L/4 L/4

EXTRA BARS (EB) SHORT CLEAR SPAN "L"

STIRRUPS STRAIGHT BARS (SB) COL STRIP


MIDDLE STRIP
COL STRIP

S/4 S/2 S/4


SHORT SPAN "S"

COL. STRIP MIDDLE STRIP COL. STRIP

COL STRIP

S/4
2⌀10 TIE BAR (CONTINUOUS)

LONG CLEAR SPAN "L"


SPAN

MIDDLE STRIP
EXTRA BARS (EB)
L/5 L/5

S/2
COL STRIP
BOTTOM BARS @ MIDDLE STRIP
BOTTOM BARS @ COL STRIP BEAM OR WALL

S/4
SHALL BE SPACED 4/3 TIMES
THE MIDDLE STRIP

TYP. RC BEAM ELEVATION


1 : 100

SCHEDULE OF REINFORCED CONCRETE BEAMS


BEAM CROSS
BEAM SECTION
LONGITUDINAL REINFORCEMENTS (UNLESS NOTED OTHERWISE
WEB BARS STIRRUPS STIRRUPS
STIRRUPS SPACING REMARKS
SCHEDULE OF SLAB REINFORCEMENT
MARK EACH FACE NO./SET ⌀
WIDTH DEPTH BAR DIA. ⌀ DISCONT. 'A' CONT. 'A' MIDSPAN CONT. 'B' DISCONT. 'B'

TB 2 3 2 3 2
1 : 50
2B1 200 400 16 1 10 1@50, 4@100, REST @250 O.C. TO C.L.
BB 2 2 2 2 2
TB 3 2 3
2B2 200 400 16 1 10 1@50, 4@100, REST @250 O.C. TO C.L. SCHEDULE OF SLAB REINFORCEMENT
BB 2 3 2
TB 3 3 3 THICK SHORT SPAN (BAR SPACING IN MM.) LONG SPAN (BAR SPACING IN MM.)
2B3 200 400 16 1 10 SLAB BAR
1@50, 4@100, REST @250 O.C. TO C.L. NESS TOP BARS DISCONT. BOTTOM BARS TOP BARS CONT. TOP BARS DISCONT. BOTTOM BARS TOP BARS CONT. REMARKS
BB 3 3 3 MARK ⌀
("t") (TBD) (BB) (TBC) (TBD) (BB) (TBC)
TB 3 3 2 3 3
RB1 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L. S1 100 10 200 200 200 200 ONE-WAY
BB 2 2 3 2 2
TB 2 2 2
RB2 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L. S2 100 10 250 225 150 250 250 200 TWO-WAY
BB 2 2 2
TB 3 3 2 3 3 CS1 100 10 200 200 200 ⌀10 @ 300 TEMP. BARS CANTILEVER
RB3 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L.
BB 2 2 4 2

3RD FLOOR
3RD FLOOR BEAM
300

OF VERT. BARS W/ 10 TIES @ 100 MM O.C. OF VERT. BARS W/ 10 TIES @ 100 MM O.C.
SPLICED NOT MORE THAN 50%
300

3000
"W"

300

200
2ND FLOOR

2ND FLOOR BEAM

"L"

SPLICED NOT MORE THAN 50%


TYP. DET. OF ISOLATED FOOTINGS SCHEDULE OF COLUMN

3000
1 : 50 1 : 50
SCHEDULE OF FOOTING SCHEDULE OF COLUMN
100mm THK. SLAB ON
FILL w/ 10mm Ø TEMP. SIZE
REQ'D REINFORCEMENTS VERT BARS TIES
FOOTING DIMENSIONS FOOTING BARS SPACED @ 300mm
FOOTING L W
EMBEDIMENT REMARKS GROUND FLOOR O.C.LINE.
FIN. FLR. B.W.LEVEL
MARK BOTTOM BARS
(m) 1 @ 0.05, 4 @ 0.10 rest
L (m) W (m) Thk (mm) C1 0.30 0.30 8-16 mm ⌀
BB along "L" BB along "W" N.G.L @ 0.15 m. O.C.

1 @ 0.05, 2 @ 0.10 rest


F1 1.20 1.20 0.30 1.00 7⌀12 7⌀12 3-10mm⌀ TRANS. BAR @ 0.30M O.C. C2 0.20 0.30 6-16 mm ⌀
@ 0.15 m. O.C.

1100
FTB FTB
F2 0.95 0.95 300 1.00 5⌀12 5⌀12 3-10mm⌀ TRANS. BAR @ 0.30M O.C. PC 0.20 0.20 4-16 mm ⌀ 10 mm ⌀ @ 0.15 m. O.C.
400

WF1 0.40 - 0.20 - - - W/10mm⌀ LONGITUDINAL BAR @ 0.30M O.C.

DRAFTSMEN: PROJECT TITLE: SHEET CONTENTS: PROFESSOR: SHEET NO.

ESPIRITU, SHEENA ANN B.


LIBO-ON, ELDON RYAN S.
ODSINADA, EJAN KIRBIE O. THREE STOREY RESIDENTIAL BUILDING ENGR. HENRY FLORENDO
PANGHULAN, LOUISE B.
SERRA, VAUGHN REMOS M.
TEODORO, MIGUEL NOLITO J.
TUASON, JERICHO A.
LOCATION: CITY OF DASMARIÑAS, CAVITE SECTION: CE151P-2_A2 DATE: 05/07/2021