D hardness, YES NO NA
recording of weights, witnessing by quality assurance, operator self-
verification program, etc.)?
Nadcap AC7118 Revision G - 61 -
15a.3.11 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
15a.3.11.1 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum) and retained as part of the manufacturing
record?
15a.3.11.2 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
15a.3.12 Is the cured potting inspected to customer requirements (for example YES NO
full depth core fill and voids)?
15a.3.16 Is the potting location inspected for location and size? YES NO
15a.3.18 For potted splices, are the core details the correct orientation? YES NO NA
15a.3.20 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
Splicing (film/foaming adhesive and crush/peg splicing) see potting for SECTION NA
potted splice
15a.4.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15a.4.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15a.4.1.4 Customer(s):
Nadcap AC7118 Revision G - 62 -
15a.4.1.5 Subscriber/Prime
Contractor(s):
15a.4.1.7 Operator:
15a.4.7 Is out time for time and temperature sensitive material verified after or YES NO
during cure to ensure it has not been exceeded?
15a.4.8 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
15a.4.9 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum) and retained as part of the manufacturing
record?
15a.4.10 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
15a.4.12 Are the component core details of the assembly prepared prior to YES NO
assembly per customer requirements and/or work instructions?
15a.4.13 Are the correct sub-assembly core details called out in the work YES NO
instructions?
15a.4.14 Is splice inspected to customer requirements (such as spliced gaps, full YES NO
depth fill)?
15a.4.15 If minor sanding of the splice is performed, is the core segregated to YES NO NA
prevent cross contamination to other processes?
15a.4.18 If tools are used to locate core details, are the tools identified? YES NO NA
15a.4.21 Is the core cleaned to remove contaminants (dust, metallic shavings)? YES NO
15a.5.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15a.5.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15a.5.1.4 Customer(s):
15a.5.1.7 Operator:
15a.5.8 Are the component core details of the assembly prepared prior to YES NO
assembly per customer requirements and/or work instructions?
Nadcap AC7118 Revision G - 64 -
15a.5.9 Are the correct sub-assembly core details called out in the work YES NO
instructions?
15a.5.10 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
15a.5.11 If tools are used to locate core details, are the tools identified? YES NO NA
15a.5.15 Is the part bagged prior to cure per customer or internal requirements? YES NO
15a.5.16 Are the materials for bagging the part (e.g., breathers, bleeders, YES NO NA
release films, bags, tacky tape, tapes, etc.) used per specified
requirements?
15a.5.17 Are leak checks on tools (i.e. mold, vacuum bags etc.) performed to the YES NO NA
documented procedures?
15a.5.18 Are TC’s welded and used per customer or internal requirements? YES NO
15a.5.19 Are the type of thermocouples used per customer or internal YES NO
requirements?
15a.5.20 Does the Auditee have an approved thermal profile on file per customer YES NO NA
requirements?
15a.5.22 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
pressure, vacuum, time, etc.) monitored, recorded and verified per
customer or internal requirements?
15a.5.23 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum and pressure) and retained as part of the
manufacturing record?
15a.5.24 Are all bagging materials removed in a manner to prevent damage to YES NO NA
the part?
15a.5.27 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
Nadcap AC7118 Revision G - 65 -
15a.5.29 After application of resin, is the resin cured within the allotted time after YES NO NA
application as per customer requirements?
15a.5.30 Is the part removed from the tool/mold in a manner to prevent damage YES NO
to the part?
15a.5.31 Is out time for time and temperature sensitive material verified after or YES NO
during cure to ensure it has not been exceeded?
15a.6.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15a.6.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15a.6.1.4 Customer(s):
15a.6.1.5 Subscriber/Prime
Contractor(s):
15a.6.1.7 Operator:
15a.6.3 Are the heat forming parameters (such as times, temperature, YES NO
pressure) customer approved, or has the Auditee documented that the
process does not degrade the core below the customer’s material
specification requirements?
15a.6.4 Is the part specific program traceable and under configuration control? YES NO NA
15a.6.5 If forming is manually controlled, are the heat forming parameters (such YES NO NA
as times, temperatures, pressure) documented (for example, a set-up
card, work instruction, procedure)?
Nadcap AC7118 Revision G - 66 -
15a.6.7 Is the tooling (such as heat forming and cooling tools) identified? YES NO
15a.6.9 If required by customer or internal Auditee procedure is the core pre- YES NO NA
dried?
15a.6.10 Is the core inspected after forming to customer or internal requirements YES NO
(such as buckle lines, node bond separations, blisters)?
15a.6.11 If the cooling of the detail is controlled in the work instructions, is the YES NO NA
process followed?
15a.6.13 Is core formed in the correct orientation with regards to ribbon YES NO
direction?
Nadcap AC7118 Revision G - 67 -
General
Machining/Trimming SECTION NA
15b.2.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15b.2.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15b.2.1.4 Customer(s):
15b.2.1.5 Subscriber/Prime
Contractor(s):
15b.2.1.7 Operator:
15b.2.3 If non-fly away materials are attached to the core to assist in machining YES NO NA
(such as peel ply, double backed pressure sensitive tape), is the
material approved by the customer?
15b.2.6 Are the equipment parameters (for example: feeds, speeds, abrasive YES NO NA
paper, drill/router bits) in compliance per customer requirements?
15b.2.7 Is the part specific program traceable and under configuration control? YES NO NA
15b.2.8 Is the core dimensionally stabilized prior to machining (such as drying) YES NO NA
per customer requirements
15b.2.9 Is the machined core cleaned to remove contaminants (dust, metallic YES NO
shavings)?
Nadcap AC7118 Revision G - 68 -
Potting SECTION NA
(fastener locations and splices, for potted inserts see miscellaneous
bonding)
Note: For potted inserts see Miscellaneous Bonding. Edge filling of
cured sandwich structures are not applicable.
15b.3.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15b.3.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15b.3.1.4 Customer(s):
15b.3.1.5 Subscriber/Prime
Contractor(s):
15b.3.1.7 Operator:
15b.3.2 Is potting of core performed in an EMA or CCA in accordance with the YES NO
documented procedure?
15b.3.10 Is the mix ratio used validated (e.g. lap shears, shore-D hardness, YES NO NA
recording of weights, witnessing by quality assurance, operator self-
verification program, etc.)?
15b.3.11 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
15b.3.11.1 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum) and retained as part of the manufacturing
record?
15b.3.11.2 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
15b.3.12 Is the cured potting inspected to customer or internal requirements (for YES NO
example full depth core fill and voids)?
15b.3.16 Is the potting location inspected for location and size? YES NO
15b.3.18 For potted splices, are the core details the correct orientation? YES NO NA
15b.3.20 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
Nadcap AC7118 Revision G - 70 -
Splicing (film/foaming adhesive and crush/peg splicing) see potting for SECTION NA
potted splice
15b.4.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15b.4.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15b.4.1.4 Customer(s):
15b.4.1.5 Subscriber/Prime
Contractor(s):
15b.4.1.7 Operator:
15b.4.7 Is out time for time and temperature sensitive material verified after YES NO
cure to ensure it has not been exceeded?
15b.4.8 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer
requirements?
15b.4.8.1 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum) and retained as part of the manufacturing
record?
15b.4.8.2 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
Nadcap AC7118 Revision G - 71 -
15b.4.10 187780
Are the component core details of the assembly prepared prior to YES NO
assembly per customer requirements and/or work instructions?
15b.4.11 Are the correct sub-assembly core details called out in the work YES NO
instructions?
15b.4.12 Is splice inspected to customer requirements (such as spliced gaps, full YES NO
depth fill)?
15b.4.13 If minor sanding of the splice is performed, is the core segregated to YES NO NA
prevent cross contamination to other processes?
15b.4.16 If tools are used to locate core details, are the tools identified? YES NO NA
15b.4.19 Is the core cleaned to remove contaminants (dust, metallic shavings)? YES NO
15b.5.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15b.5.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15b.5.1.4 Customer(s):
15b.5.1.5 Subscriber/Prime
Contractor(s):
15b.5.1.7 Operator:
15b.5.8 Are the component core details of the assembly prepared prior to YES NO
assembly per customer or internal requirements and/or work
instructions?
15b.5.9 Are the correct sub-assembly core details called out in the work YES NO
instructions?
15b.5.10 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
15b.5.11 If tools are used to locate core details, are the tools identified? YES NO NA
15b.5.15 Is the part bagged prior to cure per customer or internal requirements? YES NO
15b.5.16 Are the materials for bagging the part (e.g., breathers, bleeders, YES NO NA
release films, bags, tacky tape, tapes, etc.) used per specified
requirements?
15b.5.17 Are leak checks on tools (i.e. mold, vacuum bags etc.) performed to the YES NO NA
documented procedures?
15b.5.18 Are TC’s welded and used per customer or internal requirements? YES NO
15b.5.19 Are the type of thermocouples used per customer or internal YES NO
requirements?
15b.5.20 Does the Auditee have an approved thermal profile on file per customer YES NO NA
requirements?
Nadcap AC7118 Revision G - 73 -
15b.5.22 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
pressure, vacuum, time, etc.) monitored, recorded and verified per
requirements?
15b.5.23 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum and pressure) and retained as part of the
manufacturing record?
15b.5.24 Are all bagging materials removed in a manner to prevent damage to YES NO NA
the part?
15b.5.27 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
15b.5.29 After application of resin, is the resin cured within the allotted time after YES NO NA
application as per customer requirements?
15b.5.30 Is the part removed from the tool/mold in a manner to prevent damage YES NO
to the part?
15b.5.31 Is out time for time and temperature sensitive material verified after YES NO
cure to ensure it has not been exceeded?
15b.6.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
15b.6.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
15b.6.1.4 Customer(s):
15b.6.1.5 Subscriber/Prime
Contractor(s):
Nadcap AC7118 Revision G - 74 -
15b.6.1.7 Operator:
15b.6.3 Are the heat forming parameter (such as times, temperature, pressure) YES NO
customer approved, or has the Auditee documented that the process
does not degrade the core below the customer’s material specification
requirements?
15b.6.4 Is the part specific program traceable and under configuration control? YES NO NA
15b.6.5 If forming is manually controlled, are the heat forming parameters (such YES NO NA
as times, temperatures, pressure) documented (for example, a set-up
card, work instruction, procedure)?
15b.6.7 Is the tooling (such as heat forming and cooling tools) identified? YES NO
15b.6.9 If required by customer or internal Auditee procedure is the core pre- YES NO NA
dried?
15b.6.10 Is the core inspected after forming to customer requirements (such as YES NO
buckle lines, node bond separations, blisters)?
15b.6.11 If the cooling of the detail is controlled in the work instructions, is the YES NO NA
process followed?
15b.6.13 Is core formed in the correct orientation with regards to ribbon YES NO
direction?
Nadcap AC7118 Revision G - 75 -
Customer Requirements
16a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16a.1.1.4 Customer(s):
16a.1.1.5 Subscriber/Prime
Contractor(s):
16a.1.1.7 Operator:
General
16a.2.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
16a.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16a.2.5 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
16a.2.6 Are all bond surfaces prepared and protected, according to customer or YES NO
internal requirements, prior to the bonding operation?
16a.2.7 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
Nadcap AC7118 Revision G - 76 -
16a.2.8 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
16a.2.9 Are details (prepreg, fiber, fabric, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position, fiber alignment, and orientation per
design requirements?
16a.2.10 Does the Auditee have a verification method to ensure that all poly YES NO
film/backing paper (or other support or protective material) has been
removed prior to lay-up?
16a.2.11 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16a.2.13 If material is trimmed in place with a cutting tool, and no measures are YES NO NA
taken (e.g. shim) to protect the other plies and/or tools from being cut,
is the cut made outside of the confirmed net trim line/end of part
(EOP)?
16a.2.14 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
16a.2.15 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, etc.) used
per specified requirements?
16a.2.16 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16a.2.17 Does the Auditee protect surfaces on detail parts that are co-bonded? YES NO
16a.2.20 If applicable, are pre-fit operations (e.g. verifilms) performed and YES NO NA
compliant to the documented procedure?
16a.2.21 Are heating tools (pre-heat ovens, heat guns, irons, debulk tables, etc.) YES NO NA
controlled to a maximum temperature?
16a.2.22 Is peel ply used and removed per customer/ Auditee requirements? YES NO NA
16a.2.23 If the prepreg or adhesive material is identified to contain defects such YES NO NA
as resin rich or resin starved areas, cuts, and wrinkles– has rework or
replacement material been completed as per customer requirements
(such as splicing in new material)?
Nadcap AC7118 Revision G - 77 -
16a.2.24 If replacement materials are added to the existing kit, is the traceability YES NO NA
included with the part’s documentation and has the part’s outtime or
cure-by date been adjusted (as required)?
16a.2.25 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
Reticulation SECTION NA
16a.3.2 Is the part specific program traceable and under configuration control? YES NO NA
16a.3.3 Is the process performed in the CCA/EMA compliant to the documented YES NO
procedure?
16a.3.4 Is the reticulation process controlled to the maximum temp / time (pre- YES NO
heat oven, oven, reticulation machine, heat guns) in accordance with
customer or internal requirements?
16a.3.5.1 Is the honeycomb core cell edge surface preparation prior to YES NO
reticulation in accordance with customer requirements?
16a.3.5.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the honeycomb core cell edges per customer requirements?
16a.3.5.3 Is the storage of the reticulated honeycomb core per customer YES NO
requirements?
16a.3.5.4 Is the use of reticulated honeycomb core performed within the time YES NO
allowed by the customer?
16a.3.6.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the perforated area per customer requirements?
16a.3.6.3 Is the storage of the perforated skin, per customer requirements? YES NO
16a.3.6.4 Is the use of reticulated perforated skin performed within the time YES NO
allowed by the customer?
16a.4.3 If abrasion methods are used to prepare the non-metallic surface are YES NO NA
there provisions for the following:
b. Is the grit paper size used as specified per the customer or internal
requirement?
16a.4.4 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure no damage resulted from the removal?
16a.4.5 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure that it has been completely removed?
16a.4.6 If peel ply removal is performed in an area of the CCA, is the area YES NO NA
segregated by time, distance, or partition to keep the dry fibers from
contaminating nearby bonding operations?
Nadcap AC7118 Revision G - 79 -
16b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16b.1.1.4 Customer(s):
16b.1.1.5 Subscriber/Prime
Contractor(s):
16b.1.1.7 Operator:
General
16b.2.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
16b.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16b.2.5 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
16b.2.6 Are all bond surfaces prepared and protected, according to customer or YES NO
internal requirements, prior to the bonding operation?
16b.2.7 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
Nadcap AC7118 Revision G - 80 -
16b.2.8 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
16b.2.9 Are details (prepreg, fiber, fabric, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position, fiber alignment, and orientation per
design requirements?
16b.2.10 Does the Auditee have a verification method to ensure that all poly YES NO
film/backing paper (or other support or protective material) has been
removed prior to lay-up?
16b.2.11 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16b.2.13 If material is trimmed in place with a cutting tool, and no measures are YES NO NA
taken (e.g. shim) to protect the other plies and/or tools from being cut,
is the cut made outside of the confirmed net trim line/end of part
(EOP)?
16b.2.14 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
16b.2.15 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, etc.) used
per specified requirements?
16b.2.16 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16b.2.17 Does the Auditee protect surfaces on detail parts that are co-bonded? YES NO
16b.2.19 If applicable, are pre-fit operations (e.g. verifilms) performed and YES NO NA
compliant to the documented procedure?
16b.2.20 Are heating tools (pre-heat ovens, heat guns, irons, debulk tables, etc.) YES NO NA
controlled to a maximum temperature?
16b.2.21 Is peel ply used and removed per customer/Auditee requirements? YES NO NA
16b.2.22 Are the tables for cutting adhesives for metal bond segregated from YES NO NA
other types of processing?
16b.2.23 If metal bond details are trimmed in the CCA, is debris isolated and YES NO NA
disposed of to prevent inclusion, FOD, in the part?
16b.2.24 Are storage limits for exposed aluminum details (degreased core or YES NO NA
anodized and primed details) verified prior to bond, or is the bonding
surface activated by solvent cleaning?
Nadcap AC7118 Revision G - 81 -
16b.2.25 Are aluminum details that have exceeded their storage limit cleaned if YES NO NA
they exceed the customer’s storage requirements?
16b.2.26 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
Reticulation SECTION NA
16b.3.2 Is the part specific program traceable and under configuration control? YES NO NA
16b.3.3 Is the process performed in the CCA/EMA compliant to the documented YES NO
procedure?
YES NO
16b.3.4 Is the reticulation process controlled to the maximum temp / time (pre-
heat oven, oven, reticulation machine, heat guns) in accordance with
customer or internal requirements?
SECTION NA
16b.3.5 Honeycomb Reticulation
YES NO
16b.3.5.1 Is the honeycomb core cell edge surface preparation prior to
reticulation in accordance with customer requirements?
YES NO
16b.3.5.2 Is there a validation process in place to ensure the adhesive covers all
the honeycomb core cell edges per customer requirements?
YES NO
16b.3.5.3 Is the storage of the reticulated honeycomb core per customer
requirements?
YES NO
16b.3.5.4 Is the use of reticulated honeycomb core performed within the time
allowed by the customer?
SECTION NA
16b.3.6 Perforated Skin Reticulation
YES NO
16b.3.6.1 Is the perforated skin surface preparation prior to reticulation in
accordance with customer requirements?
YES NO
16b.3.6.2 Is there a validation process in place to ensure the adhesive covers all
the perforated area per customer requirements?
YES NO
16b.3.6.3 Is the storage of the perforated skin, per customer requirements?
YES NO
16b.3.6.4 Is the use of reticulated perforated skin performed within the time
allowed by the customer?
Nadcap AC7118 Revision G - 82 -
16c.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16c.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16c.1.1.4 Customer(s):
16c.1.1.5 Subscriber/Prime
Contractor(s):
16c.1.1.7 Operator:
General
16c.2.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
16c.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16c.2.5 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
16c.2.6 Are all bond surfaces prepared and protected, according to customer or YES NO
internal requirements, prior to the bonding operation?
16c.2.7 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
Nadcap AC7118 Revision G - 83 -
16c.2.8 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
16c.2.9 Are details (cloth, preform, braid, surfacing films, core, foam, metal, YES NO
etc.) placed in the correct position and orientation per design
requirements?
16c.2.10 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16c.2.11 If material is trimmed in place with a cutting tool, are measures taken YES NO NA
(e.g. shims) to protect other plies and/or tools from being cut?
16c.2.12 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
16c.2.13 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, infusion
tubes & media, etc.) used per specified requirements?
16c.2.14 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16c.2.15 Does the Auditee protect surfaces on detail parts that are to be co- YES NO
bonded?
16c.2.16 Are the work areas/tables for cutting dry fibers/fabric/ braid/preform YES NO NA
segregated (e.g. separate rooms, dedicated work tables, or shared
work tables cleaned before and after use) from other types of
processing to prevent cross contamination?
16d.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16d.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16d.1.1.4 Customer(s):
16d.1.1.5 Subscriber/Prime
Contractor(s):
16d.1.1.7 Operator:
General
16d.2.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
16d.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16d.2.5 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
16d.2.6 Are all bond surfaces prepared and protected, according to customer or YES NO
internal requirements, prior to the bonding operation?
16d.2.7 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
Nadcap AC7118 Revision G - 85 -
16d.2.8 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
16d.2.9 Does the Auditee have a verification method to ensure that all poly YES NO
film/backing paper (or other support or protective material) has been
removed prior to lay-up?
16d.2.10 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16d.2.12 If material is trimmed in place with a cutting tool, and no measures are YES NO NA
taken (e.g. shim) to protect the other plies and/or tools from being cut,
is the cut made outside of the confirmed net trim line/end of part
(EOP)?
16d.2.13 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
16d.2.14 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, infusion
tubes & media, etc.) used per specified requirements?
16d.2.17 If applicable, are pre-fit operations (e.g. verifilms) performed and YES NO NA
compliant to the documented procedure?
16d.2.18 Are heating tools (pre-heat ovens, heat guns, irons, debulk tables, etc.) YES NO NA
controlled to a maximum temperature?
16d.2.19 Is peel ply used and removed per customer/Auditee requirements? YES NO NA
16d.2.20 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
PAR SECTION NA
16d.3.1 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16d.3.2 Are details (prepreg, fiber, fabric, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position, fiber alignment, and orientation per
design requirements?
Nadcap AC7118 Revision G - 86 -
16d.3.3 If the prepreg or adhesive material is identified to contain defects such YES NO NA
as resin rich or resin starved areas, cuts, and wrinkles– is rework or
replacement material been completed as per customer requirements
(such as splicing in new material)?
16d.3.4 If replacement materials are added to the existing kit, is the traceability YES NO NA
included with the part’s documentation and has the part’s outtime or
cure-by date been adjusted (as required)?
16d.3.5 Does the Auditee protect surfaces on detail parts that are co-bonded? YES NO NA
MB SECTION NA
16d.4.1 Are the tables for cutting adhesives for metal bond segregated from YES NO NA
other types of processing?
16d.4.2 If metal bond details are trimmed in the CCA, is debris isolated and YES NO NA
disposed of to prevent inclusion, FOD, in the part?
16d.4.3 Are storage limits for exposed aluminum details (degreased core or YES NO NA
anodized and primed details) verified prior to bond, or is the bonding
surface activated by solvent cleaning?
16d.4.4 Are aluminum details that have exceeded their storage limit cleaned if YES NO NA
they exceed the customer’s storage requirements?
16d.4.5 Does the Auditee protect surfaces on detail parts that are co-bonded? YES NO NA
16d.4.6 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16d.4.7 Are details (prepreg, fiber, fabric, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position, fiber alignment, and orientation per
design requirements?
LRP SECTION NA
16d.5.1 Does the Auditee protect surfaces on detail parts that are co-bonded? YES NO NA
16d.5.2 Are splice and joint processes being performed in accordance with the YES NO NA
work instructions?
16d.5.3 Are details (prepreg, fiber, fabric, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position, fiber alignment, and orientation per
design requirements?
16d.5.4 Are details (cloth, preform, braid, surfacing films, core, foam, metal, YES NO NA
etc.) placed in the correct position and orientation per design
requirements?
Nadcap AC7118 Revision G - 87 -
16d.6.2 Is the part specific program traceable and under configuration control? YES NO NA
16d.6.3 Is the process performed in the CCA/EMA compliant to the documented YES NO
procedure?
16d.6.4 Is the reticulation process controlled to the maximum temp / time (pre- YES NO
heat oven, oven, reticulation machine, heat guns) in accordance with
customer or internal requirements?
16d.6.5.1 Is the honeycomb core cell edge surface preparation prior to YES NO
reticulation in accordance with customer requirements?
16d.6.5.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the honeycomb core cell edges per customer or internal requirements?
16d.6.5.3 Is the storage of the reticulated honeycomb core per customer or YES NO
internal requirements?
16d.6.5.4 Is the use of reticulated honeycomb core performed within the time YES NO
allowed by the customer?
16d.6.6.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the perforated area per customer or internal requirements?
16d.6.6.3 Is the storage of the perforated skin, per customer or internal YES NO
requirements?
16d.6.6.4 Is the use of reticulated perforated skin performed within the time YES NO
allowed by the customer?
b. Is the grit paper size used as specified per the customer or internal
requirement?
16d.7.4 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure no damage resulted from the removal?
16d.7.5 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure that it has been completely removed?
16d.7.6 If peel ply removal is performed in an area of the CCA, is the area YES NO NA
segregated by time, distance, or partition to keep the dry fibers from
contaminating nearby bonding operations?
Nadcap AC7118 Revision G - 89 -
16e.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16e.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16e.1.1.4 Customer(s):
16e.1.1.5 Subscriber/Prime
Contractor(s):
16e.1.1.7 Operator:
General
16e.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16e.2.3 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
16e.2.6 Are processes being performed in the CCA compliant to the YES NO
documented procedure?
16e.2.7 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
Nadcap AC7118 Revision G - 90 -
16e.2.8 Is the mandrel and mold tooling identified and referenced in the work YES NO NA
instructions for traceability?
16e.2.9 Is the tooling and ancillary equipment free from damage, deterioration, YES NO
debris, or contamination that could affect the part?
16e.2.10 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, etc.) used
per specified requirements?
16e.2.11 Is the part specific program traceable and under configuration control? YES NO
16e.2.12 Are material spools from a single supplier’s material or as required by YES NO
customer or internal requirements ?
16e.2.13 If the material is trimmed in place with a cutting tool, are measures YES NO NA
taken (e.g. shims) to protect other plies and/or tools from being cut?
16e.2.15 Are gaps between the tows/courses in accordance with customer or YES NO
internal requirements?
16e.2.17 Are butt splices in a single tow separated by distances as per customer YES NO
requirements?
16e.2.18 Are heating tools (hot compaction equipment, heat guns, debulk tables) YES NO NA
controlled to a maximum temperature?
16e.2.20 Does the Auditee have a procedure for periodically verifying the YES NO
accuracy and precision for the head movement and material
placement?
16e.2.21 Is peel ply used and removed per customer requirements? YES NO NA
16e.2.22 Is the preform removed and transported as per the documented YES NO NA
procedure?
16e.2.23 Are materials that come in contact with the prepreg allowed per YES NO NA
customer requirements?
16e.2.24 Are hand laid up materials and details (prepreg, fiber, fabric, surfacing YES NO NA
films, core, foam, metal, etc.) placed in the correct position, fiber
alignment, and orientation per customer requirements?
16e.2.25 Is there a verification process to visually inspect compaction rollers for YES NO
damage at a defined interval?
Nadcap AC7118 Revision G - 91 -
16e.2.26 Are there documented procedures or work instructions for process YES NO
interruptions, such as spool exchange, tow breaks?
AFP
16e.3.1 Is the AFP machine qualified and approved by the customer if YES NO NA
required?
16e.3.2 Are tows inspected for defects, folds, twists or wrinkles and reworked YES NO
per customer/Auditee requirements?
16e.3.3 If the prepreg fiber placement material is identified to contain defects YES NO NA
such as resin rich/resin starved areas, fuzz balls, buckles/wrinkles and
twisted/split tows – is rework or replacement material been completed
as per customer requirements?
16e.3.4 Are overlap splices in a single tow separated by distances as per YES NO
customer or internal requirements?
16e.3.5 Are materials laid up by the AFP placed in the correct position (end of YES NO
tow drop off within tolerance of the theoretical end of ply), fiber
alignment, and orientation per customer or internal requirements?
16e.3.6 Is the mandrel and mold tooling prepared for material application as per YES NO
customer or internal requirements?
16e.3.7 Is the mandrel positioned and is the set up process performed as per YES NO
the documented procedure?
16e.3.9 Are the environmental conditions for the material (such as creel house YES NO
or CCA) controlled per customer/Auditee requirements?
16e.3.11 Is the AFP machine compliant to the following process control YES NO
parameters as defined in the documented procedure?
16e.3.12 If tows are reworked (such as lifting to remove fuzz or replacing tow), YES NO NA
does the process prevent damaging of the fibers to the tow or
underlying material?
16e.3.13 Is the handling of the ply stack controlled to prevent damage as per the YES NO NA
documented procedure?
Nadcap AC7118 Revision G - 93 -
16f.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16f.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16f.1.1.4 Customer(s):
16f.1.1.5 Subscriber/Prime
Contractor(s):
16f.1.1.7 Operator:
General
16f.2.1 Is the correct material used as per customer or internal requirements? YES NO
16f.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16f.2.4 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
16f.2.5 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
16f.2.6 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16f.2.7 Is the mandrel tooling identified and referenced in the work instructions YES NO
for traceability?
Nadcap AC7118 Revision G - 94 -
16f.2.8 Is the tooling and ancillary equipment free from damage, deterioration, YES NO
debris, or contamination that could affect the part?
16f.2.9 Is the mandrel prepared for material application as per customer or YES NO
internal requirements?
16f.2.11 Is the part specific program traceable and under configuration control? YES NO
16f.2.12 Are refrigerated materials allowed to thaw as per customer or internal YES NO
requirements?
16f.2.14 Is the winding equipment qualified and approved by the customer if YES NO NA
required?
16f.2.16 Is the fiber orientation within tolerances per customer or internal YES NO
requirements?
16f.2.17 Is the fiber path program(s) validated during component first article? YES NO
16f.2.19 Are gaps between the tows in accordance with customer or internal YES NO
requirements?
16f.2.21 Are overlap and /or butt splices in a single tow separated by distances YES NO
as per customer or internal requirements?
16f.2.22 Is the end of tow drop off within tolerance of the theoretical end of ply YES NO
as per customer or internal requirements?
16f.2.24 Are there any material folds or wrinkles identified in the lay-up and are YES NO
they within customer or internal requirements?
16f.2.25 If the material is identified to contain defects such as resin rich/resin YES NO NA
starved areas, fuzz balls, buckles/wrinkles and twisted / split tows – is
rework or replacement material completed as per customer
requirements?
16f.2.26 Are heating tools (hot compaction equipment, heat guns, debulk tables) YES NO NA
controlled to a maximum temperature?
Nadcap AC7118 Revision G - 95 -
16f.2.29 Does the Auditee have a procedure for periodically verifying the YES NO
accuracy and precision for the head movement and tow placement?
16f.2.30 Are hand laid up materials and details applied per customer YES NO NA
requirements?
16f.2.31 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, etc.) used
per specified requirements?
16f.2.32 Is peel ply used and removed per customer requirements? YES NO NA
16f.2.33 Is the shrink wrap tape applied as per customer requirements? YES NO NA
16f.3.1 Is resin or resin mix used as per customer or internal requirements? YES NO
16f.3.3 Is resin content documented as a record traceable to the part specific YES NO
work instructions?
16g.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
16g.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16g.1.1.4 Customer(s):
16g.1.1.5 Subscriber/Prime
Contractor(s):
16g.1.1.7 Operator:
General
16g.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16g.2.4 If charges/ply stacks are frozen, are the charges/ply stacks stored flat YES NO NA
and in a manner to protect from contaminates and damage?
16g.2.5 If charge/ply stack is frozen, is the charge allowed to warm/thaw prior to YES NO NA
opening the bag?
16g.2.6 Are the materials formed within the allowed time in accordance with YES NO NA
customer or internal requirements?
16g.2.7 Are processes being performed in the CCA compliant to the YES NO
documented procedure?
Nadcap AC7118 Revision G - 97 -
16g.2.8 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16g.2.9 Are heating tools (such as heat guns) controlled to a maximum YES NO NA
temperature as per customer requirements?
16g.2.11 Is the HDF machine qualified and approved by the customer if YES NO NA
required?
16g.2.12 Is the part specific program traceable and under configuration control? YES NO
16g.2.14 If the diaphragm requires repair, does the process prevent cross YES NO NA
contamination to the charge/ply stack and adjacent processes?
16g.2.15 Is the tooling and ancillary equipment free from damage, deterioration, YES NO
debris, or contamination that could affect the part?
16g.2.16 Is the charge/ply stack prepared for forming as per customer or internal YES NO
requirements?
16g.2.17 Are materials that come in contact with the charge/ply stack allowed per YES NO NA
customer requirements?
16g.2.18 Is the charge/ply stack located onto the forming tool as per the YES NO
documented procedure?
16g.2.20 Is the forming tool positioned and set-up as per documented YES NO
procedure?
16g.2.22 Is the form cycle verified and compliant to the documented procedure? YES NO
16g.2.23 Is the formed charge/ply stack visually inspected as per customer or YES NO
internal requirements?
16g.2.24 If required, is formed charge/ply stack staged (vacuum, time, tooling) or YES NO NA
stored after forming in accordance with the work instruction?
Nadcap AC7118 Revision G - 98 -
Customer Requirements
16h.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16h.1.1.4 Customer(s):
16h.1.1.5 Subscriber/Prime
Contractor(s):
16h.1.1.7 Operator:
General
16h.2.2 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision as required)?
16h.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16h.3.2 Have metallic surfaces been prepared as specified in the planning? YES NO
16h.3.3 If a special process is required for surface preparation of the metallic YES NO NA
surface (such as PAA or Etching) has it been performed by an
approved supplier?
16h.3.4 If a manual process is used for the metallic surface preparation (such YES NO NA
as hand sanding) has it been performed as specified in the planning
(e.g. grit paper size, solvent wipe etc.)?
16h.3.5 If required, are visual standards available and used to compare surface YES NO NA
preparation?
16h.3.6 After parts have been cleaned, dried and primed, are stored parts being YES NO NA
protected per customer requirements?
16h.4.3 If abrasion methods are used to prepare the non-metallic surface are YES NO NA
there provisions for the following:
16h.4.4 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure no damage resulted from the removal?
16h.4.4.1 After peel ply removal, does the supplier have a verification method to YES NO NA
ensure that it has been completely removed?
16h.4.5 If peel ply removal is performed in an area of the CCA, is the area YES NO NA
segregated by time, distance, or partition to keep the dry fibers from
contaminating nearby bonding operations?
Nadcap AC7118 Revision G - 100 -
Adhesive Bonding
16h.5.1 Are surface prepped metallic parts being protected during fit-up from YES NO NA
coming in contact with release films (such as FEP) or other materials
which could, potentially, contaminate the surface?
16h.5.2 If parts are trimmed in or near the bonding area are there provisions to YES NO NA
safeguard against the introduction of FOD?
16h.5.3 Are film or paste adhesives within their required shelf-life/out time prior YES NO
to use and until the part is cured?
16h.5.3.1 Are materials stored as per the customer or internal requirements? YES NO
16h.5.3.2 Are parts to be bonded stored in an area per customer requirement? YES NO NA
16h.5.4 Is the laminate dried prior to bonding per customer requirements? YES NO NA
16h.5.5 If adhesive shelf life extension is used has the procedure been YES NO NA
approved by the customer?
16h.5.6 If film adhesive is used for bonding is it allowed to warm/thaw prior to YES NO NA
opening the bag?
16h.5.6.1 If film adhesive is used, is there a verification step to ensure that the YES NO NA
backing film has being removed?
16h.5.7 Are processes being performed in the CCA compliant to the YES NO
documented procedure?
16h.5.8 For temperature sensitive materials, is the material allowed to thaw YES NO NA
prior to removing it from its protective covering?
16h.5.9 If multiple part adhesive is used is it mixed at the ratios specified in the YES NO NA
documented procedure?
16h.5.9.1 If multiple part adhesive is used is no more than the maximum allowed YES NO NA
mass mixed as per customer requirement?
16h.5.11 Are mix ratios validated (e.g. lap shears, shore-D hardness, recording YES NO NA
of weights, witnessing by quality assurance, operator self -verification
program, etc.)?
16h.5.12 Is the pot life specified and monitored through the completion of the YES NO NA
bonding process?
16h.5.13.1 Are film or multiple part adhesives applied in the quantity and location YES NO NA
specified in the engineering requirements?
Nadcap AC7118 Revision G - 101 -
16h.5.14 If automated dispensing equipment is used, are the mixed ratios YES NO NA
validated?
16h.5.16 Are the correct tools, as specified in the work instruction, used for YES NO NA
bonding?
16h.5.17 Are film adhesive trim templates periodically checked and calibrated for YES NO NA
dimensional integrity?
16h.5.18 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16h.5.19 Are heating tools (such as heat guns) controlled to a maximum YES NO NA
temperature as per customer requirements?
16h.5.20 Are process control panels or tag end specimens laid up concurrently YES NO NA
with the part they represent?
16h.5.21 If a peel ply has been used to protect bonding surfaces, does the YES NO NA
Auditee have a verification method to ensure that all peel ply has been
removed without causing damage to the detail?
Reticulation SECTION NA
16h.6.2 Is the part specific program traceable and under configuration control? YES NO NA
16h.6.3 Is the process performed in the CCA/EMA compliant to the documented YES NO
procedure?
16h.6.4 Is the reticulation process controlled on the maximum temp / time (pre- YES NO
heat oven, oven reticulation machine, heat guns) in accordance with
customer or internal requirements?
16h.6.5.1 Is the honeycomb core cell edge surface preparation prior to YES NO
reticulation in accordance with customer requirements?
16h.6.5.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the honeycomb core cell edges per customer or internal requirements?
16h.6.5.3 Is the storage of the reticulated honeycomb core per customer YES NO
requirements or internal requirements?
16h.6.5.4 Is the use of reticulated honeycomb core performed within the time YES NO
allowed by the customer?
Nadcap AC7118 Revision G - 102 -
16h.6.6.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the perforated area per customer or internal requirements?
16h.6.6.3 Is the storage of the perforated skin, per customer requirements or YES NO
internal requirements?
16h.6.6.4 Is the use of the reticulated perforated skin performed within the time YES NO
allowed by the customer?
Nadcap AC7118 Revision G - 103 -
Customer Requirements
16i.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
16i.1.1.4 Customer(s):
16i.1.1.5 Subscriber/Prime
Contractor(s):
16i.1.1.7 Operator:
General
16i.2.2 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision as required)?
16i.2.3 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
YES NO
16i.3.2 Have metallic surfaces been prepared as specified in the planning?
16i.3.3 If a special process is required for surface preparation of the metallic YES NO NA
surface (such as PAA or Etching) has it been performed by an
approved supplier?
16i.3.4 If a manual process is used for the metallic surface preparation (such YES NO NA
as hand sanding) has it been performed as specified in the planning
(e.g. grit paper size, solvent wipe etc.)?
16i.3.5 If required, are visual standards available and used to compare surface YES NO NA
preparation?
16i.3.6 After parts have been cleaned, dried and primed, are stored parts being YES NO NA
protected per customer requirements?
16i.4.3 If abrasion methods are used to prepare the non-metallic surface are YES NO NA
there provisions for the following:
16i.4.4 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure no damage resulted from the removal?
16i.4.4.1 After peel ply removal, does the Auditee have a verification method to YES NO NA
ensure that it has been completely removed?
16i.4.5 If peel ply removal is performed in an area of the CCA, is the area YES NO NA
segregated by time, distance, or partition to keep the dry fibers from
contaminating nearby bonding operations?
Nadcap AC7118 Revision G - 105 -
Adhesive Bonding
16i.5.1 Are surface prepped metallic parts being protected during fit-up from YES NO NA
coming in contact with release films (such as FEP) or other materials
which could, potentially, contaminate the surface?
16i.5.2 If parts are trimmed in or near the bonding area are there provisions to YES NO NA
safeguard against the introduction of FOD?
16i.5.3 Are film or paste adhesives within their required shelf-life/out time prior YES NO
to use and until the part is cured?
16i.5.3.1 Are materials stored as per the customer or internal requirements? YES NO
16i.5.3.2 Are parts to be bonded stored in an area per customer requirement? YES NO NA
16i.5.4 Is the laminate dried prior to bonding per customer requirements? YES NO NA
16i.5.5 If adhesive shelf life extension is used has the procedure been YES NO NA
approved by the customer?
16i.5.6 If film adhesive is used for bonding is it allowed to warm/thaw prior to YES NO NA
opening the bag?
16i.5.6.1 If film adhesive is used, is there a verification step to ensure that the YES NO NA
backing film has being removed?
16i.5.7 Are processes being performed in the CCA compliant to the YES NO
documented procedure?
16i.5.8 For temperature sensitive materials, is the material allowed to thaw YES NO NA
prior to removing it from its protective covering?
16i.5.9 If multiple part adhesive is used is it mixed at the ratios specified in the YES NO NA
documented procedure?
16i.5.9.1 If multiple part adhesive is used is no more than the maximum allowed YES NO NA
mass mixed as per customer requirement?
16i.5.11 Are mix ratios validated (e.g. lap shears, shore-D hardness, recording YES NO NA
of weights, witnessing by quality assurance, operator self -verification
program, etc.)?
16i.5.12 Is the pot life specified and monitored through the completion of the YES NO NA
bonding process?
16i.5.13.1 Are film or multiple part adhesives applied in the quantity and location YES NO NA
specified in the engineering requirements?
Nadcap AC7118 Revision G - 106 -
16i.5.14 If automated dispensing equipment is used, are the mixed ratios YES NO NA
validated?
16i.5.16 Are the correct tools, as specified in the work instruction, used for YES NO NA
bonding?
16i.5.17 Are film adhesive trim templates periodically checked and calibrated for YES NO NA
dimensional integrity?
16i.5.18 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16i.5.19 Are heating tools (such as heat guns) controlled to a maximum YES NO NA
temperature as per customer requirements?
16i.5.20 Are process control panels or tag end specimens laid up concurrently YES NO NA
with the part they represent?
16i.5.21 If a peel ply has been used to protect bonding surfaces, does the YES NO NA
Auditee have a verification method to ensure that all peel ply has been
removed without causing damage to the detail?
Reticulation SECTION NA
16i.6.2 Is the part specific program traceable and under configuration control? YES NO NA
16i.6.3 Is the process performed in the CCA/EMA compliant to the documented YES NO
procedure?
16i.6.4 Is the reticulation process controlled on the maximum temp / time (pre- YES NO
heat oven, oven reticulation machine, heat guns) in accordance with
customer or internal requirements?
16i.6.5.1 Is the honeycomb core cell edge surface preparation prior to YES NO
reticulation in accordance with customer requirements?
16i.6.5.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the honeycomb core cell edges per customer or internal requirements?
16i.6.5.3 Is the storage of the reticulated honeycomb core per customer or YES NO
internal requirements?
16i.6.5.4 Is the use of reticulated honeycomb core performed within the time YES NO
allowed by the customer?
Nadcap AC7118 Revision G - 107 -
16i.6.6.2 Is there a validation process in place to ensure the adhesive covers all YES NO
the perforated area per customer or internal requirements?
16i.6.6.3 Is the storage of the perforated skin, per customer or internal YES NO
requirements?
16i.6.6.4 Is the use of the reticulated perforated skin performed within the time YES NO
allowed by the customer?
Nadcap AC7118 Revision G - 108 -
Customer Requirements
16j.1.1 Complete the following and then check the Auditee’s information (i.e.,
technique sheets, travelers) against the purchasing requirements.
16j.1.1.4 Customer(s):
16j.1.1.7 Operator:
General
16j.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
16j.2.3 Are the materials laid up within the allowed time in accordance with YES NO NA
customer requirements?
16j.2.5 Are refrigerated materials allowed to thaw as per customer or internal YES NO
requirements?
16j.2.6 Are processes being performed in the CCA compliant to the YES NO
documented procedure?
16j.2.7 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
16j.2.8 Is the mandrel and mold tooling identified and referenced in the work YES NO NA
instructions for traceability?
Nadcap AC7118 Revision G - 109 -
16j.2.9 Is the tooling and ancillary equipment free from damage, deterioration, YES NO
debris, or contamination that could affect the part?
16j.2.10 Are the expendable materials used during lay-up processing (e.g., YES NO NA
breathers, bleeders, release films, bags, tacky tape, tapes, etc.) used
per specified requirements?
16j.2.11 Is the part specific program traceable and under configuration control? YES NO
16j.2.12 Are material spools from a single supplier’s material or as required by YES NO
customer or internal requirements?
16j.2.13 If the material is trimmed in place with a cutting tool, are measures YES NO NA
taken (e.g. shims) to protect other plies and/or tools from being cut?
16j.2.15 Are gaps between the tows/courses in accordance with customer or YES NO
internal requirements?
16j.2.17 Are butt splices in a single tow separated by distances as per customer YES NO
or internal requirements?
16j.2.18 Are heating tools (hot compaction equipment, heat guns, debulk tables) YES NO NA
controlled to a maximum temperature?
16j.2.20 Does the Auditee have a procedure for periodically verifying the YES NO
accuracy and precision for the head movement and material
placement?
16j.2.21 Is peel ply used and removed per customer requirements? YES NO NA
16j.2.22 Is the preform removed and transported as per the documented YES NO NA
procedure?
16j.2.23 Are materials that come in contact with the prepreg allowed per YES NO NA
customer requirements?
16j.2.24 Are hand laid up materials and details (prepreg, fiber, fabric, surfacing YES NO NA
films, core, foam, metal, etc.) placed in the correct position, fiber
alignment, and orientation per customer requirements?
16j.2.25 Is there a verification process to visually inspect compaction rollers for YES NO
damage at a defined interval?
16j.2.26 Are there documented procedures or work instructions for process YES NO
interruptions, such as spool exchange, tow breaks?
Nadcap AC7118 Revision G - 110 -
ATL
16j.3.1 Is the tape placement surface clean and prepared as per the YES NO
documented procedure?
16j.3.3 Is the tool/table positioned and is the set up process performed as per YES NO
the documented procedure?
16j.3.4 Is the Tape Laying machine qualified and approved by the customer if YES NO NA
required?
16j.3.5 Are materials laid up by the ATL process placed in the correct position, YES NO
fiber alignment, and orientation per customer or internal requirements?
16j.3.6 Are there any material folds or wrinkles identified in the lay-up and are YES NO
they within customer or internal requirements?
16j.3.7 If the prepreg tape placement material is identified to contain defects YES NO NA
such as resin rich/resin starved areas and buckles/wrinkles – is rework
or replacement material been completed as per customer
requirements?
16j.3.8 Are defects marked by the material manufacturer removed during the YES NO NA
kit cutting or lay-up process?
16j.3.10 If courses or plies are reworked (such as removing and replacing), is YES NO NA
the reworked or previous ply verified for fiber damage?
Nadcap AC7118 Revision G - 111 -
16j.3.11 Is the handling of the ply stack controlled to prevent damage as per the YES NO
documented procedure?
16j.3.12 If required, is the ply stack cut/trimmed per the documented procedure? YES NO NA
Nadcap AC7118 Revision G - 112 -
17a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
17a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
17a.1.1.4 Customer(s):
17a.1.1.5 Subscriber/Prime
Contractor(s):
17a.1.1.7 Operator:
General
17a.2.1 Is the flashline free to allow the escapement of volatiles? (MB only) YES NO NA
17a.2.2 Is the part bagged prior to cure per customer or internal requirements? YES NO NA
17a.2.3 Are the materials for bagging the part (e.g., breathers, bleeders, YES NO
release films, bags, tacky tape, tapes, infusion tubes & media, etc.)
used per specified requirements?
17a.2.3 If silicone pressure pads are used, have they been post cured per YES NO NA
customer requirements prior to utilization with the part?
17a.2.4 Are leak checks on tools (i.e. mold, vacuum bags etc.) performed to the YES NO
documented procedures?
17a.2.5 Are TC’s welded and used per customer or internal requirements? YES NO
Nadcap AC7118 Revision G - 113 -
17a.2.7 Does the Auditee have an approved thermal profile on file per customer YES NO NA
requirements?
JOB AUDIT FOR RESIN PREPARATION AND MIXING (LRP ONLY) SECTION NA
18a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
18a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
18a.1.1.4 Customer(s):
18a.1.1.5 Subscriber/Prime
Contractor(s):
18a.1.1.7 Operator:
18a.2.1 Are the resin preparation and mixing processes performed in the CCA YES NO
or EMA compliant to the documented procedure?
18a.2.2 Is the mix ratio used validated (e.g. lap shears, shore-D hardness, YES NO
recording of weights, witnessing by quality assurance, operator self-
verification program, etc.)?
18a.2.4 Is the vessel for mixing heated to the correct temperature? YES NO
General
18a.3.1 Is pot life/working life of the resin monitored and controlled? YES NO
18a.3.2 Is the resin pre-heated to the correct temperature per customer or YES NO
internal requirements?
18a.3.3 Is the resin degassed for the correct time and at the correct YES NO
temperature per customer/processor requirements?
Nadcap AC7118 Revision G - 115 -
18a.3.5 Are resin kits sealed and labeled for traceability? YES NO NA
Nadcap AC7118 Revision G - 116 -
JOB AUDIT FOR RESIN PREPARATION AND MIXING (LRP ONLY) SECTION NA
18b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
18b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
18b.1.1.4 Customer(s):
18b.1.1.5 Subscriber/Prime
Contractor(s):
18b.1.1.7 Operator:
18b.2.1 Are the resin preparation and mixing processes performed in the CCA YES NO
or EMA compliant to the documented procedure?
18b.2.2 Is the mix ratio used validated (e.g. lap shears, shore-D hardness, YES NO
recording of weights, witnessing by quality assurance, operator self-
verification program, etc.)?
18b.2.4 Is the vessel for mixing heated to the correct temperature? YES NO
General
18b.3.1 Is pot life/working life of the resin monitored and controlled? YES NO
18b.3.2 Is the resin pre-heated to the correct temperature per customer or YES NO
internal requirements?
18b.3.3 Is the resin degassed for the correct time and at the correct YES NO
temperature per customer/processor requirements?
Nadcap AC7118 Revision G - 117 -
18b.3.5 Are resin kits sealed and labeled for traceability? YES NO NA
Nadcap AC7118 Revision G - 118 -
19a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
19a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
19a.1.1.4 Customer(s):
19a.1.1.5 Subscriber/Prime
Contractor(s):
19a.1.1.7 Operator:
General
19a.2.1 Are the resin infusion processes performed in the EMA compliant to the YES NO
documented procedure?
19a.2.6 Is the press used to keep the closed molds together during infusion set YES NO NA
to the specified pressure?
19a.2.8 Is the resin flow rate verified per customer requirements? YES NO NA
19a.2.9 Does resin exit the outlet port prior to completion of infusion? YES NO
Nadcap AC7118 Revision G - 119 -
19a.2.11 Are the inlet and outlet ports sealed/clamped to prevent air from leaking YES NO
into the bag or mold?
19b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
19b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
19b.1.1.4 Customer(s):
19b.1.1.5 Subscriber/Prime
Contractor(s):
19b.1.1.7 Operator:
General
19b.2.1 Are the resin infusion processes performed in the EMA compliant to the YES NO
documented procedure?
19b.2.6 Is the press used to keep the closed molds together during infusion set YES NO NA
to the specified pressure?
19b.2.8 Is the resin flow rate verified per customer requirements? YES NO NA
19b.2.9 Does resin exit the outlet port prior to completion of infusion? YES NO
Nadcap AC7118 Revision G - 121 -
19b.2.11 Are the inlet and outlet ports sealed/clamped to prevent air from leaking YES NO
into the bag or mold?
20a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
20a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
20a.1.1.4 Customer(s):
20a.1.1.5 Subscriber/Prime
Contractor(s):
20a.1.1.7 Operator:
General
20a.2.1 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
20a.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
20a.2.3 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
20a.3.1 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
20a.3.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
20a.3.3 Are all detail surfaces prepared and protected, according to customer YES NO NA
requirements, prior to the bonding operation?
Kitting SECTION NA
Nadcap AC7118 Revision G - 123 -
20a.4.1 Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO
the documented procedure?
20a.4.3 For temperature sensitive materials, are all material shelf life/freezer YES NO
logs updated to reflect out time?
20a.4.4 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
20a.4.5 Is the part specific program traceable and under configuration control? YES NO NA
20a.5.1 Is the raw material charge monitored and recorded as required (e.g. YES NO NA
weight)?
20a.5.6 Are details (inserts, preforms, prepreg, fiber, fabric, chopped fiber etc.) YES NO
placed in the proper position per design requirements?
20a.5.7 Are materials handled and stored within the press EMA in accordance YES NO
with customer or internal requirements?
20a.5.8 Does the Auditee have a verification method to ensure that all poly YES NO NA
film/backing paper (or other support or protective material) has been
removed prior to lay-up?
20a.5.10 If material is trimmed in place with a cutting tool, and no measures are YES NO NA
taken (e.g. shim) to protect the other plies and/or tools from being cut,
is the cut made outside of the confirmed net trim line/end of part
(EOP)?
Nadcap AC7118 Revision G - 124 -
20a.5.11 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
Cure
20a.6.1 Are materials used within their shelf life/pot life/out time? YES NO
20a.6.2 Is the temperature of the mold tool verified prior to use if thermocouples YES NO NA
are not used?
20a.6.3 If thermocouples are not used to monitor actual cure temperatures, has YES NO NA
a correlation between tool/part cure temperatures and press set
temperatures been established?
20a.6.5 Is the transfer of the component from the mold to a holding fixture YES NO NA
carried out to avoid distortion/damage or as per the customer
requirement?
20a.6.6 Is the transfer of the component from the mold to the post cure YES NO NA
operation carried out to avoid distortion/damage or as per the customer
requirement?
20a.6.7 Are process control test samples (e.g. parts or panels) processed in YES NO NA
accordance with customer requirements?
20a.6.9 Are heating tools (pre-heat ovens, heat guns, irons, debulk tables, etc.) YES NO NA
controlled to a maximum temperature?
Nadcap AC7118 Revision G - 125 -
20b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
20b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
20b.1.1.4 Customer(s):
20b.1.1.5 Subscriber/Prime
Contractor(s):
20b.1.1.7 Operator:
General
20b.2.1 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
20b.2.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
20b.2.3 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
20b.3.1 Are the correct sub-assembly parts called out in the work instructions YES NO NA
(correct drawing and revision)?
20b.3.2 Are the component parts of the assembly prepared prior to assembly YES NO NA
per customer requirements and/or work instructions?
20b.3.3 Are all detail surfaces prepared and protected, according to customer YES NO NA
requirements, prior to the bonding operation?
Kitting SECTION NA
20b.4.1 Is pattern cutting and kitting performed in the EMA or CCA compliant to YES NO
the documented procedure?
20b.4.3 For temperature sensitive materials, are all material shelf life/freezer YES NO
logs updated to reflect out time?
20b.4.4 For temperature sensitive materials, is the material allowed to thaw YES NO
prior to removing from its protective covering?
20b.4.5 Is the part specific program traceable and under configuration control? YES NO NA
20b.5.1 Is the raw material charge monitored and recorded as required (e.g. YES NO NA
weight)?
20b.5.6 Are details (inserts, preforms, prepreg, fiber, fabric, chopped fiber etc.) YES NO
placed in the proper position per design requirements?
20b.5.7 Are materials handled and stored within the press EMA in accordance YES NO
with customer or internal requirements?
20b.5.8 Does the Auditee have a verification method to ensure that all poly YES NO NA
film/backing paper (or other support or protective material) has been
removed prior to lay-up?
20b.5.10 If material is trimmed in place with a cutting tool, and no measures are YES NO NA
taken (e.g. shim) to protect the other plies and/or tools from being cut,
is the cut made outside of the confirmed net trim line/end of part
(EOP)?
20b.5.11 If shop aids are used to form or place the material, are they made from YES NO NA
an approved material?
Cure
20b.6.1 Are materials used within their shelf life/pot life/out time? YES NO
20b.6.2 Is the temperature of the mold tool verified prior to use if thermocouples YES NO NA
are not used?
20b.6.3 If thermocouples are not used to monitor actual cure temperatures, has YES NO NA
a correlation between tool/part cure temperatures and press set
temperatures been established?
20b.6.5 Is the transfer of the component from the mold to a holding fixture YES NO NA
carried out to avoid distortion/damage or as per the customer
requirement?
20b.6.6 Is the transfer of the component from the mold to the post cure YES NO NA
operation carried out to avoid distortion/damage or as per the customer
requirement?
20b.6.7 Are process control test samples (e.g. parts or panels) processed in YES NO NA
accordance with customer requirements?
20b.6.9 Are heating tools (pre-heat ovens, heat guns, irons, debulk tables, etc.) YES NO NA
controlled to a maximum temperature?
Nadcap AC7118 Revision G - 128 -
Is the part controlled under U.S. Export Control Regulations? Information YES NO
only.
Customer Requirements
20c.2.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
20c.2.1.4 Customer(s):
20c.2.1.7 Operator:
General
20c.3.1 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
20c.3.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
20c.3.3 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
20c.4.1.1 Has the preformed been dried or conditioned per customer or internal YES NO
requirements?
20c.4.1.2 Does the drying oven temperature accuracy meet customer or internal YES NO
requirements?
20c.4.1.3 If dried in an oven, are the preforms separated to permit adequate air YES NO
flow?
20c.4.2 Is the preform visibly inspected for contamination prior to use? YES NO
Nadcap AC7118 Revision G - 129 -
20c.4.5 If thermocouples are not used to monitor actual preform temperatures, YES NO NA
has a correlation between press/preform temperatures and press set
temperatures been established?
20c.4.6 Are all process parameters (such as platen temperature, press pressure, YES NO
dwell time, etc…) as required by the customer specification or the
internal requirements?
20c.4.7 Is processing data saved or recorded per customer and/or internal YES NO
requirements
20c.5.1 Has the blank been dried or conditioned per customer or internal YES NO NA
requirements?
20c.5.2 Does the method used to preheat the blank or preform meet the YES NO
customer and/or internal requirements for temperature and dwell time?
20c.5.3 Is the required fiber or ply orientation maintained during forming? YES NO
20c.5.4 Is the tool within the specified temperature range prior to the blank or YES NO
preform being inserted?
20c.5.5 Are the process parameters (pressure, dwell time, etc..) in accordance YES NO
with setup card or work instructions?
20c.5.7 Are formed parts handled and stored to prevent damage and/or distortion YES NO
per customer and/or internal requirements?
20c.5.8 Are formed parts handled and stored in a manner to prevent YES NO
contamination and ultraviolet damage per customer and/or internal
requirements?
20c.5.9 Is processing data saved or recorded per customer and/or internal YES NO
requirements?
20c.5.10 Is mold release re-applied without pooling and allowed to flash off? YES NO NA
20c.5.12 Are tools stored to prevent damage or corrosion per customer and/or YES NO
internal requirements?
Nadcap AC7118 Revision G - 130 -
Customer Requirements
20d.2.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
20d.2.1.4 Customer(s):
20d.2.1.7 Operator:
General
20d.3.1 Are processes being performed in the CCA/EMA compliant to the YES NO
documented procedure?
20d.3.2 Does the Auditee have customer approval of the work instruction on file YES NO NA
per customer requirements?
20d.3.3 Are personnel wearing attire as specified by the customer or Auditee? YES NO NA
20d.4.1.1 Has the preformed been dried or conditioned per customer or internal YES NO
requirements?
20d.4.1.2 Does the drying oven temperature accuracy meet customer or internal YES NO
requirements?
20d.4.1.3 If dried in an oven, are the preforms separated to permit adequate air YES NO
flow?
Nadcap AC7118 Revision G - 131 -
20d.4.2 Is the preform visibly inspected for contamination prior to use? YES NO
20d.4.5 If thermocouples are not used to monitor actual preform temperatures, YES NO NA
has a correlation between press/preform temperatures and press set
temperatures been established?
20d.4.6 Are all process parameters (such as platen temperature, press pressure, YES NO
dwell time, etc…) as required by the customer specification or the
internal requirements?
20d.4.7 Is processing data saved or recorded per customer and/or internal YES NO
requirements
20d.5.1 Has the blank been dried or conditioned per customer or internal YES NO NA
requirements?
20d.5.2 Does the method used to preheat the blank or preform meet the YES NO
customer and/or internal requirements for temperature and dwell time?
20d.5.3 Is the required fiber or ply orientation maintained during forming? YES NO
20d.5.4 Is the tool within the specified temperature range prior to the blank or YES NO
preform being inserted?
20d.5.5 Are the process parameters (pressure, dwell time, etc..) in accordance YES NO
with setup card or work instructions?
20d.5.7 Are formed parts handled and stored to prevent damage and/or distortion YES NO
per customer and/or internal requirements?
20d.5.8 Are formed parts handled and stored in a manner to prevent YES NO
contamination and ultraviolet damage per customer and/or internal
requirements?
20d.5.9 Is processing data saved or recorded per customer and/or internal YES NO
requirements?
20d.5.10 Is mold release re-applied without pooling and allowed to flash off? YES NO NA
20d.5.12 Are tools stored to prevent damage or corrosion per customer and/or YES NO
internal requirements?
Nadcap AC7118 Revision G - 133 -
21a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21a.1.1.4 Customer(s):
21a.1.1.5 Subscriber/Prime
Contractor(s):
21a.1.1.7 Operator:
General
21a.2.1 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
pressure, vacuum, time, etc.) monitored, recorded and verified per
customer or internal requirements?
21a.2.2 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum and pressure) and retained as part of the
manufacturing record?
21a.2.3 Are all bagging materials removed in a manner to prevent damage to YES NO
the part?
21a.2.4 Is the part removed from the tool/mold in a manner to prevent damage YES NO
to the part?
21a.2.5 Are process control panels processed in accordance with customer YES NO NA
requirements?
21a.2.6 Is out time for time and temperature sensitive material verified after or YES NO
during cure to ensure it has not been exceeded?
21a.2.7 Is the curing of parts performed in approved equipment per customer or YES NO
internal requirements?
Nadcap AC7118 Revision G - 134 -
21a.2.8 Is the part specific program traceable and under configuration control? YES NO NA
Nadcap AC7118 Revision G - 135 -
21b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21b.1.1.4 Customer(s):
21b.1.1.5 Subscriber/Prime
Contractor(s):
21b.1.1.7 Operator:
General
21b.2.1 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
21b.2.2 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, and vacuum) and retained as part of the
manufacturing record?
21b.2.3 Are all bagging materials removed in a manner to prevent damage to YES NO NA
the part?
21b.2.4 Is the part removed from the tool/mold in a manner to prevent damage YES NO NA
to the part?
21b.2.5 Are process control panels processed in accordance with customer YES NO NA
requirements?
21b.2.6 Is out time for time and temperature sensitive material verified after or YES NO NA
during cure to ensure it has not been exceeded?
Nadcap AC7118 Revision G - 136 -
21b.2.7 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
21b.2.8 After the part is removed from the tool/mold, is it protected from YES NO
handling damage, and from UV exposure when required by customer or
internal requirements?
21b.2.9 Is the part specific program traceable and under configuration control? YES NO NA
Nadcap AC7118 Revision G - 137 -
21c.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21c.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21c.1.1.4 Customer(s):
21c.1.1.5 Subscriber/Prime
Contractor(s):
21c.1.1.7 Operator:
General
21c.2.1 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
21c.2.2 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, and vacuum) and retained as part of the
manufacturing record?
21c.2.3 Is the part removed from the tool/mold in a manner to prevent damage YES NO NA
to the part?
21c.2.4 Are process control panels processed in accordance with customer YES NO NA
requirements?
21c.2.5 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
21c.2.6 After the part is removed from the tool/mold, is it protected from YES NO
handling damage, and from UV exposure when required by customer or
internal requirements?
Nadcap AC7118 Revision G - 138 -
21c.2.7 Is the part specific program traceable and under configuration control? YES NO NA
Nadcap AC7118 Revision G - 139 -
21d.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21d.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21d.1.1.4 Customer(s):
21d.1.1.5 Subscriber/Prime
Contractor(s):
21d.1.1.7 Operator:
General
21d.2.1 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
21d.2.2 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, and vacuum) and retained as part of the
manufacturing record?
21d.2.3 Is the part removed from the tool/mold in a manner to prevent damage YES NO NA
to the part?
21d.2.4 Are process control panels processed in accordance with customer YES NO NA
requirements?
21d.2.5 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
21d.2.6 After the part is removed from the tool/mold, is it protected from YES NO
handling damage, and from UV exposure when required by customer or
internal requirements?
Nadcap AC7118 Revision G - 140 -
21d.2.7 Is the part specific program traceable and under configuration control? YES NO NA
Nadcap AC7118 Revision G - 141 -
21e.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21e.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21e.1.1.4 Customer(s):
21e.1.1.5 Subscriber/Prime
Contractor(s):
21e.1.1.7 Operator:
General
21e.2.1 Is the temperature of the mold tool verified prior to use if thermocouples YES NO NA
are not used?
21e.2.2 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
pressure, vacuum, time, etc.) verified per customer or internal
requirements?
21e.2.3 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum and pressure) and is traceability to the
record retained as part of the manufacturing record?
21e.2.4 Are all bagging materials removed in a manner to prevent damage to YES NO NA
the part?
21e.2.5 Is the part removed from the tool/mold in a manner to prevent damage YES NO NA
to the part?
21e.2.6 Are process control panels processed in accordance with customer YES NO NA
requirements?
Nadcap AC7118 Revision G - 142 -
21e.2.7 Is out time for time and temperature sensitive material verified after YES NO
cure to ensure it has not been exceeded?
21e.2.8 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
21e.2.9 After the part is removed from the tool/mold, is it protected from YES NO
handling damage, and from UV exposure when required by customer or
internal requirements?
Nadcap AC7118 Revision G - 143 -
21f.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
21f.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
21f.1.1.4 Customer(s):
21f.1.1.5 Subscriber/Prime
Contractor(s):
21f.1.1.7 Operator:
General
21f.2.1 Are curing parameters (e.g. vacuum, time, max tool temp, pressure, YES NO
etc.) monitored, recorded and verified per customer or internal
requirements?
21f.2.2 Is the cure record labeled with all applicable parameters (e.g. YES NO
temperature, time, vacuum and clamping pressure) and retained as
part of the manufacturing record?
21f.2.3 Are all bagging materials removed in a manner to prevent damage to YES NO
the part?
21f.2.4 Is the part removed from the tool/mold in a manner to prevent damage YES NO NA
to the part?
21f.2.5 Are process control panels processed in accordance with customer YES NO NA
requirements?
21f.2.6 Is out time/pot life for time and temperature sensitive material verified YES NO
after or during cure to ensure it has not been exceeded?
22a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
22a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
22a.1.1.4 Customer(s):
22a.1.1.5 Subscriber/Prime
Contractor(s):
22a.1.1.7 Operator:
General
22a.2.2 Are shop aids, jigs, and templates used in the machining process YES NO
identified and used as required per work instructions?
22a.2.3 Are speeds and feed rates compliant to customer or internal YES NO
requirements?
22a.2.4 Does the surface finish of the machined composite meet the customer YES NO
or internal drawing and/or finish requirements?
22a.2.6 Is the part cleaned after machining per customer or internal YES NO
requirements?
22a.2.7 Is the part inspected for continuous flash? (metal bond only) YES NO NA
Nadcap AC7118 Revision G - 145 -
Customer Requirements
22b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
22b.1.1.4 Customer(s):
22b.1.1.5 Subscriber/Prime
Contractor(s):
22b.1.1.7 Operator:
General
22b.2.2 Is the part specific program traceable and under configuration control? YES NO
22b.2.3 Are shop aids, jigs, and templates used in the machining process YES NO
identified and used as required per work instructions?
22b.2.4 Are speeds and feed rates compliant to customer or internal YES NO
requirements?
22b.2.5 Does the surface finish of the machined composite meet the customer YES NO
or internal drawing and/or finish requirements?
22b.2.7 Is the part cleaned after machining per customer or internal YES NO
requirements?
22b.2.8 Is the part inspected for continuous flash? (metal bond only) YES NO NA
Nadcap AC7118 Revision G - 146 -
23.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
23.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
23.1.1.4 Customer(s):
Subscriber/Prime
Contractor(s):
23.1.1.5
23.1.1.7 Operator:
23.2 General
23.2.1 Are the miscellaneous bonding processes performed in the CCA or YES NO
EMA compliant to the documented procedure?
23.2.2 Are the component parts of the assembly prepared prior to assembly YES NO
per customer requirements and/or work instructions?
YES NO
23.2.3 Are the correct sub-assembly parts called out in the work instructions
(correct drawing and revision)?
23.2.4 Are all bond surfaces prepared and protected prior to the bonding YES NO
operation?
23.2.5 Are all age sensitive materials used in the process within acceptable YES NO
limits (age/shelf life)?
23.2.6 Is the mix ratio used validated (e.g. lap shears, shore-D hardness, YES NO NA
recording of weights, witnessing by quality assurance, operator self-
verification program, etc.)?
NOTE: This does not apply to automatic dispensers or pre-mix kits.
Nadcap AC7118 Revision G - 147 -
23.2.12 Are any fixtures that are required during assembly installed within the YES NO NA
pot life of the adhesive?
23.2.13 Is there a bond line thickness verification per customer requirements? YES NO NA
23.2.15 Are curing parameters (e.g. heating and cooling ramp rates and holds, YES NO
vacuum, time, etc.) monitored, recorded and verified per customer or
internal requirements?
23.2.16 Is the cure record retained when required by the customer as part of YES NO
the manufacturing record?
23.2.17 Is the curing of parts performed in approved equipment per customer YES NO NA
requirements?
Nadcap AC7118 Revision G - 148 -
Note: This section is not applicable for Auditees with a standing AC7122-P/-I/-R accreditation or if AC7122-P is
in conjunction with the current audit. If receiving tests are used for the job audits, they should be treated as
Demonstration job audits.
In-Process Demonstration
24a.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
24a.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
24a.1.1.3 Customer(s):
24a.1.1.4 Subscriber/Prime
Contractor(s):
24a.1.1.6 Operator:
General
24a.2.1 Do the work instructions or documented test procedures reference the YES NO
customer’s testing specification and/or testing standard?
24a.2.2 Do the work instructions or documented test procedures comply with YES NO
the customer’s testing specification and/or testing standard?
24a.2.4 Are specimens uniquely identified so they are traceable to the material YES NO
lot number or part number or process they represent?
24a.2.5 Are specimens preconditioned prior to test, per customer or internal YES NO NA
requirements?
24a.2.6 Are specimens tested in a monitored atmosphere that complies with YES NO
specified test method?
Nadcap AC7118 Revision G - 149 -
24a.2.7 Are specimens inspected visually and dimensionally prior to test? YES NO
24a.2.8 Did the test comply with the work instructions/documented test YES NO
procedures?
24a.2.9 Are results from all tested specimens recorded (such as tested YES NO
completion/failure, replaced, re-tests)?
In-Process Demonstration
24b.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
24b.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
24b.1.1.3 Customer(s):
24b.1.1.4 Subscriber/Prime
Contractor(s):
24b.1.1.6 Operator:
General
24b.2.1 Do the work instructions or documented test procedures reference the YES NO
customer’s testing specification and/or testing standard?
24b.2.2 Do the work instructions or documented test procedures comply with YES NO
the customer’s testing specification and/or testing standard?
24b.2.4 Are specimens uniquely identified so they are traceable to the material YES NO
lot number or part number or process they represent?
24b.2.5 Are specimens preconditioned prior to test, per customer or internal YES NO NA
requirements?
24b.2.6 Are specimens tested in a monitored atmosphere that complies with YES NO
specified test method?
24b.2.7 Are specimens inspected visually and dimensionally prior to test? YES NO
24b.2.8 Are fibers evaluated for complete dissolution and no evidence of YES NO NA
binding following resin extraction?
Nadcap AC7118 Revision G - 151 -
24b.2.9 Did the test comply with the work instructions/documented test YES NO
procedures?
24b.2.10 Are results from all tested specimens recorded (such as tested YES NO
completion/failure, replaced, re-tests)?
Nadcap AC7118 Revision G - 152 -
In-Process Demonstration
24c.0 Is the part controlled under U.S. Export Control Regulations? YES NO
Information only.
Customer Requirements
24c.1.1 Complete the following and then check the Auditee’s information (i.e., technique sheets,
travelers) against the purchasing requirements.
24c.1.1.3 Customer(s):
24c.1.1.4 Subscriber/Prime
Contractor(s):
24c.1.1.6 Operator:
General
24c.2.1 Do the work instructions or documented test procedures reference the YES NO
customer’s testing specification and/or testing standard?
24c.2.2 Do the work instructions or documented test procedures comply with YES NO
the customer’s testing specification and/or testing standard?
24c.2.4 Are specimens uniquely identified so they are traceable to the material YES NO
lot number or part number or process they represent?
24c.2.6 Are specimens preconditioned prior to test per customer or internal YES NO NA
requirements?
24c.2.7 Are specimens tested in a monitored atmosphere that complies with YES NO
specified test method?
24c.2.8 Are specimens inspected visually and dimensionally prior to test? YES NO
Nadcap AC7118 Revision G - 153 -
24c.2.9 Did the test comply with the work instructions/documented test YES NO
procedures?
24c.2.10 Are results from all tested specimens recorded (such as tested YES NO
completion/failure, replaced, re-tests)?
Nadcap AC7118 Revision G - 154 -
25. Job Audit for Calibration, Software Control, Validation, and Setup SECTION NA
of Automated Tape Laying or Automated Fiber Placement
Machines
IN-PROCESS DEMONSTRATION
General
Software Control
25a.2.1 Is there a process to control and secure the installation of new or YES NO
revised software?
25a.2.2 Does the process include validation of the software prior to it being YES NO
released for production?
25a.2.3 Is there evidence to show the software was validated prior to release? YES NO
25a.3.1 Does the validation process define the maximum head pressure or YES NO
compaction force?
25a.3.2 Are the pressure/force monitoring systems certified to an accuracy (e.g. YES NO
±15 lbs. or within two percent) over the operating range of compaction
force?
25a.3.3 Does the validation process define the maximum temperature at ply/tow YES NO
laydown?
25a.3.4 Are the temperature monitoring and controlling systems certified to an YES NO
accuracy (e.g. ±5 F) over the operating range?
25a.3.5 Does the validation process define and verify the head cooling YES NO
temperature or temperature control system?
25a.3.6 Does the validation process verify the creel monitoring thermocouple is YES NO NA
accurate when compared to an independent thermocouple and the
environment is accurate when tested at the minimum temperature?
Nadcap AC7118 Revision G - 155 -
25a.3.7 Does the validation process verify the creel humidity does not exceed YES NO NA
the material requirements and is accurate when compared to an
independent hygrometer?
25a.3.8 Does the validation process define and verify the tow tension (AFP) YES NO
(e.g. within ± 0.1 lb. at tension levels of 1 lb. or less, and within ± 10
percent at tension levels above 1 lb.)?
25a.3.9 Is the compaction roller, and outer liners, inspected for damage and YES NO
changes in durometer?
25a.3.10 Does the validation process define and verify all actuation systems (e.g. YES NO
clamps, cutters, and rollers) have accurate gauges?
25a.3.11 Does the validation process define and verify the tool indexing YES NO
requirements?
25a.3.12 Does the validation process define and verify the maximum material lay YES NO
down rate?
25a.3.13 Does the validation process define the allowable material widths? YES NO
25a.3.14 Does the validation process define and verify the ply orientation? YES NO
25a.3.15 Does the validation process define and verify the cut end is within YES NO
tolerance (e.g. ± 0.10 inch) of the intended ply boundary?
25a.3.16 Does the validation process define and verify ply/tow gaps and YES NO
overlaps?
25a.3.17 Does the validation process require inspection for ply contamination, YES NO
wrinkles, distortion, and heat damage?
25a.3.18 Does the validation process verify automated in-process inspection YES NO
equipment can accurately and consistently determine anomalies over
the range of production operating speeds?
(Section NA for any equipment assessed in job audit 16e or 16j is performed)
25a.4.1 Does the Auditee have a procedure for periodically verifying the YES NO
accuracy and precision for the head movement and material
placement?
25a.4.2 Is there a process that identifies the actions to be taken in the event YES NO
that field checks were found not to meet the requirements, and is it
being followed?
(Section NA for any equipment assessed in job audit 16e, or 16j is performed)
Nadcap AC7118 Revision G - 156 -
25a.5.1 Is there a verification process to visually inspect compaction rollers for YES NO
damage at a defined interval?
25a.5.2 Is the mandrel positioned and is the set up process performed as per YES NO
the documented procedure?
25a.5.4 Are the environmental conditions for the creel house controlled per YES NO NA
customer/Auditee requirements?
25a.6.2 If required by the customer, is the equipment in the correct location in YES NO NA
the facility?
25a.6.3 Is there a process to notify the customer when changes are made to YES NO
the equipment such as new heads, new software, location, and repair?
Nadcap AC7118 Revision G - 157 -
26. Job Audit for Laser Ply Projector Calibration, Software Control, SECTION NA
Validation, and Setup
IN-PROCESS DEMONSTRATION
General
Software Control
26a.2.1 Is there a process to control and secure the installation of new or YES NO
revised software?
26a.2.2 Does the process include validation of the software prior to it being YES NO
released for production?
26a.2.3 Is there evidence to show the software was validated prior to release? YES NO
Verification
26a.3.1 Does the verification process define a maximum beam width at the YES NO
defined distance?
26a.3.2 Does the verification process define the scribe line at the defined YES NO
distance?
26a.3.3 Does the verification process verify the centerline of the projected lines YES NO
shall be within a defined tolerance (such as ±0.030 inch) of the
intended line?
26a.3.6 Is the QA accepted tool placed at the ends of the working zone or as YES NO
close as possible?
26a.3.8 Is there a process for the maintenance, verification, and validation of YES NO NA
the targets (when required by customer)?
Nadcap AC7118 Revision G - 158 -
Validation Checks
26a.4.1 Is there a process to ensure field checks are performed prior to each YES NO
use?
26a.4.2 Is there a process that identifies the actions to be taken in the event YES NO
that field checks were found not to meet the requirements, and is it
being followed?
26a.4.3 Is there a process that addresses validation checks performed at the YES NO
beginning, during and at the end of part layup?
Part Setup
26a.5.1 Is the equipment being used within its operational parameters? YES NO
26a.5.2 Is there a process to ensure optical tooling targets are certified, and is it YES NO NA
being followed?
26a.5.3 Are the optical tooling targets checked for damage and wear? YES NO
26a.5.4 Is the positioning and mounting of optical tooling target holders in YES NO
compliance with the documented information?
26a.5.5 Is there a process for reestablishing the coordinate system when the YES NO
equipment or part is moved, and is it being followed?
26a.6.2 If required by the customer, are the projectors used with the appropriate YES NO NA
computers?
26a.6.3 If required by the customer, is the equipment in the correct location in YES NO NA
the facility?
26a.6.4 Is there a process to notify the customer when changes are made to YES NO
the equipment such as new heads, new software, location, and repair?
Nadcap AC7118 Revision G - 159 -
27. Job Audit for NC Ply Cutter Calibration, Software Control, SECTION NA
Validation, and Setup
Section NA applies when cut material exceeds edge-of-ply boundary and will be trimmed to size during layup.
IN-PROCESS DEMONSTRATION
General
Software Control
27a.2.1 Is there a process to control and secure the installation of new or YES NO
revised software?
27a.2.2 Does the process include validation of the software prior to it being YES NO
released for production?
27a.2.3 Is there evidence to show the software was validated prior to release? YES NO
27a.3.1 For equipment with a fixed table, does the validation process define a YES NO NA
maximum width and length of material to be cut in production?
27a.3.2 For equipment with continuous belts, does the validation process define YES NO NA
the maximum width and the maximum distance that can be cut without
moving the belt?
27a.3.3 Does the validation process define the maximum number of stacked YES NO
plies to be cut at one time?
27a.3.4 For equipment which can cut the edge of a charge/stack of plies, does YES NO NA
the validation process define the minimum angle of the cut?
27a.3.5 Does the validation process define the minimum radius of cut without YES NO
repositioning the blade?
27a.3.6 Does the validation process define the maximum rate of cut? YES NO
27a.3.7 Does the validation process define the maximum contour? YES NO NA
Nadcap AC7118 Revision G - 160 -
27a.3.8 Does the validation process define a pattern to be cut for evaluation? YES NO
27a.3.9 Is the test pattern validated for size, orientation, and edge profile? YES NO
27a.3.10 Does the validation process require inspection for ply contamination, YES NO
wrinkles, distortion, and heat damage?
27a.3.11 Does the verification process define the maximum width of the ink/pen YES NO NA
throughout the working envelope when used for ply location?
27a.3.12 Does the verification process define the maximum offset of the ink/pen YES NO NA
mark from the intended line, such as within 0.030 inch, when used for
ply location?
Validation Checks
27a.4.1 Is there a process to ensure field checks or setup validations are YES NO
performed prior to each daily use?
27a.4.2 Is there a process that identifies the actions to be taken in the event YES NO
that field checks were found not to meet the requirements, and is it
being followed?
27a.5.1 Is there a process defining the allowed inks or pens (types and colors)? YES NO
Part Setup
27a.6.1 Is the equipment being used within its operational parameters? YES NO
27a.6.3 Is the table bed checked for damage, wear, and resin buildup? YES NO
27a.6.4 Is there a process for cleaning the table bed of the equipment (daily, YES NO
after dry fiber cutting, approved solvents…)?
27a.6.6 If a carrier is added to the ply, is the carrier an approved contact YES NO NA
material?
27a.7.2 If required by the customer, is the equipment in the correct location in YES NO NA
the facility?
Nadcap AC7118 Revision G - 161 -
27a.7.3 Is there a process to notify the customer when changes are made to YES NO
the equipment such as new heads, new software, location, and repair?
Nadcap AC7118 Revision G - 162 -
Customer Requirements
28a.1.1 Complete the following and then check the Auditee’s information (i.e.,
technique sheets, travelers) against the purchasing requirements.
General
28a.2.1 Is the authority datasets secure, backed up, prevented from alteration, YES NO
and restricted from unauthorized access?
28a.2.2 Is dataset derivative traceable back to the current authority dataset? YES NO
28a.2.4 Are datasets segregated by status (e.g., release, in-work and YES NO
obsolete)?
28a.2.5 Do records exists showing the dataset derivative has been verified YES NO NA
when the customer’s authority dataset was translated from the as
received format into the manufacturing or inspection software?
28a.2.6 Does the work instruction have traceability to the current authority YES NO
dataset?
Nadcap AC7118 Revision G - 163 -
IN-PROCESS HISTORICAL
29a.1.2 Can OSV personnel demonstrate knowledge of dimensional criteria for YES NO
acceptance, rejection, or rework?
29a.1.3 Can OSV personnel demonstrate knowledge of raw material criteria for YES NO
acceptance, rejection, or rework?
29a.1.4 Can OSV personnel demonstrate the source of requirements for YES NO
acceptance, rejection, or rework?
29a.1.6 Can OSV personnel demonstrate media of inspection is approved for YES NO
use?
29a.1.7 Does acceptance authority media (AAM) (e.g. stamp) designate OSV YES NO
qualifications?
29a.2.1 Is the OSV personnel approved for the inspection operations YES NO
performed?
29a.2.2 Has the OSV operator completed all initial and re-qualification training? YES NO
29a.2.3 Are there records of the verification of the effectiveness of the training? YES NO
29b.1.1.2 Can OSV personnel demonstrate knowledge of cure criteria for YES NO
acceptance, rejection?
29b.1.1.4 Can OSV personnel demonstrate knowledge of process defect criteria YES NO
for acceptance, rejection?
29b.1.2.2 Can OSV personnel demonstrate knowledge of interpreting reports for YES NO
acceptance, rejection, alarms, and exceptions?
29b.1.2.3 Can OSV personnel demonstrate knowledge on cure criteria which is YES NO NA
not verified with product acceptance software?
29b.1.2.4 Can OSV personnel demonstrate the source of requirements for YES NO
acceptance, rejection, or rework?
29b.1.2.6 Does acceptance authority media (AAM) (e.g. stamp) designate OSV YES NO
qualifications?
29b.2.1 Is the OSV personnel approved for the inspection operations YES NO
performed?
29b.2.2 Has the OSV operator completed all initial and re-qualification training? YES NO
29b.2.3 Are there records of the verification of the effectiveness of the training? YES NO
Operator: ___________________________________________________
Are there records of a review and evaluation of measurement data from YES NO
the OSV program?
Nadcap AC7118 Revision G - 165 -
30. Job Audit for Partial First Article Inspection (FAI) SECTION NA
This job audit verifies compliance to FAI documented processes and procedures. Auditor to review product
which has, or should have, a partial FAI. Recommended product include: (1) product design modifications
where the part number was changed, (2) changes to NC ply cutting software for updates to ply nesting, (3)
new rate tooling which changes material, e.g. fiberglass to INVAR, (4) modifications to AFP/ATL software, (5)
modification to laser projection software, (6) change of inspection method, e.g. ply locating templates to laser
projectors, (7) use of alternate materials, e.g. film adhesive source change, and (8) new subcontractor
sources, e.g. core detail suppliers.
IN-PROCESS HISTORICAL
Customer Requirements
30a.1.1 Complete the following and then check the Auditee’s information (i.e.,
technique sheets, travelers) against the purchasing requirements.
( ) Changes in the design characteristics affecting fit, form, or function of the part
( ) Changes in numerical control program or translation to another media that can potentially
affect fit, form, or function
( ) Natural or man-made event, which may adversely affect the manufacturing process
30a.4.1 If required does the Auditee have evidence of completed Engineering YES NO NA
qualifications?
30a.4.2 If required does the Auditee have evidence the manufacturing plan was YES NO NA
customer approved?
30a.4.3 If required, has the FAI received customer review and approval? YES NO NA
30a.5.1 Does FAI verify inspection of characteristics not measurable in the final YES NO
product, such as ply location and orientation?
Nadcap AC7118 Revision G - 166 -
30a.5.2 Does FAI utilize media of inspection which has characteristics approved YES NO
by Quality?
30a.6.1 Have all fields in the FAI forms (AS9102 or equivalent) been completed YES NO
(electronically or in permanent ink)?
30a.6.2 Where a nonconformance has been documented during FAI, was the YES NO NA
First Article identified as "FAI Not Complete"?
For all revisions, changes are indicated by a vertical bar to the left of the paragraph that was revised.