Operations Management - - Unit 11 - Week 10 https://onlinecourses.nptel.ac.in/noc18_me26/un...

[email protected]

Courses » Operations Management

Announcements Course Ask a Question Progress Mentor

Unit 11 - Week 10

Course
outline
Assignment 10
The due date for submitting this assignment has passed. Due on 2018-04-04, 23:59 IST.
How to access
the portal Submitted assignment

Week 1 1) The dividing lines between random and non-random deviations from mean of the distribution are 1 point
known as;
Week 2
Upper control limit
Week 3 Lower control limit

Week 4 Control limits

Two sigma limits


Week 5
No, the answer is incorrect.
Week 6 Score: 0
Accepted Answers:
Week 7 Control limits

Week 8 2) The chart used to monitor variables data when samples are collected at regular intervals from a 1 point
business or industrial process is;
Week 9
Range chart
Week 10
P-chart
Concept of C-chart
Quality
All of the above
Total Quality
Management No, the answer is incorrect.
(TQM)
Score: 0
Total Accepted Answers:
Productive
Range chart
Maintenance
3) A six sigma process has defect level below ______ defects per million opportunities. 1 point
Statistical
Quality Control
(SQC) 3.4

Six Sigma 4.5

Quiz : 5.6
Assignment 10 © 2014 NPTEL - Privacy & Terms - Honor Code - FAQs -
6.7
A project of
Feedback In association with
week-10 No, the answer is incorrect.
Score: 0
Solution for
Assignment 10 Accepted Answers:
Funded by
3.4

1 of 3 Thursday 17 May 2018 05:42 PM


Operations Management - - Unit 11 - Week 10 https://onlinecourses.nptel.ac.in/noc18_me26/un...

4) Control chart is a;
Powered by 1 point
Week 11

Process monitoring tool


Week 12
Process control tool
DOWNLOAD
Both A and B
VIDEOS
None of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
Both A and B

5) Total Quality Management (TQM) focuses on; 1 point

Employee

Customer

Both A and B

None of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
Both A and B

6) The following is (are) considered as the machine downtime; 1 point

Waste

No material available

Breakdown

All of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
All of the above

7) Which one of the following is NOT among the 6 C’s of Total Quality Management (TQM); 1 point

Continuous improvement

Commitment

Customer focus

Capacity

No, the answer is incorrect.


Score: 0
Accepted Answers:
Capacity

8) The following is (are) the TQM principle (s); 1 point

Customer orientation.

Management-by-fact.

Employee involvement.

All of the above

No, the answer is incorrect.

2 of 3 Thursday 17 May 2018 05:42 PM


Operations Management - - Unit 11 - Week 10 https://onlinecourses.nptel.ac.in/noc18_me26/un...

Score: 0
Accepted Answers:
All of the above

9) ISO mainly emphasis on; 1 point

Prevention

Inspection

Rejection

All of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
Prevention

10)The objective (s) of the Total Productive Maintenance (TPM) is (are) to achieve; 1 point

Zero defects

Zero breakdown

Zero accidents

All of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
All of the above